Date: 11-18-13 Site Address: 4232 Blackhawk Road Unit
Resident/ Name: Eagan Pointe Senior Living, LLC Phone:
Owner Address i City / zip: 945 Sibley Memorial Highway, Lilvdale MN 55118
Applicant is: Owner _X_ Contractor
Type of Work Description of work: Demolition of Existing; Residence
Construction Cost: Multi-Family Building: (Yes / No X-J
Company: Rachel Contracting, lnc. Contact: Aaron Beming
Contractor Address: 4125 Napier Court NE City: a'n Michael
State: MN zip: _ 55376 Phone: 763-424-1500
License Lead Certificate
If the project is exempt from lead certification, please explain why: (see Page 3 for additional information)
COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING
In the last 12 months, has the City of Eagan issued a permit for a similar plan based on a master plan?
Yes _No If yes, date and address of master plan:
Licensed Plumber: Phone:
Mechanical Contractor: Phone:
Sewer & Water Contractor: Phone:
NOTE: Plans and supporting documents that you submit are considered to be public Information. Portions of
the information may be classified as non-public if you provide specific reasons, that would penult tpe'Gety to
conclude that the arv trade secrets.
CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 4540002 for protection against underground utility damage. Call 48 hours
before you intend to dig to receive locates of underground utilities. www.aopherstateonecall.ora
I hereby acknowledge that this information is complete and accurate; that the work will be In conformance with the ordinances and codes of the City of
Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in
accordance with the approved plan in the case of work which requires a review and approval of plans.
Exterior work authorized by a building permit issued in accordance with the Minnesota State Building Code must be completed within 180
days of permit Issuance.
i
`
x_ Aaron Bexning x 2~>~
Applicant's Printed Name App Ica s Signature
Page 1 of 3
Minnesota Pollution Notification of Intent t
Control Agency to
520 Lafayette Road North Perform a Demolition
St. Paul, MN 55155-4194
Asbestos Program
Doc Type: Notification
Type of notification: ❑ Original ® Amended ❑ Project cancellation
Notification must be postmarked or received ten (10) working days before demolition begins. See Item 5 for emergency
demolitions. Both start and end dates should be amended in writing as necessary to reflect current project dates.
Demolition Contractor Building Information
Name: Rachel Contracting Building name: House and Out Buildings
Address: 4125 Napier Court NE Address/Location: 4232 Blackhawk Road
City, State, Zip: Saint Michael City, State, Zip: Eagan, MN 55121
Phone number: 763.424.1500 County: Dakota
Contact name: Brent Johnson Phone number: N/A
Phone number: 763.424.1500 Age of bldg (yrs): 25 Size of bldg (sq ft): 1800/8400/2350
Number of floors, including basement level(s): 3
Building Owner Present use of bldg: Residential
Name: Eagan Pointe Sr. Living LLC Prior use of bldg: Residential
Address: 8147 Global Dd
City, State, Zip: Woodbury, MN 55125 Dates of demolition or intentional burning:
Phone number: 952-431-5700 Start date: 12/02/2013 End date: 12/11/2013
Contact name: John Myhre mm/dd/yy mm/dd/yy
Phone number: 612-799-9486
Note: If there is >260 linear feet or >160 square feet of Regulated Asbestos-Containing Material (RACM) in the building to be
demolished, it must be removed by a licensed asbestos contractor prior to demolition. The State of MN-Notice of Intent to
Perform an Asbestos Abatement Project http://www.pca.state.mn.us/publications/w-sw4-06.doc must be used to notify for
the asbestos removal.
Is nonfriable ACM present in the structure to be demolished? ® Yes Q No
Will nonfriable ACM be present in the structure at the time of demolition? ❑ Yes ® No
If Yes to both questions above, complete Items 1-9. If No to either question, complete Items 3-9.
1. If ACM will be left in place for the demolition indicate the amount of Category I and/or Category II nonfriable ACM left
in place.
Category I: - Linear feet Category II: Linear feet
Square feet Square feet
Cubic feet Cubic feet
Category I nonfriable ACM means asbestos-containing Category 11 nonfriable ACM means any material, excluding
packings, gaskets, resilient floor covering, and asphalt Category I nonfriable ACM, containing more than one
roofing products containing more than one percent percent Asbestos that, when dry, cannot be crumbled,
asbestos. pulverized, or reduced to a powder by hand pressure.
Category I nonfriable ACM is not allowed to remain Category 11 nonfriable ACM is not allowed to remain in
in place for demolition if it is in poor condition. place for demolition if it has a high probability of becoming
crumbled, pulverized, or reduced to a powder during
demolition, transport, or disposal (e.g., transite, cement,
slate roofing).
www.pca.state.mn.us • 651-296-6300 • 800-657-3864 TTY 651-282-5332 or 800-657-3864 • Available in altemative formats
w-sw4-21 • 1126111
Page 1 of 2
2. Description and location of ACM remaining in place (including number of floors and rooms):
None
3. Company and/or individual that conducted the building inspection and the procedure used to determine the presence
or absence of ACM (including analytic method): (Note: Prior to demolition all structures must be inspected by a licensed
asbestos inspector who has been certified through the Minnesota Department of Health.)
American Engineering Testing, Inc.
Analysis performed using EPA Method600/R-93 and 600/M4-82
4. Description of planned demolition and the specific method(s) that will be used:
-Total building demolition utilizing an hydraulic excavator with various demolition attachments will be used to
demolish the building and load material into trucks for proper disposal.
5. If the demolition was ordered by a government agency, please identify the agency and attach a copy of the order:
Name: Title:
Authority:
Date of order (mm/dd/yy): Start date (mm/dd/yy):
Notification for an emergency demolition must be submitted as early as possible before demolition begins, but not later than
the following working day. A demolition is considered an emergency only when the facility has been deemed structurally
unsound and in danger of imminent collapse. if the structurally unsound building is known to contain any regulated ACM or is
suspected to contain any regulated ACM, special procedures must be followed. if you are unaware of the special procedures,
instructions/ regulations can be obtained by contacting the Minnesota Pollution Control Agency (MPCA) at the address or
phone number listed below.
6. Description of procedure to be followed in the event that unexpected RACM is found or Category II nonfriable ACM
becomes crumbled, pulverized or reduced to powder:
We will stop work in the area, apply water, restrict access and notify the owner.
7. Demolition waste transporter(s) information: 8. Demolition waste disposal information: *see below for more information
Transporter name: Rachel Contracting Landfill name: SKB Landfill
Contact name: Mark Kraemer Owner/Operator: Mike Fullerton
Tranporter address: _4125 Napier Court NE Address/Location: 13425 Courthouse Blvd
City, State, Zip: St. Michael, MN 55376 City, State, Zip: Rosemount, MN
Phone number: 763.424.1500 Phone number: 651-428-1400
9. 1 certify that the above information is correct and I am a bonafide representative of the demolition contractor or
building owner and have authority to enter into agreements for my employer.
Print name: Aaron ernin Title: Project Manager
Signature: Date:11/19/2013
Important Note:
Ensure you are in compliance with Minn. R. 7035.0805 prior to the commencement of renovation/demolition.
This rule requires that the following items be removed two days prior to demolition: mixed municipal solid waste; household
hazardous waste; industrial or hazardous waste; waste tires; major appliances; items containing elemental mercury, Poly-
Chlorinated BiPhenyls (PCBs), and chlorofluorocarbons (CFCs); oil; lead; electronics; and other prohibited items. See MPCA
website at www.pca.state.mn.us/publications/w-sw4-20.pdffor a Pre-Renovation/Demolition Environmental Checklist Guidance
Document to assist with completion of this rule.
*Demolition waste must be disposed of at a permitted solid waste facility. For other disposal option please contact the regional
MPCA solid waste compliance/enforcement staff with any questions.
Submit to: Minnesota Pollution Control Agency Questions call: 651-296-6300 or 1-800-657-3864
Industrial Division - Asbestos Program
520 Lafayette Road North Fax: 651-297-1438
St. Paul, MN 55155-4194
E-mail: asbestos.demolition.pca@state.mn.us
www.pca.state.mn.us • 651-296-6300 800-657-3864 TTY 651-282-5332 or 800-657-3864 • Available in alternative formats
w-sw4-21 • 1126111
Page 2of2
11/13/2013 WED 12:54 FAX 9524315709 stonebridge construction X001/001
Use BLUE or BLACK Ink
I-- _I
For Office Use ,
Permit
City of Eap
I . C~ I
3830 Pilot Knob Road 13 Permit Fee i
Eagan MN 55122 Date Received: 1 " I l 3 ;
Phone: (651) 675-5675
Fax: (651) 675-6694 S+Di staff.
2013 COMMERCIAL BUILDING PERMIT APPLICATION
Date: 11/13/13 Site Address: 42Blackhawk Road
/
Tenant Name: .0, 41rt tell ! n-~e- .t1,0~f LVI`n (Tenant is; t~ New / Existing) Suite 0:
f6 f'°`
""I Former Tenant:
flll'~ 1
f 6 4YkY b"..~.
Name: Eagan Pointe Senior Living LLC phone: 651-312-4500
4~IJVL')PrIIPd hG~p1p+.(IS~.,. .AWXI
1984 Oakdale Avenue, W St Paul, MN 55118
Address /City/ zip:
i i X
Applicant is: Owner Contractor
rAIgYfnY~.~Q: ~
w 4 wrw~ VX' M i Description of work: New Construction -Senior Housing -f
.Him Construction CostQ
4 •,rvM L" ~v
Name: Stonebridge Construction License #
I "G~~prr ~ _Irnr.~rr
Y'"Y~ eoi~~G dt4'
M r`'
Address: 15734 Foliage Ave City: A PP IeValle
Y
'r~ ~ 4vrp(grdtMFX~(IM A`;y'yrnYY
State: MN Zip: 55124 Phone: 952-431-5700
•y,,,a~.x,°•~°° ~ al ,
•
Brad Friesz Email: bfriesz@stonebridgecommunities.com
Contact:
Name: Harriss Architects Registration
Ay11
.~'A'k.A (Y.I,IIQY~IA~AOY.~My;p4WMArv
Address: 3207 Central Ave NE City: Minneapolis
x M.
55418 -339-2190
State: MN Zip: Phone: 612
, George Johnson Email: gjohnson@harrissarchitects.com
Contact Person:
E sanrl r Y a l6iui
Licensed plumber Installing new sewer/water C4'- Phone # U OT (03q- -T?- 7e
. ..I , -..x..,_....._~._ ........A•.~.. Aw , , IA _ ..,Y~ '•rv. , r~ IIw1iy ~elYtV~.•,~.; .~AipWAIMl~Y,V~Mx.~~.bL~ a ON _x,r.- a w~ e •
"gp^ruacr~~orq? ~ ~ Y
.
x
.:.._.;AxYM. O N I 014,0 5.0.1, •t~..•. s' ,.....s.......: _ .a. :::r -.-x ~rt A„4Y;w,~AY,,. -1
11 -V
CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage.
Call 48 hours before you intend to dig to receive locates of underground utilities. www.gopherstateonecall.org
I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and
codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work Is not to start without a
permit: that the work will be in accordance with the approved plan in the case of work whigh reAuireS review and approval of plans.
x (~a d A ~nep2 x
Applicant's Printed Name Applicants Signatur
Page 1 of 3
DO NOT WRITE BELOW THIS LINE
SUBTYPES
_ Foundation _ Public Facility _ Exterior Alteration-Apartments
Commercial / Industrial _ Accessory Building _ Exterior Alteration-Commercial
Apartments _ Greenhouse / Tent _ Exterior Alteration-Public Facility
Miscellaneous Antennae
WORK TYPES
New _ Interior Improvement Siding Demolish Building*
Addition _ Exterior Improvement Reroof _ Demolish Interior
Alteration Repair Windows Demolish Foundation
Replace Water Damage Fire Repair Retaining Wall
Salon Owner Change *Demolition of entire building - give PCA handout to applicant
DESCRIPTION
Valuation lotooQ d Occupancy 5-2- MCES System r~
Plan Review Code Edition ,;200"7 MSBL SAC Units
(25%1000
Zoning City Water es-
Census Code Stories Booster Pump
# of Units Square Feet PRV
# of Buildings Length Fire Sprinklers_
Type of Construction Width
REQUIRED INSPECTIONS
Footings (New Building) Sheetrock
Footings (Deck) Final / C.O. Required
Footings (Addition) __ZFinal / No C.O. Required
V Foundation Other:
Drain Tile Pool: -Footings -Air/Gas Tests -Final
Roof: -Decking -Insulation -ice & Water -Final Siding: -Stucco Lath -Stone Lath -Brick
Framing Windows
Fireplace: -Rough In -Air Test -Final Retaining Wall
Insulation Erosion Control
Meter Size:
Final C/O Inspection: Schedule Fire Marshal to be present: Yes ✓ No
Reviewed By:tiltc. L Building Inspector Reviewed By: , Planning
COMMERCIAL FEES
Base Fee Water Quality
Surcharge 00 Water Supply & Storage (WAC)
Plan Review d rc5~ i Storm Sewer Trunk
MCES SAC Q Sewer Trunk
City SAC 9100,01) Water Trunk
S&W Permit & Surcharge 00 Street Lateral
Treatment Plant 60 Street
Treatment Plant (Irrigation) Water Lateral
Park Dedication Other:
Trail Dedication
Water Quality TOTAL~9 9 7S~
Page 2 of 3
iR,"l5
Dale Schoeppner March 13, 2014
Chief Building Official
City of Eagan
3830 Pilot Knob Road
Eagan, MN 55122-1810
Dear Mr. Schoeppner:
The Metropolitan Council Environmental Services (MCES) Division has determined SAC for the Eagan Pointe
Senior Living to be located at 4232 Blackhawk Road within the City of Eagan.
This project should be charged 79 SAC Units, as determined below.
SAC Units
Charges:
Independent Living/Assisted Living (with washers)
46 -1-bdrm units x 1.5 residents/unit = 69.00
26 - 2-bdrm units x 2 residents/unit = 52.00
121.00
121 residents @ 2.5 residents/SAC Unit 48.40
Independent Living/Assisted Living (without washers)
66 - Studio units x 1 resident/unit = 66.00
11 -1-bdrm units x 1.5 resident/unit = 16.50
2 - 2-bdrm units x 2 residents/unit = 4.00
86.5
86.5 residents @ 3.0 residents /SAC Unit 28.83
Guest Suite (no washers)
1 unit @ 80% /SAC Unit 0.80
Parking Garage
28 f.u. @ 17 f.u./SAC Unit 1.65
Total Charge: 79.68 or 80
Credits:
Demolition #119229 (SAC paid 11/23) 1.00
Net Charge: 79.00
The business information was provided to MCES by the applicant at this time. It is the City's responsibility to
substantiate the business use and size at the time of the final inspection. If there is a change in use or size, a
redetermination will need to be made.
Sincerely,
Karon Cappaert
SAC Program Technical Specialist
KC:fa: 140313A2
Determination expiration: 03/13/2016
cc: Amy Griffin, Eagan (email)
George Johnson, Harriss Associates (email)
File, MCES
J
•e Robert Street North St. Paul, MN 55101-1805
Phone 651.602.1000 1 Fax 651.602.1550 1 TTY 651.291.0904 metrocouncil.org N4FTR.OP01_I TAN
An Equal Opportunity Employer C 10 U N E
Use BLUE or BLACK Ink
«�- p� -----------------,
������V�� � For Office Use I
(�1nn �tAv1 q 1 I ��� I
Vl�� ���ltl�tl� !'�H 1 1 i L�l� Permit#: � � �
I �
I Pemiit Fee: �
3830 Pilot Knob Road I �
Eagan MN 55122 � Date Received: �
Phone:(651)675-5675 � �
Fax:(651)675-5694 � Staff: �
__�______________J
2014 COMMERCIAL PLUMBING PERMIT APPLICATION
� Please submit two(2)sets of plans with all commercial applications. �Z= Z--
Date:�T���L� Site Address: � ��a���� ��
.
Tenant: �a �Y ��� � Y i��� `�v��� � � Suite#:
Property
(�y��;�� Name: Phone:
' Name: �r�'er / � �'e(„�!1a� � License#: ����
�Ori�faG�OP „-` Address: ���� �"`"`Wa''��it���• �./�� State:��Zip:��
' --�7 .
Phone:7������� 1 Email: w�� "'� � Y�
' �New _Replacement _Repair _Rebuild _Modify Space _Work in R.O.W.
Tjlj�e Of 1l1/OCk,;
�,,,, Description of work: �
�� 4 COMMERC/AL New Construction Modiry Space
�'�
Irrigation System(_yes/_no)�RPZ/_PVB)
� '� . . Rain sensors required on irrigation systems � �
��CI'T�I�'�jfp� ' . Avg.GPM (2"turbo required unless smaller size allowed by Public Works)
Meters Call(651)675-5646 to verity that te�ts passed qrior to qickinct ua meter.
Domestic:Size&Type� �Y/� Fire: 1
� „ , „„ ,, Avg.GPM High emand devices?_Yes_No Flushometers_Yes_No
COMMERC/AL FEES Contract Value$ ����I��� x.01
$55.00 Permit Fee Minimum
i
_$ �("�(�(� Permit Fee
a�i
*If contract value is LESS than$10,010,Surcharge=$5.00 =$ � Surcharge"
'*If contract value is GREATER than$10,010,Surcharge=Contract Value x$0.0005 -�'
�""If the project valuation is over$1 million, please call for Surcharge -$ � �•�� TOTAL FEE
Following fees apply when installing a new lawn irrigation system $ Water Permit
Contact the City's Engineering Department,(651)675-5646,for required fee amounts. $ Treatment Plant
$ Water Supply&Storage
$ State Surcharge
_$ TOTAL FEE
CALL BEFORE YOU DIG. Call Gopher State One Call at(657)454-0002 for protection against underground utility damage. \
I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of
Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in
accordance with the a proved plan in the case of work which requires a review and approval of plans
X �i�lGtC� �=► ��� X
Applicant's Printed Name Applicant's Signature
�C?R flFFtCE USE; %j �f�f ` y y���, rn ed B � �i�ate�� �
�p1� �' ,
�
; .;
� � �
�Req�i�ed Inspec�flns ��i�l�r�rc�und �au�h I �"A r����st����Tsst �a{;, P�t1#Req �r� F Y�s N,o
Met�r Related ltenns 11�lete"r S�ze��, i�adi ,� �� � �y ��
� .. ...� �� ��'.
�� ° o F��ad=' s��llar��rtt€�ter ;,. S�aff;��:'
Page 1 of 3
Use BLUE or BLACK Ink
�-- ------- ---,
� For Office Use ��� I
jPermit#: � �
City a��a��� � �;
3830 Pilot Knob Road � Permit Fee: �
Eagan MN 55122 � �
Phone:(651)675-5675 � Date Received: �
Fax:(651)675-5694 � I
� Staff:
��_�����_��������J
2014 MECHANICAL PERMIT APPLI ATION
� i (�
Please submit two(2)sets of plans with all commercial applications. ��-�Z-
Date: � (�� � Site Address: d.J a Q
Tenant: Ga �� 0� � � + V , y �. Suite#:
� .: � f.. �
�
R+�51d�Ci'��WCieC ', Name: Phone:
� ';%��� Address/City/Zip:
`
t Q�,f �,,,^
y �` Name: '�r,JL/► W `� License#:
Address:J�Z7u[ � ��``� +W�il�� �� City:
�ii?l1tCc'1�t01`
�� , State:�Zip: Phone: ��`��'"����
,� ,,;', Contact: Email: w ,"� � � / v t
? . Cf *"
New Replacement Additional Alteration Demolition
�;
'
T�[�e,c�f WoCk: ' Description of work:
�
, �
�
�
�
�� ; . � t�0T�6 Ro�f,moun�e�l and gro�un�i m�aun#ed m�char�ical equiprr3e�tt�s r�quired tc�be scre�en,ed by���y"
- .,., �� � - i. t /�'�/x v = � �.°-r/i
f ;; � ! Gode� Please:cpnta+yt�h�:M+�chan�cal lnsp��ts�rfo�t.�t�format��n c�r��aermatteci s�reenin�rne#� r :::.;
� � ,,,, ,�,�.,,., -„�,,,, ,� ,�ti
RES/DENT/AL COMMERC/AL
Furnace �New Construction _Interior Improvement
Air Conditioner Install Piping Processed
Perm➢t-Type ., — — —
Air Exchanger Gas Exterior HVAC Unit
_Heat Pump Under/Above ground Tank (_Install/_Remove)
�,; ;5 y�, Other
RES/DENTIAL FEES
$60.00 Minimum Add or alteration to an existing unit(includes$5.00 State Surcharge)
$100.00 Residential New(includes$5.00 State Surcharge) _$ TOTAL FEE
COMMERCIAL FEES Contract Value$l �� ��
x.01
$55.00 Permit Fee Minimum ,�-
$70.00 Underground tank installation/removal =$_�7��Permit Fee
*If contract value is LESS than$10,010,Surcharge=$5.00 �� �
**If contract value is GREATER than$10,010,Surcharge=Contract Value x$0.0005 -$ � Surcharge"
"`*If the project valuation is over$1 million, please call for Surcharge '��
_$ 'S'� TOTAL FEE
I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of
Eagan;that I understand this is not a permit,but only an application for a permit,and work is not art ithout a permit;that the work will be in accordance
with the approved plan in the case of work which requires a review and approval of plans.
X �,� � �',��"�/�� �� X
Applicant's Printed Name ppli rtatur
j , � , .
�OR 0����U5� � ��
` ` � ��l�
,��. >�.
� �equ��ed fnspect�ons �'� � ~°�Revi�wed By � '��'�Date
x�,
�-�. C3riiierground;,..�Rc�ugh ln ' `Air 7�st ". ` as�ervice Test ' In-fifoor Heat �F.ina�:: H�fAC Sceeen�ng��Fy� '
s
t. f
� � � � Use BLUE or BLACK Ink
---------
� For Office Use j
« � Permit#: ���� I
��� of Ea a� p ��E� � . /� /�� �� �
� � r`��� Permit Fee: vJ v`
3830 Pilot Knob Road � �
Eagan MN 55122 MAR Z 1 �Q1� � Date Received: � �f� � �
Phone: (651) 675-5675
Fax: (651) 675-5694 j �� j
� Staff: I
---------------������,��`Y
2014 COMME��A�L BUILDING PERMIT APPLICATION �,��,�'�
Date: 3/18/14 Site Address: .�� Blackhawk Rd. ��
TenantName: Eagan Pointe Senior Living (Tenantis: X New/ Existing) Suite#:
Former Tenant:
%���� Name: Eagan Pointe Senior Living, LLC phone:
� �
��Q��������� � Address/Cit /Zi 1984 Oakdale Ave . / West St . Paul / 55118
��, � Y P�
� ��'��, 2 , Applicant is: Owner X Contractor
� % � Description ofwork: Senior Living 4 story wood framed w/ Precast
Typ� Qf Wor�
r�� � .� ,�,�, :, ! Construction Cost: $13, 0 0 0, 0 0 0 . 0 0
r � �:
�'� i� - k.✓R�`.
��°� ��� `" ' Name: Stonebridge Construction, Inc .License#:
,��� ` ;
15734 Folia e Ave . A le Valle
���,����,���, , Address: g City: I�P Y
� C�u-W- 7�3-2bt � 4G2.Z-
� ��� ����� State: MN Zip: 5 512 4 Phone: 9 5 2 . 4 31 . 5 7 0 0� �XT Z3 O
� Mr�rr c.utuE. nlCvmeQgfonebndecoa•rru,Rrrhes..co,�.-.
..�:
Contact: Brad Friesz Email: bfriesz@stonebridgecommunities . c m
� �
' �, Name: Harriss Architects Registration#: 22603
` ';
��,���������������,; Address: �,�� washington Ave . N City: Minneapolis
u � ; �tZ •44p•Ztoi
� ; �; j, , State: M� '� Zip: 5 5 4 01 Phone: 612 . 9 4 0 . 6 4 2 7
� �� .
��yy ,�� C7Eb� O1+N50
-� Contact P„erson: John Harriss Email:7harriss@harrissarchitects . c m
Licensed plumber installing new sewe'r/water service: JBe rd Me chan i cal Phone#: 3 2 0 . 6 5 6 . 0 8 4 7
CITE l��s,�� �u�r �r�`�r� �lacut� #ha , �r� �re ca�s�c�+��'� ����i���f�r ��ia�t P�r��ns r�#'
�lae 1n�c�rm��ra�r m� �+�����.r��l as� �rr�b�`r y �r��ro��d���recr�c r+eas�n� � f c�u��p�'����e�� �o
� C ..�� � �, �' •'�.M��Y�iRi���R������i, �,%.�',.��f�..,_l���i�3�4��A��. ... R � "� R '�q E'
� � � „ ....�:. .r, . ; ....... „s . :,." , .: ...
.. . . . . . . �.....�i. ....._.,. � ,.,:;i .....: :_,_. l
CALL BEFORE YOU DIG. Call Gopher State One Call at(651)454-0002 for protection against underground utility damage.
Call 48 hours before you intend to dig to receive locates of underground utilities. vwvw.qopherstateonecall.org
I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and
codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a
permit;that the work will be in accordance with the approved plan in the case of work whi�qui s a review and approval of plans.
X Brad Friesz �
Applicant's Printed Name ApplicanYs Signatur
✓'
�`4 Page 1 of 3
�
i. _ �
. ���3 � �I�G�cJ-���k- I�P 'C.�S�
' . � DO NOT WRITE BELOW THIS LINE �_l
SUB TYPES
Foundation Public Facility Exterior Alteration-Apartments
�Commercial/Industrial _ Accessory Building _ Exterior Alteration-Commerciai
_ Apartments _ Greenhouse/Tent _ Exterior Alteration-Public Facility
Miscellaneous Antennae
WORK TYPES
✓ New _ Interior Improvement _ Siding _ Demolish Building*
_ Addition _ Exterior Improvement _ Reroof _ Demolish Interior
_ Alteration _ Repair _ Windows _ Demolish Foundation
_ Replace _ Water Damage _ Fire Repair _ Retaining Wall
_ Salon Owner Change *Demolition of entire building-give PCA handout to applicant
DESCRIPTION � ✓
Valuation 2/T/ A�D �Occupancy ��,f�•�,I•d,A3 MCES System
Plan Review ✓ Code Edition 'ZOb? S/K 13G SAC Units
(25%_100% `�) Zoning �_ City Water �
Census Code Stories � Booster Pump
#of Units �53 Square Feet 2O�/'�?� PRV
#of Buildings 1 Length Fire Sprinklers �
Type of Construction V • � ,,�--� Width
REQUIRED INSPECTIONS
Footings(New Building) � Sheetrock
Footings(Deck) � Final/C.O. Required
Footings(Addition) Final/No C.O. Required
Foundation � Other: �/L� SlOPPAV b
� Drain Tile � / Pool: Footings _Air/Gas Tests Final
� Roof: Decking _Insulation Ice&Water �Final � Siding:_Stucco Lath Stone Lath Brick
Framing Windows
Fireplace:_Rough In Air Test Final � Retaining Wall
�Insulation � Erosion Control
Meter Size:
Final C/O Inspection: Schedule Fire Marshal to be present: V Yes No
Reviewed By: (��ri , Building Inspector Reviewed By: S��' T , Planning
COMMERCIAL FEES
Base Fee 53,q1G. ?S� Water Quality
Surcharge �$1�•rD Water Sampling Fee
Plan Review 3Sj 0�S. $9 Water Supply 8�Storage (WAC)
MCES SAC P1N/1� Storm Sewer Trunk
City SAC PA-1 D Sewer Trunk
S�W Permit 8� Surcharge �l� Water Trunk
Treatment Plant Pi4�/D Street Lateral
Treatment Plant(Irrigation) BZg. a-o Street
Park Dedication Water Lateral
Trail Dedication Other:�
Water Quality TOTA �/, �eq�./�
Page 2 of 3
Report Name:
Inspection Remarks Inspection Remarks Page: 1
Printed: 1/27/2015City of Eagan
Permit: EA125051
Permit Type: Building
Site Address: 4232 Blackhawk Rd
12/5/14 Sheathing CN:
- Nail off sheathing @ wall sections getween patio doors on the third and forth floor (east elev, north of dining hall)
- Sheath the gable end on the north elevation
- Cut back all interior walls where the intersect with the exterior sheathing plane and cut back installed sheathing @ least one stud
bay and overlap the areas with Densglass sheathing
** Ok to install house wrap (Tyveck) if adequate pictures are provided during the next inspection **
12/29/14 Partial framing (roof trusses in Area #2 "Phase 1")
- There are various corrections to be made to bracing, nailing and truss fixes. A record of this is with Matt (framing foreman) or
Nick with the GC. A reinspection will be necessary. - CORRECTIONS DONE 1/7/15
12/30/14 Partial framing (roof trusses in Area #2 - "Phase 1")
- There are various corrections to be made to bracing, nailing and truss fixes. A record of this is with Matt (framing foreman) or
Nick with the GC. A reinspection will be necessary. CORRECTIONS DONE 1/13/15
12/31/14 Partial framing (roof trusses in Area #2 - "Phase 1")
- There are various corrections to be made to bracing, nailing and truss fixes. A record of this is with Matt (framing foreman) or
Nick with the GC (Area #2 initial truss inspections have been completed). Reinspections for all sections of Area #2 will be
necessary. CORRECTIONS DONE 1/13/15
12/31/14 Partial framing (roof trusses on the east side of Area #1 - "Phase 1")
- There are various corrections to be made to bracing, nailing and truss fixes. A record of this is with Matt (framing foreman) or
Nick with the GC. A reinspection will be necessary. CORRECTIONS DONE 1/13/15
1/5/15 Partial framing (roof trusses on the west side of area #1 - "Phase 1")
- There are various corrections to be made to bracing, nailing and truss fixes. A record of this is with Matt (framing foreman) or
Nick with the GC. A reinspection will be necessary. Contractor will need to install all required diagonal roof truss bracing.
CORRECTIONS DONE 1/13/15
1/8/15 Partial framing (elevator shafts)
- Shaft framing ok - door opening header trimmers need to be checked for compliance with the relevant structural sheets
1/14/15 Framing corrections CN:
- Provied truss fixes for the misaligned trusses @ the roof peak where gusseting is required
- Redo framing @ the valley/hip connection between the trash chute & elevator shaft in the west wing (per engineers revised detal)
- Continue the Fire Wall assembly through the attic area to the bottom of the roof deck
- Install 5/8" type X gyp board to the underside of the roof deck to meet the 4' space required to be fire rated adjacent to the Fire
Wall termination.
1/15/15 Framing corrections CN:
- Finish framing columns and benches in the billard room (476).
- Fix dead space fire blocking in dead space adjacent to room 417. DONE, ML
- Fix dead space fire blocking in dead space adjacent to room 419 and fix L8 header @ the 3' X6' window opening DONE, ML -
and verify that the single ply girder. NOT DONE
- Fix dead space fire blocking in dead space adjacent to room 420 and fix L8 header @ the 3' X 6' window opening. DONE, ML
- Add the required trimmers at rough openings on the 2nd and 3rd flloor "elevator shaft A" . DONE ON THIRD FL. ONLY
1/20/15 Framing corrections CN:
Unit 301:
- Fix firestopping in dead space adjacent to the shower DONE, ML
- Add squash blocking to bearing per plan DONE, ML
- Draft stop all penetrations thru partitions above ceiling level DONE, ML
- Fire stop sprinkler line practice hole thru top plates in corridor DONE, ML
Report Name:
Inspection Remarks Inspection Remarks Page: 2
Printed: 1/27/2015City of Eagan
Permit: EA125051
Permit Type: Building
Site Address: 4232 Blackhawk Rd
Unit 302:
- Firestop penetrations thru top plates adjacent to the magic pack DOEN, ML
- Add squash blocking to bearing per plan DONE, ML
- Fix span exeeding 24" on center between floor truss that was thrown off layout DONE , ML
- Draft stop all penetrations thru partitions above ceiling DONE, ML
Unit 303:
- Provide engineering fix for missing sheet rock @ shearwall above ceiling --- WAITING---
- Add squash blocking to bearing per plan DONE, ML
- Draft stop all penetrations thru partitions above ceiling DONE, ML
- Firestop electrical cable and wires on both sides of the corridor between units 303 & 304 DONE, ML
Unit 304:
- Draft stop all penetrations thru partitions above ceiling DONE, ML
- Fix span exeeding 24" on center between floor truss that was thrown off layout DONE , ML
Unit 305:
- Add nailing plate(s) to broken top plate @ kitchen stubwall DONE, ML
- Fix gaps in deadspace near shower DONE, ML
- Continue the fire partition assembly (gyp board) thru the dead space on two applicable sides DONE, ML
- Install draft stopping DONE, ML
- Draft stop all penetrations thru partitions above ceiling DONE, ML
- Add squash blocking to bearing per plan DONE, ML
Unit 306:
- Draft stop all penetrations thru partitions above ceiling DONE CN
- Add squash blocking to bearing per plan DONE CN
- Fix dead space fire blocking DONECN
- Continue the fire partition assembly (gyp board) thru the dead space on two applicable sides NOT DONE
- Install draft stopping above ceiling @ partition separating this unit and the card room DONE CN
1/21/15 Framing corrections CN:
Unit 374 (toilet room):
- Draft stop exhaust fan duct penetration above ceiling DONE CN
Unit 373 :
- Get truss fix for broken floor truss (bearing end) *WAITING FOR FIX*
- Fire stop sprinkler pipe @ top and bottom plates DONE CN
- Fire stop practice hole through floor deck above trash enclosure DONE CN
Unit 372 (mech. room):
- Fire stop penetrations through top plates DONE CN
Unit 371:
- Complete fire caulking DONE CN
Unit 376 (card room):
- Provide engineer's judgement concerning the column bracket to beam connection, Two bolts on each bracket are missing
*WAITING FOR ENGINEERS JUDGEMENT*
1/21/15 Roof trusses Cn: (completed all truss inspections within "Phase 2")
- There are various corrections to be made to bracing, nailing and truss fixes. A record of this is with Matt (framing foreman) or
Nick with the GC. A reinspection will be necessary *SEE CORRECTIONS DATED 1/14/15*
1/22/15 Unit framing CN:
Room 360A :
- Install draft stopping above fire partition DONE CN
4th fl. elevator lobby:
- Add draft stopping above walls common with the adjacent unit 319 DONE CN
Unit 319:
- Add draft stopping above walls common with the elevator lobby DONE CN
- Add squash blocking DONE CN
Report Name:
Inspection Remarks Inspection Remarks Page: 3
Printed: 1/27/2015City of Eagan
Permit: EA125051
Permit Type: Building
Site Address: 4232 Blackhawk Rd
- Fire caulk elec wire practice holes near bathroom entrance DONE CN
- Fire caulk kitchen elec wire penetration thru top plate DONE CN
- Infill between off layout floor trusses (28" span) to support floor load above DONE CN
Unit 320:
- Fire stop elec wire penetration thru top plate @ laundry closet DONE CN
- Fire stop 3" practice hole @ fire partition top plate DONE CN
- Draft stop penetrations NOT DONE CN
- Add squash blocking NOT DONE CN
1/23/15 Unit firestopping ML:
- 301-313 ok.
1/26/15 Unit framing CN:
Unit 308:
- Install draft stopping above ceiling @ unit partition NOT DONE CN
- Secure water lines in the kitchen stub wall and shower wall, per manufacturers specs DONE CN
Uit 320:
- Install (2) L8 headers @ the windows DONE CN
- Install L9 header @ the patio door NOT DONE CN
- Seal draft stop penetrations in above ceiling draft stopping NOT DONE CN
- Rock back side of the corridor and unit separation walls in the dead space NOT DONE CN
- Add squash blocking for girder truss above NOT DONE CN
� Use BLUE or BLACK Ink
' �- --------i
U �--------- I
� ��d � For Office Use
���' \ � �� I `�' � I
Vl �� �� `�,� ��,C, i Permit#: ��I
� � � Permit Fee: ���� �
3830 Pilot Knob Road RECcIVEQ i i
Eagan MN 55122 � Date Received: j
Phone: (651)675-5675 JUN 1 7 10t4 � �
Fax:(651)675-5694 � Staff: �
� �2'3� !----------------'
2014 FIRE SUPPRESSI SYSTEMS PERMIT APPLICATION*
�ate: 6�16/2014 SiteAddress:� �ackhawk Road Eagan, MN 55122
Tenant: Eagan Pointe Senior Living su�te#:
r; Name: Eagan Pointe Senior Living LLC phone:
���p�rt�prr�rr� 4226 Blackhawk Road Ea an, MN 55122
�;,
Address/City 1 Zip: g
Applicant is: Owner X Contractor
' Description ofwork: Design and install NFPA 13 sprinkler system in new senior living facility.
Typ+�+�f
1���r1� �-.
: Construction Cost: $41 �,��� Estimated Completion Date: Jan�2O�5
� r
Name: Security Fire Sprinkler �icense#: C090
� 3308 Southwa Drive St. Cloud
������ , ����� Address: y City:
- ' state: M N Zip: 56301 Phone: 320-656-0847
� �� ������ � Calen Schumacher calen sfs rinkler.com
: ` Contact: Email: � p
FIRE PERMIT TYPE WORK TYPE
►� S rinkler System(#of heads� 2,��� Vl��ew _Addition
V Fire Pump ✓tandpipe Alterations _Remodel
Other. Other.
DESCRIPTION OF WORK: Commercial Residential Educational
FEES Contract Va�ue�411 ,�00.00 x.01
$55.00 Permit Fee Minimum _� 4,110.00 Permit Fee
''If contract value is LESS than$10,01 p, Surcharge=$5.00 2�5.5�
"*If contract value is GREATER than$10,010, Surcharge=Contract Value x$0.0005 -$ Surcharge*
"*"If the project valuation is over$1 million, please call for Surcharge 4315.50
_$ TOTAL FEE
3/4"Displacement Fire Meter-$260.00 =� 260.00 Fire Meter
_$4575.50 TOTAL FEE
*Requirements:2 complete sets of drawings and specifications,cut sheets on materials and components to be used
I hereby apply for a Fire Suppression System permit and acknowledge that the information is complete and accurate;that the work will be in
conformance with the ordinances and codes of the City of Eagan and with the Minnesota Building/Fire Codes;that I understand this is not a permit,but
only an application for a permit,and work is not to start without a permit;that the work will be in accordance with the approved plan in the case of work
which requires a review and approval of plans.
X Calen Schumacher X � � � �
Applicant's Printed Name Applicant's Signa e
,� `�`z3� 13i4�.���,��� o� ��v��—
- �+�����ci� us�.
����RE�31�1�P�CsTtL�1N�
���drQStatic �c�vu�t�arm _�,/ [?�in Test ��ugh In,
�`"�'Trip . !f Pump Test Central Station ' ' �Finai
�qn�l��nsii�ISsu„�r�c�:
��y� � �
* e
�@t'1]"!'1�f�t'+�1�1NBG��}{�: ����'. �F°'+' ^':� �r'�fE.': �, f �,.
.F.:�.�yiG�� -=��-i� ...� .....�w�.. �.......-.,�� .
I
I
Use BLUE or BLACK Ink
�-----------------i r
For Office Use I
' � �� ��1��
. � Permit#:
ij �] I �
� ��� �� �"'� "`� � Permit Fee: c��'�t �� �����
� � � �
3830 Pilot Knob Road � I
Eagan MN 55122 � Date Received: �
Phone:(651)675-5675 � �
Fax:(651)675-5694 � Staff: j
�����������������J
2014 COMMERCIAL FIRE ALARM PERMIT APP�ICATION*
Date: �a t��►�( Site Address: �'la3a g(�`�k h°,`�`�� �� G��.��^ mN S� i2�a
Tenant: C_ �n�n� icx' L* : Suite#:
� �
� ��� ��� �;`����..
a �3 ����� ' Name: Phone:
�; �i�'����� "�'�a'.�s�'sK'��X .
�����0������Wn� �°� Address/City/Zip:
�������������¢��,'�;
�� �
"�` ''���"`�f Applicant is: Owner Contractor
w�` ��.,',a.<,� ,��������'��;�
�# � � � �������:
�t *>�"*,�"}���,�� � �Y�� �nS�zs��� -
����,�,������� ��� Description of work: ��re- l�l� �<�
� ���'� ���`�� �` Estimated Completion Date:
��" ����� Construction Cost: `�''
k <�,�����• �.��
; � ��� ������ � � �
�� , ��������*��� � ���F '�2 � `JEL�c��c,n License#: �la-ou�S�3
�� � ���� ��
Name: ��2,c.1-�'�Z. ��
� � �� ����-������ ���
��.�;� `�. ����"�'� Address: l+ci'a\ (�c�Co G�. '�rt� Gi .�� 1^�
ty:
� ���o� r ctot� , ��
� (�S^ -03
��� r���s����� State: mN Zip: �.�`l�l Phone: 1 -�S� 5�
�
� � �y� � �x ,�� �� ��
<,£ ��;�������; �
:����'�_ ���:Y>� ������ Contact: �J�e�r2..
Email:
��
; ��� �,� ����'�-����`, `f New Remodel
. .�>�°����"�a}'. f�.
� ����� ��" —
�QX Addition Other.
�����4;�����'�����`���� r��:
��� _Alterations
DE�CRIPTION OF WORK: _�2ommercial _Residen#ial _Educational
FEES Contract Value$ o�.SZ�bu x.01
$55.00 Permit Fee Minimum =g o�S�L�."" Permit Fee
*If contract value is LESS than$10,010,Surcharge=$5.00
"`If contract value is GREATER than$10,010, Surcharge=Contract Value x$0.0005 -$ �'a.Sv Surcharge"
"`**If the project valuation is over$1 million, please call for Surcharge _� a��.� TOTAL FEE
*Requirements:2 complete sets of drawings and specifications,cut sheets on materials and components to be used
I hereby apply for a Fire Alarm permit and acknowledge that the information is complete and accurate;that the work will be in conformance with the
ordinances and codes of the City of Eagan and with the Minnesota Building/Fire Codes;that I understand this is not a permit, but only an application for
— a permit,and work is not to start without a permit;that the work will be in accordance with the approved plan in the case of work which requires a review
and approval of plans.
i
x ��iCV� ���
ApplicanYs Printed Name s Si
� �� ���
� : � �� �'�I�s��f� �`` °��`1
�C3�� J u �"'S : ,� �"� ���`� �.� ��' i �� ,����<��� � ��
-. �r�,ar. �a� ' , '�� .,-�' "��. .`'" ��.�i.,�`�¢si�,s,"� �,..
�
��� � $ � � s,.�.r����r�,�_5,;, �
�
� � Use BLUE or BLACK Ink
p �-------------- --�
_ ����. � For O�ce Use �� �� i
i
��4� Ol L���11 � 4\, '- i Permit#: I
3830 Pilot Knob Road �,�� � ,C i Permit Fee:��6� �
Eagan MN 55122 � j
Phone:(651)675-5675 � '� � Date Received: �
fax:(651)675-5694 � I �
� � � Staff:� I
�-----------------�
2015 MECHANICAL PERMIT APPLICATION
❑ Please submit two(2)sets of plans with all�m��cial applications.
Date: � '��-1� Site Address:�'�.'� � 1��j1 „C��� ,�tQ
Tenant: Pk90F� Pta�h 1'�� �[n�lrri/` �1 v t hS Suite#:
� ���,
�� � � � �� � �
Name: Phone:
��SIt��I1��W11�C -
� �� � y�� 4 � y� , : Address/City/Zip:
�
� � ����� �" �� Name:��4i�L!�-Tr`P ��!1P0� �'lov� License#:
�Ot1# ��Q�� Address:�,�)'��7 1'@i��1 (1�"�' � City: �r l�n 1�l{/v`
e��� �f '�€ F State: %;-l ''l Zip: S�k�� Phone: ��� - ��C%� '���
, �
� 4
��: a�` 'He- :rz"
�:y � , r
��
�` ��' � ' Contact: � �� �'����p T Email:
r4
�,; �.New Replacement Additional _Alteration Demolition
,
.
�y�e�f��Work� � Description of work:����� Cra� �!` f P1[.��� rc�r�h�r��f io� �c�' 4��ilL h «�'!°�'
� „ � ; r.. . � r f? �
° o� .�
NOTE Rbof mounted.and ground�mounted.mecharncal eqai�ment is req��red io be scre�ned by'City
' ; `;,Code ;,Plea'se contact the°�Mechanical'Inspector for�informatio�on:permittet�:screening methods.
� ' RESIDENTIAL COMMERCIAL
� ���` ,�°� � ; :
��� ��� ; �� _Fumace 7'�PJew Construction _Interior Improvement
� � �' :
� �� � � �� � .` � , Air Conditioner Install Piping Processed
� � ��m��,���e �, � 3 — — —
°����� ��,�� � � _Air Exchanger _Gas _E�erior HVAC Unit
� �" � ��� Heat Pum
w� '�� �� � — P UnderlAbove ground Tank (_Instali/_Remove)
� ' Other � �
RESIDENTIAL FEES
$60.00 Minimum Add or alteration to an existing unit(includes$5.00 State Surcharge)
$100.00 Residential New(includes$5.00 State Surcharge) _$ TOTAL FEE
COMMERCIALFEES ContractValue$,�5.`�c�` ���'' x.o1
$55.00 Permit Fee Minimum
$70.00 Underground tank installation/removal =$ .S.S; ?� _ Permit Fee
'If contract value is LESS than$10,010,Surcharge=$5.00 =$ S c��� Surcharge"
**If contract value is GREATER than$10,010,Surcharge=Contract Value x$0.0005
***If the project valuation is over$1 million,please call for Surcharge =$ �y�.� TQTAL FEE
I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and wdes of the City of I
Eagan;that I understand this is not a permit,but only an application for a permit,and work is not to start without a permit;that the work will be in accordance '
with the approved plan in the case of work which requires a review and approval of plans. �I
x ��D ��� x �
ApplicanYs Printed Name ApplicanYs Signature
�, � , � n � � �x� � �
FoR o�FrcE�rs� ��, � „ � � �� �� � ���� �� ,��,� ��� � � �, � �
� �
R@C�UI�@Cj��$p@C�10[IS °� � : e �� � � � �@1�I@W@({�;��� �� � ���s ��«�43 �slt@
* �:��v c ,� � �� �����rs c�� t � : � a '
,Undergrounc�� �RoughmJn, �� Air'}'est Gas Service Test �� ��n filao��tea� �Fir��l�; �^ �lUAG SCreening
m e _ . .x �r.. ,. 3, .,N .'� �� : N ��
I
� O � � � A� � � � ' 0 � ' 0 � ���� III
c . �
Performance Data - Low Tempera�ure Models - Hermetic Compressors � �
y�, '� �� � . .. �� � . . - .• - �I
� ..- . . - . �• • �' � ' � .
� BH*O11L6 CF04K6E ' 7484 � 6624 � 5765 9-090 ' 3293 2536 �
.s BH*014L6 CF06K6E I0610 9460..--..._.-.. ..-83A�0- _- �-=6220 - 5?s50�• -4-34-0
.� BH*025L6 CF09K6E 17940 15970 14050 10400 8700 7130 !,
�, BH*03IL6 CF12K6E 20793 18889 16931 � 12938 10952 9009
G
� � �
'' � . .. � � . - . .- - �
�. ..- . . . � �' �' �
BH*O11L6 CF04K6E 6930 6109 5289 3684 2919 2I96
� BH*014L6 CF06K6E' 9980 88�Q 779Q 5 40. 4810 3 40
�,,� BH*OZSL6 CF09K6E 16870 . 14990 . 1315Q. 9650 8040 6560
� BH*031 CF12K6E 19598 17782 15909 12070 :� � 10152 8268
\, '' �' � . .. i�• � . . -
..- . . - . � � �• �
BH*O11L6 CFO4.g6E 637.9 5597 4814 3281 2549 1856
BH*014L6 � CF06K6E 9360 8280� 7230 5270 4370 3550
.� _ BH*OZSL6 CF09g6E� 158I0 14000 I2240 8910 7390 6000 �
�BH*031L6 CF12K6E I8410 16681 14892 11206 9354 7530
'� �� i , .. • i' ► . . .- .
..- . . - . i � � i•
BII*O11L6 CF04K6E 5288 . 4581 3872 2A�77 1809 n/a
BH*014L6 CF06K6E 8130 7110 6130 4310 3500 . 2770
. - BH*�ZSL6 CF09g6E 13680 12050 10440 7440 6080 4850
BH*031L6 - CB12K6E 16056 14500 12875 9490 7770 6061
��Unit Specifications - Hermetic Compressors
� . . . . . . . �}
. ..- . i •►'. � �. .
. .- . � - . . . . . . ... .
BH*OOSH2 A ART82C1 3/8 1/2 . � 6 .i . 23.75 17:25•• : 167 •. � b7
• BH*008H2 A RRG-0100 3/8 ' 1�2 6 �- 2 ' 2835"J;23.75 1725 173 ' ' . 68
. BH*OlOH2 A RS?OCl 3/8 5/8 • 6 ' • 1 28.25 `23:75_ 17.25 1T2 68
BH*O15H2 B CRA-0I50 3/8 5/8 • 10- ' 2 28:?5 37.75� 17.25 223 71
BH*020I32 B QtD=0200 3/8 7/8 10 2 28.25 37.75 17.25 ' 72
BH*029M2 C Q2J-p3pp 12 .•7/8 16 2 28.25 37.75 19.75 246 72
BH*030A2 D CRJ-0300 . 1�2 7/8 22 1 3D.25 ' •42.5 29.75 311 73
BH*040H2 D CRM-040p i/Z i-1/8 22 1 30.25 42.5 29.75 319 73
BH*OSOFl2 D CRN 0500 1/Z i-1/8 22 1. 30.25 42S 29.75 .333 75 �
BH*OOSX6 A RS43ClE 3/8 1!L 5.5 1 28.25 23.'75 1'�.25 176 68
'BH*008X6 A RSSSCIE 3/S� 1/2 SS 1 28.25� 23.75 17.25 176 68
BH*009X6 A RS64C1E • 3/8 5/8 SS I 28.25 23.75 17.25 179 68
B�I*OIOX6 A RS7QCIE 3/8 5/8 SS 1 28.25 23.75 17.25 173 68
� BH*015�£6 B CS10K6E 3/8 SB 9 2 28.25 37.'75 17.25 230 71-
BH'�020X6 B CS12g6E 3 8 8 2' . 28 25 3 .7 17.25 230 7
BH*0�5X6 B CS14g6E 3/8 7/g 9 2 28.25 37.75 17.25 231 74
BH*030X6 D CS18K6E 1/2 7/8 20 1 30.25 42.5 29.75 314 73
BH*032X6 D CS20g6E 1/2 7!8 20 1 30.25 42.5 29.75 315 76
BH*040X6 ..D •CS27K3E i/2 1-U8 2Q 1 30.25 42.5 29.75 315 73
BH*OSOX6 • D C533B3E 1/2 1-1/8 20 1. 30.25 42.5 29.75 319 73
� BH*O11L6 A CF04g6E .3/g 5/8 5.5 1 28.25 23.75 17.25 166 73
BIi*014L6 A CF06K6E 3/8 5/8 55 . 1 28.25 23.75 1'7.25 197 'I3
. BH*025L6 B CF09BbE 3/8 7/8 9 2 28.25 �7.75 17.25 259 76
- BH*031L6 C CF12g6B 1f2 7/8 14 2 28.25 37.75 19.75 260 77
'=T tor Outdoor,N for Indoor,B for Bohnrnizer,M for Beacon �
� +a-=See back page for details t=Eshmated•sound'pressure values are 10 feet from the unit For esttmaUng sound pressure from the unii at
different distar►ces,deduct the foilowing frbm the unit values:20 feet,deduct 6 dba....for 40 feet,deduct i2 dba..... .for 80 feet,deduct 18 dba
This data is typicai of"h�ea field°condi�flns for horizontal aIr coolad condensing unfts at the outlet of the dEscharge air.The actuai sound
measurements may vary dependfng on the condensing unit installation. Factors such as reflecting walis,background noise and mounttng
conditions may have a signi8cant influence on thts data. ' •
. 8
Peggy Fleck
From: Charlie Borash
Sent: Thursday, May 14, 2015 2:08 PM
To: Peggy Fleck
Subject: �4�-2*'Blackhawk Rd
��'3�-.
PeggY
I just looked up the meter size and a 1" meter should be big enough.
Thanks
Charlie Borash
Field Maintenance Supervisor
City of Eagan Utilities Dept.
(651)675-5222
cborash@citvofea�an.com
�
�
Uss BLUE or BLACK Ink ��
�.��—��������..��.����
� ForOMce We �
� Permit#: /3l,�,T i
C�t� of Ea�n �y�
� PermitFee: �� ` �(,m'�
3880 Pilot Knob Road
i
Eagan MN 85122 j Dabe Reoeived: !
Phone:{B51�6T5-5675 /�� / j C� � I
FaX:{651)675-5B94 �� W ! �/ � / � � s��: _____ �
�----------- —�
2095 COMMERGlAL PLUMB[NG PERMIT APPLICATtON
� Please submit two{2}sets of plans wilh a!i comrrfercla!sppEicatfons.
c�- s�ad��• ��� �- ��A�.��3At��- ��=
� 1� � /r �
Tenant� Sufbe#:
�,��, i � Name: I�one:
��' �`, ; r
� � �• �� Name:_ .� n License#: �C � ��1
��� �� Address: �� � � C��ity����� .��w�lt?uL State:��t Zip: .,5 �
� M Phone:...�� C`�`' �EmaiL• � �—��'J 1'✓�
�
#��.� ,
��"��'�i - } - �.. !"' _,_,New „�,Replacement _,,,Repa�r ,_Rebuild _Modify Space ,w,Work tn R.O.W.
�
s ' �
;'�„��,, ,, *�v� R96C1'I�IOA O�WOI I(:
�
�'����a�'},����;���; . MMERC/AL _,New Co s�nx�ion _Modity Spaoe f r
�. ���;���;���°°�„� �rrl�dion SYstem{_Yes/_no}�RPZ i�„PVB) �/+1�yd/� C/G�'`L!
,�.�����"��:�:�' ��• Rafn se�s�uired on hriqatldn syate�ns �" 1p���
.� �,�'�
• Avg.aPM (2't�bO r�uired un�s smaNer s�e a�by Public Wo�s) � f�l!"
'���'�;��'�-���; _Msters Call(6b1}876-66�6 to verity that�passed�r to oicldna u�metec ���6r¢. /_
+��,,�,�„a'� `�,��� ` Domosdc:Sire�Type Firv: 1 .-rtl7ur r
.
` ' ,,;�����,��.,k Avg.GPM Hieh d�mar�devitws? Y.s,,,_,No Rust�ometers Yes No��
COMMFRClAL FEES Cor�tract Vatue S x.01
t55.00 Permit Fee Minimum
=3_fi�l - �[,� Pennit Fee
`If conbr�ct value�S I.�SS than$10,010,Surcharge=$5•i� _� Su�rge'
'*ff caifirs�ct vatue Is GREATER then 570,010,Suroharse=Cornrad Vatue x$0.0005
`"'If the pro�ed vatuation is over a1 miiGon,pfease call Tor Surcharge =$ TOTAL FEE
, Foliowing faos appty wtwn instatling a ne�nr lawn lntgstion sysbem S � Waier Pem��
Co�act ths City�'s Enpineerinp Depactment,(651)875-5646,for roqulrod fes amouMs. 3 Treatrnent PIaM
s wat�r s��y�stor�e
s ��f� �s��su�a,�
=S � � s� TOTAL FEE
CJ.(..@�FQRE YQU DI(3. Calt Gopher Stats One Cslt at(669)464-00�2 tor protedbn apxinst underqround ud�Hy damige. 1
i hetaby adcnawfedpe thst this iMormation i�t�mplete and acwrate;that the work witl be in oo�ortnaeoe wltA the ordinaf�Cas aMi codea of tl�e Clty of
Eegsn;that I unde�stsad this 1s n�a parm�,but ony an a�pibatlon Ior e perm�, and woik is npt b eiart a tlist the w�ork wili be In
e�ccotd the aPP plan in ihe cese of work wh�A t�oquirea a review and approvai ns.
x � ��;�� .� .
X �
Applicant's Printed Name Applicarrt's Sl�nature
� ���.:.:���� `��'` �a' o•r � .,[ s
.� ,� �9�..� t�ei�.�'"�''t°� '"���'re -�+���3 �'�it'tg'_"�xS�����'+S �.'�°? - � �� �,»�
� ��.
�� a: p , yC�af -�o-,a�?�"��t�,r�}3-�dv�'�s�fr x,��; �.sxs��,E,a�v� . �' • `3.... 9 x .�?a w „��" •'�„i�
L.;._�'- - � .�. �'� '/"'���'za1�� ���f��..�:����e �. � �� � R� I'F �.
fi�� r� �.�-� �� `",� 43_
+�� '. �'���.�r r,5a �,������� " :���. . � �
. - .•�. � .-7!�':!_ �� Y +��' .���,&, ,k s���_,,., .w�... � �d� �' '�t
Page 1 oi 3
Pe99Y Fleck � J�� � �
From: Linda Dralle
Sent: Friday, May 29, 2015 8:15 AM
To: Amy Griffin; Peggy Fleck; Sarah Brandel
Cc: Scott Peterson
Subject: 4232 Blackhawk Road
We have approved a 2"Omni for the irrigation system.
Thanks,
Linda
1
I
443 Lafayette Road N. ��������-� ����������- �� (651)284-5005 I
St. Paul, Minnesota 55155 � ��� � �������� 1-800-342-5354
www.dli.mn.gov ��
� -
6/9/2015 '
APPROVED FOR USE ��
Eagan Pointe Senior Living i
4226 Blackhawk Rd
EAGAN, MN 55122
RE: HYDRAULIC PASSENG Elevator ID# ELV-1025875
Site: Eagan Pointe Sen' iving Car 1
�a,�,,�'` ckhawk
Eagan, MN 551
Dear Sir/Madam:
Minnesota Statutes Chapter 326B provides that the Department of Labor and Industry, Construction Codes&
Licensing Unit, Elevator Safety Section, inspect and approve elevators and manlifts (endless belt lifts) before
they can be legally used in Minnesota. An Inspector from the Elevator Safety Section recently inspected your
facility and determined it meets requirements of the Minnesota Elevator Safety Code.
NOTE: Compliance with Minnesota Rules and the ANSI/ASME A17.1, Safety Code for Elevators and
Escalators does not necessarily assure compliance with the Americans With Disabilities
Act of 1990.
ALL ELEVATOR RELATED EQUIPMENT IS SUBJECT TO ANNUAL RENEWAL OF THE OPERATING
PERMIT: It is the owner's responsibility to maintain and keep current with all tests in accordance with the
ASME A17.1 and the ASME A17.3. Frequencies for the required tests can be found in Chapter 1307 of
the Minnesota State Building Code. Failure to maintain and perform the required tests may result in
revocation of the annual operating permit. Operation of an elevator related device without a valid
operating permit may result in an issuance of a"stop order"from the department and possible penalty of
up to $10,000. For more information see our website at: http://www.dli.mn.gov/CCLD/Elevator.asp
Sincerely,
CONSTRUCTION CODES & LICENSING
����������,<��Q
Brad Underdahl
State Elevatorinspector
c: SCHINDLER ELEVATOR CORPORATION
Dale Schoeppner, City of Eagan Building Official
This information can be provided to you in alternative formats(Braille,large print or audio).
An Equal Opportunity Employer
443 Lafayette Road N. (651)284-5005
A��C�1N�;^t�TA DEP�,RT�IE,NT t�F
St. Paul, Minnesota 55155 � ���� � i������� 1(80 j DIAL-DLI
www.dli.mn.gov � TTY: 651 297-4198
�� ,
CERTIFICATE OF
APPROVAL
PERMIT TYPE; ELV INSTALL
SITE: Eagan Pointe Senior Living Car 1
Address:��� Blackhawk Rd
City: Eagan, MN
Approval is for permit work performed by SCHINDLER ELEVATOR CORPORATION under
permit number ELV1025875, and based upon the requirements set forth in the Minnesota
Statutes, Chapter 326B.184 and Minnesota Rule 1307.0035.
For new installations,this certificate serves as your Operating Permit for the first year as required
by Minnesota Statutes, Chapter 326B.184.
If you have questions related to the issuance of this permit call:
(651) 284 5071
Department of Labor and Industry
Construction Codes and Licensing Div.
Elevator Safety Section
443 Lafayette Road N.
St. Paul,MN 55155
443 Lafayette Road N. (y�j([y���()TA C���,ARTIVI��`�" C�F (651)284-5005
St. Paul, Minnesota 55155 � ���� � i������� 1(80 j DIAL-DLI
www.dli.mn.gov 1 TTY: 651 297-4198
�`:�.
CERTIFICATE OF
APPROVAL
PERMIT TYPE; ELV INSTALL
SITE: gan,.�oi.�-t�e- ' Livi Car 2
Address� Blackhawk Rd
City: Eagan, MN
Approval is for permit work performed by SCHINDLER ELEVATOR CORPORATION under
permit number ELV1502-00036, and based upon the requirements set forth in the Minnesota
Statutes, Chapter 326B.184 and Minnesota Rule 1307.0035.
For new installations,this certificate serves as your Operating Permit for the first year as required
by Minnesota Statutes, Chapter 326B.184.
If you have questions related to the issuance of this permit call:
(651) 284 5071
Department of Labor and Industry
Construction Codes and Licensing Div.
Elevator Safety Section
443 Lafayette Road N.
St. Paul,MN 55155
443 Lafayette Road N. (651)284-5005 ��
MI�1[�IESC?TA DEFART11+l�1'�IT C��'
�
St. Paul, Minnesota 55155 ���� � l�r������ 1-800-342-5354 I
www.dli.mn.gov ����
�'
6/9/2015
APPROVED FOR USE
Eagan Pointe Senior Living
4226 Blackhawk Rd
EAGAN,MN 55122
RE: PERMIT# ELV1502-00036 �
Project: Elevator installatio Car 2
Location: Eagan,MN 55122
Address: _ Blackhawk Rd
_.__
Dear Sir/Madam:
Minnesota Statutes Chapter 326B provides that the Department of Labor and Industry,Construction Codes&Licensing
Unit,Elevator Safety Section,inspect and approve elevators and manlifts(endless beltlifts)before they can be legally
used in Minnesota. An Inspector from the Elevator Safety Section recently inspected your facility and determined it
meets requirements of the Minnesota Elevator Safety Code.
NOTE: Compliance with Minnesota Rules and the ANSI/ASME A17.1,Safety Code for Elevators and
Escalators does not necessarily assure compliance with the Americans With Disabilities
Act of 1990. � �
ALL ELEVATOR RELATED EQUIPMENT IS SUBJECT TO ANNLJAL RENEWAL OF THE OPERATING
PERMIT: It is the owner's responsibility to maintain and keep current with all tests in accordance with the
ASME A17.1 and the ASME A17.3.Frequencies for the required tests can be found in Chapter 1307 of
the Minnesota State Building Code.Failure to maintain and perform the required tests may result in
revocation of the annual operating permit.Operation of an elevator related device without a valid
operating permit may result in an issuance of a"stop order"from the department and possible penalty of
up to$10,000.For more information see our website at:http://www.dli.mn.gov/CCLD/Elevator.asp
Sincerely,
CONSTRUCTION CODES &LICENSING
���'������.��?
Brad Underdahl
State Elevator Inspector
c: SCHINDLER ELEVATOR CORPORATION
Dale Schoeppner, City of Eagan Building Official
E1FormCE2
This information can be provided to you in alternative forrnats(Braille;large print or audio).
An Equal Opportunity Employer
� �.! r � �
.� Z.� Z- �
�� � �C ����� ��
�
��,
Test and Balance Re orts
Eagan Point Senior Living
Eagan, M N
J-Berd No. 13-1561
0
� �� �'
��� � nne�chanic�l cvr��ra�tors Inc.
-- ..__..�' �
�
Complete Design Build
Plumbing & Heating Contractors
Serving the entire upper Midwest
3308 Southway Drive
Saint Cloud, MN 56301
Phone: 320-656-0847
Fax: 320-656-0312
info@j-berd.com
►
�
�
������
��� �Vlechanical ContractQrs, lnc.
*-� saoa soutnw�y c�r�ve
St.Ctoud,MW 5$3+�i
Ph�ri�:32Q-5�6•084T
Fax:��Q-6�6-ta3�2
AIR OUTLET TEST REPORT-SUPPLY
Project: Eagan Point Senior �iving
Location: Eagan MN
J-Berd Job #: 1561
AREA SERVED OUTLET DESIGN FINAL REMARKS
NO. TYPE SIZE CFM VEL CFM VEL
MUA 2
161 Kitchen
1 802 854
2 802 786
3 802 834
4 802 768
Kitchen Hood 1 2040 1838
Totals 5248 5080
Remarks:
Test perFormed by: CB
❑
1 � ���E��
�r� M�e��r�ic�l Corrtr��t�r�s, tnc.
'`-�` 33as Sou#Mway[tr�ve
S2.�loud,AAN 56�0�
F'hesn�;320-f+5G-QA-0�
FaX:3�0-8E6-b��2'
AIR OUTLET TEST REPORT-SUPPLY
Project: Eagan Point Senior Living
Location: Eagan MN
J-Berd Job #: 1561
OUTLET DESIGN FINAL
AREA SERVED NO. TYPE S�zE cFnn vE� cFnn vE� REMARKS
F20
476 Billiards 1 200 202
2 200 206
3 200 180
4 200 184
5 200 167
6 200 164
475 Corridor 1 200 208
2 200 218
Totals 1600 1529
Remarks
Test perFormed by: CB
�
�
�, � ��
��� 1k��chanic���'c�ntr��tors, trrc. , H
`�~' 33[i$S�uth^a�+�y Driv�
SE.�It�t�dy�W 5630i
Ftl6tt�;320�d'i�-4847
Eax:32d-656-031�
AIR OUTLET TEST REPORT-SUPPLY
Project: Eagan Point Senior Living
Location: Eagan MN
J-Berd Job #: 1561
AREA SERVED OUTLET DESIGN FINAL REMARKS
NO. TYPE SIZE CFM VEL CFM VEL
F3
160 Corridor 1 200 �$2
2 200 179
164 Lounge 1 200 174
2 200 178
3 200 200
169 E. Lobby 1 200 189
152 Lobby 1 200 174
2 200 203
Totals 1600 1479
Remarks:
Test performed by: CB
�
�
E R�"!
�.��� Mech�n�c�lCt�ntr��f�7�f�n�.
''�'" 33�8 Sttu#ttw�y Dr3ve
St.�Ioud�MN 5�301
Phan�:��0-666�847
��x;328-fi56-0S12
AIR OUTLET TEST REPORT-RETURN
Project: Eagan Point Senior Living
Location: Eagan Mn
J-Berd Job #: 1561
OUTLET DESIGN FINAL
AREA SERVED No. TYPE SIZE cFM vE� cFM vE� REMARKS
F10
256 Theater 1660 1709
Fresh Air 330
Remarks:
Test perFormed by: CB
■
❑
� ���
���� Mech�ni�a!�ontract4rs, ln�.
`-' ��08 S�uthway Dcive
St:Glt�ud�M�5�3d1
Phen�:32��658-0847
Fax;s2a-sss-il312
AIR OUTLET TEST REPORT-RETURN
Project: Eagan Point Senior Living
Location: Eagan MN
J-Berd Job #: 1561
AREA SERVED OUTLET DESIGN FINAL REMARKS
NO. TYPE SIZE CFM VEL CFM VEL
F20
476 Billiards 1325 �27$
Fresh Air 2�5
Remarks:
Test perFormed by: CB
■ -
,
a �
�
J �]�i1�`�`D
�1�� J!�'echanica!��r�tractc�rs, inc�_
`-'' 3308 Southway[}rit+�
St.Gloud,M�*v6391
Phvn�:�ZO-558-tI847
�,�x:�2a.�s-o��2
AIR OUTLET TEST REPORT-RETURN
Project: Eagan Point Senior Living
Location: Eagan MN
J-Berd Job #: 1561
OUTLET DESIGN FINAL
AREA SERVED NO. TYPE S�zE cFM vE� cFM vE� REMARKS
F14
281 Day Room 1715 1682
Fresh Air 10" 275
Totals 1990 II
Remarks:
Test performed by: CB
.
�l 0� �� � �e�i0
t �
y �
TO: Scott Peterson, Building Inspections # 32
�Jon Hohenstein, Community Development
Mike Ridley, Planning
✓ Darrin Bramwell, Fire Marshal
Russ Matthys, Engineering
John Gorder, Engineering
✓Aaron Nelson, Engineering
Leon Weiland, Engineering
Jon Eaton, Utilities
✓,�ric Macbeth, Maintenance S�F�L, Fcv�v�� ;wyE-,�ra
✓Gregg Hove, Maintenance
Lt. Mike Fineran, Police
�--�/k'i,�o
FROM: "".�!����, Senior Building Inspector
DATE: March 25, 2014 i
RE: Plan Review For: Eagan Pointe Senior Living I
4232 Blackhawk Rd
Lot 2, Block 1 Eagan Pointe Senior Living
The plans are in our plan review section for your review and comment.
Please return this form to my attention with your signed comments within 7 days. Please
indicate any concerns you have with these plans and resolve these issues with the affected
parties. If you are requesting that issuance of the building permit be held, please submit the
proper"hold request" form to me.
Comments:
Indicate below any fees that are to be collected with the building permit.
Amount
❑ Yes ❑ No Landscape Security Required Zoning:
❑ Yes ❑ No Water Quality Dedication Meter Size:
❑ Yes ❑ No Park Dedication
❑ Yes ❑ No Trail Dedication
❑ Yes ❑ No Tree Dedication
❑ Yes ❑ No PRV Required
Signature Date
G:\Building Inspections\FORMS\Commercial Bldgs Final & Plan Review Letters
Clt of �� �� �e�o
� �
TO: Scott Peterson, Building Inspections # 32
Jon Hohenstein, Community Development
Mike Ridley, Planning
Darrin Bramwell, Fire Marshal
Russ Matthys, Engineering
John Gorder, Engineering
Aaron Nelson, Engineering
Leon Weiland, Engineering
Jon Eaton, Utilities
Eric Macbeth, Maintenance
Gregg Hove, Maintenance
Lt. Mike Fineran, Police
FROM: '� �ee-�e�n e, Senior ilding Inspector
DATE: Mar , 14
RE: Plan Review For: Eagan Pointe Senior Living
4232 Blackhawk Rd
Lot 2, Block 1 Eagan Pointe Senior Living
The plans are in our plan review section for your review and comment.
Please return this form to my attention with your signed comments within 7 days. Please
indicate any concerns you have with these plans and resolve these issues with the affected
parties. If you are requesting that issuance of the building permit be held, please submit the
proper"hold request"form to me.
Comments:
N��
Indicate below any fees that are to be collected with the building permit.
Amount
❑ Yes ❑ No Landscape Security Required Zoning:
❑ Yes ❑ No Water Quality Dedication Meter Size:
❑ Yes ❑ No Park Dedication
❑ Yes ❑ No Trail Dedication
❑ Yes ❑ No Tree Dedication
❑ Yes ❑ No PRV Required
��_ 'c�
Signature Date
G:\Building Inspections\FORMS\Commercial Bldgs Final & Plan Review Letters
Clt of �� a� �e�o
� �
TO: Scott Peterson, Building Inspections # 32
Jon Hohenstein, Community Development
Mike Ridley, Planning
Darrin Bramwell, Fire Marshal
Russ Matthys, Engineering
John Gorder, Engineering
Aaron Nelson, Engineering
Leon Weiland, Engineering
Jon Eaton, Utilities
Eric Macbeth, Maintenance
Gregg Hove, Maintenance
Lt. Mike Fineran, Police
G�14-tiG
FROM: ���«�„`e, Senior Building Inspector
DATE: March 25, 2014
RE: Plan Review For: Eagan Pointe Senior �iving
4232 Blackhawk Rd
Lot 2, Block 1 Eagan Pointe Senior Living
The plans are in our plan review section for your review and comment.
Please return this form to my attention with your signed comments within 7 days. Please
indicate any concerns you have with these plans and resolve these issues with the affected
parties. If you are requesting that issuance of the building permit be held, please submit the
proper"hold request"form to me.
Comments:
S�P��A?�- ��f/r�t�/'
Indicate below any fees that are to be collected with the building permit.
Amount
❑ Yes ❑ No Landscape Security Required Zoning:
❑ Yes ❑ No Water Quality Dedication Meter Size:
❑ Yes ❑ No Park Dedication
❑ Yes ❑ No Trail Dedication
❑ Yes ❑ No Tree Dedication
❑ ❑ No PRV Req � d
. "/ �����
Signature Date
G:\Building Inspections\FORMS\Commercial Bldgs Final & Plan Review Letters
Cit of �a a� �e�o
Y �
TO: Scott Peterson, Building Inspections # 32
Jon Hohenstein, Community Development
Mike Ridley, Planning
Darrin Bramwell, Fire Marshal
Russ Matthys, Engineering
John Gorder, Engineering
Aaron Nelson, Engineering
Leon Weiland, Engineering
Jon Eaton, Utilities
Eric Macbeth, Maintenance
Gregg Hove, Maintenance
Lt. Mike Fineran, Police
��h-��
FROM: Iblii�-L--�, Senior Building Inspector ',
DATE: March 25, 2014
RE: Plan Review For: Eagan Pointe Senior Living
4232 Blackhawk Rd
Lot 2, Block 1 Eagan Pointe Senior Living
The plans are in our plan review section for your review and comment.
Please return this form to my attention with your signed comments within 7 days. Please
indicate any concerns you have with these plans and resolve these issues with the affected
parties. If you are requesting that issuance of the building permit be held, please submit the
proper"hold request"form to me.
Comments:
� o�s v�`-� �� � r� G� c���,-�=
� s i . �(� I - �� ,� � � �
►�D �:J V° �� j>"�� ;_.�
Indicate below any fees that are to be collected with the building permit
Amount ��
❑ Yes L�No Landscape Security Required Zoning:
❑ Yes �7` No Water Quality Dedication Meter Size:
❑ Yes �o Park Dedication
❑ Yes o Trail Dedication
Yes ❑ No Tree Dedication
Yes o PRV Re uired
_ D���
Signature Date
G:\Building Inspections\FORMS\Commercial Bldgs Final & Plan Review Letters
. � -_,
e� f t� V�`� �'_ r`'�
c.�n �t��
c�., — �U1,i1�--� b��--�°�--. —�c� � �
��
� � � �l.c�s�-o ��--�-�� t� ��=� � � � �
c� p
— 3
01, � .
�-1 ����` ,����',���— � �-�`.��``� �---�/�
� �
�� � r
I �� "J (
� � �� �� �� � -� , �� �,�„� � .�.��, � �,��
� �� �f � m. F
P ��.�....��r�., �9�'� � C'� �Z'"1"� :�{�� � � �+��
, - g . .. � .,n,,., w"M J 9, .
. �g M`� '..� g �
� ;
�� �� Y
�- - � ��� �� k � � �
� ° ��..,�
�;
�,.
��� ��� `
�. � 4�
� � � 4
ixP �,�Y p
t�,\ .r"r .Fi
a
f�*��,� ��'
f"�
,w� ��}
� �
d ���."�
,. � �'.� � ,_...f�,-�) r
f f � F��.
. . . � f,� 'i.j . f/ . .
. . j r��.,..��3� / .
/ ;
a+....//... � . .
«"" ..,. /�s' ...
f � ...�
w.,•` ��:
i `
t
�l 0 � �Il �e�0
t f �
� �
TO: Scott Peterson, Building Inspections # 32
Jon Hohenstein, Community Development
Mike Ridley, Planning
Darrin Bramwell, Fire Marshal
Russ Matthys, Engineering
John Gorder, Engineering
Aaron Nelson, Engineering
Leon Weiland, Engineering
Jon Eaton, Utilities
Eric Macbeth, Maintenance
Gregg Hove, Maintenance
Lt. Mike Fineran, Police
�
FROM: �-tence, Senior Building Inspector
DATE: March 25, 2014 ',,
RE: Plan Review For: Eagan Pointe Senior Living �
4232 Blackhawk Rd
Lot 2, Block 1 Eagan Pointe Senior Living
The plans are in our plan review section for your review and comment.
Please return this form to my attention with your si.gned comments within 7 days. Please
indicate any concerns you have with these plans and resolve these issues with the affected
parties. If you are requesting that issuance of the building permit be held, please submit the
proper"hold request" form to me.
Comments:
�'i�...3,,�� ��,., �� �, �<. .
�- _
Indicate below any fees that are to be collected with the building permit.
Amount
❑ Yes ❑ No Landscape Security Required Zoning:
❑ Yes ❑ No Water Quality Dedication Meter Size:
❑ Yes ❑ No Park Dedication
❑ Yes ❑ No Trail Dedication
❑ Yes ❑ No Tree Dedication
❑ Yes I� N PRV Required -
��
Signature � Date'�
G:\Building Inspections\FORMS\Commercial Bldgs Final & Plan Review Letters
' � . �,
Craig Novacryk
From: Mike Lence
Sent: Thursday, April 24, 2014 12:31 PM
To: Craig Novaczyk
Subject: FW: Eagan Pointe Senior Living Building Permit - Civil Plan Comments
Attachments: Sheet 4.1.JPG; Sheet 3.l.JPG
From: Aaron Nelson
Sent: Thursday, April 24, 2014 9:41 AM
To: 'jgcooper@jrhinc.com'
Cc: 'Jodie Scheidt(jscheidt jrhinc.com)'; Sarah Thomas; Mike Lence; 'johnmyhre@globeuniversity.edu'
Subject: Eagan Pointe Senior Living Building Permit - Civil Plan Comments
Mr. Cooper,
The City of Eagan Public Works has completed a review of the Civil Plans for the above-referenced building permit,and
offer the attached comments for revision and re-submittal. Our comments include very minor changes from the past
plans you provided.
Please make the following revisions and submit six(6)full size sets of the revised CIVIL plan sheets for incorporation into
the building permit. Please let me know if you have any questions.
Sheet 3.1—Final Utility Plan
1. Square off the pavement removals on Blackhawk Road and extend the southerly one to the west curb line. The
northerly one can be shown to the centerline of Blackhawk Road.
2. Re-align the water main near the building as shown to provide more clearance from the parallel sanitary sewer
line.
Sheet 4.1—Final Paving&Dimension Plan
1. Add a concrete valley gutter at the intersection with Blackhawk Road.
2. Change the 6' Bituminous Sidewalk to either a 6' Concrete Sidewalk, or an 8' Bituminous Trail.
Sheet 6.1—Details
1. Add Standard Detail Plate No. 520(concrete valley gutter)
Aaron Nelson � Assistant City Engineer � City of Eagan
City Hall�3830 Pilot Knob Road�Eagan,MN 55122�651-675-5635�651-675-5694(Fax)�anelson(c�citvofeaaan.com ����#�'�`j
�lll
THIS COMMUNICATION MAY CONTAIN CONFIDENTIAL AND/OR OTHERWISE PROPRIETARY MATERIAL and is thus for use only by the intended recipient.
If you received this in error,please contact the sender and delete the e-mail and its attachments from all computers.
1
i ✓ ��i�/�/ii !/ i � ��i ���
" - 5a�_. � i �� i. � i �Oj �i
� " �� // / /
� � .�� . , � ���� /i /y
i /, � �
i � 9i /
i.
�� �� ���� �
/� �
i
�
i
�` �
�
�
�
�ii�, ... ,, � � o� j�� i� �
����� .���� .����"--���-�--���. .. ������������//�����yi / � i i i
�y��� `� �/ � �/ /�/� � G�G/�%/% j � / /..
��� �/ �� � ..:�� ���� �� �� ��ij% : ; i
�� ������.�. �, ��.1����. ���,: � i /�i i // // / �
�� � ��� vi� �ji �
� � � � �� ��: � i
,y � , ; ; � . , ���� �
G,i �i y
/���„�._ '� � ��� � e �\ �� L����`'���i%�/i�. / � . �/
. � � ���i.���� o/ . �
o ���9� �� �
�. � ,�� ����� o iG�y �i i i �
� - ' '� ' ������� fi � �
� � -� ��/�i�. �
` �� - , � ���j���% � '� � �•
� ��� _ /�������j�j� / i.% � � ,
� �ii� /!� j :
.��� i . �" ���/�� // � i / � j
,� � ���2�\W ���'�`'iGiii � �ii�% � i ����G� �i ��i � � ���
� � `�/ \�� �.�����'�� i� �y i i i i � i i
.i �i���ii�i " i
� � '��'m� ���-.�' `�i�������� i%i � i i �.
°/ � � l �iii � i
�� � �>�� � i�I���� �i i
0
� i %���i��� "
i - '�"', \'� � „'� �i� ��� ���i��i i �
/ +� � � �� P% _:- - �����ji �/ i i ii
�� � � ��i��i� r
� �iii����i
�, � � �
� �� �
��4'�\� � . �4��� �� �i fii i�i� ��. �
� � ��a„-s��� %��/%i�� � . /
� . 4 i i������ i �
�j%%��i .
� � � / ����i�y�. i
�/ � ��i r,��
�i����� ' ' �ii o/%ii�� �i
�` �� %j�% �
�- � � �� �oi�� " i
� i ������/y
i� � �. ��� ������
� ��� ���y���
� � � �� � �r���� �
� � ���/�����
� ° o //���j. �
� �` �� ' �i%�% �
�, � � �� oi � �
: ��.� . � � �� - j�ij�ii i i.
� �. ��/�;ii �
i �
�� � l/��� �
�i���
� � � � ' %r���� �
\e �, � �i� �i
� � i ��%�
�� i � �/fii��.y�•
i �i i �i�i/�iii
�,�5< � i ��i�i/
���o�v
� �� / �� �i/%�� i
i��`=�
� �/.: �i �/����j/i i�
���
� �
� �j ���� i
/ �
� �
. � �F��� � � G��
/ � ��@:k�� � ���i�i�j � � ���� �
`' / %i/�� i ��i�% i
y v,�, ..-,.., �.,., � ,,,,,�
�
�
i o //i �
:� �':��.� �>�� �// �� ������/ i ' � � /i�
� / �/i/i� � i /i �/ o i
�� �/"���-" i iy / �..
�"- "�����. �i i . i
i �����i�i i i i �ii����' i i
%� � ii%i� � %� i i
� / �i/� ii . � �... i
i i i i i
� . i �%�/ �� y . � � �. ii�.
� �i'����ii � i� �� i i ���. i �
� i��o O, �� i
� j'����l j �/, � i,
�i��i�� �
� ' � ��% � �� � . i� �
�z �� ������i � � � ; � j i
� � , i�i���ii� i i i
.a � � i f���ii y i.. .
.� � � � /�� i / � �i
� � � i i o%�� o% ji �' � i � �i.
i' � ��� -/� � ��j�i� %�i � � .. %�.:
i�
�� ������ � �
�� �i�/ � � i !i i
/ � � �� % � i � o� �
� �� i ���� � �i � �i
� � ,��. i i � � i i
/ �:P �/ /���� � . / � % i�j/ oi /o
�.� �, � ' ��/�� . �. � . � � � �.
i ✓
. ...���� ��� ✓ i �� i � / ' /
, '.� - ��� i �i�� � G i G � i
�.., ,. ;� ��j �. j o>i�%����i � �%�� O �/i /i
i
� ' � / / / i// , i
�. � �� ��i����, � y � i i �
�... � . � � �j�i i, � � i �. � �
G � i„� �� � � y/ : � � �/� i�
. i �. � �y /.c /�/ �i��//% i � i i //i . i �.
'� '" �" i /�,�%% � � � � �/ /
/ . � � ��. �i � oioi i �. i �/ i i/
i y� �y ���. ���� ��i j .. i i �. i i �
�����. \ s� � '� �i ����f� ��%i�� . � ���� �ii
� ��: .�. �� � /� � � �� r ��i �i i .. i ii
�ry�,,. ���. � � i� i i ��� i ���i�� � ��� / � ii .
aq. . �. y/�`� .i / ,; �% ' �� � " i . � .
�y. �.v � �� � � � � ��i � � ��.i��%/ � , i �j��.
� " � ., � � U � � � i� �// / i .
� .;- ' . " �� �i.. ����� �!i i . j % . �
� � ���� , . ,. ��. � �� i � �j�/� ��i� � o� i ��,.. � ���iii i! ii���:
.... / ,......� �
. ���� � �- ,�. i� ��� � ������ii����� �%" �� �i � i �%� /i �' ✓
� � � ����� ��� �� % i � �: � /j � j ,
... ... ...... .../i , . / . �� � / �� .��o�/ � %i � �i ��:i � / i/i i %.
i ,� . . � .... ���.�:..�i /...� � // ..�i/����ii���� ,:. � /// i ///�// .,/� i / %�.
� ... � . � .�j"i �a� y�ii j��3%/"� i �i i /i . �
:�i ia�".� � � � / .. �< .�- �.�� ��� � �.� ����j�����l t i i %/:� �� i/ �.i ///�.�
�� .�,=��.�, „ :�:��, ��, �i r;� �, �`r.� �:. ����j ii. ,a..//���i�..��j��%�i��� i �� / � i �i� � i.: ���
`/ i y ����ii / � � t�, .- /.. i ��% // ����. i i�` i
a,.=�����. �i�,� ,�����9 �,,��� � �� �/�f� ; / � � � ; �if ��� %.% �i: i
�'��`���,,.����'t�i..-� �,.. ��� ���4/�'i�..✓i /�/� % -.. �/� i j � j � � �..
i��; ��� ✓�j�ii �� �� �,; �"i4,�i.��� �� . � j: i / ; .
---r��.��� i�-- ,� � ... ,%�f i��.� i ii � i�.
, ��� ��, � �.�� , ,:.�� �i .✓!�o .. % p; � �i i � �i
�.�;,. � �� ��'., :� ��,� .�:� i� ��/ j��..� �J�Oy i � i�� ��. i i %i i;
���.w���„�-. :i�� � , , �€�y.,.��� ��� .�i�%, � ����%i��i!/�; �i i/�� ii��/� ��!//� .i�i •.
� � ���,. �.i.. i��/i i�i i o / i / i �
, . �o-i. .ii ��� i� �,,.,� .. � �i . ��/ /� � � � �
� � � '� % , ��j�„ ///%i �r �i���j�����j�i �j� :.� %% � � � � �
� -����i...._._ �������i ii i . i� i " i �. i
�`� � ., � ' i�ii�i�i i� � ii j/: i// � /i:
� '�`'� �� i i i�i�% i i/ !��ii i% �
i � ��i��i �i i�r'%i i %i � i i '
- i�i��= �% !.%� , � i i!%
�i i ��-%i/�iii:..;. �i - %'f///'
,
�
� � �.
����. _ �y, fo`� �� ����� � /����iiii��/iif�j/iii� i%%ioio� �ii;
„ ,�� � �si�. .� .%o����%.i�� %�i/%%�%���i///io/ ����i i% i/, �/�i
� � ���� �. � /...z � '- � � s�.`�. �� i �i%oi�//�//. G%��/iii. ... i
� //� �. i�/�"� �i �/G � �i.///////OO///%�/ iii // /�� ' !ii-.
o�%,� �..�i�'� �`;'` O� '�// i i� i/� ���/� "�s %�j����i� %���/////��j�.
��� / �����. '������' � �// �//%j ��% � / i /�
�
- ` i //i� � i i �
��j� � ����% �� i� `!j�i/�ji ��ai�i�i///i/i%��iiii�i�� �/ .
�y�i��� �� ���j�..:��:���;%��i.�`:%i/ i �%%ii/%��%�%��/�i%j�- /,
` � �� � � i� ���� s' ����jiai i i ��ia�ii/ %�i i� j!�o
� :�� "��./� O //���-i� i .j� ��//�/�%%�%j i�%i�%0��������ii�i��j
��y O
,,����� ��"' i ��� ��� o' �� �����j �%i�i!ii�%��i ��i.. ii-�
//�� / � i � �%//� � � � ./i�� /j�i
.� '"." �-��� >'�l �i��%%�% -�i�/� � �%%i/i/ � ��'i
� �"��.� �� , �i���i�9� � i i/ �j� i� r%
�
� > d ;���;� ����� �����! , � i�///�� �ii .
.. �� �� ������i., ����..., ����j :., ijii i�i�%: %�!���
��� �. � ���,����% "�,� „ �i� ,,������0 %/o//�� �!/�i� i�ii`
�� �.�' �3� �y ��. S �- O.. i yii% �i ' /� �ii�/�
��/ � �� " -,y"%.� � % �€<' �� ��%j�. i ��/i ..%i /� ii i'.
�. � �. � ��� .v�� :i ���j� � '��.�� �`� �j i �%.i�j� %%��i j j%�
� � �-�� �`/ �� �����%%i� �� i iij/��i ` ,�
� � � ����- .�� '��� � �i�� �/�� � / • �i/ .%%/�/%ii� �ii��
: ��� �� � �..
� ����€� ���_ ��/%����/��i 0 � ��ii/i//i�/�%���i� �j�::
; � � , � � ii /�/ i �i i.
� �� �/ /�/� �i/� /i� ��� � �
' �i�� �/
����� � � � /�� �����'a � i�i//�ii iji � . / :
� � �/� ���/ ��ijj i/i i��� j
% i� i i �
� ,�: �� � ������%%o i io ��i� � �
�' � a �i� ����%i� ii i,� �i/� i i/;
� � �� �� /
���. 5_ �� �� � ��" , ���,
iij �� �j,��� :ii � �
� �
� ��..� ���� y � / � � �
� . . �� � i i �.�:' �� /i ��% . � i � � %
��"� �v- Y .:,,_w� � �� /<s�j/� /% � ' / / ;
�� ��yi... �� �� � �� �� � :�/ " .�% ���%� /%ji � i�///i i . � ..
��` f��`�� ='�d � i/ . // //�/� /✓/ij
���� ����'�� �� �' � � i i � i a
�� x ��/ � $ ��/����� / �/ ii o �
`, �, � �� -�� �..� � �� %��% /i/ ��%i� � %%
i
�
� �
s` / / / i
����� �� %��: ��� // ��� ��. //%%/ia�� �
� � �. , �� � .� �: ���i/%%%/%� �/ ' ` i i/��i � i �i�:
/���i�je �_. �� �� /� ii i
" � ' �� ,��� i � ./�/���/�'%%� � i�iii i ii iiij � %ii��
.'�-�//'� ' � �..: �� . /// �� �. i%/... ii/ . i ii ,
-�. � i.�. �.y��-�... ���" �" ���%i' %%� � ////!�% i %�i%j / i� ��j
._ � � � �� � % :r/�/�� /�/� /���/� j�. O . .
/ � � ��� , ��i�� to� �e�� ��j�/G��� /////// / /j//
-,.. � < O/%//// i 6 // ///�% i
� � .. .�i ��G ... ,� � ; i��%/j ��
�� ��� ���� ������ j�. �.� i �. %%j . / /
� . ��� �-�� ����� � �����/O i ���i/ii /ii/�� / � ��
� �,,-� � / ���i i i ///% / iiii � /
�� �,� ����c ./�� �� ���� �: : ii//i//iii �� �����.
�� �����' ��� " i/i / � � �ii
� , � %% . -� � % / i ��� �ii j i j . /
:h ' �� �% � ����%//j%, � ���. i j�j�i � i :
�`F � ��
° ,.4. � ...� ,,.,.
,. �,� a� .y��� � iii/j/i/ i � . //// / // �. i %i.
� /y. / �� .��ii�� i% /i�� � ::% � ! /
���� //�%/�/ //�/ , /%
�� r�" ��i� .. � i � . - ��� �
�y � �.:��� j�`.; � ��% //y j i /% �ii / /��i �i /�
%% �/� /
��� ��/ . �"y/ ,i i�// / �. i i�i�.
� �� � � ����i j�i i jj �� �% �i�� �i �
� r� ���/� ��/ ���/����%�% � � i i�i% j �.
� �� � �%/� � �� ////�O� ��� /ij00//� /
� ��� �7�7i� ��� ii/%ii/ � �j � a�
��y�v, ����i�i/�%'j i�i �%��i� // �j % /�
y��� ���� � y�� % � ! / //�// / � //i /�>:
/ � �i ./%���i� i.�/�/��i i// ii.i ii� �
� ////% ,///��.. .�% �i% iii
i�� �� � .. %��i �i i% ��% i��" /j / � .� .� �i
/ �� ��� � �i j:,i � .i i
� ��i//�� � '�i���%%i i/ii :�i , � ii i .
� �� �0 � z -� i ii�� . � �% � :
� �� � :,� % i ��.�/��� o�%%i i � i � i �
i: o � % // � %% �/ i ii � /
// % �///i / ���/�
�/�� j �� . o i i � i�///oi
, �� � � �/i � �ii�i
, �.�,i i� i i ��i � ��i�ij �
��: � ����������//%�/i//��i l/i ii/%ii / '� , ���.
%i �,�� � //�% .i
�i . � �.f .����'� :%� i %i �/ ���� i . / /i��.
� �� � i0 ����i � % %
� Q
-� %� �i��o "i%/�// �� %� i �����.
'� j-� ����� �'��/ i✓ /�j��� ,//// " - � : ii
%/ �i� : %r� � %%i
� �� � i/i i%/ � i
� ¢�� ���� %���%i�%�i � � ���i i�i j ii � �����
, /// �,- �i ��� a %
/ ��'£.�s� a"�j��%/%� %���i �%///�/ : / � ��� !
� � � //o
�` s �.'���� ��iiG�j / �i :. ii/j!, / "i i
�g��� �. �� �
�����
� � ��. � � � ir� � �//j � // / i
��.,.�.�,.���r � /i ��� % i/% %ii/ i
'� o/�� �`� O/i ��,r�� / i/i. ��� �
� ���� iio, o�j iiii� �� oo�� � �� i
��� �� i� �, ���i �ii�!i� �
i � O ii��iG�i� i
�����i ��j�/� � �O// //�i�/ /% /� �j ,
% �j% �� �� ! � % %
�. �� � � ��. % �" i: �/.�� �/ / j �%/ �,���
}���G � i l�� i�� �i� �� %/��/ �j
` /yi� �. �� � G�� i : ; �� � �. ; �i�-
' z � � i%��- i �%////�i� �i i o � i �% ji
� # i,; � ��������i � ii/�i ���� 'i%�j i��j /
�� a� ��� / ���j�% i ;� �:� �j � � � . i/
rr �. � �/i ���� 4�� /O ��/i%� �. �� ii! //i i �.
�/��`� ��� �� � � ij,��:j /i/ �i �� �j �/j � �
.� j �� y� � �'�'�� ����. � � /ii /�
� � w . ���� � ' c���� � �/ oii �ii �j/ jj
� �� � ���� �%, � i i i i � i
i %% i��� i
� i�> ���� ��j � ��� � i
�� .� � o /// � ,.� � /�� � �i i/i %/%/ �%i� /i0
,�.�/ � ,� ��i � i i ' ��%i %�%
� � , �' � ���� �/i iiii /� i/ i%% / ,
� � �� i o i ���� /�/ i � �//i//�� / o
% �3 / �!� . �ii ii %///// �i/%%
� `/ �� //`.�% .s/ � �: /i,/ � � ' iii �. ii/
///�.������ �_. ;• �, �i.�� �.:���i/iiiiiaiii� . ��i,. //�.,, %... ..
�///� :�" � �i'',j����:���,"i `��s-� ..,, ,� "'=��. ,��� �i� � �-"s i �:� :i�,.i i, ii .../ii
/i��.=��,��//���;.,,��`/��-�,..��.:��r%��%% � ..� / .F .. -� ,�O�:�.,r% �%i,. ,<,, i :. ..%�%�%i� .' " .
� �.T`�r�- %i ���m j ����--�o :-�- � � � �/iii i ��. i.���.
��/! !-�� ���/:�� � ;��f�;l- � � ���� �,/ � �� �
ii�i i � i i:� ,1�������� '�.�_ �� o��� i i ii i� %.
����//��� i ��%/���� ...:.:���:".. �..m„ irr`.ri .y. .� i� .i�.� , i�i � i. „ . , /�/ ..%i�
///�% � ����i�i,;, �: � �//� �;// i ;% ���% �:i� ��%%��!/
�,�/�//.���� ,.,.�/ �� � �. �/// � ��� �� �.:: ;: , � � //// � �
, ,, � %��//// � �� � �, ��/ ��, �:� � � -���
�, � ����/ .�/ �„ � „„��,,, % -.�� �,,. �,, �, i,
'�%:.c%�i,�/��..�%„ �. „% o�i i
x�:.�������.���..G.� %�/�/� :ii �
c...�. ,�����/��,.� � .:./�/�- i 'i:'i/i
.��-, ���:�. /.�, ��� ..����� -', ,�...��/ / `:-.: / � /
�� ,n�� ,��, �� , , -
,...,ii�v�� ��/��� . �l ��� . i��..--v � .% ,:.,��� .:.i� �% i /� � �� � �� �;%,
.�����h�:,;< t�..i�� ,. ... �//�-, -�i �i.o/� . :�,,.� ../ /..,. .:�
�o-ri i �,�.� �, :::j ,�!///� �,/�///'��%,� %O%�%i//
-.///%..y///./-- ?".�.. i . ../ .... , i,� >..���� ,�'�'� i/:..�i o, � .i,��: ,.. r �:: " ::. ,,.. . i..
y���j..-c, � .. �%'��� ���:.%� s�%//�i/,ii� , .` �. . , ,:.,.�..., .
��1� �� �/%� :�/////% � � ,i����/ ; _�
„����i�,�����i�� _��%% ,�,���� � ���� _, , ; �
� . �_ �li� X ��i s%%�Oi�, �i iiiii� „ , , : ,,
i:� ,,,,,� ,4�.�„�������iiii��� -._�� , _._
;���% ���j� � ;i >ii�� '-�O/////////O%%:�,.3, i , ,
������������/���%���/O ii �;,/ , � ��
,�.r/i r��.: i�� „� ,- .... �.,�//� i %�//Oi�%��'�✓O%/ii i -�:�� .yi.. .,� �,i/ i � . � -.: /
.,. .�.:� % .!-::, ' �..�ii,-ii� - �:i -:v.,- .:.. /,�. � ;;.�q,-� :� �%i%����ii.,
%
i
j.�j� �..,��z..�����q%:�� './� i.,/ :��////�'� /„ ' . � �
/� �������� �� /i�/// ,� , ��� i
�s�j��.����� %i�%�i ����� r i� ���
..:���%i;�� ..,� .,�,�� v.,.,,, .. , �>� � %�: . / ,
.. j�. 4 '%- � i �% ''v � �� � / i .
� � j/ � � �� ��i ' � � � �i%%, / /i
" 6���' � �j��� � �%/ j . i i,
� � � �j%/ % �i�i i i i
� �/� / � i�� . �/%% �� �%i. �i /�j /� � : �
i
�
�
u�:
i�-�
�
i ��y;
i
�
�
�� � -
�
i �
� � �.
�
,.: � , �
,.�/.... ..i �� i ////i �/ i
/ :: � t��"'�/'��"°�'lf�.:,y �� � y $. �O ��//G//////% i��ji %��%///i//ij /�
� ���� ��� �� ' / % ���/ � i� ✓% � i
�����;-:_.�`'� ��.���i.x�. �'6� % ��-� i� �� %o ii`. ii / � -�.ij i
�� �
� �'�o����� / � � � � � �� %�/ /�� �% i
� ' �� �
s „s;.� � �. ; �� , �_ �% � � �� 3:..� � i i/
�
� ,., �,�i� ti %��?"' ,�i
�, ����
S6roa� 'N�6 a E�ci so �a�°4 OZISS NW 'S1H913H V100N3W '3hl?Jd S?J31tlM SBdZ r� �� i<
44Z9-069(ZS6) XV� 4609-069(ZS6) 3NOHd ��/J " ' O
�n�srran nn o u �H�� �QIK�.� ���i3 m o z � � `�� � J= z
L££SS NW B 'Odl S'l6 'a' � 'M OOSZ
�3�d a3doo���i3or J0� � tn F N Q � y i� � H in �
S�O,l3/��f1S / S�33NI9N3 / S�3NNdld ,°='a°'",a"°75 I�Id'Id AZI'II,Lfl 'I�'1�II3 � � ��
� _� m ��
a4loo sMol a43 suao ao600 -� QO`7 ; a V �� ' O N �N f7
r i o�ssa+o.d aa ��Rmv a � � w ^ ,,.^ � � Q cv �
�A� ■ I ■ /���N o i 6oy�p�o ues��,��ad�s�oanP V10S3NNIW 'NV`Jtl3 � ap � �
J �TT�7'17 �T 7�rr� r�7�rT ��.j ►7 � �o � �
I I I H � � G� w cW,•P�,�oee, W o��o����aaa� �1 Y 1 1 1 1 1 Q Q l l`1�:1 5 �'.L i J.i l�L 1 Q d 1`l Y���'3 � � o ^�� M a
� uo�d si41 7041�Y7�a�,(qeiay� W $� � Y�
L
I
� O� �
-U,. �Fo U
W�� �O°' —�
� N N II
z oo� w o = o
O>�� ���
,�J � w M� c�
w�� n zf � M<
�;o z �� � w �
Fm�� �o _ � o�o w
�i�nww n" - Q r a �
E-��<� �� --_-� � =3� Q
��-� � zrw �
�y W U� Z U J~ �
W�z __"'� W a��w
W�3� _ _ — — — o m �mo� — _ — — — �
O U I ~
L� I �
�
�
I
�_----______g ___--� I
�, Qmg N> ' Q I
� ~ rn ^°»o 0
� � a�o � � Ylga� v�itt??m`a
gg \\ �� / ��b.&�,,y" °D I
^ m� N� (���\ \``_��� i�, I I
���� I
u�ic��m �`"� \ � �a�� -
� a nrn �
1 �z°'a�y ) nnn -�H �. I
� ` i`m�S / �mH <�o
�� � � i°'°' � I
\�-� u�i^mi��m
»>m I
N
>
- � 0 11
oM� o � ( n�Ho°
� Nonm a�m N
O � ri � � N I �m rn m���"a=" �
.� N . o i.�rc�n m m -..."„'>z,
� �wrm i � �
� �; N o I =_ y...
� � �� �
� o O� ^ �N
h N • . .
� p Z�.� Im,�o � � � �,�
� r
a � - ' ;9 � I F-
`s '�oo o: � , I ���
�m o� �°O�• F-
q 6 � I�-
�mmm^ � � <i
n I
�pmmm � r�000aiV
b � ^ ��w�
» m � dip I ,�ri.i �
-- ,i� .a 'N" mm 'v9
� I a �»>om
� I � ---m
>
� � � ��;)
' a� �
Y���a��, I m w-��
�ornm�c• �e�.t k morowm=�
��
iM°�mn o �wiim��
��»m > ra I F�
-- =�nn o i ���� I
��ma9 v � =°e�a � ��
';� 22m—� �qm�m �!, '�l���
II� �� m �ti�N' Hrv`8`�ap I 1 I���: c�'ii,l�,
���� �� I ,I�<n N ^rrcMiri __ � onr o 0
�� N �rn.a'9 0 �e UWmmq z ����mo�a�•e`������{��a�
l�= /� o.m o pf r :: ziV^ffi
- � x^v�iu�f r �I� aLLma � �� �� y�
,�nrno,a " W��
_ � _ ��zZ � � -- '9�� �oa m`i'�,��,�������
i�� i i � i� i o�p , � �1� Y i i 1
a
��, � r � a i
- �� �
.:
�
0
I L ���o � � � �� a w ,-. !,'I1,° �� I ��(x�����i��a��a
�' C� �'>° / .� � �_ r � � a '� � a a � �
o �,; 'i � .-� 'l.I�a �� �� �� �� �� �� ��
�oa `o Y n�w�� � 'ewaN �� i� a �a� �� �� a� �� 3� a� a
�L�- ' N�rc?3 x�`�`_'�� �d ,!I 7 ,3 i 1 i i i 3 1
vaoa $ � m°'»oo 3 1, 1, f, !, 1, 9, 3, !,
Qw�� a I o�a�mm ��il� 3 ��� �� i�+�� �� i� �� a
�m��Fn —
•� ! ��! 3 ,'D,�! �D �l,�! i9 �d '
�, ,
� ���>>> � , al� � �+� +� �' �� +� �� �� a
;; ; a _ .._�:
�5 ; �o� � � - g � � ��,��,+�,��,��,a�,a�,�
;; ' �m-
� a d .__. .�- -. <� n �r �� i r � a � a t
�n �' __. � \ ow,`,��'+ �� � �� �� �� �� ��
�ii � � ew = >o I 'a 'a� i y��� a� �� a� a� a
N d UK�m pN� w
.- � � I ,1 ,i�,z�.��W�,l� I�,li �
� � � "_ --_� .°r I ,�� �� !�'i�'Y�'A��a
� N �or�N _go��� \I o 0 I ��,i� ���,3�,��,a
' ��'_'_� o�"'S>� 79,a i! 1,°!,�!
axoza0 O I
�-, N '�__ h� -�S. __� K •� I
' �a �
..
�"" -"" "" '"""' ".�': .,:: . ... � —
�
____ ___'_ .. . .
. :. p '..: . .�.:;
-,,, �
�.m o
' _"'_' `
__ '_' "-= o „ " , �"""' '_
'-�-r.�. _______________
' '_,'
""
' �'_ "' ' __'
_'_"' _ "_ L
"_
__'__
_ - -�-
¢,i � -1 F� ❑ .�
�`3a - $ � ZZ 3Z OF, 41� N - O
- - �J d J 2Z �z FC�• p I �
� -- � - - � � Q� mQ OO �� �
� a3s� �a�a - �� aw � o Wa ; _ , �
� Q �, � � � a
�f ��, W� `� a
�
�
� � i
� i'
� '"l� � � /
� � � � � � � \ \/ \ /
� � �� ��� � �� � —� �`_�'=� \�"�" _ �`�,��0� �
�<�� �; �� ��� � �� ��� ��� �- _ � _ '4 ,-; � �� � ,\
����j �� g�� � �� ��� � �- �` ��� �/' ��' `� \\,\
������ ������ � �� ""� � �' � � , `� � � \ \
� ��n ��a � � �ts � �- "� '�';=� �\\ 1\
����.� �����e �� ����m �- �; ,p '\ \
g��si x-�,��a�� ��$� ����� �. _ 'N _ �� � '� �\'� �
� �� � �� ����� ��=�� �� 4 � \ ,;� �' �
����������?������������� y ��. _ � �o j�
� .. n♦ na�-a M 9.[ a R Y �`,/ `\ �.y' \\ \ \ \ /"
� _ ;� �" r:. �\\ � \ -.� � � �
� '- �.. � - .--: _ 1- �- �"$
."$ / � /_ ,\. LL Q �� __ _ =,ji/. Q' ', _'�
�_ '\ � ,�--_ - LL ._ �.=-. — �
�"� - �- \ ��_ ,� \ o `� -�
�- \ _ _.- � �-
� �� Q - `'�'�. _. "�"" ,�/' � �- � �
� o �r',�' 1\ \
,. �`}, � I ( �,�,/ ,p�,.d 4 \
_ �" \ ;,,,I `�
�- �" -��
�''/ - % �\ � - --- - -�
� i � ji �� \- - -�- - - I --- -�
a �w Q +_ �_ _�
- - - �� - --- �- �- -�--�
� ,o` -- --- _�- -- -�--�
0 �-;�rt--- -� �
�- -- ----�-----�---=--- � � � b I
- 3 ,
e� -- --- �_� — _�
- - - � ...� � , � i �
.s��« � o� .r,n -�'�--- -'t'�
� � � ; � ���� �. $ �� ` �---�--- -�--� ^
� W ��:lii -I _ � _—_ _T� R"
—�—
I��...�� � I :t
�� I � ,I, � _m I � n
/�" ��i ° � /��r '�
y: ,l.-`✓� $i ''� '�
�,�� � / � � W I �a I .�GI �� 4
��� � /; '/ '� � � \'� ��
��� ,l'=;,,/•'' /� ���� � ��
��� '� /. / � ,�� /
� l � /
/''' �\ � / ✓ �
/,� /, ,'�/'\.. � � /� ��\,, �,/
,� �,\ q /- / ��. � �� / /��''
d• ���\ �;� �/v ^d �. Jj"��� /�;;;�i'\
P , �. /� `�, .
.;�� /' � ,j;��' ,� / ,j�.,', '��
\'• / � � '',%� ;% � �
��., /;�\ �V /�'� ,% �° � �
� °� '�\ ',/ �\ /� �`�� � � T
.�,� �� / �
✓ 4 b
��/ � / � �
\�� c� �' � � � �
a
_�
t ,� • . . ► �,.
� � ry
Clt of �a a� �e�o
� �
TO: Scott Peterson, Building Inspections # 32
Jon Hohenstein, Community Development
Mike Ridley, Planning
Darrin Bramwell, Fire Marshal
Russ Matthys, Engineering
John Gorder, Engineering
Aaron Nelson, Engineering
Leon Weiland, Engineering
Jon Eaton, Utilities
Eric Macbeth, Maintenance
Gregg Hove, Maintenance
Lt. Mike Fineran, Police
FROM: Mike Lence, Senior Building Inspector
DATE: March 25, 2014
RE: Plan Review For: Eagan Pointe Senior Living �
4232 Blackhawk Rd
Lot 2, Block 1 Eagan Pointe Senior Living
The plans are in our plan review section for your review and comment.
Please return this form to my attention with your signed comments within 7 days. Please
indicate any concerns you have with these plans and resolve these issues with the affected
parties. If you are requesting that issuance of the building permit be held, please submit the
proper"hold request" form to me.
Comments:
���f� /r'��'!d
Indicate below any fees that are to be collected with the building permit.
Amount
Yes ❑ No Landscape Security Required Zoning:
Yes ❑ No Water Quality Dedication Meter Size:
Yes ❑ No Park Dedication
Yes ❑ No Trail Dedication
Yes No Tree Dedication Jpp.�-v ii
❑ Yes N PRV Required '
�� t� �`��
Signatur Date
G:\Building Inspections\FORMS\Commercial Bldgs Final & Plan Review Letters
r �
' � �
y
�� ,
�
� }
t t
Craig Novaczyk
From: Gregg Hove
Sent: Tuesday,June 24, 2014 3:13 PM
To: Craig Novaczyk
Cc: Sarah Thomas
Subject: Eagan Pointe South Senior Living
Craig,
Following receipt of a revised Tree Mitigation Plan from the applicant, required tree preservation mitigation is being
fulfilled on site with the installation of 57 category A trees.Therefore, at this time there is no cash dedication required
for Eagan Pointe South.
Gregg Hove I
Gregg Hove � Supervisor of Forestry � City of Eagan
Maintenance Facility�3501 Coachman Point�Eagan,MN 55122�651-675-5300�651-675- ��� �������
5360(Fax)�ghoveCa�citvofeaqan.com �
THIS COMMUNICATION MAY CONTAIN CONFIDENTIAL ANDlOR OTHERWISE PROPRIETARY MATERIAL and is thus for use only by the intended recipient.
If you received this in error,please contact the sender and delete the e-mail and its attachments from all computers.
1
' � Date:
Agenda Item:
Action
� Cityof Eagan Information
Parks and Recreation MEMO Attachments
AGENDA ITEM: EAGAN POINTE SENIOR LIVING
TO: ADVISORY PARKS COMMISSION
PREPARED BY: Gregg Hove
Preparation Date: June 11,2013 Reviewed By: [Click and enter text]
ITEM OVERVIEW: [Click and enter text]
BACKGROUND/HISTORY:
This development application's tree preservation will be considered on a single-lot, single-phase,
multiple-unit residential type of application. Per the City of Eagan Tree Preservation Ordinance
allowable tree removal for this type of development proposal is set at 30%.
ANALYSIS: TREE PRESERVATION
A tree inventory submitted with this application indicates there are 160 significant trees currently
existing on site. According to plan submittal, significant tree impacts will result in the
removal of 108 significant trees (67.5% of the total).
Because the proposed removal of significant trees removal is more than allowable there is
required tree mitigation. Tree mitigation for this application as proposed calculates to one-
hundred fifty-four(154) Category B trees (or an equivalent combination of Category A
and/or C trees).
The applicant has submitted a Tree Mitigation Plan that indicates the installment of fifty-
seven(57) category B trees as partial fulfillment of Tree Mitigation requirements.
DISCUSSION/EVALUATION:
ALTERNATIVES FOR COMMISSION CONSIDERATION:
1. The applicant shall submit a revised Tree mitigation Plan that provides complete
fulfillment of Tree Mitigation requirements through:
a. the installation of fifty-seven (57) category B trees plus,
b. an additional ninety-seven(97) Category B trees (or an equivalent number
of Category A, B, or C trees) or through a cash dedication of$29,100.00
as fulfillment of Tree Preservation requirements.
2. The applicant shall protect the preserved individual tree's critical root zones
through the placement of required Tree Protective measures (i.e. orange colored
silt fence or 4 foot polyethylene laminate safety netting),to be installed at the
Drip Line or at the perimeter of the Critical Root Zone, whichever is greater, of
significant trees/woodlands to be preserved on-site.
3. The applicant shall contact the City Forestry Division and set up a pre-
construction site inspection at least five days prior to the issuance of the grading
permit to ensure compliance with the approved Tree Preservation Plan and
placement of the Tree Protection Fencing.
Craig Novaczyk
From: Gregg Hove
Sent: Wednesday, May 21, 2014 6:50 AM
To: Craig Novaczyk
Subject: RE: Plan Review Form for Eagan Pointe Senior Living
Attachments: June-APrC - Eagan Pointe Senior Living - 5-21-14.docx
Craig,
See the attached memo for Eagan Pointe Senior Living tree preservation requirements.This was the memo that was
included in the commission packet in 2013.The required tree mitigation was then set at 154 Category B trees.They
submitted a tree preservation plan that had 57 trees being installed to go towards this tree mitigation requirement,
leaving an unmet balance of 97 trees or a cash dedication. I have not seen a revised tree mitigation plan adding the
needed 97 trees so a cash dedication will be applied.That cash dedication calculates to$29,100.00($300 per each
category B tree not supplied).
Gregg
From: Craig Novaczyk
Sent: Wednesday, May 21, 2014 6:39 AM
To: Gregg Hove
Subject: RE: Plan Review Form for Eagan Pointe Senior Living
Good morning Gregg,
The footing and foundation permit has been issued.Typically all of the fees associated with the permit are collected with
initial permit application. However,the Building permit application (above ground portion) has yet to be issued. I see no
reason that the tree dedication couldn't be added to the building permit application fees. Please send me your official
memo (for the record)with the cash amount needed, and I will collect it with the second permit application.
From: Gregg Hove
Sent: Friday, May 16, 2014 1:37 PM
To: Craig Novaczyk
Subject: FW: Plan Review Form for Eagan Pointe Senior Living
Craig,
Has the building permit for Eagan Pointe Senior Living building permit form (for dedication amounts) been processed
yet?The reason I ask is that there should have been a tree dedication amount attached to that permit.They are
installing 57 trees and the balance of their required mitigation is a cash amount of$29,100.00.
Please let me know where this is at (see email trail below).
Thanks,
G regg
1
� �
' From: Mike Lence
Sent: Friday, May 16, 2014 1:29 PM
To: Gregg Hove
Cc: Craig Novaczyk
Subject: RE: Plan Review Form for Eagan Pointe Senior Living
G regg,
You signed and returned it March 25th with no comments. Sorry about the delayed response,tracking email is getting
crazy with the new outlet mall. Craig Novacyzk is doing the review, I just got things going with the routing letter. Further
corres ondence for Ea an Pointe should be sent Crai 's wa .
p g g Y
I will have another blank copy sent to you.
Thanks,
Mike
From: Gregg Hove
Sent: Thursday, May 08, 2014 4:02 PM
To: Mike Lence
Cc: Sarah Thomas
Subject: Plan Review Form for Eagan Pointe Senior Living
Mike,
Has your form for the Eagan Pointe Senior Living site been routed around yet? I haven't seen it and that application has
a relatively large Tree Dedication fee to be collected with the building permit. Can you get me a form for this
application?
Thanks,
G regg
Gregg Hove � Supervisor of Forestry� City of Eagan
Maintenance Facility�3501 Coachman Point�Eagan,MN 55122�651-675-5300�651-675-
5360(Fax)�ghove(c�citvofeapan.com �� ���� ��
� �
, THIS COMMUNICATION MAY CONTAW CONFIDENTIAL AND/OR OTHERWISE PROPRIETARY MATERIAL and is thus for use only by the intended recipient.
If you received this in error,please contact the sender and delete the e-mail and its attachments from all computers.
2
Clt o� �a a� �e�o
� �
TO: Scott Peterson, Building Inspections # 35
Jon Hohenstein, Community Development
Mike Ridley, Planning
Darrin Bramwell, Fire Marshal
Russ Matthys, Engineering
John Gorder, Engineering
Aaron Nelson, Engineering
Leon Weiland, Engineering
Jon Eaton, Utilities
Eric Macbeth, Maintenance
Gregg Hove, Maintenance
Lt. Mike Fineran Po�ce�
C _-p-.. _____.___--���
FROM: , Senior Building Inspector
� l
DATE: T� C��G' ���/
RE: Plan Review For: Footing 8� Foundation
Eagan Pointe Senior Living
4226 Blackhawk Rd
Lot 2, Block 1 Eagan Pointe Senior Living
The plans are in our plan review section for your review and comment.
Please return this form to my attention with your signed comments within 7 days. Please
indicate any concerns you have with these plans and resolve these issues with the affected
parties. If you are requesting that issuance of the building permit be held, please submit the
proper "hold request" form to me.
Comments:
Indicate below any fees that are to be collected with the building permit.
Amount
❑ Yes ❑ No Landscape Security Required Zoning:
❑ Yes No �Nater Quality Dedication Meter Size:
❑ Yes No Park Dedication
❑ Yes ❑ No Trail Dedication
❑ Yes ❑ No Tree Dedication
❑ es ❑ No PRV Re �ired
��� - ��j� �,�
Signatu Date '
G:\Building Inspections\FORMS\Commercial Bldgs Final & Plan Review Letters
Craig Novacryk
From: Jeffrey Pierce <jpierce@stonebridgecommunities.com>
Sent: Wednesday,July 22, 2015 9:06 AM
To: Craig Novaczyk
Craig Wolf Construction has gone through every deck checking each hanger and replaced any non galvanized nail with
approved double hot dipped galvanized nails.The nails used are the the nails Carlson systems spec for this installation.
Aron Zadean was out and met with both Matt Clement with Wolf and myself and is satisfied with replacement and nails
used.Thank you
Jeff Pierce
Superintendent Ce116123632503
STONEBRIDGE Apple Valley, MN.55124
ipierce@stonebrid�ecommunities.com
AA/EOE
1
. �
GENUINE
. � , � � INTERCHANGE BRANDS, LLC
CONSTRUCTION
SUPPLIES
Per your request, I have noted our Galvanizing specs for Hot Dip Galvanized products
below for your use.
Hot Dip Galvanized: Our Hot Dip Galvanized "Hot Nails" are manufactured to meet or exceed the
requirements of ASTM designation A641/A641 —97, Class 1 zinc coating under S 1.2 which is the
requirement as designated in ASTM F1667—97, Standard Specification for Driven Fasteners: Nails,
Spikes, and Staples. In fact, "Hot Nails" are manufactured to 1 oz./sq.ft. specification which is over
double the zinc coating weight called for on a Class 1. This is also the zinc weight requirement of
ASTM A153.
Regards,
Gary Leaders
Global Procurement Specialist
REVIEWED
� � �
Date: b � � r 5
Eagan Building Inspectfons Divlsion
INTERCHANGE BRANDS, LLC
8958 J Street Omaha, NE 68127
Phone: 402 331-4426 Fax: 402 331-4689 1-800-458-6635
www.interchanqebrands.com
�
C - O
I O w N
II� ''�.., � � � � � e i o
'��� " o o � 8 i E
���. C N O O Ql � � i LL
'. �� O Lfl L � : c
N - � m � p
� C O � �1
, I p' �O C L a� � a o b ( :�
' � I � y � E � v� o _ � � I a
c' N
c� Y C C L7 O N '_�'
� I � � � E E� � E M F =
0
m N N N
(A I� � Q FL-� � � o N ui � a
L (/l Z rp a Q
O d U � tUi���
� C � A �i
I C O E � y� I
Ql- I
(n N C. �
� O 7 �
� N L a C
N �-
� C O N
J • v= I
Z01 O Ql > N+�- _ � II
N -u E C 9� t�A �
N cn - oo � c U li
E �� a °' 0_`6 ' � rn I
UJ C �—� �CV N =
N E N N N N N N N N N F—Q F— � 'j' il
N N N N N N N N N
+i N M� F'�p i
aZ �
� J t a � i
E � � o i,
E n r co co I- n- � I
v,
� OJ /^ J
� � � � V, � �
K O � M � � M r f0 � cD �— �y.�-in E i
� � O � � O � O � O I � Cn �o�� c�.s
W � d z°,��° v i
� � m�o� m
E = A�o o a ���.
F- � � m
a u> �n o o Z (.`3 a`,�� � �'
J � O] N � � N M � f+7 � � Z C t '�,.
* M r o7 M � t0 N t0 N Q W � �,
U m
J W z� �
Z '�
J j . �a
� � � O�i OfOi Q W � zm 3 �II
'O V 00 � OD N � W � OD r z � U .
� M O (h (h O M O M O �''�.
� �
� W m m � �.
_ � N N N N M
� � ln N O � O � O `_
� � O r .= O r O r O � k
� ' (
¢ � I
� N tn � N -
£ M ch M M
a � N N N N N N N N N �I
o no � � oror� o � E�Z ww I
E U E E V E U E cLi X
E � E . E � E � E �
�
L (!j L C7 � i
m � � Q p
� t = L = O I
L � L r L � (
o a O o o m � �
E c E E E o � = I
N ' fq V! N �3
H � F H � .N � Q �.
_ _ _ _ = p� � - I
x i
� � ^ � � � o E m E �III
,= X X x X X g � i
N N N N N "-
(/� � � t in � m� c
N N p� o C � 2'c
c o O 9 d
d �
2 U' C7 iq � E `m� o
U U � U � v o � E c� d
� 2 2 2 S S � w � -
•4 v v v v v a Q o
� " ` "
Z o 0 0 0 0 � E LS60'0 / 7'0=��-{ �� E �
N�
E L
d H H H H H F-Z _= r`6.a a N
- a a d a a � �a��'o i E- Z a�,� �
76E0'0 / 6*�
p � � I � .. I
� '� p ' I
W �N r � .• ,. � ' � �,., � �
W � � O �
� �J V L i i, � i � I � ���
ui �j Z � I I
Z y� _ � C � o i O ; O � � � i
W z v, �L �j � C� i a l � ai `� � `� m �
� V r d c p �I ° ' � �a = � I -a
a � �' �° � Z ' � i ° v � ' �' '
N � I > I o� ' � � � � � z I � i �
INTERCHA�G�
w :
_ GENUINE
fnterchange 8rands fasfeners are unconditionatty guoranteed �;,: � �
with a"no questions asked"replacement of any lnternc�tnge '"
fastenen that prove ro be incompatl6le for the tvol they are CO�PUE'$7O",
designed to fit or prove to be defective.
a��::
GENUINE Some hrsteners are now � � *
y r
� �?�`���� � avalfabJe in industrial �,,;�: ���,,,�
����+���� grade for rreore demcndrng � .�
��PPLIES N �7 applkation� �- � ���.
,.-'� ����,���� ' �r, ` Contactyourinterchonge �� ��� � �g�r �- �
> �;� '�` � 8randsReprese»tadvelor �;�� �" �
for Your toughes#�abs! �o.eFn�orr�arton. _. - �
�,.,. � � � :
LF i p ^-;.—e .k-ns_xv+-w-.«�«.. n. +�-z+n+rttxvrrv+r� ..a...
_ _ � M1� _
� �
.«�$�'�,'� R
-•,,
Fasteners and C�rrc�sion
The performance of fasteners in wood is primarity determined by three factors:
•the fastener metal and any coating;
•chemical composition of the wood;
•and the emironment they live in.
Gaivanizing adds rust resistance to carbon steel.Galvanized fasteners and many wuods work weli togetfier outdoors.Satt air,
high humitfity and industrial air pollution may eventually cause a breakdown of ihe zinc to a{low rust arrd bleeding.
Some waods contain chemicais that react witii certain metals to produce a chemical precipitate.Redwood and cedar contain
tannin which reacts with zinc galvanizing producing brown to black stains.The naturai acid'+ry of some woods can cause
metal deterioration.The chemical tom�sosition of woods may change with the addition of chemical preservatives and fire
retardants which contain salts that can destroy certain fasteners.
Common sense and experience wili dictate the proper fastener in most applications.ReaNy tough conditlons may cail for
aluminum or stainless steel fasteners.Special,unusual or untried applications may require consuitation wi#h your lumber
dealer.local or national building associates,wood praduct manufatturers ar enginee�s at your insurance company may
provide good information at no cost.
Hot Qipped Galvanized Naiis
Interchange Brands hot dipped gatvan'szed PT and PTOR nails meet the requirements of the i99t IC60 Uniform Building
Code(UBC?s#andards for power driven nails as specified in Table 25-7 7 T in Part IV.Furthermore,they exceed ASTM A641-41,
Class i!specfications for coatir�g weight,which calfs for a.S ounce/ftj.
Interthange hot dipped galvanized nail specification talts for a minimum tliicicness of 1.0 ounce/ft�,doubling Class II
specificatians,exceeding ASTM A641-91,Class 1i1.
R��.Ot�C�81�5 ��
Interthange 8rands 1�ed�.ock red coating fastenen have increased withdrawal values
and are testec!to exceed mast standard coating holding power�y at least 4D%. ����'� ���
� r .., • ., . •, •,
On January 1,2DC31F,govemment mandates went into effect that tolerate this corrosive environment have been confusing,
requiring companies engaged in pressure-treating lumber as a coMradictory and latking tonsensus for the most part.
form of preservative to cease using chemical compounds that Until more is understood about Lhe effecis of the various
contain arsenic.Chromaied Copper Arsenic,or CCA,was the formutations on the market with metallic abjeds in general and
most common compaund used in the market and its use will fasteners in partitular,Interchange Brands',LLC recommends
nearly cease as a result. the use of stainless steel as the basis material for fastener�used
In response to this mandate,severa!formulations have been in pressure-treated Iumber.The peace ot mind afforded by
and will be hitting the market.While they aH will conform to using stainless steel far outweighs ihe cost in what is currentiy
the new government standards for toxicity,almost aA of therri an uncertain s'stuatior�.Fastener faiMures ca�sed by accelerated
will be extremeiy corrosive to any form af inetal that comes in corrosion in the applications where preserved iumber is used
tontact with wood preserved with them.This includes fasten- could have significant consequences that can be avoided by
ers,freming hardware,strapping and any other metaltic objeds� using steinless steel.
Testing to determine proper recommendations for products
Mot afl tooh referenced in fhis callog uccept the fu!!rnnge of tastener sizes.Some of the Lools shown may be older versions of tunent
toots and are no longer avaitable for sale.The older models ore lisied co help our custamers rdentity ihe iasteners their older tools may
shoat We tecommend that you refer to your too/'s operators manua(ior the fasterrer specifications and size information for your�ool.
18
�rvva�cE
Carison Systems, LLC
10840 FiARNEY STREET Date: 12l�9h4 Page: 1
�MAHA.NE 68154 Mail To: 15014538
Invoice Number: N1110006573
Customer Nurnber; �
S Wotf Constructian Co�any S Wo1f Construction Company
Q 7 ATiN: ACGOUFiTS PAYABLE H T ATTN: ACCOUNTS PAYABLE
L � 2202 WOIF WAY I 0 2202 uOLF WAY
D WES7 DES MOINES IA 50265 P NEST DES MOINES IA 50265
---�
�RDER N0. ORDER DATE CUSTDMER P.O. N0. MEMO
ht[10005541 12/1S/i4 EAgah Senior Matt
P[CK SL1P NO� BHIP DATE SHFP fRON SN[P VtA PPD/COLC TERMS DUE DA�E
M11000554107 12/1$/14 Eagan acct mgr deliver Prepaid 15 Days NEi 01/03/15
IiEM 4ESCRIPTIOH UkiT SHtPPED BACKORDERED NET ?R3CE EX7ENOED PR10E
PfJH04D148-NDG Joist Hanger carton 75 � � �
406G93 Nait 7-1/2in x.i4H HpG Smooth
_. . _.:;c __._...
SAIES REPRESENTATIVE: Aaron 2dan Total Extended �
OIRECT INOUtRIES T0: Phone:651-b88-0077 1279 TRAPP RflAD SUITE 140 Sales Tax
Fax:6S1-6$8-bb22 EAGAN, h1N 55121 FOT0.L �
�� � f (,i�i Li .Ji✓'!� ( � �
Return This Bottom Portion ldith Payment.
Garlson Systems, LLG ''
� 41atf Construction Company � � �
Customer Number and Name Invoice Nu�er Inwoice Amount Rmount Enclosed
REMIT T0: CARISON SYSTEMS, LLC
P.O. BOX 303b
OMAHA, HE 68903-0036
r�
ReportName: Cl� Of Eagari Printed: 7/21/2015
Inspection Remarks Page: 1
Inspection Remarks
Permit: EA125051
Permit Type: Building
Site Address: 4232 Blackhawk Rd
**For ALL previous remarks,please go to G drive:Building Inspections�Building Inspection Issues�2015�Eagan Pointe Senior
Living.**
3/23/15 Framing corrections ML:
-Add blocking under beam carrying roof vaulted trusses east side dining.DONE,ML
-Add nut and tighten another on west side hold downs.Check bolt positioning in hold downs.DONE,ML
-Add nail plate and firecaulk to plmg vent pipe in dining room.DONE,ML
-Fasten all LVL's per manufacturer's specs.DONE CN
-Add full bearing of roof truss on beams throughout dining area(truss design sign of�DONE,ML(letter from truss engineer)
3/26/15 Firestopping and Sheetrock CN:
-Firestop I beam and bracket membrane penetrations in elevator"A"& "B"shaft enclosures(2 hr shaft)
-Grease shaft rock completed except where shaft support brackets are to be installed(contractor to provide photos or call for
inspection when completed)-SEE REMARKS BELOW,DATED 4/10/15
3/27/15 Insulation and framing CN:
-Front entry vestibule framing and insulation not ready
3/30/15 Private Dining room area framing CN:
-Private dining rm(#163)elec,r/i not completed-DONE CN
-All shear walls need to be inspected in the private dining room-DONE CN
-Replace missing truss bracing-DONE CN
-Firestop two romex wire penetrations thru top plate-DONE CN
4/1/15 Framing CN:
-Wrong holdowns were installed @ kitchen shearwall HDU 8's were installed,HDU 11's are required.DONE CN
4/7/15 Sheetrock CN:
- 1 st floor,Phase II unit dead spaces:All dead spaces with exception to units 128, 129, 130, 139,& 140 have been inspected.
DONE CN
4/10/15 Framing and sheetrock of the 2hr rated grease&make-up air sha8s CN:
**Propose a detail by the architect and engineer of record for an alternate method of design that will meet the code requirements
for the two hour shaft construction and rating.**(Listed assembly-GA FILE NO.WP 4136)
ISSUES NOTED on 4/10/15: -DONE CN
-Gyp board missing.
-Gyp board fasteners missing per rated assembly.DONE CN
-Gyp board seams not staggered on the overlapped per rated assembly(16"per rated assembly).DONE CN
-Face layer of Gyp board not fire taped.per rated assembly.(reference"note 6"of the explanatory notes-Gyp Manual)DONE CN
-Bearing studs cut in corridor wall(carrying floor load above).FIX DONE CN
**Alternate method of design reviewed and accepted in concept.Inspections to follow.Details will be within the plan file. **
INSPECTIONS COMPLETED 5/7/15 CN
4/22/15 Entrance canopy framing CN:
-Repair broken column footing(3rd column from the entrance door)DONE ML
-Add T bracing to truss webs @ LR11&LRG10 trusses @ drive thru canopy DONE CN
-Add missing jack rafters @ all four corners-from hip ridges to beams-DONE CN
5/27/15 Partial Final C/O-Phase 1 units on 3rd and 4th levels(checked smoke detection,electrical finals,&sprinkler coverages '
only). �
-Unit 301:Missing sprinkler coverage in the kitchen area-DONE '
-Unit 306:Inter connected smoke detecor in sleeping room not functioning-DONE �I
' i, . . . . . . .
Report Name: Printed: 7/2 U2015
Inspection Remarks Clty Of Eagan Page: 2
Inspection Remarks �
Permit: EA125051 I�
I Permit Type: Building ,
Site Address: 4232 Blackhawk Rd I
-Unit 308:C/O detector more than 10'from one of the bedrooms I!
-Unit 408:GO detector more than 10'from one of the bedrooms-DONE '
**Other noted issues** '
-Some of the double corridor door openings do not meet the minimun 6'-8"requirement-N/A ',
-Need to check AFF dimensions for window fall protection requirements(reference Minnesota Rules Parts 1303.2300 to '
1300.2320).-DONE ',
-Some of the exit signs in the corridors are obscured by ceiling lights(need to be moved)-DONE I
5/28/15 Partial Final C/O-Phase 1 units on lst and 2nd levels(checked smoke detection,electrical fmals&sprinkler coverages ��
only). ��
-Unit 201: Sprinkler head(s)need trim pieces I
-Unit 202:Bedroom smoke detector not functioning ',
-Unit 101:Missing a bedroom smoke detector • '
-Units:102,202,302,402 U shaped kitchens do not meet the 60"clearance required for Type B units ',
-Units: 107,207,307,407 U shapled kitchens do not meet the 60"clearance required for Type B units ,
**Other noted issues** '�
-Some of the double corridor door openings do not meet the minimun 6'-8"requirement ,
-Need to check AFF dimensions for window fall protection requirements(reference Minnesota Rules Parts 1303.2300 to �I
1300.2320).
-Some of the exit signs in the corridors are obscured by ceiling lights(need to be moved)
6/9/15 Partial fmal c/o inspection CN:
-Add stair guards and handrailings @ phase 2 attic access stair
-Firestop I beam penetrations on the interior side of the rated trash room 003 walls i
-Verify fusible links @ slid'mg trash chute termination doors(both trash termination rooms) 'i
-Fire stop sprink pipe penetration @ stair enclosure"E"garage level(garage side of wall) II
-Fire stop sprink pipe penetration @ stair enclosure"C"garage level(stair encl.side)
-Need to inspect smoke gasketing @ all rated doors in garage level
-Need access to elevator"B"equipment room for inspection
6/10/15 Partial final c/o inspection CN:
-Complete a1104 units in phase 1 (lst to 4th floors)
-Install Area of Refuge corridor identification signage
-Install all stair enclosure door glazing
-Stiffen deck guardrail in unit 420
-Provide required water closet clear floor space in the public use accessible toilet rooms(all levels,both phases)
-Patch sheetrock @ 3rd floar Mechanical room
-Firecaulk gastite and greenfield penetrations @ 4th floor mechanical room
-Firecaulk gastite and greenfield penetrations in unit 317 magic pac room
-Adjust door closer&latch system @ 3rd floor elev lobby
' 6/1 U15 Partial fmal c/o inspection CN:
-Eliminate AOR's in stairwells A,B,and D on the second floor and relocate them per the architects addendum
-Install window limitters in unit #202
-Install window limitters in unit # 1 ll
-Install combo smoke/c/o detector in unit# 108 bedroom
-Install window limitters in unit#102
-Provide required water closet clear floor space in the public use accessible toilet rooms(all levels,both phases)
-Install trap wraps in all public accessible toilet rooms
**3rd&4th floars phasell is not generally ready**
**All 3rd&4th floor phase 11 units passed railing,smoke detection,and electrical fmals**
-Adjust all entry doors on phase 113rd&4th floars
-Check all entry door sweeps and smoke gaskets on 3rd and 4th floors
�
Report Name: Printed: 7/2 U2015 ,
Inspection Remarks Cl� Of Eagan Page: 3
Inspection Remarks
Permit: EA125051
Permit Type: Building
Site Address: 4232 Blackhawk Rd
-Install floorin in units 421 thru 427
g
-Fix latches for trashroom doors and maintain the 2hr separation around trash door frame penetrations
-Unit #428 needs trap wraps for both the lav and kitchen sink(Kit.sink not plumbed yet) -floor to shower transition does not
comply and electrical wiring hanging out of kitchen wall not connected to anything
-Install closer,latch,sweep,&threshold @ elev.lobby doors
-Fire stop ceiling&wall penetrations in phase two mechanical room
-Check electrical room door and electrical panels
-Unit 443 needs complying floor to shower transition
-Install AOR signage in corridors 3rd&4th floors
-Fire stop penetrations in rated wall of magic pac in#327
-Fix hole in ceiling in unit#325
**Phase 11 lst and 2nd floors including common areas,not inspected to date**
6/15/15 Temp C/O conditions:
**See conditions of Temp C/O in the plan review file#32**
I,I
.
�.
Craig Novacryk
From: George Johnson <GJohnson@harrissarchitects.com>
Sent: Friday,June 12, 2015 2:24 PM
To: Dale Schoeppner; Craig Novaczyk
Cc: mcurrie@stonebridgecommunities.com;jpierce@stonebridgecommunities.com
Subject: Eagan Pointe egress
Dale,
I am writing you to outline the items we discussed over the phone earlier today.Our issues on this are related to
changes that Craig and I agreed upon related to areas of refuge on the second floor.With the need for our egress to
wrap under the stairs and exit to the exterior on the first flaor,our stairs going to the second floor are configured
differently on the second floor.The change at this level reduces the landing on the second and makes it tight for a 30x48
accessible space for area of refuge.All other floors have the required width without doubt for an area of refuge. Craig
and I agreed on a solution that included using the horizontal exit at the 2 hour firewall to provide an area of refuge for
both the east and west wings.The original agreement included placing two way communication on each side of the fire
wall to serve each building. Unfortunately,these issued drawings were missed and the changes were not incorporated
into the construction. Instead,the contractor provided area of refuge call stations at stairs A, B, and E.
I did some research and I believe that we meet the requirements of the code and are providing a safe building for the
occupants.
Each 30x42 area of refuge is required to be placed so that it does not impede clearances for egress through the stair.
Stair E meets these clearances without question. Craig stated that stairs A and B do not meet the width required.Stairs
A and B are located in the west building(west of the 2 hour firewall).The west building has an occupant load of 105
occupants.There are currently 3 means of egress from this floor.This means that the occupant load for these stairs is 35
occupants. Per 1007.3,accessible means of egress stairs are required to have 48" clear with the exception being any
stair in a building that is fully sprinklered (exception 3).We then fall back to the minimum clearance for stairs as tisted in
1009.1.This section states that any stair with less than 50 occupants shall have a clear width of 36".As we are serving 35
occupants with these stairs,we are altowed a clear width of 36".The stairs are designed with a 4'-3" width but that is
above and beyond the required clearance. Essentially, what this means is that in order for the stair to meet clearance
requirements for an area of refuge,we need the 30"width of the area of refuge as well as 36"for the egress width.We
currently meet this 5'-6" minimum. In my interpretation, stairs A and B have areas of refuge that meet code.
Areas of refuge are required at 1 per every 200 occupants.As stated before,the west building on the second floor has �
105 occupants.The east building on the second floor has 371 occupants.This means that the west building needs 1 area
of refuge but currently has 2 (stair A and stair B)and the east building needs 2 areas of refuge but has only 1 (stair E).
However,this doesn't factor in the horizontal exit.After doing some research it seems to me that the horizontal exit
allows us to rework the plan that Craig and I previously agreed to.Section 1022 explains horizontal exiting.Our 2 hour
fire wall provides what we need for separation for a horizontal exit. Per 1022.1, a horizontal exit may not constitute
more than half of the total number of exits or exit width.We meet this for both buildings as the horizontal exit provides
1 of 3 exits on the west building and 1 of 5 exits on the east building. Per 1022.1,the horizontal exit does not require
adding occupant load from the occupants entering through the horizontal exit.Just as stairs are sized per the occupant
load of the floor they serve and not the total building load, horizontal exiting assumes that occupants that are egressing
are doing so in order and do not compound.The specific wording of 1022.1 is"The area into which a horizontal exit
leads shall be provided with exits adequate to meet the occupant requirements of this chapter, but not including the
added occupant capacity imposed by persons entering it through horizontal exits from another area.At least one of its
exits shall lead directly to the exterior or to an exit enclosure".
�
. -`
What a horizontal exit provides us is a "refuge area" per 1022.4.This is a means of providing safety for occupants by
getting them through a fire wall and holding them until the fire is suppressed or they are able to egress.The capacity of
the refuge area is calculated by the width of the door. In this case, we have a 34" egress door, which allows 226
occupants per table 1005.1 factor of.15" per occupant.We only need 171 occupants to get us down to the 200
occupants per area of refuge in the east building. Section 1022.4 states that the capacity of the refuge area shall be
calculated by providing 3 square feet per original occupant plus each horizontal exit occupant.This means that we need
a room in the west building that will provide for the 171 occupants of the horizontal exit plus their original occupants.
171 x 3 =513 square feet.The day room area has an occupant load of 50 occupants. 50 x 3= 150 square feet.Total
between the two is an area of 663 square feet.The day room is well over that area at 1508 square feet.
Once those occupants are through the horizontal exit,they are in a new building.They have space to take refuge from a
fire or to egress.They have two means of egress directly to the exterior that do not require them to reenter the east
building(Stair A and B).They have two areas of refuge with two way communication (Stair A and B) if necessary but the
refuge area via horizontal exit doesn't require it.
Another way to look at this is that there are a total of 476 occupants.This would require 3 areas of refuge if we looked
at it more traditionally. We are providing 2 areas of refuge on the west building and 1 in the east building.We are
essentially transferring occupants from the east building into the west building to allow them use of the extra area of
refuge.We meet all travel distances in the east building to the horizontal exit.Once they pass through the horizontal
exit,they have exited the building that is burning,just as they would if they were entering an exit enclosure.They can
now make their way to the refuge area,or an exit stair with an area of refuge or simply egress from the building. Please
call me to discuss this as I am sure you will have questions.This is a lot to digest.Thank you.
Architectu�e
George Johnson
HARRISSASSOCIATES,LLC
515 Washington Ave N
Minneapolis, MN 55401
Suite 200C
Phone:(612)339-2190
Cell:(612)940-2101
Fax:(612)339-4783
z
y �t
443 Lafayette Road N. (�o�[��j�j��(�TA GE,F"ART�ENT Q�' (651)284-5005
St. Paul, Min�nesota 55155 � � � � �������� 1-800-342-5354
www.dli.mn. ov �� �
�,.,
6/9/2015
APPROVED FOR USE
Eagan Pointe Senior Living
4226 Blackhawk Rd
EAGAN,MN 55122
RE: PERMIT# ELV 1502-00036
Project: Elevator installation Car 2
Location: Eagan,MN 55122
Address: 4226 Blackhawk Rd
Dear Sir/Madam:
Minnesota Statutes Chapter 326B provides that the Department of Labor and Industry,Construction Codes&Licensing
Unit,Elevatar Safety Section,inspect and approve elevators and manlifts(endless belt lifts)before they can be legally
used in Minnesota. An Inspector from the Elevator Safety Section recently inspected your facility and determined it
meets requirements of the Minnesota Elevator Safety Code.
NOTE: Compliance with Minnesota Rules and the ANSI/ASME A17.1,Safety Code for Elevators and
Escalators does not necessarily assure compliance with the Americans With Disabilities
Act of 1990.
ALL ELEVATOR RELATED EQUIPMENT IS SUBJECT TO ANNL7AL RENEWAL OF THE OPERATING
PERMIT: It is the owner's responsibility to maintain and keep current with all tests in accordance with the
ASME A17.1 and the ASME A17.3.Frequencies for the required tests can be found in Chapter 1307 of
the Minnesota State Building Code.Failure to maintain and perform the required tests may result in
revocation of the annual operating permit.Operation of an elevator related device without a valid
operating permit may result in an issuance of a"stop order"from the department and possible penalty of
up to$10,000.For more information see our website at:http://www.dli.mn.gov/CCLD/Elevator.asp
Sincerely,
CONSTRUCTION CODES &LICENSING
���������,����
$rad Underdahl
State Elevator Inspector
c: SCHINDLER ELEVATOR CORPORATION
Dale Schoeppner,City of Eagan Building Official
E1FormCE2
This information can be provided to you in alternative formats(Braille,large print or audio).
An Equal Opportunity Employer
• r �
443 Lafayette Road N. �I�y[����y-�� p�p,��TMENT ,UF`� (651)284-5005
St. Paul, Minnesota 55155 � ����� � ����� i �� 1(80 j DIAL-DLI
www.dli.mn.gov TTY: 651 297-4198
� �.�,
�,_�.,,
CERTIFICATE OF
APPROVAL
PERMIT TYPE; ELV INSTALL
SITE: Eagan Pointe Senior Living Car 2
Address: 4226 Blackhawk Rd
City: Eagan, MN
Approval is for permit work performed by SCHINDLER ELEVATOR CORPORATION under
permit number ELV1502-00036, and based upon the requirements set forth in the Minnesota
Statutes, Chapter 326B.184 and Minnesota Rule 1307.0035.
For new installations, this certi�cate serves as your Operating Permit for the first year as required
by Minnesota Statutes, Chapter 326B.184.
If you have questions related to the issuance of this permit call:
(651)284 5071
Department of Labor and Industry
Construction Codes and Licensing Div.
Elevator Safety Section
443 Lafayette Road N.
St. Paul,MN 55155
.
loaa�
March 26, 2014
Mike Maguire
Mayor Stonebridge Construction
c/o Brad Friesz
Paul Bakken 15734 Foliage Ave
Apple Valley, MN 55124
Cyndee Fields
Gary Hansen �: Eagan Pointe Senior Living
Meg r�iiey 4232 Blackhawk Rd
Council Members
Dear Brad,
Dave Osberg
City Administrator We have started our review of the construction documents submitted in pursuit of
obtaining a building permit for the above-referenced project. This review is not intended
to be an exhaustive and comprehensive report. Unless otherwise noted, all references are
to the 2006 I.B.C. It is our goal that this review will help you in complying with the
applicable codes and we are, therefore, requesting that the following items be addressed:
�Submit 1 set of Ene mpliance forms o� �a�e
Municipal Center '
V�,�e�t�g-a ' ' (Use Ashrae Stand���04 compliance forms.)
3830 Pilot Knob Road �' Submit 1 Emergency Response Site Plan (example enclosed with contact person
Eagan, MN 551 22-1 81 0 provided)
651.675.5000 phone �' Provide Fire stopping details including what type of penetration, material passing
651.675.5012 fax through and manufacturer's drawing for maintain the rated assembly.
651.454.8535 TDD - SUUTTllt F1T'e PT'OteCtlOri System Plan for review. Contact Fire Marshal Darrin
Bramwe11651-675-5905.
Maintenance Facility If you have questions regarding this letter please contact me at 651-675-5676 or
3501 Coachman Point IrileriCe(C1Cit� a�ri.COri1.
Eagan, MN 55122
Sincerely,
651.675.5300 phone
651.675.5360 fax
651.454.8535 TDD Mike Lence
Senior Building Inspector
www.cityofeagan.com
The Lone Oak Tree
The symbol of
strength and growth
in our community.
4 ���
Eagan Point review comments:
• A vertical clearance of 98" is required for the overhead garage door and the entire drive aisle
through the underground garage leading to the van accessible parking space. (Sec. 502.6 MSAC)
• Is the underground parking for residents only?
• Three accessible parking spaces are required @ the grade level parking lot.There are 67 total
spaces. (Table 1106.1).
• Tenant storage room exiting? Potential for 67 occupants.
• Provide shop drawings for the precast column and beam systems and framing if available
• Verify that the exterior accessible route(s) meet the 5%maximum slope.
• Provide details for the mounting height of the manually operated exterior control switch for the
automatic door(s). (404.3.5 MSAC)
• Areas of refuge in stairwells (A4-6 and A4-8)? Required two way communication details?(1007.6 ',
—1007.6.5, IBC) !
• Guardrail baluster spacing @ detail 5/A4-9/? (Section 1013.3, IBC)
• Hand railing termination(s)for the open stairway @ 1/A4-9?
• Opening protection for elevator doors (707.7, IBC)
• Smoke and draft protection for elevator doors? (715.4.3.1, IBC)
• Clear floor space width for the accessible showers @ 2/A9-2? (30" minimum requirement)
• Identify the 4 required accessible living units for the I-1 occupancy
• Designate whether you plan to use Option A(1004.11.3.1) or Option 8(1004.11.3.2)for the
Type 8 units.
• Vertical Fire Wall continuity through the attic space?
• Structural stability of the Fire WaIR (705.5—705.6, IBC)
• Vertical continuity of the Fire Barriers? (706.5, IBC)
• Protection of Structural Members(714.2, IBC)
�� .
• Access to RTU's
• Window fall protection?
• Decks sprinklered?
• Stand pipes?
• Fire alarms system? (907.2.6)
• Smoke alarms? (907.2.10.1.2)
• Fire and Smoke Dampers? (see table attached to pg. 110 in IBC)
:�,
�
Craig Novaczyk
From: George Johnson <GJohnson@harrissarchitects.com>
Sent: Friday, April 11, 2014 4:17 PM
To: Craig Novaczyk
Subject: Eagan Pointe second floor area of refuge
Attachments: 3154-PLN-FL02.pdf
Craig,
I looked back through my notes on the area of refuge and figured out what our plan was. It did not get communicated
properly in the drawings.
The egress stairs A, B, and D do not allow for an area of refuge on the second floor.This is because we have direct egress
from the corridor to the exterior through the stair on the first level.This forces us to go with a single straight run stair
and limits our second floor landing.
Stair E has the clearance required for an area of refuge on the second floor because it does not exit at the first floor like
the other stairs.
Our 2 hour fire wall separates the building into two buildings (west and east).The west building only has 105 occupants
on the second floor. By code,we need only one area of refuge as the ratio is 1 area per every 200 occupants. Per
1007.6.2,we are using that horizontal exit for separation for the area of refuge.The east building has 371 occupants on
the second floor. By code,we need two areas of refuge.We have one area of refuge in Stair E.Similarly to the west
building,we have a second area of refuge utilizing the horizontal exit.All areas of the east and west building would have
the required number of areas of refuge within the required travel distance. We would provide two way communication
to all of these areas of refuge.The central office is typically the central control point and is always monitored.The areas
of refuge within the corridor would not reduce the width of the corridor below our required egress width.
I have attached a drawing to explain this in further detail. Please let me know if this makes sense to you. We are only
doing this in the 2"d floor as we prefer to do them in the stairwells if space allows. If this is acceptable, I will put together
the drawings to officially communicate the information.Thanks.
GEORGE JOHNSON
HAR R1SS ASSOCIATES, LLC
515 Washington Ave N
Minneapolis, MN 55401
Suite 200C
Phone: (612)339-2190
Cell: (612)940-2101
Fax: (612)339-4783
1
W
� � � U
- ' z Z u- p U
�= � QWW �
J � �
� � UO � O
� � OQ � w
� ¢ � W �
w � � �
Q
�.0 N
� Q � z ,;
� WZQ ��
� � � �
OQ O m U
N
� � O
� �
Z � W ° \
Qz z � � �W �` �—
J � � z
? � I— � � w W QH � �
U W c�
� � � � � Q � � � � �
'nWw �- �- � pO � QO
� c.v» Q � w v� � � � � �
� Qu' � Npp W WF— �' z l_� =
`ZQ � �W � � QQUQO , C� !-
� lt- � � W W JZZ (� Q l-�J � Q
Wc� � � vU —� —> > Z � f—
!- � Q � zU Q � � � � � C� �
QO � � � Q � � � Uw � �
z �
� a � � � � U C� J
� �
�� � �
�- �
— -- �
-- � ��-------------p�
; I 0; �
; ! I �
— � -� � �
0 0 '
I '
�
� � J
� �
� ■�
�
� I �
o � �
-� �
, � �
I,I � �
,
� ; o;
; � -J z
� � � ��+35Si3tSEi� Ot `
-_ "II""" J � _ V
''�'isiiiii+it'', i:p = W (�
� ;;,,;;;;;; � � cn � � f— � W C�
W z � _ �j �ssi't'sii'siii' � (� f— O p Q
� �1c� � �;. f— � � ;;;:;;;',;; w � zQ � o � � �1'
� J � O � � � '•4�f��E��f�� � Q � � � O I..L
� � a � � � 0 � � OO � VO � W � �
� � � � � � wu� Q mU p � cn �-
QUU � w � � �, � � � v� w � �
QWU _ � � cnu- <:
QO � "Qw � o Q Q p
� O
�
� �
��
t l� �--
W Q �
� O
<. E- Wu.. �
W � � X
<,,
� z � w
�;> �t Q J
�" � (� � Q
� z J Z
i % Q
L1.J � � �
� � Z �
�� m � �
� J =
o � � �
w UWm
�� z � � Cj -� ?
� � QW � O �
JD— � � O
� � � � � 0 �
(L = � () � U' � u— =
I-- w O f-
OE- OQ w
Qz � w �n � � o- Wz �
� WQ � � Q � �
� w
� �- QC� �
O � � � �
. *• � w z �
�.
._
d
STtJNEBRIDGE �
CiCiOM tOMtE/7;TO GCEA7iYON,7'O LOMMLN/7"'/. ,
Temporary Certificate of Occupancy '
Conditions
Date: 4/28/2015
These are the conditions to open the Eagan Pointe Senior Living Project, located at 4323
Blackhawk Road, Eagan, MN, on June 15t", 2015. Any items that are not covered or anticipate
could change must be discussed with the City of Eagan prior to Temporary Certi�cate of
Occupancy being issued.
I. Required Completed Items
a. Interior of Building
i. All Life Safety and ADA items will be complete
ii. Substantial Completion of the Common Areas (With the exception of
items listed in Il.a.iv)
iii. All doors with proper hardware installed (Closers,Thresholds, Sweeps,
etc. —with the exception of items listed in Il.a.iv)
iv. All Stairwells complete
v. Elevators will be operational and lobbies complete
vi. Commercial kitchen and Health Department inspections complete
vii. Sprinkler system and fire alarm will be complete
viii. Electrical fixtures complete in common spaces and units
ix. All ADA items complete (grab bars, correct signage, common spaces)
x. Building furniture will be ongoing
xi. Phone lines will be active and tested
xii. Signage—interior and exterior
xiii. Deck railings installed. If any missing will be on 15t floor where not
required
xiv. Plumbing, Electrical, HVAC and Sprinkler final inspections
�
xv. All fire/smoke, radiation and smoke dampers in and tested
, xvi. All Memory Care magnetic locks in place and hooked in with alarm
system
xvii. All emergency light and exit signage installed
xviii. Garage complete. We will have material stored in garage in designated
area. All striping complete. This will be located near the garage door.
xix. All smoke detectors and CO monitoring complete
b. Exterior of Building
i. All curb and gutter
ii. Repairs to existing lift of parking lot to insure a smooth parking lot
lil. 15Y lift of paving. All striping required by code. Any bituminous ramping ',
required to meet ADA requirements. 'i
iv. Install all required street and parking signage
v. All exterior side walks
vi. All exterior finishes on the building
vii. Building sign complete
viii. Substantial completion of grading on site
II. Items to be complete after Temporary Certificate of Occupancy(items to be
complete by July 15th- Exterior items could be delayed dependent on weather)
a. Interior of Building
i. Non-Life Safety Items
ii. Drywall and paint touch up could be ongoing throughout building
iii. Owner Punch List items will be ongoing, including all associated work by
contractors
iv. Memory Care Areas: 2"d and 3rd floor.
• This includes common spaces and units
• Item to be complete include: All corridor doors and hardware to
separate area from remainder of building, vinyl flooring, cabinets,
countertops, plumbing, HVAC and electrical inspection complete.
Light fixtures complete.
• Items not complete include: Common area woodwork and doors
(except those listed above), common area wallpaper, Common
area carpet, paint, unit woodwork (except cabinets) and carpet.
• Hallways to remain clear in case of emergency egress
�
, ,. . �
• Doors entering area (including stairwell doors) will have magnetic
locks and all correct hardware.
• Magnetic locks will require a code to get into area, but will drop
with the fire alarm or loss of power
• Gyperete floor will be poured. This will be a level surface
v. Final cleaning of units and common spaces will be ongoing. Move-in
units and common spaces will be priority
vi. Building Furniture, Wall Art, etc. will still be being placed
vii. Carpet Base in corridor areas will be ongoing
viii. Blinds and Draperies in common spaces
ix. Any cabinets that are incorrect (due to manufacturer issues) in units
could be an issue (no more than 5 units). If this issue arises,we will do
what is possible to locate the incomplete units in memory care areas on
2"a and 3�d floor
b. Exterior of Building
i. Finish all infiltration ponds. To be done once landscaping is complete.
ii. Landscape building site
iii. Remove temporary road used for construction purposes and finish
�rading at fire department site. Will review process to try to complete by
June 15t". Will update city on process and plan to�et complete
iv. Seeding fire department site. Will also review and see if this is possible
to finish up prior to June 15th. Will update citv on process and plan to�et
complete
v. Second lift of paving and striping
vi. Installing bike path along Blackhawk
NOTE: A good faith effort will be made by Stonebridge Construction to complete grading on
complete site by June 15th. Once exterior finishes (siding, brick, stone, gutters) are substantially
complete and brick washing is done, excavator will start on work around building. Anticipated
to start is May 2ptn
;. ,
'` Craig Novacryk
From: George Johnson <GJohnson@harrissarchitects.com>
Sent: Thursday,April 23, 2015 12:34 PM
To: Craig Novaczyk
Cc: mcurrie@stonebridgecommunities.com; David Ness;
jpierce@stonebridgecommunities.com
Subject: Eagan Pointe shaft wall details
Attachments: ASI-22.pdf; UL Design BW-S-0013.pdf
Craig, ,
I've been working with USG building materials on the best way to deal with the issues we have in the shaft at Eagan. It is I
their opinion that the aligned joints(which do not meet the requirements for that shaft wall assembly)are essentially
the same as a perimeter relief(head or base of wall joint) detail.Although a perimeter condition as detailed in their
assemblies would have a continuous stud or track backing the joint,that stud does not provide the rating protection. It
provides protection of the joint as the assembly would typically be in an exposed location that could be damaged or
compromised from an impact. In our discussions,they didn't feel that this was an issue as this condition would only be
within the shaft. If you feel it necessary,we could provide a protective light gauge piece of inetal secured over the fire
caulk to assure that it wouldn't ever be disturbed and remain in place.
As far as the closure of the shaft openings, we also worked with USG to come up with a detail that continues the same
wood framed shaft wall and utilizes a joint that is also similar to the perimeter relief detail at the joint. I have shown the
detail with a numbered notation to reflect the sequencing of construction.Give me a call to discuss this when you have a
chance.
I'm sorry about the delay on this.Typically,we do not detail the closure of that system and it has taken me a bit of time
to work with USG to find a detail I was comfortable with regarding life safety.Typically,we provide the guidelines of the
shaft through the UL or GA file requirements and the contractor is obligated to meet those requirements through means
and methods to access and complete the work. I appreciate the extra level of care taken in this situation.
I have not officially issued this change. I want to make sure that we both understand and agree upon a direction before I
cut this loose.
GEORGE JOHNSON
HARRISS ASSOCIATES, LLC
515 Washington Ave N
Minneapolis, MN 55401
Suite 200C
Phone: (612)339-2190
CeIL• (612)940-2101
Fax: (612)339-4783
� 1
I �- ' XHBN.BW-S-0013 -Joint Systems Page 1 of 3
�.
*
�� nw��m� r_cRr�GireT�nw� �IHEGTi1R�f
System No. BW-S-0013
XHBN.BW-S-0013
)oint Systems
Paae Bottom
Design/System/Construction/Assembly Usage Disclaimer
• Authorities Having Jurisdiction should be consulted in all cases as to the particular requirements covering the installation and use of UL
Certified products,equipment,system,devices,and materials.
• Authorities Havi�g Jurisdiction should be consulted before construction.
• Fire resistance assemblies and products are developed by the design submitter and have been investigated by UL for compliance with
applicable requirements.The published information cannot always address every construction nuance encountered in the field.
• When field issues arise, it is recommended the first contact for assistance be the technical service staff provided by the product
manufacturer noted for the design. Users of fire resistance assemblies are advised to consult the general Guide Information for each
product category and each group of assemblies.The Guide Information includes specifics concerning alternate materials and alternate
methods of construction.
• Only products which bear UL's Mark are considered Certified.
XHBN - )oint Systems
XHBN7 - �oint Systems Certified for Canada
See General Information for Joint Svstems
See General Information for]oint Svstems Certified for Canada
J System No. BW-S-0013
Mdy 18,2012
ANSI/UL2079 CAN/ULC 5115
Assembly Ratings— 1 and 2 Hr(See Item 2) F Ratings— 1 and 2 Hr(See Item 2)
]oint Width-5/8 In. Max FT Ratings—1 and 2 Hr(See Item 2)
FH Ratings— 1 and 2 Hr(See Item 2)
FTH Ratings— 1 and 2 Hr(See Item 2)
]oint Width-5/8 In.Max
http://database.ul.com/cgi-bin/XYV/template/LISEXT/1 FRAME/showpage.html?name=X... 10/9/2014
XHBN.BW-S-0013 -Joint Systems Page 2 of 3 �` -
�
���
.
_..., �..,! ._
�_. ,.
� � € �
��-� 3 �. ��...
�,.
�
� �
�� � x
3 �
... ��:.. � � �,��,.
�
�
i
.
�c...w�sm�em-.. ..sna.... ,,..�.n . ..,..�...:.... .�w: -.>.�n..-:...fv�a r:.... "'. . . ..... . ..xi.A,:- .xm...a,:e .. ..... ...... ..+rr.._s.n..
�� �
� � �xJi
� � �
�.....,...�+u- .�� ...:.. .. �� ...... ur...::m..:xim=�.r�>.v.....x.mx....... ,,..-.:r.W.:..:srcau ..,�:�- ...... ......�..�. ,... .......... ....�w....w.,....m:..
' r
�
§
1.Floor Assembly—Min 4-1/2 in.(114 mm)thick reinforced lightweight or normal weight(100-150 pcf or 1600-2400
kg/m3)structurel concrete.Floor may also be constructed of any min 6 in.(152 mm)thick UL Classified hollow-core
Precast Concrete Units*.
See Precast Concrete Units(CFTV)category in the Fire Resistance Directory for names of
manufactures.
2.Wall Assembly—The 1 or 2 h fire rated gypsum board/steel stud wall assembly shall be constructed of the materials �
and in the manner specified in the individual U400,V400 or W400 Series Wall and Partition Design in the UL Fire Resistance
Directory.In addition,the wall may incorporate a head-of-wall joint system constructed as specified in the HW Series Joint
Systems in the UL Fire Resistance Directory.The wall shall include the following construction features:
A.Steel Floor Runner—Floor runners of wall assembly shall consist of min No.25 gauge galv
steel channels sized to accommodate steel studs(Item 2B).Floor runners to be provided with nom
1-1/4 in.(32 mm)flanges.Runners secured with steel fasteners spaced max 24 in. (610 mm)OC.
B.Studs—Min size as specified in the individual design.Studs cut 3/8 to 5/8 in. (10 to 16 mm)
less in length than assembly height with bottom nesting in,resting on and fastened to floor runner
with sheet metal screws.Stud spacing not to exceed 24 in. (610 mm)OC.
C.Gypsum Board*—Gypsum board installed to a min total thickness of 5/8 or 1-1/4 in. (16 or
32 mm)on each side of wall for a 1 or 2 hr rated wall,respectively.Wall to be constructed as
specified in the individual U400 or V400 Series Design in the UL Fire Resistance Directory,except
that a nom 1/4 in.(6 mm)gap shall be maintained between the bottom of gypsum board and top
of concrete floor.
The hourly ratings of the joint system are equal to the hourly fire rating of the wall.
3. Fill,Void or Cavity Material*-Sealant—Max separation between top of floor and bottom of gypsum board is 5/8 in.
(16 mm).Min 1/2 in. (13 mm)thickness of fill material installed on each side of the wall between the bottom of the
gypsum board and the top of the concrete floor.
UNITED STATES GYPSUM CO—Type A or AS
*Indicates such products shall bear the UL or cUL Certification Mark for jurisdictions employing the UL or cUL Certification
(such as Canada),respectively.
http://database.ul.com/cgi-bin/XYV/template/LISEXT/1 FRAME/showpage.html?name=X... 10/9/2014
!
XHBN.B W-S-0013 -Joint Systems Page 3 of 3
�
Last U�dated on 2012-OS-18
Ouestions? Print this oaqe Terms of Use Paqe Top
c0 2014 UL LLC
When the UL Leaf Mark is on the product,or when the word"EnvironmenY'is included in the UL Mark,please search the UL Environment database
for additional information regarding this product's certification.
The appearance of a company's name or product in this database does not in itself assure that products so identified have been manufactured
under UL's Follow-Up Service.Only those products bearing the UL Mark should be considered to be Certified and covered under UL's Follow-Up
Service.Always look for the Mark on the product.
UL permits the reproduction of the material contained in the Online Certification Directory subject to the following conditions: 1.The Guide
Information,Assemblies,Constructions,Designs,Systems,and/or Certifications(files)must be presented in their entirety and in a non-misleading
manner,without any manipulation of the data(or drawings).2.The statement"Reprinted from the Online Certifications Directory with permission
from UL"must appear adjacent to the extracted material. In addition,the reprinted material must include a copyright notice in the following
format: "�O z014 UL LLC".
z
http://database.ul.com/cgi-bin/XYV/template/LISEXT/1 FRAME/showpage.html?name=X... 10/9/2014
�
o �
N �
m
N �
N N m
o � �
Ga
� � O
Q
r�T �
(x �y
w
O� � � � � �
�0 � (L O?� � �
'aN LLO acn �.J ww��Q O�
Op� w �
�� Q= cr)Z JC ncp�u>��LL (K�
�"—� ~"� �� W~ n�fY�U ��
W� � @ �� ��=��m�- En �
�� X� Q� r t-cAQE 0_`n �= T \
J� J� �� s�m�LL���Q �-Q v
�a a aJ � a, F"'a zZ �t� � �
wLL� zO Zw �� '�`���aU� a� � �
��� Q� OQ z� 1���O�Q �� � _
N �`� �Oz1 �w
Q
���� O� OO� � � � V1
� � o ii �
� �
Q � '- � � �
�� Q p � �� �
_ �~ � �- w �z ��= 0_1 C� Z � _`
�\�n� � ~ � Z U ��wQ� �� ( r1
w�°�w 'aaDwu. F UC �u. A�f�K zF � � � �
�� ' �c�j �r� � = t-� � LL�yc�1= Ocn '�j
����LL �QW\ o� u' aWLLa� nZ Jl
n�-��n ��� � �� '�u ����Q �0 4C � c� �
ZpQwz4 �uww �Q � �� �u m� {—
���Ou� R�cLLI� 11-1 Nci . x NQ��� �Q-� � V1
cn � t'J �� LL l�S � � Q Q F LL cQ� R�
1� �J a J�� �� J � �� W�� µJ LL� � �
Q X��Q � �� [L� � ,n\'° ����U_ L]O
Z lil W }Q N��F Y� 0- J U�I L' O W ��� �
�tD �Q Z �c�i) 'Q= . U�J � �N � Z�LQCQ
�i-Q `,LA1 �x� U�- � r
r+
W
Q
�
�
� Q� � �
�-� �R�d a��zQ
� UQ �U�am �
O LL� �
�= m� ww��� �
�O � �fll mWLL�� �
v� �W ��@O� �
�x� �W@*-� C�
O��w ���?LL � � _ �
���� w���� � � � �
W � c�
4a4Q �`���W � � _��
.����n a��.'LLca �
� c9� ����
. � � �
_ � � �
Ca � � !
� � cb� i
,� � I
. . . . .. � - .. �
. . c�
� � �
� � ��
� a�.
� o�
�
w �W
�
� ���e
� �z�
U���
u � �'=
P� V e��
� �E�
, �i=a�
�
Architecture
ARCHITECT'S SUPPLEMENTAL INSTRUCTIONS - ASI #22
DATE: 04/24/2015 2 Pages
TO: Matt Currie— Stonebridge Construction
CC TO OWNER: Lance Lemieux
...........................................................................................................................................................
FROM: George Johnson
PROJECT: Eagan Pointe Senior Living PROJECT #: 3154
...........................................................................................................................................................
RE: Mechanical shaft wall details
ATTACHMENTS: 11x17 sheets ASI-22.1
This work shall be carried out in accordance with the following supplemental instructions—issued in
accordance with the Contract Documents, without change in Contract Sum or Contract Time. Proceeding
with the work in accordance with these instructions indicates your acknowledgement that there will be no
change in the Contract Sum or Contract Time.
DESCRIPTION:
Sheet ASI-22.1
-Add details for proper closure of shaft wall access openings and improperly
' installed shaft wall assemblies
Note: general contractor to verify and correct the following
-any missing layers of gypsum board on shaft assembly
-any aligned gypsum board joints (to be lapped per attached detail or standard
assembly documentation)
-any missing fasteners per standard assembly documentation
Note: bottom of shaft not required to be enclosed per MN building code section
707.11 exception #3 (no combustibles in shaft and no openings or penetrations to
the interior of the building). Contractor to enclose all shaft related combustible ,
framing at bottom of shaft with (2) layers of type `X' gypsum board. '
�:
v�Eu��a
,�►: � � �
Eagan Buildfng �napec�ions�ivtsion
Harriss Associates, LLC � 515 Washington Ave N Suite 200C � Minneapolis, MN 55401
P: (612) 339-2190 F: (612) 339-4783 ��
��,�-,���,.� . - �,� „�...�.< ,
�
� �g .� ���u�, �. �:.r, �;
� , ` � >�
��.,��.,,�-4«�.. - � � ���
� ° � ' >„ `
;
.. � �
: �..�.�.�_,� �� �
x . + _ � , .�� ,,, �
� :� . .,_' ,.
., _ ..�._ ,�.�»K.�,».�,�,h.»�......r�_..�,��,.��.,�,.�,�«.4r,, ,�.�,�
�
o �
N �
N N M
� � �
F � o
a �
�
� � m � � �i
W o���o � �
o� �o aW ��Qo �o ��
zQ n� Zo x�� , �LLLL �� �
�W� �- � w ��du 'f-'�- '�
WLLoc �m �� ao�z�m�' �o Z �
p�¢Oi r� [�� NqW—� KS U
�`�� 1W �w "'��m���7a o-Q JJ-�
��` a� �N � �a�W`� �� �� � �
�;w� z= z� _� ������� �° � /"�
Zal� v� � "�- Q�LL3t�aZ � - ���
° Z� ���LL�Z� �,,, `" � W
� "��=QoW �a � tl
�NLLNtt]Uan QOa1 J�j — r�
1 V1
� � oo �
� 4C � � w
��
W �/
=m�'�0���� a W � �'�_ � � z 1�-�
"� o�`"��� - �z � ����� �' � � �
W mW= � ,�Wµ� � oLL& � z�/� �4[
}� m'�m �� � _� �J �_ � LLwm � �Oco �y/ �
QI�NUZLLQ tu0�_� ZQ W qWLL� pF �
o�'?�oa� J??� �� �'�z N£-�.��� Qo � � �
p R' �ri � NT�N�Q
���U��ZN R�N�W N� . x N�l]0 u �J � Vl
1a���W�w ��l7�—R' � Q QriY W� m3 m
����a��W Qm��� ' ,� �,°����� o$� � I-�
�Xm QmQ� o�m � ��z�oz wW� � �
z �� �u
��c`�n��Oz��w N���z .. Oc�i� �O zm� �
Q�Q�tp�Q(K (�xQU� r , .
t'�'�
1�
1�
�
Z� � �
@ o ��w
�N N W�QN JQ F'�"I
M N W W O Q�LL�j� �
vXap�� c��f�W I�W �-- �
� r^ Q� Q � �
��; m ?�d—�—�� � �
���.�� O��`�Z�J
u1�3 J(Q ��X W�m� � �— � �
LL U � 0.._£� '� C� u
�� W ��'�'��SWn � —
�°��`� Q��'v�a�aa � c� o��
L1_l
_
; r� —u c�
� � L1Jl
�-- 4C
� � �
� �
�
� W c�
� o � ��
� az
� oZ�
w k?W
�
dy��
� ����
11 ��`�
Q:y'�
I
( Lse�OA Tr�MNffRy��iC. .
3624 Labota F�oad
W)ils 8ear tdce.MN 5511D-3128
BS1.�d19120 Fa�c 651.48182D1
rvwwJarsonemyr.eom
!
� ���
� Structura! Testing and Special lnspection -
Program Summary Schedule
,
ProJ�ct Nams g,aga.n Poit�te Senioc Liyintt p►akd No. '
I.aaitlon 4226 Blackhawk Rnad Permtt No.
�,�
Ea�q MN ' ,
_ _.
Tecfiolcal T � __ ��
3ectlon /lrtid� D�scr}pHon� i��° Rapvrt As�t��
. F uen Fkra
zs a - _: saas _,�,� _ r� _ .� �
25 . b Cancrete TA. . Per 'on. I
ZS c _ �
� TA . Pez tio�n �
25 a Steel 3I•T. Per on _.
_
Not�s:TNs�le et�aU De AAed out and 4�duded h fhe SMucUxal T _ _
(�3 PenrAt No.bo be provkfed by ihe Buldhg otfldau. �and Spedal�nsPedla►Fragram.
Cl) ReFerbnoed�o Rie speclAc te�t scoQe aecYan In Rie progrem. .
(3) tJse dasalpratle perlBC Sec.�on 170i,ae adopted DY t�OrneoOta State B�ng Code.
f'� SPedd h�aPeetor-7edxYcai,Specfai inaPedor-Stnx��al,Te�ng Apency.
(5} Wee1dY.�Aor�MiY.Per 7�Per Floa�r e1c,
{8? Fimt oo�rncled b DeNam servicea, o
ACKNOWLEDGEMEt�tTS
Each approprlate.r �sentaUve shaU s)gn bebw:
.�O'� Firm Gktktl�/��8�2. pAte / -JZ'J
,_ _ �_
ContncWr' ? • Flrm �
, :_ � - , . . - -. te �/r -i '�
At+�h
_ _ ..
= " Flnn Hai►iss Dats 11l12h3
` SER ' -:.
� : Flrm —Larso_ . n��neerInF:._._._ Dat° 1�1/12/13
� SI T13 ��.��li�'t�Pr.��Nh.SDate l/~I�- f�
.. _ -------�
: Ta .. '
� Fiflll�[�n:6i-altiLnTri�spr�rllj'D9t8 ��-�a-��
�
F r Flrm
Qats
: - �
� It roqixaled bY e►glneeder�ttoot of tecord cr bu�sing ofRct�,lhe Inc�vtd��ai narrrea of aA prospecdve apedal hspedaa
� and tlro work tl�ey k�bend to abeerve alwl be IdentHfed.
�°� TA�T�Er�phea�dR�cad 8FT�6qcVthsp�qpr-Tednk:�l SFS�3pxhlkrp�or-Stuclxal
�9� f�Fahkalor
,. Accepled br tha Buqdln9 aA�pnent 8y Date
r
t �.
J
� �� � �
i
�
June 16, 2015 HGTS Project# 13-631
Mr. Matt Currie
Stonebridge Construction, Inc.
15734 Foliage Avenue
Apple Valley, MN 55124
Re: Final Report, Special Inspections and Construction Materials Tests,
Eagan Pointe Senior Living,4226 Blackhawk Road, Eagan, Minnesota
Dear Mr. Currie:
We have completed the Special Inspections and construction materials tests for the Eagan Point Senior
Living apartments at the southeast corner of Diffley Road and Blackhawk Road in Eagan, Minnesota.
The project included construction of an approximate 45,000 square foot footprint building which consisted
of four stories above grade and one story of below grade for underground parking under most of the building
and associated surface parking lots. Qualified technicians performed the field tests and observations
under the direction of a licensed professional engineer. Our services were performed on an as-needed
basis as scheduled by you or your authorized representative.
In accordance with Section 1704 of the International Building Code and the agreed upon scope of services,
special inspections and testing was provided for the following items:
Soils
Our excavation observations included visual and manual classification of the soils encountered by shallow
hand auger borings. Soil cuttings recovered from the hand auger(s) were classified in accordance with
ASTM Test Method D 2488. The turning resistance of the hand auger was used to estimate the soils
density or consistency. The exposed soil cuttings retrieved from the hand auger borings generally
consisted of native Clayey Sand, Silty Sand, Poorly Graded Sand with Silt, or Poorly Graded Sand
corresponding to the ASTM classification SC, SM, SP-SM,and SP, respectively. Lesser amounts of Lean
Clay(CL)and Silt(ML)were also encountered.
The Dynamic Cone Penetrometer (DCP) tests were completed along the footing bottoms using a solid
metal rod fitted with a 1 3/8-inch diameter conical point. The point is driven into the soil with a 10-pound
weight falling 24 inches. The number of blows required to drive the point each 6-inch increment was used
to judge the soils' relative density and as a basis to estimate the soils ability to support the proposed
construction.
Soil corrections (clean out excavations) included previously placed fill, loose or soft soils and other
deleterious materials within the proposed building pad areas. The clean out excavations within the
building pad were limited, but where required, typically ranged from about one to eight feet deep.
.� �s
__ _
Pa � e � z
We performed Sixty-four(64)compaction tests in the fill and backfill placed during site grading,construction
and utility placement. Soil tested included building pad fill, wall backfill and utility backfill to evaluate the
effectiveness of the contractor compaction methods and to evaluate their suitability to support the
anticipated structural loads. However, eight of the compact�on test taken during the project we conducted
on the building pad for the vacant lot west of the apartment building. Based on the results of our
compaction tests, the soil was compacted to densities meeting project requirements
Based on the results of our observations, hand auger borings, DCP tests and compaction tests (where
applicable), it is our opinion the exposed soils were suitable for support of the anticipated structural loads.
Reinforcing Steel
We reviewed the reinforcement and dowel requirements on the project structural plans. Information
included the bar size, bar length, bar spacing, bar location and splice lengths. We also noted if the
reinforcement was free of rust, scale and soil prior to placement.
Discrepancies were noted during construction that required attention from the Structural Engineer. These
discrepancies were logged in a form attached at the end of this report and corrective actions were noted.
Based on our observations the reinforcing steel was placed in accordance with project plans. There are
currently no unresolved reinforcement issues.
Concrete
Concrete placement observations were performed to monitor the procedures being used by the contractor
and to determine if they were consistent with industry standards. The placement procedures were judged
to have met the project requirements.
Routine tests to determine the plastic concretes' slump, temperature, and air content were done during the
pour. In addition, concrete cylinders were cast at rates specified in the project specifications to evaluate
the concrete's compressive strength.
The concrete cylinders cast were temporarily stored at the site and returned to our laboratory for moist
curing and testing. Results of the concrete compressive strength tests indicate that the specimens tested
met the required minimum 28-day compressive strength. There are currently no unresolved concrete
related issues.
Masonry
Masonry observations included verifying the size and location of the structural elements and verifying the
specified size, grade, and type of reinforcement. We also verified the protection of masonry during cold
and/or hot weather for compliance as outlined in IBC Section 2104.3 and 2104.4.
Prior to grouting we observed the cleanliness of the grout space, placement of reinforcement and
connectors. Grout placement was verified to ensure compliance with code and construction documents.
Routine tests to determine the plastic grouts' slump, and/or temperature were completed at the time of
�825 Ce ;�v�e��te �, Mirtu+�� iis� ��i 5 ' 'T
.�
Page � 3
_..._. _ __
casting samples for compressive strength. Masonry block prisms were constructed by the contractor
on-site as required by project specifications.
The masonry test specimens were temporarily stored at the site and returned to a laboratory for moist
curing and testing,except for block prisms which were dry cured at the laboratory. Results of the masonry
compressive strength tests indicate that the specimens tested met the required minimum 28-day
compressive strength, and are attached. The exception was the second set of masonry block prisms, of
which the average strength of the 3 samples broke at 1680 psi whereas the specified strength was 1900 psi.
The structural engineer was notified and acceptable the results as satisfactory. A third block prism test was
performed/constructed and met specifications.
Based on our observations the masonry construction was judged to have met project requirements. There
are currently no unresolved masonry issues.
Spray Applied Fire Resistant Material
The Intumescent paint thickness was check per Technical Manual 12-B Standard Practice for the Testing
and Inspection of Field Applied Thin-Film Intumescent Fire Resistive Materials. Field thicknesses were
measured and noted in the attached report. There are currently no unresolved fireproofing of structural
steel issues.
Conclusions
Based upon the inspections, testing and evaluations performed, it is our professional judgment that, to the
best of our knowledge,the inspected work was performed and completed in accordance with the approved
plans, specifications and applicable workmanship provisions of the International Building Code.
���� � ,�irv�+��;,�: �, 21� eapatis, MN ��54+�7
�, . .
Pag � � 4
_ _ _ __
General
Services performed by Haugo GeoTechnical Services LLC have been conducted with that level of care and
skill ordinarily exercised by members of the profession currently practicing in this area. No warranty,
express or implied, is made.
Thank you for the opportunity to provide the testing services for this project. If you have any questions
regarding this report or need additional information please contact Joe Westphal at 612.269.4027 or Paul
Haugo at 612.554.4829.
Sincerely,
Haugo GeoTechnical Services LLC
�� �����
�:;.�
Paul Haugo
President
I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision
and that I am a duly Registered Professional Engineer under the laws of the State of Minnesota.
���������
�`,�Y��� � �`,��,����
� ,�- �,
`� „� �1�� .
,�� �� � � ��
�� �
� r..
.� .
Joe Westphal, P.E. %� ` � � ��;�
Project Engineer %,�� �,�,�
License Number 49833 �'�s�r�������,�t`*
Expires June, 2016
Attachments: Compressive Strength of Concrete Cylinder, Report for Sets 1 thru 38 �,
Masonry Test Report(Block), Sets 1 to 4 I
Compressive Strength of Masonry Samples(Grout), M-1 to M-2
Report of Field Compaction Tests,Tests 1 thru 64
Proctor Test Reports,Tests P-1 thru P-10
Steel Field Report, 10 pages
Special Inspection Discrepancy Summary Log
'���� �e ,�v+e�t�e S, �i�eapo, ' , R+�I� ���4'?'
� GONSTRU�TIC?N ENGiNEER1NG L,�BC?RATORY, [NC',
�� TESTING FOFt QUAUTY AND�TRENGTH
,
::�.....:.......:.::.......::........:.........:...:........�;i`��,,�I������t��'..............:...,.::.:...:;_ .
Project; Eagan Pointe Seniar Living Date. January 15,2Q15
4226 Biackhawk Rd, Eagan,MN Praject No: L-158Q8
Report to: HGTS Report No: #1
,
; 13579 Grove Drive Present at Site;
#27$
_
= Maple Grove,IVIN�53'f 1 `
AtEentian: Pau[Haugo
:
Veri�ect substrate conditian of beams and columns forthe 2nd floor framin .
;' 1,All'�tems ar�:sho rimed with Tenemec rimer
- er hone conversation befinreen Jeff PiercelStanebrid e and the ainfm contractor on 1l15
Paint contractor verified with the intumescent ainf manufacturer that it'rs ok to s r� over the rim�d steel.
: 2. �ome lue adhesive is still attached to a cou le of c�lurnns after rem�val of the woad framin
� -CEL t�cM advised removal of adhesive or eheek wri#h manufacture o#Ir�turnescent a'tnt to veri that th�
t adhesive would be ok ta s ra ovee:
3. Swbstrate is in sufficient condition to be s ra ed after uerifin item#2 abave.
; __ _
..e
= Copy: 1.Job File Report By;
' Re�iewed By: �
: 5661 Intemational Parkway-Minneapolis, Minnesota 55428-(763}533-9�34-FAX(763)5�3-9586
lab@cel-inc.com
_ _
�__.,,,,, . _ , �,,.. , _�,
�� ,_ ., ,---e ___ n.� �__ __� ._ ._.__
__ _
l
, � I
,
�
; �r Ct�NSTRUCTIt)N ENG[NEERING LABQRAfi�RYs INC.
�� TESTING FOR QUALITY AND STRENGTH
�;,
- : ....:.:...... ::....�fi���;�`1�1*.#�,���?�3F�'�.::,........:.:.......:....,,..:....::...........:.........
Project: Eagan Painte Senior Living Date: January 30,2Q15
; 4226 Blackhawk Rd, Eagan, MN Praject No: L-15008
Repart to: HGTS Report No: 2
; �13579 Grave Drive Present�t Site:
;
� #278
. Map1e Grove,MN 55311
: Attention: Paui Haugo
= Phase 1 - 1 st,�nd, 3rd itoor
' Infumescent: ain#mil thickness was checked er Techn�eal Manual 12-8 Standard Practice for the Testin
;
z and(ns ection of Field A lied Thin-Film Inumeseent Fire Resistive Materials. The a licator s ra ed
0 _
; Albi Fir� roofin material,Aibi cfad TF.A[}e�elsko Series 6t�Q4 caatin thickness ua "e was used t�
f ineasure the Mil thickness a lied.
_
-� � �� �� �
; 1. Jeffl�tonebrid e rovided CEL uvith#he re uired thickness to be a lied to the eolumns.
z 2. 7"x7"calumns re uired 119 mils avera e thickness J 5"x5°calumns re uired 123 mils avera e thickness
;
3. Thickness tolerence-7"x7"=95-143 mils / 5"�c5"=96.5- 1�48 mils
:
: 3. 6 co(umns on each Eevel 18 tofa( were s ot checked and found:ta be at or belaw the min�murn tolera�nce
= on most surfaces.
� 4. Measured mi(thickness was wrote on each surface ofi the calumns on all levels
5. Jeff/Stonebrid e will nati CEL when Phase 1 area is read far retestin .
; _
t
Capy: 1. Job'Fi[e Report By:, _.. .,
° __ e:./�
= Reviewed By:
� _
,
J
��
; 5661 lnternationai Parkway-Minneapolis, Minnesofa 5542�-{763)533-9534-fAX(763}533-9586
lab@cel-inc.corr�
_ _ __ _ _
= �r CfJNSTF`tUCTION ENGINEERING LABORATC}RY, INC.
` �i�'
TESTING FOR QUALITY AND STRENGTH
, _.
:.
-� .... ::. . :::. ...��.[...�I��..t;���F�41�`�'.::.;.......::........'......:. . , ... '
Project. Eagan Pointe Senior Living Date: February 2,2015
4226 Blackhawk Rd, Eagan,MN Froject No. L-15008
; Report to. HGTS Report Na: 3
,
13578 Grove Drive Present at Site:
� #278
Maple Grave,MN 55311
: ; Attentian: Faui Haugo
� Phase 1 -1st, 2nd, 3rd flaor
' Intumescent aint mil thickness was checked er Technical Manual 12-B Standard Practice for the Tesfin '
;
and Ins ection of Field A lied Thin-Film Inumescer�t Fire Resistive Materials.The a t`rcator s ed
;
Atbi Fire roafin material,Albi clad TF.A DeFelsko Series 6Q00 coatin thickness ua e was used to
measure the Mil thickness a lied.
� _ _
_ �. Jeffl Stonebrid e rovided CEL with the re uired thickness ta be a lied to the column�.
: 2. 7"x7"calumns re uired 119 mils avera e thickness / 5"x5"columns t uired 123 mils avera e thickness
= 3.Thickness tolerence-7"x7"=95-143 mils 1 5"x5°=98.5-148 mils
; 3. 1 randami selected colurnn on each levet was measured far thickness.
= 4. Measured mil thickness was with in toierenc.�.Actual measurements are�'ecorded on the attached
° mil thickness sheet.
5. Phase 1 area meets 'ob s ec re uiremen#s.
:
F
_ �
Gapy:;1.Job File Report By: 1„�,�,�..,,�,�_ ._ � .�
_; Reviewed By..
_i
_ �661 Intemational Parkway-Minneapalis,Minnesota 55428-(763)533-9534-FAX(763}533-9586
lab(a�cel-inc.com
Y
: Q �,� Q a Q
�
. N . . .. . _ . . ..
ET N r G4- tn �� sh r .
� z � ��� N M M M M M
= :...: >•- :r r r� e- r- .r
� L
J ��
O M
W
.. � ,. � �.� :Q �� ��� � �
� O �
_ _ . . . .
.... ...... . f � "k} -�C} ��� U}��. {t} ((}
� N
,F �
w'
z
_ ': j �
..! �
'�. (�j � .�} QT
Y`AS � �M
_ �' r.
� .{a� � fV . �;.
�.� o C
• Y�'a N o
� �' �
Z �'_.r� N � :N �
� . a ii „ �
�' �' � -[2 ?"
� �; � � �S �
r � m 1t?
� � 'Z tn �rn �:m r.w 'a� i�
� �: LL ...1 r � G1 �y
.��,` i.�+ d fA g � M
.� ao . � �E
I d � :; � ��j J � ^
� . � � � 4' � c�
m (jj , ,� � �-
; Q . �
i � t"• � �. :N.- N M d �C {V �
�i 16e' p �.�
(� p �:, �F`
� �: 3 4p W
Z .�. � � a
W � � ��
LLI � �; � � � � �<o � '�
° Z �3r .�.. � � ,�..n !�.e
' � .� � �
; � � �� � � ' y t°�
z u. ,wt a � — �:
LLI �"Q}'' Q in c
a: �,�1 �, '$ c
3 Q.�� ttl- � . , � . .. 3 �.
�. � :F+1 .,M ... � ?�
��.1- ... � O, AC} O - � ��. �.
� �• N O
_��. ��. �: f � � � � �� �: e�- �r e�-. � W.:
� �
F C Q.
�• d {�'
� o o us a o o �
tl� :_ a
Z� �Sv��� �� �. o� ao h w� � � �.��. M � �;� �.� ��r �:
�' �;
. V� � ��. C� � � � � � �.
` � � � �u�. ItT O' C'i tt� �[? O� 10 ��
: _� � � � N N M��� N M ��� �M N� v ��.
` J V1 � .- e- c- r e- a- , ��.
� 'i3 �
3 q� � � � ,,�d e7
' � �, Q � u� o S'i O u� [s �
.c �
� � N M M M M �/
; � � EQ� e�� A; �"' f T f� !� �{L
� � � O O �
� f0 L+ � i.� • • . � �
, a � C� c� � W ;�� � � � x � `� � �
_ � c° F�.. � °o °' _ �a U�> h ;�r' ' u,� �s�Cj �
� � � Y
; � '�' .= P � SL a d ,- •_ �v M. . Q C.. C � �. C . .
t± �p L. � Go � � �
c�
�� p pt°o 0 o a �
: a: "�' 'i, f�U U C3 U �
O � � . � Ci�
: a = r� Np�, M � ;�
� �� �� �,�-� ��� �� �
; : � � - - - .�
, ..:: � . � a_j'U ��"O at�'i n � p:
< �
; �
___ ___ _____ __._
. �
° � Gt}NSTRUGTIQN ENGINEERING LABQRATORY, IN�:
�� TESTING FOR QUALITY AND STRENGTH
:::..:..:..�....::.:.......::.....:.......':......:.::::..-&1:`���:.�1�1�1����Qt�T.:....�....�:......... :u.....::....,....:........:.....:..:
Project: Eagan Pointe Senior Living Date; februa 20,2015
4226 Biackhawk Rd,Eagan, MN Project No: L-15008
Report ta: HGTS Report No: 4
` 13579 Grove Drive Present at Site:
#278
: Maple Grove,MN 553�t1
Attention; Paut Hauga .
� Rhas�2 t�3- 1 st, 2nd, 3rd floor
, lntumescent aint rnil thickness was checked er Technical Manual 12-B Star�dard Practica far the Testin
and Ins ection of Field A lied Thin-Flm tnumescent Fire Resistive Materials. The a licatar s ra ed ;
' Albi Fire roofin material,Albi clad TF.A DeFe[sko Series 600�coatin thickness ua �was used to ;
; measure the Mil thickness� lied. _ �
i
;
; 1; Jeff1 Stonebrict e rovided CEL with the re uired thickness to be a lied to the colurnns& beams �
2. The c�mmons and Merno IAssited livin area's were checked �
i
` 3.A combination of 1 cokumn and 1 beam were randomi selected far thickness festin on each leuel j
I
4. A eou le of surfaces were belawthe minimum#alerence and were marked for touch u . I
- 1 st level commons area-bottom side of the tubes and 2 surfaces of 1 calumn
_ -2nd level assisted livin - 1 column face and the ta side of the battom flan es af the beams
� 5. 4ther framin iterns in area of re airs were s +ot checked and found to be satisfactc� . - - - - -
; 6.After corrective touch u ,tMose surfaces can be added fo the thickness re orE#ar avera in ur oses.
• 7. Jefff Stonebrid e scheduled final thickness testin far wed. �eb.25,2Q'15.
� , ,
� Copy; 1.Job F'ile Report By: -�,,_,..._ ,�,_
Revtewed By:._
= 5661 Internationa)Parkway-MinneapoCis,Minnesota 55428-(763)533-953�-FAX(763)5�3-9586
lab@cel-inc,com
♦ y
L= CONSTRUCTION ENGINEERING LABORATORY, INC.
TESTING FOR QUALITY AND STRENGTH
.:.:.:.:.:.:::.:::.:.:.:.::::::::::�:�:�::�:�:::�:�:�::::.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:.:
:::::::::::�;7`� � �`: ::: .: : ': : . .:�::: : :::::::::::::::::::::::::::::::::::�:::::::::::::'::::€;:::::::::;:`:��::::::::::;:::::;:::':��::::::::::::::::::
°��� ������'�''°'°'�-'=`°`�`�'�`�'�'`°� =�=��`�������°������°�°�°"����� �������° ..EEI...Fl.�L.fl�
...�t��QF�T.........................................................................:.:.:.:.:.:.:...:.:.:.:.:.:.:.:.:.:.:
Project: Eagan Pointe Senior Living Date: February 25, 2015
4226 Biackhawk Rd, Eagan, MN Project No: L-15008
Report to: HGTS Report No: 5
13579 Grove Drive Present at Site:
#278
Maple Grove, MN 55311
Attention: Paul Haugo
Phase 2 & 3- 1 st, 2nd, 3rd fioor/Final
Intumescent aint mii thickness was checked er Technical Manual 12-B Standard Practice for the Testin
and Ins ection of Field A lied Thin-Film Inumescent Fire Resistive Materials. The a licator s ra ed
Albi Fire roofin material, Albi clad TF. A DeFelsko Series 6000 coatin thickness ua e was used to
measure the Mil thickness a lied.
1. Jeff/Stonebrid e rovided CEL with the re uired thickness to be a lied to the columns&beams
2. The commons and Memo /Assited livin area's were checked
3.A combination of 1 column and 1 beam were randomi selected for thickness testin on each level
4. A cou le of surfaces were below the minimum tolerence and were marked for touch u on re ort#4
- 1 st level commons area- bottom side of the tubes and 2 surfaces of 1 column
-2nd level assisted livin - 1 column face and the to side of the bottom flan es of the beams
5. The a licator corrected areas of deficienc .
6. Measured mil thickness is now in tolerence.Actual measurements are recorded on the attached
mil thickness sheet.
7. Phase 2 & 3 areas meets 'ob s ec re uirements.
d '
Copy: 1. Job File Report By: i
Reviewed By:
5661 International Parkway-Minneapolis, Minnesota 55428-(763)533-9534-FAX(763)533-9586
lab@cel-inacom
2 �
N N �1
a � 'i a a
N
....
I ::•::.
::.�.
....
....
..... —__...........
O)N (O M
a N` C �p � � �y.
.. m �V I� I� T M
� Q L
//iy1'> F.
G .-j � �
U \
lJ
\
i �
a � � O
d �� N a0 N a0 t�
� N N � �
N
<
N
z �
� �
'.':.':. J � �
,'�M\ � .- t7 �
LIiA.'
' L�' W M
�'. m t�
.�.. � 7
t� ~ N (h
.'.�'. 0 �
;-�? N C
� _.�: � o
Z ��' � o � �
:c;.a. �
ii �
�: �.�:� .n
�.,..: �
�' ::�; �
0
� �n o m �rs
� rn rn
� � � z �rn m n io �
� :�: � J � � J l � 3 �
,i,. O N G1 M
� Z �"� � Z N W "' N �p �y �E
O t~.7 :'.'�`M"�: � V � a ^ ' � � '�'.
m W .',4�'. ^ Q j� � N �
� � :c: � U 3 ��r- �i r�v �d � N
� C•. a � tf1 C
Z � �'�'� � � @ �
Z :�:'�!l�.. '0 � (0
Q .�' ' � V
—a, �„ ;:ut: 'o �
� ::f[t: � c a`�
W J �G�:� � � c
� WQ :�-: '^
� � � � � �n � � N � c
Z CB �:ti: '^ I I I �
� � .�;. � L I J Q � � a-�i
Z � :.iii'. ¢ a C O c U
LU � ::a�s.�: � E '� v �
a�
Z � ��:: � E 3 �
O W i.QF: � n� i� � � >"
F� .�.�".: �
a
O � � � �
~ '�' � V' N �O r
U ..L'. r � � � � . .d.. .. �.
... . . . . ' _.. . . � . .._ . aasc . ._ . . . . . .. . . . . . . .0 .. .. ._ _..
.....
� :�. � f6
' I"' .A> �r, �n C O I
?:�:: o 0
N :r�. Z �"� CO CO N V�' p N
Z .�. rn m n io n � � c `
� � �
O iwi — c I
V :�: � � cn !0 4 '
��': C � � �n O � O O a_ �
J W � m N � n M M W �
M rG
O 'O � e- •- �
� �i ��a
� � j Z O O y�
� �j Q � . V�' C N
�
C '� > > O ` d
'0 V O O = O 6 - � LL.
n- � � � fD W r N W �. � � X � C
C m (A � N = ~� w o � t- cV �n iA� t'�
� (p �— 1` 00 — � N g a u in > � � �
� s � �i ro
W � = sM- � � 0.. W o � � �
� � � � n � c
v ,O c mmo � o .n m
d a � mU ~ U �
'� E 'C
o �
a � � � i�
O C. o m m Q.
N �+' N 1� ' N c y
� Q O �mU � t�0 � �
J J m '� m •
, L
N tlf fp
a ° � a a
a� �
rn a� d. o 0
e m c co ao
Z �� > � � c�o v v
� ��u ¢ L
� ��� �
w
�
a � @ � a o0
�'� � N N
O
� � � � �
N
a
�
z
� co
:..:::. � �
J
Y'1 O � t� �
m.. U
i.: W M
:S?��: m �
;�. � �
r
r ci M
_.,�. N c�o
V "� � � �
Z '..�.`�..�. � oo � u.
:'•^� o ii
}" ':�:� >+
•.�: � � o 0 o m �
� :��: � � rn �
Q �.�� � � � Z �rn �o �� �n �i � rn
v�
u. � � � � ; �
�~ ��; ai o �% o a m
x to Z N W � � � �, � � � �� �O E
O � _'�` � v � = u�i `° `° � � Q�
m W d Q' i' ami coo.��E
g � �:�� 'p O `+ R
� .�. a v 3 � �, M.� � � � � ��
�e o �::a�: � � rn oi � m
Z ::i�: v m co �
Z Q •:++: > N a
a-, � •.�: � „�
•t� � � �
W .� `W�� � o o g c
W � =��� W � � � � fO � `° �
N � � N y�m
Z ('J :..�.. fn a� C
� � �: � Q ' �o a�
� y �'N
Z lL :ww. � � C p p O N V
W � .+f'"i o 0 tn f0 �O 'D C
Z :;�; F E tn f0 N �
Z f" •:(q. � � E �
O � ::Gk: ° c� r� (j � �.
.Q
F"' '.v.�' O 0 � � O 3
U ,... v p �n �. � .�
_ :�.e: m �n � � -a @
1 . _ _ v __ a
.�,,;
� :'�: � m
' � ::01:• :: c
� .`'r. �o u� � � 5 0
Z ��L�ju','. Z m w n u M (O CO � � C l0
O �i�• � � C
�
U �:� C � � �, �n u� � � '� '
� (a r' m N (�O f�0 `� � �
_I W m ( � �
` � � �
O "a � tf1 �� n a ��--LJ
.� � , Z � o o O N
Y 'C •
N � � � � � � � �
C y > > O P N
_ 'O � O O � � � a ' 6 li
n- C9 U' co w � > n X � � � �
v, v� "� cC x
..._ C m � � � S f-�- W w � T M N
� CO �— f� 00 — g a �v��i > ~ � � � � uvi
Y �
W � S � � � d o � �, M Y o � E �
E E Y
''' C c � a�i m � u�0i � � >+
v �"' O � a�V 00 V � m
� � C � m � O
Q Q, m 0 N —, N {y � Q
� Q U � m m � mt� C �
J J m J m F � ��.
x
4 L I
I
I
�
I
. �
a ° LL d a a
a� �
m N �y-� � � M � �
a R C
'> > V � � N N N M
L
J a �
�
����,�
�
a Y� � o o cn o u� �n
C' V V�' O O M M
O
�' M M �A � � ��A
N
K
�
� �
.':.::' J (� .
� O � r� M
i.. W M
:�1: m �
.e"' tn �
:::. � a M
i:lQ( O tD
i-3� N �
V .•��.. O Q
:.�. � X
Z '�' N o0 � �-
;�.. � � �
} ��' � � .Q � >' c�i
.r: � � m u>
O �i�� N � � z �rn m �.� � � � t%�
� ::�. � � � � 1 l � 3 �
q �..��".�'.'v Ci � 'F'� o ^ �� N � M
aG x ' � Z y � m > to �
� �j a � ro G� r o
� ~ ��. � � � V
U' :.h�: V �, �
� fO N E
w :Y. ^ Q �.
Q R' `�' O 0 3 �'f �, �o�r v V' N
'� as '�' a V '>_ � c
�e p ?GS} �o r� � m
Z ::a: � m
Z a �.�:.: ,�°� a
::�: � �,�
� � :'�: � � v
W � �W: �, > co � c
W a ;�_:
W 1� �O N Y N.
Z (� ����� vNi � � C
� •'^'�• � N � O N
(� � '1�iv.: �-d
� N � �
W � �. ° � y � � c o
z � � y c
Z � .�. N 3 G
. O W "� � h i7 0 � Y
f- :�:�: E u� u� �n o 0 0 � fa
� :.�.
(� ::3''.. N 'V' c0 t0 M M .^- �
.� .�r' � . � � . N d . . . . .
' � :Z}. � � .- .�- C
E„� :0�: N f0
� N ::_�: �, � o � o o � o
Z � � �
Z :�. m ro ��o M atOo a�Oo N `P � c
� � r- � r- � �
O �iw• — � C
U .iG'. rn C v� �{
•E: C � � -,� � � � O O O
� � � O M a0 a� �
.._I W M m � 1 N a0 00 � s�- � � � u)
�
O � � � I �i na �
c � > Z � � u� u� in � N
N �1C •� .
� � � � � � N � N N �
G � > > O � •- •- � �
_ � � � � � � � - o' - Q' 11
a � � N W � � W p_ V' ` in N in d �
C v�
� � � � � � ga uo-i > ~ `Tr `O � �� uVi
� co
W VN' 2 � � � p. w �w �I p c c c c �
..�+ C � � f6 0 0 0 o c
: +% �
v
o � � m U U U U � �
�
� c n ao ao
O
G�. � � o ; pQ' ; Q ; Q � �
d' Q o JQ �m �Q � a'
L ` k
i
N
l6 O � � � �
. a LL" Q- d 0. �.
�
� p) � O O o c0 t17 tC7
N C
.. - �� � 7 V N N M N � �
� ��-=��1 , a f"
Owa� ����r� i _ O O
•
J 0 � O O
a ` . F V V�' � t�Cl M M
N
K
Z �
� �
:':.'.' � �
� 17 �
�r1 � �
m U �
•� W �
' 1':
:��• � M
.�n; Ln �i tD �
� v
?:1�: O X
:•.7i:• N � Q
U .c. �
:.1�C: N � �-
Z ..�'d..: 00 — v
� .�• @ O � � m rn
� •��•
:-G: � r' -�j Z �m m n� �� d c�
0 3 M
� :�: � � � ; � 3 � �
� M
� d 0 Y � ^ � � '� � �
� = R Z N w � � � Q; U
m Z :�-: � d Q � � N E
�, m � m
W ��� • �i N
Q OC "10: C � 3 .- a �o� 'a tn C
J v~i '�� a V � t� :3 `-°
(7 p �-'�� � u�i o.
Z Z :•:�; � ��
Q -:w: c a)
?.UF: � c
� � :�UF: C
W � �wm��� ,� > co +`�. 'rn
� W Q .LG:: � n co in �J N y C
� ' � O O d
: z (� "��' � � Q—
� i�w�: r�- a�+ C y U
� 0 •G�i.' N O C
Z LL .i�i�t. � a NV� � '� C
W �` �" v� Q V�! '�2
Z ::�: � . � �
Z F- :tA: � a> >.
_ O W .•.QI�. oi ro O � m
r ::��: E o 0 0 0 ,n �n o 3
~ "�:' � � N N N M p�p � L (6
V ��: � a� a
:.c�: �a
� .�;. c �o
' � =�: c o
' � •.�W:• o 0 0 o u� �n
� •.�' � � � � M � � p L �
.iTr�. rn ro n co � c- C N
Z �; � � N C
O�♦ i��i+.' l0
V .i�•. � C � . N ln O O tl') tn � y CO
� > N � m N N � � � a�o a�o ro t�C1
J W M '
� '
O 'C � � �i ��a
•c � � Z � o o � � � N
� � N '�
� j Q N N V' C7 p�p p�p �
N f0 N Qj � � � � �
C
.._ �O (� � � � a) in a`6i in N a. � li.
(� t- }� p, X X C
�
� m (n � N = gg � � Q F" in � in � d' ti �
Cp � f� 00 — = N �a U N > �
� N (� M N lB � � ��i �� � c
w v = •- � � a = � E �
� cYi E > > > ' � >+
y � O � p�pU U V V � 'C
. � :i+ _
� Q d O Nt[i MC� � Q c �
a � w �, Q �Q � d
d, Q � �w a�i�„� a'� v � �'
J J Q J a J a #
��
Craig Novacryk
From: George Johnson <GJohnson@harrissarchitects.com>
Sent: Tuesday, April 28, 2015 1022 AM
To: Craig Novaczyk
��� mcurrie@stonebridgecommunities.com;jpierce@stonebridgecommunities.com; David
Ness;John Harriss
Subject: RE:ASI-22 Eagan Pointe a itiona sh �������
�311:' ( .
Craig, � ��
Dafi�a:
I spoke with Curt Wiehle at the state to get some clarity on t i��l�s �� e verified.
Minnesota has amendments, due to winter weather, requiring 1:20 walks in some portions of the accessible route on
the exterior of the building.The code does not eliminate ramps from all accessible routes on the exterior. It reads as
follows:
402.2 Components
Accessible routes shall consist of one or more of the following components: walking surfaces with a slope not steeper
than 1:20, doors and doorways, ramps, curb ramps,excluding the flared sides, elevators, and platform lifts.All
components of an accessible route shall comply with the applicable portions of this standard.
Exceptions:
1. Ramps shall not be a component of exterior accessible routes connecting accessible parking spaces and
accessible loading zones with accessible building entrances.
a. This is the only location where a ramp is not allowed. We currently meet this requirement for
access from the accessible stalls to the entrance. Egress points from the building are allowed to have
ramps as a component of the accessible route. All doors other than the main entrance are, as far as a
code analysis is concerned, egress only and are not considered accessible entrances.
2. Where multiple buildings are provided on a site, ramps shall not be a component of exterior accessible
routes connecting accessible building entrances.This exceptiorr does not apply to buildings not normally
occupied.
a. This is related to the connection of multiple buildings with accessible entrances on one site. It
would allow ramps to things such as garages or gazebos as they are not normally occupied.
3. Ramps shall not be a component of exterior accessible routes to Type A and Type B units intended to be
occupied as a residence unless the provision of a walking surface with a slope not steeper than 1:20 is not
feasible.
a. This is related to individual residences and also reinforces the idea that the entrance shall not be
accessed via anything more than 1:20 unless it is not feasible.
Essentially, the only location where a ramp is not allowed on the exterior is between accessible parking and the
accessible building entrance. Our design, currently allows a disabled individual to park in an accessible stall and travel via
the drive, a curb ramp at the front of the porte cochere and up a surmountable curb (per the requirements of a curb
ramp)to the building entrance with a maximum walking surface of 1:20. We have checked with civil on all other walks
and we should not have any accessible routes that exceed 1:20 without a rail and 1:12 with a rail. I am going to have
them do a final site verification of everything and have it documented when they stake the walk around the back from
the dining hall.As we were permitted under the 2007 code,that is the section I have referenced.Speaking with Curt,the
2012 code changes the language but it still only prohibits ramps at the accessible entrance.Thank you.
i
GEORGE JOHNSON
HARRISS ASSOCIATES, LLC
515 Washington Ave N
Minneapolis, MN 55401
Suite 200C
.:. .. _,:. »a,wrsawµiaMlf�rr; �
Phone: (�12)339-2190 �w � .� ,
CeIL• (612)940-2101 ���� �, �� �� �� � �� ',� `� � �
�;_.'�'Mt �
wr�w�wr��k.��,a.��r�wawwµ�
Fax: (612)339-4783 • `
,: x .
�,.�v���,�..�..,�.,,�.,��.�,�«,e��..,�..�,:. #
,�,,,,� � . . • ' _. _��.__ . .. .... ,�_� .0,
<, � .�+F�,mW .
n�. . .. ��..._..�m�� n.�_,...._,. _.....:.�,�_.�� .�.,4__ v., .,� _a �_ _ -___.
From: Crai�'"lvovaczyi�'�rr1`ai�Ita:C�Plc�rr�z�4c�_�tty�€ea�ar�.con�]
Sent: Friday, April 24, 2015 1:13 PM
To: 'George Johnson'
Subject: RE: ASI-22 Eagan Pointe additional shaft details
Thanks George,
We still ne2d to get your interpretation concerning the exterior accessible route. Our interpretation is that an exterior
walkway serving as an accessible route shall not exceed 1:20 in slope. Please state your case in writing, based on the
applicable Code sections.
I will be out of the office until Monday.
Craig,
.�v.�. .._._,. . �.n.n._. .w�. _ ,�._�....
From: George]ohnson [mailto:GJohnsonC�harrissarchitects.com]
Sent: Friday, April 24, 2015 11:18 AM
To: Craig Novaczyk
Cc: mcurrieC�stonebridgecommunities.com; David Ness; iqierceC�stonebridctecommunities.com
Subject: ASI-22 Eagan Pointe additional shaft details
Here is the ASI based on the discussion we had in the field this morning. Call me if you have any questions.This has also
been uploaded to our file sharing site.Thank you all for your help on this.
GEORGE JOHNSON
H�LR RISS ASSOCIATES, LLC
515 Washington Ave N
Minneapolis, MN 55401
Suite 200C
Phone: (612)339-2190
Cell: (612)940-2101
Fax: (612)339-4783
2
Craig Novaczyk
From: Jeffrey Pierce <jpierce@stonebridgecommunities.com>
Sent: Thursday, March 26, 2015 2:55 PM
To: Craig Novaczyk
Cc: nzink@stonebridgecommunities.com
Subjec#: Fwd: Column approval
---------- Forwarded message----------
From: Catherine Kray<ckray@larsonen�r.com>
Date:Thu,26 Mar 201518:02:32+0000
Subject: RE: Column approval
To:Jeffrey Pierce<ipierce@stonebrid�ecommunities.com>
Cc: George Johnson<GJohnson@harrissarchitects.com>
1eff-The 7"x 7" glued laminated columns are an acceptable substitute for the 7"x 7" PSL columns specified on the
drawings for column type C3 in the dining room.
Cathy ,�,,,..r..v.
Catherine Kray, P.E. (MN) ,,,�......--��� '�"��
EV ��� �
Design Engineer Q ��'�
� ; s
Larson Engineering, Inc. �: �
3524 Labore Road �#e� � � �� � ,
White Bear Lake, MN 55110-5126 � d�n9�,�g���.tQons Divigior
ir
651.481.9120 Fax: 651.481.9201 �,agan�
u
ckrav@larsonengr.com
-----Original Message-----
From:Jeffrey Pierce [mailto:ipierce@stonebrid�ecommunities.com]
Sent:Tuesday, March 24, 2015 3:06 PM
To:Catherine Kray
_._------Cc:Ge6rge Johnson
Subject:Column approval
Cathy we are getting our frame inspection in Dining room inspector has
issue with 10 7"x 7"columns.Structural calls out 7"x 7" PSL
lumber company sent and we used 7" x 7"glue laminated beams are they OK as a substitute? Hope to get answer soon.
Thank you!!
Jeff Pierce
Superintendent Ce116123632503
STONEBRIDGE Apple Valley, MN.55124
ipierce@stonebrid�ecommunities.com
AA/EOE
1
� j
Craig Novaczyk
From: Jeffrey Pierce <jpierce@stonebridgecommunities.com>
Sent: Wednesday, February 11, 2015 920 AM
To: Craig Novaczyk
Subject: Fwd: Eagan Pointe - Column attachment
---------- Forwarded message----------
From: Catherine Kray<ckrav@larsonen�r.com>
Date:Tue, 10 Feb 2015 18:43:33 +0000
Subject: RE: Eagan Pointe-Column attachment
To:George Johnson<GJohnson@harrissarchitects.com>
Cc: "jpierce@stonebrid�ecommunities.com"<ipierce@stonebrid�ecommunities.com>
Two bolts are acceptable for the saddle to beam connection.
Cathy
Catherine Kray, P.E. (MN) �� � �,
Design Engineer �' �m {�
P¢�"��y�tF ^ �' ���
$ &l'�...�.. , ll ,.. ���
Larson Engineering, Inc. > C,�`'7f"��i
3524 Labore Road �y`�� ��—��y � ~�
White Bear Lake, MN 55110-5126 y y jj �S
651.481.9120 Fax: 651.481.9201 ��`r°��'
ckrav@larsonengr.com �y�"`'���`''� G''�`"`�������5 ���E`����
-----Original Message-----
From: George Johnson [mailto:GJohnson@harrissarchitects.com]
Sent:Tuesday, February 10, 2015 10:35 AM
To: Catherine Kray
Cc: ipierce@stonebrid�ecommunities.com
Subject: FW: Column attachment
Cathy,
There is a beam to column connection in the third floor card room that, due to the way things timed out in construction,
only allowed two out of the four bolts to connect to the wood beam.They want to know if that is sufficient and if it isn't,
how can we deal with a fix on this?Attached is a photo. We are looking at the 4C3 column top with saddles and the 5C3
column coming down through the floor. It is the reverse saddle on the 5C3 that only connects with two bolts.This is at
the intersection of the north/south corridor with the east/west corridor.The issue is the
GEORGEIOHNSON
HARRISS ASSOCIATES, LLC
515 Washington Ave N
Minneapolis, MN 55401
Suite 200C
Phone: (612)339-2190
CeIL• (612)940-2101
Fax: (612)339-4783
1
* ►
George. 2-bolts missing tying column into beam third floor card room.
Craig(inspector wants engineer approval that it is ok to skip).Would be impossible to attach with bolts now.
�
t
�
\ a
\ 1
1
\
\
?
3
4
3
3
�
3
�
;
1
,'�0\
��
2
Craig Novaczyk
From: Jeffrey Pierce <jpierce@stonebridgecommunities.com>
Sent: Wednesday, February 11, 2015 9:21 AM
To: Craig Novaczyk
Subject: Fwd: Fire treated roof sheathing - Eagan Pointe
---------- Forwarded message----------
From: George Johnson<GJohnson@harrissarchitects.com>
Date: Wed, 14 Jan 2015 15:09:06-0600
Subject: Fire treated roof sheathing- Eagan Pointe
To:Craig Novaczyk<CNovaczvk@citvofea�an.com>
Cc:ipierce@stonebrid�ecommunities.com, mcurrie@stonebrid�ecommunities.com
Craig,
Jeff informed me that they missed a portion of the fire treated roof sheathing at Eagan. Per the building code section
705.6 (vertical continuity of fire walls)we can use either fire retardant-treated-wood sheathing within 4' of the fire wall
or 5/8"type x gyp board directly beneath the underside of combustible roof sheathing within 4'of the fire wall. In this
situation,we would have a mixture of the two. I would assume that if we lapped it over the fire retardant plywood by a
foot and fire caulked the edge, that it would be equivalent but I would like to verify if that works for you.
GEORGEJOHNSON
HARRISS ASSOCIATES, LLC
515 Washington Ave N
Minneapolis, MN 55401
Suite 200C
Phone: (612)339-2190
Cell: (612)940-2101
Fax: (612)339-4783
�.. . .. . _ .»�..:.-
4_ .���A?G .�.�.r��
�s��.. _��!!/t_�_..___---
f _._._._
�'� ° .,��.���;,,--. ---__
� � � .� � w ,� �„ ,x A
� . ,W.:., �.,�."����., ,_ a �
i I
. �
Craig Novaczyk
From: Jeffrey Pierce <jpierce@stonebridgecommunities.com>
Sent: Wednesday, February 04, 2015 9:02 AM
To: Craig Novaczyk
Subject: Fwd: Cantilevered decks.
Attachments: Cant Deck Beam Fix.pdf
---------- Forwarded message----------
From:Jeffrey Pierce<jpierce@stonebrid�ecommunities.com>
Date:Tue,3 Feb 201510:39:23 -0600
Subject: Fwd: Cantilevered decks.
To: nzink<nzink@stonebrid�ecommunities.com>, Matt Clement<mclement@wolfconstruction.net>
---------- Forwarded message----------
From:Catherine Kray<ckrav@larsonen�r.com>
Date: Mon,2 Feb 2015 21:43:06+0000
Subject: RE: Cantilevered decks.
To:Jeffrey Pierce<jpierce@stonebrid�ecommunities.com>
Cc: George lohnson<GJohnsonCa)harrissarchitects.com>, Matt Currie<mcurrie@stonebrid�ecommunities.com>
Please see attached sketch showing a fix Matt and I discussed this afternoon for where the double 2x12 cantilevered
deck beams attach to the trusses.
Let me know if there are any questions.
Cathy
Catherine Kray, P.E. (MN)
Design Engineer
Larson Engineering, Inc.
3524 Labore Road
White Bear Lake, MN 55110-5126
651.481.9120 Fax: 651.481.9201
ckrav@larsonen�r.com
-----Original Message-----
From:Jeffrey Pierce [mailto:ipierce@stonebrid�ecommunities.comJ
Sent: Monday, February 02, 2015 2:18 PM
To:Catherine Kray
Cr. George Johnson; Matt Currie
Subject: Fwd: Cantilevered decks.
Cathy if you could call Matt Clement at 6053669529.We have some major issues with framers messing things up your
help is very much appreciated!
---------- Forwarded message----------
From: Matt Clement<mclement@wolfconstruction.net>
Date: Mon,02 Feb 201513:15:29-0600
Subject: Cantilevered decks.
To:Jeffrey Pierce <ipierce@stonebrid�ecommunities.com>
1
Jeff there multiple locations where Kathy's detail for how the beams attach inside the floor system will not work out
with the hangers how she would like them. We need another method at these locations where the beams are against
the floor trusses. If needs she can call and I can explain over the phone.
Matt Clement
Wolf Construction
mclement@wolfconstruction.net
P 515.225.8866
C 605.366.9529
2202 Wolf Way
West Des Moines, IA 50265
z
i. ' �T�i ��5 �� � .-� � �t��.
r
g} yYs
�Nbx r ��Pr�,�3 &,S�ei � g r $r� 'i
"�' � �����, � � �� ���'�.� � � � '��
r�ti w� ���� '��� s
�
��'�,�E � r�k= � *� �'<s �
`,,t� ;�� i � .� �
� "3 � ;� "-�'
,
� �� : �
� �,�"> �
� � �
� y�� � ge r
� ��� � > � � �.� �
� �I."1:.: �� �� � �� �, >
� "� � � � � ��' �„ �
��� � �
�0 4� .
,� � � ��
� � � �t � , � ;� �,
, � , -� � � �k I #����„
�
�
� < �. `� � �,�
,
A s
:- ' , ' ��
s � f�
, '����� � � � �� \ �
� � _. ,
� � �� `
.� ;
� P ' � � _
, �" � �>
� �c �� � �3 �� � ��'
� �' �.�t ��� ; `t" �41[iie �,� ,�
, , r i i�
� �,NI li���4i i� �
c
��� tFd�� q���i�,���y1,�t � �
� w� �r,� � — ����
�
e� �, �
` , � � ;i , ' I '" ���`, ,��€� ' �'�lipi,i��I � � ��' '' ..
r � i I ii
5ib�rqt � �
t
� ,; �
�"
t
� �
� �
��` � .
a
`: ��.
�J �,
� � �"�
a 3��. , �st, �
� �� a
,� ��
;,, � �� —
�� � � � �.
�� A, �, 1 � r �
� �" � a � � ''� �
� � �. � ��� � 1 �� � �� �. � � � � � �
� �� �i ��I ��� � . �� - � �
� .
�`��:. � � 1 } ` �
! � ��°
— ��-, � ( �i ( ; ,� `i�d� � � � � .
I 1 1 r � �, � ,� � �
�.n.. , �f�� �_ , � = r � � � �
'� 1 f , !
� j t •
i� � � � � � � �
� � ,� � � ; � � ,� � •
� � ���f �`r � � � � � �
` � s�� �� � � { f ' �� ' � c
� � ( tlf
�„r.+r".:.,. � ,�f!1� '�t�� �F ! � �, i � .•
1
`� ,� r�� � �� � � !
_ � , p
, w
,,o,N' *� � � � � r . .e �
-�^+ � �" �1 a� � ��;� ' � i# s
��..,.-� ., � �
''�,�� '`�t�� � ill�� u �.
� � '�. �t� I� �`�� �
�;,,� � . . t . ...�
�
,.�"'� ��`
�" >
� ^�,; '_� ��
.- , _
,� .� �x
,,�.�
,.,���
� �
.�
',,„��'`'�' ,���
.. � � � ��.,�,,
�
�� ��.; � � � '�,., ` �
��: �� �y.� � � ��
—., , �
b�,
f
����
�
��� � �v �� ;�`��
,�� n �_e, �. �� �� , �,� . ""
�� _
_
_,_
�
�
MEMORANDUM
To: Mr. Matt Currie,Stonebridge Construction Inc.
Frorn: Mr.Joe Westphal P.E.,Project Engineer,Haugo GeoTechnical Services (HGTS)
CC: Mr.Jeff Pierce,Stonebridge;Mr.Paul Haugo,HGTS;Mr.Craig Novaczyk,City of Eagan
Date: Friday,September 12,2014
Re: Fireproofing Special Inspections,Eagan Pointe Senior Living,Eagan,MN
This memorandum is an acknowledgement of the additional Special Inspections requested for the
Eagan Pointe Senior Living project in Eagan, Minnesota. Briefly; Haugo GeoTechnical Services
(HGTS) is currenfly performing the construction materials testing and Special Inspections for the
project.The project involves spay applying intumescent paint(fire-proofing coatings)on some of the
structural steel beams and columns within the structure. Intumescent paint observations are a
Special Inspection item and were not initially included on the project Special Inspection Schedule.
Because of that the City of Eagan is requiring intumescent paint observations.
On Tuesday September 9th, 2014 a meeting was held on-site with representatives of Stonebridge
Construction,Inc. (Stonebridge) the City of Eagan,the intumescent paint applicator and intumescent
paint supplier in attendance. HGTS was represented by our sub-contractor, Construction
Engineering Laboratory (CEL), who will perform the intumescent paint field observations. During
the meeting the City requested the following items;
• Submittal of qualifications of the intumescent paint contractor as well as individual
certifications of each of the on-site workers. It is our understanding these qualifications will
be submitted to Stonebridge.
• Thickness measurements of the intumescent paint.
• Some of the beams and columns were partially obscured with wood framing. The wood
framing must be removed so that the intumescent paint can be applied to all surfaces.
• Sill plates and other existing framing on top of the beams do not require removal.
• Beams and columns must be clean and free of soil or other materials that may affect bonding
of the paint to them.
Based on comments by the intumescent paint supplier we understand that the intumescent paint is
weather sensitive and because of that it cannot be applied until the building is enclosed. We
anticipate application to commence in about 3 to 4 weeks.
Inspections/observations will be scheduled through HGTS by Stonebridge with field thickness
measurements and observations performed by Mr. Bruce Riley of CEL. Inspection reports will be ,
provided to Stonebridge and the City of Eagan in a timely manner.
Thank you for the opportunity to assist you on this project. If you have any questions or need
additional information please contact Joe Westphal at 612-269-4027 or Paul Haugo at 612-554-4829.
���� +�� ;�,���c� �� �' �a�a ' , �I� ����
Stonebridge Communities Mail - Eagan Pointe: Deck Piers Page 1 of 2
Search Images Mail Drive Calendar Sites Mobile Waliet More »
jpierce@stonebridgecommunities.com � Standard View �Account� Settinqs � Help � Si n out
,�
�
,�, :
���. �
�__.__. _.____.___________ __.._...____ �__.....___
���� Search Mail I� Search the Web iShow search oqtions
�---. . _..._�._�._..._..�............._� �_!. '� ` Create a filter
Compose Mail « gack to Inbox ; Archive� Report Spam �Delete � < Newer 2 of
:__�._. .� ��._._�._�_...��..�._�_
��� ..��.__�_
Inbox 2 �More Actions... �'_. Go � hundreds Older>
�_ �._._.� �____.........._.____ �
Starred �� `"�����"�������
�Print �New wirYdow
Sent Mail
Drafts � Eagan Pointe: Deck Piers ��,b�X
All Mail G�ther'ne Kray < ckray@larsonengr.com> Tue,Apr 8, 2014 at 8:46 ANI
S am 11 To: "Jeff Pierce(jpierce@stonebridgecommunities.com)"
Trash <jpierce@stonebridgecommunities.com>
R2DIV�Reqlv to a!I�Forward�Print�Delete�Show oriqinal
Contacts
Labels Good morning,Jeff.
F€�Ilouv u�
�'�t�� Per our phone conversation this morning,in lieu of i2"diameter sonotubes for the deck
Prioritv piers,you can use i2"x 12"CMU piers with(4)-#5 vert and#3 ties @ 8"OC.Also—the
Edit Iabels dimensions locating these piers are shown on sheets Sio2,Sio3,and Sio4.Thus,you
shouldn't have to get them from the architectural plans.
Call if you have further questions.
Cathy
Catherine Kray
Design Engineer
Larson Engineering, Inc.
3524 Labore Road
White Bear Lake,MN 55110-5126
651.481.9120 Fax: 651.481.9201
ckravCc�larsonenpr.com
� �w,����� � ��<=.f.>�+�
�<��,°����vr�c;��r.��°� /�?,� . �`������
�Y:�.t� �� - -_____
��'�.��u � �
9379� Z01� ��l��sr����r�c�3�1'��r�c������r�e�� _' �ENG I �� 'y"lat`fS DIVISIl3N
This email is the property of Larson Engineering, Inc.All material contained herein and any
accompanying documents are confidential,may be privileged,and are intended solely for the person
https://mail.google.com/maiUu/0/h/lnlhlthht4mwi/?&v=c&th=1454198bfd3ccb2e 4/8/2014
Stonebridge Communities Mail - Eagan Pointe: Garage Door Piers & Ftgs Page 1 of 2
Search Images Mail Drive Calendar Sites Mobile Wallet More »
jpierce@stonebridgecommunities.com � Standard View �Account� Settinqs�Neip � Sign out
' �Ir�� -
,
� � _��_�_�_..___:
_�._� __._____
__ .
�� E """,�;'"__...._.... .,,
� ' y Search Mail Search the Web €Show search options
� ,
,
�.. . � .._...._. � . � __..... � ___. ,
�....�.._..._.......................................... �i8ai8 8 iiii8i
___,_.............i
Compose Mail « gack to Inbox � Archive �Report Sparri � Delete �
� i < Newer 4 of
;.____.._ t__�_._..�.._____.__..__......._� �.__...me._...��_�.......
Inbox 3 More Actions... u � Go � hundreds Older>
_____�. __
Starred �° ---�--_�,,.,_____._.�;
�, __._�
Sent Mail
�Print �New window
Drafts � Eagan Pointe: Garage Door Piers & Ftgs ,�aax
All Mail ��tg���-R�� �r�y <ckray@larsonengr.com> Tue,Apr 8, 2014 at 8:32 AM
S am 11 To: Jeffrey Pierce<jpierce@stonebridgecommunities.com>
Trash Replv�Replv to all�Forward�Print�Delete�Show oriqinal
Contacts
Labels Gc�o�l rnc�rr�ing,J�ff.
��i�o��,�
r�;�G
rvo�es
Pr`°r`t� Per c�ur�hane canversation, it is acce��ak�le far yc�u to drill a��d e�oxy�i�e
Edit labels
��t��a�r 8" intc� the �c�t�ting for the foc�ti���;a�1c� CMU pi€�r t�at were ac�cied �i�
�he gar��e dc��r�i�1te1.
� Ple�se s:�11 if you have f�zrt�er qi7estac�ns.
Thanks and h�vt�a�;reat dayl
Cathy
Catherine Kray
Design Engineer
Larson Engineering, Inc.
3524 Labare Road
Ytlhife Bear Lake,MN 55110-5126
651.481.9120 Fax: 651.481.9201
ckrav(a�larsonenqccom �'�rt^��
����'�����D
���'���i �� �- � __�
s���E;�r��r��aa�r.ve�� �1NSP �T����1 —_._,.�
VR�ION ,
�9T� �2t��4 ��I��r��ir�g 35���r�csf���ir����
https://mail.google.com/mail/u/0/h/1 n 1 h 1 thht4mwi/?&v=c&th=145418b546144025 4/8/2G 14
Dale Schoeppner
From: Craig Novaczyk
Sent: Tuesday, February 10, 2015 8:36 AM
To: 'George Johnson'
Cc: 'mcurrie@stonebridgecommunities.com'; 'ross@wre-mn.com';
'jpierce@stonebridgecommunities.com'
Subject: RE: Eagan Pointe electrical boxes accessibility response
Good morning George,
I have discussed your proposal with the B.O., and he is willing to accept your proposal for an alternate method of design
concerning the electrical panel heights with two conditions
1. There is a 24/7 maintenance staff on site. I
2. The panel doors are locked and serviced by the maintenance staff only. ',
Please contact me with any questions,
Craig
From: George Johnson [mailto:GJohnson@harrissarchitects.com]
Sent: Friday, February 06, 2015 10:22 AM
To: Craig Novaczyk
Cc: mcurrie@stonebridgecommunities.com; ross@wre-mn.com; jpierce@stonebridgecommunities.com
Subject: Eagan Pointe electrical boxes accessibility ,
Craig,
I spoke with Curt Wiehle,the State of Minnesota accessibility specialist about the panels to get a more solid
understanding of this panel issue. He stated that you are correct that the panels in A and B units need to be within the
reach range to the main breaker if they are to be accessed by the tenants.
It is my understanding that there is no individual metering for each tenant room and electrical is not directly paid for by
the tenants.The power is directly managed by the owner and it is their policy that all work with breakers is to be done
by building staff only.Typically,the boxes are locked for the memory care users for their safety.To reinforce this point
of staff only access to the circuit panels,we could extend locking to all of the panels throughout the project.
Curt stated that if this was the case,the panels would not need to meet reach range requirements per the MN building
code accessibility scoping information in chapter 11. He stated that it would be considered an employee work area and
would only need to be on an accessible route. We would meet this requirement. I would ask that you consider this
approach when making a final decision.
GEORGE JOHNSON
HA R R T�'S ASSOCIATES, LLC
515 Washington Ave N
Minneapolis, MN 55401
Suite 200C
Phone: (612)339-2190
Cell:(612)940-2101
1 �
S , s
Dale Schoeppner ~
From: George Johnson <GJohnson@harrissarchitects.com>
Sent: Tuesday, September 09, 2014 10:23 AM
To: Craig Novaczyk
Subject: FW: Eagan Pointe: Demising Wall Detail w/ Detaii Attached
Attachments: Demising Wall w Ladder Trusses.pdf
Craig,
I apologize for the delay in getting this to you. After reviewing our detail, we discovered thafi we had an issue with
structural shear wall conditions that made our previous idea not work.Attached is what we are now hoping to do. We
would essentially build the demising walls to the bottom of the trusses and then provide ladder trusses sheathed in OSB
on top of them to create the fireblocking.This works better than trying to sheath the walls all the way up in gyp board
because they can build the ladder trusses,fully sheathed, in sections and then install them so that they do not have to
work in the close quarters in the truss space. It should also provide a more substantial fireblock than the mineral wool,
which is difficult to secure and have confidence that it will remain in place.
We do have some demising walls that are already framed all the way to the deck above. In those conditions, we will run
the gyp board all the way up and make it work, but moving forward we would frame the walls as shown in the sketch.
Let me know what you think of this solution.Thank you.
GEORGE JOHNSON
HA.RRISS ASSOCIATES, LLC
515 Washington Ave N
Minneapolis, MN 55401
Suite 200C
Phone: (612)339-2190
Cell:(612)940-2101
Fax: (612)339-4783
_ _ .
1
r . s
Larson Engineerins,Inc. SU63ECT ��� Tc�t�s' ShlEET fJt}: OF
_ 3524 Labore Road ���1 b(2,, (,.t���� PRflJECT NO. ����L.�Q
VJhite Bear Lake,N1N 5511 Q-5126
651.48fi.9i2Q F�:651.481.9201' ��I��i� Y t}AT C� ��°'
+uww.larsonengr.com
_
__
���t t�1�J�' ���� ���.,1, "" '��'��'���
_ _ . =�S��1F�t. �c,11k1.�:.- __ __ _
y _ ' f�Yl° �'solk�tt:�
, .
C,�. ` 1 to el cnmrr�r� .t .;
,
�t..� � : _ ��
--- , __ �.,,,,,,,, �
�� �� --- - . , _ , , _ __, ��:' � -�N��fi�.�s P��i��s���k��,_, _ __ , _.
: . � W/►rt►t., SC,f-�'�bt1 t�E�
�c�s+�-r�t�� : ,
_ ; � :
It�d �:onnma�? _
_ t►s,�tc.S @ tc;'r�� r��t�sF� �'i.��t
_ ___„_, � _ �� T#�vS�,S
t.,�� _
_ - ' TRusS�S
- -- _ � �
_,_ _
�. ,e „ _.__ _
__�, _ �._ _._ r_ _„ „__ „
�2� �� _ con����� �- - -- _ __.
��1 US � `
... . .. ..... �5i?'i tJ�.T.. .. .. .. .�.. . . . . ��_ � . . . ... . � . ....� _ -. �._� _._ .. .. .___.
. . ... _._._ , . .._ _...
. . ..-. � ..� . . i , .. .... ...
=- . a .� � . , r. _,, . � . r �; . a . .,: �e� .• ... _�P
. . . . . . .� . . +a ,. _. �:. . .� , .
. . . . .i . . �r . ` . .. .. . . . .
,. . .. ..... . ..... ... . . . - .. . r . .. " . � . . . .. . . .. . .. . .. . ....
�.. . . .. . . .. .. .
.. . ...... : . . . . . . �*� .
_ . . y �AcIc,.S �R 8��
• _ �JA�u..�c.���,bvt,,,� _
.. . . . . . ... .. 4 ... .��. . ... `• �
....._. ..._.., , :..._ . ...
. .�_. , __..__.,, , __. .
_ .� .._._. :, ._,..,�_ �.._,., ____. „_ . .s. .. ... ..
��! fsJ�+GlGLJ - ,•
:4 •` : �+���121,�t1�t.t_, I
.
, � ;
Larson Engineering,Inc, SUBJECT E'�H,f��\"fJ `�D I��� S��h)�n���� �h�=SMEET NO. OF
3524 Labore Road ��C ��� � I � c-a ,I
White Bear Lake,MN 55110-5126 `�� � � `,��- PROJECT NO. ����d�(,-{'
651.481.9120 Fax:651.481.9201 BY �'.�� DATE(?�' � I -=�•
www.larsonengr.com
Larson
CSI�F��-�`<r� �!- �f�f��' � �f 1"-} ��_�� ��� 12. �
�Do�l` I�C� �X�-��J�1�..�
r r,
, ,
i � �(�''x i to� C-►�<<� P����°
� /� i� � �,�� ��.�� �; �, ��c:�����-
; �
;�
(�� �'Gs � � .I o�.►G i NAt�- 12., c',f-1 u
�'� �i � ��R-c����,�) c���-�.. C=�F' �1�.�'.
/
�, . , _ �. � i _ . c
'`., _ j %� ` o , r� CC�) _ � G=� �.)U���.�
�
- i, __ , �� % • c
0 ' /' �' �~� � ���(,i�..E"� ` �
� ��_� _ _ , ; . - � E..�'�X ( L�IQ � (�J�TZ�
b ,� ��Y�1ST �..i ��
,
� I --���-�'I--� ��1 M i N
�r� �x rE���>�oc�, o�� � i ��A� �r� �xr�
r�T��T
__
_ . __ .__ _ __ __
,.� ,
Report Name: Clty Of�j agan Printed: 7/22/2015
Inspection Remarks Page: 1
Inspection Remarks
Permit: EA125051
Permit Type: Building
Site Address: 4232 Blackhawk Rd
**For ALL previous remarks,please go to G drive:Building Inspections�Building Inspection Issues�201SEagan Pointe Senior
Living.**
3/23/15 Framing corrections ML: .
-Add blocking under beam carrying roof vaulted trusses east side dining.DONE,ML
-Add nut and tighten another on west side hold downs.Check bolt positioning in hold downs.DONE,ML
-Add nail plate and firecaulk to plmg vent pipe in dining room.DONE,ML
-Fasten all LVL's per manufacturer's specs.DONE CN
-Add full bearing of roof truss on beams tlu�oughout dining area(truss design sign of�DONE,ML(letter from truss engineer)
3/26/15 Firestopping and Sheetrock CN:
-Firestop I beam and bracket membrane penetrations in elevator"A"& "B"shaft enclosures(2 hr shaft)
-Grease shaft rock completed except where shaft support brackets are to be installed(contractor to provide photos or call far
inspection when completed)-SEE REMARKS BELOW,DATED 4/10/15
3/27/15 Insulation and framing CN:
-Front entry vestibule framing and insulation not ready
3/30/15 Private Dining room area framing CN:
-Private dining rm(#163)elec,r/i not completed-DONE CN
-All shear walls need to be inspected in the private dining room-DONE CN
-Replace missing truss bracing-DONE CN
-Firestop two romex wire penetrations thru top plate-DONE CN
4/1/I S Framing CN:
-Wrong holdowns were installed @ kitchen shearwall HDU 8's were installed,HDU ll's are required.DONE CN
4/7/15 Sheetrock CN:
- 1 st floar,Phase II unit dead spaces:All dead spaces with exception to units 128, 129, 130, 139,& 140 have been inspected.
DONE CN
4/10/15 Framing and sheetrock of the 2hr rated gease&make-up air shafts CN:
**Propose a detail by the architect and engineer of record for an alternate method of design that will meet the code requirements
for the two hour shaft construction and rating.**(Listed assembly-GA FILE NO.WP 4136)
ISSUES NOTED on 4/10/15: -DONE CN
-Gyp board missing.
-Gyp board fasteners missing per rated assembly.DONE CN
-Gyp board seams not staggered on the overlapped per rated assembly(16"per rated assembly).DONE CN
-Face layer of Gyp board not fire taped.per rated assembly.(reference"note 6"of the explanatory notes-Gyp Manual)DONE CN
-Bearing studs cut in corridor wall(carrying floor load above).FIX DONE CN
**Alternate method of design reviewed and accepted in concept. Inspections to follow.Details will be within the plan file. **
INSPECTIONS COMPLETED 5/7/15 CN
4/22/15 Entrance canopy framing CN:
-Repair broken column footing(3rd column from the entrance door)DONE ML
-Add T bracing to truss webs @ LR11&LRG10 trusses @ drive thru canopy DONE CN
-Add missing jack rafters @ all four corners-from hip ridges to beams-DONE CN
5/27/15 Partial Final C/O-Phase 1 units on 3rd and 4th levels(checked smoke detection,electrical fmals,&sprinkler coverages
only).
-Unit 30L•Missing sprinkler coverage in the kitchen area-DONE
-Unit 306: Inter connected smoke detecor in sleeping room not functioning-DONE
. .,
Rep°rtNa'"e: City of Eagan Printed: 7/22/2015
Inspection Remarks Page: 2
Inspection Remarks
Permit: EA125051
Permit Type: Building
Site Address: 4232 Blackhawk Rd
-Unit 308: C/O detector more than 10'from one of the bedrooms
-Unit 408: C/O detector more than 10'from one of the bedrooms-DONE
**Other noted issues**
-Some of the double corridor door openings do not meet the minimun 6'-8"requirement-N/A
-Need to check AFF dimensions for window fall protection requirements(reference Minnesota Rules Parts 1303.2300 to
1300.2320).-DONE
-Some of the exit signs in the corridors are obscured by ceiling lights(need to be moved)-DONE
5/28/15 Partial Final C/O-Phase 1 units on lst and 2nd levels(checked smoke detection,electrical fmals&sprinkler coverages
only).
-Unit 201: Sprinkler head(s)need trim pieces
-Unit 202:Bedroom smoke detector not functioning
-Unit 101:Missing a bedroom smoke detector
-Units :102,202,302,402 U shaped kitchens do not meet the 60"clearance required far Type B units
-Units : 107,207,307,407 U shapled kitchens do not meet the 60"clearance required for Type B units
**Other noted issues**
-Some of the double corridor door openings do not meet the minimun 6'-8"requirement
-Need to check AFF dimensions for window fall protection requirements(reference Minnesota Rules Parts 1303.2300 to
1300.2320).
-Some of the exit signs in the corridors are obscured by ceiling lights(need to be moved)
6/9/15 Partial fmal c/o inspection CN:
-Add stair guards and handrailings @ phase 2 attic access stair
-Firestop I beam penetrations on the interior side of the rated trash room 003 walls
-Verify fusible links @ sliding trash chute termination doors(both trash termination rooms)
-Fire stop sprink pipe penetration @ stair enclosure "E"garage level(garage side of wall)
-Fire stop sprink pipe penetration @ stair enclosure"C"garage level(stair encl.side)
-Need to inspect smoke gasketing @ all rated doors in garage level
-Need access to elevator"B"equipment room for inspection
6/10/15 Partial final c/o inspection CN:
-Complete a1104 units in phase 1 (lst to 4th floors)
-Install Area of Refuge corridor identification signage
-Install all stair enclosure door glazing
-Stiffen deck guardrail in unit 420
-Provide required water closet clear floor space in the public use accessible toilet rooms(all levels,both phases)
-Patch sheetrock @ 3rd floar Mechanical room
-Firecaulk gastite and greenfield penetrations @ 4th floor mechanical room
-Firecaulk gastite and greenfield penetrations in unit 317 magic pac room
-Adjust door closer&latch system @ 3rd floor elev lobby
6/1 U15 Partial final c/o inspection CN:
-Eliminate AOR's in stairwells A,B,and D on the second floor and relocate them per the architects addendum
-Install window limitters in unit #202
-Install window limitters in unit # 111
-Install combo smoke/c/o detector in unit# 108 bedroom
-Install window limitters in unit#102
-Provide required water closet clear floor space in the public use accessible toilet rooms(all levels,both phases)
-Install trap wraps in all public accessible toilet rooms
**3rd&4th floors phasell is not generally ready**
**All 3rd&4th floor phase 11 units passed railing,smoke detection,and electrical finals**
-Adjust all entry doors on phase 113rd&4th floors
-Check all entry door sweeps and smoke gaskets on 3rd and 4th floors
,, ,_ .,
Report Name: City of Eagan Printed: 7/22/2015
Inspection Remarks Page: 3
Inspection Remarks
Permit: EA125051
Permit Type: Building
Site Address: 4232 Blackhawk Rd
� -Install flooring in units 421 thru 427
-Fix latches for trashroom doors and maintain the 2hr separation around trash door frame penetrations
-Unit #428 needs trap wraps for both the lav and kitchen sink(Kit. sink not plumbed yet) -floor to shower transition does not
comply and electrical wiring hanging out of kitchen wall not connected to anything
-Install closer,latch, sweep,&threshold @ elev.lobby doors
-Fire stop ceiling&wall penetrations in phase two mechanical room
-Check electrical room door and electrical panels
-Unit 443 needs complying floor to shower transition
-Install AOR signage in corridors 3rd&4th floors
-Fire stop penetrations in rated wall of magic pac in#327 '
-Fix hole in ceiling in unit#325 '�
**Phase 11 lst and 2nd floors including common areas,not inspected to date** I
6/15/15 Temp C/O conditions:
** See conditions of Temp GO in the plan review file#32**
µ w ;Re�p�rt�Tame: Printed: 3/30/2015
Inspection Remarks City of Eagan Pa e: 1
Inspection Remarks g
Permit: EA125051
Permit Type: Building
Site Address: 4232 Blackhawk Rd
**For ALL previous remarks;please go to G drive: Building Inspections�Building Inspection Issues�20151Eagan Pointe Senior
Living.**
1/14/15 Framing corrections CN:(reinspect corrections from attic catwalk)
-Provied truss fixes for the misaligned trusses @ the roof peak where gusseting is required DONE CN
-Redo framing @ the valley/hip connection between the trash chute&elevator shaft in the west wing(per engineers revised detal)
DONE CN
-Continue the Fire Wall assembly through the attic area to the bottom of the roof deck DONE CN �
-Install 5/8"type X gyp board to the underside of the roof deck to meet the 4'space required to be fire rated adjacent to the Fire
Wall termination.DONE CN
1/2U15 Framing corrections CN:
-Provide engineer's judgement concerning the colwnn bracket to beam connection,Two bolts on each bracket are missing
*WAITING FOR ENGINEERS NDGEMENT*-DONE CN
1/2l/15 Roof trusses Cn:(completed all truss inspections within"Phase 2")
-There are various corrections to be made to bracing,nailing and truss fixes.A record of this is with Matt(framing foreman)or
Nick with the GC.A reinspection will be necessary*SEE CORRECTIONS DATED 1/14/15 ALSO*
1/28/15 Unit framing CN:
All applicable units:
-Rock dead space wa11s common with the corridors and party walls
-Inspect framing and insulation @ magic pac rooms
2/2/15 Unit insulation CN:
Units 319&320:
-Insulate unit separation and corridor walls-DONE CN
2/2/15 Unit framing CN:
Units 307,308,316&317: -DONE CN
-Install canted deck beams per the plan details
Units 207,208,215,&216:-DONE CN
-Install canted deck_beazns p.er.the plan details DONE CN
Room#251(fitness room):
-Fix L12 header, (3) 117/8"Micro's.req'd-DONE CN
-Fire stop wire and pipe penetrations thru top and bottom plates-DONE CN
Room 260A:
-Fire stop wire penetrations thru top and bottom plates-DONE CN
2/5/15 Unit framing CN:
Unit 107:
-Install canted deck beams-DONE CN
-Fire stop penetrations-DONE CN
-Seal penetrarions in draft stopping-DONE CN
-Fire stop 3"plumbing practice hole in precast plank(closet)-DONE CN
Unit 108:
-Install canted deck beams-DONE CN
-Fire stop practice holes in top plate next to the shower vent-DONE CN
-Fire stop 3"plumbing practice hole in precast plank next to shower vent-DONE CN
-Fire stop cast pipe penetrations @ floor level-DONE CN
-Fire stop sprinkler pipe @ celing level fire block-DONE CN
2/9/15 Framing CN:
-Complete framing and fire blocking in mail room
,_ Repc�rt Name: Clt3' Of Eagall Printed: 3/30/2015
�Inspection Remarks Page: 2
Inspection Remarks
Permit: EA125051
Permit Type: Building
Site Address: 4232 Blackhawk Rd
-Complete plumbing r/i's @ rooms 166 and 167(toilet rooms)
2/10/15 Framing CN(for all applicable units) :
-Install flashing to all decks prior to installing decking
-Make sure all pocketed beams have full bearing beneath them
2/20/15 Framing ML,:
-Stud at Magicpak Room 335.DONE,ML
-Cantilever deck detail incomplete Room 336.DONE,ML
2/24/15 Framing CN:
-Dinning Room attics will all require attic accesses DONE CN
-Fix conidor rim board that was cut(smiley face cut into rim board)in phase 2,3rd floor.Floor joist beazing has been comprimised
DONE CN
3/2/15 Cortections CN:
Unit 41 S:
-Fix sheetrock cut outs @ rated unit separation wall DONE CN
-Fire caulk water closet supply line @ rated unit separation wall DONE CN
Unit 427:
-Install missing wall studs(approximately 4 studs missing)DONE CN
Room 460 A:
-Firestop dryer vent penetrations @ rate wall assembly
Attic catwalk:
-Consult the architect for a framing detail @ the roof valley/ridge connection adjacent to the Fire Wall DONE CN
-Install intermediate rails on both catwalk stairs DONE CN
3/12/15 Framing corrections CN ,
Unit 142:
-Fix damaged exterior sheathing and replace the dislodged stud DONE CN
Units 138, 139,& 140:
-Fix 3 gang headers @ unit entrance doors.One of the 2 X 10's has been separated from the other two.DONE CN
3/12/15 Framing corrections ML
-Add titan anch
ors m bottom plate m rooms 134,135, 136& 137. DONE CN
-Add LVL headers at Beauty Salon,2nd floor.DONE CN
3/13/15 Fire stopping
Unit 309:
-Check fire stopping @ water closet supply line
3/13/15 Framing corrections:
Unit#325:
-Provide engineering for cantilevered deck beam that has 8 addition 2'X12"s ganged together to achieve the proper width of the
deck.ENGINEERING RECEIVED:(add three thru bolts connecting all ten of the framing members) DONE CN
-Provide engineered fix for top chord bearing on common room beams on levels 2 and 3.(full bearing not achieved do to actual
beam placement during construction).ENGINEERING RECEIVED AND INSPECTIONS DONE CN
3/16/15 Fraxning corrections CN:
-Install Fire Wall extensions thru the soffits.DONE CN
-Fix cut mono roof truss bracing within the dining room areaDONE,ML
-Complete the shear wall in unit #136.DONE CN
-Install the required Titan fasteners to all 1 st floor shearwall wall sole plates per Section detail 2/5404.(48"oc and within 12"of
.: �te�tfrt Name: Cl� Of Eagan Printed: 3/30/2015
Inspection Remarks Page: 3
Inspection Remarks .
Permit: EA125051
Permit Type: Building
Site Address: 4232 Biackhawk Rd
the end of the sole plates).DONE ML
3/17/15 Framing correction.ML
-Unit 136 complete nailing of shearwall next to tub surround.DONE CN
3/19/15 Framing corrections CN:
Room 157(employee lounge)
-Fix gaps around the triangular shaped dead space fire blocking(ceiling level)DONE,ML
-Install missing fire blocking @ the elongated double wall dead space(ceiling level)DONE,ML
-Fire stop plumbing pipe penetrations thru bottom plateDONE,ML
-Fire stop the open ends of the electrical conduits penetrating the floor in the elongated dead space DONE CN
Stair enclosure"C"
-Repair damage gyp board(holes)in the rated wall assembly DONE CN
Room 154(Pub)
-Fire stop cast plumbing pipe penetrations @ floor and ceiling levels DONE,ML
-Fire stop all additional penetrations as well DONE,ML
-Remove foam @ column fire stopping and replace with code complying fire stopping material(ceiling level)DONE,ML
-Complete the installation of the partially driven Titan plate anchor(beneath the frame duct opening)DONE,ML
3/23/15 Framing corrections ML:
-Add blocking under beam carrying roof vaulted trusses east side dining.DONE,ML
-Add nut and tighten another on west side hold downs.Check bolt positioning in hold downs.DONE,ML '
-Add nail plate and firecaulk to plmg vent pipe in dining room.DONE,ML I
-Fasten a11 LVL's per manufacturer's specs.DONE CN
-Add full bearing of roof truss on beams throughout dining azea(truss design sign oi�DONE,ML(letter from truss engineer)
3/26/15 Firestopping and Sheetrock CN:
-Firestop I beam and bracket membrane penetrations in elevator"B"shaft enclosure(2 hr shaft)
-Grease shaft rock completed except where shaft support brackets are to be installed(contractor to provide photos or call for
inspection when completed)
3/27/15Insulation and framing CN:
— ___ _ _ _—.._.- --------- -
-Front entry vestibule framing and insulation not ready
3/30/15 Dining room area framing CN:
-Private duung rm(#163)elec,r/i not completed
-All shear walls need to be inspected in the main and private dining rooms
4232 Blackhawk Road — Eagan Pointe Senior Living— Permit #125051
12/5/14 Sheathing CN:
- Nail off sheathing @ wall sections getween patio doors on the third and forth floor (east elev, north of dining
hall)
- Sheath the gable end on the north elevation
- Cut back all interior walls where the intersect with the exterior sheathing plane and cut back installed
sheathing @ least one stud bay and overlap the areas with Densglass sheathing
** Ok to install house wrap (Tyveck) if adequate pictures are provided during the next inspection **
12/29/14 Partial framing (roof trusses in Area#2 "Phase 1")
-There are various corrections to be made to bracing, nailing and truss fixes. A record of this is with Matt
(framing foreman) or Nick with the GC. A reinspection will be necessary. - CORRECTIONS DONE 1/7/15
12/30/14 Partial framing(roof trusses in Area #2 - "Phase 1")
-There are various corrections to be made to bracing, nailing and truss fixes. A record of this is with Matt
(framing foreman) or Nick with the GC. A reinspection will be necessary. CORRECTIONS DONE 1/13/15
12/31/14 Partial framing(roof trusses in Area#2 - "Phase 1")
-There are various corrections to be made to bracing, nailing and truss fixes. A record of this is with Matt
(framing foreman) or Nick with the GC (Area #2 initial truss inspections have been completed). Reinspections
for all sections of Area #2 will be necessary. CORRECTIONS DONE 1/13/15
12/31/14 Partial framing(roof trusses on the east side of Area#1- "Phase 1")
-There are various corrections to be made to bracing, nailing and truss fixes. A record of this is with Matt
(framing foreman) or Nick with the GC. A reinspection will be necessary. CORRECTIONS DONE 1/13/15
1/5/15 Partial framing(roof trusses on the west side of area#1- "Phase 1")
-There are various corrections to be made to bracing, nailing and truss fixes. A record of this is with Matt
(framing foreman) or Nick with the GC. A reinspection will be necessary. Contractor will need to install all
required diagonal roof truss bracing.
CORRECTIONS DONE 1/13/15
1/8/15 Partial framing(elevator shafts)
- Shaft framing ok- door opening header trimmers need to be checked for compliance with the relevant
structural sheets
1/14/15 Framing corrections CN:
- Provied truss fixes for the misaligned trusses @ the roof peak where gusseting is required
- Redo framing @ the valley/hip connection between the trash chute & elevator shaft in the west wing (per
engineers revised detal)
- Continue the Fire Wall assembly through the attic area to the bottom of the roof deck
- Install 5/8" type X gyp board to the underside of the roof deck to meet the 4' space required to be fire rated
adjacent to the Fire Wall termination.
1/15/15 Framing corrections CN:
- Finish framing columns and benches in the billard room (476).
4232 Blackhawk Road — Eagan Pointe Senior Living— Permit #125051
- Fix dead space fire blocking in dead space adjacent to room 417. DONE, ML
- Fix dead space fire blocking in dead space adjacent to room 419 and fix L8 header @ the �' X6' window
opening DONE, ML- and verify that the single ply girder. NOT DONE
- Fix dead space fire blocking in dead space adjacent to room 420 and fix L8 header @ the 3' X 6' window
opening. DONE, ML
-Add the required trimmers at rough openings on the 2nd and 3rd flloor "elevator shaft A" . DONE ON THIRD
FL. ONLY
1/20/15 Framing corrections CN:
Unit 301:
- Fix firestopping in dead space adjacent to the shower DONE, ML
-Add squash blocking to bearing per plan DONE, ML
- Draft stop all penetrations thru partitions above ceiling level DONE, ML
- Fire stop sprinkler line practice hole thru top plates in corridor DONE, ML
Unit 302:
- Firestop penetrations thru top plates adjacent to the magic pack DOEN, ML
-Add squash blocking to bearing per plan DONE, ML
- Fix span exeeding 24" on center between floor truss that was thrown off layout DONE, ML
- Draft stop all penetrations thru partitions above ceiling DONE, ML
Unit 303:
- Provide engineering fix for missing sheet rock @ shearwall above ceiling---WAITING---
-Add squash blocking to bearing per plan DONE, ML
- Draft stop all penetrations thru partitions above ceiling DONE, ML
- Firestop electrical cable and wires on both sides of the corridor between units 303 & 304 DONE, ML
Unit 304:
- Draft stop all penetrations thru partitions above ceiling DONE, ML
- Fix span exeeding 24" on center between floor truss that was thrown off layout DONE, ML
Unit 305:
-Add nailing plate(s) to broken top plate @ kitchen stubwall DONE, ML
- Fix gaps in deadspace near shower DONE, ML
- Continue the fire partition assembly (gyp board)thru the dead space on two applicable sides DONE, ML
- Install draft stopping DONE, ML
- Draft stop all penetrations thru partitions above ceiling DONE, ML
-Add squash blocking to bearing per plan DONE, ML
Unit 306:
- Draft stop all penetrations thru partitions above ceiling DONE CN
-Add squash blocking to bearing per plan DONE CN
- Fix dead space fire blocking DONECN
- Continue the fire partition assembly (gyp board)thru the dead space on two applicable sides NOT DONE
- Install draft stopping above ceiling @ partition separating this unit and the card room DONE CN
1/21/15 Framing corrections CN: I
Unit 374 (toilet room):
- Draft stop exhaust fan duct penetration above ceiling DONE CN
Unit 373 :
4232 Blackhawk Road — Eagan Pointe Senior Living— Permit #125051
- Get truss fix for broken floor truss (bearing end) *WAITING FOR FIX*
- Fire stop sprinkler pipe @ top and bottom plates DONE CN
- Fire stop practice hole through floor deck above trash enclosure DONE CN
Unit 372 (mech. room):
- Fire stop penetrations through top plates DONE CN
Unit 371:
- Complete fire caulking DONE CN
Unit 376 (card room):
- Provide engineer's judgement concerning the column bracket to beam connection, Two bolts on each
bracket are missing
*WAITING FOR ENGINEERS JUDGEMENT*
1/21/15 Roof trusses Cn: (completed all truss inspections within "Phase 2")
-There are various corrections to be made to bracing, nailing and truss fixes. A record of this is with Matt
(framing foreman) or Nick with the GC. A reinspection will be necessary*SEE CORRECTIONS DATED 1/14/15*
1/22/15 Unit framing CN:
Room 360A :
- Install draft stopping above fire partition DONE CN
4th fl. elevator lobby:
-Add draft stopping above walls common with the adjacent unit 319 DONE CN
Unit 319:
-Add draft stopping above walls common with the elevator lobby DONE CN
-Add squash blocking DONE CN
- Fire caulk elec wire practice holes near bathroom entrance DONE CN
- Fire caulk kitchen elec wire penetration thru top plate DONE CN
- Infill between off layout floor trusses (28" span)to support floor load above DONE CN
Unit 320:
- Fire stop elec wire penetration thru top plate @ laundry closet DONE CN
- Fire stop 3" practice hole @ fire partition top plate DONE CN
- Draft stop penetrations NOT DONE CN
-Add squash blocking NOT DONE CN
1/23/15 Unit firestopping ML:
- 301-313 ok.
1/26/15 Unit framing CN:
Unit 308:
- Install draft stopping above ceiling @ unit partition DONE CN
- Secure water lines in the kitchen stub wall and shower wall, per manufacturers specs DONE CN
Uit 320:
- Install (2) L8 headers @ the windows DONE CN
- Install L9 header @ the patio door DONE CN
- Seal draft stop penetrations in above ceiling draft stopping DONE CN
-Add squash blocking for girder truss above DONE CN
4232 Blackhawk Road — Eagan Pointe Senior Living— Permit #125051
1/27/15 Unit framing CN:
Unit 314:
- Fire barrier issue not resolved - DONE CN
Unit 315:
- Fire barrier issue not resolved DONE CN
Unit 316:
- Fire barrier issue not resolved DONE CN
- Install squash blocking DONE ML
1/28/15 Unit framing CN:
Unit 201:
- Draft stop penetrations @ party walls DONE CN
- Rock dead space wall DONE CN
Unit 203:
- Draft stop penetrations @ party walls DONE CN
- Fix broken fire block @ party wall DONE CN
Unit 204:
- Fix broken fire block @ party wall DONE CN
- Replace missing fire block @ party wall DONE DN
- Draft stop penetrations@ party wall DONECN
U n it 205:
- Draft stop penetrations@ party wall DONE CN
- Replace missing fire block @ party wall DONE CN
Unit 206:
- Replace missing fire block @ party wall DONE CN
- Rock dead space walls DONE CN
All applicable units:
- Rock dead space walls common with the corridors and party walls
- Inspect framing and insulation @ magic pac rooms
1/14/15 Framing corrections CN: (reinspect corrections from attic catwalk)
- Provied truss fixes for the misaligned trusses @ the roof peak where gusseting is required DONE CN
- Redo framing @ the valley/hip connection between the trash chute & elevator shaft in the west wing (per
engineers revised detal) DONE CN
- Continue the Fire Wall assembly through the attic area to the bottom of the roof deck DONE CN
- Install5/8"type X gyp board to the underside of the roof deck to meet the 4' space required to be fire rated
adjacent to the Fire Wall termination. DONE CN
1/21/15 Framing corrections CN:
- Provide engineer's judgement concerning the column bracket to beam connection,Two bolts on each
bracket are missing
*WAITING FOR ENGINEERS 1UDGEMENT* - DONE CN
1/21/15 Roof trusses Cn: (completed all truss inspections within "Phase 2")
4232 Blackhawk Road — Eagan Pointe Senior Living— Permit #125051
-There are various corrections to be made to bracing, nailing and truss fixes. A record of this is with Matt
(framing foreman) or Nick with the GC. A reinspection will be necessary *SEE CORRECTIONS DATED 1/14/15
ALSO*
1/28/15 Unit framing CN:
All applicable units:
- Rock dead space walls common with the corridors and party walls
- Inspect framing and insulation @ magic pac rooms
2/2/15 Unit insulation CN:
Units 319 & 320:
- Insulate unit separation and corridor walls- DONE CN
2/2/15 Unit framing CN:
Units 307,308,316 & 317 : - DONE CN
- Install canted deck beams per the plan details
Units 207,208,215, & 216 : - DONE CN
- Install canted deck beams per the plan details DONE CN
Room #251 (fitness room):
- Fix L12 header, (3) 11 7/8" Micro's. req'd - DONE CN
- Fire stop wire and pipe penetrations thru top and bottom plates - DONE CN
Room 260A:
- Fire stop wire penetrations thru top and bottom plates - DONE CN
2/5/15 Unit framing CN:
Unit 107:
- Install canted deck beams - DONE CN
- Fire stop penetrations - DONE CN
- Seal penetrations in draft stopping- DONE CN
- Fire stop 3" plumbing practice hole in precast plank (closet) - DONE CN
Unit 108:
- Install canted deck beams- DONE CN
- Fire stop practice holes in top plate next to the shower vent- DONE CN
- Fire stop 3" plumbing practice hole in precast plank next to shower vent- DONE CN
- Fire stop cast pipe penetrations @ floor level - DONE CN
- Fire stop sprinkler pipe @ celing level fire block- DONE CN
2/9/15 Framing CN:
- Complete framing and fire blocking in mail room
- Complete plumbing r/i's @ rooms 166 and 167 (toilet rooms) ,
2/10/15 Framing CN (for all applicable units) : II
- Install flashing to all decks prior to installing decking
- Make sure all pocketed beams have full bearing beneath them
4232 Blackhawk Road — Eagan Pointe Senior Living— Permit #125051
2/20/15 Framing ML:
-Stud at Magicpak Room 335. DONE, ML
- Cantilever deck detail incomplete Room 336. DONE, ML
2/24/15 Framing CN:
- Dinning Room attics will all require attic accesses DONE CN
- Fix corridor rim board that was cut (smiley face cut into rim board) in phase 2, 3rd floor. Floor joist bearing
has been comprimised DONE CN
3/2/15 Corrections CN:
Unit 415 :
- Fix sheetrock cut outs @ rated unit separation wall DONE CN
- Fire caulk water closet supply line @ rated unit separation wall DONE CN
Unit 427 :
- Install missing wall studs (approximately 4 studs missing) DONE CN
Room 460 A :
- Firestop dryer vent penetrations @ rate wall assembly
Attic catwalk :
- Consult the architect for a framing detail @ the roof valley/ridge connection adjacent to the Fire Walt DONE
CN
- Install intermediate rails on both catwalk stairs DONE CN
3/12/15 Framing corrections CN
Unit 142:
- Fix damaged exterior sheathing and replace the dislodged stud DONE CN
Units 138, 139, & 140:
- Fix 3 gang headers @ unit entrance doors. One of the 2 X 10's has been separated from the other two. DONE
CN
3/12/15 Framing corrections ML
-Add titan anchors in bottom plate in rooms 134,135, 136 & 137. DONE CN
-Add LVL headers at Beauty Salon, 2nd floor. DONE CN
3/13/15 Fire stopping
Unit 309 :
- Check fire stopping @ water closet supply line
3/13/15 Framing corrections:
Unit# 325:
- Provide engineering for cantilevered deck beam that has 8 addition 2' X12"s ganged together to achieve the
proper width of the deck. ENGINEERING RECEIVED : (add three thru bolts connecting all ten of the framing
members) DONE CN
- Provide engineered fix for top chord bearing on common room beams on levels 2 and 3. (full bearing not
achieved do to actual beam placement during construction). ENGINEERING RECEIVED AND INSPECTIONS DONE
CN
4232 Blackhawk Road — Eagan Pointe Senior Living— Permit #125051
3/16/15 Framing corrections CN:
- Install Fire Wall extensions thru the soffits. DONE CN
- Fix cut mono roof truss bracing within the dining room areaDONE, ML
- Complete the shear wall in unit #136. DONE CN
- Install the required Titan fasteners to all 1st floor shearwall wall sole plates per Section detail 2/S404. (48" oc
and within 12" of the end of the sole plates). DONE ML
3/17/15 Framing correction. ML
- Unit 136 complete nailing of shearwall next to tub surround. DONE CN
3/19/15 Framing corrections CN: I�,
Room 157 (employee lounge) �'
- Fix gaps around the triangular shaped dead space fire blocking (ceiling level) DONE, ML
- Install missing fire blocking @ the elongated double wall dead space (ceiling level) DONE, ML
- Fire stop plumbing pipe penetrations thru bottom plateDONE, ML
- Fire stop the open ends of the electrical conduits penetrating the floor in the elongated dead space DONE
CN
Stair enclosure "C"
- Repair damage gyp board (holes) in the rated wall assembly DONE CN
Room 154 (Pub)
- Fire stop cast plumbing pipe penetrations @ floor and ceiling levels DONE, ML
- Fire stop all additional penetrations as well DONE, ML
- Remove foam @ column fire stopping and replace with code complying fire stopping material (ceiling level)
DONf, ML
-.Complete the installation of the partially driven Titan plate anchor (beneath the frame duct opening ) DONE,
ML
1 GC0alL
,
For Office Use
1,1 i i Permit#: /539 I 7
,,,,,.. .., ,„0 :: E AGA N
1
Permit Fee: vCC 0
Date /.''�5-�q
Received:
3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810 p /
(651)675-5675 I TDD: (651)454-8535 I FAX: (651)675-5694 W.A.) 1 `�1 Staff:
buildinoinspectionsc citvofeaoan.com L. y ,
2019 COMMERCIAL FIRE ALARM PERMIT APPLICATION
Date: 1' 11 tt� "1
Site Address: 2 1�tcs,c,k k, (J &oav- mry s31--e
Tenant: Z S Po nte St L.;v,'nr� Suite#:
O Requirements: 2 complete sets of drawings and specifications, cut sheets on materials and components I
f
x '',"4:"."'-'` Name: SJ.- w �^�.N.: Phone
;�� � ��NST' � 1t-ii ��_���-�-.�.� __� _��..�
° a t Address/City/Zip: S(45 S,rta rhetn-ur4 (.4w
p - L'''' Applicant is: Owner _�QContractor
: , , Description of work: J(.ck . 3 •C:re. Cthir holrke.cL
k` Construction Cost: 1,Stsv Estimated Completion Date:
�w Name: le.t..kri z. Pit-e-4- bec.Jr�:AN 5.rti_ License#: Exto 3,b3
,1,04,,,,,..4N
° Address: 4q? 000.. c.,,,..,1/4. City: 17-67 14
m
State: A?'1+U a� ( rc)
� - I Zip: S 7 Phone: S'�l Sti 3S'Z
'4 Contact: Email: P c)ljar-kz,�, e F-S4/"N.L,cw•
, , _New Remodel
\,°A.1./J° ddition Other:
a : , Alterations
DESCRIPTION OF WORK: n Commercial _Residential _Educational
/V
FEES O 171(tir1 fl AA Contract Value$ I SZ0 x.01
$60.00 Permit Fee Minimums be rJ 7-c•
=$ & 0 Permit Fee
Surcharge=Contract Value x$0.0005 =$ •-7 5� Surcharge*
If the project valuation is over$1 million, please call for Surcharge
=$ Goa"c TOTAL FEE
You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's
website at www.citvofeaaan.com/subscribe.
I hereby apply for a Fire Alarm permit and acknowledge that the information is complete and accurate;that the work will be in conformance with the
ordinances and codes of the City of Eagan and with the Minnesota Building/Fire Codes;that I understand this ist not a permit,but only an application for
a permit,and work is not to start without a permit;that the work will be in accordance with the approve. • •n in the case of work which requires a review
and ap val of plans.
x 'r• v7oev5 x � ^ ife,"4°-""---
App cant's Printed Name App,,r•nt s 5ignatur
,•grik..„y
!
�`� 117111 � ,. �� :�f p�•����f ��° j,�elf��� �i�. ��`ft � - ? �..A.,"'''':.1":',:!
��� �,�,.r��i." �.� '` T � '�> ..'