02/04/1993 - Advisory Parks & Recreation Commission
MEMORANDUM
TO: ADVISORY PARKS, RECREATION AND NATURAL RESOURCES
COMMISSION
FROM: KEN VRAA, DIRECTOR OF PARKS AND RECREATION
DATE: FEBRUARY 1, 1993
RE: FEBRUARY 4, 1993, COMMISSION MEETING
Preceding the regular Commission meeting, the Recreation Sub-committee will meet at 6:00 p.m.
That meeting will take place in the Conference rooms adjacent to the Council Chambers.
Two announcements at this time. Chairman, Jack Johnson, has resigned from the Advisory
Commission. Staff received a call from Mr. Johnson early last week in which he indicated that
the nature of his work changed significantly causing him to frequently be absent from the City
and from attending to his responsibilities as an Advisory Commission member. Jack expressed
regrets in having to do so, having enjoyed serving on the Commission, but recognized that his
work conditions have changed significantly and precludes him from serving on the Commission
any longer.
The second item of importance is Steve Sullivan, Landscape Architect/Parks Planner has
accepted a position with the Dakota County Parks Department. Steve's resignation is included
in the packet for your review. I am sure we all wish Steve well in his new position that is
obviously an advancement for Steve in his career goals. Steve's last day with the City will be
February 12, 1993.
Consent Agenda
After the traditional formalities of the Advisory Commission's meeting, the first item under the
Consent Agenda is the Oak Cliff Pond 2nd Addition. A single motion to approve all consent
items would be in order.
Development Proposals
There are two items under Development Proposals which staff has provided background
information on. The Commission is asked to carefully review the memorandum by Water
Quality Resource Coordinator, Rich Brasch, having to do with this particular addition.
Old Business
There are three items under Old Business. The first item is the Minnesota Releaf Grant
Program update. Staff has previously reviewed this item in terms of. making the grant
application and its acceptance. This memo speaks to the implementation of that grant for the
city.
I',
The second item is park naming. At the workshop meeting in January, the Commission
questioned if the Manor Lake Subdivision was named for the Lake, or the lake followed the
name of the subdivision. Mrs. Holz, the family that has owned the property stated that the lake
did not have an "official name". Staff will be asking the Commission to place this on the March
Agenda.
The last item is the golf driving range. Staff has included a memorandum concerning the golf
driving range at Lexington/Diffley site. This memorandum covers the Council's review of this-
at its Tuesday, February 2 meeting and additional information concerning costs that the Advisory
Commission had asked for at its January meeting.
New Business
The first item under New Business is a review of the structuring of the Advisory Parks,
Recreation and Natural Resources Commission. Staff has provided a cover memorandum and
background information pertaining to this particular discussion. The Commission is asked to
provide their input and provide "fact-finding" background information for the City Council prior
to the Council's meeting of February 16, 1993. The Council hopes to, at that time, make their
appointments to the Commission as well as a determination of restructuring.
Scope of Services/Parks Systems Plan Update
Staff has again included a final draft of the Scope of Services intended for the Park Systems Plan
update. In addition to the Scope of Services there would be a cover letter and timeline sent to
various firms who specialize or have had background in developing Park Systems Plans. The
Commission is asked to review the Scope of Services document, make any additions necessary
or appropriate. Once the Commission is comfortable with the document, it would be
appropriate for them to forward this to the City Council with their recommendations.
Landscape. Tree Preservation and Turf Establishment Policies
Included in this packet is a memorandum regarding the Landscape, Turf Establishment and Tree
Preservations Ordinances/Policies. Staff has been working on this for some time and has
recently presented to the City Council the Landscape Ordinance portion of this document. The
Advisory Parks and Recreation Commission has reviewed this ordinance several months ago and
had recommended to the City Council its adoption. It has been further reviewed by the City
Attorney's office, staff and Planning Commission and forwarded to the City Council at the
February 2, 1993 Council meeting. Superintendent of Parks, Jon VonDeLinde will review the
ordinances bringing the Advisory Commission up to date on each of the particular aspects
involved.
Parks Development
There is one item under Parks Development having to do with the creation of sand volleyball
courts at Goat Hill Park. This information is contained on a separate memorandum contained
within the packet.
Water Quality
Water Quality Coordinator, Rich Brasch, had intended to provide a brief presentation to the
Advisory Commission on Water Quality policies and practices. However, given the length of this
agenda and the issues having to do with the restructuring of the Advisory Commission, this item
has not been placed on the agenda but will be placed on the March meeting.
Other Business and Reports
There are several items under Other Business and Reports which do not necessarily require
Advisory Commission action.
As always, if members of the Advisory Commission are unable to attend the Commission
meeting, notification of staff would be appreciated.
Respectfully submitted,
Ken Vraa,
Director of Parks and Recreation
KV/dj
COMMISSION2-93COVR.MEM
AGENDA
ADVISORY PARKS, RECREATION AND NATURAL RESOURCES COMMISSION
EAGAN, MINNESOTA
Thursday, February 4, 1993
7:00 PM
Eagan Municipal Center
A. 7:00 P.M. Regular Meeting - Eagan Municipal Center
B. Call to Order and Pledge of Allegiance
C. Approval of Agenda
D. Approval of Minutes of Regular Meeting of January 7, 1993
F. Visitors to be Heard
G. Consent Agenda
(1) Oak Cliff Pond 2nd - OCP Home Incorporated
H. Development Proposals
(1) Pondview Townhomes - Good Value Homes
(2) Deerhawk Addition - Dakota County State Park
1. Old Business
(1) Minnesota Relief Grant Program Update
(2) Park Naming
(3) Golf Driving Range Update
J. New Business
(1) 1993 Advisory Parks Recreation and Natural Resources Commission
(2) Scope of Services - Park System Plan Update
(3) Landscape, Tree Preservation and Turf Establishment Policies
K. Parks Development
(1) Sand Volleyball Courts - Goat Hill Park
L. Water Quality
M. Other Business and Reports
(1) ADA Update
(2) Minnesota Valley Trail Update
(3) Department Happenings
N. Round Table
0. Adjournment
NOTE: RECREATION SUB-COMMITTEE WILL MEET AT 6:00 PM.
MINUTES OF REGULAR MEETING OF
ADVISORY PARKS, RECREATION AND NATURAL RESOURCES COMMISSION
EAGAN, MINNESOTA
JANUARY 7, 1993
A regular meeting of the Advisory Parks, Recreation and Natural Resources Commission was called
to order at 7:00 p.m. on Thursday, January 7, 1993 with the following Commission members present: Erin
lpsen-Borgersen, Jonathan Widem, Ted Billy, Jack Johnson, Lee Markell, Dan Mooradian and Kevin Knight.
Commission Member Deborah Johnson was not present. Staff present included Ken Vraa, Director of Parks
and Recreation; Stephen Sullivan, Landscape Architect/Park Planner; Dorothy Peterson, Superintendent of
Recreation; John VonDeLinde, Parks Superintendent; Rich brasch, Water Quality Coordinator; Dan Schultz,
Intern and Cherryl Mesko,Secretary. Superintendent of Recreation Peterson introduced Dan Schultz to the
Commission noting that he would be interning with the Department for 12 weeks and would conclude his
internship with a presentation to the Commission.
AGENDA
Director Vraa noted that Signal Point Addition was pulled from the Consent Agenda and asked that Park
Naming be deferred to the February, 1993 meeting. Erin Ipsen-Borgersen moved, Lee Markell seconded the
motion with all members voting in favor to accept the Agenda as amended.
MINUTES OF REGULAR MEETING OF DECEMBER 3, 1992
Kevin Knight moved, Ted Billy seconded with all members voting in favor to accept the minutes of
December 3, 1992 as presented.
CONSENT AGENDA
After review of the park and trail dedication issues by Park Planner Stephen Sullivan and review of the
water quality issues by Water Resources Coordinator Rich Brasch, Ted Billy moved, Erin Ipsen-Borgersen
seconded the motion to make the following recommendations to the City Council. All members voted in favor.
1. Engstrom's Deerwood Second Addition - Robert Engstrom Companies. That the proposal be
subject to a cash parks dedication and a cash trails dedication. That the developer provide
staff with a tree protection plan prior to final plat which indicates the location of tree
protection fencing which is to be installed and maintained during the construction time frame.
the development be subject to a cash water quality dedication which is estimated at $1,940,
in lieu of on-site ponding.
2. Four Oaks Estates - Rosewood Corporation. That the proposal be subject to a cash parks
dedication and a cash trails dedication. The development be subject to a cash dedication in
lieu of ponding to meet water quality treatment requirements with the dedication to be
adjusted to reflect the low level of development density on the site.
TOWN CENTRE 70 - 15TH ADDITION
Landscape Architect/Park Planner Sullivan introduced this item as a preliminary plat for a Kohl's
Department Store located east of Town Centre Drive, west of Denmark Avenue and north of WalMart
Department Store. Steve reviewed the parks and trails dedication issues relevant to this proposal indicating
staff's recommendation for a cash parks and trails dedication.
ADVISORY PARKS, RECREATION AND NATURAL RESOURCES COMMISSION
Minutes of January 7, 19993 Meeting
Page 2
Water Resources Coordinator Brasch then reviewed the water quality issues relevant to this site. Rich
noted that the Commission would need to make a recommendation regarding whether the development should
be subject to a ponding requirement and/or a cash dedication requirement to meet water quality standards as
set by the city in its water quality management plan. He continued that there are no wetland filling or draining
issues associated with this plat application.
Rich noted that the storm sewer layout for this development proposal would direct runoff to pond JP-
66.1, a nutrient basin designed to treat runoff from the WalMart site before discharge to another small sediment
basin, then Fish Lake. Staff reported in May, 1991 that additional on-site ponding would be needed for the
WalMart development to protect water quality in Fish Lake to meet water quality treatment standards when the
remainder of the 27 acre parcel developed. Mr. Brasch continued that only by pre-treating runoff from the
proposed development and substantially improving treatment of runoff from the off-site area can this
development meet the requirement of preventing any further deterioration of water quality in Fish Lake as a
result of development.
Mr. Brasch indicated that Pond JP-66 must have a minimum surface acreage and wet pond volume at
normal water level of .55 acres and 3.00 acre feet respectively, in order to meet minimum treatment
requirements to protect Fish Lake. In addition, separation between pond inlets and the outlet needs to be at
least 350 feet and a skimmer must be constructed on the outlet.
After further discussion, Kevin Knight moved, Erin lpsen-Borgersen seconded with all members voting
in favor to make the following recommendations to the City Council regarding Town Centre 70 - 15th Addition:
1. The proposal be subject to a cash Parks Dedication.
2. The proposal be subject to a cash Trails Dedication.
Ted Billy moved, Kevin Knight seconded with all members voting in favor to make the following
additional recommendations to the City Council regarding Town Centre 70 - 15th Addition:
1. The development be subject to an on-site ponding requirement to meet water quality treatment
standards to prevent any further deterioration of water quality to Fish Lake. The design of the
on-site treatment pond should be subject to staff approval.
WENZEL ADDITION
Park Planner/Landscape Architect Steve Sullivan introduced this item indicating the Commission has
reviewed this development previously, however significant changes were made to the site plan resulting in the
need to bring it back before the Commission. The parcel. is located south of Deerwood Middle/Elementary
School and north of County Road 30. When Park Service Area #21 was reviewed previously the Commission
felt that the future land use of the 80 acre undeveloped property west of the Wenzel property would determine
the parkland needs for PSA #21. When the Commission reviewed this development in September, it made
recommendations to the developer based on the request for a revised site plan being submitted. Those
recommendations included the site plan preserving the oak stand at the northwest edge of the pond, providing
for required recreational open space and that the developer examine the potential of a trail encircling the pond.
ADVISORY PARKS, RECREATION AND NATURAL RESOURCES COMMISSION
Minutes of January 7, 1993 Meeting
Page 3
Mr. Sullivan outlined parks and trails dedication issues noting that staff is recommending a cash parks
dedication. Relative to trails dedication, it was noted that the Wenzel property has not provided towards the
cost of an 8' bituminous trail that currently exists adjacent to the parcel on the north side of County Road 30
resulting in the requirement of a cash trails dedication. Steve continued that the proposal indicates a 25' trail
easement within the northeast corner of the plat providing pedestrian linkage to Deerwood Elementary/Middle
School which lies north of the parcel. The School District approves this alignment and will provide a concrete
sidewalk to the trail easement with the developer being responsible for providing an 8' wide trail pad at finish
grade and the City of Eagan being responsible for the installation of the concrete sidewalk.
Additionally the site indicates a 30' foot outlot between Lot 5, Block 3 and Lot 1, Block 4. This outlot
provides a central pedestrian corridor to Deerwood School, however the steep slopes result in this becoming
a non-feasible pedestrian corridor. Staff has recommended that the developer delete the central pedestrian
outlot from the plat. Steve added that if greater accessibility to the school from the westerly multi-family area
is needed, a future east/west pedestrian link to the future extension of Thomas Lake Road may have merit.
Relative to woodland preservation, Steve indicated that the developer has agreed to a custom
development approach to Lots 4-8 of Block 5 which lies within the wooded area west and northwest of the
pond. Steve continued that the need for 19,000 square feet of open space requirement would be provided for
in the plan where there are several large greenspace areas west of the north/south public road.
After discussion, Ted Billy moved, Dan Mooradian seconded the motion with all members voting in
favor to make the following recommendations to the City Council regarding Wenzel Addition;
1. The plat be subject to a cash Parks Dedication.
2. The plat be subject to a cash Trails Dedication.
3. The developer grade an 8' wide trail pad to the Deerwood School property within the easterly
trai[way easement. The developer coordinate the alignment, grading and sequencing with the
School District.
4. The developer delete the central pedestrian outlot from the plat.
5. The developer provide a tree protection plan for City review and approval prior to final
platting.
6. The developer utilize a custom development approach for Lots 4-8 of Block 5 using a grading
and site planning approach which is specific to preserving the oak trees on each lot.
7. The development plan be revised to provide 19,000 square feet of recreational open space.
The grading plan be modified providing flatter grades within the open space west of the
proposed north/south road. The plan is to be approved by Parks and Recreation staff.
8. The development to include custom grading approach for Lots 10-16, Block 5 to preserve trees
on each lot.
Water Resources Coordinator Brasch reviewed the water quality and wetland protection requirements
for this development. He noted that the site contains 3 wetlands which encompass a total of about 4.72 acres.
The largest of the wetlands is a Type 5 open water wetland with a Type 1 bottom-land wooded fringe. This
wetland is associated with Pond BP-4 and is approximately 4.45 acres in surface area. The second wetland
is .02 acres of Type 2 wet meadow located near the northeastern edge of the first wetland and the third is
located in the north central portion of the site,northwest of the Deerwood Elementary parking lot and
encompasses approximately .25 acres of Type 1 bottom-land forest. Rich noted that the total wetlands to be
replaced would be .28 acres with a replacement option contiguous to BP-4 on the northeast part of the site.
Pond BP-4 is used primarily to reduce the pollutant loading to Blackhawk Lake. The developer proposes to
use the existing low area at the northeastern limits of Pond BP-4 to expand the wetland area.
ADVISORY PARKS, RECREATION AND NATURAL RESOURCES COMMISSION
Minutes of January 7, 1993 Meeting
Page 4
Rich outlined discussions that had occurred with the developer and City Staff relative to staff working
with the developer to excavate and re-shape the remainder of the pond. In response to a question regarding
the City's cost in this joint project, Mr. Brasch responded that the City's portion would be approximately 40-
45% of the estimated $40,000 cost.
After discussion, Dan Mooradian moved, Jonathan Widem seconded with all members voting in favor
to make the following recommendations to the City Council regarding Wenzel Addition:
1. The development meet its water quality obligation by creating through excavation an
additional 2.4 acre-feet of storage in the southern end of Pond BP-4. The excavation plan
must be approved by City staff. The developer work with the City to excavate and re-shape
the remainder of the pond. Finally the proposed wetland replacement plan be approved
contingent on submission of a final wetlands impact and mitigation report and compliance
with the requirements of the Wetland Conservation Act.
GOLF DRIVING RANGE/REQUEST AND PROPOSAL
Director Vraa introduced this item as a new proposal from Rick Kuchera and Ryan Helgeson requesting
use of the Lexington\Diffley parkland parcel for a golf driving range for a period in excess of three years. Ken
reminded the Commission that they had reviewed a similar request in October of 1992 from Mike King.
Director Vraa then introduced Rick Kuchera and Ryan Helgeson.
Mr. Helgeson explained their interest in pursuing a golf driving range at this site noting the obvious
void of a similar facility in Eagan. It was noted that Mr. Kuchera and Mr. Helgeson will incur all costs of
development including site development/construction, seeding/sodding, installation of an irrigation system, on
site storage building and any other materials, equipment or supplies required to operate the driving range.
Their proposal includes using existing access and expanding parking. Mr. Helgeson expressed their desire to
have the best golf driving range in the Twin Cities. In their research Mr. Helgeson continued, they found that
although Eagan has two golf facilities they do not have a practice site. The projection is that the facility will
generate $30,000+ in revenue in 3.5 years. It is anticipated that the property will be left in better condition
than when development starts, the facility will maintain a professional image, offer top customer service and
provide multiple benefits to the city. Ryan continued that once the lease term has expired the turf area that
remains will be conducive to soccer play or other recreational uses.
After the presentation by Mr. Helgeson and Mr. Kuchera, Commission Member Billy expressed his
concern for losing a portion of the Lexington Diffley site for approximately 4 summers. Ted continued that if
the City Council wanted to develop this site they would not be able to until the summer of 1997 with
anticipated use in 1998. Director Vraa clarified that the site needs to be graded no matter what the time frame
for development will be. Ken continued that if the site were graded in 1993 in preparation of an athletic
facility, those facilities would not be available for use until fall of 1995. Mr. Billy noted that this use could
certainly fill a void that currently exists and if permission is granted to proceed the City may discover that a
golf driving range is the best use for this location even after the lease has expired.
In response to a question regarding when this facility would like to open for operation, Mr. Helgeson
responded they wanted to be opened by July 1,1993. Lee Markell asked when a decision would need to be
made to which Mr. Helgeson responded February 15 in order to begin seeding by April 15,1993. Ted Billy
asked if staff had any reservations regarding the timing for such a project. Director Vraa responded that in
reference to softball, staff would be opposed to giving up room on the site where fields may be developed,
however, at the present time the City has exceeded the standards set for soccer fields therefore, the golf driving
range may
ADVISORY PARKS, RECREATION AND NATURAL RESOURCES COMMISSION
Minutes of January 7, 1993 Meeting
Page 5
be an alternative to placing soccer fields at this time. Superintendent of Recreation Peterson added that
currently staff is programming golf lessons in Savage because of the lack of closer facilities that can
accommodate the interest. As a result, the numbers participating in golf lessons have steadily declined.
Kevin Knight expressed his support for saving costs by working with the County when County Road
30 is upgraded, however, he expressed his concern that this use fit into the overall plan for the site. After
further discussion, Kevin Knight moved, Jonathan Widem seconded with all members voting in favor to
recommend that staff work with Mr. Kuchera and Mr. Helgeson on the possibility of a lease to provide a golf
driving range at Lexington/Diffley, that a long range site plan be done to help determine if this is an appropriate
and needed use at the site, that the cost for electrical hook-up and a 2 inch water supply line be reviewed since
these are the costs the City would be asked to incur and that this issue be brought back to the Commission in
February.
REQUEST FOR NEIGHBORHOOD SKATING RINK
Director Vraa introduced this item as a request by Randal Hemmerlin to place a pleasure skating rink
near Woodland School off Wescott Road. Mr.Hemmerlin noted that the neighborhoods surrounding Woodland
Elementary School have many youth and adults who would benefit from such a skating rink. Mr. Vraa brought
the Commission's attention to the letter responding to Mr. Hemmerlin's request in which Mr. Vraa explained
that the Advisory Commission will take the request under advisement pending the updating of the Park System's
Plan. Ken explained that he had thanked Mr. Hemmerlin for his letter and directed him and his neighbors to
enjoy the skating facilities at Bridle Ridge Park which is the closest skating facility.
Ted Billy concurred with the response to Mr.Hemmerlin as did other Commission members. Kevin
Knight reiterated the importance of proceeding in a timely fashion to update the Park System's Plan. Mr. Vraa
responded that he hoped to have a draft of the Scope of Services for the Commission to review at their
February meeting.
WETLANDS - COMMENTS ON PERMANENT RULES
Water Resources Coordinator Brasch reviewed with the Commission the letter sent on behalf of both
the City of Eagan and The Gun Club Lake Watershed Management Organization relative to the proposed
permanent rules to implement the Wetland Conservation Act of 1991. Rich reviewed the five comments that
were shared and outlined in the packet indicating he would have more information for the Commission in
February.
Kevin Knight asked if the comments expressed in the letter of December 23 were echoed by other
cities. Mr. Brasch indicated that the coalition had submitted responses based on 14 issues and they were
anxious to hear feedback on those issues.
Jack Johnson thanked Rich for the extensive amount of work that has gone into getting this work done
and also complemented Rich on his receipt of an Environmental Education Award. Mr. Johnson expressed the
Commission's appreciation for Rich's excellent work and the reputation he has earned in being a leader in this
field.
OAK WILT
Superintendent of Parks VonDeLinde updated the Commission on the joint Council/Commission
workshop of November 10 where the issue of oak wilt was discussed. John continued. that the primary
questions were relative to how a program such as this could be funded. John reviewed the potential sources
of funds within the proposed 1993 Forestry operating budget that might be shifted to start this program but he
also reviewed the impact to the forestry operations if that were to happen. It did provide, however, an option
to consider if the Council chose to proceed with this issue. After reviewing the costs involved John indicated
that the Commission could recommend that nothing be done at this time, suggest that a portion of the Forestry
budget be used to begin the process by providing a more accurate picture of damage through aerial
photography, or the Commission could ask that the City Council look for other means to support this project.
ADVISORY PARKS, RECREATION AND NATURAL RESOURCES COMMISSION
Minutes of January 7, 1993 Meeting
Page 6
Lee Markell expressed his concern that this is an issue that isn't going to get better and that time was
of the essence. Mr. VonDeLinde responded that once there is some baseline information, which could be
provided through aerial photographs, the City will be better able to look at what needs to be done. John added
that we are currently losing 1200-1500 trees a year.
Jack Johnson added that the aerial mapping and education would be a good place to start. He
suggested approaching the City Council to see if funding can be allocated to at least start identifying and
resolving the problems that exist on public property. John VonDeLinde reminded the Commission that this is
a disease that requires technical expertise specifically as it relates to diagnosis and treatment. In order to do
a good job on this, staff time is needed to get it up and running.
After further discussion, Jack Johnson moved, Jonathan Widem seconded with all members voting in
favor to approach the City Council to examine the option of supplemental funding for oak wilt abatement for
1993 with the suggestion that the initial funding be used to provide an aerial inventory of the extent of the
disease.
1993 BUDGET UPDATE
Director Vraa introduced this item explaining that staff typically updates the Commission on the status
of the budget. Ken noted that there was a shift of funds from contractual to salary to allow for the change in
status of employees who were previously treated as contractual employees. Ken added that there is a need to
cut approximately $20,000 out of the temporary/seasonal budget as well.
DEPARTMENT HAPPENINGS
Superintendent of Recreation Peterson outlined several items including the numbers of skatersthat have
been using the rinks, all Tiny Tots classes are filled for the winter session, church youth groups are requesting
ice times for their organized use and Eagan Hockey Association ice time has increased due to increased
numbers of registrations. Dorothy reiterated the need to balance open skating with the requests for organized
use.
Parks Superintendent VonDeLinde reviewed the ongoing process of updating the Landscape Ordinance
which will be brought before the Commission in February, the mulching of trees and clearing of the native
prairie in Thomas Lake Park, lake aeration systems were put in place at Schwanz and Fish Lake and base
flooding which began in early December was curtailed due to warm weather but was able to resume to allow
for good skating conditions by late December.
'Dorothy Peterson concluded by inviting Commission Members to participate in the Winter Weekend
events scheduled for January 29, 30 and 31st.
With no further business to conduct, Lee Markell moved, Erin Ipsen-Borgersen seconded with all
members voting in favor to adjourn the meeting. The meeting was adjourned at 10:10 p.m.
ZI
/Sec reta ry Date
MEMORANDUM
TO: ADVISORY PARKS, RECREATION AND NATURAL RESOURCES
COMMISSION
FROM: STEPHEN SULLIVAN, PARKS PLANNER/LANDSCAPE ARCHITECT
DATE: JANUARY 28, 1993
RE: OAK CLIFF POND 2ND ADDITION
Request
An application has been received requesting the platting of 23 detached townhouses on 13
acres. The request also includes a Comprehensive Guide Plan Amendment from D-III
(Mixed Residential 6 - 12 units/acre) to D-II (Mixed Residential 0-6 units/acre).
Background
The subject parcel is located west of Slaters Road and south of Cliff Road.
The parcel is within the Winkler Jackson Planned Development. The Planned Development
Agreement provided a parkland dedication of Slaters Acres Park to fulfill the obligation for
the residential land uses within the Planned Development. The Planned Development
Agreement also provides for the development of up to 99 units on the subject parcel. A
preliminary plat was approved in 1987 for 33 units on this property. A final plat was never
submitted.
Items for Commission Action
The Commission will need to review and make recommendations regarding the following
items:
1. What is the parks dedication?
2. What is the trails dedication?
3. What is the developmental impact to the woodland resource?
Parks Dedication
As mentioned, the parks dedication has been fulfilled in accordance with the Winkler
Jackson Planned Development.
1/•
Oak Cliff Pond 2nd Addition
January 28, 1993
Page 2
Trails Dedication
The Planned Development Agreement is specific to developers responsibility to install a
bituminous trail along the east side of Slater Road from Cliff Road to Slater Acres Park.
Therefore, the parcel's location west of Slater Road is not responsible or trail construction
or a cash trails dedication.
Woodland Resource
The 13 ace site is composed of a 3 acre pond and 10 acres of mature red oak woods. The
grading limits include 6 acres preserving 4 acres of woods. This wooded area is platted as
outlot B and will be part of a homeowner's association.
The loss of 6 acres of oak woods with the development of 23 lots on this 13 acre parcel
leaves over 50% of the site unaltered. Approximately 40% of the mature oak woods will
be preserved.
The densities allowed within this parcel at 99 per the Winkler Jackson Planned
Development to 33 according to the previous preliminary plat and now 23 units as currently
proposed is providing greater benefit in the preservation of trees. The current proposal also
includes the reforestation of approximately 40 trees along the north property line.
Staff recommends that the proponent submit a tree protection plan for City review and
approval prior to final plat.
For Commission Action
The Commission may consider the following recommendations:
The proponent submit a tree protection plan for City review and approval prior to
final plat.
SS/nh
cc Ken Vraa, Director of Parks and Recreation
n1/oakdiff.apr
r
MEMO TO: ADVISORY PARKS, RECREATION, AND NATURAL RESOURCES
COMMISSION
FROM: RICH BRASCH, WATER RESOURCES COORDINATOR
DATE: JANUARY 28, 1993
SUBJECT: WATER QUALITY REQUIREMENTS AND WETLAND PROTECTION ISSUES
FOR OAK CLIFF POND 2ND ADDITION.
PROPOSAL
This preliminary plat is for a 23 lot townhouse development on
approximately 13 acres within the Winkler Jackson Planned
development located west of Slater Road and south of Cliff Road in
the NW 1/4 of Section 31 in southwest Eagan (Figure 1). The
Comprehensive Guide Plan Amendment will also be necessary to lower
the intensity of allowable land use on the parcel from D-III (mixed
residential 6-12 units/acre) to D-II (mixed residential, 0-6 units
per acre).
FOR COMMISSION REVIEW
The Commission will need to review and make a recommendation
regarding whether the development should be subject to a ponding
requirement and/or cash dedication requirement to meet water
quality -standards as set by the City in it's water quality
management plan.,. In addition, there are wetlands issues associated
with the plat.
WATER QUALITY ANALYSIS
The proposed development is located in the furthest upstream reach
of drainage basin A. Runoff from the proposed development will
discharge to Pond AP-10, a Type 3 shallow fresh marsh classified as
a nutrient basin in the City water quality management plan. Pond
AP-19 lies somewhat further downstream in Slater's Acres Park, and
is designated as a Class 3 scenic recreation water body in the
water quality management plan. To prevent any further
deterioration in Pond AP-19 as well as to offer some protection to
the large wetland complex associated with Pond AP-10, on-site
ponding is recommended to meet treatment requirements for this
development.
Only about 7.4 acres of the 13 acre site will be graded for the
development, with much of the ungraded area lying adjacent to the
pond. However, about 2.6 acres of the development is planned to
drain directly to the pond from the entrance street (Figure 2).
Ponding to treat this runoff is not feasible because of the steep
hillside between the road and the pond, and modification of the
grades to change drainage of this area toward the proposed
treatment pond, while not impossible, would be very expensive and
disruptive to adjacent downslope woodlands. To compensate, an
1~
over-sized detention basin should be constructed to provide a
higher level of treatment for runoff from the remaining 4.8 acres
of the area to be developed. To meet these standards, the
detention basin must have a volume below normal water level of at
least .7 acre-feet and a minimum average depth of at least 3 feet,
and the design should be subject to staff approval. In adition, a
sump should be constructed just off the flared end of the storm
sewer pipe entering Pond AP-10 from the north to help reduce the
amount of large-grained material entering the wetland.
WETLANDS ISSUES
As requested by City staff, a field survey was conducted on January
7, 1993 by the developer's consultant to identify and delineate
wetlands on the development parcel. The only wetland located and
delineated on the site was the one associated with Pond AP-10.
This wetland is characterized as a Type 3 shallow fresh marsh
approximately 3.4 acres in area and located on the eastern half of
the property (Figure 2). The developer does not plan to fill,
burn, or drain the wetland.
STAFF RECOMMENDATION
Staff recommends that the proposed development be required to
provide a pond on site to treat stormwater runoff from the southern
portion of the site. The treatment pond design should be subject
to staff approval and have a wet pond volume of at least .7 acre-
feet and a minimum average depth of 3 feet. A sump should be
excavated just off the flared end of the storm sewer entering Pond
AP-10 from the north. Finally, filling or draining of Pond AP-10
or the adjacent wetland is prohibited.
Rich Brasch
Water Resources Coordinator
2 /i
CL. VI m
n Figure ] ® T _.z
LIAM
S e~h _/r TH AP-4Vv'. PARK
=o EN _w CL. IV CL` FA A-x
CL. V
A 8y U ClttqF
juNIOR
b of C - s t lJ
HIGH o1
2- ic
J s I w Ir
RX k , .y << (/MCP 2
11 -1 v it,
21. Rlrlic if ' C1=ARkll tf
1CR
AP-21.I A-aa is' '2' I8 - r`
L. V AP-
VARI CL. III
L V,
v ` A 9 CLI _ % 4 'P E. -r
Ap-
CC-CLR Ili
o ~I r- 4 AP- VI .CL~VLL1 - -
\-pp =MME CL.-II/
v 7V -25;'
CLV
LLJ Location of Development ACPL-. 5V0
II _ i - ~CLL ,I I j
ep 5
.7104
:AK
i L I Il D17 ' C L. V I ^i L
z tom. ' J I RAMNfAL--f e~-~ i - T
4" 1V
RI DK~,
121 -.c
A Pik
CL.
TER!
too%
CL. VI
P-I8
CL.V
A~I 4 AP-17' LP-
^/I EAGAN DAKOT(COUNTY P.r~
C_A-rr
- SA -xx 8LP- 1.1
CL. IV
1~ L 4
23 w A-zz
1
. j~~:rl!!•,~~i ~IIIJI;~i a~ III;~.; - - -
T nra I- ...rn 'I ~ry . I I' I...e• I.n. r. L:s.^:~ -
wsc+ I. , I .rw•• . ~M LF
a glut
11 •"1'•
00 Il C/ 11 .w 1 . /l i ~Z~iY~~j •-~-'T~~ -:ss.:J.L.
I I"~~ 1 ' _ 1 i'`. Stormwater Stormsewer inlet ~e~un.....-
(Northern)
SEEM-
ul1 / ` 1 . ~1'~ ewuws.rw«wrwrl~t aaww..l...w
PLANT UST
! COMMON NAME OENUE/SPECIgj P997'I; IV
tidy C4r, IIT/ A: C. I 1 ' ' I s•••/ NA. aw a+alx p-, 11. r
~ ~ ( ( 1 as coot •+s wlt nl.. .
I~1
ail
~ \ / / ~ • 1 tIU_tTM10 Y~oDs 1 ' 1. - ul Wra 11LL Ia+C r. rl. rwlr• r 1 1
/ - .nr w.I MI/IIW Mw.111. IMI::M ?1 A f
I~ L.._ i , Y, s l l l! I I
•~wln.~w I i I ( .1
• OAK CUFF POND 2ND ADDITION LANDSCAPE PLAN -
MEMORANDUM
TO: ADVISORY PARKS, RECREATION AND . NATURAL RESOURCES
COMMISSION
FROM: STEPHEN SULLIVAN, LANDSCAPE ARCHITECT/PARKS PLANNER
DATE: DECEMBER 21, 1992
RE: PONDVIEW TOWNHOMES
Request
An application has been made requesting the rezoning of 11.3 acres from Agricultural to R-3
Townhomes and the preliminary plat of 34 units.
Items for Commission Review
The Commission will need to review and make recommendations regarding.the following items:
1. What is the Parks Dedication obligation?
2. What is the Trails Dedication obligation?
3. What is impact to the woodland resource?
4. What is the Recreation Open Space obligation?
Item #1 Parks Dedication
The parcel is within Parks Service Area # 21. This P.S.A. is currently not served with a public
park. The Commission has reviewed the parkland need within this P.S.A. with the platting of
Deerwood Middle School. The Commission recommendation was to determine the parkland need
for the P.S.A. at the time land use was designated for an 80 acre parcel located at Diffley and I-
35E. It currently is not determined whether this parcel will be a commercial or residential land
use. The updating of the Comprehensive Parks Systems Plan may also provide the opportunity
to evaluate P.S.A. #21.
The developer has built similar subdivisions in other communities. Based on these developments
it appears that the typical resident is an empty-nester and/or single adults. The developer's
experience. is that there are few children with his other subdivisions.
Staff recommends a cash Parks Dedication.
Item #2 Trails Dedication
The proposal is subject to a cash Trails Dedication.
Item #3 Woodland Resource
The vegetative character of the site is primarily small, secondary growth covering a majority of
the parcel. Most of this plant material is insignificant and will be lost with development. Larger
/7`
boxelders and elms line the western pond edge. These trees are proposed to be preserved with
development. Staff feels that these tree masses are important in that they provide a naturalized
setting for the pond. Tree removal adjacent to the pond edge, similar to that by Pilot Knob Road,
would have a negative visual consequence. Staff recommends that the developer provide a tre
protection plan indicating temporary fencing adjacent to these shoreland trees during construction.
A 48" cottonwood exists within the northwest corner of the site. The cottonwood is proposed to
be removed. The cottonwood's location and elevation along with the proposed density and
limited site configuration make it extremely difficult to preserve this tree. A storm sewer is
proposed along the east property line adjacent to the Ronald Bruestle property. This storm sewer
alignment is close to a tree mass adjacent to the pond. This existing tree mass provides an
effective buffer between these differing land uses. Staff recommends that the development plan
preserves these trees.
Item #4 Recreation Open Space
Chapter 11 of the City Code provides for Recreation Open Space within all multiple family
developments. The code reads as follows:
12. Each multiple dwelling complex shall have a minimum recreation area equal to two
hundred (200) square feet for each dwelling unit containing two (2) or less
bedrooms and one hundred (100) additional square feel for each dwelling unit
containing more than two (2) bedrooms. Said recreation area shall be a minimum
of one hundred (100) feet from any ponding area.
Source: Ordinance No. 52
Effective Date: 4-25-75
The 34 units of multiple at 200 square feet equates to 6,800 square feet. Adequate greenspa
exists adjacent to the unit central to the site and with minor grading could accommodate the
recreation open space requirement.
For Commission Action
The Commission may consider the following recommendations:
- The proposal be subject to a cash Parks Dedication.
- The proposal be subject to a cash Trails Dedication.
- The developer revise the grades adjacent to the central unit providing a minimum
of 6800 square feet of flat recreation open space.
- The developer provide staff with a tree protection plan prior to final plat which
locates fencing to protect significant trees during the construction time frame.
- The site plan preserve the trees adjacent to the single family home providing the
area a buffer between the adjacent differing land uses.
The site plan preserve the trees adjacent to the pond.
cc. Ken Vraa, Director of Parks and Recreation
COMMISSIONPONDVIEW. DED
MEMO TO: ADVISORY PARKS, RECREATION AND
NATURAL RESOURCES COMMISSION
FROM: RICH BRASCH, WATER RESOURCES COORDINATOR
DATE: JANUARY 27, 1993
SUBJECT: WATER QUALITY REQUIREMENTS AND WETLAND PROTECTION ISSUES
FOR PONDVIEW TOWNHOMES
- GOOD VALUE HOMES INCORPORATED
PROPOSAL
This preliminary plat is for a 27 unit townhome complex on
approximately 12.5 acres located along the north side of Englert
Road, west of Pilot Knob Road, in the southeast 1/4 of Section 16
(Figure 1). The land is currently zoned for agricultural uses and
will be rezoned to an R-3 (Townhouse) zoning classification.
FOR COMMISSION REVIEW
The Commission will need to review and make a recommendation
regarding whether the development should be subject to a ponding
requirement and/or a cash dedication requirement to meet water
quality standards as set by the city in it's water quality
management plan. In addition, there are wetland impact issues and
a proposed wetland replacement plan associated with this plat
application.
WATER QUALITY ANALYSIS
This proposed development is located in drainage basin J. Runoff
from the development will discharge to pond JP-3, a 10-acre wetland
classified as a sediment basin in the city's water quality
management plan (Figure 2). Pond JP-3 is directly connected with
Fish Lake, one of the city's top water quality management
priorities.
Water quality modeling indicates that with no treatment of
stormwater, post-development runoff from the 6.1 acres of developed
area would increase phosphorus loading to Fish Lake by only about
.3% and would not affect nutrient concentrations in a way which is
detectable. A hypothetical pond of approximately .23 acres in
surface area and .56 acre feet in volume would be required to treat
the runoff before discharge to pond JP-3.
While it is physically possible to create an on-site treatment
pond, creation of such a pond would be very disruptive to the
proposed site plan and possibly incompatible with economically
feasible development of the site. More importantly, the city will
IR'
soon begin a diagnostic treatment feasibility study on Fish Lake to
determine the cause of, and develop a plan to rectify, poor water
quality conditions in the lake. Pond JP-3 provides a reasonably
good buffer between Fish Lake and the proposed development and
staff's judgement is that improvements in other portions of the
watershed will be much more cost effective in reducing phosphorus
loading to Fish Lake. Thus, a cash water quality dedication in
lieu of ponding might be most appropriate. Particulate inputs to
the wetland associated with pond JP-3 could be minimized by
requiring construction of sumps off each of the two storm water
inlets in the proposed development site. A cash dedication could
be revised downward to account for a credit associated with
construction of these sumps.
WETLAND IMPACTS ISSUES
Over half the site (6.4 acres) is occupied by a pond/wetland
.complex. Pond JP-3 is classified as a protected water by the
Minnesota DNR and activities which would alter the cross sectional
area below the ordinary high water mark are regulated by the
Minnesota Department of Natural Resources. No such activities are
proposed as part of this development.
Adjacent to the DNR protected wetland is a fringe wetland. This
fringe wetland was delineated throughout the development site on
November 11, 1992 by a consultant hired by the developer. The
developer has proposed to fill approximately 230 square feet of
this fringe wetland to allow placement of two townhouse units in
the northern portion of the site between the noise reduction berm
along Highway 35E on the west side of the site and the wetland on
the east side of the site. In response to a request from the city
for documentation that filling of the wetland was necessary and
unavoidable, the developers consultant submitted the following in
a letter dated December 8, 1992.
"The design of the site was laid out to avoid impacts to the DNR wetland and
the seasonally flooded wetlands. A 50 foot setback has been maintained from
the DNR wetland and the seasonably flooded wetlands have been avoided except
for a small area where the separation between the wetland and the noise
attenuation berm is reduced to 80 feet. Failure to fill this area would
result in the loss of building units 1, 2, 3, and 4, and a toss of
approximately $400,000 in revenue."
Replacement for the filled wetland area would be on-site and in-
kind. The mitigation area would be located as shown on Figure 2
and would be excavated to the elevation of the existing wetland
fringe to create a substrate and gradient that would allow sedges
in the fringe to expand. Replacement would be supervised by a
qualified contractor.
STAFF RECOMMENDATION
Staff recommends that the proposed development be required to
provide a cash dedication in lieu of on-site ponding to meet water
quality treatment requirements. Excavated sumps of at least 80
cubic yards should be created at the end of each storm water pipe
entering the wetland from the development. The cash dedication
will be reduced commensurately to provide a credit for the area and
volume of these sumps.
Because of the small area of fill proposed and the steps that the
developer has taken to minimize filling, the proposed wetland
replacement plan should be approved as proposed.
Rich Brasch
Water Resources Coordinator
RB/nab
•
6b:aprnrc.361
fir.
COA
Figure ] ? PA C 14
I11
a.~CL. I l ~ 0 i
T CHMA i i Lc'-4 -
a o• C-C GHLAMCC
21° K a `mil DOOM
C
tL. V1 O-3 P-5
ACHWAN
\ Y~ FOX PAR
K zs
UNISYS
-d RIDGE
ae ~~4 P-I
cam CL .
a D MINES A fl / V6
Q _ 1 rTM7 art.. C -h
( Y r
N0. I
~REY
L
VIl.,CL. V1 wA ERi j It Vol ilS,i;bG n(_
14. I
'XN
/2ND 4 \C~ 0 PLAN AnrE /Tm`~?'1'~" - 1-~CM(1J
l r2NT ,CwN g.~?f
? C P - 12^ ~ ' :E ytRE
CL. V11 PyBl:q'-r ~Z1.. V na ( 1w %r 70 SE
3L:)r). gtr ROYA6 OAK
Ak. C P - 6 3g' =171H
a IS CL. V1 n
'75 27
Location of Develonrtent
24
J-d
CL. V
bbb
EyCf1
1,P-38 1EPI CL. VIt JP-5
2LAC;crlaR~tc. 27' j L
PARK rl -2 i
Ml B
30 C
BP-29.1 Y2
. /I f
w I r --B P-2
~ ~ B - o 'ter
r-~ y -S j 48" b -b - $F:
VII 'J Per- j i JONN . YR*X BP g Z g j ,
r XMAW CL. ETd1M0Cc
LIMI C LANCAL , " C 5 y J SC C
PARK N
r• 8P-25 BP-4 PIM
~CL~`t1 a/ C L. V II ta,l CL.VII BP "I BE
I ; ? 4 C H. {
a2 C. S. A. H CL. V bl - a La..
ASTER
P-r
_Igpr nP-rSl~.~/ ! IL I ! 8 I ,urw
j Jlj ;llt!!~ t~ Proposed Site for Replacement Dow
it j i, - Wetland
111.. /1 ~ ~ ' i
j7j 1 ~J ~II A \~4•"" r Itf~w~••f~Nr. Mr
I l tj' r t ~tj~! t:~- •j - "111„ I ` 7
J ..a:. 'l; ~ tl I
I- rj1 jiffjd AoKd JP-3
''•i tjI jt ~j r. \ rmr~nrw .•'I
1'11 rj lljj?~
w [r M tNlwt [r
!'(l/I jt j ! ` - _ ww.r wrrMC.w. y
71 llj~•j j~ t' ~ w[wua b
N t 7 t ~r 0 1
•.i ~ Y j ! ! i-' "w N I• j • • wrt..,.r wo. rt{
,I 1 1~ f •t - y _ J t4• ! ( raw{ 7~ 0
v LEGEND
7 _ - ~ t u.w+ tonow
} ( - E t ! r'" Haws mw.....
Un awe
U / n.ww1 twf nP'. N
wtww Y _t. M•w N • t. tl 4
s?c.-
IN
• "~sj` TYPICAL DRIVEWAY SECTION
• - ~ w.o• r+ om.w, t•.I w r1 oA.wt. - A 4'
arM • MOM N..rt wt.
92843
STREET SECTION DIVERSION DITCH SILT FENCE DETAIL
,w[t. 3 of
MEMORANDUM
TO: ADVISORY PARKS, RECREATION AND NATURAL RESOURCES
COMMISSION
FROM: STEPHEN SULLIVAN, PARKS PLANNER/LANDSCAPE ARCHITECT
DATE: JANUARY 28, 1993
RE: DEERHAWK ADDITION
Re guest
An application has been submitted requesting the preliminary plat of 6 single family lots on
2.42 acres.
Background
The site is located south of Deerwood Drive and east of Blackhawk Drive.
The Commission has previously reviewed this proposal and recommended a cash parks and
trails dedication. The current proposal adds one more lot within the parcel. The additional
lot does not provide any significant influence to the Commission's previous
recommendations. The proposal is being returned to the Commission primarily for Water
Quality review.
For Commission Action
The Commission may consider the following recommendations:
The proposal be subject to a cash parks dedication.
The proposal be subject to a cash trials dedication.
SS/nh
cc Ken Vraa, Director of Parks and Recreation
nl/deerhawk.apr
MEMO TO: ADVISORY PARKS, RECREATION, AND NATURAL RESOURCES
COMMISSION
FROM: RICH BRASCH, WATER RESOURCES COORDINATOR
DATE: JANUARY 28, 1993
SUBJECT: REVIEW OF WETLAND PROTECTION ISSUES FOR DEERHAWK
ADDITION-DAKOTA STATE BANK
PROPOSAL
This preliminary plat application is for a single family
residential development consisting of six lots on 2.4 acres located
along the southside of Deerwood Drive in the southeast 1/4 of
Section 20 (Figure 1). The Commission previously reviewed this
development for compliance with water quality and wetland
protection requirements at its September 1992 meeting. At that
time, the developer was proposing to.subdivide the parcel into five
lots instead of six, as is now proposed.
FOR COMMISSION REVIEW
The Commission is being requested to review its previous
recommendations on both water quality and wetlands protection
issues.
WATER QUALITY ISSUES REVIEW
At the September 1992 meeting, the Commission recommended that the
developer be required to provide a cash dedication to satisfy water
quality requirements for the parcel. This recommendation appears
applicable to the current development proposal as well, except that
the cash amount should be adjusted upward slightly to account for
the increased impervious area associated with the addition of an
extra lot.
WETLANDS ISSUES REVIEW
The Commission also authorized filling of up to 1500 feet of a
wetland on the site, provided the filled wetland area was replaced
on the site at a ratio of at least 1:1 to meet the requirements of
the state Wetlands Conservation Act. This authorization was
recommended to avoid destruction of a number of mature oak trees
toward the rear of Lot 3, which would have occurred if the house
pad had been moved to completely avoid wetlands impacts. It was
also predicated on the existence of adequate space in the northwest
corner of the site to expand the existing wetland to the west to
meet replacement requirements.
1
It has recently come to light that the developer did not delineate
the limits of the wetland on the site, as had been recommended by
City staff. A wetland area had.been designated on the most recent
site plan available to staff at the time of review (Figure 2), but
it has been learned that this was a hypothetical, rather than an
actual wetland limit. Field reconnaissance of the site by City
staff indicate that the wetland on the site may be significantly
larger than the one designated on the original site plan. Thus,
there is some question whether there will be adequate space on the
site to replace the filled wetland area without impacting the
current site plan. Since the current owner of the site intends to
sell the parcel to a developer after plat approval is obtained from
the City, it seems reasonable that the spatial feasibility of
meeting the wetland replacement requirements on the site should be
assured so that the City, the present owner, and the future
developer are all aware of what is needed to comply with the state
Wetlands Conservation Act.
STAFF RECOMMENDATIONS
Staff recommends that the Commission consider the following:
1. Require that the City be supplied with an accurate,
documented delineation of all on-site wetlands and that
a wetland replacement plan be prepared and approved by
the City prior to preliminary plat approval
2. Attach to the preliminary plat.a condition that neither
a field delineation of wetland(s) on site or a
replacement plan has been completed for the parcel, and
that authorization to fill up to 1, 500 square feet of the
wetland is contingent on submission and approval of the
delineation findings and a replacement plan after
preliminary plat but prior to approval of the final plat.
The developer should be required to provide a cash dedication in
lieu of on-site ponding to meet water quality requirements.
Rich Brasch
Water Resources Coordinator
2 ~7•
-tea D LL L BP - 1.2
ST AN ME Figure 1 CL. VII
SILL
BP-
AOQ
ga r>+ ! BLACKmAk.
! PARK
DE
IL
C
AVPII N
Rt K SP-29.1
A - %Nv I I
P -5 P
iAr AV
Location of Proposed Developr.
AP-4~~. iJ
N CL 1V =--y c7.2 8P-2
~'y'_w r CL.V11- -Zf CL.V11
P-35 acx ,i B-S 8P-
34
_4 CL. V ~~,K A-x I' ~2 3 a ti CL.V
a P75.3
CL. V11
v('
a;'i BP-23 yI1
i t ~ ~ ~\.i ,l 'ter . t~~ il• ~ U
...~'~CL VII/
8
P-~-~
CL.
SIX
C ~11RI!I I - =Szk -
OUR, 'SL T
.30 j5" 12' le
AP-26 ,C
CL. III
RAH N C 4 V I~ t i T
ArP-~k9: CLI LAXE CENTRE.
CEC&R pIU A P` YI - 1,
MME L )
/ C%X_. .11 SAFAR
LTV LE EAT
AP-50 _ M.
1Rx CL. VII L I F law E,
41h J
81 J -OAK ON L. V i /
COU fa ,-A P-14
SAT I CL.VI
?H1•* R AA C KE R
R1 b 1 12
i QP I L.S
Ficrure 2
a i
.8 its
r:- •i}:•i;i= :'i Ford dt3 ~ 11
ist
C pi
i j;~ 'iil i :c; s~;':€:t~ r•:}- ~ x)11
i. s i t s - i 3 j s 3!3 [•fi. •
i i 3ies i iri i v
a Z
. ' \ ~ ~ -..'at •a ~,.o .jam , i ~ 6 =
vp~
^4 i 1
s
t't a 1u E'« 1 •
i.' _ `tom! - Y / .f ^I' ' is
or- I
~ i L~f at ~ •..t' o ~ ~.1•f i'''ce
Ift
.',,•ti.~, - _ -=r'-r 1.%`''~ -w.-- X11 ) `L.. '!_~1=/,
"CEI
1 Tv
E lIIIlYM7PYIG.L jl i j:,.'~+-L~~ J _
MEMO TO: EAGAN ADVISORY PARKS, RECREATION,
AND NATURAL RESOURCES COMMISSION
JOHN VONDELINDE, SUPERINTENDENT OF PARKS
FROM: TOM SCHUSTER, CITY FORESTER
DATE: JANUARY 25, 1993
SUBJECT: LEXINGTON SQUARE "RELEAF" GRANT PROJECT
The intent of this memo is to provide an update on the status of the Minnesota Releaf
Grant which was recently awarded to the City of Eagan by the Minnesota Department of
Natural Resources. This $4,000 grant is intended to fund an innovative project of tree
planting for energy conservation on a neighborhood-level basis. For the purposes of this
project, the Lexington Square subdivision was selected over other neighborhoods for reasons
previously cited to the Commission. Under the provisions of the grant each homeowner in
Lexington Square will be asked to plant two tree seedlings, along with Tubex tree shelters
in strategic locations in their yard to promote energy conservation. The seedlings and tree
shelters will be provided free of charge to the homeowners.
This program is unique insofar as it uses small planting stock (but in high quantity)
combined with Tubex tree shelters which are believed to significantly accelerate tree growth.
The long-term goals of this project are to learn more about:
1) The environmental impact of tree planting for energy conservation on an entire
neighborhood, and
2) The feasibility of using seedlings and tree shelters in large scale projects in an urban
setting.
To deliver this program to the community, staff will be sending a preliminary mailing to
each home in the Lexington Square neighborhood on February 1st of this year. Getting
homeowners to think in terms of tree planting for energy conservation will be the main
purpose of the letter. A description of the benefits of tree planting for energy conservation,
overview of the Minnesota Releaf Program, and how projects are selected will also be
discussed in the letter.
A second mailing will reach homeowners by March 15th. This letter will clearly spell out
the steps for individual participation in the Lexington Square project. A thorough
description of available species, informational material about Tubex tree shelters, and a
request form/thumbnail sketch sheet will be included. Residents will fill out the sketch
sheet showing the proposed planting site and species in relation to the placement of the
house on the lot. This request form/site plan will be returned to the Forestry Division by
April 1st.
1
Each request for trees will be reviewed on-site by the City Forester. A third letter will be
sent (when planting stock becomes available) providing residents with planting and tree care
instruction. This final letter will also inform residents when and where their trees and
Tubex shelters can be picked up. The City will also provide a source of woodchips to
residents for use around their new trees. Northview Park is a likely location for the
distribution.
But, this project does not end when the trees are planted. Forestry staff will continue to
monitor planting success and growth rates by a combination of on-site inspections and
surveys over the next several years. Planting success and tree growth rate are not difficult
to measure. Long-term energy conservation, however, will be more difficult to quantify, but
even the occasional visitor to this neighborhood will appreciate the aesthetic contributions
made by these trees.
If you have any questions concerning this project please contact John VonDeLinde or me
at 681-4300.
Tom Schuster
City Forester
TS/nab
7b:aprnrc.025
2 .
MEMORANDUM
TO: ADVISORY PARKS, RECREATION AND NATURAL RESOURCES
COMMISSION
FROM: KEN VRAA, DIRECTOR OF PARKS AND RECREATION
DATE: FEBRUARY 1, 1993
RE: GOLF DRIVING RANGE UPDATE
Background
At the January Advisory Commission meeting, the Commission gave tentative approval for
the use of the Lexington/Diffley site for use as a golf driving range. That tentative approval
was conditioned on the fact that use of the site would not be beyond 1996. Additional
concern of the Advisory Commission was for the cost involved for providing the electrical
service to the golf driving range and the water utility connection. Staff has now reviewed
those costs.
The Eagan City Council will be reviewing the request at a workshop session on February
2, 1993, preceding the normal Council meeting. Because of the agenda workload of the
Council, staff accelerated this item onto the Council's agenda for February 2, to get a
preliminary reading and further work direction for staff and the Advisory Commission.
Utility Cost
Operations supervisor, Rich Pelletier, reviewed cost estimates for providing water and
electrical service. This information is based on research done with the city's water utility
division and electrical service being provided to the U.S. West Cellular facility now being
constructed at Lexington/Diffley site. Without a specific site plan these cost estimates may
change but are based on reasonable estimates for providing the service based on concept
plans. Cost for providing water service includes connecting to an existing water main,
installing gate valve, tee, water meter and service bends. If the work were to include
installation of 200 feet of 4" ductile iron pipe from the existing hydrant to the proposed
facility location, the costs would be approximately $6,300.00. This cost could be reduced by
approximately $3,800.00 by eliminating the installation of 200' of ductile iron pipe and
substituting that for plastic pipe with the requirement that this be installed by the
proponents of this proposal.
Verbal estimate has been supplied by an electrical contractor of $1,500.00 for 100 amp
service located at the proposed driving range. This amount could be less depending upon
where Dakota Electric will allow electrical supply to be tapped into. Greater review needs
to be done on this project subsequent to the determination of the electrical service to the
U.S. West Cellular building project.
City Council Comments
As mentioned in the background information, the City Council will be reviewing the issue
of the Lexington/Diffley site for a golf driving range at their pre-Council workshop session
on Tuesday evening. Staff will be in attendance at that meeting to provide you with
background on the City Council's discussion regarding this proposal. Council may request
additional information from staff and Commission regarding this proposal.
For Commission Review
The Advisory Commission should review the cost associated with this project and provide
additional direction to staff and/or respond to City Council directives regarding this request.
KV/dj
COMMISSIONAPRCOLRMEM
MEMORANDUM
TO: ADVISORY PARKS, RECREATION AND NATURAL RESOURCES
COMMISSION
FROM: KEN VRAA, DIRECTOR OF PARKS AND RECREATION
DATE: FEBRUARY 1, 1993
RE: STRUCTURING THE ADVISORY PARKS, RECREATION AND NATURAL
RESOURCES COMMISSION
The Advisory Parks and Recreation Commission members had been notified by the City
Administrator of the City Council's discussion at their regular meeting of January 19, 1993,
regarding the appointments and consideration to be given to the restructuring of the
Advisory Commission. Attached to this memorandum is correspondence providing
additional background about this restructuring.
Alternatives
It appears that there are several alternatives for the Advisory Commission to discuss and
consider in making their comments and findings known to the City Council. These
alternatives are as follows:
A. Leave the Commission as it currently exists.
B. Expand the Commission to a greater member.
C. Re-structure the Commission duties and provide for two separate and distinct
City Commissions; one for Parks and Recreation and another for Natural
Resources.
D. Restructure the Advisory Commission to include a sub-committee of non-
Advisory Parks and Recreation Commission members with the sole purpose
of reviewing environmental issues. The Advisory Commission would remain
intact as a seven member commission (or could be expanded to include
additional members) with members of the A.P.R.N.R. serving on the sub-
committee.
It would be appropriate for the Advisory Commission to review each of these alternatives
and discuss the pros and cons as to the structuring of the Commission in each of the various
alternatives. The Commission may consider other alternatives.
In reviewing the alternatives, the Advisory Commission should also review how the
structuring would be proposed in terms of work flow, interrelationships with other City
Commissions, staff and public agencies. For example, if the Advisory Commission
recommends, and the City Council adopts two separate commissions, what would be the
work flow for a developer proposing a preliminary plat? Would that plat go first to the
Advisory Planning Commission, then the Natural Resource Commission and then the Parks
Commission or other work flow?
For Commission Action
To present their findings and recommendations to the City Council in regards to the
restructuring of the Advisory Parks, Recreation and Natural Resource Commission.
KV/dj
COMMISSIONCOMSPL/T.MEM
~(o .
city of ecicjcin
January 21, 1993 MO Mayor EGAN
PATRICIA AWADA
SHAWN HUNTER
SANDRA A. MASIN
THEODORE WACHTER
Council Members
Re: Advisory Parks, Recreation i Natural Resources THOMAS HEDGES
Commission Appointments City Admininstrator
EUGENE VAN OVERBEKE
Dear Ms. Ipsen-Borgersen: City Clerk
In official action taken by the Eagan City Council at their last
regular meeting held on Tuesday, January 19, 1993, formal appointments
to the Advisory Parks, Recreation & Natural Resources Commission were
delayed until the February 16, 1993, City Council meeting.
Appointments are being delayed to allow consideration to be given to a
restructuring of the Commission as it presently exists. Approximately
two years ago, the City Council added natural resources to the Advisory
Parks & Recreation Commission. Following the interviews held on
January 12, the City Council discussed various alternatives that would
allow the City to utilize the excellent talent interviewed that
evening. The City Council has identified a number of environmental
issues and would like to involve volunteers from the community to help
achieve the many goals.
The management team will address alternatives for the restructuring of
the APRNRC, discuss the alternatives with the Commission at their next
regular meeting on February 4, and present the findings for Council
consideration at the February 16 meeting. Appointments will be made at
that same meeting following a determination by the council as to how
the Commission should be structured in the future.
On behalf of Mayor Egan and the City Council, I want to thank you for
your interview and interest in serving the community and recognize any
inconvenience in attending the January 19 meeting only to learn that
appointments would not be made that evening.
Sincerely S
Thomas L. Hedges
City Administrator
cc: Ken Vraa, Director of Parks & Recreation
TLH/vmd
IUNICIPAL CENTER THE LONE OAK TREE MAINTENANCE FACILITY
3830 PILOT KNOB ROAD THE SYMBOL OF STRENGTH AND GROWTH IN OUR COMMUNITY 3501 COACHMAN POINT
EAGAN. MINNESOTA 55122-1897 EAGAN. MINNESOTA 55122
PHONE: (612) 681-4600 PHONE: (612) 681-4300
FAX: (612) 681-4612 Equal Opportunity/Affirmative Action Employer FAX: (612) 681.4360
TDD: (612) 454.8535 TDD: (612) 454-8535
j '1 .
MEMORANDUM
TO: TOM HEDGES, CITY ADMINISTRATOR
FROM: KEN VRAA, DIRECTOR OF PARKS AND RECREATION
DATE: JANUARY 14, 1993
RE: ADVISORY PARKS, RECREATION AND NATURAL RESOURCES
COMMISSION
Issue
Your recent memo asked for an immediate response regarding the Council discussion about
the restructuring of the Advisory Parks, Recreation and Natural Resources Commission into
two separate commissions or into distinct sub-committees.
Discussion and Background
You will recall that throughout much of the 1980's, the Advisory Commission was a ten
member body. After the election of Vic Ellison as mayor, the Council reduced the
Commission to seven members plus one alternate. In 1990, the Advisory Commission, after
several meetings to review the issue, recommended that the Commission become known as
the Parks, Recreation and Natural Resources Commission. Attached is background material
and a mission statement that relates to that name change prepared by George Kubik,
Chairperson of the Advisory Commission.
The history of the Advisory Commission has been one of deep involvement in environmental
issues. In 1982, when the Advisory Commission undertook the Parks Systems Study, the
Commission was a strong advocate for the section on Ponds and Lakes in the Parks Plan.
Their concerns were for identification of those significant lakes that were natural resources
and would be enhancements to the City and the Park System. They recognized the
interrelationship of having quality natural resources which would lend themselves to
development of recreational opportunities. Shortly after that, the Advisory Commission took
to the City Council a recommendation to create a compost site. At that time, the issue of
landfill abatement and waste reduction was not a major issue as it is today. The
Commission literally was the forerunner of the compost program in Eagan. In 1985, the
Commission recommended that the City adopt a landscape policy. They further went on
to recommend that the City adopt a landscape ordinance, which is in its final stages of staff
review.
With the development of the Water Quality Management Plan, it was members of the
Advisory Commission who took a lead role in its development. Finally, the Commission has
been concerned about the oak wilt problem and the development of a master street tree
planting plan. In short, the history of the Advisory Commission over the last decade has
been a deep involvement in a broad range of environmental issues. This concern is likely
to continue given the make up of the current Commission. In fact, if the City Council were
to come the conclusion that two commissions were desirable, I would not at all be surprised
if at least two, if not more, current commission members would prefer to serve on the
Natural Resource Commission.
Given that there are so many excellent candidates to serve on the Parks and Recreation
Commission and, given the large range of issues that the Advisory Commission is currently
dealing with, I would like to suggest that the Council consider expanding the Commission
back to ten members. I believe this would be beneficial for a number of reasons.
First, it would take advantage of those people who are genuinely interested in serving on
the Advisory Commission and obviously have a talent. Two, it would avoid the potential
conflicts that two Advisory Commissions might have in reviewing issues that are so
dramatically inter-related. I believe that has been one of the advantages of the Advisory
Parks, Recreation and Natural Resources Commission over the last several years. The
Commission has grown to understand and appreciate the issues having to do with
environmental preservation and protection, the need for recreation and parks opportunities;
and how these blend together: Third, it would avoid a third step for a developer having to
present development proposals to a Planning Commission, Parks and Recreation
Commission and then a Natural Resource Commission. I believe the Advisory Commission
has been able to effectively blend both their concerns for environment and for parks. Those
same results may not have occurred if projects were looked at through narrow visions of
parks and another for natural resources. The creation of the water quality plan best
represents this interrelationship. Blackhawk Park is another example. The Parks and
Recreation Commission, shared their concern for environment, and how it would impact the
park's design. That may not have happened with two separate commissions. It is clear that
it did happen with one commission whose members were adequately educated on the issues
of both park needs and environmental concerns. There are similar examples with other
park areas in which environmental concerns have played a role in the park's acquisition and
design that might have been lost had there been two separate bodies. Fourth, water quality
dedication, as part of the state statutes, is contained within Parks Dedication. In essence,
water quality and Parks Dedication are viewed as one.
Another advantage of having a larger body, rather than two separate bodies, is the effective
merging of priorities. Having two commissions establishing separate priorities which overlap
in areas such as water, ponds and lakes, and forestry might be even more difficult than it
already is. Past commissions have not been hampered by lack of innovation and good ideas;
rather, they have been hampered by insufficient resources in which to carry out many of the
ideas and programs that have been generated. Therefore, I would recommend a larger
body, (ie. ten members) which can be grouped in subcommittees for effective work.
Other Items to Consider
You will recall that when the City Council did change the membership of the Commission
from ten to seven, that the City Ordinance had to be modified before that could take effect.
Consequently, the City Council should be aware that an Ordinance amendment would have
to be processed. I would defer to City Attorney, Jim Sheldon, as to the procedure
requirement, that would need to be followed before such an ordinance amendment is
adopted.
The Commission itself may have some individual and collective thinking on how they feel
about this issue. Given the discussion that lead up to the renaming of the Advisory
Commission in 1990 it would be my expectation that the majority of the members would
prefer one commission. Nevertheless, you may wish to consider their feelings on the issue.
There may very well be members of the Advisory Commission who would like to serve on
a Natural Resource Commission if they were forced to decide between two commissions.
You had asked for some quick comments and perspectives on this issue. I have tried to
provide that to you but I feel that I may have, in my haste, n1 provided you with enough.
I would be happy to discuss this further, and to provide additional information concerning
the current make up of the Commission, how expansion could lead to appointing new
individuals and how we can meet some of the objectives inherent in developing a strong
Natural Resource/Community Awareness Educational Program.
In Summation
The City once had a ten member Commission.. The Commission has had a long history of
involvement in environment issues, and continues to speak aggressively about environmental
issues. The environment is deeply inter-related with park and recreation opportunities.
Members of the Commission may have their own feelings about separating into two different
Commissions; at least two members may be interested in serving on such a Commission if
established. An ordinance amendment would probably be required to change the structure
of the Commission.
KV/dj
D2COMMDN.MEM
ko .
MEMORANDUM
TO: EAGAN PARKS AND RECREATION DEPARTMENT
EAGAN ADVISORY PARKS AND RECREATION COMMISSIONS
FROM: GEORGE H. KUBIK, CHAIRPERSON-EAGAN ADVISORY PARKS AND
RECREATION COMMISSION
DATE: JANUARY 4, 1990
RE: DRAFT PROPOSAL FOR NATURAL RESOURCES MISSION STATEMENT
AND PROPOSAL TO AMEND CHARTER FOR EAGAN ADVISORY PARKS
AND RECREATION COMMISSION
As we move into the new decade of the 1990's, the City of Eagan and its citizens are
expressing increased interest in the natural resources which surround them. A strong
message is being sent! As representatives of the citizens of Eagan, we need to direct
increased attention to addressing our natural resources in a strategic and anticipatory
manner. , The need for increased emphasis on natural resource coordination, cooperation
and strategic planning is, of vital importance to both present and future generations.
In this spirit, it is hereby proposed that the mission of the Eagan Advisory Parks and
Recreation Commission be amended to include responsibility for the preservation and
enhancement of the natural resources of the City of Eagan. The following is an initial draft
intended to describe one possible framework for this activity.
PROPOSED AMENDMENT: NATURAL RESOURCES MISSION STATEMENT
EAGAN ADVISORY PARKS AND RECREATION COMMISSION
(DRAFT AMENDMENT FOR DISCUSSION)
PROPOSED ACTIONS:
(1) To change the name of the Eagan Advisory Parks and Recreation
Commission
From: Eagan Advisory Parks and Recreation Commission
To: Eagan Advisory Parks, Recreation and Natural Resources
Commission
(2) To amend the statement of mission of the Eagan Advisory Parks and
Recreation Commission to include responsibility for the preservation and
enhancement of the natural resources of the City of Eagan.
The mission statement could be worded in such a manner as to incorporate
the challenge that accompanies the responsibility for the future of natural
resources in the City of Eagan. Suggested wording could state:
The mission of the Eagan Advisory Parks, Recreation and Natural
Resources Commission..... is to assist in serving present and future
generations of the City of Eagan by preserving and enhancing
management of our rich heritage of fish, wildlife, waters, wetlands,
forests, prairies, minerals, public lands and other natural resources,
in order to preserve and enhance our environment and quality of life.
The attendant natural resource responsibilities would include the following:
A. Review development proposals and city activities for their impact(s) on
the natural resources of the City of Eagan. Make recommendations
to the City Council concerning impacts or concerns in involving natural
resources of Eagan.
B. Coordinate natural resource issues, plans and functions with other City
departments, commissions and appointed groups. Coordinate with
other public and private entities having regulatory authority or formal
involvement with the natural resources of the City of Eagan.
C. Develop and maintain a strategic master plan(s) for the natural
resources of the City of Eagan. Said plan(s) will address:
(1) The current status and historical baselines of Eagan natural
resources;
(2) Assessment of current natural resource systems
(including strength/weakness/opportunity/threat
analysis); and,
(3) Strategic assessment of natural resource goals, objectives and
opportunities for the City of Eagan.
D. Provide community direction and focus for natural resource issues,
plans and policies impacting the City of Eagan. Develop citizen
involvement in natural resource programs and activities. Coordinate
Eagan natural resource programs and activities with other natural
resource programs, interest groups and private parties.
F. Provide leadership in maintaining and enhancing the natural resources
of the City of Eagan.
(3) To establish and maintain a Natural Resources Standing Committee, and such
other committees as may be necessary, to conduct the natural resource duties
and responsibilities set forth herein.
(Note: It is imperative that any proposed changes to the mission statement of
the Eagan Advisory Parks and Recreation Commission be presented
to the City Council and thoroughly reviewed and coordinated with
other City Departments, commissions and appointed groups. Among
the issues that should be addressed are:
A. The additional staff resources of the city that will be required
to support and conduct this activity.
B. Funding sources and funding levels for master planning and
other natural resource related activities (e.g., for city staff or
consultants).
C. Changes that must be' made in City laws, regulations, policies,
or statements to accommodate this proposed mission
amendment.)
I have not had the opportunity to discuss these recommendations and considerations with
the City staff or other Commission members. Thus, the document maybe a little rough
around the edges. Please review this document carefully and I encourage you to offer any
suggestions for improvement or change.
SCOPE OF SERVICES
EAGAN PARKS & RECREATION SYSTEM PLAN
Revised 1122193
The "Scope of Services" follows an intended order by which it is expected the final document
may appear. The work effort may or may not follow this order.
I. Prepare an introduction to the Parks & Recreation System Plan. Identify the historic
perspectives and influences which affect the community and the parks system.
11. Prepare with Commission/Counci I a Mission Statementfor the Eagan Parks, Recreation
and Natural Resources system.
A. Value statements may be listed in support of the Mission Statement.
B. A Statement of Philosophy and Beliefs shall be included.
C Goals within the current Comprehensive Park System Plan shall be evaluated
and revised as necessary.
D. Fundamental goals and objectives of the Parks, Recreation and Natural
Resources system shall be developed.
III. Prepare a section which explains the process and methodology used in the
preparation of the study.
IV. With City staff assistance, inventory and examine the existing Park and Recreation
system.
A. Inventory and examine existing parks and recreation facilities, developed parks
and undeveloped park areas.
B. Inventory and examine existing recreation programs and public services.
C. Inventory and examine existing Park Service District Areas for adequacy and
appropriateness; update where appropriate.
D. Inventory and examine existing neighborhood Park Service Areas for adequacy
and appropriateness; update neighborhood Park Service Areas where
appropriate.
E. Inventory and examine private and other public agency facilities which
provide parks and recreation opportunities for residents.
V. Facilitate and gain public input regarding Parks and Recreation System needs and
deficiencies.
A. Conduct structured, interactive "listening sessions" with the community to
receive suggestions concerning the Park Systems needs and recreation needs.
B. Receive suggestions and record comments of the "community at large".
C. Receive suggestions and record comments of identified users of the Park
System. (ie. Eagan Athletic Association, Community Education, Advisory
Commission, past Commission members, other special interest groups)
D. Collect community information concerning programs, natural resources, trails
and special use needs. From the public input process prepare a "user-based"
needs assessment for an effective level of program service and facilities.
VI. Review and develop standards for the Parks, Recreation and Natural Resources
System. Review in the context of the entire system, Park Service Districts and Park
Service Areas.
A. Review existing park standards for relevance.
B. Propose revisions to standards where deemed appropriate.
C. Portray the qualitative and quantitative park system needs and deficiencies and
projected deficiencies at five and ten years; define qualitative components.
Define for System and Park Service Districts.
D. Develop recreation program standards.
E. Review inter-agency relationships which could benefit park facilties, program
delivery and levels of service.
F. Prepare a statement detailing the role, relationships, suitability and the impact
of other private and public facilities. Examine their ability to meet current and
future recreation needs of the community.
VII Acquisition and development. Review and examine priorities for the Park, Recreation
and Natural Resources System
A. Prepare a statement detailing how existing city facilities/parkland can be
adapted to meet current and future needs.
B. Determine acquisition priorities for the parks and open space system.
1. Identify specific parcels for acquisition.
2. Develop preliminary acquisition priorities.
C. Examine development priorities for the Park System.
1. Establish criteria and a methodology for determining development
priorities.
2. Identify priorities for developed and undeveloped sites which resolve
system needs, Planning District needs and Park Service Area needs.
4
3. Prepare a preliminary list of development priorities with general cost
esti mates.
4. Integrate within the development plan a 10 year plan for facilities
replacement and renewal.
D. Prepare a plan section dealing with "special use" facilities.
1. Define a list of special use facilities which are not dealt with in the
general planning context of a neighborhood park or through the park
system in general.
2. Evaluate' the need, benefits and constraints in providing this special
facility within the Parks, Recreation and Natural Resources System.
3. Identify how/where the special use needs will be met. (ie. local parks,
county special use, etc.)
VIII. Update the Trails System Plan.
A. Prepare a map showing existing trails.
B. Gather input from interest groups, affected individuals, agencies and general
public on trail use and needs.
C. Establish criteria and methodology for prioritization of trailway development.
D. Identify trail networking opportunities with adjoining communities and
agencies.
E. Prepare a "Preliminary Trails System Plan".
F. Evaluate the feasibility for trails extension and connections; identify potential
constraints in these proposed trail links.
G. Conduct a public meeting to gain input on the Preliminary Trails System Plan.
H. Prepare final Trails System Plan.
IX. Prepare recommendations for effective utilization of natural resources.
A. Identify specific and unique natural resources for preservation, recreation or
facility development.
B. Review the Water Quality Management Plan to identify water bodies offering
potential for recreation use and programming.
C. Prioritize development and acquisition of natural resource base
facilities/program for enhancement.
D. Review current management policies and practices for maintaining and
k1
enhancing these natural resources.
E. Identify potential for natural resources based interpretive and recreation
opportunities.
X. Develop a vision of the future for Parks, Recreation and Natural Resources within the
City of Eagan.
A. Prepare a written statement which is consistent with the mission statement,
goals and policies of the city.
B. Utilizing exhibits, concept plans and charts further define a vision of Eagan
Parks for the next five to ten years and at full development.
XI. Develop policies for Parks, Recreation and Natural Resources System regarding:
• Park System
'Acquisition
• Development
•Maintenance
• Natural Resources
• Recreation
'Marketing/Public Relations
XII. Review funding to meet Parks, Recreation and Natural Resources acquisition,
development, replacement and programmatic needs.
A. Review funding needs for next five to ten years.
B. Identify potential sources of revenue to meet these needs.
C. Examine potential entrepeneural strategies and opportunities.
XIII. Prepare a master set of reproducable quality materials to be duplicated, collated and
assembled into a plan document.
XIV. Associated expectations.
• Review with the City Council and Commission the entrepeneural programs
which provide positive cash flow with which to sustain on-going operations;
what opportunities exists; (ie. golf driving range, pitch and putt course, rental
operations, concessions) what is the city's position relative to these types of
operations?
• Specifically review neighborhood Park Service Sections 18, 21, 10E, 15, and
22 for neighborhood park needs.
• Review policy statements contained within the existing plan for relevancy in
the 1990's and the new plan.
• Review the distribution of major facilities by park planning district; assist with
determining the relevancy of the facilities in providing 'local' recreational
opportunities; which could be reduced/expanded upon.
• Graphs, tables and illustrations can be used in the main body of the
document. The appendix will contain support information at the end of the
document rather than in the main body.
• Challenge the City on their consensus views of developing "mini parks' to
meet "localized" needs for social and physical development.
• Review with the City the existing Maintenance Management Plan; specifically,
maintenance goals, policies and objectives.
• Review development potential of several existing park parcels. Develop
written statements as to how these parcels should be utilized in the future to
meet system needs (ie. Rahn Park, Patrick Eagan Park, LeMay Lake, Windcrest
Addition).
• Discuss ways to retain non-City recreation facilities/parks, both private and
public, within the community and region. (ie. private golf courses, the Caponi
Art Park, Fort Snelling, School District facilities)
• Project athletic field needs and space available, how do we meet these needs?
At discussion should be the issue of lights vs. field development.
• Review infrastructure replacement cost in the context of new development
and additional acquisition.
• Integrate priorities: park development priorities; park acquisition priorities;
special use priorities.
• Review regulation and compliance with ADA in all facilities and programs.
KV/dj
D2PSPSCOPE.OLN
MEMO TO: ADVISORY PARKS, RECREATION, AND NATURAL RESOURCES COMMISSION
FROM: JOHN K. VONDELINDE, SUPERINTENDENT OF PARKS
DATE: JANUARY 28, 1993
SUBJECT: PROPOSED LANDSCAPE AND TURF ESTABLISHMENT ORDINANCES, AND TREE
PRESERVATION POLICY
The purpose of this memorandum, and the documents which follow, is to request the input and review of the
Commission on several new policies being presented by staff which relate to tree preservation and landscaping
in new developments.
BACKGROUND
In June, 1990, the Advisory Parks and Recreation Commission recommended, and the City Council adopted, a
series of changes to the City's "post-development" landscape and tree maintenance ordinances. Specifically, these
included an updating of the City's shade tree disease ordinances, the adoption of a new ordinance governing turf
establishment and erosion control on newly developed lots, and a new program for allowing the planting of trees
within public road right-of-way areas under a permit system administered by the Forestry Division.
Recognizing an interest of the City to refine and expand the "post-development" ordinances, as well as establish
more clearly articulated policies for landscaping and tree preservation in new developments, a "Landscape
Committee" was formed in November to develop and review new landscaping and tree preservation policies.
That committee consists of representatives from the Parks/Forestry, Community Development and Public
Works/Engineering Departments, as well as the Assistant City Attorney and a planning consultant. As a result
of the Committee's work effort, three new draft environmental policies have been developed. They are:
• New landscaping regulations under Chapter 11 (Land Use Regulations) of the City Code,
• New regulations governing lawn establishment and maintenance under Chapter 10 (Public
Protection) of the City Code, and
• A new tree preservation and replacement policy.
A brief description of each of these environmental policies is described in the sections which follow.
LANDSCAPE ORDINANCE
A copy of the proposed landscape ordinance is provided on pages j through of the packet. This
ordinance represents a final draft of the policy which has been adopted by the Advisory Planning Commission
and is being recommended for ratification by the City Council. This policy will apply to all new developments
with the exception of single-family developments. It is the intention of the Landscape Committee to develop
specific recommendations pertaining to single family developments following the adoption of the zoning controls.
As the Commission may know, the current ordinance does not place any specific quantitative standards on
developers for landscaping within new developments. The code merely requires that a landscape plan be
approved by the City, which indicates the size, location, quantity and species of all plant materials. While the
use of general design parameters and City staff review has worked well in most instances, it is the consensus of
the Landscape Committee that a more comprehensive landscape policy will be more effe ;,.ive towards ensuring
long-term quality landscaping and equity among all new developments.
Among the items addressed within the new landscape ordinance are the following-
1 ~5I.
• Findings, purpose, and scope of the landscape ordinance,
• Landscape plan requirements,
• Performance guarantee requirements,
• Definitions of terms,
• Minimum landscape requirements,
• Standards for parking lot islands, slopes and berms,
• Maintenance and erosion control requirements,
• Turf establishment and tree preservation requirements (references to other policy statements),
• Landscaping requirements along freeway corridors,
• Irrigation system specifications,
• Requirements for screens and buffers, and
• Control of tree planting on public property/right-of-ways.
As this list would indicate, the new ordinance develops a broader and more specific set of standards as it pertains
to landscaping within multi-family, commercial, and industrial land use developments.
Because the zoning controls are under the purview of the City's Planning Commission, the APRNC need not
take any specific action on this item. The Planning Commission has already approved the proposed Landscape
Ordinance at their regular meeting on January 26th. The ordinance will be advanced to the City Council on
February 2nd and is expected to be adopted at that time.
LAWN ESTABLISHMENT AND MAINTENANCE
As a matter of history, the Parks and Recreation Department, through its Maintenance Division has overseen
the City's Nuisance Weed enforcement and Turfgrass Establishment Ordinance since the early 1970's. In June,
1990, the City Council adopted changes to the Turfgrass Ordinance which placed new requirements on private
property owners, mandating the establishment of suitable turfgrass on all front, side, and maintained rear lot
portions of any private property within one year of grading or final occupancy, whichever is sooner, and that all
turf be maintained at a height of not more than six inches. The code also requires control of all nuisance and
noxious weeds.
While those elements of the code have been implemented successfully, there is a growing interest among
property owners to develop woodland or meadow restorations on their property. The primary interest in making
these landscape modifications is to enhance the environmental and aesthetic quality of the property while
reducing long-term maintenance needs.
Unfortunately, the current. ordinance is silent on the issue of meadow or woodland restoration. At times, this
has created difficult situations for staff in interpreting what is "appropriate" ground cover treatments between
differring land uses and varying perceptions of adjacent property owners. In response, the Landscape Committee
has prepared a new series of draft provisions that would essentially replace the existing language in Section 10.21
Subd. 2 and 4 of the City Code. These new provisions would more clearly define the standards governing turf
establishment and maintenance, and would allow for the restoration of meadow or woodland areas under certain
prescribed parameters and procedures. An ordinance adopted earlier this year by the City of Minnetonka was
used as a model for this revision, but it also incorporates existing policies, guidelines, and social/environmental
conditions which are germane to the City of Eagan. A copy of the draft Turf Establishment and Maintenance
2 5\
Ordinance can be found on pages through for the Commission's review. As currently proposed,
the new ordinance would contain the following pro ons:
• A preamble of findings, purpose, and scope
• Definition of terms
• Application of standards (Note: This ordinance will apply to both developed property and property
which has received development approval from the City.)
• Establishment standards and timelines
• Exceptions for areas restored to woodland or meadow conditions
• Specific parameters and requirements for woodland or meadow restorations,
• A definition of areas for which turf establishment does not apply (e.g., natural areas), and
• A declaration of public nuisances.
In summary, the proposed Turfgrass Ordinance is considered to be a less strict but more reasonable approach
to restoring and maintaining the natural landscape of the community. This new policy will offer the public an
opportunity to select less intensively maintained, and more environmentally acceptable, methods of landscape
treatment.
Since the enforcement of this ordinance is currently under the jurisdiction of the Parks, Recreation, and Natural
Resources Department, it would be appropriate for the Commission to approve, modify, or deny the proposed
final draft of the Turfgrass Establishment and Maintenance Ordinance.
TREE PRESERVATION AND REPLACEMENT POLICY
The City of Eagan does not currently have a specific ordinance, policy, or guideline which addresses standards
for the preservation and/or replacement of trees within new developments or building sites. To date, most tree
preservation initiatives have been worked out between developers, builders, and staff through a negotiation
process. As the Commission is aware, tree preservation measures have been approved by the APNRC in the
review of preliminary plats and development proposals. However, these conditions and requirements are not
founded in any specific ordinance or public policy doctrine of the City.
Lacking this, the Landscape Committee has placed high priority on the creation of a Tree Preservation and
Replacement Policy which is applicable to all new developments and new building construction. The proposed
policy takes into consideration model ordinances from a number of communities, including Apple Valley,
Plymouth, Eden Prairie, and Lakeville. Given the length and detail of this document, and its application to both
subdivisions and already planted property, the Committee has agreed that it be referenced in the framework of
a policy guideline and not in ordinance form per se. This will avoid duplication within the ordinance and allow
greater flexibility to staff in the interpretation and future modification of the policy to meet the changing needs
of the community. A copy of the proposed tree preservation policy can be found on pages through 1
of the packet.
In its basic form, the policy requires developers and builders to preserve any significant trees and woodland
masses within the "land alteration zone" of the site. This area is defined to include any area in which movement
of earth, alteration of topography, soil compaction, or other change in the natural character of the land occurs
as a result of site preparation and grading, construction or any other activity. The policy, as currently written,
does not require the preservation or replacement of trees which are occupied by the building pad. The
Landscape Committee is currently discussing mitigation requirements, if a-', that would apply to the area of a
site occupied by parking lots, driveways and other impervious surfaces. A ~ J% replacement ratio may be found
to be the most practicable and reasonable standard for those areas.
3 53.
The following elements are contained within the proposed Tree Preservation Policy.
• A statement of intent, purpose, and application,
• Definition of terms,
• Written tree preservation plan requirements,
• Identification of measures to protect significant trees,
• Procedures for staking and review of tree protection measures,
• Financial guarantee requirements,
• Requirements for removal of all nuisance or diseased trees prior to construction, and
• Procedures for final inspection and release of securities.
Lastly, the Tree Preservation Policy includes a tree replacement schedule. The policy would require the
developer to replace every significant tree lost during construction with two deciduous and/or coniferous trees
meeting the minimum site requirements of the City, and to guarantee any replacement tree for a period of one
year following its planting.
The Tree Preservation Policy has been discussed in concept at two meetings of the Landscape Committee, but
will require additional review before a final draft is prepared. At this point, it appears that the City Forester
will be charged with the review, coordination, and monitoring of the Tree Preservation Plans. In light of this,
and in accordance with the Commission's previous review and approval of Tree Preservation Plans (for recent
plats), it would be appropriate for the Commission to comment on the intent, purpose, and conditions which are
outlined in the proposed policy. Following the Commission's input and subsequent review by the Landscape
Committee, it is the intention of staff to bring this item before the APRNC, at their March meeting, for approval
of a "final" draft.
FOR COMMISSION ACTION
1. To approve, modify, or deny the proposed Turf Establishment and Maintenance Ordinance.
2. To review and comment on the proposed Tree Preservation and Replacement Policy.
ohn K VonDeLinde
Superintendent of Parks
JKV/sb
cc: Ken Vraa, Director of Parks and Recreation
Tom Colbert, Director of Public Works
John Hohenstein, Assistant to the City Administrator
31wp:advis.027
3
4
ORDINANCE NO. 2ND SERIES
AN ORDINANCE OF THE CITY OF EAGAN, MINNESOTA, AMENDING EAGAN CITY
CODE CHAPTER ELEVEN ENTITLED "LANDUSE REGULATIONS (ZONING)" BY
AMENDING SECTION 11.10, SUBD. 15, REGARDING REGULATION OF THE
PLACEMENT AND MAINTENANCE OF TREES AND LANDSCAPING; AND BY ADOPTING
BY REFERENCE EAGAN CITY CODE CHAPTER 1 AND SECTION 11.99.
The City Council of the City of Eagan does ordain:
Section 1. Eagan City Code Chapter 11 is hereby amended by changing
Section 11.10, subd. 15, to read as follows:
Subd. 15. Landscaping.
A. An approved landscape plan shall be required for
all new commercial, industrial and multiple residential
developments. Said landscape plan shall include the size,
location, quantity and species of all plant materials.
B. The Council may require a landscape bond to insure
that all, plant materials are planted and maintained for at
least one (1) year.
A. Findings, Purpose and Scope.
1. The City Council finds:
a. Trees produce oxygen a necessary element for
human survival;
b. Trees appreciably reduce the ever-increasing
environmentally dangerous carbon dioxide
content of the air and play a vital role in
purifying the air breathed;
C. Trees transpire considerable amounts of water
each day. thereby purifying the air;
d. Trees participate in the natural process of
neutralizing waste water passing through the
ground from the surface to ground water
tables and lower aquifers;
e. Trees, through their root systems, stabilize
the ground water tables and play an important
and effective part in soil conservation.
erosion control and flood control;
5b
Trees are an invaluable physical, aesthetic,
and psychological counterpoint to the urban
setting, making urban life more comfortable
by providing shade and cooling the air and
land, reducing noise levels and glare, and
breaking the monotony of human developments
on the land, particularly parking areas; and
g_ Trees affect the desirability of land and its
property values.
2. Purpose.
Based on the foregoing findings, the Council declares
that it is desirable and essential to the health,
safety, and welfare of the City to protect certain
existing trees and plant materials, to require new and
additional plant materials and trees, to prohibit the
planting of certain species and to require the
maintenance of plant materials and trees as set forth
in this Section.
3. Scope.
The provisions of this Section shall apply only to
privately-owned property, excluding any property within
public rights-of-way which are regulated in Chapter 7
of the City Code.
B. Landscape Plan.
1. Plan Required A landscape plan shall be approved
by the City and implemented by the property owner:
a. For any new development or new building
construction in any commercial; multiple
residential (R-2 R-3, and R-4); industrial
institutional zoning district; and planned
development districts except as otherwise
provided by specific planned development
agreements;
b. For any existing commercial industrial or
institutional building to be expanded by ten
(10) percent or greater square feet, where an
approved landscape plan is not on file with
the City; and
.-2- 66.
No building permit for any construction described in
Subparagraphs (a) and (b) of this Paragraph shall be
issued unless a landscape plan required hereunder is
approved by the City.
The plan as required under Subparagraph (b) of this
Paragraph may be implemented over a period of three (3)
Years and a performance guarantee shall not be
required However, if the plan is not fully implemented
within three (3) years, the City may complete the
landscaping, and if necessary, attempt to recover its
cost from the benefitted property for the improvement.
2. Landscape Plan Required.
In every case where landscaping is required by
provision of the City Code or by an approval granted by
the City, for a building or structure to be constructed
on property, the applicant for the building permit
shall submit a landscape plan prepared in accordance
with the provision of this Section. The Landscape Plan
shall include the following information:
a. General: Name and address of developer,
owner, and contact person: name and address
of, Minnesota registered landscape architect,
or Minnesota certified nurseryperson; date of
plan preparation; date and description of all
revisions; name of project or development.
b. Site Map: One (1) scale drawing of the site
based upon a survey of property lines with
indication of scale and north point: name and
alignment of proposed and existing adjacent
on-site streets; location of all proposed and
existing utility easements and right-of-ways:
location of existing and proposed buildings;
topographic contours using main sea level
datum at two-foot contour intervals: existing
and proposed location of parking areas: water
bodies; proposed sidewalks and trails.
c. Two (2) scale drawings of proposed
landscaping for the site based upon a survey
of property lines with indication of scale
and North point; existing and proposed
topographic contours using mean sea level
datum at two-foot intervals; details of
proposed planting beds and foundation
-3- 51.
plantings; delineation of both sodded and
seeded area: location and identification of
proposed landscape or man-made materials used
to provide screening from adiacent and
neighboring properties; location and
identification of trees; details of fences,
tie walls, planting boxes, retaining walls,
berms and other landscape improvements and
details in legible scale; location of
landscape islands and planter beds with
identification of plant materials used.
d. Planting Schedule: A table containing the
common names and botanical names, size of
plant materials, root specifications,
quantities and special planting
instructions.
3. Performance Guarantee.
a. A Performance Guarantee shall be required to
insure completion and maintenance of all
landscaping in accordance with the approved
landscape Plan required hereunder.
b. The Performance Guarantee shall be approved
in form as to security by the C
c. The Performance Guarantee shall be in the
amount of five thousand ($5,000.00) dollars
sublect to modification by the City--Council..
d. The Performance Guarantee shall cover one
full calendar year subsequent to the
completion of the landscaping as provided in
the approved Landscape Plan and shall be
released only upon inspection and written
notice of conformance by the City,
e. For any landscaping or screening that is
unacceptable, the applicant shall replace the
material to the satisfaction of the City
before the Guarantee is release. Where this
is not done, the City, at its sole
discretion, may use the proceeds of the
Performance Guarantee to accomplish
performance. When the Performance Guarantee
is insufficient to cover the cost and
complete the landscaping.
-4- s~•
C. Landscape Specifications.
1. Definitions. For purpose of this Section, the
following definitions shall apply:
a. Caliper: The length of a straight line
measured through the trunk of a tree six (6)
inches above ground level.
b. Coniferous/Evergreen Tree: A woody plant
which, at maturity, is at least thirty (30)
feet or more in height, having foliage on the
outermost portion of the branches year-round.
c. Deciduous Overstory Shade Tree: A woody plant
which, at maturity, is thirty (30) feet or
more in height having foilage on the
outermost portion of the branches year-round.
d. Deciduous Understory Ornamental Tree: A woody
plant which, at maturity, is less than thirty
(30) feet or more in height with a single
trunk, unbranched for several feet above the
ground having a defined crown which loses
leaves annually.
e. Plant Material Average Size (Coniferous): The
total height of all coniferous trees six (6)
feet or over, divided by the total number of
such trees.
f. Plant Materials Average Size (Shade or
Ornamental): The total diameter of all
deciduous overstory trees two and one-half
(235) or more in diameter, divided by the
total number of trees.
2. All Landscape Plans and landscaping under this
Section shall follow and be in compliance and the
following requirements together with all other City
Code regulations.
-5- 5/ .
a. Minimum size at time of planting:
1) Deciduous overstory plantings shall be
a minimum of two and one-half (2~,)
caliper inches.
LL Deciduous understory trees shall be a
minimum of one and one-half (1-3;)
caliper inches.
(3) Coniferous trees shall be a minimum of
six (6) feet in height.
.(4) Hedge materials shall be a minimum of
three (3) feet in height.
b. Minimum Required Plant Material: The
Landscape Plan and landscaping thereunder
shall provide for plant material equal to
three (3%) percent of the value of the
building(s), not including the cost of land
and site improvements.
Credit may be given for existing plant
materials, which will be preserved.
The City may approve a landscape plan, which
does not meet this standard, where the intent
and purpose of this ordinance is otherwise
met.
c. Planting Islands: Planting islands shall be
required where necessary to visually break up
expanses of hard surface parking areas. to
provide safe and efficient traffic movement,
and to define rows of parking. Planting
islands shall occupy at least five (5)
percent of the parking area. Planting islands
shall not be required in parking areas with
less than fifty (50) parking spaces. Planting
shall be in accordance with Chapter 11 of the
City Code.
d. Method of Installation: All deciduous and
coniferous trees shall be planted in
accordance with American Nurseryman's
standards.
-6-
e. Lawn Maintenance and Establishment: Lawn
maintenance and establishment shall be
required in accordance with Chapter 10 of the
City Code.
f. Slopes and Berms: Slopes and berms steeper
than three (3) feet horizontal to one (1)
foot vertical shall not be permitted unless
specifically approved by the City. In areas
where steeper slopes are allowed, there shall
be special landscape treatment such as
special seed mixtures terracing or retaining
walls.
g_ Landscape Maintenance: The property owner
shall be responsible for the maintenance of
all landscaped areas and the installation of
healthy replacement plants for any plants
that die or are removed due to disease.
Maintenance shall include removal of litter,
dead plant materials, unhealthy or diseased
trees, and necessary pruning Natural water
courses within a buffer shall be maintained
as free flowing and free of debris.
h. Erosion Control: All areas of any site shall
be restored and maintained in accordance with
provisions of the Eagan Erosion Control
Manual, and other requirements of the City
Code.
i. Placement of Plant Materials: No plant
materials shall be permitted, within any
utility easement or street right-of-way
except as otherwise permitted under Chapter 7
of the City Code.
i Diseased and Nuisance Trees: Prior to
grading all diseased and nuisance trees, on
the sub'i ect property, shall be identified by
the City Forester in accordance with Chapter
10 of the City Code. All diseased and
nuisance trees so identified shall be removed
from the property at the time of grading and
prior to the commencement of building
construction.
-7- ~pf.
k. Tree Preservation: Tree preservation shall be
required in accordance with the_ Tree
Preservation Guidelines as adopted by the
Eagan City Council.
D. Landscaping Along Freeway Corridors.
1. Purpose. The provisions in this Paragraph are
adopted in order to preserve protect and enhance
existing landscapes and landscaping which were provided
by the Minnesota Department of Transportation and is
located along Interstate Highways 35E and 494 and T.H.
77 (Cedar Avenue).
2. Visual Penetration Areas. The requirements herein
shall apply to those areas along the freeway system in
the City where the visual penetration of the motorist
extends beyond the right-of-way boundary as identified
in the Eagan Comprehensive Plan.
3. Existing Wooded Lots. Existing wooded areas
designated in the Eagan Comprehensive Guide Plan shall
be preserved for a minimum of fifty (50) feet adiacent
and parallel to the freeway right-of-way. Beyond fifty
(50) feet, existing wooded areas shall be preserved
except that a maximum of forty (40%) percent of the
wooded area may be developed with an impervious surface
provided all other applicable ordinances of the City
pertaining to impervious surface, preservation of
trees vegetation and slopes are met.
4. Screening visual Penetration Areas. Adjacent to
the freeway right-of-way as identified in the City
Comprehensive Guide Plan, a planting screen of a
mixture of overstorV and understory coniferous plant
material shall be planted which shall provide a visual
screen at time of maturity.
This planting shall be provided within the minimum
twenty-five (25) foot setback area required ad-lacent to
freeway right-of-way.
Irrigation Systems.
1. System Required.
a. All Landscape Plans and implementation
thereof required by this Section shall include an
underground irrigation system as follows:
-8-
p Z
R-1 Districts: Not required.
R-2 District: Required.
R-3 District: Required.
R-4 District: Required.
Commercial Districts: Required.
Industrial and R D Districts: Required.
Public Facilities: Required.
Agricultural: Not required.
Public Parks: Not required.
Planned Development: Refer to above districts
and related uses.
b. Exception. If the property area to be
landscaped is very large or reserved for future
expansion or the system would not be in keeping
with the character of the area as determined by
the City, an underground irrigation system is not
required.
2. System Specification. All irrigation systems shall
be a fully automatic programmable system. capable
of alternate date watering. Each system shall be
ri capable of achieving one inch of precipitation per
.;week under an alternate day watering regime. The
system shall provide head to head coverage with
uniform levels of total precipitation throughout
all irrigated areas, and shall provide full-and
equal coverage onto public rights-of-way to the
back of curb. Systems which extend beyond private
property onto public rights-of-way shall be
subiect to approval by the City under Chapter 7 of
the City Code The system shall meet Minnesota
Department of Health standards and shall provide
backflow preventors All systems shall have a
designated billing address.
F. Screens'and Buffers.
1. Definition and Purpose. Screens and buffers are
designated units of yard or open area where distance,
planting, berming and fencing help minimize adverse
impacts of public nuisances, such as• noise; glare;
activity; or dust; which are oftentimes associated with
parking storage, signs or buildings.
-9- (p3.
2. Screens and Buffers Requirements.
a. All parking loading service utility, and
outdoor storage areas shall be screened from
all public streets and adiacent differing
land use by a combination of any of the
following: earth mounds, walls, fences,
shrubs, deciduous overstorv, understorv or
coniferous trees or hedge materials.
The height and depth of the screening shall
be consistent with the height and size of the
area to be screened. When natural materials,
such as trees or hedges are used to meet the
screening requirements of this Paragraph,
density and species of planting shall be such
as to achieve seventy-five (75%) percent
opacity year round at maturity.
b. Buffers All lot boundary lines shall be
bordered by a buffer which shall not extend
into or be located within any portion of a
street right-of-way. Where a required
drainage, utility or other easement is
partially or wholly within a required buffer,
the developer shall design and implement an
alternative buffer to eliminate or minimize
plantings within the required easement. Such
design may necessitate choosing a buffer with
more land area and fewer re uired plantings.
C. Exception to Requirements. Buffer yard
requirements may be waived or modified by the
City where the intent is otherwise satisfied
by significant change in elevation, an
existing screen, significant distance or
similar circumstances.
3. Completion Deadline. All-plant-materials required
within a specified buffer yard shall be planted to
completion within six (6) months from date of issuance
of a building permit unless otherwise approved by the
City due to the time of the year or construction for a
large project In no case shall the period exceed six
6 months from issuance of the certificate of
occupancy.
-10- ~tf,
4. Responsibility for Buffer. The property owner of
the heavier use district shall be responsible for the
establishment of a buffer. An adiacent owner of the
lighter use shall be required to provide plant material
and other normal landscape features along the common
lot line which will aid in the creation of the buffer.
`G. Trees on Public Property.
Trees located within the public right-of-way
(boulevard area) or public easement shall be planted
and maintained in accordance with the provisions of
Chapter 7 of the City Code.
H. Prohibited Tree Species.
It shall be unlawful to introduce any of the following
prohibited species to any lot or land parcel where such
trees are not naturally occurring or to plant upon
public land or right-of-way:
Gingko (female only)
Box Elder
Non-disease resistant Elm Species
Non-hybrid Cottonwood species
Section 2. Eagan City Code Chapter 1 entitled "General Provisions and
Definitions Applicable to the Entire City Code Including 'Penalty for
Violation"' and Section 11.99, entitled "Violation a Misdemeanor" are
hereby adopted in their entirety by reference as though repeated
verbatim.
Section 3. Effective Date. This ordinance shall take effect upon its
adoption and publication according to law.
ATTEST: CITY OF EAGAN
City Council
By: E. J. VanOverbeke By: Thomas A. Egan
Its: Clerk Its: Mayor
Date Ordinance Adopted:
Date Ordinance Published in the Legal Newspaper:
Date of Advisory Planning Commission Hearing:
-11- 5 .
Section 1. City Code Section 10.21 Subdivisions 2 and 4 are repealed and a new
Section 10.21 Subdivision 2 is added to the City Code to read as follows:
Special Provisions - Lawn Establishment and Maintenance
1 Preamble. The City Council finds that there are a variety of landscapes in the City
which add diversity and a richness to the query of life. Certain areas in the City have been
allowed to return to a natural condition following development. These have been accepted
by the vast majori of City residents as appropriate and as part of the unique quality of life
in the community. There are community a cpectations. however. that once an area has been
disturbed. landscaped. or otherwise maintained. that the area will continue to be maintained
in a consistent manner. When vegetation in that area is not consistently maintained, it
becomes aesthetically unpleasing and violates community standards. Proper which appears
neglected may decrease the value of adjacent properties. In addition, if vegetation is not
properly maintained. there may be the following adverse impacts on public health, safety.
and welfare:
a. Undesirable vegetation such as common buckthorn. quackgrass. and other weeds
may invade and threaten to supplant other more desirable vegetation.
Vegetation which causes allergic reactions, such as ragweed. may develop, and
Tall vegetation may impair visibility when entering or exiting public roads.
driveways or trails.
The City Council finds that it is in the public interest to allow property owners to choose
the We of landscaping on their properties and to make changes in that vegetation. The
Council finds that the establishment of prairie. meadow. and woodland plant communities
is an acceptable landscape treatment in the City.
As a protection for the larger community, however this change in vegetation must be
properly established, managed and maintained and the period of the transition must be
minimized. This requires special consideration because weeds may grow during the first few
ygars of transition before the new vegetation predominates Therefore. the Council finds
that this We of vegetation is acceptable if it is properly maintained to shorten the transition
period and if notice is given of the intended result.
The City Council enacts this ordinance to balance the public interest in a variety of
vegetation with the public need to ensure proper maintenance of that vegetation. The
Council finds that establishing a height and area limitation for certain vegetation is in the
best interest of the public health, safety. and welfare and constitutes a reasonable
maintenance standard.
2 Definitions. For purposes of this section, the following words shall have the meanings
specified below.
1
(P 6
"Meadow" is an area of grasses and flowering broad-leaf plants which are native
to. or adapted to. the State of Minnesota which are commonly found in meadow and
prairie plant communities. except weeds.
"Woodland" is an area of coniferous or deciduous trees or shrubs. grasses. broad-
leaf plants, and other vegetation which are native to. or adapted to. the State of
Minnesota which are commonly found in woodland communities, except weeds.
.c. Turfgrasses" are commercially available cultured turfgrass varieties which are
commonly used in regularly cut lawn areas including bluegrass. fescue and W& grass
blends.
"Turfgrass" is an area of land which is occupied by a minimum of 90 percent
turferasses.
g "Regularly cut" means mowing or otherwise cutting the vegetation so that it does
not exceed six inches in height.
f. "Noxious weeds" are those plants designated as such by the State of Minnesota
pursuant to Minnesota Statutes Section 18,171. Subd. 5.
g, "Weeds" include all noxious weeds, buffalobur, burdock: common cocklebur.
crabgrass dandelions. jimsonweed. guackgrass. common and giant ragweed. field
sandbur. velvetleaf. and wild sunflower Weeds also include anything that is
horticulturally out of place. For example a tree seedling is a weed in a vegetable
garden A proper owner may establish that a plant or plants are not horticulturally
out of place by providing a written landscape plan for the area in question, complete
with a listing and location of plant species The plants specifically listed above may
not be included within the landscape plan Vegetation which does not comply with
this plan are weeds.
3, Application of Standards: The establishment and maintenance standard in sections
4 and 5. below, apply to property which has been developed with a building as defined in
the Building Code including vacant property combined with developed proper for tax
purposes. and property which has received development approval s) from the City:
4. Establishment Standard:
All disturbed or maintained areas of a site not occupied by buildings. parking,
storage. landscape beds, other physi^ cal improvements. or areas defined in Section 5.b.
shall be established in maintainable turfgrass which is suitable to the existing
conditions of the site including soils, slopes. and shade considerations. Except as
otherwise permitted by the City. in accordance with an approved landscape plan. all
turfgrass shall be established through sodding. or seeding and mulching and shall be
completed within twelve months of the issuance of a building permit or eight months
2
!01.
of the issuance of the Certificate of Occupy, whichever is sooner. All disturbed
areas of a site within three feet of all impervious surfaces shall be established through
sodding. All areas of the site shall comply with the provisions of the Eagan Erosion
Control Manual. The property owner shall be responsible for supplemental watering
of all areas established with turfgrass to ensure sufficient establishment and root
development. In cases where turfgrass or other ground cover establishment is
required for the purposes of controlling erosion, the City may, at its discretion.
establish a shorter period of time for compliance with this requirement.
Exception. Up to 50 percent of all disturbed or maintained areas requiring
turf ass may be restored to a meadow or woodland condition as defined herein.
providing the following conditions are met:
L The prior vegetation is eliminated and the meadow or woodland
vegetation is established through transplanting. seeding or other means of
propagation.
2. The following prohibited tree species are not used in woodland
restorations:
Gingko (female only)
Box Elder
Non-disease resistant elm species
Non-hybrid cottonwood species
Where a meadow or woodland restoration abuts turfgrass areas on an
adjoining prop. a minimum of three feet of turfgrass is established and
maintained along the edge of the proper in order to provide a transition zone
between the two types of plant communities.
4 Appropriate steps are taken to control soil erosion during the transition
period to meadow or woodland All areas of the site shall comply with the
provisions of the Eagan Erosion Control Manual.
The provisions of this exception may be waived or modified by the Ci
where the intent and purposes are otherwise met as determined by the City,
Maintenance Standard
All turfgrasses and weeds must not exceed a height of six inches. measured from
the base at ground level to the tip of each stalk. stem. blade. or leaf,
b, This requirement does not apply to the following:
1 a wetland or flood plain designated on the official city wetland inventory
3 (j ,
or zoning mad
2 a drainage pond or ditch which stores or conveys storm-water,
3. an area currently being used as pasture land for domestic hoofed animals.
4 an area in which the land and vegetation appears not to have been
graded. landscaped, mowed. or otherwise previously disturbed by human or
mechanical means. Determination of what constitutes this type of area will be
based on a reasonable judgment of the present appearance of the area. The
recent history of the area may be relevant to this determination.
5, steeply sloped areas where mowing or cutting of the vegetation is not
practicable for reasons of human safely or equipment operation.
an area established with meadow or woodland vegetation in accordance
with the provisions of this section.
. Declaration of Public Nuisance. The following are public nuisances subject to
abatement under this chapter:
1 noxious weeds.
vegetation which does not meet the exceptions to the maintenance
standard specified in paragraph 5.b above. and
2 vegetation which violates the sight-distance standards in Chapter 7 of the
City Code.
Section 2. Any violation of this ordinance is subject to the penalties and provisions of
Chapter of the City Code.
Section 3. This ordinance is effective 30 days after publication.
31xp:tawnord358
4
CITY OF EAGAN
TREE PRESERVATION GUIDELINES
INTENT
It is the intent of the City of Eagan to protect, preserve, and enhance the natural
environment of the community and to encourage a resourceful and prudent approach to the
development of wooded areas. In the interest of achieving these objectives the City of
Eagan has established comprehensive tree preservation guidelines relating to the:
• Protection and preservation of the environment and natural beauty of the city
• Promotion of orderly development of wooded areas to minimize tree and
habitat losses
• Evaluation of the impacts to trees and wooded areas resulting from
development
• Establishment of minimal standards for tree preservation and the mitigation
of environmental impacts resulting from tree removal
• Provision of incentives for creative land use and good site design which
preserves trees and minimizes tree removal and clearcutting during
development, and
• Enforcement of tree preservation guidelines to promote and protect the public
health, safety and welfare of the community
APPLICATION
These guidelines shall apply to all sites of new development and new building construction
in the City of Eagan.
DEFINITIONS
Construction Area
That area of a property which will be occupied by buildings, parking, driveways,
storage, or other physical features constituting an impermeable surface.
i r
The length of a straight line measured through the trunk of a tree at six (6) inches
above ground level.
Coniferous/Evergreen Tree
A woody plant which, at maturity, is at least thirty (30) feet or more in height, having
foliage on the outermost portion of the branches year-round.
Land Alteration Zone
Any area in which movement of earth, alteration in topography, soil compaction,
disruption of vegetation, change in soil chemistry, or any other change in the natural
character of the land occurs as a result of site preparation, grading, building
construction or any other construction activity.
Deciduous Tree
A woody plant which, at maturity, is thirty (30) feet or more in height, with a single
trunk, unbranched for several feet above the ground, having a defined crown, and
which looses leaves annually.
Drip Line or Root Zone
The farthest distance away from the trunk of a tree that rain or dew will fall directly
to the ground from the leaves or branches of the tree.
Diameter
The length of a straight line measured through the trunk of a tree four and one half
feet above the ground.
Forester
A person holding a Bachelor's degree in forestry from an accredited four-year college
of forestry.
Landscape Architect
A person certified and licensed in the State of Minnesota as a Professional
Landscape Architect.
Significant Tree
A healthy tree measuring a minimum of eight inches in diameter for long lived
hardwood deciduous trees or a minimum of 12 inches in diameter for softwood
deciduous trees measured at 54 inches above the ground, and a minimum of 12 feet
in height for coniferous/evergreen trees.
DEVELOPERS
The following process for preserving trees shall be required of all developers:
1. Developers will be required to do the following:
a) Prepare a Tree Preservation Plan which shall be incorporated on the grading
plan
b) Ensure the tree preservation plan is followed during site development
c) Submit a financial security for compliance with the approved tree preservation
plan in an amount and under the conditions specified by the City Council on
an annual basis
d) Comply with the City's Tree Replacement Policy
2. The Tree Preservation Plan must be certified by a forester or landscape architect
retained by the developer or builder. The Tree Preservation Plan shall include the
following items:
• The name(s) and address(es) of property owners, builders and/or developers
• A statement relating to the proposed use of the land including the type of
building or structure situated thereon or contemplated to be built thereon
• Mass graded areas and limits of land disturbance
• Custom graded lots
• Size, species, and location of all significant trees within and adjacent to the
proposed land alteration zone
• Identification of all significant trees within the land alteration zone
• Identification of all significant trees proposed to be removed within the
construction area of the land alteration-zone
• Measures proposed to protect significant trees
~Z•
a) Installation of snow fencing or polyethylene laminate safety netting
placed at the drip line of significant trees to be preserved. These
fences are to be shown on the tree preservation plan
b) Installation of erosion control measures in compliance with the Eagan
Erosion Control Manual.
c) Prevention of change in soil chemistry due to concrete washout and
leakage or spillage of toxic materials such as fuels or paints
d) Measures to prevent the pruning of oak trees between April 15 and
July 1
Measures to protect significant trees may include but are not limited to:
e) Installation of retaining walls or tree wells to preserve trees
f) Placement of utilities in common trenches outside of the drip line of
significant trees or use of tunneled installation.
g) Use of tree root aeration systems.
h) Transplanting of significant trees into a protected area for later moving
into their permanent sites within the land alteraiton zone.
The tree protection measures shall remain in place until all grading and construction
activity is terminated.
3. All significant trees ten feet or more outside of the construction area shall be
required to be saved..
4. The Tree Preservation Plan shall be submitted with preliminary plat plans in
accordance with Section 13.3 of the City Code or as part of the landscape plan as
required under Section 11.10, Subd. 15 of the city's zoning ordinance.
5. The tree preservation plan will be reviewed by the City to determine the best
available layout to preserve significant trees and enhance the efforts of the developer
or builder to mitigate damage to significant trees. The developer, builder and City
staff shall meet prior to the development of the final grading plan to determine the
placement of buildings, parking, driveways, streets, storage and other physical
features which result in the fewest significant trees being destroyed or damaged.
6. The developer or builder shall provide the required financial guarantee following
approval of the Tree Preservation plan to ensure protection of all significant trees.
7. The developer will be responsible for ensuring the Tree Preservation Plan is followed
during site grading and building construction.
8. All sites shall be staked per the approved grading plan before grading is to
commence. The proposed grading plan shall be submitted to the City at least five
working days prior to the issuance of grading permit to ensure compliance with the
approved Tree Preservation Plan. The City shall inspect the construction site prior
to the beginning of the project to ensure that protective fencing and other protective
measures to preserve trees are in place. No encroachment, grading, trenching, filling,
compaction, or change in soil chemistry shall occur within the fenced areas protecting
the root zone of trees to be saved.
9. Prior to grading all diseased and nuisance trees, on the subject property, shall be
identified by the City Forester in accordance with Section 10.20 of the City Code.
All diseased and nuisance trees so identified shall be removed from the property at
the time of mass grading.
10. After the mass grading has been completed and streets and utilities installed, the
forester or landscape architect shall:
a. Certify in writing to the City the tree preservation plan was followed.
b. Certify in writing to the City the tree protection measures were installed.
c. Indicate which significant trees remain and which have been destroyed or
damaged.
11. If any significant tree indicated to be saved on the Tree Preservation Plan is
destroyed or damaged the Tree Replacement Policy will be enforced by the city (see
attachment for guidelines on tree replacement).
12. The financial security will be released upon verification by the City that the Tree
Preservation Plan was followed and Tree Replacement Policy was complied with
where necessary.
BUILDERS - SINGLE FAMILY RESIDENCES
The following process for preserving trees shall be required of all builders of single-family
(R-1) residences.
1. The City will require an individual lot Tree Preservation Plan incorporated on the
required site survey. The plan shall be consistent with the original tree preservation
plan for the plat. The Builder will be responsible for ensuring the Tree Preservation
Plan is followed during building construction. Placement of homes and driveways
should be where the fewest significant trees would be destroyed or damaged. .
2. The individual lot Tree Preservation Plan must be provided by the Builder and
include:
• The name(s) and address(es) of property owner(s), and builder(s).
• Size species and location of all significant trees within and adjacent to the
proposed construction zone.
• Identification of all significant trees within the land alteration zone.
• Identification of all significant trees proposed to be removed from within the
construction area of the land alteration zone.
• Measures proposed to protect significant trees.
7
Measures to protect significant trees shall include:
a) Installation of snow fencing or polyethylene laminate safety netting placed at
the drip line of significant trees to be preserved. These fences are to be
shown on the tree preservation plan.
b) Installation of erosion control measures in compliance with the Eagan Erosion
Control Manual.
c) Prevention of change in soil chemistry due to concrete washout and leakage
or spillage of toxic materials such as fuels or paints
d) Measures to prevent the pruning of oak trees between April 15 and July 1
The tree protection measures shall remain in place until all grading and construction
activity is terminated.
3. All significant trees ten feet or more outside of the construction area shall be
required to be saved.
4. The tree preservation plan will be reviewed by the City to determine the best
available layout of buildings and driveways which will resut in the fewest significant
trees being destroyed or damaged.
5. Builders will be required to obtain certification from the City at least five working
days prior to the application for a building permit confirming tree protection
measures are installed.
6. Builders will be required to furnish, at the time of building permit application, a
$1,000 security for tree protection requirements if significant trees are present within
the land alteration zone of the property.
7. Building inspectors will continue to monitor the tree protection measures at the time
of routine inspections.
8. Prior to the issuance of a. certificate of occupancy, the builder shall certify that all the
tree protection measures identified on the tree preservation plan were completed
from the start of construction to the end of construction.
9. If any significant tree indicated to be saved on the Tree Preservation Plan is
destroyed or damaged the tree replacement policy will be enforced by the City (see
attachment for guidelines on tree replacement)
10. The financial security will be released upon verification by the City that the Tree
Preservation Plan was followed and Tree Replacement Policy was complied with,
where necessary.
6b:treepres359
!5I
CITY OF EAGAN
TREE REPLACEMENT POLICY
Developers and builders will be required to replace all significant trees which were indicated
on the tree preservation plan to be saved but ultimately were destroyed or damaged. The
developer or builder will be required to replace each of the significant trees destroyed or
damaged with two replacement trees. Replacement trees must be no less than the following
sizes:
Deciduous Trees - No less than 2 1/2 inches in diameter
Coniferous Trees - No less than 6 feet in height
Not more than 30 percent of the replacement trees shall be of the same type of tree without
the approval of the City Forester.
Replacement trees shall be planted on the subject property. If for some reason, all the
replacement trees cannot be planted on the subject property, those remaining to be planted
shall be located on property owned by the city. The City Forester shall determine the
location of the placement of trees on city property.
Any replacement tree which is not alive or healthy, or any significant tree to be saved which
subsequently dies due to construction activity within one (1) year after the date that the last
replacement trees have been planted, shall be removed by the developer or builder and
replaced with a new healthy tree meeting the same minimum size requirements within eight
months of removal.
6b:treepres359
1(O .
MEMORANDUM
TO: ADVISORY PARKS, RECREATION AND NATURAL RESOURCES
COMMISSION
FROM: KEN VRAA, DIRECTOR OF PARKS AND RECREATION
PAULA NOWARIAK, RECREATION SUPERVISOR
DATE: JANUARY 28, 1993
RE: SAND VOLLEYBALL COURTS
BACKGROUND
Sand volleyball is fast becoming a popular activity for Eagan residents. Currently, there are
two sand volleyball courts at Rahn Athletic Park. Staff is exploring options of additional
sand volleyball court placement within the city due to the heavy usage by the public and
league play at Rahn. The Rahn courts were constructed during the 1990 summer/fall
construction season, and ready for league play during the summer of 1991. There were ten
teams and one evening of play in 1991, and twenty-one teams and two nights of play in 1992.
Currently there is not room to expand nights of play at Rahn because of softball usage,
parking problems and the heavy usage by public groups. In addition, there has been a
number of requests for sand volleyball courts for general patron use. Staff has looked at
a number of potential sites for the courts.
ISSUE
There is a current need to expand the sand volleyball leagues for the summer of 1993. Staff
has explored the idea of utilizing the hockey rinks at Goat Hill Park as sand volleyball
courts. Maintenance and recreation staff drew up varied plans that provide opportunities
for placing sand volleyball courts within hockey rinks.
PROPOSAL
The proposal to fill this need of providing sand volleyball is to bring in 10 - 12" of sand into
a hockey rink. The sand would be removed before the start of the skating season so as not
to interfere with the skating season.
DISCUSSION
As stated earlier, a number of sites were looked at for placement of sand volleyball courts.
Northview Athletic was considered but was not proposed because the space that is available
would be better used for other amenities for the park. A site at Eagan High was viewed,
and determined to be too small. Neighborhood parks in which space might be available
lack sufficient parking for sand volleyball activity.
7
Goat Hill Park with placement in hockey rinks is a viable solution to space problems for
sand volleyball courts. The rinks can still be used during the winter months, while the
summer months will utilize many hours of volleyball fun for residents of Eagan. Goat Hill
will accommodate groups, picnics, leagues and casual use.
Attached you will find four of the' variations explored. Each option includes a breakdown
of costs for materials, labor, equipment, sand removal and installation.
The plans include single court layouts with edging, double and three court options without
edging.
Some courts were laid out side by side, others end to end, while additional options provided
east-west orientations.
Depressing the courts, by excavating material and then filling in with sand is not a valid
option as maintaining ice over 12 inches of sand is not possible. Hollow spots develop and
"break-through" is likely to occur. Therefore, this option has not been given any further
consideration.
The sand that is removed will be either stored on site or used in the winter by the streets
department for snow and ice control.
RECOMMENDATIONS
Recreation and maintenance staff recommend/Option D with double courts and no edging
in one. hockey rink. This option, in staff's opinion, provides the best all-around play
situation. Goat Hill Park is recommended as the site for the following reasons:
1. The parking lot is large enough to accommodate both baseball and volleyball
users.
2. The hockey rinks are lighted which would provide extra game times after
sunset.
3. The scheduling of sand volleyball league games can be coordinated with the
baseball schedule in order to utilize the building attendant for both activities.
4. Goat Hill Park has two hockey rinks which will provide opportunity for
additional courts as sand volleyball expands.
FOR COMMISSION ACTION
It is appropriate at this time for the Commission to approve or amend staff's
recommendation concerning this approach to providing additional sand volleyball facilities
in the city.
COMMISSIONSAND VB. MEM
2r6
1
OPTION A
<-15L> 284 cu.yds sand
85' edger
T
276
151
X15' OPTION B 5 60
E 1~
200 cu. yds sand
300' edger
Th
15'
90'
T m T
12'6" 12'6" 12'6"
9
30' x 60' 30'x60'
OPTION C
E 2T6~ < 630 cu yds, sand E 2T6~ ~ T6~
T T T
12'6" 12'6" 1216n
T T
276" 276"
4
OPTION D
20' 630 cu.yds sand 39'9"
T T
27'6" 276"
4
ESTIMATED COST OF SAND VOLLEYBALL COURTS
IN HOCKEY RINK
SINGLE COURT WITH 1 SIDE EDGED
Materials
85'edger at $8.00 per foot $ 680.00
284 yd3 sand at $4.48 yd3 1,270.00
1 net at $70.00 70.00
Labor
Installation
Edger & posts 8 hrs. @ $20 $ 160.00
Spread/level sand 8 hrs. @ $20 160.00
Removal
Edger & posts 2 hrs. @ $20 40.00
Sand/hauling 16 hrs. @ $20 320.00
Equipment
Installation
Loader 4 hrs. @ $56 $ 224.00
Bobcat 4 hrs. @ $35 140.00
Removal
Loader 8 hrs. @ $56 448.00
Bobcat 8 hrs. @ $35 280.00
Tandem Truck(s) 16 hrs. @ $35 560.00
$4,352.00
_
,
r
{
!
•
4
,
i
i
I
r I :
R.
m r
-
0
y
H
,
~J 1 J
t -
I
E.._...,. - -
i
r
i
{
I
VV_ V _V - V
! u1
Single Court With Total Perimeter Edged
Materials
300' edger at $8.00 per foot $2,400.00
200 yd3 sand at $4.48 yd3 896.00
1 net at $70.00 70.00
Labor
Installation
Edger & posts 32 hrs. @ $20 $ 640.00
Spread/level sand 8 hrs. @ $20 160.00
Removal
Edger 6 hrs. @ $20 120.00
Sand/hauling 26 hrs. @ $20 520.00
Equipment
Installation
Loader 4 hrs. @ $56 $ 224.00
Bobcat 4 hrs. @ $35 140.00
Removal
Loader 5 hrs. @ $56 280.00
Bobcat 5 hrs. @ $35 175.00
Tandem Truck(s) 10 hrs. @ $35 350.00
$5,975.00
2
•
I
j I
115.
r
10
` f •
-j- YP
{
3 COURTS/NO EDGING
Materials
630 yd3 sand at $4.48 yd3 $2,820.00
3 nets at $70.00 210.00
Labor
Installation
Posts 3 hrs. @ $20 $ 60.00
Removal
Sand/hauling 32 hrs. @ $20 640.00
Equipment
Installation
Loader 16 hrs. @ $56 $ 896.00
Bobcat 8 hrs. @ $35 280.00
Removal
Loader 16 hrs. @ $56 896.00
Bobcat 8 hrs. @ $35 280.00
Tandem Truck(s) 32 hrs. @ $35 1,120.00
$7,202.00
Cost per Court $2,400.00
4
a f ~I
i
1 ' j a
i i y r 1 ~ I ~ ~ j f
51
f
I
1
i
}
DOUBLE COURTS/NO EDGING
Materials
630 yd3 sand at $4.48 yd3 $2,820.00
2 nets at $70.00 140.00
Labor
Installation
Posts 2 hrs. @ $20 $ 40.00
Removal
Sand/hauling 32 hrs. @ $20 640.00
Equipment
Installation
Loader 16 hrs. @ $56 $ 896.00
Bobcat 8 hrs. @ $35 280.00
Removal
Loader 16 hrs. @ $56 896.00
Bobcat 8 hrs. @ $35 280.00
Tandem Truck(s) 32 hrs. @ $35 1.120.00
$7,112.00
Cost per Court $3,556.00
5
i 1 -
Vi
it
c
{ ~I
ti
w F
I e
ao
MEMORANDUM
TO: ADVISORY PARKS, RECREATION AND NATURAL RESOURCES
COMMISSION
FROM: DOROTHY PETERSON, SUPERINTENDENT OF RECREATION
DATE: JANUARY 28, 1993
RE: ADA UPDATE
BACKGROUND
The Commission may recall that city facilities, including park shelter buildings, parking lots
and other ancillary park elements were evaluated for accessibility in 1992. A limited
number of barriers were identified at park facilities.
Part two of the Federally directed ADA accessibility assessment has been completed. At
issue is barriers to participation in city programs.
DISCUSSION
Facility Barriers: The Department will address the list of required structural changes at
the following facilities in 1993:
• Trapp Farm Shelter Building: under concrete pad in front of exterior
restroom doors.
• Goat Hill Shelter Building: widen sidewalk to exterior restroom doors.
• Bridle Ridge Shelter Building: lower pull plates on entrance door.
• Quarry Shelter Building: subject to cost, may be deferred to 1994, widen the
concrete path to exterior restroom doors.
Barriers for which structural changes are under study, recognizing that a January 1995
completion date is mandated, include:
• Trapp Farm Pavilion: wheel chair accessibility for the drinking fountain.
• Sky Hill Shelter Building: alternative to door knobs on exterior restroom
doors.
• Throughout the system: height of telephones.
• Throughout the system: tactile signage.
• Carnelian Shelter: vestibule repair.
• Throughout the system: location of handicapped parking.
Program barriers: The following categories of potential barriers to participation were
addressed:
• Written materials, tools, equipment and other aids.
• Steps to be taken to ensure accessibility in the use of those materials, tools,
equipment and aids.
• A listing of specific activities or individual elements that comprise a program.
• A list of program elements that are potentially inaccessible.
• Steps to be taken to ensure accessibility.
Staff categorized all Recreation Programs into one of four categories. They are: Adult
Athletics, Youth Activities, Lessons and Special Events.
Extensive lists of items were generated for each category of inquiry. For example: Youth
activities: written material, parent letters, tools, scissors, books, school buses, music jump
ropes, etc.; steps to ensure accessibility: nerf balls, volunteer aids, alternate transportation.
Specific activities were identified, for example: craft projects, cut, paste, color, listen.
Department activities that have the potential to be inaccessible to disabled persons are the
adult athletic leagues, field trips due to the use of school buses and perhaps specific
destinations as well.
The Department lists several alternative actions to obtain accessibility. They include:
• Provide alternate sites.
• Provide interpreters when requested, utilizing the 96 hour standard.
• Solicit volunteer aids.
• Provide alternative transportation.
The Department has identified a line item in the 1993 budget for ADA related program
issues. It is anticipated that initial requests will be for auxiliary aids such as interpreters.
This represents official incorporation of what staff have already provided when needed. The
unknown piece is what form future requests for providing accessibility to programs will take.
Staff will be present to respond to questions the Commission might have. No official action
by the Commission is required.
COMMISSIONADA UPDAT.MEM
ADA RECREATION PROGRAM EVALUATION
(Updated from Section 504 Evaluation)
January 20, 1993
Introduction
Eagan offers a diverse variety of recreation programs through its Parks and Recreation Department.
Hence, these programs are evaluated for accessibility under a separate section. The ORS, which stands
for Office of Revenue Sharing, rules require that not all the City's programs be accessible, but when
viewed in their entirety are accessible and usable by persons with disabilities. This would constitute
affording equal opportunity to persons with disabilities.
Evaluation
The following survey questions were addressed as part of the evaluation and are based on evaluative
criteria of Section 504 of the Rehabilitation Act of 1973.
What publications, regarding programs, are prepared for the general public? City Newsletter,
flyers, posters, cable TV bulletins and Recreation Hotline.
2. What recruitment materials are used? Meetings or oral presentations, printed recruitment
materials and special program flyers.
3. What are the limitations on the number of handicapped persons that may participate in the
program? The City does not limit by policy; however, in practicality an influx of persons with
disabilities may limit the number/size of a class.
Depending upon the type and degree of disability, additional staff, aids, volunteers and interpreters
will be solicited to augment the program, providing training/orientation of staff to handle the
disability.
4. What criteria or tests are used in the program admission process? Criteria by age for some
programs; e.g. preschool programs and adult softball.
5. What forms are used in the admission process? In-person registration is preferred for all programs
and assistance is available on site to complete all required forms and every attempt will be made
to register all interested persons.
g3.
6. Present a list of all written materials, tools, equipment and other aids used by each program:
Adult Athletics Youth Activities Lessons Special Events
Letters to parents
Rules Flyers
Printed local rules Weather information Weather information Program brochures
Printed schedule Books Golf clubs PA system
Bats Records Golf balls Inner tubes
Softballs Crayons Driving range Picnic tables
Broomballs Scissors Putting green Fishing poles
Broomball brooms Paste/glue Tennis rackets Portable toilet
Volleyball Paper Tennis balls Auditoriums
7' net height Playground balls Tennis courts Ampitheatres
Basketball Soccer balls Music for dance lessons Recreation Hotline
Scorebooks Baseball Ice skates Ice skates
Soccer ball Softball Ice rink Shelter buildings
Football Bats Shelter buildings Buses
Hockey stick Pitching machines Recreation Hotline
Puck TV/VCR Cross country skis
Skates Jump ropes Ski poles
Hoops Cross country ski trail
Portable toilet Portable toilet
Shelter buildings
Tables
Pillo Pollo game
Field trips - buses
Roller skating
Ice skating
Beaver Mt.
Como Park
Downhill Skiing
Wave pool, etc.
7. Steps to be taken to ensure accessibility in the use of the above-listed materials, tools, equipment
or other aids are as follows:
Adult Athletics Youth Activities Lessons Special Events
Hearing impaired Adjustable height tables Visual demonstration of Auxiliary aids
can and do play; Balls of the Nerf variety skills Interpreters
2 or 3 EMR play onHardcourt areas that are Some tennis courts are Volunteers
one softball team wheel chair accessible wheel chair accessible
Sensitive to open- Auxiliary aids if requested Auxiliary aids if requested
ing the field gate Alternate site Alternate site
for wheel chair
accessibility;
auxiliary aids if
requested
8. List the individual elements or specific activities that comprise the program:
Adult Athletics Youth Activities Lessons Special Events
League play for: Craft projects Golf & tennis Various, could be:
Games; low organization, game etiquette tubing on a hill
Broomball board and active skills of the game listening to a concert,
Basketball Singing scoring speaker or directions;
Softball Story reading & telling play Fishing from a dock
Volleyball Field trips (buses & Dance Eating
Soccer specific activity) listen to music Skating
Football Nature Hikes specific steps A hayride
Ice hockey Scavenger hunts choreographed dances
Boot hockey Special events such as: Cross country ski
Run Pet shows what to wear
Skate Clown Day how to ski
Jump Everybody's birthday how to get up when one
Throw Bike decorating falls!
Hit a ball Walk Ice skating
Control a puck on Run on ice learning
stick Read
;atch a ball Listen
Speak
Write
Color
Paint
Paste
Strike a ball with a bat
9. For each element listed above, below are listed those that are or have the potential to be
inaccessible to disabled participants:
Adult Athletics Youth Activities Lessons Special Events
League play is not Field trips subject to Wheel chair cannot go Ampitheatre is soft
typically access- destination and ability onto putting green; surface
ible to wheel to get onto a regular Narrow tennis court gates Must walk to top of
chair bound school bus; the tubing hill
participants; "Hear" directions, stories
or music?
~s'
10. For each inaccessible feature, below are listed steps to be taken to obtain accessibility:
Adult Athletics Youth Activities Lessons Special Events
Interpreters Provide interpreter when Provide interpreter Volunteer aids if
needed Adjust teaching to a requested
Secure volunteers if less rapid pace
disabled participate Prior notification will
Provide alternate sites allow for adaptation of
Provide appropriate of equipment
transportation Alternate sites
11. No testing is used in the programs. Written form, voluntary, program evaluations are requested
from participants or parent/guardian.
12. The City Council has established the Advisory Parks, Recreation Natural Resources Commission
and appoints members to this Commission. To ensure equal opportunities for the selection and
participation on the Commission by the disabled, openings and program offerings will be placed
on the City's TDD system and updated on a regular basis.
13. Listed below are facilities or parts of facilities used during the program:
-Parks
-Park shelters
-Generic community recreation facilities
-Council chambers dias
14. The following are provided to persons during their participation in the program:
a. Transportation
b. Food services
c. Social, recreational or athletic services
For each, the measures taken to ensure non-discriminatory participation, communication, selection,
application or structural access is as follows:
Alternative transportation and food services will be provided upon prenotification by
participant to any special needs, e.g. rent a lift van, alternative foods selected, and volunteer
aids.
5. Using ANSI Standards of Accessibility, listed below for each facility are those inaccessible features
limiting the program. (Since structural compliance is discussed in detail in another portion of this
report, this section will only apply to facility's inaccessibility as it. affects program access.)
Athletics
Gravel surface around a restroom building
Tennis courts entrance gates are narrow
Grassy slopes from some parking lots to courts
Youth Activities
Nature trails: slopes greater than 5 degrees
asphalt or no trails
no guide rails on trails
16. Listed below are steps that will be taken to ensure program accessibility when program is "viewed
in its entirety" including:
a) Relocation: alternate site first preference.
Other than relocate, programs could be adapted at site if not cost prohibitive by:
1) adding more groups
2) increased hours
3) add instructors/aids
b) preparing for relocation upon notice of needs of a disabled individual:
Numerous facilities within the community make alternate sites feasible.
c) revising structure or format of activity so as to not need the space in question:
With alternate sites available, accessibility can be achieved.
d) discontinuing the activity:
This is not likely to be done, and would be considered only as a last alternative.
e) other measures to achieve accessibility:
Co-sponsorship with another community to offer a program.
D24DAEVAL.REQ
S7.
ADVISORY PARKS, RECREATION & NATURAL RESOURCE COMMISSION
DEPARTMENT HAPPENINGS
JANUARY 29, 1993
1. Fifty (50) first graders from Northview Elementary School came to Oak Woods
on January 26. They recited a poem in unison, read to Seniors (one to one),
munched on cookies the Seniors had baked and sipped apple juice provided by
the Department. The boys and girls eagerly gave hand-made Valentines to the
Seniors.
It was interesting to note the hesitancy on the part of the Seniors and the first
graders - initially. What fun they all ended up having. There were goodbye
hugs, lingering over "one more story" and inquiry from the students whether they
could come back.
And, they will be back - once a month for the remainder of the school year,
thanks to a grant from the Independent School District #196 Youth Connection
Council which will cover bussing costs.
2. * « A full roster of 30 youth participated in the winter babysitting/latchkey clinic.
3. * « Forty-five (45) youth grades 3 - 6 are taking part in the Bandy School. A year
ago 25 youth were registered.
4. * « The Dakota Civic Theatre's run of "On Golden Pond" ends on February 6.
Reports are that the play is excellent. The theatre, in Yankee Square Shopping
Center, has taken "form". The seating is very near to the stage. It is an intimate
setting. Funding remains the core issue! "Crimes of the Heart" opens on March
5. Call the theatre at 686-7277 to reserve tickets.
5. Cross country ski lessons have been completed. Twenty (20) adults participated;
capacity is 36. Valley Bike and Ski provides rental equipment, at a reduced rate.
They are the most organized vendor staff has encountered for this sport. Dakota
County Parks grooms a beginner loop at Schultz Lake specifically for the
Department's classes.
6. * « The 1993 City map has gone to the printer. Once again, the front side of the
map is Discover Us! Parks and Recreation facility and program related
information.
7. * « The Teddy Bear Band visits Eagan on Sunday, February 28, at 2:00 p.m.
Admission is a non-perishable food item for the local food shelf. The event has
been moved into the Eagan High School gymnasium (from Dakota Hills Middle
School gymnasium) to avoid potential parking problems with the High School's
matinee performance of "Encore '93".
8. * « Staff are gearing up to conduct numerous National Youth Sports Coaches Clinics
for baseball, softball, soccer and track. Clinics will be held in early April.
9. * « Intern, Dan Schultz, has participated in numerous and varied Department
activities. He is directing the 4-Man Hockey League, will conduct the Winter
Weekend Ice Fishing event, has observed Parks Maintenance at work, learned
from supervisors in the maintenance division, and attended various meetings and
workshops with staff. His research project is an update of demographics as they
pertain to park service districts. Dan's presentation to the Commission will
occur at the March 4, 1993 meeting.
10. The Winter Season has been an active one. The weather has been adequate
enough to allow for the warming shelters to be open every day, except two, since
opening officially on Tuesday, December 22, 1992. The tubing hill has been busy
and sees a large number of groups. Bridle Ridge is almost always overflowing
with skaters. Clearwater and Goat Hill remain popular.
There have been accidents ranging from cuts and bruises to broken bones. The
number of report forms filed to date are:
Trapp Farm 24
Bridle Ridge 4
Rahn 3
Ridgecliff 3
Quarry 2
Woodhaven 2
Goat Hill 2
Carnelian 1
Sky Hill 1
Clearwater 1
Staff tries to complete a form for every accident, injury or incident that occurs.
Our job is to try to prevent injuries rather than waiting for them to happen.
11. Broomball leagues are busy. Game misconducts are on the rise with four
suspensions levied to date. Sportsmanship and taking responsibility for your
behavior are stressed, yet incidents continue to arise.. The League Director
regularly visits games to observe and promote recreational competition.
12. * « Boot hockey started the season with a suspension, but has since settled down.
Weather has not been ideal for Sundays.
13. * Four-Man hockey, also has met some poor weather, but the ice has been much
improved over past years.
Overall, skaters have enjoyed good ice conditions all season long. Their
complaints seem to arise when snow falls during open hours and on Sundays and
holidays when no maintenance occurs. Obviously weekends and holidays are the
busiest days at the winter recreation sites.
14. Over $1,600.00 has been earned through hot chocolate sales. $1,900.00 has been
spent on supplies that should last through the end of the season around mid-
February.
15. The Winter Adult Volleyball Leagues are in their fourth week of play. A total
of 78 teams are participating. Ten women's power and six men's power play on
Tuesday evenings at Dakota Hills Middle School. On Fridays, 40 co-ed
recreational teams play at five elementary schools in Eagan. Also, on Fridays,
16 co-ed officiated teams play at Dakota Hills Middle. On February 4, 1993, six
men's teams will begin play at the Volleyball Institute of Minnesota near 1494
and Pilot Knob Road in Mendota Heights.
16. * << Park maintenance staff continued routine maintenance (sweeping and flooding-
weather permitting) at the city's 32 ice rinks on a Monday through Saturday
basis.
17. * Steve Hadden, Park Maintenance Worker, assisted the Eagan Hockey
Association with their "Hockey Jamboree" on January 16, 1993. This annual
event is held at Rahn Park, and utilizes both hockey rinks for a day long
tournament.
18. * « Hockey rink lines were painted on all of the hockey rinks that had suitable ice
surfaces, in accordance with the winter maintenance plan.
19. * << Members of the Park Maintenance staff assisted the Street Department in
plowing and sanding operations in our continuing tradition of interdepartmental
cooperation. Most notable was the assistance Park Maintenance Workers Don
Buecksler and Steve Taylor provided during the January 20, 1993 ice storm.
20. * « An anonymous local business has stepped forward to underwrite the cost of
producing the 1993 Arbor Day poster for distribution in the elementary schools
and at the annual Arbor Day programs.
21. * << The winter lake aeration systems were placed in an operational mode at Fish
and Schwanz Lakes on January 28th. Weekly monitoring of the sites indicated
rapidly declining oxygen levels as a result of increasing snow depth.
22. * < Kristi Morast, Eagan's MIS coordinator, and Park Maintenance supervisory staff
met with representatives of Ultimap, a local software company to explore the
Geographical Information Systems (G.I.S.) they offer. There are many
operations that could be enhanced by a G.I.S. program, and staff will continue
researching the programs available.
23. * « Eagan continued it's role as leader of the South Metro Parks Alliance. This
loosely organized group was formed to share pertinent information between
neighboring communities. On January 26, Eagan hosted a program on sledding
hills. Public sledding facilities were toured in Burnsville, Apple Valley and
Eagan. The program ended at Trapp Farm Park with lunch and a presentation
by Dave Drugg of Berkley Risk Services discussing ways to reduce risk exposure
and public liability while operating municipal sledding hill facilities.
COMMISSIONHAPPENI.93
MEMORANDUM
TO: KEN VRAA, DIRECTOR OF PARKS AND RECREATION
FROM: STEPHEN SULLIVAN, LANDSCAPE ARCHITECT/PARK PLANNER X11
DATE: JANUARY 25, 1993
RE: LETTER OF RESIGNATION
As we have discussed, this is to inform you that effective January 25, I give notice of my
resignation to the City of Eagan. I am providing one month notice with my last day of
employment scheduled for February 19, 1993. I wish to receive vacation February 16-19.
As discussed with Holly Duffy, I will pay for insurance coverage during the period in
February in which I am no longer employed with the City of Eagan.
Having concluded the business portion of this memorandum I would like to share a
description of my future position and a short personal reference of my experience at Eagan.
I've been hired. by the Dakota County Parks Department as their Parks
Development/Operation Manager. In short, I oversee the development of the Dakota County
Parks System and the maintenance division. I failed to mention that I am also responsible
for a hydroelectric dam on Lake Bylisby Regional Park. I hope fair notice has been provided
for those residing downstream that were will soon be a greenhorn operating the flood gates.
My experience at Eagan has been one comprised of sensational projects and more
importantly, relationships with talented people. Over the next few weeks I will be spreading
my heartfelt thanks to my fellow friends and co-workers. Specific to this memorandum I
would like to thank you, Ken,. and the entire Parks and Recreation Department. Your
leadership provided me with keen direction and a strong example. You're leadership has
inspired and mentored me. Your confidence in me over these nine years has instilled me
with a stronger self perception. I always said, You are the best idea man in the business."
Although commonly mentioned in jest, the statement is profoundly true. Your extraordinary
ability to generate and conceptualize ideas stimulated my creativity and has made me a
better Landscape Architect. Some of my best memories are when you and I would sit in
your office brainstorming over a particular item, eventually locking in to a strong concept
and having this concept evolve into a park design or facility. Eagan is filled with parks and
facilities authored by your ideas and creativity. I could go on and on. Thank you, Ken, for
making my time in Eagan a time of growth and benefit.
I would have preferred to leave at a time when things were slow but thinking back over the
past nine years, there has never been a slow period. Projects like the current Comprehensive
Park System Plan update, Lexington/Diffley athletic site, PSA 36E, ADA, Landscape Policy,
Tree Protection Policy, Blackhawk Park and the typical day to day tasks exemplify the
consistently high work load of the Parks Planner/Landscape Architect position and Parks and
Recreation Department. It is a comfort to know, as with changes of the past, that the
Department will rally as a unified team and take over in my absence.
It has truly been a joy to work and develop relationships with you, the Department, City
Staff, Commission and Council. My experience and relationships at Eagan have paved the
path to this new challenge. For this I am indebted to all of you and offer my humble thanks.
SS:cm
cc: Tom Hedges, City Administrator
Holly Duffy, Assistant to City Administrator
Mr. Ken Vraa February 3, 1993
Director Parks & Recreation
3830 Pilot Knob
Eagan, MN 55122
Ken;
As previously discussed in our meeting on January 27, 1993,
I have taken over the Eagan traveling soccer program effective
September 1, 1992. In that short amount of time a great many
changes have taken place. An eleven member Board of Directors
was formed to guide and direct Eagan soccer, now and into the
future. The board has had to address immediate problems related
to the retention of our more promising players to select teams,
coaching requirements, coaches education, and the in-house soccer
program.
To date the board has interviewed and hired a professional
coach to provide 10 hours of instruction with each of our
traveling teams, and are currently running a United States Soccer
Federation sanctioned '!D" license coarse for our coaching staff.
As you can well imagine these programs are both time consuming
and bear considerable cost to our program which are then passed
onto the players. With the hopes of remaining both competetive
on and off the field with surrounding communities, and to attract
players to continue in our program, we have had to increase our
registration fee $25.00 to $30.00 per player. Our fees will
range from $95.00 to $120.00 U10 through U19, respectively.
At the time I became Director of Eagan Soccer the program
was in debt to the amount of $1300.00. Upon the soccer boards
conception we have inventoried all of our equipment while
attempting to formulate a budget that can raise us out of debt,
teach our players, and provide a cost effective program. We feel
that we can accomplish these objectives with our current budget
which did not allow for the field usage fee of $60.00 per team.
We are not asking that the field usage fee be totally withdrawn
but delayed for one year. With the current re-organization we
have undergone, we will make the necessary changes that will
allow us to provide our children a program worthy of their
abilities. The delaying of this fee is necessary in these most
trying of economic times to ensure the success of our program.
Regards,
Wayrfe A. Huot
Director Eagan Soccer
January 21, 1993
Ms. Dorothy Peterson
Parks Superintendant
City of Eagan
3830 Pilot Knob Road
Eagan, MN 55122-1897
Dear Dorothy:
Thank you for your past help in trying to help me secure a
permit to gain entry into one of the fields at the Goat's Hill
park to free-run my Afghan Hound.
I am writing to appeal the decision. One more try does not
hurt.
I am willing to pay a fee for this permit. As you say, you are
concerned that you will have scads of people trying to get
similar permits. I think that if you charged for these
permits and put restrictions like picking up after the dogs and
any other litter, that it would deter other dog owners except
the most serious and considerate. Not too many people are in
the same boat I am, with an Afghan Hound (big runners) living
in a townhouse.
Please rethink this. I can be reached at 696-0140 wk and
454-4018 hm.
Tha ks for the consideration.
Anna Fredrickson
SUBJECT: COMPREHENSIVE GUIDE PLAN AMENDMENT,
PRELIMINARY PLAT
(OAK CLIFF POND 2ND ADDITION)
APPLICANT: OCP HOMES INC.
LOCATION: OUTLOT B, OAK CLIFF ADDITION &
OUTLOT D, OAK CLIFF POND ADDITION
EXISTING ZONING: PLANNED DEVELOPMENT (PD)
DATE OF PUBLIC HEARING: JANUARY 26, 1993
DATE OF REPORT: JANUARY 14, 1993
COMPILED BY: COMMUNITY DEVELOPMENT DEPARTMENT
APPLICATION SUMMARY: Separate applications have been submitted requesting a
Comprehensive Land Use Guide Plan Amendment changing the land use density from D-III
(Mixed Residential, 6-12 units/acre) to D-II (Mixed Residential, 0-6 units/acre) for
approximately 13 acres and a Preliminary Plat consisting of 23 detached townhouse lots
within the Winkler Jackson Planned Development located west of Slater Road and south of
Cliff Road.
BACKGROUND: In July 1982 the City Council approved the Winkler Jackson Planned
Development. This PD allowed for a mixture of commercial and residential uses. The
agreement called for a maximum of 311 housing units west of Slater Road. In March 1984
Oak Cliff Addition was approved with 75 R-1 (single family) lots and nine twin home lots
(93 total units) and also a condition specifying the new density for all of the residential area
west of Slater Road to be a maximum 231 units. With that condition, potentially 138 units
could be developed on the remaining 22 acres for a density of 6.3 units/acre consistent with
the R-3 (Townhouse) zoning district. In April 1987 three twin home lots were rezoned to
R-1, raising the allowable total number of units west of Slater Road to 141. In 1987 the Oak
Cliff Pond Addition was platted as 42 detached townhouse lots and Outlot B (subject site)
for future development. With that development, the potential development of 99 units for
Outlot B remained. There was also a Preliminary Plat approved for the Oak Cliff Pond 2nd
Addition containing 33 units on Outlot B in 1987; however, the final plat was never
submitted, even after preliminary plat extensions in 1989 and 1990.
LOCATION/EXISTING CONDITIONS: The 13-acre site is located south of Oak Cliff 6th
and 7th Additions which are zoned NB (Neighborhood Business) within the Winkler Jackson
Planned Development. Oak Cliff 6th Addition was approved for a reception hall that
directly abuts this site on the NW portion of the plat. Oak Cliff 7th contains the new
SuperAmerica on the corner of Slater and Cliff Roads and undeveloped property between
y,.
that building and the subject site. A Comprehensive Guide Plan Amendment is necessary
to bring the proposed density level into conformance with the Guide Plan. The gross density
of the plat is 1.78 units/acre. The applicant is requesting the Guide Plan Amendment to be
D-II (Mixed Residential, 0-6 units/acre) due to the unit type and the non-standard lot sizes.
The hilly site is currently undeveloped with a large pond (AP-10) located on the eastern
portion of the plat. It is covered with significant mature hardwood vegetation.
COMMENTS: The applicant is proposing a 23 lot detached townhome development. The
23 lots will take access from two private cul-de-sacs - Westwood Street and Woodhill Court.
Both streets act as long singular cul-de-sacs and are over 500' long if measured from the
main access point along Slater Road (Woodhill Court approximately 900' long and
Westwood Street approximately 950' long). The applicant is proposing to follow the concept
of the initial phase of Oak Cliff Pond which has 42 lots and is 75% built. The concept is to
provide the privacy and independence of single family ownership with the convenience of
the services provided by a townhome development. The existing homeowners' association
in Phase I will be expanded to incorporate the 23 new lots and common area. The streets
are private and owned by the association. An unbuildable 30' outlot is being provided along
the Burnsville border and it is almost 20' wide along the single family area to the south of
the second addition.
The homes will be similar to those in the Oak Cliff Pond 1st Addition and will range in price
from $135,000 to $200,000, whereas homes in the first addition varied in price from $125,000
to $180,000. The homes will have cedar or redwood siding and trim. In 1988 the City
amended the Code to require 50% maintenance-free exteriors in R-3 and R-4 zoning
districts. The applicant would like to continue the style of the first addition and a variance
would be necessary. Roofs are an 8/12 pitch with weathered wood asphalt shingles or wood
shakes. Exterior colors are in a complementary range of gray with white trim. The home
plans and siting will be adjusted to fit grades. The lots are an average of 5' to 10' wider than
those in the first addition to accommodate the existing terrain and to maximize views. It was
the intent of the developer to design the lots to reduce the impact on the steep slopes near
Pond AP-10 by shifting the lots to the west as far as possible. The applicant has chosen to
use retaining walls as a measure to preserve the existing trees, where possible. The site plan
also shows a wood chip trail in the NW corner of the lot leading to the church.
The existing woods that will remain are generally located along the perimeter of the site.
The open area on the north property line where Lots 1-5, Block 2, will be screened as a part
of the Oak Cliff 7th Addition and additional landscaping is proposed with this development.
The NE side of the entry road adjoining Slater Road will be landscaped. Landscaping of
each lot will be included in the purchase price of the home. Each home will include: sod
for all yard areas, an underground sprinkler system for yard areas, a shade tree, an
ornamental tree, an evergreen and six shrubs in a rock mulch bed with poly edging.
PARKS & RECREATION: The parcel is within the Winkler Jackson Planned Development
and has previously fulfilled its parks dedication with a land dedication of Slater Acres Park.
The Planned Development Agreement is specific in regards to the location of a trailway
along the east side of Slater Road. Therefore, this parcel is not subject to a trailways
dedication.
Staff is currently reviewing the developmental impact to the woodland resource and will be
providing this at the February APRNR Commission meeting.
GRADING/DRAINAGE: The proposed site consists of wooded and rolling topography with
an elevation differential of 70 feet. The low point of the site is the normal water level of
the easterly adjacent pond designated as Pond AP-10 in the City of Eagan's Comprehensive
Storm Sewer Plan. The high point of the site is along the west property line.
The proposed grading plan attempts to maintain a 40 to 100 foot undisturbed area along the
westerly side of the pond. No grading is proposed below the high water level contour. Also,
the grading plan shows that the existing woods along the west property line are to be saved.
The grading on Lots 1 through 5 of Block 2 will require the removal of all of the trees on
these lots. This will open up the north edge of the plan to the parking lot of the proposed
reception hall of Oak Cliff 7th Addition. Also, the steep slopes down from the parking lot
to the backyards of the proposed lots makes screening and buffering difficult.
The preliminary grading plan shows a maximum of 10 feet of cut which will occur where the
proposed private street will be built along the north edge of Pond AP-10. The maximum
fill on the site is proposed to be 6 feet. To minimize disturbance to the site, the developer
proposes to construct four separate retaining walls. The largest retaining wall will be a two-
tier wall with each tier 11 feet high. This wall is proposed to be constructed along the north
edge of the proposed private street as the street is constructed along the north edge of Pond
AP-10. The developer shall submit detailed plans and specifications covering the
construction of the proposed retaining walls with the final grading plan.
The drainage from this site is proposed to be intercepted by two separate storm sewer
systems. The first system will drain the low point of the private street located at the north
end of Pond AP-10. This system will drain 2.0 acres of this site plus 0.6 acres of Oak Cliff
6th Addition directly into Pond AP-10. The second system will drain 3.0 acres of area
around the two cul-de-sacs into a new water quality treatment pond that is proposed to be
constructed along the west edge of Pond AP-10. The water quality treatment pond will also
receive runoff from 1.3 acres of backyard area from this site and 0.5 acres of backyards from
the adjacent single-family development to the south.
The development will be responsible for installing and maintaining erosion control measures
in accordance with the City's Erosion/Sediment Control Manual Standards. To help prevent
erosion into Pond AP-10, the development shall protect the trees and vegetation for a 40
foot buffer strip along Pond AP-10.
WATER QUALITY REQUIREMENTS: This proposed development is located in the
furthest upstream reach of Drainage Basin A. Runoff from the proposed development will
discharge to Pond AP-10, a Type 5 deep marsh classified as a nutrient basin in the City's
Water Quality Management Plan. Pond AP-19 lies somewhat further downstream in Slaters
Acres Park, and is designated as a Class 3 scenic recreation waterbody. Largely to prevent
any further deterioration in the water quality of Pond AP-19, on-site ponding will be
recommended to treat runoff from this proposed development. Because 2.6 acres of the
development north of Pond AP-10 will drain directly to this pond without treatment, a
slightly larger than normal detention basin will need to be constructed to provide additional
treatment for the runoff from the 4.8 acres that will drain to the new water quality treatment
pond. The detention basin required must have a volume below normal water level of at
least 0.7 acre-feet and a minimum average depth of at least 3 feet. The pond design should
be subject to staff approval.
There is at least one major wetland complex on the site. The developer will be required
to identify and delineate all wetlands on the site, outline the impacts expected with regard
to filling or draining, and propose a plan, if necessary, to mitigate any impacts. A short
report summarizing the findings will be due by Monday, January 25, if the development
proposal is to be reviewed at the February meeting of the Advisory Parks, Recreation, and
Natural Resources Commission. Staff will likely recommend that any filling of the Type 5
wetland associated with Pond AP-10 be prohibited.
These recommendations are subject to approval by the Advisory Parks, Recreation and
Natural Resources Commission.
UTILITIES: Sanitary sewer of sufficient size, capacity and depth has been stubbed to the
proposed site from the existing stub street provided by the Oak Cliff Pond development.
The preliminary utility plan shows constructing an 8" sanitary sewer around the north edge
of Pond AP-10 and then to the west. The sanitary sewer will follow the centerline alignment
of the private street system through this plat.
Water main of sufficient size, pressure and capacity has been stubbed to the site from the
existing stub street in the northeast comer of the site and from the single family
development of Oak Cliff 4th Addition to the south. As shown on the preliminary utility
plan, the water main shall connect to both stubs and loop through the site.
Individual sanitary sewer and water services shall be provided to each lot. The 8" sanitary
sewer line and the 6" DIP water main that will serve this site shall be publicly maintained
lines built to City standards.
STREET/ACCESS/CIRCULATION: Access to the proposed site is readily available from
a stub street in the northeast comer of the site that was provided by the Oak Cliff Pond
development. The stub street is 100 feet from Slater Road, which is a publicly maintained
City street.
The development proposes to accomplish the internal traffic circulation by the use of private
streets. City Code requires the width of the private street to be 28 feet face-to-face as
shown on the site plan. The private streets shall be constructed with bituminous surfacing
and concrete curb and gutter.
RIGHT-OF-WAYS/EASEMENTS/PERMITS: No additional right-of-way for Slater Road
will be required as a condition of this development.
The proposed Outlot A shall dedicate a ponding and drainage and utility easement over the
new water quality treatment pond and over Pond AP-10 up to three feet above the HWL
of the ponds.
The development will be responsible for ensuring that all regulatory agency permits (MPCA,
MnDept. of Health, MWCC, MnDNR, etc.) are obtained prior to final plat approval.
FINANCIAL OBLIGATION - Oak Cliff Pond 2nd
Based upon the study of the financial obligations collected in the past and the uses proposed
for the property, the following charges are proposed. The charges are computed using the
City's existing fee schedule and connections proposed to be made to the City's utility system
based on the submitted plans.
Improvement Use Rate Quantity Amount
None ~-Q
CONDITIONS OF PRELIMINARY PLAT APPROVAL FOR OAK CLIFF POND 2ND
ADDITION
1. These standard conditions of plat approval as adopted by Council action on July
10, 1990 shall be complied with:
Al,B1,B4,C1,C2,C4,C5,Dl,El,Fl,G1,andHI
2. A Variance to allow the cul-de-sac lengths on the plan dated 12/15/92 shall be
approved.
3. A copy of the declaration of covenants will be submitted to the City prior to Final
Plat.
4. The wooded areas to be preserved will be delineated on the approved grading
plan and snow fencing shall be installed prior to grading.
5. A Variance to the R-3/R-4 exterior finish requirements shall be allowed.
6. Landscape irrigation shall be required.
7. The final grading plan shall include detailed plans and specifications covering the
construction of the proposed retaining walls.
8. The water main layout shall include connections to the 8" stub in the northeast
corner of the site and to the 6" stub in the southwest corner of the site.
9. The development shall protect the trees and vegetative cover for a width of 40 feet
around the edge of Pond AP-10.
STANDARD CONDITIONS OF PLAT APPROVAL
A. Financial Obligations
1. This development shall accept its additional financial
obligations as defined in the staff's report in
accordance with the final plat dimensions and the rates
in effect at the time of final plat approval.
B. Easements and Rights-of-Way
1. This development shall dedicate 10' drainage and utility
easements centered over all common lot lines and adjacent
to private property or public right-of-way.
2. This development shall dedicate, provide, or financially
guarantee the acquisition costs of additional drainage,
ponding, and utility easements as required by the
alignment, depth, and storage capacity of all required
public utilities and streets located beyond the
boundaries of this plat or, outside of dedicated public
right-of-way as necessary to service this development or
accommodate it.
3. This development shall dedicate all public right-of-way
and temporary slope easements for ultimate development
of adjacent roadways as required by the appropriate
.jurisdictional agency.
4. This development shall dedicate adequate drainage and
pending easements to incorporate the required high water
elevation necessitated by City storm water storage volume
requirements.
C. Plans and Specifications
1. All public streets and utilities necessary to provide
service to this development shall be designed by a
registered professional engineer in accordance with City
codes, engineering standards, guidelines and policies.
2. A detailed grading, drainage, erosion, and sediment
control plan must be prepared in accordance with current
City standards prior to final plat approval.
3. This development shall insure that all temporary dead end
public streets shall have a cul-de-sac constructed in
accordance with City engineering standards.
Al -
STANDARD CONDITIONS OF PLAT APPROVAL
PAGE TWO -
4. A detailed landscape plan shall be submitted on the
proposed grading plan. The financial guarantee shall be
included in the Development Contract and not be released
until one year after the date of installation.
5. All internal public and private streets shall be
constructed within the required right-of-way in
accordance with City Code and engineering standards.
D. Public Tmflrovements
i. If any public improvements are to be installed under a
City contract, the appropriate project must be approved
at a formal public hearing by Council action prior to
final plat approval.
E. Permits
1. This development shall be responsible for the acquisition
of all regulatory agency permits in the time frame
required by the affected agency..
F. Parks and Trails Dedication
1. This development shall fulfill its parks dedication
requirements as recommended by the Advisory Parks and
Recreation commission and approved by Council action.
G. Water Duality Dedication
1. This development shall be responsible for providing a
cash dedication in addition to/in lieu of ponding
requirements in accordance with the criteria identified
in the City's Water-Quality Management Plan.
E. Other
1. All standard platting and zoning conditions shall•be
adhered to unless specifically granted a variance by
Council action.
Advisory Planning Commission City Council
Approved: August 25, 1987 September 15, 1987,
Revised: Duly 10, 1990
plataprv.eon
LTS #2
l0
OAK CLIFF PONDS 2ND ADDITION
z r g fEq
qy
a IF
A Y
Wo STREET MAP
N
NCY
u TTLE
PIN
NW . 4,
o PARK S 3 TR
T KINGS 3• J -u
5P`pW Hl
N SE
FIR
LJ Jt
ZONING MAP AiL]I
P
E
D-111 LDdl
D-1V
6 NB LB
L LB
o-In
D-IV:
D-11
P D-1
COMP GUIDE PLAN MAP
105
I
opt
C'tl
ft-dV
oil
1 ~ I ,I N. Ins ' ( ~ ~ ~ \ ' ~ a
= ~ X111 , , l . • 4 / \ I I:
3 y I:1• 1 it
I ~ v
K ~ iC S[
i ttll{{~ N
IiihiIIIIlaiiiI
I
ls~• / ~ I
1 n
TN
77
i{! . 1 d•'+ ! ' ~ ~/'){rte /
lit R• ' ~ `1 \ ~ ~w
r
t ~ it F ~ \••L, / ~ !
ov'sew
21
1 l
1V
Jill
77
rs ~ sc x ' I
• • Ol I Y~t.CSEJ I Ar
•
j 7e1.:E' CiT cry \ - -
i `I
1 / V
I
Aff-A
~ `i ~ ~ X19 ~
Y
t4
! (U E
IVL t. t c r
2 7 P
t O ~ ~ '2 ZZ
An tG
z 3
}_};~{~3 lj~~yt ~~ihii ;tF)1= s~i1fi6 1 >#hs E )j IM?
' r• < ~ rk ~ f} 5
1A z
val
I 1 r \ / /
09
5 9W
E ~ • ~ ; 1 A r ~ qtr
\ - 1 fit{
XVO 1049
01
G1 i
' t•i l Si N :i»• I 1
OlTwAoe
S a -ice f#i...................1..":
s t"T'+~_- ~ i I. I,f# j:::~?-!iifi~s:~ ~3u ; i:~ali: yy ~i ~ ~ ~ ~ ~ ~ e o ~ Y
t C ii+a # i !..11 I II tl #oi#~.~1 ;i • o i i a $ $ I ; 'E
111 f ,~~.I }:i_i 1 .•E!'.•{{~i #tl
:!a#.s#i! ii#
# i 3 ~;.ffl.l~il~i{~t~Ttlii,itif!#i3:#I jy= { O~-~'..~- •~,~-•i
i~t f # t
ii i # 0 1 a s
f! . i
7?
I ~ a t
Ai I.
as rat:
J P Eva
~ 1 IUL
Nits! 1.5;
u O
.p I
AP-51
,tuarar~ -r A -I' 892.3
1 8t9l { i } • APT7 894.0
u, 8,16,3 t. 41 1
WGH - ff Y) 11,
2 AP 8? l r l I ( I 11! T e. 0.9
cr rig4l 888.5 '!Il I~ t
T
"r~' f ~Bt7t~ ~j t A`y 1 CV \6 Iy , ' ,,4 e .
'.~1.11{l4~31I~1} Nf`rlMt~ A-Z4 1 ti•i ~ ~1 .
V, K r l 2 f AP-12
( 1 rl Ir 893.3
904.0
1131 ~,~i,~~;< P8 1' r, l I I , AP 2a AP 22. Ir 'A -43;
1Y5 ,8T7:0f~l',S#~ til ! ,I.:t 8T2.0{I 873.6 96.0
880.D 9DOA ~y .
J. S 1 i`Y 8.78,2 L
A-aq 15` 12` 18 a
1 9 ? I 'v AP-26 i ~r N'
4-8 3: 1;
M.4RI 689:5 4 15.. i (
A-cc
892 3 t5' AP-23 art
'iS4 = $88. M r~~7 t 889.3 I 6i r i; AP.,49 , t , 90QQ
1= \ } ~I n 74.0 h I , AP-40
im
8815.0 AP-11 1l912.1
PP ~...AR 9.l 889.2. !{9 {
j+ J 111900.0 93.0 I i
P-25
i7thr i~ 116!' ''9040 AP-50 880 885.0
.5 . AP-42 It
886.0 895.0
892.0 le" ,n ! 905.0
A11 A dd
J AP-1~ ~PP-50. 1 AP-50 2 AP 13 , N
919.7 `9000a I hi 900.d 190 m j AP-14 i ` BP-32
925.6 ; 9I2.I
J y2J6 933.9
y ~r
1~~'~T 1 t FN r { Ii AP-44 A•-H ( i 9379
trp:/ lit 915.9 i = [ 1
9196
~:tf A I yy l i I 1? 1 I A ee , S2 >a~
tl)_l, d''~_7 APTI , +916.0 AP 15..q 48
fn
I:rr~ r, .93 6- - r.v:. 919.0 AP 16 9088'
R 5r g T~ t~ ~~1 X26 0 i 9/5 0 92 : 1 r' Ai
~a 1 F 9
} 3 r
1g
P I, AP 15.1'•
r~r
9220 .10 911.0
FIB CSt`~ 1$ l`rX926:2 APT30 I 913.5
925.5 9 7.0
All t: A -34
.n fl!.1 ail
7^~ 4. Vii' 6.0
It. 1 it ''a3' Q.O~
I r^ n{d,1~,. 992.0 2 b A-
/2y 1 r ' `
A-xx
P-3pQ3 P 331
1006.0. SITE FIGURE No. 17
STORM SEWER LAYOUT
MAP
CITY OF
EAGAN ~i~.
OCP
HOMES, .
INC.
January 13, 1993
Jim Sturm, City Planner
City of Eagan
3830 Pilot Knob Road
Eagan, MN 55122-1897
RE: Oak C l i f f Pond, 2nd Addition
Preliminary Plat Application
Dear Jim:
At the City Staff-Developer meeting for t is proposal, you
suggested a neighborhood meeting might be elpful to inform
neighbors and answer their questions. I'just wanted to let you
know that we have followed up on that suggesti n. However, since
there were over 70 owners covered by the not ce provisions, we
tried to focus on the directly affected neighb rs.
For the owners in Phase I of Oak Cliff Pond, e briefed them at
their annual owners' meeting on January 10. About 80% were in
attendence. The main question was the amount f woods to remain
along the west side of the pond and home price
We have sent informational letters and maps to the eight abutting
residential property owners in Eagan and Burnsville (Copy
attached). In the letter, we offer a phone nu ber for additional
information and offer to bring large scale plan to their homes if
they prefer. Since there is no traffic flow i to the River Woods
or Oak Cliff subdivisions, I assumed there would be little interest
on the part of homeowners who do not abut the d velopment area and
concentrated on personal service to those dire tly affected.
Thank you for your suggestion. I hope this me is the need.
furs trul
mes C. Dimond
Pr ent
JD/jc
8609 Lyndale Avenue South # 10 1 B Bloomington, Minnesota 55420 (612)881-0127
OCP
HOMES,
INC.
January 12, 1993
Mr. & Mrs.
White Oak Ct.
Eagan, MN 55122
Dear
Within the last couple of days, you probably have received a notice
from the City of Eagan of a Public Hearing for Phase II of the Oak
Cliff Pond Development. OCP Homes, Inc. will be continuing the
current development that is along Slater Rd. in a westerly
direction. Since you are a neighbor whose property abuts the
proposed development, I wanted to make some information about the
Second Phase of Oak Cliff Pond available to you.
The site adjoins River Woods in Burnsville on the west and the
northerly lots on the Cul de Sac of White Oak Circle in Eagan on
the south. About four years ago, a plat was approved by the City
for 33 homes on this land. Our plat proposes to reduce this to 23
homes. These will be the same type of homes as are currently being
built on Wildwood Ln. and Wyndemere Ct. in Oak Cliff Pond. While
they are called townhouses by City Code, the homes are essentially
single family homes with an Association to provide exterior
services. The homes in Phase I sold for $125,000 to $180,000. We
anticipate the second phase will be $10,000 to $15,000 higher.
The plat was designed to be as consistent as possible with the
steep slopes of the property and to maintain the natural woods
around the perimeter of the site. To help deal with the slopes,
the average lot size for Phase II is about 40% greater than the
Phase I lots and substantially more common area will be provided.
Enclosed are a couple of site maps, showing the proposed plat.
Your lot is marked in yellow. If you have any questions or
comments about this proposal I would invite you to give me a call
at 881-0127. If you would like to see a large scale copy of the
plat, let me know. I can be available to stop by to show it to you
and answer questions if you would like.
Yours truly,
James C. Dimond
President
1138609 Lyndale Avenue South # 10 1 B Bloomington, Minnesota 55420 (612) 881-0127
144. 4P
- Jpp•00 r~
, 7 ^ 1
d 1 C I `
, 169.29
Olc^"'~~~ Dq~' 011-01
1 1
Aft jrjQt,
OIITIOT A
~V Ou
,a E 7 i 9- qs ~~~o
31 32 3 L ~ ' J 3 t 1
.s« /,gyp ~ p tit ~ ` - ? ~ t :
to-
z too LOT A
• r ser °
26
4 uq:~ao 34 Cv
Oki 11-01
29
7 35
go 4; \s
6 it
15
9 16
E ~4 ` vim! CH
37 '95
5"
39 0
41 • 4 13
40 a!h-
Ot 4-3
fir.. .wy. w ' 6
;L• w•• 42 . r1:t1.0f,. r:;4 'r
0..u• sf.M w. ITt9. r~
tw21•~~ a a N0..% I 1 2.14 2
V 1 117. 4 R
f Rio oAN t•A~ j _ 8 4 v 3 M
A 4U -7
45 , 44 ; 43
_ % , 10. 1
ri 68:10 ~1 ea
ANY WAY
Ali 1 \ e .10 46 13
47 57 59 Z R ° 2 ~p y
4"8S, MwLw O 1I w I _ Ca•' 3
41 Mr
56 '4P 'j
4
vr~
60
0.~yr•Y1,rl~ '~j ~L O ~l~IIO 'e ••l i I •
( 5 •
SI . .~•r . • 7 et Q
• O J N
rot
% 14 - 136:6_] a-2 ' `p~~Ai' ~w~•' P, 52 .19 IF w 0
62
X41 ~ , °+t " , ?ti- . "
,i\ i~17~i°'s\ 1~~~ .w , 1.t1Y• ~J 4 63
SUBJECT: REZONING & PRELIMINARY PLAT
(POND VIEW TOWNHOMES)
APPLICANT: GOOD VALUE HOMES
LOCATION: SE 1/4 OF SECTION 16
EXISTING ZONING: AGRICULTURAL (AG)
DATE OF PUBLIC HEARING: JANUARY 26, 1993
DATE OF REPORT: JANUARY 13, 1993
COMPILED BY: COMMUNITY DEVELOPMENT DEPARTMENT
APPLICATION SUMMARY: Separate applications have been submitted requesting a
Rezoning from Agricultural to R-3 (Townhome) and a Preliminary Plat consisting of 34
units on approximately 11.3 acres for P.I.D. #10-01600-012-78 located north of Englert
Road, west of Pilot Knob Road, east of I-35E and south of Agricultural property adjacent
to the Duckwood Crossing Addition.
EXISTING CONDITIONS: The property is zoned Agricultural and is designated D-II
Mixed Residential (0-6 units/acre). A large ponding area subject to the City's Shoreland
Ordinance comprises 6.4 acres of the site which is relatively flat and contains some
secondary tree growth and prairie grass. The west edge of the site is adjacent to MnDOT
right-of-way that lies east of the freeway fence.
COMMENTS: The applicant is proposing a two-phase development of 34 owner-occupied
townhouse units among seven individual buildings (one seven-unit, one six-unit, two five-unit,
two four-unit, and one three-unit building). Phase I calls for 27 units on 10.9 acres resulting
in a net density of 5.25 units/acre which is consistent with the Land Use Guide Plan. The
proposed Phase II (.4 acre Outlot A) consists of one 7-unit building. Development of this
phase is contingent upon MnDOT turning back I-35E right-of-way to the property owner.
The one-acre piece of right-of-way adjacent to the subject property east of the freeway fence
is necessary to provide access and allow for a proper building setback for Phase II (Outlot
A).
The applicant has initiated these proceedings with MnDOT to designate all right-of-way east
of the freeway fence as excess right-of-way. This can be a rather lengthy process due to
federal government involvement with interstate freeways.
As proposed, all units meet the R-3 building and parking setback requirements. The
thirteen units adjacent to the pond meet the City's Shoreland Ordinance required 50'
building setback from the Ordinary High Water Mark.
//s'
According to Good Value Homes, the market for these two and thre bedroom townhomes
will be young, professional singles, couples, and empty nesters. The o-story units will be
approximately 1,100 sq. ft. and all exterior materials will be maintena ce-free as required by
City Code. In addition to general interior options, fireplace, porch d patio options are
also available.
A conceptual landscape plan was submitted. Additional landscaping ' be required along
the freeway and underground irrigation will be required for all lands and sodded areas.
PARKS & RECREATION: The vegetative character of the site is p ' arily small, secondary
growth covering a majority of the parcel. Most of this plant material insignificant and will
be lost with development. Larger box elders and elms line the west rn pond edge. These
trees are proposed to be preserved with development. Staff feels tha these tree masses are
important in that they provide a naturalized setting for the pond. Tr removal adjacent to
the pond edge, similar to that by Pilot Knob Road would h ve a negative visual
consequence. Staff recommends that the developer provide a tree pr tection plan indicating
temporary fencing adjacent to these shoreland trees during constru tion.
The plat is subject to both a cash parks and trails dedication.
GRADING/DRAINAGE & EROSION CONTROL: The preliminary grading plan proposes
to grade approximately 4 acres of this site to prepare the area for townhouses and private
streets. The maximum cut is 12 feet in the southeast portion of this site and the maximum
fill is 6 feet in the northwest comer of this site. The development shall maintain a 30 foot
vegetative buffer strip along the edge of Pond JP-3. The 30 foot buffer strip contains, a
dense grass cover and light woods that will control erosion of sediments into Pond JP-3.
There is a 10 foot berm along the west edge of this development that was constructed by
MnDOT with the Interstate 35-E project. The preliminary grading plan shows that the
proposed townhouses will have a first floor elevation of 6 feet to 12 feet below the top of
the berm.
Drainage from this site will be conveyed via the proposed storm sewer system to Pond JP-3
which is located in the east half of this plat. Pond JP-3 is a pond in the City's
Comprehensive Storm Water Management Plan, and it has an existing 12" outlet across Pilot
Knob Road that discharges into Fish Lake. The lowest entry levels of the proposed
townhouses shall maintain a 3 foot freeboard above the high water level of Pond JP-3.
The proposed storm sewer system that will serve this site shall include catch basins to drain
the upgrading of Englert Road. Also, a storm sewer stub shall be added to drain the low
area in the undeveloped property south of Englert Road to Pond JP-3.
The development will be responsible for installing and maintaining erosion control measures
in accordance with the City's Erosion/Sediment Control Manual Standards.
WATER QUALITY & WETLANDS: This proposed development is located in Drainage
Basin J. Runoff from the development will discharge to JP-3, a 10-acre wetland classified
as a Type 6 sediment basin in the City's Water Quality Management Plan. Pond JP-3 is
directly connected with Fish Lake, one of the City's top water quality management priorities.
Staff will recommend construction of two sumps off the flared end of each stormwater pipe
discharging to Pond JP-3 from the development. Accommodation of additional on-site
ponding would be difficult, and there are other more cost effective ways of protecting water
quality in Fish Lake. Thus, the remainder of the water quality requirements will be met by
a cash dedication based on the actual 6.1 acres of the development site.
The developer also proposes to fill up to 230 square feet of fringe wetland associated with
Pond JP-3. Assuming avoidance and sequencing activities are adequate, on-site and in-kind
replacement will be provided near the northern boundary of the development area at a ratio
of 1:1 as required under the interim program guidelines of the 1991 Wetland Conservation
Act.
UTILITIES: Sanitary sewer of sufficient size, capacity and depth is readily available to
serve this site from an existing 15" sanitary sewer line that was constructed by the City in
the early 1970's in Englert Road. The preliminary utility plan shows connecting to the 15"
sanitary sewer and extending 8" lateral lines along the private streets and 4" service lines up
to each individual unit in this townhouse development. The upgrading of Englert Road shall
ills
include the extension of sanitary sewer services to existing houses along Englert Road and
adding sanitary sewer stubs to serve the future development of the vacant property along
Englert Road.
Water main of sufficient size, pressure and capacity is available to serve this site from an
existing 8" stub at the intersection of Pilot Knob Road and Englert oad. The preliminary
water main layout plan shows connecting to the 8" stub and extending an 8" water main in
Englert Road and then 6" water main through the site along the private streets. This
development shall include the 300 foot section of 6" water main along the west edge of the
plat that will provide a loop from the Englert Road water main to the proposed 6" water
main in the private street. The preliminary utility plan proposes t provide individual 1"
water services to each unit of the townhouse development. Water services shall-also be
added to the existing houses along Englert Road and also to serve a future development
of the undeveloped property along Englert Road.
This development will be required to stub an 8" sanitary sewer and 6" water main to the
north property line for service to the future development to the no . The sanitary sewer
stub elevation at the north property line shall be 845 to serve the future development to the
north.
STREETS/ACCESS/CIRCULATION: Access to this development will be from Englert
Road which is currently a gravel street that connects to Pilot Knob Road. The developer
has petitioned the City to upgrade Englert Road in conjunction with s development. The
upgrading of Englert Road to City standards shall include a 32 oot wide street with
concrete curb and gutter and bituminous surfacing.
Except for Englert Road, the proposed streets within this developm nt are proposed to be
privately owned and maintained. The private street system shall a constructed to City
Code requirements. All private street construction shall have crowned centerline
providing for directional drainage into the gutter line and subseque tly into a storm sewer
system. At intersections, the street grade shall not exceed 3% or the first 100 feet
approaching said intersection. As shown on the preliminary site an, the private street
along the west edge of the development will not be constructed until he excess right-of-way
from MnDOT is vacated. This section of privte street would servthe future 7 units of
Outlot A.
RIGHT-OF-WAY/EASEMENTS/PERMITS: This development will be responsible for
dedicating 30 feet of half right-of-way for Englert Road along its south property line. In
addition, this development will be responsible for obtaining necessary easements and right-
of-way outside of this development to allow the construction of Engle Road to occur. The
final plat for this development will not dedicate right-of-way for the internal streets since
the streets will be privately owned. The final plat shall dedicate easements of sufficient
width based on the depth of the utilities for the lateral lines that wills rve this development.
The final plat shall also include a ponding easement over Pond JP-3 p to three feet above
its high water level.
The developer has applied to MnDOT to vacate excess right-of-way along the west property
line of this site. The excess right-of-way is 50 feet wide north of Englert Road for a distance
of 300 feet and then 90 feet wide for a distance of approximately 230 feet up to the north
property line of this site.
The area around the cul-de-sac of Englert Road is City owned right-of-way. The developer
shall petition the City to vacate the excess right-of-way around the cul-de-sac to allow for
the platting of Lots 25, 26, and 27.
The development will be responsible for ensuring that all regulatory agency permits (MPCA,
MnDept of Health, MWCC, Dakota County Highway Department, MnDOT, etc.) are
obtained prior to final plat approval.
FINANCIAL OBLIGATION - Pondview Townhomes
Based upon the study of the financial obligations collected in the past and the uses proposed
for the property, the following charges are proposed. The charges are computed using the
City's existing fee schedule and connections proposed to be made to the City's utility system
based on the submitted plans.
Improvement Use Rate Quantity Amount
Water Trunk $775/Lot 34 lots $26,350
Lateral Benefit 17.80/ff 559.25 if 9.794
Sanitary Sewer
Total $36,144
There are outstanding levied assessments totaling $3,347 which will be apportioned to the lots
created by this addition. There are no pending assessments on the property.
PRELIMINARY PLAT CONDITIONS FOR POND VIEW ADDITI N
1. These standard conditions of plat approval as adopted by Council action on July
10, 1990 shall be complied with:
Al, B1, B2, B3, B4, C1, C2, C3, C4, C5, D1, El, F1, G1, & HI
2. All exterior building materials shall be maintenance-free.
3. All landscaped and sodded areas shall be served by underground irrigation.
4. All trash/recycling containers shall be stored in individual garages.
5. A copy of the Homeowners Association and Townhouse Bylaws shall be submitted
for review by the City Attorney. ll
6. Temporary fencing shall be provided to protect sh 'eland trees during
construction.
7. The development shall maintain a 30 foot vegetative buff r strip along the edge
of Pond JP-3.
8. The lowest entry level of the proposed townhouses sh ll maintain a 3 foot
freeboard above the HWL of Pond JP-3.
9. The public hearing for the upgrading of Englert Road to a City street with
bituminous surfacing and concrete curb and gutter and th extension of utilities
shall be approved by Council prior to final plat approval.
10. The development is required to provide adequate storm se r to drain the existing
low area in the undeveloped property south of Englert Rod.
11. The development is required to provide sanitary sewer and water main service to
the northerly adjacent undeveloped property.
12. The developer shall petition the City to vacate the excess right-of-way around the
cul-de-sac of Englert Road prior to final plat approval to allow for the platting of
Lots 25, 26 and 27.
13. The development shall include the 300 foot section of 6" water main along the
west edge of the plat that will provide a looping system.
00
STANDARD CONDITIONS OF PLAT APPROVAL
A. Financial Obligations
1. This development shall accept its additional financial
obligations as defined in the staff's report in
accordance with the final plat dimensions and the rates
in effect at the time of final plat approval.
B. Easements and Rights-of-Way
1. This development shall dedicate 10' drainage and utility
easements centered over all common lot lines and adjacent
to private property or public right-of-way.
2. This development shall dedicate, provide, or financially
guarantee the acquisition costs of additional drainage,
ponding, and utility easements as required by the
alignment, depth, and storage capacity of all required
public utilities and streets located beyond the
boundaries of this plat or outside of dedicated public
right-of-way as necessary to service this development or
accommodate it.
3. This development shall dedicate all public right-of-way
and temporary slope easements for ultimate development
of adjacent roadways as required by the appropriate
jurisdictional agency.
4. This development shall dedicate adequate drainage and
ponding easements to incorporate the required high water
elevation necessitated by City storm water storage volume
requirements.
c. Plans and specifications
1. All public streets and utilities necessary to provide
service to this development shall be designed by a
registered professional engineer in accordance with City
codes, engineering standards, guidelines and policies.
2. A detailed grading, drainage, erosion, and sediment
control plan must be prepared in accordance with current
City standards prior to final plat approval.
3. This development shall insure that all temporary dead end
public streets shall have a cul-de-sac constructed in
accordance with City engineering standards.
STA*.DARD CONDITIONS OF PLAT APPROVAL
PAGE TWO -
4. A detailed landscape plan shall b submitted on the
proposed grading plan. The financia guarantee shall be
included in the Development Contract and not be released
until one year after the date of ins allation.
5. All internal public and private streets shall be
constructed within the required right-of-way in
accordance with City Code and engine ring standards.
D. Public Sm2rovements
1. If any public improvements are to b installed under a
City contract, the appropriate prof at must be approved
at a formal public hearing by Coun it action prior to
final plat approval.
E. Permits
1. This development shall be responsible for the acquisition
of all regulatory agency permits in the time frame
required by the affected agency..
F. Parks and Trails Dedication
1. This development shall fulfill it parks dedication
requirements as recommended by the Advisory Parks and
Recreation Commission and approved y Council action.
G. Water Duality Dedication
1. This development shall be responsi le for providing a.
cash dedication in addition to/i lieu of ponding
requirements in accordance with the criteria identified
in the City's Water-Quality Managem nt Plan.
H. Other
1. All standard platting and zoning onditions shali'be
adhered to unless specifically gr nted a variance by
Council action.
Advisory Planning Commission ity council
Approved: August 25, 1987 a tember 15 1987'
Revisedt ul 10 1990
plataprv.coa -
LTS *2
is c ( s+ 1 to '
f~ g C 53
N OP
N S +1~9
5 0 NE NW ,VE
LANE
a - - _ _ G4~AOSSAO~
TM
LOCATION
N yJ 1 t L ENGLEF KOISTAC' `rte'-''~M(
IL 00 I u C T
r~ R COMM
pN • ESCrT•
a d
EACAN ~ ERCLa« a
4 q *mIC PAL LA
a k CENT[R~ WINuC AvE
R+(a4
nAg
ur ?.e l 7PFC r,
PLot Kim p^rgc FZ
l:KvR-2
IL
ALI
ZONING'-
R-I I A
4-.
~_.C ) CITY 4 _
4 HALL
PK
R-1
R,;-IAr PK
PF
D-I11 d0 csc
LB A
ri D-IV
~
LB D•111
D•1
GUIDE PLAN 1
D-11
? 1L
PF
P . PF 0.11 D-1
D-I
D-I Al
I NTERSTAtE ,35E
r - I I EXCESS ,.y»h
11 ,..1!
7 • R.O.W. f~ Y
O
E >r t ' • y A
gig
JI
a I
la ~1 _
! MM',1'!
I ~ =R
41
ox,
S.A kNo&
h! N 1%1 p
31
MINAR' PLAT ULTEIG ENGINEERS, INC.
P ND VIEW TOWNHOMES 6201 EASr RIVER ROAD -
W re Joe
p, u . t_ ~.~e.•.t A ~.!!N_ AGNMEAPOUJ, *WAWSOTA ENE/
PNOW ?EDN 1714100 PAX NW ritiIN1
w
-
- - -
-
r 5
..r i s ` !~1 !r .1,,` ` to , t ~ "i a (I _
\4 J,*E IN
r Ulf
! f_ I,, f li i
r y
oil
•
t•
$ g PRELIMINARY GRADING PLAN ULTEIG ENGINEERS INC. DAVE
CA A w- r°L POND VIEW TO WNHOMES 5201 EAST RIKR ROAD
R&M so*
rtnMeAroua. MWOFaorA uur
PROW rsu) Ear-2e00 FAX 19121 37L 11CI ' ~~to±e or.» _ _
_ .w.rro o•om•- 901P US (916) XYd OO99YL9 ltlp 3NOHd d r
11199 YLOS3NN19 XI1OdV3NNS1 -MN•~G `--tI tnto-On art v
OYOu 13A/1 isv`3 Sorg S3WOHNMOA M31A ON d -'-1°°R""'""'"' A'-•_ I ,`mr N
..rosH,• ;tro "ONI SH33NIJN3 01317n inov7 unln ~avram Sad ~ O1
1110
~ I~~I 1 I
f I% 1
t ( ¦ = W
I j Y a ~ ~~,s
01 `1 p ~ Lt
tot i
10
.tt•t.._o 1
• ~ tt uor_r SS3JX)
3
1aL SV dig
1NI
~F p
I I
!it' /'~~7i '11111'
f I 1`i 11 i~
I t
jjb;; OACN AN r' I b N
X PARK
~-d a RIDGE
;P-26 .48
° 790.0; j,~;__J f' \ Af ' 876.
~02.OYP- r~i; -h - BB~ r rv_ 18
t , J
- - om
Of T i g 3:5 ^t'i .,u vi I -l~~ T- ./1l -~~l
185:0 1 29.7 lSlt s ~akLtna r ~tl C`
) 'Suwlcy
Op-
CP-12
826.5 N Ic 25 0
829.6 ?Suri =1y,.92g 7
BLOC
CP-6 ?~T1t cl`r / ' <z rt ;~z DP-2~
4. ( 790.7 'k r r~ c F1,~ JP-66; ;890
C11 . 3r ; ( i stn ~1s 8T1 09
J j'w 806.0 27"
ri. 880T
t~i+til ( " QN~~. ~.~al.l , ~a~ I ~ j~aU',511 N~ Iari.nJ l.~ y Q,;
+4• \ oG ; 44.0 P-gT.li;a4:..
P~r1' 846.5_ 76.0 y,JP-6T °A:u
t NOf
8440 BP'30 i _ ` . 184£5
2
A CKpt/I n
f cnt;ri f 80Q
11411 01 a
0 .51
'i>?i"~ti' I al , rt~?t_L~5%.,L't`-r~,..Y P-4
Bp-J44
Lill 0
It~tt n fi 't+ l~ ~j~t r c• i ' r r,' t L 'i 1'f
I 823.8 J b.
834.0 sp.
Cii i HALL ' lr
BLACKHI
PARKS 27
13P
qjpAyE
Ft BP-29-1
916.0 °2 r,. ~ : ` ( } `t . ~ pr A. W
920.0 -I - 2, `:1 F { -818.
B=b es2.ss esoq re
11 48"
16 T~ r 1 } 2 7E" A- S / 8 86 0
-
oocio i
SITE
FIGURE No. 17
STORM SEWER LAYOUT
MAP
CITY OF
EAGAN
v ` ANT
ERSTATE 352
0 I I , \ EXCESS .-,ya.
y
1, R.0.w
y ~Sf
''~41 +1y NO ~ZZZw~ or
• • •
A.
46 1
9$ s
Jig
QOO ell~
s ma'orl l
i I r~ f
:
ICI I I ~Z w
L2 R
N O > l ~~G
o
IZZ?
9 p U H J N - w O G m
V A i+N oD i p \ Z Z
- 0 /
c SA.y N>e Ro
.9 7e N w u J H w - - m O_ 3 AD
~ ~ w • w i 1.N 4 u 0 ~ ,
r fill
Oq -
6 PRELIMIN4Rl PLAT ULTEIG ENGINEERS, INC. wrc w~.~,~es
POND VIEW TOWNHOMES S201 EAST RIVER ROAD
a ssr- SUITE 002
Oy. n 4 ALJ.tx S-"~- I ENEAPOLIS. M ESOTA SNSI
W PNOIIE (0121 8714000 PAX 19121 S741JM cee= o=..•r.a .
SUBJECT: PRELIMINARY PLAT
(DEERHAWK ADDITION)
APPLICANT: DAKOTA COUNTY STATE BANK
LOCATION: P.I.D. #10-02000-011-75
(SE QUARTER SECTION 20)
EXISTING ZONING: SINGLE FAMILY (R-1)
DATE OF PUBLIC HEARING: AUGUST 2S, 1992
DATE OF REPORT: AUGUST 12, 1992
COMPILED BY: COMMUNITY DEVELOPMENT DEPARTMENT
APPLICATION SUMMARY: An application has been submitted requesting a Preliminary
Plat consisting of five single family lots on approximately 2.42 acres of R-1 (Single Family)
zoned land. The City's Comprehensive Guide Plan designates this area D-II (0-6 units/acre)
which is consistent with both the present zoning and proposed use. The site is located at
the southeast intersection of Blackhawk Road and Deerwood Drive.
EXISTING CONDITIONS: The site contains a significant amount of mature vegetation,
including many oaks. The topography ranges from gentle to severe slope and there is a
wetland located in the northwest comer of the site. City trails are located along both
Deerwood Drive and Blackhawk Road adjacent to this parcel.
COMMENTS: According to the applicant, the bank has held the property for two years and
is subdividing the 2.42 acre parcel into lots for individual ownership. At this time, custom
home sites are proposed and no mass grading is proposed.
The lots range in size from 12,000 sq. ft. to 26,265 sq. ft. and have a lot width of 85' or
more. As proposed, all lots meet code requirements. Lots 1 and 2 will take access from
Blackhawk Road, while Lots 3 through 5 will gain access from Deerwood Drive. Due to the
size of right-of-way for Blackhawk Road and Deerwood Drive, a 40' front building setback
would normally be required.
The applicant is proposing a front building setback of 30' which is consistent with existing
building setbacks north of this plat along Deerwood Drive and existing homes fronting
Blackhawk Road west of the site. The 30' setback is proposed to maximize tree preservation
and limit excessive grading. City Code section 11.20, subd. B.1. allows new single family
homes to maintain prevailing front building setbacks of existing homes in an established
area.
PARKS & RECREATION: Parks & Recreation staff will be recommending a cash parks
dedication and a cash trails dedication to the Advisory, Parks, Recreation, and Natural
Resources Commission at its September 3, 1992 meeting.
13v
GRADING/DRAINAGE/EROSION CONTROL: A minimal amount of grading will be
necessary to prepare Lots 1 & 5 for house construction. The preliminary grading plan shows
grading on Lots 2, 3 & 4 to prepare those lots for house construction. The existing wetland
on Lots 2 & 3 would be relocated to the west and the wetland would be redefined onto the
north half of Lot 2. The maximum cuts on this site are proposed to be 10 feet, and the
maximum fill is 4 feet.
The drainage off of the frontyards of the lots will be directed to the adjoining streets. The
drainage off of the backyards of the lots will be directed to the proposed wetland on Lot 2.
The preliminary grading and drainage plan shows proposed storm sewer be constructed to
drain the wetland to the existing storm sewer on Deerwood Drive. The houses abutting the
wetland shall have a lowest entry level of elevation 889.0 to provide two feet of freeboard
above the 100-year HWL that the wetland could flood to.
The developer has sent a letter to the City asking if the City had any interest in purchasing
property on this development for storm water ponding. The City is analyzing the existing
storm sewer systems and ponds in this area to see if the location and economics are feasible
for adding another pond to the City's stormwater management system.
The developer will be responsible for installing and maintaining erosion control measures
in accordance with the City's Erosion/Sediment Control Manual Standards. The site
contains many mature trees. According to the preliminary grading, drainage and
development plan, about half of the wooded area will remain in the undisturbed state even
after the houses are added.
WATER QUALITY: This development will be subject to a cash dedication requirement to
meet water quality standards. The amount of the dedication is estimated at approximately
$1,900. In addition, the developer will need to' delineate and meet State Wetland
Conservation Act requirements for all wetlands on the development site. The delineations
and impact analysis must be submitted for review to staff no later than Monday, August 23,
1992.
Recommendations on both water quality mitigation and wetland protection are subject to
approval by the Parks, Recreation, and Natural Resources Committee.
UTILITIES: Adequate sanitary sewer of sufficient depth and capacity is readily available
to the lots from an existing 9" sanitary sewer along the east side of Blackhawk Road or from
an existing 9" sanitary sewer along the north side of Deerwood Drive.
Adequate water main service of sufficient pressure and capacity has been provided from an
existing 16" water main along the west side of Blackhawk Road and an existing 18" water
main along the north side of Deerwood Drive. The preliminary utility plan shows
connecting to the existing mainlines in Blackhawk Road and Deerwood Drive and stubbing
services across the roads to the proposed lots. Individual sewer and water services will be
provided to each lot for sewer and water service. The developer will be responsible for
repairing the streets at each of the service crossings.
STREETS /ACCESS/CIRCULATION. Street access to this development is available from
Deerwood Drive on the north side and Blackhawk Road along the west side of the site.
The development proposes to add three driveways out to Deerwood Drive and two
driveways out to Blackhawk Road. No driveways will be allowed onto Taconite Trail until
the existing driveway on Taconite Trail is improved to a City standard street with concrete
curb and gutter and bituminous surfacing. The preliminary development plan does not show
any driveway from the new lots to be added onto Taconite Trail. In the surrounding
developments of Cedar Grove 7 and Cedar Grove 8, the houses abutting Deerwood Drive
and Blackhawk Road have driveways that connect to the City streets.
RIGHT-OF-WAY f EASEMENTS,/PF S: As shown on the preliminary plat, 50 feet of
half right-of-way shall be provided along the lots that abut Blackhawk Road and Deerwood
Drive.
The developer will be responsible for obtaining all the necessary permits from the affected
agencies such as MPCA, MWCC, Dept. of Health, MN DNR, etc., prior to final plat
approval.
FINANCIAL OBLIGATION - Deerhawk Addition
Based upon the study of the financial obligations collected in the past and the uses proposed
for the property, the following charges are proposed. The charges are computed using the
.City's existing fee schedule and connections proposed to be made to the City's utility system
based on the submitted plans.
Improvement Use Rate Quantity Amount
Storm Sewer Trunk S.F. .069 S.F., 79,225 S.F. $ 5,467
Lateral Benefit S.F. 15.30 if 502 if 7,681
Water
Lateral Benefit S.F. 17.25 if 502 if 8,660.
Sanitary Sewer
Lateral Benefit S.F. 19.55 if 105 if 2.053
Storm Sewer
Total 1
There is a balance of $4,166 of assessments payable on the parcel. The succeeding parcels will
be allocated their pro-rata share of this balance payable.
CONDITIONS OF PLAT APPROVAL FOR DEERHAWK ADDITION
1. These standard conditions of plat approval as adopted by Council action on July
10, 1990 shall be complied with:
Al, B1, B4, C1, C2, El, F1, G1, and H1
2. Tree preservation shall be accomplished with a physical barrier prior to any site
grading.
3. 30' front building setbacks shall be allowed for all lots.
4. The lowest entry level of the houses on this site shall have a minimum elevation
of 889.0 to provide two feet of freeboard above the 100-year HWL of the wetland.
5. Individual sanitary sewer and water services will be provided to each lot and the
developer will be responsible for repairing the existing streets at each crossing.
6. No driveways will be allowed onto Taconite Trail until the existing driveway on
Taconite Trail is improved to a City standards street with concrete curb and gutter
and bituminous surfacing.
STANDARD CONDITIONS OP PLAT APPROVAL
A. Financial Obligations
1. This development shall accept its additional financial
obligations as defined in the staff's report in
accordance with the final plat dimensions and the rates
in effect at the time of final plat approval.
B. Easements and Rights-of-Way
1. This development shall dedicate 10' drainage and utility
easements centered over all common lot lines and adjacent
to private property or public right-of-way.
2. This development shall dedicate, provide, or financially
guarantee the acquisition costs of additional drainage,
ponding, and utility easements as required by the
alignment, depth, and storage capacity of all required
public utilities and streets located beyond the
boundaries of this plat or outside of dedicated public
right-of-way as necessary to service this development or
accommodate it.
3. This development shall dedicate all public right-of-way
and temporary slope easements for ultimate development
of adjacent roadways as required by the appropriate
jurisdictional agency.
4. This development shall dedicate adequate drainage and
ponding easements to incorporate the required high water
elevation necessitated by City storm water storage volume
requirements.
C. Plans and specifications
1. All public streets and utilities necessary to provide
service to this development shall be designed by a
registered professional engineer in accordance with City
codes, engineering standards, guidelines and policies.
2. A detailed grading, drainage, erosion, and sediment
control plan must be prepared in accordance with current
City standards prior to final plat approval.
3. This development shall insure that all temporary dead end
public streets shall have a cul-de-sac constructed in
accordance with City engineering standards.
13~'
STANDARD CONDITIONS OF PLAT APPROVAL
PAGE TWO
4. A detailed landscape plan shall be submitted on the
proposed grading plan. The financial guarantee shall be
included in the Development Contract and not be released
until one year after the date of installation.
5. All internal public and private streets shall be
constructed within the required right-of-way in
accordance with City Code and engineering standards.
D. Public improvements
1. If any public improvements are to be installed under a
City contract, the appropriate project must be approved
at a formal public hearing by Council action prior to
final plat approval.
E. Permits
1. This development shall be responsible for the acquisition
of all regulatory agency permits in the time frame
required by the affected agency.:
'F. Parks and Trails Dedication
1. This : development shall fulfill its parks dedication
requirements as recommended by the Advisory Parks and
Recreation Commission and approved by Council action.
G. Water Ouality Dedication
1. This development shall be responsible for providing a
cash dedication in addition to/in lieu of pending
requirements in accordance with the criteria identified
in the City's Water-Quality Management Plan.
E. Other
1. All standard platting and zoning conditions shali'be
adhered to unless specifically granted a variance by
Council action.
Advisory Planning Commission City Council
Approved: August 25, 1987 September 15, 1987
Revised: July 10, 1990
plataprv.con
LTS #2
-377 loi -1
. ~w-+ ..,;.''dn ?`p D tp^ JAI 1R c~
N t 1"ISSf~ I. PJ 'tir. .y
NE ; .n P[
9 •aan
EMPORT
AVE
16f-.NNA ~f; p 1NTICE +VE
".~off..-. veBRC w•
TR
LOCATION AC NIT ACON
UES7b
n* I
aRNEL:AN 4RK
J~ - M CT /I /
t E.OOwLa17w
'Tur
u ry v •
I _ _ ^~1~, iMT ICY
~Ry ,+t' AT4R?
no
• l NE
AOOWI AFW .
_ ~IELO ~ I Mar- /
I 11CO RO NO 30 1
I1r7-TOL ~T 1~ ~/I
[f7P4i1GR-- j -jam A~ blfl LE+ 40A0 •
`Q` r ~TEMI f !
N0 }Y"
~ p ~ T 4)/?~eJ o',/ tP LWAY l~ i II rap
rSA EYT ~~q• 9LACKHMN
PARK PK
t Cr,:mrc. s ~Rn Ei
;Sir
',R 4
ZONING ~:-t - - A _
n-.•.- L' i 1,' WLANOAL
eaRR
R8 -RB El1 Imo.
f A •~B y1 a 11 K
OAK
04
- 04
GUIDE PLAN
y^ ° Ps
04
I o-a1 ~ -
•p.•1 _ .p PC
LID
Ns
Pc
Rs P
caa 0.m f
04" _
04
04 1
• •--mac..-~ •P
• / ~t pc
nw ~ _ P nTV P
UP(
1 - , Oj y S l 1: / / r 1
13 13'
I I rl , r 1-
13
Hi:SSSS::::S
\ 1 :C:'•ii:::'it• S•
f
J t r 1 _ I ......:•2:•:~ 3iiit'•
! / I I r . ' n I ii.,•~~I~~i:: • ESe:Fi3•'• 1 t / 14
i1 p \ / I el W 1. •itiS SSS'S:• SS St^ii:t:i::'•'2 1 Z • .4
t r P iii.. ~
/ a 1 c / ; 'A' 1 iii,ii.11j.iiiir::• ! 1 / : !r` `
1
1 ( 4 q 11 1 ~'lQ~ »i; r i./ r~ It
t 1 0 IO ' 'r
o nof no-M.U.o ..o::
Mimi. -
it fY:••Siti~.'.':
W . 2 r 1 r , . I
/ _ 1 1 a W : e iii J+ ` It U IIp r I' Sii 1 I/ \
1 t J 1 O i» » o 11 1. 1
\ 0 r 4 iL'•i«:«iii:.., 11 1 I f
. p y
iiiii3:..iii:.• •jii•:Si'E~ t / _ s
H'i
r ' O ' iti•• i"..::::::?iiii33:~eiE::::E•::•:~:•
1 I r ? d P ~:;p.:»i«~.'17•ii«iii
W. 0
.
ii.
S :
,
--r--- ~------------r-~ ,i -
----:-~<cs7$s•~;i .iti1- taa~=*_,rac s"^ia
v "Vol, H/hdHbA8,
I ~1 _ tin l I ~1 _ i
. 1~ , . r- it / / 1 1 iy +
all
1, \ 9
6+ 11 ! ' / \ - I r !
I t4~~,
P L, I 11 _ y\ \
r- i y \ 11 r
7.
a z
III
14,
N led
$ • € ~ dal=s=.~3~~ii1.3
3 , z
W il; l ; H
I-J
' ~ ` ; • Ali - a'` : ~ / ` ~ , \ ~ ~ fem.
4L. U04
® 3 t _ / /lid /".y..~; 4 g^I j 4 I'~ •
' dE' w w
_
,_~tE o f fir.. E s 2 as x
Tt.
1~oj %P
1 00
f 14 r, I
vi A
i I: ii•~ / •
10,
ti/ Ll4
-r iei d t, "oT _ `i ~i4r._ ~a ti; Y
k-M
/r1i R Dxa:.D ~'a`2Y~! rt:4: D g
FINANCIAL OBLIGATION
LEGEND
LATERAL BENEFIT WATER
Won LATERAL BENEFIT SANITARY SEWER
• sly. =m>mscae aaae®v>s Ew®. I ez+
4' w.,~ ( I ~~r-/• LATERAL BENEFIT STORM SEWER
STORM SEWER TRUNK
~~~1"~~? I rr ~Jr. T~~,.J~''~ti•,Y,'r,+YA44':':y4!.~.;-=
sum
f a,. l f " ~1 .a to , T .r. n, y,; '1
MIf A I ~ - f 1 N• • ~
+--1-+-+ ! I• ~'~'Y••e`Y.~.,~:'~:TI..r ' : 1. ! ...G~•' ~..1''~• .
I.X-X X:
_ ~ ~ ; ^ rte, .;'~,ti ' x
214-
wck ^ I }{."f.'••', r~:}~{::ti R l~ /.//aa`l_ ^~~;.r'.r,.,'~i":'C~:" j`u•\\
~ ~ ••?iwi/tir 1- ~ / ~ . • ~ • ?ie:::.r ~ 1.
~ ~ / tic,'
_ 7 Y _ /TAGN1( lKA1f N , _ ! +~W~bE 00A, Race Aa,
jLr
PILZLIxXRARS ILA? 01: DEE1 HAWK ADDX 1 X - -
• - _
A -h -38 ~1 ,BOOD j$ AChFI~~
• ~ 8 AP41.4
j-'82100
AP rJ 04- -;T R
r 8/BB_ 1 - y T-t
AP-36 _ _ 5 r T' ~t r' `r
7087 r r. P
27
80/3 7,Y.0.
8P-2
803.6
54 r A-k 807.b 782.3 BP-29,
.r 0 ` 7 t 3 ` t'.• , T11 89.7'
A P- 1 4 A! BP-291
200.6 916.0
~
20.0
F' 2 ~I
rr. t- y ' 1
2 le-
i.' BP-2F
6 _.u r • 9
858 o
pi 862.6
r ! P663- )t- 868.0
Bp- ro ' ' • .27i?' :A-s 8820 48
-n+ --72 ' 36 895.2
A-0
FE RW is - V
n A•o A-~ P R D
JP-37
872.0-
BP-3 -
889.9 !.876.0
8P-35 905z r
=Y; 908.0
920.2 j J a
AP- 4
886.3 k-~'`-- 1? : / i BP-25 874.2 BF
8?0.6 ::AP,T.T 98865 8E
92.2 B4f2*?
825 N -900.0 a-! t
920:0
-^AP7 923 930.0-
8894 1599.O~P-28_- / d IR
LEGEND
PONDING AREAS
STORM SEWERS (exletInp) . . . . . . . . . •
STORM SEWERS (Propos@0 . . . . . . . . .
STORM LIFT STATION (existing) . . . . . . . •
STORM LIFT STATION (propoeem . . . . . . . O
STORM FORCE MAIN -6 ? ?
MAJOR DIVISION a~
POND NORMAL WATER LEVEL . . . . . . . 900.0
POND HIGH WATER LEVEL . . . . . . . . 900.0
OVERLAND DRAINAGE ROUTE
FIGURE No. 17
STORM SEWER LAYOUT
MAP
CITY OF
EAGAN