EA187894 - Building - Commercial/Industrial - Robert Hamilton - Issued Date 12/29/2023PERMIT
City of Eagan " ° , Permit Type: Building
3830 Pilot Knob Rd
Eagan, MN 55122 ,,e_° _.,, EAGAN Permit Number: EA187894
(651) 675-5675
www.cityofeagan.com
JWI
8 7 8 9 4*
Date Issued: 12/29/2023
Site Address: 3030 Lexington Ave 200B
Lot: 1 Block: 1 Addition: Eagandale Center Industrial Pk 13th
PID:10-22512-01-010
Use: Robert Hamilton HURM
)K 1 0— Z Z 5 1 Z— 0 1— 0 1 0
Description:
Sub Type: Commercial/Industrial
Work Type: Alteration Construction Type: II -B
Description: Tenant Expansion
Census Code: - Occupancy:
Zoning: I-1
Square Feet: 0
Comments:
Fee Summary: BL - Base Fee $840.20 0801.4085
Valuation: 58,185.00 BL - Plan Review 65% $546.13 0720.4222
Surcharge - Based on Valuation $29.09 9001 2195
Total: $1,415.42
Contractor:
Sever Construction Company
5151 Edina Industrial Blvd
Edina MN 55439
(952) 698-6186
- Applicant - I Owner:
Guider Group -Lexington LLC
% Steven B Liefschultz
5900 Green Oak Dr Ste 305
Minnetonka MN 55343
This permit shall be null and void if work does not start within 180 days of issuance, or if work is suspended for 180 days or more after
started.
I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State
of Minnesota Statutes and City of Eagan Ordinances.
ApplicantlPermitee: Signature Issued By: Signature
t.T,...,.,......._...—_----.-- ----- �
I For Office Use
Zi�ZS l_I
Building Permit #: +
_ !
N o .° I S&W PermitMC
EA #: !
I Permit Fee. t
! I
1
3830 PILOT KNOB ROAD I EAGAN, MN 551 8�I Date Received:
�V 0 3 2023
(651) 675-56751 FAX: (651) 675-5694 1 j
I Date Issued: I
Plan Submittal: uildin ins ections cif of a om I-----
COMMERCIAL BUILDING PERMIT APPLICATION
Date: 11/03/2023 site Address: 3030 Lexington Avenue South Suite #: 200B
Tenant Name: Robert Hamiltion
Tenant is: ❑New Q Existing
Former Tenant (if applicable):
Name: Mary Jo Tuttle 952-698-6183
Applicant Phone:
Applicant is: ❑ Owner 0 Contractor ❑ Agent Email: Maryjo.tuttle@SeverCo.com
Type of Description of work: Tenant Expansion
Work $58,185.00
Construction Cost:
t
Company: Sever Construction Company Contact: Shawn Cross
Building Address/City/Zip: 5151 Edina Industrial Blvd., Suite 650, Edina, MN 55439
ContractorPhone: 952-746-5068 Email: Shawn. Cross@SeverCo.com
License #: Expiration Date: � 17— +0 � Q 1 +?
Company: Blumentals Architecture Contact: Drew Wolf
Architeckl
Engineer Address/City/Zip:1600 Marshall Street NE Suite 1 Minneapolis, MN 55413
Phone: 612-331-2222 Email: dreww@blumentals.com
Sewer & Company: Contact:
Water
Address/City/Zip
Phone:
License #:
Email:
Date:
❑ I understand that Plumbing, Mechanical, Fire Suppression, and Sign work require separate applications.
I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan;
that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the
approved plan in the case of work which requires a review and approval of plans.
XMary Jo Tuttle
Applicant's Printed Name
X a��
Applicant' ( nature
MCES USE: Letter Reference: 231121A3 Address ID: 5158 Payment ID: 473543
Date of Determination: 11/21/23
Greetings!
Please see the determination below.
Determination Expiration: 11/21/25
Project Name: Robert Hamilton
Project Address: 3030 Lexington Avenue South
Suite #/Campus: 2006
City Name: Eagan
Applicant: Shawn Cross, Sever Construction Company
Special Notes: The City is required to report this project with the normal SAC Activity Report if a permit is issued.
Charge Calculation:
Mixed Use: 22,885 sq. ft. @ 3800 sq. ft. / SAC = 6.02
Total Charge: 6.02
Credit Calculation:
Lexington Commerce Center (Non -conforming GSF 09/97)
Mixed Use: 22,885 sq. ft. @ 3800 sq. ft. / SAC = 6.02
Total Credit: 6.02
Net SAC: 0.00 = 0 SAC Due
The business information was provided to MCES by the applicant at this time. It is the City's responsibility to substantiate the
business use and size at the time of the final inspection. If there is a change in use or size, a redetermination will need to be
made. If you have any questions email me at: sara.running@metc.state.mn.us.
Thank you,
Sara Running
SAC Technician
Please visit our SAC website by going to: http://www.metrocouncil.org/SACprogram
METROPOLITAN
C O U N C I L