3915 Denmark Ave•SITE'ADDRESS 3q 1 5 C k VA 610.( L IL-( _ Unit # Permit #
Sect./Sub. ?L1 v? C y t
INSPECTION INSPECTOR DATE COMMENTS
INSPECTION RECORD
CITY OF EAGAN PERMIT TYPE:
- 3$310 Pilot Knob Road Permit Number:
Eagan, Minnesota 55122-1897 Date Issued:
(612) 681-4675
SITE ADDRESS:
PERMIT SUBTYPE:
APPLICANT:
TYPE OF WORK:
tit ?; f l? r r' 1 1 41 PI
1;111 1 11 1 N1,
fiv, N! I'll
IAN Rf:VIFWFO HY CRAIG NOVA('/Y#'
1 1.1'AM WrNNFMIl1ti 0
00 FRANCI AVf NI.IF.
L.
¦r
Permit Holder Date Telephone N
PLUMBING
HVAC
Inspection Date Insp. Comments
FOOTINGS
FOUND
FRAMING
ROOFING
ROUGH
PLUMBING
PLBG
AIR TEST
ROUGH
HEATING
GAS SVC
TEST
INSUL
GYP BOARD
FIREPLACE
FIREPLACE
AIR TEST
FINAL PLBG
FINAL HTG
ORSAT
TEST
BLDG FINAL
DOMESTIC
METER
IRRIGATION
METER
FLUSH
MAINS
CONDUCTIVITY
TEST
HYDROSTATIC
TEST
BSMT R.I.
BSMT FINAL
DECK FTG
DECK FINAL -
ACITY OF EAGAN
3830 Pilot Knob Road
Eagan, Minnesota 55122-1897
(612)881-4675
SITE ADDRESS:
PERMIT
3915 DENMARK AVE
LOT: BLOCK:
WINDCREST
9 -30 9?5
PERMIT TYPE: B U I L D I N G
Permit Number: 0 3 3 3 5 5
Date Issued: 09/22/98
DESCRIPTION: PEAK ALERT
Byiid'in,g,Permit Type
Building'Wo,rk Type
fi
1 ..4
REM"":REVIEWED BY CRAIG NOVACZYK.
ARCHITECT: WILLIAM HENNEMUTH #9910
7300 FRANCE AVENUE SOUTH
FEE SUMMARY: VALUATION $40,000
Base Fee $.00
Surcharge _ X20.00
Total Fee $20.00
PRM§ACTSgq 5 , C F
4005 W 65TH ST
EDINA MN
(612) 920-6123
GENERATOR
P
tz-
NEW
- Rpp La cant - OWNER'
29206123 CITY OF EAGAN
3830 PILOT
55435 EAGAN
(651)681-4600
KNOB RD
MN 55122
I hereby' acknowledge that I have read this
information is correct and agree to comply
.Statutes and pity,pf Eagan Ordinances.
L_
a APPLICANT/PE11RMITlEJE SIGNATURE
application and state that the
with all applicable State of Mn.
SUED BY. SIGNATURE
J
1998 BUILDING PERMIT APPLICATION (COMMERCIAL)-7:?-<--'?
CITY OF EAGAN O - O O
681-4675
r p
Submit following to obtain necessary permit ?Qk?Ci iTt-: L /T? -5
??L 7
Foundation Only New Construction Interior improveme t
structural plans (2 sets) architectural plans (2 sets) architectural plans (2 sets)
civil plans (2 sets) structural plans (2 sets) code analysis (1)
code analysis (1) " civil plans (2 sets) project specs (i set)
soils report (1) landscaping plans (2 sets) Key Plan
project specs (1) code analysis (1) " energy calculations (1) not always "
Special Inspections & Testing Schedule " soils report (1) Electric Power & Lighting Form (1) not always "
SAC determination letter from MCNVS - SAC determination letter from MCNVS - SAC determination letter from MC/WS -
call 602-1000 call 602-1000 call 602.1000
Special Inspections & Testing Schedule (1)
project specs (1)
energy calculations (1)
Electric Power & Lighting Form (1 °
Contact Building Inspections for sample
Food & Beverage or Lodging facilities: Plan must be submitted to Minnesota Department of Health. Call 215-0700 for details.
DATE: - z-- 9S WORKTYPE:? NEW REMODEL
DESCRIPTION OF WORK:
3f'ts_ ,
00
CONSTRUCTION COST: - TENANT NAME: G?
SITE ADDRESS:
LOT BLOCK
Name: C- I / `1 t? T" a k t'' Phone #:
PROPERTY Lases- First
OWNER
Street
City
rl
State:
Zip:
Company: , ?• ?4G,r, t (n +- s,,s Phone #: R<;10- L 12-3
CONTRACTOR ' I?t o
Street Address: `t,5 w, /
tOStt-N M License # 2
City ?A t 1n ? State: d f !-n Zip: SS J
ARCHITECT/ 11? II 11'' ^_ r?
ENGINEER Company:_ W I t tG , ?C hn ?YhW Phone #: S SBg?
I) >>
Registration #: Oiq I E>
Street Address: 1,2?0 rrayice )4Le '?SD,,M ?L
City wok State: r frl Zip:
Sewer & water licensed plumber (only if installing sewer & water):
I her oCAIJt t- ead this application and state that the information is correct and agree to comply with all applicable State of
Minn sofa &4&tq@ Snq of Ea Ian Ordinances.
Signature of Applitan?
SUBD. W u _? C l v? P.I.D. #
SUITE #:
OFFICE USE ONLY
BUILDING PERMIT TYPE
? 01 Foundation 19 Comm./Ind. Misc. ? 21 Miscellaneous
? 18 CommAnd. ? 20 Public Facility
WORK TYPE G??IG/?Err 5G?}QS oNLy
F D ? ??f?lt ?G E A, ? GS??f?dl•/i /o,(J S/ % ,E
31 New ? 33 Alterations ? 35 Tenant Finish
? 32 Addition ? 34 Repair ? 37 Demolition
GENERAL INFORMATION
Const. (Actual)
(Allowable)
UBC Occupancy
Zoning
# of Stories 0
Length
Depth 3
APPROVALS
Planning
Permit Fee
Surcharge
Plan Review
MC/WS SAC
City SAC
Water Conn.
S/W Permit
S/W Surcharge
Treatment PI.
Park Ded.
Trails Ded.
Water Qual.
Other
Copies
Total:
% SAC
SAC Units
Meter Size
Basement sq. ft.
First Floor sq. ft.
sq. ft.
sq. ft.
sq. ft.
sq. ft.
Footprint sq. ft.
Building
MC/WS System
City Water
Fire Sprinklered
Census Code
SAC Code
Census Bldg.
Census Unit
V? Engineering Variance
Valuation: $ d
?( C
3d
MEMORANDUM
TO: PAT GEAGAN, CHIEF OF POLICE
ASSISTANT TO THE CITY ADMINISTRATOR
DALE WEGLEITNER, FIRE MARSHAL
PLUMBING INSPECTOR - f»
ELECTRICAL INSPECTOR
PUBLIC WORKS/ ENGINEERING DIVISION /UTILITIES/STREETS
GENE VANOVERBEKE, FINANCE DIRECTOR
RICH BRASCH, WATER RESOURCES COORDINATOR
MIKE RIDLEY, SENIOR PLANNER
GREGG HOVE, SUPERVISOR OF FORESTRY
FROM: WAYNE MILLER, BUILDING INSPECTOR
DATE: 9 5APT /!v?
RE: PLAN REVIEW
The _ preliminary ?( construction plans for PEAT( ALBR>" -emoxh-noN
are in our plan review section for your review and comment.
Please return this form to Dale Schoeppner with your signed comments and the date of
review. If you have any concerns with these plans, please so indicate on this form and notify and
resolve these issues with the affected parties. If you are requesting that issuance of the building
permit be held, please fill out the proper "hold" request form.
Comments: ?W Y ?4S 'rN'1S "sAj& 0? ftw UiS(4(4? -DD95 IT
Wf,-o bb f 16??? 'Slued. " wt.,
Indicate any fees that are to be collected with the building permit:
AMOUNT
? Yes 2ro"No landscape security required
? Yes ?
}}}}N???o water quality dedication
? Yes ??-
??-
o park dedication
? Yes No trail dedication
? Yes ? No tree dedication
es ? Nq?A
Sign t
ZONING? 1V
q.
Date
CDirORNISPLAN REVIEW WAYNL N1
J
MEN10RANDUM
TO: PAT GE.>GAN, CHIEF OF POLICE
ASSISTANT TO THE CITY ADMINISTRATOR
DALE R'EGLEITNER. FIRE LNIARSHAL
PLUMBING INSPECTOR
ELECTRICAL INSPECTOR
PUBLIC WORKS1 ENGINEERING DIVISION /UTILITIES/STREETS
GENE VANOVERBEKE, FINANCE DIRECTOR
RICH BR_aSCH, WATER RESOURCES COORDINATOR
MIKE RIDLEY, SENIOR PLANNER
GREGG HOVE, SUPERVISOR OF FORESTRY
FROG[: WAYNE MILLER, BUILDING INSPECTOR
DATE: rI 5E? ??
RE: PLAN REVIEW
/t ;w p
The _ preliminary )( construction plans for ID,5#X 41,OR7- G ENB/IAT/aN
are in our plan review section for your review and comment.
Please return this form to Dale Schoeaoner with your signed comments and the date of
review. If you have any concerns with these plans, please so indicate on this form and notify and
resolve these issues with the affected parties. If you are requesting that issuance of the building
permit be held, please fill out the proper "hold" request form.
Comments:
Indicate any fees that are to be collected with the building permit:
AMOUNT
? Yes ? No
? Yes ? No
? Yes ? No
? Yes ? No
? Yes ? No
? Yqs ? No
Signature
landscape security required
water quality dedication
park dedication
trail dedication
tree dedication
ZONING?
Date
l111-010URL\N RLVILW WA\ NO.M
MEMORANDUM
TO: PAT GEAGAN, CHIEF OF POLICE
ASSISTANT TO THE CITY ADMINISTRATOR
DALE WEGLEITNER, FIRE MARSHAL
PLUMBING INSPECTOR A
ELECTRICAL INSPECTOR
PUBLIC WORKS/ ENGINEERING DIVISION /UTILITIES/STREETS
GENE VANOVERBEKE, FINANCE DIRECTOR
RICH BRASCH, WATER RESOURCES COORDINATOR
MIKE RIDLEY, SENIOR PLANNER
GREGG HOVE, SUPERVISOR OF FORESTRY
FROM: WAYNE MILLER, BUILDING INSPECTOR
DATE: 9 5BO7' y'V?
RE: PLAN REVIEW
/ I14 -* h
The _ preliminary )( construction plans for PEAK #LfRT G XMXf >•T/oy
are in our plan review section for your review and comment.
Please return this form to Dale Schoeppner with your signed comments and the date of
review. If you have any concerns with these plans; please so indicate on this form and notify and
resolve these issues with the affected parties. If you are requesting that issuance of the building
permit be held, please fill out the proper "hold" request form.
Comments:
Indicate any fees that are to be collected with the building permit:
AMOUNT
? Yes ? No landscape security required
? Yes ? No water quality dedication
? Yes ? No park dedication
? Yes ? No trail dedication
? Yes No tree dedication
? Yes No ,
Signature
ZONING?
I-11-?K
Date
CD/FORMS/PLAN REVIEW WAYNEM
MEMORANDUM
TO: PAT GEAGAN, CHIEF OF POLICE
ASSISTANT TO THE CITY ADMINISTRATOR
DALE WEGLEITNER, FIRE MARSHAL
PLUMBING INSPECTOR - A»
ELECTRICAL INSPECTOR
PUBLIC WORKS/ ENGINEERING DIVISION /UTILITIES/STREETS
GENE VANOVERBEKE, FINANCE DIRECTOR
RICH BRASCH, WATER RESOURCES COORDINATOR
MIKE RIDLEY, SENIOR PLANNER
GREGG HOVE, SUPERVISOR OF FORESTRY
FROM: WAYNE MILLER, BUILDING INSPECTOR
DATE: 9 ?07' Ftr
RE: PLAN REVIEW
?,bo :sr- h
j The _ preliminary /*? construction plans for Pg#x #LoR r G eAulth-7T/off
are in our plan review section for your review and comment.
Please return this form to Dale Schoeppner with your signed comments and the date of
review. If you have any concerns with these plans, please so indicate on this form and notify and
resolve these issues with the affected parties. If you are requesting that issuance of the building
permit be held, please fill out the proper "hold" request form.
Comments:
Indicate any fees that are to be collected with the building permit:
AMOUNT
? Yes ? No landscape security required
? Yes ? No water quality dedication
? Yes ? No park dedication
? Yes ? No trail dedication
? Yes ? No tree dedication
? Yes ? No _
Date
Signature
CDiFORMS/PLAN REVIEW WAYNE NI
ZONING?
//-? ?/
r
MEMORANDUM
TO: PAT GEAGAN, CHIEF OF POLICE
ASSISTANT TO THE CITY ADMINISTRATOR
DALE WEGLEITNER, FIRE MARSHAL
PLUMBING INSPECTOR
ELECTRICAL INSPECTOR
PUBLIC WORKS/ ENGINEERING DIVISION /UTILITIES/STREETS
GENE VANOVERBEKE, FINANCE DIRECTOR
RICH BRASCH, WATER RESOURCES COORDINATOR
MIKE RIDLEY, SENIOR PLANNER
GREGG HOVE, SUPERVISOR OF FORESTRY
FROM: WAYNE MILLER, BUILDING INSPECTOR
DATE: 9 $EP7",ftr
RE: PLAIN REVIEW
'e-/1' O fi
The _ preliminary J- construction plans for 105,+X #LBRT GENARR-T/aN
are in our plan review section for your review and comment.
Please return this form to Dale Schoeppner with your signed comments and the date of
review. If you have any concerns with these plans, please so indicate on this form and notify and
resolve these issues with the affected parties. If you are requesting that issuance of the building
permit be held, please fill out the proper "hold" request form.
Comments:
Indicate any fees that are to be collected with the building permit:
AMOUNT
? Yes ? No landscape security required
? Yes ? No water quality dedication
? Yes ? No park dedication
? Yes ? No trail dedication
? Yes ? No tree dedication
? Y s 0 ?No
Signature
ZONING?
Date
CUiFUKNIS?PLAN ILLVILW WAYNL NI
A---,
NI EMO RAND UNI
TO: PAT GEAGAN, CHIEF OF POLICE
ASSISTANT TO THE CITY ADMINISTRATOR
DALE WEGLEITNER. FIRE MARSHAL
PLUNIBING INSPECTOR
ELECTRICAL INSPECTOR
PUBLIC WORKS/ ENGINEERING DIVISION /UTILITIES/STREETS
GENE VANOVERBEKE, FINANCE DIRECTOR
RICH BRASCH, WATER RESOURCES COORDINATOR
MIKE RIDLEY, SENIOR PLANNER
GREGG HOVE, SUPERVISOR OF FORESTRY
FROM: WAYNE MILLER, BUILDING INSPECTOR
DATE: J? JAor 1!fr
RE: PLAIN REVIEW
The -preliminary -L construction plans for pc,+x #iogr /.xAme r/oy
are in our plan review section for your review and comment.
Please return this form to Dale Schoeppner with your signed comments and the date of
review. If you have any concerns with these plans, please so indicate on this form and notify and
resolve these issues with the affected parties. If you are requesting that issuance of the building
permit be held, please fill out the proper "hold" request form.
Comments: rVK- Gr9in??hst
T
Indicate any fees that are to be collected with the building permit:
AMOUNT
? Yes ? No landscape security required
? Yes ? No water quality dedication
? Yes ? No park dedication
? Yes ? No trail dedication
? Yes ? No tree dedication
? Yes ? No
, _,,'
iI at Lire
ZONING?
Date
CD&ORMS.VLAN RLVIEW WAYNE M
\Rqa ?
19W BUILDING PERMIT APPLICATION (COMMERCIAL)
CITY OF EAGAN
681-4675
Submit following to obtain necessarv permit
???599 S I
.531-4 9
Foundation Only New Construction Interior Improvement
structural plans (2 sets) architectural plans (2 sets) architectural plans (2 sets)
civil plans (2 sets) structural plans (2 sets) code analysis (1)
code analysis (1) " civil plans (2 sets) project specs (1 set)
soils report (1) landscaping plans (2 sets) Key Plan
project specs (1) code analysis (1)" energy calculations (1)not always -
Special Inspections & Testing Schedule " soils report (1) Electric Power & Lighting Form (1) not always
SAC determination letter from MC=S - SAC determination letter from MCMIS - SAC determination letter from MCMIS -
rail 602-1000 call 602-1000 call 602-1000
Special Inspections & Testing Schedule (1)
project specs (1)
energy calculations (1)
Electric Power & Lighting Forth 1)
wnma ounuing inspections Tor sample
Food & Beverage or Lodging facilities: Plan must be submitted to Minnesota Department of Health. Call 215-0700 for details.
DATE: OS l2 io /9
WORK TYPE: V- NEW REMODEL
DESCRIPTION OF WORK: MECI-)Anr IeA?- 3U I L-0f (4 Gr
CONSTRUCTION COST: 32Z ?D`? TENANT NAME: G I o? ?A&AAl
SITE ADDRESS:
LOT D
E
n (-l?_-t-l0--
BLOCK C) SUBD. W SJ C?kk"C,? P.I.D.#
C- 17-( of 1EA GAN
PROPERTY Last
OWNER
Street
C4)NXF ACFOR
ARCHITECT/
ENGINEER
City
3830
E A &W4
First
c, aT 46VD 8
Company: 6-1:ze' 57TI KE
Phone #:
J1' o A ?
State: 1141V
SUITE #:
??I) Co8 f-466v
zip: .S5 f Z Z
CallSY72bZf1ON ?ophone #: ? fo127 ¢? ?'' ZZZ ?j
Street Address: k ZZ 1 4 T!1 /yN? , l ) 5U, t) o License #
City 54A IZO(N? , -PW State: /"/1/
zip: S S¢2 3
Company: W A TEYZ 7C14N y oG I/ IAIhone #: (°I 20 $y'-7-7 3757
Name: FCtN WPVW Registration #:
Street Address: Ioo PAR k. A"fC
City 46?PA-/M SAM State: W :z iz. _? ?S 1
In n
Sewer & water licensed plumber (only if installing sewer & water):
I hereby acknowledge that I have read this application and state that the information is correct and agree )??mpl it pplicablel?t of
Minnesota Statutes and City of Eagan Ordinances.
Signature of Applicant:
OFFICE USE ONLY
BUILDING PERMIT TYPE
? 01 Foundation
? 18 CommAnd
WORK TYPE
31 New
? 32 Addition
GENERAL INFORMATION
? 19 Comm./Ind. Misc.
A 20 Public Facility
? 33 Alterations
? 34 Repair
? 21 Miscellaneous
? 35 Tenant Finish
? 37 Demolition
Const. (Actual) UN Basement sq
_ . ft. 1 b o MC/WS System
(Allowable) J
First Floor sq . ft. 16 0 City Water
UBC Occupancy 52 i sq. ft. Fire Sprinklered
Zoning sq. ft. Census Code 3 /
# of Stories a sq. ft. SAC Code O
Length _O sq. ft. Census Bldg. DI
Depth HD Footprint sq. ft. IZ O Census Unit _L
APPROVALS
Planning
Building k-L? Engineering
Variance
Permit Fee
Surcharge
Plan Review
MC/WS SAC
City SAC
Water Conn.
S/W Permit
S/W Surcharge J'
Treatment PI.
Park Ded.
Trails Ded.
Water Qual.
Other
Copies
Total:
Valuation: $ 3 ?? ;;k, op0
% SAC 1,06)
SAC Units
Meter Size