Loading...
01/05/1989 - Advisory Parks & Recreation Commission MEND TO: S ADVISCORY PARKS & RECREATION C-: - I FIM: EM VRAA, DIRECICR OF PAM " nATE: JANUARY 3, 1989 RE: CONKISSION PI - JANUARY 5, 1989 The regular meeting agenda will preceded by a brief awards p of thanks to the Park Rangers/Police Explorers. Their efforts t 1s st year, the recent discovery apprehension of individuals tryLiq to dismantle the aluminum bleachers at Goat Hill Park, are appreciated by staff. Unfortunately, this will the last meeting for Bob Porter. Bob has chosen not to seek re-appointment to the Commission. Bob was first appointed January, 1986, for a three year term. We thank him for his time, energy and contributions to the Eagan k System the Community. PROPOSAIS .DEVEIDPNENT There are two development proposals; separate reports are included for commission review. The first proposal, Coventry Pass, is now being revised by the developer from t is shown in the report. This department I s analysis of the proposed park in this plat was given to the Planning Commission for their Decenber 22nd meeting. The Planning Commission deferred action for sixty (60) days, pending review by the Parks & Recreation Commission. The City has now notified that Northland Mortgage will also involved the plat and there will changes made in the proposal. The Commission should still review this plat for consideration and direction on the location of the proposed park. Town Center 100 - 7th Addition, should reviewed for trails dedication. Town Center 100 previously fulfilled its dedication, as part of the PUD agreement. OTD BUSINESS Parks Superintendent, John VonDeLinde, has prepared an update on the water quality report. John will provide a brief verbal overview at the meeting. The Co mission has requested the development of a "philosophy statement" on the Community Center. Please review the enclosed draft. You may wish to prepare revisions for presentation to the entire C ission. NEW BUSINESS At present, a City well is being drilled k for the south well field. At staff's request, the design of the well house structure has been modeled after the other park shelters, Rahn Park particular, material and design. Staff would like to review with the Commission the building plans for comment and recommendation. A neighborhood meeting is also scheduled for January loth. OC14MUNIW CENTER UPDATE Staff will update the commission on the Community Center, which is now chiefly "informational campaign" to the Community. However, staff is working with O.S.M., Consulting Engineers, preparing a preliminary engineering report on the site work; this will completed by the end of January. A review of Consultant Management Services, regarding a construction manager, is now being studied. If the referendum is successful, this work will have been completed, allowing progress on the Community Center, 2nd phase, to move along without untimely delay. ar= BUSINESS AND 1aTQWS There are several brief items that staff would like to bring the commission up-to-date on, including the Departuent's Happenings, Pilot Knob Park lights, new hirings, just to mention a few. The end of the year has usually meant a "year report" or over-view of the department's achievements, as well as areas of growing concern that require Commission and Staff attention. However, the department's work load, activities, Community Center, etc., have taken a higher priority and been extremely time consumptive. Consequently, there hasn't been time to prepare a report for this year. See you on January 5th. Happy le, Y ! K Vraa jbls Enclosure AGENDA ADVISORY PARKS AND RECREATION COMMISSION EAGAN, MINNESOTA Thursday, January 5, 1989 7:00 P.M. Eagan Municipal Center A. Call to Order and Pledge of Allegiance B. Approval of Agenda C. Approval of Minutes of Regular Meeting of December 1, 1988 D. Park Ranger Explorers Presentation E. Development Proposals (1) Coventry Pass - Frontier Companies (2) Town Centre 100 7th - Federal Land F. Old Business (1) Water Quality - Update (2) Community Center Philosophy Statement G. New Business (1) Evergreen Park Well House H. Parks Development I. Community Center Update J. Other Business and Reports (1) Department Happenings K. Adjournment Subject to ao roval MINUTES OF A REGULAR MEETING OF THE ADVISORY PARKS AND RECREATION COMMISSION EAGAN, MINNESOTA U R~' 5, 1989 A regular meeting of the Advisory Parks and Recreation Commission was called to order at 7:00 P.M. on Thursday, December 1, 1988 with the following Commission Members present: Dick Carroll, Ted Billy, Sandy Masin, JoAnne Alt, Wayne Sames, Michele Swanson, Bob Porter and George Kubik. Staff present included Director of Parks and Recreation, Ken Vraa; Landscape Architect/Parks Planner, Steve Sullivan; Parks Superintendent, John VonDeLinde; Recreation Supervisor, Dorothy Peterson; Parks Secretary, Cherryl Mesko; Recreation Intern, Beth Mundy; Parks Intern, Mel Bailey. AGENDA Michele Swanson requested that School District 196 Liaison report be added under New Business. Also requested for addition to the agenda was update of MnDot turnback and the Santa Calling program. JoAnne Alt moved, Michele Swanson seconded with all members voting in favor to accept the agenda as amended. MINUTES FROM NOVEMBER 3,1988 MLLTING JoAnne Alt moved, Dick Carroll seconded with all members voting in favor to accept the minutes as presented. CONSENT AGENDA The following consent agenda item was presented for approval. On a motion by George Kubik, seconded by Bob Porter with all members voting in favor, the Commission approved recommendation to the City Council of the following: 1. EPISCOPAL CHURCH ADDITION - SAINTS MARTHA AND MARY - That this proposal be subject to an 8 foot bituminous trail along Lexington Avenue and Diffley Road. That this proposal be subject to a cash parkland dedication with any change in land use other than a church facility. PARK CENTER ADDITION - FEDERAL LAND COMPANY Steve Sullivan reviewed this parcel which is located south of the undeveloped portion of Rahn Park at the intersection of Cliff Road and Cliff Lake Road. Mr. Sullivan reminded the Commission that they had reviewed this proposal in April of 1988 and at that time had expressed some concerns for the loss of oak trees adjacent to Rahn Park as well as the compatibility of R3 zoning versus commercial as has been planned for this Advisory Parks and Recreation Commission Minutes of December 1, 1988 Meeting Page 2 parcel. The current proposal under review by the Commission was brought before the Advisory Planning Commission at the November meeting and was denied due primarily to the omission of an elderly housing site on this parcel as well as the traffic impact of the plan as presented. Mr. Sullivan stated that there are six issues that the Commission needs to review which include: 1. Is the proposed land use change from R3 to Commercial PD compatible with Rahn Park? 2. Does the proposal make every effort to preserve the existing significant vegetation? 3. Does the proposal provide adequate screening to provide a reasonable buffer to Rahn Park? 4. What are the pedestrian transportation needs? 5. What impact does the additional run-off have on Rahn Park? 6. What is the parkland dedication requirement? Sandy Masin asked if the Commission could request that trees be preserved along the northern side of the project to buffer Rahn Park from whatever the development was on this parcel. Steve Sullivan responded that if the large trees could be preserved,this would provide a good buffer for the park. Jim Sturm of the Planning Department has requested the developer to do a tree survey so the City has a better idea of what impact development will have on the existing vegetation. Dick Carroll noted that the site plan on page 44 of the packet showed that the addition of a parking lot in the northern area of the development would eliminate most, if not all the trees that exist. Dick Carroll questioned the status of Dakota County HRA's proposal for considering a senior housing project on this parcel. Mr. Sullivan noted that the County is taking appraisals of property for a senior housing facility and has met with the City of Eagan. Federal Land has given Dakota County a price for purchasing a portion of this parcel so it is being considered at this time. Federal Land is proceeding with this current plan, however. Wayne Sames noted that in an early concept plan this parcel showed senior housing as part of the plan. Bob Porter asked if a land dedication could be requested if this parcel remains as R-3 zoning to which Mr.Vraa responded affirmatively. Mr Porter then noted that in requesting a land dedication the City could then establish it's own buffer for the park. Dick Carroll commented that it should be the responsibility of the developer to provide for this type of buffer to a park area. Sandy Masin asked if the water run-off could be filtered before entering the park. Mr. Sullivan stated that that was the intention of Pond AP-50 which will provides for water entering this retention pond before entering the park pond. JoAnne Alt noted that this plan was by far the worst presented for this parcel to date. She felt elderly housing would be a much more compatible use of this parcel. 5. Advisory Parks and Recreation Commission Minutes of December 1, 1988 Meeting Page 3 George Kubik expressed concern for the water quality due to the amount of oil that will be running off from the parking lot area. Steve Sullivan noted that in talking to the engineering department they would like to see a filter eliminate this type of runoff however they have not seen one to date. Further concern regarding the parking lot was the lack of green islands to break up the parking lot. Mr. Carroll also noted that because of the steep embankment on the north side of the parking lot it would be very difficult to berm this area to eliminate views directly to the loading docks from the park if the parking lot is developed to its full potential which is shown as a possibility. Mr. Sames noted that this plan was not compatible with the project across Rahn Cliff Road. After further discussion JoAnne Alt moved that the Advisory Parks and Recreation Commission recommend to the Advisory Planning Commission that the Comprehensive Guide Plan not be amended because of the impact on Rahn Park. The motion further stated that the following recommendations be made before approval 1. The developer provide staff with a tree inventory and revise the grading/layout plan to preserve additional significant vegetation 2. The developer resubmit a landscape plan which increases the density and size of plant material adjacent to Rahn Park providing the required screening/buffering according to the Landscape Policy. 3. A 5 foot wide sidewalk be placed along Cliff Road and the existing sidewalk adjacent to old Rahn Road be extended to the proposed 8 foot trail along Cliff Lake Road. 4. That a catch basin be placed for run-off before entering Rahn Park. 5. That this parcel be subject to a cash parkland dedication Sandy Masin added that relative to the run-off issue, the details of this issue should be worked out between the engineering department and staff to insure the least amount of impact on Rahn Park. Dick Carroll seconded the motion and all members voted in favor. HUD Director Vraa stated that Mr. Mike Doeherty is in contact with HUD and working on the particulars for the agreement to purchase the 65 acre site. At this point HUD is not certain if all the property will be included because of some unresolved title issues. Part of the agreement would provide that any judgments against the bank would go back to HUD and the City of Eagan would not be involved in any way with them. At this time the attorneys are waiting for the Washington office of HUD to sign off on the agreement. We are hopeful a closing can occur yet this month. A redesign of the site was at the meeting for Commission members to review if they chose. Advisory Parks and Recreation Commission Minutes of December 1, 1988 Meeting Page 4 MURPHY PROPERTY Director Vraa explained that the City will get title to MnDot property adjacent to the Murphy property near Blackhawk Park to help with the negotiation of an access road into the park. The surveying crew will be establishing the legal description of the parcel so that the negotiations with Mr. Murphy can begin soon. PROGRAM EVALUATIONS - BETH Y Beth Mundy, interning in the Recreation Department for the past 12 weeks addressed the Commission and introduced the project she had been assigned by the department relating to evaluating programs provided by the City of Eagan. The activity that Beth planned and supervised as part of her assignment from the University of Minnesota was the annual Halloween Spook Trail. This was a very positive and educational experience for her. Beth began by stating that 51 letters had been sent to various Parks and Recreation Departments requesting information on their evaluation procedures. Of the letters sent out, 27 responses were received and 3 stated they had no formal evaluations at this point. Beth's research found that 67% of the evaluations received were specific in nature. The general evaluations reviewed were too generic in their content and would probably not be beneficial to programs currently operating in the Parks and Recreation Department. In reviewing the specific evaluations, Beth concluded that the ultimate evaluation should be completed by the participant. In the case of children's programs, this evaluation would need to be done by the parent provided they had an opportunity to observe the class in action. One day events, however, being difficult to evaluate, should be handled by an after action report. Beth noted that it would have been helpful to have after action reports for each special event to enable the subsequent program to operate in an efficient and informed manner. Chairman Carroll thanked Beth for her in-depth report and noted that this process for evaluating programs would be invaluable to the department. Wayne Sames suggested that a suggestion box be installed at the shelter buildings for people to respond to the drop-in kinds of use the buildings provide. PARKS DEVELOPMENT Parks Planner, Steve Sullivan updated the Commission on pending parks development and parks projects. Thomas Lake pavilion is almost completed with site restoration to occur in the spring. Ohmann Park was not seeded this year, however the irrigation system was installed and the trenches compacted, Slater Acres Park's seeding was completed, the bituminous Rahn Advisory Parks and Recreation Commission Minutes of December 1,1988 Meeting Page 5 Road Trail was completed with the rejected 60 feet of trail to be completed in spring. Pilot Knob hockey light poles are up and the lights will be on soon. Heine Pond park has been graded, seeded, and the trail bed is down. The sand blanket and bituminous work will be done in ';hr spring. Mooney Lake has been cleaned up but the bituminous trail is not down as yet and the Well Site skating oval is nearing completion. COMMUNITY CENTER UPDATE Director Vraa stated that work is progressing very well on the Community Center to date. Most of the Commission members were present at the joint meeting and were given the latest details outlining the costs and changes. A proposed philosophy statement was provided for the Commission members for their review and recommendations. Mr.Kubik suggested that the members take the statement with them, review it and get back together later to review and revise as necessary. Mr. Kubik also complimented staff for the excellent presentation they gave at the joint Council/Commission meeting . UNISYS TRAIL MEETING Steve Sullivan stated that a meeting was held for the neighbors north of the Unisys property to review the proposed trail linking Pilot Knob Park and Quarry Park. The meeting was attended by 5 people. At this meeting it was apparent that the residents are unclear of what the impact would be to their properties. Some felt it would be beneficial whereas some felt this was a negative. It appears that once the 15 foot offset is staked the neighbors will be able to see what the actual impact of the trail would be to their property. A second meeting will occur once the staking has been completed so the placement of the trail is easier to visualize. George Kubik noted that there was indeed some confusion on this issue and once the staking is completed the residents can better assess the situation. WINTER PROGRAM UPDATE Recreation Supervisor Dorothy Peterson updated the Commission on the activities for the winter programs. Currently staff is preparing for the winter skating/sliding season with many of the seasonal staff returning from last year. An advertisement was run four times but the best response to date has been word of mouth for new seasonal workers. Flyers are being prepared for each shelter showing the scheduled hours, rules, etc. A meeting has occurred with Eagan Hockey Association which will have 20 teams participating this year compared with 12 from last year. Dorothy also indicated that the space at Goat Hill is being planned more for pleasure skaters and neighborhood hockey games. Advisory Parks and Recreation Commission Minutes of December 1, 1988 Meeting Page 6 DANIEL DRIVE TRAIL Steve Sullivan explained that residents adjacent to a trail planned on Daniel Drive are wanting to have the location of the trail changed from the west side to the east side. As background, Steve noted that the idea for the trail is for a transportation network between Diffley and Lexington to provide access to Schwanz Lake. People north of Trapp Farm Park would be able to go south to Trapp Farm Park on this trail. On the west side of Daniel Trail the development provides for 2 side yards, 10-11 front yards, 3 street crossings. On the east side the development provides for 7 side yards, 5 backyards and 4 street crossings. It is unknown what the impact is for property on the north side of Daniel Drive, west of the 7, 5, 4 configuration. The residents are requesting that the Advisory Parks and Recreation Commission make a recommendation to change the development contract so that the trail can be moved from the west side of Daniel Trail to the east side of Daniel Trail. Sandy Masin asked if the reason for the change of location was for safety. Steve responded that residents are concerned about backing out onto the trail. Wayne Sames noted that if there was going to be a neighborhood meeting on this issue that residents on both the west and east side should be included not only the residents petitioning for the change. Director Vraa noted that there are 10 homesites on the west site with 7 homes already built. The Parks Department position is that the agreement that exists is between the owners of that property and the developer and should be settled between them without bringing the City back into the process. Steve Sullivan stated that the first call came when the trail was being installed; that the residents felt the bituminous trail wasn't compatible with their homes and would prefer a sidewalk. Bob Porter stated that the homeowners should be negotiating with Tri-Land to do a sidewalk versus a trail. Member Billy stated that this is a regrettable situation but felt the City should not be caught up in the middle of a negotiation that should take place between homeowners and developer. Member Kubik stated that the Commission makes a good faith effort to keep the public informed about the total trail system and felt that the trail should be built as planned. Dick Carroll noted that the developer had ample opportunity to request a change before this time and felt this was a little late in the game to be making changes in the development contract. He also stated he had no preference for this being a trail or a sidewalk. Bob Porter asked if there were any other sidewalks in this area to which Steve Sullivan responded affirmatively. The sidewalk seemed to be more compatible with the surrounding area. Advisory Parks and Recreation Commission Minutes of December 1, 1988 Meeting Page 7 After further discussion Bob Porter moved, Wayne Sames seconded with all members voting in favor to recommend that the contract be completed per the development agreement with the only option of choice being that of a sidewalk or a bituminous trail for the reasons discussed above. HAPPENINGS Ken Vraa noted that the Santa Calling program is scheduled for December 13, 14 and 15 and the department is still looking for volunteers. He passed out a sampling of letters received to date from the parents. Mr. Vraa also noted that staff has been working for some time on the development of brochures that will be used for marketing purposes and to date the brochure cover has been completed and was shared with Commission members. The brochures themselves are still being worked on. The first 6-month calendar has been delivered for distribution to homes in Eagan. This year apartments will be covered for the first time. SCHOOL DISTRICT 196 LIAISON Michele Swanson brought the Commission up to date on the meetings she has attended as liaison to School District 196. They are in the process of goal setting with youth development set as the number one priority. The existing and expanding latch key program would result in the school district asking other groups that generally use the schools' facilities after hours to no longer use them due to lack of space. With no further business to conduct, Sandy Masin moved, JoAnne Alt seconded with all members voting in favor to adjourn the meeting. The meeting was adjourned at 9:30 P.M. DATE SECRETARY MEMORANDUM TO: ADVISORY PARKS AND RECREATION COMMISSION FRO : STEPHEN SULLIVAN, LANDSCAPE ARCHITECT/PARKS PLANNER DATE: DECEMBER 30, 1988 RE: COVENTRY PASS ADDITION PROPOSAL Applications have been submitted requesting the rezoning from Agriculture to R-1 single family and the preliminary plat of 227 lots on 122 acres. BACKGROUND The parcel is located east of Dodd Road approximately one-half mile north of County Road 30. The adjacent land uses are as follows: North - Central Fence Company - Light Industrial Zoning South - Country Hollow Subdivision - R-1 Zoning Clarkson Place Addition - Limited Business Zoning East - Inver Grove Heights (undeveloped) Light Industrial Zoning West - Hills of Stonebridge R-1 Zoning ` ~Xt. a. mph ~ ~ F\ W MlE w SEGO' CKa XW z~T~ ,scan _ 0 g a t S n wvn S tot a90 \ ~a Lij 4j4ow The site is within Park Service District 24 which currently has no neighborhood park. Both the Comprehensive Land use Plan and Parks System Plan designate a neighborhood park within the subject parcel. The Coventry Pass Addition proposes parkland dedication ' 4R'K s~ y CC within the southeast corner of the proposal. > The proposal was brought before the Advisory Planning Commission at the December 22 meeting. The Advisory Planning Commission recommended that the Coventry Pass Addition proposal be tabled until the Advisory Parks and Recreation Commission had the opportunity to review and comment on the parkland k dedication. On Wednesday, December 28 Staff was informed of a significant change On Wednesday, December 28 Staff was informed of a significant change regarding the proposal and engineering/planning firm representing the Coventry Pass application. Wayne Tower from Pioneer Engineering approached the City representing the new land planning firm. He explained that the subdivision was to be redesigned. In a brief meeting, park and city planning staff reviewed with Wayne our concerns for the Coventry Pass proposal. Pioneer Engineering will be resubmitting a subdivision plan including the revised parkland dedication on January 3, 1989. The Commission will have the opportunity to review the revision at the January 5 meeting. This review is primarily informational due to staff having inadequate time to complete a comprehensive evaluation. Therefore, this staff report primarily analyzes; Park Service #24, it's parks needs and alternative locations for the neighborhood park. ISSUES Staff has identified several issues for Advisory Commission review and recommendation: 1. What are the parkland needs for Park Service area #24? 2. What are the parkland site alternatives for Park Service District #24? 3. What is the park's dedication requirement? ISSUE #1 What are the parkland needs for Park Service Area #24? Eagan's Comprehensive Land Use Plan identifies a park west of the northern pond adjacent to Dodd Road. Dale Runkle, Director of Community Development, performed the initial analysis and recommended the parkland location. The Comprehensive Guide Plan designation for the park use was based on the following criteria: 1. The parcel is within 1/2 mile to all users within the service area. 2. Adequate acreage is available for a neighborhood park. 3. The parcel provide topography which is developmentally compatible for a neighborhood park. 4. The proximity to Dodd Road and the proposed trails provides effective pedestrian and vehicular transportation to the park. 5. The parkland is adjacent to mature trees and a significant pond. LAND USE r' 1 r ~ 'D d P GUIDE LAN O`er °D, 1 ..a j DN weama M YP-'am 71 . ,66 a Dm ~ ) Dal re..www,v~a.:Aaa.-rwi .TfJ'jJ M M%MF.u.w. a» ' w......w a * ~ csc aro ax w .w~rs+awnb...M wn . ql. PMN WR b. r r~r w.. °a ~ ~r`~ a ~ t 1 ~ oDi 8 3l - , l , ct~ d D - ~ B Aupua 1iM DI a Oa t Dl.G ~yL b, " ^ ' t OF EAGAN Eagan Comprehensive Parks System Plan in 1982 and again in 1984 evaluated Park Service Area #24 for it's parkland needs. The results concurred with the Comprehensive Land Use Plan and recommended a parkland acquisition west of the northern pond adjacent to Dodd Road. ?t, cal future pa ftes 1 _i!lt~'.- -...w.. l T' ..+wk .ar. WR wt M'rpt \ 4 ' }~_~i ~£S wpx. pa+prkrWaa.aa t 1 t, R art • h H p.d. hr, ~ l• eaw Y9m1 A ~ p+4 {zkap'rcdim r O . - »l ° ~t m tit n wkB % N it ppd. r s:a xas ~rrm„ aeciaFx+ Vv3 cit Staff estimates that Park Service #24 at buildout will have a population of 1340. This population is based on 405 lots with 3.3 people per household. The Comprehensive Parks System Plan designates population criteria for park type as follows: 1. Mini-Park - Serves a small service area, usually less than a quarter mile radius, population served is at least 500 residents. 2. Neighborhood Park - Optimal service area is within 1/2 mile radius. 2000 - 5000 residents served. This population equates similarly to service areas 31W/25W which contain Slater Acres Park and Lakeside/ South Oaks Park. Therefore, staff recommends a facility program consistent with park standards reflective of these existing parks. The facility program may include: 1. Playground, 5500 square feet 2. Hardcourt Play Area, 1600 square feet 3. Informal Play Area, 62,500 square feet 4. Softball Field, 250' radius 5. Trails 6. Passive/Picnic Area 7. Parking Lot, 10 stalls (optional). The usable acreage of Slater Acres Park is approximately 6.2 acres with Lakeside/South Oaks at 7.5 acres. Staff estimates that the usable acreage for parkland within Service District #24 should range from 5-7 acres. A park within Neighborhood Park Service Area #24 is supported by several adjacent neighboring parks. This includes Bridle Ridge Park located approximately 1/2 mile west of the subject parcel. Bridle Ridge will provide user support with it's hockey rink and free skating facilities. Lakeside Park is located 3/4 mile south. Lastly School District #196 has acquired an elementary school site approximately 1/2 to 3/4 mile from Neighborhood Park Service Area #24. The elementary school will have the typical recreational facilities, i.e. playground, ballfields, hard courts, soccer fields. ISSUE #2 What are the parkland sites alternatives for Park Service District #24? Staff has performed a comprehensive evaluation of the subject parcel determining feasible parkland locations. The primary criteria for selection is based on the following: 1. Conformance to the Comprehensive Park System Plan standards. 2. Meeting the proposed facility program. 3. Compatible facility integration to the site. 4. Developmental efficiency. 5. Relationship to the neighborhood service area. 6. Relationship to park supportive natural resources. 7. Adaptability to subdivision design ;f Three possible park locations have been identified. The first, identified as parkland alternative A, is located west of the large ponding area JP-23. The second, identified as alternative B, is located north of JP-23. The third, identified as parkland alternative ~ C, is located both north and south all southerly pond JP-24.Of of the smA PARCEL :max Parkland alternative A located west of JP-23 can be characterized by moderate to flat slopes adjacent to Dodd Road with steep slopes adjacent to the easterly pond. Significant deciduous overstory vegetation exists on the steep slopes with the remainder of the parcel in long grasses. The site drains from the westerly plateau east towards the pond. The pond is approximately 6 acres in size with a normal water level of 852.3 and a high water level of 857.3. The pond remains in open water throughout the year. (See Attachment #1) The parkland size is approximately 10 acres. Approximately 6.8 acres contain slopes less than 12% and above the pond's high water elevation. The parcel is located within 1/2 mile of all residents within the park service area. In regard to the parks centrality to the park service area staff estimates that approximately 25% of the user population exists north of the park and 75% to the south. The alternative provides 500 feet of street frontage along Dodd Road and approximately 75 feet of frontage along two cul-de-sacs located north and south of the parcel. The facility program meets the Parks Systems standards for a typical neighborhood park. The facility program includes the following: 1. Parking lot - 10 stalls 2. Ballfield - 250 feet radius 3. Soccer field - 200 x 300 feet, overlay 4. Hard court play area - 50 feet x 85 feet 5. Playground 6. Picnic area 7. Trails 8. Pond access This park alternative offers limited but compatible facility integration. The developable slopes configuration allows a ballfield/soccer field overlay only within the northern portion of the parkland parcel. The parking lot takes access from Dodd Road. Minimal internal road frontage is available for vehicular access. The residual portion of developable slopes is utilized for the playground and hard court play area. A narrow finger of moderate slopes extends to the pond and the adjacent woods. This area provides an accessible pedestrian access to the ponds shoreline and supports a small scenic picnic area. A distance of 550 feet between the pond and Dodd Road does not allow for an internal north/south residential road link adjacent to the park. Also, the existing intersections of Stonebridge Drive and Elrene Road dictate access locations into the development. These given accesses along with the park's narrow width do not allow internal road frontage except off a northern and southern cul-de- sac. Therefore, internal pedestrian access would occur via two 1/3 acre parkland extensions from the cul-de-sacs to the primary park area. The positive aspects to this design is the separation of the vehicular and pedestrian access to the park. The negative aspect is the park has a secondary visual orientation within the park service area, with primary visual orientation from Dodd Road. The park is not self marketing to the park service area and is influenced by the visual aspect and noise generated by Dodd Road. The Comprehensive Park System Plan identifies a boulevard trail along Dodd Road. This trail can also be used for pedestrian access to parkland alternative A. The topography has the greatest impact on development cost and efficiencies. Without completing a comprehensive cost estimate staff speculates that development costs for grading will be moderate to high due to increased common excavation quantities. The ballfield/soccer field will generate the most significant grading costs with cuts and fills of approximately 10 feet - 12 feet. All other facilities should have costs equivalent to our current development values. Staff has identified two park supportive natural resources. The first is the pond. The pond provides a strong visual benefit to the park. Functionally the pond offers minimal opportunity for canoeing, fishing or other water related recreational opportunities. The storm ponding aspects do not provide for ice skating. A looped trail around the pond is feasible but the steep slopes would result in high development costs. Staff would recommend that trail easement be placed around pond JP-23 to allow for future trailway considerations. The second item is the significant trees along the steep slopes. These trees provide a visual maturity to the park setting and enhance the picnic/passive opportunities for the user. Staff recommends that the developer provide conservation easements in areas of significant vegetation. Park Alternative A allows for complimentary lot subdivision. The park separates the northern and southern neighborhood resulting in two cul-de- sacs and the omission of a through road. PARCEL B Parkland Alternative B located north of JP-23 can also be characterized by moderate to flat slopes within its northern portion with steep slopes adjacent to Pond JP-23. Significant deciduous overstory vegetation exists on the steep slopes with the remaining portion of the parcel in harvest crops. (See Attachment #2) The parkland alternative is approximately 10.2 acres. Approximately 6.8 acres contain slopes less than 12% and above the pond's high water level. The parcel is located within 3/4 mile of all residents within the park service area. In regards to the park centrality within the park service area staff estimates approximately 18% of the user population exists north of the park and 82% to the south. The alternative provides 1500 lineal feet of frontage along three internal streets. The facility program meets the Parks System standards for a typical neighborhood park. The facility program is identical to Parkland Alternate A. The facility program includes the following: 1. Parking Lot 10 stalls 2. Ballfield 250 foot radius 3. Soccer field 200 feet x 300 feet overlay 4. Hard court play area - 50 feet x 85 feet 5. Playground 6. Picnic area 7. Trails 8. Pond access The park alternative provides a strong facility layout with orderly transition to complimentary facilities. Similarly to Parkland Alternative A the developable slopes configuration provide for a ballfield/soccer overlay within the eastern portion of the parkland parcel. The parking lot takes access from the northern east/west road. The residual portion of development supports the playground and hard court play area. Moderate slopes extend to the pond centrally within the park. This area provides a scenic access to the pond and westerly picnic area. Staff feels that the picnic area in Alternate Parkland B is of higher quality than Alternative A. The picnic areas developmental area is larger and is more adaptable for picnic/passive use. Pedestrian access would primarily occur from internal residential roads. A future trail along Dodd Road would effectively service users with the southwestern portion of Neighborhood Park Service Area 24. The park has significant off-site visual orientation due to the large amount of street frontage. The park may be over exposed. The topography has the greatest impact on development cost and efficiencies. Without completing a comprehensive cost estimate staff speculates that development costs for grading will be moderate to high due to increased common excavation quantities. The ballfield/soccer field will generate the most significant grading costs with cuts and fills of approximately 10 feet to 12 feet. All other facilities should have costs equivalent to our current development values. Identical to Park Alternative A staff has identified two park supportive natural resources within Parcel B. The first is the pond. The pond provides a strong visual benefit to the park. Again, a looped trail around the pond is feasible but the steep slopes would result in high development costs. Staff would recommend that a trail easement be placed around pond JP-23 to allow for future trailway considerations. The second item is the significant trees along the steep slopes. These trees provide a visual maturity to the park setting and enhance the picnic/passive opportunities for the park user. Staff would recommend that the developer provide conservation easements in areas of significant vegetation. The park layout appears to allow for complimentary lot subdivision. An apparent problem may be the significant lineal road footage along the park. The design provides roadway with no developmental cost support by residential lots. The road frontage is significantly higher than the 250 feet minimum suggested by the Commission when reviewing the Bur Oaks proposal. As a frame of reference,1500 lineal feet of road frontage equates to the frontage of Walnut Hill Park. PARCEL C Parkland Alternative C is located in the southeast corner of the subject parcel adjacent to pond JP-24. The parkland parcel is characterized by moderate and steep slopes south of the pond. North of the pond the proposed park is steep slopes. A majority of the parcel is in meadow grass with significant deciduous overstory trees located adjacent to the pond. The pond is approximately 4.7 acres with a normal water level of 843.3 and high water level of 849.0. The pond is extremely shallow and may be seasonally dry. (See Attachment #3) The parkland size is approximately 14.3 acres. Approximately 5.1 acres contains slopes less than 12% and above JP-23's high water level. The parcel is located within 1/2 mile of all residents within the park service area. In regards to the parks centrality to the park service area staff estimates that approximately 53% of the population lies north of the par;. and 47% to the south. This alternative provides 500 feet of street frontage along an internal residential road. The facility program falls short of a neighborhood park but exceeds the standards for a typical mini-park. The facility program is typical, except the soccer field is omitted and a 150' x 200' open play area overlay is substituted. This is a result of the park having less develr ital acreage to the prior alternatives. The facility program include- the following: 1. Parking lot - 10 stalls 2. Ballfield - 25 foot radius 3. Open play area 4. Hardcourt play area - 40 feet x 40 feet 5. Playground 6. Picnic area 7. Looped pond trail This park alternative offers limited but compatible facility integration. The limiting aspect is that only 4.4 acres is developable - the area which is located on the south side of the pond. Within the 4.4 acres the ballfield/open play field overlay extends into a small portion of the steep slopes. The extension can be engineered to accommodate the ballfield. Vehicular and pedestrian access is from an internal north/south residential road. The playground and single hoop hard court play area would lie east of the parking lot. The finish grade of the park would allow for pond to be easily accessible. As well, a loop trail around the pond could be easily developed. The pond has a scenic quality when in water. The surrounding mature oaks provide an ambient canopy experience. A majority of the pond is currently dry and miscellaneous litter pollutes its potential beauty. Staff feels that if this site is to be considered for parkland the developer should be responsible in deepening the pond providing year round water cover and also removal of all debris. Again, the topography has the greatest impact on development costs and efficiencies. Without completing a comprehensive cost estimate staff speculates that development costs for grading will be moderate to high due to increased common excavation quantities. The ballfield/soccer field will generate the most significant grading costs with cut and fills of approximately 8 feet to 10 feet. All other facilities should have costs equivalent to our current development values. Similarly to Alternatives A and B staff has identified two park supportive natural resources. First, an improved pond could provide a strong visual benefit. Alternative A and B tends to utilize the northern pond as a visual amenity and a destination point via a spur trail. In park alternative C, the pond becomes visually and functionally connected to the adjacent facilities. The pond becomes a hub to an easily assessable loop trail system. Second, mature oaks and the south facing slope enhances the trail and picnic area experience. Parkland Alternative C versus A and B tends to provide the least impact for residential subdivision. This alternative simply omits a short cul-de-sac and 12 lots, Staff feels that the westerly north/south street should be realigned to provide additional park area. The additional park area would increase distances between facilities allowing areas for transition and landscaping. SUMMATION The three identified alternatives could adequately service the parkland needs for Neighborhood Service Area #24. Each alternative possesses many positives with few negatives. Park Alternative A provides the following: Adequate developmental acreage to meet facility program for a typical neighborhood park. * Limited but compatible facility integration to site. Mature trees Pond Access Moderate to high grading costs Dodd Road frontage Minimal internal road frontage Separate pedestrian and vehicular access. Park Alternative B provides the following: Adequate developmental acreage to meet facility program for a typical neighborhood park Strong facility layout Mature trees Pond access Moderate to high grading costs 1500 feet internal road frontage Not central to service area Park Alternative C provides the following: Inadequate developmental acreage to meet facility program for a typical neighborhood park Exceed mini-park facility standards Limited but compatible facility integration to site Mature trees Seasonally wet, potentially scenic ponding area Littered site Looped trail Minimal impact for residential subdivision ISSUE #3 What is the parkland dedication need? The Comprehensive Land Use and also Park Systems Plan identifies a parkland acquisition within neighborhood park service area #24. The current proposal is requesting a preliminary plat of 227 lots on 122 acres. Based on a total land dedication, park alternatives A & B would be responsible for 9.76 acres of parkland. Park alternative C would be responsible for 12.2 acres. The Commission may consider discussing whether any credit should be extended towards any of the three parkland alternatives. The Parkland Dedication Policy reads: Land dedicated is to be located outside of drainways, flood plans or ponding areas after the site has been developed. Grades exceeding 12% or are unsuitable for parks development can be considered for partial dedication. Where ponding has been determined to have a park function, credit can be given at a rate of 50% of the pond and adjoining land area below the high water level; a minimum of 70% of land above the high water mark shall be dedicated before pond credit is granted. Other City park dedication policies relating to pond dedication must also be complied with. Both Parkland Alternative A and B have approximately 6.8 acres above the high water elevation and with slopes less the 12%. If no credit is given for the pond/steep slopes, the developer would be responsible for contributing a cash dedication balance of $29,140.23. Parkland Alternative C has approximately 5.1 acres above the high water elevation and with slopes less than 12%. If no credit is given for the pond/steep slopes the developer would be responsible for contributing a cash dedication balance of $58,932.91. FOR COMMISSION ACTION The Commission does not need to take action on the current proposal at the January 5th meeting. The revised proposal will be brought before the Commission at the February meeting. The Commission may give staff and the applicant direction on: (1) The parkland needs within Neighborhood Park Service Area #24 (2) The preferred park alternative (3) Park dedication conditions O LU O OOOOQO 0 NNW Li I C\j LLJ 0 00O00000 ® 0 } 0 O 0 0 0 0 ~tTt ilJ~ ° oor p ND LT RATI B 60 i f CY) 47 /l if \t ' -r- 24 Q ? _ O } ' 1 e"' l(~G? 1 0 CL d PARKLA~D ALT'E/R'NATIVE a4 too 40 2 TO: ADVISORY P & MIMATION 9+` I LI , IANDSCAPE DATE: a 16, 1988 RE: TOM CENTER 100 - 7TH ADDITION PROPOSAL Federal Land Carpany has submitted a request for the prelim nary plc : of two (2) lots and one (1) outlot on 19.5 acres currently zo~~ad T mitad Business (LB). cnvD The parcel is located north of O' Leary Park and c Estates. The property fronts Town Centre Drive with the proposed Waterford Apartments lying to the east. The Commission has previously reviewed this parcel at the time of the q:1,.. Heights Commercial Parks P.D. The park dedication requirement for the parcel has been fulfilled as a requirement of the P.D. agreement. The Commission has also reviewed the property in conjunction with the Waterford Apartment proposal. The C ission may recall that a trails study was performed to determine trails locations within the Eagan Heights Commercial PD. The Cam-aission evaluated trail locations and priorities based on user needs as generated by the differing land uses. The Commission previously recommended that trails/sidewalks placed (See Figure #1): o the north side of Town Center Drive from Lexington Road to Denmark Avenue. o the west side of O'Leary lane from Yankee Doodle Road to Town Centre Drive. o the south side of Town Drive 'from Denmark to the western of Waterford apartments. a the west side of Waterford Apartments from Town Centre Drive to O'Leary Park. a the north side of O' Leary Take from Widgeon Way to the Spur Trail on the west side of Waterford Apartments. o the east side of Yankee Place from Yankee Place from Doodle to Town e Drive. ISSUES Staff has identified the following issues for review: 1. What are the pedestrian transportation needs? 2. What is the visual in-pact to O'I Park? 3. What is the developmental inpact of water quality of O'Leary Lake? ISSUE 1 The proposal will responsible for the placement of a 5' wide, sidewalk along the south side of Town Centre Drive. The Commission may recall that a trail link from this sidewalk north/south to OLeary Park is to occur along the westerly of the Waterford Apartment property. This proposed trail link lies directly east of the current proposal. The Waterford Apartment proposal offers little space and steep topography in which the trail to O'Leary Park could occur. Staff suggests that the trail area designated within the Waterford development in combination with a 201 easement along the east property line of the current proposal would provide greater flexibility for this pedestrian link. Waterford t & Town Centre 100, 7th Addition, would responsible for compatible grading and installation of a 5' wide sidewalk from Town Centre Drive towards O'Leary Park. well, both developments depict eight foot wide east/west trail so' utk-a of their buildings. These trails should tie together and an bitum r.c)=cps spur continue (at the sidewalk intersection) south to O'Leary Park. The western of this east/west trail currently ties to existing 201 trail easement tying to Widgeon Way. Staff suggests that this trail tie into the easement approximately 140' west of it's current terminus. (See Figure #2) ISSUE II The current proposal is for a one story office building located approximately 145' north of O'Leary Park and 110' of the lake. Tie building finishes t the park will brick and glass, with a ro 'o1 roof band. The building will utilize these finishes on all sides. A majority of the parking is screened from the park by the building. A service drive to a below storage area is proposed on the south side of the building. The storage area is intended for the building tenants and unloading would typically occur internally. Staff feels that the single story structure, finish palette and parking lot orientation minimizes tI-e visual impact of this development. After review of the landscape pl, n staff suggests that additional plant material used to provid='.a g, transition between the office park land use. ISSUE III The storm water plan proposes having a majority of the run off either sheet drain, or run into existing 12" line outletting into O'Leary Lake. The Water Quality Management Plan classifies 'Leary lake as a 'rI water (indirect n ) . O'Leary lake has also been identi----i~ -Ls one of the five most important water bodies in the Eagan k System. The City's Engineering t, along with the Dakota County Water Conservation District, has recommended that a portion of the parking lot run-off, which is proposed to outlet directly into O'Leary Lake, redirected to a holding (DP-20) north of Town Centre Drive. Pond DP- 20 then outlets to O'Leary Lake. This pond will a the storm water storage needs as a nutrient trap reduce the nu i l( >ad i t rr to Leary lake. Staff concurs that the rerouting of storm v 0 minimizes the inpact to the water quality of 'Leary lake, Z -.iJ our fifth ranked resource. CSI I I The Commission may consider the following recommendations: 1. A 20' wide trail easement placed along easterly pi 'j line. 2. The developer, conjunction with easterly property owner, responsible in providing a 5' wide concrete sidewalk from Town Centre Drive north/south to the proposed eight foot east/west bituminous pathway. 3. The eight foot wide east/west trail proposed the rear yard revised directly tied to the proposed trail within the Waterford Apartment Proposal. Also, the westerly trail terminus extend approximately 140' west to the southwest property corner. 4. The developer extends an eight foot bituminous trail to O'Leary Park from the proposed eight foot east/west bituminous trail. This north/south trail link field staked approved by the City's landscape Architect prior to installation to insure compatible linkage to O'Leary Park pedestrian system. 5. A five foot wide sidewalk placed along the south side of the Town e Drive. 6. Additional plant material placed south of the building southeast parking lot corner to provide additional buffer/ transition to O'Leary Park. 7. The storm water plan revised to re-route parking lot stoic at to pond DP-20. SS/bls 'iY.f'ti~`'.•ibA;f.~.M..•.....•.009000.••Y 4*0000 ..i..i.«..•......•:0.0.9.•.4 *..9....9.9:0090000090099......9.•.9....9.9......9.....9.9..9.........9..9..........9. N9*r by c.c, a-ae 8T wdwc ay c.c. (YANKEE DOODLE ROAD) GO ROAD NO 28 ~ „ u° ~1`;f 11111111011 1111111111111111"Bill'illlllllilllllillllliiillll III111111111 l i I ti111.11 IMMI iIIliNliMI-[ it if o z + ( tawx ccx*xc too rccox ?oo,ro. I~ rn M > 4 I rn T V r` 1liUtlil11l1t i1t lI11II-I1IGI ~ r TOWN CE THE --tfNTRf•,:L'-£3RivE- - w f 9 \ V E„ • - ..tO~'L w'w'{l "il ~ ~1 'J~, OUTL9T A ; wa.c yy ? ® l s 910® tj h . wvess ? \ a• ~ <{J ( ( i i ! i LOT y = s*.~ %4:, '`~~l~~ll X11 111111IIIIIIIIIItlllllllii11II1i 111 ilili111111H111i1 } y /fy?t TawN_. ec~esRE-~ er+1 - # " "Ill illill ill#IllllilIfni tlllltilltlltlilillin y = y TOWN CEN~RE 100 SIXTH ADD. A `-,D]',10 : oUTLDT _ ® OUTLOT A y; ® TL T 4 • 1 - 0• 9{90 99 .04®999i999f9®f0999994s y4499•e.9.4999~..9i99. • 1 1 i y t --~w> _ ' • 9•t® if°~ DUTLDT C 21 ® =y * . rj• ` O'LEARY t t~ %'r • • v~: t°i ° * i. • ANUc r MANY L 9 I L .a Jl7iJr• LAKE 1 $ ' `'m :a' ' * a • ~ -.o« . v~ P ,or ~~,s C~ a ~ r .,r,_..« ..++,r ~,5,,seC ,gym -..I?s ~ a' fi-t 179~f FIGURE 1 TRANSPO"RTATIOMPLAN'' - - A . PEDESTRIAN 40 it{tlt{Iitll{ti uIrnU Ut{I'€ 11's' SY k I\ Ifllitl IU' M• J ww®.wwwwwww w ` 4` I is i t 1 * l ~ / ?f4 ~~f Ile b u M .{Q P e8 I,I h OD cm i• a® o o-, \ 0 z w sL c* m wa w a\\ ~ \ l LLt7 ~ulltl - \ Tp P 14 ~Jil It" y _ ( 4~,,,~{L `J ® \ `A ~yA ~f ? f'yP i 995a~ AD ]pd- - 'f~ ~ ~ ~L ~~'T"' Y°~~\\~` ~ •+f •I~•• ;r~~ mil"-® iI( ,~}ti ..w ? -r.'-t ( < R~ j,, n` ,fit i t ` Ott `f+ G A i,~i~`'~ x(~s'f•M'' _ 1 \1.~ ~\--~F _ f i s r I {y /'M<f _ 1~,~ ~~L"(~~y~*•°' ~ j(~fy/,'~ a `^jljs(. MEMO TO: EAGAN ADVISORY PARKS AND RECREATION COMMISSION FROM: JOHN K. VO ELI DE, SUPERINTENDENT OF PARK~.I DATE: DECEMBER 15, 1988 SUBJECT: UPDATE ON WATER QUALITY MANAGEMENT STUDY The purpose of this memorandum is to provide you with a brief outline of recent developments on the wetlands/lakes classification program and water quality management plan. The Citizens Task Force on water quality met on December 12th to discuss a number of issues. The first issue dealt with monitoring and in-basin sampling of priority lakes in the City. Over the next two years the Soil and Water Conservation District will be sampling 13 water bodies on a number of water quality indices including such things as PH, total phosphorus, coliform bacteria, suspended solids, oxygen, etc. The purpose of the sampling is to create some baseline data from which to evaluate the current conditions of these waterbodies in relation to the prescribed management objectives. It was decided that the collection of samples would be done internally and would be a shared program between the Streets, Utilities, and Parks and Recreation Departme ts. Tlisz, will involve a small amount of staff time over the t' xrea_r-s in physically collecting the samples from the 1.? s of the samples will be done by a private laboratory select d t?:rough a quotation or competitive bid procedure. The Minnesota Pollution Control Agency has offered to keep track of this information on their computers looking for such things as quality trends, comparisons between lakes, etc. Eagan will also be submitting an application to the Pollution Control Agency requesting their participation in the -ling program. At this point it seems likely that the PCA 1 be willing to conduct intensive in-lake sampling on at lea t two waterbodies. This would reduce the amount of lab analysis costs to the City which are currently estimated at about $16,000.00. The U.S. Geological Survey is also being contacted to determine whether or not some of their ongoing sampling may already take into consideration many of Eagan's priority lakes. There was a discussion about the propcs~I. to utilize r- representatives in the long range Secchi di . sampling of 1 located next to parks. This approach is strongly supported y the Task Force and is seen as a way of bringing the public closer to the planning and management aspects of the program. At some point, likely in the spring, the department will be advancing this notion to the park representatives for their reaction and comment. If the response is favorable the Pollution Control Agency and SWCD would work closely with these volunteers EAGAN ADVISORY PARKS AND RECREATION COMMISSION DECEMBER 15, 1988 PAGE 2. to train and assist them with the sampling program. The s -ling is quite simple requiring only a small boat or canoe to _ cnto the lake, and a Secchi disk sampling device available fi a the PCA at a cost of about $10.00. The Citizens Task Force then discussed the proposed adoption of a new classification level referred to as "Scenic Recreation Wetlands." SWCD staff outlined the proposed selection criteria and management objectives for this new classification. After some discussion the Task Force decided unanimously to adopt the new classification and to set it at a Level "3" in the overall hierarchy. "Wildlife ponds," formerly Level 3, w.JL now be shifted to Level 4. Treatment basins will be rep' °_fied at Levels 5, 6 and 7. A copy of the selection cr-aeria and management objectives for Scenic Recreation Wetlands is attached for your reference. The Task Force also adopted the Commission's recommendations classification changes for several waterbodies. Conri members may recall that a recommendation was mAd tO ,rt Schwanz Lake from a Level 2 to a Level 1, "D', Cont. t." Recommendations were also made to downgrade Burrvi Tv Pond asa Level 1 to Level 2 and to upgrade about 15 former Class "Stormwater Detention" ponds to the new Class 3, IIS:-.nic Recreation Wetlands." These changes were adopted in full by the Task Force and will be incorporated into the final draft classification scheme. With regard to the rankings of lakes and ponds for monitoring L_1 management the Task Force also recommended adoption of t Commission's proposed list of priorities. From what was once a list of just a few lakes and ponds, the monitoring program has now grown to include 11 park related lakes out of a total sampling field of 13. The following lakes and ponds will be sampled over the next two years (Commission ranking is indicated for reference) : Lake Rank Thomas Lake, BP 12 1 Blackhawk Lake, BP 11 2 Fish Lake, JP 4 3 Schwanz Lake, LP 32 4 O'Leary Pond, DP 7 5 McCarthy Lake, JP 9 6 Lemay Lake, DP 2 7 Heine Pond, BP 5 8 Patrick Eagan Park, JP 8 11 Langhoven Lake, Woodhaven Park, AP 1 12 Mooney Pond, JP 7 17 EAGAN ADVISORY PARKS AND RECREATION COMMISSION DECEMBER 15, 1988 PAGE 3. The SWCD staff also outlined their proposal for the planning process, from now until adoption of a final plan. A copy of the major plan elements and discussion of components contained therein is attached for your reference along with the time line. As you can see, the final plan is expected to be adorted some time in June. Prior to that, however, there will be -n opportunity for review and input of the APRC of the ca- 1 This would likely occur in late February or March (foll -ing t: community center bond referendum). The APRC should also be made aware that the City Engineering Department is initiating a complete redrafting of the city's storm water management plan. This is being done partly in recognition of the need to restrict bounce and flood duration ^n many of the ponds and lakes classified for recreation Pu:°p s o.:, where residential development may be affected. The of the Storm Water Management Plan will be done concurrent wit] planning and adoption of the Water Quality Plan since both nd a interrelationships and are dependent on one another. In t'.-,a interests of establishing maximum water elevations on lakes and ponds within or adjacent to park areas, department staff have already been working with the SWCD and Engineering Department in establ°shing acceptable high water levels. The City's engin ring consultant, Bonestro, Rosene, Anderlik and Associ e , will then be using this information t'> design or retro t he storm water system to achieve desired objec ves, where they are economically feasible. ra John K. VonDe®.iu Sup rinenent of Parks J /nab WILDLIFE POND CLASSIFICATION CHANGES District personnel met with Mike Mueller of MN DNR and John Von de Linde of the Parks Commission to discuss improving the Type III Wildlife pond criteria and standards. This meeting resulted in the following recommendation: Instead of a two-tiered Wildlife class, have two distinct classifications: Type III Scenic Recreation Wetlands Selections Criteria: - Public access available. - ,wetland characteristics and vegetation. - Conducive to education/interpretive use. Standard: - Maintain OHWL and restrict bounce duration to less than 10 days. - Promote growth of wetland vegetation. - For deeper ponds TSI (SD) summer average not to exceed 80. Type IV Wildlife Habitat Selection Criteria: - Pond bounce does not exceed two feet for a one year storm. - Mixture of open water and vegetation. - Land use is conducive to wildlife. Standard: TSI (SD): Summer average not to exceed 80 AGREEMENT This Agreement is entered into between the Dakota County Soil and Water Conservation District, hereinafter referred to as the District, and the City of Eagan, hereinafter referred to as the City. The City wishes to obtain services to prepare a Water Quality Management Plan. The District has agreed to provide these services under the terms and conditions set forth herewith: 1. Effective Dates This Agreement shall be effective upon such date as it is executed and shall remain in effect for six months or thru May 1989, whichever is longer. 2. Services to be Provided The Services identified below shall be completed to the extent identified and according to the respective time frames. 2.1 Plan Administration Chair, facilitate, provide and maintain the necessary minutes and documentation for conducting the business of the City's Water Quality Task Force. The Task Force shall serve as the principle public body in the City for reviewing and drafting a plan for submission to the Eagan City Council. Task involves administering 10 Task Force meetings. 2.2 Complete Water Quality Standards and Waterbody Classification Task involves completing a waterbody classification system acceptable to the Task Force; classifying all Eagan waterbodies identified in the Gun Club Lake WMO Wetland Inventory; establishing water quality standards for each class of waterbody that is acceptable to the Task Force. Task to be completed by January, 1989. 2.3 Water Quality Monitoring Program Develop a water quality monitoring program. This will include identifying representative waterbodies for sampling based on the classification scheme, water quality parameters to be tested for and a sampling schedule. Implementation of the water quality monitoring program is not covered by this Agreement. Task to be completed so that sampling can begin as soon as possible, spring of 1989. 2.4 Stormwater Plan Coordination Work with Bonestroo, Rosene, Anderlik and Associates to identify the positive and negative impacts of water quality management on storm water management. Task involves identifying issues, conflicts and alternatives for the two efforts. Task to be completed by February 17, 1989. 2.5 Management and Administrative Capabilities Work with Eagan City staff to determine financial and regulatory capabilities and the impacts of water quality management on City financial and staff resources and zoning. Task to be completed by February 17, 1989. 2.6 Issue Identification and Conflict Resolution Present identifiable issues, and alternatives for resolving them to the Task Force. Assist Task Force in developing a process for resolving conflicts arising from the approved waterbody classification. Task to be completed by February 27, 1989. 2.7 Draft Water Quality Management, Plan Develop a draft water quality management plan. The water quality management plan shall identify management strategies to be utilized within the City of Eagan to protect and preserve the waterbodies for their intended use. Watershed specific measures shall be identified for high priority waterbodies. Maintenance requirements and a capital improvement program shall also be outlined in this draft water quality management plan. This task will be completed by March 13, 1989 and include 15 copies of the draft water quality management plan. 2.8 Evaluate Political and Economic Issues from Public Review of Draft Plan A public hearing will then be held to take comments on the proposed waterbody classifications and draft plan. Based on the presented comments, the advisory committee shall recommend to the City final waterbody classifications. A color coded map, scale 1:24,000, shall be presented with this recommendation. A document identifying the classification system, its method of development, and tabular presentation of final waterbody classifications shall also be prepared. This task shall be completed within three weeks of the Public Hearing. 2.9 Final Water Quality Management Plan The final water quality management plan will be prepared by incorporating the comments and concerns identified at the Public Hearing. The content of this final water quality management plan will include: 1. An outline of the waterbody classification system that has been adopted by the City of Eagan. 2. A final classification of all waterbodies within the City of Eagan along with a procedure that may be followed if a given waterbody classification is disputed. 3. A water quality management plan that will state policies and outline practices that the City of Eagan must follow in order to insure that the City of Eagan's waterbodies are preserved for their intended use. 4. Recommendations concerning location and sizing of nutrient detention basins will be provided. 5. A capital improvement program that will outline the project and funding needs that City of Eagan must commit to achieve the goals of the water quality management plan. 6. A yearly water quality monitoring program that will allow the City of Eagan to evaluate the performance of the improvements and management techniques prescribed in the plan. This final plan shall be completed by May 1989 and include 50 copies of the final plan. I X) Dec Jan Feb Mar Aor May Jun TASK Task Force Meetings * Water Quality Stds Wetland Classification * Water Quality Monitoring * Storm Water Plan Coord. Fin. & Regul. Needs Issue I.D. & Conflict Resol. Draft Plan Public Hearing & Review * Final Plan COMMUNITY CENTER PHILOSOPHY STATEMENT The Community Center philosophy was initiated when our civic leaders designated a site in 1978 for a future Community facility. Their farsighted approach was to have a facility which provided for a multitude of recreational opportunities for the entire family. The Eagan Community Center is designed to serve as the civic, social and recreational hub of the City. The Center will be a source of pride and enjoyment for people of all ages while creating a sense of identify for Eagan. Programs will promote family participation in a variety of recreational functions and be responsive to the needs and desires of the total community. In order to serve all age and interest levels, a balanced approach to programming and scheduling uses will be taken. No single activity will dominate or go without representation. The Community Center will provide quality leadership and programming to encourage self-wellness and growth through recreation. TO: ISO PARES SaSI DECEMBER DATE: 22, 1988 RE: a GPJ . PARK - WELL HOUSE BUIIDIWx APROPOSAL The City of Eagan, Engineering Department requests Advisory & Recreation Commission review of the proposed well house building i c it within Evergreen Park. BACN3RQLJND A second Water Treatment Plant has been proposed at the inters .nn of Cliff Road and Ches Mar Drive. This facility will fulfill the demands for the City. Supporting the Water Treatment Plant is an a rra°y o ~f wells located at the south end of Eagan. A study was pei . and approved for designating well site locations. Evergreen Park is a selected site for a well and associated structure (See Figure #1) The well is currently being drilled. Prior to the construction of the Water Treatment Building, the well, capable of treating raw t-ir, will support periods which demand peak water usage. FOR CC , Z' I REVIEW The Commission will need to review the following items: 1. Is the Well House enclosure appropriate for Evergreen Park? 2. What is the inpact to Evergreen k? 1 The proposed structure strongly reflects the arc.ii' rural configuration/style of the Rahn Athletic Shelter Building. Ins: -I of a restroom core, this space is converted to ptreatment rooms. The structure maintains a small picnic shelter area. (See Figure #2) All exterior material types finishes will match our t park building standards. The only perceivable difference is the sky_il__`- '2ich provides maintenance access to the well. The layout includes a bituminous service drive from Lodgepole Court to the Well House. The service drive alignment removes approximately 251 from t':e left field corner. The softball field was designed with 200' outf.? The Park System Standards prefer a 275' outfield dimension with a minimum for all neighborhood softball fields. The existing I k configuration offers opportunity for relocating the facility or the access drive. A neighborhood meeting has been scheduled for 5:15 P.M., on January 9th, located at the Eagan Municipal Center. FOR I ACNON 1. To approve the well house architectural/layout plan OR To revise the well house architectural plan/layout plan 1. ,t n® i;i i :5 :z :35:+;2: > >:o:•>:•:: = o~ LL t> I n^. i r t rJ lac, t'P«^i:E [e^P • , ~R 8 °G: a.e.a `a R sV ~•t.:~ii:.iirii+:: 4 eF d'.®ns c.n•® y iiii^'i:fi1~~?~=:~" ° • Oa leid CCL 4t ^d'. e d FIGURE 1 I s ~ i 4 i > _ rr F I ° , 7~; C i I 1 l ~ y 14 II I 1 m t l ' Ii,1 II m~!P~ f i B 1 I ~ i i' f f ;Jill 1. A neichborhood meeting with residents from the W ` cr t Addition, the to the east of the community, was held on r ,er 29th. The n '--u'ig was scheduled to explain there would not a road connection to their s ivision. 2. A meeting with residents of bridge Court, the Townhomes located adjacent to Goat Hill Park and the HUD property is scheduled for January 12th at 7:00 P.M. This will be an informal meeting to determine resident concerns regarding park development of the HUD property, etc. 3. The old McCarthy house was removed from ic7,~ r «z had contacted both the State and County Historical Sc .i,.- y, Lnd -ey had no ` interest saving the structure. The Caromission had 2arli declared "no park interest"; and the City's Historical Committee also stated the facility was of no value to them. The house had been subject to vandalism, prior to use by the Eagan Athletic Association. 4. Two residents have complained about the briaht lights at the Pilot Knob rink. lights are located t" • 'I in lights at other rinks. Staff r.' t has I- angle of light to determine if is any s-a-_y W Lc fl may cause the problem, or if it is just the r:wness cf th- lights that is causing the distraction. 5. Rick Bertz and Tim Pawlenty are organizing a "Vote Yes" campaign for thComm6. Program Number "Two" has begun airing on Cable, G" ,~~nne . 33 and 16, regarding the Community Center. A third show is plann l which will be a "question and answer" type show. 7. Letters have gone out to service organizations community groups, offering a presentation by staff on the proposed plans for the C inanity Center. The City Newsletter is to go to the printers by December 28th, and into Eagan homes scmetime after J Yy 7th. 8. The draft agreement is being finalized for the W." 3 p•- exhibits, property descriptions, etc., have been complet 1. At ue is the "top soil". Assuming this can be resolved, it's likely the property can be transferred early next year. 9. The glare shields have been installed at Goat Hill Park. The six fixtures selected were aimed predominately to the east- affecting on Avenue. Members may want to take a trip to the park to determine for themselves what input they may have had. 10. A line of eager parents began forming prior to 9:30 A.M. for the opening of winter program registration on Decenber 17. Pre-school activities receive the most concentrated notice on tat first c Activities such Imagine That, Me Two and Fit. ux 4 I.1 rapidly. The anticipated winter decline Tin cr alt or:<'Ll Activities participants did occur. Parents hesital to t-:ck:: wi,--1t(--,r driving with a 3 year old and an infant to be bundled up. 11. Parents of pre-school programs returned evaluation forms to the department. one recurring nt was attended to immediately, i.e., the morning sessions of Tiny Tots are now scheduled from 9:30- 11:30 A.M., because many Tbts parents have Kindergartners who 'io from school at noon! The evaluations positively re " fc_ _x_ _l the philosophy, curriculum and staffing levels of pre-school activities. The socialization aspects of the programs received high marks. Staff's observation of the high quality of leadership exhibited by program instructors v ifi_e d by those ficonpleting the evaluation forms. The department is fortunate to have Judy Forde and Dawn on. If any one aspect of the pre-school programs received n ative it was registration. Recreation staff re-reviewing equal opportunity/priority to current participants, annual registration/ two fiscal years, current registration procedure/adjustments needed to handle increased volume "in-person"/"mail-in" priority. and 12. A smooth opening of the skating r' o L December 17. The glitches were minor tt r "2N, ation ,::_:.L heard saying - "Opening! That's a piece of ctkel" Snow please, for Trapp F ! 13. S t' lessons will get underway on Tuesdays and Thurs&-iys, beginning on January 3, 1989. A s t' oval has been d _'loycd at Well Site Park. Staff is anticipating an increase in particij,.,ar,~tl-n-, this year. 14. Well Site will remain open until 9:30 or 10:00 P.M. on New Year's Eve. The department will shot cider. 15. The br ll leagues got underway as planned. Was it the spirit of the holiday season that prwpted one manager to call in his score and say - "the refs were terrific"?' (His team won!) Final count on broomball team is 28, compared to 25 a year ago. 16. North le Calling . . . over 350 K ' r ^ r g f r ` - and first q t ti ers received calls from Santa . volunb ; fn L Vie Jaycees, Rct.,iL City staff and staff spouses "Ho Hold" for surprised and excits_ld youngsters. There are war stories, ask Steve and K ! 17, The back side of the City map will highl ,f.t Parks Recreation facilities once again, we markc'. ything we can! 18. Looking ahead to the Winter Eagan on February 3, 4 and 5. Commission nvinbers have been so helpful with hosting events in the past. The opportunity to volunteer to help is extended the C fission a ! The events are: Family S- SHill Fri, Feb. 3 7 - 9 Skiing - -31t' Cross/Blue Shield Fri, Feb. 3 7 Ice Fishing nt t - Fish I' -,at. , Feb. 4 1 - 3 Sliding Party/Sr-mian ildin! - Trapp Farm, Sun. Feb. 5 1-4 The softball tournament will run all day Saturday and the broomballers want tou! 19. The Seniors Christmas Pot Luck party was well attended. Fifty -,)lks, including five first time attenders came. It was a sr-r? lr f- - '1-y 50 games of Bingo! Police Santa, Donn Smith, brought trma ~ the gathering. We even sang some Chri:t C roll good basses the group! 20. The warm weather early November early December efforts to begin the base flooding operation of the skating rinks. Flooding didn't actually begin until Wednesday, Decwber 7th, about a week a half beyond the anticipated starting date. is left only ten days for ice build on the rinks prior to the scheduled opening on Decemeber 17th. Needless say the rinks were in marginal to fair condition for the opening. The cold weather late December helped the maintenance to catch with the establishment of base ice. Sub-zero temperatures in the week following Christmas permitted flooding to bring the ice up good to excellent conditions. Work also began with of the Zamboni ice shaver leveling the skating surfaces. Thus far, - ff have concentrated on the A and B rinks, ` with shaving ° don- --ior to establishment of the red blue lines. By prel ° '.na -y at zr-_ s it appears that the Zamboni will greatly assist the 3oL -irtm L- in providing a high quality level in skating surfaces. 21. Relating to the maintenance of skating rinks, the new rink at Well Site is working out very well, as is the pleasure rink at Bridle Ridge Park. The tolerance of the grading operation at Well Site is extremely good, which has permitted the establishment of 17as`a it in on-going operations at this site. The new pleasure rink at ' '"?e Ridge Park is also good condition and offers a good size surface of approximately 100 ft. in diameter. 22. The six snow fall of December 26th, offered the first opportunity to groom the cross country ski trails this year. The Parks & Recreation Department is again contracting with the Lakeville Parks & Recreation Department this year for the grooming of cross country ski trails. All trails are now open generally good condition. At Patrick Eagan k, the ""olde" cross country sign also replaced to provide direction skiers. 23. The snowfall on the 26th proved to a fairly signific-1 clean-up operation for maintenance staff. Everyone worked e),zr-..-,ly hard on the morning of the 27th get all the cross country ski site areas and parking lots open by noon that day. The department managers were particularly pleased with the effort put forth in makang sure that the sites were open ready to use by that afternoon. 24. u ay® December 22, the old " y House" in trick Eagan Park was demolished removed, as per previous dip tion by the Comission. The basement area was backfilled with gravel dnd the well was capped on a temporary basis pending possibility of future use. 25. The de t received its operating for the lake aeration systems at Fish S 2 lakes. Testing of the aeration systems will now done in consultation with the Department of Natural Resources. If and when the oxygen levels reach a low level in the lakes, operation will begin under direction from the D.N.R. 26. John Vo Li e received a professional enrichment scholarship from the Minnesota Recreation and k Foundation in December. John will be using this scholarship to attend the 3rd year, Executive Development Program for Park and Recreation Administrators at Indiana University early February. December 16, 1988 Dear Cambridge Court Homeowner: Several months ago I spoke with Colleen Halley, oti, of, gig J in the Cambridge Court Association, regarding the le ge, o L.;'a property to the north of your residence. At the time of her call, acquisition of the land by the City for parks purposes a distinct possibility. Over the course of the last several months, the "possibility" of acquisition of this property has now become a "probability". Although the City has yet to come to final terms on the acquisition, it now appears that the department will purchasing this property, perhaps within the next thirty to sixty days. The department has been developing some early concept plans for the use of this land. Before we get deeply into the planning process, I would like to meet with you and other residents of Cambridge Court to discuss various alternatives address your concerns for development of i:3 property. I would l ` e to invite you to informal discussion on T1 - -day, J<-nnu:Iry 12th, at 7:00 P.M, Eagan Municipal Center (City Hall), .x.30 Pilot Road. This meeting will be on the lower level. I look forward to meeting you at that time. Sincerely, Ken Vraa Director of Parks & Recreation KV/bls cc: Rochelle Burnhart, Association gager Steve Sullivan, Landscape Architect/Parks Planner Tom Hedges, City Administrator 3830 PICOT KNOB ROAD, P.0 BOX 21199 VAC ELLISON EAGAN, MINNESOTA 55121 Mayor PHONE: (612) 454-8100 THOMAS EGAN DAVID K. GUSTAFSON PAMELA McCREA THEODORE WACHTER Council Members THOMAS HEDGE Clay Administrator VAN OVE City Clerk December 22, 1988 Re: Blackhawk Community Park Dear Resident: In response to your recent letter regarding Blackhawk Community Park, I would be pleased to meet with you and your neighbors to discuss your suggestions for use of Blackhawk Park as a nature center. Although, the City has not taken formal action on the issue recently, the City has previously designated Patrick Eagan Park for such a community use. Patrick Eagan is in excess of one hundred five (105) acres, and has tremendous diversity in vegetation and topography - making it an ideal site for such a facility. However, this is still some years off, so until some formal planning takes place, it will remain a preliminary designation. As you are aware, the City has been waiting to acquire a south access to Blackhawk Park for some years. The recent platting of the Blackhawk Ponds Addition, has been the start of that process. You'll recall that when the Blackhawk Oaks and Blackhawk Lakes Additions were being platted several years ago, the issue of access to Blackhawk Park was of concern to the neighborhood, Commission and Council. Then, as now, the primary access is through Palisade; adjacent residents wanted to have this designated as a local or a secondary access. The City's parks planning consultant prepared a site analysis and reviewed various alternatives for providing both access and parking. The access point ultimately chosen was from the south, rather than an enlargement of the existing Palisade access. It was recognized at that time that access would not be possible until development activity was initiated on property to the south. THE LONE O TREE...THE S BOL OF STRENGTH D H IN OUR COMMUNITY BLACKHAWK COMMUNITY PARK DECEMBER 20, 1988 PAGE TWO With the final platting of the Blackhawk Ponds Addition by Meritor Development, the City has been able to acquire a portion of the necessary road right-of-way for the south access. Additional property acquisition will still be necessary from Mr. Murphy, who owns some forty (40) acres to the south, to complete this connection. Survey work must first be completed before negotiations for property acquisition can be initiated. Consequently, until the City is able to acquire the necessary property, the beginning of the design/development process for Blackhawk Park will continue to remain on a "hold" status. Regarding water quality, the Parks & Recreation Commission has hear n aggressive force in trying to improve upon and maintain water quality within the City. In 1982, with the Parks System Plan, the Park. and Recreation Commission analyzed the potential for recreational use of some fifteen (15) major water bodies in the City. It was recognized then that Blackhawk Lake appeared to have "considerable potential" for year-round fish habitat. Unfortunately, the lake does not have sufficient depth to consistently prevent winter kill, and an intensive management program, including aeration, would be necessary. (Incidentally, Mr. Murphy tells me that the lake was once much smaller than it is today. The east portion of the lake as we see it now, was once pasture land. Evidence that the lake is indeed very shallow!) Two members of the Advisory Parks & Recreation Commission, along with Parks Superintendent, John VonDeLinde, are currently serving on the Eagan Water Quality Citizens Task Force. This Task Force has been establishing a list of objectives and priorities for sampling/monitoring ponds and lakes, as well as the development of an action oriented improvement program for water bodies that lie in or adjacent to public parks and open spaces. The Parks & Recreation Commission has just recently recommended to the Task Force, that Blackhawk Lake be considered a direct contact lake, and ranked #2 behind Thomas Lake. The recommendation for this high priority considered accessibility and the potential that this water body provides for recreational purposes. The water quality task force is still in the review process and no final report has been published at this time. In any case, we would certainly agree that the water quality of Blackhawk can and should be improved, therefore efforts by the City and the Parks and Recreation Commission will continue. I would be happy to meet with the homeowners of this area to discuss Blackhawk Park. As part of the normal parks planning process, the Commission would conduct a neighborhood meeting, extending beyond the adjacent property owners of the park. However, I can certainly meet with BLACKHAWK COMMUNITY PARK DECEMBER 20, 1988 PAGE THREE you to discuss your ideas and concerns. I would typically be able to ree4 you at your convenience and relatively soon, however, as project manager for the recently proposed Community Center, I amn, scheduled to b a presenting speaker at numerous public informational and civic organization meetings over the course of the next eight weeks. Might I suggest that a eating be set sometime in late February. If you have a designated contact -rson in your Association, I would be happy to work with them to set up a ®-te and meeting location. Sincerely, 1' r Ken Vraa Director of Parks & Recreation KV/bls cc: Tom Hedges, City Administrator Advisory Parks & Recreation Commission CITY OF EAGAN SUBJECT: REZONING/PRELIMINARY PLAT (COVENTRY PASS ADDITION) APPLIC : FRONTIER COMPANIES LOCATION: 1/4 SECTION 24 EXISTING ZONING: A (AGRICULTURAL) DATE OF PUBLIC HEARING: DECEMBER 22, 1988 DATE OF REPORT: DECEMBER 15, 1988 REPORTED BY: PLANNING & ENGINEERING DEPARTMENTS APPLICATION SUMMARY: Separate applications have been submitted requesting a Rezoning of 122.4 Ag (Agricultural) acres to an R-1 (Single Family) district and a Preliminary Plat for the Coventry Pass Addition consisting of 227 lots. This large triangular site is located east of Dodd Road abutting Inver Grove Heights to the east. COMPREHENSIVE LAND USE GUIDE PLAN The Eagan Comprehensive Guide Plan is the City's statement of goals, objectives and policies for guiding future development within the City. The Land Use Plan designates the types and locations of future land use for all property in Eagan. The boundaries of these future land uses are generally located for undeveloped or under-developed parcels. When a specific development project is proposed for such parcels, the locations and boundaries of the land use designations should be refined to reflect appropriate developments. The proposed project includes property designated in the Land Use Plan for D-II (Mixed Residential - 0-6 units per acre), P (Parks), and IND (Industrial). The proposed development contains 240 single family lots plus a 15-acre (approx.) park, and would be consistent with the D-II and P designations. However, the location for the proposed park is different from the area designated for P on the Land Use Plan. As such, the proposed project requires a Comprehensive Plan Amendment within the project boundaries to: 1) change the area designated P to D-II, 2) change portions of the area designated D-II to P, and 3) change the area designated IND to D-II. The amendment changing the land use designation from D-II to P and P to D-II is basically a relocation of the same uses within the project area, rather than a change in land use types. Likewise, given the current location of the D-II area to the south of the existing IND area, the amendment changing the land use designation from IND to D-II is essentially a refinement of the land use designation boundaries. 'ff I- PROJECT BACKGROUND The Comprehensive Plan, as well as the Parks System Plan, recognizes the need of a neighborhood park in this portion of the City. That area was previously illustrated between Dodd Road and the large pond near the center of the site. This application proposes to shift the park to the southeast portion of the site adjacent to industrial zoned Inver Grove Heights and the GB zoned Clarkson Place Addition to the south. The City's Parks Department reviewed this site and a park development plan submitted by the applicant to determine whether the proposed layout met the City's neighborhood park requirements. The 15.84 acres shown do not meet those requirements. 11.06 acres are above the high water line (HWL). Of that area only 2.4 acres have slopes less than 12% and .54 acres are between 0-5%. EXISTING CONDITIONS/SITE PLAN This site consists primarily of open grassland with scattered oaks near the pond and the farmstead east of the central pond. Those buildings, as well as the trees, will be removed with this plan. The plan assumes that the adjacent land in Inver Grove Heights will be rezoned from Industrial to Single Family in the future. If that does not occur, there is very little buffer between that area. Staff is also concerned with having so many double fronted lots along Dodd Road. The subdivision chapter of the City Code states: Double frontage and reverse frontage lots shall be avoided except where essential to provide separation of development from traffic arterials, or to overcome specific disadvantages of topography and orientation. A planting screen easement of at least ten feet (10') in width may be required by the City, across which there shall be no right to vehicular access. Said screen shall only be required along the line of lots where said screen would be at an elevation as related to the traffic arterial so as to provide an effective screen. All lots are above 12,000 square feet and are at leat 85' wide at the setback line. GRADING/DRAINAGE/EROSIONS CONTROL: The preliminary grading plan submitted as a prt of this application proposed cut and fill areas ranging from 30' to 25', respectively. Fill of approximately 25' is proposed to be placed over an existing 12" PVC sanitary sewer, 6" water main and 12" storm sewer forcemain in the southwest corner of the development. Staff recommends that these three lines shall be removed and replaced with new lines installed at the proper depths and in the alignment of Street A. The preliminary street grades as shown on the grading plan meet the City's standards. This development shall match the existing grades provided in the adjoining Country Hollow development. The grading plan shows slopes steeper than a 3:1 slope on Lot 19, Block 8. If the grading plan cannot be revised to show a 3:1 slope, then a retaining wall shall be required or a slope easement will have to be obtained from the adjacent property to the north. Staff recommends that the grading plan along the north end of Pond JP-25.3 be revised to show that the pond shall be excavated to the normal water level. The storm sewer lines that enter the north end of the pond shall be combined and discharge at the L. The development is proposing to convey the site generated storm water runoff from the north end of the site to Pond JP-56 as per the City's Comprehensive Storm Sewer Plan. The preliminary drainage plan proposes to provide for an outlet for Pond JP-56 to Pond JP-23, which also receives storm water runoff from the central portion of the development. As shown on the drainage plan, Pond JP-23 shall have a storm sewer outlet draining to Pond JP-24. The southeastern area of this development drains to Pond JP-24, and an outlet for this pond is proposed to drain to Pond JP-25.3. A storm sewer outlet pipe shall also be provided as shown on the drainage plan for Pond JP-25.4. A majority of this pond is located on parcel number 010-79, which is currently undeveloped. The Country Hollow 2nd Addition development shall be providing a storm sewer outlet for Pond JP-25.3 to Pond JP-26, which is in the Country Hollow Addition. A storm sewer line is proposed to be stubbed to the southwest corner of parcel number 010-79. This storm sewer line shall have sufficient capacity to handle a flow of 4 cfs. The proposed drainage plan for the southwestern portion of this development shall have a storm sewer system that proposes to convey the runoff of 20 cfs from this area plus the 4 cfs from parcel number 010-79 to an existing 24" storm sewer line on Lantern Lane in the Country Hollow development. The existing 24" storm sewer has sufficient capacity and depth to handle the projected runoff. Staff recommends that a storm sewer inlet be added in between Lots 8 and 9 of Block 6 to collect the runoff water in the back yard swale. The storm sewer inlet shall have sufficient capacity to handle 5 cfs. The development will be required to provide emergency overland outlets from all low areas. According to the drainage plan submitted for review, the development will be required to collect the runoff from two existing culverts that cross Dodd Road north of Elrene Road. UTILITIES: Sanitary sewer service of sufficient depth and capacity is readily available to the site in three locations along the south property line of the development. The proposed sanitary sewer line that is shown to connect to the existing 12" PVC sanitary sewer along Prairie Ridge Road shall be designed to handle a peak flow of 1.1 cubic feet per second. Staff recommends that an 8" sanitary sewer line shall be added along the lot line in between Lots 12 and 13 of Block 8 to serve parcel number 012-80. On a temporary basis, 42 lots in the Hills of Stonebridge development were allowed to connect to the sanitary sewer that drains northerly through the West Publishing development. As per the Comprehensive Sanitary Sewer Plan, the 42 lots in the northeast corner of the Hills of Stonebridge development shall drain southerly to this development. Therefore, this development shall add an 8" sanitary sewer line from Street K to an existing manhole on the east side of Dodd Road in the northwest corner of this development. According to the utility plan submitted for review, the developer proposes to construct 1600 of 30' to 46' deep sanitary sewer. Staff recommends that alternative layouts should be examined by the developer to avoid the deep sanitary sewer lines. Water main service of sufficient pressure and capacity is readily available along the south side and west side of the development. The development is proposing to connect to the existing 12" water main on Dodd Raod and loop through the development and connect to three existing 6" water main stubs that have been provided by the Country Hollow 1st and 2nd Addition developments. The 1988 Water Distribution System Plan shows an 8" trunk water main shall be installed through this development from the existing 12" water main on Dodd Road to the southeast corner of this development. Staff recommends that sanitary sewer and water main service shall be extended to parcel number 012-76 in the southeast corner of this development. STREETS/ACCESS/CIRCULATION: Street access to this site is readily available from Dodd Road on the west and three streets on the south that circulate through the Country Hollow 1st and 2nd Additions to Diffley Road. This development will improve the access to the Country Hollow development, which has access off Diffley Road in only one location. Temporary cul-de-sacs will be required on the ends of all stub streets. According to the street layout plan submitted for review, Street E is proposed to be a cul-de-sac. Staff recommends that the developer work with the southeasterly adjacent proerty owner (parcel number 012-76 and 017-76) to determine if Street E should be extended to the south for future access for these adjacent parcels. The additional traffic generated from this development will accelerate the need for Dodd Road to be upgraded within the next 2 - 3 years. Dodd Road is currently a rural section 2-lane street that is dedicated as a municipal state aid street. SITE PLAN: Staff recommends thta Lot 1 of Block 1 should be revised to dedicate an outlot in the northwest corner of Lot 1 to improve the street access for parcel number 010-53 onto proposed Street A. Access to parcel number 010-53 onto Dodd Road will be difficult and undesirable because Dodd Road is 10' to 20' higher than this parcel along its north end. EASEMENTS/RIGHT-OF-WAYS/PERMITS: The development will be required to provide the appropriate ponding easements for all the ponds in this development to the required high water level and storage volume requirements in accordance with the City of Eagan's Comprehensive Storm Sewer Plan. Temporary easements will be required for all of the temporary cul-de-sacs. All regulatory agency permits shall be acquired within the appropriate time frame as rquired by the affected agency. A 50' half right-of-way shall be dedicated for Dodd Road. SOIL AND WATER RESOURCES: Evaluation of the impact of this development on the City soil and water resources has been evaluated by the County Soil and Water Conservation District (SWCD). Their review and comments are incorporated in a memo dated December 9, 1988 and attached hereto. FINANCIAL OBLIGATIONS: Portions of the property incorporating this proposed development have been previously assessed for trunk related benefits from existing infrastructure facilities. Of the total area of 122 acres, 55.5 acres have been previously assessed for trunk area sanitary sewer; 86.6 acres have been assessed for trunk area water and 55.48 acres have been assessed for trunk area storm sewer. There presently exists a pending assessment under Project 541 for storm sewer laterals incorporating 3.5 acres at the total pending amount of $4,373.00. In accordance with present City policies, this development shall fulfill its financial obligations for the unassessed portions of this property described as follows: ITEM PROJ. RATE QUANTITY AMOUNT Trunk area sanitary sewer 505 $ 655/lot 136 lots $89,080 Trunk area water 505 630/lot 46 lots 28,980 Trunk area storm sewer 505 $ 0.053/sf 49.24 acres 113,679 Dodd Road Upgrade Future 24.02/ff* 2,608.54 ft 62,657 TOTAL FINANCIAL OBLIGATION $294,396 * One half residential rate in accordance with special assessment policy 87-1. All final financial obligations shall be calculated in accordance with the dimensions contained on the final plat and the rates in effect at the time of final plat approval. CONDITIONS: COVENTRY PASS 1. All standard conditions of plat approval as adopted by Council action on September 15, 1987 shall be complied with. 2. The proposed cul-de-sac in the southeast corner of this plat shall be eliminated and the street extended to provide access to the unplatted property to the south. 3. All necessary utilities shall be extended to the development boundaries as necessary to provide for future extension and/or connection to existing upstream facilities. 4. Lot 1, Block 1 in the southwest corner shall be revi:-o create a triangular Outlot for future replatting with the adjacent property to the southwest. 5. The final plat shall adequately resolve all concerns addressed by the staff report and these conditions. 6. All lots adjacent to Industrial/Commercial zoned land shall be noted as such on any advertising material. STANDARD CONDITIONS OF PIAT APPROVAL A. Assessments 1. This development shall accept its additional assessment obligations as defined in the staff's report in accordance with the final plat dimensions and the rates in effect at the time of final plat approval. B. Easements and Rights-of-Way 1. This development shall dedicate 10' drainage and utility easements centered over all common lot lines and adjacent to private property or public right-of-way. 2. This development shall dedicate, provide, or financially guarantee its proportionate share of the acquisition costs of additional drainage, ponding, and utility easements as required by the alignment, depth, and storage capacity of all required public utilities and streets located beyond the boundaries of this plat or outside of dedicated public right-of-way as necessary to service this development. 3. This development shall dedicate all public right-of-way and temporary slope easements for ultimate development of adjacent roadways as required by the appropriate jurisdictional agency. 4. This development shall dedicate adequate drainage and ponding easements to incorporate the required high water elevation necessitated by City storm water storage volume requirements. C. Plans and Specifications 1. All public streets and utilities necessary to provide service to this development shall be designed by a registered professional engineer in accordance with City codes and engineering standards and policies, and approved by staff prior to final plat approval. 2. A detailed grading, drainage, erosion, and sediment control plan must be prepared in accordance with current City standards and approved by staff prior to final plat approval. 3. This development shall insure that all temporary dead end public streets shall have a cul-de-sac constructed in accordance with City engineering standards. 4. A detailed landscape plan shall be submitted on the proposed grading plan and approved by staff prior to the final plat approval. The financial guarantee shall be included in the Development Contract and not released until one year after the date of installation. STANDARD CONDITIONS OF PLAT APPROVAL PAGE TWO 5. All internal public and private streets shall be constructed within the required right-of-way in accordance with City design standards. D. Public Improvements 1 . I f any public improvements are to be installed under a City contract, the appropriate project must be approved by Council action prior to final plat approval. E. Permits 1. This development shall be responsible for the acquisition of all regulatory agency permits in the time frame required by the affected agency. F. Parks Dedication 1. This development shall fulfull its parks dedication requirements as recommended by the Advisory Parks and Recreation Commission and approved by Council action. G. Other 1. All standard platting and zoning conditions shall be adhered to unless specifically granted a variance by Council action. Advisory Planning Commission City Council Approved: Auaust 25, 1987 September 15, 1987 Revised: LTS#2 STANDARD h n .f. ~ i " ~It/IRI[ (x Ra 1 e ,f tit ADD J00 ~dt ~ af' .rx~ •3 1 y ~ Fr~a~~ 0-m _ R_E 1 i i t { ~ ~p• 4_._ ~__a~ so t 4200 y^i "6 ~ ! !U6f TOR S SUMO MO i$ 1 711 x -log E E 0) m o V vs c 6., o ° ro ° c E 0= 52 c r` cn O 7,00 o t a A T7 m"' 'O Uf tai m V m= c Wx 0) Co-n, R, 0 'U f0 p tA m p. 4m)- 0 m I V5 -OD c'cm'Q Eammmocd a>cM-OBZZEs'ipo o r~ r N t9~ttgtt3r CtO~'tVf~ 0- {~,w~Ia rrrr cv ~j7 S1HOGH~l MOH H3nM ` I4 _ v e qw ~r 6 -fT m 2 1 6 t S LP: t c a 0 cc) o.9 t fi P ' ` i, ,l q. t tee. F i i I~ ~•f. A' r. I ~O t OD~` rte; k ~ ~ f ~ t BOUNDARY- SURVEY FOR MEDICAL INCORPORATED SURVEY OF : % ~ ,pp®* Vii,' + a,. , _ .'":..'.,..,s . "~i - - { .r Z we+« w . _ r PA BOUNDARY SURVEY I ,.T ....r. r = ....»k .was C ~k ?*~rniorx REFERENCE ONLY PRELIMINARY PLAT l1 OF fJ' I i"t1' COVENTRY PASS EAGAN, MINNESOTA j? D- I . 0 I .OVERALL PLAN- CD- k°~ ~.~~--t_- ? D~+s 3 l~ LIST OF DRAWNGS 1 / ~ y AWY iIAT ATM 4 19ELYiANY DW G AptA . I/~ x-J Yb s N[E -ARY GA GA AMGMA E got)T9 .a,nnWY q 1tYEY w€nEH[m mv~ err c KAT t _ 1 I e,r s: A AWr r a - Oj~,;.} ? L f - ? - _ i 1 ; .,•as~. a„vem.. e,r g6.O9.11Y nran* t' Q 11 , \ ~ ? . s ' `l ~ _ voyfL, W9•r a: A Arrr nan ~r~ ~---c--i®s I ."_-".Jf° ultm TY~A LLOT zon Ao+lnas>nN D Q Q-." VICINITY MAP SITE DATA LOT DATA - SITE _ .....a• :>a. PAW ~ r~ `~b ~ i yam- o.»,,, COVENTRY PASS PRELIMINARY PLAT I } V3HV 14J 109 ti :-77 1MId A, 11 F7 - „ ~~~a? -C? C I 'ZI J 7- 1 -77 t ~ a _ r rrt; x ( Q ' / , L---+~ k? 41? YImJ ? • to . ?fj~lf a.~M :;r+ i /S e j t a t~ ~ s ~ ~ • r ~ u ' ss ~ • J/~~ .L_ J ^ ,.G/'~ ~t~ s p' c 1 E i El !i t~ ? ? as ? ? N , / EILEI El El a ar e4 " t )IVd =Y r oaf 1 J d 'r -ci • ? s .r I • (f~'''(7 r Jam.. „ r .`t ,a,,y . s~f' Q _ w " ate. ET E];', Ell, LD 2: 0 M 0 El El 'M Nf = dsswas i lie 7 t - 1I Nay I ••s•NOIsemen-v~-••• .1 3 . ~ ia~ } 'El tj: u \@ li r )I.1Fv t t I C ~y AS ' iS 777 tl i i71F1 111M /t t v lit 1B _ KK r t ~l~y~. • i 'SFr ` ;....i fr y t ' r 1~ ariN.'A~ J t . + C t1 ~ HI w q p~ \ }~1 8 ®8 w $S~ t uli Z J T~ ilt~4 / e Q, 14 c4l b x i+ 1~~h I tit{ z'~ g t r xrK»s,nsr i, t6 t iti1 °t'?e ~.3j is1;~® t ~~IIII t C ' 4 t tj j' fit[ ~ All ? ~t ? Gj I I - ? El El c,: k p Ili -'C~ 4'R _ t t1 R S M t / ~1~ rat Y .S ~~1. C31 4. -El El El ;1 L~-F 4 Elt n y a E3 I Z ! p a: n r CL iasa a»~+s L-713fro *Jd J• ~ ~ < I`\ y7NM0 SNNSIAIV t`+1G e}(° i E-h• GGgr,[N f LQ7 j ljjj ~F!4 .0 JP-I6 = C!k 6 JP-446 3333 g9942. 8 2.00 JP 17 L~ 6 JP-4t' 848.. ji'• 6650 886.3 288ro L3-15JP_12 ell..; I 6Tg W JP-4p 7 :0 JP-32 8 't j ~ )P-I& n 54" s C~ 69as I 1 P- 6a1c+ Acs JP-31 j, V rti 1 C e8 p7r70 N r NVP.p J+1 4 ® Ta > JP-t9t:. 870.2 J-P JP-34 874.0 N-s- ,r 872J c n 892.0 JP-20 t 955. !_.S-17 J,w f r{{{ 00001* 23 2 ; -JP°2t 84.0 J t ?840,0 / r* 9s00 dw JP-22 MI ®ar> 836.0 4JP-2'9 LS-IB 817.05 1 I 1 JP-26 ( 804.0 J oo t j, 89~ 1~... TO~ S4A NO 77 JP 28 ct @36.0 J-bb it 969p HORN J_V LP-32 ~'i? 9730 'S0 _i.P-{ 9770 _ L 7- 892.0 884.4 9I7. 4 O 4.0 - - L3- ~FlBA LP-33 12 886.2 LP-30 LP-34 mar Lo- 7 9160 2S .i ? 4 8$9.0 b 99dp LP-49 29 9e o SUBJECT PARCEL of eagah approved: sty r LI G to WORKS MASTER PLAN DEPARTME (G , N -AA !2u ° 911 77~ 3 i c -~a~ N-Y N ell 4 i > ® _,i • stssa.~tai `fit 63C C•JJ ~ F 457 < a. A 10" K Key 56 10 ( to L C- I 1 1 112 4 l 53 L ss H o, I ) .I C L L c-es ccc ~ is - LAKES E PARK ! ~f C-Z 1 I t o V- 1 C - E E city of eagan rove : plat ar PUBLIC S"ITARY SEWER bWORKS DEPARTMENT b 11 _ Ile547/71.0., QLP 740 y, %l -.s/71.01 u r,- (t9 3/71.0 -20 16" 2 3 NNORTHVIEu IE» r`~r'+?'~ti 178: "7! n. PARK EAGAN WGH SCHOOL 20 ADDITION 0 „l GPM R 3 cu 11/75.0 A "A~ 2? r n w0 az \ E 20 87/100 71.9/95.0 I r IP 4 MG GRb47NO`~ F STORAGE 1 1 z - riw[. rose t_, ~t I I L.E 16n 18 01 f - 1 1 UBJECT PARCEL FIG#3 L.Jty of eac standard -in WATER approved ; Pia fie PUBLIC WORKS DEPARTMEN MASTER PLAN d df 6b s} fi ' Fe Q z a ~ a acct xp ~ a 4L Ix ,O,J r,. a suu ?®rM Ile Oll f i( ~l_®~ l I U ®W•• WY W®®® ® IWWi - Y. Rq i 8 1 ( ~ N ED) c l L? / • . •hl' Q _ / Off? . IJlf i t ~ mot. , \ ~ L... `f p~ ,O ~ a p `gyp c,°~• ~ °oa `®_!o ° Its . ti .Gp + 'fOi... ij o p pW '?i-t® jj• 0 fl 11-0 Ii•IOEn s nA.1 'p inn . li;,? I I rI; l ,.?aP RECEIVEDUC-C 6 123 PR iNARY PLAT 4/a ~e ZI opal A, Of ~41,0~?~?;C COVENTRY PASS (,lQ EAAN, MINNESOTA 0., -OVERALL PLAP4 r 0 1 :yi ~ ti 1 too 11 Q°. p. 1 11~ J~ Q°? Q' `fit .%r°'® 111 i 1' . a (1l i . w w ism X41 p C1>G 0 . m i lam 0 own 41 w.RY....~ ® V--L LOT ter~+er.uanr+ni > VIC°°rY M, A P T pom ftm ...Y~ SITE ,r^ '/1` 0 ` , r•'~"'j 1 .~,~•7"'• A, w.+..u,. w.,»+wr...* ....r Y.....ew .,,...r Ii d?l a ? : ?l:? oil 7 COVENTRY PASS r ar { .r Kn ,..w ~ fM YY,p .F.A.tIMI[}OY. ~ jy LL~ W g ti a tc a s i o ~E » tG C F I ° e. ~ Rt. n w = a R R RX 14 oj ,a~ ,r w, n"e c~rwt . . \ Q \ rrwMO LLI vo 10 : 13 r~ ' 1 larn 1n` (~Qw Ct (ga,.p 11. ± •a.. . CJ: twatawRr o ~n tl Jill I'll OR Oz ~~IIU ® i i • e i 1't ;•r i IjC'1 •Ilr LECEI'd lob P R INARY PLAT LA W~ (W COVENTRY PASS '0% 09 3 Fil _ \ EAAN, MINNESOTA 40 IV QE ORA cop ed ~ a • C p' i n°: r» Mau- No '7)6 10 0 ' 1 1 0. -0 : ~ q •L7 a`t' °-®'4 I`ll 'Ji i ! 0 0. ~ sw~c.~- A ~a O, QC! -0 ? - 1 1 1 1 - -70 d4 . ! O / ~U fl ! TIPK~ LOT 10 ' VICP-M MAP S DATA + ?0.000:01 ti { LOT DATA SITE .e 11 }1_ V ENTRY PASS $ r PRELIMINARY PLAT ~rcwn+~~ I[~f i. s~OIa M~a.w DAKOTA COUNTY SOIL AND WATER CONSERVATION DISTRICT Farmington Professional Building P.O. Box 129 821 Third Street Farmington, MN 55024 Phone: (612) 463-8626 MINNESOTA SOIL ANt)WATER CONSERVATION DISTRICTS December 9, 1988 To: Mike Foertsch City of Eagan From: Barb McCarthy and John Barten Dakota County S1,7-D Re: Coventry Pass Preliminary Plat Review Soil Resources Soils on site are generally well suited to the development proposed. According to the Dakota County Soil Survey, soils with a high water table occur in depressional areas on the site (see attached plat). These soils typically have a seasonal high water table within 1-3 feet of the existing surface. These soils also have a high potential for frost action. R -endations: Soil borings should be done by a geotechnical firm to determine the suitability of soils on site for the proposed use and the corrective soils work required. Water Resources The main water resource issue for the Coventry Pass Development is the impact of the land use change on the quality of downstream waterbodies. The increase in nutrient runoff resulting from the development of this area was estimated using models developed by William Walker Jr. and Reckhow and Simpson. The models estimate that approximately 78 pounds of phosphorus per year are currently exported from the site. Following development, approximately 104 pounds of phosphorus will be discharged to downstream waterbodies from JP-26. As shown on the preliminary plat, runoff will be discharged AN EQUAL OPPORTUNITY EMPLOYER into five different waterbodies. The drainage areas contributing to each of the five waterbodies is shown below: 15.65 acres to the North Pond 48.25 acres to JP-23 24.74 acres to JP-24 17.79 acres to JP-25 16.00 acres to JP-26 The Walker Model was used to estimate the wet pond volumes needed in each waterbody in order to reduce nutrient export from the site to pre-development levels. The necessary pond sizes and volumes are as follows: Surface size wet pond volume Unnamed North pond 0.5 acre 1.34 ac. ft. JP-23 1.3 acre 5 ac. ft. JP-24 2.3 acre 9.3 ac. ft. JP-25 1.3 acre 5,0 ac. ft. JP-26 4.5 acre 18 ac. ft. The grading plans for the site show that the size and wet pond volume for the unnamed pond are probably adquate for nutrient removal. However, the plans are not d--Aled enough to estimate the existing volumes of JP-23 or JP-24. The wetland inventory data shows that although the sizes of JP-23 and JP-24 are large enough, their depth will need to be increased in order to achieve adequate storage volumes. The site grading plans for the Country Hollow developments indicated that the volume and size of JP-25 is adequate for nutrient removal, but that JP-26 needs to be enlarged to function properly. Because JP-26 is the discharge pond for this development, it is the most crucial waterbody for reducing downstream nutrient movement. Erosion and Sediment Control Plan Review An incomplete Erosion and Sediment Control (E&SC) Plan submitted with the Preliminary Plat. The following are specific E&SC comments for Coventry Pass that need to be addressed: 1. The proposed slopes on the backside of lots 14 and 15, block 6, and lots 3 and 4, block 8, is steeper than a 3:1 slope. We recommend that all slopes be no steeper than 3:1. On slopes steeper than 4:1, we recommend the installation of erosion control matting. 2. It appears that lots will be benched. A lot benching detail should be included on the plan. 3, It should be identified on the plan under GC-1 that the site will be seeded and mulched within 15 days after rough grading. 4. Specifications for seeding and mulching the site should be included on the plan. 5. Silt fence should be installed on the contour and not up and down hills as identified on the plan. A detail for the installation of the silt fence should be included on the plan. 6. Under GC-1l, it should be identified on the plan that all areas will be seeded and mulched within 15 days after utilities are installed. 7. The plan should identify the location of construction entrances. A detail for tree rock construction entrance oad should be included on the plan. 8. Stormsewer inlet filters may be needed to prevent sediment from entering ponds. This detail should be included on the plan, 9. Stormsewer outlets should be adequately protected with riprap to prevent erosion from occurring. 10. Identify on the plan where topsoil will be placed, 11. Include anticipated construction schedules for: a. rough grading b, utility installation c, curb and gutter d. paving 12. A temporary sediment trap should be installed on lot 9, block 8. Recommendation For Action We recommend that erosion and sediment control and water quality issues be resolved before a grading permit is issued or final plat approval. cc: Frontier Companies Suburban Engineering CITY OF G SUBJECT: PRELIMINARY PLAT (TOWN CENTRE 100 7TH) APPLIC : FEDERAL LAND COMPANY LOCATION: OUTLOT A, TOWN CENTRE 100 6TH ADDITION EXISTING ZONING: LB (LIMITED BUSINESS) WITHIN THE TOWN CENTRE 100 PLANNED DEVELOPMENT DATE OF PUBLIC HEARING: DECEMBER 22, 1988 DATE OF REPORT: DECEMBER 15, 1988 REPORTED BY: PLANNING AND ENGINEERING DEPARTMENTS APPLICATION SUMMARY An application has been submitted requesting a Preliminary Plat for the Town Centre 100 7th Addition consisting of two lots and an outlot on 19.5 previously-zoned LB (Limited Business) acres within the Town Centre 100 Planned Development. This proposal for a single-story office building is consistent with the Planned Development and no amendments are necessary. The site is located on the south side of Town Centre Drive. EXISTING CONDITIONS/SITE PLAN Adjacent land uses are the previously-approved Waterford Apartments to the east, undeveloped Limited Business land to the west, Community Shopping Center land on the north side of Town Centre Drive, and the Duckwood Estates subdivision and O'Leary Park to the south. This site is primarily open, flat grassland except along the southern property line that falls rapidly towards O'Leary Lake and the park. The edge of the pond is heavily wooded and should not be disturbed if careful grading is practiced. The west side of the lake has single-family homes backing up to it and this site. The existing trees on these lots make a nice buffer. The homes are approximately 20' higher than the closest parking lot elevation. O'Leary Lake is classified as a General Development Lake within the City's Shoreland Ordinance. All building and parking setbacks meet Code requirements. The Minnesota Department of Natural Resources will also have to complete their review of this project prior to City Council action. The building area will be platted as two lots containing 7.2 acres, with the remaining area a 12.3-acre outlot. The two lots will allow separate ownership of the 52,400-square-foot building. A basement level contains 16,000 square feet and will be used as a storage/service area for the tenants only. The site plan was modified at staff's request in order to make the parking area more efficient and to increase setbacks along the southern property line and adjacent to the apartments. All building and parking code requirements have been adhered to. Two hundred seventy-three parking stalls have been provided. A bituminous trail is proposed around the north side of O'Leary Lake that will connect to the trails in the park and eventually to Town Centre Drive. An easement and trail along the east property line are desired by the Parks Department in order to provide this connection. Due to the steep drop towards the lake, the location of the trail will need to be staked in the field to insure site sensitivity. The building itself will be constructed of brick or limestone similar to the Waterview office building. A decorative sign band and parapet will blend in nicely with building elevations. The building and landscaping are integrated well. Staff recommends additional landscape screening near the southern parking lot area. GRADING/DRAINAGE/EROSION CONTROL: T1:e proposed site was previously rough graded as a part of the Town Centre development, therefore, minimal site grading is required for site development. The preliminary grading plan submitted as a part of this application proposed cut and fill areas ranging from 6' to 12', respectively. The development is proposing to construct three retaining walls along the south side of the proposed building. The development will be required to submit detailed plans and specifications for the proposed retaining wall construction for staff review and approval. The preliminary grading plan shows that no grading will be done below the L (high water level) of Pond DP-7- The proposed internal storm sewer system will need to be revised. The proposed storm sewer connection to the existing 12" public system in the northwest corner of the development will not be allowed. The existing 12" storm sewer in the location of the proposed connection does not have adequate capacity to accommodate the site runoff. Staff recommends that the site runoff in the northwest corner of the development drain through a storm sewer system that connects to an existing 18" storm sewer stub on Town Centre Drive. If the site runoff from the northwest corner of the site is diverted to the storm sewer system on Town Centre Drive, then the existing 12" storm sewer has adequate capacity for the site runoff from the southwest corner of the site. Then the proposed storm sewer system in the southwest corner of the site can connect to the existing 12" storm sewer as the preliminary drainage plan shows. The northeast corner of the site will be drained by a storm sewer line that will connect to an existing 15" storm sewer stub on Town Centre Drive. The existing storm sewer system on Town Centre Drive drains northerly to Pond DP-20. Pond DP-20 has an outlet via the existing 12" storm sewer system thaL drains southerly through the western side of the site and into 7od DP-7 (O'Leary Lake). Staff recommends that a storm sewer stub designed to handle a flow of 4 cfs shall be added to the northeast corner of Outlot A. The storm sewer stub shall connect to the existing 18" storm sewer stub off Town Centre Drive. UTILITIES: Sanitary sewer of sufficient depth and capacity to serve Lot 1 is readily available in Town Centre Drive. A 6" sanitary sewer service has been provided to the property line. The invert elevation of the 6" service stub is an elevation of approximately 897. Therefore, the garage level of the proposed building cannot be served by a gravity line to Town Centre Drive. Sanitary sewer of sufficient depth and capacity to serve Lot 2 and the garage level of the proposed building is readily available along the east property line of the development. A 12" trunk sanitary sewer line has been provided with an invert elevation of approximately 872.5. Water main service of sufficient capacity and pressure is readily available in Town Centre Drive. Two 6" water main stubs have been provided off the existing 12" water main in Town Centre Drive. The development proposes to take its water main service from the westerly existing water service stub provided. Sufficient fire hydrant protection was provided as a part of the Town Centre development. The preliminary utility plan proposes to serve Lots 1 and 2 with one 6" sanitary sewer service and one 6" water service. Staff recommends that each lot shall have its own sanitary sewer and water service. The development proposes to relocate two existing hydrants because the hydrants are located in proposed driveways. Staff recommends that the development shall add new gate valves on the hydrant leads when the hydrants are relocated. STREETS/ACCESS/CIRCULATION/TRAILWAYS: Access to the site is taken directly from Town Centre Drive. A proposed 24" wide ingress and a 24" wide egress driveway are proposed in the center of the development. Two other driveways are proposed; one on the east side and another on the west side of the development. Both of these driveways shall be 30' wide with 25' radii. The preliminary grading, drainage and erosion control plan proposes an 8' wide bituminous trail along the south side of the development. Staff recommends that the trail shall be constructed all the way to the west property line of the development and all the way to the existing trail system in O'Leary Park along the east side of the development. EASEMENTS/RIGHT-OF-WAY/PERMITS: Cross easements will be required for the proposed parking lot traffic to ensure that each platted parcel has access to public right-of-way. The development will be required to provide appropriate easements for all public utilities constructed outside of public right-of-way which serve more than one potential user. Sufficient right-of-way for Town Centre Drive was provided for with the original platting of the Town Centre 100 development. The development will be required to provide the appropriate ponding easement for Pond DP-7 to incorporate the required high water level and storage volume requirements in accordance with the City of Eagan's Comprehensive Storm Sewer Plan. Additional easement will be required for the 20' to 40' deep existing 12" sanitary sewer which is along the east property line of the development. All regulatory agency permits shall be acquired within the appropriate time frame as required by the affected agency. FINANCIAL OBLIGATIONS: This proposed development has been previously assessed for all related benefit from the existing infrastructure facility serving this proposed development with the exception of the following current pending assessments: PROJ # ITEM AMT 443 Ponding Easement Acquisiton $71,664* 512 Street Lighting 15,771* *Pro-rated based on area calculation of this development. Although the applicant has not revised the storm sewer/drainage plan in accordance with staff's directive, if final designs conform with staff recommendations, the additional financial obligation will be a requirement of this development for the connection to the existing 12" trunk storm sewer outlet from Pond DP-20 to Pond DP-7 (O'Leary Lake): ITEM PROJ # CLASS RATE QTY AMT Lateral Benefit - 429 Commercial $62.75/if $213.37/if $13,176 Trunk Storm Sewer The identified financial obligations of this development iould be imposed as a condition of final plat approval. All final financial obligations will be calculated in accordance with the final approved site/grading plans, final plat dimensions and rates in effect at the time of final plat approval. SOIL & WATER RESOURCES: Evaluation of this development has been performed by the County Soil & Water Conservation District. Their comments are incorporated as a part of the staff report and attached hereto. 1. These standard conditions of plat approval as adopted by Council action on September 15, 1987 shall be complied with: Al, B4, C2, C4, El, Fl, and Gl. 2. All trash shall be contained within the building. The building shall be constructed on all four sides with the same materials. 3. The landscaping shall be increased along the southern property line adjacent to the park and by the southwestern parking stalls. 4. A trail easement and trail shall be provided along the eastern property line from Town Centre Drive to the park. That trail and the trail along the north side of O'Leary Lake shall be staked in the field and reviewed/approved by the City's park planner before construction occurs. 5. All signage shall be subject to the one-time fee of $2.50 per square foot. 6. No rooftop mechanical equipment shall be visible from Town Centre Drive. 7. The site grading plan shall be revised to limit direct surface water discharge into the existing 12" trunk storm sewer through the western edge at 7.0 cfs. 8. A storm sewer extension shall be stubbed to Outlot A to the west from the existing 18" storm sewer stub in Town Centre Drive adequate to handle potential future flow of 4.0 cfs. 9. A 20' - 30' utility easement shall be dedicated adjacent to the east property line as necessitated by the depth of the existing 12" trunk sanitary sewer line. 10. Any relocation of existing utilities (hydrants, catch basins, etc.) shall be designed and constructed in accordance with City requirements. 11. Each newly created lot shall have a separate sanitary sewer and water service connected to the appropriate city utility. 12. The east and west entrance to this development shall have a minimum width of 30' with 25' radii. 13. This development shall construct an 8' bituminous trailway from the west boundary of this development to the existing trail system located within O'Leary Park to the southeast. 14, Adequate cross easements must be dedicated as necessary to ensure adequate access to public right-of-way. 15. This development shall conform to the Soil & Water Conservation requirements as identified in the County SWCD letter of December 12, 1988. STANDARD CONDITIONS OF PLAT APPROVAL A. Assessments 1. This development shall accept its additional assessment obligations as defined in the staff's report in accordance with the final plat dimensions and the rates in effect at the time of final plat approval. B. Easements and Rights-of-Way 1. This development shall dedicate 10' drainage and utility easements centered over all common lot lines and adjacent to private property or public right-of-way. 2. This development shall dedicate, provide, or financially guarantee its proportionate share of the acquisition costs of additional drainage, ponding, and utility easements as required by the alignment, depth, and storage capacity of all required public utilities and streets located beyond the boundaries of thi.> plat or outside of dedicated public right-of-way as ,sec: iry to service this development. 3. This development shall dedicate all public right-of-way and temporary slope easements for ultimate development of adjacent roadways as required by the appropriate jurisdictional agency. 4. This development shall dedicate adequate drainage and ponding easements to incorporate the required high water elevation necessitated by City storm water storage volume requirements. C. Plans and Specifications 1. All public streets and utilities necessary to provide service to this development shall be designed by a registered professional engineer in accordance with City codes and engineering standards and policies, and approved by staff prior to final plat approval. 2. A detailed grading, drainage, erosion, and sediment control plan must be prepared in accordance with current City standards and approved by staff prior to final plat approval. 3. This development shall insure that all temporary dead end public streets shall have a cul-de-sac constructed in accordance with City engineering standards. 4. A detailed landscape plan shall be submitted on the proposed grading plan and approved by staff prior to the final plat approval. The financial guarantee shall be included in the Development Contract and not releasedA until one year after the date of installation. Er STANDARD CONDITIONS OF PLAT APPROVAL PAGE TWO 5. All internal public and private streets shall be constructed within the required right-of-way in accordance with City design standards. D. Public Improvements 1. If any public improvements are to be installed under a City contract, the appropriate project must be approved by Council action prior to final plat approval. E. Permits 1. This development shall be responsible for the acquisition of all regulatory agency permits in the time frame required by the affected agency. F. Parks Dedication 1. This development shall fulfull its parks dedication requirements as recommended by the Advisory Parks and Recreation Commission and approved by Council action. G. Other 1. All standard platting and zoning conditions shall be adhered to unless specifically granted a variance by Council action. Advisory Planning Commission City Council Approved: August 25, 1987 September 15, 1987 Revised: LTS#2 STANDARD o nMd1 514E ~WA i ie _ t Ga P R q. _ A. 1 1~ € ~n f cAapuc ,/f r f 4 }1 couASt :Ei ~ g Ir x rn ~ !t 3, 0/ l s * ( / r .ti-I 2 TON, CARI IFGs caGl wGOT KNOB Now i~ TV, 'Orr ru M i' 1 . iy i y•21~= iB:i y S } N .011 1 Will 8° ;1 `AI=L i1 v c~ rl :Il" s ii 'az i8[ _I € I°:sla i celL~ 3c z s 1 - - - I Y~ i has:i P•;Ei a i i a' i - I.. x, r_ P i,l ~ wall .}2e i~°~ 1 illi $ i z 2 y i ~ 1; 1 G ° S 3~. •I I s seta LWL OU) _a~m ~r J 1 co: /Aw P. Y a / twl co: e11 3YO,OO.,N 1, q~; L_"____r__.+~ --I F I v : d 1.ni: }i , 0 IH 1=4~ s {fig eT~ A j, %M1 _ZZ / a TOWN CENTRE OFFICE PARK PREUMARD ANAL WA RAND PREP D MFTAE CAP P*tf" N441 A4f lA4 CAP P 4X.A1ED LASS 811KF'UP SOUP STOF* / * CR FACE $ .rLnna°natrsrv'cgre. ~ r 4 i t D D STC,UKRWE - (4 D ® PREf D -SUSN IANI t \ D A[C4X)STICA4. PARTIAL ELEVATION g6tAAFED (AASS - } Q u s z STOP- / SRKC PACE - • e= TOWN CENTRE DRIVE - - ivr = - - ' a to' _ >aa,..w WALL SECTION ( P.) i W d two z DATA V t.r_.r _ .es-e•_ WKORIG AREA PAAU EMe Fw9f Flow 11.100 SF 3 B.. wr A 12,500 SF O - r Phan Two F:s1 H.- 10,S04 SF a..-.w -x_240 SF _ - - Toial Finn Uow 52.40 SF t _ S' t •as<mtt4 44,000 SF PARRMG aae <.rrwr R<qked 452,400 SF % 05%). 450 Sf 217 54aUs ate 1 PeoaxlM EhAd- 271 SlAtk - - .n c; TMa1 111 PLAN J}fF} _ \ SflIFYICINITY MAP I e w l 1• -;,j 1 A ' t i a8 r , / All. G ~ 1 ~b I ~ ~w r .1 f~ s F~ c- ti J r p r ~ bx e .s ' II K X~7ie' t 1 6. 41 a®v ® "y® s w ui 4 err W ` y- A : .i a J °z J zz r t t 0U a~ / r a LL, i w w it sis ( I `a I III, x 3 1 a ~ ®z I w \ \ r tl 1 1 i x I. 1 I 0 y p yA p' _rn. 1.__ a ti t / x II 5 r-1 PLANT LIST / + -tllo -%W 4 I ara u zt, BG5 / n V `F'tar t2 2 r f 4 - a'3 ei~ g cv G~tNKlrO f ~a/! ti !oC) 6tLO t ! Zf/,- !56 AP aiJ`1! 1ztAN i~IN! iS G3Ni rS NIG, A 44 c), 6 -16 V 1595 GC / AXOKAA, M Z7? 7A° Par 5' OL. Cr, gte CA4ZFI~T nt a+ / rs ac o zA° Fir z° c.c vs w PUT C°oc, A!7 J / z a i4 yft° r 4 D. L. offisman 40 zn y ZIK por° 12° Oc o CENTRE DRIVE ace amts lid a'LEARY FAKE AID -...».w~..w TOWN CENTRE OFFICE PARK FEDERAL LAND L=j asrw4ppniwnv+a• K ~ PLAN e a+t•.1®cow.•ar X . MH COMPANY Preliminary plot TOWN CENTRE 100 SEVENTH ADDITION -N` / r T_ \b \\\xgex 6, +dw 43vft[rF P4 Slftl aAOeT}O:. ecor,rnre~ . P.G pl.x x)r o MV/f -All - raa¢: a~oac uar .Apox~c waamrz a.ra. maws arr,..,u,aa„- wx 1. sa«. a um.+aa .a. ex.r ..smog aa. sma .a. rc. ro.anox vs.am .v. rx.r +.oro.a . ao+ a. as«m a aam.mss rx.r a.muol u.las .a-mx_ro.anu aaa.msa .a. as.r a+on ac mx • sss. »m .a. rc. na. z.mm+.< ».aas .a. rx.rl.mnm+,. .rao.,s•se aecu, rso.on ,a.:c.r».>assa ane. s...a. rx. ra. ams sa as.as, .a. rc. ras. uoaa r..p.m.. r.r >w e® . /'.;,,-'h BOEBHAVE UNOSUA YEYiP. ..o. r.a ,+.e <...+n~ Vaermrt,-Y~u_ C ae4,+-a..v ~"3': r n° su... sV . SHEET I OF 2 SHEETS YANKrE Q5 1220 T CE RE 12 2$ DP-x -P2 2 r I 4J 1 1 121 \2 10 I - ',,SRI A7-~ T0WN CENTRE ~4a0 ?Y ~ SEVEN AG T0 N 21 O'Ll 1243 r N 1,358 2 5 JGK 124 w a= r t- • t y UCKW DD RIVE' 28 627 41 2 4 NARGER city PiJOLr,, 11ppro* pis to WORKS cC FAR U TY SOIL AND WATER CONSERVATION DISTRICT Farmington Professional Building P.O. Box 129 821 Third Street Farmington, MN 55024 Phone: (612) 463.8626 MINNESOTA 4L SOIL ANDWATER CONSERVATION DISTRICTS t Decemoer 12, 1988 TO: Mike Poertsch City of Fagan RRC`°`: Lynn Cnakoian and Joan Barten Dakota County Sm"'D !RP.: Preliminary Plat review of Town Center Office Park. Soil and Water Resource Review Soil Resource Review current soils information is availaole for this site. Previous gracing work has disturbed the natural soils. To ensure tnat there are no limitations for building faun'iations or streets, soil borings should be taken by a gc:otechn ical fi r,r. O,7ater Resource Review The main water resource concern for this site is tide impact of development on the water quality of P-7 (O'Leary Lake). P-7 is classified as a Type II waterbody and is ranked as one of the five most important waterbodies by the Pagan Park Departrent. The impact of site development on JP-7 was estimated using a model developed by William Walker Jr. The ,walker Model indicates that pnosohorus loading to VP-7 from this 7.23 acre site will increase from approximately four pounds/year to twenty pounds/year following development. The ,Walker Model indicates that a properly designed pond with (.4 acres of surface area and 1,5 acre feet of wet pond volume will reduce nutrient loading to near pre-development levels. The pond should be triangular in shape and have a mean depth of at least four feet. The inlet and outlet pipes should be at opposite ends of the pond. AN EQUAL OPPORTUNITY EMPLOYER Erosion and Sediment Control Review The following review is based on the Preliminary Grading, Drainage, Erosion Control and Utility Plan submitted with the preliminary plat. The following General Criteria were not addressed in the plan. These criteria need to be satisfied before a grading permit is granted or final plat approval. GC-1 and GC-2 Stabilization of denuded areas Seeding and mulching specifications and schedules need to be provided on the plan. The area of primary importance is the fill slope along the lake. CC-3 Protection of adjacent properties Some specific plan needs to be developed to keep sediment out of O'Leary Lake. A berm and sediment basin system may be possible or the slope may be benched to reduce runoff velocities and volume. In addition Building Construction traffic must be prohibited from the fill slope areas along the Lake. The practices to be used must be clearly labeled on the plan. CC-4 Construction schedules Preliminary construction schedule must be on the plan that outlines when sediment trapping measures will be installed and when seeding will be accomplished. GC-5 Sediment basin If a sediment basin is used on this site the design must be to Soil Conservation Service #350 specification. GC-9 Stormsewer inlet protection We recommend placement of silt fence around stomp sewer catch basins that are located in unpaved parking lot art,.:;. Use of this practice depends on construction schedules, but a detail should be provided on the plan that shows the design that may be needed. GC-l2 Construction access routes All ingress-egress points to the site require a rock construction entrance. Nhere these will be located and a design detail must be on the plan. CC-13 and CC-14 Disooosition and Maintenance A contact person must be named on the plan who will handle erosion control compliance questions, should they arise. cc: Federal Land Company Westwood Planning and Engineering Company