Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
EA189169 - Building - Commercial/Industrial - Issued Date 04/10/2024
PERMIT City of Eagan , , Permit Type: Building 3830 Pilot Knob Rd '.b° '�°pF°� Permit Number: EA189169 Eagan, MN 55122 a" ��°" EAGAN (65 1)675-5675 www.cityofeagan.com E R 1 8 9 1 6 9 Date Issued: 4/10/2024 Site Address: 1345 Corporate Center Cur Lot: I Block: 1 Addition: Eagandale Center 1st PI D:10-22535-01-010 Use: Monarch * 10 - 22535 - 0 1 — D 10 Description: Sub Type: Commercial/Industrial Construction Type: V-B Work Type: Int Impr Description: Census Code: - Occupancy: A-3 Zoning: PD Square Feet: 0 Comments: Fee Summary: BL- Base Fee $1,861.65 0801.4085 BL- Plan Review 65% $1,210.07 0720.4222 Valuation: 200,000.00 Surcharge- Based on Valuation $100.00 9001.2195 Total: $3,171.72 Contractor: - Applicant - Owner: Anthony Construction Inc 1345 Corporate Center Curve LLC 6213 W Lake St 638 Southbend Ave St. Louis Park MN 55416 Mankato MN 56001 (952)994-2200 This permit shall be null and void if work does not start within 180 days of issuance,or if work is suspended for 180 days or more after started. I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Applicant/Permitee: Signature Issued By: Signature r--------------------------I E C E I VE I For Office Use c Y I ! ® a I Building Permit#: 11 024 e ® % % o� �� i S&W Permit#: I Permit Fee:4 I I I I I I Date Received: I 3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810 I I (651)675-5675 1 FAX: (651)675-5694 I Date Issued: I Plan Submittal: buildinginspectionsCa�citvofeagan com --------------------------I COMMERCIAL BUILDING PERMIT APPLICATION Date: 1/08/24 site address: 1345 Corportate Center Curve suite#: Tenant Name: Monarch Tenant is: ❑ New 14 Existing Former Tenant(if applicable): Name: Anthony Construction, Inc 952-994-2200 t; ApplicanPhone: Applicant is: ❑ Owner Contractor ❑ Agent Email: Type of' Description of work: finish a section of walkout basement to make conference room Work $200,000 Construction Cost: Company: Anthony Construction Inc contact: Anthony Zucker Building Address/City/zip: 6213 W Lake St, St Louis Park, MN 55416 Contractor, 952-994-2200 anthony@anthonyconstructioninc.com Phone: Email: y@anthon y License#: CR355390 Expiration Date: 03/31/2024 Company: EInagdy Architects Contact: Al Elnagdy Architect) 4556 Winnetka Ave Engineer Address/City/Zip: Phone: 612-2451297 Email: a•elnagdy47@gmail.com .Sewers Company: Contact: Water` Contra ctord Address/City/Zip: Requdred f0 Phone: Email: new construction and additions License#: Expiration Date: 1 understand that Plumbing, Mechanical, Fire Suppression, and Sign work require separate applications. N©Tf� Plansnd$uppbrtln `docuritt .that fou suliittif are cocidered to kis public i)sfbrmatlon. PbrtionJof the information ma bd'classl ied:a noh�`u ll �pt I" rovlde's ebi 60—re sons t atwould� '®rmit the CIN tQ conclude that fhe .are twade ecrets� I hereby acknowledge that this information is complete and accurate;that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit;that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. xAnthony Zucker X Applicant's Printed Name Applicant's Signature Letter Reference: 240209A6 Address ID:622011 Payment ID:475960 METROPOLITAN Date of Determination:02/09/24 Determination Expiration:02/09/26 C O U N C 1 L Greetings! Please see the determination below. Project Name: Monarch Health Management Project Address: 1345 Corporate Center Curve Suite#/Campus: N/A City Name: Eagan Applicant: Anthony Zucker,Anthony Construction Special Notes: The City is required to report this project with the normal SAC Activity Report if a permit is issued. Charge Calculation: Office: 8809 sq.ft. @ 2650 sq.ft./SAC=3.32 Parking Garage: 16 fixture units @ 17 fixture units/SAC=0.94 Total Charge: 4.26 Credit Calculation: Eagandale Business Center(SAC 08/05) =4.00 Total Credit: 4.QQ Net SAC: 0.26 = 0 SAC Due The business information was provided to MCES by the applicant at this time. It is the City's responsibility to substantiate the business use and size at the time of the final inspection. If there is a change in use or size,a redetermination will need to be made. If you have any questions,email me at: sara.runnine@metc.state.mn.us Thank you, Sana SAC Technician Metropolitan Council Environmental Services 390 Robert Street North,Saint Paul,MN 55101-1805 An Equal Opportunity Employer P 651.602.1770 1 F 651.602.1030 1 TTY 651.291.0904 www mp mr.minnil nrn/RARnrnnram