2018-10-30MCES USE: Letter Reference: 18103OA1 Address ID: 5238 Payment ID: 416784
Date of Determination: 10/30/18 Determination Expiration: 10/30/20
2tings!
Please see the determination below.
Project Name: Thomson Reuters l 0 U) 1`1 �6-4'1q,i G G`
4
Project Address: 610 Opperman Drive
Suite #/Campus: Building C, Level 2
City Name: Eagan
Applicant: Jeff Loehmann, Gardner Builders, LLC
V90
//, /�; -- / r'
Special Notes: The City will be charged no additional SAC Units for this project, as determined below. *The rules allow for
these 2 net credits where SAC was actually paid to either be taken city-wide or left site-specific. Any net credits taken city-wide
can only be taken if the project is reported to MCES at the time the permit is issued. Otherwise, the net credits remain site-
specific. The project is required to be reported with your normal SAC Activity Report if a permit is issued.
Charge Calculation:
Office: 48,882 sq. ft. @ 2650 sq. ft. / SAC = 18.45
Total Charge: 18.45
Credit Calculation:
Thomson West Facility (SAC 08/94, 12/08) = 20.79
Total Credit: 20.79
SAC: -2.34 — or — 0 SAC Due
The business information was provided to MCES by the applicant at this time. It is the City's responsibility to substantiate the
business use and size at the time of the final inspection. If there is a change in use or size, a redetermination will need to be
made. If you have any questions email me at: cors.mccullough@metc.state.mn.us.
Thank you,
SAC Technician
Please visit our SAC website by going to: http://www.metrocouncil,org/SAC12rogram
J
L