2963 Center CtCITY OF EAGAN
3830 Pilot Knob Road
Eagan, Minnesota 55123
(612) 681-4675
INSPECTION RECORD
PERMIT TYPE:
Permit Number:
Date Issued:
SITE ADDRESS: i r} 1. 10 N i?, ? APPLICANT:
+ ? 11: ? . I 1 ? !if. . I 1 rJr
? i??j??sF?i???? i? R N i I i; i 14111P, I k 1!11 i•t?ii r u a Ei. t,' r rRr,n_ 46i.
? PERMIT SUBTYPE: TYPE OF WORK:
,. .
,
NF W . ? ?
ii i r? ?i %11 E t!. t F 1) r. '•: fl t_ r?
I , , I , I i iI , ; , I s•1 i 1 .1 - ,
1 14)
;. ?
? 1A
,
? J
\
Pertntt No. Pertnlt Holder Date Telephone #
SNV
PLUMBING
9'a 93 ?/? s
HVAC
ELECTRIC
ELECTRIC
InspecUon Date Insp. Comments
Footin95 I A
Foundation
Framing
Roofing
Rough Plbg.
Rough Htg. % 30
Isul.
Rreplace
Final Htg.
Orsat Test
Fnal Plbg.
Y, Plbg. Inspector - Notify Plumher
Const. Meter
EngrJPlan
Bldg. Final S
Deck Ftg.
Dedc Fnal
Well Yr;'q en ! e?n dler t er
s . (
Pr. Diap. D (? •
i
v
.
C1'Tl 4F EAGAN
3830 Pilot Knob Road
Eagan, Minnesota 55123
ON
:CORD
PERMIT TYPE:
Permit Number:
Date Issued;
0.' i fi`) N
ci<? / 0 a f 9 1
?
SITE ADDRESS: < <, 1. 10 f; t ,?, h .
r, r
?„1i?liPtl i i? PI ( t;? I NUt?`. I It I l1f 1'AkY ?d f
? PERMIT SUBTYPE-
rti;
APPLIGANT:
TYPE OF WORK:
'i ., , i , . ,:;I
{I NAMI f IN1!,1!
1 F yAH! : Itl ANIIA 1 Nt
INSPECTION
ii DA . DA
M Ok (it.'; :. !'!I l F}i1 !
14 1 1 1 1 114141 f'+11J1 1: I;tllltif I 1'; Ab'1'P11VI 11
PermR No. Permft Holder Oate Telephone N
S/W
PLUN181NG
HVAC
ELECTRIC
ELEC7RJC
Inspectfon Date Insp. CommeMs
Footings I 9/?A? .?
Foundation
Framing
Roofing
Rough Pibg.
d
? v
Rough Htg.
Isul.
Fireplace
Final Htg.
Orsat Test
Final Pibg. ? Plbg. Inspector - Notify Plumber
Const. Meter
Engr./Plan
Bldg. Finai r?/f 2 V'
Deck Ftg.
Deck Flnaf
Well
Pr. Disp.
CITY OF EAGAN Remarks
Addition ???-ALE CENTFR 1 Lot 10 Rlk
Owner Street
state Eagan , rqv 55122
Improvement Date Amount Annual Years Payment Receipt Date
STREET SURF. 1 2 2$46.oo 28j?.6o 10
STREET RESTOR.
GRAOING
6fl
? 1
QQ
59- 0
10
SAN SEW TRUNK 0 10.2 0
SEWER LATERAL
4 1V 469.54 1
WATERMAIN
WATER LATERAL 1970 1
WATER AREA 1970 1
STORM SEW TRK 1970 15
* STORM SEW LAT 1970 LS
CURB & GUTTER
SIDEWALK
STREET LIGHT
WATER CONN.
BUILDING PER.
5AC
PAR K
t3'? Cmficate nf eccucpanc?
?iti) of "aa
.? Vww"S 3«occtin
l This Certi}`ecate issued pursua»1 to the requirements of the Uniform BuildiRg Code
certifying that at tlte time of issuance this structure was in compliance with the various
orrtinances of the Cety regulatiag building constrrrction or use. For the followiRg:
uae Classifuation: ?DID-KDG 9ML gWg. pennft xo. 20461
oCCUP-y TYa B2 zmins niwia I I rype coRSc II-N 5'PRIIiK
rnwwr of auikhna ?M RYAN Addma 6511 iFM AVE S, MPlS
B.--g Addren EERM JiOIktT ?? ;LIO, BS, F.are?avuF CLR Il?ID HC # I
/% ? -
Dme:
Bm7dieg OHicial ,
P06T IN A CONSPICUOUS PLACE
,:d.low, ,
WtMficate of C"anq
This Cenificate issued prrrsrrant to tlee requirements of the Uniform Building Code
certifying that at tlu time of rssuance tfris structwe was in complianre with the various
ordinumces of tlu Cery regWating buildiRg construction vr use. For the following:
use Clavsificatioo: 0DtVIlM-M0M Il"TROMM aldg. Flnmit No. 218%
B2
?? ? RT RYAN OQdST ???a 6511 ?lAR A?VE S, MnS
a? naa? 2q63 CFN1IIt ODUR'f ?L 10, BS, °"?''WE i?TIFR Il?ID PK # 1
, //SA ?-
--
aMI&Mg offic-
POST IN A CONSPICUOUS PLACE
2 5 9- O L Q ? ?FFl E US ONLY This requesi wid 18 monMs Irom voltdaHOn dale pnnted in *is bo .
S?3f?
. {
PLEASE PRINT OR TYPE
Repuesv Dok Roogh-in inspeclion requi ? Yes ? No Inapection Olher Than Rwgh-In: ? Ready Now 0 Witl Cvll
(tYoo mael mll the inspecmr whe n ready) Date Reody:
I, Jo/licensed coniracfor Q owner here6y reques} inspeciion o4 the obove electrical work of:
Job Addrees (Straet, Bov, or Rome No.) Glry Zip Code
2°Lt) , e . ., F?
Saiion No. Tawnship Name ar No. Range No
I
Occupant N
no
RD `6 `J- 5 S-iv
Power Supplier Pddrezs
?U Jn
Eleanwl Conkawr (CompanY Nome) Convanor license Na. NwsMr Lic Na ?Plam Eled. Only?
C? A ?
Moiling Mdress (CoMmcror or Owner Performing Insbllafion)
AuMonad Signobre (C clor or Ownar PaAorminB Inskllotion) Phorre No.
EB.OO& IA-10 y(95v 'STATEBOARDCOPY-SEEINSUE7IONSONBACKOFYELLOWCOPY
II I II IIN IIII REQUEST FOR ELECTRICAL INSPECTION SW.-
5 9 q 2 8`I * Phone (812) 642-0800 J?/W9(y upe: Ap
Home t. Bldg. Other:°??c?'?."t New Addn
n
ommercial Indushial Fartn - E- Remad Re air
r Cond. Htg. Equip. Wafer Hfr. Load Mg . 01Fier:
D er Ron e Elec. Heat Tem . Service
'X" above the work mvered by this request Enter remarks in fhis space and on t6e 6ack of ihe whife copy only.
Calculafe Inspecfion Fee - ihis Inspection Request will nof be ocrepfed withaut }he mrreci fee:
Olher Fce ,i` Service EMrance Sae Fee # Circvils/Feeders Fee
Mobile Home Park Sfall 0 to 200 Amps I dIW 0 to 100 Amps
Streef L}g./Tmffic Sig. Above 200 Amps Above 100 Amps 510
Trons{ormer/Generotor ?
INSPECTOR'SIISEONLY T?TAL
/ 5-0
$ign/OWline L}g. Xfmr. ? ?
v ;? - s
Alarm/Remote Control
$wimmingPool I hembc.fi+hatllmectedtheel 's?allali h?einon dab?:bbd
Irrigalion 8aom Rough-In
S
ecial Ins
ecfion ?
p
p
Investigotive Fee Final
Minnesota State Board of ElecVicity 'f827 University Ave., Rm. S-128 St. Paul, MN 55104
THIS INSTALLATION MAY BE ORDERED DISCONNECTED F NOT COMPLEfED WITHIN 18 MONTH3.
a 1? 9f??'
?Q # ?
? 0
Requ t Date
Y ? Fir No. 11
I` ` gh-in Inapection
equiretl? !..runi?
' ? Reatly Now Q Notity Inspeclor
When Reetly?
7 Yes
Ifdlicensed comracror p owner hereby request inspection of above elechical work at:
Job Atltlress (Street. Box or Route No.)
3 e
rt
t Gity
4L w
=,, ,ei, „
Section No. Township Name or No. Ha No. Co 061`. 4
T
Occupant (PRINT)
V ( I kN
1
PhonyNO/ ? s1 / e .? `l
??o --i c
Pow r Suppuer
. S P. AtlCress
m
iZIi
Eu ?+u. ueWk.-t ??/,
ElecVic I Gom atlo? ICOmpany Name) '
`
<
?
S Contractor§ License No.
/ZD ?
C#
c ? ?-q
C
<C
- t? ? 6
Mailing Atldress iCOmrecto, or Owner M1aking Installa/uf+ nI / ??//}?f
D?C.?../?/.
,ii)?????? /
Amhoriz c SgnaWre iCOnlracto,iOwner Maxing InslallaLOn1 PM1One Number
-4 9 8 68z S
MINNESOTA STATE BOARD OF ELEICITV THIS INSPECTION REOUEST WILL NOT'
Griggs-MlUway 810g. - Room 5413 BE ACGEPTED BY THE STATE BOAR?,-'
1821 University Ave. St. Peul, MN 5510E UNLESS PROPEF INSPECTION FEE 15
Vhone (612) 602-0800 ENCLOSEO. I ,
REQUEST FOR ELECTRICAL INSPECTION ,'"EB-0000ry1-08
7 d- llir See Insvucnons for completing fiis larm on eflck al yellow mpy, ?-
9 7cO'i "X" Below Work,Govered by This Aequest ??•'
ew Add Repr TypeotBuilding AppliancesWired EquipmeMWired
Home Range Temporary Service
Duplex Water Heater Electric Heating
Apt. Builtling Dryer Other-(Specify)
Comm.llndustrial Fumace
Farm Air Conditioner
OtOer(specityl CanVacror's RemaBS: .
Compute Inspectian Fee 8elow.'
# Other Fee Service Entrance5ize Fee # Circuils/Feaders Fee
#
0 ro 200 Amps 0 to 100 Amps z
Swimming Pool
TrSnsformers ' Above 200 4111 Amps Above 100 _ Amps
Signs Inspecror6 Use Only: 7 T TAL
s ?
Irri
ation Booms Q? _
g
Special Inspection
aiarm/Communication THIS INSTALLATION MAY BE ORD ONNECTED IF NOT
Other Fee COMPLETED WITHIN 18 THS.
L the Elecirical Inspector, hereby Det ,
Roug h-in
certify that the above inspection has F;,,ai --? ( oeie
been made.
OFFICE USE ONLY
This reQUest voitl 18 monlhs Irom
Seriai # M0
cnip # W33 y16
' Permit # a- 160 (?
? Address: 1%?j (? a7f? C't'- 1 AGREE TO COMPLY WITH CtTY OF EAGAN
ORDINANCES
Signature:
` f7aizt,. _ P/h a. •
Y)A-P-? _ _ ._3/.y -_
'Sertal # 4??8' k'/ 9 64
Chip # /j .1 7 / 7 YS /
Permit # o? / O D ?
? Address:?2 /? _3n??
1 AGREE TO COMPLY WITH CITY OF EAGAN
ORDINANCES
Signature:?-,, ?a
PERMIT
0Tfi( OF EAGAN
?. 3830 Pilot Knob Road
Eagan, Minnesota 55123
(612) 681-4675
? ?
/
PERMITTYPE: auiLorNc
Permit Number: 021898
Date Issued: 0 9/ 0 9/ 9 3
SITE ADDRESS:
2963 CENTER G7
LOT: 10 BI.OCK: 5
EAGANDALE CENTER INDUSTRIAL PARK #1
P.I.N.: 10-22500-100-05
DESCRIPTION:
TENANT: BLANDA INC
B41.1dfrtyyPermzt Type COMM./IND. MISC.
¢uilditc6-4tark Type TENANT FINISH
8e IIccupanov B-2
?
r-
,- -,
???
0 cl
A? ??? (LN ?.??'° 0 `?u n!
REMARKS:
DO NOT ISSUE C 0 UNTIL LIGHT POWER BUDGET IS APPROVEp
FEE SUMMARY:
Base Fee
Plan Review
Surcharge
Total Fee
VALUATION
$207.00
$194.55
$10.00
$351.55
$20,00@
N?0T45T-INC, R J PP 128664632 R0
TtYA" J"'R4'FfN CONST INC
6511 CEDAR AVE S 6511 CEDAR AVE S
MINNEAPOLIS MN 56423 MINNEAPOLIS MN 55423
(612) 866-4632 (612)866-4632
I hereby acknowledge that X haVa read thia applicatican and state that the
information is correct and agreg to cotnply w3;th all appiicable Statio tzf Mn,'
5taty es and City Qf Eagan Clydx;nances.
?
APPLICANT/P RMITEE SIGNATU ISSUED 8:51 ATURE I
REACTIVATE _
PERMI? i`
JL14qa
CITY OF EAGAN
1993 BUILDING PERMIT
68'i-4675
APPLICA
,
_ 08 ?,
SINGLE & MULTI-FAMILY 2 sets of plans, 3 registered site surveys, 1 copy energy
calcs.
COMMERCIAL 2 sets of architectura7 8 structural plans, i set of
specifications, 1 copy of energy calcs.
Penalty applies: 1) when permit is typed, but not picked up by last working day of month.
in which request is made, 2) address is changed or 3) lot change i:s requested once permit
is issued.
Date /c;P7/ '91 Yal uat i on of work a?0,?f1 a°
Add
Si
ress:
te
SiREFT fUITE M
/
?6'
???
?
+ ?----
-
Tenant Name: (commercial only) ,,
?
LAT BLOCK SUBD. ?,v?ra. _I„?j r„f
? ? r,?} P.I.D. N
Descri tion of work: 90 7'_ 'A????
The applicant is: 0 Owner J?rContractor ? Other (o.s«iee)
Name j° oa/ Phone ???Id
Property LAST "R:
Owner Address 0?`/ n-
SiREET iTE t
State Alv{^? Zip
Cit
y
Company ? ONS? Phone 76,777 -5 a'
Contractor Address 6??? EY??dn- ??-t ,'9<:) _ License N Exp.
City ?S• State ziP
Company Phone
Architect/
Engineer Name Registration #
Address
City State ZiP
Sewer & water licensed plumber . Processing time for
sewer & water permits is two days once area has been approved:
i hereby acknowledge that I h e read this application and state that the information is
correct and agree to comply with al] applicabl State of Minnesota tatut s and City of
Eagan Ordinances.
5lgnature of Applicant:
r
OFFICE USE ONLY
BUILDING PERMIT TYPE ? OI Foundation ? 06 Duplex ? il Apt./Lodging
O 02 SF Dwg. ? 07 4-Plex ? 12 Rlulti. Misc.
? 03 5F Addition ? OB B-Plex ? 13 6arage/Accessory
? 04 SF Porch ? 09 12-Plex ? 14 Fireplace
? 05 SF Misc. O 10 Multi. Add'1. O 15 Deck
woRK rrPe
?d:??ltew- ? 33 Alterations Cfi 35 Tenant :F:i:n:is ? 37 Demolish
? 32 Addition El 34 Repair 0-36'M3ve
GENERAL INF ORMATION
Const. (Actual) ' Basement sq. ft. MWCC System
(Allowable) lst F1. sq. ft. City Water
UBC Occupancy R-2 2nd F1. sq. ft. PRV Required
Zoning Sq. Ft. total Booster Pump
k of Stories Footprint Sq. ft. Fire Sprinkler
length On-site well Census Code ,3 27
Depth On-site sewage AC Lode
c?,,tSwS bl?l?.
?
?`-vC
APPROVALS
Planning Building Assessments
Engineering Variance
REQUIRED IN SPECTIONS '
O Site O Footing Pf Framing 0 Insulation
? Wallboard PL Final 0 Draintile ? Fireplace
? 16 Basement Finish
O 17 Swim Pool
V 18 Comn./Ind.
? 19 Comm./Ind. Misc.
O 20 Pub11c facility
? 21 Miscellaneous
.0
Permit Fee
Surcharge
Plan Review
License
MWCC SAC
City SAC
Water Conn.
Water Meter
Acct. Deposit
S/W Permit
S/W Surcharge
Treatment P1.
Road Unit
Park Ded.
Trails Ded.
Copies
Other
Total:
.:PC r7, oc) I wtLet;m:
rC,cc
l -?,u
$ .2-D oc n
SAC %
SAC Units
CITY'OVEAGAN
A-3830 Pilot Knob Road
Eagan, Minnesota 55123
(612) 681-4675
SITE ADDRESS:
P.I.N.: 10-22500-100-05
SALE)
COMM./IND.
NEW
B-2
II-N SPR
I1
125
120
1
15,00@
PERMIT
PERMIT TYPE:
Permi[ Number:
Date Issued:
2963 CENTER CT
LOT: 10 BLOCK: 5
EAGANDALE CENTER INDUS7RIAL PARK #1
DESCRIPTION:
c 1? BUILDIN?
?
020961
06/19/93
),
r
C1??? ?L1 r'
BLDG 3HElL(FOR
B,u`ildingi,?Permit Type
9uilding Work Type
;'UBC Occupancy?.,
? Construction Type
?Zoning
? Building Length )
euilding Width
? Byilding stories -
s
- ._S,quare Feet '
?.._.?
VA?"
i.
?
REMARKS:
S & W pLBR -
FEE SUMMARY:
Base Fee
Plan Review
Surcharge
SAC
SAC 8
SAC Units
Subtotal
VALUATION $200,000
$989.50 CITY SAC
$643.18 S S W PERMIT
$100.00 S & W SURCHARGE
$2,250.00 TREAT MENT PLAN7
100 ROAD UMIT
3 PARK DEDICATION
$3,982.68 TRAIL DEDICATION
Total Fee
CONTRACTOR:
RYAN CONST INC, R
6511 CEDAR
MINNEAPOLIS
(612) 866-4632
- Applicant -
J 28669632
AVE S
MN 55423
$10,834.07
OWNER:
RYAN RON
6511 CEDAR AVE 5
MINNEAPDLI3 MN 55423
(612)866-4632
I hereby acknowledge that I have read this epplication and state that the
information is correct and agree to comply with all applicab2e State af Mn.
Statut's and City of Eagan Ordinances.
L ?
?I?Q,? .Pl A
APPLICANT/PERMITEE SIGNATURE UED FY: IGNA RE ?
T?
$300.00
$100.00
$.50
$972.00
$2,059.20
$1,916.65
81.503.04
REACTIVATE _
PERMIT t _
?09 ?1
cirr oF EAGaN
1993 BUILDING PERMITAPPLlCATION $104,;4v
681-4675
SIN6lE & MULTI-FAMILY 2 sets of plans, 3 registered site surveys, 1 copy of energy
calcs.
COMMERCIAL 2 sets of architecturai & structural plans, 1 set of
specifications, i copy of energy calcs.
Penalty applies: 1) when permit is typed, but not picked up by last working day of month-
in which request is made, 2) address is changed or 3) lot change is requested once permit
is issued.
Date /1 J 3 4aluation of wor
Site Address: ?°° 296 w-
SiREET SUITE ?
7enant Name: (commercial only)
IDT ? BLOCK SIIBD.?`pf,?l? . Y•I•D. * '
?
Descri tion of work: .v; 7.1',?c /vI? 4L? `--
The applicant is: ? Owner Contractor ? Other (oeaortbe)
Name Phone
Property L.St I-rsST
Owner 65
qddress
STREET $TE 0
City State %'^?%? ZiP
Company z' ?i --G??? Phone c'6/- 14?
Contractor Address L<-?l/ E.an- N, License # Exp.
City lll?,?? ? State Zip
Company !Y'.?'? ' 40r1 L Phone lk???
Architect/
Name Registration /j 6tl:Z
Engineer
Address
.
City State 2ip S ?
Sewer & water licensed plumber . Processing time for
sewer & water permits is two days once area has been approved.
I hereby acknowledge that I have read this appl.ication and state that the information is
correct and agree to comply with, 11 applicable St of Minnesota Statutes and City of
Eagan Ordinances.
Signature of Applicant:
?
OFFICE USE ONLY
BUILDING PERMIT TYPE ? 01 foundatian ? 06 Duptex ? 11 Apt./Lodging
C] 02 SF Dwg. ? 07 4-Plex E3 12 Multi. Misc.
? 03 SF Addition ? 08 8-Plex ? 13 Garage/Accessary
? 04 SF Porch ? 09 12-Plex O 14 Fireplace
0 05 SF Misc. ? 30 Multi. Add'l. ? 15 Deck
WORK TYPE
? 31 New ? 33 Alterations O 35 Tenant Finish
32 Addition ? 34 Repair ? 36 Move
GENERAL INFORMATION
9-- :
? 1kd$rsenienC°F?p''sh
? 17 5wim Pool
? 18 Comn./Ind.
19 Comm./Ind. Misc.
? 20 Public Fatitity
? 21 Miscellaneous
? 31 Demolish
Const. (Actual) _U?N SpR Basement sq. ft. MWCC System Y Q
(Allowable) ist Fi. sq. ft. City Mater
UBC Occupancy PR- 2 2nd F1. sq. ft. PRY Required
Zoning ?L Sq. Ft. total ), vo0 Booster PumP
s of Stories Footprint Sq. ft. is°°p Fire Sprinkler
Length I2o ' On-site well Census Code ,32.
Depth i?• pn-site sewage SAC Code
? ?0
APPROVALS ??
?
CA^ ?
a
-
Planning Building Assessments ?
Engineering ?. Variance
RFGIUIRED INSPECTIONS
? Site
l7 Wallboard
? Footing
? Fina1
? Framing
? Draintile
? Insulation
? Fireplace
Permit Fee I S4. 5?`' v.w.c;a,: g?-U C?0 c7
Surcharge /oo ,00
Plan Review
License
^
MWCC 5AC ,Zy .oo 3x rySc a Z2-i'U
City SAC 3oo,vo Gr
Water CDnn: 3 ycjp? ? ? n o..
Water Meter
Acct. Deposit , ,
S/W Permit vo 3 x3211-= `) 7z '
S/W Surcharge , sv ., X:
P'
, "i s
°'O (,
1
Treatment Pl. q72,00 ,
-
i
?
Road Unit
rk Ded
P 2 asq,zo J,7C? q-? x li"7c3 = Zp,?ej, 2v
.
a
Trails Ded. iSo3.oH p?Ll2 ,
Copies
Other ?--
7 6666 5a=?t jqlb,b?
7ota1 : ?
U83 o ,
SAC % ?oD
SAC Units
_,?
1,7~ x16 5q = 15-o3.o 0
.
PLEASE COMPLETE FOR ALL COMAERCIAUINDUSTRIAL BUILDINGS. ALSO COMPLETE
FOR APARTMENT BUILDINGS OR OTFER MULTI-FAMILY BUILDINGS WHEN SEPARATE
PERMTTS ARE NOT REQUIRED FOR EACH DWELLING UNTT.
0
D. :;'E: odw,_ .? ? 1992 CO"?';'ItA^.I' ?RICE: $
/
NEW BUILDING
I1v'TERIOR IMPROVEMENT
WORK DESCRIPTION: J?.(/9GF ?5?) y???EcbF ?/l'Ck < Rc90r Tott
FEES
1% OF C4NTRALT FEE $
PROCESSED PIPING: $25.00
MINIMUM FEE: $25.00
STATE SURCHARGE $.50 FOR EACH $1,000 OF PERMTf FEE.
.,_ .. .. .... . . .. ..
TOTAL $ aS yaa
STTE ADDRESS:,,a9?103 et/zF/'cn,,Z ?°rscp?2T S'S/Z /
OWNER NAME: C'niz/STkUC.T,zncrTELEPHONE #:
TENANT NAME: (IMPROVEMENTS ONL1) P, T k YIa41I X4,b<T
INSTALLER: lyFigrl &L"''C
ADDRESS: '`/5?a I ?'A?2ll /DZ
,
CTTY: 041&? E%3/ STATE: WZIZ/ ZIP CODE:
TELEPHONE #:
IGNE OF PERMITTEE
Y-a -93 AG4! Ag?_ ,e:s
CTI'Y INSPE OR .
9?6-93 t4- 30 30
1993 MECHANICAL PERMTT (CONIIVIERCIAL)
CITY OF EAGAN
3830 PIIAT KNOB RD
EAGAN MN 55122
(612) 6814675
?f ?
PLEASE COMPLETE FOR ALL COMMERCIALJINDUSTRIAL BUILDINGS. ALSO COMPLETE
FOR APARTMENT BUILDINGS OR OTHER MULTI-FAMILY BUILDINGS WHEN SEPARA'I'E
PERMITS ARE NOT REQUIRED FOR EACH DWELLING UNTf.
DATE: .4t, P;IQ /g 4,3 CONTRACT PRICE: $ae
NEW BUILDING
INTERIOR IMPROVEMENT
WORK DESCRIPTION:
1% OF CONTRt1CI" FEE
PROCESSED PIPING:
MINIMUM FEE:
STATE SURCHARGE
TOTAL
FEES
$ X
$25.00
$25.00
.50
$.50 FOR EACH $1,000 OF eERMI';t' FEE.
?.......
$ d/<2 %n
SITE ADDRESS:?p?,?
OWNER NAME:)?TkYi4iLl TELEPHONE #: &.6 `I6 3zw-
TENANf NAME: (IMPROVEMENTS ONLY)
INSTALLER: /j'Jl-2= f?lll9G
ADDRESS: ?7 Fs?c9 i ;;'iqg K ? CITY: ehi?.S?5E/L/ STATE:^/J'i'/J/ ZIP CODE, 4;7<-3>'7
1993 MECHANICAL PERMIT (COMIVIERCIAL)
C1TY OF EAGAN
3830 PIIAT KNOB RD
EAGAN MN 55122
(612) 6814675
TELEPHONE #:
PLEASE COMPLETE FOR ALL COMNIERCLAI,/INDUSTRIAI, BUI1 DINGS. ALSO FOR MUI.TI-
FAMILY BUILDINGS WHEN SEPARATE PERMITS ARE NOT REQUIRED FOR EACH
DWELLIlVG LINTT.
L-`NEW CONSTRUCfION
ADD ON
REPAIR
WORK DESCRIPTION:
RA-- .
CONTRACT PRICE:
?:`.. .
FEE: 196 OF CONTRACT FEE.
STATE SURC$ARGE: $.50 FOR EACH $1,000 OF ?M FEE.
MINIMUM FEE: $ 25.00
CONTRAGT PRICE X 1%
STATESURCHARGE
TOTAL
$ -a-?- • 50
SITE ADDRESS: _ P /`?3 CeENTr--r CT
TENANT NAME: R\n N Ql?a, . STE. #
OWNER NAME: R,? g.nltiV coNsT-
INSTALLER: n x kvr? P 1 ? --c h`4
nnnxESS: 3c?5o K?ti N?-a? Or
a-
CITY: Z?-7/s9 ft-IJ STATE: Mv- ZIP CODE: 55-0
PHONE #: _YS-? 6?ys
FOR• • al ' ?
CITY OF EAGAN APPLICANT
PLUMBING PERMIT (COMMERCIAL)
CITY OF EAGAN
3830 PII,OT KNOB RD
EAGAN MN 55122
(612) 681-4675
_ city of eagan
TO: DIANE DOWNS, UTILITY BILLING CLERK
FROM: ED KIRSCHT, SR. ENGINEERING TECHNICIAN
DATE: OCTOBER 19, 1993
SUBJECT: REF COMPUTATION
2963 CENTER COURT
LOT 10, BLOCK 5, EAGANDALE CENTER INDUSTRIAL PARK
RYAN BUILDING
MEMO
I have computed the REF's for Lot 10, Biock 5, Eagandale Center Industrial Park located
at 2963 Center Court. The total REF's are 6.7.
My computations are based on a site plan prepared by R.J. Ryan Construction, Inc. dated
April 22, 1993. The total lot area is 1.77 acres of which 1.03 acres (58%) is considered
impermeable surface.
01????
Edward- J. Kirs ht
Sr. Engineering Technician
cc: Mike Foertsch
EJK/je
?I(;, I?n, ?!;:?;;I????.?? Lrr?r ?t'?, ??. d
111b'citV oF eegan ?
THOMASEGAN
Mpyor
May 18, 1993 PATRICIA AWADA
SHAWN HUNTER
SANDRA A. MASIN
. THEODORE WACHTER
Council Members
TOM RYAN THOMAS HED6E5
R J RYAN CONST INC citv aaministiotor
6571 CEDAR AVE S E. J. VAN OVERBEKE
MINNEAPOLIS MN 55423 Ciry Clerk
Re: Proposed Ryan building - 2963 West Service Road
Dear Mr. Ryan:
We have completed our review of the construction documents submitted in pursuit of
obtaining a building permit for the above-referenced project. The comments listed below
are limited in scope to selected areas of speciai concern and are not intended to
comprise a compiete and exhaustive report.
The structural engineer of record must complete the enclosed Special Inspection and
Testing Schedule form. Please return the form to our office after obtaining all of the
proper acknowledgement signatures. Each special inspector, fabricator, and testing
agent must submit a Final Inspection/Test Report or Certificate of Compliance, as
applicable, to our division 6efore a Certificate of Occupancy will be issued for the
building. Guidelines for speciai inspection and testing accompany the schedule--
Uniform Building Code (USC), sections 302(c) and 306(c) and (g).
2. Please note that the Uniform Building Code Standards referenced in the building
code (a fist occurs in chapter 60) is a part of the code. Other standards providing
equivalent performance may be used only when such alternates are approved by the
building official under the provisions of Section 105 of the building code--UBC,
section 6001.
3. Provide certified verification that the proposed lighting power budget complies with
the Model Energy Code (MEC), section 505 as amended by Minnesota Rules, part
7670.0800, subpart 2. P{ease note that this amendment requires, with certain
modifications, the budget to be calculated in accordance with 1993 criteria as
specified in the Code of Federal Regulations, title 10, part 435.103. An information
packet and worksheets are available from the Department of Public Service Energy
information Center, telephone number 296-5175.
MUNICIPAL CENTER
3830 PILOT KNOB ROAD
EAGAN, MINNESOiA 55122-1897
PHONE (612) 681-4600
FAX: (612) 681-4612
TDD:(612) 454-8535
THE LONE OAK TREE
THE SVMBOL OF STRENGTH AND GROWTH IN OUR COMMUNITY
Equal Opportunlty/Affirmaflve Acilon Employer
MAINTENANCE FACILITY
3501 COACHMAN POINT
EAGAN, MINNESOTA 55122
PHONE: (612) 681-4300
FAX: (612) 681-4360
iDD:(612)454-8535
TOM RYAN
MAY 18, 1993
PAGE TWO
4. Please submit two copies of certified electrical, mechanical (HVAC), plumbing, and
fire-suppression systems plans--Minnesota Rules, chapter-part 1800.5200 and UBC,
section 302(b).
5. Provide a letter of SAC unit determination from the Metropolitan Waste Control
Commission.
6. Provide signage at the handicap parking stalls, visible from the vehicle parked in the
stall.
It is our hope that this report will be of benefit to you in achieving a project that complies
with the various state and local codes, laws, and ordinances.
Sincerely,
Joe Merchak, Construction Analyst
Protective Inspections Division
Department of Community Development
Enclosure
JM/mg
cc: Ron Ryan, Engineer
Len Lampert, Architect
Doug Reid, Chief Building Official
Construction Inspectors
/ TO
1. LocationZ.L-
2. Nature of Work
` •
CITY OF EAGAN ? • • ? • , , ? ?
ti
, C'o 1) r7-e
YERMZT
WZTHZN CITY PROPERTY/RIGHT-OF-WAY/EASEMENTS
(1-12,
Page 1 of 5
L? f /ti ,?Gt?o%s
Vs !-? ru J f'Arfc n ? r
3. Indicate below items to be affected and include a sketch or plan of work to be done.
Curb 6 GutteY Street Surface
Trail/Sidewalk Trees:
Pond/Wetlands Public
Traffic Control Devices/Signs Private
Drainage Utilities
Structures/Buildings Other
4. Method of Installation or Construction (?yoJ?9 I.u;,T,o /?f" ?+'9
i o
5. Work to start on or after: and shall be completed by: unless an
extension granted to: by:
DATE STAFF/DATE
6. Will detouring of traffic be necessary? . If necessary to detour traffic,
describe suggested route:
DETOURS: The Director of Public Works shall be notified in writinp at least 72
o s in ad ance of any detour being established, changed or discontinued.
NAME OFAPPLICANT •J J?i - ? f,- YHONE O d?O`
ADDRESS pJl? L,EDAr? ?'V Y-Q LEASE YRINT /fjD S / //?V/ S?7d?
?/?
STREET if CITY n STATE 2IP
NAME OF PARTY OR ORG? ?I T ON PERFORMING WORK K ??'D,(/K ?I?s
CONTACT PERSON: , Xl? EM GENCY (24 HR. ) PHONE
ADDRESS DAY PNONE
STREET CITY STATE ZIP
The undersi? ed herewith accepts the terms and conditions of this permit by the City of Eagan
as herein co tained and a e to fully comply therewith to the satisfaction f the City of 1917
Eagan.
Signe • ? Title:?/ _ DATE:
•---------------------------------------------------------------^ ---------------------------
FOR CITY USE ONLY AUTHORIZATION OF YERMIT
FINANCIAL SECURITY: AMOUNT:
Fee: $ f0, `!4 ReceiptNo.CR 03664
TYPE:
(Cash,bond,IAC,etc.)
Yermit No.
In consideration of agreement to comply in all respects with the regulations of the City of
Eagan covering such operations, and pursuant to authorization duly given hy said City of
Eagan; permission is hereby granted for the work to be done as described in the above
application, said work to be done in accordance with special provisions.as hereby stated:
APPROVED BY: DEPT. OF PUBLIC WORKS
BY: 9-29-?3
/DATE
ALL LEGAL REQUIREMENTS SHOWN ON REVERSE SIDE AND ON ALL "SPECIAL PROVISIONS" TO BE COMPLIED
WITH! THE DATE WHEN WORK IS COMPI.ETED MUST BE REPORTED TO THE EAGAN CITY ENGINEER.
Permit No. Page 2 of 5
PERTINENT REGlTIATIONS
Safety
1. Traffic shall be allowed to pass and to be protected at all times. If it is not
possible to allow traffic to pass, a suitable detour must be provided and plans
submitted to the Director of Public Works 72 hours in advance.
2. Barricades shall be erected in a manner which will provide suitable visibility in all
directions. All barricades shall be in good condition, and all signs shall be of such
size and legibility to provide adequate warning to oncoming traffic. At least two 7"
flashing amber lights shall be mounted on each end barricade with one on an advance
warning sign.
3. Excavations must be shored or sheeted when necessary to prevent under-mining of
roadway, trailways, utilities, or for safety reasons.
4. Guys or stays shall not be attached to trees on right-of-way or pxivate property
without written permission.
5. Flagnen shall be furnished by the party or organization performing the work whenever
the work being done creates a hazard either to the traffic using said road or the
personnel engaged in the construction, or when directed to do so by the City.
OPERATIONS
1, Permit on Job--Permits or copies shall be kept on the site of the work while it is in
progress in the custody of the individual in charge, and shall be exhibited upon
request made by any City official.
2. Provisions and Specifications--These general provisions, specifications and Std. Plate
P-1 shall be considered as forming an integral part of each and every permit issued for
operations within Eagan. The work suthori2ed by this permit shall be done at such time
and in such manner as shall be consistent with the safety of the public and shall
conform to all requirements and standards of the City. If at any time it shall be
found by the City that the work is not being or has not been properly performed, the
permittee, upon being notified by the City, shall immediately take the necessary steps,
at his own expense, to place the work in condition to conform to said requirements or
standards.
3. Execution--The permittee shall use diligence in the execution of the work authorized
under this permit in order not to endanger or unnecessarily obstruct travel along any
xoad ox trailway. Operations shall be so conductad at all times as to permit safe and
reasonable free travel over the roads and trailways within the limits of the work
herein prescribed. All safety measures for the free movement of traffic shall be
provided by the permittee at his own cost.
4. Coriformity to Laws--The installation shall be made in conformity with all applicable
laws, regulations and codes covering said installations. All installations shall be
made in conformity with regulations of governmental agencies for the protection of tlie
public.
e. The applicant shall furnish a bond or financial guarantee in the amount to be
determined by the City which is requixed to ensure adequate & timely completion
of repair. This bond or financial guarantee shall remain in effect for.2 years
subsequent to completion of street repair to pzotect the City from defects in
material, worlmanship or non-compliance with City Standards or specifications.
.
, Yermit No. Page 3 of 5
b. The applicant shall furnish evidence of puhlic liability insurance of not less
than $100,000/300,000 and property damage of not less than $25,000 issued by an
insurance company authorized to do business in the State of Minnesota on which
the City is named as an additional insured patty.
c. Except for the negligent acts of the City, its agents and its employees, the
permittee shall assume all liability for, and save the City, its agents and its
employees, harmless and defend same at its sole cost and expense fxom any and all
claims for damages, actions or causes of action arising out of the work to be
done herein and the continuing uses by the permittee, including but not limited
to the placing, constructing, and reconstructing, maintatning, protecting and use
of said facility under this application and permit for construction.
5. Existing Facilities--The utility facility and installations shall not interfere with
any existing utility facility on the City's right-of-way or easements. It is the
responsibility of the applicant to call for necessary locations of existing utilities.
(Gopher One 454-0002)
6. Private Property--The work permit or permit for construction as issued does not in any
way imply an easement on private property.
7. Quality of Work--Finished surface, base and sub-base of road or trailway upon
completion of work shall be at least equal to or hetter than specifications of
originally provided road or trailway in accordance with City Standard Specifications.
Surface shall be finished within 48 hours unon comvletion of backfill.
8. Curr_ng Trees--The permission herein granted does not confer upon the permittee the
rig?.- to cut, remove or destroy trees or shrubbery within the legal limits of the
rig:`.-of-way, easements that are not specifically identified on the plan attached to
this permit or relieve permittee from obtaining any consent otherwise required from the
owner of the property adjacent thereto.
9. Drainage--All waterways and lines of drainage shall remain operative,
10. Pole Anchors--Poie anchors, anchors, bracea or other construction will be permitted
within right-of-way or easements and will be approved on a case by case basis.
11. Driving Limitations.
a. Driving or parking on City trails or sidewalks shall only be permitted for those
operations requiring direct access to the boulevard area.
6. Vehicles operating or parked within the right-of-way area shall utilize their
warning flashers at all times.
c. Vehicles driving on trails or sidewalks shall not operate in excess of 5 miles
per hour. Vehicles shall operate at slower apeeds vhen weather conditlons, trail
conditions, poor visibility, obstructed sightlines or other conditions require
special precautions to ensure the safety of trail users and the general public.
d. Driving shall not be.pern¢itted within those boulevard.areas where damage to turf
trailways or other infrastzucture may occur.
e. Vehicles shall not be parked on trails or sidewalks in such a manner as to
unnecessarily impede the safe and efficient use of trailways by the general
public.
Permit No. Page 4 af 5
12. Vehicles or equipment traversing roads or trailway surfaces shall not utilize studded
or chained tires, caterpillar traction, or any other form of traction which will result
in damage to the surface.
13. Clean-Up--Street, trailways and affected right-of-way shall be scraped clean at the end
of each mork day and swept clean after constructSon is completed and left in a neat and
presentable condition.
14. Trees and Ve getati on -Burning or disking operations and/or the use of chemicals to
control or destzoy trees, brush and other vegetation is prohibited without prior
approval from the City.
15. Replacement of Sod--Wherever top-soil and sod are disturbed, they shall be replaced end
maintained satisfactorily until the turf is established.
The undersigned hereby declares he/she has read and will comply with all tha PERTINENT
REGUTATIONS as stated above and relevant City Ordinances.
DATE: SIGNED:
Revised Sf93
LTS#1-PERMIT.FM
??? v VI J
PROPERTV tINE
L
SAME AS REMOVED
(3" IrNNIMUTA)
SAME AS iiE/AOVED
(6" MINIMtJM)
TRAILWAY
1. Curb and Gutter shall be removed only after saw cutting at joints and replaced
according to specifications or Standard Plate.
2, Bituminous pavement area removed shall be saw cut prior to.patching.
3. Boulevard sod removed shall be replaced with minimum 4" of topsoil and cultured sod.
4. 2341 bituminous wear course shall be paved between May lst and November 15th for
permanent patch. Temporary cold mix patch should be used November 16th to April 20th
(or as permitted by weather).
5. Class 5, 100% crushed aggregate base.
6. Roadway closures in accordance with Appendix B- Traffic Control for street or highway
work zones - MnDOT/MUTCD.
7. Bituminous trailway closure requirements same as roadway in #6 above.
B. Backfill shall be thoroughly compacted by the "Specified Density Method" of compaction.
All suitable backfill material placed below a depth of five (5) feet below the final
pavement surface shall be placed in maximum lifts of twelve (12) to eighteen (18)
inches and compacted to a minimum ninety-five (95X) percent of ASTM Specification D698-
64T (Standard Proctor Density), method "A". All suitable backfill material placed
-within five (5) feet below the final pavement surface shall be placed in lifts not to
exceed twelve (12) inches and compacted to a minimum of one-hundred (lOD%) percent of
the above ASTM Specification.
ity o1 eagan STREET AND BITUMINOUS TRAI! WAY appfOV@CI ; Standafd
C
plate
PUBUC EXCAVATIONlPATCHOETAIL ? WORK$ 5/93
. -?
DE PARTMEN TRT,FFIC CONTROL REQUIREMENTS P
, ? .
, (To be ueed
PRO.TEC1' NAMB
, LOCATION
,C/D11651 SPECIAL ZNSPBCTION ANA TESTIxiG BCHEbULE I /
fn accordance aith the "Cuidelines for Special Inepection ind Teating")
eef!rTni. Tn4DF.[`TTAf! RCHE'DVLE
pRO?BCT NO.
1?)
PER}SIT N0. 20961
?
catia Type of Raport Aseigned
*
e ti
t c
s tion 2
Firm 3
Fre rfc
Firm 4
Earthwork/Backfill Testing A en As Necessary Braun Eng.
Foundation Testinq Agen As Necessary? Braun En .
High Strength Boltinq S ecial Ins . 1 Time I Ron Ryan
Frame Inspection Special Ins . 1 Time ? Ron Ryan
I
I
?
I
Notas:
7his echedvle to be filled out and ineluded in the projeer apeaificwtir n.
unavailable at that time to be filled out when applying for a building pesmit.
(l) Pwrmit No. to be provided by the 9uilding Official.
(2) Uee descriptione per U.S.C. Section 306.
(3) Speeial Znepector, Teeting Agent or Fabricator. j
(4) Firm contraaCed to perform eervices. j
ACKltOWLEDOEKENTS
Fech appropriats repreeentative must aign below:
Snformation
Ownez: Firm: Datei:
tracto :
Co Firm: 0ZS R- dW CousgfLuc'Pav natei: 5/((9 g3
n
A:ehitact: irm: I_RunP-6Z? ?WV'ee4'S Datel: S/
SER: Firm: Ov i YR Dat?: S( 9
.h SI: Firm: Rok) KAv
- Date: S(S
-
• si: Firm: Date:
TAs _Firm: ?5RAUL) Date: S l9
TA: Firm: Date:
?
F: Firm: Date:
D
t
:
F: Firm: a
e
• The individual name9 of all prospective epecial inepectore
obaerve muet bs identified on the reverae eide of this forn
and the worilk they intend to
I
Leqend: SER ? Structural Engineer of Aecord SI = Special InepactQr
TA ? Taetiaq Agent F= Fabricatvr ?
Aecepbed for the Buildinq Departmant 8y oate: 3- 1?3-53
Ryan
jkkR
Construction, Inc.
6511 Cedar Avenue South
• Minneapolis, Minnesota 55423 • (612) 866-4632 • Fax 866-0390
May 17, 1993
City of Eagan
Municipal Center
3830 Pilot Rnob Road
Eagan, MN 55122-1897
Attention: Joe Merchak
Reference: Proposed Ryan Building
2963 Center Court
Dear Joe:
Enclosed is a completed and signed Special Inspection Schedule for
the above referenced facility. Periodic reports and a final report
will be issued to your office as indicated. I have also enclosed
signed, certified copies of our Energy Code Compliance report.
R.J. Ryan Construction, Inc. will resolve other issues outlined in
your May 18, 1993 letter within 30 days.
If you have any questions reqarding and of the ahove, please don't
hesitate to call.
Sincerely,
R.,7 RYAN CONST UCTION, INC.
Tom RyaC n
TR:rb
B:TR-RJR-1
An Equal Opportunity Employer
?YA u l?-,w. "I u6
CA6Aa, MU
ENERGY CODE ANALYSIS
Gross Wall Area Sq. Ft, x ?S U=
Gro ss Rooi Area Sq. Ft. x U=
TOTAL Sa. Ft. x U = ?-
ACTUAL ,CONSTRUCTION SQ. FT. x U
1. Single Glass ` SQ.
- Ft. x U=
2. Double Glass .? Sa. Ft. x S? U=
3. Triple Glass Sa. Ft. x U=
H..M.. Type 1 Sq. Ft. x 175 U= t1
?. Door
O.H. Type 2 Sq. Ft. x Z; U=
Type 3 Sq. Ft. x U=
5. Net Wall (Tota l) Sq. Ft. -
Type 1 ?%=n Sa. Ft. x U= --
Type 2 Sa. Ft. x U=
Type 3 Sq. Ft. x U=
6. Skylight Sa. Ft. x U=
7. Net Roof Type 1 ?^^= Sa. Ft. x •='? U= co
Type 2 Sa. Ft. x J=
TOTAL Sa, r^t. x U
,?,ccuai Construction
J x S c. Ft. is L2s s i h?. ??;- --- •.'`?± r!=?; :;;ai... a?ecifira$on oH
... . -.
? _. ....,[ ... .... _ :,....:,.-__. _,
.:.. ., .... . ., ,::..??
'"han Code Reauirements. m;:::ri .: . ..... ...... . . .::. .. ?-: -_: •-, ..,._..t
...,....-- : ... . :.: . .. .: . .... .. .... . ...::. ..... _
.._:..__ .... .. ...... .__. . _ _ .. .._. ..._.._.__ed
rc-
C?
? Metropolitan Waste Control Commission
Mears Park Centre, 230 East Fifth Street, St. Paul, Minnesota SS IO1-1633
612 222-8423
May 18, 1993
Mr. Joe Merchak
Construction Analyst
City of Eagan
3830 Pilot Knob Road
Eagan, MN 55122
Dear Mr. Merchak:
RECEcVED
P9AY 2 D 9993
The Metropolitan Waste Control Commission determined SAC for the Ryan
Building to be located at Eaqandale Center within tY-,e City oP Eagan.
This project should be charged 3 SAC IInits, as determined below.
Charges:
Office
2480 sq. ft. @ 2400 sq. ft.(SAC Unit
Warehouse
11492 sq. ft. @ 7000 sq. ft./SAC Unit
Total Charge
If you have any questions, call Jodi Edwards at 229-2113.
Sincerely,
r? cr?.P?L 1'Y • ?,h? ?-
Roger W. Jan ?ig
Planner
RWJ:JLE
93051455
cc: S. Selby, MWCC
Carolyn Krech, Finance Department, Eagan
Mark Sonstegard, R J Ryan
SAC Units
1.03
1.64
2.67 oT 3
Equel Opportunity/Affirmatlve Acdon Employer
? i?ii
CITY OF EAGAN
OFFICE INFORMATION MEMO
70 DATE TIME
FFiOM OF
PHONE NO. RECEIVED BV:
H Was here to see you Will call again
Please call Returned your call
ACTION REMAHKS/MESSAGES
Review and aee me
Review antl comment
Prepara reply for my aig. ?
I
? ?°
Reply antl send me copy
Foryourapproval
For your informetion
Forsignature 1 'j? ?e??AUeb
As we discussed
AS you requested !?' .1 dS TIrvr AL16.
AT 0 Y
Take appraprlate action Y
Retum
FILE n DISTFIBUTE n OVER
PHOTOCOPY:
ONE SIDE ONLY COLLATE
NO. OF COPIES HEAD TO HEAD STAPLE
DATE NEEDED HEAD TO FOOT (Other)
rvowr
ROUGH DRAFT RUSH
DATE NEEDED SINGLE SPACE ? FINAL COPY
DOUBLESPACE CARBONS
• ,?
(ELPA COMPLIANCE FORNn
EXTERIOR LIGHTING POWER ALLOWANCE
Project tide
Date
RYAN BUILDING
, 06/23/93
Column 1 Column 2 Column 3 Column 4 Column 5
.
Exterior Area Description
Atea or
L:ength
(A)
Unit Power
Dertsity (UPD)
from table 9-1 Ezterior
Lighting Power
Allowance
A x UPD
Connccted
Lighting
Power
FAST EXTERIOR 125' .25 W/FT 31. 340
SOUTH EXTERIOR
121
'
20. W/FT
WEST EXTERIOR 95'
, .25
624
340
Totals 925 850
MEDINA ELECTRIC, INC.
BY - HARVEY 0. DAHL
1993
y
.?.r.,-; _.... __...__. _....r a?_,..
?
Pag?e 1 ?" 0 f993
MINNFSOTA EIVERGY CODE COMPLIANCE FO --
Electrical and Lighting. Powe? Budget. - -
Project Tide: R L/VN DA
Address:
Bldg Type: ?t ?? ?1V ?Nt b
IQ4/tt .v
Gross Floor Area: /S'D 00 S Q FT,
ACKNOWLEDGEMENTS, Fach appropriate representative must sign below:
Representing
Designer:
Signature
Date
Contractor: IVebIN/b 54dG7QiV?t, De?? ?/? ' ?
Accepted for the building depanment by: ?
?
EI.ECTRIC POWER
Individual units in multifamily dwellings are provided with separate metering.
Electrical pane] fceder and all branch feader wiring in nonresidendal bulldings 3
stories or ]ess are capable of accepting a clamp-on meter.
LIGHTING• MPVrn?r R trnFn-rFN'rc
7 Each enclosed space has at least one lighting control, or equivatent control, for
each 450 sauare feet of floor area. ,:
1[?&,? Controls for spaces used as a whole do not control more than one 20 ampere
?
?
circuit with minimum of thret convols.
?[?, All fluorescent lamp ballasu must meet the Federal standards for energy
/ efficiency as indicated by a circle "E" printed on the label.
Use of single-lamp fluorescent ballasu is minimized by tandem wiring one- and
thrce-lamp luminaires.
LIGHT'ING• EXT'ERIOR
VOS The exterior connected lighang power as designed and installed is less than or
equal to the ezterior lighting power allowance, and documentadon is attached.
-t
Electrical and Lighting Power BudPet Checkltst
Page 2
rrojecc Ticte: BL # A/A ?9
LIGHTING: IIVTERIOR ,
IhES The interior connected ligh6ng power, as designod and installed, is less than or
" equal to the interior lighting powwallowance, and documentation is attached.
('The interior connected lighting power includes permanently installed lighting pius
supplemental or task-related lighting provided by movable or plug-in luminaires.)
To determine compliance,
X? 0 the prescrippve alternative was used.
the performance alternative was used.
?71 ERNALLY ILLUMIlVATED EXTf SIGNS
ves Electrical consumpdon of intemally illuminated ezit signs dces not exceed 20
I watts of resistive power and a maximum of 40 volt amperes.
ELFrMr MnTnR FFFrCIENrrrc
All permanenfly wired, single-spced, Design A& B polyphase inducdon motors
of 1 horsepower or more have NEMA nominal efficiencies which mcet or ezcced
those in the table below:
I --)
OPEN ENCLOSED
Power
3600 w*t
I800 RPM
1200 nsM
AW vrM
7600 npw
It00 Rna
1200 Rpm
900 Rpm
- 14 FiP 82.516 625!6 80.U4 74.0% 82.3!6 E2.516 80.0% 74.016
5-9HP 65.3'4 67.5% t7.576 67.576 67.5% 67.ST? 67.5!6 85.516
10.19}[P a8.5% 89.1!6 90.2% 89.1!6 69.5f 19.5% 89.5!6 88.5%
20-49 HP 90.2!6 91.0% 91.0!6 90.2% 903% 91.0% 90.296 89.5!6
3499 FW 94.4!6 97.0!6 93.0x 91.7$ 92.1% 93.0% 93.0S 91.7'b
IOP121
FP 93.076 94.1% 9{.176 97.6% 93.6% %3% 9?.1!6 97.0!6
125fiP
and gmur 93.65 94.5R 91.1x 93.6% 94Sx 94.5% 94.176 93.616
(ILPA COMPLIANCE FORM?
ILPA -- INTERIOR LIGHTING POWER ALLOWANCE
PERFORMANCE PROCEDURE
PROJECT TITLE: $L A N L--) 4 DATE: yZ,1G?9 3
cOiU,m i cduum z conu,M 3 coiu„m a c?onm s cAivnn, 6 coloma 7
Arn 0
Are+lActivity Cuegory
i1PU.
Arra d Work Pfane Area
Factor Iigytiag Power 8udad
(LtPD x Awp x AF) Cceanactod
Ligbtiug Power
T r i i7 n?'r Or!^ir 1.3 /'T / Z(r
2 0?? o?;? /, 3 4g6 .
3 S o? a Z
R? s-? ?. o?,
.9
47
1.4 ?
s ? -?- .. o o ..... • 5
49
/, ?
'
G ,.Kr, wd ew. 16 246
. z
?
r "f, s .? . ,.5, /4 ?
Uolisled Space 0.2 1
LP
A 7
I"!' 4 7
?
m
-T2 ?
0
i
cn
w
-n
?;o
?
0
W
?
?
E!?
D
Z
O
O
z
?
--?
c
c?
--3
0
Z
z
?
?
x
z
0
6.
?
a
6
6
C
U
?
C
10.793 ?RI 17?02 RJ RYAN CuKb 1 KUU " v"
Calumn 1 Column 2 Column 9 Cnlumn 4 Calumn S
zcerim Area Uescripcicn
Arft ar
La+gth
(A)
Unic Power
Dauiry (IPD)
from u6k 4 -1 Exterior
i.wluns Fewm
„ Allawance
A z UPD
Connactca
Li¢bwC
fbwer
?`
F 5 1 z s' ?:° W
?-f
:'
30? w
Cv e ! 2S.'.:". w? ,300
'f- 6'
;
T«.t. ? a e?, a D
BRAUNsm
INTERTEC
Broun Interrec Engineering, Inc.
6801 Woshington Avenue South
. P.O. Box 39108
~ Minneapolis, Minnesofa 55439-0108
612-941-5600 Fax:941-4751
?
September 9, 1993
Mr. Tom Ryan (2)
R.I. Ryan Construction
6511 Cedaz Avenue South
Minneapolis, MN 55423
Deaz Mr. Ryan:
SFa 17 1993
Enginrers ond Scienfisls Serving
rha Bollr antl NoWral fnvironmenfs
Project BABX-93-276
Re: Excavauon Observations and Compaction Testing for the Proposed Huebsch Linen
Bnilding and the 5pec Commerciai Building on Center Court in Eagan, Minnesota
As you authorized on May 20, 1993, we have recendy completed excavation observations and
compaction testing for the above-referenced buildings. The purpose of our excavatioa
observations was to assist in judging the suitabIlity of the soils in the bottom of the excavations
for fill and foundation support.
Background Information
During our work, we had access to the foundation evaluations performed by our firm (Braun
Intertec reports BABX-93-144 and BABX-93-178). The general soil profile in the proposed
Huebsch Linen building area was about 3 to 14 feet of fill and topsoil over alluvial deposits of
sand. The generaC soil profile in the proposed spec building area was about 1 to 7 feet of fill,
possible fill and topsoil over alluvial deposits of sand.
Mr. Tom Ryan of R.J. Ryan Construction indicated the Huebsch Linen building will be a one-
story, slab-on-grade structure with a building footprint of approximately 20,000 square feet.
Roof loads will be supported on perimeter tilt-up walls and interior columns. Mr. Ryan also
indicaterl the spec commercial building will also be a one-story, slah-on-grade suucmre with a
building footprint of approximately 15,000 squaze feet. Roof loads will be supported on
perimeter tiit-up walls and interior columns.
Locations and Elevations
The Iocations and elevations used in the field at the time of our work and referenced in this
report were related to stakes placed by others. Braun Intertec does not do construction
surveying and must rely on the accuracy of staking placed by the surveyor or the contractor.
Elevations and locations should be considered approximate.
a.
R. J. Ryan Construction
Project BABX-93-276
September 9, 1993
Page 2
Fxcavation Observations
Huebsch Linen Building
Our excavation observations were performed between May 20, 1993 and June 3, 1993, by a
project engineer. We met Mr. Bob Nyan of Nyan Excavating at the site. Our services
included observing the soils encountered in the bottom of ihe mass eaccavation for the building
pad and the trenches dug for the perimeter footings. In addition, shallow hand auger borings
were performed in the soils exposed in the botbom of ihe excavation. Soil classifications were
determined by examining the auger cuttings. Approximate density of the soils encountered was
estimated by judging the force required to advance the auger.
The elevation at the bottom of the footing trenches ranged from approximately 877 in the
loading dock azea to 881. Several hand auger probes were performed to a depth of about
2 1/2 feet in the bottom of the excavations. These hand auger probes encountered brown and
dazk grey sIlty sand, sand with silt and poorly graded sand with varying amounts of gravel.
These soils were judged to be in a medium dense condition.
Based on the site staking, it appeared that the mass excavation had a suitable 1:1 oversize.
This oversize is necessary for lateral suppoR of the footings throughout the fill sequence. No
oversize was necessary in the footing trenches, because the footings were placed on the
natural(y occuning alluvial soils.
Spec Commercial Building
Our excavation o6servations for the mass excavation of the building pad were performed on
May 20, 1993, by a project engineer. We met Mr. Bob Nyan of Nyan Excavating at the site.
Our services included observing the soils encountered in the bottom of the mass excavation for
the building pad. In addition, shallow hand auger borings were performed in the soils exposed
in the bottom of the excavation. 3oIl classifications were deternuned by examining the auger
cuttings. Approximate density of the soils encountered was estimated by judging the force
required to advance the augec.
Several hand auger probes were performed to a depth of about 2 112 feet in the bottom of the
excavation. These hand auger probes encounteced brown and dazk grey silty sand, sand with
silt, and poorly graded sand with vazying amounts of gravel. These soils were judged to be in
a metiium dense condition.
Based on the site staking, it appeazed that the mass excavation had a suitable 1:1 oversize.
This oversize is necessary for lateral support of the footings throughout the filt sequence.
R. J. Ryan Construction
Project BABX-93-276
September 9, 1993
Page 3
We were not notified by the excavator when excavation proceflures were being performed for
the strip footings for the spec commercial building. Therefore, no observations of the fooung
trenches were performed for the spec commercial buiIding.
Compaction Testing
Huebsch Linen Building
The on-site fill soils were used to fill the excavation and as backfill azound the footings. The
fill was compacted with a self-propelled vibratory compactor. Nine compaction tests were
performed as the fill was placed. The test results indicate the fill tested met or exceeded the
minimum recommended densiry of 98 percent of the standazd Proctor density (ASTM D 698)
below footings and 95 percent in other building pad areas. The results of these compaction
tests are attached to this report.
Spec Commercial Building
The on-site fill soils were used to fill the excavation and as backfill azound the foocings. The
fill was compacted with a self-propelled vibratory compactor. Fourteen compaction tests were
performed in the buIlding pad, under the floor slab and in the footing backfill. The test results
indicate the fill tested met or exceeded the minimum recommended density of 98 percent of tfie
standazd Proctor densiry (ASTM D 698) below the footings and 95 percent in the remaining fill
and backfill. The results of these compaction tesu are aiso attached to this report.
Cancrete Testing
During this time period, three sets of concrete cylinders cast by the contractor for the Huebsch
Linen building were tested for compressive strength. The results of the tests are attached to
this report. To date, all test results indicate that the specified strength was met at the 28-day
age.
Conclusions
Based on the results of our excavation observation, hand auger probes and compaction tests, it
is our opinion the soils encommtered in the bottom of the excavations we observed are suitable
for support of the anricipated 3,000-pound per squaze foot loadings.
General
Services performed by Braun Intertec have been conducted in a manner consistent with that
level of caze and skill ordinazily exercised by members of the profession currendy practicing in
this azea under similaz budget and time resuainu. No warranty, expressed or implied, is made.
R. J. Ryan Construction
Project BABX-93-276
September 9, 1993
Page 4
It has been a pleasure performing these services for you. If you have any questions regazding
this report, please call Ron Vickery at (612) 942-1777 or I.oren Braun at (612) 942-4817.
SincerelAVickery
Project Engineer
ProFessional Certification
I hereby certify that this report was prepazed by me or
under my direct supervision and that I am a duly
Registered Professional Engineer under the laws of the
State of Minnesota.
Loren W. Braun, P.E.
Senior Engineer
Registration Number: 14969
Date: September 9, 1993
Attachment:
Compaction Test Results
Proctor Test Resulu
Compressive Test Resulu
cc: Mr. Joe Merchak; City of Eagan
;
nwUwb:r1e\babx\93276kpt
Report of Field Compaction Tests
Date: 7uly 2, 1993 Project: BABX-93-276 Report: 1
Client:
Mr. Tom Ryan
R.J. Ryan Constrvction
6511 Cedaz Avenue South
Minneapolis, MN 55423
Project Description:
Huebsch Linen Building and Spec Commercial Building
Center Court, Eagan, Minnesota
Test
No.
Date Soil
I.D.
No.
Class.
Optimum
Moisture Max. Lab
Dry Density
(pct) 7n Place
°h
Moisture In P1ace
Dry Dextsity
(pcfl
Percent
Compaction
Specired
Compaction
Comments
1 5/21/93 P-2 SM 14.1 114.0 14.7 114.9 100'h 98 lA
2 5/21/93 P-3 SM 10.2 127.1 10.9 125.6 99 95 lA
Commenu: A. Test results comply with specifications.
B. Test results do not comply with specifications.
C. Test results comply with air-void specifications.
XX Nucleaz Method ASTM D 2922-81
Sand Cone Method ASTM D 1556-82
XX Standazd Proctor ASTM D 698-91
Modified Proctor ASTM D 1557-91
Tes
Not
Test Location
Elevationl
1 59'South and 1'h' West of Future NE Buildin Corner, S ec. Commercial Bld ., Ft . 890
2 151/2' North and 60' West of SE Buildin Comer, Huebsch Linen Buildin , Floor 890
' Benchmazk:
cc:
mms:babx\93276\ct.1
" k 114?' '/
I'Al
Ronald W. Vickery
Project Engineer
Report of Field Compaction Tests
Date: July 2, 1993 Project: BABX-93-276 Report: 2
Client:
Mr. Tom Ryan
R.J. Ryan Construction
6511 Cedaz Avenue South
Project Description:
Huebsch Linen Building and Spec Commercial Building
Center Court, Eagan, Minnesota
Minneapolis, MN 55423
No.
FTt
Date Soil
I.D.
No.
Class.
Optimum
Moisture Max. Lab
Dry Density
(pct) 7n Place
96
Moisture In Place
Dry Density
(pcf)
Percent
Compaction I
Specired
Compaction
Comments
3 5/26/93 P-3 SM 10.2 127.1 12.5 122.6 96 98 1B
4 5/26/93 P-2 SM 14.1 114.0 18.1 116.3 102 98 lA
5 5/26/93 P-2 SM 14.1 114.0 13.1 120.3 1051h 98 lA
6 5/26/93 P-3 SM 10.2 127.1 11.3 124.3 97ifs 98 1B
7 5/26/93 P-3 SM 10.2 127.1 10.0 128.2 101 98 lA
8 5/26/93 P-3 SM 10.2 127.1 10.3 128.4 101 98 lA
9 5/26/93 P-3 SM 10.2 127,1 12.5 125.2 981h 98 lA
Commenu: A. Test results comply with specifications.
B. Test results do not comply with specifications.
C. Test results comply with air-void specifications.
Nuclear Method ASTM D 2922-81
Sand Cone Method A3TM D 1556-82
_ 3tandazd Proctor
Modified Proctor
ASTM D 698-91
ASTM D 1557-91
Test
No.
Test Location
Elevation'
3 14' South of NE Future Buildin Corner on Ft . Line, S ec. Commerical Buildin , Ft . 895
4 44' S and 2' W of Future NE Buildin Corner on Ft . Line, S ec. Commercial Buildin , Ft . 894
5 43'k' South of Future NE Buildin Corner on Ft . Line S ec. Commercial Buildin , Ft . 893
6 20' East of Pro osed NW Buildin Corner on Ft . Line, S ec. Commercial Buildin , Ft . 896
7 120' East of Pro osed NW Buildin Corner on Ft . Line S ec. Commercial Buildin Ft . 895'k
8 70'h' North of Pro osed SE Buildin Corner on Ft . Line S ec. Commercial Buildin Ft . 896
9 35' West of Pro osed SE Building Corner on Ftg. Line, Huebsch Linen Building, Ftg. 893
1 Benchmazk:
cc:
mme:babx\93276\ct.2 Project Engineer
Report of FYeld Compaction Tests
Date: Iuly 2, 1993 Project: BABX-93-276 Report: 3
Client:
Mr. Tom Ryan
R.J. Ryan Construction
6511 Cedaz Avenue South
Project Description:
Huebsch Linen Building and Spec Commercial Building
Center Court, Eagan, Minnesota
Minneapolis, MN 55423
Tesk
No.
Date Soil
I.D.
No.
Class. Optimmn
Moisture Max. Lab
Dcy Density
(pcf) In P1ace
%
Moisture In Place
Dry Density
(pct) Percert
Compaction Specified
Compaction
Comments
10 5/26/93 P-3 SM 10.2 127.1 11.3 126.4 991h 98 lA
Comments: A. Test results comply with specifications.
B. Test results do not comply with specifications.
C. Test results comply with air-void spuifications.
Nuclear Method ASTM D 2922-81
Sand Cone Method ASTM D 1556-82
Standazd Proctor ASTM D 698-91
Modified Proctor ASTM D 1557-91
Test
No.
Test Location
Elevation'
10 54' North of Pro osed SE Buildin Comer on Ft . Line, Huebsch Linen Buildin , Ft . 893'h
' Benchmark:
cc:
mms:babx\93276\ct.3
x 0//
Ronal W. Vickery
Project Engineer
Report of Fleld Compaction Tests
Date: September 10, 1993
Project: BABX-93-276
Report: 4
Client:
Mr. Tom Ryan
R.J. Ryan Construction
6511 Cedaz Avenue South
Minneapolis, MN 55423
Project Description:
Center Court
Huebsch Linen Building and Spec Commercial Building
Eagan, Minnesota -
est
ate
ype
Soil
ID and
Classitication
Optimwn
Moisture•
(%) Mex. Lab
Dry Deasity'
(Std.Proc.)
(pcf)
Inplace
Moisture
(%) 7nplace
Dry
Density
(pct)
Relative
Compaction
(%) Specified
Minimum
Compact.
(%)
omments
11 7/12/93 N P-1: SP-SM 8.1 133.2 7.5 134.5 101 95 A
12 7/12/93 N P-1: SP-SM 8.1 133.2 8.4 134.0 1001h 95 A
13 7/12/93 N P-3: 3M 10.2 127.1 5.9 129.2 1011h 95 A
14 7/12/93 N P-3: SM 10.2 127.1 9.2 128.1 100'h 95 A
15 7/12/93 N P-3: 5M 10.2 127.1 7.7 128.3 101 95 A
16 7/12/93 N P-1: SP-SM 8.1 133.2 7.6 131.6 99 95 A
17 7/12/93 N P-1: SP-SM 8.1 1312 83 129.1 97 95 L-ii
Key: N = Nuclear, ASTM D 2922 A= Test resuits comply with specifications.
SC = Sand Cone, ASTM D 1556 B= Test results do not comply with specifications.
= O.M. and M.L.D.D. rounded to neazest 0.5
Test Test Locatian Elevation
11 Huebsch Linen Bld : 23'/z'S, 45'W of Existin NE (I5) Buildin Corner (Floor Slab) 893
12 Huebsch Linen Bld : 95'/z'S, 54'W of Existin NE (IS) Buildin Comer (Floor Slab 893
13 Huebsch Linen Bld : 40'N, 48'W of Existin SE (IS) BuIldin Comer (Floor Slab) 893
14 Huebsch Linen Bld : 35'A'N, 3'E of Existin SE (OS) Buildin Comer (Exterior Wall Backfill) 894
15 Huebsch Linen Bld : 391fz'S, 6'E of Existin NE (OS) Buildin Corner (Exterior Wall Backfill) 894
16 Huebsch Linen Bld : 6'N, 26'E of Existin NW (OS) Buiidin Corner (Exterior Wall Backfill) 894
1'7 5 ec Commercial Bld : 19S, 6'fz'E of Existin NE (03) Buildin Corner (Exterior Wall Backf'ill) 900
Elevation Reference:
ce:
Braun
Project Engineer
mjaWabx\932761ct.4
Report of Field Compaction Tests
Date: September 10, 1993
Project: BABX-93-276
Report: 5
CGent:
Mr. Tom Ryan
R.J. Ryan Construction
6511 Cedaz Avenue South
MinneaDOlis, MN 55423
Project Description:
Center Court
Huebsch Linen Building and Spec Commerciai Building
Eagan, Minnesota
est
ate
ype
Soil
ID and
Classification
Optimiun
Moisture'
(%) Max.I,ab
Dry Deosity"
(Std.Proc.)
(pcf)
Inpiace
Moistwe
(%) Inplace
Dry
Deasity
(pcf)
Relative
Compaction
(°.b) Specified
Minimmn
Compact.
(%)
omments
18 7/12/93 N P-2: SM 14.1 114.0 9.9 116.7 102 95 A
19 7/13193 N P-1: SP-5M 8.1 133.2 8.2 130.7 98 95 A
20 7/13/93 N P-1: SP-SM 8.1 133.2 8.1 131.3 981/z 95 A
21 7/13193 N P-3: SM 10.2 127.1 11.5 125.4 98'/? 95 A
22 7/13/93 N P-1: SM 8.1 133.2 9.3 130.9 98 95 A
23 7/13/93 N P-2: SM 14.1 114.0 7.2 116.7 102 95 A
Key: N = Nuclear, ASTM D 2922 A= Test results comply with specifications.
SC = 3and Cone, ASTM D 1556 B= Test resulis do not comply with specificauons.
* = O.M. and M.L.D.D. rounded to neazest 0.5
Test Test Location Elevation
18 5 ec Commercial Bld : 4'S, 54'E of Existin SW (OS) Buildin Corner (Exterior Wail Backfill) 900
19 S ec Commercial Bld : 30'h'3, 19'/z'W of Ezistin NE (IS) Buildin Corner (Floor Slab) 899
20 S ec Commercial Bld : 90'/z'S, 21'/z'W of Existin NE (IS) Buildin Comer (Floor Slab) 899
21 S ec Commercial Bld : 60'S, 60'W of Existin NE (IS) Buildin Comer (Floor Slab) 899
22 S ec Commercial Bld : 16'S, 96'W of Existin NE (IS) Buildin Corner (Floor Slab) 899
23 S ec Commercial Bld : 18'h'N, 17'E of Existin SW (IS) Buildin Comer (Floor Slab) 899
Eleva[ion Reference:
cc:
Braun Intertec Corporauon
Ro W. Vickery
Project Engineer
mjs\babx\93276k1.5
Report of Field Compaction Tests
Date: September 10, 1993
Project: BABX-93-276
Repott: b
Client:
Mr. Tom Ryan
R.I. Ryan Construction
6511 Cedaz Avenue South
Minneaoolis. MN 55423
Project Description:
Center Court
Huebsch Linen Building and Spec Commercial Building
Eagan, Minnesota
a
ate
ype
Soil
ID and
Classiticatian
Optimton
Moisture'
(%) Max. Lab
Dry Density'
(Std.ProcJ
(pcf)
Inplace
Moisture
(%) Inplace
Dry
Density
(pct)
Rela4ve
Compaction
(°k) Specified
Minimumm
Compact.
(°,b)
omments
24 7/23/93 N P-2: 3M 14.1 114.0 10.8 112.6 99 95 A
25 7/23/93 N P-2: SM 14.1 114.0 13.9 113.5 991h 95 A
26 7/23/93 N P-3: SM 10.2 127.1 10.9 124.7 98 95 A
27 7/23/93 N P-1: SP-SM 8.1 133.2 103 130.1 97'h 95 A
28 7/23/93 N P-1: SP-SM 8.1 133.2 7.2 128.7 96'h 95 A
29 7/23193 N P-3: SM 10.2 127.1 8.2 125.7 99 95 A
30 7/23/93 N P-1: SP-SM 8.1 133.2 9.8 128.5 96'h 95 A
%ey: N = Nuclear, ASTM D 2922 A= Test results comply with specifications.
SC = Sand Cone, ASTM D 1556 B= Test results do not comply with specifications.
* = O.M. and M.L.D.D. rounded to neazest 0.5
Test Test Location ElevaHon
24 S ec Commercial Bld : 33'W, 3'S of Existin SE (IS) Buildin Corner (Exterior Wall Backfill 893
25 S ec Commercial Bld : 40'N, 3'E of Existin SE 5) Buildin Corner (Exterior Wall Backfill) 893
26 3 ec Commercial Bld : 13'W, 3'N of Existin NE (IS) Buildin Corner (Exterior Wall Backfill) 893
27 S ec Commercial Bld : 23'E, 4'N of Existin NW (IS) Buildin Corner (Exterior Wall Backfill) 893
28 Heubsch Linen Bld : 10'N, 4'W of Existin SW Buildin Corner (Exterior Wall Backfill) 890
29 Heubsch Linen Bld : 110'N, 3'W of Existin SW Buildin Corner (Exterior Wall Backfill) 889
30 Heubsch Linen Bld : 2PS, 4'W of Existin NW Buildin Corner (Exterior Wall Backfill) 890
Elevation Reference:
cc:
Braun Intertec Corporation .
Ronal W. Vickery
Project Engineer
mjs16abx1932761ct.6
Report of Field Compaction Tests
Date: September 10, 1993
Project: BABX-93-276
Report: 7
Client:
Mr. Tom Ryan
R.I. Ryan Construction
6511 Cedaz Avenue South
Minneapolis. MN 55423
Project Description:
Center Court
Huebsch Linen Building and Spec Cornmercial Building
Eagan, Minnesota
est
ate
ype
Soil
ID and
Classification
Optimum
Moisture'
(°k) Max. Lab
Dry Density*
(Std.Proc.)
(pct)
7nplace
Moisture
(°k) 7nplace
Dry
Density
(pcf)
Relative
Compaction
(°k) Speciried
Minimwn
Compact.
(°k)
omments
31 7/23/93 N P-1: SP-SM 8.1 133.2 6.9 131.2 98'h 95 A
32 7/23/93 N P-1: SP-SM 8.1 133.2 6.2 126.8 95 95 A
33 7/23/93 N P-3: SM 10.2 127.1 8.4 126.6 99'fz 95 A
34 7/23193 N P-1: SP-SM 8.1 133.2 6.6 1303 98 95 A
Key: N = Nuclear, ASTM D 2922
SC = Sand Cone, ASTM D 1556
* = O.M. and M.L.D.D. rounded to nearest 0.5
A= Test results comply with specificauons.
B= Test results do not comply with specifications.
Test Test Locatiou Elevation
31 Huebsch Linen Bld : 29'W, 4'N of Exisdn NE Buildin Comer (Exterior Wall Backfill) 893
32 Huebsch Linea Bld : 100'S, 4'E of Existin NE Buildin Corner (Exterior Wall Backfill) 893'h
33 Huebsch Linen Bld : 171h'W, 4'S of Existin SE Buildin Comer (Exterior Wall Backfill) 893lh
34 Huebsch Linen Bld : 35'E, 4'S of Existin SW Buildin Comer (Exterior Wall Backf'ill) 890
Elevation Reference:
cc:
mjel6abx193276\ct.7
Braun Intertec Corporation
?
Ron d W. Vickery
Project Engineer
BR p??'" 8wun Inte'fec Engineering, Inc.
?? 6801 washington Avenue south
I N T E E C P O. Boz 39108
Minneopolis, Minnesota 55439-0108
612-941-5600 Fox:941-4751
Engineers and Scientistt Serving
L3b01"dt01`)' CO$PflCt10II C}l'dP`dCtQI7StICS Of SOIl (Pl'OCtOothe Builf and Notuml Environmenfs
Date: September 13, 1993
Project: BABX-93-276
Client: Description:
Mr. Tom Ryan Huebsch Linexi Building and
R.J. Ryan Construction Spec Commetcial Building
6511 Cedar Avenue South Center Court, Eagan, Minnesota
Minneapolis, MN 55423
FSeld Data:
Data Sampled : 5/20/93 Test Number . P-1
Samplad By . Braun Intertec Location Sampled :
Classification . SP-SM - Poody graded sand with silt and gravel fine- to medium-grained, brown
I,aboratory Data:
ASTM D: 698-91 Proceduce: C Date Tested: 5120193
As Received Water Content: - Prep. Method: Wet Rammer Type: Manual
Sieve Data, % on 3/4": 12% % 3/4"-318": 109b % 3/8" -#4: 12%
Size of'Oversize": +3/4" Percen[ Oversize: 1296 Spec. Gravity: 2.70
Maximum Dry Unit Weight, pcf
Optimum Water Content, %
Curve Values Coaecte3 Values (ASTM D 4718)
133.2 f 136'h cf
8.1 % 7.0 %
135
133
w 131
?
?
en
.?
?
'e
a 129
?
A
127
125
Zero Air Voids
(&?Caw
S.G.= 2.70
(Assumed)
Water Content, 90 5 7 9 11 13 lSoabx193276\pl
? ? ? ? s`" Braun InteHec Corporation
6801 Woshingfon Avenue South
INTERTEC POBox39108
Minneapolis, Minnesoto 55439-0I08
6 1 2-941 5600 Fax947-4157
1.3b01'.7t01'3' COIIlP`dCt10I1 Ct187"dCtCI'LSt1CS O{ 5'Oll ftOCt01') Errgineers ond $cientisls $erving
the Buili and Na)urol Environmenls'
Date: July 2, 1993
Project: BABX-93-276
Client: Description:
Mr. Tom Ryan Huebsch Linen Building and
R.J. Ryan Coastruction Spec Commemial Building
6511 Cedar Avenue South Center Court, Eagan, Minnesota
Minneapolis, MN 55423
Field Data:
Date Sampled : 5/21/93 Test Number . P-2
Sampled By . Braua Intertec L.ocation Sampled :
Classification . SM - Silty sand, fine-grained, brown
Laboratory Dafa:
ASTM D: 698-91 Procedure: A Date Tested: 5/21l93
As Received Water Conteut 11.5Y Prep. Method: Dry Rammer Type: Manual
Sieve Data, % on 3/4": 0 % 3/4"-3/8": 1.0% % 3/8" - p4: 2.090
Size of "Oversize": +4 Perceat Qversize: 3% Spec. Gtavity: 2.65
(`„vP. Valuac Coaected Values (ASTM D 4718)
Maximum Dry Unit Weight, pcf
Optimum Water Content, %
114.0 f 114 f
14.1 % 14 90
Zero Air Voids
?
U
?.?
co
?
3
?
?
T
4
Q
111
109
Water Content, 90 $
115
113
10
12 14 16
C_4a'AOU)0utie
S.G.= 2.65
(Assumed)
l8babx\9327b\p2
BRAU ?W s`" 6wun Intertec Corporaeion
??? 6801 Washingbn Avenue $outh
I NTERTEC P.O.Box39108
Minneapolis, Minnesota 554394108
612-9475600 Fox941-4751
labol"dtoColn action Characteristics of Soii (ProcYor)
? p E"9;neers a„d scie?r,sn servin9
the Buill and Nafural Environmenh`*
Date: July 2, 1993
Project: BABX-93-276
Client: Descrip6on:
Mr. Tom Ryan Huebsch Linen Building and
R.J. Ryan ConstrucYioa Spec Commeicial Building
6511 Czdar Aveaue South Center Court, Eagan, Minnesota
Minneapolis MN 55423
Field Data:
Date Sampled . 5/21/93 Test Number . P-3
Sampled By . Braun Iatertec I.ocation Sampled :
Classificatioa . SM - Silty sand with gravel, fine- to medium-grained, brown
Laboratory Data:
ASTM D: 698-91 Procedure: C Date Tested: 5/21/93
As Received Water Content: 10.0 Prep. Method: Wet Rammer Type: Manual
Sieve Data, % on 3/4": 9% Y6 3/4"-3/8": 4% % 3/8" -#4: 2.0&
Si2e of "Oversize": +314 Percent Oversize: 9% Spec. Grevity: 2.7
n....o v?u,..< Cn.rrrted Valueq (ASTM D 47181
Maaimum Dry Uni[ Weight, pcf
Optimum Water Content, %
129
127.1 f 130 f
10.2 90 9/2 90
Zero Air Voids
,??QaW
w 127
U
c
w
.?
3
G
a 125
T
4
Q
123
121
Water Content, 9 7
9
11 13 15
S.G.= 2.'70
(Assumed)
l%abz193276\p3
BRAUNSm
INTERTEC
Brcun inferfec Engineering. Inc.
6801 Woshingfon Avenue South
P.O. Box 39108
Minneapolis, Minnesofa 55439-0108
612-941-5600 Fox:941-4151
fngineers and Scienfists Serving
fhe 8ulft and NaNrol Environments
COMPRESSIVE TEST OF CONCRETE CYLINDER
Test Method: ASTM C 39, 6"X12" Cylinder
CLIENT :
R7 Ryan Construction
Attn: Mr. Tom Ryan
6511 Cedar Avenue South
Minneapolis, MN 55423
DATE : August'10, 1993
PROJECT ID : BABX93276
PROJECT DESCRIPTION :
Huebsch Linen Buildinq
Spec Commercial Building
Concrete Testing
Eagan, MN
FIELD DATA : DESIGN DATA :
Set Number . 1 Mix Design : Not Given
Date Cast . 7/ 12/93 Supplier : Cem5tone
Time Cast : Not Given Specified Air : Not Given
Measured Slump : Not Given Specified Strength : 4000
Measured Air : Not Given Truck or Ticket #: Not Given
Concrete Temperature: Not Given Cylinders per Set . 3
A1r Temperature : Not Given
Cxlinder Cast By : Client
Liquid Added at Site: Not Determined
Sample Location : Floor slab, qrids C and D, 1-6, Huebsch Linen Bldg.
Sample Date Test Field Lab Test Max Load Cyl Area Compressive Remarks
No. Recvd Date Cure Cure Age (pounds) (sq in) Strength, psi Code(s)
lA 7/13 7/19 1 6 7
113 7/13 8/09 1 27 28
Specified Strength at 28 Days (psi)
4000
D
D1
REMARKS :
D:The specified strength was met at the 7-day age according to the above
test results.
D1:The specified strength was met at the 28-day age according to the above
test results.
cc
118970 28.46 4180
158660 28.37 5590
Reviewed by :
Ronald W. Vickery
Project Engineer
.eNsm
BRAY
INTERTEC
COMPRESSIVE TEST OF CONCRETE CYLINDER
Test Method: ASTM C 39, 61IX12" Cylinder
CLIENT :
RT Ryan Construction
Attn: Mr. Tom Ryan
6511 Cedar Avenue South
Minneapolis, MN 55423
Brcun Inferfec Engineering. Inc.
6801 Washingtan Avenua South
P.O. Box 39708
Minneapolis, Minnesota 554 3 9-01 0 8
612-941-5600 Faz:941-4151
Engineers and Scientish Serving
fhe Buih ond Nolurol Environments
DATE : Auqust 10, 1993
PROJECT ID : BABX93276
PROJECT DESCRIPTION :
Huebsch Linen Buildinq
Spec Commercial Building
Concrete Testing
Eagan, MN
FIELD DATA : DESIGN DATA :
Set Number . 2 Mix Design : Not Given
Date Cast . 7/13193 Supplier : Cemstone
Time Cast : Not Given Specified Air : Not Given
Measured Slump : Not Given Specified Strength : 4000
Measured Air : Not Given Truck or Ticket #: Not Given
Concrete Temperature: Not Given Cylinders per Set . 3
Air Temperature : Not Given
Cxlinder Cast By : Client ,
Liquid Added at Site: Not Determined
Sample Location : Floor slab, grids A and B, 1-6, Huebsch Linen Bldg.
Sample Date Test Field Lab Test Max Load Cyl Area Compressive Remarks
No. Recvd Date Cure Cure Age (pounds) (sq in) Strength, psi Code(s)
2A 7/15 7/20 2 5 7 134990 28.43
2B 7/15 8/10 2 26 28 170490 28.34
Specified Strength at 28 Days (psi) :
4750 D
6020 D1
4000
REMARKS :
D:The specified strength was met at the 7-day age according to the above
test results.
D1:The specified strength was met at the 28-day aqe according to the above
test results.
cc :
Reviewed b??G'
ald W. Vickery
Project Engineer
BRAUNSM
INTERTEC
COMPRESSIVE TEST OF CONCRETE CYLINDER
Test Method: ASTM C 39, 61IX12" Cylinder
CLIENT :
R.J Ryan Construction
Attn: Mr. Tom Ryan
6511 Cedar Avenue South
Minneapolis, MN 55423
Braun Infarfac Enginaering. Inc.
6601 Washingfon Avenue Soufh
P.O. 8ox 39108
Minneapolis, Minnesofa 55d39-Oi08
612-941-5600 Fax:941-4151
Engineers and Scientish Serving
the Built ond Naturol Environmenfs
DATE : August 11, 1993
PROJECT ID : BABX93276
PROJECT DESCRIPTION :
Huebsch Linen Buildin9
Spec Commercial Building
Concrete Testinq
Eagan, MN
FIELD DATA : DESIGN DATA :
Set Number . 3 Mix Design : Not Given
Date Cast . 7/14/93 Supplier : Cemstone
Time Cast : Not Given Specified Air : Not Given
Measured Slump : Not Given Specified Strength : 4000
Measured Air : Not Given Truck or Ticket # : Not Given
Concrete Temperature: Not Given Cylinders per Set . 3
Ai
T
t t Gi
N
r
empera
ure : ven
o
Cvlinder Cast By : Client
Liquid Added at Site: Not Determined
Sample Location : Floor slab, grids B and C, 1-6, Huebsch Linen Bldg.
Sample Date Test Field Lab Test Max Load Cyl Area Compressive Remarks
No. Recvd Date Cure Cure Age (pounds) (sq in) Strength, psi Code(s)
3A 7/15 7/21 1 6 7 121850 28.40
3B 7/15 8/11 1 27 28 159910 28.46
Specified Strength at 28 Days (psi) :
4290 D
5620 D1
4000
REMARKS :
D:The specified strength was met at the 7-day age according to the above
test results.
D1:The specified strength was met at the 28-day age according to the above
test results.
cc
Reviewed by :
G/
Ro'nald W. Vickery
Project Engineer
Lockadle arc adju~trnent
I 16 Noule variations
9 standard nozzleis 8 low angle nozxles
f ~ TORO 5700 ; Plastic / Commercial riser
Finish grade ~ N Finish grade
= Ratcheting riser 3" pop-up sfroke
3" pop•up w/positive spring
( 570C-3P only ) retraction
4~~ po~up ( 570C-4P only ) TORO S700 series
0 r
i . . . . . ~ . ~ ~ TORO 570 series ~ gear driven sprinkler fixed spray sprinkler 8~~ ' ~2~~
w! positive spring
r~traction Built-in checkvalve ~ S700C only )
Cut off riser
Fitting (saddle, or Cut oPf riser
insert ~tting) Pipe Fitting 1 insert 1 saddle 1
<
~ Pipe (Pvc! Poly.)
A . . ~ . . j . . .
. . .~~~.aa~ema.. ~wma.ys?~' . . . . . . . .~.,mml z P .~.~w... :~.,~~~,.~„~.J... .~,.,,a-~,~,,.,.-_ ' . ' ~ ; . ~ . ,m.....,-_,._.; ~x.,m..,-.,..-...-- . .
. ~ . . ~ ~ . _,.._,_.e.,._.J ~ 5 ~ . ~ ~ ~ ~ ~ ~.1 M- ~ ~NSTALI~AT~~N
`„M~.~.r. .~,s~, .,.:.e .~._w.M.. ~ ~ .._u..,,...d~~,~~,_,u „W,~..~....~M~. v~ i r ~i DEYAIL ~o scA~~ 5700 ~NSTALLAT~~N
~ C~ ,
~ , ~ , s 3 SPIi~U(LE~SSYSIEAAS . r ~ ~~TAIL NOSCAL~' ' )r Y
r. ...m.....ar.~w.....+r.~.~aw«.;r.,.:w ~~m.:~rvH..m...rnw...e~.~..w.~arsmv~m..+«-.......~,i....-s ~r4P.. . ~ ,........x:.. ..,~..u.~,:m ,vanv~.r.. . ~ . . w.~ .m .:...~e..,,,... . . mw„ . w¢~m.~....wxa+nn«w«w-.+.AC.«.arm.«sM w~{... ,.~.~a.'a ~ S . d ~~y a 4. . w~~ . . . r§ . . ..:5PHIXI(1CN94STfA15 . .
~ , . ~ 1 . . . . . ~ h,,,. . . . . . . ~ ~'"~4.. . . ~ . ~ .
~ ~ ~ . ~ ~ . . . . ~ ~ ~ . . 5 ~ ~ . ~ ~ ~ . . . . . .
f t ~ . . . . _-~i :~.a.. . . . . . .
~ s j i'O~p Indoor/outdoor ~ ~ut~matic controtler
. ' ~ . . . . I . ~ ~ ' ~ ` . . ~ . ~ ----->~Aanual b~ed . t t, i 1~ . ~ ~
~ k E ~'`''-~1„ electric vaive ' ' ' ' Plasfic/Metalcabrnet
. . ~ : ~ ~ . . . ~ ~ E I { wfo flow controll , ~ locking aover w/mefal ~ablr?~fi
• o u ~ ~ ~ ~ g ~ ~ . . . . . '.~y ~ . ~ ~ . TORO 264-Q6-04
~ ~ . . . - . . . . . . b : . ~ ~ . . . , . . . - ~ ~ . P~ale thread inlet 6, 9, f2stations~ndrotl~r
by male thread o TORO
. . . \ . . . . . . . . ( Q~ F } . . . . ~ . . :mww+n~m»mmM+,xxrn„:.uwr,~.!axT~n°" . trAmxw4 outlet Wa11/Pedestal mount ~ ( Pedestat mount
i p . f ~ ~a~ ~ ~ oniy on meta! ca6tnet J;
' 1-~.b~~ ~ , Finish grade Gondu?t / Pvc '
~ ' k f~'' ~ ~ ~,~,4.,, ~ , ~ Vai~e box . Valve ect~~'in~ wire
~ , r.., a ; - ~ , * ~r~x~3s~~ ~ ~ ( 24V etectric ) ~
a , c ~ ~ ~ ; ; ~ 0 24VAC solenoid w
~ , ""-w~,~. ~ i ~ `~bi~'~ ~~~'Vs~s~~i ~~G~ bh`""o"~ ..,.~,~«.a.~ . F , ~ ~ infemal / Plug•in iransformer
~„^,w..~.`"`~ ~ !~fi ~ • ; ~ i ~,~..M i~ 1" el~ctric valve V
.,,s^u + % , , , ~y ~ ~ w/ flow con4roll _O lSION ~I CONTROLLER DETAl~.
~ ~ ` ' ! n ~ ' ~~~s~ ~ ~ k~ ~ w g <µ.~,tr.a,~~~„~~»:.«,~ ~.,..,M.~.~;., . ' TORO 254-16-04 NO SCALE
.~.w....ue.:. ~ ,i t . . . a ~,n.,.~.m zs.,au.~:,m,M~.. qw , ~..~:.,..v.~..,n.~.,,a.,C,µ,«..,y..~~. ~~.,~.x..e.. . ~ ~ r . ~ ~ . w ' t RRale thread inlet '
' ~ ~ `i `S~t'C9 ~ ~'~`x~c9 ~ { } ~ ~C` ~ _ ~ } ~ .~_~y,~~.a;~.,~,w,~.~,~.~.~~.m~.~w~..._., ~ 3 ~ r r~C9 ~(~p~~ ~ b}( ~f139f~ OUt~@'~ srAUi~i~nsvsreus ~ 4~ ~
( { ~E ~ ~ ~ ? ~ _ l , ~ : ~ ~ j C, ~ ~"'c,~~ ~'°~~~s f~cr~~s~.'
, ; ~ , ~ ~ ~ ; ~ ~ i : ~ q; , ~~,.,~~,'~~~~~.i , ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
~ y ~ ~ " - ; : ~ ~ , ~ , . ~ ; : k ~ . 7`~ r~ ~5~~ r~~~.~~ ~'~~~a , _ . ~ ~ ~ ~ , ~ _ ~ , - ~r~~~.~~ ~'~~~a~ ~ - _ _
y ~ ~ # < ~ ~ ~ ~ , ~ ` ~ a ~ I ~ ~ ' t ~ ~a i ; ~ ~ _ . ~,~u_ ~ ~ .b, u ~
; ~ 's ~ ~ ~`I ~a , „ , g ~ ~~~98H ~ r~`~`~ +#~~~r,a~ ~tl"t~s~F~ ~t~~ . ~ , t ; a: ; , jt ~ , ~ ; . 0 ATI~ L E T IL
~ Z ~o c~~~; ~g ~ ' ~~q~•~', '~Z C'~~~t t,.,f N SCO ALE
. . . . . ; i '~"~+'~~~4 ~g~..~~~n,~L`it8@~k~4~~fa'~`"a~~ 3 i ~ i; ~ ~ ~ ~ ~ ~ ` ,
, . ~ t ~ ~ ~ ~ ~ ~ ~ ~ r ' ` ~ ( G a ~ -,..M....-- "*~~b~ ~ t ; ~ ~ 3 ~ ; ~ . . . . Si ~ ~ ` ~ ~ . i ~ . ~a~~.~ ~ ~ ~ ~ ~
. ~ . t~ ~ : e ~s r ~ ~ ~
; i ~ ` .~~..a ; , ~ ~ ~
~ ~ ~ ' ~ ~ ~ ~ ~ ~ ~ ~ ~ $ ; ~ 4~
R ~ a ~ 1 ~ < ~a ~ ~
; - i ~ x ~ ~ ~ ~ ~a ~ ~ ~ ~ ~ C,~ ~ ~
~ f ' 3 g ~ 4 ~ ~ ~
1~ ~i ~ ~ ~ } ~ ` ~ { ~ ~ „ , ~ , _ , .~i~~s~ ~ ~g
# .I i ~ . . p{ ' ' ~ . . ~ R ' j ~i . . i . . . i ~ . . ~ ~
~ ~ r ~ ~ ~ ~ ~ ~ ~ ~i , ~ ~ ~ a r ~ ~ ~ '§`~a ¢E b
~ ; } ~ ~ ` r ~ ~ ~ ~ ~ ~ , k~~ ~~~3 C~N~e'' Co~~+
~ ~ ~ ~y` " ~ ~
, 7 . y~ F# . ~:j ~ . . . .,k . . I ~ . . . Go~' tn~ (~LOGIC I;AGqNbprG~' F
t g
~ 3, ~ ~ ~ ' ~ ~ ~ ~ ~ ~ _ ~~D~~TR~A~1. PI4?2~ No, ~ NT R
~ ~ 4 ~ ~ ~ ~ ~
n ~ ~ ~ ~ ~ , ~ ~ , ~ ^ , . 3, - ~ ~ ~ . ~r ~
~ .L € ~ ~ ~ ~ ~ i I~ " ~ F ` ~
~ !L f " r~ ~ , . . ~ ` ~ ~ ~ ' ~ , r ~ ~ ~ ~ ~ . N ~ ~ ~ ~ s ~q v~;~-3~~
~ ~ a ~ ~
~ ~!s s' ~a ~ ` r ~ ~
~ ~ + s I~ ~ N' • 2,0 3 j'. ~y,, ~
~ ~ ~ , ~ ~ y . " t ' ~ n,„~.„~~~~~r.~~~~.~.~.~. ~ k . . ;~s. ~..,..~r..... .~.....w.a,.~:.....~.... ~ . w . ~ , . ~ . . ~ i. . . ~ i' ~ ; r ~ ~ 1 ~ ~
2 ' ~ + ,w '.ra+Gwn++KS.~,v ~wkwu.m.avw.~.~.n'Prcnn ne~s...rvrvi...., i, n+Rr .-.y.t ,ur nn~,)4VVWnm-. vt+~•EK»rvN`ti'+~~- . . , i ,3
, ~ +~..,~,„;r~,,.,, f ~ ~ ~~s~ } ~ p ~ m-,.w.-.~:~ / w ~ ~ f _ ~ p ~ ,
~ , ~ - . x ~ ~ ~ ~ , ~ „ ~ ~ ~ ~ ._....~~s ~v~.".,, .,w,»~.~.~J~~a.„,~~ I ` ~ V~ ~ rc....r a A~f $'4R'2(4°~ p/J ~ ~ . . ~y . ~ a ~.,.:t-...e . ~
~ , , . ~ , v:,. , . . ~ ~ ~ ` y ~ - ~ ! . . ~ ~ ~
I ° ! , ~ ~ , ~
( ~ ~ ~
* : ~ } ~ ~CA~~ ~m~~ ~ ~
; ~
t r
s , ; y °
,
1
~ ; ° ~ GD~ A ~s' ~AZGoNS 1'~R ~trnv~e
, ~ y~~,~ ~ ~~~.:~~~~~,,,~N.U.~.~~,w . „ ~wv,.~n~,,,~~.~.~.~.~~~~.« , "'^y»...,..~e~ ~,a~„,~, ~ ~ w,~ h~ ~J~V~w ~
~ Mu~.~, ~ ~ ? u ~ ' , : ~ ~ ,~°,.r, ; ~ ~ ~ ~ , ~ ~ , :
~ s::~.~~.~, ~..,,,a. ~~..~,~~.~~~...x . ~.~~,.;f ' ~
~
~ PROJECT: SHEET N.
~~~a
,
w
DFtAWN BY: ' ~ OF:
CHEGKED BY; SHEET
TITLE; .~'~p~~ JOB N~. ` DATE: ~
_ a~~;,
~
. . . ~ . . ~ ~
. . . ~ '
---~A~onual bb~ed ~
---t" elecfric valvo ~ ~ ' I: ~ w/o fbw cpntroll '
TORO 26d-OB-OR ~ ~ Finish grade
~ ~ Male thr~ed inlet ~
by male thre~d - Ratcheting rlser
, ! outiet ~ ( 57'OC•3P onlY ) ~
Finish prade ( 570C~9P only )
s ~ : r ~ ~ ~ ° TORO 570 sarles
~ , ~ -~Vaiv~ box Y, fixedspraysprinkler
C 'sa w! posftive ~pring ~ 24YAC e~lanold ~ retractfon ~
w,.,..,, ~ ~ Cut otf rlaer ' od 1" ~lectrie valve ~ Fitting (eetldl~, or
~ .,...~.~..M~. ~4 wl flow conlroN Insert fitting) '
. . i . k.yrynV^uay 1'~w ..u~~/'?~i ..?^'~~kv/•htl .«~r .~w. . . . . . . . . . . . . ~ ~ ~yM .w . . q . ~1' ~`n».~. ~.In . ~.W,We~Y ~n«rr^~.~.wm, . . . . . . . . . ~~M ur " r d ?ORO!264-16-04 s Pipe ~ ,
. ~ ~ . . . ~ „ . ~~~w'dx~r,m°N ~r w . . . . . ~ . . ~ . .,....--.,,F..-....~ a , . • tNr..~. . wa;~ . ~ ~ . . . . . ~ , .'r~"`.gy^~'*. ~~..w.~wro+: w.~.,.... ~ . . ~ _ "`i+„sr.,.g~ . ' _ $A«w,~,.°~"•1,r,-.r. ~ Male thread inlet ' ~
~ ~ ~ . ~ . . . . ~ ~ ~T..r..- r " ~ " ;..~.e„,.,. . ~ . ~y ~ ~+w*~,.~,,,~ ~ . . . . , ~ , by Insert outlet ~ ~ ;
. . . ~ . .J . ~ ww+~.w+ww~.w~ ""u""."^+'~,~,,r. ~ ~ a' . ~ ~ ~ 4 . w..._. _ 3 .,.~..~k ~ ~ ! ~ ^~w 'mg ~ ~ ~
, . , . ~-.....~r. . . ~ ~ i . ~ T~?w,r~...,a,.1""""`R...er.«w.~.*TM.rwi"<'~'!smM~.'.'.p"`~. ,"'4..w. ~1 w an a~,wuk.,1 , X ~ i . . , . . . ~ . r , ~ . r . ..e ` . . " ^'~»~«o~"°~""'i~`n...,..,Wr „ ~ . .
. . ~ ~ ~ . ~ ~ .r q ~ , . . . , - . : . :j,:' . ~ . . . ~ ~ : '~,.t'"'' q ~ _ 57~ 4NST ~LpTI ~
~ ~ . ~ ~ ~ ~ ' .~,F.„ ~.~,~-^~...M...,._.. ,~_.«,n.p,rM.....n„......w„m. ~ ~rr ~^v, ~.M«. ~ DETAIL No sca~e
. . . ~ . . . . t C . r ~.F' } .y ~ «.w....,°..~-°•.~..,.-~.M.F-m.m.«. , . ~ . ~ ~ . . ~ . . . . . . . t , ~ . ' ~ . . .
. . , . •a~.....~..,.~ ~ rw~ ~ ~ . ~ . . . . . ' ~ . . ! P! ?M!N++4vw 4.k~°f^+"'?% ~.w~~ ^ py~ FUi . . . / y,wn.~...,,.~~eriix~+.«~.,.~xnw +,'~~+s.iw~w, ~,P+S~~;Pdp ~ ~~'~C 1~A~.V~ ~~'AIL ,~~~,,.E~,s~a,~a ~ _ x ~~A~~ , .
~ m~,. . . < . . . . . . . . ~ . ~ . . ~ r r . ~ , .w~ ~ . . . ~ . ' r ' ~ , , . ~ r ~ " . ~ f ~~7 . i~, 9 ;
~ ~ ~ ~ ~ ~ ~ ~ r'~~ ~ ~ ~ 1~~` ~ ~ i t,,a ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
- i ~ 5 t ~ ' ~ ~,.'.,;,.°`„,.a , ti . . . . ~ ~I ~ q~~l . . ~k . ' . f~ ~ 9 _ ~
~ ~ . . ~ ~ . . . . . . . . . . . ~ . . 1 ~ f: fi/~ ~~A ~ . . ±i ~ ` ' ~ ' ~ . ~ ~ ~ ( l i d~ ; , Y ~ ~ ~ ~ ~ ~ ~
~ ~ ~ - ~ ~ ~ ~~.~1 ~ ~ ~ , ~ t i r ?m~...+ _ .
~ l~ } a Q ~ ~ i f , . . ~ i ~ , . . . . ~ ~ . . . . . T ~ ~ ~ l T4i?D Intloor / nutdoor
I ~ i . ~ ~ ~ ' ~F~ , . , s@~ . . . ~ ~ ~ 11 ~ i ~ ' , i . - . . ~ automatlc contrafler ~ ~ ~ ~ ~
~ ~ ~ ~ 1 . . . ; . . ~ ~ ~ , , : ~ . `
. . . 6~~. . , ~i,;..,i . . . . . . . . . . ~ . j • 1 l ~ : t,' ' : . ; . ~i ~ ~ ~ . . ~ . . I . . ' ti ~ , , , Piastic/Metal cabJnat
~ ~ F d ~ d r~ ~ ; ~ ~r ~ ~ ~ ; . . , ; F locking covar w/metal cabinet ~ ~
; ~ i ~l ~
I; f, r , i 1; ~ ! ' ~ ~ i 6, 9, i1 stadon controller
~ ~ ; : , r , , ~ ~ ~ ~ s , ~ ~ ; ~ { 'll~lto ~ j ~ W~UI Petlasta! mount
~ ~ r ~ , ~ k ~ ~ ! { Pede~tal mount '
~ ~ . . . . , ~ . ' i3~:.. ~ '::'t ~ i : . . . . . . . . ~ . ~ i.'~~:.:~ . . t~ ~ anly on met~! cebinet )
, i . , . . F . , ~ . ~ .~I . , . a ! rt~tf ~ ,~.4 ~ ui 6;{ i . :iU.. j" ~ :r i ~ ' ~ . . ~ . . . ~ d . . a ~.n • , , , ~ ~ 3c to-~5~;u~„~`d1' ° ~.tEJ~w,i,a.o,.wC ~.4u~.s.s9va.~s~.~ ' i .,9_..6, '~+~.:S.e ! ..~.WVwu ~.~rL.a'`.:~..as..v, ~.rs~.:.4?,~.~.-.~.?„,~.y~~ d ..~my,.,.~{.u,..,,,krvww.v,:swau....,..~~.a..uv~. c . . . ~ ~ . . . . . . . . , . ~ . . . . . ' _ ? ' ~ CanduJt l Pvc ~ ~ ~
~ ~ ~ ~ ~ . , ~ ~ , 1 r Vefve ac~uating vrlre
~ > > ~ k ' ' @ ;(?4Vel~cbic) '
~ ~ ~ ~ ~ ° i~ o ~ ~ _ ~ ~ . ~ . 'Yk..;~ ,t~.! . '1„ If ~t, . gF~ )d 1 q•~ rF ,i L ~1 }}1 ~ { ~ 1
. . . . . . . ~ ~ . . d ~ t-~Y/'ry ! X . ` ~ . ~ ~ . . . . . : ~ 1 . ~ ~ t . . . . . . . ~ ~ . ~ ~ ~ . ~ ~ . ` ~ ~ ~ ~ ~ ~ IntemstlPlug~ln fr~nelcrmor ' ~ , ~ , ' k
a + f " 4 t , , ~ _ ~ ~ ~ ~
5, , ( ~ . [ ti,' ~ ; ~ . ~ ~ t , . . . , ~ ~ ~ ~ x , ~ . . r : ~ _ . . . ,i~~ , ? ~ s . z ~ , ~ j # '.I f r ~ ~ ~'~~~01~ Il CphlTROI.l~~R Q~TAI~. ~ ~ r M _ ?.''r ~~~at F-,,...._..._..~ _
y . . . .':.i~ I ~ ~ F..HI r . . . . . ~ ~ ~ 6 k x ~ ~=J; E' . ~ } : ~ 3 .~d i
. . . i3~ ~ ; 51 t ~ ~ t . . . . 'y . . , 1.~~ S k ~ ~ . . ~ ~ . ~ t 4 t . . ~ ~ Rp~,~^ 1' ~ ~ ~ ' a ~ ' ~I i ~ ~ @. • ~ j ~ ~ ~ ~ ~ ~ ~ " ~ ~ . SNkaKi1~NA a1GWA ~ " ; ~e,. . ~ i ~ . .,k
~ ~ ~ + ~ ~~s`~du ~ a~ ~ ~ , , i ~ ~ ; ~ ~ ' ~ , t . , ~ - ~ p , , _ , , ~ ' ' , '""v~*~an . ~ . ,'~~t a k x ~ , ~ , . a . . . 9 ~ , . . . . ~ ° ' ~ i~ , " ' ~ , . "t~ ~ . ; . t ~~y,ft : 3! ~ J _ _ . k r
. . . ~ . ~ ~ . , . . . . . . . . . . mt u ~r~, 1 .~"~.::d . . 1 ~ . . . . ~ _ ,
~ ~ ~ ~ ~ ~ ~ ~ ~ ~ P' , u s, ~ , I ~ i~ i ~ . ~
~ ~ ~ ~ ~t~ ~i 1, ~ ` . . . ~ jy . ~ ~ . . r~ r `i , a, ' + + ~ ~ i ~ , ~ x': ~ ~ ~ I.;Y t .~~~~i . . ~ . . ~ .
. . ~ ~ ~ 7 ~ ' . . . ' . ' . ~ . . . . ;p z ~ ' I . ~ t ~ . . . . . , ~ : p e d ~ ~ d ~ ~ . . . . . . . ~ . . ~ ~ ~ ~ f ~ . ~ . . . ~ ~ . ~ !~f
. . ~ ~ ~ ~ 7 r.: j t ' .~..?~~1~' ~ , . . . i ,i } ~ ~ ~ ~ g ~ , ~ ¢ry ~R,,Q.~~/ro+['I'A~q,~ ~e'~. ~T ~
. . ,4 i Y~ i" 4~'i , , . > ~ ~ ! ~ r'~ ~ f t . , , n ~ . ~ ~ ~ ~ . . . ~y,~~ "C ~ ~ . ~r~ ~justment {
~ ~ ~ ~ Y ~na d ~ i I~~ f r . . . - . . 67+ ~7~ ~ ~t l F ,,p, .1 ~ ' ~ ~ l.zS , ' ~ ~ G . . , ~rcJ~w~af~ . 16 N v~rtatlnna
. . ~ , ~ ~ ~ , , ~I ~i~x ~ i p ~S . . . . . ~ `Y, ~ ~ ~f _ ' ~ ' ~
, , , ~ ~ ~ . . . ~ . ~ ~ c Rr . ~ v ti. - . . . . . . . . . . , ~ ~ . , , ~ . ~ . . ~ . I~ ~ r ~ , `~ti . . . ~r ' ~ . u i ~ , ~ . . . . ~ . ~ i r v , ~ ~ ' T'oTd Via~*? T ~..t~reter ~ ~~N~t ~ sl~n~Ar6 tosat;~l~l~ ~ , , ~ ~ y 9 lo~ tt~ai~ ' r ~ li~. I x t~~... I
. . . ~ f r Pa .ii ' i '1 . . ~ . . . . , ' ; , ~ ' ~ ~ . . . . . . . . ~ . . . . . . . ~ . r . S I i . i ? ~ ~ ~ y ~~r ~ t ~ ~ ~ ~ ~ ~ , ro~a s~~ ~
~ i . , . . ~ . . ~ ' . ~ i . F E , ~ . 9 ~ + R . , . , ~n~,`." 'i`3 .7"~~-~ ~ ° ~l~~l ~'r~ ~a~l~'~ ~ ~ ~ Pl~ticl~ommarci~lri~er ~ ~ ~ ,
. . . . . . p . . , , , i ~ ~ o 3 ~ ~ . M . . ~ § ~ r , ~ , Yy 6 . ~ . . . i l ~ . . . . . . ~ ~~~k ~ . ~ , ~ ~ Y;,, ~ y I . ' ~
. . . . ~ jr. f . . . . ~ ~ _ ~ 1 i5d r;~ ~ it . . ~ . ~ ~ ` , ~ ~ ~inr¢~~ ~ p~ ~ inlSh gfade ~ t ` ~ ' '(^m~-o~ 5"~~ Z ~iv~~C3 ~~r v~9a~"~ t ~ ~ '
. . . . ~ ~i , ~ . . . ~ ~ ~i ; . . y ~ . . . ' ' .~..j' ~ . , t' , . , ~ . . . ~ ' . . ~ . , t . . ~t ~ A ' ' ~ t ~ " ~ ~ ' , ,ce« , ~ ~ ~ "~"a~o 5 °l04 ~,,~'~r~~?~..~1 ~ed~~ 3" Pop~up stroke
. . . . . W ~ . . ' . ~ .i. ~ i. . . . ~ . . . ~~.:.'i . . . . ' . . . . . ~ . = t ~ ~ ~ Cir ( wlposltive spring
t . ~ ~ ' t _ • . I ' . f ' . . . t ~ ~^ri - ~ if., ~ . . . ~ ` ~ ' ~ r i I retraction J ~ ~ ro ~f~+~~, ~'rad~~ ~~~~t~ '
~ ~ a ~~:e ` ' ' ~ " , i 1 F ~ I ~~i i~, TORO S7Q0 series >
( t I, , ~ , ` ! ~ ~ ~ , ~ ~ , . t ~ ~ ' (~1 '~~4 ~~3b~. t~ ~ ~~1~, -1~'° gear driv~n Bprinkler
~ ~ ~
~ ~ ; ~ ' ~ ' ~ ~ . . N . , . . . j'. . . . . , ~ -i N ' ~ ' . . ~ :y' . ~ ~ f. r
, . ~ ~ y, . . . . . . ~ . ~ ~ , ~ ~ . . 4 . ; ° ~ ~ ~ . . ~ i . : . , ~ ~ t Built•in checkvalve 1: ~ ( 57tI0C onlY I
. . . , . i ~ ' ~ . ~ . . ~ . . ~ ~ ~ ~ . ~ ~ , . ~ ` ' ` ' . . . , , . ' . " , . . . . . . . . . . . ~ . - . . . ' . ~ ~ . : . ' ' . .
F u~»~ k `+u,:.ar4: ~ ~ " ~ - ~ , y , , j Cut off ri,a~r ~ ~ ~
~ ~ i ~ , ~ " " " a, , i ~ ~ ~ ~ , ~ ~ ~ ~ . ~ , ~ , 13 ~ 4~ Fittin~ {]nsert 1 saddle ) j
' . ' . ' ~ " ` , ~ ~j F4 . ~ ' . .`r ~ .'i. . . . . ' I. • . . ~ t . Y . i~~ ' ~ ~ ~ ~ ~ l/'~' a ~ ~trG?t. C ~Ot~ ~
. ~ ~ . { . ~ ~ ` . . . . 1 . ~ y ::~I ` ~ . . . . ' .i, 'n~, ! ~ ` . ' ' . ~ . ~ , ~ Pipe (Pvc! Poly.) : x~ ~ ~
~ .c . . ~ ~ y . ~ . YM1`0evn.Q~'q n~.h'M~h+~?'fi?~!y'~.""'~""}r+m*...w..+~mry'(~,"PlRn ~ .~r i f . ~ : , . ~ f Y . . . ~ . . _ Ir
. s " . , ~.1 ~ j . . . , e r . , . ~ 4.n ~ -~e. ~ ~ ~ ~ . , ~ ` L r, ~I, ~3 L oc Q~~' ~ N p ~ ~ ~ 1 l~ a ~ ; : ~ . ; C' ~'~I T`~12 l~du~s~Mt~l ~'A~e~ No. j ~
~ , , „ • , . ,L . . r'.n . . , . ~ t ~ i
. . 7 . ` . . , ~ . . ~ . . . , , , ~ , . . ;v~ ~ ~ ~ ~ . E . . , ;
~ _ . . - i J 6,r+" ~ ' ~ ~ . 1 ~ : ` ~ ~700 ~ sT L~.~ ~ .
, . I Q a ; , . . ' ~ ~ ~ 1' y} ~ 1~ ~ . . . b ~ r ~ 'M~!'A'hM, MPIYP -N~~i . ' ~N l~~~~ . . . . _ . i1 ~ ~~TAI~, ~D~~AL~ ' ~ u~
. . .~1`1 . . / . . 4~: ~f, ~ ~r , , , r, ° ' ~ ~ . ~ , : ~ ~ . z ~ ~ , . , ~ , , ~ ~ ' ~ bPRU1Nt8fl6PNY&4m ~ .
, { ~ ' ~ . ~ ~ ~ . A, , . . ' a , ' . . ~ . r.~' ~
, , . 1, ' . . . ~ , ~ ~ ~ . ~ ~ e M1 : k~ .
~ i . ~ ` ~ , ~ r~r~~ ~ ~ ~ ~ ~ , ' ' ~ r~.
. . 7 l ~ ~ ~ ~ ~ ~ ~ ~ y , y . ~r ~ , ' ~ ~ . . , . ~ f a, , S.x,;~ ~ 'n,. ~ . . ~ ~ . ~ ~ ~ ; , i"~ . . ~ ~ . . + ~ . ~ ~ . . , , ~ ~ , ~~$p ~ Z 0 ~
~ '1.+ ~ { ' r? i ~ : ~ ~ , ' a j n ~ 7 . r „
~ ~ . . ~ - . . . . . . . e: t . ~ . . . . . £ ~ ",hA ' ~ . . ~ ~ . . . ~ ' ~ , s . . . . . . . . ~ . . . ~ ~ . ~ . . . I , . i i9 # , + ~ ~ ~Z~~~~~~~
. . ~ ~ . . ' ~ , . . ~~4~'. ~ ~y. ~?r°•-'~. ~^`e~ . ~ ~ ,p+:, ~ ' . . " „ . . ~ I . re _ , e , , , k~,~„, a,~ ~ ~ ~~`~,~rr . ~ . . ~ . . ,
~ ~ ~ 1 ~ ~ ~ ~ , ,„,tPv ~,r~~ri . 'r'~, . ~ , ; g ' ~ ` ~ ' r~'° ~ i ~ ~ ~
~ ; , r , ~ . . . . . . ~ . . . . ~ . ~ , . . ~ . . . ~ r ' . :~r ~f: . . . . ' ( ~ ~ b ~.,x ~'1R~ ?S Gn~ ~ ~41 ~ ti Z5'~ p~l~
, . . ~ e . . ~ . F, , ~~+wr~.~ " , ~ . ~ . ~ ~+*eM ~ ~ . . .y~ ~ z'~ ~ ~i..,-,.. . ~ . , . . , , . ~ s • p ~ ~,ZS n
h~mxr+-...-ar-+ti,rA... ~'~A ~y.~;'. ~ „ . . , , . , ~ rczF ~ ~ " , . . . . , ' ~ ~m+ rn~a~,+~ , t ~ . a~ "t , R ~ ~r, ~ ~ ~ " ,~~`r"R 6° ~ h ;i~ ~ ~ , ~ 't tMfJMe H r . i~., . . - ~ ` . ~ . ~ ~ } _ ~ . ~ . ~ , . . 1.., ~ . . ~ . . - ~ ~ ~ , . ~rK~l+~+~ `~*~rm~+~,.~,~ 7 ..en.,~„,R,a~„n,riw*°7+,"~„~,n~ }~~1Wa(~"~o,^" . . ~ ~~rr , ~,p
, , ~ . ' v , . , ~ . . - mr . , . . . ` Y ,~,.~,,,m~ ,1: ~ ~ i,` > ~ ~ , , . . . s , . . , : ~ e ~ ~ ~ ~ ~ ; '
~ . . . ~ ~ . . . , , ~~~i . . . . ~ . . . ~ . y- . ~ ~ . ~a ~ ~ ~ ~ . - , , , ~ p.~. ~ , ~ a i ~ ~ ~ - . . ~y , ~ . , . . . . . . . . . . . . t"'.~.~*~+'e"+ . . . . , . . . . . . . ~ . . . ~.a. ~ ~q , . r.-. ,r. . ~ . ~ , . ~,i , . ~ . . . . . . . . . . . . , ~ ~ . . . . , . . . , . . . . . , . ~ . . . . . . . . . . . . . ~ ; ~ . . . . . . . . . . . . . . . . . ~ . ~ . . . . . . ~ . . . . . . . . . . ~ . . , . . . . . . . . . . a~ . I.. ~ . ~ . . . . , ~ . . . ~ . 6~ : . . . . . ~ . - ~ , . : . ' ~ ` .r"r .,y , ~"'r.ar,~r. ~ •a!~aum»vs+,~mwMam~+w~l: . ~ ~ ~ . . . . , ,i*~ ~ . ,Y . y ~ "1 i k ' 4 ~i ~ c~ t~ , ~ ~I r
q . 4 . , . ~ ~ .r~ . ~ 1~ ~ ~ ' ,a~ ~y- ~ N~~r~ nt' . ~ ~ ~ ~ ~i ~ W . ~ : . M'~ ~§~n~n" ~ ' ' ~ 5.,i' ~ ~r . ~ J' T M1'~ A' ,p i , . . - ~ , . .yer. •t-~ ~U :t ' ] ~ . " ' w° a p ~ - ~ . } ~ . . , ~ " ~ ~,,r . ~p , E a . . ( t , ' ;
. ~ . . } 'S „r r ~u , 9+' ~ , ` . , ~ , ~ . . . . . . . . . ~ ' , ' ~''R.' . M~" ~ t' . . , . ` ~ ~ • ~ ~ ~?t~,+. ~ ' i ~ ~ ' ~
' ~
, , , , ~ ~ , , . , PRINTS REVISICINS " _ „ ~ , : ~ ~ ~
~
~ ~
~ . ~ v~l ~ ~ I ~ i ~
~ , , , ~ ~ ` ~ ~~,~~fi~ ~a ~ ~ SN~~TNO.
~ 1, , , , t t51 t s ~ ~ . ~ t ^ qai,rl p , ~ r ~ ~ ~ ' ~ ~ 4~~~, ~b ; ~ „ . . ~ ,xr~ ~ ~ wp~ ~ ' a ~ ~ , ~ >
; ~ . ~ , . ' - _ ~ , ~ f ~ ~ t `
zrg , . . . . . . . z rc ~ .7r' il ~ ~ - . av . . ' J. . . } . . : , i , , b a ,r a , . ~,i r<~t 1 . : " AWN BY : - y~+ r~YM~' "i , ~ r ; ~ { 5 i ~„J lt m ~Y3 s ~ t ~ ~~a > ~ ~ ~ k , t f N ' ~n~~~{ a+~' ~ t~` r ~ , ~ ~ ~~yl~~E~~ "~~~1.; r
y~ I ' ~+KELl r 7,1111 ( i ' 4G~ a,~ u " ~ s ~ '~i 1~; m. ~!~'fl~i~~~~~~ ~f tt~ y ~ ~ . ~ ~ ~ ;tef~ ~ p@ s ~ i~~, ~1 ~ ~ ~ rr~ ^~~E".~ i * ~ J ~ ,k~~~~' ~ ~ x t~ Q ~ : . ~ ~ -
~y. . ~ F 4+~.. ;r C~]:f . a. , ~i t 's" ~ , ~ ~ u~ ; Y . ~3, 4~g ~ ~ ~ ~ s~~~r ~
~ . . . ~ . I . ~ . , , Y.. .i....,., :1 . n, ~ „'I. ~ . :6 ~ . i . . . . . . . e~~ . . .M1 . , ..~?[a.~ lSl... .t, . r . ~ 7~ i . . . . . , . ,Yip. cn.. . . , t 6~ ~ ~ ~ ~+~~1" ~ ~ ~ ~va~ ~ ~ ~ ~r ~t ~ ~ u~ ~ ~ ~ ~ ...P ~ s~ , ~ ~ , ~ TITi~ ~if~Ct,I g~t,~~ ~ t~f~ Jp8 N0. ~ ~ ~ ~ ~ ~ ~ G ~Y
y = y . . ~ , . L~' ~ ~ a ~ t ~ ~t ~~d c ~ p ~ ~ rS3~J'~ V ~ i ~ I ~ ~ ~E "9~ A~~~'~ i ~~I~z~~' a ~ ~ . }a ~ t~,'~' ~~''w,t . ~'~~~~.`~E.~ ~ ~ ' ~ _
_ _ ~ ~ ~ls..~t'~`~'"~ ~ ~ ~ a t ~'+u' . ~ . ~ ~ ~ e ~~~6ii~ ~ ~'~~G' ~ ~ ~ QA~~ ~ ~ , , _ ~ , ~ ~ . . . ~ ' ~i
,)do �j o32-94
g6c)d-
11'
ChC-c+L
C!tyofaall iso �'la�s
3830 Pilot Knob Road
Eagan MN 55122
Phone: (651) 675-5675
Fax: (651) 675-5694
Use BLUE or BLACK Ink
For Office Use
Permit#:
Permit Fee: 0 �Z
Date Received:
Staff:
L
2016 MECHANICAL PERMIT APPLICATION
❑ Please submit two (2) sets of plans with al commercial applications.
Date: O I ' o� 2016 Site Address: v [C�3 C
Tenant:
Suite #:
Resident/Owner
Name: OCi. ^6(4. i\C. Phone: 65/ / " ' ft / 7(Z
Address / City / Zip: 1(03 (e.--%,. C -6 -s2 -T" L" act,` , 1/4 a 5542/
Contractor
Name:
e t ' ' iti _:',Act.. , C� � License #:
Address: )5 r t".W Ai- dr, City: - O Tvv S f j c
State: Ni Zip: S-450 1 3 Phone: (P S i -al 92 - c/C/33
Contact. f ,e 8eGk(0 - Email: S ,YI E'c" cz`,- 46 -' ''CJ -C vt--1/4-
Type of Work
New Replacement Additional Alteration Demolition
[
Description of work: 7 --P1q' ce 2- e'tcN-:, )0 rc i nctc.ka jed 21'u `,lt• - Si Z -
NOTE: Roof mounted and ground mounted mechanical equipment' is required to be` screened by City
Code. Please contact the Mechanical Inspector for information on permitted screening methods.
Permit Type
RESIDENTIAL
Furnace
COMMERCIAL
New Construction Interior Improvement
Air Conditioner
Install Piping Processed
Air Exchanger
Gas - Exterior HVAC Unit
Heat Pump
/
Under/Above ground Tank ( Install / Remove)
Other
_
RESIDENTIAL FEES
$60.00 Minimum Add or alteration
to an existing unit, includes State
includes State Surcharge
Surcharge
= $ TOTAL FEE
$100.00 Residential New,
COMMERCIAL FEES
$60.00 Permit Fee Minimum
includes State Surcharge
call for Surcharge
Contract Value $ ,' 73S x .01
j
= $ ` 15 1 3 5 Permit Fee
$75.00 Underground tank installation/removal,
Surcharge = Contract Value x $0.0005
If the project valuation is over $1 million, please
= $ 1 - 57 Surcharge
_pp C,
= $ j S - TOTAL FEE
I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of
Eagan; that 1 understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance
with the approved plan in the case of work which requires a review and approval of plans.
x j
174 vie 4_x e /i Loci
Applicant's Printed Name
FOR OFFICE USE
Required Inspections:
Underground Rough In Air Test Ga
plicant's Signature
Reviewed By: '"'" ` D
Service Test In -floor Heat .
Final HVAC Screening
06/06/2018 14:57 FAX 7634165731 Egan Company lj001/002
For Office Use
. r
•
::::
EAAN
L9
3830 PILOT KNOB ROAD p EAGAN,MN 55122-1810 Dale Received: 1'/E
(651)675-5675 I TDD;(651)454-8535 I FAX;(651)675-5694 Staff:
Plan Submittal;epiansj&citvofeagan.com L
2018 COMMERCIAL PLUMBING PERMIT APPLICATION
❑ Please submit two(2)sets of paper plans with all commercial applications as well as an electronic set of the
submittal,submitted via email,CD or flash drive
Date: 5/31/18 Site Address: 2963 Center Court,Eagan,MN 55121
Tenant: Blanda,Inc.
_ Suite#:
Property
Owner Name; Blanda, Inc. Phone; 651-688.9510
Name: Egan Company License p: PC001010
Contractor Address: 11611 Business Park Blvd N City: Champlin State: MN Zip: 55316
Phone: 763-762-5601 Email; cje@eganco.com
Type of Work New _Replacement _Repair _Rebuild Modify Space `Work in R.O.W.
Description of work: Install new RPZ for utility sink per city inspector
COMMERCIAL _New Construction Modify Space
_Irrigation System yes/_no)(L_RPZ/_PVB)
• Rain sensors required on Irrigation systems
Permit Type • Avg.GPM (2"turbo required unless smaller size allowed by Public Works)
Meters Call(851)675-5646 to verity that tests passed prior to oickind uQmeter,
Domestic;Size&Type 112' walla Fire: 1
Avg.GPM High demand devices?_Yes No Flushometere_Yes No
COMMERCIAL FEES Contract Value$ x.01
$60.00 Permit Fee Minimum =$ 60.00 Permit Fee
$60.00 PVB/RPZ Permit(includes State Surcharge)
Surcharge=Contract Value x 50.0005
$ Surcharge
If the project valuation is over$1 million,please call for Surcharge =$ 60.00 TOTAL FEE
Following fees apply when installing a new lawn irrigation system $ Water Permit
Contact the City's Engineering Department,(651)675-5646,for required fee amounts. $ Treatment Plant
$ Water Supply&Storage
_�.__ ___ .......... ......_..._____ .._...._......._.—...._..._::_.._._....._w...........__._. �...- $.......... �._._._ ._. State Surcharge
_5 TOTAL FEE
You may subacribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City'a website et
www.citvofeaoan.comffubseribe.
CALL BEFORE`f:4ld In. Cell Gopher State One Call at(651)454-0002 for protection against underground utility damage.
hereby acknowledge that this Information is complete and accurate;that the work will be In conformance with the ordinances and codes of the City of Eagan:that I
understand this is not a permit,but only art application for a permit,and work Is not to start ' out a permit that the work will be in accordance with the approved
plan in the case of work which requires a review and approval of plans. +
Christy Erickson x EtierWA--
Applicant's
Printed Name App icant's nature
FOR OFFICE USE Approved Sy: Date:
Required Inspections: Under Ground _Rough..In Air Test _Gas Teat _Final PRV Required: Yes_No
Meter Related Items: Meter Size Radio Read Manometer Staff:
Page 1 of 3
For Office Use---------
I
Permit #:
Permit Fee:AGAN
I 1
JECIEI 1
V� I Date Received: 1
3830 PILOT KNOB ROAD EAGAN, MN 55122-1810 I I
(651) 675-5675 TDD: (651) 454-85351 FAX: (651) 675-5694 1 Staff: 1
buildinginspections(a�cityofeagan. com DECCl• ��� L _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
1230401-R
2018 FIRE SUPPRESSION - MIT APPLICATION
Date: 12.5.18 Site Address: 2963 Center Court 55121
Tenant: Blanda Inc Suite #:
❑ Requirements: 2 complete sets of drawings and specifications, cut sheets on materials and components
Name: Phone.-
Property
hone:Property Owner Address / City / Zip:
Applicant is: Owner Contractor
Type of Work Description of work:
Contractor
Construction Cost:
Name: Ahern Fire Protection
Address: 13705 26th Ave #110
State: M N Zip: 55441
Estimated Completion Date:
License #: C039
City:
Plymouth
Phone: 612.8 4 3 . 3 217
Contact: Stephanie Pembertc0,ail: spemberton@ahernfire.com
FIRE PERMIT TYPE
X Sprinkler System (# of heads �)
Fire Pump Standpipe
Other -
DESCRIPTIO �3� X mmercial
T�e�'ic enc" y Correc"rions
FEES
$60.00 Permit Fee Minimum
Surcharge = Contract Value x $0.0005
If the project valuation is over $1 million, please call for Surcharge
$100.00 Residential New (includes State Surcharge)
3/4" Fire Meter - $290.00
WORK TYPE
New Addition
Alterations Remodel
Other:
Residential
Educational
Contract Value $
=$ 60.00
_ $ 0.35
_ $ 60.35
_$
_$
700.00 x.01
Permit Fee
Surcharge
TOTAL FEE
Fire Meter
TOTAL FEE
You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's
website at www.cityofeagan.com/subscribe.
I hereby apply for a Fire Suppression System permit and acknowledge that the information is complete and accurate; that the work will be in
conformance with the ordinances and codes of the City of Eagan and with the Minnesota Building/Fire Codes; that I understand this is not a permit, but
only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work
which requires a review and approval of plans.
x Stephanie Pemberton x SLP
Applicant's Printed Name Applicant's Signature
FOR OFFICE USE
REQUIRED INSPECTIONS
Hydrostatic
Trip
Conditions of Issuance:
Flow Alarm Drain Test
Pump Test Central Station
Rough In
Final
Permit Reviewed by: r� -�'' Date: /G2, ! l l �J