Loading...
03/29/1977 - City Council Special MIiMW OF A SPECIAL P=MU OF THE EAGAN CITY COUNCIL EAGAN, MMIESOTA MARCH 29, 1977 A special meeting of the Ea~~an City Council was held on March 29, 1977 at 7:00 P.M. at the Eagan City Hall. Members present were Mayor Herb Polzin and City Council Me'nbers Ted Wachter, Jim Smith, Bill Rydrych and Art Rahn. Also present were the following members of the staff: City Administrator Tom Hedges, Police Chief Abrtin DesLauriers, Building; Inspector Dale Petersen and Fire Marshall Doug Reid. Police Department Facility. A special meeting was called by 7Wor Herb Polzin to consider a revised plan for the planned construction of a new Police Department Building. City Council Ptrrber Wachter and City Administrator Hedges gave a report on the sub committees findings which include a recommendation to consider a two story building with a full basement. It was explained that a full basement would provide storage for the mechanical system and record keeping, the first story would be the Police Department and the second story would be constructed for the City Council Chamber and Administrative Offices. City Council Member Wachter presented the finding of the sub committee relating to the heat and air conditioning; system stating that a forced air system is less expensive and provides an even constant temperature desirable for offices. He also stated that pre-stress concrete was reviewed by the committee. City Council Member Wachter reported that the committees recommendation is to consider pre-stress concrete as an alternative for construction of the new building. Jim Horne appeared, representing Horne Architects, and discussed a number of concepts on the new buildinap, plans as discussed by the sub committee. He stated that future expansion is one imortant consideration and than discussed the advantages and disadvantages of a forced air mechanical system and pre-stress concrete. - 1 - City Council Member Smith stated that a basement should be included in the building plans and further if a full basement is desired for the facility there should be consideration to eliminate the 20' x 80' addition. After further discussion on the ccrrmittees findine;s Mayor Polzin directed the City Administrator to research the cost of the entire complex and in addition the various methods of financing the total building complex. The meeting was adjourned at 9:30 P.M. Dated : CL"4w- s ti ? Mayor ATTST: City Clerk -2-