Loading...
EA187894 - Building - Commercial/Industrial - Robert Hamilton - Issued Date 12/29/2023PERMIT City of Eagan " ° , Permit Type: Building 3830 Pilot Knob Rd Eagan, MN 55122 ,,e_° _.,, EAGAN Permit Number: EA187894 (651) 675-5675 www.cityofeagan.com JWI 8 7 8 9 4* Date Issued: 12/29/2023 Site Address: 3030 Lexington Ave 200B Lot: 1 Block: 1 Addition: Eagandale Center Industrial Pk 13th PID:10-22512-01-010 Use: Robert Hamilton HURM )K 1 0— Z Z 5 1 Z— 0 1— 0 1 0 Description: Sub Type: Commercial/Industrial Work Type: Alteration Construction Type: II -B Description: Tenant Expansion Census Code: - Occupancy: Zoning: I-1 Square Feet: 0 Comments: Fee Summary: BL - Base Fee $840.20 0801.4085 Valuation: 58,185.00 BL - Plan Review 65% $546.13 0720.4222 Surcharge - Based on Valuation $29.09 9001 2195 Total: $1,415.42 Contractor: Sever Construction Company 5151 Edina Industrial Blvd Edina MN 55439 (952) 698-6186 - Applicant - I Owner: Guider Group -Lexington LLC % Steven B Liefschultz 5900 Green Oak Dr Ste 305 Minnetonka MN 55343 This permit shall be null and void if work does not start within 180 days of issuance, or if work is suspended for 180 days or more after started. I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. ApplicantlPermitee: Signature Issued By: Signature t.T,...,.,......._...—_----.-- ----- � I For Office Use Zi�ZS l_I Building Permit #: + _ ! N o .° I S&W PermitMC EA #: ! I Permit Fee. t ! I 1 3830 PILOT KNOB ROAD I EAGAN, MN 551 8�I Date Received: �V 0 3 2023 (651) 675-56751 FAX: (651) 675-5694 1 j I Date Issued: I Plan Submittal: uildin ins ections cif of a om I----- COMMERCIAL BUILDING PERMIT APPLICATION Date: 11/03/2023 site Address: 3030 Lexington Avenue South Suite #: 200B Tenant Name: Robert Hamiltion Tenant is: ❑New Q Existing Former Tenant (if applicable): Name: Mary Jo Tuttle 952-698-6183 Applicant Phone: Applicant is: ❑ Owner 0 Contractor ❑ Agent Email: Maryjo.tuttle@SeverCo.com Type of Description of work: Tenant Expansion Work $58,185.00 Construction Cost: t Company: Sever Construction Company Contact: Shawn Cross Building Address/City/Zip: 5151 Edina Industrial Blvd., Suite 650, Edina, MN 55439 ContractorPhone: 952-746-5068 Email: Shawn. Cross@SeverCo.com License #: Expiration Date: � 17— +0 � Q 1 +? Company: Blumentals Architecture Contact: Drew Wolf Architeckl Engineer Address/City/Zip:1600 Marshall Street NE Suite 1 Minneapolis, MN 55413 Phone: 612-331-2222 Email: dreww@blumentals.com Sewer & Company: Contact: Water Address/City/Zip Phone: License #: Email: Date: ❑ I understand that Plumbing, Mechanical, Fire Suppression, and Sign work require separate applications. I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. XMary Jo Tuttle Applicant's Printed Name X a�� Applicant' ( nature MCES USE: Letter Reference: 231121A3 Address ID: 5158 Payment ID: 473543 Date of Determination: 11/21/23 Greetings! Please see the determination below. Determination Expiration: 11/21/25 Project Name: Robert Hamilton Project Address: 3030 Lexington Avenue South Suite #/Campus: 2006 City Name: Eagan Applicant: Shawn Cross, Sever Construction Company Special Notes: The City is required to report this project with the normal SAC Activity Report if a permit is issued. Charge Calculation: Mixed Use: 22,885 sq. ft. @ 3800 sq. ft. / SAC = 6.02 Total Charge: 6.02 Credit Calculation: Lexington Commerce Center (Non -conforming GSF 09/97) Mixed Use: 22,885 sq. ft. @ 3800 sq. ft. / SAC = 6.02 Total Credit: 6.02 Net SAC: 0.00 = 0 SAC Due The business information was provided to MCES by the applicant at this time. It is the City's responsibility to substantiate the business use and size at the time of the final inspection. If there is a change in use or size, a redetermination will need to be made. If you have any questions email me at: sara.running@metc.state.mn.us. Thank you, Sara Running SAC Technician Please visit our SAC website by going to: http://www.metrocouncil.org/SACprogram METROPOLITAN C O U N C I L