EA189064 - Building - Commercial/Industrial - Issued Date 02/27/2024 PERMIT
City of Eagan . , , Permit Type: Building
3830 Pilot Knob Rd q,�;,� Permit Number: EA189064
Eagan, MN 55122 EAGAN
(651)675-5675 111111111111111111111111111111111111111111 11H
www.cityofeagan.com * E A 1 8 9 0 6 4 *
Date Issued: 2/27/2024
Site Address: 3054 Eagandale P1
Lot: Block: Addition:
PID:
Use: The Havens at Eagandale
Description:
Sub Type: Commercial/Industrial Construction Type: V-B
Work Type: Alteration
Description: Coverting from R-1 to R2 Occupancy
Census Code: - Occupancy: R-2
Zoning: PD
Square Feet: 0
Comments:
BL-Base Fee
Fee Summary: $54.28 0$0801.4085
L-Plan Review 65% 20.4222
B
Valuation: 2,000.00 Surcharge-Based on Valuation $1.00 9001.2195
SAC-Commercial/Industrial $4,970.00 9220.2275
City SAC(O1 Unit) $285.00 9376.4681
Treatment Plant-Commercial $2,309.40 6101.4684
Total: $7,703.18
Contractor: - Applicant - Owner:
Solid Arc Construction
151 Reiner Road
North York ON
(647)567-4375
This permit shall be null and void if work does not start within 180 days of issuance, or if work is suspended for 180 days or more after
started.
I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State
of Minnesota Statutes and City of Eagan Ordinances,
Applicant/Permitee: Signature Issued By: Signature
r-------------------------
I For Office Use
) c� (,( 4
14 0 I Building Permit#:
�% 0 i
S&W Permit#: I
I �' .0�3� i
EAGAN I Permit Fee: t
I 1
I Date Received: I
3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810 I I
(651)675-5675 1 FAX: (651)675-5694 1 Date Issued: I
Plan Submittal: buildinginsgections(o)citvofeagan.com I ______I
COMMERCIAL BUILDING PERMIT APPLICATION
2/1/24 3054 Ea andale PI
Date: Site Address: g Suite#:
Tenant Name: The Haven at Eagandale Tenant is: ❑ New 0 Existing
Former Tenant(if applicable):
Name: CWP Eagan I LLC Phone: 201-819-1122
Applicant
Applicant is: 1Z Owner ❑ Contractor ❑ Agent Email: jonathan@churchwickpartners.com
Type of Description of work: Changing from R-1 occupancy to R-2 occupancy
Work $1200
Construction Cost:
Company: Solid Arc Construction Contact: Scott Kaye
Building Address/City/Zip: 151 Reiner Road North York Ontario M3h 2L8
Contractor Phone: Email:516-220-7220 Scott solidarc.ca
License#: Expiration Date:
Company: Contact:
Architect/
Engineer Address/City/Zip:
Phone: Email:
Sewer& Company: Contact:
Water
Contractor Address/City/Zip:
Required for Phone: Email:
new construction
and additions
I License#: Expiration Date:
1u I understand that Plumbing, Mechanical, Fire Suppression, and Sign work require separate applications.
NOTE: Plans and supporting documents that you submit are considered to be public information. Portions of the information
may be classified as non-public if you provide specific reasons that would permit the City to conclude that they are trade secrets.
I hereby acknowledge that this information is complete and accurate;that the work will be in conformance with the ordinances and codes of the City of Eagan;
that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit;that the work will be in accordance with the
approved plan in the case of work which requires a review and approval of plans.
Jonathan Schwalb X
Applicant's Printed Name Ap cant's Signature
-LJ 9 ob Letter Reference: 24011662 Address ID:768382 Payment ID:475345
METROPOLITAN ti
i
mnaon:01/16/24 Determination Expiration:01/16/26
C O U N C I L Date of Deter
� P
Greetings!
Please see the determination below.
Project Name: Haven at Eagandale Building 9
Project Address: 3054 Eagandale Place
City Name: Eagan
Applicant: Jonathan Schwalb, Churchwick Partners
Special Notes: None
Charge Calculation:
Apartment—no washer in unit: 8 units @ 1 unit/SAC x 80%=6.40
Total Charge: 6.40
Credit Calculation:
Residence Inn (SAC 06/87,04/16) -3040 Eagandale Place
Hotel/Motel: 8 rooms @ 2 rooms/SAC=4.00
Kitchenettes: 8 kitchenettes x 10 gallons/day @ 274 gallons/SAC=0.29
Total Credit: 4.29
Net SAC: 2.11 = Z SAC Due
The business information was provided to MCES by the applicant at this time. It is the City's responsibility to substantiate the
business use and size at the time of the final inspection. If there is a change in use or size, a redetermination will need to be
made. If you have any questions, email me at: toni.ianzig@metc.state.mn.us.
Thank you,
SAC Program Technician
Metropolitan Council Environmental Services
390 Robert Street North, Saint Paul, MN 55101-1805 An Equal Opportunity Employer
P 651.602.17701 F 651.602.10301 TTY 651.291.0904
www mizfmrrtnunr.il nrn/CAr:nrnnrnm
FOR OFFICE USE ONLY
SUB TYPES Site Address: 3054 Eagandale PI
Foundation — Public Facility _ Antennae The Haven at Eagandale
✓ Commercial/Industrial _ Accessory Building Tenant:
Apartments _ Greenhouse/Tent Permit#: 189064
WORK TYPES
New _ Interior Improvement Demolish Building*
Addition _ Exterior Improvement Demolish Interior
✓ Alteration _ Retaining Wall Demolish Foundation
DESCRIPTION *Demolition of entire building-give PCA handout to applicant
Valuation 2000 min. Code Edition MNBC-2020 MCES System ✓
Plan Review - Zoning PD SAC Units 2 per letter
Census Code - Stories - City Water ✓
#of Units - Square Feet - Fire Sprinklers
Type of Construction V-B Length -
Occupancy R-2 Width -
REQUIRED INSPECTIONS
Footings_New Building—Addition Retaining Wall
Foundation Foundation Before Backfill Other:
Vapor Barrier Other:
✓ Framing 30 Minutes ✓ 1 Hour
Insulation
✓ Sheetrock ✓ Final/C.O. Required
Roof:_Decking _Insulation _Ice&Water _Final Final/No C.O. Required
Siding:_Lath _Brick_EFIS
Fireplace:_Rough In _Air Test _Final
Pool:_Footings —Air/Gas Tests Final
Final C/O Inspection: Schedule Fire Marshal to be present: ✓ Yes No
New Business to Eagan: YES
Reviewed By: Anders Kitteison , Building Inspector
FEES
Base Fee $83.50 Landscape Guarantee (9001.2257)
Surcharge $ 1.00 Tree Mitigation (9111.4677)
Plan Review $54.28 Tree Performance Security (9111.2257)
MCES SAC $4,970.00 Stormwater Performance Security (6501.2257)
City SAC $285.00
S&W Permit& Surcharge
Treatment Plant $2,309.40
Treatment Plant(Irrigation)
Park Dedication (9328.4670)
Trail Dedication (9375.4671) TOTAL: $ 7,703.18
Revised 8/19/2022