Loading...
08/22/1967 - City Council Special MINUTES OF 11 SPECIAL MEETING OF THE BOARD OF SUPERVISORS EAGAN TOWNSHIP, DAKOTA COUN1Y, MINNESOTA AUgust 22, 1967 A special aeeting of the Board of Supervisors of Bagan. township was beld at the town hall at 8:00 o.clock P. M. on August 22, 1967, at which all members were present~ The Cbai1'lll8n annoUllced.that the first order of business would be the opening of bids for the extension of Rahn Road to Beau de Rue Drive. The following bids were submitted: M. E. Kraft Excavation W. J. Ebertz Excavation J. A. Denens T. M. Wlllmus Construction Fisher Construction Enebak Construction Husting & Engstrom Ames Construction ' $11,997.50 19,160.00 13,917.00 13,397.30 12,015.50 11,048.50 10,418.50 14,061.00 After reviewing th,e bids, aDd upon motion by Supervisor Rahn, and seconded by Cba1.rman Klein it was RESOLVED that the bid of Husting and Engstrom, Inc. in the sum of $10,418.50 be, and it ber~by is, accepted and that the contract be let to said contractor. Mr. Jean Parranto appeared on behalf of Su Su Ling Drive-in in relation to a request for a ,building permit at the Northwest corner of Beau de Rue Drive and Cedar Avenue. Upon motion by Chairman Klein, seconded by Supervisor Rahn, it was RESOLVED that said building permit application be, and hereby is approved, subject however to submissinn of an application, approval by the town engineer and final approval by the Advisory Planning Cormnittee. The Board accepted two applications from DCa Company requesting construe', tion and assessement toward benefited property of graveling and surfacing certain streets in proposed Cedar Industrial Park including Seneea ROad, , Shawnee Road and part of Kenabec Drive. The second application was for - 1 - r.w t '7 (~ . -; .{ " sewer and lateral mains along the new roadl'lay from Cedar Avenue to Highllay 1!13. Upon motion by Chairman Klein, secO'4ded by Supervisor Rahn it was RESOLVED that said requests be, and hereby are, accepted and referred to the town engineer for the preparation of plans and further study. Upon motion by Supervisor Schwanz, seconded by Supervisor Rahn, it was RESOLVED that specifications for a half ton pick-up truck to be used by the town water and sewer superintendent be prepared by the town engineer and further that the clerk be authorized to advertize for bids. Upon motion the meeting adjourned. Dated: August 22, 1967. ~f;< ~ Clerk - 2 - fJ J7 ?: