3035 Holiday Lane - RPZ Report 5/24/2413ACKFLOW PREVENTER TEST REPORT
"ir,� S-513
Manufacturer of Assembly: tt li& .q Model# C-u XL
Sure of Assembly: 3/L Vl p
Serial lt�� �� 1�
Location of Assembly: Floor# k^si\. n G^ {
Roomd Date test was performed:J[y`7")
Reduced:P,ressureRrlOdple RP) —TEST RESULTS
Check Valve#2
Shutoff Valve 92 Check Valve #1
Pressure Differential
Relief Valve
Initial Test
Closed Tight _Yes —No
Dosed Tight —Yes Closed light —Yes—No
—No
Pressure Drop Across
Opened at psid
[heck Valve pl sid
Describe parts and
repairs when needed
Flnal Ten
Closed Tight �Yes_No
Closed Tight >*Yes Closed Tight, Yes —No
—No
Pressure Drop Across
Opened at.-_psid
Check Valve#1 4.1 psid
Double Check BReknow Prevention Assembly (DC) -TEST RESULTS
Check Valve#1
Geck Valve#2
Shutoff Valve#2
Closed Tight—Yes_No
Closed light
Initial Test
—Yes_No
Closed Tight —Yes
d
sid
_No
Describe parts and
repairs when needed
Closed Tght _Yes —No
Closed Tight
final Test
-Yes—No
Closed fight —Yes—No
psid
psid
` Pressure Vacuum Breaker Assembly fPVB) or Spill Resistant Vacuum Breaker
(SRVB) -:TEST RESULTS
Air Inlet Valve
Check Valve
Shutoff#2
Failed to Open —Yes —No
Closed Tight —Yes—No
Initial Test
Pressure Drop Across
Closed Tight —Yes—No
0 ened at sid
Check Valve 91 sid
Describe parts and
repairs when needed
ClosedTight
Final TTestOpenedat__psld
—Yes—No
Pressure Drop Across
ClosedTight —Yes —No
CheckValvi psid
........—••-^ .1=•vWa mrosmatgn provided by me to be co e[ + a`he tested device is tuncuoning with the limits of the standards.
Name (Print), �`i(\ rZQPky D,� Slgnrture Date: a�
State of MN Cerfificate Number:
BACKFLOW PREVENTER TEST REPORT
BACKFLOW Abbtill i IrvraanlrrrT16 f
e Model k
System Served: c"�l �C�'+� Manufacturer of Assembh/:S-
�� . .
SerialN r I/A
size of Assembly: Room
3i ,�
Room d Ny*�^' n-r�^" Date test was performed:
Location of Assembly: Floor e,Q
Initial Test
Describe parts and
repairs when needed
Final Test
initial Test
Describe parts and
repairs when needed
Final Test
Initial Test
Check Valve#z � �•�^"""
Closed Tigh
Closed Tight _Yes_No Closed Tight _Yes_,No pressure Drop Across
_. ..._.._.. osid
Closed'N6ht Yes _No I Closed Tight Yes _No pressure Drop
Il Check Valve D'.
Double Check BackflOW Prevention Asse mblV (DC) .—TE
Check Valve N3
Yes _No Closed Lght _Yes _No
Closed Tighi
sid
psid
Closed Tight NO
Closed Tight Yes _No
sld�—
psid
re Vacuum Breaker Assembly (PVB) or Spill Resistant Vacuum BI
Check Valve
Air Inlet Valve posed Tight _.•Yes �No
Failed to Open_ Yes _No
Pressure Drop Across
Opened at osid
Opened at D,-I osid
Closed Tight _Yes_No
Closed Tight —Yes—No
Closed Tight _Yes._No
Describe Para and Yes _No
repairs when needed Closed Tight _Yes _No Closed 7lHht _
Pressure Drop Across
Final Test Opened at Ps Check
Check Valve al psld svkh the limits of the standards.
he tested device is functioning
�,
oin information Provided by me to be correct Date:
CERTIFICATION• erti� e_
''1cO Name (print): Signature:
—
&...r ramiri ate Number: _