2017 FIRE SUPPRESSION SYSTEMS PERMIT APPLICATION
Date: 4-26-18 Site Address: 4300 Dodd Rd
Tenant: Pinewood Community School Suite#:
0 Requirements: 2 complete sets of drawings and specifications, cut sheets on materials and components
• a Name: Pinewood Community School Phone:
Property Owner
( Address/City/Zip: 4300 Dodd Rd
A••licant is: Owner X Contracto _
Description of work: Fire Suppression m � �� I �
D
Type of Work P System Upgrades d� �GQ 1��c� • n �
G f a
Construction Cost: $4,153.49 Estimated Com•letion Date: Already Completed
Name: Total Fire Protection License#: C050
Address: 1004 7th Ave NE • City: Brandon
Contractor
fi
State: SD Zip: 57005 Phone: (605)582-2400
Contact: Merissa Schlepp Email: mschlepp@tfpsd.com
,, �
FIRE PERMIT TYPE u,_ .�... .... ............. ... . .�_ WORK TYPE
.... �.._.... .... _.. _�...�
X Sprinkler System (#of heads 1 _
Y ) New —Addition
—Fire Pump —Standpipe X Alterations _Remodel
Other: Other:
DESCRIPTION OF WORK: Commercial ____Residential –Educational
FEES
Contract Value$ 4,153.49 x.01
$60.00 Permit Fee Minimum
_$ 60.00 Permit Fee
Surcharge=Contract Value x$0.0005
If the project valuation is over$1 million, please call for Surcharge =$ 2.07 Surcharge
$100.00 Residential New (includes State Surcharge) _$ 62.07 TOTAL FEE
3/4" Fire Meter-$290.00 =$ Fire Meter
_$ TOTAL FEE
You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's
website at www.citvofeagan.com/subscribe.
I hereby apply for a Fire Suppression System permit and acknowledge that the information is complete and accurate;that the work will be in
conformance with the ordinances and codes of the City of Eagan and with the Minnesota Building/Fire Codes;that I understand this is not a permit, but
only an application for a permit,and work is not to start without a permit;that the work will be in accordance with the approved plan in the case of work
which requires a review and approval of plans. v�
x x ,/e5142.4ct SeiteeNt
Applicant's Printed Name Applicant's Signature
/ 9/
FOR
OFFICE USE
REQUIRED INSPECTIONS
Hydrostatic Flow Alarm Drain Test Rough In
Trip Pump Test Central Station Final
Conditions of Issuance:
ff
Permit Reviewed by: Qr.
3 Date: / ' / l
Use BLUE or BLACK Ink
r
For Office U 1
I ~C~ 1
City of EaRd~ ~ Permit#: J ~
I .
I Permit Fee: I
3830 Pilot Knob Road
Eagan MN 55122
1 Date Received: I
Phone: (651) 675-5675 1
Fax: (651) 675-5694 1 staff:
-----------------I
2011 COMMERCIAL BUILDING PERMIT APPLICATION
Date: Site Address: I o A Rc/~
Tenant Name: (Tenant is: New / Existing) Suite
Former Tenant:
PROPERTY OWNER Name: Phone:
Address / City / Zip:
Applicant is: Owner Contractor
TYPE OF WORK Description of work: eoc-A rd <,z :4,~.-.,4%
Construction Cost:
%3. DL7~J
CONTRACTOR Name: BV-4,s Fad, License
..i
Address: -25-'10 C R;A_CAi" ~ ~,z( Ckl_ City: ~4 U-' M
~y
State: h 1J Zip: S- LC c'( Phone: 6 5-1 7 10
Contact: 7 ~e_Vi G h So%-, Emai1: i~c-Qti M!S i-A"C>S dk
ARCHITECT / Name: ~_1111-srliik-l ;111; Registration
ENGINEER
Address: 9 ) k 2-0 Bc~ 9-:-' Xe City:
State: J''I ti Zip: ~Sy2Z, Phone:
Contact Person: & 6 -5cj t Email:
Licensed plumber installing new sewer/water service: Phone
NOTE: Plans and supporting documents that you submit are considered to be public information. Portions of
the information may be classified as non-public if you provide specific reasons that would permit the City to
conclude that the are trade secrets.
CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage.
Call 48 hours before you intend to dig to receive locates of underground utilities. www.gopherstateonecall.org
I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and
codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a
permit; that the woyrfk will bea\ in accordance with the approved plan in the case of wo* which requires a review and approval of plans.
x 51,C I/ -iItF ✓ ~Y'~. c~✓4 X ` -
Applicant's Printed Name Applicant' Signature
Page 1 of 3
~60 DO&I k' J,
DO NOT WRITE BELOW THIS LINE
SUB TYPES
Foundation Public Facility _ Accessory Building
- Apartments _ Commercial / Industrial _ Exterior Alteration-Apartments
_ Lodging _ Greenhouse/ Tent _ Exterior Alteration-Commercial
Miscellaneous Antennae Exterior Alteration-Public Facility
WORK TYPES
- New _ Interior Improvement Siding _ Demolish Building*
- Addition _ Exterior Improvement Reroof Demolish Interior
Alteration Repair Windows Demolish Foundation
- Replace _ Water Damage Fire Repair _ Salon Owner Change
- Retaining Wall *Demolition of entire building - give PCA handout to applicant
DESCRIPTION
Valuation Occupancy MCES System
Plan Review Code Edition SAC Units
(25%_ 100%_) Zoning City Water
Census Code Stories Booster Pump
# of Units Square Feet PRV
# of Buildings Length Fire Sprinklers
Type of Construction Width
REQUIRED INSPECTIONS
Footings (New Building) Sheetrock
Footings (Deck) Final / C.O. Required
Footings (Addition) Final / No C.O. Required
Foundation Other:
Drain Tile Pool: -Footings -Air/Gas Tests -Final
Roof: -Decking -Insulation -ice & Wate Final Siding: -Stucco Lath -Stone Lath -Brick
Framing Windows
Fireplace: -Rough In -Air Test -Final Retaining Wall
Insulation Erosion Control
Meter Size:
Final C/O Inspection: chhedule Fire Marshal to be present: Yes No
Reviewed By: ML- , Building Inspector Reviewed By: , Planning
COMMERCIAL FEES
Base Fee Water Quality
Surcharge Water Supply & Storage (WAC)
Plan Review Storm Sewer Trunk
MCES SAC Sewer Trunk
City SAC Water Trunk
S&W Permit & Surcharge Street Lateral
Treatment Plant Street
Treatment Plant (Irrigation) Water Lateral
Park Dedication Other:
Trail Dedication
Water Quality TOTAL
Page 2 of 3
Use BLUE or BLACK Ink
ur if;ice U,,,
J f p~ Permit
Co1 Eania / n 'JUL 1 4 RG~ I Permit Fee: ✓ ~CJ~
I
3830 Pilot Knob Road _c,
Eagan MN 55122 l I Date Received: 7
Phone: (651) 675-5675
Fax: (651) 675-5694 Staff:
2010 COMMERCIAL FIRE ALARM PERMIT APPLICATION*
Date: 9111115 Site Address: '136b Oodd Road, Fa W IPIV 55 ,3 3
Tenant: PG i m-l o cC Suite
PROPERTY OWNER Name: 150 194 Phone:
Address / City / Zip: i 4gg5 btamr"dlPa-4 t~ AL ad-, fW ' &AA
Applicant is: Owner Y- Contractor
TYPE OF WORK Description of work: Ft re .414-12rri O. We rm e ri ~ -SID 1:B
f 't O
L)[3Q Estimated Completion Date:
Construction Cost: 015
CONTRACTOR Name: EAat) 6brn4q&i 1 License TS DoaaY
Address: 7(,pc~J~ ~bD/L~ y / 1 City: 61,0 1 YI) AW16
State: M/0 Zip: JJ~Lfo~L7 Phone: 7&3 - 7_&,? ' 71-16g
Contact: 4w 5-10 ✓s Y Email: /sSjo ye r Q eqa4-) cc. eeLi
New Remodel
WORK TYPE Addition _ Other:
Alterations
DESCRIPTION OF WORK: _ Commercial _ Residential _X Educational
FEES
$50.50 Minimum (includes State Surcharge) OR Contract Value $ tx1%
$ ~~Q • U C? Permit Fee
- If Permit Fee is less than $1,000, surcharge is $.50.
If Permit Fee is > $1,000, surcharge increases by $.50 for each = $ 5-00 State Surcharge
$1,000 Permit Fee (i.e. a $1,001-$2,000 Permit Fee requires a $1.00 surcharge).
$ a~5tJ 1Off' TOTAL FEE
'Requirements: 2 complete sets of drawings and specifications, cut sheets on materials and components to be used
I hereby apply for a Fire Alarm permit and acknowledge that the information is complete and accurate; that the work will be in conformance with the
ordinances and codes of the City of Eagan and with the Minnesota Building/Fire Codes; that I understand this is not a permit, but only an application for
a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review
and approval of plans.
XV~E~1 ,'14~f x ~L✓
Applicant's Printed Name Applicant's Si na re
FOR OFFICE USE Reviewed 6 _ Date:
Required Inspections: Rough In Final
z ; or Office Use I
Permit _1~1~ e t `J I
City of Eapn
i Permif Fee: 1
3630 Pilot Knob Road
I Date Received:
Eagan MN 55122 I 1
Phone: (651) 675-5675 i
Fax: (651) 675-5694 I Staff:
I I
I SUPPRESSION SYSTEMS PERMIT APPLICATION*
Date Site Address: 't ° 0 cl
f
Tenant: Suite °
[PROPERTY OWNER Name: Phone: _
Address / City / Zip:
Applicant is: Owner Contractor
TYPE OF WORK Description of work:
Estimated Co etion Date:'
Construction Cost:
CONTRACTOR Name: t Tli l rte``' License
Address
~f
City: --State: = Vf Zip:
Phone: 0 Contact Person:
FIRE PERMIT TYPE WORK TYPE
j Sprinkler System of heads ) - New
Fire Pump -Addition
Alterations
Standpipe _ Remodel
Other: Other:
DESCRIPTION OF WORK: Commercial - Residential Educational
FEES
$50.50 Minimum (includes State Surcharge) OR Contract Value $ 1( mac',
- $ Permit Fee
- If Permit Fee is less than $1,000, surcharge is $.50.
- If Permit Fee is > $1,000, surcharge increases by $.50 for each = State Surcharge
$1,000 Permit Fee (i.e. a $1,001-$2,000 Permit Fee requires a $1.00 surcharge). TOTAL FEE
3/4" Displacement Fire Meter - $183.00 $ Fire Meter
$ TOTAL FEE
*Requirements: 2 complete sets of drawings and specifications, cut sheets on materials and components to be used
i hereby apply for a Fire Suppression System permit and acknowledge that the information is complete and accurate; that the work will be in
conformance with the ordinances and codes of the City of Eagan and with the Minnesota Buildinp/FiI e Codes; that I understand this is not a permit, but
only an application for a permit, and work is not to start without a permit; that the work will be ipyaccgrdance with the approved plan in the case of work
which requires a review and approval of plans.
1. +L X
Printed Nam Applicant's Signature
FOR OFFICE USE
REQUIRED INSPECTIONS
_ Hydrostatic Flow Alarm Drain Test Rough In
_ Trip _ Pump Test Central Station Final
Conditions of Issuance:
Permit Reviewed by: c~- Date:
PINEWOOD ELEMENTARY CITY OF EAGAN NO 17273
3830 Pilot Kr)h Road, P.O. Box 21-199, Eagan, MN 55721
BUILDING PERMIT r' . ? PHONE: 454-8100 Receipt # 2 y?/ ./ I ?
Ud?/ ?y Q??
To be used for SCHOOL Est. Value $5 ,486 ,000
Site Address 4300 DODD RD
Lot 1 Block 1 Sec/Sub. STERNS
Parcel No.
wlName INDEPENDENT SCHOOI DTST 196
o Address 14445 DIAMOND P9TH
City ROSEMOIINT Phone 423-9400
tF Name LOEFFEIrENGSTRAND CO
'04 Address 1040 S SIXTH ST
? City HOPKINS Phone 935-0141
?w Name WOLD ASSOCIATION
?? Address 6 W FIFTH ST, SUITE 520
aW City ST PAUL Phone 227-7773
I hereby acknowlege that I have read ihis application and state that the
information is corcect and agree lo compiy wilh all applicable State of
Minnesota Statutes antl Ciry ol Eagan Ord\in,ances. ??? ?
Signature of Permitee ??M d :??l? "y
A Buiming Permit is issued to: LOEFFEL-ENGSTRAND CO
on ihe express condi[ion that all work shall be done in accordance with all
applicatle State ot Mi n
,nesota Statutes and Ciry oi Eagan Ordinances.
Builtling ONicial
OFFICE USE DNLY
Occupancy E-1-A-2.1 FEFS
Zoning PF
(ACtuap Const II-_l._$$ ?Bldg. Permit IZ , 512-00 ?
(Allowabie) II--1-11R ?Surcharge 1_,524_30 -
# of Stories ?
351
"
?Plan Review 4,571.70
Lenglh
DeOth ZZ.Q? SAQCity 4+800.00 "
S.F.Tolal 78, &W MCWC97•600.00 .
SAC
S.F. FaotOrinls SZ r 150 ,
On Si1e Sewage _ Water Conn
On Site Weil - Water Meter
MWCC System XX
City Waler XX_ Acct. Deposil
PRV Required - `'SNJ Permit 20.00
Boosler Pump - ?Sryy Surcharga 1.00
'
Treatment PI 10, 944. 00 _
APPROVALS Road Unit 15. 300.00
Planner - park Detl.
Council
BIdg.Ofl. _ Copies
Varianca - TOTAL 77,273.00
PINEWOOD ELEMENTARY
i, _: ,''* CITY OF EAGAN N0 16962
BUILDING PERMIT
To be used for FOUNDATION Est. Value
Receipt # ` ' 0 " w--0
Date AUG 22 , 1982
Site Address 4300 DODD RD
LOt 1 BIOCk 1 SBC/SUb. STERNS OFFICE USE ONLY
Parcel No. occupancy .- ) FEFS
Zoning _
w Name TNDFpFp]pFNT C H00 D RT(`T 1 (ACtuai) Const Permit 60.00
Bldg
o AddteSS 14445 DIAMOND PATH (Allowable) _
.
-
Surchar e
9
City ROSEMOIINT phone 423-9400 N o15tOries -
Plan Review
lenglh
o Name LOEFFEL-ENGSTRAND CO Depih SAC
Cit
g¢
Address 1040 S SIXTH ST
s.F.rocai -
y
,
-
•
City HOPKINS phone 935-0141
S.F. Footpdncs SAC,nncwcc
-
F On Sile Sewage _ Waler Conn
$w Name WOLD ASSOCIATION OnSiteWen
AddreSS 5 W FIFTH ST, SiJITE 520
MwCCSystem - waterMeter
?
i W City ST PAUL_ phone 7-777 City Water xx AccL Deposit
PRV Require0 - S/W Permit
I hereby acknowlege ihat I have reatl this application and state that the Booster Pump - SMI Surcharge
inlormation is correct and agree to comply with all applica6le Sta ol
Minnesota StatNes and City ol Ea an Ordinances.
t
? Trealmem PI
SignaWre of Permitee 4 AVVROVALS Road Unit
? A Building Permit is issued to: LOEFFEL-ENGSTRAND CO Pla"^8f - Park Ded.
on the express contlilion that all work shall be done in accordance with all Council
ipplicable Stale of Minnesota Statute
s an
d City
Jof Eagan Ordinances. gld9, pff. Copies
I
y
,
ilding Otticial ?? N1,_sY.T I fAr' ! h 1 i I /1 Variance - TOTAL 60.00
3830 Pilot Knob Road, P.O. Box 21-199, Eagan, MN 55121
PHONE: 454-8700
"/[f 'v
7 9 0 2
' - `J? ?SCo/f
? 00
[?
,Ur
Requast Date
8 Fire No. Rough-in Inspeclion
'
R
? Ready Now ? H
l
I
??r
- 3 0- 9 o f7 Yes
No ,
hen R
tly
IN licensed contractor ? owner hereby request inspection of above electrical work at:
JoC Address (Sireet, Box or floute NoJ /?
U0 ?ODD /CO D Ciry
EA6An?
SecTion No. Township Name or No. Range No. Counry
koT.9-
?cryWant (PRIMI PMre No.
PoweA, Su.PPlier
? t?/GOj?- tLEGTlZ/G Atldress
31,fvo 4Wo977
(I)FS7 7,+,eln ,•)6TO-) ssW
ilec?tI ConUacror (Company Nartre) ponVgclwS Licensa No.
JTF ENS -LECTR C 11 -&qAory -r?C D S? 7 -
MaAinp AOtlress (COMratlor or Owner Making InsWllation) '
i? ow oN6-.Z,gX6- nl SS35
AWhonzBtl Sig ntracl r i In ') Phane Number
{!76 - 6
NINNESOTR $TATE ppp OX-ELEMHIqTY THIS INSPECTION flEQUEST WILL NOT
C+rlggaMltlwey Bitl .- Raom 5173 BE ACCEPTED BV THE STATE BOAPD
1821 I/niversity Ave., SL Poul, MN 55104 UNLESS PROPER INSPECTION FEE IS
Vhone(672)602-0800 ENCIOSED.
REQUEST FOR ELECTRICAL INSPECTION
? See WEiycliqhs for completing this /orm on back of yellow copy.
P 7190p
`X" Below Work Covered by This Request
. Eg.
4
e Add Rep. TypeoBUilding AppliancesWired EquipmentWired
Home Range Temporary Service
Duplex Water Heater Electric Heating
Apt. Building Dryer Other (Specify)
Comm./Industrial Furnace
Farm Air Conditioner
Other (specity) Conlmcla9 Remarks:
Compute lnspection Fee Below:
# Other Fee # ServiceEntranceSize Fee # Circutts/Feeders Fee
Swimming Pool 0 to 200 Amps 0 to 100 Amps
Tran5lormers Above 200 _ Amps e 00 _ Amps
SIgnS Inspectw5 Use Onty: TOTA
L
Irrigation 8ooms O ?
Special Inspection
Min71¢um f ee
Alarm/COmmunication ?0l?E.Q ?pNT20L ?2??? $ 15
50
Olher Fee .
I, the Electrical Inspector, hereby
rtif
th
t th
b
i
c
h Rvugh-in oa?e
y
a
e a
ove
nspection
e
as
been made. F;nai
' oate ?./
T[?/
OFFICE USE ONLY
This request mitl 18 momhs Imm
71ul 7?
0 66414,?j ? (A500
Request Date
?/ ?/ p
'
p " Fre No. Rough-in Inspection
Requlred?
eatly Now ? WII Notify Inspectw
Wh
R
d
7
/j
pc
/ ? ?Ves en
ea
y
I 'censed contractor ? owner hereby request inspection of above electrical work at:
Jo0 Atlaress sVeel, Box or Rwte NaJ Ciry
5?30o I?o,oi? o ?9 p
Saclbn No. Township Nartre w No. Range No. Caunry
OccuPat (PFINr) PMrre No.
„vE L"? o cr DO /
Power Supplier Atldress
Elecincal Contractor (Campeny Name) - Contrectork Licanse No.
Al O 5l0 0/ 3-
Mailing Pdtlress (COMraclor or Owner Makirg Irretellelion) ,
7,3 .L ?A/ - £ So .oL S SS slo ?
ANho' atl Signature (COntredor/Owner Meltin InsWllaiion) Piwne Num
lDer
/
/
`I`?
MINNESOTA STATE BOAPD OF ELECTRICITY THIS INSPEGTION REQUEST WILL NOT
OrlggrMlGwey Bltlg. - Hoom 5173 BE ACCEPTED BY THE STATE 80ARD
1821 Unlvereiry Ave., Sc Paul, MN 55104 UNLESS PROPER INSPECTION FEE IS
Phom (BiR) 6424180111 ENCL0.SED.
C}/?/FO REQU€ST:•OR ELECTRICAL INSPECTION &IM ^ene.o,foooi-m
? See instrumions tor complating this (omn on beck of yeliow copy.
N 66414 'X" Below Work Covered by This Request
Ne% Atltl Rep. TypeofBuilOing AppliancesWired EquipmentWiretl
Home Range Temporary Service
Duplex Water Heater Elearic Heeting -
Apt. Building Dryer Other (Specify)
2 omm./Indusirial Furnace
rm ' Air Conditioner
piher (s city? Conlreclor§ Remdrks:
G ot ?',(, ,g'aA/° D/sOc'?SE2-biSHmf}cifis?
Lompute Inspection Fee 8elow:
.# Other fee # ServiceEntrance Size Fee # Circuks/Feeders fee
Swimming Pool 0 to 200 Amps / 0 to 100 Amps
Transformers Above 200 _ Amps Above 100 _ Amps
Signs Inspectw5 Use Onry: TpTAL
Irrigation Booms ?? ? ? / S? ST?
Special Inspeclion
Alarm/Communication
Other Fee
I, the Electrical Inspector, hereby
ce
ti
th
tth
b
i
i
h R°"g""n
. oate
r
ry
a
ea
ove
nspect
on
as
been made.
OFFICE USE ONW
This requesl voitl 18 monlhs hpm
Y?6?
? 0791p . s
Requesr Oaie
a
? Fire No. Rough-in Inspection
Fequiretl?
?eatly Now ? Will Notiy Inspector
/ ?Ves & WhenReatly7
I'&?j' licensed contractor O owner hereby request inspection of above electrical work at:
JoD Atltlress (Street Box or Route No.? ?
f
' Ciry
.
?
.C c??C
Seclion No- TOwnship Name or No. Renge No. County
Occupant(PRINT)
?Ilew?:?,? Phone No.
Power SuOPlier ADOress
ElecVical ConV/actmi (CO/mpeny Name)
? t?//1/J? ? ??? /L ? Conlrador5license No.
? ? / ?'?'- `
MaiTing rl04ress (ConVac[or or Owner Making Installaoon)
1/
C 1
4
"+
AI We< /
Autnorize0 S?1 4Z,4COnVactor ner Ma' g Installation) Phone Number
/J ?{ .y (
;7
21? I/ ?\
MINRES(STp STpTE BOAFD OF ELECMfGITV THIS MSPECTION REOUEST WILL NOT
Grlgps-MiCway BIOg. - Raam S•173 BE ACCEPTEO BV THE $TATE BOARD
1821 UnlversHy Ave., St. Peul, MN 5510d UNLESS PROPER INSPECTION FEE IS
Phane(81Y) 6424)800 ENCLOSEO.
9/V/190 HEQUEST F?ELECTRICAL INSPECTION
? ?$ee instmqions tor mplefing this lorm on back W yellow copy.
0 7-9 1 Q "X" Below Work Covered by This Request
EB.00001-08
`??190-7
ew Adtl Rep. Type of Building AppliancesWired EquipmentWired
Home Range ° -- - - Temporary Service
Duplez Water Heater Electric Heating
Apt Building Dryer Other (Speci )
Comm./Industrial ' FUrnace f• :
Farm Air Conditioner
01M1er (specity) ConVactor5 Femarks:,?1,
IIompute lnspection Fee Belaw: f-p",
# Other Fee # ServiceEntranceSize Fee # Circuits/Feeders Fee
Swimming Pool 0 to 200 Amps 0 t 00 Amps
7ransformers Above 200 _ Amps 0_ Amps
Si9ns Inspeaar5 Use Oniy: TOTAL i-
)
?
IrrigationBooms O --
t`
Special Inspec[ion ?
Alarm/Communication THIS INSTALLATION MAY BE ORDERED DISCONNECTEO IF NOT
Other Fee COMPLETED WITHIN 16 M N S.
I, the Electrical Inspecroc hereby
certity that ihe above inspection has
been made. Rough-in
F;,,ai oa
oei
-7/
L E USE ONLV
3quest void 18 monNS iro.
??
f?
23 9 3zi /g/
Request Date . ' Fire No. Rough-in lnspection
- Required? ? Reaay Now ? W II Notiry Inspecror
O?I s
O ? Ves ? N. When ReatlY7
I i
d
t
cense
con
ractor ? owner hereby re quest inspection of above electncal work at:
Job Adtlress (Street, Box or Route No.) Ciry
" o-U 1?4 ck,,, ue 'Ok I E a
SeGion No. Township Name or No. -
qange No. Counry
a ?a
O=pant (PRINT) Phone Na.
1 3
r w
Power Supplier qydren
Eleprital CoMraqor (COmpany Neme) Coritractor5 License No.
4 e ? ?, 03 pyg7
Mall' Atltlrass (COn4aelor or Owner Malting 1 stalletio0
r? S6 ooa
Au gn re(COntr r/Wirrer M' Inslaliation) Phone Number
so 7- d 3 a(c O
NINNESOTA STA7E 90AR0 OP ELECTRICITY THIS WSPECTION REQUEST WILL NOT
Griggs#1ltlway BWg. - poom S173 BE ACCEPTEO BVTNE STATE BOARO
1821 Unlversiry Ave., SL Peul, MN 55100 UNLESS PROPEFl INSPECTION FEE IS
Phone(el3)69Y-0800 ENCLOSED.
lwlp? REDUEST FOR ELECTRICAL INSPECTION
? See instructions br mmpleGtg Ihis (ortn on back of yellow cnpy.
P 7 2 3 9 3 X" Below Work Covered by This Request
-N EB-W001-07
~ //P 2SS-
917?1'9 9
Ne% Add Rep. Typeofeuilding AppliancesWired EquipmentWired
Home Range Temporary Service
Duplex Water Heater Electric Heating
Apt Builtling Dryer ' Other (Specity) ? Q?d fa?-.
Comm./Industrial Furnace
Farm Air Conditioner
Oroer (spei ) / Convecfor5 Remarks:
Compute Inspection Fee Below:
# Other Fee # ServiCeEntranceSize Fee # CirCUits/Feetlers Fee
SWimming Pool 0 t0 200 Amps 3 0 t0 100 Amps 60
Transfortners Above 200 _ Amps Above 100 _ Amps
Slgns Inspectors U. Only: -- 7p7pL
Irtigation Booms
? .GJ
a /. SJ
Special Inspection
Alarm/Communication
Other Fee
I, the Electrical Inspecror, hereby
certif
th
t th
b
i
ti
h Rough-in oate
y
a
e a
ove
nspec
on
as
been made. Final oata
OFFICE USE ONLY
This request voi0 18 months frwn
?'/.?/ff g
P 556L17
REDUEST FOR ELECTRICAL INSPECTION
? See insvucibns ior completing ihis form an back of yellow copy.
"X" 8elow Work Covered by This Request
w EB-00001-07
e AE3 TypeoBuiltling AppliancesWired EquipmentWired
Home Ranqe Temporary Service
Duplex Water Heater Electric Heating
Apt. Building Dryer Other (Specity)
Comm./Industrial Furnace
Farm Air Conditioner
Olher(specify)
Compute lnspecfion Fee Below: U
# Other Fee # ServiceEntrancaSize Fee # Ci¢uits/Feeders Fee
Swimming Pool 0 to 200 Amps 0 to 700 Amps
Transformers Above 200 _ Amps Abov _ Amps
Signs Inspector's Use ony: T AL
Irrigation Booms ? ?.? ?
Special Inspection
AIarMCommunication
Other Fee
I, the Elecirical Inspector, hereby
tif
th
t th
b
i RougMn ? oaterj
7
y
cer
a
ove
e a
nspection has
been made. Fnal oet
OFFlCE USE ONLY
This request wia 18 months irom
5 07 •,Ci i •, ??/n. ?s?? "
Request Date_ .??
•V Fire No. Pough-in Inspectbn
Requiretl9
f]Yes ?NO
? Reatly Now Will No' Inspector
?
I licensed contractor ? owner hereby reque t inspectipn ve
I i ctrical wor t: -50
Job Atldress (SVeef, Roule oJ Cily i /
J
Section No. Township Name ar No. Range No. Co
OccupaM (PRIN'n
? Phone No.
Power Supplier qpdr¢sy
Electri Cqit or (COmpeny
1.Qi ? " CpnVacto 5 Licrose No.
Q
Meiling AEdress (C/o'm?ractor rn ne ing Installation)
ot ?
a-?? ? J?
•
_..
AuNOnzeC 5' Or/Owner Mekj talle' ) Phone Number /
MINNESOTA STATE BOAFO OF ELECTii1Cl THIS INSPECTION REOUEST W ILL NOT
Gtlg9s11111tlwry Bltlg. - Room 5113 BE ACCEPTEO BV THE STATE BOARO
1821 Unfvarcity Ave., SL Paul, MN 55104 UNLESS PROPER INSPECTION FEE IS
Ptwne (612) 642-0BOU ENCLOSEO.
II I IIYII 11?1I? II) III II II III REQUEST FOR ELECTRICAL INSPECTION 7??sm? 5
Minnesota f Rm & 8'c
821 Une sity Ave St Paul, MN 55104
* 0 3 4 6 2 7 1 0*Pnone (642) 642-0800 (37h7
Home Duplex Apt. Bldg. Ofher: New Addn
Commercial Indushial Farm Remod Re air
Air Cond. H}g. Equip. Wafer Htc Load Mgmf. Ofher.
D er Ron e Elec. Heot Tem . Service
'X' above the work covered 6y this requesi. Enter remarlcs in this space ond on the back of fhe whife copy only.
School Remodel
Calculoie lnspedion Fee - ihrs Inspection Request will not be accepted wifhout ibe correct fee:
ONier Fce f Service Enkance $ize Fee # Circuih/Feeders fee
Mobile Home Park Stall 0 to 200 Amps 0 to 100 Amps 1 95
$freet ltg./fraHic Sig. Above 200 Amps ove 100 Amps
TransformedGenerofor INSPECTOR'S USE ONLY ea> °
$ign/Outline Lig. Xfmr. ?
61
Alarm/Remote Con4ol
$wimming Poal
I hereb ceni ad t6 electnml inelallaAon descnbed herein on 16 dates sMled
Irriga}ion Boom Rough-In " Dah
Special Inspection
Investigafive Fee
THIS INSTAILATION MAY BE ORDEREtb DI ONNECT IF NOT COMPLETED WITHIN 18 ONTHS.
3 4 6-2 71 ED
. . ,. OFFI E USE LV This request.oid 1 B monihs fram wlidatlon date pnnred in fhis box.
s7?7 rI/? gs
Q
PLEASE PRINT OR TYPE I pI
Request Dafe Rmgh-?n invpedion reqoired2 a Yes ? No InspMlon Other Than Rough-In: ? Ready Now p.] Will Call
3/ 3/ 9 7 (You must coll the inspedar when reody) Dote Ready:
I, IU licensed controdor ? owner hereby request inspection of the above eledriml work at:
lob Pddress (Areet, Bax, ar Rook No) City Zip Code
4300 Dodd Road Eagan 55123
Secnon No. Township Name or No. Ronge No. Firc No. Covnry
Dakota
Oavpant Phone No.
PINEWOOD ELEMENTARY SCHOOL (Shaw-L nd uist 454-0670
Power Supplier _ _ _ Address _ _ _
ElecMcal ConhaWr (Compony Nome) Gontmcror ticense No. Maater Lic No. (Plam Elee. Only)
Burnsville Electric, Inc. CA00342 ---
Mailing Pddrw (Comndor or Owner PeAorming insmllanon)
117 Belmont Rd A le Valle 55124
AoPooriz 7e(Co erPedorminglnak anan - - P
-6002
E8-00007A10 6/95 ' STp7EBOARDCOVY•SEEINSTRUCTONSONBACKOFVELLOWCOPY
EWCEIPT ?
CITY OF EAGAN
3830 PILOT KNOB ROAD
EAGAN, MINNESOTA 55122 '
OATE I r f 19 -?
nFCErvEO
iNOM
AMOUNT $
'
?
Y ?
O CASH
lJ? CHECK
?-
j
?? [? ?,•' (y , ?
?.W
FUND 08JECT AMOUNT
Thank You
BY
C 4541
& DOLLARS
1m
ol
14hite--Payas Capy
Yelbw-PosGrg CoPY
Pirilc-fNe Gopy
..,w., y.y?,>.?y.?,,•,,-, •-?,.:F.e;??"' 's^'k..F!cr-=-r'.?' .":.t•*t . `+._c.? . ? a..:
PINEW00D ELF.MEI3TARY CITY OF EAGAN ;. O
; -. .•. ?. 17273
3830 Pilot Knob Road, P.O. Box 21-199, Eagan, MN 55121
? PHONE:454-8100 ; .
' BUILDINCs PERMIT Receipt # /
To be used tor SCHOOL Est. value $5 ,486 ,000 Date NOV 3 19 89
Site Address
Lot 1 Block
Parcel No.
W Name arwarcnUrJrT st;ttWL D1ST 196
Address t?+5 BIMDND PATH
o City RIDSEMOLIMT Phone 423-9400
, o Name LOEFF81.-EidGSTRAND CO
ou
° Address 1? S 3IXZ'B 8T
? citY HOPKINS Phone 935-0141
U W Name VOLD ASUTIOrt
~_
?u
Address ? ST. SUITE 520
<W Clty PAXIL Phone -
I hereby acknowlege that I have read this application and state that the
information is correct and agree to comply with all applicable State of
Minnesota Statutes and City of Eagan Ordinances.
5ignature of Permitee
A Building Permit is issued to: LO$ML-EHGSTRMg CO
on Ihe express condition that all work shall be done in accordance with all
applicable State of Minnesota Statutes and City of Eagan Ordinances.
Building Official
SeclSub.
OFFICE U SE ONLY
Occupancy g'- 1 k-
2' 1 FEFS
?
2oning
A
l
l
C
11"1 MR
it 12s312.?
Bid
P
(
)
Ctua
ons erm
g.
(Aliowable) Ij-i HR 1.524.30
Surcharge
x ot Stones
4,571.70
Lenqth Plan Review
•
498?.00
Depth -WO
78 SAC,City
S.F. Tolal
S.F. Faotpnnts ,
s2 ?T? ?? ??Q??
SAC, MCWC 9
On Site Sewage _ Water Conn
On Site Well ? Walar Meter
MWCC System
?
Acc
t. Deposit
Ciry Water
Zp
??
PRV Required _ S!W Permit
Booster Pump - S/W 5urcharge 1.00
Treatment pI 10, 9".00
APPROVALS Road Unit 15,300.00
Planner _
CounCil
BIdg.OH. _
Variance _
Park Ded.
Copies
TOTAL 77,273.00
Permit No. Permit Holder Date Telephone tl
WaTER
1 ?i-
// ?
c'
SEWER
PLUMBING
(L2/
H.V.A.C.
ELECTRIC
Inspection Date " nsp. Com
Foornys i ?i 8g ul.B
Foundation
Framing
Roofing
Rough Plbg.
Rough Htg.
Isul.
Fireplace
Final Htg.
Fnal Plbg.
COnst. Meter Plbq. Inspector - Notify Plumber
Engr.lPlan
Bldg. Final
! q ? ?.` .
Deck Ftg.
Deck Final
weli
Pr. Disp.
9 00 ? N
CITY OF EAGAN 42 16962
3830 Pilot Knob Road, P.O. Box 21-199, Eagan, MN 55121
PHONE:454-8100
BUILQING PERMIT
'
Receipt #
To be used for FOUNa?TION Est. Value Date AM Z Z , 198g
Site Address 4300 DODD RD
Lot i Block i Sec/Sub. s1?.M OFFICE USE ONLY
Parcel No. occuPancy FEFS
Zoning
W
Name I1?ID? SC80?L DISTRICT i-90
(Actual) Const
-
Bldg. Permit ?•?
o AddreSS 14445 DIAMD? PATH (Allowable) -
Surchar e
9
City 1?SF?lOUNTC Phone 4Z3-9400 X of Stories -
Plan Review
lenglh
o Name ?X"E?E?'$?p ? Depth SAC
Cit
Z
Addfess 1040 S si1= ST
S.F. Totai -
- ,
y
~
Clty HQPK?'q$ Phone 935'0141
S.F. Footprmts
- SAC, MCwCC
W
t
C
WOLD ASSMU
I On Site Sewage er
a
onn
W W T
ON
Name On Sde Well
_W
=
6 W FIFT[I ST¦ SUI''L 320
Address
MwCC s stem
y
? water Meter
iW
City Oa pA? PhOne 227-7773
City Water ?
_
?l. De?sit
PRV Required _ S/W Permit
I hereby acknowiege that I have read ihis application and state that the Booster Pump - S/W Surcharge
information is coRect and agree to comply with all applicable State oi
Minnesota Statutes and City ot Eagan Ordinances.
"'? Treatment PI
Signature of Permitee --' ? ?-'"?? APPROVALS Road Urnt
A Building Permit is issued to: LOEFFElo-ENGSTRM '(O Ptanner - Park Ded.
on the express condition that all work shall be done in acwrdance with all Council
applicable State of Minnesota Statutes and City of Eagan Ordinances. gidg, pry, _ Cop+es
Building OHiCial - Variance - TOTAL ???
Permit No_ Permk Holder Date Telephone #
-WATj,R Z/O . (cLuij //Mw a/ ev
SEWER
PLUMBING n
H.V.A.C. /OcJ C'- 111918Y
ELECTRIC , rj •? • ? ? {r '?, 0' ??
Mspectfon Date Insp. Comments
FoOtings I
Foundation
Framing
Raoting
Rough Plbg.
Rough Hig.
Isul.
Freplace
Final Hlg.
Final Plbg.
Const. Meter Plbg. Inspector - Noti(y Plumber
Engr./Plan
Bldg. Final
Deck Ftg.
Deck Final
Weil
Pr. Disp.
o-t.0-8'9 2 ao
,, .
? co -?1.
.? • . ?
PERMIT #
. ? ?
e•MECHANICAL PERMIT RECEIPT #
CITY OF EAGAN ? f;?
3830 PILOT KNOB ROAQ, EAGAN, MN 55122 DATE
CONTiiACT PRICE PHONE: 454-8100 For Office Use Only:
Site Address BLDG. TYPE WORK DESCRIPTION
Lot Block f Sec/Sub - Res New
? .
? Name ?ult Add-on
m Comm. Repai[
? Address
Other
c City Phone
FEES
? Name RES. HVAC 0-100 M BTU -$24.00
c Address ADDITIONAL 50 M BTU - 6.00
p City Phone (RES. HVAC INCLUDES A/C ON NEW
CONSTRUCTION)
GAS OUTLETS (MINIMUM - 1 PER PERMIT} - 1.50 EA.
TYPE OF WOHK COMM/INd FEE - i96 OF CONTRACT FEE
ForCed Air M BTU APT. BLDGS. - COMM. RATE APPLIES
TOWNHOUSE 8 CONDOS - RES. RATE APPLIES
Boiler M BTU MINIMUM RESIDENTIAL FEE - ALL ADD-ON &
Unit Heater M BTU REMODELS - 12.00
Air Cond. M BTU MINIMUM COMMERCIAL FEE - 20.00
STATE SURCHARGE PER PERMIT - .50
Vent CFM
(ADD $.50 S/C IF PERMIT PRICE GOES
Gas Piping Outlets # BEYOND $1,000)
Other $ A ?
FEE
SIGNATUF?E OF PERMITTEErt
S/C:
TOTAL• FOR: CITY OF EAGAN
? ?
? ?-
- ? ? ?????%??-?-?`
CONTRACT PRICE:
Site Address
Lot ? BIOC
PERMIT #
PLUMBING PERMIT RECEIPT # CITY OF EAGAN
3830 PILOT KNOB ROAD, EAGAN, MN 55122 DATE
? rvame ? • ?
? Address
c City
. Name _
c Address
p C'tY -
+ • r-?` BLDG. TYPE WORK DESCRIPTION
Sec/Sub Res. New
Mult. Add-on
_ _ __?_ ?
Comm. ?- Repair
Phone
FEES
COMM/IND FEE - 146 OF CONTRACT FEE
APT. BLDGS - COMM RATE APPLIES
TOWNHOUSE & CONDO - RES. RATE APPLIES
MINIMUM - RESIDENTIAL FEE - $12.00
MINIMUM - COMM/IND FEE - $20.00
STATE SURCHARGE PER PERMIT - .50
(ADD $.50 S/C IF PERMIT PRICE GOES
BEYONO $1,000.00)
Other
RES. PLBG. ONLY - COMPLETE THE FOLI.OWING
NO. FIXTURES TOTAL
Water Closet - $3.00 $
Sath Tubs - $3.00
Lavatory - $3.00
Shower - $3.00
Kitchen Sink - $3.00
Urinat/Bidet - $3.00
Laundry Tray - $3.00
Floor Drains - $1.50
Water Heater - $1 50
Whirlpool - $3.00
Gas Piping Outlets - $1.50
(MINIMUM - 1 PER PERMIT)
Softener - $5.00
well - $10.00
Private Disp. - $10.00
Rough Openings - $1.50
FEE: s 1 - - - : 'e _r r _.?•?'w _? II STATE S/C:
FOR CITY OF EAGAN GRAND TOTAL•
?
? .. lo
130
AT
? ? _z ? ?' S ,?•-?-?? ? ?l?
?k4
3 -23-9U ?
?-
3-?d J ? y-y
q-6 - ?70 11-=G? . k
9
_ 2? f p G? ?r c?-??????2'`.?•"_'
?
INSPE
CITY OF EAGAN
3830 Pilot Knob Road
Eagan, Minnesota 55122-1897
(612) 681-4675
? SITE ADDRESS:
I PERMIT SUBTYPE:
TYPE OF WORK:
<<; - i , 1 s t1i,
til, I < <, I "ti
i9'M1 '3 tti 4 1
O:ilZG l9 7
(,? 1 ra t
AiInT1 tON ?
r r. br: dt0trr) F l E. 14E M 1 AitY
INSPECTION DA .
; ., .•
.:, f i! I? ? 1!!;'y I
ON RECORD
PERMIT TYPE:
Permit Number:
Date Issued:
:r.? n ? .• ,
APPLICANT:
t t. t,? ? 4 +.11 at,r??
? l,'FMARKt;: rlii:.ll: F+(+IiM
Pertnlt No. P rmft Holder Date Telephone M
ELECTRIC
PLUMBING 8'y'Q
HVAC
Inspsctlon Date ` Insp. Comments
FOOTINGS 7 /,/,Q
rcz:)
FOUND 7
?
FRAMING
ROOFING
ROUGH
PLUMBING
PIBG
AIR TEST
ROUGH
HEATING
dAS SVC
TEST
INSUL
GYP BQARD
FIREPLACE
FIREPLACE
AIR TEST
FINAL PLBG
FINAL HTG
ORSAT
TEST
BLDG FINAL
BSMT R.I.
BSMT FINAL
DECK FT(3
DECK FINAL
IdSPfCT? N INSPECTOR DATE COMMENTS
SITE ADDRESS
B Sect./Sub.
Unit # Permit #
INSPECTION INSPECTOR DATE - COMMENTS
?Y
?
4? ? -
?v'?
9• ?
? yro w
? 9• / 3 p? i 9-9v cu,? . ? i,?a,?.?
- 9-/9-?
?f 9-ir =
:? ? ` .
3EWER & WATER PEFiMIT
CITY OF EAGAN
3830 Pilot Knob Rd.
Eagan, MN 55422-1897
?,.
SITE ADDRESS
LOT BLOCK t SEC/SUB
APPUCANT:
ADDRESS:
CITY, STATE ZIP ? ?• ? '?
PHONE: -
?
PLUMBER:
ADDRESS: H
i
CITY, STATE ZIP
PHONE: Li
OWNER:
ADDRESS: A ?}u ?:•,-
CITY, STATE ZIP
PHONE:
tE1MER & WATER PERMIT
CITY OF EAGAN
3830 Pilot Knotr R6.
Eagan, MN 55122-1897
METER # PERMIT DATE
CHIP # WATER PERMIT #
METER SIZE B.P. RECEIPT #
ISSUE DATE B.P. RECEIPT DATE
PERMIT REQUESTED
? SEWER WATER - TAPS ?
? COMM/IND - RESIDENTIAL `
..?. NEW - EXfSTING
I AGREE TO COMPLY WITH CITY OF
EAGAN ORDINANCES:
SIGNATURE WHEN METER ISSUED
METER #
CHIP #
METER SIZE
ISSUE DATE
PERMIT pATE
WATER PEfiMtT # _
B.P. RECEIPT # -
B.P. RECEIPT DATE
PRV - BOOSTER PUMP
SITE ADDRESS PERMIT REGlUESTED
LOT 'BLOCK " SEC/SUB
APPLICANT: SEWER WATER -T,
ADDRESS: _ COMM/IND _ RESIDEN'
CITY, STATE ZIP
PHONE: T NEW - EXISTING
PLUMBER: ADDRESS: - - f
CITY, STATE ZIP ?
PHONE:
OWNER: --
ADDRESS: ' GITY, STATE • ZIP
PHONE: -' -- -
I AGREE TO COMPLY WITH CITY OF
EAGAN ORDINANCES:
SIGNATURE WHEN METER iSSUED
PLEASE ALLOW TWO WORKING DAYS FOR PROCESSING. FOR S70RM SEWER PERMITS, CONTACT
ENGINEERING DEPT. APPLICANT AND PLUMBER WILL BE NOTIFIED WHEN PERMIT IS PROCESSED.
Rd.
DATE 151
OFFICE USE ONLY
METEq af8 PERMIT DATE 11 191
PERMIT # 11087
CHIP 31?' ^ 4541
METEa SIZE 3' C-B.P. RECEIPT # v
ISSUE DATE B.P. RECEIPT DATEl l/ 9/ 89
_ PRV - BOOSTER PUMP
SITE A[)DRESS PERMIT REQUESTED
LOT I?LOCK _?__SEC/SUB Z+e-S I '=- ?-1? `.??r,t?
_)L SEWER .? WATER -TAPS
APPUCANT: eiQ CxQrJ_i I r- I L J.,?;
ADDRESS: i S Ih t C 1- ?? ?
CITY, STATE ZIP PHONE: 1'?'1.
PLUMBER: nvt,) Jt:Li '?FC
ADDRESS:1 ? L., ?-n.I fi?`? 4 f)
CITY, STATE t ZIp
PHONE: qq ' ^L f C)WMER: 1 La U 5CitQ?c, L n 1?;f 141a
ADDRESS:
CITY, STATE R c?F Y441-) t_ , f M IJ_ ZIP
Y_ COMM/IND
ZNEW
_ RESIDENTIAL
_ EXISTING
Lawn Sprinkler Meters are to be Installed
Ahead of Domestic Meters on Water Line.
c:rwriitrwILL NO't be aiven for Deduct Meters. .
I AGREI
EAGAN
WHEp METER
OF
- ?; 7
CALL 4544220 FOR INSPECTIONS. FOR STORM
?
? _ ? ..? . ?..?
CITY OF EAGAN METER # PERMIT DATE 11 / 9/ 89
3830 Pilot Knob Rd. 11087
Eagan, MN 55122-1897 CHIP # PERIrAIT #
4541
METER SIZE ?
B.P. RECEIPT #
DATE T I l} ISSUE QATE B.P. RECEIPT QATEi l/ 4/ 89
_ PRV - BOOSTER PUMP
SITE A
DRESS PERMIT REGIUESTED
?
LOT
BLOCK ?
SEC/SUB ? • ? ? ' t ?t - L? ?- ? '
-
_ ? SEWER ', WATER - TAPS
? COMMIIND - RESIQENTIAL
? NEW - EXISTING
PIUMBER:
ADDRESS:
CITY, STATE_?K ZIP
PHdNE:
nvunr.oo.
CITY, STATE ZIP
PHONE:
Lawn Sprinkler Meters are to be Installed
Ahead of Domestic Meters on Water Line.
Credi!'WILL NOT he given for Deduct Meters. .
I AGREE TO COMPLY, WRH CITY OF
EAGAN ORDINANCES., j
SIGNATURE WHEN METER ISSUED
0 FOR INSPECTIONS. FOR STORM
SEWER & WATER PERMIT
CITY OF EAGAN METER # -
3830 Pilot Knob Rd.
Eagan, MN 55122-1897 I CHIP #
METER SIZE
ISSUE DATE
SITE ADDRESS `{3 0 0 Gdtp, Rb
LOT I BLOCK I SEC/SUB ame $,0 S
APPLICANT; LO EF FE L- -?*-? CS1 _
ADDRESS: la''kU sd?1x'Lk stiXt.li ST
CITY, STATE !t D? K t 115 Mp.l ZIp S 5 3?43
PHONE: 0 ?'-E \
OFFICE USE ONLY
PERMff DATE
WATER PERMIT #
B.P. RECEIPT #
B.P. RECEIPT DATE
PRV - BOOSTER PUMP
PERMIT REOUESTEO
r;
? SEWER ? WATER -
-k--' COMM/IND - RESIDI
-V-1 NEW
EXISTING
PLUMBER: /A ?t 4'v?- Pk 0 «ftk'--
ADDRESS: 1-L40`k Gsxn nm--\ 0AG, 11 I AGREE TO COMPLY WITH CITY OF
CITY, STATE &V205UILL rI Zip 5 5k33-7 EAGAN ORDINANCES:
PHONE: !8!N - L-I qG??4
OWNER: S C.HOv't-
ADDRESS: I 44U? o,Vk''^V0n SIGNATURE WHEN METER ISSUED
CiTY, STATE Q MV? ZIP
PHONE: ?°1 y a d
PLEASE ALLOW TWO WORKING DAYS FOR PROCESSING. FOR STORM SEWER PERMITS, CONTACT
ENGINEERING DEPT. APPLICANT AND PLUMBER WILL BE NOTIFIED WHEN PERMIT IS PROCESSED.
i
; fiEWER & WATER PERMIT
i CITY OF EAGAN METER # -
, 3830 Pilot Knob Rd.
Eagan, MN 55122-1897 CHIP#-
I METER SIZE
? ISSUE DATE
SITE ADDRESS -' '?-) ? ) c•.Q ???
LOT A BLOCK ? SEC/SUB sk4,r.1-1,
APPLICANT: LC e-- q r
ADDRESS: --
CITY, STATE ZIP
PHONE: - - o ? 4 ?
PLUMBER: ? {N hn e.,1 L'n c? _ h A . ? ,
ADORESS: ?i-4 '} 'l
CITY, STATE k ?.._ ;ill, ? nn r! ZIP
PHONE: J v r !1
OWNER: ? r xNcl -_, '" ?) =, -t- *? , = 1 '? f
ADDRESS: 'L+ uW 5- j-, \ /k M cJ ? c? -P -?-E-t
CITY, STATE M: ? ZIp
PHONE: o
?
iE ONLY
PERMIT DATE -
WATER PERMIT #
B.P. RECEIPT #
B.P. RECEIPT DATE
- PRV _ BOOSTER PUMP
PERMIT REQUESTED
SEWER ? WATER _
-Z-' COMM/IND _ RESIDEN
? NEW - EXISTING
I AGREE TO COMPLY WITH CITY OF
EAGAN ORDINANCES:
SIGNATURE WHEN METER ISSUED
PLEASE ALLOW TWO WORKING DAYS FOR PiiOCESSING. FOR STORM SEWER PERMITS, CONTACT
ENGINEERING DEPT. APPLICANT AND PLUMBER WILL BE NOTIFIED WHEN PERMIT IS PROCESSED.
SGTE OF NICNESOTA
.??>.
..;.. . .....
Department of
Administration
FOR OFFICE USE ONLY
Projact Number.
, Date
Amount of Check Check Number
S
Received By Construction Cost
Construction Authorization:
APPLICATION FOR PLAN REVIEW
CONSTRUCTION AUTHORIZATION BY STATE AGENCY OR LOCAL GOVERNM
Building Codes & Standards Division
408 Metro Square Building
7th & Robert Streets
St. Paul, Minnesota 55101
(612) 296-4639
Project Title
City, Caunty Construction Cost
$
Name of Architect/Engineer Firm Phone No.
Address of Firm City, State, Zip
NEW B ILDING EXISTING BUILDING ALLOWABLE FLOOR AREA
Type(s) of Construction Typels) of Construction Basic Allowable Floor Area
Occupancy Classificatian(s) Occupancy Classification(s) Increase Over One-Story
Number of Stories Number of Stories Increase For Open SidOes
Sq. Ft. Per Occupancy Sq. Ft. Per Floor Total Flaor Area Maximum Allowable Floor Area
Totel Floor Area Yes No Rated Area Separation Wall Rating(sl
Corridors
Yes No Change of Occupancy Separation Rating{s)
New Building Occupancy
Area Separation Yes No Sprinklered for One
Addition Walls Hour Construction
Sprinklered for Area
Sprinklered Sprinklered Increase
Design load(s) Used: Additional Infomotan
UBC Chapt. 23
u
r L evfl ^" .4nr SF
-i,:l i n
",lor Of
:pu
: i n Le vf,-.
"outh o',
ARCHITECT/ENGINEER: As the plan preparer I hereby certify that reasonable care has been given to compliance with
a licable laws, ordinances, and buildin cod re tin to desi n.
Name (Print) Si a re ` ^ Date Minnesota Registretion No.
I .. . ;
?
?
BC-00049-01 (8166)
Building Official
• - '?`.- CASH RECEIPT
CITY OF EAGAN
, 3830 PILOT KNOB ROAD
EAGAN, MINNESOTA 55122
n..F -?- a 3
fn i9 -Qa-
x[WWo Y {} .??
AMOUNT
d
8 DOLUFS
O CASH {Q CHECK
r?
_•4-
.w
Fl1ND OBJECT AMOUNT
? 971 _ %?OS u c>
Thank Youv?
No 93130 ??le-Paym C?
YODw-Poong Copy
. Pink-File Copy
-f 1.) yY Fa g
Diane/Enda Paul didn't have a gun to get the
chip l1. will get when they check the service.
CASH RECEIPT
CITY OF EAGAN
? 3830 PILOT KN08 ROAD
" p .lQ EAGAN, MINNESOTA 55122
Y?` /? r7
onTe iy ? ?.?
AMOUNT S n il
?/C/
?jf v 97 8 DOLLARS
? CASH -96 HECK ?
?3
9109 ,
C Ya",?
Pink-Ftle CoPY
,
Thank You
er /??'
?
CASH RECEIPT
C! ! Y ?? ?AGAN
?j 3830 PtLOT KNOB ROAD
EAGAN, MINNESOTA 55122
DATE
cen o (?} .__. ?l
s w
J
AMOUNT $ /'?O Thank You
aY?
C 7865 ?????
Pink--File Capy .
g DOLLARS
?m
? CASH ?CHECK
? ..
?________________-
? Permit#: ?
I
I ?
? Permit Fee:
? I
I /-'
I Date Received: -"/ -a I
I
I
j Staff: I
L - - - - - - - - - - - - - - - - - I
2008 COMMERCIAL P UMBING P
no/
Date: 'a V Site Address: "73QD
Tenant:
APPLICATION
Suite #:
PROPERTY Name: • J - "t Phone:
OWNER
CONTRAGTOR Name: ^ iql P License #: DlY I 55S - -PM
Address: In AlIiCLU! f •City: State: ?'?/`2ip:5sial
&--45
-2-X
XVS- C
Ph
P Uu LL
.
one: t
.
ontact
e rson:
TYPE OF New Replacement Repair
T LRebuild _ Modify Space Woric in R.O.W.
WORK ?P?IA
(
I
t'
.
i
Description of work:
.
PERMITTYPE COMMERCIAL
_ New Construction _ Modify Space
Irrigation System (_ yes /_ no) L RPZ! _ PVB)
• Rain sensors required on irrigation systems
• Avg. GPM _(2'turbo required unless smaller size allowed by Public Works)
Meters Call (651) 675-5646 to verity that tests passed prior to oickinq up meter. . .
Domestic: Size & Type Fire: Size 8 Price 3/4" meter 183.00 .
Avg. GPM High demand devices?_Yes_ No .
Flushometers Yes_No PRVRequired Yes No
COMMERCIAL FEES:
$50.50 Minimum (includes State Surcharge) OR Contract vaiue $ x 1%
= $ , )l.JDQ Permit Fee
Required on ALL new buildings and boulevard irrigation systems 4 _$ " Radio Meter Read
- If Permit Fee is less than $1,000, surcharge is $.50 . _$ Metef(5) .
- If Pertnit Fee is > E1,000, surcharge increases by $.50 for each $1,000
$7
000 P
it P
e
i
e
$1
001
$2
000 P
it F
i
00 ?7-?
S
ch
r
e
/ St
t
_
•
,
eim
e
(
.
. a
,
-
,
erm
ee requ
res a$1.
surcharge). e
ur
g
a
a
$
?..
Following fees apply when installing a new lawn irrigation system. $ Water Pertnit
Call the City's Engineering Depadment, ( nts.
? .-
s
?(I
?
I
? $ Treatment Pl
nt
O
_
Y
U
l?
$ Water Supply & $torage
FEB U 7 2008
$ State Surcharge -
TOTAL FEES $ 5?,SJ
I hereby acknowledge thal Ihis infortnation is co Wete antl accurate; ihat the work willibe in conformance with the ortlinances and codes of the City of Ea9an; ihat I under5isnd this
is not a permit, but onty an application for a per ertniX ihat the vrork will be In accortlance 'th pe approved plan in the case oF work which
requires a revlew and approval of plans.
X ?, kA.??? V-. Himtipi X -
ApplicanYs Print d Name Apppc nYs gn
Page
Zlsv(?2
?
U
2006 COMMERCIAL BUILDING rERuT arrLicaTiorr
. Civil Plans
• Certificate of Survey
• Code Analysis
• Project Specs
. Spec. Insp. & Testing Schedule
• Soils Report
• Meter size must be established
1
1
1
1
1
1
City Of Eagan
3830 Pilot Knob Road, Eagan Mn 55122
Telephone # 651-675-5675 FAX # 651-675-5694
(2) sets
(2)
(?)
??? ..
(?)
• SAC detertnination • call 651-602-1000
. Architecturel Plans (2) sets
• Structural Pians (2)
• Civil Plans (2)
. Landscaping Plans (2)
• CodeAnalysis (1)"
• Certificate of Survey (1)
• Spec. Insp. & Testing Schedule (1) "
• Meter size must be established
. ProjectSpecs (1)
• EnergyCalculations (1) "
• Electric Power & Lighting Form (1)
• Master Exit Plan (1)
• Emergency Response Site Plan (1)
. SoilsReport (1)
• SAC detertnination - call 651-602-1 000
. Fire Stopping Su6mittals -
• Fire Suooression/Alarm Form
?
cttu?
d 1 11-
. Architectural Plans (2) sets
• CodeAnalysis (1)
• ProjectSpecs (1)
• Key Plan (1)
• Master Exit Plan (1)
• Energy Calculations (1) not always"
• Elec. Power & Lighting Form (1) not always"
. Meter size must be established-if applicable
1
1
1
1
1
• SAC determination - call 651-602-1000
Call MN llept oti Health at 651-201-4500 for details regarding food & beverage or lodging facilities.
•` Contact Building Inspections for sample and if required
•`• Permit for new building or addition wil] no[ be processed without Emergency Response Site Plan.
/
Date 12 / 17 / 2007 Cons[ruction Cost 1 20.200.00
Site Address 4300 DOdd Road Unit/Ste #
TenantName
I pinew0od Elementary $chool Former Tenant Name
Descript[onofWork Remove drywall walls, install water proofing and re-install drywall walls
Property Owner IDS # 196 Telephone#?51 ) 423-7702
Applicant is: _ Owner X Contractor Contact #: (651 ) 455-0031
Contractor Parkos Construction Comoany
address 1010 S Robert Street City West St. Paul
State Minnesota Zip 55118 Telephone#(651 ) 455.-o(131
Arch/Engr Wold Architects Registration#
Address 305 St. Peter Street City St. Paul
State M innesota Zip 55102 Telephone#(651 ) 727-7773
Licensed plumber installing new sewer/water service: Phone #:
I hereby apply for a Commercial Building Permit and acknowledge that the information is complete and accurate; that the work will be in
ormance with [he ordinances and codes of the City of Eagan and the State of MN Statutes; I understand this is not a pernut, I?Rt only an
Nor licarion for a peimit, and work is not to start without a permir, that the work will be in accordance' US jthe(?ppived,p]in?thg case of
work which requires a review and approval of plans. li i I
or..r, i 7 2007
?
/?i??'G?" / ?'/r??'?-`i??S ??
ApplicanYs Printed Name Applica?: Signature ?i?
DO NOT WRITE BELOW THIS LINE
Sub Types
? 01 Foundation
? 14 Aparhnents
? 15 Lodging
? 25 Miscellaneous
Work Types
? 31 New
? 32 Addition
001? 33 Alteration
? 34 Replacement
? 26 Public Faciliry
X? 27 Commercial/Industrial
? 28 Greenhouse
? 29 Antennae
? 35 Int Improvement ? 38
? 36 Move Bldg. ? 42
? 37 Demolish (Bldg)* ? 43
•Demolition (Entire Bldg only) - Give P
Valuation 2 000 ?
Plan Rev 100% _ 25% _
SAC Units
N6r. of Units O
Nbr. of Bldgs
Required Inspections
_ Footings (new bldg)
_ Footings (deck)
_ Footings (addiuon)
Foundation
? Drain Tile ,
_ Driveway Apron
Roof Ice Pr Decking
? Framing
? 30 Accessory Building
? 32 Ext Alt Apartments
? 34 Ext Alt-Commercia]
? 35 Ext Alt-Public Facility
? 37 Nail Salon
Demolish (Interior) ? 44 Siding
Demolish (Foundation) ? 45 Fire Repair
Reroof ? 46 Windows/Doors
CA handout to applicant
Type of Const :a ' 1?5 Width
Occupancy .`? MCES System
Zoning City Water
Stories Boaster Pump
Sq. Ft. PRV
Length Fire Sprinklered
_ Fireplace _ R.I. _ Au Test _ Final
_ Insularion
_ Sheetrock
FinallC.O.
? FinaUNo C.O.
_ Other
Insul _ Final _ Pool Ftgs AulGas Tesu Final
_ Siding _ Stucco Lath _ Stone Lath _ Final
_ Windows
Final CIO Inspection: Schedule Fire Marshal to be present. _ Yes "No
Approved By: Planning COA-16= Building Inspector
Base Fee
Surcharge
Plan Review
SAC-MCES
SAGCity
SIW Permit
S/VJ Surcharge
Treatment Plant
Treatment Plant (Irrigation)
Park Dedication
Trail Dedication
Water 4uality
Water Supply & Storage (WAC)
3 5?f . e-o
/ O
Financial Guarantee
Storm Sewer Trunk
Sewer Lateral
Street
Water Lateral
Other
Total
" . Go
0
•
Sewer Trunk
Water Trunk •
Z$0./o
2005 COMMERCIAL BUILDING PERMIT APPLICATION
LPGi?j City Of Eagan
3830 Pilot Knob Road, Eagan Mn 55122
Telephone # 651-675-5675 FAX 9 651-675-5694
• Structurel Plans (2) sets . ArchRedural Plans (2) sets •
• Civil Plans (2) • StruGural Plans (2) •
• Certificate of Survey (1) . Civil Plans (2)
• Code Analysis (1) " • Landscaping Plans (2) •
• PrqedSpecs (1) • CadeAnalysis (1) " •
• Spec. Insp. & Testing Schedule " . Certificate of Survey (1) •
• Soils Report . (1) • Spec. Insp. & Testing Schedule (1) " •
• Meter size must be established • Meter size must be established •
J • ProjectSpecs (1)
1 . Energy Calculations (1) "
1 • Electric Power & Lighting Form (1) "
! • Master Exit Plan (1)
1
1 • Emergency Response Site Plan (1)
'w6fl")6
CA.q,J.xA -i(ats (N?
ArchRedurel Plans (2) sets
CodeAnalysis (1) "
PmjectSpecs (1)
Key Plan (1)
Master Exit Plan (1)
Energy Calculations (1) not always"
Elec. Power & Lighting Fortn (1) nM aW+ays"
Meter size must be established-if applicable
• Soils Report (1) . ,
• SAC determination - call 651-602-1000 . SAC detertnination - ca11 6 51-602-1 000 • SAC detertnination - wIi 651-602-1000
• • Fire Stoooina Submittals .
Call MN Uept of Health at 651-215-0700 for details regarding food & beverage or lodging facilities.
** Contact Building Inspections for sample and if required
'** Permit for new building or addition will not be processed without Emergency Response Site Plan.
Date 7 /??l DS Construcfion Cost 'eyj 000 .60
Site Address ellsbe QodQ 'cilGg Uniuste #
Tenant Name jg;iWOOd erA/konrrv a-F"" Former Tenant Name
a?s. dd. vrr.vo r?klcl.? ??'.
Description of Work _Z?,_S4"G0 c ?/hA?p?C C?,G?ctc ? QC?d/??'e S?eCaIJ-?' e4*c14'6A'
Property Owner ? r ; Telephone # ( (oSn ?0?.3 ' 774?
? ?(?f s? O?a Sc,aa?.? /?tn1 sfaG
Contractor 24'i1v..?
Address a??? ly+o9?'n+ ?d?y o2 City H
State Zip
Arch/Engr }?? ?UL iRgiooatio ?
Address ? City
`
State Zip ` e # ( )
Licensed plumber instaliing new sewerhvater service : Phone #:
I hereby apply for a Commercial Building Permit and acknowledge that the information is complete and accurate;
that the work will be in conformance with the ordinances and codes of the City of Eagan and the State of MN
Statutes; I understand this is not a permit, but only an application for a permit, and work is not to start without a
permit; that the work will be in accordance with the approved plan in the case of work which requires a review and
approval of plans.
S o
ApplicanYs Printed Name ApplicanPs Signature
OFFICE USE ONLY
Sub Types
? 01 Foundation ? 26 Public Facility ? 30 Accessory Building
? 14 Apartments 4?- 27 CommerciaUIndustrial ? 32 Ext Alt-Apartments
? 15 Lodging 0 28 Greenhouse ? 34 Ext Alt-Commercial
? 25 Miscellaneous ? 29 Antennae ? 35 Ext Alt-Public Facility
? 37 Nail Salon
Work Types
? 31 New ?8- 35 Int Improvement ? 36 Demolish (Interior) ? 44 Siding
? 32 Addition ? 36 Move Bldg. ? 42 Demolish (Foundation) ? 45 Fire Repair
? 33 Alteration ? 37 Demolish (Bldg)' ? 43 Reroof ? 48 Windows/Doors
? 34 Replacement *Demolition (Entire Bldg only) - Give PCA handout to applicant
?
Valuation ? Ob e Type of Const ? a' Width
Plan Rev 100% 25°/a Occupancy ? MCES System
Census Code Zoning PF City Water
SAC Units - ? " Stories Booster Pump
Nbr. of Units Q Sq. Ft. PRV
Nbr. of Bldgs I Length Fire Sprinklered
Required Inspections
_ Footings (new bldg)
_ Footings(deck)
_ Footings (addition)
Foundation
Drain Tile
Roof Ice Pr _ Decking _ Insul _ Final
/ Framing
_ F'veplace _ R.I. _ Air Test _ Final
Approved By:
Base Fee
Surcharge
Plan Review
SAC-MCES
SAGCity
SNV Permit
SNV Surcharge
Treatrnent Plant
Treatment Piant (Irrigation)
Park Dedica6on
Trail Dedication
Water Quality
Water Supply & Storage (WAC)
_ Insulation
/FinaUC.O.
? Final/No C.O.
Other
_ Pool Ftgs Air/Gas Tests _ Final
_ Siding _ Stucco _ Stone
Windows
Planning ?" Building Inspector
7. z S"
7,00
D . 0-41
Financial Guarantee
Storm Sewer Trunk
Sewer Lateral
Street
Water Laterai
Other
Total
?f g. 7?lS
Sewer Trunk
_-
Water Trunk
V-0 =r
(ST-1 ii 3
2004 COMMERCIAL BUILDING PERMIT APPLICATION
City Of Eagan
3830 Pilot Knob Road, Eagan Mn 55122
Telephone # 651-675-5675 FAX # 651-675-5694
?%, f9."a?
• Structural Plans (2) sets • Archilectural Plans (2) sets • Architedural Plans (2) sets
• Civil Plans (2) . Structural Plans (2) • Code Matysis (1)
• Certificate of Survey (1) • Civil Plans (2) • Project Specs (1)
. Code Analysis (1) " • Landsraping Plans (2) • Key Plan (1)
• Project5pecs (1) • CodeAnalysis (1) • MasterExitPian (1)
• Spec. Insp. & Testing Scheduie " • Certificate of Survey (1) • Energy Calculations (1) not always"
• Soils Report (1) . Spec. Insp. & Testing Schedule (1) " • Etec. Power & Lighting Fortn (1) not always'"
. Meler size must be established • Meter size must be established • Meter size must be established-'rf applicable
1 • ProjectSpecs (1)
1 • EnergyCalculations . (1)
d • Electric Power & Lighting Fortn (1)
! • Master Exit Plan (1) l
L • Emergency Response Site Plan (1)
L • SoilsReport (1) d
• SAC determinatlon - pll 651-602-1 000 • SAC detertnination - rall 651-602-1 000 SAC detertninafion - pll 651-602-1000
MN Deot o£Heal[h at 651-215-0700
food & beveraEeor
•• Contact Building Inspections for sample and if required when it states "not always".
**' Permit for new buitding or addi[ion will no[ be processed wi[hout Emergency Response Site Plan.
Date 7 / Z9 / 0-y ConstructionCost ?g00-O?
/ /
Site Address y
.300 /?e/p' Unit/Ste #
?/
Tenan[ Name /i'idE ??o? ??/?7 Former Tenant Name
Description of Work , tAi I/r?f/? ?-n??? d?P,E
Property Owner Telephone # ( )
Contractor 4110S ?i?Sf
Address /4/0 -5- ,?
Ci[y
State Zip ??11g Telephone fl (GS/ ) yss00?/
Arch/Engr Registration #
Address City
State Zip Telephone # ( )
Licensed plumber installing new sewer/water service: Phone #
I hereby apply for a Commercial Building Permit and acknowledge that the info ion is complete and ccurate;
that the work will be in conformance with the ordinances and codes of the City o agan ane a e of MN
Statutes; I understand this is not a permit, but only an application for a permit, and work is not to start without a
permit; that the work will be in accordance with the approved plan in the case of work which requires a review and
approval of plans.
ApplicanYs Prin ed Name ApplicanYs Sign e
OFFICE USE ONLY
Sub Types
? 01 Foundation
? 14 Aparhments
? 15 Lodging
? 25 Miscellaneous
Work Types
? 31 New
? 32 Addition
? 33 Alteration
? 34 Replacement
0 26 Public Facility ? 30 Accessory Building
? 27 CommerciaUIndustrial ? 32 Ext Alt-Apartments
0 28 Greenhouse ? 34 Ext Alt-Commercial
O 29 Antennae ? 35 Ext Alt-Public Facility
? 37 Nail Salon
? 35 Int Improvement ? 38 Demolish (Interior) ? 44 Siding
? 36 Move Bldg. ? 42 Demolish (Foundati on) ? 45 Fire Repair
? 37 Demolish (Bldg)' ? 43 Reroof ? 46 Windows/Doors
, 'Demolition (Entire Bitlg only) - Give PCA handout to appliwnt
Valuation 3 a o 6 / occupancy
Census Code 43 ? Zoning
SAC Units Stories
Nbr. of Units Sq. Ft.
Nbr. of Bldgs Length
Type of Const W- ' 8 Width
Required Inspections
_ Footings(new bidg)
_ Foorings(deck)
_ Footings (addition)
Foundarion
Drain Tile
? MCES System ?
City water -?
Booster Pump
PRV ?
Fire Sprinklered
_ Insulation
/FinaUC.O.
? FinallNo C.O.
Other
iRoof _ Ice Pr _ Decldng _ Insul _ Final _ Pool
? Framing _ Siding
_ Fireplace _ R.I. _ Air Test _ Final _ Windows
P,pproved By: Planning ? Building Inspector
Base Fee
Surcharge
Plan Review
MCES SAC
City SAC
Water Supply & Storage (WAC)
S/W Permit
S/W Surcharge
Treatment Plant
Park Dedication
Trails Dedication
Water Quality
Copies
Water Trunk
Sewer Trunk
Other
Total
_ Ftgs _ A'u/Gas Tests _ Final
Stucco Stone
!, INDEPENDENT SCHOOL DISTRICT 196
14445 DIAMOND PATH WEST
ROSEMOUNT, MINNESOTA 5 506 8-41 99
Office: (651) 423-7702
Fax: (651) 423-7730
February 4, 2004
Eagan Fire Marshall
Dale Wegleitner
3795 Pilot Knob Road
Eagan, MN 55123
Deaz Mr. Wegleitner:
?3 Uo ? ?Cc.
¦ MIKE SCHWANKE
Coordinator of Facilities
Cell Phone: (612) 919-1040
E-mail: schwanma@do.isd196.k12.mn.us
fIN 0 F(- cDao
9
J
In an effort to limit the number of false alarms at our schools each year, ISD 196 is
proposing removing all pull stations not required per the new International Fire Code.
This letter is meant to inform you about our plan. I will be sending a floor plan showing
which pull stations aze going to be removed and where some will be added. The district
will make sure that at a minimum, there aze pull stations located in the main office,
custodial area, food service or kitchen area and wood shop.
Please find a map of Pinewood Elementary and Blackhawk Middle School which will be
our pilot schools for this project. On each map I have an azea for you to sign if it meets
your approval. Please review and retum with your approval. If you have any questions
or concerns please feel free to contact me at (651) 423-7735.
Sincerely,
\
_.'_. ?-Y. L). ^
Jon Deutsch
Health and Safety Supervisor
Independent School District 196
cc: Mike Schwanke, ISD 196, Coordinator ofFacilities
196 Educating our studenfs to reach their full potential
$erving Apple Valley, Bumsville, Coates, Eagan, Inver Grove Heights,
Lakeville, Rosemount, and Empire and Vermillion Townships
y . ?
OnRequest"'
PiMwaoaes ;:\
? rm p ^
Floer Plan (ryplup
\
p _ ..?....v ,.•••.•. ??, etOB . .??A101
S ? ..,.? uwr ' °? ?•,
9tl?Gretle 1slGMe
_-_Bawm.nt
8105 ??• ?-? ' ? A102 .?•
4Bi GaOe 3N Gratle
%' ' \,''? • .??\.
Biad A103
•.
B103 >?s 4th GreCa ? ?° ?' 3rtl Gretle ?.? r P104
41h Oretle lkl? ?f 3rtl Grade ,T? •,??
9 sg '`?„l. sr" ??.
110
8102 A124 d?A105
qthG?atle Me4leCentar 3rEGretle
(t ° ?\
B107
?@11 1A1 3? ? A108
?\. srasreaa :
HOrfl Wlth Stl'Ob0 amcmae pms y
? .i? ?:.\ L? ,$ 1??"?I ?' ^ ` ` ?? ?? ?A11 ?''y'' % ?1
p,A119
G 1I1I q?\
@ Y@
;,- W700 °•:. ;, ` - I111L__'JI li"' ,? 3 A W102
? /`:•?. :, ?-??1 __:?.? .T-- o?k?oom?l ?i? ++a'_ ° ? /.,:i:
Pull Station --
. ?., am craae ?": .: ? ? ? ?? ^- ?? --r•, %^f ?.J' rmm cmae
.. ----- --?-??
?
f' B11B A120 A12DA A122
\\ - .-.._._...__._... ?isiGrade 8118 1slGetla ELP/Eniich. A121 Center8asetl
Control Panel RR? ? II ?
Bolle Rm. _. =`
f 1 / I
Pinewood ES
o m? za? aa? sa eo? iao,
Pull staiions to be removed (5) IIIIIIIIII
?
? ?12?on 0
? .
OnRequest"'
...?.. m ? ? -? Pin?woatl ES
p m ?FlearPlen(TYDiup
. .., ....a..,? .:%
u _ B?Il6 AP07
ceFrwi 2naGretle \..:-?- ?2nGGraaa
Lt Floar ,14
? \ 4~/
/? ??_???? d
6205 A202
2nOGmtle smr.rane
B2D0
A204 i`
2n0 GraEe ?y Stn GraCe p203 ?
8103
2nEOrade 61hdretle ,
x:.
2nd Grade SN Gatle • \
?% •?
?, .?. .l
8201 ?A206 %
2ntlGrede ' Qips? ? Oids f ??r' SinOatla
/;
L.D
wzos '?9,w?'?''a ?
A2 1-1
J / ? W2a2 Spee
.? ComPu[er 8215 ???? A220
51h Grede e
S?art?oun ? \\
?.;' . geChI IJ
? Hom with Strobe °? • a ? cemerea:aa
5??
???1
? Pull Station n s szso
npRm. -9 A MainOAwe AGrea
? - -'? B252 's e
.` II , rkroom? A241 ?
f
Control Panel I B22B ??1 ?1249a Nurse ry A° A233 Klntlergetlen
L? -_'-
B228 piy?Washing 8232 ? - Bo s
"°m.
srora e, -_?
Ym ?.. '?? A248 e' .\ Q
? -L? ? 1st Gtade
Cafelatlfl?6
?. - A. Cant
-A24 11._PA233A
. , L. =
Kilrhen r p?` I
-? u. PtlnGPe ,i? ?\y KlnOergerten rn
II _ _ _ _ _ _ _ ^ ,. ? ?
_m ?,_ Ir _ _ Gitls 245 ?
-?? AdInsNiIXlon oYSr
? ?I I tli L-.? ?
18 -
22
t 0
?
C 1.0 ce 8244 :..I ? ?
?
8231 ComEOi I 7I
A225
B220 NotlK$Ym A232 6 inJ
Room Reca?d"19 Kintlergerten wmaeroent
If_ . , s C Musi ? y L
I 7
ll? ??I? C01
IIIII I 1242 Vocal Music ...
B230 L.o
Soulh Gym n
Pinewood ES ---- - '
-----
---- - - -d ?
? o ioxoao- eoW mo? Pull stations to be removed (12) IIIIIIIIII
(D Pull stations to remain (3)
? Pull stations to be added (2)
PLUMBING (COMMERCIAL)
Permit Application
C`1 City Of Eagan
3830 Pilot Knob Road, Eagan Mn 55122
Telephone # 651-675-5675 FAX # 651-675-5674
Date
2 / 2 10 / 03
_
Site Address Unit ?t
Tenant Name vriukw&A Former Tenant Name
PropertyOwner ?, ?l? ? Q
Telephone # (?) p?
Contractor
Addres
City A?
State Zip Telephone # ILL7
)
The Applicant is _ Owner Contractor Other
Work Type _ New Bldg Add-on _ Repair RPZ PVB Irrigation sys[em *
* Jer Wobschall to calcula[e fees. Re uired eter size is P' turbo unless smaller size ermit[ed b Public Works
Description of Work ?on
To mqwre if Pressure Reducmg Vs1ve is requirzd on new service, caI1651-675-5G46
Meters - Call 651-675-5300 to verify [hat hydrostatic, conductivity, and bacteria rests passed orior to oickine uo meter
Imgation Size & Type Avg GPM
Fire Size & Price 3/4" di lacement S 156.00
Domestic Size & Type Avg GPM Includes high demand devices? _ Yes _ No
Flushometers _ Yes _ No PRV Required _ Yes _ No
Permit Fee $50.50 mininium (includes S[ate Surcharge) r,
?l i
"
Contract Value $ x .Ol% i
Fee
n R 2002 Bas
?
? I I(
M t s)
Required on all new buildings & boulevard irrieation svstems $ ' Me[er Read
Ifbasc fee is $1,000 or less, surcharge is $.50 $ " State SuiChazge
If base fee is over $1,000, surcAarge is $.50 p¢r $1,000 of the Base Fee
Following fees apply only when instnlling new irrigatioo system ? $ Y ? Y ^ ? Water Pertnit ^
Conqct Jerry Wobschall at 651-675-5024 for required fee amounts
$ Treahnent Plant
$ Water Supply & Storage
$ State Surcharge
------------------------------------------------------------------------------------------
-
-- ----------- --------------- ----
- ---------------------------
/
$ Total Fee
I hereby apply for a Commereial Plumbmg Permit and acknowledge that the information is complete and accurate; that the work will be in
conformance with the ordinances and codes of the City of Fagan and with the Plumbing Codes; that I understand this is not a permit, but only an
applica6on for a peanit, and work is not to start without a permit; that the work wi be in accordance with the approved plan in the case of work
which requires a eview and approval of plans.
Applicants rite Name ' Applic zou
CITY USE ONLY
REQUIRED INSPECTIONS: _ U.G. _ Air Test _ Gas Test _ Rough In _ Final
PLANS SUBMITTED APPROVED BY: ! P BUILDING INSPECTOR
?
General Information
• Radio Meter Read (required on all new buildings & boulevard irrigation systems- $157.00
• RPZ's must be rebuilt every five yeazs. A minimum fee permit per address is required for RPZ rebuilding or repairing.
• Water, meters include copper horn/strainer, remote wue, and touch-pad meter ,
GPM METERS USE PRICE GPM METERS :'USE PRICE
1-20 5/8" residential ' $121:00 4=120 1-1/2° ° iTllgation Syst $ 781.00
displacement sm coaunercial turbine** must 1'eCeive
maximum
approval
continuous
10 from Public
• Works
2-30 3/4" lawn irrigation $156.00 4-160 2" turbine , lg urigarion syst $ 982.00
maximum displacement residential • . &
continuous sm commercial production lines
IS
3-50 1" displacement very lg res $200.00 I/4 to 160 2" compound bldgs over $ 1,860.00
bldg to 24 units 65 units
maximum sm commercial &
continuous & ]g comm bldgs
25 irri ation s tems
5-100 1-1/2" bldgs 25-64 units $484.00
tnaximum displacement &
continuous most comm bidgs
50
METERS REOUIItiNG 30-DAY ADVANCE NOTICE PRIOR TO PICK UP
GPM METERS USE PRICE GPM METERS USE PRICE
5-350 3" turbine very Ig irrigation $1,328.00 6-500 4" compound +300 unit bldgs & $3,702.00
syst & production very Ig comm bldgs
lines
112-320 3" compound +200 unit bldgs $2,411.00 10-1000 6" compound +400 unit bldgs $6,100.00
very Ig comm bldgs very lg comm bldgs
15-1000 4" turbine verylg irrigation $2,329.00
syst
& production lines
Uomments
• To schedule inspection of the inside water line and backflow preventey call 651-675-5675.
• To arrange for water turn-on, ca11 65 1-675-5 300.
cc: Maintenance Division Clerical Technician Updated I/03
i
48F •- :?
? CITY OF EAGAN
3830 Pilot Knob Road
Eagan, Minnesota 55122-1897
(612) 681-4675
SITE ADDRESS:
PERMIT
4300 DODD RD
LOT: 1 BLOCK: 1
STERNS
P.I.N.: 10-72550-010-01
DESCRIPTION:
PERMITTYPE: auzLozNG
Permit Number: 029641
Date Issued: 0 3/ 2 6/ 9 7
ELEMENTARY
PUBLIC FACILITY
ADDITION
E-1
II 1-HR
38
24
1
912
326 SCHOOLS/ED.
_..r?
%
Building Permit Type
Buzlding Work Type
U?BC occupancy'??.
ConstYuction Typse
Building'?Length ??, .
Bnilding.Width
6uildingstQries,'
S.quare' Feet ,
' Ceis;us Cocte ,
REMARKS:
MUSIC ROOM
FEE SUMMARY:
VALUATION
Base'Fee
Plan Review
Surcharge
Total Fee
$85,000
?'- PINEWOOD
r
$793.50
$515.78
$42.50
$1,351.78
CONTRACTOR: - Applicant - OWNER:
SRiAW-LUNDQUIST ASSOC INC 24549670 IND SCHOOL DISTRICT 196
2505 DODD RD 14445 DIAMOND PATH
ST PAUL MN 55121 ROSEMOUNT MN 55068
(612) 454-0670
L
I hareby aokn-dwledge that S have read tfiis?appFication and' state thet th6
informatavn is correct and agree ta comply,,with all applicable State of Mn.
5tatu Cit gan Ordinances.
PLICA lPERMITEE SIGNATURE
R?,'r)j rnz-
ISSUED B: SI ATU E _
__.J
14L41 1997 BUILDING PERMI A F EAIGAN CATION (COMMERCIAL)
CITY
681-4675 "-r
UL?U .g')ff
The following are required with appropriate certification for all Pgyy wnstrudion:
? 2 each: archdectural plans; mech. 8 elec. plans; fire sprinkler plans; strudural plans; site plans; landscaping plans; greding/dreinagelerosion control
plan; utllity plan
• 1 each: set of specifiptions; set of energy calwlations; eledrical power 8 lighting form; Special Inspections 8 Testing Schedule
? Letter from MCANS (phone #222-8423) indicating SAC determination
? Code analysis indicating: codes used: occupancy classiflcations; setbacks; maximum allowable area as per Building and City Codes alang with sq.
ft. per floor; type of construction (synopsis of construdion components) 8 any accupancy or area separation walis;
occupancy loads; exit synopsis wRh a diagrem indieating exking loads from each room or area, havel paths 8 all ratad
corridors; plumbing fixtures; and parking.
DATE: 3- I a' 97 WORK TYPE: e NEw REMODEL
DESCRIPTION OF WORK: j4VD1--17(nJ T0 6cr5-17006; 5CAOel- -
CONSTRUCTION COST: SS4 00 0 TENANT NAME: ig ?
SITEADDRESS
LOT--?- BLOCK--L_ SUBD. P.I.D.#
PROPERTY
OWNER
CONTRACTOR
ARCHITECTI
ENGINEER
REC?I?Y?
MAR 10 1997
BY.` '
Name: ) SD -4?-- I ci -6 Phone #:
us. rinai
Street Address / ??'s ????+'??? ?
Ciry: ?uh= State: ?'l Zip: =?46g
Company:G?- Liz) natt lSTT ? Phone #:
Street Address:
City: 6CS;k-tA-L m V'3 Zip:
Company: iAl-D Ay-e-? Phone #: 22-7-777-S
Name: ?P')10A Registration
Street Address:
Ciry: State: Yo ,j Zip: 2
Sewer 8 water licensed plumber (only if installing sewer & water):
I hereby acknowledge that I have read this application and state that
applicable State of Minnesota Statutes and City of Eagan Ordinances.,
comply with all
Signature of
OFFICE USE ONLY
BUILDING PERMIT TYPE
? 01 Foundation
? 18 Comm./Ind
WORK TYPE
? 19 Comm./Ind. Misc.
,:?;W'20 Public Facility
? 31 New ? 33 Alterations
? 32 Addition ? 34 Repair
't-. ?oc.r4-/0-i..sa. l2?..,_
GENERAL INFORMATION
Const. (Actual) .0 • l-Ha
(Allowable) 4"• /-Ho-
UBC Occupancy £ • /
Zoning
# of Stories I
Length 38
Depth z
APPROVALS
Planning
Basement sq. ft.
First Floor sq. ft.
sq. ft.
sq. ft.
sq. ft.
sq. ft.
Footprint sq. ft.
Building
A
1? t?, ILAt
? 21 Miscellaneous
? 35 Tenant Finish
? 37 Demolition
MC/WS 5ystem
4/L City Water ?
Fire Sprinklered f%
Census Code 3 Zl
SAC Code .30
Census Bldg. 1_
yi z Census Unit I
Engineering Variance
Permit Fee
Surcharge
Plan Review
MCNVS SAC
City SAC
Water Conn.
S/W Permit
S/W Surcharge
Treatment Pi.
Road Unit
Park Ded.
Trails Ded.
Water Qual.
Other
Copies
Total:
C
Valuation: $ ?S; o00
% SAC
SAC Units
Meter Size
- city of eagan
TO: PAT GEAGAN, CHIEF OF POLICE
JON NOHENS7EIN, ASSISTANT TO THE ClTY ADMINISTRATOR
DALE WEGLEITNER, F1RE MARSHAL
ELECTRICALINSPECTOR
PUBLIC WORKSlENGINEERING/UTILITIES/STREETS
GENE VANOVERBEKE, FINANCE DIRECTOR ?
RICti BRASCH, WATER RESOURCES COOROINATOR
MIKE RIDLEY, SENIOR PLANNER
GREGG NOVE, SUPERVISOR OF FORESTRY
FROM: DALE SCHOEPPNER, SENIOR INSPECTOR
DATE: y- I I -97
SUBJECT: PtAN REVIEW
MEMO
4- 1 3
L I r3?? ?
The _ preliminary construcfion plans for ?•?j c? c c o =Lc, µ?= a??+?z Y Sc ?'?: cL
are in our plan review secfion for your review and comment.
Please notify the Protec5ve Inspections Division if you have any reason that these pians should not be approved and
resolve any problems with the affected pardes. If you are requesting that issuance of the building permd be held, please
fiil out the proper "hold" request fortn.
Commentg: G'?rt c / l7a 1'e, . /1"nA y? C?VL!22,, 70" ??..1?.
Indicate any fees that are to be collected with the building permit:
? Yes ? No
? Yes ? No
? Yes ? No
? Yes ? No
? Yes ? No
? Yes ? No
landsppe security required
water quality dedication
park dedication
trail dedication
tree dediqUon
Signature
Amount
Date
plaww.row.
.'s W
_ city of eagan
TO: PAT GEAGAN, C1ilEF OF POUCE
JON HOHENSTEIN, ASSISTANT TO THE C1TY AOMINISTRATOR
DALE WEGLEITNER, FIRE MARSHAL
ELECTRICALINSPECTOR
PUBUC WORKSlENGINEERING/UTIL1TiES/STREETS!
GENE VANOVERBEKE, FINANCE DIRECTOR
RICN BR4SCH, WATER RESQURCES COORDINATOR
MIKE RIDLEY, SENIOR PLANNER
GFtEGG HOVE, SUPE32VISOR OF FORESTRY
FROM: DALE SCNOEPPNER, SENIOR INSPECTOR
DATE: Z- I I-q 7
SUBJECT: PLAN REVIEW
MEMO
...r i 3
'?=?t}ZNS .9-.?dlTi?=nl
The _preliminary construction plans for _P, &+e: wcc o +-Lc,µ ?-N-r,n-Z y Sc ?-k_cr_
are in our plan review seaian for your review and comment.
Please notify the Protecfive Inspeclions Division if you have any reason that these plans should not be approved and
resolve any proolems with the affeded parties. If yau are requesfing that issuance of the building permft be held, please
fiil out the proper "hold' request fortn.
Camments: 6w-
Indicate any fees that are to be calleded with the buiiding pertnit:
Amaun
? Yes ? No landsqpe security required
? Yes ? No . water quality dedicatian
? Yes ? No park dedicadan
? Yes ? No traii dedication
? Yes ? Na tree dedipuon
? Yes ? No
Q?L 2- r9-9-?
' Signature Date
ol..?.
Y?.^:l`.?J .:.Y^
?
_ city of eagan
TO: PAT GFAGAN, CNIEF OF PdUCE
JON HOHE4STE3N, ASSiSTANT TO THE C1TY AOMINISTRATOR
OALE WEGLEITNER, F1RE MARSHAL
ELECTRICALINSPECTOR
PUBLIC WORKSIENGiNEERlNGNTII.1TfES/STREETS'
GENE VANOVERBE3CE. FINANCE OIRECTOR
RlCH BRASCN, WATER RESOURCES COORDlNATOR
MIKE RIOLE`(, SENIOR PLANNER
GREGG HOVE. SUPERVI50R OF FORESTRY
FROM: DALE SCNOEPPNER, SENIOR INSPECTOR
DATE: 2- I I-97
SiJBJECT: PWN REVIEW
Pa,a N .
MEMG
- ? S
L ? S?? i
The_preliminary construclionplansfor -T-1' ??ic? cct)
are in our plan review seaion far your review and commenL
Piease nodfy the Protective InspeCJans Divisian if you have any reasan that these plans should nat he approved and
resolve any problems with the atieCed parties. If you are requesting that issuance of the huiiding permit be held, piease
fill out the proper'hald' reQuest form.
Comments:
Indicate any fees that are to be collecied with the building pertnit:
? Yes ? No landsqpe securiiy required
? Yes ? No water quaiiry dedication
? Yes ? No parlc dedication
? Yes ? No Vail dediwtion
? Yes ? No Vee dedicatian
? Yes ? No
Signature
Amaunt
a a/ 97
Da[e
- city of eagan
TO: PAT GEAGAN, CHIEF OF POLICE
JON HOHENSTEIN, ASSISTANT Td THE ClTY ADMINISTRATOR
DALE WEGLE3TNER, FIRE MARSNAL
ELECTRICALINSPECTOR
PUBLIC WORKSIENGINEERING/UTiLITIESISTREETS
GENE VANOVERBEKE, FINANCE DIRECTOR
RIC}i BRASCti, WATER RESOURCES COORDINATOR
CMIKE. RIDLEY, SENIOR PLANNER , ?
GREGG HOVE, SUPERVISOR OF FORESTRY
FROM: DALE SCtiOEPPNEft, SENIOR INSPECTOR
DATE: Z - ! 1 - q 7
SUBJECT: PLAN REVIEW
MEMO
±?: i 3
L I r3?? ?
?7T=v}i2NS lTicnl
The _ preliminary ? construction plans for -T-? , N j?_ ?2 c o Sc r?: c L
are in our pian review secfion for your review and comment.
Please notlfy the Protective Inspections Division if you have any reason that these pians should not he approved and
resolve any problems with the affected parties. If you are requesting that issuance of the building pertnk be held, please
fill out the proper 'hold' request form.
Comments:
Indicate any fees that are to 6e coll "i with the buiiding pertnit:
Amoun
? Yes ? No ? --ired
? Yes ? No %J
? Yes ? No ?
? Yes ? P'
? Yes ? ? ? _
? Yes ? ? ( ' ? ?
Si- ?j ate
?
o?.a.
??,?? ?lr ?? ??6? ?
,?
,
- city of eagan
TO: PAT GEAGAN, CHIEF OF POUCE
?JON HOHENSTEIN, ASSISTANT TO THE CITY AOMINI5TRATOR7
DALE WEGLEITNER, FIRE MARSHAL
ELECTRICALINSPECTOR
PUBLIC WORKS/ENGINEERING/UTILITIES/S7REETS
GENE VANOVERBEKE, FINANCE DIRECTOR
RICH BRASCN, WATER RESOURCE5 COOROINATaR
MIKE RIDLEY, SENIOR PLANNER
GREGG HOVE, SUPERVISOR OF FORESTRY
FROM: DALE SC}iOEPPNER, SENIOR INSPECTOR
DATE: Z- I 1- y 7
SUBJECT: PLAN REVIEW
MEMO
s? i 3
L
h? =??,2nls ,q-.2O ITi<:n/
The _ preliminary construction plans for ?• ti= w c c D t=LcrN a7•t, 7z Y Sc ?? c L
are in our pian review seciion for your review and comment.
Please notify the Protective inspections Division if you have any reasan that these plans should not be approved and
resolve any protlems with the affected parties. If you are requesting that issuance of the building pertnit be held, piease
fill aut the proper "hold" request fortn.
Comments:
Indicate any fees that are to be coliected with the building pertnit:
? Yes ? No
? Yes ? No
? Yes ? No
? Yes ? No
? Yes ? No
Iandscape security required
water quality dedication
park dedication
Vail dedication
tree dedication
? Yes ? No
Le
nature
Am un
R
Date ?
P?.Iw
.? W
M
_ city of eagan
?
H HdM
? FEB 111997
T0: PAT GEAGAN, CHIEF OF POLICE
JON HOHENSTEIN, ASSISTANT TO THE C1TY ADMINISTRATOR
DALE WEGLE3TNER, FIRE MARSHAL
ELECTRICALINSPECTOR
PUBLIC WORKS/ENGINEERINGlUTILITIES/STREETS
GENE VANOVERBEKE, FINANCE DIRECTOR
RiCN BRASCH, WATER RESOURCES COORDINATOR
MIKE RIDIEY, SENIOR PLANNER
GF2EGG HOVE, SUPERVISOR OF FORESTRY/
FROM: DALE SCHOEPPNER, SENIOR INSPECTOR
DATE: y- i I-9 7
SUBJECT: PLAN REVIEW
:t?- i 3
MEMO
L I r34-? i
The _preliminary % cons2rudion plans far ?• Na wcc U rL=,µ 4H? 44 ;,#,2 y Sc ??cL
are in our plan review sedion far your review and comment.
D1e2se r.c:iAy the ?ro:ec:ivs Ir.specficns Divisien if you have ar.y rezson thai these ptans shculd net he appra: ed and
resoive any probfems with the affected parties. If you are requesting that issuance of the building permit be held, please
fill out the proper "hold" request fortn.
Comments:
Indicate any fees that are to be colleded with the building pertnit:
? Yes ? No landscape security required
? Yes ? No water quality dedication
? Yes ? No park dedication
? Yes ? No trail dedication
?
Yes .---
0
No
tree dediption
? Yes ? No
&
t ature ?
Amaunt
Z'I(
Da e
plvtrav.iw
?,,,,t? s ?? ??
1989 BDILDING PERMIT IPPLICITION
CITY OF EAGAN
I (oq (o :1
SINGLS FAMILY Di1ELLIAGS
2 3ET3 OF PLANS
3 HEGISTEUED SITE SOBYEY3
1 SET OF EqEAGY CILCS.
MULTIPLS DiiELLINGS RENT?L URTT3
COTSlEACIIL
2 3ET3 OF IACHITECTURAL
6 STBUCTIIAIL PLANS
1 SET OF SPECIPICITIONS
1 3ET OF ENENGI CALCS.
FOR 3ALS Ul1IiS • OF 06ITS
wOTEt 1DDRE53ES POR COANEA LOTS - CONTRACTOA/90MEOWNER M03T DESIGNASE W9ICH IDDAFSS
IS DESIBED. NO CH?NGES fiILL BE AW.OWED ONCE BQILDINd PEAMIT I.4 I33DED..
9E!tEB S*.l9TEA PERMIT FEES 9t!D ICC4U!!f USp43IT !'-m.-3 FJII.L BE LNCLIfiED fiI'!'8 THF BUILUE*iQ
PEAHTT FEE. PROCESSING TIME FOA 3EIiEA ABD 1i9TER PEAMIi3 I3 TWO DIIS ONCE l PERMIT 8A3
BEEP CAMPLETED INDICATING A LICENSED PLUlBEA.
PENALTY APPLIF-% WHENt PERMIT IS NOT PAID FOA IN SAHE MONTH IT 13 HEUUES'Ph:U.
LOT CHAN(3E IS AEpUESTED ONCE PEflt92T IS ISSUED.
?r?,?TIN.Ci f' FUUN.DP.2l.
?
To Be Used For: S ?N?00\ Yaluation: Dates 1q`'Z?\
4300
Site Address -z>oa,7. OFFICE 03B ONLI
Lot ? Bloek ? Oceupaney FF.S
` Zoning
' 'Sub ,Jle fzw5 Aetual Const Bldg. Permit
Allorrable Sureharge
{3uner 5cvcA Dis?? 1,? 1 of stories Plan Aeviesr
a Length SAC. City
Address 1'+µ45 Dk<.w^on?} ?'aAh Depth SAC, MWCC
S.F. Total Nater Conn
r,ity/Zip Code MtA ?JJ06g Footprint S.F. Water Meter
`A 400
t;ontractor (I-->.
Address 004C? S?-,
City/Zip Code ?ACDP???=? rJFJ3
Phone ( Co\Z?
Areh. /Engr. W o?? ASS oc. xr??%0'1
Aadress (;, We_?Ff??`St'. su:?-s?
City/Zip Code 5`t• PRV?L- 40. S-rjl0-2-
Phone # ((olZ? 22?1 --1-1-7.3
lIITLTIPLE DWELLINGS
2 3ET3 OF PLLN3
BEGISTfit1ED 3IiE 30AVESS -
(CHECH fi2TH HLDG DIV.)
1 3Ef OF LNSAGI ClLC3.
On aite aexage
On aite well
MWCC SysLem -lef
Citq vater l.?
PAY required _
Booster Pump _
tPP80VAL3
Plermer
Council
Bldg. Off.
Varianee
Acct. Deposit
S/W Permit
S/il Sureharge
Treatment Y1.
Aoad Dnit
Park Ded.
Copies
SDBSOTAL
Penaltq
TOTAL
oc
/_ ji 7
?1??
?
t) o- J
x .c?oo s = f,
c;
. ;o989 HI1I1-DIIiG PERMTT APPLICATION
CITY OF EAGAN
'9141813
3INGLE FAMILY DWELLIRGS l51L2IPI.E DiIELLINGS C014ERCI9L
2 3ETS OF PLANS
3 REGISTEAED SITE SOR9EY3
1 SET OF EAEAGY CALCS.
2 36T3 OF PLiN3
BEGISTfiRED 3ITE 30RVEYS -
(CHECE tiITH BLDC DI9.)
1 SET OF EAEAGY CALCS.
¢
5 ,4 $c?,occ) Date:
MULTIPLE D1iELLINGS RENTAL ONITS F09 SALE D9ITS / OF DBITS
n0TEt ADDRES3ffi FOR COAHER LOT3 - WNTAACTOR/HOMEOiiNER MOST DESIGNA7E flHICH ADDRESS
IS DFSIAED. AO C$`NGES AILL BE lLiAflED ONCE BOILDING PERMIT I3 ISSDED..
ccwcg & veTgP. P3EQlI? F-VF-Q enD erC^Lt!9? DEPOS23 V-WSS IiIS.L EE L?CLOL+ED WT!'H TSE BOIL4S*14
PEIMTT FEE. PROCFSSING TIME FOA SEfiEH lAD WATER PElBlITS IS TWO DAYS ONCE ! PERMIT HAS
BEEA COMPLETED INDICITIHG A LICEN3ED PLOlBEA.
PENALTY IPPLIR$* WHENs PERMIT IS NOT PAID FOR IN SAME MONTH IT I5 REQUESTZll.
LOT CAANGE IS REQOESTED OPICE PERMIT IS ISSUED.
P,?e,wo? E \?.M???-?•-7
To Be Used For: Valuation:
4-?00
Site Address zoaz? ? RO. F-
Lot ? Block t
: ?sun ,ST?1? rits ADD??1t?+t1
ok-ner
Address
City/Zip Code (ZoS?rnou? M? sJUGfS
-:e (C.
Coatractor
Address IO4C
City/Zip Code
Phone c)
Arch./Engr. W o`? A5S oc ic,?ko-\
Address (; We.t
City/Zip Code 5'r• PAv.,L- N\Q . S!S102
?
Phone 0
Dceupaney E-I A-2-1
Zoning PF
Actual Const :I-1 N¢
Allorrable ZI-iHR
i of atories 2
Length 35!'
Depth 22v'
S.F. Total 2S."20
Footprint S.F. 52 ISo
On site aewage
On site xell
MWCC System ?
City water v
PRV required _
Hooster Pump _
2 SfiTS OF ARCHISECTURAL
8 STaOCTQRAL PLANS
1 SET OF BPECIFIC9TIONS
1 SET OF SAEHGY CALC3.
wm
Bldg. Permit M51Z -I
Sureharge ,
I y3a
Plan Review 1-15 ,17?
SAC, City
SAC, MWCC ?
99600
Hater Conn
Water Meter --
Acet. Deposit
S/W Permit a o°
S/W Surcharge I "
Treatment Y1. 10944 _
Aoad Onit 1 S"oo
Park Ded. ?
Copies
SUBTOTAL
Penalty
TOTAL
ZIM-10/30
Pc- eMir
I S-r I vao, oJc) -
W,ySs&K X a.oo=
I/nt.UE - 5,_?4k6 , v oo
35yo
!!** *-%?h
89,z_ ?'
:.3.0 Y? ? •
r-" . ,
SUP,C-HAP-Ge
Is-r t'S,oDo,ovo = lSoo
y96,0ao x, oooos= Zy, 3p
Iszy, 10
Pe-view FeEl,
--
I 2Si 2 x sa '/, _(256
?r b? y7
S?-G ?4`6 uuns?
Ionxy?S= LI%oo
Mwu. 5?S ? 48 = 2 7? o0
TR,PLT, ZZSX48 = f094 U
ILOOa LlwI r
?551 Ac-,R6 )c ?oZo = fs3ov
?T'c:TC-CuC?fT ?sr;„ atn??.l i?asc?+ro.,tt,
15 36'1 1Z = ?`gy
L BL ( CITYUSEONLY RECEIPT#: llalyx3
SUBD? ? RECEIPTDATE: 69a'91141,9
APPROVED BY: INSPECTOR MECHANICAL PERMIT#: 16Ia
1999 IdECHANICAL f'ERNIIT (CQb'.M£RC1AL)
CITY dF E4fiAN
S$SO PILOT KNO$ }tD
EAfiAN, MN 55122
(651) 681-4675
Piease complete for: all commercial/industrial buildings
multi-family buildings when separate permits are not required for each dwelling unit
DAT'E: 6-10-99 CONIRACTPRICE: $12,100.00
WORK TYPE: NEW CONSTRUCTION X INTERIOR IMPROVEMENT
DESCRIPTION OF WORK: Remodel Ductwark
FEES: 1% of contract price OR $30.00 minimum fee, whichever is greater.
Processed piping - $30.00
CONTRACT PRICE x 1% $727 _Qp
PROCESSED PIPING
PERMIT FEE gt zi _ nn
STAT'E SURCHARGE .6„{?5- : J'?0 ($.50 per $1;000 o etmit ee due on all permiu.)
TOTAL ??' •? -??-
??? /. 5v
SITE ADDRESS: 4300 Dodd Road EaQan
OWNERNAME: Independent School Dist 11196 pHONE#:
(AREA CODE)
TENANTNAME (IMPROVEMENTS ONLY): Pinewood Elementarv
INSTALLER: Northwest Sheetmetal Co of St. Paul
ADDRESS: 110 Sycamore St W
CITY:
PHONE #: 651-31Q-0102
(AREA CODE)
STATE: MN ZIP: 55117
Q
S GNATU F PE ITTEE
?
CITY USE ONLY +
L B RECEIPT #: ? LDqI6_
SUBD. RECEIPTDATE
APPROVED BY: INSPECTOR PLUMBING PERMIT ApZ-I-i
1999 PLUMSUVfi PERMrr (coMuiEtcIAL)
CITY QF F-kfiAN
S$SO PILOT KNOB EtD
EAGAv, Htx 55122
(651)681-4675
Please complete for: all commerciallindustrial buildings
mul[i-family buildings when separate building permits aze not required for each dwelling uni[
installation of backflow preventer in commercial areas or residential boulevards
Dare: Work Type: _ New Bldg. _ Add-on _ Repair _ U.G. Sprinkler _ RPZ
Description oP W ork:
To inyui: e ii Pressure Reducing 1'aive is re<,uired on ne:r c_: vice, aait £21-4646.
?EES
1% of contract P ? - ! ? L?1r?/
rice or $30.00 minimum Conhact Price: $ ? x 1% $ -
COMPLETE THIS AREA ONLY IF 1NSTALLI2VG 1iNDERGROLIND SPRINKLER SYSTEM
Backflow Preventer Permit Fee - $ 30A0
R'ater Meter: 2" Turbo
889.00 unless plan approved for smaller size
Sen•ice: _ existing (iF coming off domestic line) OR _ new
/f "neiv service" contact Jenv Wobschn(] Finance Consulrnnt to confirm addine fees for
Water Perniit & Surcharge - $ 50.50
Water Supplv & Storage - $ 825.00
Water Treatment Plant Charge - $ 468.00
Permit Fee
State surcharge is calculated from Pemut Fee at right -
$.50 for each $1.000 with a minimum of $.50 due
State Surcharge $ . 14
Tetal Fee a ldtC-=;o
I hereby acknowledge that I have read this applicarion, state that the infoimarion is correct, and agree to comply with all applicable Ciry
of Eagan ordinances. It is the applicant's responsibiliry to notify the property owner that the City of Eagan assumes no liability for any
damages caused by the Ciry during its normal operational and maintenance activities to the facilities conshucted under this permit within
Ciry property/right-of-way/easement.
SITE ADDRESS: _ -31)1) Ile-/'
TENANT NAME: 9/,Ot&W& D C? c..&%Y/?jz/%AWTELEPHONE #:
INSTALLER NAME:
STREET ADDRESS:
CITY:
(AREA CODE
TELEPHONE #: cp J ? 7 ? -' 6D 15
(AREA .ODE)
STATE: ZIP:
0??? ? ?
SIGNATCJRE OF PERMITTEE
L I BL I CITY USE ONLY
SUBD. q?ziCf-ncw-?
APPROVED BY: '
A
, INSPECTOR
RECEIPT #: I 16 dI iP In
RECEIPT DATE: [I ' I O ^ oi ci
MECHANICAL PERMIT #: 2)_????G?O
19991H£CHANICEkL PEiiMIT (COMMEACIikL)
CITY OF £i4HAN
3830 PILOT KNOS RD
EALsA?iv, M1v 55122
(651) 6$1-4675
Please complete for: all commercial/industrial buildings
muiii-iamiiy buiidings wF.an separa[a perruiis are nui requir-e; ;nr each c-weiiiriy urtit
DATE: CONTRACT PRICE:
WORK TYPE: ? NEW CONSTRUCT'fON X INTERIOR IMPROVEMENT
DESCRIPTTON OF WORK:
FEES: 1% of contract price OR $30.00 minimum fee, whichever is geater.
Processed piping - $30.00
CONTRACT PRICE x 1%
PROCESSED PIPING
PERMIT FEE
STATESURCHARGE
TOTAL
($.50 per $1,000 of certnit fee due on all permits.)
SITE ADDRESS: ?Z? -10b D'p leU
OWNERNAME: /f//????' 660 EZE,?PHONE#:
TENANT NAME (IMPROVEMENTS ONL1):
INSTALLER:
(AREA CODE)
ArA? MW4?..Y.j ...?•
nDDxESS: 1400 E. Hwy. 36
PHONE #: IO ?- 7 9--lod/?
ap ewoo , (AREA CODE)
CITY: STATE: ZIP:
tIGNATURE O PERMITTEE
3 5 q-?Y
1999 BUII.DING PERMIT APPLICATION (COMMERCIAL)
CITY OF EAGAN
651 681-4675
Re uirements to buildin ermit
i8L3 co . /9
Foundation Oni New Construction interior Im rovement
• Structural Plans (2 sets) . Architectural Plans (2 sets) • Architeclural Plans (2 sets)
• Civil Plans (2 sets) • Structural Plans (2 sets) • Code Analysis (1) "
• Code Analysis (1) " • Civil Plans (2 sets) • Project Specs (1 set)
. Project Specs (1) • Landscaping Plans (2 se[s) • Key Plan
• Spec. Insp. & Testin9 Schedule • Code Malysis (1) '" • Master Ezit Plan
• SAC determination letter from MGES - • SAC determina6on letter from MGES - call • SAC determination lelter from MClES - rall
ca11651-602-1000 651-602-1000 651-602-7000
• Spec.lnsp.&TestingSchedule (1) " • EnergyCalalations (1)notalways"
• Project Specs (1) • Elec. Power 8 Lighting Form (1) not aMays "
• Energy Calwlations (1) "
• ElecVic Power & Lightlng Form (1) °
• Master Exit Plan
• 5oils Re ort 1
" Contact Building Inspections for sample
Food & beverage or lodging facilities: Plan must be submitted to Minnesota Department of Health.
DATE: 5- /Z-9G]
WORK TYPE:
Call 651-215-0700 for etails.
_ NEW _ REMODEL
DESCRIPTION OF WORK: gJlL61N6 AODl TZOA{
CONSTRUCTION COST:040D' Oeig TENANT NAME: P1N&WooD E74EY1. SGbfDD L
SITE ADDRESS: //?O t.bDJD /2pf1'Q SUITE #:
LOT I BLOCK I SUBD. P.I.D. #
Name: Phone #: (05/-42 3-"}702
PROPERTY Last Fust
O`?Wi ER
Sheet Address: / 4/1/ L( S D1911,10NQ p?Te
Ciry /2d5E;1k1,0u,v7-- State: M N, Zip: 56-06$
Company: IVD/16ORJ 6u51/LUC.7GU/t/ Phone#: 6r/2-A&k -&o& fP
CONTRACTOR
Saeet wddress: 59o S 6aL0 c.=x/ !//fG[d..x1 7cifiv
Ciry Up1.,06U V4l,t,6'y State: Mw Zip: ??22
ARCHITECT/
ENGINEER
Company: W6f.b
2-.
MAY 13 AM
City
S ST. P&-r&71- ST
Phone #: /o s( - 2 Z'7 ''7 7 73
Regisharion #: lQOz;'2
State: /LIA? Zip: 1$5'10Z
Sewer 8 water licensed plum6er (onlv if installina sewer & water):
i hereby acknowledge Ihat I have read this appiication, state that the information is cor nd agreeto comply ' all applicable State
of Minnesota Statutes and City of Eagan Ordinancas.
Signature of Applicant
?
oa?Q
OFFICE USE ONLY
BUILDING PERMIT TYPE
? 01 Foundation ? 26 Public Facility
? 25 Miscellaneous jK,27 Commercial/Industrial
WORK TYPE
? 28 Greenhouse
? 29 Antennae
Sc/1ov /
? 31 New ? 34 Repairs ? 37 Demolish Bldg. ? 43 Siding/Soffits/Facia
K32 Addition ? 35 Tenant Impr ? 38 Demolish (Interior) ? 44 Windows/Doors
? 33 Alterations ? 36 Move Bldg. ? 42 Reroof ? 45 Fire Repair
GENERAL INFURMATION
Const. (Actual) '„a - I Re- Basement sq . ft. Census Code ??JZ
(Allowable) TjnL Aj-rIZFirst Floor sq . ft. SAC Code 40
UBC Occupancy ? sq. ft. No. of Units _I_
Zoning ? sq . ft. No. of Bldgs. o
# of Stories sq . ft. MC/ES System
Length sq . ft. City Water
Width Footprint sq. ft. (og Fire Sprinklered
APPROVALS '
Planning Building Engineering Variance
?
Z33
VALUATION: oa-p.i
$ 500,600
Permit Fee A,
.
Surcharge
? I v 1. ti
7.
Plan Review
? , ?
MC/ES SAC /DSbx B G % SAC 0
D
City SAC /aox B.= ? goo e0 SAC Units 8
Water Supply & Storage Meter Size
S/W Permit
SM/ Surcharge
Treatment Piant 40X 8_ v
Park Dedication
- :
Trails Dedication -
Water Quality
Other -
Copies
Total ? / 6 &-30, 1
?
.
. . ,. .. •
i i?rJr-;
,..
.. .. ?:('. .. . s
*r„
r.j(.,:.;I::.:: ;Ij:rl?;•c?,• '?_;'.' ?17;
1 'i
, .,
31 i jir ri
.?_. .f?.r??
.. I.i ?il!
.
. ,. ;..1.;-.
?II
''
I '( . ?tXI
i.id!JI::
f
r ,
...?.-,....,? ?.??... I:.i.i.?:WP..!
i
? 4
.:M [_?. 1.". ..U. ..
rl,,
p..in,,,,;?.. , . ?.. . ..
..Ll
?
i
? I I r' ''• , , . .? l.??l I • I ? .???i ? ..!'..?
. . . . .... . t
?
91 --i
i
c•ii
- i
?
?
'
.. , ... . _ ?
r
...a?
3 146 :l.t•,.
'
? !?.i::'•:?
.,..:..
. ? ....,
?
;,a :
. , in
?: _? J r .r. ?•.llc
'P,..Yi . l;ni;:r Y(.;.^I.ll{'iTll"l.l:
r?..i;--;7:N r-.!_ N;De c£'i.
J , q. i ::) r i 5?":: c . .. .?::-, : [kr,
ii .
.JC.;Sr.:'. .IF I I
:St'I 'r-.'.Ci Y r.,:tl 50 1. 00
......:a:l.?:??: ii','V„?
!J!iif::'. . i'?•, r•J?^?I.li."? .
? L OFFICE USE ONLY
L?
? RECEIPT#: 7,5211
SUBD. RECEIPT OATE: G o? I
1997 PLUMBING PERMIT (COMMERCIAL)
CITY OF EAGAN
3830 PILOT KNOB RD
EAGAN, MN 55122
(612) 6874675
Please compbte for: • all commercial/industrial builEings.
• muRi-family buildings when separete pertnits are RQ,j required for each dwelling unit.
• Deckfiow preventer to be installed in commerdal areas or residential DoubvarOs
OATE: G//f / WORK TYPE: _ New Conat. J--?
AddAn _ Repair
?
DESCRIPTION OF WORK:
IS WATER METER REQUIRED? _ Ye5 ±?No. ARE FLUSHOMETERS TO BE INSTALLED7 _ Yes '?No
UNDERGROUND SPRINKLER SYSTEM
INSTALLING METER? _ Ves ? No. NEW SERVICE7 _ Yes !/^ No WATER PLOW: GPM.
Pressure Reducing VaWe may be required H installing new service - contad City's Engineering Department at 681-4646.
FAILURE TO PROVIDE THE ABOVE INFORMATION WIIL RESULT IN A DELAY OF METER tSSUANCE
FEES
Mlnimum fce oi $25.00 oi 1% of coMrect price, whichever is greater. Mlnimum Stete Surcharge of a.50 tlue on all pertnits.
CONTRACT PRICE: $ lz.z 4000. Od x 1% = $ I d?O •09
COMPLETE THIS AREA ONLY IF INSTALLING UNDERGROUND SPRINKLER SYSTEM
BACKFLOW PREVENTER FEE $ 25.00 = §
WATER PERMIT (new service only) 50.00 = $
WAC (new service only - per connection) 760.00 = $
WATER TREATMENT (new senice only - per conneMion) 420.00 = $
CITY INSTALIED TAP 300.00 = $
METER: t" =$785.00 , 2" TURBO =$846.D0 ? g
PERMIT FEE $ I10• dD
FlGURE SURCWIRGE AT 60 CENTS FOR EVERY $11,000 OF PERMIT iEE GUE STATE SURCHARGE $ effd
TOTAL $ I A? 0, -5o
I hereby adcnowbdge that I have read Nis applieaUon, state that the intortnation is comect, and apiee to wmply with ali applicabb City ot Eagan ordinances.
R ia fhe applicaM's responsi6ilily to notily Ne property ownerthat the Cly of Eagan assumes no liebility for any damages caused by the City during ds nortnal
operetional anE maintenance aclivities to the faciikies eonstructed under Mis pertnit wRhin Ciry Droperry/right-of-way/easerrrent.
5ITEADDRESS: ?0eve-l ?I ? C,7/
TErurrr w4ME: G?'0o &/ y Sre.
OWNER NAME:
INSTALLERNAME: !'7Gi/1Wi19 G 7ELEPHONE4: ter9D- ¢?? a
STREETADDRESS: -/ZqO '1? Ll;p 14?
arv: lTt?a.?s?sLL?? srnre: ??•-vi-?. zia:
zJ x
APPLICANTS SIGNATURE
OfFlCE IIbE ONLV • PEVERyE SDE
??-
;_?teV?l?
??0c) u??& ?-_CD
Project: pinewood Elementary School-Addition Project #: 980385
Description: two Story-two classrtn addition
Location: City of Eagan
1. Duties af Muoicipality. Please check the duties you are willing to contract (a or b must be
initialed by State Building Inspector).
a. Attend to all aspects of State Building Code administration, including:
1. Preliminary plan review with Building Codes and Standards Division Plan
Review Staff when required by the Building Codes and Standards Division.
2. Plan Review of building and grounds with municipal plan review comments,
designers responses, and state plan review application form signed by
designer and forwarded to the Building Codes and Standards Division.
3. Interpretations, application, and enforcement of all code provisions.
4. Issuance of all permits.
5. Documentation on file of all equivatences and modifications to code as
required by UBC 105 and 106.
6. Maintain all records.
7. Issuance of certificate of occupancy with a copy informing the State
Building Inspector when services are completed.
6. Attend to all required inspections of said building including:
1. Issuance of all permits.
2. Maintain all records.
3. Issuance of certificate of occupancy with a copy informing the State
Building Inspector when services are completed.
2. All costs otbuilding code administration sha116e as prescribed by Minnesota
Statute 16B.61 Subd. la.
IN WITNESS WHEREOF, the par[ies have caused this agreement to be duly executed
intending to be bound thereby.
7 A?PROVED:
1
? , 9/,?se
BU LD OFFICIAL D?TE??
APPROVED:
STATE BUILDING OFFICIAL
VED: DATE:
MUNICIPAL MANAGER/AD INIS'CRATOR DATE PaFormAG Page: 2
'.D'L-? q l I ?e lq R
4o bC. +- S4v-&4.w.4? 1,Q..t,J .
MEMO TO: DIANE DOT4N8l IITILITY SILLING CLERR
FROM: EDWARD RIRSCHT, 8R. ENC3INEERING TECH
DATE: OCTOBER 24, 1990
SQBJECT: STREETLIGHT ENERGY COSTS FOR LOT 1, BLOCR 1 OF
STERNS ADDITION (PINEWOOD ELEMENTARY SCHOOL)
This memo is to inform your Department to start to invoice the
energy costs effective December 1, 1990 for Lot 1, Block 1 of
Sterns Addition (Pinewood Elementary School) for 3-150 watt high
pressure sodium street lights.
Invoice Lot 1, Block 1, Sterns Addition $82.80 per quarter (3-150
watt at $8.00 per month per light =$72.00 x 15% overhead = $82.80.
Edward J. irscht
Sr. Engineering Tech
cc: Michael P. Foertsch, Assistant City Engineer
EJK/jf
'sso oio o/
MEMO TO: DZANE DOWNB? IITILITY BZLLING CLSRR
FROM: EDWARD J. RIRSCHT, SR. ENGINEERING TECH
DATE: AUGIIST 30, 1990
SIIBJECT: PINEWOOD ELEMENTARY SCHOOL
4300 DODD ROAD
I have computed the REF's for Pinewood Elementary School and the
total REF's are 38.8.
r
Sr.yEngineering•Tech
cc: Michael P. Foertsch, Assistant City Engineer
EJK/jf
_A _.
?r er
STeguS APr?rrlo?
STATE OF MINNESOTA
DEPARTMENT OF AOMINISTRATION
SAINT PAUL
BUILDING CODES AND
STANDARDS DIVISION
September 13, 1990
Eric Linner AIN
Wold Association
530 Northern Federal
St. Pau], Minreseta
Dear ldr. Linner:
408 METRO SOUARE
7TH ANp ROBERT STS.
BT. PAUL, MN 55101
Phona, 612/2964639
6uilding
55102
Our files do not indicate that proper notification has been sent to School Districi
196 indicating proper usage of the second story in the new elementary schools
in Eagan and Rosemount.
We have enclosed a copy of the second story of this school design showing where
the kindergarten, first and second grade classes could be located to comply
with UBC E302(c).
Because of the linitations of UQC 802(c) requiring a sprinklered building throughout
and second story stair exits to be for exclusive use of the kindei-garten, firsi
or second grade students, locations of third, fourth and fifth grade students
are restricted to specific classrooms on the second story when kindergarteri,
first or second gr•ade students are also located on the second stoi°y.
As shown on the enclosed drawing, vre have divided the classrooms into four groups.
The objective of UBC 802(c) is when stairs are used as an exit from tfie second
story for kinderga.rten, first or second grade students it must be exclusively
for them and not used as an exit for older children.
To meet ihis requirement we have determined tfiat the following situations would
comply:
l. lf the eniire second story was I;indergarien (K), first or second grade
students, or;
2. If classroom groups A or p or A and D were K, first or second grade
students because they would use stairs #1 or #5 as an exit, or;
3. If classroom groups B and C were K, first or second grade students.
(Note 6oth B and C must be K, fii°st or second grade stutients because
they aiould use stair #3 as an exit.)
AN EQUAL OPPORTUNITY EMPLOYEfl
-A210-OO
Page Two
September 13, 1990
Mr. Eric Linner
Kindergarten, first or second grade students may be mixed with third, fourth
and fifth grade students on ihe first story provided they do not use stairs
to second story for exits.
Please forward this information to District 196 offices as we have sent copies
to Eagan and Rosemount building officials and fire marshals.
If you have any questions, contact our office at 612-296-4630.
Yours truly,
B DING ODES & S
ichard A. Brooks
Uirector
RAB:p
cc: ?Uoug Reid, Bldg
Ronald Wasmund,
enclosure
Offl., Eagan
Bldg. Offl., Rosemount
Department of
Administration
BUILDIN6 CODES AND
STANDARDS DIVISION
..r, -
/- /' /9l, ift?zzc-?
COPY TO BUILDING OFFICIAL :
Reid, Douglas Michael
City of Eagan .
3830 Pilot Knob Road
Eagan MN 55122
Project Tit1e : Pinewood School
Project Descr.: Sprinkle
DATE : 09/04/90
Location : Eagan
Date Received : 083090
Plan Review Number: 900402
Reviewer: Arnie Olson Phone: 612/296-2929
Dear Building Official:
The construction documents, for the project deacribed
above, have been reviewed and found to be in substantial
compliance with requirements of the Minnesota State Suilding
Code. Enclosed is a aigned copy authorizing conatruction of
the project. Such authorization by this office doea not
relieve the Building Official from the reaponsibility of
code compliance enforcement prior to iesuance of the
certificate of occupancy.
Yours truly,
BUILDING CODES & STANDARDS
!Zyn" g ' ?
Thomae R. Joachi?
Supervisor, Plan Review
TJ:p
attachment: Application For Plan Review Form
Form BDB0013A
408 Maro Square
7th and Aohrt Sts.
Saint PaW, Mioneso[a 55101
Phone. (612) 296-0639
FAX: (612) 297-1973
w? R
G?.?a?c' ?:V r
4JjN\f4
STATE OF MINNESOTA
DEPARTMENT OF ADMINISTRATION
3AINT PAUL
BUILDINO COOES AND CONSTRUCTION AUTHORIZATION
STANDARDS DIVISION
COPY TO BUILDING OFFICIAL :
Reid, Douglas Michael
City of Eagan
3830 Pilot Knob Road
Eagan MN 55122
408 M6TR0 BOIIARE
7TH AND ROBERT 6T5.
HT. PAUL, MN 58101
Phone: 612/296-4639
DATE : 08/09/89
Project Title : ISD # 196 Schools
Project Descr.: Pinewood & Shannon Park Elementary's.
Location : Eagan & Rosemount
Date Received : 051789
P1an Review Number: 890251
Dear Building Official:
The construction documents, for the project described
above, have been reviewed and found to be in substantial
compliance with requirements of the Minnesota State Building
Code. Enclosed is a signed copy authorizing construction of
the project. Such authorization by this office does not
relieve the Building Official from the responsibility of
code compliance enforcement prior to issuance of the
certificate of occupancy.
Yours truly,
BUTLD CODES & STANDARDS -
c?-C? V'-
Thomas R. Jo h'm
Supervisor, 1 n Review
TJ:p
attachment: Application For Plan Review Form
FOrnt BDB0013A
AN EQUAL OPPORTUNITY EMPLOYER
-ap-O
PrAN RF-vzFN aM'rrrs
PFOJU7P `:I'1`Lti: Pinewood, Shannon Park Is'lementary Schools, ISD #196
? HCD PLAN [JD. 890251 O
PIAN REVIL•TED BY: Scott McLellan Si?I `-'- v
Ccde Administrator
The comnents listed belcxa refer to documents that make up the Minnesota State
Building Ccde. Certain code deficiencies may not have been included in this
report, but that shall not be construed as an approval of such code
cleficiencies.
1. UBC 505(e). Provide evidence that openings B232L and B232M and glazed
openings between 13232A and B232B, croriply with this code for a 1-1/2 hour
fire protection rating.
2. UBC 603 and 803. Fnsure that Pinewrood Sckiool has access to a cortpleted
public street prior tio occupancy.
3. UBC Table 17-A and Chapter 19. The classification of this building is
Type II-N and Type II ore hour. Cpmbustible framing such as the fire
retardant plywood and framing shown in details 1/6100, 3/7415 and 47/4200
is not permitted. Respecify in all locations.
4. UBC 808. Door B219B must be a 3/4 hour labeled assembly.
5. UBC 809 Amended. Ensure that the fire alarm system is installed
so throughout and complies with NFPA 72-A-79 and this section.
6. UBC 3302 (b) . The maxim.ml permitted occLpant loac7 of 910, when foldin9
doors are operi shall be posted riear the main exit of the %qq/Cafeteria.
Each of the partitioned gyms shall be posted for 135.
7. UBC 3303(b). The exit doors installed in the folding gSRn partitions mist
be loca ted b) provide the minimnn required exit separation frmn Room B231.
8. UBC 3304(g) Identify "AUTODR" as shaan in hardware schedule.
9. [JBC 3317/3318. Verify that the second required exit from Roan B231, which
passes throuqh the folding partition, is not provided with a latch or lock.
10. iJBC 3305(h). Transfer grill ductwork system is not permitted in corridor
walls. Redesign accordingly.
a
11. UBC 3305(h), Glazed openings A209L and A209M must be identified as 1/4
inch thick wire glass installed in steel frames.
12. UBC 3305(h). Respecify glazing in Room II250 tp be within 25& of each wall.
13. UBC 3306. Specify the rise arx3 run of stair F tA conply with this code.
14. UBC 3314. I1luminated exit signs shall be installed at the second
0 required exit from Rooms A221, A233 and B231.
15. UBC 3314. Illuminated exit sign shall be deleted from above door I3220A.
16. UBC 3207. Note the roof located over ICindergarten wing. It is not clear.
? that the corner.s without drains will drain properly. Please caranent.
17. UBC 3801. The aubomatic fire sprinkler system m.ist be installed
throughout the building in accordance with UBC Standard 3E3-1. Shop
drawings rrust be su6mitted for our review prior to installation.
18. UBC Chapter 42. Verify that "Tackboard" and its.cwering caTply with this
chapter for flamespread or area. See exceptirn 1 of 4204(a).
19. UHC 4304(e). Verify that penetrations of fire resistive walls which
require protected apenings will be rnly ty occasional pipes, conduits,
sleeves and electrical outlets of cqrper, sheet steel or ferrous
construction.
20. UBC 4304(e). Specify a listed firestopping design for each fire resistive
wall penetratirn requiring protected openings.
21. UHC 5406(d). It is mt clear that aluminum windaas (V) conaist of safety
glazinq where required. Verify i:he lites in excess of 9 sq. ft. and whose
lowest edge is less than 18 inches abwe the finishcd floor or walking
surface.
22. NLSBC 1340.0300 Subp. 2. Access tn the main building entrance from the
handicap parking stalls, shall be 1y a 9 foot wide walk with a slope not
exceeding 1 vertical ho 20 horizontal. Specify accordingly.
? 23. MSBC 1340.0300 Subp. 5. Identify harr3icap parking stalls with above ground
signage as specified by Minnesota Statutes.
24. MSBC 1340.0300 Subp. 6.E. The following doors shall be providecl v:ith a 1
foot landing on the ]atch side; A126A and B, A212, B246, 8249, 8212.
25. MSBC 1340.0500 Subp, 1. Front entry stalls shall have bars mounted on
both sides. Revise 2/A1.2. Side entry shall have lavs recessed for
access to water closet. 4/A1.2.
26. MSHC 1340.0300 Subp. 6.F. Specify lever handles at tAilet room entrances.
27. MSBC 1340.0500 Subps. 1, 2, 3, arid 5. Provide elevaticns of toilet rooms
• and shaaers which shaa campliance with these sections.
28. MSBC 1340.0600 Subp. 2. Identify that mirrors, shelves arxl taael racks,
dispensers, etc., will be mounted so that the bottom/working height is no
higher than 40 inches above the floor.
29. MSHC 1340.0800. Identify that the top of controls for elevatpr controls,
thermostats, fire alarms, arr3 similar equipment shall be not higher than
five feet above the floor.
30. MSBC 1340.0900. Identify that tactile identification will be provided as
required.
`';s:`
?
. 31. The soils investigation report for Shannon Park identifies allawable
bearing capacity of betwean 1500 ko 3000 powx]s per square foot drpenc9ing
? on the £mting e'levation. The footings havc heen design for 2000 PSF.
Fnsure that soils are corrected to provide the safe rninirrozm allavak;le
bearing capacity of 2000 PSF.
32. UBC 2308(b). Indicate rn the structural drawings the equivalent fluid
pressure used in the design of the retaining and belaa-grade walls.
33. UBC 2304(c). Indicate ai the structural drawings that classroom were
designed for a mininwn concentrated load of 1000 pounds or that Ehe
stresses produced }Dy the required uniform loading are greater.
34. UBC 2714. Irr7icate rn the drawings arr] specifications that "Structural
we lding shall be in accordance with the 'Structural Welding Code-Steel'
ANSI/AWS D1.1-84 as adopted with amerclments try UBC Standard No. 27-6".
35. UBC 2715. Zndicate cn the drawings and sgecifications that, "The design,
fabrication, and erectirn of open web steel joists an3 joist girders shall
be in accordance with UBC Standard 27-4".
36. UHC 2720. Irxiicate rn the drawings ard specifications that, "The
fabrication, erection, identification and painting of structural steel
shall be in accordance with UBC Standard No. 27-21'.
37. UBC 2713. Indicate ai the drawing and specifications that, "Structural
joints using A325 or A490 bolts Types 1, 2 arr] 3, or equivalent fasteners
? are designed and shall be assembled itt accordance with UBC Standard tvo.
27-7".
38. UBC Chapter 27. Indicate an the drawings and specifications that,
"StrLv-tural steel work shall be in accordance with UBC Chapter 27 arxl the
applicable referenced standards".
39. UBC 306 (a). 7fie aaner is responsible to e[tploy a special inspector to
inspect the follaving: soils correcticn/excavatiari; placement of cowrete
and reinEorcing steel; reinforced masonry; structural welding;
high-strength bolting. Please acknaaledge that the aaner has been
notified of same.
40. ICC 502.1 and 3. Exterior energy envelope calculations shall be cowleted
acrl submitted Uo verify canpIiarice with this seciton.
41. P'IDC 504.8.2.1 Idzntify that all lavatories will be equipped with outlet
devices which limit the flaa of hot water to a maxiimmt of 0.5 gpm or be
equipped with self-closing valves.
42. MOC 503.2.3 Amended. The rated capacity of the heating/cooling system may
not be greater thaui 115 percent of the calculated heating load nor more
than 100 percent of the calculated cooling load. Provide justifying load
calculations in accordance with Sectirn 1345.0200 of the State Mechanical
Code.
11
43. The installer of the uriderground fuel oi7. storage tanks m:st receive
approval fran the StaGe Fite Marshal Divisim prior to instal.lation.
44. MSBC 1340.3300. Clarify that all air handling units over 2000 CFt9 will be
provided with smoke detector shutdaMm,
45. MSBC 1340.1110. Specify that a grease interceptor will he installed as
required.
46. Submit letter from local fire marshal and huilding official that you met
local ordinances £or prcperty setbacks, hydrant spacing, fire truck access
roadways and turnarounds, etc.
SM:p
6/19/89
:.?
S7ATE OF MINNESO7A
DEPARTMENT OF ADMINISTRATION
SAINT PAUL
BUILDINO CODES AND
STANDARDS DIVISION
July 31, 1989
Mr. Eric B. Linner, AIA
Project Manager
The Wold Association Architects
6 West 5th Street, Suite 520
St. Paul, MN 55102
SUBJECT: Our Review of Your July 14 Letter Regarding
Pinewood and Shannon Park Elementary Schools
Dear Mr. Linner:
dOB METRO SOUARE
7TH AND HUDERT STS.
ST. PAUL, MN 55101
Phone: 612/296-4639
The following items are numbered in accordance with our plan review letter
and remain to be addressed as indicated:
(1) 3. Except for incidental wood framing as permitted by code, wood
construction in this building type is prohibited.
(2) 6. Specify required signage.
(3) 8. Explain function and purpose.
(4) 9. A second appropriately-spaced exit is required from Room B231.
(5) 12. Reduce glazing area as required.
(6) 23. Specify required signage.
(7) 25. The intent is that side entry stalls can have two useable grab bars.
Rear mounted grab bars are not useable in front entry stalls.
(8) 27. Vertical bars must be extended to 30 inches above the seat. All
showers must be handicap accessible.
(9) 30. Specify required signage.
(10) 31. Either the assumed bearing capacity must be revised to 1500 PSF or
the soils report must be updated.
(11) 32.-38. Revisions must be made by the registered structural designer.
(12) 46. We are still awaiting confirmation from the City of Rosemount.
These and all items required to be changed as identified in our previous
letter, must be incorporated into the contract documents and submitted to
this office.
Sincerely,
BUILDING CODES AND STANDARDS DIVISION
Scott D. McLellan
Code Administrator/Consultant
SMCL/hj AN fQUAL OPPORTUNITY EMPLOYER
cc: Thomas Joachim •?•v
??
?
The Wold Association • Architects 6 West 5th Street, $uite 520, St.Paul, Minnesota 55102 612/ 2277773
July 14, 1989
Mr. Thanas R. Joachim ?--.-
Supervisor, Plan Review ?'>!1 ?.?.r? _._
State of Minnesota ?F,-li
Deoartment of Adninistration
40$ Metro Sauare ?r .
St, Paul, Minnesota 55101
?
Re; Pinewood and Shannon Park Elementary Schools '--`---""""-----?----1
Carmission No. 8826
Dear Thomas:
We have reviewed vour plan review and have addressed the items as follows:
Item l: You have allowed one hour glazing (contra-flam glass) and a
sprinkler head water wall at openings to canoly with the 1-1/2
hour rating. We have done this with the understanding this is an
acceoted oractice.
Item 2: The CitY of Eagan and City of Rosernount are having streets built
in front of both buildings this sumner/fall. They will be done
bv Sumner of 1990 for school occuoancy.
Iterrt 3: ' We will have the wood framing inside the building covered with
5/8" gypsum board type "x". Chapter 19 references Chapter 17 for
fire-resistive reauirements. UBC 1709 requires non-combustible
faces; the coverings are of non-combustible metal.
..Item 4: We will change door B2196 to 60 minute construction.
Ltem-5i Fire alarm system is designed to comply with NFPA-72-A-79.
__. ? .
' Item 6: '
,Signage will be done under a separate oackage.
,Ltenr-7:- We will locate exit doors in both partitions to accomplish
exiting.
?J Item 8:.` AUTODR refers to a UL listed Autanatic Door Bottan.
Clark D. Wold
MichaelS.Coz
Gl
N
L
ILEYII 9
?
This is not a req,uired exit, per our preliminary code revi.ew.
orman
ewwe
. .
Kevin P. Suilivan
CliflordN.Buikema ;C_ Yltem-16':- 'Transfer duct system in corridor walls to be revised. Revisions
Eric B. Linner
Caren S. Iverson
submi tted at a 1 ater date.
AN EQUAL OPPORTUNITY EMPLOYER
,_Itern 11: This was changed bv Addendum #2.
Item 12i, We are installing a sprinkler water wall at these borrowed lights.
.. - __
,_I.terrr-T3: ""Stair 'F' has 5-6" risers and 4-12" treads, which meets the code.
,. .I.tern-14: Illuminated exit signs will be installed at the second exits fran Rooms
A221, A233, B231.
,. Item-15: -Exit sign above door B220A will be deleted.
Item 16: 'Roof drains are located at the low ooint on this roof. We are
confident water will drain.
Item 17: An autanatic sarinkler s.ystem will be installed throughout the building
in accordance with governing codes. Shop drawings will be prepared and
submitted for review by the Mechanical Contractor.
Item 18: Tackboard and covering has a Class I flamesoread.
Item-19:" All openings in fire resistive walls will meet the UBC.
Item-20: Specifications reauire the contractor installing firestoooing to submit
a listed firestopoing design they will be using. We will forward this
information when we recieve it.
Item 21: All aluminum windows are 20" or more above finished floor. Aluminum
curtain wall windows lower than 20" above finished floor have safetv
glass (Glass types #2 & 5) as reouired by the U6C.
Item 22: Access to the main entrv will ineet the MSBC.
Item 23: Signage will be done by seoarate aackaqe.
Item 24: Doors A126A and B, MSBC 1340.0300 Subp. 3 does not reouire these to be
a handicapped entrance. Doors A212 and E3212 have one foot at latch
side of door. Doors B246 and B249 have 7'-0" on latch side of door.
Item 25: MSBC 1340.0500 Subp. 1 allows one side and one rear grab bar. Toilet
Roan (4/A1.2) is designed per detail 14 on page 179 of MSBC.
Item 26: Lever handles are specified.
Item 27: We have attached re4uired details. The shower is not public, and will
not be handicap accessible.
,. Item 28:- Installation of all devices will meet MSBC.
,,. I-tem 29:' Installation of ali devices will meet MSBC.
___..1
,- Item 30:: Signage will be by separate package.
,- _ ItemThe structural notes indicate that the bearing value is to be field
' verified. The soils engineer oreviously indicated that 2,000 psf
bearing capacity soil is anticipated.
t rrC_Ltems--32-38° Notes have been added to drawings per attached Supplemental
Instruction.
?I•?em34':" The Owner has hired Twin Cit,y Testing.
,.ItwL-44;---An exterior enerQy envelope calculation has been completed and is
included with this letter.
,;,?,.,_I.tan-41-? All public lavatories have self-closing valves.
IteaM42" The buildina is divided into six (6) cooling zones. Each zone is
- served b,y an air handling unit with an air cooled condensing unit.
CALCULATED LOAD
AHU #1 70 Tons
AHU #2 52 Tons
AHU #3 69.5 Tons
AHU #4 46 Tons
AHU #5 11.5 Tons
AHU {i7 7.5 Tons
IPMENT $ELECTION LOAD
JO Tons
57 Tons
70 Tons
49.6 Tons
14 Tons
7.5 Tons
Equipment selection is based on the capacity nearest the calculated
load.
The total calculated heating load for the building is 4512 M3H. This
load includes: transmission, infiltration, ventilation and domestic
hot water. The boilers were selected 2/3 the calculated load or 2/3 x
4512 MBH = 3008 MBH, The nearest boiler size is 3350 MBH output.
This method has one (1) boiler supplying the heat a majorit,y of the
time and onlv at extreme conditions will the second boiler cane on.
This also will provide the building owner standb,y capacity.
ILem-43:"" The Mechanical Contractor shall be notified that they must first
receive aDoroval from the State Fire Marshal division orior to
installing the underground fuel oil storage tank.
4AW ..Item-44:- All air handling units over 2000 CFM have smoke detection for
autanatic shutdown.
,,Jtem-45?'" A grease interceotor will be provided if reauired hy the local
authorities.
. Item 46;: Letter from Citv of.Eagan is attached. City of Rosemount is unclear
-- as to what vou want.
Please call us to go over an.y issues unclear.
S i ncerel y,
THE WOLD ASSOCIATION
t* V ?^ufMVf/?/
Eric B. Linner, AIA
Project Manager
cc: Ron LaMere, Mike Plumedahl, Len Groschen, Naeem Oureshi, Kevin Sullivan
Enclosures
pl_IC A9 '8`3 IHE IduLI! H'_?=?VCIHTTiifl
i
The Wold Association • Architects
August 9, 1989
P.?131
8 West 5th Street, Suite 520, St.Paul, Minnesota 55102 612/227 7773
Mr. Thomas Joachim
Snprsvisor, Plaa Review
Minncsota Department of Adminisiration
90$ Metro Sqwve Building
St. Paul, Minnesota 55101
RE: Pinewood attd Shanaon Pazk Eleineatary School
Commission No. 8826
Dear Tom:
Per our meeting this aftnrnoon, the following issues were discussed and resolvod so
authorization for construcuon can be issued to be Gti[ies of Eagan and Rosemount.
(1) 3. We hAVe changed the plywood sheaTLing to gypsum sheatbing.
(2) 6. Signage which will be donc under a separate package will meet the MSBC,
(3) 8. Automatic door bottom refers to a LJT. luted sound conuol in tke, music
suite.
(4) 9- The operable partitions have persoa doors located oa the south end of the
room to supplement existing.
(5) ]2. We will eiSher reduce the amount ol' glazing or iastall 45 miuuta y,lazing,
(6) 23• Sigaage which will be done undor a separate package will m"t zha ?v1S13C.
(7) 25. We.will revise ihe gab baz on the stall in quesROn to b,avc side mounted
bars.
(8) 27. The shower is for privata use and will not be available for public use
during activities scheduted at the gyrunasium.
(9) 30. Signage wLich wilt be dane uadmr a aeparate package will meet tkn MSBC.
(30) 31, 'Iwia City Testing is forwarding a IGttcr conGrmiag the verbaJ bearring
Cianc 1), wad caP8C+t3' af 2,000 PSP'. We will fotwaid a topy of this to your office.
Michael S. Cox .
Norman L. Glawwe .. Kavin P. Sullivan
ClAlord N. Buikema Eric H. Linnqr ? Caren S. Iversan
AN EQUAL OPPORTUNITY EMPLOYER
RIIG 09 789 08:25 THE bIOLD HSSOCIATI,_?iI F'.3'?
L.etter to Mr. Thomu Joachim
August 9, 1989
Page'Itvo
(11) 32•38. These revisions were issued under Archi[ectural Supplemenfal Instruction
#2. By referencing th6se cbangea ta Structural Drawing 51,0, Lhe
- commencs fall under the siUmature of tke auucturul tnqnaEr.
(12) 46. . Wa a;rZ waiting for a lZtter &om tLa City of ltosempunt. We underscand
you will nac hold up the process by waiting for this lettzr. We agree to
work with thcm and resolve ttny issuos Ihey have.
Wc understand you will fax cons[ruction authorizations immediately after you receivc this
response. T6ank you for your timely response in resolving these usues.
Sincerely,
THE WpI.T) ASSOCIA7ZON
?6 WAW
Eric B. Ianner, ATA
Project Maoager
. a
Tne woId associati«, , archdects
(D ee
Reference DetaYs Plan Ref.
i
?
z 1
-a
?
51 te
GRAE) EARS
?2411 x 3(p"
MIRFOR
LAVATORY MIRRORS
NorE :
gF-E 11,V' P L AN S FOR
LOCATIO NS OF ACCESSORIE
SubJectTOILET? E>ATH ACCESSORIES-MOUNTING NEICaN7S
I Date: JuW 131)q&M Reviabns Q/-}S /"'a Job No. %2'2) 1
i
10800
OF GC7gC1
3795 Pilot Knob Rood
Eagan, Minnesota 55122
Phone:(612) 454-5274
June 29, 1989
V?.. V
JUL 0 5 iz-)39
THp W04fj ASSUCIATI()N
Mr. Eric B. Linner
The Wold Association - Architects
6 West 5th Street
Suite 520
St. Paul, MN 55102
Dear Mr. Linner,
viC ELLISON
Moyor
MOMiaS EGAN
DAVID K. GUSiAF$ON
PAMEIA McCREA
iHEODORE WACHiER
Council Membeis
1NOMA5 IIEDGES
City Administialor
EUGENEVAN OVERBEKE
CiN Oark
After review the plans for Pinewood School, the City of Eaqan Fire
Department has no problems with current design for fire protection
and access to the building.
Sincerely,
00??,? ? ? IL
Dale L. Wegleitner
FIRE IidSPECTOR
cc: Doug Reid, Chief Building Inspector
school.dlw
fire department
KEN SOU?iORN
Celel
DICK SCHINDELDECNER
Awsicnt Cniel
DAVE DI IOLA
dsftciCniei
THE LONE OAK TREE...THE SYMBOL OF STRENGTH AND GROWfH IN OUR COMMUNITY
ARCHIT[CT'S
SUPPLEMEN7AL INSTRUCTIONS
AfA DOCUMLNT G7 70 (lnsVuctions on revcrse sic7e)
PROJECT: Pinewood Elementary/Eagan
(name,address) Shannon Park Elementary/
Rosemount
O%A'NEr.: Ind. School District 0196
TO: Loeffel-Engstrand Co.
(Contractor) 1040 South Sixth Street
Hopkins, MN 55343
CON7KAC1' rOR: General Construction
Owner 0 [3ertsch
Architect (Z linner
Consultant N LaMere, Welter, Plwnedahl
Contractor W Coffman
field ?
Other ?
ARCHITECT'S SUPPLEMENTAL
INSTRUCTION NO: 2
DATE OF ISSUANCE: July 13, 1989
ARCHITrCT: The Wold Association
6 West Fifth 5treet, Suite 520
St. Paul, MIJ 55102
ARCHIT[CT'S PROJECT NO: 8826
The \Vork shall be carried out in accordance with the following supplemental instrudions issued in accord-
ance with Ihe Cnniract Documenis without change in Contract Sum or Coniract Time. Pnor to proceeding
in accordance wifh these instructions, indicate your acceptance or these insiructions ior minor change to
the bVork as consistent with the Contract Documenls and return a copy b the Architect.
Description:
Add the following notes to Sheet 51.0 as requested by the State of Minnesota:
1. An equivalent fluid weight of 45 pcf was used in the design of retaining and
below grade walls.
2. A uniform floor loading governed the floor design in lieu of a 1,000 lb.
concentrated load distributed over a space 2.5 feet square.
3. Structural welding shall be in accordance with the "Structural Welding Code -
Steel" ANSI/AWS D1.1-84 as adopted with amendments by UBC Standard No. 27.6.
4. The design, fabrication and erection of open web steel joists and joist girders
shall be in accordance with the UBC Standard 27-4.
5. The fabrication, erection and identification and painting of structural steel
shall be in accordance with UBC Standard 27-2.
6. Structural joints using A325 or A490 bolts Type 1, 2 and 3 or equivalent
fasteners are designed and shall be assembled in accordance with UBC Standard
27-7.
7. Sti•uctural steel work shall be in accordance with UBC Chapter 27 and the
applicable referenced standards.
issuEO: THE WOLD ASSOCIATION .scCePTeo:
BY t&XQ, ?UWV BY
Architect Contractor Date
AIA DOCUMENT G710 • AR[HITECT'S SUPPLEME\'TAL IN'STRURION$ • AIARCH 19:9 EDRIO\' • AIAc'
01979 • THE AAIERICAN IkSTiTUTE OF ARCNITECTt, 1735 ?E\Y 1'OFK A\'E., N.W.. \YASHINGTOh', U.C. 20006 G710-1979
EXTERIOR ENVELOPE AVERAGE "U" COMPUTATTOPI
041NER Indeoendent School District N196
$ITE ADDRE55 14445 Diamond Path Road
Rosemount, MN DATE 7-12'89 PHONE 423-9400 .
Pinewood b Shannon Park Elementary Schools
Determine working square footage of each.
1. Total exposed wall area ....... 24_638 •_ sq. ft. x.23_
2. Total roof/ceiling area ...... 46.894 sq. ft. x.06 = z 814
Total exposed wall area above floor = 24,638 s.F
a. Total wall window area ........................... 2,142 S.F.
b. Total door area ................................ _ ---- _
...................
c. Total sliding glass door area -----
d. Total fireplace wall area ........................ -----
e. Total wall firamirig area (average l(%)...:........ -----
f. Total net wall.area above floor ................. 22.496 S.F.
g. Total rim joist area ............................ -----
Total ezposed foundation area = -----
........
h. Total foundation window area ...........:. -----
i. Toal net foundation area abcve grade ......... -----
Determine "U" value cf each wall segment.
a. 2,142 S.F. X"U" .56 = 1 ,199_
b. X lout[ --- _ .
c: ----- •X liuli -----
d. ----- X ttuto --- - -----
e. ----- X iouti --- - -----
f. 22,496 S.F. X?-U,- .08 = 1,799
g . ----- X ltu,t --- -----
h. - X "u" -
i ----- X tiull --- - -----
3 ..................................... Tota1 = 2 998
If item R3 is the sane as, or less than item fl, you have met the intent
of S6C 6006(c)2. ' .
I
Total exposed roof/ceilina area = 46,894 S.F.
J. Total skylight area............................. 415 S.F.
k. Total roof/ceiling framing area {average 10%)... ---
1. Total net insula:2d roof/ceiling area........... 46.479 S.F.
Oetermine "U"' value for each roof/ceiling segment.
J. . 415 S.F. X°U" .56 = 232
k. --- i( ,iull --- - ---
?• 46.479 S.F X [lull .06 = 2.788 ,
4 ..................................Tota1 = 3,ozo
If total of n4 is the same as, or less than ycu have met the intent of
SBC 6006(c)l.
Alternate Building Emrelope Design
To utilize the total envelope system m=thod, the values established by the
sum of items #3 and.#4 shall not be greater than the sum of items nl and T2.
l. S 66.6 + 2. 2.814 = 8,480
. 3 2.998 + 4. 3,020 = 6,018
MECHANICAL REVIS[ONS
PINEWOOD AND SHANNON PARK
ELEMENTARYSCHOOLS
70B NO. 43744
1. SHEET M9: MAIN LEVEL PLAN - HVAC
a. Revise transfer ductwork above vestibule A240 as per attached Drawing 1 of
4. Eliminate the 4 transfer openings with fire dampers and install 2 transfer
ducts across the vestibule.
b. Revise the return air ductwork from AHU #2 above Corridor A239 as per
attached drawing 2 of 4. Revise the rduting of the 3" HWS as shown.
Eliminate the 3 transfer openings with fire dampers along the east wall of
A239. Eliminate the Type "D" 48 x 6 return grille in Corridor A239.
2. SHEET M10: MAIN LEVEL PLAN - HVAC
a. Eliminate the Type "D" 48 x 6 return grille in Corridor A239.
b. Revise the location of the 24 x 48 pressure relief from B241 to B235 as per
attached drawing 3 of 4.
c. Room B233 - Eliminate the 10 x 10 transfer with fire damper in north wall.
Provide a 10 x!0 transfer duct to B235 as per attached drawing 3 of 4.
d. Room B235 - Eliminate the Type "F" 8 x 6 transfer grille, duct and fire
damper in north wall.
e. Room B235B - Eliminate the Type "F" 8 x 6 transfer grille, duct and fire
damper in north wall. Provide an S x 8 transfer duct to 8235 as per attached
drawing 4 of 4.
f. Provide a 36 x 18 transfer duct between Rooms 8235 and B246 as per
attached Drawing 4 of 4.
g, Room 6249 - Eliminate the 4$ x 18 transfer opening with fire damper in east
wall. Provide a 48 x 18 transfer duct to 8246 as per attached Drawing 4 of 4.
h. Room 8243 - Eliminate the 24 x 12 transfer duct with fire damper in south
wall. Provide a 24 x 12 transfer duct to Room 8246 as per attached Drawing
4 uf 4.
i. Room 8245 - Extend the 28 x 12 transfer duct to Room B246 as per attached
Drawing 4 of 4. Eliminate the fire damper and the 28 x 12 transfer sleeve on
Grid "6".
d,
N ?
.?
'? T •.
?
O i
5' oP-
'/l'/I I f/I ' w I /, I
L/y'
, ?? I ? ? 24 x 48 .? P To ?
4a0 P oa /Pwvop'
o I L -? J
N ; I
I I I
'C?.A?
, I _ ?3Z_ _ • i I
? II I O( I 10
?
r-t---- -
_ K=_ax_ ? 4. i L
? ?
Fit15 ?' 1?ct2? ' ?? ? ?c's•?- - 6?'iSB_ _ ??«?->-"y ,
? FIF: `11'whP:.Fq,
??
z4r+8-.vP_ I I F ?•? E- ?
To'PRESS.:_?I ?? A.F.p.-j? '? I A.F,O._ i i 12nB
REUEF-or! I ? 1 I ?al I 65l _ ?
_ ?RooF .6ETW4u ?
Jo.?SZS ? J ? I I -A.E!? f --? ?
?
-1
ILIO ?,
? 14sio _
i v Br 10 3" ? ? ?cr¢ ? i
8n? I I 25ac •l'il. ?oe II ?IZ ? 12R? I
f- -? {- •-i 8y¢?Z?
?%_L` ? ?? ZeocF?
_EAC1=
} . ?ii? I 6 ?o??x??•- . o???? ? . -`-- I ?
gd . \zoo?t
? B•b ? S ? I ? ? Lr(. ??R :c1- ? ?? T ? lix , .-235
? .btSo .
- - T ? -I $i49
=E-f2,x u o
- '?' 1y+ 2as?f? B I It`¢ y y ?Y?? S,ro??
W 6KT?.T-SThL
AFW M'2 -. _ . ? =
.=_A.24rZti
. 'I I ?4? 31 8° .
I
MICHAUD
COOLEY O
ERICKSON ELEMENTARY
SCHOOLS DRAWN 8Y
? F?.J COMM. NO. SHEEf NO.
?
.
& Associates. Inc. (e1r?•l
SUrtEtdIS C]SFOUplMAVENUESOUTH Min?AVOl6.MiNNF50fA53d15
ISD NO. 7JE)
ROSEMOUNT, MN.
CHECKED BY
fZ 5 h!
DATE
Z- I
lvt
?F 4
SHEETS
1 ? ??1.. . 124?4 ? -
ai?CFN " 12.fIz
' ZSo C?1i I O 34 : ?C 9? ?
T r 00 3?5 c
N
." 3,'
?
24x2?? ? -Joaf.? i S O .
1$o tF } $ ri IZ-
?
I
_ F11GNT -T-STP,T H s.?4 T I \ 10"} i
'7
ztyz4
%? I y?°1) I zeocr
4 _r JtZ4?o 1 _ t I ??t15_Ct1+
2
? i
4, 14 To Cvu +?.7
12iko
- ? ? - _ _ ?- - ?
? -->,
cuH-7 3 ?S 4
2so
M ?
3? 2 I I I
? ?2 8
d
? 2.--0-6 x_3o TR? FE .... v. . ?t/1 :
?1(L DJCTS :.C3ETW??I-?.- LL = ? _? ? .
-JotSTS - CooM-p«AfTE- 3 ? v'? I?L? 4
wI STI?vt'ryKPrl -x -Az4o N 251
A I i -4 i
3(o C U }{ * (o--
ir
? ?- -
r ?
zNWs-t=-
kC `
,o-,V: K
z-7s e _. , m
r
T?tPE ?6'-QAD? ? ?
ET..uNCEL E i .
i , 7t
o' 3 J I?
.; -x?NC. lk-o(L-
?2iSCFfI +o? ? .-- ?is-cFb
'• x2.4?Jp=to . . \
MICHAUD
COOLEY O? ELEMENTARY
SCHOOLS DRAWN BY
J F?.I COMM. N0.
?314`4 SHEEC NO.
1
EKSON
&ASSOCiates.lnc. c?„??.roe?a, (ethllPaoa?
SUrtEU25 E45fOURIMAVENUESOUiN MiwaEAPOUS.MiNNESOTA55nl3 ISD NO. 196
ROSEMOUNT.MN. CHECKED BY
f?5rl DATE
'1-Iq=?9
oF 4
SHEETS
175 cFr?_.
_,4:? II uP T. Aku'?'1 -- AiSo
I I rJ -14 ?
T_
! i 24?vr. s?P. ? ?
11
l 5o?i4 i I I i ?FRorl o.?w kz_
toxlv.
i '
I-I
'yl
E:? 6Ln24
?+? ? V4
_
3
-8(6r:34__. I s
.34t86
?P.7o
_ I AHu ?2
4'p 18r18 ?4r165a . ? .9Ceri_ZO=?
-4
A J ?t
C ={o. ?j ??1?r5
we CFt+ ? *-?.
L 6y? ?gp \ I ?o?y? f? ? V
IF-
!a
d ? ?lYIL- co y
? i T r -N-
?
I----oG- , , wa 2aor.zL
? N
8rlti ? v ,
Z?
Y?4,? T I ? ??? G?o'la 48x18Ot?.:_ 3
s io
r ? T ;?4
z??F
?
I '?'lo? I I ' l? (' . ?? • -:_-:-?.- "- ? \
? 3y L?- .cJO ?' k X_38f;
?
j 4, "W . ? ? f?L I l?C •?• ?4' _
? L?? I I p
I ' T ? 12 lo \
L_
i `
\ I I 0ONI
x..ZnA '00' 2 j-DiJ.
50 CPh1 I .I t -9 ? ? ..
3y
d. ? 12 $ I i
?+ 1 _ r
-A
x _ A2'M
? I i _ 25o CPh .... ?
--4
E9
Pi
'L i 8r10:
MICHAUD ELEMENTARY ORAWN BY
J
1 COMM. N0.
4314? SHEET N0.
COOLEY
? SCHOOLS F"
. Z
ERICKSON
i
&
t
I ISD NO. 196 CHECKED BY DATE
4"
Assoc
a
es,
nc. MN
ROSEMOUNT 9514 -7- OF
SUTE1]25 d]SiCUfliNAVENUE$OUiH MMNEAVOl6,MINNESOTASSHS .
. SHEETS
J . ' ?oT'E : IiJSTP.I.L D1FF, .g ._
• ' ? ? Fws
o ?0?5 S ? s
f i Zd ? 20??
r ',
?- I i I I e7 14'?? ?,L/"Y
; i ???'?
'? ?IoTE I ?PiLL. --???-
'?? ' DUCT 00.? ...1 ? ? i ' •
???
L?
o?sY S hG ? ? . ? ?
Ti
(u-
PRoTECTtJ?E Co?6R I I ?, ! !?
1\ _-a ---_ _ •r:-l a,t? ._ ?
I I B"- 8` oP /Sr I I
-?----?-
-'
.. .` -?WS. i :..
3. I? ? c-s p_ '? I i gz3t \-2r,.f?o - K=e?(._ ?
SzgS ?' i5o cer? ? .
O (-
I?- I e-? -
A.F.D.-7? t2
?io_CF..? r l QEl1'EF_or± ? I •
A.p.O. i I RooF 6??EEV I_ J
? ? ? 8xG - ?#T-a Sr- r- FFwt? - ',? lo
kwS? -\
8r10 3n
-
1"6°P zSU:2@? _
-6L1c- yz? - ?54- u I I - _ ?
?
u5 ? ?0?? `; 'r -b =
? -- - --- --- ? ?????? ? -
? ? ? 643 4i? I
lo2.4
.24?
? ?i ?,r, N I I I f?_?
11.F ?- o.ro._.? _
?j
? I J/ --? ? -7 ?
I Bz43 ioo
MiCFwub ?
?
s ELEMENTARY
SCHOOLS DRAWN BY
J F\.J COMM. ND.
•1-314?. SHEET NO.
3
ON O
Ern
& Associates. Inc.
SVIiE 15I5 S]O FQURIH AVENOF $OUTM MMNEAGOl6. MMINESOIA 55115 ISD NO. 196
ROSEMOUNT, MN. CHECKEO 8Y
R 5 ? DATE
7- ?Q-_ $9
oF ?e
SHEETS
\\?
Metropolitan Waste Control Commission
Mears Park Cen[re, 230 Eas[ Fifth Street, S[. Paul, Minnesota 55101
612 222-8423
June 16, 1989
Mr. Joe Merchak
Construction Analyst
City of Eagan
3830 Pilot Knob Road
Eagan, MN 55122
Dear Mr. Merchak:
This letter is to inform you that the Metropolitan Waste Control
Commission has made a SAC determination for the Pinewood Elementary
to be located within the City of Eagan.
It has been determined that 48 SAC Units should be assigned to this
building. This determination was made as follows:
Charges:
School (Elementary)
25,728 sq. ft. @ 30 sq. ft./student @
18 students/SAC Unit
If you have any questions, please call.
S' rely,
??--J?--'?-
Donald S. Bluhm
Staff Engineer
DSB:RWJ:jle
89061653
cc: S. Selby, MWCC
E. M. Blinner, The Wold Associates
Carolyn Krech, Finance Department, Eagan
Equal Opportunity/Affirmative Action Employer
?'O
SAC Units
47.64 or 48
; . .
minnesota department of health
717 s.e. delaware st. p.o. box 9441 minneapolis 55440
O ?612) 6235000
Tune 1, 1989
Independent School District No. 196
c/o Mr. R.J. Rehwaldt, Superintendent
14445 Diamond Path
Rosemount, Minnesota 55068
Gentlemen/Ladies:
Subject: Plumbing for Pinewood Elementary School, Rosemount,
Dakota County. Minnesota. Plan No. 91494
We are enclosing a copy of our report covering an examination of
plans and specifications on the above-designated project. A set of
' the identified plans and specifications is also being returned to
you. IT IS THE PROSECT OWNER'S RESPONSIBILITY TO RETAIN THE PLANS AT
THE PROJECT LOCATION.
Your attention is directed to the attached statement pertaining to
inspection of the plumbing. It is important that we receive the
information indicated in order that the necessary inspection may be
made.
The plans and specifications appear to be in general conformance with
the standards of this Department. When the project is completed,
please communicate with an Environmental Health sanitarian in our
Metro District Office in Minneapolis, Minnesota (612/623-5337), in
order to schedule a final inspection.
If you have any questions in regard to plumhing inspections, please
call 612/623-5377.
Zf you have any questions in regard to the information contained in
this report, please contact Lewis Anderson at 612/623-5357.
Sincerely yours,
Gary L. Englund, P.E., Chief
Section of Water Supply
and Engineering
GLE:LEA:paw
Enclosures
cc: Department of Education
The Wold Association
Ron Wasmund, Building Inspector ?
an equal opportunity employer
MINIVESOTA DEPARTMENT OF TiEALTH
Division of Environmentat Health
REPORT OF PLANS
Plans and specifications on plumbing: Pinewood Elemen[ary School, Rosemouut, Dakota Couaty, Mianesota,
Plan No. 91494
Prepared and submitted by The Wold Associatioo, Six West Fifth Street, Suite 520, St. Paul, Minnesota 55102
Owners6ip: Iadependent Sc6ool District No. 196, c/o Mr. R.J. Rehwaldt, Superintendent, 14445 Diamond Path,
Rosemount, Minnesota 55068
Date Examined: May 30, 1989 Date Received: May 17, 1989
SCOPE: This examination is limited to the design of this particutar project only insofar as the provisious
of the Minuesota Plumbiug Code, as amended, apply, and does no[ cover the water supply or sewerage system
to which t6is plumbing system is connected. "Che examination of plans is based upon the supposition that
the data on which the design is based are correct, and that necessary legal aut6ority has been obtained to
construct the project. The responsibility for the design of strucwral features and the efficiency of
equipment must be taken by the project designer. Approval is contingent upon satisfactory dispositiou of
any requirements included in this report.
INSPECTIONS: Special care should be taken to insure that the material and iustallation of the plumbing
system are in accordance with the provisions of the Minnesota Plumbing Code. It is necessary that the
State Heatth Department make roughing-in and final inspections of the plumbing system to determine whether
it complies with the Code. Provisious should be made for applying an air test at the time of the
roughing-in inspection as outlined in Minn. Rules, p. 4715.2820, of the Code. [n order to faciiitate this
work, a self-addressed card is attached which shouid be returned to this office. The name of the plumbing
contractor s6outd be indicated so arrangements cau be made for him to notify the State Health Department
that the installation will be ready for a test and inspection.
No acceptance of the plumbing ins[allation can be given until inspection and testing of the roughing-in
work (Minn. Rules, p. 4715.2820, subp. 2), finished piumbing (Minn. Rules, p. 4715.2820, subp. 3), and
inspection of the completed installation by a representative of the State Health Department indicates
compliance with the provisions of the Code.
REQUIREMENTS:
1. A double-wall heat exchanger is required for the hot water heater. It must be desigued in a way that
any failure of a single wall will allow discharge to the atmosphere of the heat trausfer medium or
potable water contaiued by the wall. The discharge location must be visible to the operator or owner,
and located so that no hazards are created by the discharge.
2. The three-compartment sink bcated iu the kitchen shall be provided with 3/4-inch water supplies.
3. Horizon[al spacing of copper [ubing hangers, for pipe 1 1/4 inch or less in diameter, shall be 6 feet
(see Minn. Ru1es, p. 4715.1430).
4. PVC pipe used for the drain, waste and vent system shall comply with ASTM D2665.
5. ABS pipe used for the drain, waste and vent system shall comply with ASTM D2661.
6. The installation of reduced pressure zone bacAClow preven[ers is permitted only when periodic testing
is done by a trained backflow preventer tester acceptable to the administrative authority. Inspection
intervals shall noi exceed one year, and records must be kept. All devices must be tested aFter
initial installation to assure [hat debris from the piping iostallation has not interfered with the
functioning oF the device.
Pinewood Elemeutary School -2- ]une 1, 1989
Plan No. 91494
7. Island ventiog of FixYUres K3, K4 and the wash fountain shall be in acwrdance with Minn. Rules,
p. 4715.2650, subp. 3. The veot should rise to a peak, as shown on the enclosed handout, in order to
comply with Minn. Rules, p. 4715.2540, subp. 2.
8. If the water inlet to the dishwashing machine is below the spill line of the fixture, provide a vacuum
breaker.
9. The fire service conuection to t6e potable water supply shall be made through a double-check valve
backftow preventer, in lieu of a detecior check valve, unless deemed otherwise by the 1oca1 authority.
10. The connection for the future lawn sprinkler system shall be provided with an approved backflow
preveu[er.
11. Verify that fixture branch conneciioos to vertical waste pipes are not below the weir of the fixture
trap.
Authorization for construction in accordance with the approved plans may be withdrawn if wnsiruction is
not uudertaken within a period of two years. The fact that plans have beeu approved does not necessarily
mean that recommendations or requirements for change will not be made at some later time when changed
conditions, addi[ional iaformation or advanced knowiedge make improvements necessary.
Approved by:
li uvw?
Milton R. Bellin, P.E., Supervisor
Engineering Unit
Section of Water Supply aod Engineering
612/623-5517
Lewis E. Anderson
Engineering Aide
Section of Water Supply and Engineering
612/623-5357
L 1 81 57aew?? ADDlTiG'N
The Woid Association • Architects
6 West 5th Street, Suite 520, St.Paul, Minnesota 55102 612/ 227-7773
June 23, 1989 F?UN 2 6 1989
Mr. Ron Wasmund Mr. Doug Reid
City of Rosemount City of Eagan
2875 145th Street West 3830 Pilot Knob Road
Rosemount, Minnesota 55068 Eagan, Minnesota 55122
RE: Shannon Park Elementary 5chool
Pinewood Elementary School
Commission No. 8826
Gentlemen:
The State Building Codes and 5tandards Division has requested that we
submit a letter from the local fire marshal and building official from
each of these projects. The letter should state that the plans and
soecifications meet local ordinances for property setbacks, hydrant
spacing, fire truck access roadways and turnarounds, etc.
Please send this letter at your earliest convenience so we can get
approval from the State to proceed with building permit issuance and
construction.
Sincerely,
THE WOLD ASSOCIATION
?Kc, 6 [.wv
Eric B. Linner, AIA
Project Manager
cc: Jerr,y Bertsch
Clark D. Wold
Michael S. Cox
Norman L. Glewwe
Kevin P. Sullivan
Clifford N. Buikema
Enc B. Linner
Caren S.Iverson
AN EQUAL OPPORTUNITY EMPlOYER
CONTRACTOR'S MATERIAL & TEST CERTIFICATE FOR ABOVEGROUND PIPING
PflOCEDURE _ - - . '
Upon mmpletlon.of work, inspection and teats shall be made bV the contractor's representative and witnessed by an owner's mpmentative. All
defects shall be carrected and system left in service Wfore wntrector'a personnel finelly leave the Job. A cettifipte shall be filled out arM signed bY both representatives. Copies sliall ba prepared for epprovinB euthorities, ownen and contractor. It is understood the owner's representative's signeture in no way prejudicea any claim against contrattor for faulty material, poor workmanship,
or feilure to wmply with approving authority's requiromenU or local ordinances. I (
v- ni. ncoa
* ? ?.
,CYo r
??f? 'dS D_ r, a-i
ACCEPTED BY APPROVING AVTHORITY(5) NAMES
MONMKRISKMM c t
ADORE55 OWYMAVIILtio
L4904EAPOM MN 554M
PLANS
INSTALLATIOrv GONFORMS TO ACCEPTED P44N5 YES F-1 NO
EpUIPMENTUSEDISAPPROVEO
IF NO
EXPLAIN DEVIATIONS .?JNES [:] NO
,
HAS PERSON IN CNARGE OF FIRE EQUIPMENT BEEN INSTRUCTED AS TO LOCATION ES Q NO
OF CONTROI VqLVES AND CARE ANO MAINTENANCE OF TMIS NEW EqUIPMENT
IF NO, EXPVIIN
INSTRUCTIONS
. HAVE CpPIES OF APPROPRIATE INSTRUCTIONS AND CARE AfVO MAINTENANCE CHA RTS YES ONO
AND NFPA 13A BEEN LEFT ON PREMISES '
IF NO, EXPLAIN '
LOCATION
OFSYSTEM suaaues eLoGS.
MAKE MODEL YEAR OF ORIFICE QUANTITV TEMPERATURE
MANUFACTUFiE SIZE RATING
C
ATZA "
,
L-
SPRINKLERS i6fp
PIPE CONFOi2M5 TO STANDARD
, YES ? NO
PIPEANU FITTINGSCONFORMTO
STANOARO . YES ONO
FITTINGS IF NO, EXPLAIN - -
ALARM D EV ICE MAXIMUM TIME l0 OPERA7E 7HROUGH 7EST PIPE
ALARM
VALVE TVPE MAKE MODEI MIN. SEC.
OR FLOW C N077
INDICATOR
DRVVALVE 00 M -
MAKE MODEL SERIALNO. MAKE MODEL 5 NO.
E WATER ALARM
TIME TO WATER AIR TRIP POIN pEACHED OPERATED
PRESSURE PRESSURE AIFt PBEDWR 7Ey70UTLET• PROPERIV
DRV PIPE MIN. SEC. P51 PSI MIN. SEC. YFS NO
OPERATING . .
TEST Without
Q.O.O.
W itn
Q.O.D.
iF no,
?
85A (LU80)
•MEASUf2E0 FROM THE TIME INSPECTOR'S TEST CONNECTION VALVE IS OPENED.
PFiINTED IN TME U.S.A. FOR NATIONAL FIRE SPRiNKLER ASSOCIATION, INC., P.O. BOX 1000, PATTERSON, N.V. 12563 ,(OVER)
QPNEUMATIC ?EIECTRIC ?HYDfiAULIC
VES LJNO
„« n iu,,
DELUGE & I5 THEKE AN ACCE55181E FACILITY IN E UIT FOR IF. NO. EXPlA1N
PREACTION ?YES ?NO
VALVES
OOESEACHCIRCVITOPERATE CIiiCUIT MAXIMVMTIMETO
MAK MODEL StWERVI51ot.ILO55AtaRM oPEqqTE OFEwiTERELFPSe
VES NO YES NO IN. SEC.
?
HVDR_STATIC: Hydrostatic tests shall be made at not lezs.then 200 Psi (13.6 bars) for two hours or 50 Psi (3.4 bars) a6ove static
pressure in excess of 150 psi (10.2 bars) tor two haurs. Differential dry-pipe valve clappers shall be left open during test to prevent dama9e.
All aboveground DiPing leakage shali be stopped.
TEST F LU HING: Flow the required rate uncil wacer iz clear as indica2ed by no collettion of foreign material in burlap bags at outle[s such as
DESCRIPTION hY rad blow?offs. Flush at flows not less Man 400 GPM (1514 L/min) for 4-inch pipe, 600 GPM (2271 Umin) tor 5-inch pipe,
750 GPM 12839 L/minl tor 6•inch pipe, 1000 GPM 13785 L/minl for 8-inch pipe, 1500 GPM (5678 L/min) tor 10inch pipe and 2000
GPM (7570 L/min) for 12-inch pipe. When supply cannot produce stiputated flow raies, obtain maximum available.
PN AT C: Establish 40 psi (2,7 bars) air pressure and measure drop whith shall not exceed 1•X psi (0.1 bare) in 24 hours. Test
pressure tan s at normal water level and air pressure and measure air pressure drop which shall not exceed 7-Y, pai (0.1 bars) in 24 hours.
ALL PIPING MYOROSTATICALLV TESTED AT Z PSI FOR: Z HRS. IF NO, STATE REASON
- ORY PIPING PNEUMATICALLY TESTEO ?YES ? NO
' EQUIPMENT OPERATESPROPERLV YE ? E?
DRAIN REAOING OF GAGE LDCATED NEAR WATER SUPPLV U P T6T PIPE OVEN W I DE
TESTS TEST STATICPRESSURE: PSI
Underground mains and lead in connections to aystem risers flushed before connection made to sprinkler piping.
VERIFIEDBVCOPYOFTMEUFpRMN0.85B XYES ?NO OTMER E%PLAIN
. FLUSNED BV INSTALIER OF UNOER-
GROUNO57RINKLERPIPING P5?VES ?NO
BLANKTESTING NUMBER VSEO ?,p?qTIONS . NVMBER REMOVEO
GASKETS
wEIDEDPIPIN YES ?NO
IF VES...
00 YOU CERTIFY AS THE SVRIfVKLER CONTRACTOP TNAT WELOING GROCEDURES GOMPLY
WITHTHEqEQUIREMENT50FATLEA5TAW5D10.9,LEVELAR-3 ?YES ?NO
DO YOU CERTIFY THAT THE WELDING WAS PERFORMED BY WELDERS QUALIFIED IN
WELDING COMPLIANCE WITH THE REQUIREMENTS OF AT LEAST AWS 010.9, LEVEL AR•3 ?ES ? NO
. OO YOU CERTIFV THAT WELDING WAS CARRIEO OUT IN COMPLIANCE WITH A
DOCUMENTED QUALITV CONTROL CROCEDVFiE TO INSVRE THAT ALL OISGS ARE
RETRIEVEO, THAT OPENINGS IN PIPING ARE SMpOTH, THAT SLAG ANO OTHER
WELOING RESIOUE ARE REMOVED, AND THAT TNE INTERNAL DIAMETERS OF ES ? NO
PIPING ARE NOT PENETRATEO
HVDRAULIC NqMEPL.qTE PqOVI0E0 IF NO, EXPIAIN
DATA
NAMEPLATE
YES ? NO
REMARKS
uni e ?cr f irv atKvlGt W l l n HLL CONTROL VAt.VES OPEN:
OF
SIGNATUR ES
TESTS WITNESSED BY
CONTRACTOR'S MATERIAL & TEST CERTIFICATE FOR HBOVEGROUND PIPING
- PROCEDURE - „_ - "- .
Upon mmpletlon.of work, inspection and teets shall be made by the contractor's representative and witneand by an owner's reprasentative,'All
.. defecta shall be corrected and rystem lett in service bafore eontrector's penonnel finally leave the job. -
A certificate shall be filled out and si9ned by bath representatives. Copies shall be prepared for approvinp authorities, owners arM contrector.
It is understood the owner s representative's signature In no way prejudicas any claim agairnt wntractor for faulty meterial, poor workmenship,
or failure to tomply with epproving authority's requirements or local ordinances.
NC1cI'?x? t?l-G-n?C+,tTAP?
APPROVING AVTHORITY(5) NAMES
IERCIAL RISK SERVICES, (NC. PLANS
INSTALLATION CDNFORMS TO ACCEPTED PLANS
EQUIPMENT USED IS APPROVEO
IF NO,EXPIAIN DEVIATIONS
F-1 NO
[:] NO
HAS PERSON IN CHqRGE OF FIRE EQUIPMENT BEEN INSTRVCTEO AS TO LOCATION YES Q NO
OF CONTROL VALVES AND CARE AND MAINTENANCE OF 4HI5 NEW EQVIPMENT
IF NO, EKPLAIN ..
INSTRUCTIONS
HAVE COPIES OF APPROPiiIATE INSTFVCTIONS AND CARE AND MAINTENANCE CHARTS VES ONO
AND NFPA 13A BEEN LEFT ON PREMISES
IF NO, EXPLAIN
LOCATION SUPPLIES aLOGS.
OFSYSTEM ??? le7 r_
MAKE MOOEI YEAROF
MANUFACTURE ORIFICE
SIZE QUANTITV TEMPERATURE
RATING
SPRINKLERS
PIPE AND
FITTINGS PIPE CONFORMS TO 1 , STANDAR? ? VES ONO
FITTINGS CONFORM TO ? . 3 STANOARD . YES 0 NO
IF NO, EXPIAIN . ,
ALARM DEV ICE MAXIMIAM T1ME 7D OPERAlE THROIIGH TEST PIPE
ALAqM
VALVE TVPE MAKE MODEL MIN. SEC.
OR fLOW ? pn A5M_ A W (j
INDICATOR
DRY VALVE Q.O D.
MAKE MODEL SERIAL NO. MAKE MODEL NO.
-
TIME TO
WATER
PRESSUflE
AIR
PRESSURE
TRIP POI
AIR URE IME WATER
. REACHED
TEST OUTLET' ALARM
OPERATED
PROPERLY
DRV PIPE MIN. SEG. ?51 PSI MIN. SEC. YES NO
OPERATING
TEST
Without Q.O.D. . . .
wirn
O.O.D.
IF NO,
-' ' ---- I'MEASURED FROM THE TIME INSPECTOR'S TEST CONNEGTION VALVE 6 OPErvEO. --?..:--' -\
QPbU) PRINTED IN THE U.S.A. FOR NATIONAL FIRE SPHINKLER ASSOCIATION, INC.. P.O. BO% 1000, PATTERSON, N.V. 12563 (OVER)
OPERATION
OPNEUMATIC ?ELECTRIC ?HYDRAULIC
PIPIIVG ED OyES ?NO OETECTINGMEDIASUPERVI QYES ?NO
IDOESVAWEOPERATE ROM?E MANUALTf31PAND/ORREMOTECONTR NS n n
DELUGE & IS THERE AN ACCE5519LE FACtLITY IN E UIT FO IF.NO, EXPLAIN
PREACTION ?YES ?NO
VALVES
. DOESEAGiCiRCUITOPERATE CIRCUIT MAXIMUM TIME TO
M MODEL SUPERVISIONLC65AlARM OPERA LEHSE OPERATERELEJtiSE
YES NO YES NO MIN. SEC.
HYDROSTATIC: Hydrostatic tests shall be made at not less than 200 Psi (13.6 bars) for two hours or 50 psi (3.4 bars) above static
pressure in exceu of 150 psi (10.2 bars) for two hours. Differential dry?pipe valve clappers shall be leh open during test to prevent damage.
All aboveground piping leakage shall be stapped. -
FLUSHING
Fl
h
i
d
TEST ow t
re
:
e requ
rete until water is clear as indicated by no collection of foreign material in burlap bags at outlets such as
DESCRIPTION hy racTnis and blowotfs. Fiush a[ flows not less than 400 GPM (1519 l/min) for 4-inch pipe, 600 GPM (2271 L/min) for 5-inch pipe, -
750 GPM (2839 L/min) for 6-inch pipe, 1000 GPM (3785 L/min) for 8-inch pipe, 1500 GPM (5678 L/min) far 70-inch pipe and 2000
GPM (7570 L/min) for 12-inch pipe. When supply cannot pioduce stipulated flow ratea,obtain maximum available.
PNEUMATIQ E
6li
h 40
i
h
il
2J 6
i
d
i
1
'
i
1 6
4 h
)
s[a
s
ps
(
ars
a
r pressure an
measure drop wh
ch s
a
not exceed
-
ars) in 2
h ps
(0.
ours. Test pressure tan s at normal water level and air pressure end measure air pressure drop whieh shall not exceed 1-'h pzi (0.7 bars) in 24 hours.
ALL PIPING HYOROSTATICALLY TESTED AT 7ClPPSI FOR -'Z--HRS. IF NO, STATE REASON
- DRY PIPING PNEUMATICALLY TESTED YES ? NO
EQUIPMENT OPERATES PROPERLY
DRAIN READING OF GAGE LACATED NEAR WATER UPPLV T@5T PIPE:. D C PR?UR2 W&H VAEVEd TEST PIPE OPEN W IDE
TESTS
TEST ??s e 3v:4 H?QYc?z.'"??'
STATICPRESSURE: PSI =yv9 t<++ o?M .??YSI
Underground mains and lead in connectiona to;ystem risers flushed before connection made to sprinkler piping.
VERIFIED BV COPV OF THE U FORM NO, 858 `??YES ? NO OTHER EXPLAIN
FLUSHEO BV INSTALLER OF VNDER-
GROUND SPRINKLER PIPING ES ?NO
BLANKTESTING
NUMBER USEO
LOCATIONS REMOVED
NUMBER
GASKETS
wELDED PIPING YES ? NO
IF VES...
DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR TNAT WELOING PROCEDURES COMPIY -
WITH THE REQUIREMENTS OF AT LEAST AWS D30.9, LEVEL AR-3 UaYES ONO
DO YOU CERTIFV THAT THE WELOING WAS PERFORMED BY WELDERS QUALIFIED IN
WELDING COMGLIANCE WITH TNE REQUIREMENTS OF AT LEAST AWS 030.9, LEVELAR-3 ES ? NO
00 YOU CERTIFY THAT WELDING WAS CARRIED OUT IN GOMPLIANCE WITH A
DOCUMENTED QUALITY CONTROL CROCEDVRE TO INSURE THAT ALL DISCS ARE
RETRIEVEO, THAT OPENINGS IN PIPING Af3E SMOOTH, THAT SLAG ANO OTHER -
?f
WELDING RESIDUE ARE REMOVED, ANO THAT THE INTERNAL DIAMETERS OF ' A74.YFS ? NO
1
"
PIPING ARE NpT PENETRATED
y
r
HYDRAUIIC NAMEPL.qTEPROVI? O IFNO,EXPLAIN . .
DATA
NAMEPIATE
YES ? NO
REMAHKS
DATE LEFT IN SERVICE WITH ALl CONTROL VALVES 07EN:
OF
SIGNATUAES I FpR
NOTES
TESTS
- ?c?
CONTRACTOR'S MATERIAL & TEST CERTIFICATE FOR ABOVEGROUND PIPING
PHOCEDURE
Upan wmple6ortof work, inspection and tasts shall ba made 6y the contractar'e representa[ive and witnessed by an owners represantatWe.All
-defectz shell be corrected and syHem left in service before contractor's personnel finally leave the job. "
A certifitate shall ha filied out and signed by both representatives. Copies shall be prepared for approving authorities, awners and contrattor.
It is undentood the owner's representative's signature in no way prejudices anV claim against wntrattor for faulty material, poor workmanship, or failure to comply with approving authority's requirementa or local ordinances. v
BV APPROVING AUTHORITY(5) NAM
IMMERCIAL RISK SERVICES, INM
PLANS
i'! I?[.'G'kL,
INSTALLATION CONFORMS TO ACCEPTED
EQUIPMENT USED IS AVPiiOV ED
IF NO, EXPLAIN OEVIATIONS
F-I NO
[:] NO
INSTRUCTIONS
HHS PERSON IN CHARGE OF FIRE EQUI
OF CONTROI V HLV ES AND CARE AND
IF NO,EXPLAIN
FiAVE COPIES OF APPROPRIATE INSTRUCTIONS AND CARE AND MAINTENANCE CFiARTS
AND NFPA 13A BEEN LEFT ON PREMISES
IF NO. EXPLAIN
LOCATION ISUPPLIESBLDGS._,_ ?
NO
vrara?cm ? ??p? !Q^'rj / tiaL
MAKE MODEL VE OF
Ml+N ACTURE ORIFICE
SIZE QUANTITY TEMPERATURE
RATING
E ?C 'I O ye-, 1 5 14
SPRINKLERS
PIPEAND
FITTINGS PIPECONF00.MST0 • STANDARD ES ED NO
FITTINGSCONFORMTO• ?? .• IJ STANDARD - YES C] NO
IF NO,EXPLAIN
ALARM DEVICE MAXIMUMTIME100PERAlETiROUGHTESTPIPE
ALARM
VALVE
TVPE
MAKE
MOOEL
MIN.
SEC.
OR FLOW C
C'rJ
,L• 5 v,(FfJ
INDICATOR
DFY VALVE a.? ?-
MqKE MODEL SERIALNO. MAKE MODEL N0.
TIMETO
WATER pRESSURE AIF
PRESSURE TRIPPOI
PJR URE ME WATER
REACHED
TESTOUTLET• ALARM
OPERATED
PROPERLV
DRYPIPE MIN. SEC. P51 P51 MIN. SEC. VES NO .
OPERATING
TEST
Without
Q.O.D.
.
.
With
Q.O.D.
IF NO,
'-?- "' - I'MEASURED FROM THE TIME INSPEGTOR'S TEST CONNECTION VALVE IS OPENED. -?
(10-80) PFINTED IN THE U:S.A. FOR NATIONAL FIRE SPRINKLER ASSOCIATION, INC., P.O. BOX 1000, PATTERSON, N.Y. 12563 (OV
PNEUMATIC ?ELECTRIC ?HYDRAULIC
vcc i itin
DELUGE & TS THERE AN ACCESSIBLE FACILITY IN E V IT FO IF, NO, EXPLAIN
PREACTION ?YES ?NO
VALVES
DOESEAf1-1CIRCVITOPERATE CIRCUIT NIAXIMUMTIMETO
M MODEL SUPERVISIIXN LOSSALARM OPERATE LEqSE OPERATERELEASE
YES NO YES NO Irv. SEC:
HVDROSTATIC: Hydroscatic tests shall be made at not less than 200 psi (13.6 bars) for two hours or 50 psi (3.4 bars) above static .
pres:ure in exceu of 150 psi (102 bars) for two hours. Differential dry-pipe valve clappers shall be leh open during test to prevent damage.
All aboveground piping leakage shall be stopped,
TEST F LUSHING: Flow the required rete until water is clear as indicated 6y no collection of foreign material in burlap bags at outlets such as
DESCRIPTION hy rants and blowoffs. Flush at flPws not less than 400 GPM (1514 L/min) for 4-inch pipe, 600 GPM (2271 L/min) for 54nch pipe, .
750 GPM (2839 L/min) for 6-inch ipe, 1000 GPM (3785 Llmin) for 8-inch pipe, 1500 GPM (5678 L/min) for 70-inch pipe and 2000
GPM (7570 L/min) for 12•inch pipe. When supply cannot produce stipuletad flow rates, obtain maximum available.
P MATIC: Establish 40 pzi i2.7 6ars1 air Dressure and measure drop which shell not exceed 1=h Psi (0.1 bars) in 24 hours. Test.
pressure tan s at normal water level and air pretsure and measure air pressure drop which shall not exceed 1-1/2 Psi (0.7 bars) in 24 hours.
ALL PIPING MVOROSTATICAILV TESTED AT ;ZOO PSI FOR HRS. IF NO. STATE REASON
' DRY PIPING PNEUMATICALLY TESTEO YES ? NO .
EQUIPMENTOPERATESPROPEfiLV VES•,OM•;:'.r_:^ %
READING OF GAGE LOCqTED NEAR WATER PPLV TEST PIPJE .R6IDUAL PR65URE WITF'I'VALYE'HV TEST PIPE OPEN W I DE
TESTS TEST I
STATICPRESSURE: PSI - 3?7'S1
5y' stem risera flushed before connection made to sprinkler piping.
Underground mains and lead in connections
to
?
f
VERIFIED BV COPV OFTNE U FORMN0.858 112YYES ?NO OTHER EXPLAIN
FLUSHED BY INSTALLER OF UNOEFi• V
r
GROUND SPRINKLER PIPING VES uNO
BLANKTESTING NUMBER VSED LOCATIONS NVMBEq REMOVE?
GASKETS
WELDEDPIPIN ?NO
IFYES...
DO VOV CERTIFY AS THE SPRINKIER CONTRACTOR THAT WELOIMG PROCEDURES COMPLV
YES ?NO
WITH THE REQUIREMENTS OF AT LEAST AWS 030.9, LEVEL AR3
WELDING DO YOV CERTIFY THAT THE WELOING WAS PEqFORMED BY WELDERS QUALIFIED IN ?p
YE$ ? NO
COMPLIANCE WITH THE REQUIREMENTS OF AT LEAST AW5 D10.9, LEVEL AR-3 (?d
/\
DO VOU CERTIFY THAT WELOING WAS CARRIED OUT IN COMPIIANCE WITM A
DOCUMENTED QUALITY CONTROL PROCEDURE TO INSVRE TNAT ALL DISGS ARE.
RETRIEVED, THAT OPENINGS IN PIPING ARE SMOOTH, THAT SLAG AND OTNER
?/
WELDINGRESIDUEAREf3EMOVEO,ANOTHATTNEINTERNALDIAMETER50F /?/{yES ?NO
PIPING ARE NOT PENETRATED ' V-
HYDRAUIIC NAMEPLATE PROV IDEO IF NJ, EXPLAIN
onrn
NAMEPIATE
YES ? NO
•_ I DATE I.EFT IN SERV ICE W ITH ALl CONTROL VALV ES OPEN:
REMARKS
OF SPqI
SIGNATURES
r11GL cf L ? p .
TESTS WITNESSEO BY
B5A BACK - ' - -
TO: PAT GEAGAN, CHIEF OF POLICE
ASSISTANT TO THE CITY ADMINISTRATOR
DALE WEGLEITNER, FIRE MARSHAL
PLUMBING INSPECTOR : DIRK HOUSE
ELECTRICAL[NSPECTOR
PUBLIC WORKS/ ENGINEERING DIVISION /UTILITIES/STREETS
GENE VANOVERBEKE, FINANCE DIItECTOR
MIKE RIDLEY, SENIOR PLANNER
GREGG HOVE, SUPERVISOR OF FORESTRY
FROM: WAYNE MILLER, BUILDIIYG INSPECTOR FILE
#2
DATE: May 18, 1999
RE: PLAN REVIEW 4300 DODD RD
Ll, Bl, STERNSJ
The _ preliminary x construction plans for Pinewood Elementary School
Add'n aze in our plan review section for your review and comment.
Please retum this form to Dale Schoeppner with your signed comments and the date of
review. If you have any concerns with these plans, please so indicate on this form and notify and
resolve these issues with the affected parties. If you aze requesting that issuance of the building
permit be held, please fill out the proper "hold" request form.
Comments:
Indicate any fees that aze to be collected with the building permit:
AMOUNT
? Yes ? No landscape security required
? Yes ? No water quality dedication
? Yes ? No pazk dedication
? Yes ? No trail dedication
? Yes ? No tree dedication
? Yes ? No
ZONING?
Signature
Date
CD/FORMS/PLAN REVIEW WAYNE M
,C II,91; ?? lc? a 1 rgl9 9
RECEIVED
04Agkso FEB 1$yt Dep ent of Administrauon
LETTER OF AGREEMENT
DELEGATION OF STATE BUILDING CODE ADNIIl4ISTRATION
FOR PUBLIC BUILDINGS - MINNESOTA STATE STATUTE 16B.61 Subd. l a
MUNICIPALITY, circle one (city, county, township)
Reid, Douglas MicfraeI +.
City of Eagan
3830 Pilot Knob Road
Eagan NIlV 55122
PROJECT: Pinewood Elementary Addition
LoCaTION: City of Eagan
COUNTY: Dakota
DESCRIPTION: Classroom Addition & Sprinklering
nnnRESS: ? 4300 Doilc!-B?ad'&-BiffleyRoad-,
,. ? - Rd.
•????+????fr??xt+xxw++w???wreww?+??+r+????n?
* ASSIGNED PROJECT NUNIBER: 19990055
**k*k?!***fekki:atfrW NkMfF*rt****fe*****:k:k:k*****k
Date: 2/9/1999
Date Received: 2/9/1999
This letter shall serve as a contractual agreement pursuant to Niinnesota Statute
16B.61 5ubd.1a, between City of Eagan :he
Commissioner of Administration for transfer of State Building Code
administration from the Minnesota Department of Administration to the
municipality for the "Public Building" or "State Licensed Facility" project
described in this agreement.
THIS AGREEMENT MUST BE RETURNED WITHIN 15 WORKING DAYS.
Buildino Cndcs and Standards Division, 408 Mctro Squarc Building. 131 7th Plaec East, St. Paul, MN 55101-2181
Voicc: 651.296.4639, Fax: 651:297.1973: TTY: 1.8(H).6273529 and ask for 296.9929
? ?? y
?,' ' "6n"so Department of Adminisuation
?i?a. •.
Project: Pinewood Elementary Addition Project #: 19990055
Description: Classroom Addition & Sprinklering
Location: City of Eagan
1. Duties of Municipality. Please check the duties you are willing to contract (a or b must be
initialed by State Building Inspector).
A a. Attend ro all aspects of State Building Code administration, including:
1. Preliminary plan review with Building Codes and Standards Division Plan
Review Staff when required by the Building Codes and Standards Division.
2. Plan Review of building and grounds with municipal plan review comments,
designers responses, aud state plan review application form signed by
designer and forwarded to t6e Building Codes and Standards Division.
3. Interpretations, application, and enforcement of all code provisions.
4. Issuance of all permits.
5. Documentation on file of all equivalences and modifications to code as
required by UBC 105 and 106.
6. Maintain all records.
7. Issuance of certificate of occupancy with a copy informing the State
Butlding Inspector when services are comple[ed.
')( b. A[tend to all required inspections of said building including:
1. Issuance of aIl permits.
2. Maintain all records.
3. Issuance of certificate of occupancy with a copy informing t6e State
Building Inspector when services are completed.
2. AI? costs of building code administration shall be as prescri6ed by Minnesota
Statute 16B.61 Subd. la.
IN WITNESS WHEREOF, the parties have caused this agreement to be duly ezecuted
intending to be bound thereby.
AP VED:
BUILDING FFICIAL /15ATI
PROVE E :
Q
MUNICIPAL 1 AG R/ADMIPiI TRAT R
APPROVED:
STATE BUILDING OFFICIAL
DATE:
DATE PaFormAG Page: 2
Building Codes und Stundards Division. 408 Metm Syu;ue BuilJing, 13 t 7th Place East, St. Paul. MN 55101-2181
Voicr. 65 I?96d639, Fux: 651?97.1973; TTY: 1.800.627.3529 an4 ask for 296.9929
-----------------
/ \
*>% **
* * * *
* * * *
?c * ? *
yc * * Ac
* * * *
?K * * *
* * * *
* ?t * *
* * * *
* * * *
* ***?K%??k:X *
* ***X?k??%? *
* * * *
* * * *
* * * *
* * A? *
* * * *
*?k* ***
C\\\\\]
C\\\\\]
.L /i a /, aze"-?- •
- .. - FXFeE F="Fi13TlE-:GTZ0N LECY'
?- ?
GOLM-F' U'9"' EE-E,:- V! F?_S Z G N
?y,.?;,?. ?F?l'? • l?'/?s ov r???'? 7 if?? /?-
/'/,?/??'?' /J/%S?o 41la10'..s /3 Th,ev 19,
*c VI K3. HF? AU"ll' 0MA Y- YC VG=' F:,: 3 Til KL E Fa W
*C "S"Y" _ F" AL,7 6_ . 1'S MY^ G P`I _ A[
*c 6i ?-15 a e6--A6.S0 *c
Xc*?cXc*XC*??C?k?**?*kc?C?Ec***?KkC*%C:k?X*:??C?C???%?kc****?:#*??Xc*:??X:X*X?*k?k?%kXC?%*?K*XCk?%??c%?*%k*?*
?C CQNTRACTCIR VIKII`IG AUTOMATIC SF'RINKLER CC7MF'AMY *
* NAME FINk"WUOD ELEMENTAFiY SCHO(JL *
* LQCATI014 4360 DODD ROAD, EAGAIY MN. *
. * SYS'iEM N0.
* CDNTFtACT h10. 6986
*
****:k%k?k?kc%?kc**?K**%?*??X?K**dck?*:k?K?*X?Xc??**:X*???K*kC?c%k*****:K%c***?k?ckCkc?k?#kckc***X?*?**
? ?'FZXrla? l IEaF_c
ar:?•-3 ?-?'n? a?-zD??..?3??;r
_.._... _.__......_.._._..---------._..._..__. _..'---._._._..__.._
IdYDFiAULIf. Dr:iIGly II`1F'UF.MA'iIUI"1 _1-!EL'T'
PIAMI= F'1PIi::W(2U;7 EL_EMEPi'YAIiY SCh{l)L''L Dia'T'E 11/7!39
LOCATIiIIY 4300 DOllU F:DAD, EaGAN MPl.
fiUILI?IMG FRLCAST CGP4C SY;>TCit 14C1. _
CUPITF{!-1CTCili '1TnTNG FiU70Nii"-i'T':f.C SF'FiIhIKLER CUMP'AI"IY Cl]hl'1'F::1CT ,•IU. 69E:36
CAI_Cl,'LA'i'LD BY i r•1RK TLMi<!iEUI_L DRA41I1`IG ND. :i OF 4
CCP`lSTRL1C1':[(]hi: ( ?CGii?US'TTL;I_L (`i,)I`IqN-C:OiiBt1STTL-;l_L CI_ZLII`IG I-IESGHT S"
[]L'C(Jk'Ftl•ICY CI_r'SS3hOOP1 ?
- -'-"---------'-"--"'-_-'__.-'-------_.__..._._..-'-'-'------....----'-------------
E !(K)1`IFF'A13 (X)L7.EiA:Z. f:ll?D. i?AZ.GP.t b( );:( )a( )ic:X.l-I(•1Z.
Y ! f 31`N='F'A 237 OI`il=l='A 231C hiGt;iii- 2-2.1 iu? Ct1RV1:"
S ! ! 7 f]'i'Hi_:F.
T i>"'r'E:I:Tf'TC RULI1iG Mi^iDl_ BY Li(iE
i=
Pi !ill'ii_i-^i 0F F,F'Iill`1KLE.it Cf'LRA'i'iOPf 1500 SYF,';fiM TY1=1:::
IllE!•i:i:LT"f•- Gfih .1 (X)WEi'( )AF^t( )IiELUGGS :I;RE:1C'iTf11Y
Ii !i=1fiLA F'ER Si'fiIl`IKLEC; 196 Si'Ril`IKi_L.li Oli NCJZZLE
E ! I-IOi>E AL_Ll?WFi14C:E: GPM-II`3s^Ti?G 0 MA<<:E RELLA£+I...;c t4UI?EL F-i
S i Ht:1::L Ftl_LOLJtaI":i=[ GPM.Ul;?'c-I_r•I_ 100 .s'.:ZE 5!2 K:-FA( Tl{i
;'.L2
I ! IiF§Cif :iF'R:CNKLF::I? rat_LOWAiy[:F 0 TEi4F•EFiii'TIJRE IiA1'I"IG 1'_55
i;
ly !
CALCULATSGI'I ! F>F'ii i'i[_CdU:Lf-':Fi:"il 210.67 F'ET fiEQUI'r"::_D :2.79 Fi'i L.t^i:r'>'L U'r Fii:ili::lti
;>UPihirli'( ! C 1=AC1U'ri L,':>I_li: C'v1=RF!LiyD 120 UI`!DLRi;Filll:l`ID 140
-- - ---......-'----._.._............_... _... _..- ---- ---........_?._....?...._........_.._._..?..._........ _..- ----..__...----._.._........-- ------°-
W!Wt1'1 C::I=: F'Lu41 '1'cS7 ! I'lJi•i;=' Di,'T A !'i AINK U1=: F:ii::SEli'+lEl j:F;
ii r. ?.J?.
!DIa1 C ?)F 1G r ? Ri`I i C.IJ i.itiF' 0 1 l'.AY'. 'J
T! T'T.Mlii: O1' TI:::,S'T' ! Ai GI'-'ii 0 ? E:L.G_V. ??
E 01 fi i:.i. (P'J'i) 73 ? I:LI_l:.Y V
F: !REslDuAL (r•EI) ;•.;,. ? 1 wELL
! f-':_C1W ( t;i'i•f ) 1950 ! ! ;'RUUF I-L.i.1W GF'M 0
,; !ELLVfa'1'IUPi ;'?IiL:I:.. ! ?
;j
p
F' !i_Q;::;a?I0;" .!... C:i:TY M^-:I1; DC1D^., & Di:LAWRl:
L !:>(llI'riC;c lJF ii'IFOiti•iF•iT:UI'i :i:l:'?"Y CtF Eil(rAI'I
Y !
-----------_....__._....----........----------------------___----.....----......--
! CCMMCliiT'T'Y CLAJS LQCraTIC3hl
C! S'T'U[iAGl= H'i. AfiEra A:CSL_L W:, UT!-!
0 !.iTORHGE MGTFiiJD:S;iLID i'ILETi I I'hILLGT 1IZlt:D 'L h:HCn ..
? i:?:::-_:?:?::::_:=-::-__,___'_____'_:_:W:::?_='_'_?'_:___'_:__`__'__''?_'_'___'_?___'_==?.W•?'__-_?___==___??=='_'_"
i`i ? . ( )SI!`IGI_c (iOiJi iC(7!`I`d'L•MTSGi`Ii1L PALLEi'( )iiUiOPiii1'?:C STURAGE( )CNCAF'SULA7E1?
! f1 ! ( )Dt)tJI:Lc R041! 7SLAVE Fr"d_LLT( )a0l_ID SilEl_'lTPiGC 7PlON-LI`IL"FPSULATED
v! H! ( )111JLT ;C='LE R[]4J t) 01='CI`I
T
0! K! FLUE S='AC1PiG: CVc:Ai?AhICE:STJFAGc 'T'l] CEIL'IhIG
R ! ! L01`lGITUDIMAL TRAhiEVti:F:S[
A
G ! ! HGRIZ`J19TAL EtARRTERS F'IiOVl'liED:
E ! !
=_'------==-----------
UI`iIi'S - DiAMETER (T!`ICH) LEi'IGiH (FDUT) FLP,W (GF'P'i) F'fiL:ia"L'RE !PSi7
?Z i?E: F? 11'?-,C 0 T'a L,.'Tg 0 9"`H--Es'h" ?0." F"U T E: Fa ?- E: ST Ev !I"-N
:X :X .,"c W `w" X V:
JUB- F'INLWOGD '-L"I_E:iMicN"!'ARY :iCl-If.1f:1L JCIB PIU 6986 Da;'1'F_ f 1/?/c;'i' F'AC;F_ 2
Fi...QWa I4'1'0 IsIJILL''11`IGm:il%$#'•'d%It;n:a%iC?X:k:?Jii?c:i<:?Y•l,?'M'M:k'k:k'.'Fic:X:?c:ic
? EDVZ - F" 71:. 1"1IC_ @,w"• (CN CO?? ? L-FEd-'fi.E:P'?? -T- r='n IRY
DCI9;;ITY X A;iEA
Q.1o9 X S5i3(7.Co = 5ao.t?G-
% OVEITiAGE = 0.45 = 6; .5i)
KMI.K;`. - 0A0
TNSI:C,'r_ HOSE;a == UAO
ni.rrSzllr HOEES = 100.00
FLG'vi Ftl_:Cd'D Fi)F'{ SiST[::.'S = :i?,Sii
FLOW (-0',T BA..`?G 0!- F,SSEFi. = 2:7.5;i
hIN FLOW AT r.rS:= OF r,::si_I;' = 0.,00
TOi'(11_ FLOW = 317.50
S.i.r- i'IL F'1?E3?i;liL - 73,00
Rk:S.T.G(.ii4L F(iiaSl.iUli!:: _ 74.00 Ft:Ii:SIDUAI... FLOW = 1050.90
FLOW i='RI:li1 CI1"Y Sll(°';>L`f A'i ':'.nPSI -4%%,'=;;i Gf'M
F'RE::.`.'.;'Ul=_C_ t=i:LM CIJn:'JL [ TC.1'AL FLOW = 77.56
ELEVri'i'T.i)!9 = 0.00 -rQ(];' _ :,,
rsO. i:tA C. Li_r+GT;-, r-AcTur; 1. Fi_ow PF r-i_nw V_Lr.icirY
i 15.600 10.1 r r'-.:`.aG).Vr. J L. ? -?
r .?
n.;, ,?,.t?n ,;1',?:Sfj r.?.n,.
. ,
.. 2.140 140 1703.00 Ct Fi ti.... 1.:9 317.50 1.96
3 8.140 140 116.00 t 0.00 0.t)5 ";" ">+c} 1.34
Aa5Ti7:i'IC'•I`1A1_ Vr=u_VI::: U:?uS, t';r, = ryi.r,,
??/!yc- .!2?
SAFETY ;iAi±:+ilY _ on
G.
F'hl:'.:ivLJi1L AV(y:Cl.ABI_I:' FOR .;`:;'>'il:N ? 7 4qF .?lsc-%??
5YS T,5?17'7 D?.s/Gi./
G&;ZSs' ?b wl .c .& = '!?! E Z /SSkj
/ 7'?'?? ? " /"s?'
;.? X/Z- - ? / ?/7T/.<!c
,Sj4100' IZ
:g?c Xc Ac Asc °w• ? J? ? ?^ 7 ?Cr ? ?? ;La ?-?9 ?'ti ? '9 - ? ? :`Va=" IFZl r-l0<L E:!F:. CO_ °.X ax DXW
JC1B- F':[IyEWUUD Ei_ C:MLl`ITF1FiY SCIiQOL JOY"• NO 6906 DF1TE 1 t!:'/i3'9 F'F`iGL 3
?X*?*?:?k;i<?<;?;?,c?;K:K%k:K?:k:z•x,??*?
- ------ *.?:Kr;:,c:a:xwkE
. ?4QTt 1 TQ
._.___._--- t?r?:;:??:?:?ac,?m?a;cr<:?;?:?:x;K;,<;z:?ii:?CM?•l'C;X%SC%F%K?F;?'IC%Kk.'%K
'-----.._._.____.__.--------'--'-"-
HYllF{LC.
Qp -----_-"'-
C. ---°---
--
EC1U7:L`.
'--------
F'iF'i-
-------"-
F'T -__'-'-----
-------------"---"-"'-------
F'T
FI':I'-°. FI_OW DIt1. F':7'iTCIG F'i'LvS. F'E. F'4' MO7E;i
FOIbIT [1T LOS:i/F LEiNG i H.`: i[]'i. F';= F'M
-
19.5(7 --------
5.1f?q ----------
()c 2.t`7 -'-------
0.42 ---?-----
1?.16 -------------___-.----?•
C?r=i- J.i9 X 1.a.rt0:iQF.
,61 C:::120 ' ",' 5.0 S.G{.) 0.00 f:- 5,820 V... 6.5:
---------- 19.60
------ 0.0977
--------
- 5.42 0.53
=
19.SU --------- --------- ---------
12.69 ---------------------
-----
I( 1()= 5,500
6G,OJ
F/
fl Gl?r
------------
E.
F
19.60 1.104 SE 2.0
c-s20 TT 5.0
19.60 0.0a7:
19.60
19.63 ;.it;•? :,E _.,,
C:n:'t 20
19.60 ...';/U;:'
20.11 i n412
C =1 : V
::9.71 4.0950
20.71
G
60.42 0
----------------
21. .> T
H
81 .81 0
c31.ot
2 d h0
---------------------
2.00 12.9b
?,0U 0.3i3
7.00 O.SQ
---------------------
t3.!)A
--------------- ------
Qn= 0.10 X 196.00SC?F-
I(= v.b: 0 V - 6.57
n 11__ 5.430
-------------------------------------------
fti.iiv" 12.i6 L7Fi= 0.10 X i96.00::CiF.
4.00 010(l) F:= 5.620 V- 5.57
20.00 I.F5
-----------------------------------------------
i{J.OO 54.1'k 14.11 K== 5.4:0 1='= 13.71
Ko/= 0.00 0.40 Vnc._OCII'Y = 7.69
1o.00 0.95 i3.7i
-----------------------------------------------
9„5:;7 14. 00 15.06 15.06 K- 5.4:.0 F'= 54.05
C-123 0 00 0,00 0.5; VI_ L_UCiTY = 8.66
.0994
--- •-- - - --- - ----.
_._.._
----5_
(??? _.
._..-1.?,9
------ -
1A.`:`-
-._------
...----3 _ -? ?;.
?`---
---- __
t.5V? 6E 4. v :_". :.?U 16.45 16.45 h- 5.430 F'- 15.52
C=1:0 1'1' 3..0 ';.
? ?i?9 C?.t)J 0..='3 VE LCCIiY = 1?.73
.1742
-- Z5.
------ 50
- -----
,
6.1r
------ ---
i5.52
----- _ _ _
,
---- ?- • ?J-
-
:?.C}4 K 12= 17.190
_
,
n
..., l,
------
-------
19.50 i.it}=t :•}E _..O 0.42 12.1-6 QA= 0.10 X 06 .00SCdF.
ri C:=12(? i'T 5,0 5,00 O.Ur3 K= 5.E20 V= 5.57
-----_.- 19.50
--------- - 0.0477
------ -
-----
-------- 5.42
----- - 0.53
-------- --
------ / /07
---------------
------
G.00 9.687 14.00 12.69 12.69 P= 0070 F'= 12.64
I C=-1201 0.00 0.00 0.05 V'cl_(7CITY = 201
19.50 0.0123
- 14.00 {).17 12.64
1y.1:' -
1.53:' ---
4)F_ --------
4.O ------
27.50 ------°---
12.86 ------ --------------
K= 5.100 f'= ------
12.85
J C=120 5T 8.4 0.00 0.00 VEI_QCIT''i = 5.64
------ -----39_Z2
- 0.044'?
------ -
----
--- :i5_50- ----f -?O
--
------- '`'/&?.?
-----°°------
------
3°-32 14.46 K 13= 50.340
3
_;7' ?? 2f
4?
L
_ ___= .._._._ __
JUB- F':[ML WOLID EL [ML•:I•I?AIiY SCHOOL J(]E{ FI(7 6936 DATE 11l7i39 F'; GL' 4
:k?kY6X<BcY?".?;;tYFYF:rYFW:K>X`X `":Y;<;x:?c:K?c:i: :k:k:#;k%8;<:;C*fiC140'T':_ 1 TO
-
HYDRLC. •-----_..-
GA --------
vzA. --.___...-----
cQur.V. --- _.__ __---
PSF'E --------
'r'T --------
P'T --....------------ -------
fiE1=. 1=LUW °C" FITTING FTGS. FL. F'L+ MO'iES
F'OTI`1T OT LUS:i; F LEI`IG'fIIS TOT. I'F F'14
19.50 ------
i.Sn4 ---------
"E 2.0 -_ ___-.------
14.42 --°-------
12.16 ---._.---- -___...___---.-•......_......____-_
CtA= 0.10 X 146.00vDF.
„ C:=1X) 2.GO O_O6'. K:= 5.620 V= 6.57
----- 19.60 ?J.t?7977
-------- ---
----•- ----16_42
-- _1_u?J
-- -
--------
----- --
/?
-------
'Z0.10 1.452 10.00 13.76 13.76 K= 5.500 F'= 13.:36
B C::=:120 0.00 Pi.,(}o 0.40 4LL_Of::I'I'Y = 7.66
--------- 39,70
------- 0.0949
--------
-------- 10.00
----------- 0.95
-------- i:3.35
-------- .il
-------------
--------
:.'0.42 5.452 14.00 14.71 14.71 h:= 5.147U F= 13.79
C G-120 0.00 0.oFi 0.92 VELOCITY = 11.64
------------ 60.12
------- 0.2046
--------
--------- 14.00
--
--- 2.07
-------- '.3.79
-------- 3 ff?j
-----
22.<::i 1.537 iiE 4,0 --
---
---
27.50 -
17.10 17.58 h= 5.500 F'= 16.63
D G=1 2{•i i i 6,0 2.00 0.00 0.95 VL I_OCITY = i i.84
-------- 32.5 5
----__.- 0.7772
-------•-
-- - 35.30 6.29 15.63
???
0.00 2,4:.'.r3 Iz.72 21.07 23.`L31 K= 17.00{} i- 21.71
i C-=Q(-) 0.00 0.00 0.16 Vf:40CITY= 4.85
32.31 0.0202 12_50 o_25 23_.71
33.3L
2.635
1::.50__
-24.12
24.12 ---------
K_ 17.1"0 F'= -------
23 48
z c=1??c? U,?,0 0.??o o.r,a vi_i...c?,?Irv
= ??,7G
--------- t
{4l
1S.?S:Ir
-------
?:?.?'.}l?:i^?
--
,{ 1?..'..o
.( I.j'i
rJ`.°A4? /?
?/?
?/:v.s
--
------
--------
5G.U2 ------
2.e35 --------
:.E b.:0 -----------
75.00 --------
<:s.zb --------
25.:6 ---
--
h= 10.340 P- 24.i6
:S L'.::::120 30.00 3.00 1.10 VELOCITY = i2.:4
216.57
r.
J.1 ?Oq i:)S.;J,9 1<.?S?t `:.'4 .16
0.00 2.615 65.:70 c;i.:'J 31.90 h:- 0.000 F'= 36.60
4 C:.-.1c,' 0.00 0.00 Kiu Vt!_ar..zTY _ 12.:=:
------------ 216.6:
-------- 0.1204
--------
------ 66.00 7.95 3$.00 .
0.(7J r
2.5;5 --
iC 5.i7 -----------
??.i)w
1, --------
45.85 ----- ---
45.?, :,.s ?- •--- -------
K::: 0.000 P- -___--_
4•;,7?-
?
4r; C==i20 7T12,O 18.00 p,oo j,10 V1=1._t_(::iT'( = 1::.:3
06.6:' 0.1204 ,"s7.00 4.46 44.75
0.00 3.260 1G i'.U 14.00 50.31 50.34 K= 0.000 P= ?'.'?.84
5 C=i^U 7,00 0.00 0.47 VLi._0(:ITY = $.32
--------- 216.67
------- 0.0427
------•--
--
-- 21.00 0.90 49.8;
-
-----
-------------
-------
0.O0 3.260 -
---
20L :.0 ___--------
:501.00 --------
51.21 -
-
51.21 K= 0.000 P= 50.74
6 C=120 540.00 0.00 0,47 `J"L•'I_UGT7Y = 8.32
06.67 0.0427 441.00 13.^03 50.74
29h.b7 - - --____._ __--'-•----_._ __.....-----
"IU.O; -------- ••--• --
K 14= 25.890
TOIi2
--------- -------
;?16.67 --------
3.260 --------
OE 7.0 -----------
11.50 --------
70.04 -------- --------------------
QA= 216.6 PT= 70.04
Tiil=:2 C=120 105.0 15.00 0.00 VELOCITY = 8 02
216.57 0.0427 26.50 i.':3
4c AX 4c AMc %V I Ih: I g" Y `Lr u"-v u.J 1- 0 P'ti u=-e "Ir "r E" F-i Y 8` 7 ?ti. L. P7 R C E) _ .°x 4c: w xc
JO;c- ('II`ILWpqD EL GMEhITARY SL"HQOL J(JLi hl(] 6986 Ur,TL t 1 i; {39 F'A GE 5
yF%?>K7kN:k:;Y:;c:k Xc;rlt?c?K%k* ??w';rXC;??,'>K>K%KW;;t;k>k*>k?:Gif(J'T'C i TO
HYDnLC.
C?F'i
DiCi. _
LCdUI'J.' ? --__.._._-
F'IP` ---------•-
f='i ------....
Pr ._......_--_---- -._.._ _??=--m
Rt=1=', FLUW 'L"" FITTII`IG Fl'G:i. F'C F'V NC:T ES
F'GTI`IT
' CT LU`aS/F LEI'IC:TI•la^ TGT. F'F F'!`I
___`__
=___ =_=_'=_ _
0.00 _______: _':
:3.025 __?_='?_=___::?:
/BJ :___-? ='= =:::
0.50 -?::-::_==___
75.17 _'_•___ ?.._
71.17 :_:?-__=_:?_:?.
h= 0.000 :.- ?.-
F'= __-;__ ?
70.54
GV C=120 10.00 0.00 0.63 YEi..QL'I?Y = 9.66
--------- 216.67
------- 0.{)613
------- 10.UOr.
--------- 1o.50 0.64 70.54
.
--
--
0.U0
4.260 -- ---------
3.()0 ---------
71.81 -------
71.81 _._
--.______
ft= L.+JUrJ _
F'= -----
71.65
HDLk C=12rJ 0.00 0.00 0.10 * YELQf:ITY = 4.37
216.57 0.016 3.00 0.03 71.65
°---_..___ _._____...
O.UG ___•---.-
4.026 -
_.______..._-.
' q: iT,
--------_
4.00
___.__...,-_.._
71.84
._.__.._..-__
71.84
-__....---.---_
I;= 0.000
_.--
P=
-------
:1:54
VHaY C=S20 L? 53.00 0.00 0.20 V"ELOC:CTY = ].415
216.6: J.+JtSti 58.GciF. 62.00 0.71 71.64
21 5. G7 --__...._--- ----- _ __.
72.79 -._ _.._..--- ----- -_ _. ---
hi 15_ 25. ---
400 -------
so:;r:
a'dc gc %YC Ac '? I tl< g 6'-tl lr? eN LJ 1- ED 11 d`u T' X 1-- ? : Q°" ft 3" tl^'J UC: 9_ E: R L: 0 _ Ac alt W %8K
JUEs-• FTry1=WUUD EI_'-L"hiCly l"AR'( SL'40UL JCE: Nr 6935 DFlTE S 1 f?lcii' F'AGI= 6
**?***?:kM??%K**%c?K**?..<?;?c***a?:Xm?W?1TCR SUF'PLY SCHEMAiIC*°itYd:K:iC:Y?F*Xc****:ic}k:k;X%K%k*%K*."n'%X;fi***:lc
--__,.._..._------°-'------'-__._--? ??•_?______-----'---'--------------------------
----------------------------
?------•-- -----
-------------------------------------------------------------?
! S'I'ATTC F'Fi"L-'S. i
i *{__ 70,000 F'SI i
i ,
! . i
! . U i
! . F' i
i _ F,
! . L ?
! . Y i
! . i
i . c i
! . U ?
R ?
! . V !
! . L !
! . F'I;CS. AVATLAEL.E !
? * C-- 77.564 F'SI !
! SAFETY riARGIIti ^
! 3.034 F',SI v . !
? SYSTE'M DEMANn--? ?K--------------* ? .-- =LDW AVA?LA:LF !
! 216.67 G PM J 100 G I' M I-I (:l:i LA . 972. 34 G I" t1 !
? s? `?.,z • 7qr.? j I ! . !
' ------------
/ ---- . ?
! IE ! T CI' AL Y7c11FiI`ID ! . !
`.: ! 74030 F'&':L A'1 ! . i
! J li ! 316.67 Gi'iy ! . !
II -------"'---'----- . ?
C RCSIDUAL FRE..-:;* !
74.000 FSI nT . !
! I D 1050.00 vF'M . !
N i
m 4456.11 GP"M * !
? f E AT 20.000 F';:>'I !
i ,r p ?
! *C-- 0000 F'SI {i:_L.L'YA'LI014)
i
i
i ?
i
!-------------------------------------- -----------------------------?
FLOW (GF'ri)
FLOW SUMMAliY
SYSTCM FL04! 21 0. Fi7 Gf-'M
OUTSTDE HQSG 100.00 GF'M
TOTRL DGMAI4D 316.6: GPM
**kcXcX?X?**:K**?KX?%c:k?C*:Kk?%kX?k??a?X?XCkcN?*%C*?C?kk??*%K?**k?:k?skN?d?k?***%C***X?:KX??K??k*?a??X?*?kkC%k**??Ckc%c?CkCkc**
s-?- _ ?• ? ia ?. ? a a-? r^? _ d'fla.r? 7
HYDfiAULIC DGSIGIN IPIFOC:MATSOM SWEET
NAME FINEWOOD ELEMEPi'iACtiY SCHOOL DATE f 1/7/89
LQCATIOh1 4300 DDI)D ROAD, EAGAM MN.
RUILDII4G S7EEL RAR JOIS'T, BEAMS & MGTAL Df-:CK SYS7CM MA. 4
COH7RACTCIR VIKIMG AUTOMATIC SPRINKLER COMPANY COM7RAC:T M0. 6986
GraGCULATED RY MRfiK TEMEtRGULL DRAWING N0. f OF 4
CONSTRIJCTIOhi: ( 7COMRUSTTBLE (X)MOhI-COMRUSTIEsLE CEILIPIG 1-IEIGHT 9'
OCGUPANCY G_ASSftt]OM - ------------------------------------_.__?__??________=---_=_????=_____=_____===
S ! (X)MFF'A13 (X)LT.i-IAZ. ORD. HAZ.GF'. ( )1( )2( )3( )EX.HAZ.
Y !( )IYFPA 231 C)h1FPA 231C FIGURF_ 2-2.1Cb) CUkVG
S ! ( ) 0'iHEft
T !( )SAECIf"TG RULIPfG MADE HY DATE
E
M ! AREA Or SPRINKLER QF'EfiATT(JI`I 1500 SYSTEH TYFC
!DENSITY- GF'M ,f (X)WETC >DRY< 7DELUGE( )F'FiEACTIDht
D !AREA F'ER SPRINKLER 196 SI'RTNKLEI", OR N(7ZZLE
E!HQSE ALLOWAI4CE GF''M-IMSIDE 0 MAKE FiEL1ARLE MODEL F-1
S ! HOSE ALLDWAI`fCC GPM-OUTSTDE 100 SIZE 5/2 K-FACT6Fi 5.62
I !fiACK SPRINKLER AL_LOWAI4CE 0 TEMF'ERATUfiE RATIPIG 555
G !
N !
CALCULATi01Y ! GFd1 kEUUIRGD?248.09 F'SI fiEOUIFiE:D'72.28 TAT^RASE (]F kIS'L-'R ^^
SUhiMARY ! C FACTDR USED : DVEFiHCAD 120 U19DEkGROUI`1D 140
----
W! W(-tTER FLQW 7rST ! F'UMF' DftTA ! TANh OFt kF_SEFtVpTR
A! DA'i'E flF 'iEST ! RATF D Co-1F' 0 ! CAF'. 0
T!TIMC OF TL'ST ! AT GP'M 0 ! ELEV. 0
E!STA7I£ fF'SI7 78 ! ELEV Q !
f; ! kESIDl1AL (PSI ) 74 ! ! WELL
! FLOW ( GF'M ) 1 O50 ! !Pf:UOF FLDW GPM 0
S !-ELEVATIUN STkECT ! !
l! i --------------------
p !
F' ! LOCR7ION : 1 6' GITY MAIIY D[JDD E DELAWf;E
L!SOURCE QF It`IFpRMATIOM :CT'T'Y QF EAGFtN
Y !
---------------------------------c-=---------------_--_____---_____________
!COMMODITY CLASS LOCATIQN
C!S'iOfiAGE HT. AR[A AISLE WTDTH
0!.S7Gf;AGE 1'rETHQD:SULTD F'TLED Y. FALLETIZED Y. RACK L
m ! ? ( )SIhIGL.E kOW( )cnNvEnTZONAL PALLET( )AUTOMATTC SZORAGE( )EhiCAF'SULATED
! R ! ( )DOUBLE FiOW( )SLAVE P'ALLET( )SULID S!•IELVTlNG( ?NQPI-ENCAPSULATED
S !. A ! ( )MULTIFLE fi0W C )OPCM
T ? C
0[ K! FLUE SPACII`iG: CLEARAMCE:STORAGE 70 CEILIIYG
Fi ! ! LOIYGITIJDINAL TRANSVERS[
A ! !
G ! ! HORIZUHTAL RAk`h'IERS f'fiOVIDED:
E ! f
------------------------------------------------------==-=----------------------
UNITS - DIAi1ETEk CIi4CN7 LEtYGTH (FOOT) FLLIW (GF'M) F'RESSURE (PSI}
**:k**?**X?:k?lc**:K:X***?*?Xtk?:ic*dc*%c?K***XC?C?C*kckC*k?*?K:k%?:I??kak?%*****?C****?*??%?CXs?K??k**********?K**
.. . F'Y Fi.EE F?EZOT?l-__UT E39^9--0Y CE31"6F?9JTEri DE:SI G9"il
WWWW WI KI NC;, AUT0MAT= G SPFZI ?KL-EF;? C? ? ??W4cW
JUH- pTMEWQqD ELEMEMTARY SCH00L JQB MO 6986 DA7E 11/7/89 PAGE &
***************************WATER FL.OWS IN70 RIJILD'ING***************************
F C? F: - F?I 1^i E:W
DEMSITY X AfiEA
o.soo x 1500.00
OVERAGE = 100.00 GF'M
RACKS
I14SIDE HDSES
OUTSIDE HOSES
DO5>
= 150. 00
= 100,00
= 0.00 = 0.00
= 500.00
FLOW RECi'D F0?'i SYSTEM =
FLOW AT EcRSE 01= RISER =
MIN FLOW A'T FfaSC OF FiISER
T(l'TAL FLOW
0.00
350.00
Sl'ATZC FRESSURL- = 78,00
kESIDUAL F'RESSUIiE = 74.00 kFSIDUAL
FLOW FROM CI7Y SllF'PLY A7 2()F'SI = 4456
FRCSSUriE FRDM CUFiYE Q 70TAL FLOW
ELEVA'iIOM = 0.00 F00'T'
Mt7. IIIA C. LEIYGTH FAL'TOf.
1 16.600 fU0 9240.00 Q H
2 8.140 140 5703.00 [} H
3 8.140 140 1:36.00 Q
ADDITIOIVAL VALVE LOSS. ETC.
SAFETY MAFiGIN
F'Y:ESSURE AVAILATiLE FI]ft SYSTEi'l
FLOW = 1050.00
GFM
= 77.47
= 0.
+ FLOW F'F FLOW V[LOCITY
0.00 0.48 350.00 0.52
0.00 5.54 354.00 2.16
0.00 0.07 250.00 1.54
= Q.flQ
=
75.38 ?? ???rn?
256,88
250.00
WWWW V_??Nr? AUT??A-rac sfi?= rN???? 00_ *C*c4c3c
JOR•- PIMEWOOD ELEMENTARY SCHODL JQE+ NO 6986 AATE 11/7J$9 PAGE ?
************************ ********REMDTE 2 TO BOSf??**?**?*#?***?*?*??******???***?
----
HYDRLC. ---------------
OA "C' ----------
ECiUIV, ---------
PIF'E ---------
F•T ----------------------=----
PT
kEF. FLOW DIA. FITTING FTGS. F'C PY NUTES
FOINT , QT LOSS/F LEPIGTWS TOT. F'F FH
. ?- --^------------
f9.60 1.104 ---------
OE 2.0 ---------
0.83 --------
i`.fb ----------------------------
QA= 0.10 X 196.00SQF.
L? C=120 1 T 5.6 5.00 0.00 K= 5.620 V= 6.57
19.60 0.0977 5.83 0.57
19.60
Gj /j2 vu x
14.87 1.104 SE 2.0
s / C=120 fT 5.0
14.87 8.8586
S
?
14.87
7.69
K 2U= 5.490
----------------------
QA= 0.10 X 148.70SL71= .
K= 5.620 V = 4.98
K 21= 5.360
??i?V f
?.?/" 1L ? j riC-? ??42 /??.?.J ?? t
14.-87 5.104 'iE 2.0 6.53 7.00 L7A= 0.10 X 148.70SOF.
C=120 1T 5.0 7.00 0.00 K= 5.620. V= 4.98
54.87 0.0586 13.83 0.81
14.87 7.81 K 22= 5.328
^ `
? /146?7 ----- /QS?;??'
.
16.80 1.104 fE 2.0 2.83
C=520 fT 5.0 7.00
16.80 0.0734 9.83
---------------------------------------
16.aU
i?
n GJW?^+6
___f--------------
ss.ao 1.104 iE 2.0
N1 C=120 1T 5.0
16.80 0,0734
------------------------------------
16.55 1.452 OE 4.0
n C=S20 9T 8.0
33.35
------------- 0.0688
---------------
0.00 5.687
C-t 20
33.35 0.0331
17.82 2.154
R C=f 20
51.17 0.0222
12.73
4.83 7.00
7.00 0.00
fi.S3 0.69
lelS: s"
6.83
7.00
f3.£i3
6.00
8.00
14.00
2,00
0.00
2.00
6.00
0.00
6.00
17.67 2.154 OE 5.0 1.25
S C=120 1T10.0 10.00
____---==T=68.84_0.038511.25
---------------------
8.94 QA= O.SO X 768.00SQF.
0.00 K= 5.620 V= 5.63
0.72
------------------------------------
9.66 K 23= 5.410
8.94 QA= 0.10 X 168.00SRF.
0.00 K= 5.620 V = 3.53
_-_? _0-_ __..----- --------?-2v ---- ---____
4.96 9.96 K= 5.320 F= 9.68
0.00 0.28 VELOL':[TY = 6.45
0.96
--------- 4,68
------ Z1ti??;
---
------
10.92 50.92 K= 0,000 P= 10.77'
0.00 4.15 VELQCITY = 4.78
0.07 10.77
--------
10.99 -------
10.49 ---------------
K= 5.450 F'= ------
50.85
0.00 0.14 VELOCSTY = 4,50
0.13
- 10.65
------- ,3)dn
---
------
-------
il.i2 1i.12 h= 5.360 F'= 10.87
0.00 0.25 VELDCSTY = 6.05
---0_43
- 10.87
-------
--------?-?-j -
------
JOB- FIN EWqDD ELEMCMTAf;Y SCH ODL JQR MO 6986 DATE 17J7/89 f-AGC -0/0
********
--
- -- -- *********Xc*Nc******kc*****REMpTC 2 'PO ?C1SR*?k?.%Xckc?K**?K*?K?**:?*?X?%cr%?k?K*?*kc:??K?*?X
-
HYDFiLC. ---------
QA -.__ _._ _._._._._.- •---_ _ _._
DIA. EQUIV. _ _ _ _ _ _--
F'IF'E ----------
PT -----
F'T ---_._._ _--------------
REF. FLOW •C' FITTIMG FTGS. PE FV kcaKNtkc:k NQ7ES
fiOIhtT OT LOSS/F LEPIGTHS TOT. PF PN
68.$4 17.55 K 24= 20.250
f0
----?`f .... .....................
f6.80 1.104 tE 2.0 $.50 E3.94 QA= 0.10 X 168.00SLIF.
C=120 ST 5.0 7.00 0.00 R= 5.620 V= 5.63
W 16.30 0.0734 15.50 1.14
-------------
-------- ---------
16.80 ----------- ------- -------- -.---------
i0.06 ----- --------
K 25= 5.290
1S
-------- --- -/W - °- /A;??_ // ---------
f9.60 1.104 OC 2.0 0.E33 52.16 QA= 0.10 X 196.oasQr-.
X C=120 1T 5.U 5.00 0.00 K= 5.620 V= 6.57
-------- 4 9. 60
--------- 0.0977
-----------
------- 5.33
-------- 0.57
----------
-----
---------------------
O.QO 1.687 OE 4.0 7.50 12.73 12.73 K= 0.000 f'= 12.68
- C=120 fT 8.0 8.00 0.00 0.05 VELDCITY = 2.£31
-------- 19.60
------- 0.0123 15.50 0.19 12.68
---------------
--
S 9. b0 ----------- ------- -------- ----------
12.92 ----- ------
K 26= 5.450
12
-------- ---? ?- ___-- ---.------------------
19.60 1.504 1C 2.0 54.83 12.16 G!A= 0.10 X 196.00SCiF.
T C=120 2.00 0.00 K= 5.620 V= 6.57
-----•--- 59.60
--------- 0.0977
-----------
------- 16.83
--------- 1.64
----------
------ / ?r
-----------------____
20.10 1.452 14.00 53.80 73.30 K= 5.440 P= 13.40
U C=120 0.00 0.00 0.40 VELDCTTY = 7.68
-------- 39,70
--------- 0.0949
-----------
-------- 14.00
-------- 1.33
-----,_--, 13.40
----- `?-
-----•?--??--?-----??-
20.99 1.687 OE 4.0 6.50 15.13 15.13 K= 5.490 F'= 14.62
W C=120 fT 8.0 8.00 0.00 0.51 VEl_OGTTY = 8.70
64.69 0.1003 14.50 1.45
-T 74.62 3IAynj
60.69 16.58 K 27= 14.900
11
---------- 3 G?.t?_
y ----- -
/ ------------------
19.60 f.104 OE 2,0 14.83 12.16 QA= 0.10 X 196.00SRF:
K C=120 fT 5.0 5.00 0.00 K= 5.620 V= 6.57
-------- 19.60
-------- 0.0977
------------
------- 14.83
-------- 1.94
----------
----- / 4*2
--- ------
20.32 1.452 14.00 14.10 14.10 K= 5.490 F= 13.70
L C=120 0.00 0.00 0.40 VELQCITY = 7.73
-------- _39_92
-- 0.0959
-------°---
------- _5 4'00
-- _1 _34
-- --- S 3.70
--•--- -----, y??-
-°------
21.21 1.687 pE 4.0 6.50 15.44 55.44 K= 5.490 F'= 14.92
M C=120 1T 8.0 8.00 0.00 0.52 VkLOGTTY = 8.77
61.13 0.1016----' ------- -14 50 7.47
------ •--- 54.92
-----
?
------- ? ??___=____
*ww=K VX9•:2 h-9G AiJiT'OMA-rlc vF'FixB`flKL.ER ?? - wwhcw
JUB- FINEWOOA El_E MEI4TAf.Y SCHOUL JOR NO 6986 DA'fE 1 S/7l89 PAGE /1¢
**?k?*X?%??k?***?kk??ckc?: ?c***???k **?c:Kkc**?cf,EMtlTE 2 TO RQSR*kc** *?c?*%c?c?k :k?X?X?k?*?ck:Xc?%s**?cx?a????**
---------
HYDKL.C. --------
RA -------
DIA. •----------
EC2UIV. --------•-
PIFE ------__--
PT -------
F'T -_--__---_____-------
REi=. FLOW 'C' FITTIHG FTGS. FG PV ?:kXc:%Xc MOTES
f'DINT QT LD5S/F LEhIG7HS TOT. F'r PN
--------- ---?
8... 12
,? '.635
14.00
f 6.97
16.91
K=y 20.260 F= 16.43
10 C=120 0.00 0.00 0.48 VELOCITY = 8,42
143_25 0.0560 14j00 0.78 16.43
-----
------------5------
_________ _
-
82.01 -------
2.632 __
-------- __
--
50.00 -----____
77.69 __
17.69 K= 20.190 F'= 16,50
11 C=f 20 O.OF? 0.00 1. 1 9' VELOCSTY = 13.27
--------- 225.26
-----•--- 0.f305
-------
---------- 10.00
--------- 1.30
--------- 16.50
-------
--------------------
22. £33 2.635 1 E 6.0 90, OU 1 8. 99 13.79 K= 5.450 F'= 17.55
12 C=120 6.00 0.00 1.44 VELOCITY = 14.59
248.09 0.1546 96.08 14.85 17.55
O.0U
3.260 ---
OE 7.0 ---------
37.00 ------
33.84
33.84
li= 0.000 F'- 33.23
12A C=120 i7f5,0 15,00 0.00 0.61 VC-1_OCITY = 9.53
--------- 248.09
-------- 0.0548
---
--
- 52.00 2.85
------ 33.23
-------
--------------------
2R8.09 -- --
------- --------- ---
36.69 h 28= 40.960
13
--------- --------
248.U9 -------
..',.2f>0 ---------- ---------
102.00 ---------
36.-69 ------- ------------_____---
C1A= 24a.0 PT= 36.69
13 C=120 0.00 0.00 V[LQCITY = 9.53
--------- 248.09
-------- 0.0543
-------
------ 102.00 5.60
------
-------
--------____---------
O.OU 3.260 ----
16E 7,0 ---------
300.00 ---
42.29 42.29 tC= 0.000 F= 41.68
14 C=520 f12.00 0.00 0.65 VELOCITY = 9.53
248:09 0.0548 412.00 22.61 41.68
0..00 -- ----
3.260 ----------
OE 7,0 ---------
11.50 ----°__-
64.90 ------
64.90
h= 0.000 P= 64.29
T01"i5 C=120 1T15.0 15.00 0.00 0.61 VEI_OCITY = 9.53
248.09 0.0548 26,50 1.43 64.29
-------------------
-------- ---------
0.00 -------
3.063 ---------- ---------
0.50 ---------
66.35 -------
66.35 -
K= 0.000 R= 65.57
GV C=12O 10.00 0.00 0.73 VCLDCTTY = 10.76
248.09 0.0737 4Q.00F. 10.50 0.77 65.57
----
--------------------
-------- --------
O.OE1 -------
4.260 ----------- ---------
3.00 ---------
67.12 ---
67.12 h= 0.400 P= 66.94
HDEF C=120 0.00 0.00 0.21 VEI_OGITY = 5.58
248.49 0.0149 3.00 0.04 66.94
-------- ------•--
0. n0 -------
4.026 ------___--
jb? iT ---------
4.00 ---------
f? f 6 -------
67.16 --------------------
K= 0.000 F'= 66.90'
VASY C=120 icv 58.00 . 0.26 VF1_ ' = 6.24
248.09 0.0196 58, OUF . 62.00 1.22 66 90 P'E= Fl7R HT OF 9.0
-- --------------------
-------- --------
248.09 ------- ----------- --------- ---------
72.28 ----- K 29= 29.180
HQSR
---?-------- 7s 36 _ 'Sl - ---------------------
??W'W VXKgNG
JUH- F'IMEWOOD ELEMF_N'fARY SCHUOL JOB Nn 6986 DATE 11/7l89 PAGL`
*****************************WATER SUF'F'LY JCIiEt1A7TC*********#****************#**
!---------------------------------------------------------------------i?----_-_
! STATIC FRES. !
! *C-- 78.000 PSI
!
! . ?
! . U i
? . P i
p' • i
? - ` i
i . Y i
i _ c i
! . U ?
i , R i
! . Y !
t . E ?
! . F'FES. AVAILABLE !
C•-- 77.481 PSI
!
i SRFETY t1AfiGTP1 ^ . 1
! 3.117 PSI v . !
? SYSTEM DEMAMD-? *--------------* * C-- FLOW AVAILABLE !
! 248.09 GF'M / 100 Gf-'M HUSE ^ . 996.33 G1='M !
i
e 72'
/ --------! !
f ------- .
E ! TOTAL DEMAI'lA ! . !
V ! 74.370 PSI AT ! . ! '
R ! 348.09 GP'M ! . !
? I U ---------------- . ?
C FESIDUAL f'FE 9.-3? !
74.000 F'SI A7 . !
D 1050.00 GPM . !
i / ry _ i
/ A
f M
/ E
/ D
/
*C-- 3.900 F'SI
(ELEVATION)
FLOW (GFM)
4456.11 GI='M•
AT 20.000 PSI
FLOW SUMMARY
SYSTEM FLOW 248.09 GPM f?
OUTSIDS HOSE 100.00 Gi'M
TOTAL DEMAI4D 348.09 GF'M
VXKaNr? AUYDMAYxC sF•R=?KL_F=R
s T_ F• C!mUe..... awsi x ra e--o _ /?f? ?3
HYDfiAULIC DESIGhE I141=0RMRTION SHEET
NAM[ FThIEWO0A ELEMEM'iAr<Y SCHOOL DATE 17/7/89
lOCA7IQN 4300 ?ODD ROAD, EAGAIY t1iN.
BUILAIhIG STCCL Bl1C< JOTS'T, RF_AMS & ME'rAL DECif SYSTEM NQ. t
CIIIYTfiACTOR VIKIhiG AUTOf1A7iC SPRINKLER COMF'APIY CONTfiACT t`tD. 6486
CALCUtAI'ED RY MARIC TEMBREULL DRAW3MG N0, 1 OF 4
COMSTfiUCTI014: ( )CUMRUSTTHLE (X)1901'1-COMLiUSTILiLE CEILIMG FIEIGHT 9'
OCCUI=AI4CY CLASSf.D(JM _ _____.___-.-----_..-----•--___________._______-------------------------
S ! (X)`IFF'A13 (X)LT.HAZ. DRD. HAZ.GF'. ( )1( )y( )3( 3EX.HAZ,
Y !( )NFF'A 231 ONFPA 231C FIGLIkE 2-2.1 (6) Cl1RVk
S ! < > 0'1'NER
T !( )SF'ECTF'IG RiJLING MADE BY Dh1TC
E
N ! AREA OF SF'RINKLEI"t OF'LfiA'iI01N 1500 SYST[M TYF'E
!DEhISITY- GF'M S (X)4JET( )DRY( )llELUGE( )PfiEACTION
D ! AI;L"A i"sER SPRINKLER 176 SPRINKLER DR NOZZLC
E!HOSE ALLQWANCE GF'M-INSIDE 0 MAKE fiCLIARLE i'fOACL F-S
S ! HOSC AI_LOWf-YPICG GPM-QU7STDl_ 100 SSZE S f2 K-FACTOR 5.62
Y!FACK SPRINKLER ALLOWAPICL 0 TEMF'ERATURE RATIPIG 155
G !
N !
__.__.--____----------------------------------------------
CALCULATIdN ! GF'hi kEl7UTfFh_'D 267.29 F'SI Fif:CdUIRF_D 77.54 F1T PASE RF fiISEfF
SUMMARY ! C FACfUI'; USCD: l7VF'RNE"AD 120 UrybERGROtJI`tD 140
-------------°--.---------.________--.-.---------__.______--._' _______._.---------------
W! WATER FLOW TI=ST ! FIJMP Df1TA . 7ANh OR fiCSERYUTR
A!DA'TE OF TEST ! kATED CAF' 0 ! CAF'. 0
T!TIME 0F Tk"S'T ! AT GPM 0 ! ELEV. 0
E !STATIC (FST) 78 ! ELEV 0 !
R !RGSIDUAL (PSI) ,74 ! ! WCLL
tFLOW (GPM) 1U50 ! ! F'f;pOF FLCIW GrM 0
S !FLEVATIDIY sTRr_e'r ! !
___________
p ?
P ! LOl:ATICIN : S b' C:[7Y Mr-lIhl ?ODD & DELAWRE
L. !SOURCE DF T14F'OFiMATI01Y :GI'1'Y OF 'cAGAII
Y !
------------------_--_-•-------______.----------•---------------------------
!COMMOAITY CLASS LDCATION
C! STOFtAGL HT. ARCA A:[SLE WZDTH
Q!STURAGE METHOD:SQLID F'ILED Y. FALLETIZED Y. FACK Y.
M
M ! ! ( )SIhlGLE RIIW( )CD1`IVeMTItlhlpL F'ALLET( )AUTOMATIC STORAGE( )ENCAF'SULp7ED
! Fi ! ( )DOUF+LE ROW( )SLAVE F'ALLCT( )SqLID ShIELVIPtG( )N014-ENCAPSULAT'ED
S!. A! ( )MUL7IF'1_.E RpW C) Qf'EIY
T ? C ! _____________?------------------•----___----------__=_____=_______===_
-------------------------------------
0! K! FLUE SFACINIG= CLEAFANCE:STORAGE 'i0 CEIIING
k ! ! LOPIGTTUDIMAL TRANSVEf:SE
A !
G ! ! HORIZON'I'AL RARRIEftS PRDVIDED:
e1 ?
--------------------------------------------------------------------------------
UHZTS - DIAMETEF CIMCH7 LEMGTH (FOOT) FLRW (GFM) FFESSURE (F'SI)
****aY**?kk??***%cNCX?k????k?%?*:k??C?*:%:X?*?C:K*:KNc*:K?C*??C?Ckcdc*kC*:k?C%C??k???#%?**?k%?N?*?k%?*?C%c:K*:%%c?:k:k**:k*
FI F,:E= F^FK:0TEG"Y-I CIM--E:9Y GOiM'fiF"LA"5?E:R m,E:SI G64
W . WWW wXKxNG AuyoHATIC SF•FZThlKLE? ??- *c*c*c*c
J09- PINEWOOD ELEMEPITAF,Y SCHQqL JOB NO 6986 DA7E 11/7/89 F'AGE 14
*:k%t*#**kC****kckcXc******:k*****WATER FLOWS IPI70 PIJIl.AI14G?kk??%k**%k:??K?k?#*?%k??k?k??k*%?*Xc%c?k?K?k*
FOiF,: - F•a h9Elx
DEMSITY X AFEA
0.100 X 5500.00
Y, OVEI:AGE = 0.79
RACKS
IMSIDE kDSES
QU7SIDC HOSES
IE3 01 II} EL_F= T'SE- 9^9-r PuWiY"
= 150.00
= 1i8.50
= 0.00
= 0.00
= 100. 00
FLOW fiEl}'D FOfi 5Y51'EM = 268.54
FLD4t AT RASE OF RISEFY = 26$.50
hiIM FLOW AT EsASL C]F RTSL"f. = 0.00
TOTAL FLDW - 36E3.50
S"FaTSC F'ftiESStJftE = 78.08
FFESSDURL F'RESSUfiE = 74.00 RESIDUAL FL04J =
FLOW FkOM CITY SUPF'LY AT 20PSI = 4456 GFM
RRESSIJRE FtiOM CUf:YE e TOTAL F1_DW =
ELEVATIOfY = 0.00 FQQT =
N0, DIA C.
1 16.600 100
2 G.140 140
3 8.140 140
ADDI7IQIYAi VALVE
SAFE'TY riAFtGIl4
PRESSURE AVAILAR
LGNGTI-I FACTOf,
9240.00 Q H
1703.00 C7 H
136.00 Cl
LOSS, ETC.
_E FQR SYSTEM
S=FA?OL-
5050.00
77.42
0.
+ FLOW f'F FLOW VEL.OCITY
0.04 0.53 368.50 0.55
0.00 1.70 368.50 2,27
0.00 0.08 268.50 f, 65
= o . oo jv 9r? , % ?%?
-
O.U?
- ?5
. S 2 G` ?S-??
DleWW* VrKXNr? AUraMAr=C sRRa?KL-CR 00_ WWWW
JOb- PINEWOOD EI_EMC197AFY SCHOOL JUF PIO 6986 DATE 1517/89 PAGE Sy
******************#*************kEMOTE 3 TO EtOSR??***????*?****?????*?***?##?*?*
---------
HYDRLC. --------
QA -------
"C' ----------
EQUIV. --------
FIP_C ---------
F'T -------
PT --------------------
kEF. FLOW DIA. FITTING FTGS. FC F'V NOTES *****
POIN7 Q7 LOSS/F LEMGTHS TOT. PF FM
--------- --------
14.87 -------
1.104 -------__
1E 2.0 _--------
1.83 ---------
7.00 --?----- ---------------___--
QA= 0.10 X 148.70SQF.
C=120 1T 5.0 7.00 0.00 K= 5.620 V= 4.48
--------- _14.87
-------- 0.0586
-------
--------- 8.83
- 0.52
------
-
-------
---------------
`
f4.87 - -------- -
-
7.52 -----
K 30= 5.420
-_-__- _________- _________ _________ _____-_ ___-_____'__________
t6.80 1.104 7E 2,0 6,17 8.94 QA= 0.10 X 168.00SQF.
C=120 f7 5.0 7.00 0.00 K= 5.620 V= 5.63
--
- 56.80 8.8734 13.17 0.97
-
-
-- ----°-
1b.80 ------- ---------- -------- --------
4.91 ------ - -
K 31_ - 5.344
d, F
-------- --------
14.a7 --------
f.f04 ----------
OE 2.0 ---------
0.5?7 ---------
7.00 ------- --------------------
QA= O.iO X 14$.70S'LI1=.
?I C=520 ST 5.0 5.00 0.00 K= 5.620 V= 4.98
-------- 44.87
-------- 0.8586
----- 5.67 0.33
-
-------
---------------------
14.87 --- ---------- --------- --------
7.33 K 32= 5.490
L
-------- --------
f8.00 --------
1.104 ----------
1E 2,0 ---------
8.58 ---------
50.26 ------- --------------------
QA= 0.10 X f80.00SQF.
-y-I C=120 iT 5.0 7.00 0.00 K= 5.620 V= 6.03
1-
------- 18.00
----
- 0.0834 15.58 1.30
-
°-----
--------------------
- -
--
18.00 -------- ---------- --------- --------
11.56 K 33= 5.290
T
-------- --------
14.87 --------
1.104 ----------
!)E 2.0 ---------
2.00 ---------
7.00 ------- -------------______--
QA= 0.10 X 148.70StiF.
A// C=120 17 5.0 5.00 0.00 K= 5.620 V= 4.98
-------- 14.87
-------- 0.0586
-----
- 7.00 0.41
-
------
--------------------
14.f37 -
- ---------- --------- --------
7.41 - K 34= 5.460
/V
-------- --------
f4.87 --------
1.704 ----------
1E 2.0 ---------
1.67 ---------
7.00 ------- --------------------
QA= 0.10 X 14$,70SQF:
Ki C=120 7T 5.0 7.00 0.00 K= 5.820 Y= 4.98
-------- 14.87
-------- 0.0586
--------
---------- 8.67
--------- 0.51
---------
------- f/w
--------------------
0.00 1.452 12.00 7.51 7.51 K= 0,000 R= 7.45
K C=120 0.00 0.00 0.06 VELOCITY = 2.87
-------- 14.87
-------- 0.0554 12.00 0.19
- 7.45
-------
--------------------
15.04 --------
1.452 ---------- ---------
9.50 --------
7.70 K= 5.420 P= 7.70
L C=120 0.00 0.00 VELOCI7Y = 5.74
29.91 0.0562 9.50 0.53
------------
______
WWWW V_ ?? MC;- AUTOMATI ? ?F=*RI r-lKLEF;: GE3_ ACICICAC
JOD- pIN EW00D EI_EMErvTARY SCHOOL JOB NO 69$6 DATE 11/7/89 PAGE 16
******** ************************REMO TE 3 TO H03R******???** ?*?****?*?****???****
--------
HYDkLC. ---------
RA -------------------
DIA. EQUIV. -------
F'IFE ----------
FT ------
FT --------------------
REF. FLOW 'C" FITTTNG FTGS. FE F'V MUTES
POIIYT RT LOSS/F LEhIGI'1-IS 70T. FF
------- PN
-----
- ------
29.y1 ------------------- ------- -----?----
8.?3 ------ ---?---------______
li 35^ 10.930
F
------- Z
- ' -----
----- --- --------
------
--------------------
14.87 5.f04 iE 2.0 10.50 7.00 RA= 0.10 X 143.70SQF.
M C=f 20 4.00 4.00 ?K= 5.620 V= 4.98
-------- 14.87
--------- 0.0586
------------------- 14.50
------- 0.85
----------
------ / /ff?
-- ------
15.07 1.452 OE 4,0 4.00 7.$5 7.85 h= 5.460 P= 7.62
H C=120 1T 8.0 8.00 0.00 0.23 YtLpCITY = 5.79
-------- 24.94
--------- 0.0563
------------------- 12.00
------- 0.68
--
- 7.62
------ --------------------
:30.R6 4.6$7 9.50 ------
-
8.53 K= 10.430 F= $.53
F C=120 0.00 0.00 VELnCITY = 8.66
-------- 60.40
--------- 0.0994
------------------- 9.50
------- 4.94 '
----------
------ ?55,
-- ------
16.40 2.154 OE 5.0 28.50 4.47 9.47 K= 5.420 F= 4.16
Q C=120 1Ti0.0 50.00 0.00 0.34 VLLOCITY = 6.75
-------- 76.80
-------- 0.0471
-------------------- 38.50
------- 1.82
---------- 9.16
------
j?
-- ------
76.80 11.29 K 36= 22.860
22
-- 6 --
-----'?i?'
^ ?7 -- --------_.____-------
14.87 1.104 5E 2.0 12.67 7.00 QA= 0.10 X 148.70SLtF,
F C=520 2.00 0.00 IC= 5.620 V= 4.93
---°--- _fA_87
-- 0?0586 _____
--°---- 14_b7 ° 0.86
----------
------_ ,
_------ /f? -------
_ 15.16 5.452 12.00 7.86 7.86 K= 5.490 F= 7.63
G C=120 0.00 0.00 0.23 VEl_OCITY = 5.81
-------- 30.03
--------- 0.0566
------------------- 12.00
------- 0..68
---------- 7.63
------
-- -?-?--------------
, 15.54 1.452 7.00 8.54 8.54 K= 5.490 F= $.Of
H C=120 0.00 0.00 0.53 VELOCITY = $.32
-------- 45.57
-------- 0.1225
-------------------- 7.00
------- 0.66
---------- 8•01
------ 3s
-- 5
9.40 h 37= 54.860
I
-------- ---c - 7
--//G---- 75 ----?----J
---- S -
------
°------------------
18.00 1.144 5E 2.0 8.58 10.26 QA= 0.10 X 180.00SCiF:
If C=120 f7 5.0 7.00 0.00 K= 5.620 V= 6.03
-^-^---- ---18.00 0.0834
-------------------- 15.58
------- 1.30
----------
------
-------1 ?------__
49.53 1.687 12.00 11.56 11.56 li= 14.860 F= 10.93
I C=120 0.00 0.00 0.63 VELOCITY = 9.63
----- --- 67.13
-------- 0.1208
----------
..
12.00 1.45 10.93
-- =f--------
19.50 ----------
2.154 hE 5.0 -------
23.50 ----------
13.01 ------
13.01 ------
K= 5.440 F'= 12.62
J C=120 .1'i10.0 10.00 0.00 0.39 VELOCITY = 7.62
86.63 0.0589 38.50 2.27 12.62 ,j %?'S
#W** wI KT Mr? AUTDHATI C SF=?FZI ?ML-eR 00- WWWW
JOH- F•IN EWOOD ELEM[MTARY SCHOOL JOR HO 6986 DATE 11/7/39 F'AGC 17
******** **&*********************REMOTE 3 TO ? OSfi??*** ****?*?****??*?*****?******
-------
NYDKLC. ---------
QA ---------------
DIra. EL7UIV. -------------
F'SFE --------
FT ------
F7 --------------------
REF. FLOW 'C' FITTII4G FTGS. F'C PV NUTES *:X***
ROIhIT. QT LOSS/F IENGTHS 707. FF F'hl
-------- ---------
86.63 --------------- ------------- --------
15.28 ------ --------------------
K 38= 22.160
21
?C
-_-_`-_
-"'_-
----°-
4yi? /l?y
(JG" _________T
------- -----
14.37 1.104 2E 2.0 13.67 7.00 QA= 0.10 X 148.70SQF.
A C=120 4.00 0.00 K= 5.620 V= 4.98
-------- 14.87
--------- 0.0586
----
- 57.67 1.04
--
------ / ??
-- ------
i5.iS -
---------
1.452 -------------
12.00 ------
8.04 8.04 K= 5.420 P= 7.81
B C=120 0.00 0.00 0.23 VELOCITY = 5.81
-------- 30.02
---°--- 0.0366
--------------- 12.00
------------- 0.68
-------- 7.81
-°--- ?
------?=-A -L -------
15.51 1.452 3.50 8.72 8.72 K= 5.420 P= 8.19
C C=120 0.00 0.00 0.53 VELOCITY = 8.87
-------- 45.53
-------- 0.1223
---------------- 3.50
------------- 0.43
-------- 8.19
------ 3
-- ------
45.5-3 9.15 K 39= f5.050
D
______^_ _____....___-________.______ ______?__?,__ _____.___ ___ !C?4_____________-.-____
i6.a0 1.104 1-E 1.4 6.17 8.94 QA= 0.90 X'f68.UUSQF.
D5 C=100 1T 3.5 5.00 0.00 K= 5.620 V= 5.63
-------- 16.80
-------- 0.1029
---------------- 1i.f7
- ----------- 1.15
--------
------ l/q?7
- -------------------
46.46 5.687 12.50 10.04 50.09 K= 15.050 F= 9.53
D C=500 0.00 0.00 0.56 VELOCITY = 9.07
-------- 63.26
-------- 0.1517
---------------- 12.50
------------- 1.90
-------- 9.53
------ -51-140
-- ------
17.61 1.687 15.50 11.99 11.99 K= 5.290 F'= 15,08
E C-fOo 0.00 0,00 0.91 VEIOCITY = 11.60
80.87 0.2390 15.50 3.71 1 1. 08
----
---------------------
-------- --------
0.00 ----------------
2.154 UE 3.5 -------------
16.50 --------
15.70 --
15.70 IC= 0.000 P'= 15.36
20A C=100 1T 7.1 7.13 0.00 0.34 VELOCITY = 7.tt
-------- 80.87
-------- 0.0727
-°
-
- 23.63
----
- 1.72
-------- 15.36
-----
---------------------
0,00 ---------
-
-
2.635 ----
----
11.00 17.42 17.42 A= 0.000 R= 17.27
20 G=100 0.00 0.00 0.15 VELOL'ITY = 4.75
-------- 80.87
-------- 0.0272
- t1.00 0.30 17.27
-
--------------------
91.45 ---------------
2.635 -------------
71.00 --------
17.72 -----
77.72 K= 22:160 p= 17.03
21 C=100 0.00 0.40 0.69 VELOCITY = t0.13
172_32 O?ff04 ft_00 1.21
- 17.03
----
------ /O -------
----____ --
94.97 `
----
------
2.635 OE 4.2 ----
----
41.90 -
--
78.93 -
18.93 K= 22.860 P= 17.26
22 C=100 tT 8.5 8.56 0.00 1.67 VELOCITY = 15.71
267.29 0.2488 49.56 12.33
----- 17.26
----- /?T- /7?0171
-- ------
-------
_ ---------
267.29 ---------------- ------------- ---
31.26 K 40= 47.850
13
WWWW VI kI NG AUyo"ATI ? ?Rr-c5 NKLEFZ CO_ WWWW
JOB- F'INEWOOD ELEMENTAkY SCHOOL JOB NO 6986 DATE 11/7/89 PAGE 1S
************************
-
- *****#**REMOTE 3 TD RQSR??****?*??? ?****?*?*?***????****
-
HYDRLC. --------
CiA -------
DIA. ----------
EL7U7V. ---------
fIF'E --------
FT --------
F'7 ----•------- ---------
fiEF, FLQW 'C' FIT7I19G FTGS. F'E F'V 140TES
POIhl7 . QT LOSS/F LEhIGTHS TOT. FF F'M
-° °
2----
b7.`9
---?---
3.?6Q
----------
---------
102.00
-------
31.26
°-------
____?_--?-
QA_ ?67.?
------?-
FT_ 35.?6
13 C=120 0.00 0.00 VELOCITY = 50.27
-------- 267.29
------°- 0.0629
-------
------- 502.00
-
- 6.42
----
--------
-----------
-°------
0.00 3.260 ---
15E 7.0 ----
---
300.00 ----
37.68 37.68 K= 0.000 P= 36.97
14 C=120 112,00 0.00 0.75 VELOCITY = 10.36
-----
- 267.29 0.0629 412.00 25.95 36.97
--
---------
-
- ---------
0.00 -------
3.260 ----------
OE 7.0 ---------
11.50 --------
63.53 --------
63.63 --------
-
IC= 0.000 F'= 52.92
TRRf C=12O fT75.0 15.00 0.00 0.71 VELOCITY = 10.26
267.29 4.0629 26.50 1.67 62.92
-
---
-------- ---------
0.00 -------
3.068 ----------
J8 ---------
0.50 -------
65.30 ---------
65.30 -------
---
K= 0.000 ------
R= 64.39
GV L"=120 10.00 0.00 0.91 VELOCITY = 11.59
_
-------- 267.29
--------- 0.0846
---- 10.00F. 10.50
- 0.89
----- 64.39
--------
-----------
---------
O.DO ---
4.260 ---------- -----
----
3.OFf ---
66.1`9 66.19 K= 0.000 F= 65.95
HDER G=12U 0.00 0.00 0.24 VELOCITY = 6.41
267 ?9 O.Ot71 3.00 0?05 65.95
-------- ---------
0.00 -------
4.026 ----------
72FF ---------
4. tl0 --------
66.24 ---°---
66.24 -----------
K= O.Oa4 --------
F'= 65.93
VRSY G=120 58.00 3.90? •.31 VELOCITY = 6.73
267.29 0.0225 58.OOF. 62.00 f. U 65.93 f-'E= FQft HT. OF 9.0
-------- --------- ---- ------ ----------- ---------
267.29 --- ---------- -- 71.54 K 45= 31.600
HOSR
-------- -- -F--s ?------ /6'/
----
---
--------
---------
?'"?? 'el-
/y-
JOB- WIMEWOOD EI_EMENTARY SCHOOL JOB NO 6986 DATE 11/7/89 F'AGE 19
******************?*********?WATER SUF'PLY SCNENA7IC**************#**#****M******
-----------------------------------------------------------------------
--------
! ----------------------------------------
----------------------------- I
! i
! STATIC F'kES. !
F *C-- 7E3.000 FSI !
? i
' . I
! . S !
? . U ?
1 . P !
i , F• ' i
! . L !
. Y i
i i
! . C !
? u !
? R ?
? y ,
? E ,
! _ . FRES. AVAILABLE !
! * C-- 77.427 PSI
!
! SAFEi'Y MAfiGIM ^ !
! 3.577 PSI v . ?
! SYSTLM UEMAI4D--) *--------------* * <-- FLDW AVAILARLE !
! 267.29 GPM / 100 GPM HOS'L-' ^ . 1071.10 GPM !
? ? 7/•??fr?S1 ? ! • '
---------------- . ?
E ! TOTAL DEMAI`lD ! . !
! / V ! 73.$50 P'SI AT! . !
k ! 367.29 GF'M ! . !
U ---------------- !
C FESSDUAL PkES.->* !
74.000 FSI AT . !
A 1050.00 GF'M . !
N . !
p
M 4456.1.1 6F14. * !
E AT 20.000 PSI
!
D i
! *C-- 3.900 PSI (LLEVATION) !
? i
i i
!----------------- -----------------------__-------------
?
FLOW (GPM)
FLOW SUHMARY
SYSTEM FLOW 267.29 GFM
OUTSIDE HOSE 100.00 GF'M
TOTAL DEMAMD 367.29 GF'M
_ __\
---------------
** *?z
* * * ?
* * * ?
* ? * *
* * * *
* * *
* * *
* * *
* *m*???*
* * *
* * *
* * * ?
* * * *
* * * *
x?** ***
_ _ _vgFZF:',
*
*
*
?
*
*
*
F-F: 0"4- CC TX0riih9 Ei Y
C?ih?G?'1.13'EF?. 1]E5'g ?h9
a
K = s- ? ?_?
^T:exa??f.•?^1I?JY??-a-R+? g f''~ 1. I"3 Wr-{ ?-0 lJ? ?Yy/??
y ,?. yr?>?
.?n?epY?.'G? ¦ yL
Yg 1 a• G =
?'M1 J Y r r 11?11 VJ, X?? - 3c
:Ac 46 i 6:3 6-4461 8(} :1K
?Dc?C=1?aK????K??K?K?cs}c?C:kc:Oc?C?c?C?C?C?:?K?=K???:?a4c
?*??K?k%?X??C?%*:K***?k*?*sOc?k%??%??%?k**%c%?XcX??C%?%?:K*XckC*kc?k?C?C*k?XcX?*k?*YFkC*?*?X?XX?a?X?*?Kk?%??X%?**?:%%?
* CONTRACTOF VIKING AU70MA7IC SF'RIMKLER COMPANY *
* NAI'iE PIMEWOOD ELEME19TAfiY SCHOOL ?
* LOCATIOH 4300 DDDD RDAD, EAGAM MIY. ?
* SYS7EM NO. S *
* COMTRACT FIO. 6986
%C***%c%?**?c:%**??k?K**M?*%?*?ic:K***?KXCX?*kcsX%c:X%?:k%?**:K*?kk?*?K?k?K*?:k?*?%k?%?:kXcYC%?*?k#**?%??K*Xc**
waKaNC;- AU70MA7=0 sF•R$NKl??
6i ?-"?'.-d:3 6--$6.a 0
HYDFAULIC DGSIGM IPfFOftiMATION SI-IEET
HAME PIryEW00D ELEMEhITARY SCHOOL DATC 1117189
LUCRTIOM 4300 DODD FDAD, EAGAN HI`I.
Rl1ILDIMG S7EEL RAF JDIST, &EAMS & METAL DEGK SYS7EM Nn. f
CONTIiACTOf; VIKII`1G AIJTOMA7IC SPRIh1nLEfi COMFAI`IY C014TRACT PlO. 6986
CALCULATED $Y MAR1< TEMBREULL DRAWING N0. f OF 4
CONSTRIJC7IOh1:( )COt113USTT81_E (X)NUN-CDMBUSTIRLE CESLII'IG HEIGHT 14'
OCCUPAMGY MECI-IANICAL kQaM
S !(X)!'IF'F'A 13 ( )LT.HFtZ. ORD.NAZ.GE'. (X)1 t 32( )3( )EX.HAZ.
Y !( )NFF'A 231 ()hIFF'A 231G FIGURF_ 2-2.1 (6) CUFVE
S !( 7qTNER
T!t )SPEL'LFIC RULiNG MADE BY DATE
E
M ! At":EA OF SF'kSl`1KLER Of•'EiiAl'IDl9 1230 SYS7EM TYF'C
lDENSITY- GfiM .16 (X)WET( )DKY( )DELUGE( )F'fiEACTIq14
D !AREA F'ER SPRT14hLER 103 SPRII`IKLER Dfi NtIZZLE
E ! HOSE Ak.LOWANCE GF'M-IhISIDC 0 MAhE CEIYTRAL NiqDEL A
S!HOSE ALLQWANGE GF'M-OUTSIDE 250 SIZC 1!2 IC-FACTOR 5.6
I ! FACK SF'kIMKLf:l2 ALLOWANCE 0 TEMF'ERATURE RATIhIG 165
G !
N !
----------------
CALCULATIL7M ! GF'M REC7UIRED 220.67 F'SI REC7UIFE:D 59.77 AT HASE OF RISEk
SUMMAf;Y ! C FACTOFi USED : OVEf,HEAD 120 UI`IDERGRUUIYD 140
---------------------------------------------------------------------.---______--
W! Wt1TECi FLOW TCST ! F'Ut11'' D(1TA ! TANK Of; fiCSERV0If1
A!DA'iE OF 7EST i RATED Cr1P 0 ! CAF. 0
T!TIML` 01= TLST ! AT GF'M 0 ! ELEV. 0
E!STATIC (PSI) 78 ! ELEV 0 !
R !RES'iDUAL (f-'SI) 74 ! ! W[LL
! FLOW ( GFM ) 1 050 ! ! PfiOQF FLOW GF'M 0
S !ELEVATI014 SiREET ! !
, 1 _______ --__ --------------------------.------
F i - ----°-----
F' !LQCATlON :16` CSTY MAIM DODD h DELAWRE
L!SOUFiCE C1F TINFOfiPfATION :CI'iY OF EAG(-`iN
Y !
--'-------- °------.--------------------------=------____________---------________
. CUi1M0DITY GLASS LOCATION
C!STOfiAGE H7. AREA AISLE WIDTH
0!STDftAGE MfTHUD:SOLID F'ILED Y. F'ALLETIZED Y. E:ACK 7_
M _________
M ! ! ( )SIMGLE ROW( )CDI4VEMTIOPfAL RALLET( )AUTOMATIC STORAGE( )ENCfiF'SULATED
! R! ()DOUBLE kOWt 3SLAVE F'ALLET( )SULID S!-IELVIMG( )MON-ENGAF'SULATEA
S A ! ( )MUL'fIFLE fi0W ( )OF'EN
T ! G
0! K! FLUE SF'ACIPIG: CLEARAMCE:SI'OFRGE TO CERIhtG
f: ! ! LONGITUDlNAL TFtANSVERSC
A ! !
G ! ! HDFtIZONTAL RAkRIERS FROYIDED:
E ! !
-------------
--------------------------------------------------------------------------------
Ut4ITS - DIAMETER (IMCH) LENG7H (FOO7') FLOW (GYM) FFESSURE (F'SI)
*XC?*****kC?C***?K:k??CXc%??Xkc%??%kC?*?Kak?*:k*?C??%A?:k*%?*kc%?Xc?%?X?**%c*?CA?Xc%C*%k%?**?k*?:9?X??X?Xc#**#**%?**?%*?*
FXFZE F?F-r0TlE:0'i`T 0N--1BY GOI'SF'LJrTEF;L E> ES2 G8`6
W*C:@C*c 'W'T IsXhBIG fiaLA'4'E3MiMaT2 C SPRS G`iKLEFi GCb _ *cw *c*c
JOB- PINEWOOD ELEMEhI7AkY SCHODL JUB IYO 6986 DATE 11/7/89 PAGE 2
**:k***Xc*kC**Xc***:k**:#*:K******WATEI'z FLQWS IINTO PUILDING#?K:kN??%??h?*??%k?k?k?k??K%c**??*?**%??
VCA F'i. - F' I 1"$ E:W
DEMSITY X AfiEA
0.160 X 1250.00
Y. QVERAGE = 0.1i
KncKs
INSID[ HOSES
OUTSIDE HOSES
FC30D ELEZ:HE-:hil-Fc%RY 5'GB-???IL
= 200.0p/?
0
? iL.l%V
= 0.00
'
= 0.00
= 250.00 ,
FLOW RECt' D FOR SYSTEM = 222.00
FLOW AT BASE OF RISER = 222,00
MIhI FLDW A7 RASC OF f.ISI=R = 0.00
TOTAL FLOW = 472.00
STATIC PRESSUfiC = 78.00
hESIDUAL PRESSUf.C = 74.00 RESIDUAL FLOW = 1050.00
FLDW FROM CITY SUFFLY AT ZUPSI = 4456 GFM
FRESSUftE FfiOM Cllh'VE @ TOTAL FLOW = 77.08
ELEVATIOIN - 0,00 FUDT = 0.
N0. DIA C.
f 16.600 100
2 8.140 140
3 8.140 140
ADDITIOMAL VALV[
SAFETY MARGIt4
FFESSUtiE AVAIGATiI
L ? S- J
1 -7;`W, .,
. ?-.
LEFiGT!-I FAGTOFt
9240.00 R H
5703.00 0 H
136.00 0
LCJSS, ETC.
_E FOR SYSTEM
f FLOW F'1= FLOW VI=LQCI7Y
0.00 0.64 472.00 0,70
0.00 2.63 472.00 2.91
0.00 0.05 222.00 1.37
= 0 00
= o.oa
= 73.SS 79
Z? %??v rf evr
WWWW wxhXNG AUYoHAraC sF•r<aNKLE:I:ZZ 00_ WWWW
JOH- PINEWOOD ELEMEMTARY SCHOOL JOR NO 6986 DATE 11/7/89 PAGE 3
********* ***#**M***#************fiEM07E 4 TO NOSft??***??*??? *?**?m?*?***?*??*?***
HYDRLC. QA `C' EQUIV. FIFE FT F'T
REF. FLOW DIA. FITTIHG F7GS. F'C F'V ***?? NOTES *?***
POIMT Q7 _ LOSS/F LEMGTHS TtlT. F'F F'N
---------
_ --------
17.28 -----------------
1.104 --------
11.92 ---------
4.52 -------- --------------------
RA= 8.16 X 508.00SQF.
A C=120 0.00 0.00 K= 5.600 V= 5.74
17.28 0.0774 11.92 0.92
----- / /;J?;7
--------------------
--------- -------
17.82 ------------------
1.452 --------
11.92 ---------
10.44 ---
10.44 K= 5.600 F'= 10.13
B C=120 0.00 0.00 0.31 VELOCITY = 6.79
35. 1 0 0.0756 11.92 0.90 1 0. 7 3
---- 17 /;G?S
--------------------
--------- -------
S8.t5 ------------------
1.452 --------
11.92 ---------
11.34 ----
11.34 K= 5.600 F'= 10.62
C C=120 0.00 0.00 0.72 VELOCITY = 10.33
--------- 53.35
------- 0.1640
--------------
- 11.92 'f .96 10.62
----
7. ,y,g?s
--------------------
19.37 --
-
1.452 OE 4.0 --------
4.00 ---------
13.30 ----
13.30 K= 5.600 P= 11.96
D C=120 fT 8.0 8.00 0.00 1.34 VELOf:ITY = 54.08
--------- 72.72
-
--- 0.2910
-------- 52.00 3.44 11.96
--------
-------------??-----
-
--
72.72 --
-------- -------- ---------
16.79 K 45= 17.750
27
r ., ? ?1 {
`.r? V ?J%?? ?Pd \ /1
. ?.C??
?
?l- ..
^JrI ??i-j
?????????'???_????v????
----------- _
. ,
57.2$ 1.104 ti.92 9.52 QA= 0.16 X f08.0090F.
A C=120 0.00 0.00 K= 5.600 V= 5.79
--------- 17.28
------- 0.0774
------------------ 11.92
-------- 0.92
---------
-------- JIV7
--- -----
17.82 1.452 11.92 10.44 10.44 K= 5.600 F'= 10.13
8 C=520 0.00 0.00 0.31 VCl013ITY = 6.79
--------- 35.10
--- 0.0756
----- f i.92 0.90 1 0. 1 3
-- .%3U(?'J?
--------------------
----
18.25 ---
----------
1.452 --------
11.92 ---------
11.34 ------
17.34 h= 5.600 F= 10.62
C C=12O 0.00 0.00 0.72 VCLDCITY = 50.33
53.35 0.1640 1 1.92 1.96 10,62
--- -- __°------------ -------- --------- ---°--- ----------- ---
19.37 1.452 OE 4.0 4.00 13.30 13.30 K= 5.600 P` - 1f.96
D C-120 17 8.0 8.00 0.00 1.34 VELDCITY = 74.08
--- 72.72 0.2450
°
- 12.00 3.49
- 11.96
-----
--
-----------?---------
------ -------
0.00 °-
-
-----------
2.635 OE 6.0 --------
1.50 --___---
16.79 -
16.79 K= 0,000 F= 16,67
25 C=120 1T12.0 12.00 0.00 O.12 VELOCITY = 4.27
--------- 72.72
------ 0.0159
---------- 13.50 0.22 16.67
----
--------------------
-
72.72 ----
---- -------- ---------
17.01 ---- K 46= 17.630
28
------------ --9 -----------------------
17.28 1.104 11.92 9.52 QA= 0.16 X 108.OOs^QF.
A C=12O 0.00 0.00 K= 5.600 V= 5.78
-------- 17.28
-------- 0.0774
------------------ 11.92
-------- 0.92
---------
-------- / lf?
-- ------
17.82 1.452 11.92 10.44 10.44 K= 5.600 F= 10.13
B C=120 0.00 0.00 0.31 VELOCITY = 6.79
.
-------- 35 .1 0
-- 0.0756 1 1. 92 0.90 10.13 yIA?i5'5
------------
???? waK X ?? ?U ?0 M?raC s?R x????? ??_ *c *c 3c W
JO&- FIHEWQOD EI_EMENTARY SCHOOL JOB MO 6986 DATE ff/7/09 PAGE 4
*******##*************** ********REHOTE 4 TO RDS???*****?**?*****?**?M*?**?***??*
---------
HYDkLC. --------
RA -------
DIA. ----------
EQUIV. ---------
F'IF'E ---------
FT -------
F'T ------- -----
REF. FLOW •C" F3TTIPIG FTGS. PE PV NUTES *?***
FIIINT QT LOSS/F LENGTHS TOT. F'F PN
----
f8.25 -------
1.452 ---------- ---------
St..92
--
-------
71.34
-------
11.34
--------------------
F:= 5.600 F'= 10.62
C C=120 0.00 0,00 0.72 VEI_OCITY = 10.33
--------- 53.35
------- 0.7690 ti.92 1.96 .
----- 10.62
------- 3
-- ------
-
19.37 -------
1.452 ----------
OE 4.0 ---------
4.00 ----
13.30 13.30 K= 5.600 F'= 11.96
D C=520 ST 8.0 8.00 0.00 1.34 V[LOCTTY = 54.08
_
--------- 72.72
-------- 0.2910
-------
---------- 12.00
--------- 3.49
--------- 11.96
------- ?i-
-------=------------
U.00 2.635 9.04 16.79 16.74 K= 0.000 P= 16.67
26 C=120 0.00 0.00 0.12 VELOCITY = 4.27
72.72 0-0159 9.00 0.74 ,
- 16.67
---
--------------------
--------- --------
73.03 -------
2.635 ----------
OE 6.0 ---------
7.50 --------
16.93 ---- IC= 17.750 P= 16.93
27 C=120 f752.0 f'L 00 0.00 VELOCITY = 8.57
145.75 0.0578 19.50 1.13
----
- 8
----------------°-
____------ --------
74.92 -------
2.635 -°_____--
2E 6.0 ---------
18.00 -----
18.06 ------ -
K= 17.630 R= 18.05
28 C=120 12.00 0.00 YELOCITY = 12.97
--------- 220.67
----- 0.7245 30.00 3.74
-----
-- fy A6'5
--------------------
---
0.00 -------
2.635 ----------
UE 6.0 ---------
21.00 ----
21.80 -----
21.80 K= 0.000 P= 20.66
29 C=120 fT12.0 12.00 0,00 1.14 VELDL'ITY = 12.97
220.67 0.1245 33.00 4.71 20.66
-------------
--
--------- --------
22O.b7 ------- ---------- --------- ---------
25.91 ------- ----
-
K 47= 43,350
30
_ __ ______ __ry _-___
2?0.67 __._' ___
3.?60 _ _______`._ ________._
36.00 _______-_
25.95 ______ _ __ ____.___
C7A- 220.6 F'T- - 25.91
30 C=120 0.00 0.00 VELOCITY = 8.43
220.67 0.0441 36.00 1.59
-------------------
-------- --------
0.00 --------
3.260 ----------
16E 7.0 ---------
300.00 ---------
27.50 ------
27.50 --
K= 0.000 F= 27.01
74 G=120 412.00 0.00 4.49 VELO(:I7Y = 8.47
----
- 220.67
-- 0.0441 412.00 18.20
-- 27.01
---------------------
--
- -
-----
0.!)0 --------
3.260 ----------
OE 7.0 ---------
f5.50 -----
-
45.70 -------
45.74 K= 0.000 P= 45.21
TOR1 C=120 f755.0 15.00 0.00 0.49 VELOCITY = 8.47
220.67 0.0441 26.54 1.17 45.21
-------- --------
0_00 --------
3.068 -?BJ ----- ---------
0.50 --------
46.87 -------
46.87 ------- ... -------
K= 0.000 F= 46.25-
GV C=120 50.00 0.00 0.62 YELOCITY = 9.57
220.67 0.0593 10.OUF. 10.50 0.62 46.25
---------------
-------- --------
0.00 ------
4.260 ----------- --------
3.00 ---------
47.49 -------
47.49 -----
K= O.OUO F'= 47.32
HDER C=120 0.00 0.00 0.17 V£LOCITY = 4.96
220.67 0.0120 3.00 0.04 47.32
-------- --------
00
0 -------
4.026 -----------
i6? ! T --------
4.00 ---------
47.53 -------
47.53 ---------------------
K= 0.000 P= 47.32
.
VASY C=f 20 1 C.u 58.00 f.,. 0.2f VEI_ CITY = 5.55
220.67 0.0158 58.OOF. 62.00 0.98 47.32 F'E= FOR I-IT. OF 25.9r
WWWW VaKs?? ?U-FaMATZC '57F-F:;aNKLCR CO_ WWWW
JOB- F'INEWOOD ELEMEHTARY SCHDDL JOLt NO 6995 DATE 11/7l89 FAGC 5
****************#***************kEM07E 4 TO BOSfi*?***&?***??***?****?**???*?****
--=-=-=--=----------------------------------=----°====___=__---_____--------=??
--------------------------------- ------------------
HYDFLC. QA DIA. EQUIV. F'IF'E PT PT
fiEF, FLOW 'C• FITTII4G F7G5. PE FV t4UTES
PQINT QT LDSS/F LEhIGTHS Tp7. FF PN
--"'---------------- - -------
-----===-==----------------------"----------
2?0.6 K 48= 28.540
. HOSR.. >
222_
---------LG'C ------- ------------------------------
.Jllir'r ??J.??- ? f-• . .
?*:4cjc' W IKXNr? aNUToM^TI C SfiRIt4KLEK' G? - 3c:*cAc*c
JOB- PIMEWOOD ELEML'MTARY SL'HOOL JOR NQ 6986 DATE 11/7/89 FAGC b
****************************#WATER SUF'F'LY SCHEMATIC******#**********************
--------- ---------------
!-------------------------------------------- ?
-------------------------
-
! i
! . S'iATlC FRES. !
! sC-- 78.000 FSI !
! . S t
? . u ?
i , p t
i _ . F ?
! . L !
! . Y ?
! . C !
E . U !
! . R i
! . y !
! . E !
! . FftES. AVAILABLE !
! * <-- 77.093 PSI !
! SAFETY MAftGIN ^ . !
! 13.753 F'SI v . !
? SYSTCM DEMAMD--> *--------------* ?c C-- FLOW AYASLAPLE !
! 220.67 GPM / 250 GPM HOSE ^ . 2578.82 GPM !
! o sq.77 G.<.l
? i ---------------- . !
E ! 7Q7AL DEMAI`ID ! . !
V ! 63.340 PST pT'! . !
k i 470.67 GPM ! . !
U ----------------- . !
! / C RESTDUAL PkES.-)* !
! ! 74.000 PSI A7 . !
D 1050.00 GPM
. !
M . !
f / p t
t1 445b.11 GPM.
i / E AT 20.000 FSI !
i .. / D i
! *C-- 11.260 FSI (ELEVA'iION) !
i i
' i
? I
r --------------------------------------------------------------------- I
FI.OW (GfiM)
FLOW SUMMAFY
SYS7Et1 FLOW 220.67 GPM 6+'r ,
?-
OUTSIDE HOSE 250.00 GPM
TOTAL DEMAND 470.67 GPM
?^?
?* **
* * z? *
* * ? *
* * ? *
? * * *
* * * *
:? * * ? ? * * *
? * * *
* *****?z? *
* * * *
? * * *
* * * *
* * * *
C\\\\\]
C\\\\\7
___ FXF<E F"F',:CA'T"EGT]C C.%N FtY C:?MF?ICJT'E*Ft nESI Gi^9
fG>?9?"?? "?" S '%?iti11?5io ,r'; o
y1c ?+c ?gc agc ?c ?1c ?1c ?C agc ?K nK ?1K ? ?c ?k: ?Fc ?c ?}c: a7c ?c: ?Ic ?ic ?C ?c: ?Fc ?1c s?c nk: ?K ?1c
=K S' ?" ? P dA? ?..6 9? , i•7i :$ hil Ha1 ? ?Fc
:@c 61 -'2 -.S346 --4 +SSO-
******** * **Yc*** *kc** * *4c * * *****kC*** * * * ** * * * ** **%c** ** %k** * * * * * ***kc* ** :k* ** Xc*
* CON7RAC7OR VIKII•IG AUTqt1ATIC SF'RI14KLER COMPAMY *
* MAME FINEWODD ELEMENTARY SCNODL *
* LOCATIOM 4300 DODD RDAD, EAGAI4 MM. *
* SYSTEM N0. 3 ?
* COtVTkACT ht0. 6986 *
:k ?K:K %? ?:K * %c * Xc %k * #:k ? %K %c %k :k kt ?t:k X ? ? X? Xt:K *:k * * * *:? * k? kc at * ?C:K ?* * * %K * %c :X ?c * * kc kc kc ?Ic ?C ?C kC kC :K k? X? * * %? ? * %? * %?
VY h? MCw AUTaMATI C SPFi:XMIOtiLE:FC
P'AU8_ , mlCWN_
6i : -r5??-?+F B4
? HYDRAULIC DESIGN INf=QhMATIOM Si-IEET
------------------------------------
NAME PINLWOQD ELEMEMTARY SCNOOL DATE S5/7/89
LOCATIOIY 4300 DODD ROAD. EAGAN MPI.
BUILDIhiG STECL RAK JOIST, REAMS & MCTAL DGC1C SYST[M NO: 3
COHTRACTOfi YTKIPIG AUTOMATTC SF'FIIYKLER C0MF'AMY CDhITF2ACT IMO. 6986
CALCULAT'CD $Y MAFiK 7Ei'fBRGULL DI"iAWING hIU. 2 OF 4
COMSTRUCTIO14:( )COMBUSTIHLE (X)NUN-COMBUSTIHLE CEILlPiG HEIGHT 26'
OCL'UF'pPtCY GYMSI`EASIUPI '
---------------------------------------------------------------------------------
S !(X)h1FF'A13 (X)LT.HAZ. pRD. MAZ.GF'.( )1( )2( )3( )EX.HAZ.
Y !t >rlFF'A 231 ()NI=PA 234G FTGURE 2-2,i(b) CURVE
S !C )07HEk
T!C )SF'EGTFIC RULIMG MADE RY DATE
E
hi !AREA DF SF'filhll<IEC. OF'EkATION 5500 SYSTEM TYI='C
lDENSITY- GF'M .1 (X)WET( 7DfiY( )DELUGC( )FFEACTION
D ! AREA F'£Fi SF'kINKLER 196 SF'kINICLECi QR N(JZZLE
E ! HOSE ALLQWAMCE GF'Pi-INSInE U MAIfE CEN7fiAL MODEL A
S!HOSE A1_LOWANCF GPM-OI.JTSIDL' 100 SIZE 1/2 K-FACTOR 5.6
I !RACK SPFfINtALI_R ALLUWANCE 0 TEt'F'EfiATIIfiE F'iA7Il'IG 165
G !
N !
_ _ _ __ ________ _._----------------------------------_ ?_._._.? ?___...__---------------
CALCULATILIM ! GF'M REL7lJIF:l=D 193.62 PSI REQUIFED 62.19 A7 RASE DF RISER
SUMMAFY ! C FACTOR USCD : UVL`FhIEAD 120 U19DEhGROUCID 140
-- ------------------------_______-----------------___----°-.--________________
W! W(-1TER FLDW TCST ! FUMF' DATA ! TAfYIC OFi RGSERYDIfi
A!DA'T'E OF TEST ! RATE? CAF' 0 ! CAF. 0
T!7IFfE DF TCST ! A'T' GF'M 0 ! ELEV. 0
E!STATSC (F'SI) 78 ! ELEV 0 !
F !kESTDUAI_ (FSI) 74 ! ! WELL
! FLC1W ( GPM ) 1 O50 ! ! FRODF FI.OW GF'M 0
S !ELCVATIUM S'iREET ! !
U i---------------•----___.___________--------,_=_= '___=?____"---=__=_==__=_
---- ----------------°------------------
p !
F' !LOCA'ilON :16" CSTY MAIhI DODD te DF_LAWR[
L!SOUR(:E DF TNF'OF;MATION :GY'T'Y UF EAGNN
Y !
! CDMMDDT'TY CLASS LOCATIDhI
C!S70RAGE HT. AfiEA AISLE WID7H
Q!STOh"AGE METHC1D:SOLID PILED Y. PALLETIZEb Y. FiACK Y.
M ????___=____-'--------------=--------------------------===--??.???___=____==___"
---------- -------- ------------
Pf ! ! ( )SIlYGLE ROW( )CUNVEMTIONAL FALLET( )AU70MATIC STDFiFaGE( )EIYCAFSULA7ED
! k! ODOUIiL£ ROWE JSLAVE Ft-1L_LET( )SOLID SHELVIHG( )NUN-EIYCAPSIJLATED
S ? A ! ( )MUL7TFLE kOW ( )OFEN
T ! C !
D! K! FLUE SF'ACING: CLEARAMCE:STURAGE TQ CEILING
k ! ! LOMGI'iUDT14AL TRAI4SVERSE
A ! !
G !_ ! HOkIZONTAL RRRRIERS F'RQVIDED:
E ! !
--------------------------------------------------------------------------------
UNITS - DIAt1ETER (IIYCH) LtI4G'iH (FODT) FLOW (GFM) FRESSURE (F'SI)
*#:%?*:X:k***?*?K?%?***%c**Xck?kc*Xckc:ica?yC?C?C*:k*%X?k?**?K?%?%X*?C*%c***Nc:K?k**?%#%?X??k???Xkc?C?C*Xc?CXc?C?C?:C??***
1= 11 it E P'FZ C3 TE0'TIa1^i--SY C 0 M F'9._9T'E_ FZ ffJ, E: SIE;- 9"9>
???W VI K:S h9G ALJi'"@-QMoATI C SF'RI TWKLEFa C0_ WWWW
JQB- PIiNEWOOD ELEMEIYTARY SCFIOOL JOA h10 6986 DA'TE 1 i/7/89 FAGE 2
******:k:k***:k****:k**********WATER fiLOWS IINTO RUILDTPfG*?k?%c?:k:%K?K?x?a%?:k:?:**:K?k:k**N?%c?:K?X?k
FCAR - F'II^4E4c
DEMSITY _ X AFiEA
0.f00 X i500.00
Y, OYERAGC = 0.30
RACIiS
IMS:(DE HOSES
OUTSID[ H(ISCS
100I} E L. E-M!E 1%R'G- AFZY' S" 01-Y 0E31It._
- 150.00
= 45.00
= 0.00 - 0.00
= 100.0?
FLOW kEQ'D FOR SYSTEM =
FLOW A'f BASE ?F f:SSER =
MTN FLOW A'i RASL` OF RTSCk
TQTAL FLOW
0.00
295.00
STATSC F'fiESSUf:E - 78.00
fiESIDUAL F'RESSl1f.E = 74.00 kESTDIJAL
FLOW FFiOM CI7Y SUF'F'LY AT 20PSI = 4456
FRtSSURE Fi;QM CURVE @ TDTAL FLOW
ELEVATIOIY = 0.00 F00T
hlf]. AIA •C`
1 16.600 100
2 8.140 140
3 8.140 140
RDDI'TTQIYAL VALVH
SAFETY MARGIM
FRESSUFiC AVAILAEs
FLOW = 1050.04
GFM
- 77.61
= 0.
t FLOW F1= FLOW VELOCITY
0.00 0.35 295.00 0.44
O.OU 1.12 295.00 1.82
0.00 0.04 595.00 5.20
- 6
0..0000 ,5,g
=
- 76.09
LEN6TI-! FACTOf.
9240.00 G H
1703.00 0 H
136.00 0
LOSS, ETC.
_E FOR SYS7EM
? i{?? 2 " ?s?iz
195. 00
195.00
Aci"X?
X/? ?/ G /. ? T7j•--'?
?-?
?-
3lc4c:K Ac r.r r r.: = a-a G AL,+ -e- ca MA'r r c:: vF?RxrqKL.. ? ? Co_ Acxcw*c
JO&- F•IN[WUOD ELEMENTAC.Y SCI-IOOL JOP NO 6986 DATE f 117/fl9 PA GE 3
*******kc******:k*****************f.
----•--------
- EMOTE 5 T O BDSR**?**:??k?X?k#??**???%??%*?kc** *%XBc?K?C***
HYDFLC. ----
. RA --------
•C" ----====
ERUIV. -=----===
PIPE -=--??????
PT =__==_?
PT ??===_=_???__ _____=_
REF. FLOW pIA. FITTIMG FTGS. PC FV NOTES
PQINT QT , LOSSIF LENGTHS TOT. F'F Fht
19.50 1.104 13.00 12.13 C7A= 0.10 X 19 5.00SOF.
E C=120 0.00 0.00 K= 5.600 V= 6.53
„ -Y--
---- ---f9_50 0.0968
--------
----°--- __'f3_00?
- ?__ 1.26
-------
-------
-------? ?
-
-------
2U.18 1.452 11.67 13.39 13.39 1C= 5.600 F'= 12.49
F C=120 0.00 0.00 0.40 VELQL'I7Y = 7.63
--------- _39_b8
-- 0.0948
--_------
--------- 11.67
--------- 1.11
---------- 12.99
------- ?
?
----- y--.v_'S
-------
, 20.64 1.452 11.67 14.50 14.50 K= 5.600 F'= 73.58
G C=120 0.00 0.00 0.92 YELpCITY = fS.b$
--------
?
b0.3?
-------- 0.2059
--------
--------- 11.67
--------- 2.40
---------- 13.58
------- 3 y?
--
------
21.83 1.452 OE 4.0 22.00 16.90 16.90 K= 5.600 P= 15.19
H C=120 iT 8.0 8.00 0.00 1.71 VELOCITY = 15.91
-------- 82.15
-------- 0.3646
--------
--
-- 30.00 10.94 i5.59
- l? br-75
--
82.15 --
--- --------- ----------
27.84 -----
- --
K SU= 55.570 --
--
51
.?`____'
_ n
`C?Lv?N?i //3?L!?J^ _ U
__ __'_'_?_____
__ ?,dGJls- ?.____
__._--__
19.50 1.452 OE 4.0 22.00 12.13 QA= 0.10 X 14 5.0090F.
C=120 1T 8.U 8.00 0.00 K= 5.600 Y= 3.78
Z 19
SO 0
0254 30
00 0.'76
-- --^
_ _
_
_
--------- ---
_
_ Y
---------
------- ?
--- --?-----
-------
i9.S0 12.89 K 51= 5.430
52
-------- ---'--- --- ---- ----------.'"-- -------
49.50 1.104 13.00 12.13 CtA= 0.10 X 19 5,00SQF,
E C-120 0.00 0,04 K= 5.600 V= 6.53
-------- 19.50
-------- 0.0968
------- -
--------- 13.00
-------- - 1.25
----------
------- ?
-------? ?--------
20.18 1.452 11.67 13.39 13.34 K= 5.600 F= 12.99
F C=120 0.00 0.40 0.40 VELpCITY = 7.68
-------- _39_6$
-- _0_0948- -------'- --`i1_b7 1.11
-------- 12.99
-------
?h'Gs
-------------
-------
20.64 1.452 15.67 14.50 14.50 K= 5.600 P= 13,58
G C=120 0.00 0.00 0.92 VELQL'ITY = 11,6$
-------- 60.32
-------- 0.2059
------- -
--------- 11.67
-------- - 2.40
-------- -- 13.58
------ - 3?S
-------------
-------"
21.83 1.452 OE 4.0 22.00 56.90 16.90 K= 5.600 P= 15,19
H C=i20 1T 8.0 8.00 0.00 1.71 VELOCITY = 15.95
,.
-------- E3?.f5
----?--- 0.3646
------
-
-- 30.00 10.94 15.14
¢/?5
0.00 -
2.635 ---
^--- --------°
14.67 ---------
27.84 -------
27.84 ---°
--
IC= 0.000 F= -------
27.68
50 C=120 0.00 0.00 0.16 VELQCITY = 4.83
°__°---- 82.55
-----°° 0.0200
°----- _
------ 14.67 0.29 27.68
-
-
----
82.58
2.635 --- ------°-
14.67 ----------
28.13 ------- -------
--
--
K= 75.570 P= ---
2£3,13
Si C=120 0.00 0.00 VELOCITY = 9.68
164.73 0.0725 14_67 1.06 ???
_
---"- --------- -
??____-"----------------
---------
---------
---------
- - -----
-
---------------------
----------------- ---------
_______
W:KWilc 'tr'= KI HF, AuT'o1'fiaA'rI C SF'F:.a 1"9K1.._ER Cn_ WWWW
JUH- PINEWOUD ELEMEhITAFY SCI100L JOA NO 6986 DpTE 11/7/89 FAGk. 4
*********%c*********%K*#**%:kC******REMOTE 5 70 BOSR?N?*****?Kk??:?Xc?K*?XNt%c???c?CMc?c*?X:.Kk??K?K?*
--=-=-=---------------------------=»=_____
------------------- __=_?___=____`?----__---------------
------ ---------------
HYDFLC. QA DTA. EQUYV. PIF'E F'T FT
REF. FLOW 'C' FITTING FTGS. F'E FV hUTES
FOIMT
- Q7 LOSS/F LEMGTHS Tq7. F'f FM
-- -----------------
28.II9 2.535 -------
-----
-------
23.00
----------
29.19
-----
29.19
---------------------
K- 5.430 F= 28.35
52 C=120 0.00 0.00 0.88 VELOCITY = 1f.38
------- 193.62 0.0977
-----------------
----------- 23.00
°------ 2.25
---------- 28.3f
-----
-------------`5-------
0.00 2.635 3E 6.0 35.00 31.44 3f.44 K= 0.000 P= 30.56
53 C=120 1Tf2.0 30.00 0.00 0.88 VELD('.ITY = 11.3E3
------- f93.62 0.0977
-----------------
--------- 65.09
-- 6.36
---
-- 30.56
-----
---------------------
0.00 2.635 ---
SE 6,0 -----
13.00 -----
37.80 37.80 K= 0.000 P= 36.92
54 C=120 1Tf2.0 58.00 0.00 0.88 VLLOCITY = 11.3E3
------ f93.62 0.0977
--------------
--
--
-
- 31.00 3.03
-- 36.92
-----
---------------------
--
9. t)0 2.633 --
--
----
2E 6.0 --------
37.00 --------
40.83 40.33 K= 0.000 P= 39.95
SS C=120 ST12.0 24,00 0.00 0.88 VELOCITY = S1,33
------- 193.62 0.0977
-----------------
-- 6f.00 5.47 39.95
-
------
-
-
193.62 ---------- ------- ----------
46.80 ---- --------
---
--
K 52= 28.300
TOR3
------- -----------------
193.62 2.635 -----------
OE 6.0 --------
11,50 ----------
45.80 ----- ---------------------
C1A= 593.5 PT= 46.80
TOR3 C=120 fT12.0 52.00 0.00 VELOCITY = ff.39
193.62 0.0977 23.50 2.30
------- ----------------- ----------- -------- ---------- ----- ---------------------
0.00 2.469 0.50 49.10 49.50 K= 0.000 F'= 47.96
GV C=120 7.00 0.00 1.14 VELOL'ITY = 52.96
------ 193.62 0.f342
------------------ 7.OUF.
------- 7.50 1.0f
- 47.96
------
---------------------
0.00 4.260 ---- --------
5.00 --------
50.17 50.11 h= 0.000 F= 49.98
HDEti C=520 0.00 0.00 0.13 VELDCITY = 4.35
193.62 0.0094 5.00 0.05 49.48
------- -----------------
0.00 4.026 -----------
)g` j'' --------
4.00 ----------
50.16 -----
50.16 ---------------------
K= 0.000 F'= 50.00
Vf-tSY C=520 ??? 58.00 15 'b 0.16 VEI_OGITY = 4.87
_ 193.62 0.0124 58.OOF. 62.00 0.77 50.00 (L= FOR H7.
----------
i93.62
, ----------- -------- ---'------
?.f4 ----
?
-------------------
K 53= 24.550
ROSR
/y'S a)GPr?-i f'`
9'
`
s? 7?=?
'?
------ _
--- _
-
-
-
-- -------- -
-- ---- ---------------------
=?
,
:K WW*c 'A.+t I @C I M C:; AUT 0M A'4" I 0 S' F• RI HKL E rt G O_ ? ? :*Cw
JO$- PIhf[WOOD ELEMENTARY SCHOOL JOR M(J 69II6 DATE 1117189 F'AGE 5
*****************************WATER SUF'P'LY SCNEMATTC*:K*:K************:k*****Xc*tK**%c*
1_-____________________________' j
---------------^-------"-"_-------____
.
I ?
! STA7IC FRES. !
! *C-- . 78.000 F'SI ?
! . I
t , u ?
p ?
I . . F ?
i _ L i
t . Y !
{ i
! • . C !
! . . U i
i _ R ?
! v !
i , E i
! . . pkES. AVAILAbLE !
C-- 77.625 F'SI !
! SAFETY MARGIN ^ . !
! 13.921 F'SI v . !
? SYSTEM DEMAhfD--3 ?--------------* * C-- FLqW AVAILABLE !
!
! 193.62 GPM / 1 00 GPM HOSE ^ . 2090.53 GPM
6v • 19/&i ? ! - •
? i ---------------- ?
! f E ! 7DTAL UEMA!`ID ! . . !
V ! 63.700 F'SI A'T! . !
k ! 293.62 GPM ! . !
U ---------------- !
C f.ESIDUAL F'ftES.->* !
74.000 PSI A'i
D 1050.00 GPM . !
!4 . !
A . !
M 4456.11 GPM
* !
I / E AT 20.000 PSI !
D '
! *C-- 1i.260 PSI (ELEVA7IDN)
!
i i
i i
l---------------------------------------------°-----------------------!
FLOW (GPM)
FLOW SUMMARY
SYSTEM FLOW 193.62 GPM ?
OUTSIDE HOSE 700.00 GPM TOTAL DE11AhID 293.62 GPM
.
SYECIFICATIONS
OPERATING
Operating Temperature:
Sensor: -50F Lo +1220F (-20)C to +500C)
Monitor: -50F to *1220F (-200C to +500C)
Response Time:
Vapor sensor: 30 seconds max.
L.iquid sensor: 30 seconds max.
Recover Time:
Vapor sensor: 1 minute max.
Liquid sensor: 1 minute max.
Alarm Delay Time: Immediate or 3'.5 hours
(can be bypassed)
Sensor Life:
Vapor sensor: 2 years min.
Liquid sensor: 2 years min.
Effecta of Liquid Immersion:
Vapor sensor: No damage
Liquid sensor: Activatea alarm
Max. Wire Distance: 500 ft. using 18 AWG
(monitor to sensor)
Control Unit
12409 CUUNT ROAD 11 ?.
BURNSVILLE. N 55337 -p1
(612)890 868 ?r=`'_. ?
ED ? REVISE. RJESU8MIT I I I 'it ED ? REJECTEj ? -
DATED BY
7,
.trac[ rs aDProval of shon dra•.ving cr sampies
' rpli e tM1e subcontracto, :or any O eaiion frOm
(.±T t5 Of th° COnIfdCl tlOCJmR?.s
pility ipr errors or omtssions. inrW<ling siies.
- :105. J antilies or locations.
Alarm Horn
? Alarm and
?Malfunction
? Indicators
Sensor
Inputs
Double-Wall Application Single-Wall Application '
(Sensor well shown)
. VaporSensor
.
\
t
-- - '
` ,
r =
$
' %
1 3lutd Senaor 1
Vapor
ensor i
?
' Groundwater !
Leref ,.
LiqWd Sensor "
V
?'?Petro Vlend 6900 Santa Fe Drive • Hodgkins, IL 80525-9909 • Phone (312) 485-4200
Telex: 27-0040 • Fax: (312) 485-7137
PHYSICAL
Power Requirement: 115i 220 Vuc. 60 VA. 60 Hz
Dimensions:
Monltor: 81h" h x 6'/a" d
Liquid sensor: Yx" dia. x 1112" long
Vapor sensor: %" dia. x 1'/" long
(14 ft. of lead wire is attached to all sensors)
Weight: 7 Ib.
Equipment Clasaification:
Liquid or Vapor Sensors: Intrinsically saFe for
Class I, Div. 1, Groups C& D*
Monitor: General Purpose
•As defined by the 9ational F.lectric Cude and UL listed'_'+RI
NOTE: Preliminary information.
Subject to engineering improvements
and/or other changes. All trade names
are copyrighted. Patents pending.
?
l
Form N. 60-6898 PSENT-2 0 1989. PETRO VEND, INC. 0 PetrpVend
0 MAOE IN U.S.A. (9)
petrovene PETROSENTRYTM
24-HOUR MONITORING FOR LEAKING
UNDERGROUND STORAGE TANKS
Leaking underground storage tanks have recently
been identified as potential sources for both soil and
groundwater contamination. Local, state and federal
agencies have taken action to help reduce possible
environmental damage by legislating tough new
guidelines regarding the installation, location and
monitoring of underground storage tanks.
To help facilities comply with current pollution
control measures, Petro Vend is introducing the
Petroaentry Tank I.eak Detection System. This low-
cost, low maintenance instrument can detect gasoline
and other light hydrocarbon vapors that can leak
from underground storage systems. A liquid sensor is
also available to detect the presence of liquid buildup.
The instrument is comprised of long-life, solid-state,
vapor and liquid sensors, which are connected to a
centrally located monitoring and alarm module. The
sensors can be located up to 500 feet from the
monitor. Placed in bore holes around the perimeter of
the tanks, pipelines or between the tank's walls, the
sensors continuously monitor for vapor or liquid
presence. Signals are then sent back to the alarm
module.
Q
e::?....
?
? ,.
?•a•u-aa;'?',::.:
FEATURES
¦ Interfaces with Petrosonic III.
¦ Simple setup and operation. No
complex procedures or calibration
equipment are necessary.
¦ Background interferents (such as
methane) cancelled during setup.
¦ Long-life, solid-state sensors that
are not degraded by high vapor
concentrations or liquid
submersion.
¦ Intrinsically safe sensors for
Class I, Division 1, Groups C&D, as
defined by the National Electrical
Code. UL liated.
¦ Maintenance is reduced to a
simple sensitivity check. (Expose
the vapor sensor to hydrocarbon
vapors and check its response.)
¦ Relays are standard for remote
alarm and remote trouble.
¦ Audible and visual alarms
provided with front panel test
button. Iliscrete LEDs inside the
unit provide indication of which
sensor has caused the alarm or
trouble.
¦ Built-in time delay to prevent
false alarms.
¦ Up to 8 liquid sensors, 4 vapor
sensors, or a combination of the
two types may be used with the
alarm module.
PETROSONIC ffi" , l
Tank Gauging Systems . ?
? MP_8SIIPP.Cf1PClt • Petrosonic converts height of product to temperature
Capabi I ities corrected volume.
"
. Measures levels to a resolution of .001
and volume to a resolution
of .1 gallon in a 10,000 gallon tank.
• Accurately determines delivery quantities automatically.
• The immersed sensors will take 3 or more temperature readings and
then calculate an average temperature for that tank.
• Water level at the bottom ot tank is measured to the nearest 1/10"
and detects the presence of as little as 2/10" of water.
Alarms • 7 flag alerts can be set and are fully programmable:
Low Fuel Level, High Fuel Level, High Water Level, Leaks,
Hardware Failure, Theft and External Input.
• Continuous leak detection even during station hours.
• User can program what constitutes a leak depending on his tank size.
• Theft alarm is activated after station is closed. Theft determination is
programmable by user.
t
Reports
• A series of delivery, theft, leakage and inventory reports can print
automatically or be programmed to print at preset times.
• An optional 212A modem is also available for remote data retrieval and
can be connected to a CRT or a standard line printer.
• Optional 40 column plain paper printer reports levels, times of alarms,
dates of deliveries, etc.
• A total of 25 of each of the 7 unique reports are held in memory until
I cleared or updated.
Specifications Typical Installation
, ,NOOORs
imensions: ELROSONiG
Co..AO,
Width 18° (45.7 cm), ouTOOOes
Height 15" (38.1 cm), a °
Depth 5" (12.7 cm).
Power Requirements: GaoUNo-?.L
Less than 25 watts.
MOBE
inoici*ou
WI.TERLEVEI
NpICF?OX
NOte.
ALL TRADE NAMES ARE COPYRIGHTED. PATENTS PENDING.
Subject to engineering improvements and/or other changes.
DiStflbUtOd By: - Form No. 80-6379PSI11 CP4 01988, PETIIO VEND, INC.
PETROSONIC a
?
Tank Gauging Systems
12409 COUNTY ROAD ti
?i,y? a+. BURNSVILLE. MN 55337
(141 CONiP
(672)890-4868
j ,-, :':1;REVIEWED ? REVISE, RESUBMIT
! ? ?'REVIEWED ? REJECTED
i ? ?AS NOTED
? S;:?rfot+a?C.I?nc `=GHEGKEG BY DATEO BY
Tne?Conlracto?s a rO '- • ? ppVai GI s11op;Grag5 01 5ample5
s0all noi relfEVe the suCCOntracto? `ar anywindev?aUO:r from
me requinmanubt tr,e contract docuaen,, ncr from ?ne..
., / MSponSiDiliry for errors
dim or cmissi6ns. inclutling srzes. '
-.( ensinns. quamities or locatiDns. II
??.
The Petrosonic" III watches over your
tanks 24 hours'a day even when your
operation is 'iclosed. TF?e system
generates automatically or,upQn request
accurate,reports on fue4,levels;,volume
of produbt-(-t&?pet-ature corrected),
ullage, deliveries, water levels, leaks
and theft. Its several alarms can alert
managementito a quick;loss of product,
leaks, high;water, lowiproduct level,
overfills ancl other emergency details.
The Petrosonic III can be polled by
most central camputers for generating
Slie-detailed reports-vuhi?.h-are?essential
to today's petroleum marketers and
fleet operations.
- , -- -
- = ?: -
• Each Petrosonic Control
Cabinet can handle up
to 8 probes.
• The probes are electrically
isolated from the tank.
• Standard and custom
probes available for various
size tanks.
(
l
• 24 character LCD display
gives on-site data and
easy-to-foilow instructions
for programming.
Petrosonic III can instantly display or print status
" '. of any tank on demand.
TELEX: 27-0040 r ` ' : _ .• : ` -: -¦ /`?? PETHO VEND, INC -: ;
FAX: (312) 485-7137 •?'Pe?? ?ICIIfl 6900 Santa Fe Drive
Hodgkins, IL 60525 9909
(312) 485-4200
Manhoies and Fill Boxes
Ai 06 Containment
Manholes
4"
Model No.
t
od
una
eal
rain
alve
rain
Hose
Made especially for large capacity
applications. Emco Wheaton's A106
Containment Manholes can hold up
to 26 gallons of liquid. Special buna
seai clamps securely around fill pipe
assuring tight seal.
Available in 2 sizes, with or wilhout
drain assembly which returns captured
product to underground tank via a
3/<' drain hose.
--Materials - -^•-- " ?` ' "
Lid: Cast Iron
Body: Cast Iron & Fabricated Steel
Seal: Buna N & Viton
Drain Ass'y.: 8rass
Clamp: Steel
Drain
Dimension A Dimension B
A106-001 26 gal.
A106-002 20.89 gal.
A717 Manhole
yes 16"
no 16"
The A717 manhole provides access to
the underground tank from the dnve
surface and offers drive-over traffic
protection. Wide body design allows for
setGing or shifting of the underground
tank without damage to the concrete or
piping, and also permits fast coupling
for product drops. Easy-0pening
manhole cover is diamond treaded,
heavy dury cast iron. Also available with
Part. No. 408914 checkered steel lid.
Individually boxed for easy shipping
and storage. '
T
B
32" 1251bs.
24" 1001bs.
Model No. Size (I.D.) Weight A B
A717-019 10" 361bs. 11" 6'h"
A717-022 12" 561bs. 13" 12"
Materials
Body: Galvanized Steel Lid: Cast Iron
14
Accessories (order separetely)
491044: Centenng Brecket
y.
T.
Overfi/1 Prevention Valve
? oPw s1-so
The OP W 61-SO overfill prevention
valve is designed to be a simple, low
cost solution to positive shut-off of
product fiil for underground storage
tanks. The shut-off valve is an integral
part of the 4" drop tube used for
submerged fiiling. No extensive or
expensive excavation is required. The
OPW 61-SO can easily be retrofit into
existing locations. No special manhoies
are required. Insialling the OPW 61-SO
is as simple as changing drop tubes.
The OPW 61-SO is a two stage shut-
off valve. When liquid level rises to ..
level A the valve mechanism is released
and the valve closes automatically
with the flow. This reduces the flow
rete to approximately 5 gpm through
a bypass valve. The operator may
then stop the filling process, discon-
nect and drain the delivery hose. As
long as the liquid level exceeds A, the
valve will close automatically each
time delivery is attempted.
If the storage tank is overfilled to an
unsafe condition and the liquid rises
to level B, the bypass valve closes.
No additional liquid will flow into the
tank untii the level drops below a
reset point.
Feafures:
¦ Simple,easyandquickinstailation - no
excavation or special manholes required.
¦ Economical - costsafractionofexpensive,
complicated and difficult to install valves.
¦ Completelyautomaticoperation-nopre-
checks to perform, no resets, no overrides to
be broken or abused.
¦ Works at all flow rates- operates directly from
liquid level.
¦ Will accept a dipstick for gauging.
¦ Retrofits directly - for existing tanks and 4"
riser"pipes.
¦ Automatichosedrain-f6roperatorcon-
venience. „ • _
.--- / -- _- - - ----
Actuating Hoat _ ' . : - .. .
-_,
? ? ':•-., '"._ ......__ .."- -- -- ----.._
?-_ - ,
? 1 .. .
ef?
P
ositive
; , . . ..
ShubOft Valve
OPW 1
? Spill Container
°c°?°0 °? _..- >XE 0 o°
Patent No.4,667,711
Other patents pending
The OPW 61-SO is furnished with complete
instructions and hardware tor field or shop
assembly.
For complete assembly and installation
instructions, refer to C-3557-PA.
Materlals
Valve body: cast aluminum
Float: nitrile rubber, ciosed cell foam
Valve: aluminum
Seals: viton
Upper and Lower Drop Tube: aluminum
Engineering Data
Maximum bury depth: 5 feet
Maximum tank diameter. 8 feet
SIZE:4" 61-SO-4000 WT.:151bs.
? 3Yi',min.
LEVEL"[
LEVEL
/ 8'/i', min.
6" o17iL locaUnderground Tank, typical
?
19 ?-
PLUMBING, HEATING, COOLING o RESIDENTIAL, COMMERCIAL, INDUSTRIAI•LICENSEDANDBONDEDTHROUGHOUTMINNESOTA
(612) 4543095
(612) 880.4868
?L.
?cy4?ICAi C NtR710?S\
TO: CITY OF EAGAN
3530 PILOT KNOB ROAD
EAGAN. MN. 55122
GENTLEMEN:
WE ARE SENDING YOU $R Attached
? Shop drawings ? Prints
? Copy of letter ? Change order
12409 COUNTY ROAD 11, BUHNSVIILE, MINNESOTA 55937
ISLSTIl EInl D1F tl WQl1VSI1V11MQIS
OATE 9/25/89 JOBNO.
ATTENTION
CITY FIRE MARSHALL
RE:
PINEWOOD EI.EMENTARY SCHOOL I.S.D. #196
DODD ROAD AIdD HACKMORE DRIVE
? Underseparatecovervia_
? Plans ? Samples
?
following items:
? Specifications
COPIES DATE NO. DESCRIPTION
1 6,000 GALLON FUEL OIL TANK INSTALLATION DATA AND APPROVALS
FROM STATE FIRE MARSHALLS OFFICE
F-
I
THESE ARE TRANSMITTED as checked below:
? Forapproval ? Approved as submitted ? Resubmit copies for approval
? Foryouruse ? Approved as noted ? Submit copies for distribution
? Asrequested ? Returned for corrections ? Return corrected prints
? For review and comment ? FOR INSTALLATION PERMIT
? FOR BIDS DUE 19- ? PRINTS RETURNED AFTER LOAN TO US
REMARKS ANY QUESTIONS PLEASE CALL.
COPY TO
SIGNED:
ED KLAMM JR. OPE ONS MANAGER
llenelwures ere noraa nofa$ klntlly noHryus at onee.
WHITE: OrigineVCustomer PINK: FIIB
N
?o
-V
124o9r.ourair-"v'u
'vMti 55,337
RNSNLLE
0 . .
BU
89U-.t2f,F
t
^
o,c1 .
(6
.1
k41 w
-Q FiEVIEVlED ? REVIS[. RESt,`BMiT
? RE-V!EW[D ? RGJECTED
r,:, MO TED
r?jcC5 EO 8V DATC-D 6Y ??
s
C . / . _ 7_1'?
_
ltip (:a•.ti]r,b:.y :..??„ ?:.i ,r ;bp:•.piw:.??; .,r s?iu:ilPS
1"? l1f V 7?r ?:OOI
hr1l lb? ) ? 1
"
l. 1! 4 I
il l? . 0 I.1
Ih ?] ?:'; ? OI I? , r .
.
pnb i l?. n nnni i Ir nn Iht;
i
:?.p??r!:Ihi?ly f-.?r n?-.?rs' ies.
nr nm.?:;ions. m6ludmy s
(! vnk?lclpn5. Q?:3??I?IinS GI IU! •f??U?15?-l-
P,•:iNWpy covERS•.
SYMBOL IDENTIFICATION
) D.
• OO 4"NPTMonitorlVent(oN£ WJFLF?,DiP57icIt. MoNt'roR) Q LiftLug
QQ 22" Uiameter Manway wilh 3 lillings in each wver (ouE To PiOq Hold down strap Iocation4etaFianerV)
NqVE LA?DE?? ?oN? ro ?IRVE'?svs?er? c"?
(A,)1 FL E . PiPs-ricY:-- iIER4, NOTES
p DuftEx DedBLE Flr-nN 2-4" NP'r Teo H WRLt_ FirrirJ 5 RcKoss F oaA E«F 0714E?
(r?) I- LI 11 !f PT TFFQbix9 WALL FITTig4
F TNi M N?R? TD NhJE ca?eBo?l sTEEc. ?-qneEK
i IS MArJu1A !o AJE "SyST.Er.Q C'I (ADPE St}/AP W STJD Q)d !{SS •
SEPARA-rE DWCl.
? FPP Not_DDownl s-r pps PRoJiDEp Fo EAcH -rAoK oN s STEM e
CUSTOPAERG RI C,S mC DEST ?ATIEN &0METHOD tj
RECOMMENDEDSERVICE ?£TRo?EVM P o?UCT
NO. REVISION DATE
XERXES CORPORATION
,i S Enl
ri
S FT. 6,000 GAL.
DOUBLE WALL Z
Specification:
The contractor shall provide
Fiberglass Reinforced Plas-
tic (FRP) U.L. labeled under-
ground storage tanks as
shown on the drawings.
Sizes and fittings shall be as
shown. The tanks shall be
Century-Cast'" Tanks as
manufactured by XERXES
CORPORATION.
Tanks shall be tested and
installed with pea gravel or
crushed stone as specified
in the current installation
instructions provided with the
tank.
1. e it..: 11 !, s:";1`??VK•f/;J?',.as.
- n
LI!Yi;'JJJH I.E. ju.J SL.:67
-lli 1'^? ag(?.-1.-('' .
? RF_V:SC-. ?'?E.i:!Bhb7
CJ FU
NOTE.
I - iANK, MANMAY, GASKET [ COVEH BY %EH%E5.
2- SUHP 6 GROMMETS BY OTMERS, SUPPLIED BY %ERXES
OF OUi510E EOUIFMENi MANUFACTUHER.
3- FIELO CUTTING B ASSEMBLY BY OiMERS.
4 - ALL PIPING BY OTHERS.
5- OGlIONAL S1U0 HING SEGMENTS SUVPLIED BY %ERXES
IIPON ONDER.
6- SUMP GOVEF OPENINGS APE EITHEN 72- DIA. OR 30- DIA.
SPECIFY OIAMETEP NNEN PLAC/NG ONOEN. .
SEALING GROMHET
-'-
SINGLE NALL GIPIN?
GHONHEi
71MARY AIVING
?SELONOARY PIGING
. / .,.....,..._E _..iKEi
.?S`(S'TEM C r;
IM11CLUt>?> S'T"I)
1? injy f?SS-/ .
4 REOUIRED)
I
. R
? SECT[ON 15600
U[YDERGROUND FUEL TANK SYSTEM
? PART1-GENERAL
? 1.1 WORK INCLUDED
p+• Complete underground fuel tank system as noted on drawings and
? specified herein.
B. Associated piping and equipment.
? 1•z RELAT_ E
A. Section 15010: General provisions
? B. Section 15050: Testing and Balancing
C. Section 15060: Piping materials and Methods
? D. Section 15105: Excavation and Backfilling
E• Section 15110: Valves
:
F. Section 15605: Fuel Handling System
1.3 REFERENCE STANDARDS
A. ASTM $pecification D4021-81: Glass Fiher Reinforced Polyester
Underground Petroleum Storage Tanks
B. Factory Mutual File 7.1.OK6AF.A5.
C. General Services Administration, Public Building Service
Specification, PBS: 1568 Guide
D. Military Specification MIL-T-52777q, Dated July 6, 1978, Tanks, Storage,
Underground, Glass Fiber Reinforced Plastic.
E. National Fire Protection Association NFPA 30 Flammable and
Combustible Liquids Code and NFpq 31 Standards for Installation of Oil
Burning Equipment
F. National Sanitation Foundation Testing Laboratory, 7anuary 1984, Listing
of Piastic System Components and Related Materials, Standard 15.
G. Underwriters Laboratories, Inc. UL 1316 Glass Fiber Reinforced Plastic
Underground Storage Tanksfor Petroleum Products.
43744
15600-1
_?t-
PART. 2 - PRODUCTS
2.1 ACCEPTABLE MANUFACTURERS
A. Tanks and Accessories: Owens-Corning Fiberglas Corporation, Xerxes.
2.2 GENERAL
A. Provide glass fiber reinforced 360 degree double-walled polyester
underground tank. Tank shall be non-contaminating to the product stored
and be capable of storing liquids with specific gravity up to 1.1 Tank shall
be chemically inert to petroleum products.
B. Manufacturer shall warrant to the Owner:
1. The tank will be free from defects in materials and workmanship for
a period of one yeaz following the date of original delivery by the
manufacturer.
2. The tank will not fail due to external corrosion for a period of 30
years from date of original purchase.
3. The tank will not fail due to internal corrosion, provided the tank is
used solely for storing fuel oil at temperatures not to exceed 150° F.
at the tank interior surface.
4. The tank will not leak due to structural failure for a period of 30
years from date of original purchase, provided the tank installation
is performed and validated by a contractor trained and certified by
the manufacturer and the tank is used as stated above. Structural
failure shall be defined as breakage or collapse. Contractor shall be
certified 6y the tank manufacturer and shall furnish certification to
the Owner that the tank was installed according to the
manufacturer's recommendations.
C. Provide striker plates under all tank openings, and UL certification plates
affixed to the tank.
2.3 LOADING CONDITIONS
A. Tank shall meet the following design criteria.
1. External hydrostatic pressure. Buried in ground with 7 feet of
overburden over the top of the tank, the hole fuily flooded and a
safety factor of 5 to 1 against general buckling.
2. Surface loads: When installed according to manufacturer's
installation instructions, tanks shall withstand surface H-20 aale
loads(32,D00 Ibs./axle).
3. Internal load: Primary tank and annular space shall withstand
pressure test of 5 psig on tanks of 4 foot through 10 foot diameters,
resulting in a 5 to 1 safety factor.
43744 15600-2
4. Tanks shall.be designed to suppoct accessory.equipment such as
heating coils, ladders, drop tubes, etc. when installed according to
manufacturer's recommendations and limitations.
2.4 PRODUCT STORAGE REQUIREMENTS
A. All primary tanks m ust be vented. Tanks shall be designed for operation
at atmospheric pressure only, except for use with vapor recovery systems
at a pressure or vacuum of approximately 1 psig.
B. Annular Space: Tank shall have a space between the primary and
secondary shell wails to allow for the free flow and containment of all
leaked product from the primary tank.
C. Tank shall be designed to provide monitoring capability as noted:
1. Accessibility to the tank bottom between the primary and secondary
walls at both ends of the tank. Tanks shall have one 4 inch NPT
fitting lxated at each end of the tank.
2. The following continuous monitoring conditions shall be compatible
with the cavity between the inner and outer tank:
a. Vented to atmosphere.
b. Sealed tank cavity
c. Vacuum - 3 inches mercury maximum (1.5 psig maximum)
d. Positive air pressure (3 psig maximum)
e. Hydrostatic pressure - 7 foot maximum head pressure over tank
top.
2.5 TANK ACCESSORIES
A. Accessories and fittings to the storage tank shall meet the following
criteria. All accessories shall be installed 6y the manufacturer or in
accordance with the manufacturer's instructions unless otherwise stated in
these specifications.
1. Certification Piate - Underwriters' Laboratory Label and Factory
Mutual Label shalt be permanently affixed to each tank.
2. Anchor Straps - Provide glass fiber-reinforced plastic anchor straps
for eaeh tank shown. Number and location of straps shall be as
specified by manufacturer. Each strap shall he capable of
withstanding the buoyancy load for tank diameter as shown.
4 foot p- 4,200 lbs. 8 foot p- 25,000 lbs.
6 foot Q- 18,000 lbs. 10 foot Q- 32,000 ibs.
Straps shall be standard as supplied by the tank manufacturer.
43744
15600-3
3. Flanged.Manways
a. Provide one (1) 22 inch standard flanged manway with each tank
of 2,500 gallon or more capacity.
b. All manways shall be furnished complete with U.L. listed
gaskets, bolts, interface ring, and covers.
c. Provide manway risers 48 inches in diameter and 42 inches high .
to provide access to the manway lid. A 24 inch x 24 inch
galvanized street box with cover must be provided by ?
contractor for ai-grade instailation. '
d. Provide fiberglass manway exrension tubes 24 inches long for
the manways as required.
e. For tanks of 2,500 gallon capacity or more, each standard steel
manway cover shall have three 4 inch NPT fittings welded in
place at 120 degrees spacing. The 22 inch manway cover
fittings shall be on an 8 inch radius from center of cover to
centerline fitting.
f. Manway access shali be through piping sump specified elsewhere
in this section.
4. Fill Tubes
a. Tubes shall be aluminum.
b. Tubes shall be factory installed, 4 inch diameter, and shall
include a 6 inch steel fitting with double tapped reducer bushing
to 4 inch diameter.
c. Tubes shall be standard items as manufactured and installed by
tank manufacturer.
d. A flexible connector, as manufactured by Teleflex, or
equivalent, shall connect tank to exterior fill tube. From
connector, exterior fill tube shall extend vertically into a spill
containment manhole.
e. Provide a Model OPW 6150 overfill protection valve and fill cap
in fill tube. I
5. Spill Containment Manhole
a. Provide Model EBW-705-BG manhole with locking lid over fill. ?
Access through 18" manhole with solid lid.
b. Manhole provides 25 gallon capacity and 'spill containment, ?
sealed watertight with spring loaded drain.
43744 15600-4
6. Tank Fi.ttings - Threaded - NPT
a. All threaded fittings on U.L. labeled tanks for storage of
petroleum products shail be constructed consistent with
requirements of U.L. label. Fittings to be supplied with
threaded cast iron plugs and located as shown on the drawings.
Contractor shall verify number of fittings required.
b. All standard threaded fittings shall be 4 inches in diameter and
shall be half couplings. Reducers are to be used for smaller
sizes where specified and provided hy contractor.
c. Strength - NPT fittings shall withstand minimum of 150 foot-
pounds of torque and 1,000 foot-pounds of bending, both with
2:1 factor of safety.
d. All rigid internal piping shall be terminafed 6 inches from
bottom of tanks.
7. Ladders - Shall be standard carhon steel supplied by tank
manufacturer.
8. Lifting Lugs - Provide lifting lug(s) on all tanks. Lugs shall be
capable of withstanding weight of tank with safety factor of 3 to 1.
9. Product Piping - Provide product Lines Consisting of double wall
fiberglass pipe as manufactured by A.O. Smith or Ameron. Primary
piping shall be 1 inch in diameter and outer piping shall be 4 inches
in diameter. All piping shall be U.L. listed for use with petroleum
products. Piping shall pitch back to tank piping sump.
10. Product Piping Connectors - Connections of fiberglass product
piping to the storage tank and to steel piping within building shall be
made with flexibte connectors as manufactured by Teleflex or
equivalent.
11. Vent Pipe - Install fiberglass, single wall vent pipe for below grade
portion of vent line. Acceptable manufacturers include Ameron or
A. O. Smith. Ail pipes must be U.L. listed for use with petroleum
products. Above grade vent pipe shall consist of galvanized steel
pipe with suitable vent cover of cast iron body, threaded ends and 40
mesh brass screens. Above grade pipe and cover shali meet all local
and state codes. Connector fitting of fiberglass and steel pipe shall
be flexible type as manufactured by Teleflex or equivalent. Pipe
size to be as shown on drawings.
12. Dip Stick - Provide calibrated dip stick for measuring volume of oil
in tank.
43744 15600-5
13: : Flexible Dipstick Monitoring ?
a. Provide flexihle dipstick kit Model FD-25 for monitoring douhle
wall tanks. Kit shall consist of polyethylene conduit and highly' ?
plasticized PVC dipstick.
14. Pipe Sump - Contractor shall provide water tight fiberglass piping
sump with fittings, Model SPS-42-30A with interface ring.
Contractor shall supply 36-inch diameter steel manhole with bolted
cover and retaining sleeve to provide access to pipe sump.
15. Tank Level Monitor
a. Provide remote reading UL listed tank gauging system, which
shall be of dial hydrostatic type, utilizing integral built-in hand
pump for manual operation. The instrument shall be factory
calibrated for tank contents and indicated on 29 1/2" dial scale
marked for 10,000 gallons without use.of gauge glass or fluids.
The gauging system shall be Model P-29 as manufactured by the
Pneumercator Company or approved equal.
b. Alternate): Giibarco, Veeder-Root, Model tank monitor 3
eleCtronic monitoring system. Includes panel with liquid crystal
display, integral printer for mounting within building. Provide
probe for liquid level monitoring, interstitial monitoring and
pipe sump monitoring including cap and ring assembly. Provide
conduit routing and connections to all monitoring points and
access as required.
PART 3 - EXECUTION
3.1 GENERAL
A. Tanks and accessories shall be tested and installed according to current
installation instructions provided with tanks.
3.2 TANK INSTALLATION
A. Tank location and proposed elevations are shown on drawings. The
excavation shall be observed by Engineer prior to installation of new
storage tank. A minimum of 24 inches of excavation oversizing must be
provided on all sides of new tank. 5heeting and bracing shall be required
in excavation if this oversizing can not be maintained or if a minimum 1:1
slope can not be maintained from structure footings to excavation.
B. Tank must be unloaded from delivery truck and installed by using
installation lift lugs as recommended by manufacturer. Tank shall not be
rolled or dropped.
43744 15600-6
i
? C. Before-tank is installed; itmusr be pressure tested to 5 psig in accordance
with manufacturer's instructions. Entire tank and fittings shall first be
soaped. Test shall be long enough to insure that there are no leaks as
? indicated hy soap bubbles or drop in pressure. Tank test shall be observed
by Engineer.
D. Tank shall be placed in ercavation at specified location. A minimum of 12
? inches of approved backfill hedding shall cover bottom of excavation.
Tank shall not be placed directly on concrete slabs, timbers, beams or
cradles.
? E. Alt excavated material removed for installation of new tank must be
replaced with approved backfill. Approved backfill shall not be mixed
with sand or native soil. Approved backfili shall consist of gravel (pea
? gravei) with mix of particle sizes not less than 1/8 inch or more than 3/4
inch. Washed stone or gravel crushings may also be used with angular
particle size not less than 1/8 inch or more than 1/2 inch. All backfiil
? material must meet ASTM C-33 Paragraph 9.1 for quality and soundness.
F. Backfilling of tank and pipes shall he performed in following manner. A
12 inch lift of approved backfill material shall be placed evenly around
? tank. Backfill must be pushed completely beneath tank bottom, between
ribs and under end caps to provide necessary tank support. A long handled
probe and shovel can be used to push gravel beneath tank. An additional
12 inch lift of approved backfill shall then be placed evenly around tank.
? The probing procedure of the backfill shall be repeated. After completion
of second lift, backfill may be brought to the top of the tank or to grade
without additional handwork. Approved backfill shall not be mechanicaily
? compacted in area of tank. Backfiliing procedures shall be observed by
Engineer.
3.3 PIPING INSTALLATION
A. Double wall piping shali be installed in accordance with manufacturer's
instructions. Proposed layout of piping is shown on drawings. Pipes shall
be pressure tested as recommended by manufacturer prior to'connecting
to storage tank. Bottom of pipe trench must be graded to provide even
support for pipe. A minimum of 4 inches of approved backfill bedding
shall be placed below and between pipes. A minimum of 12 inches of
approved backfill shall be placed between top of pipe and ground surface.
I
8. Primary piping shall pass through fitting of pipe sump that has been
instailed on tank. A flexible connector shall connect primary piping to
tank. Outer jacket of double wall piping shall be terminated and
cemented to pipe sump fitting, piping must he sufficiently sloped from
6uilding to pipe sump to allow for drainage of outer pipe in event of an
accidental leak from primary Piping. Any leaked product from primary
piping must be contained in outer pipe and drain into pipe sump.
3.4 LEAK AND TANtC LEVEL MONITORING SYSTEM INSTALLAT[ON
A. Conduit will be provided by Division 16, from building to pipe sump, for
future monitoring system use. •
43744
15600-7
?
B. Alternate: Electronic . monitoring - system as recommended by
manufacturer.
3.5 MANHOLE AND STREETBOX INSTALLATION
A. A 36 inch diameter manhole, solid cover and retaining sleeve shall be
installed to provide access to piping sump. A 12-inch diameter streetbox,
bolted cover and retaining sleeve shall be installed to provide access to
Reservoir Sensor. Retaining sleeves for these access holes (where
specified) must be non-load bearing and be terminated minimum of 6
inches from any portion of tank. Fill box, manhole and street box rings
shall be mounted in minimum 9-inch thick concrete slabs as shown on
drawings. Slabs shall extend a minimum of 1 foot beyond outside radius of
access holes.
3.6 TESTING
,
A. All tests shall be performed in accordance with manufacturer's ?
instructions. After the various components of system have been properly
adjusted by the Contractor, Contractor shall demonstrate to satisfaction '
of the Engineer and Owner that system meets performance requirements
for which it was designed. In event any portion of system fails co meet i
various tests, Contractor shall make necessary repairs or adjustments.
Test shall be repeated until satisfactory performance is obtained. All ?
tests shall be witnessed by Engineer or Owner. Ail instruments and
equipment required to properly conduct tests shall be furnished by
Contractor.
3.7 FUEL GAUGE SYSTEM ?
A. Provide a 2 inch conduit from tank to the gauge location for gauge tubing. `
B. Install tank level monitoring gauge or alternate electronic monitoring ?
panel inside building at location shown on drawings or as selected by
Owner. ?
END OF SECTION
43744 15600-8
DII!ISION OF STATE FIRE MARSHAL
MARKET HOUSE
289 EAST STH STREET
ST. PAUL, MINNESOTA 55107
TELEPHONE: (812) 296-7841
August 21, 1989
Klamm, Inc.
12409 County Road 11
Burnsville, MN 55337
a
STATE OF MINNESOTA
DEPARTMENT OF PUBLIC SAFETY
File No. 890358
n,i ; I :
Pinewood Elementary School, Indenendant School Dist 196,
Dodd Road and Hackmoore Drive, Eagan, MN. Underground installation
Re• of one (1) 6',000 gallon Double wall tank fiberglass tank, with
' piping for building heating oil storage.
To Whom it may Concern:
The plans for the above installation have been reviewed pursuant to Minnesota Statutes,
1974, Chapter 249F.19.
Preliminary approval is given for the aforementioned project subject to compliance with
the provisions of Minnesota Statutes, State Fire Marshal Regulations, and local ordi-
nances and permits. Construction shall be in conformance with the standards contained in
National Fire Protection Association Pamphlet 30, Flammahle and Combustible Liquids Code
(1981 edition as amended).
Final approval will be given following an inspection of the facility by either your area
local fire authority or Deputy State Fire Plarshal.
Approval of the project described in this letter does not relieve the applicant of re-
sponsibility to other Federal, State or local agencies regarding adherence to regulations
or the need to obtain necessary approval.
Questions concerning this project should be addressed in writing to our office for a for-
mal response.
Please refer to the file number listed above in all future correspondence concerning this
project.
Yours very truly,
Thoma . ace, State Fire Marshal
by: Raymo d 4'e" e
Deput State Fire Marshal - Code SDecialist
COPY DISTRIBUTIOtJ:'White-Facility, Blue-Fire Department, Green-Central Office, Pink-Codes
Specialist, Gold-Investigator, Yellow-Pollution Control Agency
Y.*`ta..• _ • .
-'-_ .
AlJ6 2 2 9909 ?
<
AN EOUAL OPPORTUNITY EMPLOYER
... i______-__._ t
? Fer Oitire Use I
, vzm,R a: _//?---
I ?
? I
1 ?
? Date Receive7:
? Statf:
I -
2003 FIRE SUPPRESSIOIV Sl(STEMS PERMf°f APPLiCATIOIV*
Date: 3"5;0-16ck Site Address: '! ?t.O,ACl
Tenant:7?1 (\? WodCS ??`?-? ? ? Suite #:
PROPERTY OWNER Name: n3LG Phone: _,
Address / City / Zip:
Applicant is: __ Owner _ Contractor
TYPE OF WORK Description ot work: _ 1?
Construction Cost: ??? _ Estimated Co etion Date:
?
r
_ License #:
CONTRACTOR Name:
.
l
?ats
Address:
Ci
C"
?
? ;.'W
Zip: 65,/2)3
.
State:
_ u
- .-
ty:-
? _
_
.
Phone: tns 1- Contact Person:
FIRE PERMIT TYPE ? WORK TYPE
? Sprinkler System (# of heads New
Fire Pump Addition
_ Alterations
_ Standpipe Remodel
Other. _ Other
DESCRIPTION OF WORK: Commercial _ Residential ? Educational
FEES
$50.50 Minimum (indudes State Surcharge) OR Contract Value $ I=1 _ x 1%
_ $ _ Permit Fe2
- II Permit Fez is fess than $1,000, surcharge is $.50.
State Surcharge
=$
- It Permit Fee is >$1,OOQ surcharge increases by $.50 for each _
$1,000 Permit F°e (i.e. a$1,001-$2,000 Permit Fee requlres 2$1.00 surcharge). $?? TOTALh''?eE '
3/4" Displacement Fire Meter -$183.00 $ Fire Arle[er
g T07AL FEE
..,.. ?., tie ?.ee.+ --
'RequiremeMS: 2 complete sets of drawings and spemncatwns, CUi Snee[s on maienala a...+
I hereby appty ior a Fire Suppression System permit and acknowledge that the information is compleie and accurale; Ihat the work will be in
conformance with tha ordinances and codes o} the Ciry of Eagan and with the Minnesota Buildiny(Fi) re Coder, that 1 understand this is not a permit, but
only 2n application tor a permlt, and work is not to start without a permit; that the work will be irJaccordance wifh ifie appAOVad p7an in ihe case of work
which requires a review and approval oi plans.
M ? t]'L'L?? S k1 +' X
Applicani's Printed Pfame ApplicanPs Signature
F6R OFFICE USE
REQUIRED INSPECTIONS
_ Hydrostatic Flow Alarm _ Drain Test Rough In
Trip Pump Tesi Central Siation X Final
Conditions of Issuance:
Permit Reviewed by: ?, . i?_ _ Date:
s - - -
~ ak ~~7~~,'~ vx r+ d ~ a j tt ~ ro ~ ~ + ^t;n a , . . ~ ~ ~ ~ S e~~e ~ . a~Y . . . , , . . , . . . - . . . . . . . ~ . , . ~ , . . . . ~ . , ,
y ~
, r s . ' . ~ ~ , r . , _ . ~ : wn r. , a Y ~ a UO " aaqeunN uollaa=sl6ab
~ ~ . . ~ ~ ~ ~ ~ , / , 9 N 1 , . { ,
, ~ . ~ a ~ ' q,, ~v_ ~ ~ , ~ E ~ k~ , , ~ , Ua ~ i 'pN wnaN3Qad 68-ei~5 . ~ ~
k' ~A*" . { . ~ , ' . . . ` . . , . . . ~ ~ '~T
. . . . . ' ~ +v i ' ~ / /i ; , a} o s~e a aa un )o ,23eiS "7 J •
. ; W 3 {i ~3 ~ p , pa.+a~s~6aa~ ~(~np e we I~eyl Pue uc ~ leyl pue uolsIn.aadns
~ . , p 3~aaip ~,w aaAun ,ao aw aaedaad si , , , ~ " , q P I paaedaad seM 3aoda,~ ;
, ~o uoi;e~i}l~ads ue~d slyi 3~41 d~i~aa~ 3e41 ,tjilaa~ ~(qa.AaN I A3a ' ~
^k 7'~ ,P~;k ~ -TM>---~,--. ,
c ~ 1~>i` ' o ~4 ~ i~
~ ~ ,~.a ~ .,,e ` I , ~ ~ ~ q~ .`i~~Ni'~I , ~ra~ ~.r, ~ ~ ~~~~:i:~ ne 7
X ,A:' ~1W I d S ~ , , ~ ~1~15~,? ; ~ ' . , ~ ~ ,~n,sini~ ~e~sae~~~ ~u~ ~t''~~ , .
~ ' ~;~i.• ~ r ' ~ ' `'~:s~'~` . ,Y'~~
, : F.~ ~ ~ ~nd ~ - a. ~ ~ ~ s~st
r~ ~ ~ . ~ ~Yr s' r~ ~ o ~
~x, ~ ~ r:. ~ ~ ~ . ~ `4 Y~' , . f~~, ~ , } W ~ ~ m Q HQ . HQ D . LLI Q Q~
. ~ . , 6~~3~ t... _ . ~3~1 1 A ~ ,~N, ~ E .4.._ . . .
~'~r~~ ~4. ie ~ , ; ~ c~ (f) W Q `
~ , ~ ~ ~O~ODU U} • ~ ~OO~Z z~
n~~~~~'~.. ~ . ~ ' ~ y~~ ~~~(~~/r. : . ~I ~ . , . . ~ ~ JU- M=C]
y:~,~.!^7M1,,~`,i'. . . . , T . . . . . . . . . P ~Jt~ ' - . . ~ j ~ D ~cnO~ crU
v . ~ ~e - ~ . ~ -v ~ , ~ . g~~~:~' A ~ 11 i,. 0 ~f ~ ~ W~ UO OZ
~~r~~;~',~ ( m.urm ~ . F- wZ4z _W W= .
~ o 'x F ~ ~ u., m x S' p,, j~.y:"' -I m I ~ ~mW~ • ~ ~ Z p ~-D~WZco .
a ,,t ~a i,~?+ .t I , _ , C ~ ~EUz~ ` ~ ~ U
< f '-il-__ ; ~ _ . _ _ ',r . N ~ ~ tf') ~V~W W }C~
0 ~ n i . . . i ~ J.;~n ~ Z~ ~ ~ ~ ~ ~ ~a~~ ~ ~ J ~Z 0 dW W= ; Q QWJZWJ .,..1M ~
~ i \ T ~ ' m ~-Pr,,i ~ . ~ ~ ~ ~ . u') ~ N Z UW~a >a
;~,nr'~' I Ip~m ~ ~p~ . ~ ~:~~w~ ~ ~ ' o ~ ~ ~ L oZ >
~ , ~ m ~a~ a O , ~ ~
~ t ~ i, ~ t ~ ,~a ~ c~ i C;~ d - O O~ ~a~J O • ZWLr) OUcnCD cnZ
o' ~ ~ P~ tn~~~f--Z~ Zp
`k~~-_.. , i I r I o 3 i , I ~ ~ - ~ ~ ~ ~ m ~ ,i., ; . . lC.....: n p'j _ cn z I z
- - - - --r ; ~ ~ ~ - i U ~ _ . . _ - . . . _ . . _ j ' ~ ~ ~ M ~ u') W~~O~N' ~u
~ i ~ ~ ..»r ~ ~ - i , . . .
n:i>~r~~. . ~.~_.~~Y~-~__ ~ ~ ' ~ ~
; , : , ~ ~ _ i . _ _ _ , ~ - - , ~ , ~ _ - - - _ _ _ ' . ~ _ , . - ~ . ' ~
a;-!~ ~ ~ - ~~~_i~ ,~~1, ~ ' ~
~f , ; ~ ~ Z ~i~;: ~ , i
;~"`~';r~ ~ i • . (n H,~.,~ ~ , . W Q ~ 1 Nr 1 . .
_ Q J m ~ ~ ~ ~ T ~ f O O~ O ~ v
y; 4; ' ; i--- , z = = J ~ - '~r i I p-I V-1 ~i o t~ w Z U l~, O ~
~x ~ 0 0 ~ o ~1,~ Z Z ~ I~ CA ~ 1 ~ ~ z Z O d Q~~ ~ . , U~ Q J OC ~ U Z U
'tl I 1 ~o ~ m ~t ~,,~u~,k r Fc ~ 1~. - O O b.~ • ~ ~ i . ;.~;C=:;..i~ m N c o P c W U
t 'i I~~ 3_ m~~ocm~ .,..I li Cl ~ Z ~ ~ i' 1° , m ~ I- I- W W W ~ ~x?i~'. ~ ~ ~ < N ~ ~ ~ ~ ~ ~ ~ . ; O ~ ~ t!~ ~ ~ u~ < 3 ~
~ x:~±~; ~ ~ ; ~ ~ ~ ~ m ' ~ b ~I ~ ~ t ~ ~ ` r~ z W W O O~- O ~ g o~ u- C X r J (1~y? ,n 2
a ,r:,. ; E c - ° r _ L c ~ ~ ~ Q. ~ ~ ~ V t- ~ ~ ~ E ~~,~~rw~~ ~ N o m F I ~ ; z w u~ 4 ~y ~ ~ • 3o
~:i o 7 x ~ I ~I ~ ~o ~ ~ O O O O~-~ ~ ~',w i ' ~ ~ y ' ~ i ~ P n -I .P _ ~ ~ ~ ~ _ X fY .,.V ~ J rL a W x ui ~ d Z 2; Q• ~ U
c,~: ea: u N 1, , ~ N°° tP o ~ n. 4. ~ W 4 a $ y j D ~ " 3 a ~ y`ir m ~ L w, r . ~ ~ w ~ 3 a ~3 lb ca w ~ ,0 ? d z ~ , 0 Q s
~ ~ < ; e _ m ~p ~ r ~ d ~ 7~ I I~•• Y r I~ rn N t .o , ~t~~ . f N , ~ ~ r .P o m d a , . ~r ~ ~ ~ ~ ~ Z ~ • . ~ Z1
„ s . A~o °~1~ °u 1-2Z :t' 4 ` :~','M1 ~c ~ ~ ~ ' o ~ ~r N m 1'~ t ~ 2'-zd 3" ~
~~~~r~ -;1t~ 11 ~ I ~ ~ t~.~' Y A1 m„~ r ~ a- U . . '^r~~::".:~,r.,,. . ~ , F, ~ ~ j~* ~i ~ . i m p 0" L~ J J J WJ •d Z. ai OL • W . J
- , ~ r v o f J a ~ O O o L v. A ~ q"~,~}•.~ f _ . x _ a___L -0 __-1 i ~ - o : • 0 • t~ d' £o~ , x. ~fl „te : x, ~ I I ; - ~ - _ , m v ; I~ T ~£Z ~ . ~ . l rn rn 1 W z 4 ..1 oWC }Z. o L 3 o i ~:4 ~ d. cp
~s-a ~ ~ x v! ( '_f~ Ut nr T L ~ h ~z ~ j ; j p S ~ ~ ~ ~ Q e " ~ < , , , .'~.y,~ . ° ' , ~ : i -j- 'P Q a ~ f Z h t d lo s n W
' ~ _ _ ~ I _ _ - - _ . - j-. . I ~ Q _ : , , _ _ + 's ~'a, ~ f ~ ~ u. ~ W W u A ~~3 oQ tzz- ~ Q vci ut? Q
ro,a ~ ~+~~t; , ~ ~ ~ ~ ~ I ~ - - zJLL : ff ~s , . ' i l I ~ ! o ( ~ 's. J LL' L Q ~ o Q La z'o t J ~
~.c~ ( ~ ~ N N- ~ ~ ~ V~ 3~.:~}~" J ~ i " i N Z4 ~ ~ ~ W d. ~ oNw ?-Wa.v' Y ~3 J' 4 I ~+W 1: ( .C
~~K - :z; ~ ~i W r. n ' ~-k:: , ~ o f ~ ~ n a ~ ~ ~ ~a ~i ~ ca ~ V L G' in'Q ~nN •3v
~"i~.r~;+~ ( i . ~ j . '~F 7 ~ i ~ ~ 1 Z s`~~~~.rry,;,; . s _ - ( ~ ~ 3 Y ~
: - .F 4` I ^ ~ m -1 d ~ ,=;~'1~'~; ; ~ c ~ o ~ ,1 i I ~ ~ 3 - o. r•, , s~ ~~o f1~.Q ~ d+ ~
Y ~ m ~ N'~~ L r X. ~ I ~ co ~ x;o ~m~ ~ ~ N' x L ~ 1~ It' 'p ~ ' ~ 1 c O~ ~ • ~
Y N ~ i o,~ o~ o~ r~,, ,r ~'y~ I ~ k`- i~ ~ x m ~ 0 1 '~a~~ T u. ~ .o ~ , ~ f ~ V'~ ' ~ ~Z ~i ~ ~ , , .
~a~ ~ I n K ~ 6r .~0 C ~ ..A G p - - _ _ . _ _ i <I A ~ ' ' ' i' i I i ~ ~ a ° ~ ~ ~ ~ I ~ ~N~ n - - - y~~ d ~ o Z ? ~ t r~, ~
1~ ~ N-{ 11 ~ r- I~ ~ 1 Q U' . /q ~ o. J~ ~~k. ~ i • • ~ ~ o u ~ ~ v~ t~~_ ~n . r ~ c t~ p ~ i ~ ~ ' o; ` d . ~i.,~~:,:~~~ , x ~ r 1~'~ ~ll~ i ~ S ~ i ~ ~ ~ r e.. J 1 ~ ; • .7 W' ~ ~ orrd W o ~ ~ LLD
~ ~r~,;~~' ~ I r ~ N - " D p ~ ~ ' i ' ~ ~ r r (f~ I Y ~ ~ ~ ~ ~ J ~~~s~ r ~ ~ xm .f;~, I~ ~I, , c , VH" ~ sNt-~J n J j -j
~ T, ~ ~ ~ Q j,:.` ; ,T - - a0 ~ du.W , t, r~ ~ Q N i a< p .~0C ` ~Z , > W
, ~,~,M.. ; „yr N G esa ~ ~S' ~ ~ ol~.o-uQ ° 'i W L
, ~ ~ ~ ~N ~h' ~ W~tud a ~ ~ ~ ~ ~ ~ 1 d~ ~ . c,; t, ,a o• , 1 ot i,.,,. . . ~ , ~ ~ It~ - 1~ '.s~~:.;;w~ ;~:'~~~A r ~ U M ~ J V Bd~ a h~ ~6- N.0~ Q J ~W0 .,~-LL.o~ v I O \
.ia ~ ~ - trJ ~ ~ ~ . ~ ~ ~i0 ~ .~;;i:~"~~ ~ ..,..i f 1 ~ ~ ~L ~ ~ , W~, aNr ! JTs4
a', . , Cll I ' .i%~ c~:'.: x' l f ~'1 ~ c~ ` ~ ~ ~ p" 1~ - N 1~' S td1 v y ~ I o • ^I ,rFJ ~
~ r.~t~ ,..5' , CD J V O ~ ~~;,~,ra.,;~!,y< ~ ~ 2~d y I ~W J lL i < j j W ~T ~ o. 1L . .
~ V N ~ Z F° Y Y° h° " ~ ~ ~ ~ ~ V ~ ~ c~ J~ L I, ' f ' 0 3 u. p ~ V m
,~~~.h,,`~,: _ ~ / I- CJ Q~ 0
'~~"h~i~ yM1 . l ~ \ r i_0° ~n . ^ p " ,F~:'„ ~ ~ ~ Z Z a ~ eq
"u~i~ ~ ~ ~ 0 '~",:..:"p~i;; AV ~ ~ ro ~1 i r i ~ • c1 O ~ f-'1 - - - - - F = ~
a x: e~ i ~r I- N ~3 ~ j. O ; , ~ N t c~ -J~')
~;'1`.;~ Z ~ ~ 2~t+''7''„ . ' O .:r3 U
;~{~"5; ~ ` • ~~y . ~ ? ~ o d t!. ~ V)
~rz~ :i
~'a ' ?-3 _ W 1. ~ 0
~ ~~~~;,~;'y~,:. ~ Y~~SAOl~Oq ~ ~5?~: ~~~pt ~~~~?6a G v 7 0 ? Z
~E~''a 0 ~i~~~ ~e~epf , C~
41x5 ° 0 4*~ ~~~1~~ . K) ~ < ~~1 1 . ar~~r O p a,~ e a O N L o. ~ • 9 Q J ~ ?.i o- 6 u. .01 2 U. , ~ L
~t ee~~q ~ ~ ~ ~ ~ , , . oi~~ rn 1rLt T ~ o~, 2~
' ~~f~ , . ~ 6~ ~ , Ql ,A ~ , ~ L r
~ - ~ ' 1.~Q J`3p d~2 u+jdo ?o ~ J t~ a.~= '7E" ~ rY
1 ~n ~ZI`~~ ? ~ ~ ~ ~ ~ D~ • f~ , ~ i ~ F o ~ W 7 tJ ~a 1 r W.,o
~ ~ ~,,:~x;. _...--_tq-~-_ ; ~ ~ , l. r , P k . . ~ < o 0 o x 4.8~
"y~y.e I." . . . . N ~ ` r~-.~ n 0
. ~ 0 f~ U p~ M C~~`~
~ . U~ ~ v - f~ O ~ ~ 1
~.,k~:, i ~ ~ ¦ i ~'s;h d' ¦ ¦ ti - _ d' ¦ ~ ~~-1~~...~-'
' ~ ` _
~ . ~ l'`~ , _ , , ay ~ O _ _ - ",~k~;;; O N Ol In
;~r, r' ~ O
s~;~~:': ~ ~ N ~ ~ ~ ~~,~A, . ~ ~ ~ _ IV~!' , 1 -
0 ~ ~ ~ t~ F- I~ 6' ln m ~ ' ~ l ~ ~ , ~ ~ ~
~ p 0 C~ p v ' r~ ~ ~ r~ a • , : ~ ~ ~ - m J ~
g ~ ~ co _ r ~ Q,, ~ M r~ co J Q I
~~.~;,~:`,~u . ~ J rn m r~ ~ ~ .n' ;S p Q' ' • 01 ~ m ~
~ , . ,~p;h ~i' 0) , ~
" < t~ ~7 m i~, , d' ~ r~ V O I1 ~
, O ~ , . ~ , ~t (p F , ~ ~ m ~ E,. o , 1 E t ri
~N~~ , a~ ~ ~ m u, ~ E o _ ~ ` E il g°a ~ C:
itMN U ~ ' • ~ ' . , . F- ~0 N . -
t. , . t ~ . ~ . - ~-T--- - - _ . . _ _ _ . _ . - _ -
_ _ - ~ , • , • • ~ ~ ~ 'o 0 0
t ~ \ r~,~~ ~ o~ , . G l
, _ o- ~ o _ o ~ ~ ~ o ~ ~~.t~... I . i ~ 0 ,:o;. . o E ` \ O ~ Q13 ~ ~ ~ ~ ~ .
r Oj (V ~ x' ` ~ pl roo
',r~,~~ ; ~ . ' ( _ ~ ~r . . ~ ~ dl ~ t. i , I'~ ' , ~ \ ~ ~ I A
~~}r ~ o~ ~ ~ , ~ ~ ~ ~ ~ O ~ ~ ~
'~~::;F'~ ' ' . = U . , ~ ~ i x O
, ~ F- . , , ~ • O t~ ; r:r~ ° ~ ~ ~ d' ~ ~ N ~ m o C Le
~~;k~~:~.. i ~ • ~"ti :,~f ra~='"'' . Ql ~ o ~ P Uj o~=C: • ~ U °c:3~' .
k;:~;~ ~ - , ~ w - ~ ~ . . ~ u U ~ipN O ~ c am
. . , b ~ ~ d' ~ Q C ~ r.~"~ ~ - ~ • ~ . lt, \ • ~
'~~~k~fi~.~~~~~ , f ~ ~ . ~ S ~ ~
a ~~~~~~.v'~~«r:';-;~ _ : . ~ , ~ ~ 4~~ h.d.~, .~:+y . 1 . r^ ~,a~.i, ~ ~ } , • . r'' / . 0
n,,;; ~~4l,. „,i,sri~,ra , ~ , , ~ ~ • c9 ~s~i.~'i . A . . J W
,5~~~' .i , ~ - } ~~~~x~ ~ca;a.:. . • O ~ ti '
~r I - Q Y; ,':~~'~'i~~t. ' ~ . ~ ,~,M1.~,v.~;g;~ J,1 'Z ~ J ~
i;~~ Z' i d- Q. 4~~~1' F~t'.~,~~'., ' Q QI~ i , 2:
, ~ ~ ~ S ~ c' a N~ W ` , . Q
. ~ ~ > ~ ~o . 0 ~ C9,..,~XI v~ ~
~ , ~ c~ 0 j O ,,u~~ ~s ~ Q 4; a ~
~ 6 y ~ rx ~ o ~;s~~' ' ° W. ~ W tD ~t aD N
~ c~ 0 ~ - ~ U . ' cJ ~ ~ - _ ~ ~ ~ , V~ oi d' Q d~
` ~ O ~I ~ W M o, ~ ~ 0 ~ ~ , S ~
, , p ~ o ~ ~ ~ ~ * , ) S • 0' ~ a J a ~ ~ v~ ~
.;Y,~ ~ Q ~J' N Q~ ~ ~ l
l,' , t~ ~ V ~ ~ 61 ~ U' ~~,r' 0~ 6' d N ~ fn 2
si"i` ) ~r M ~ y ~ N Q ~ a . . ' • , -J
_ N _ _ _ ~a~,,~ ~ , ~ ~ :i. .~"~~F . . . V
~ , O ~
+ ~ ~ O e.r, . . t~~ y,~ ~ ~'>,i:; ' , . Q ~ .1 ~
y . ~ k . ~ ~ N ~ ~~.~a> { ~ N C~' p ~y Q) "
d' Q~ r,y 0~6 m
y~.. aFk ~ - . ~ ,.1. . . z'~ ~ ~1 ~ v~~. ; a ~ C~ ~
~~~,~?z . ~ - O ~ 2'+ `^~i'i!~ t - Ol A~ , , - , ZZ6 N N
~f~~,~.•~, , ~ d'
,.""a ' ' ~ ~ ~ ` .d,.~' ~ . Ob6
* ~~SG r, , ~f~~~,f~':~'~ , ~ . - • .
p ~7 , ~x r,d~~` ¢u T ~y ' ~ .
, ~~C1~~;'~;l~'..r..." ~ ' . " t•~.n.t~ .
~ . , 7 ~ Y~ in~t: .}"9'.'b' ~ ~ • ~ r :yF '
~R'~.''x?~';
;
~ . . ~ . . ~ `n:.. . ~~;~~~i,~ . ~ ~ . C
~ ~r~~;r ' / ~~~~e, ,4E~.s a' ~ ' ' ' ~ ~
~ , , ~ tia~`,W.., , .
r,.~',~ ,~',-1 ' ~ , ~ ~ ,
p ~ ,iff~p i . ' ( . . - . 1
~ . ~7 ~Z6 rv ~ ~~s.~,nFk , ; ; 'y'~
~`~'v . ~ .
, t::- r , p O , \ !
a'•;rk~;r ; _ . ~ , . ' , e Q ~ _ ~J~^
k"i~~+~=•;r.•Fi, t v^ , '~f,i,.',;: ~ • ~
~7:~.sra ~ . . . . i . ~ *
~ ~ ~ i Q _ ! ~
; ~ ~ ~ ~ ' d ~ , ~ . i ~
. 1 .'q7, ~ ' { - . ' . r` "It:i,`,'; `
,p+Y~j ~ ~ _
~ ~y .i f~"~ . ~ , . . $~y,tl ~ . ~ '
} t, 9Z6 - ,:,,a;~.,,~: ~ ° , ~ . ,
; ~ ~ , , , -
y 1
, 8~ x,~::: . ~ , 6 :~,:;.4 ~ ~
i ~ ~ e ' ~ ~
~~ii ~ W ~ ;G ~~;~v.-::s:: ~ • f-' ~6``
~ ; ~ ~ . ~ . LL ~w ~ . ~,2
~ ~ .....i"' (7 ~ ~ \ ~qx ~
.;,~r , ti , Z~6 . j ~ ~ ( ~
t~ ~ ~ , ' ~ ~~''S~~,.,:;~ ~ . ~ ~ ~ Q ~ p,~`
~ , J _ ..A2i'i~i,5'. ~ ~ A . ' # J, ~ ~ 0 1.1~ tj(~C . . • ;
} , tr ~ ~ , - 1 . ~ , ~V s ~
~i ~ ~ 1 .:'Ft;l.fi~:.~~: ,
,;~t^.i~~~.",~' 1 . :a~ d ~ t.: , . . . ~
;.r.,~:~~~~ 9£6 J r • ~ 1 J
A ~~';r•. ~ 7 Q a~ t`~ . . ' ~ .
~ ' . _ ~'r;: ( 8 ~ r
~ ~ ~ ~ ~ ' ~ ~ , r , ~ ' . , ~-r.
~ -w'~~~ ~ O +~,~,-o:M,w„~~_ ' ; + Q , , , N
, ~ v . ~ m
y . . , sf h~r;%";:'; , ~ . . _ . ' rc~ : t.. , - a:t,.. , . , . _ „ . ?ra ra~ ~ - : ; `
w .1..-f... . ~ ` ~Y pg1„V •Y.r ~ , ~ti~ \ ~ ~ P h4 . ~ ~
, ~ ~1;.~y k , f ~1, . . y'' ''~JV . . , . _ . .
. ~T1~J ~ h ] r.:~ ~ . ~ 9~'~~ . . ~ . '1-
; f ~6 ~ , ' ` ~
~ ~ ;~yr ~ y ~;;s,:r ~ _ ' ,
~~"'~`r: ; I '.°41 a . , . .
P~.'+` ~r~.; c~ " . r t~~. ~ <<: w .
~9 1y~Y"' F` s . ~ . . i . ~~r~ t~i ~ { , ~ ~ ~ ~ ~ , ' ~ ~ . aN .
7 , r .a~: o ~ . ~ ~ . ;
, a a o a~~~~.. o ~ ~ ~ ^
ry 9 l, ~.f"i: ~ . . • ~ . . . ~,'a F . , . . . . 4 ~ . o ~ ~
ry~~,~:.r : w ~l ~~~F . , 1,N r,~_,., , M ~lp ~~'.r I ~ ~ Y~ ~ , ~ .
- ~/1~] . { . . i~ 4i . ~ . , ~ -
3~ , ~ • ~ . ~ ~ ~ ~ . • ~''l~7~'t, r~ . . ~ ~ . . .M t ~ , ':4 ~ . ` ~
.';~t . d ^ . - . , r ~ , ~ .
~ ~ t~x3~r - V , r ~,r a~'r ' 7 ,
r ~ Q . V~";~1, X . ' ~ ~ ~ k ° wi. ti . . , ..y.v
~q~g i ,.,~,t'.R,}"+'[F~ I i f', 4 . . . . . . ~ . . ~
wr.Ym~~ . ~,~~~r 9 . _ . . _ . t 1~i`'~'e Mi' .f'4 ~ , . .r. r ~ „ d r ~"~u . ' ~ . I r . ~ t ~ 4 I ~ 3t~ f ' 41 . ~ . ~ ~ 1 , . . . - . , . ~ . . . . . . , . " e ~ , 6:..
~ DtK -J4vaC ~ ~ ~f ~ ~ ' ' ~ . . . , ' , ~ ~ ~ Q d A+ ...`f,ia,4 . ` . . , r . ~ ~ . . ..in.
~ p yb^`~~y, i ;4yv . ' . r~. ~ '*5q , ~ . ( ? k : ~ • ' - . . . . Q . ; .4~"614..~NS ~y ~ ~ , . , . _
. i f~A~2A,. Y ~~~,xw~ . . . " ' , ' . . ~ ' _ . ' ~ ..s. i-...`..../"'._. ~ a . , . . . ~ ~ _ „ . . . r~.-,~sd}s ,p.r~~: ~q- . , ~ ~ ' - ~ , . . . . . . . . . . ~s
~ ~ t , ~ , L w ~~,r - , - ~ ' ' , ~ y,
,r~~ _ ..yM+r b~ d , . . . ' . . . ~ ~ , ' ~ . . . ' ~ ~ 2 R•. ~ ~ ~ y; ,7 ~i . . . . E~~' - ~ ~ . , . ~ . /
r e~ i~+;:~~Y~re ~ r~ ' . . , ~ . . ~ ` 4 . . ~ ~ o ~ , . • • . - '
~ > ~ : . 1~~• h ? ~ . ~ ~ ~ ~ nhj'y- ~1.i.y .i r : . " ' . ~ ~ . ' . . . ~
. ~r ~a~~~-,R ~ ~ ~{.t •r~j,~. ~ ~ ~1~~ . . . . ~ . ~ . . - . . ~ . . . , . . ~ ~ l,n f ~ y.. i ~f~4p . ~ .^.Y ~y, s~ . , ~ . ' .,Y' y d l" G~,•~p '1 ~'~'"Il' R ~~,f , ~ ~ . ; . . . ~ . . .
j'; 4 ~d~l'"~'•a~~J (l~ 'Vr~}.~ SZ~~ fi . . ' . ~ , . . . ' ~ r . 5 v ~ { ~l ~ 1 te ~F~) ~.S ~ Y y ~ . ' , ~ . ~ ~ . . . . . . ~ . . r * > • tit~ ~7 , y. { i~•s i ~z , ~c
, , . . 4' '~~C~ Trx..,x d~.... eS~~. ° ~ t' d'Ya+~ , . ~ . • ~ , . ' . ' . ~ ~ . iyf,~,~~a^ ~ y rS~ i ~ >'"S 1~.~'. s f ~'L s.~ , ~ ' . 9 ~ y 4 ' ~J~` , a~r~~,~ F 1 ~a~ .i~ ~'xwd ~y.... . . 4'. . wM'1;: _ 4' ~ , ~ . . , ~ ~.,,_i - . . ~ ' . . .
~ , ~ ' . . . . . . . q ' ~i . . . . . 4 - , . , } M i. ;r~~ ".?~~...'.r, ..,,i.. ` , dr-. . ..r~ ...~e.rYa'.' ..i ~ .s~° . : . . :~f~ . , . ' tt . . . . . ~ . '.6t..a.w.:.c.++e.~.:r,:u+.:.ti:~- ' ~ _,......:_......c-.,..:. . . , ~ , q . ! ..,y,n . ~ - _ . .x._...__ . , ` - . - _ ..1.. ..,.~sww:+. ~ ' t 7~ ..t..y
J.j~U ~ , , `~V < ~ r . ~ ~ ~ • ' - ~ . 2 . ~ ~ ~ . - ~ ~i. ~ ~ ~ v , ~*n ~ ~ f~~M ar.~.xi,~„ ~
~,1 ~ ~ ~ _ . . - r.f, ; f~ . ~ . . . ~ . . . ~ . . ~ ~ ~ ~s~' i
a ~ _ ~ t . ~ ~ ~ `cj ~ ~ . . ~ , . . ~ . ~ ~ a
> . _ ~ . ~ , ~U~~ • . . . a x~~$ 'k ~
O C~ _I , : , ~ : . . , ~
A - - , ~ ~ 4 ' ~ . . ~ . . . "r. . R~.:
G a . ~ Q_ . ~ ~ ' ~
. G ~ ' - 1. ~ ~ ~ ~ _ ~ ~
E • . . a ~ ~ ~
~ ~ _ . . _ _ . . ~ ~ ~
. . f. . . . . . . . ~
~ ~~c~ - ~
. ~ . Yi~ . . . ~.~~r ' ~ ~ ~
~ ~ , ~ 4 g ~ W ~
. , ~ ~ 11 . . ACKAMORE DRIV . ~ . . . ~ ~ W
, ~ • ~ ~ ~ ~ ~
~ fi
~
~ ~
y , . ~ ' ~+r~ 1
MATCN CITY WALKWAY
~
~ ! ~
i MATCH ClTY WALKWAY , ,LKWAY ~ ~ ~ ~ ~ ~ ~
1 ~ . BlTUMlNOUS WALKWAY ~ ~ ~ ~ ~Z •
1 J ~ ! ....t ~
, ' ~ ~ _ ° ~ ` ~ ~ i~... _
. . . ~ i . ~ ~ . ~ . r . . ~ ~ . I•',. . . . ~ ~ ~ . ~ ~ . ~ . . ~ ~ ~ ~
. . . . . . . . i~ .
. ~ . ~ . . ~ . ~ i I~ . . . . 1 ~ ~ ~ ~ ~ ~ ~ ~ ~ Q d ~
~ ~ ~ . . ~ . ~ . ~ ~ . ~ . ~ ~ ~ ' ~ . . c~ ciTY ~ ~ Q p e~
~ ~ S~ i i 4 q~, ST ~T CONSTRUCT N ~ J ~ ~ ,i
~ 7/ ~ gi.f ~
i f,.. , PI.AYiNG r I~' ~ ~ ~ ~
~ p, , j h 10' x !0` % ~ . ; '
~ ~ ~ ~ ~ ~ i N ~ ~F= ` ' ,R N e j ~
200 R ~ , ~ ,R ~ OO~R ~ ~ ' ~s
~3~R h ~ x
. ~o f 1~.. ~ 1 E . ~ . :
~ \ \ j l~, , g3, c'• : i
p~ 16' ~ ; ! ' ~ Q ~ LEGEND ` ~
~ \ j 6• e, , p - PROPERTY LINE • ' ~
I ' RQPOSED ~ 0 ~a ~ P _ ~ ~ • - RI6HT OF WAY ~ '
~ O ' ~Q. . , 2 Q 0 o PR~PERTY IRON ' ~ ~ ;
BUILDING , , o d ~ ~ ~~~Q N G ~ CONGRETE SIDEWALK ~ ~ ~ ,
~ ~ Q~ 0' R 28' R i~o ~ ~l HP HANDICAPPED PARKING ~"1 '
, ~ Q ` r ~ ` ~ ~ \'i 2. S- ~ ~ L ' ~ . ~ ~ ~ Q ~I ~ ~ L
o N y j ~z 11 ~ ~ f ~ ~ ~ ~
+ q R? p , !p ~Q / . ~ ~ 5 ~ g, ~j p, (
_ a U rT P~ . . / ~~ti ~ ~ ~
(p ti ~ S~ ti ,
_ ~ ~ ~ ~ ~ a~ To ~ , . . ~"i~s o J
~ 4 S4FTBALL y~ ti ~ 60~ ~ p R ~L , ~ ; ~ ~ ~
Q INFIELD . , , ~ ~ ~ ~ ~ ~ ~ ~ 2 ~ ~ - ~ ~'~i ~ ~ ~
~ . . I ~ N ~ ~ •_~a~~~ ~ ~
~ ~ ~ ~0 0 Q ~ i 50 0 h' r ~ a v i ~ ~ ~ io a ~ .
~ BACKSTOP J ; A . . ; J ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~
J , 0 Q' BUILDING ~ ,9~ . . , 9r ; . ~ ~ ~ ~ ~ _ _ _ ~
V _ RID CINES ; , _ ~ , ~ ~ , ~ , ~ ~ ~ ~ -
0' R a so. . . . . . . . . . e . ~ ~ . v~; - . ' ,f ` ~ ~ 28' R
~ ~ , , /j~ S ~ ~ 8 R l S R~~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ a ~
~ ~i ~ Tq R,o / ~ h BIT I / ~ ~ o ~ ~
, UMINOU A 0 ~ . o . i, SERVIC ~ q ~'y . _ o. E ~ ~ ~ ~ ~ ~ ~ ~ _
~ ~ ~ ~ 'P/~- J J
' ~ , . ~ ~ ~ ~/~G, , ~ - / ~ / , ~ ~
26' R ~ ~ f ~ ~ ~ ~ ~ s ~QjL % p. ~ . ' . . . . .
0 F~j~FGy . - ' ~3 + ~
15 ~o~ ~0 9}- ~h . ~ ~p. / ti . . ~i~,, ~
\ \ . . ~ ' ~ . ~ ~ ~ ;
. i ~/T~ i , , M~No ~ / i ~ , g~' ~e ~~5 4~
~,s ~ \ . . ; . ii5• , / o . . , . , . . . 'i ;
• _ BUI~DING i BITUMINO 6, 3c~- ~
ORIENTATION HA~D PIAY! ~S ~Y ~ 6~9 ~ ~ ~ ~VG SURFAC 9~ 0. ~ ~ ~ i ~ ~ ~ : _ r:z~
. ~~y 8 q N qr c ~ ~ ~ ~ ~ ~ ~ ~ ~ NOTE5:~ ~ ~
` 0 5 .s: , E YAJ ' , OFT PIAYiN6 SURFAC ~ ~ I. ALL< DfMENSlONS FROM BUILDING ARE ~ROM ° ~ ~e, ~ '
A o ~o ~ ~ ~ FACE 0~ ~ BUILDING. ~ ~ L ` ~ ~ ~ ~ ~ ~ o~~~: m c
1~ 0 ~ Z. ALL DlMEMS(ONS TO BACK OF CURB, u~cn~ '
. 25 35' a 3, ALL DfMENSiONS AND ANGLES ARE ROUNDED
V-TY N } " I Q5' CUR6 ~ ~ OFF T0 NEAREST WHOLE ~UMBER. 2~ m. ~ c ~ s~,
, M , ~ . ~ ~ u , ~ f~,~... 4.BUl~DING f00TPRINT DIMENSIONS WILL BE 3~° " SUPPLIED TO CONTRACTOR PRIOR TO ~`o {0 ~
EADOW ROAD - o ~ , - ~ STARTING VdORK. ~v ~ ~ ~ ~ ~ ~ ~
~ , ~ , . ra.-~ ~ . MATCH LOCATION WITH 5. PROVIDE TWO BASKETBA~L BACKBOARDS AND ~
' ~ i FUTURE DEVELOPMENT ONE 7ETHERBALL UNIT, VERlFY EXACT ws ro' ~
i - ~ ~ LOCATlON WITH ARCHITECT ~IN~ FIELD, r '
/ a / . 6.USE Mn1DOT STANDARD FOR PAINTING ~~~s ` ~ ` HANDICAPPE~ PARKING STALLS:, L,°o ~ y ~ 1
~ _ > ~ / L. ~ 7. VERIFY PROPERTY LINE AND ~ORIVEWAY ' ~ ~ ' ' ~ ~ ~ ~ u~v, ~ ~ ~ o' ~
~ o ~ ' a` ~ INTERSECTION LOCATION WITH-0WNER AND ~ ; ~
/ ~ ° ~ _ ~ CITY PRIOR TO CONSTRUCTIQN. ~ L'~ ~ ~
~ ~ ~ m~a~ ~ - , _ ~ . m w ~ .'~i ; ~ ~ : . . . ~
~ / PLAYlNG FIELD „
. l ' - ~ ~
SOFT
~ BALL INFIELD
- ti BA STOP ~ ~ STOP ~ ~ ~ ~ ~
300' f7YP:) ' ~
I00' TYP) ~ ~
. 35 , ~ SCALE IN FEE~' ~ ~ ~ ~ ~
'0 25:' 5U 100 ~ t~3 ~ a~~,
~ , ~ ~ ~ ~ _ . , ~r . ~
. ~ ~ ~ ;
a z
~ ~ ~ ~ `
~ ~ . . '°k.
, . . ~ ~ ~ ~a..
: ~ . f~ '
~ . . . 1~ ~ ~ ~
~
' ' ~ ~ , r,,~
I a, mee~a;~.~4~+1~~~~k~~ : ,
m
~ _
~ . . ~ . . . . ~ ~ 1 r
, y ~ . ~ ~ ~ . . . ~ . . hr
° ; j ~
r . .
. . . . ' . ' , ~ ~ . ~ r y~
~ , , , . . ~ . . . . . . ~ ~ . ~ .
, . .
s,w....v ~ . _ _ . . . _ . _ . _ . . .r . . . . . . . . . . ~ . . . . . . _ . . / ~ ~ ~ ~
r
411,a". City or Eta"
3830 Pilot Knob Road
Eagan MN 55122
Phone: (651) 675-5675
Fax: (651) 675-5694
Use BLUE or BLACK Ink
For Office Us
Permit #: 7 /� valeQ
Permit Fee:
dor
Date Received:
Staff:
2013 COMMERCIAL PLUMBING PERMIT APPLICATION
❑ Please submit two (2) sets of plans with all commercial applications.
Date: Site Address: 420 C.2
Tenant:
Lee, env I 9 h'
Suite #:
Name:
`"4G' /'GQC License #: 06 /5.55 A.
State: , /.i Zip:. ,%2/
Address: 95% JA c✓uC'-e �� City: '%/�7'� ,�7
Phone: 5/ 211 Email: 64t 4:C/ G/''S r LAJP,67 CO
New Replacement Repair )e Rebuild Modify Space Work in R.O.W.
Description of work:
COMMERCIAL New Construction Modify Space
_ Irrigation System ( yes / no) (r, RPZ / _ PVB)
• Rain sensors required on irrigation systems
• Avg. GPM (2" turbo required unless smaller size allowed by Public Works)
Meters Call (651) 675-5646 to verity that tests passedprior to picking un meter.
Fire: 1
Domestic: Size & Type Fiushometers Yes _No
Avg. GPM High demand devices? Yes No
COMMERCIAL FEES:
$60.00 Minimum (includes $5.00 State Surcharge) _ $ Permit Fee
Radio Meter Read
Required on ALL new buildings and boulevard irrigation systems -� $ Meter M
s)
State Surcharge
*If the project valuation is over $1 million, please call for Surcharge $ _ .
$ Water Permit
Following fees apply when installing a new lawn irrigation system a Water
Perent itant
Contact the City's Engineering Department, (651) 675-5646, for required fee amounts. $ Water Supply & Storage
State Surcharge
OR Contract Value $ x 1%
CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you
intend to dig to receive locates of underground utilities. www aoaherstateonecall.ora
I gthat
I understand
that thiinformation a butlete onlyand accurate; that an application fortaework per t, and work l be in conformance
to startth the w houtranances and codes of permt that the workhwill be ofn
Eagan; that I understand this is notpermit,�
accordance with the approved plan in the case of work which requires a review and approval of plans,
x
plicant's Printed Name
x
Applicant's Signature
FOR OFFICE USE Approved By Date
Required Inspections: Under Ground Rough -In _Air Test ___Gas Test : ,_.__Final PRV Required _ YesNo
3
Minnesota Department of Human Services
June 30, 2014
Zoning Administrator
City of Eagan
3830 Pilot Knob Road
Eagan, MN 55122
Re: Zoning Notification of Application for
Department of Human Services Program License
License Number: 1048769
This is to inform you that the Department of Human Services, Division of Licensing has
an application for a program to be licensed under Minnesota Rules, parts 9503.0005 to
9503A170 from Pinewood Head Start, Pinewood Elementary School,4300 D�dd
Road,Eagan,MN 55123 to provide day care for 20 children.
Issuance of this license is subject to compliance with the provisions of Minnesota
Statutes, Chapter 245A.
If you do not contact the Division of Licensing within 30 days of receipt of this letter, we
will consider this facility to be in compliance with your local zoning code.
If you have questions regarding the facility or its location,please contact Lisa Ostrom at
651-322-3543.
If you have any questions regarding this letter, contact Kelly Gans at 651-431-6530 or
fa�information to (651)431-7673.
Sincerely,
t'� la/l/1V1�YU/i'�
�
Peggy Cunningham, Unit Manager
Licensing Division
Office of Inspector General
dme
PO Box 64242 *Saint Paul,Minnesota*55164-0242 *An Equal Opportunity Employer
http://www.dhs.state.mn.us/licensing
- 4110. Use BLUE or BLACK Ink
For Office Use 14161L°Id
CityOl EaUll :::::e:
'k 5 3�.
3830 Pilot Knob Road RECEIVED
Eagan MN 55122 Date Received: 2.] ‘G 11-7
FEB 15 2017
Phone: (651) 675-5675
Fax: (651) 675-5694 Staff:
LA/VI
2017 COMM ERCIAL BUILDING PERMIT APPLICATION LA'
(( �.
02/14/17 4300 Dodd Rd "1'� \
Date: Site Address:�
Tenant Name: 1� e C� � (Tenant is: New/ Existing) Suite#:
Former Tenant:
0: Independent School District 196 Phone: 651-423-7700
Name:
'I5 �5€
1 " k
ProOwner Address/City/Zip: 3455 153rd Street West Rosemount, MN 55068
Y Applicant is: Owner X Contractor
ak r�
y,i New secure vestibule and interior remodel
�II,Il T ,,pe of Worts L1:11,1,,i11111 M! Description of work:
'i k $80 000
"�� iii _ Construction Cost: ,
' _ � r Wenck Construction N/A - CM Format
� �,,"'-_,,„ ( G i l
�, Name: License#:
a�i�����lil�ul��'9V��d9
' 7500 Olson Memorial Highway City: Golden Valley
. @I�I111'ti ti, k �., Address:
s Cc r tactor
ir,� State: MN Zip: 55427 Phone: 763-252-6883
I,
Inelson�wenck.com
s' iii Ali i<'l �,ii
�'�I„�„� '�"J6��� contact: Luke Nelson
I�1� � Email:
,'�.„„,4,,11,'0!!,EIL ::;., h*'I Wold Architects & Engineers 21055
'�'i��l�' Name: Registration#:
«171; SII
332 Minnesota Street Suite W2000 Saint Paul
'i Address: City:,Itcc 651-227-7773
���a�,��� �,,, �,�,�I���,�, 55101
�i��,„„,i State: Zip: Phone:
�inlnl�'I�p 'I �' p�' 1'�?II ' Scott McQueen smcqueen�woldae.com
„ „ : � ,11i`,'' ., Contact Person: Email:
Licensed plumber installing new sewer/water service: Phone#:
N4?E Plans and supporting cdocu n e at4y ttbmit re ons der ftp,public informs on.''?o tins of
,,,,r,:,,,,,,;,,,,,,,
he mfo '% r' "'i�/asstfietl s an- a f' i e e � l ason hat tl r t 'p�!I
�„� ( 1 l t-- �y �I11Iji ^� P'iI III' II' , 1 _ �'��,
' T ck P' ,',1,,o4,,,,,,„pLI ! �1 IIIv �ac Ll ,,1,1:-'''''
-'' . �"fM�� N�� � III) ... ..
I�ii� �iIIllitipli iIi dilkl� o v i � ,. � ''��',�s �Ilh� —mz3 ti I
CALL BEFORE YOU DIG. Call Gopher State One Call at(651)454-0002 for protection against underground utility damage.
Call 48 hours before you intend to dig to receive locates of underground utilities. www.gor herstateonecall.orq
I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and
codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a
permit;that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans.
x
Lukt. t. Sova xdiietz_A,
Applicant's Printed Name Applicant's Signature
Page 1 of 3
1.0j. ,� I �
DO NOT WRITE BELOW THIS LINE Ck#Ci
SUB TYPES
Foundation _ Public Facility _ Exterior Alteration-Apartments
')( Commercial/Industrial Accessory Building _ Exterior Alteration-Commercial
Apartments _ Greenhouse/Tent _ Exterior Alteration-Public Facility
Miscellaneous Antennae
WORK TYPES
New x Interior Improvement Siding Demolish Building*
Addition Exterior Improvement Reroof _ Demolish Interior
Alteration _ Repair Windows _ Demolish Foundation
Replace _ Water Damage Fire Repair _ Retaining Wall
Salon Owner Change *Demolition of entire building—give PCA handout to applicant
DESCRIPTION
Valuation *fp,oO D Occupancy MCES System l/GS
Plan Review `/ Code Edition 24 S AVG SAC Units
(25% 100% 1) Zoning .?F City Water
Census Code Stories Booster Pump --
#of Units Square Feet PRV �
#of Buildings Length Fire Sprinklers
Type of Construction 2Z'3 Width
REQUIRED INSPECTIONS
Footings(New Building) Final/C.O. Required
Footings(Deck) x Final/No C.O. Required
Footings(Addition) Other:
Foundation Foundation Before Backfill Pool:_Footings _Air/Gas Tests Final
Drain Tile Siding: Stucco Lath Stone Lath _Brick EFIS
Roof:_Decking Insulation _Ice&Water Final Retaining Wall
X Framing )'( 30 Minutes 1 Hour Erosion Control
Fireplace: Rough In Air Test Final Concrete Entrance Apron
Insulation Meter Size:
Sheetrock Electronic Plans Required
Windows
Final C/O Inspectio I• I-.-le Fire Marshal to be present: X Yes No
di
Reviewed By: ` , Planning New Business to Eagan: 71/4)6
Reviewed By: ,. � , Building Inspector
FEES Water Quality
it
Base Fee 906
0)74ccky ,
e (*,40., For Office Use%�` ,�, :::::e;
61 c : (e.0,(
�' y
R Date Received: /410"
�/
3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810 /
(651)675-5675 I TDD:(651)454-8535 I FAX: (651)675-5694 , Staff:
buildinginspectionsaa(�cityofeaoan.com ;`Cul 15 2018 L N
2018 COMMERCIAL FIRE ALA M P RMIT APPLICATION
Date: Site Address: Ueda' �0O /•
Tenant: i'�(-'( ("(-� Suite#:
0 Requirements: 2 complete sets of drawings and specifications,cut sheets on materials and components
ISD 196 651-423-7700
Name: Phone:
PropertyOwner Address/city/zip: 3455 153rd st. W. Rosemount, MN 55068
Applicant is: Owner X Contractor
Type sof Work
Description of work: Add 1 monitor module and 2 relay modules for lockdown
Construction Cost: 900.00 Estimated Completion Date:
Name: North Ridge Communications LLC License#: TS718995
Contractor
Address: 12701 Chowen ave. Suit 104B city. Burnsville
State: MN N Zip: 55377 Phone: 952-456-6447
Brad Long tin bradl@northridgecom.com
Contact: Email:
New Remodel
Work Tye, V Addition Other:
Alterations
DESCRIPTION OF WORK: _Commercial Residential Educational
FEES Contract Value$900'00 x.01
$60.00 Permit Fee Minimum
=$ 60 Permit Fee
Surcharge=Contract Value x$0.0005 =$ .45 Surcharge*
If the project valuation is over$1 million,please call for Surcharge 60.45
_$ TOTAL FEE
You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's
website at www.citvofeagan.com/subscribe.
I hereby apply for a Fire Alarm permit and acknowledge that the information is complete and accurate;that the work will be in conformance with the
ordinances and codes of the City of Eagan and with the Minnesota Building/Fire Codes;that I understand this is not a permit,but only an application for
a permit,and work is not to start without a permit;that the work will be in accordance with the approved plan in the case of work which requires a review
and approval of plans.
xBradley Longtin x CJS," ';> r %;9
Applicant's Printed Name Ap•licant's Si. ature
FOF OFFICE•U R y - ,' «ID : /' I
I , , -� k F k�t}VE t� t I €E ,
m ctivk i ] • { �i
fed" i, �,
,Irl$�1 :: �� : .a '� I" �+ .F• tl"e �� � � � � •,< a iiti
1��For Office Use cc �jR
o ® i # Permit#: / J C " di4ec
cra � , R�i
AGAN
" ," `r '0 Permit Fee: do 3- �' 5,,2-?-
,
'"`► Staff: , J
4
3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810 I Payment Recvd: Yes No
-49
(651)675-5675 I TDD:(651)454-8535 I FAX: (651)675-5694 _ I _.(•
Email: buildin ins ections ci ofea an.com ,�N^"Ele
g p (� ty 9 ���1��° � I
Plans: ElectronicPaper
Plan Submittal: eolansCa�citvofeaoan.com __ ____ ____
MAY 2 9 2019
2019 COMMERCIAL MECHANICAL PERMIT APPLICATION
❑ Please submit two(2)sets of paper plans with all commercial applications as well as an electronic set of the
submittal, submitted via email, CD or flash drive
Date: S•Z`1- 1cr Site Address: Q3oo 1-) r9c', ,6. LAgcn • !MJ -1.7 Z3
Tenant: ?tnllwc,,r�. IS .v4l' Suite#:
Name: I�nR wbv� F(¢»'1.rt77777:34)vv;vPrL? 1& ,
Phone: �o�( 'G,8 3 bo y
fi g Address/City/Zip: y300 (7udc Q�.
: Name: CAr�I aechcvl(CCLk. License#:
%- ••• Address: SW`s �1��Sbort Ave . City: �Q�
" State: M 1.1 Zip: SS S Phone: 46 3"C3 3 .3 03� ]� 0
e r Contact: Lam=�S� Email: /0)5"e w Gorpkr0 I'Y1Pcl'Iw1 f Cu I-cel
New Replacement Additional Alteration ff
Demolition
•:•i,'.:r..•.•,....',441,:;";":','
z
F f �
7
{ i
V
r
a ew .ex -b � w
Description of work � r1 V to rF(o
1 ,- sv a!C ::,4 #4t n 1 rte lsi equ a tte sc by .N
K%r P r- c r r � 1 qtr v,.',,,,. ... - - t_ �Nt�i` '•�±n ... t , � •,
Ai z v� COMMERCIAL
Y J
New Construction )C Interior Improvement
AL f
Permit , X''''' Install Piping Processed
q� h M s
Gas Exterior HVAC Unit
Under/Above ground Tank ( Install/_Remove)
COMMERCIAL FEES
$60.00 Permit Fee Minimum Contract Value$ 13,lOv x.0"18
$75.00 Underground tank removal, includes State Surcharge =$ Permit Fee
Surcharge=Contract Value x$0.0005 =$ Surcharge
If the project valuation is over$1 million,please call for Surcharge =$ TOTAL FEE
You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's
website at www.citvofeagan.com/subscribe.
I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of
Eagan;that I understand this is not a permit,but only an application for a permit,and work is not to start without a permit;that the work will be in accordance
with the app ) :: *Ian in the case of work which requires a review and approval of plans.
Pos E.
x / xj4
ppliica , s rinted Name Applicant's Signature
�. Sergi est In for Heat Final HVAC K «t