Loading...
EA190329 - Building - Greenhouse/Tent - Issued Date 04/19/2024 PERMIT City of Eagan a , , , Permit Type: Building 3830 Pilot Knob Rd ,,�;,^ %;,��, Permit Number: EA190329 Eagan, MN 55122 EAGAN (651)675-5675 111111111111 www.cityofeagan.com * E R 1 9 0 3 2 9 Date Issued: 4/19/2024 Site Address: 2600 Vikings Cir Lot: 1 Block: 1 Addition: Viking Lakes 2nd PID:10-82011-01-010 111111111111111111111111111 11111111111 IN 11111111111 im Use: TCO Stadiums-JDRF * 1 0 — S Z 0 1 1 — 0 1 — 0 1 0 Description: Sub Type: Greenhouse/Tent Construction Type: Work Type: Temporary Description: 5/16-5/20 Census Code: - Occupancy: Zoning: Square Feet: 0 Comments: Fee Summary: BL-Plan Review- Fixed $40.00 0720.4222 Greenhouse/Tent $94.00 0801.4085 Surcharge-Fixed $1.00 9001.2195 Total: $135.00 Contractor: - Applicant - Owner: Ultimate Events Minnesota Vlkingsfootball LLC 13405 15th Avenue N 2600 Vikings Cir Plymouth MN 55441 Eagan MN 55121 (952)346-0101 This permit shall be null and void if work does not start within 180 days of issuance,or if work is suspended for 180 days or more after started. I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Applicant/Permitee: Signature Issued By: Signature --------------------------I I For Office Use I Building Permit#: 190 1) a • of 1 S&W Permit#:_ EAGAN I Permit Fee: 1 Date Received: I 3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810 I (651)675-56751 FAX: (651)675-5694 Date Issued: Plan Submittal: buildinainspections(a)citvofeagan.com I -------------------------I COMMERCIAL BUILDING PERMIT APPLICATION Date: I O 1 Site Address: 2 v O �'m ng s c+l rG( V Suite M Tenant Name:�G I v1 10 t I Tenant is: ❑ New ® Existing Former Tenant(if applicable): Name: �II I 1 I 1 ,�I�V �lLl 11�� Phone: �IF/� -'�/✓ / U� D Applicant rn C(� Yt (/ con? Applicant is: ❑ Owner I@Contractor ❑Agent Email: V,�1 Wunso in �^'� —mn' "©n? tom 1 n Ag JRE T tlf ;° Description of work 1, / ry l _ Construction Cost. 6H Q�� ��X�� ✓��" Company: � � M Contact: V Nf ISO 1 1Yv Building Address/City/Zip: t t� Q vv"a^n cosm ttirACtOr Phone: U' J ✓�") c/IF/ Email: 017 +� e" r / " (��� License#: Expiration Date: Company: Contact: ArchiteW Engines Address/C4/Zip: Phone: Email: SBW91171 Company: Contact: Wainer �sdlYlflttR Address/City/Zip: ReQuired for Phone: Email: nViWOMMUCtion ,. sand ad� License#: Expiration Date: ❑ I understand that Plumbing,Mechanical, Fire Suppression,and Sign work require separate applications. NOTE:Plans and supporting documents that you submit are considered to be public Information. Portlons of the kdbrMatit .u; m efasspletl as non bec[f. u rovide s clic reasons that would rrnit the C to conclude that a .Y... I hereby acknowledge that this information is complete and accurate;that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit,but only an application for a permit,and work is not to s art without a permit;that the work will Lie in accordance with the approved plan in the case of work which requires a review and approval of plans. X Mmanda &amw x Applicant's Printed Name pp cant's Signature FOR OFFICE USE ONLY SUB TYPES Site Address: Foundation Public Facility Antennae Tenant: ` Commercial/industrial _ Accessory Building — _ Apartments Greenhouse/Tent Permit#: WORK TYPES New Interior Improvement Demolish Building* _ Addition _ Exterior Improvement Demolish Interior _ Alteration _ Retaining Wall Demolish Foundation *Demolition of entire building-give PCA handout to applicant DESCRIPTION 1 Valuation Code Edition /i'`�}FG-20� MCES System Plan Review Zoning SAC Units Census Code Stories City Water #of Units Square Feet Fire Sprinklers Type of Construction Length Occupancy Width REQUIRED INSPECTIONS Footings_New Building_Addition Retaining Wall Foundation Foundation Before Backfill Other: Vapor BarrierOther: ✓Framing 30 Minutes �,1 Hour Insulation Sheetrock Final/C.O.Required Roof:_Decking _insulation _Ice&Water ,_Final V Final/No C.O.Required Siding:_Lath _Brick_EFIS Fireplace:_Rough In Air Test _Final Pool:_Footings Air/Gas Tests —Final Final C/O Inspection: Schedule Fire Marshal to be present: V/Yes No New Business to Eagan: Reviewed By: Building Inspector FEES Base Fee Landscape Guarantee(9001.2257) Surcharge Tree Mitigation (9111.4677) Plan Review Tree Performance Security(9111.2257) MCES SAC Stormwater Performance Security(6501.2257) City SAC S&W Permit&Surcharge Treatment Plant Treatment Plant(Irrigation) Park Dedication (9328.4670) 2 Trail Dedication (9375.4671) TOTAL: $ f35�