Loading...
2025-06-18 Pre-Demolition Work Plan Approval BF0003053MINNESOTA POLLUTION CONTROL AGENCY 520 Lafayette Road North I St. Paul, Minnesota 55155-4194 1 651-296-6300 800-657-3864 1 Use your preferred relay service I info.pca@state.mn.us I Equal Opportunity Employer June 18, 2025 VIA EMAIL Maggie Dykes Dakota County Community Development Agency 1228 Town Centre Dr Eagan, MN 55123-1066 RE: Approval of Phase II Investigation Work Plan Unisys Eagan, 1500 Towerview Rd, Eagan MPCA Site ID: BF0003053 MPCA Billing ID: 104204 PIN: 107995001030 Dear Maggie Dykes: The Minnesota Pollution Control Agency (MPCA) Brownfields staff in the Voluntary Investigation and Cleanup (VIC) Program has reviewed the Pre -Demolition Environmental Investigation Work Plan (Work Plan) submitted for the Unisys Eagan site, located at the address referenced above (the Site). The Work Plan dated May 23, 2025, was submitted on your behalf by Braun Intertec Corporation. The Site is a 39.01 -acre parcel that is developed with several vacant structures, including a 335,300 - square -foot multi -story data center building known as Building J, a generator building, and an irrigation control shed. A City of Eagan pump/well house is also located on the Site. From approximately 1982 to 1991, Building J was operated by Unisys Corporation (formerly Sperry/Univac) as a semi -conductor manufacturing facility. From 1991 through 2022, the site was occupied by Northwest Airlines, later Delta Airlines, and was used primarily as a computer data center. The property was sold to Digital Realty in 2013 and remained under their ownership until the Dakota County Community Development Agency (CDA) acquired it in August 2024. Since January 2022, the buildings have been unoccupied. In the short term, the CDA plans to demolish the three vacant buildings on the Site—Building J, the generator building, and the irrigation control building—to address ongoing safety concerns, eliminate maintenance costs, and prepare the property for redevelopment. The CDA eventually intends to redevelop a portion of the Site with a mix of senior and affordable multifamily residential housing, with the remainder of the Site potentially sold to private developers for complementary commercial or residential use. The purpose of this Work Plan is specifically to support demolition activities at the Site, along with a pending Construction Contingency Plan that will be submitted under separate cover. Additional investigation of the Site will likely be necessary to support future redevelopment. t-rem-vic2-12 - 815121 Maggie Dykes Page 2 June 18, 2025 The Work Plan is hereby approved. Please keep me informed of any deviations from the Work Plan during implementation. This letter is subject to the disclaimers found in Attachment A. If you have any questions about this letter, please contact Madison Scheer, Project Manager, at 651-757-2821 or by email at madison.scheer@state.mn.us. Sincerely, -MaA;aOO' , AZ4e'r'V This document has been electronically signed. Madison Scheer Project Manger Voluntary Investigation and Cleanup Unit Remediation Division Enclosure cc: Brandon Brayfield, Braun Intertec Corporation Mark Keefer, Braun Intertec Corporation Elizabeth VanHoose, City of Eagan Cathy Undem, Dakota County Disclaimers UNISYS EAGAN MPCA Project Number: BF0003053 1. Reservation of authorities Attachment A The MPCA Commissioner reserves the authority to take any appropriate actions with respect to any release, threatened release, or other conditions at the Site. The MPCA Commissioner also reserves the authority to take such actions if the voluntary party does not proceed in the manner described in this letter or if actions taken or omitted by the voluntary party with respect to the Site contribute to any release or threatened release or create an imminent and substantial danger to public health and welfare. 2. No MPCA assumption of liability The MPCA, its Commissioner and staff do not assume any liability for any release, threatened release or other conditions at the Site or for any actions taken or omitted by the voluntary party with regard to the release, threatened release, or other conditions at the Site, whether the actions taken or omitted are in accordance with this letter or otherwise. 3. Letter based on current information All statements, conclusions and representations in this letter are based upon information known to the MPCA Commissioner and staff at the time this letter was issued. The MPCA Commissioner and staff reserve the authority to modify or rescind any such statement, conclusion, or representation and to take any appropriate action under his authority if the MPCA Commissioner or staff acquires information after issuance of this letter that provides a basis for such modification or action. 4. Disclaimer regarding use or development of the property The MPCA, its Commissioner and staff do not warrant that the Site is suitable or appropriate for any particular use. 5. Disclaimer regarding investigative or response action at the property Nothing in this letter is intended to authorize any response action under Minn. Stat. § 1156.17, subd. 12. Page 1 of 1