3240 Denmark AveA Structural Steel Special Inspection Final Report NWA Federal Credit Union Denmark Avenue Eagan, Minnesota Prepared for Shaw Construction Project AV-04-06333 April 12, 2005 Braun Intertec Corporation BRAUN Braun lnfartac Corporation P'nane 9529952000 INTERTEC 11001 Hampshire Avenues Fox 9529952020 Minneapolis, MN 55438 Web boun..terlec co. April 12, 2005 Mr. Earl Gebauer Shaw Construction 7685 Corporate Way Eden Prairie, MN 55344 Re: Structural Steel Special Inspection Final Report NWA Federal Credit Union Denmark Avenue Eagan, Minnesota Dear Mr. Gebauer: Project AV-04-06333 Please find attached the Structural Steel Special Inspection Final Report for the NWA Federal Credit Union (Wings Financial) and the supporting Special Inspection Daily Reports for your review and records. Special Inspections and Testing Procedures The special inspection services were provided by International Code Council (ICC) certified special inspectors in accordance with the requirements of Chapter 1700 of the International Building Code (IBC), the Special Inspection and Testing Schedule and the project plans and specifications. The purpose of the special inspection services is to provide a review of the work being performed by the various contractors to determine if the work is being done according to the approved construction documents. The special inspector does not have the responsibility or authority to, nor is it the intent of special inspections to have them, judge or modify the construction documents. Only the structural engineer of record can do this. As the special inspections were completed, a Special Inspection Daily Report was prepared to summarize the result of our inspections and testing. Copies of this report were provided to the site representative of the contractor for his review and records. As part of this report, items needing correction or discrepancies observed from the approved construction documents were noted. Plans and Specifications The approved plans and project documents were used for our inspections throughout the duration of the project. From time to time, we have received plan modifications from the project structural engineer. When received, these have been used to evaluate the work completed in the field. Visual Weld Examinations Visual weld examinations were conducted in accordance with American Welding Society (AWS) D1.1- 2004, Figure 5.4 and Table 6.1 requirements and the requirements of the project plans and specifications. Providing engineering and environmental solutions since 1957 Shaw Construction Project AV-04-06333 April 12, 2005 Page 2 Bolting Observations Bolting observations were conducted in accordance with the requirements of the project plans and specifications to determine if the boltholes were filled and, if used, the splined end of the tension control bolts were separated from the body of the bolt. Removal of the splined end is a direct indicator the bolt has been torqued to the minimum snap off load. At connections where the splined ends were not removed, or if standard hex-head bolts were used, the torque applied to the bolt by the contractor was determined using a hand-held torque wrench. In addition, each connection was observed for fit-up and to determine if the various plies were in contact with one another. Deck Weld Observations Deck weld observations were conducted in accordance with AWS D1.3-1998, Section 6.1 requirements and the requirements of the project plans and specifications. In addition, the location and the completeness of the side lap fasteners were observed and evaluated. General Services performed by Braun Intertec personnel on this project have been conducted with that level of care and skill ordinarily exercised by members of the profession currently practicing in this area. No warranty, express or implied, is made. Thank you for the opportunity to provide the special inspection and testing services for this project. After review of the attached Structural Steel Special Inspection Final Report, if you have any questions or require additional information, please call Dan Graham at 952.995.2524 or Mike Heuer at 952.995-2258. Sincerely, BRAUN INTERTEC CORPORATION Daniel P. Graham ICC Certified Special Inspector-S ctural Steel and Welding Michael M. euer, PE Vice President-Principal Engineer Attachment: Structural Steel Special Inspection Final Report C. Mr. Arlen P. Grant; Mattson/Macdonald Structural Engineers Mr. Rob Golish; Braun Intertec - Lakeville Mr. Dale R. Schoeppner; City of Eagan Inspections Department Speclnsp Rpt-NWA Fed Credit Union BRAUN Braun Inlerle< Corporation Phane 952 995 2000 INTE RTEC 11001 Hompshue Avenues ran 9529952020 Mvmeopolo, MN 55c38 Web O'mc ..tetlec co, Special Inspection Final Report Page 1 of I City of: Eagan Date: April 12, 2005 Attention: Mr. Earl Gebauer Project: NWA Federal Credit Union Denmark Avenue Eagan, Minnesota Braun Intertec Project: AV-04-06333 In accordance with Section 1704 of the International Building Code and the agreed upon scope of services, special inspections and testing has been provided for the following items: 1704.3.3 Bolting. The bolted connections detailed in the attached reports were observed according to the requirements of the project plans and specifications. Corrections were made as required. No 1704.3.1 Structural Welding. The welded connections detailed in the attached reports were observed according to the requirements of the project plans and specifications. Discrepancies were noted and documented. Following the required corrections, the connections were found to be acceptable. There are currently no outstanding or unresolved structural-steel-related issues. The deck welding and side-lap fasteners detailed in the attached reports were observed and found to be acceptable after review by the project structural engineer. There are currently no outstanding or Conclusion Based upon the inspections performed and the attached reports, it is our professional judgment that, to the best of our knowledge, the inspected structural steel related work was performed and completed in accordance with the approved plans, specifications, structural engineer provided modifications and applicable workmanship provisions of the International Building Code. Inspecting Firm: Braun Intertec Corporation I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Michael M Heuer, E Vice President-Principal Engineer License Number: 15571 April 12, 2005 Attachments: Special Inspection Daily Report Steel I through 3 Mattson/Macdonald Field Report dated November 29, 2004 Providing engineering and environmental solutions since 1957 BRAUN SIDRFT I NTE RTEC Special Inspection Daily Report City of E4«? Report No.: S? rl..,n 1 CFe??' Date of This Report. t t- I I ^o,{ Project Name :W F vrtt,.c'r.t ?eraora\ C.??}tM-a-+Project No.: Au- O`( - ora 313 Project Address: Client: 1 ) Crsv Cart cFi Client Project No.: Weather: Iu,c,,.y Temperature: Y/ .F Type of Inspection: Inspection Coverage: ? Continuous ? Masonry ? Rebor Placement ? Foundations ? Special Cases Periodic ® Welding & Bolting ? Concrete Placement ? Fireproofing ? Piles & Piers ? Tendon Placement ? Soils Did the architect or engineer authorize changes to city approved plans? Yes ? (listed Below) No ? D?cription and location of work completed: t TT r^ r] ?ca r J a t 1't 1r ??\2? l spa f\ O-? t?v l- 1.Q yo- G, , A ' 1-4 - A'1` 1 C?4? rocr?? l.a t r1 VN-e.G List tests performed: • Are there any discrepancies noted from this day's observations? Yes ? No 12 • Are there any outstanding discrepancies on this project? Yes ? No • If yes, see attached Summary Sheet. To the best of our knowledge, work inspected was done in accordance with the approved plans, specifications and applicable workmanship provisions of the current IBC/UBC, except as noted above. Signed: Zl) LM- Print Full Name: aoy..e t tD V Date: // - I.D.No.: (owoFS,-K White copy to Braun Intertec file. Blue copy to Project Site Representative. ProvidirrW engineering and environmental wluaons since 1957 1 clry=- NTERTEC Special Inspection Daily Report City of L a v\ Report No.: $'I^rW f'tin 1-;20 Date of This Report: ProjectName: kc`3• c F.v+Mw "r 4c'Pin) _ Project No.: m6 3 3 3 Project Address: J CV-e-J t (_)*ai- -- - - - Client: SI,., X A cows I,'? t-ta- Client Project No.: Weather: r t - Temperature: Type of Inspection: Inspection Coverage: ? Continuous ? Masonry ? Rebar Placement ? Foundations ? Special Cases I Periodic Welding & Bolting ? Concrete Placement ? Fireproofing ? Piles & Piers ? Tendon Placement ? Soils Did the architect or engineer authorize changes to city approved plans? Yes ? (Listed Below) No ? Description and location of work completed: 'O \ A 0r c.? 1ti12. US o..>?O?" S? c? ? n ?c..c 1-et,.,71rS G• ` ? A ^ L ?t ,kol PAL Lg2t- .? S'?l P t sle, ?c?t s mot( G ` Z Ac] -? - 3 BarrQ? tv-'\A- ?Q,t+,\ ??SI 1. (SeL? ceaCJ-5 1'0 ?e vz4LLqxj 12.' aQh i ysa t Q??+?? ?, / e fllrw•?. 4L?1s-av 4 Pi.a 'r?n I^aV, eY+ I ')b ?P +L° u t2xJ2cJ? ? ? Ill Are there any discrepancies noted from this days observations? Yes r®7 No ? ?2 o f • Are there any outstanding discrepancies on this project? Yes rr?r No ? • If yes, see attached Summary Sheet. To the best of our knowledge, work inspected was done in accordance with the approved plans, specifications and applicable workmanship provisions of the current IBCAJBC, except as noted above. (? Signed: Date: a n rtL?/ nf? p Print Full Name: d)wA o I.D. No.: ?O 3-y) ?S White copy to Braun intertec fife. Blue copy to Frojecr Site Representative. Providing mgmeennng and environmental solutions since 1957 Co,nti4 teatio of Special Inspector Daily Deport 1 N T E RT E C City of <nv? Page of _ Report Number: lid vc?,rCi sLeo??at Date of This Report: 11-i?-Jq Project Name' ?^? F awr ??I^r l t Project No.: ,4 V- og - aofo m (Note: This is a continuation of a report. The first page of this report has information which should not be ® separated from this continuation.) Y i v.?Q?Pr A?..c SOI.:zS ?n,Tr ? !Sa-.i? s f- J L TAC 5?04L l?l w.'? Tb '?0 1 Prs? Ct,??iP c? 1 " Uatf rR J0. ? ??' a?3 c 1 weld erA ? t'o112c? ? Sze ?1-e .r =LQ ?nv`QCY?bu.\ V`Q_J e& 1? SC - Q31? 3,V•, Teus o c ?+r`?'o? 'dolts o-t' Roo- L? .?? G? Z- A ?. ?t _. . A :?_.• ... On r1AA.m. +Nn'3l C?$CbQpfil.¢.?05 'rt.2 Fo l\o ? ?t a r ?.I 8. l+ M;,sH< o ?o,fil_ ox? c,LLX'. C" 4 taP2 To the best of our knowledge, work inspected was done in accordance with the approved plans, specifications and applicable workmanship provisions of the UBC, except as noted above. Signed: J ` Date: 11 ?1 oy Print Full Name: 'A m", p 6 a? I.D. Number: I o°'to R V - (White copy to Braun Intertec file. Blue copy to General Contractor.) f=\specinsp.422 4/24196 eon'tnuatkiii ©f BRAUN" Special `nspector Daily Plep°r€ Page .? INTERTEC °f? City of (-- °-C q'v'? s} eo C? a Date of This Report: Report Number: 54'uCj'Lyat if-a7-o Project Name: W? 1p,fsX-t LM f CeekL C } Project No.: 10Ca (Note: This is a continuation of a report. The first page of this report has information which should not be separated from this continuation.) a +a s a tzti,? 3 L?. tA- A ph&JIly Tr ?QvCe (?? P SC? To the best of our knowledge, work inspected was done in accordance with the approved plans, specifications and applicable workmanship provisions of the UBC, except as noted above. Signed: ` '?Y \ Date: 111a-o I l 1 i? S Print Full Name: I.D. Number: (White copy to Braun Intertec file. Blue copy to General Contractor.) frm\specinsp.422 4/24196 ace ' NTERTEC Special Inspection Daily Report City of L45o,. Sk- t N R S t-g ?? L b' 3 Date of This Report: i 1'.z- v,4 ?, o.: epor , aJ y W S' F t l ??aia ProjeciNo : AV-Ot-(- 033 u1* Project Name: • ^ ti . . Project Address: Clientr `r (n - r o c N (,? Weather:/ Client Project No.: Temperature: Type of Inspection: Inspection Coverage: ? Continuous ? Masonry ? Rebar Placement ? Foundations ? Special Cases Periodic ® Welding & Bolting ? Concrete Placement ? Fireproofing ? Piles & Piers ? Tendon Placement ? Soils Did the architect or eng ineer authorize changes to city approved plans? Yes ? (Listed Below) No ? Description and location of work completed: Q m <, g L ? te,sa?o vshk\w / 61 ` a 2. r-3 - 170, rfal ?A ALo WPI IS v4- 4.ae Nd-?c+a? a• 11-- ((JJ rG-?^C^ '^rt OJ?vJ ?M1?flr h'?j? D l R? /- h VII_?t A V N L.a,C t?Q1V e L?fYL "?4 ? lk O K '0, YOWw [? ?'t iw _Q A e- cLp Le O p fe 14,n1?1 r4n..3(?-?/tZe 14?Cr.S nocJ r.92lClo? aw? ??-alz.lLer? ?e Crfrted: p y? ?? ?• ci t r C d tr t UP - J co-ti se? l C t _ t Cv_•1- ._..__ni044 . cf.Q?.\ 7L4i, q15 ;k J o0 t',4'4Q? 1).. I i- • Are there any discrepancies noted from this day's observations? Yes ? No • Are there any outstanding discrepancies on this project? Yes ? No 'gs • If yes, see attached Summary Sheet. To the best of our knowledge, work inspected was done in accordance with the approved plans, specifications and applicable workmanship provisions of the current IBC/UBC, except as noted above. Signed: Date: Print Full Name: 10'n'(L I. D. No.: (OSVJf 5-^Jr6 White copy to Braun Intertec file. Blue copy to Project Site Representative. Providing engineering and environmental soluaom since 1957 ContinuaLon of Special Itespector Daily Report N T E RT E C Pale of City of FuI i Report Number: S v chid 51 a? `?3 Date of This Report: - Project Name: FAJ4z-J Project No.: 4 ? - oL4 - oG z a e (Note: This is a continuation of a report. The first page of this report has information which should not be separated from this continuation.) 1 I tj La- (;.. I co\v, " G ? 80,7r,,-eel y .t l? o w P+o? ('l.ed lk4 Le A ?7f y 1ekc? c ;wl tf ?+ Cam,. A- c Fa.?tac,9 a.?? cew,?ta.?er? F 't itl- tyre t ?? o Oe% ve. 61I A i t g tir r, Yer re„'eaerj h A 0,-e e. ,( Fr - a? httI1 4alL tzTe ?cYU 0 L" rDDp- S C III utnti Ca fa 11,T 3oC 14,C.k.Q S To the best of our knowledge, work inspected was done in accordance with the approved plans, specifications and -applicable workmanship provisions of the UBC, except as noted above. Signed: Date: 1 i L-off Print Full Name: Oa-, -e k ?r[7 mom- I.D. Number: /aV65(?-'Er, (White copy to Braun Intertec file. Blue copy to General Contractor.) frm\specinsp.422 4x24196 i® 0 ¦ i® L 0 Q W L Post-ir Fax Note 7671 401 Date 1Z-1 pa ge To From AROZ.- Co-/Dept ^ T..r Co. Phone # f$ 5 ?q56 Phone # _ Fax # Fax # . C I L . == Mattson/Macdonald Structural Engineers 11516WLake Street IMinneapolis, MN 554081p:612.827.7825@612.827.0805 project: Wings Financial reporter: Arlen P. Grant e-mail: arlen@mattsonmacdonald.com dateltime: November 29, 2004 1:30 pm job #: 04338.00 weather: Mostly Sunny, 30 degrees Contacted on Site: 1. David, Shaw Construction 2. Jeff, Steel Stud Contractor 3. Tim, Structural Steel Contractor Items Observed: 1. Interference of structural steel column base plate and steel stud shear wall base attachment 2. Interference of night deposit box opening with light gage x strapping. Interference of structural steel canopy beam with light gage x strapping along east elevation. 3. Northam barrel vault roof beam is bearing on 213 of tube calumns. This is structurally acceptable as built 4. The south east canopy structural steel column top plate has been field welded at the north and south sides of column in lieu of boiling. This is structurally acceptable as built. 5. Short W12 beams at sides of northern building recess have been field welded in lieu of bolted. This is structurally acceptable as built. Items Discussed: 1. Structurally acceptable to omit steel stud shear wall base attachment where it interferes with the column base plate and run x strapping past the shear wall jamb and weld to the structural steel column with same weld specified for jamb member. 2. Structurally acceptable to move the and of the shear wall jamb north approximately 8' where It Interferes with the night deposit box rough opening. Structurally acceptable to anchor the light gage x strapping to the top of the adjacent structural steel column in lieu of the light gage jamb where it interferes with the canopy beam. 3. Structurally acceptable to install shear wall base anchors at inside of stud assemblies where door frames will Interfere. 4. Jeff stated that he thought there would be issues with hitting the rebar in the masonry bond beams when installing the anchors at the base of the light gage shear walls. Stmcturelly acceptable to cut the rebar when these bars are intersected. Per later conversation with David, the anchors installation is difficult due to hitting the rebar. Cutting the rebar is difficult and may be cost prohibitive. The steel stud contractor will attempt the installation of more anchors. Final coordination of this will be forthcoming pending input from the Mattson Macdonald, Shaw Construction and the Steel Stud contractor. 5. Discussed structural steel loose brick lintels with David, Jeff and Tim. It appears that all the lintels are on site. 5. Structural steel tube at the front of the entrance tower will be located at the top of the window. The location of the tube will be coordinated directly with the window shop drawings. Copies to: Earl, Shaw Rob, HTG Architects 0°11.09 . Wa 2005 COMMERCIAL PLUMBING PERMIT APPLICATION CITY OF EAGAN 3830 PILOT KNOB ROAD, EAGAN MN 55122 651-675-5675 AS3o. n Date 0 5 i i S p Site Address 32,4c) , +vti, p tt Tl 2 • Unit # Tenant Name (a l"s 1 2.?d ?c t a c C94fl ' ? U} 3 tas Former Tenant Name Property Owner Telephone # ( ) Contractor D/-\L F= 5,??. C N SEn? ?'o +'? P A u `t' Address CIZo L n st wv w + sv > ?iZeEt Jr>? 1 City ?j cc? tic +,1?# State _ 1Vl a Zip `j 5 Q 7-c: Telepbone # (`j 5't) A % 4 - I'7 Z 3 License # 4' M Z.7 6S Expires: tZ- 31-vS The Applicant is Owner >,C Contractor Other Work Type 'C New Bldg Modify Tenant Space _ RPZ _ PVB _ New _ Repair/Rebuild _ Replace _ Irrigation system Work within public right of-way/easement _ Yes _ No Rain sensors are required on irrigation systems Description of Work 1N4? lstR tc/??i. rtts?r To inquire if Pressure Reducing Valve is required on new service, call 651-675-5646 Meters - Call 651-675-5300 to verify that hydrostatic, conductivity, and bacteria tests passed prior to picking up meter. Irrigation Size & Type I'/Z " Avg GPM Z6 2" turbo req'd unless smaller size allowed by Public Works Fire Size & Price 3/4" displacement $161.00 Domestic Size & Type Avg GPM Includes high demand devices? - Yes _ No Flushometers - Yes -No PRV Required _ Yes -No Permit Fee $50.50 minimum (includes State Surcharge) 013 0 Contract Value $ x 1% 5 Permit Fee Q?{ p O v "' ?? I $ Nrete.(s) f Required on all new buildings & boulevard irrigation systems $ Radio Meter Read If permit fee is $1,000 or less, surcharge is S.50 $ J" State Surcharge If permit fee is over $1,000, surcharge is $.50 per $1,000 of the Permit Fee ----- ----------- ----- ____--- it P S W Following fees apply only when installing new irrigation system $ ater erm Call Jerry Wobschall at 651-675-5024 for required fee amounts $ ?f'r NJ.T L e tPlant Tre n a p ? p ? - b $ V Q ! ??/? afer Supply & Storage $ r State Surcharge --------------- - - f- T 5 d o? - T ^ F $ , N I hereby apply for a Commercial Plumbing Permit and acknowledge that the information is complete and accu te_;I that the work will be I r conformance with the ordinances and codes of the City of Eagan and with the Plumbing Codes; that i understand th1" e 1 application for a permit, and work is not to start without a permit; that the work will b in accordance with the appr ?pbi3a in Ate b'flw0 whiefl,requires a J review and approval of plans. Applicant's Si (gnature Appjt?rt's Printed ame CITY USE ONLY REQUIRED INSPECTIONS: U.G. Air Test Gas Test _ Rough in Final PLANS SUBMITTED APPROVED BY: 5'2,-3"OJ-' BUILDING INSPECTOR General Information • Radio Meter Read (required on all new buildings & boulevard irrigation systems- $141.00 • RPZ's must be tested every year and rebuilt every five years. Test results should be mailed to Paul Heuer at the City of Eagan. • A minimum fee permit per address is required for the following RPZ's: new, rebuild reuair, remove. • Water meters include copper horn/strainer, remote wire, and touch-pad meter. METERS RE UIRING 4-HOUR ADVANCE NOTICE PRIOR TO PICKUP GPM METERS r7QE 1-20 5/8" residential displacement sm commercial maximum continuous 10 2-30 3/4° lawn irrigation maximum displacement residential continuous sm commercial 15 3-50 1" displacement very lg res bldg to 24 units maximum sm commercial continuous & 25 irr1 ation s stern 5-100 bldgs 25-64 units maximum displacement & continuous most comm bldgs 50 PRICE GPM $125.00 4-120 4-160 1 , to 160 USE PRICE ation syst $ 735.00 b lic Works st approve eter size igation cyst $ 931.00 l ction lines dgs over $ 1 ,849.00 5 units mm bldgs METERS REQUIRING 30-DAY ADVANCE NOTICE PRIOR TO PICK UP GPAi ' METERS USE PRICE 5-350 3" turbine very Ig irrigation $1,182.0 syst & production lines 1/2-320 3" compound +200 unit bldgs $2,282,0 very 19 Comm bldgs 5-1000 4" turbine very Ig irrigation $2,226.01 syst & production lines 6_50 GPM METERS USE 0 4" compound +300 unit bldgs & very Ig comm bldgs 0-1000 6" compound +400 unit bldgs very Ig comm bldgs • To schedule inspection of the inside water line and backflow preventer, call 651-675-5675. • To arrange for water turn-on, call 651-675-5300. cc: Maintenance DMsjon Cimeal Technician PRICE January 2005 City of Eagan 3830 PILOT KNOB RD EAGAN, MN 55122 (651) 675-5675 Permit Type: Permit Number: Date Issued: Sewer / Water EA066135 09/13/2004 Site Address: 3240 Denmark Ave Lot: 1 Block- 1 Addition: Olson Burger PID: 10-54200-010-01 Use: Wings Federal Credit Union Description: Sub Type: Commercial Work Type: New Description- R# 74642 Meter Size Type Manufacturer Meter Nbr Remote Number Line Size Remarks' Didn't want to wait for building permit to hook up sewer & water. Sewer and Water fees will be paid with the building pemtit. cn/jmr Fee Summary: SAC - Commercial/Industrial 2,700.00 9220.2275 Sewer Permit 50.00 6201 4532 Surcharge - Fixed 0.50 9001.2195 Treatment Plant 1,176.00 6101.4685 Water Permit 50.00 6101.4507 Treatment Plant - Irrigation 588.00 6101.4685 City SAC v ?..? 200.00 9379.4681 [ {? Tota ee5: $4,764.56 Contractor: -Applicant - Owner: Lee Construction, SW RIC14ARD T BURGER TSTE 18833 Kristte Ln St. Lie. 1363 Eden Prairie, MN 55346 7503 WEST SHORE DR (612) 937-2478 EDINA, MN 554354023 952-997-8116 I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Applicant/Permitee: Signature Issued By: Signature Permit #: p ?o 3 Receipt Date: CITY OF EAGAN 2004 SEWER AND WATER CONNECTION AND AVAILABILITY CHARGES ?,/, ? --ExwmG COMMERCIAL PROPERTY Address 32?- s Den mark Ave. Property Owner W\S rtma6ml R u basl'v?r- S.W441 Telephone #: tcrl - 811 co Plumber S Lk 1 n115{ I yA m*V\ Date of Inquiry: Contact Name: 5t 1 Lf-e. - tin - 2418 Wj : &AZ) 8(zb' &51 Sewer 8" Sewer Service T atP nl charge Cad $24.60/ff CCJNSTRUCTION Eai I ccbaucr r-,yrr ,,ai r nrpnree? A IdunRAmr, 1P: cs 3ia 'V'] 9i_'7i 826r •?c, i)l1A t° ? Lip $ 138000 00 00 50 permit required ,.try ,h,nt,?,a>im? t Font Total uxu,h,momarviu umt Sewer and Water 8" Sewer Service 6" Water Service Sewer lateral charge @ $24.60/ff Water lateral charge @ $31.30/f£ Sewer trunk @ $2,060/acre Water trunk @ $2,165/acre City SAC @ $100/unit MCES SAC @ $1,350/unit Receipt # , Date Water supply & storage @ $3,415/acre Treatment plant @ $588/SAC unit Septic abandonment Permit Fee State Surcharge Total Separate plumbing permit required Nu2nber of SAC units is determined by the Metropolitan Council " Water Serv e Later ar f e " f v,?L t'? l $ 2.310.00 g Trunk @ U 1 C y { l Water supply sa. ? r Treatment pla n _ 267 - y Permit Fee 50.00 State Surcharge LA ?d.? t'?w? Z .50 $ ?1 X80 00 S 2 10.00 - - -f9- ? I -a- 200.00 `I 0o o L a OFFICE USE ONLY PRV required 140 R-O-W Permit: Cit yCounty^A Unpaid Permit Fees City Financed i J0 - ,5;t ^ ?a t v ?t`71e0(7 ? (I t ? 100.00 .50 $ ?F 'l (? `t . SC?i 1 i cc: Carolyn Krech, Finance Department SHAW CONSTRUCTION 7685 Corporate Way Eden Prairie, NN 55344-2021 TRANSMITTAL TO City of Eagan Building Department 952-937.8214 952-934.9433 Fax wmeshawconstruct.com DATE 9/8/04 JOB # 0414 RE Wings Financial Credit Union 3240 Denmark Avenue Eagan- MN WE ARE SENDING YOU X? Attached ? Under separate cover via hand delivery the following items: ? Shop Drawings ? Prints © Plans ? Samples ? Specifications ? Copy of Letter ? Change Order COPIES DATE NO. DESCRIPTION 2 9/1/04 Full set Architectural, Structural & Civil Plans (Bid Package No. 2) Includes Survey, Landscape Plan & Code Analysis 1 9/1/04 Project Specifications 1 5/12/04 Soils Report 9/8/04 Building Permit Application - Building Shell THESE ARE TRANSMIT LD as checked below. ? For approval ? Approved as submitted ? Resubmit copies for approval x? For your use ? Approved as noted ? Submit copies for distribution ? As requested ? Returned for corrections ? Retum corrected prints ? FORBIDS DUE ? PRINTS RE'T'URNED AFTER LOAN TO US REMARKS Special Inspections Schedule Energy Calculation Worksheet & Emergency Response Site Plan will follow within next week The plumbing HVAC & Electric trades are design/build & their permit applications will be made by respective subcontractors performing/designing their work We have broken ground this week (under separate grading permit) & would like a Foundations Permit by September 22, 2004 if at all possible Please feel free to call me or the architect with any questions. Thank you. COPY File SIGNED it Metropolitan Council Environmental Services August 26, 2004 Dale Schoeppner Building Official City of Eagan 3830 Pilot Knob Road Eagan, MN 55122 Dear Mr. Schoeppner: lr P A`JG 3 0 2004 The Metropolitan Council Environmental Services Division has determined SAC for the Wings Financial Credit Union to be located of 3240 Denmark Ave. within the City of Eagan. - This project should be charged 2 SAC Units, as determined below. Charges: Bank 5280 sq. ft. @ 2400 sq. ft./SAC Unit If you have any questions, call me at 651-602-1113. Sincerely, Jodr L. Edwards ?CU Staff Specialist Municipal Services Section JLE: (75) 04082653 cc: S. Selby, MCES Carolyn Krech, Finance Department, Eagan Earl Gebaur, Shaw Construction SAC Units 2.20 or 2 Metro Info Line 602-1888 230 East Fifth Street • St. Pant, Minnesota 55101-1626 • (651) 602-1005 • Fax 602-1138 • TTY 291-0904 Ao E,.W Opp rtmlly Employer V!s M.EM,ORAIN'J)X1M"i ? uaNl_a #23 !D TOM STRUVE, SUPERINTENDENT OF STREETS & EQUIPMENT LEON WEILAND, CONSTRUCTION INSPECTOR DALE WEGLEITNER, FIRE MARSHAL ERIC MACBETH, WATER RESOURCES COORDINATOR GREGG HOVE, CITY FORESTER JOHN GORDER, ASSISTANT CITY ENGINEER KENT THERKELSEN, CHIEF OF POLICE MARK ANDERSON, ELECTRICAL INSPECTOR MIKE RIDLEY, SENIOR PLANNER PAUL HEUER, SYSTEMS ANALYST SCOTT PETERSON, BUILDING INSPECTOR TOM COLBERT, DIRECTOR OF PUBLIC WORKS Fo m TOM PEPPER, CHIEF FINANCIAL OFFICER LANE WEGENER, ENGINEERING TECHNICIAN _EROM- MIKE LENCE, SENIOR INSPECTOR DATE: SEPTEMBER 15, 2004 RE: WINGS FINANCIAL FEDERAL CREDIT UNION 3240 DENMARK AVE LOT 1 BLOCK 1 OLSON BURGER ADDITION The plans are in our plan review section for your review and comment. Please return this form to my attention with your signed comments and the date of review within seven days. If you have any concerns with these plans, please so indicate on this form and notify and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please fill out the proper "hold" request form. Comments: rl 5,- 4 d . ? ° GJ rn dl wA,, vro ic7mo.7? cAo/CG 7w Indicate any fees that are to be collected with the building permit: AMOUNT ? Yes ? No landscape security required ? Yes ? No water quality dedication ? Yes ? No park dedication ? Yes ? trail dedication ? Yes ?? o tree dedication ? Yes d ?p PRV Required ZONING? METER SIZE 1o `a4- Signature Date 9 /,a,0 °y ME°MO'RNMD'UM ?n:,r. „ .. ?N #23 TO: TOM STRUVE, SUPERINTENDENT OF STREETS & EQUIPMENT LEON WEILAND, CONSTRUCTION INSPECTOR DALE WEGLEITNER, FIRE MARSHAL ERIC MACBETH, WATER RESOURCES COORDINATOR GREGG HOVE, CITY FORESTER JOHN GORDER, ASSISTANT CITY ENGINEER KENT THERKELSEN, CHIEF OF POLICE MARK ANDERSON, ELECTRICAL INSPECTOR MIKE RIDLEY, SENIOR PLANNER PAUL HEUER, SYSTEMS ANALYST SCOTT PETERSON, BUILDING INSPECTOR TOM COLBERT, DIRECTOR OF PUBLIC WORKS TOM PEPPER, CHIEF FINANCIAL OFFICER LANE WEGENER, ENGINEERING TECHNICIAN FROM: MIKE LENCE, SENIOR INSPECTOR DATE: SEPTEMBER 15, 2004 RE: WINGS FINANCIAL FEDERAL CREDIT UNION 3240 DENMARK AVE LOT 1 BLOCK 1 OLSON BURGER ADDITION The plans are in our plan review section for your review and comment. Please return this form to my attention with your signed comments and the date of review within seven days. If you have any concerns with these plans, please so indicate on this form and notify and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please fill out the proper "hold" request form. Comments: el -? 1'.C Indicate any fees that are to be collected with the building permit: AMOUNT ? Yes ? No landscape security required ? Yes ? No water quality dedication ? Yes ? No park dedication ? Yes ? No trail dedication ? Yes ? No tree dedication ? Yes ? No PRV Required Signature ZONING? METER SIZE `; Date Ti&-? C.ArI "' p.?, II IR: 11 Li+ff n "4I MEMORANDUM #23 TO: TOM STRUVE, SUPERINTENDENT OF STREETS & EQUIPMENT LEON WEILAND, CONSTRUCTION INSPECTOR DALE WEGLEITNER, FIRE MARSHAL ERIC MACBETH, WATER RESOURCES COORDINATOR GREGG HOVE, CITY FORESTER JOHN GORDER, ASSISTANT CITY ENGINEER KENT THERKELSEN, CHIEF OF POLICE MARK ANDERSON, ELECTRICAL INSPECTOR MIKE RIDLEY, SENIOR PLANNER PAUL HEUER, SYSTEMS ANALYST SCOTT PETERSON, BUILDING INSPECTOR TOM COLBERT, DIRECTOR OF PUBLIC WORKS TOM PEPPER, CHIEF FINANCIAL OFFICER LANE WEGENER, ENGINEERING TECHNICIAN FROM: MIKE LENCE, SENIOR INSPECTOR DATE: SEPTEMBER 15, 2004 RE: WINGS FINANCIAL FEDERAL CREDIT UNION 3240 DENMARK AVE LOT 1 BLOCK 1 OLSON BURGER ADDITION The plans are in our plan review section for your review and comment. Please return this form to my attention with your signed comments and the date of review within seven days. If you have any concerns with these plans, please so indicate on this form and notify and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please fill out the proper "hold" request form. Comments: 1 r ri ?a L13c?Ll?l ?a,? 4aOGu,) 6_4 any fees that are to be collected with the building permit: AMOUNT tZ Yes ? No ? Yes '0 No 1 Yes ? No ? Yes No ? Yes No ?? Yes 0 No Signature landscape security required water quality dedication park dedication trail dedication tree dedication PRV Required ZONING? PiD METER SIZE Ili zo Date OF city of eagan PAT GEAGAN Mayor PEGGY CARLSON CYNDEE FIELDS MIKE MAGUIRE MEG TILLEY Council Members THOMAS HEDGES City Administrator Municipal Center: 3830 Pilot Knob Road Eagan, MN 55122-1897 Phone: 651.675.5000 Fax: 651.675.5012 TDD: 651.454.8535 Maintenance Facility: 3501 Coachman Point Eagan, MN 55122 Phone: 651.675.5300 Fax: 651.675.5360 TDD: 651.454.8535 www.cityofeagan.com THE LONE OAK TREE The symbol of strength and growth in our community October 4, 2004 Mr. Earl Gebauer Shaw Construction, Inc. 7685 Corporate Way Eden Prairie, MN 55344 Re: Permit Application - Wings Financial Lot 1, Block I Olson-Burger Addition Dear Mr. Gebauer: r I have reviewed the plans you submitted for building permits for the above property and have found the following: • The city's landscape ordinance requires that automatic irrigation be provided for all landscaped areas. The landscape plan did not specifically state that irrigation would be provided, although the notes contained a reference to irrigation. Please be sure that irrigation is installed to serve all landscaped areas. The Planned Development Agreement specifies that the building materials must be colors that match those presented to the city Planning Commission on July 27, 2004. While the colors were not listed on the Elevation Plan submitted for the building permit, the building materials and colors are identified on the building elevations plan that is in the exhibits of the Planned Development Agreement, and the building must comply with the Planned Development Agreement. Also, a Site Lighting Plan was not submitted as part of the application for building permit. The Site Lighting Plan is part of the Planned Development Agreement and site lighting must comply with the Planned Development Agreement. If you have any questions, please call me at 651-681-4691. Sincerely, Pamela Dudziak cJ Planner cc: Mike Lence, Senior Inspector Gene Haugland, Haugland Companies n?iIIV#Fx 1 j:, rie v, (r n. ], . OiRAINDU,M #23 TO: TOM STRUVE, SUPERINTENDENT OF STREETS & EQUIPMENT LEON WEILAND, CONSTRUCTION INSPECTOR DALE WEGLEITNER, FIRE MARSHAL ERIC MACBETH, WATER RESOURCES COORDINATOR GREGG HOVE, CITY FORESTER JOHN GORDER, ASSISTANT CITY ENGINEER KENT THERKELSEN, CHIEF OF POLICE MARK ANDERSON, ELECTRICAL INSPECTOR MIKE RIDLEY, SENIOR PLANNER PAUL HEUER, SYSTEMS ANALYST SCOTT PETERSON, BUILDING INSPECTOR TOM COLBERT, DIRECTOR OF PUBLIC WORKS TOM PEPPER, CHIEF FINANCIAL OFFICER LANE WEGENER, ENGINEERING TECHNICIAN FROM: MIKE LENCE, SENIOR INSPECTOR DATE: SEPTEMBER 15, 2004 RE- WINGS FINANCIAL FEDERAL CREDIT UNION 3240 DENMARK AVE LOT 1 BLOCK 1 OLSON BURGER ADDITION The plans are in our plan review section for your review and comment. Please return this form to my attention with your signed comments and the date of review within seven days. If you have any concerns with these plans, please so indicate on this form and notify and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please fill out the proper "hold" request form. Comments: 0k - ? Yes ? No landscape security required ? Yes ? No water quality dedication ? Yes ? No park dedication ? Yes ? No trail dedication ? Yes ? No tree dedication ? Yes CSI" No PRV Required S*ature h ZONING? METER SIZE 9-2B-c>?, Date Indicate any fees that are to be collected with the building permit: AMOUNT MEMORANDUM d IIL I'? i'YJ ''il;ll?p yP."' hl??iin•?r' :? i'q #23 TO: TOM STRUVE, SUPERINTENDENT OF STREETS & EQUIPMENT LEON WEILAND, CONSTRUCTION INSPECTOR DALE WEGLEITNER, FIRE MARSHAL ERIC MACBETH, WATER RESOURCES COORDINATOR GREGG HOVE, CITY FORESTER JOHN GORDER, ASSISTANT CITY ENGINEER KENT THERKELSEN, CHIEF OF POLICE MARK ANDERSON, ELECTRICAL INSPECTOR MIKE RIDLEY, SENIOR PLANNER PAUL HEUER, SYSTEMS ANALYST SCOTT PETERSON, BUILDING INSPECTOR TOM COLBERT, DIRECTOR OF PUBLIC WORKS TOM PEPPER, CHIEF FINANCIAL OFFICER LANE WEGENER, ENGINEERING TECHNICIAN FROM: MIKE LENCE, SENIOR INSPECTOR DATE: SEPTEMBER 15, 2004 RE: WINGS FINANCIAL FEDERAL CREDIT UNION 3240 DENMARK AVE LOT I BLOCK 1 OLSON BURGER ADDITION The plans are in our plan review section for your review and comment. Please return this form to my attention with your signed comments and the date of review within seven days. If you have any concerns with these plans, please so indicate on this form and notify and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please fill out the proper "hold" request form. Comments: Indicate any fees that are to be collected with the building permit: AMOUNT ? Yes ? No landscape security required ? Yes ? No water quality dedication ? Yes ? No park dedication ? Yes ? No trail dedication ? Yes t No tree dedication ? Yes i ? Nq PR equired Signature ZONING? METER SIZE 9 -6 ?oq Date Ili HP 1 6 2004 JrvA I M-EM<ORA.('d'D:IUM' #23 TO: TOM STRUVE, SUPERINTENDENT OF STREETS & EQUIPMENT LEON WEILAND, CONSTRUCTION INSPECTOR DALE WEGLEITNER, FIRE MARSHAL ERIC MACBETH, WATER RESOURCES COORDINATOR GREGG HOVE, CITY FORESTER JOHN GORDER, ASSISTANT CITY ENGINEER KENT THERKELSEN, CHIEF OF POLICE MARK ANDERSON, ELECTRICAL INSPECTOR MIKE RIDLEY, SENIOR PLANNER PAUL HEUER, SYSTEMS ANALYST SCOTT PETERSON, BUILDING INSPECTOR TOM COLBERT, DIRECTOR OF PUBLIC WORKS TOM PEPPER, CHIEF FINANCIAL OFFICER LANE WEGENER, ENGINEERING TECHNICIAN FROM: MIKE LENCE, SENIOR INSPECTOR DATE: SEPTEMBER 15, 2004 RE: WINGS FINANCIAL FEDERAL CREDIT UNION 3240 DENMARK AVE LOT I BLOCK 1 OLSON BURGER ADDITION The plans are in our plan review section for your review and comment. Please return this form to my attention with your signed comments and the date of review within seven days. If you have any concerns with these plans, please so indicate on this form and notify and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please fill out the proper "hold" request form. Comments: Indicate any fees that are to be collected with the building permit: AMOUNT ? Yes ? No landscape security required ? Yes 9 No water quality dedication ? Yes No park dedication ? Yes ? No trail dedication ? Yes ? No tree dedication ZONING? METER SIZE ? No PRV equired ? r Signa e ?-Z Date NX M, OR AN 1),IJIMIJ, 11J, #23 TO: TOM STRUVE, SUPERINTENDENT OF STREETS & EQUIPMENT LEON WEILAND, CONSTRUCTION INSPECTOR DALE WEGLEITNER, FIRE MARSHAL ERIC MACBETH, WATER RESOURCES COORDINATOR GREGG HOVE, CITY FORESTER JOHN GORDER, ASSISTANT CITY ENGINEER KENT THERKELSEN, CHIEF OF POLICE MARK ANDERSON, ELECTRICAL INSPECTOR MIKE RIDLEY, SENIOR PLANNER PAUL HEUER, SYSTEMS ANALYST SCOTT PETERSON, BUILDING INSPECTOR TOM COLBERT, DIRECTOR OF PUBLIC WORKS TOM PEPPER, CHIEF FINANCIAL OFFICER LANE WEGENER, ENGINEERING TECHNICIAN FROM: MIKE LENCE, SENIOR INSPECTOR DATE: SEPTEMBER 15, 2004 RE: WINGS FINANCIAL FEDERAL CREDIT UNION 3240 DENMARK AVE LOT 1 BLOCK I OLSON BURGER ADDITION The plans are in our plan review section for your review and comment. Please return this form to my attention with your signed comments and the date of review within seven days. If you have any concerns with these plans, please so indicate on this form and notify and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please fill out the proper "hold" request form. Comments: e,? , 14h Indicate any fees that are to be collected with the building permit: AMOUNT ? Yes ? No landscape security required ? Yes ? No water quality dedication ? Yes ? No park dedication ? Yes ? No trail dedication ? Yes ? No tree dedication ? Yes ? No PRV Required Signature ZONING? METER SIZE Date ?O , ?J ?6ClC ` 2004 COMMERCIAL BUILDING PERMIT APPLICATION oaa0'rv City Of Eagan 3830 Pilot Knob Road, Eagan Mn 55122 Telephone # 651-675-5(75 FAX # 651-675-5694 Wi=t--? (F ld i3'_? `t 3---?) I \ 2) "- -G-0 Yy? lAi _ 101 • Structural Plans (2) sets • Architectural Plans (2) sets • Architectural Plans (2) sets • Civil Plans (2) • Structural Plans (2) • Code Analysis (1) " • Certificate of Survey (1) • Civil Plans (2) • Project Specs (1) • Code Analysis (1) • Landscaping Plans (2) • Key Plan (1) • Project Specs (1) • Code Analysis (1) " • Master Exit Plan (1) " • Spec. Insp. & Testing Schedule " • Certificate of Survey (1) • Energy Calculations (1) not always " • Soils Report (1) • Spec. Insp. & Testing Schedule (1) " . Elec. Power & Lighting Forth (1) not always • Meter size must be established • Meter size must be established • Meter size must be established-if applicable j • Project Specs (1) .j • Energy Calculations (1) " j d • Electric Power & Lighting Form (1) 1 • Master Exit Plan (1) i t . Emergency Response Site Plan (1) y • Soils Report (1) cart ,roeo,,,,rnnenn _ ran Rfit_Rro_ mn0 SAC determination - call 651-602.1 000 SAC determination - call 651-602-1000 Call MN Dept of Health at 651-215-0700 for details regarding food & beverage or lodging facilities. ** Contact Building Inspections for sample and if required when it states "not always". *** Pen-nit for new building or addition will not be processed without Emergency Response Site Plan. Date / Construction Cost US, Qy:?, C? Site Address 32y 1,tf? Ma?? Au s Unit/Ste # '- Tenant Name ''„1\ : Ac.jlc ?? Former Tenant Name 11? - ?cw C??SF6tic ?6LY1 C Description of Work ?Cw CaV?S?CuL T,1? ° r. S Wc7s 1Julf ° ?n -??? t1 EC SQ. ;L.. :11Z C. 1 p FCV V Property Owner )Telephone # \ . fc o \,NS, y, o Contractor COt1',Ck taA Address Co??c 5? ??a`I Ciry l ?ec? ?c C tL State (1SZ) `1 ?? L\?? ?y Zip SS 3` q Telephone # 15 &ANDWick. Arc ngr A rCN,1 r kC CA Registration # Z l?? ?3 Address d City M4?? PS1SleP 11 ????I? ?x° ? ?l1CZ State ? _ r ?? n \V Zip 5 ? e Telephone # (ryS Z`1 -? yQ C) ? 1 Licensed plumber installing new sewer/water service: :S-v-J "Lee Cons <c c? bl1 Phone #: ( ?Z) -4 I hereby apply for a Commercial that the work will be in con Statutes; I understand this is permit; that the work will be approval of plains. By I acknowledge that the information is complete and accurate; nces and codes of the City of Eagan and the State of MN application for a permit, and work is not to start without a proved plan in the case of work which requires a review and Applicant's Printed Name Applicant's Signature Sub Types ? 01 Foundation ? 14 Apartments ? 15 Lodging ? 25 Miscellaneous Work Types ET? 31 New ? 32 Addition ? 33 Alteration ? 34 Replacement OFFICE USE ONLY ? 26 Public Facility e 27 Commercial/Industrial ? 28 Greenhouse ? 29 Antennae I ? 30 Accessory Buildi>}g ? 32 Ext Alt-Apartments ' ? 34 Ext Alt-Commercial ? 35 Ext Alt-Public Facility ? 37 Nail Salon ? 35 Int Improvement ? 38 Demolish (Interior) ? 44 Siding ? 36 Move Bldg. ? 42 Demolish (Foundation) ? 45 Fire Repair ? 37 Demolish (Bldg)' ? 43 Reroof ? 46 Windows/Doors 'Demolition (Entire Bldg only) - Give PCA handout to applicant valuation 925000 Occupancy Census Code JZ Zoning SAC Units a? ?+wri av Cott"ab-Stories Nbr. of Units Sq. Ft. Nbr. of Bldgs Length Type of Const __UFJ 2000 M gL Width Required Inspections ? Footings (new bldg) - Footings (deck) Footings (addition) _? Foundation _ Drain Tile/ 8 MCES System e S City Water ?, r 5 t Booster Pump - S_ c'Z PRV Fire Sprinklered fJl7 _? Insulation _?Final/C.O. _ FinaUNo C.O Other „hoof _ Ice Pr _ Decking _ Insul _ Final - Framing Fireplace _ R.I. -Air Test -Final Approved By: Planning AL_ Base Fee Surcharge Plan Review MCES SAC City SAC Water Supply & Storage (WAC) S/W Permit S/W Surcharge Treatment Plant Park Dedication Trails Dedicationff Water Quality Copies Water Trunk Sewer Trunk Other( IandscaPa Secant'.) Total - Pool _ Ftgs _ Air/Gas Tests -Final - Siding _ Stucco - Stone Windows Building Inspector 531. S0 Lk ga,sd 3,s49.3? Di??+ioui c.?1e.?+?,_ a ? ? (e (a 135 p r9 `m ?` C) << - Moa-Awv? C c?.4ec?e? too 0 '54 l?a3aZ,co s???.?o q? Irvtorc?t?l3s I rfi SDO.00 -? ?? x,'+31 3 S,S' PERMIT City-of Eagan f" Permit Type: Sewer / water 3830 PILOT KNOB RD Permit Number: EA066135 EAGAN, MN 55122 (651) 675-5675 ?) isi,?t?_ :> (?? `-_? ?=_ ?;.? _ • Date Issued: 09/13/2004 Site Address: 3240 Denmark Ave Lot: I Block: 1 Addition: Olson Burger PID: 10-54200-010-01 Use: Wings Federal Credit Union Description: Sub Type: Commercial Work Type: New Description: R# 74642 Meter Size ' Type Manufacturer Meter Nbr Remote Number Line Size Remarks' Didn't want to watt for building permit to hook up sewer & water. (ld) Fee Summary: SAC - CommerciallIndustrial 2,700.00 9220.2275 Sewer Pemri[ 50.00 6201.4532 Surcharge - Fixed 0.50 9001.2195 Treatment Plant 1,176.00 6101.4685 Water Permit 50.00 6101.4507 Treatment Plant - In igatton 588.00 6101.4685 City SAC 200.00 9379.4681 Total Fees: $4,764.50 Contractor: - Applicant - Uwner: Lee Construction, SW RICHARD T BURGER TSTE 18833 Kristie Ln St. Lic.: 1363 Eden Prairie, MN 55346 7503 WEST SHORE DR (612) 937-2478 EDINA, MN 554354023 952-997-8116 I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Applicant/Pcrmitee: Signature Issued By: Signature 2004 COMMERCIAL PLUMBING PERMIT APPLICATION CITY OF EAGAN 3830 PILOT KNOB ROAD, EAGAN MN 5551122 CI-1 2_G 651-67?-56675 ?5O l ZS n o ?' Date II /12 /oq Site Address _3qn (7*_ty M kjzy_ Unit # Tenant Name Nv/,? ?i.?rta? n i PvaeAC CRcp Former Tenant Name u tJtarj Property Owner Telephone # ( ) Contractor DALE S07-605CJ Can Qaw,,c _ Address aZol 7F^Q:t ?? rv N s FIZEGt,??_ City &C /a ,., C.kg.? State M a Zip S 5 Jzo Telephone # (q52) A 5h 4- 17 Z 3 The Applicant is Owner !/Contractor Other Repair _ RPZ _ PVB Work Type _ NewBldg _ Add-on - _ Irrigation system: " Rain sensors required. Wobschall to calculate fees. Jerry Description of Work ? t7 g?to c fN,aj'i BZt:RIL Sl.src. lZ?ata Wn 4t IZ&4 s g J To inquire if ressum Reducing Valve is required on new service, call 651-675-5646 Meters - Call 651-675-5300 to verify that hydrostatic, conductivity, and bacteria tests passed prior to picking up meter. Irrigation Size & Type Avg GPM 2" turbo req'd unless smaller size allowed by Public Works Fire Size & Price 3/4" displacement $155.00 Domestic Size & Type I " Avg GPM G _ Includes high demand devices? ? Yes _ No Flushometers t/Yes No PRV Required Yes 1 / No r F - g98 Permit Fee $50.50 minimum (includes State Surcharge) co Contract Value $ Z 2 DGDx 1% _ $ -Z ZO 10 Base Fee $ Z 00 - Meter(s) Required on all new buildings & boulevard irrigation systems $ I w I . O co Radio Meter Read if base fee is $1,000 or less, surcharge is $.50 $ S° State Surcharge If base fee is over $1,000, surcharge is $.50 per S1,000 of the Base Fee Following fees apply only when installing new irrigation system $ Water Permit Contact Jeny Wobschall at 651-675-5024 for required fee amounts t Treatment Plant II Water Supply & Storage ?II NO V 15 2004 $ State Surcharge U -- ----------------------------------------------------------- ------------------- - --- - ------------------- ----------- - -------------------- By _ 5c?1 $ Total Fee I hereby apply for a Commercial Plumbing Permit and acknowledge that the information is complete and accurate; that the work wtu be in conformance with the ordinances and codes of the City of Eagan and with the Plumbing Codes; that I understand this is not a permit, but only an application for a permit, and work is not to start without a pemilt; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. D"N,LE !SOSZFt, ISE'r3 Or&. s@da.t? Applicant's Printed Name Applicant's Signature CITY USE ONLY REQUIRED INSPECTIONS: _ U.G. Air Test - Gas Test Rough In Final PLANS SUBMITTED APPROVED BY: S J i I- ( I? ` y V , BUILDING INSPECTOR General Information • Radio Meter Read (required on all new buildings & boulevard irrigation systems- $141.00 • RPZ's must be rebuilt every five years. A minimum fee permit per address is required for RPZ rebuilding or repairing. • Water meters include copper horn/strainer, remote wire, and touch-pad meter. METERS REQUIRING A 4-HOUR ADVANCE NOTICE PRIOR TO PICK UP GPM METERS USE PRICE GPM METERS USE PRICE 1-20 5/8" residential $121.00 4-120 1-1/2" irrigation syst $ 788.00 displacement sm commercial turbine" must receive maximum approval continuous 10 from Public Works 2-30 3/4" lawn irrigation $155.00 4-160 2" turbine Ig irrigation syst $ 992.00 maximum displacement residential & continuous sm commercial production lines 15 3-50 1" displacement very Ig res $200.00 1/4 to 160 2" compound bldgs over $ 1,880.00 bldg to 24 units 65 units maximum sm commercial & continuous & Ig comm bldgs 25 irri ation systems 5-100 1-1/2" bldgs 25-64 units $488.00 maximum displacement & continuous most comm bldgs 50 METERS REQUIRING 30-DAY ADVANCE NOTICE PRIOR TO PICK UP GPM METERS USE PRICE GPM METERS USE PRICE 5-350 3" turbine very Ig irrigation $1,338.00 6-500 4" compound +300 unit bldgs & $3,749.00 syst & production very Ig comm bldgs lines 1/2-320 3" compound +200 unit bldgs $2,407.00 10-1000 6" compound +400 unit bldgs $6,124.00 very Ig comm bldgs very Ig comm bldgs 15-1000 4" turbine very Ig irrigation $2,384.00 cyst & production lines ?.umutena • To schedule inspection of the inside water line and backilow preventer, call 651-675-5675. • To arrange for water turn-on, call 651-675-5300. cc: Maintenance Division Clerical Technician Updated 5/04 Permit #: ? G 13 Receipt Date: CITY OF EAGAN 2004 SEWER AND WATER CONNECTION AND AVAILABILITY CHARGES Ne Address 3Z+d Imo, Mark Aue. Property owner W tV 5C Q, lrmcmCiul FCU 0(yURG 8'30.(14 a Telephone #: k?,) 9Cn - 81 Plumber 5 . W. Lee- 1 zn-..Aru610V? Date of Inquiry: -?,\ k-` jNA ;;*o J Contact Name: 5*u2 Lf-e, - l? l c{3.7-241 f e11: AZ) $loJ• ?05? PROPERTY -14bLlr OFFICE USE ONLY PRV required 0v R-O-W Permit: CityMCountyN4 Unpaid Permit Fees City Financed Sewer 8" Sewer Service $ 1 380 0C Lateral charge @ $24.60/ff T @ $2,060/acre City S $100/unit MCES SAC $1,350/unit Receipt # Date tSeptic abandonment 50.00 Permit Fee 50.00 State Surcharge 50 Total Water Trunk @ , 5/a( Water supply & Treatment plant @ Permit Fee State Surcharge Service large @ $31.30/ff Total @ $3,415/acre 1SAC unit permit required Sewer and Water 8" Sewer Service 6" Water Service Sewer lateral charge @ $24.60/ff Water lateral charge @ $31.30/ff Sewer trunk @ $2,060/acre Water trunk @ $2,165/acre City SAC @ $100/unit MCES SAC @ $1,350/unit Receipt # , Date Water supply & storage @ $3,415/acre Treatment plant @ $588/SAC unit Septic abandonment Permit Fee State Surcharge Total Separate plumbing permit required Number of SAC units is determined by the Metropolitan Council $ $ 2,310.00 50.00 .50 ec,d ,bJ 614se"?f M oni- ao o .a o l)1 4( . a? 00.0 .? F? b? ass I`%a ??0 c7 ?0 9e c? 0, /X Mk 0 100.00 ? DA t" Sssg d C? 5 0 ?\ $ 4. `1 C- . ?? Services cc: Carolyn Krech, Finance Department Metropolitan Council Environmental Services August 26, 2004 Dale Schoeppner Building Official City of Eagan 3830 Pilot Knob Road Eagan, MN 55122 Dear Mr. Schoeppner: A??;. 3 0 2004 The Metropolitan Council Environmental Services Division has determined SAC for the Wings Financial Credit Union to be located at 3240 Dertinark Ave. within the City of Eagan. This project should be charged 2 SAC Units, as determined below. Charges: Bank 5280 sq. ft. @ 2400 sq. ft./SAC Unit If you have any questions, call me at 651-602-1113. Sincerely, Jodi L. Edwards Staff Specialist Municipal Services Section JLE: (75) 04082653 cc: S. Selby, MCES Carolyn Krech, Finance Department, Eagan Earl Gebaur, Shaw Construction SAC Units 2.20 or 2 Metro Info Line 602-1888 230 East Fifth Street • St. Paul. Minnesota 55101-1626 • (651) 602-1005 • Fax 602-1138 • M 291-0904 An Equal Opportunity Employer III City of EapIl Wo TO: DALE SCHOEPPNER CHIEF BUILDING OFFICIAL DALE WEGLETTNER, FIRE MARSHAL PAUL OLSON, SUPERINTENDENT OF PARKS MIKE RIDLEY, SENIOR PLANNER CAROL TUMINI, UTILITY BILLING CLERK T TM PARR, ENGINEERING TECHNICIAN LEON WEILAND, CONSTRUCTION INSPECTOR TOM COLBERT, PUBLIC WORKS DIRECTOR JOHN GORDER, DEVELOPMENT/DESIGN ENGINEER TOM STRUVE, SUPERINTENDENT OF STREETS & EQUIPMENT PAUL HEUER, SYSTEMS ANALYST ERIC MACBETH, WATER RESOURCE COORDINATOR MARK ANDERSON, ELECTRICAL INSPECTOR SCOTT PETERSON, PLUMBING INSPECTOR MIKE LENCE, SENIOR INSPECTOR FROM: TERRY ZELENKA, COMBINATION INSPECTOR DATE: MARCH 11, 2005 SUBJECT: FINAL INSPECTION FOR 3240 DENMARK AVE WINGS FEDERAL CREDIT UNION LEGAL: LOT 1 BLOCK 1 OLSON BURGER The Protective Inspections Division will be performing a final inspection at 3240 Denmark Avenue on Monday, April 4, 2005. If you are requesting that the Certificate of Occupancy be held, please fill out the proper hold request form. Failure to return the hold request form will be considered your approval. The person, or department, requesting the hold is responsible for notifying and resolving any problems with the affected parties. III, ,? ,.III III" gill '?'?a. f .:.rl 1, i I,. V, Iq ?Yil dh"'fa. 1?, Y, .ig?r tll I MEMORANDUM ".II #23 TO: TOM STRUVE, SUPERINTENDENT OF STREETS & EQUIPMENT LEON WEILAND, CONSTRUCTION INSPECTOR DALE WEGLEITNER, FIRE MARSHAL ERIC MACBETH, WATER RESOURCES COORDINATOR GREGG HOVE, CITY FORESTER JOHN GORDER, ASSISTANT CITY ENGINEER KENT THERKELSEN, CHIEF OF POLICE MARK ANDERSON, ELECTRICAL INSPECTOR MIKE RIDLEY, SENIOR PLANNER PAUL HEUER, SYSTEMS ANALYST SCOTT PETERSON, BUILDING INSPECTOR TOM COLBERT, DIRECTOR OF PUBLIC WORKS TOM PEPPER, CHIEF FINANCIAL OFFICER LANE WEGENER, ENGINEERING TECHNICIAN FROM: MIKE LENCE, SENIOR INSPECTOR DATE: SEPTEMBER 15, 2004 RE: WINGS FINANCIAL FEDERAL CREDIT UNION 3240 DENMARK AVE LOT 1 BLOCK 1 OLSON BURGER ADDITION The plans are in our plan review section for your review and comment. Please return this form to my attention with your signed comments and the date of review within seven days. If you have any concerns with these plans, please so indicate on this form and notify and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please fill out the proper "hold" request form. Comments: Indicate any fees that are to be collected with the building permit: AMOUNT ? Yes ? No landscape security required ? Yes ? No water quality dedication ? Yes ? No park dedication ? Yes ? No trail dedication ? Yes ? No tree dedication ? Yes ? No PRV Required Signature ZONING? METER SIZE Date • Structural Plans • Civil Plans • Certificate of Survey • Code Analysis • Project Specs • Spec. Insp. & Testing Schedule •' • Soils Report • Meter size must be established l 1 1 1 1 1 • SAC determination - call 651-602-' 2004 COMMERCIAL BUILDING PERMIT APPLICATION City Of Eagan 3830 Pilot Knob Road, Eagan Mn 55122 Telephone # 651-675-5675 FAX # 651-675-5694 (2) sets I • Architectural Plans (2) • Structural Plans (1) • Civil Plans (1) " . Landscaping Plans (1) . Code Analysis • Certificate of Survey (1) • Spec. Insp. & Testing Schedule . Meter size must be established • Project Specs • Energy Calculations . Electric Power & Lighting Form • Master Exit Plan • Emergency Response Site Plan • Soils Report non . SAC determination - call 651-60 4/OS, a/ t 1h4 -3 (2) • Code Analysis (1) " (2) • Project Specs (1) (2) • Key Plan (1) (1) " . Master Exit Plan (1) (1) • Energy Calculations (1) not always" (1) " • Elec. Power & Lightin g Form (1) not always" • Meter size must be established-if applicable (1) (1) " 1 (1)" t SAC d Call MN Dept of Health at 651-215-0700 for details regarding food & beverage or lodging facilities. ** Contact Building Inspections for sample and if required when it states "not always". ••• Permit for new building or addition will not be processed without Emergency Response Site Plan. Date t0 / ZZ / U ` Construction Cost Site Address 32-?1? ? ec. Mo T? No e, • Unit/Ste # Tenant Name fl/11 iiv?k Former Tenant Name '?A)A- IJF J?l+l? Description of Work N,\.AA-o ` 1 ? ??Mt? a()n1`???1 1 CahbkNCkil7?? -? l ` \ nC ?C- U` `?c?y L?+ Telephone # (%5L Rci1: ? S? Property Owner td o. T • Contractor S\r-. ov? C,3?r.?ficvc kd1N? Address '1(` S City ?f??ct. C Q State M \? Zip GC V? Telephone # (O'U) Arc ngr L Acc?-.• %e C1 Registration # `z 0U?l Address q?j LX7 City M??S ?t r?r e? Z, State \ _ 7777 Zip SS3 ti Telephone # (gam) 7 l3'fi3 ?? U 7-re-7-fl-T-FIF u V11 LL. Licensed plumber inst OCT 2 2 2004 gnew sewer/waters SEC?? LQ6Q ce: SWL-nCo4nt>t?, . Phone#:( 5? ) ?3ti'ZK`r`3 By I hereby apply for a ommercia u1 mg Permit and acknowledge that the information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan and the State of MN Statutes; I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. Applicant's Printed Name Applicant's Signature Sub Types ? 01 Foundation ? 14 Apartments ? 15 Lodging ? 25 Miscellaneous Work Types ? 31 New ? 32 Addition ? 33 Alteration ? 34 Replacement OFFICE USE ONLY ? 26 Public Facility K 27 Commercial/Industrial ? 28 Greenhouse ? 29 Antennae 35 Int improvement ? 38 ? 36 Move Bldg. ? 42 ? 37 Demolish (Bldg)' ? 43 'Demolition (Entire Bldg only) - Give P Valuation :5T up I Occupancy Census Code 47 Zoning ? 6 ADOITCCLVif z - SAt SAC U it n s Stories Nbr. of Units D Sq. Ft. Nbr. of Bldgs Length Type of Const V "6 Width Required Inspections Footings (new bldg) - Footings (deck) _ Footings (addition) _ Foundation Drain Tile ? 30 Accessory Building ? 32 Ext Alt-Apartments ? 34 Ext Alt-Commercial ? 35 Ext Alt-Public Facility ? 37 Nail Salon Demolish (Interior) ? 44 Siding Demolish (Foundation) ? 45 Fire Repair Reroof ? 46 Windows/Doors CA handout to applicant 1 MCES System p- City Water Booster Pump PRV Fire Sprinklered V- Insulation Final/C.O. _ Final/No C.O. Other of _ Ice Pr _ Decking _ Insul _ Final _ Pool Framing _ Siding Fireplace _ RI. _ Air Test _ Final Windows Approved By: Planning C X16- Building Inspector Base Fee Surcharge Plan Review MCES SAC City SAC Water Supply & Storage (WAC) SM Permit S/W Surcharge Treatment Plant Park Dedication Trails Dedication Water Quality Copies Water Trunk Sewer Trunk Other Total Ftgs _ Air/Gas Tests - Final Stucco Stone /-/ 29Z9 2004 COMMERCIAL MECHANICAL PERMIT APPLICATION City Of Eagan _ (a l q 3830 Pilot Knob Road, Eagan MN 55122 Telephone # 651-675-5675 Please complete for: commercial/industrial buildings multi-fannly buildings when separate permits are not required for each dwelling unit Date /z / A- I a`/ Site Street Address '3Zgo 1>?NMifix(L f}vc Unit# Tenant Name (if applicable) L>ul N(o S F i^mA,+a.Ae_ Previous Tenant Name Property Owner Telephone # ( ) Contractor MODiF N ttr*n-El )Nr- Street Address 7-,- I I b' S?- N - City M?? 5 State M nt Zip 55 4 18 Telephone # ( 6 12- ) 761-3 35 8 Bond Expires: The Applicant is Owner --11 \ Contractor Other D O?? Work Type New Construction - Underground Tank _ Install emov ee below _ Interior Improvement _ Install Piping - Processed _ Nature of Work: /f>vAe fr7L ??9+rJ "When instal ing/removing underground tank, call for inspection by Fire Marshal and Plumbing Inspector Permit Fees: $70.50 underground tank installation/removal $50.50 Minimum (includes State Surcharge) or Contract Value $ ?IE /,5 0 x 1% Permit Fee • If nernnt fee is $1,000 or less, add $.50 => $ State Surcharge If ermlt fee is over $1,000, add $.50 for 3 S C , S d l F every $1,000 permit fee A Tota ee $ I hereby apply for a Commercial Mechanical Permit and acknowledge that the iniormation is complete and accurate; that the worx will be in conformance with the ordinances and codes of the City of Eagan and with the Mechanical Codes; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. Applicant's Printed Name nrs ijrgnature Approved By: 6 J Inspector Date: March 21, 2007 Protecting, maintaining and improving the health of all Minnesotans Spin the Planet Enterprises 1700 Highway 36 Roseville, Minnesota 55113 Gentlemen/Ladies, Subject: Food and Beverage Equipment at Jimmy John's, Eagan, Dakota County, Minnesota, Plan No. 070816 We are enclosing a copy of our report covering an examination of plans and specifications on the above-designated project. The plans and specifications appear to be in general compliance with the standards of this department. Please see the enclosed report for additional changes and/or comments. It is the project owner's responsibility to retain the plans at the project location. This review does not pertain to the Engineering design (i.e., plumbing, swimming pools, service connections, sewage systems). A separate report regarding the Engineering Review will be sent. Ten working days prior to completion of the project, please contact Ms. Pamela Steinbach with our Metro district office at 651/632-5147 in order to arrange for a final on-site inspection. A final opening inspection cannot be conducted until the food, beverage and lodging license application is submitted with the appropriate fee to the main office. If you have any questions in regard to the information contained in this report, please contact me at 651/643-2160. Sincerely, C ?" f*_ Charles A. McFee, Sanitarian Environmental Health Services Section P.O. Box 64975 ' St. Paul, Minnesota 55164-0975 CAM:ajk ? E Enclosure MAR 2 6 2007 cc: Crowe Construction Management Mr. Dirk House, Plumbing Inspector Ms. Pamela Steinbach, Minnesota Department of Health Ms. Laura Huseby, Minnesota Department of Health General Information: 651-201-5000 • Toll-free: 888-345-0823 • TTY 651-201-5797 • w .health.state.mn.us An equal opportunity employer MINNESOTA DEPARTMENT OF HEALTH Division of Environmental Health REPORT ON PLANS Plans and specifications on food and beverage equipment: Jimmy John's, Plan No. 070816 Location?3240 Denmark Avenue, Eagan,-Dakota County, Minnesota Date Examined: March 21, 2007 Date Received: March 14, 2007, February 12, 2007 Submitted by: Crowe Construction Management, 350 St. Peter Street, Suite 258, St. Paul, Minnesota 55102 Phone #: 651/203-1166 Ownership: Spin the Planet Enterprises, 1700 Highway 36, Roseville, Minnesota 55113 Phone #: 651/288-1404 The following are corrections or requests for additional information necessary before construction of your project: Scope of project: new construction of food service establishment with 36 seats and drive-up window. Drive-up window must have either: an air curtain or screened window operating to exclude flying pests from the premises. Cabinetry submitted indicating laminate interior is not allowed or approved. Review for compliance. Plans submitted indicate a walk-in cooler which was crossed out on re-submitted equipment schedule and indicated two-door Traulsen refrigeration unit (G-20010). The model of Traulsen is not provided on the plan equipment schedule, nor was the plan re-submitted to indicate change or location of refrigeration unit and walk-in cooler. Ice beverage unit manufacturer is Hoshizaki, but Coke was submitted on resubmitted equipment schedule. No information was provided on certified food manager. Ensure future plans and equipment schedule and specification sheets for equipment all indicate the same manufacturer, model and location of equipment. Looking for information that should be in plan review submitted takes time and results in delayed approval of plan submission. Equipment Standards - General Requirements: Food and beverage equipment shall meet the applicable standards of National Sanitation Foundation (NSF), Edison Testing Laboratories (ETL), Underwriters Laboratory (UL) to NSF standards or Canadian Standards Association (CSA) to NSF. The proper sticker, fabricator information and embossment identification shall be displayed on the equipment. Provide specification (cut sheets) information from manufacturer for the following item(s) or equipment. Pop dispenser machine. Jimmy John's Food & Beverage Equipment Plan No. 070816 Page 2 March 21, 2007 All counter mounted equipment shall be on four (4) inch NSF legs or sealed to the counter top unless it is less than 30 pounds and easily moveable. Hobart Electric slicer. Customer self-service beverage dispensers shall be push-button operated, or otherwise operated to protect the lip contact surface of glasses. 2. Food contact surfaces - General Requirements: Primary food contact surfaces (tables and counters) shall be of stainless steel construction in compliance with NSF Standard No. 2 or equivalent. Plastic laminate surfaces are not acceptable for food contact and food.preparation surfaces. 3. Cabinetry within the food service area: (including salad bar and buffet tables) In all areas where food equipment involves beat or moisture, or where food comes in contact with the surface, a stainless steel finish or equivalent is required. All service counters and other millwork surfaces shall be protected with stainless steel, plastic laminate or equivalent (as determined by plan review) to cover all exposed wood. Cutouts in millwork shall be sealed by the fabricator in an approved method. All counters shall be on a solid raised masonry base of not more than four (4) inches with approved basecove or six (6) inch NSF legs or castors meeting NSF standards. If a solid raised masonry base is used, the cabinet shall overhang by at least one (1) inch, but not more than four (4) inches with approved basecove. Enclosed hollow bases are NOT permitted. 4. Refrigeration- General Requirements: All refrigeration facilities must maintain potentially hazardous foods at 41° F or below Each refrigeration unit must have a thermometer accurate to within +/- 2° F. Beverage dispensers that are customer self-service must be push button type Condensate from walk-in refrigeration equipment shall be drained to a floor drain located outside of the unit, or the unit shall be equipped with an evaporator pan. Floor drains are prohibited inside the unit. Do not install drain lines, conduit lines, etc. on interior surfaces of walk-in coolers and freezers. Jimmy John's Food & Beverage Equipment Plan No. 070816 Page 3 March 21, 2007 5. Ventilation System: Provide an NSF approved ventilation hood over cooking equipment which will capture and eliminate moisture, vapors, smoke, fumes, odors, heat and grease laden vapors. Type II hood required: above the proofer/oven unit. Verify that all commercial hood ventilation systems on the premises shall comply with the 2001 Minnesota Mechanical Code, which adopts NFPA 96-2001, the 2000 International Mechanical Code and the 2000 International Fuel Gas Code with attachments. Provide an air balance test by a qualified heating and ventilation professional. Air balance tests shall indicate the establishment's air handling units operate as designed and in compliance with applicable mechanical codes. A food preparation area should be under slight negative pressure (less than 0.02 inches-water gauge). Plan submitted indicate a second "future" oven/proofer, unit installation, all permits and plans must be obtained, tested and approved prior to operation. Three-Compartment Sink: Sink bowls shall be adequately sized for the largest utensil to be washed in three- compartment sink. Provide approved racks, shelves or dish tables for air drying of equipment and utensils next to the ware wash sink. Provide approved sanitizer test kit(s) at the three-compartment sink. Food Preparation Sink: Provide an approved food preparation sink that is separate from all other sinks. The food preparation sink must have side-splash protection installed at intersection with the three-compartment sink or located away from the three-compartment sink. Handsinks: Install an approved splashguard at handsink or maintain at least 18 inches of clearance between products and other equipment. Review all sink locations for compliance. All handsinks shall be provided with hand cleanser, single-service toweling and nail brush. Each handwashing sink shall provide water at a temperature of at least 110° F through a mixing valve or a combination valve. Jimmy John's Food & Beverage Equipment Plan No. 070816 Page 4 March 21, 2007 9. Walk-in Cooler/Freezers -General Requirements Provide approved flooring and basecove for the walk-in cooler or freezer. Aluminum or stainless steel floor for the freezer. Effectively enclose the area above the walk-in cooler/freezer units with fixed or removable panel(s). This may not be used for storage. Provide access and ventilation for equipment in this area as recommended by installer. Shelving shall be approved for use in refrigerated environment. 10. Walls- General Requirements: Wall surfaces in splash zones or high moisture areas such as ware washing, food preparation, handsink and janitorial sink areas, etc. shall be finished with durable, non- absorbent materials to eight feet in height or the ceiling. Approved materials are: a. A fiberglass re-inforced panel (FRP), or b. Ceramic the that is smooth, cleanable and light colored. c. Stainless steel or equivalent materials shall be installed behind cook line. The kitchen area has tile on part of the above-wall painted, semi-gloss paint at minimum required. Review for compliance. 11. Restrooms and Janitorial Areas - General Requirements: Restroom walls shall have FRP or ceramic tile to a minimum of four (4) feet in height. Restrooms shall have proper basecove with materials similar to flooring. Provide utility sink or curbed cleaning facility with a floor drain for cleaning mops and for the disposal of mop water or similar liquid wastes. Janitorial areas shall have FRP, ceramic tile or equivalent, stainless steel or cleanable block walls in the splash area. Unfinished gypsum wallboard is not acceptable in the janitorial area. Provide mop hanger in janitorial area. Provide vacuum breakers at all threaded hose bibbs. Jimmy John's Food & Beverage Equipment Plan No. 070816 Page 5 March 21, 2007 12. Floors - General Requirements: Floors in kitchens, bars, other rooms where food is stored, prepared or washed, employee dressing or locker rooms, toilet rooms and janitorial rooms shall be smooth, non-absorbent, durable and easy to clean. Quarry tile, ceramic tile, terrazzo and an epoxy resin surface with a 5 mil application installed on a smooth, concrete surface. Epoxy or polyurethane base grout shall be utilized. A four inch integral basecove ('/4 inch radius minimum) constructed of the same materials as the floor shall be installed at the floor/wall junctions. Quarry Tile All tile and grout shall be sealed per manufacturers' recommendations. Ceramic Tile A copy of the material specifications shall be submitted for review and approval before installation. All tile and grout shall be sealed per manufacturers' recommendations. 13. Ceilings- General Requirements: Ceilings in kitchens, bars and bar service areas, other rooms where food is stored, prepared, or washed, toilet rooms and janitorial rooms shall be smooth, non-absorbent, durable and easy to clean. Acceptable materials include: a. Vinyl coated acoustic ceiling panels; b. Light in color; c. Smooth in texture; and d. No exposed rafters, bar joists or trusses are permitted. 14. Plumbing- General Requirements: All plumbing plans shall be approved by the Minnesota Department of Labor and Industry (DOLI) or delegated agent. Submit complete plans for review to that department. Jimmy John's Food & Beverage Equipment Plan No. 070816 Page 6 March 21, 2007 A separate on-site inspection will be conducted by the Minnesota Department of Labor and Industry plumbing inspector or delegated agent to determine compliance with the Minnesota Plumbing Code. All plumbing equipment shall be installed in accordance with the Minnesota Plumbing Code for a commercial establishment. All hot water generating equipment (water heaters) shall be constructed to meet NSF standards and be manufactured by an authorized fabricator. All hot water generating equipment (water heaters) shall be of adequate capacity to meet the needs of the anticipated demand of the establishment. Locate water heater in an accessible location. All threaded hose bibbs shall utilize an approved vacuum breaker per Minnesota Plumbing Code requirements. Each interceptor and separator shall be so installed that it is readily accessible for removal of cover, servicing and maintenance. Interceptors and separators shall be maintained in efficient operating condition by periodic removal of accumulated grease, scum, oil, or other floating substances, and solids, deposited in the interceptor or separator. All pipe chases that pass through walls shall be tightly sealed and covered All utility pipes shall be enclosed in walls or ceiling. 15. Lighting - General Requirements: Provide effective shielding, such as plastic shields, plastic sleeves with end caps, shatterproof bulbs and other approved devices for all lighting fixtures in area of exposed food, clean equipment, utensils, and linens, or unwrapped single service and single use articles. Ventilation hoods and other areas where safety is of concern shall provide at 50 foot- candles of light at the working surfaces. Install a sufficient number of vapor proof light fixtures in the walk-in cooler and/or freezer to provide a minimum of 10 foot candles measured at 30 inches above the floor. Jimmy John's Food & Beverage Equipment Plan No. 070816 Page 7 March 21, 2007 16. Restrooms - General Requirements: All restrooms shall be provided mechanical ventilation. All restroom doors shall be self-closing. All restroom handsinks shall be stocked appropriately. 17. Other Code Requirements: All other approvals from local units of government shall be obtained prior to construction beginning. This includes building construction inspections, zoning approvals or other regulatory approvals. Comply with the Minnesota Clean Indoor Air Act (MCIAA). Sincerely, o" P ? Charles A. McFee, Sanitarian Environmental Health Services Section P.O. Box 64975 St. Paul, Minnesota 55164-0975 r Use BLUE or BLACK Ink For Off# Ny of Eagn APR 99 i Permit / h ZQ10 I Permit Fee: 3830 Pilot Knob Road I Eagan MN 55122 Date Received: I I Phone: (651) 675-5675 I I Fax: (651) 675-5694 1 staff-------------- 2010 COMMERCIAL PLUMBING PERMIT APPLICATION Date: 4/20/10 Site Address: 3240 Denmark Avenue Tenant: Wings Financial Credit Union Suite PROPERTY OWNER Name: Art Ham Phone: 612.282.7405 CONTRACTOR Name: Corval Constructors, Inc. License 63886PM Address: 1633 Eustis Street City: St. Paul State: MN Zip: 55108 Phone: 651.645.0451 Email: P7ohnson@corvalgroup.com TYPE OF _ New _ Replacement _ Repair X Rebuild _ Modify Space _ Work in R.O.W. WORK Description of work: Rebuild RPZ COMMERCIAL TYPE _ New Construction _ Modify Space Irrigation System yes / _ no) ( X RPZ PVB) • Rain sensors required on irrigation systems • Avg. GPM (2" turbo required unless smaller size allowed by Public Works) Meters Call (651) 675-5646 to verity that tests passed prior to picking up meter. Domestic: Size & Type Fire: 1 Avg. GPM High demand devices? Yes No Flushometers Yes No COMMERCIAL FEES: $50.50 Minimum (includes State Surcharge) OR Contract value $ X1% = $ Permit Fee Required on ALL new buildings and boulevard irrigation systems 4 = $ Radio Meter Read - If Permit Fi@ is less than $1,000, surcharge is $.50 = $ Meter(s) - If Permit Fee is > $1,000, surcharge increases by $.50 for each $1,000 $1,000 Permit Fee (i.e. a $1,00142,000 Permit Fee requires a $1.00 surcharge). = $ State Surcharge Following fees apply when installing a new lawn irrigation system. $ Water Permit Call the City's Engineering Department, (651) 6755646, for required fee amounts. $ Treatment Plant $ Water Supply & Storage $ State Surcharge TOTAL FEES $ 5 0 . 5 0 CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.aooherstateonecall.orp I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to s i hout a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. x Richard Poser x ` Applicant's Printed Name Applicant's Signature FOR OFFICE USE Approved By: Date: Required Inspections: Under Ground Rough-In Air Test Gas Test Final PRV Required: _ Yes No Page 1 of 3 . �G� ��PC�jG�c� , Use BLUE or BLACK Ink �� � �a ✓�7,f � For Office Use I . I � I ��6� ��L���n � Permit#: I ll � , 3830 Pilot Knob Road I Permit Fee: 9 I I ����p Eagan MN 55122 �AY � a LU•�ti I Date Received:�—�cp�� j Phone:(651)675-5675 � � Fax:(651)675-5694 � Staff`� ___________j L----- 2015 COMMERCIAL PLUMBING PERMIT APPLICATION ❑ Please submit two(2)sets of plans with all commercial applications. Date: 5/22/2015 SiteAddress: 3240 Denmark Ave Tenant: Wings Financial Suite#: '���� Win s Financial N/A �� �� < Name: g Phone: � '�M , /� Name: Egan Companies � � License#: �I�/��� "t � �J ����'��� ` ' Address: 7625 Boone Ave C�ty.Brooklyn Park State: � Zip: 55428 ��� Phone: �63-732-7405 � Email: brw@eganco.com New Replacement _Repair X Rebuild _Modify Space Work in R.O.W. '�'�r�p�;�'�' � — — � — Description of work: COMMERC/AL New Construction Modify Space _Irrigation System(_yes/_no)( X RPZ/ PVB) • Rain sensors required on irrigation systems � ��3i`�'�t�T�i� ; • Avg.GPM (2"turbo required unless smaller size allowed by Public Works) _Meters Call(651)675-5646 to verity that tests passed�rior to oicking uo meter. Domestic:Size&Type Fire: 1 ' Avg.GPM High demand devices?_Yes No Flushometers_Yes No COMMERC/AL FEES Contract Value$ x.01 $55.00 Permit Fee Minimum 55 . 00 _$ Permit Fee "If contract value is LESS than$10,010,Surcharge=$5.00 =$ 5 . 0 0 Surcharge' I "*If contract value is GREATER than$10,010,Surcharge=Contract Value x$0.0005 6 0 . 0 0 I�� •"'If the project valuation is over$1 million,please call for Surcharge -$ TOTAL FEE � Following fees apply when installing a new lawn irrigation system $ Water Permit Contact the City's Engineering Department,(651)675-5646,for required fee amounts. $ Treatment Plant $ Water Supply&Storage $ State Surcharge _$ TOTAL FEE CALL BEFORE YOU DIG. Call Gopher State One Call at(651)454-0002 for protection against underground utility damage. \ I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the Ciry of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. x _L��!=L'2I��' (.��S�r���°'I x,�e�� .��,._ ,�—,t? �ld:�. _ ApplicanYs Printed Name ApplicanYs Signature Ft}R��FICE US� Appro�t By: Da�a*,� R�qui�Ins�ct#ons: �Untler Gr�und Rough-!n Air 1'est ,,,_,_Gas Test �Final , F�R�f Requir�:�,Yes�,,,t�lts Meter Reiated It�emrn�: Met�r Siz� Radiv Read Mar�ometer �t�'f� Page 1 of 3 , 4 , 4 Use BLUE or BLACK Ink 1 For Office Use /1u� QI I; 4o, . Permit:ee ,Citof EaanPermit : 3 (L'l .'6 ` 1 3830 Pilot Knob Road I Eagan MN 55122 ?_/ 7' 7 1 Phone: (651) 675-5675 RECEIVED Date Received: Y Fax: (651)675-5694 \ I JUL 1 7 2017 Staff: I 2017 COMMERCIAL BUILDING PERMIT APPLICATION Site Address: 3240 Denmark Ave Date: 7/17/17 Tenant Name: Wings Financial (Tenant is: New/X Existing) Suite#: NA Former Tenant: NA Wings Financial 952-997-8240 1 Name: Phone: Pro. y own:x ' Address/City/Zip: 14985 Glazier Ave, Apple Valley, MN 55124 Its Applicant is: Owner X Contractor ®r `: Description of work: Interior Refresh/Remodel pe of 275 000.00 �.� / " , : " Construction Cost: ' MIC Services LLC Name: License#: 220 West 90th St Bloomington Coo or Address: City: ntr M N 55420 612-221-0027 t State: Zip: Phone: °i 9 Contact: Joel Peterson Email:joel.peterson@micsmn.com Krech, O'brien, Muller & Assoc. Registration#: 6115 Cahill Ave Inver Grove Heights Architect/Engineer Address: city: g �- "� State: MN Zip: 55076 Phone: 651-451-4605 �fi Contact Person: Alisha Simones Email: asimones@komainc.com Licensed plumber installing new sewer/water service: Phone#: NOTE:Plans and suppo'`11 • locumen at yo bmit are con isle • to.. •u. iron• P% of , the inform t'o maybe c ass f e'tqs non-public f Yro "de masons that wou d . ' th • tY �conc a that..,.°Y-....4. r.de secrets.,, CALL BEFORE YOU DIG. Call Gopher State One Call at(651)454-0002 for protec'.n .gainst und: ground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.go. ers.teonec.11.. g I hereby acknowledge that this information is complete and accurate; that the work w I be n confo a ce /-ith the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an applicati 4 for. pe.rmi �.,, w.,' is not to start without a permit;that the work will be in accordance with the approved plan in the case of work ich equire -7r:- - aimd approval of plans. lir xJoel Peterson I, Applicant's Printed Name Applica,Vs Signatu Page 1 of 3 r ."3. 1-&_106-17/714e0 NOT WRITE BELOW THIS LINE / 0� SUB TYPES Foundation Public Facility _ Exterior Alteration—Apartments ')C Commercial/Industrial Accessory Building Exterior Alteration—Commercial Apartments Greenhouse/Tent Exterior Alteration—Public Facility Miscellaneous Antennae WORK TYPES New )( Interior Improvement Siding Demolish Building* Addition Exterior Improvement Reroof Demolish Interior Alteration Repair Windows Demolish Foundation Replace Water Damage Fire Repair Retaining Wall Salon Owner Change *Demolition of entire building—give PCA handout to applicant DESCRIPTION n ` Valuation '275,�a.00 Occupancy (3 MCES System Plan Review / Code Edition Zs"`5 POSZ-- SAC Units "� ' 25% 100% ( _ ) Zoning 4, City Water Census Code Stories Booster Pump #of Units Square Feet PRV #of Buildings Length Fire Sprinklers -- Type of Construction 6 Width REQUIRED INSPECTIONS Footings_New Building_Deck Addition Drain Tile Foundation Foundation Before Backfill Retaining Wall Vapor Barrier Erosion Control Framing K 30 Minutes 1 Hour Steel Reinforcement Insulation Concrete Entrance Apron Sheetrock Other: Roof: Decking Insulation _Ice&Water Final Meter Size: Siding:_Stucco Lath _Stone Lath Brick_EFIS Electronic As-Built Plans Required Windows Fireplace: Rough In Air Test Final _ Final/C.O. Required Pool: Footings Air/Gas Tests Final "X_ Final/No C.O. Required Final C/O Inspection: Soh- --- * - Marshal to be present: Yes No Reviewed By: / % //-dimpr- , Planning New Business to Eagan: 1"-f Reviewed By: �� .-- , Building Inspector FEES Water Quality Base Fee `Z, b6 -7-1` Storm Sewer Trunk t 0 Surcharge i37. Sewer Trunk , Plan Review f 349, 39 Water Trunk MCES SAC Street Lateral City SAC Street S&W Permit& Surcharge Water Lateral Treatment Plant Stormwater Performance Security Treatment Plant(Irrigation) Landscape Security Park Dedication Other: Trail Dedication TOTAL: # ]u13 i Page 2 of 3 MCES USE: Letter Reference: 170731C2 Address ID:712996 Payment ID:403597 ) q((209 Date of Determination: 07/31/17 Determination Expiration:07/31/19 Greetings! Please see the determination below. Project Name: Wings Financial Project Address: 3240 Denmark Avenue Suite#/Campus: N/A City Name: Eagan Applicant: Joel Peterson, MIC Services Special Notes: The City will be charged no additional SAC Units for this project, as determined below. *The rules allow for this 1 net credit where SAC was actually paid to either be taken city-wide or left site-specific. Any net credits taken city-wide can only be taken if the project is reported to MCES at the time the permit is issued. Otherwise,the net credits remain site-specific. Charge Calculation: Office: 3423 sq. ft. @ 2400 sq. ft./SAC= 1.43 Meeting: 203 5q. ft. @ 1650 sq. ft./SAC=0.12 Total Charge: 1.55 Credit Calculation: Wings Financial Credit Union (SAC 09/04) = 2.20 Total Credit: 2.20 Net SAC: -0.65* —or— 0 SAC Due The business information was provided to MCES by the applicant at this time. It is the City's responsibility to substantiate the business use and size at the time of the final inspection. If there is a change in use or size, a redetermination will need to be made. If you have any questions email me at: !Caron.cappaert@nietc.state.mn.us. Thank you, Karon Cappaert Administrative Specialist Please visit our SAC website by going to: http://www.metrocouncil.org/SACprogram 390 Robert Street North( St. Paul,MN 55101-1805' Phone 651.602.1000 I Fax 651.602.15550 j TTY 651.291.0904 I metrocouncil.org M Er [ ()f';31,C"C° „ AN ftt.i1 VPPO Ont .: ?phyor C; O ll M1 C t_ 6:7,7 � e Use BLUE or BLACK Ink - For Office Us City of Eaail � Permit#: / s 76 3830 Pilot Knob Road ( Permitee: Eagan MN 55122 r F 'ti'1-7 (651)675-5675 Date Received: buildinginspections cf .cityofeaaan.com Staff: J 2017 COMMERCIAL PLUMBING PERMIT APPLICATION 0 Please submit two(2)sets of plans with all commercial applications. Date: 7-71r-f.-1 Site Address: t3af VO &e e24. , e~ Tenant: ;.4Q st ct'..f Suite#: Property Owner Name: j ,, /`i' 'tatec,r4/ Phone: Name: JZ.. /' 4 q+',,,,, tr...." License#: Contractor v7af; s, ,'r City: e -' r /./ 'f State . eZip: �1" %✓Address:6CQ 7,9✓ Email: •d c ? 't -,XVcowPhone: Type of New Replacement ^Repair _Rebuildviodify Space _Work in R.O.W. Description of work: v /6P/o c ,regi•- ',.Vc, . (1',":,4,..."( COMMERCIAL _New Construction GrModify Space Irrigation System(_,yes/_no)(_RPZ/ PVB) • Rain sensors required on irrigation systems Permit Type • Avg.GPM (2"turbo required unless smaller size allowed by Public Works) Meters Call(651)675-5646 to verity that tests passed prior to picking up meter. Domestic:Size&Type Fire: 1 Avg,GPM High demand devices?Yes_No Flushometers_Yes_No COMMERCIAL FEES Contract Value$ 4©c x.01 $60.00 Permit Fee Minimum $60.00 PVB/RP2 Permit(includes State Surcharge) _ " ,�✓t' Permit Fee Surcharge=Contract Value x$0.0005 =$ r'• v G Surcharge If the project valuation is over$1 million,please call for Surcharge =$ Vf. iF TOTAL FEE Following fees apply when installing a new lawn irrigation system $ Water Permit Contact the City's Engineering Department,(651)675-5646,for required fee amounts. $ Treatment Plant $ Water Supply&Storage $ State Surcharge s" =$ �/' t) TOTAL FEE You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's website at www.citvofeagan.com/subscribe. CALL BEFORE YOU DIG. Call Gopher State One Call at(651)454-0002 for protection against underground utility damage. I hereby acknowledge that this information is complete and accurate;that the work will be in conformance with the ordinances and codes of the City of Eagan;that I understand this is not a permit,but only an application for a permit,and work is not to start without a permit;that the work will be in accordance with the approved plan in the case of workrkwhich requires a review and approval of plans. x s /' 'r- W,¢,. •..,,_.., x f . Applicant's Printed Name App tcant's Signature FOR OFFICE USE Approved By: ' Dam: , / Required Inspections. .., Under Ground <„ Rough-ln Air Test _Gas Test .Final PRV RequiredYes No Meter Related items Meter Size Radio Read Manometer Staff: _ Page 1 of 3 '1215A 1061,555' JJ� J"ic c1 / ')�"c`i _ Use BLUE or BLACK Ink 1` / For Office Use,.t 1 4Permit#: /4/D2 " '*6 Cly of�aa� Jib � � 3830 Pilot Knob�ad Permit Fee: l( , Eagan MN 55122 Date Received:�"v—7/-7 Phone:(651)675-5675 I Fax:(651)675-5694I Staff: Ai)P/// i L 2017 MECHANICAL PERMIT APPLICATION ❑ Please submit two (2)sets of plans with all commercial applications. Date:/0/10)17 Site Address: 3?4O beh �rvIA Tenant:// (>J1n9(It V-IavAV(/'/l._. Suite#: Resident1 f41 Name: Phone: i ' t_ , = Address/City/Zip: A` Name: e- ti v rCA+ License#: 6ontrac bt-1 0 ,i'.,-464"44744-43-1040-4 Address: S 8>LL1 149L/1JW bal.- City: 52, 1 (-- i State: 141A1 Zip: 6—ci/7S Phone: C®6 1 —;e1 ,- 7'3 3 v / ..._ ,- Contactsi "� Email 'j ( -fJJJ �s G�i 4p 41 w New Replacement Additional if Alteration Demolition Type of Work Description of work: iNOTE.Roo1f mounted and groundamounted mechanical equipment is.required to be screened by City Code.inPlease contact the Mechanical Inspector for information on ermitted screenin methods RESIDENTIAL COMMERCIAL Furnace New Construction Interior Improvement PermitT e —Air Conditioner Install Piping Processed a x , y t Air Exchanger Gas Exterior HVAC Unit Heat Pump _Under/Above ground Tank ( Install/-Remove) ,�.� Other II I 01. R1.1rd hliA) RESIDENTIAL FEES $60.00 Minimum Add or alteration to an existing unit, includes State Surcharge $100.00 Residential New, includes State Surcharge =$ TOTAL FEE COMMERCIAL FEES Contract Value$ cos ✓ x.01 $60.00 Permit Fee Minimum $75.00 Underground tank installation/removal,includes State Surcharge =$ 4%•OP Permit Fee Surcharge=Contract Value x$0.0005 =$ r�T/ Surcharge If the project valuation is over$1 million,please call for Surcharge =$ -1 I- n 419 TOTAL FEE I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan;that I understand this is not a permit,but only an application for a permit,and work is not to start without a permit;that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. Applicant's Printed Name App cants Signature FOOFFICE USE , " R Required Inspections: R' iewed By: 1 Date: 1 0 IQ ( 11 Underground Rough In Air Test Gas Service Te In-floor Heat 3 Final HVAC Screening