Loading...
860 Cliff Rd Use BLUE or BLACK Ink I For Office U~sle~~ , Permit "J -7 23 1 City of EaedIl , JUL 0 9 REC Q , Permit Fee:. 3830 Pilot Knob Road l , Eagan MN 55122 Date Received: j Phone: (651) 675-5675 , Fax: (651) 675.5694 $tatf: 2010 COMMERCIAL BUILDING PERMIT APPLICATION f' lG Date: .7/11/ '-~O10 Site Address: (8 W _ (LL. i FF' 12c>-AO. Tenant Name: C R k ®-r A C00 ,11r)/ JOA z)4 S (Tenant is: New / X Existing) Suite Former Tenant: PROPERTY OWNER Name: p A kaT A (fjoo,41-Z P A 2 k S Phone: Address/City /Zip: 1H t~AL.AVi4e Ave APPce 11ALL4T Applicant is: _X_ Owner Contractor TYPE OF WORK Description of work: NErec M o nr y rr• +eAlr 6'/VT2An/CG S> 6 AI d Construction Cost:t , r 7S do CONTRACTOR Name: License Address: City: State: Zip: Phone: Contact. Email: ARCHITECT / Name: Registration ENGINEER Address: City: State: Zip: Phone: Contact Person: Email: Licensed plumber installing new sewer/water service: Phone NOTE. Plans and supporting documents that you submit are considered to be public information. Portions of the information may be classified as non-public if you provide specific reasons that would permit the City to conclude that the are trade secrets. CAtL BEFC?R , YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.Aopherstateonecall.org 1 hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and odes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit, that the work will be in accordance with the approved plan in the case of wo ich requires a review and appro 1 of plans. x I~Jf5OVAl I S r/LerE/L►Mt~TN x Applicant's Printed Name Applicant's Signature Page 1 of 3 i e, C a- 33 s C t~7~ ~5 -7 7,-3 DO NOT WRITE BELOW THIS LINE SWS TYPES Foundation Public Facility Accessory Building _ Apartments Commercial / Industrial _ Exterior Alteration Apartments _ Lodging _ Greenhouse / Tent _ Exterior Alteratlon-Commercial ` Miscellaneous Antennae Exterior Alteration-Public Facility WORK TYPES New Interior Improvement _ Siding Demolish Building* _ Addition Exterior Improvement Reroof _ Demolish Interior Alteration _ Repair Windows Demolish Foundation Replace _ Water Damage Fire Repair Salon Owner Change _ Retaining Wall *nemolition of entire building - give PCA handout to applicant DESCRIPTION Valuation b Occupancy MCES System Plan Review Code Edition SAC Units (25%~ 100%~ Zoning City Water Census Code Stories Booster Pump # of Units Square Feet PRV # of Buildings Length Fire Sprinklers Type of Construction Width REQUIRED INSPECTIONS Footings (New Building) Sheetrock Footings (Deck) Pinal / C.O. Required Footings (Addition) Final / No C.O. Required Foundation Other. Drain Tile Pool: -Footings Air/Gas Tests `Final Roof: -Decking _,„_fnsulation -foe & Water „-Final Siding: __Stucco Lath Stone lath .,,,,,.,Brick framing Windows Fireplace: -Rough In Air Test _,__Final Retaining Wall Insulation Erosion Control Meter We: Final C/O Inspection: Schedule Fire Marshal to be present: Yes ___No Reviewed By: Building Inspector Reviewed By: Planning COMMERCIAL FEES Base Fee Water Quality Surcharge Water Supply & Storage (WAC) Plan Review Storm Sewer Trunk MCES SAC Sewer Trunk City SAC Water Trunk S&W Permit & Surcharge Street Lateral Treatment Plant Street Treatment Plant (Irrigation) Water Lateral Park Dedication Other: Trail Dedication Water Quality TOTAL Page 2 of 3 I 41? City of Eap 3830 Pilot Knob Road Eagan MN 55122 Phone: (651) 675-5675 Fax: (651) 675-5694 ,-------- ---------, ? For O_ffice UseQ QQ I i Permit #: ? ? j Permit Fee I? i ? ? DateRecei .?0? I ? ? StaN: ? ------ ---------- 2008 COMMERCIAL PLUMBING PERMIT APPLICA Date: 0 1 D 1 v[] Site Address: C(Up T?- Tenant: ?/ i1 C l i Suite #: PROPERTY 1( o-r'i rit 1 f'l A? Name: T n Cl X?,'b Phone: Ln'11 -"(O"i -a-i 55 OWNER - CONTRACTOR Name: License #: Address:?5??4 NVQ• City: State:?,r) Zip: 5?a? Phone:7TCo?J-!?J?i,3-,--?010 ContactPerson: HI IQrc°i-Yj TYPE OF Replacement Repair New x Rebuild _ Modi(y Space _ Work in R.O.W. WORK _ - ' I D'CJ V hI J ?l 7 I ?` SZq q t d - - 1 l Description of work: e _ 1 (JL PERMIT TYPE COMMERCIAL New Construction Modify Space Irrigation System ( yes 1_ no) (_ RPZ PVB) • Rain sensors required on irrigation systems • Avg. GPM _(2" lurbo required unless s maller size allowed by Public Works) Meters Call (651) 675-5646 to verity that tests passed prior to oickina uo meter. Domestic: Size & Type Fire: Size & Price 3/4" meter 1$83.00 Avg. GPM High demand devices? _Yes _ No Flushometers _Yes _NO PRV Required _Yes _NO ?I COMMERCIAL FEES: $50.50 Minimum (includes State Surcharge) OR contract vaiue S?? •- x 1% Permit Fee Required on ALL new buildings and boulevard irrigation systems 4_$ Radio Meter Read - If Pertnit Fee is leu than $1,000, surcharge is $.50 =$ Meter(5) - If Perrnit F?e is> $7,000, surcharge increases by $.50 for each $1,000 $1,000 Permit Fee (i.e. a$1,OOb$2,000 Permit Fee reqwres a$7.00 surcharge). _$ State Surcharge Following Sees apply when Installing a new lawn irrigation system. $ water Permit Call the City's Engineering Department, (651) 675-5646, br required fee amoums. $ Treatment Plant $ Water Supply & Storage $ • SO State Surcharge TOTAL FEES $ I hereby acknowletlge that Ihis inFOrmation is completa and accurata; ihat the work wtll be In conformanca wIN the ordinances end cades of the Ciry ol Eegan; [hat I undarstand this is not a permit, but only an application tor a permit, and work Is nol fo start wilhout a permit; ihat the work will be in accortlance with the appmved plan in the case ol wak which requires a review antl appmval ol plans. X ??r,F I lex, V(Dli, siucl Applicant's Prlnted Name ?"IicanYs Signature FOR OFFICE USE APpr6vBd?By: Date: Ground Rough-In Air Test Gas Test _Final Page 1 of 3 ?2ZZ 2 2006 COMMERCIAL BUILDING PERMIT APPLICATION City Of Eagan 3830 Pilot Knob Road, Eagan Mn 55122 Telephone 9 651-675-5675 FAX # 651-675-5694 • Structural Plans (2) sets . Civil Plans (2) . Certificate of Survey (1) • CodeAnatysis (1) " . ProjectSpecs (1) . Spec. Insp. & Testing Schedule " • Soils Report (1) . Meler size musf be established 1 1 1 1 1 1 • SACdetermination-ca11651-602•1 000 *q9. Zs ??, l La,( r?zs .,?J Sk . Architedural Plans (2) sets • CodeAnalysis (1) " . Project Specs (1) • Key Plan (1) . Master Exit Plan (1) . Energy Calculations (1) not always'" . Elec. Power & Lighting Form (1) not always" . Meter size must be esta6lished-if applica6le 1 1 d 1 l. SAC delermination - call 651-602-1000 CaII MN llept of Health at 651-215-0700 f facilil Contact Building Inspections for sample and if required ** * Permit for new building or addition will not be processed without Emergency Response Site Plan. Date/_/ ? 3 / G6 Construction Cost y, vov "Of Site Address o ?, ?o Q d. ,E'A w i IInit/Ste # TenantName ?korn J?aaks For enantName s?k0 L Z ?.+k? a?AC,a JqN 2 3 . Description of Work vW o o-s?,oe wacc i6 c¢-,s7? 0 0 C???n?6 F"a2 tIc°NO PropertyOwner UAlco?-?a eGUniTy +?AZIc4 Telephone#(6S/ )'13?-U6qJ- ?Je.v-,.s Applicant is: X Owner _ Contractor Cantac[ #: ( 6s"i ) ?r3 `6 - z1691 < <cc 01` ?o 7- a ? 5-3 Contractor 3Akorrj Co?^i'r/ /?A akS Address /?ICiSS GAc ftK,¢ 19-ve City ppL2 l/w«e? ? State ?vl n/ Zip S"'S/ 2 S? Telephoue#((,?y ) cJ3-4/6 4/ Arch/Engr 1/v f a r d- A s so cin-r f S Registration # ?? 7o s Address y63S NicutS /?ej oS? City ,qvaN State M IV Zip Telephone #(6 S%) 6 a ?- 77 ZZ Licensedplumberinstallingnewsewerlwaterservice: Phone#: (? I hereby apply for a Commercial Building Permit and acknowledge that the mformation is compiete and accurate; that the work will be in conformance with the oxdinances and codes of the City of Eagan and the State of MN Statutes; I understand this is not a permit, but only an application for a permit, and work is not ro start without a permit; that the work wil] be in accordance with the approved plari in the case of work which requires a review and approval of plans. • Architectural Plans (2) sets • Slmctural Plans (2) • Civil Plans (2) • Landscaping Plans (2) • CodeAnatysis (1) " • Certifcale of Survey (1) • Spec, fnsp. & Testin9 Schedule (1) " • Meter size must be established • Project5pecs (1) • EnergyCalculations (1) " . Electnc Power & Lighting Fortn (1) " • Master Exit Plan (1) . Emergency Response Site Plan (1) • Soils Report (1) • SACdetermination-ca1165'I-602-t D00 . Fire Stonoina Submitfals or details regarding food& beverage or lodging +/G Y)ZArni J 5 (-';Z e , E'2.M 11 T r-l 1?0_1 Applicant's Printed Name Applicant's Signature DO NOT WRITE BELOW THIS LINE Sub Types El 01 Foundation ? 14 Apartments [J 15 Lodging ? 25 Miscellaneous Work Types ? 31 New ? 32 Addition ,B' 33 Alteratio n ? 34 Replace ment Valuation 000 J Plan Rev 100% f 25% SAC Units "' d " Nbr. of Units s Nbr. of Bldgs 1 ,X 26 Public Facility ? 30 Accessory Building ?@°C 27 CommerciallIndustrial ? 32 Ext Alt-Apartments ? 28 Greenhouse ? 34 Exf Alt-Commercial ? 29 Antennae ? 35 Ext Alt-Public Facility ? 37 Nail Salon ? 35 Int Improvement ? 38 Demolish (Interior) ? 44 Siding ? 36 Move Bldg. ? 42 Demolish (Foundation) ? 45 Fire Repair ? 37 Demolish (Bidg)` C] 43 Reroof O 46 Windows/Daors `Demolition (Entire Bldg anly) • Give PCA handout to applicant ? Type of Const g Width Occupancy MCES System Zoning City Water Stories Booster Pump Sq. Ft. PRV Length Fire Sprinklered Required Inspections _ Footings (new bldg) Footings (deck) _sell Footings (addition) Foundation Drain Tile _ Driveway Apron Rwf Ice Pr _ Decking _ Insul _ Final v Framing _ Fireplace _ R.I. _ Air Test _ Final Insulation ? Sheetrock /FinaUC.O. ? FinaVNo C.O ? Other _ Pool Ftgs AirlGas Tests Final Siding _ Stucco Lath _ Stone Lath _ Final W indows Final C/O Inspection_ Schedule Fire Marshai to be present. Approved By: Planning eemca- Base Fee Surcharge Plan Review SAC-MCES SAC-City SM! Permit S/W Surcharge Treatment Plant Treatment Plant (Irrigalion) Park Dedication Trail Dedication Water Quality Water Supply & Storage (WAC) Yes No Building Inspector Financial Guarantee Storm Sewer Trunk Sewer Lateral Street Water Lateral Other Total SewerTrunk Water Trunk t:?? -?-3(-) pf?4 GgU1.lma.rt? Name: ?p q.[G0i} (OJNS`[ { ?R"'5 DfL? t ' Phone#: Last First StreetAddress:SDSD ? y7 t? ?? ?• ?T City: t _4%. 1 )N45 State: COMMERCIAL 2002 BUILDING PERMIT APPLICATION CITY OF EAGAN 651-681-4675 oundation Onl New Construction Interior Im rovement . Structural Plans (2) sets • Nchitectural Plans (2) seGs • ArchiteGural Pians (2) sets . Civil Plans (2) • Struc[ural Plans (2) . Code Malysis (1) " . CeAifirate of Survey (1) . Civil Plans (2) . Project Specs (1) • Code Analysis (1) • Landscaping Plans (2) • Key Plan (1) • Project5pecs (1) • CodeAnalysis (1) . Master Exit Plan (1) • Spec. Insp. & Tesdng Schedule " . GertiTicate of Survey (1) . Energy Caiculations (1) not always" . Soils Report (1) . Spec. lnsp. & Testing Schedule (1) " . Elec. Power & Lightlng Form (1) not always" • Meter size must be established • Meter size must be esfablished . Meter size must be esta6lished - if applicable . Project Specs (1) 1 • EnergyCalculations (1) " 1 1 • Electric Power & Lighting Form (1) " l 1 • Master Exit Plan (1) 1 1 . Fire Protection Plan (7)" 1 1 • SoilsReport (1) d . MClES SAC determination letter • MClES SAC determination letter . MClES SAC determination letter cali 651-602-1000 ca11651-602-1000 ' ca11 6 51-6 02-1 00 0 Contact Building Inspections for sample Food & 6everage or lodging facilities - submit plan to MN department of Health. Call 651-215-0700 ior details. DATE: ?t ?( u QL WORK TYPE: -& NEW _ REMODEL CONSTRUCTION COST:,, I, ?? 1 ob0 SITEADDRESS: 751oD C1 's.0_ WD TENANT NAME: Qt5xk60-49 C?o dN `Y SUITE #: FORMER TENANT NAME, IF APPLICABLE: DESCRIPTION OF WORK Company: /,5 Jti*" ?o?ST,'2J?'Cr?2-S ?n1C , Phone #: ( 4S 1 PROPERTY OWNER CONTRACTOR ARCHITECT/ ENGINEER Sneet Address: lY qy (04 10 CgA4 1 ?a si'o ,E-0 Pi- °3se(3 " l" (3 f 4!3$ 4fLGZ ziP: ?;So s 3 )"1') `f V414S ciry: 5. Prw&- srace: Mrr ztp: C-s' 'PP,O)(: Mke? ?' uEFrL'r?++?I (ost• 43a•4's&iG MkNk?.. (DkkarA ? Company: ?01rP-rPF.Rf' ?' S.7[ vp?_ Phone #: ((. l2. )_%y ? 10'7 O Name: SJvh-A 5" Registration#: i??? r StreetAddress: /DO 1JN5o^4 PGft JJIVSk-_-?44 -for-[ (GrJ City:. ('1n.5N4%GA-POL35 5tate: Licensed plumber installing new sewerlwater service: Phone #: I hereby acknowVedge that I have read this application, state that the information is correct, and agree Minnesota Statutes and City of Eagan OMinances. Signature of Applicant: Uptlated 1/02 OFFICE USE ONLY SUBTYPE ? 01 Foundauon ? 14 Apartmenls ? 15 Lodging ? 25 Miscellaneous WORK TYPE X 31 New ? 32 Addition ? 33 Alterations ? 34 Replacement ;K 26 Public Facility L? 27 Commercia]/Industrial ? 28 Greenhouse ? 29 Antennae GENERAL INFORMATION Census Code 3 ///ls SAC Code ? No. of Units No. of Bldgs. ? Const. (Actual) .. (Allowable) V • h( UBC Occupancy A -3 Zoning # of Stories L,ength Width Basement sq. ft. First Floor sq. ft. sq. ft. MISCELLANEOUS INSPECTIONS ? Gas Service Test ? Heating APPROVALS Spy D3b ? Insulahon ? 30 Accessory Bldg. ? 32 Ext Alt - Apts. ? 34 Ext Alt - Comm. ? 35 Ext Alt - PF ? 37 Nail Salon sq. ft. sq. ft. sq. ft. sq. ft. MC/ES System City Water Fire Sprinklered q Plumbing ? ? Stucco/Stone Planning Building (2,JEAM(r-, Engineering Permit Fee ( rb 1, ?.5 Surcharge S • o 0 Plan Review D- o 0 MC/ES SAC 00 - e-o City SAC ? oO . a-v Water Supply & Storage S/W Permit I ° c- • &4-? SIW Surcharge Yo ' Treatment Plant (40 Park Dedication Trails Dedication ` Water Quality ? Other [!n?3W?G?[W?, C}¢kQ6,6s Copies rotal 51 1 ?. ? 35 Tenant Impr ? 42 Demolish (Foundation) ? 46 Windows/Doors ? 36 Move Bldg ? 43 Reroof ? 47 Repair ? 37 Demolish (Bldg) ? 44 Siding 0 48 Authorization ? 38 Demolish (Int) ? 45 Fire Repair Variance VALUATION $ 10 ibb6 ? ?TG? ? FOUh1DAZRo?I b?t.?/. % SAC 100 0/a SAC Units ? Meter Size - - • ? ?/Ni4?+t1UfJ-L _ . ?, . . . ? • C7Uftz*Aqr? k5 cvkrurO @ r?z, PZr-Mro?-? 7?0 ?e en(lecf,d 4 t -A„?/&k4y Lo ?- ? P? 1 o cJ? s S-rf Jl1 O?Y, --'.> --, 2004 COMMERCIAL BUILDING PERMIT APPLICATION City Of Eagan , 3830 Pilot Knob Road, Eagan Mn 55122 O,? Telephone # 651-675-5675 FAX # 651-675-5694 Foundation Onl New Buildin Interior Im rovement • Strudural Plans (2) sets • Nchitecturel Plans (2) sets • Architectural Plans (2) sets . Civil Plans (2) • Structural Plans (2) • Code Analysis (1) " • Certificate of Survey (1) . Civil Plans (2) • Project Specs (1) . Code Analysis (1) " • Landsqping Plans (2) • Key Plan (1) • Project Specs (1) • Code Analysis (1) " • Master Exit Plan (1) • Spec. Insp. & Testing Schedule • Certificate of Survey (1) • Energy Calculations (1) not always" • Sods Report (1) • Spec. Insp. & Testing Schedule (1) " • Elec. Power & Lighting Form (1) not always" • Meter size must be established • Meter size must be established • Meter size must be established-if applicable l. . ProjectSpecs (1) 1 • EnergyCalculations (1) b • Electric Power & Lighting Fortn (1) 1 • Master Exit Plan (1) 1 1 • Emergency Response Site Plan (1) 1 • Soils Report (1) 1 • SAC determination - call 651-602-1000 • SAC determination - call 651-602-1000 SAC determination - call 851-602-1000 Call MN Dept of Health at 651-215-0700 for details regarding food & 6everage or lodging facilities. Contact Building Inspections for sample and if required when rt states "not always". *** Permit for uew building or addition will not be processed without Emergency Response Site Plan. Date Site Address /o7 d ?G O - Construction Cost UniUSte # O? o Tenant Name •(C o? Q V wW? Former Tenant Name Description of Work n2 Ov-C V4 aKA ? / ?C& E Property Owner Telephoue #( lo Contractor Address City State _ M 1J Zip Telephone # ( ) Arch/Engr 2004 Registration # Address City State Zip Telephone # ( ) Licensed plumber Installing new sewer/water service: Phone #: (_) I hereby apply for a Commercial Building Permit and acknowledge that the information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan and the State of MN Statutes; I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. IZ) o,V 6-, P?_C, ApplicanPs Printed Name ApplicanPs Signature OFFICE USE ONLY Sub Types :1 01 Foundation 11 14 Apar[ments 71 15 Lodging ? 25 Miscellaneous !J 26 Public Facility 'X 27 Commercial/Induslrial ? 28 Greenhouse ? 29 Antennae ; ? 30 Accessory Building ? 32 Ext Alt-Apartments D 34 Ext Alt-Commercial D 35 Ext Alt-Public Faciliry ? 37 Nail Salon Work Types ? 31 New ? 35 Int Improvement ? 38 Demolish (Interior) ? 44 Siding ? 32 Addition ? 36 Move Bldg. ? 42 Demolish (Foundation) ? 45 Fire Repair * 33 Alteration ? 37 Demolish (81dg)* ? 43 Reroof ? 46 Windows/Doors ? 34 ReplaCement •Demolition (Entire 81dg only) - Give PCA hantlout to applicant Valuatlon Occupancy A t-3 MCES System Census Code ?f3 7 Zoning City Water SAC Units -` ?`- Stories Booster Pump Nbr. of Units '- Sq. Ft. PRV Nbr. of Bldgs ? Length Fire Sprinklered Type of Const Width Required Inspections _ Footiugs (new bldg) Insulation _ Footings (deck) FinaVC O _ Footings(addition) ? . . FinallNo C.O. _ Foundation Other Drain Tile - Roof Ice Pr ? F Decking _ Insul Final Pool Ftgs Air/Gas Tests Final ranung Siding Stucw Stone _ Fireplace _ R.I. _ Air Test _ Final Windows Approved By: Planning tir-Building Inspector Base Fee Surcharge Plan Review MCES SAC Ciry SAC Water Supply & Storage S/W Permit S/W Surcharge Treatment Plant Park Dedication Trails Dedication Water Quality Copies Other Total ?- : , . CONIMER8IAL ? `'?f 2002 BUILDING PERMIT APPLICATION ? c ? CITY OF EAGAN ? 651-681-4675 pne- ?.M l'r 1 /Y&4 Fn( )tiIDA.Tft)v.I PPR irnr Y-? GC.6nY? Foundation Onl New Construction Interior I rovement • S[ructural ?lans (2) sets • Archrteclural Plans (2) sets • Architectural Plans (2) sels • Crvtl Plans (2) • Slructurel Plans (2) • Code Analysis (1) ^ • CenifcateofSurvey (1) CivdPlans (2) • ProjectSpecs (1) • CodeAnalyss (1)" LanCscapinqPlans (2) • KeyPlan (1) • Project5pecs (1) CodeAnalysis (1) " • Master Exit Plan (t) • Spec. Insp. 8 Tesling Schedule " • Certificate of Survey (7) • Energy Calculations (1) not always" • SoAs Report (1) . Spec. Insp. & Tesnng Schedule (1) " • Elec. Power & Lighting Form (1) nol always" . Meler size must be established Meter size must be established • Meter size must be esta6lished - if applicable Project Specs (1) 1 • EnergyCalculations (7) " ! 1 • Electric Power & Lighling Form (1) 1 • Master Exit Plan (1) 1 1 • FireProtecGOnPlan (1)" 1 1 • Soils Report (1) 1 • MGES SAC de[erminaGon letter • MGES SAC determination IeHer • MGES SAC determination letter c311 651-602•1000 call 651-002-1000 WII 657-602-1000 " Contact Building Inspections for sample Food & beverage or lodging facilities - submit plan to MN Department of Health. Call 651-215-0700 for details. DATE: 4?l d?0G WORK TYPE: ? NEW _ REMODEL CONSTRUCTION COST: 000 ,t-" SITEADDRESS: C.:P*4 PA-r, TENANT NAME: ? 4 Ca "i+q Co i- SUITE #: FORMER TENANT NAME, IF APPLICABLE: DESCRIPTION OF WORK Nf,-J 'k 4 i.AgI`l t (i2 PROPERTY OWNER r Name: DA-(A ,k lo Int il !ka-GS 0 fGG ? Phone (?t5'! t% Last Fust Street ! ?- I ?` 5(, ?As r Ciry: State: M? Zip: 3 Company: !, S gl.AC-K 6v,?S'(a.JCTa{LS _cn1C . Phone#: (loS? 1344 s CONTRACTOR Sneet Address: ly qS Sw *-rJ P'^ City: ei?, Pth/` State: ?"t^J Zip: ? s t 1 ? 'Peo ) eJ::J-: N?kqYewAiIii ?s ???3a • 4?s? c MAWill (Dakora CO.) .4RCHITECT/ EYG[tiEER Company: ?q¢T?? v 7,i?? Phone #: ( G IL ) 3y ? /G7 n : V ame: Registration #: i Street Address: !GO ?)N +Or•s Ciry: State: M?j r__?'t_ =?- , :? .. ' Licensed plumber installing new sewerlwater service: Phone #: I? J'r? `?? I I hereby acknowledge that I have read this application, state that the information is wrrect, and agree tgomply with all ?tf(e $tate of Minnesota Statutes and Gty of Eagan Ordinances. '7 // y--- --- -- _J Signature of Applicant? f UOaated 1i0: ?-, OFFICE USE ONLY SUBTYPE Ol Founda[ion 14 Apartments 15 Lodging 25 Miscellaneous WORK TYPE ? 3l New 32 Addition 33 Alterations _ 34 Replacement _' 26 Public Faciltry x 27 CommerciaUIndustrial _' 28 Greenhouse , 29 Antennae _ 30 Accessory Bldg. 32 Ext Alt - Apu. 34 Ext ,41t - Comm. 35 Ext Alt - PF 37 Nail Salon _ 35 Tenant Impr 42 Demolish (Foundation) _ 36 Move Bldg = 43 Reroof - 37 Demolish (Bldg) - 44 Siding ? 38 Demolish (Int) = 45 Fire Repair GENERAL INFORMATION -ensus Code _2d_b_ Zoning iAC Code ? D # of Stories Vo. of Units 1 Length Vo. c ' Bldgs. ? Width (F,otual) V • ?1 Basement sq. ft. (_allowable) v•*4 First Fioor sq. ft. `JBC Occupancy A '?) sq. ft. YIISCELLANEOUS INSPECTIONS Gas Service Test = Heating 4PPROVALS 'lanning 'ermit Fee 3urcharge 'lan Review v1C/ES SAC :ity SAC Nater Supply 8 Storage 46 W'indo«s,Doors -- 47 Repair _ 48 Au:honzation ? sq. ft. I sq. ft. I'Zy sq. fr. sq. ft. MC/E5 System f.,030City Water Fire Sprinklered - Insulation : Plumbmg Butlding C2&(O Engineering ? -? - Stucco.Stone Variance rJ"'? (c I. Z4j VALUATION $Iq o, OD D? 4RS, oU % SAC 0 /00 v SAC Units A_ Meter Size i/W Permit /k(,E, OTNT:V-- f-F,-ES W e7R-C- 3/W Surcharge w /T/-f- F7Z-, ?-? I-r- i reatment Plant 'ark Dedication ; rails Dedication Nater Quality DtherOONNE5L7loIJ lf?,WD:'ldo,}.SGb Ste secoplD" SHff-lr Fo28P-CcKDaWj :opies `otai i(o1 t71 • 04'r 1812 city of eagan R me It To: CTI'Y OF EAGAN 3830 PILOT KIVOB ROAD EAGAN MN 55121 657 675-5021 @illinaAdOress• 1084$7 DAKOTA COUNTY PARKS 8500 127I'H STREET E. HASTINGS, MN 55033 ATTN: STEVE SULLIVAN 0 INVOICE 1812 Invoite Date 6/3/03 Due Date WITHIN 30 DAYS OF INVOICE DATE ltem Remazk Amount TAUNK STORM SEWER CONNECTION 76,448.00 AND AVAILABILITY CHARGE 860 CLIFF ROAD - VISTTORS CENTER (BLDG. PERMIT 54054) L3:t! k'u=eipf NJO:Cirr- 4'4rf1 - _• ,a' i: ---_ H.:: T--13! "etF1DiAId@b'Gi IG.44`v.i^l" Total Amount Invoiced 76,448.00 Sales Tax Total Balance Due 76,998.00 ?kl coQ }„ °i-S-1-1 , y611 Dakaha County Real Estate Inquiry Dakota County Real Estate Inquiry Data Updated 711102 ? Page 1 of 1 Legend Rir phatos may b e displaceE byupto80 Feet Shadauus may musa additianal apparent displacement. Buildinps may appearto lean due m camera angle Oate of phoEograpAp.20C0 Air Photo - Choose a search meNOO, enter critena, and Gick Go or hit enter key. House #:I Go Addressf- !LO PIN:I Go This applicalion was developetl by the GIS unrt of the Dakota County Survev_and Land Intormation Department in cooperatlon with Assessing Services, Trea sur_er , Auoiror anA Propertv Record-? Departmenls /? c e u n r r?n / ??,' L07 /1 ' GhJn C/??r7 PJ / ???,???f?`' Cl? dJ?? ?d`nS i"?.?+"7`? /!'(% r/ rl e G' p/ Q n d ?? [ J! f u',/ ? L' /1 ' .° •? J L y3 Sbo s?<</?1? e.?yf s? ? f f f-74 G? a3.3Sl f're % 3Yo s= V 3, 7b'J ;UQnr?o'Y J'lw?c?r fr?n ? x y ?,'!y ?h?afPr? ?•-?,^E,. ? 93i /fn? ?/,r,? '! 3Sf?c !- ,. X i o,? s Y'f ? ?- . I . ? ? ? e:. • ? t4 _' .../esrimap.dll?Name=webq 1 &Left=547372.224628144&Bottom=212123.4875&Right=550027/12/2002 ? Select option and click map: Zoom In ? ?' Whole County I Refresh Map 5 9 C O U N T Y Office of che Counry Board Dakora Counry Adminirtauon Center 1590 Highway 55 Hasungs, MN 55033 651.438.4418 Fax 651.438.4405 www.co.dakota.mn.us se hm?m an recy?led Paper N 30%posimnvumr wssa an pllPt IX1CIIiJ\RT Fl0.0FEi AUgUSt 27, 2002 Mayor Patricia Awada City Of Eagan Ciry Hall 3830 Pilot Knob Rd Eagan MN 55122 Eagan City Council Members City Of Eagan City Hall 3830 Pilot Knob Rd Eagan MN 55122 RE: Building Permit for Lebanon Hills Regional Park Visitor Center and Trailhead Building Dear Mayor Awada and Council Members: As you are aware, as part of the issuance of the 6uilding permit by the City for the above- referenced project, a trunk storm sewer connection and availability charge was imposed by the City in the amount of $76,448. Because this charge was not anticipated by the County and not included in the Project budget, the County requested the Eagan City Council defer payment of the charge at the August 13, 2002 special Council Workshop. The Council agreed to authorize the issuance of the building permit prior to payment of this charge if the County would commit to the payment of the charge as a condition of receiving the occupancy permit, unless an agreement addressing this issue is reached hefore then. Enclosed please find the Board resolution approved by the Dakota County Board of Commissioners on August 27, 2002, acknowledging the Countys understanding that it must pay the appropriate trunk storm sewer connection and availability charge, not to exceed $76,448, based on a mutually agreed amount consistent with the City ordinance and other appiicable law, prior to the City's issuance of the occupancy permit for the visitor center/trailhead buiiding. The delay in paying the trunk storm sewer connection and availability charge will allow the County and the City time to come to agreement on the appropriate charge based on the results of the pending Water Management Study for Lebanon Hills Regional Park, an investigat;on of :he p!a!!ing of the pa: ce! of land on w. hich the Visitor Csnter and ?r2i!h°ad Building is located, along with other related issues. Sincer .?? ? D nald J. Maher, Chair akota County Board of Commissioners enclosure cc: Brandt Richardson, County AdminisVator Steve Sullivan, Director Parks Department Thomas Hedges, Eagan City Administrator Thomas Colhert, Eagan Public Works Director BOARD OF COUNTY COMMISSIONERS DAKOTA COUNTY, MINNESOTA August 27, 2002 Resolution No. 02-415 Motion by Commissioner Krause Second by Commissioner Branning Authorization To Submit Letter To The City Of Eagan Committing To Pay Trunk Storm Sewer Area Charges Associated With The Issuance Of The Lebanon Visitor CenterlTreilhead Building Permit WHEREAS, Resolution No. 86-270 (June 17, 1986) provides that the County plans to keep surface water inside Lebanon Hills Regional Paric within the park boundaries and surface water outside the park oufside the park boundaries of Lebanon Hills Regional Park (LHRP) and have the option to connect to the City of Eagan storm sewer system in the future; and WHEREAS, recent high precipitation events has resulted in Flooding of LHRP, County Road (CR) 32, and private properties; and WHEREAS, Dakota County applied to the City of Eagan for a building permit for the visitor center/trailhead improvement and was recently made aware of an unanticipated City trunk storm sewer connection and availability charge of $76,448; and WHEREAS, adequate funds to pay the appropriate trunk storm sewer connection and availability charge are available from the Metropolitan Council Operations and Maintenance funds; and WHEREAS, Dakota County is preparing a Water Management Plan for Lebanon Hills Regional Park; and WHEREAS, the future completion of the Water Management Plan will assist Eagan and Dakota County as to the extent and need for connection to the municipal storm sewer system; and WHEREAS, Dakota County requested that the trunk storm sewer connection and availability charge be delayed until the completion of the Water Management Plan; and WHEREAS, the Eagan City Council agreed to the deferral of said charge and to the issuance of a building pertnit provided the appropriate trunk storm sewer connection and availability charge is paid prior to the City's issuance of the occupancy permit for the visitor center/trailhead project. NOW, THEREFORE, BE IT RESOLVED, That the Dakota County Board of Commissioners hereby authorizes the County eoard Chair to submit a letter to the City of Eagan committing to pay an appropriate trunk storm sewer connection and availability charge in a mutually agreed upon amount consistent with local ordinance and other applicable law, prior to the City's issuance of the occupancy permit for the visitor center/trailhead building; and BE IT FURTHER RESOLVED, That such charge shall not exceed $76,445; and BE IT FURTHER RESOLVED, That the County Board understands that the City may not issue an occupancy permit for the visitor center/Vailhead building until the trunk storm sewer connection and availability charge in a mutually agreed upon amount or in the amount of $76,448 is paid; and BE IT FURTHER RESOLVED, That the 2002 Parks Capital Improvement Program is here6y amerded as follows: Revenue Metropolitan Council Operations and Maintenance Funds $76,448 Ecpense Lebanon Visitor Center Project $76,448 STATE OF MINNESOTA County of DakoNa YES Hartis Maher Bataglia Schouweiler Turner Kreuse Branning X HaMs X Maher I, Mary S. Scheide, Clerk to the Board of the County of Dakofa, State of Minnesota, do herehy certity that I have compsred the foregoing copy of a resolution with the original minutes of the proceedings of the NO Board of Counry Commissioners, Dakota County, Minnesota, at their session held on the 27"' day of August 2002, now on file in the Counly - Administration Department, and have found the same to be a We and - correct copy thereof. X Bataglia wtness my hand and official seal of Dakota County lhis 271h day of X Schouweiler August 2002. X Tumer • X Krause ? Clerk to the Board X Branning ,?.•?6.2002 .8:35AM DAKOTA COUNTY PHYS DEV ADMIN DAKOTA COUNTY BOARD OF COMMISSIONERS N0, 6016 P. 4 REQUEST FOR BOARD ACTION 9.3 - Authorization To Submit letter 7o The City Of Eagan Committing To Pay Trunk Storm Sewer Connection and AvailabFlity Charges Assoclated wth The Issuance C1f 7he Lebanon Visitor Centerffrailhead Building Pertnit Mea6ng Date: 8/27I02 item Type: Consent-Acbon Division: PHYSICAL DEVELOPMENT Department: Parks Contact: Steve Sullivan Telephone: 851-438-4662 Prepared 6y: StevO Sulliven Reviewed by: N/A N1A FiscaUFTE Impact: ? None ? Amount included in current budget ? Budget amendment requasted ? FTE inclutled in current compiement ? New F7E(s) requested-WA ? Othef PURPOSE/ACTION REQUES7ED - Authorize submittal af a letter to the Ciry oi Eagan regarding paymenl of trunk storm sewer connection 2nd availa6ility charges associated with the issuance ot the Lebanon Visitor CenterlTrailhead builtling permit, pri0r to the occttp8ncy permit bemg issued by the Cily- • Amend the Parks Capital Improvement Program budget for the Lebanon VisitOr Centerlfrailhead prnject. SUMMARY in 1986, the Counry 8oard requested that LHRP be exGuded hom the Ciry of EeBan's W nk storm sewer project, with the opdon to connect to tne Eagan starm sewer system in the tuture, subject to payment of required asse5sments (AMaChment Pti Resalution 86-270). The request was besed on the County's stated inten[ ta keep surtace water in5itle LHRP wi[hin park bountl0ries and surfae6 water outside LHRP outside the parK boundaries. Pending Water Manaaement Pla? WMP) for LHRP: Over the past several years, inaedsCd stormwater within LHRP and the surrounding area has resultCd in flooding in the park, on County Road (CR) 32 (Cliff Road) and on private lands. The Counly Board authorized a conhad with Barr Engineering to prepere a Water Management Plan (WMP) to ecologicaly manage the quaniity and quality of waters wiihin the watershed (Resolution No. 02-13; 1/8ro2). 7he plan will establish manegement altemBWes fOr stormwater entering UtB pefk from Eagan, Rosemount and Appie Valley (the Gun C[uh and Vermillian River watersheds) and the need for an outlet connection to the Eagan storm sewer system. The drdft plan is nearing complelion and is tentativaly srheduled for presentation at the Oelober Phygical Deveiopment Committee mseting. LHRP Visitor Centerfl'railheao Project: Dakota County applied to the City for a building permit for the project and was recentty informed af a City wnk storm sewer connection and availability Cherge of $78,448- This cherge provides for the availabilily and Connection to the Eagan storm sewer system. i'his eharge is separate fram any storm sewer utility charge that may be assessed for the use of the Eagan storm sewer system. The City's rationale for the charge is that the County commitment to wntain stormwater within LHRP and not use the municipai storm sewer has not baen maint8ined. Recent hlgh precipit8tion and flooding has resulted m pumping into Eagan's storm sewer system to protect the flooding of the LHRP, CR 32 antl 4ownsVeam private properties. To not delay the issuance of the building permit, staff worked anth Eagan staff, saggesting that this unanticipated charge he deferred and the specific amount Cetermined upon completion af the WMP, which would darify the extent ta which the Eagan storm sawef System would be needed to manage excess stormwater and the appropriate charge (Attachment B, letter to Tom Colbert). Eagan slaff's reply lo the request was that the charge could not be delayed administratively; it would nbed City Council auchorizafion. On August 13, 2002, the Ci[y Council approved delaying the trunk storm sewer cOnnec6on and availability Charge provided the County sends a letter of intent to make the appropriat6 payment pri0r to issuance of the occupancy permit. The charge woultl be based on a mutually agreed amount or the ciiy-calwlated amount af 876,448 if agreement is not rearJ+ed (Attachment C, letter from Tom Colbert). Upon receipt of the letter, the Ciry would provide the buiiding permit for the projecL In subsequent discussions. Eagan statf clarified that the mutually agree0 amount could be based on an arcay of consideretions such 2s the Water Menagement Plan, platting the tr8ilheed/vi5itor center building site, and appliea6on of the muniefpal ordinance and othAr laws. EXPLANA710N OF FISCAtJFTE IMPACT The V isitor Genterfi'railhead projeCt bUdget dces not inGude ddequate tunds far the unanticipaled trunk storm sewer area charge. Existing Metropolitan Council Opera6ons and Maintenanoe funds are available ta pay Ihis charge. An amendment of the 2002 Parks Capital lmprovement Program is necessary. C8127/2002 7:20 PM Paga 1 n;?SsB-27.doc Agenda Page Na. l RECElVEU JUL 19J„?PV, 2002 Drvision of Physical Development Susan L. Hoyc Director Mr. Tom Calbert Dakota County WesCern $ervice Cencer public Works Director 14955 Galax,e Avenue City of Eagan Apple Valley, MN 55 I24-8579 3830 Pilot Knob Road Eagan, MN 55122 U ENGINEERINGpEpqRTMENT 952.8917000 Fax 952.891.7031 Re: Permits Related to Lebanon Hilis Regional Park Trailhead Development www.co.dakoca mn.us Dear Tom: Thank you for arranging the meeting with Steve Sullivan and me to discuss the utility fees associated with the Lebanon Hills Trailhead and site development. It is our understanding that to receive a building permit from the City of Eagan for this construction project that the County is required to cover fees for storm water, sanitary sewer and water utilities. As we discussed, the fees for the sanitary sewer and water utilities were anticipated as part of the project costs and do not present an issue. However, the storm water charge is something that we need to ascertain after we receive the storm water plan for the Lebanon Hills Regional Park from Barr Engineering. Once this report is received, we will meet with you to discuss its recommendations and what that means for access to the City of Eagan's storm water management system, including any storm water improvements within the park and any proposed connections to the City's system. In the meantime, we recognize that the County, as to the issuance of the building permit, is subject to the standard development storm water charges like any other developer within the City of Eagan. Although the final figure may vary based upon the Lebanon Hills Regional Park watershed management plan, the cost is currently being calculated at 50% of the single family residential rate based upon the applicable acreage. Please cal! me if yeu have ary qu_s!ier,s. !^Je lock !orr:ard to addressirg our m., ul?ual stor.m water concerns in the near future. Sincerely, Susan L. Hoyt, Director ? PHYSICAL DEVELOPMENT DI IO P c: Steven Sullivan, Parks Director Kathy Scott, Assistant County Attorney ?a R,nrm on mni<e a.ae. .nn 3m oovo.on:-,.?,.?. uu Mx moc? sreioru .-.i.:: ?6..2002 -8:37Aid DAK01'A COUNTY PHYS DEV ADMIN ` cit°y oF eagan 1'ATRICIA E AWADA .Mna ?'AIR. 6rV'QCFN !'-?GGYGUtLSON .YNDEE FIE1pS uEC nuZr C?a naff„a= cHOrnns xEocEs c:,ryAdLmniwxwr ?lun?apal Ce?r. 3830 PJar Kneb Roid Eae,an, MN 5512b1897 ? Pkone. 651.681.4600 I Eu. 651.681.4612 i DD: 651.454.8595 Yf?teuauce Fncility: i50, CwdvomPOmc Eagan, MN 55122 'honc: 651.6b1.4300 f u: 651.681.4360 TDD7 551-454.8535 wvvH:cayufagpo.rnm "RiE LONb OAlf"1 REE -- The sym6d ofmc*di 104 glpvth in our Augvst 16, 2002 Mx. Steve Sullivan, Director Dakota Counry Perks lkpazhnent 8500 127"' S4eet Easc Hastisigs, MN 55033 N0. 6016 P. 9 ATTaCHMENT ('i Re: Lebanon ITills Ttegional Park - V isitor's Center lduilding Permit (Schultz Lake) Deur Stevc, As yw am aw'az'e, at the August 13 sQecial Council WorkshoQ, the City Cowcil considered yaur request to delay the payment of the Storsn ulatc?t Ih'ainage COnuecbOn fces ceQniTed a'iU7 the issuarnee of the building permic for the above referenced facility proposed to be cansUucted an Pazcel 10-03504-010-01 (860 Cliff RdJ. We appreciate your attendance along with Couutassioner Schouweiler m present this issue to rhe Couneil. It was aolmowledged thac the Ciry has already issued the footings and foundarion portion of tLis peimit ro uunimizt any delays while the Councy addresses the connection fee obli$auons of ttus developarent proposal. The $tomi Water Ihamagc Comxecuon fee has been calcula#ed Yo be S76,448 for thu BO-acre pazcel. You infoaned the Conncil of the County's current efforts w compleUe a uiasur drainage plsn fbr the Lebanon Hills Regional Park. Due to yota contractor not being able to proceed withait the full building permit for this Visito{s Center, you then presented a cequest Por the Council to issue the pcrmit and defer the collection o£ this relaud eameetioa fee unril the master plsn has been completcd. Tltis would allow the City and Cotixity to hopefully ceme m a final resolutiou on the overall dzainage issues along with several other outstanding issues regardiug the County Parks developmczrt and odher pending finanaial obligurions (i.e. special assessmenrs). You had suggested chat, if neeessary, rhe Council could withhold the issuance of the occupaucy permit unril tLese issues were resolved. In response to yom requeyc, the Couaal was relueSant w he the occupaney ecrti5cate to tit resolulion of the varied and complex issnas that have heen pending for several years akeady. However, there was a consensus that they would be wiIling to authonze the issuance of the building pemrit if the County would commit to the payment af thc reftrenced storm drainage comiechon fee aa a condition of receiving the occupancy permit, tuiless an ageemeat addressmg this aztd other outstanding issues can be reached by both ageneies befoze theu. We ]mow how impoiiant this project is to our joint constituents. Please let me ]mow if there is _ anything morc chaz I can do to help more this projcct aiong. $lIIGCfCly? Thomas A. CDihen, P.E. ?Cc: Mayor and City Crnmcil Directar of Puhlic Warks %Thomas L. Hedges, City Adnvaistramr cni+unuNry I 052 Area Designation 2002 Estimate of StoRn Sewer Charge Estimated Area Pond Area Not Owned Designation @HWL Pond Area 7/11/2002 Area without Ponds L39 212 127.2 LP22 26.5 58.3 L37 40 LP25 42 35.8 L36 119 LP45 26.1 92.9 L38 52 LP24 14.6 37.4 L42 123 LP19 12.4 110.6 L45 32 LP17 9 23 L44 120 84 LP18 10 26 L41 51 LP21 11.5 39.5 L16 206 35 LP38 49.7 121.3 L46 106 86 LP16 14.7 5.3 L47 23 LP15 8 15 L48 32 5 LP14 5.8 21.2 L49 37 LP13 13.1 23.9 L43 115 LP20 11.7 103.3 L50 231 28 LP12 60 143 L53 48 15 LP9 5.1 27.9 L55 161 60 LP7 10.6 90.4 L56 62 LP60 6.9 55.1 1770 4402 299.9 1029.9 Ifa-&J 0\?D/)Iyx 1770 -4402 1329.8 1329.8 Acres Assessment Charge X's.8 Jensen, Obrien & 1063.84 Assessable acres Mcdonough x's 1960.20 Watershed $ 2,085,339 BL57 106 BL65 73 BL66 66 BL67 159 79.5 A40 64 A46 28 A45 34 20 A73 55 40 585 139.5 AssessmentCharge Park North of Minnesota Zoo 585 -139.5 445.5 x's.8 356.4 Acres x's 196020 /Acre $ 698,675 Total $ 2,783,954 Q. ?z 'fey-D "il oa, „?? telQol , (0M p,,-e BLPB BLP2 BLP59 BLP1 .045/Sq Ft /to-,?, de- ????? 1029.9 1029.9 1029.9 1029.9 x's 196020 $ 2,018,810 12.1 93.9 14.1 58.9 1.5 64.5 4.1 75.4 64 28 14 15 31.8 413.7 473.7 413.7 413.7 x's 1960.20 $ 810,935 $2,829.745 0 ' city oF eaqan PAT GEAGAN Mayor PEGGY CARLSON CYNDEE F(ELDS MIKE MAGU[RE 1vfEG TILLEY Council Members THOMAS HEDGES Ciry Adminisaaror Municipal Center: 3830 Piloc Knob Road Eagan, MN 55122-1897 Phone: 651.675.5000 Fu: 651.6755012 TDD: 651.454.8535 Maintenan<e Faciliry: 3501 Coachman Point Eagan, MN 55122 Phone: 651.675.5300 Fax: 651.675.5360 TDD: 651.454.8535 www.ciryofeagan.com "CHE LONE OAKTREE The symbol of saengch snd g1row[h in our communiry July 30, 2003 Re: Lebanon Hilis Park Interpretive Center Mr. Craig 7ohnson Dakota County Parks 8500 127`h Street East Hastings, MN 55033 Deaz Mr. Johnson: I am writing to follow-up on the discussions we have had regarding the pazking lot at the new interpretive center at 860 Cliff Road. As we discussed, the revised parking lot layout is acceptable, now providing 24-foot aisles for emergency vehicle access, and 10-foot wide stalls as required by City Code. As we discussed, the City's Zoning Code states that planting islands aze required in lots of 50 stalls or more "to visually break up expanses of hazd-surface parking areas, to provide safe and efficient traffic movement, and to define rows of pazking. Planting islands shall occupy at least five (5°/o) percent of the pazking area." In addition, "All off-street parking azeas of four (4) vehicles or more shall be constrttcted with concrete curbs." Since the County is utilizing the existing parking lot for the new interpretive center, the City will not require upgrade of the existing pazking lot at this time. However, any expansion of the lot at a future date will require upgrades to meet these code standards. Please note that future projects also will be required to sadsfy these and other City Code standazds in effect at the time of the project. ' If you have any questions, please call me at 651-675-5691. Sincerely, Pamela Dudziak Planner Capital Planning and Project Management Ken Harrington,AICP Manager Dakota Counry Adminis[ration Center 1590 Highway 55 Hasungs. MN 55033 651.438 4544 Fax 651.438.4521 wvrN co.dakotamn us c . U N July 28, 2003 City of Eagan 3830 Pilot Knob Road Eagan, MN 55122-1897 Attention: Pamela Dudziak Craig Novaczyk Re: Permanent Erosion Control Project: Dakota County Lebanon Hills Visitor Center Dear Craig and Pamela: el.. \ s Per our eariier telephone discussions, betow is the requested proposed schedule from our landscaping subcontractor to provide the permanent erosion control for the above referenced project. The temporary erosion control has been completed and the plantings for the landscape plan are nearing completion. Once the parking lot plan has been approved and the lot has been striped accordingly, we will request another inspection to obtain the conditional certificate of occupancy allowing the public to enter the building. Our, proposed seeding schedule for this fall is as follows: 1. Spray to kill off vegetation on or about September 10th 2. Dormant seed and mulch on or about October 15th If you have any questions or concerns, please feel free to contact me. Mary Pennington Project Manager Capital Planning and Project Management 651.438.4566 Sincerely, cc: Bruce Blair, Dakota County Parks Craig Johnson, Dakota County Parks Jeff Schoenbrauer, Brauer and Associates wnnt.a ol renClea ?e, nn 3c;e yoa co??mer -ne PAT GEAGTN Mayor PEGGY CARLSON CYNDEE FIELDS MIKE YIAGUIRE MEG TILLEY Councd Membets city oF eagan THOMP.S HEDGES Ciry Adminiscracor Municipal Cencer: 3830 Piloc Knob Road Eagan, MN 55122-1897 Phone: 651.675.5000 Fxs: 651.675.5012 TDD: 651.454.8535 Maintenanre Eaciliry: 3501 Coachman Poin[ Engan, MN 55122 Phone: 651.675.5300 Fax: 651.675.5360 TDD: 651.454.8535 www.ciryofngan.com THE LONE OAK TREE The symbol oFsneng[h and growch in our mmmunicv July 10, 2003 Ms. Mary Pennington Dakota County Capital Planning and Project Management 1590 Highway SS Hastings, MN 55033 Re: Lebanon Hills Pazk Interpretive Center Dear Ms. Pennington: I am writing in response to your request for a final inspection on the new interpretive center at 860 Cliff Road. I understand you have been in contact with our Senior Inspector, Craig Novaczyk regarding this matter. The parking plan delivered to us last week shows nine-foot wide angled pazking stalls with 16-foot one-way drive aisles. This layout is unacceptable. At least one drivz aisle must be a muumum of 24-feet wide to provide sufficient width for emergency vehicles to get &om the entrance drive to the north end of the parking lot to access the new building. Also, city ordinances require a minimum parking stall width of 10 feet. Please redesign the pazking lot layout to satisfy these standards and provide rivo copies of the new plan to us. If you have any questions, please call me at 651-675-5691, or Craig Novaczyk at 651-675-5683. Sincerely, ?C-?- Pamela Dudziak ? Planner cc: Craig Novaczyk ? . ,.? Minnesota Pollution Control Agency August 12, 2002 RECEIdED c7 140 : Mr. Thoma`s Colbert City Engineer 3830 Pilot Knob Road F.agan, Minnesota 55122 AUG 14 2002 FAGHN ENGINEERING DEPARTMEPJT Dear Mr. Colbert: Enclosed is the Permit Number 37811 for the construction and operation of a sanitary sewer extension system to be located in Eagan, Minnesota. Please carefully review the permit, including any Special Conditions, Genera] Conditions (No. 1-20) and information relative to plans and the permit application. If you have any questions, please contact me at (651)296-8722, or toll free at 1-800-657-3864. 'ncerely, l) Davi A. Sahli, P.E. Metro Region Regional Environmental Management Division DAS:jeh Enclosures: Sewer Extension Permit General Conditions cc: City Council c/o Thomas Hedges, City Administrator 7ason Benson, WSB & Associates, Inc. Roger Janzig, Metropolitan Council-Environmental Services 520 Lafayette Rd. N., St. Paul, MN 55155-4194; (651) 296-6300 (Voice); (651) 282-5332 (TTY) St. Paul • Brainerd • Detroit Lakes • Duluth • Mankato • Marshall • Rochester • Willmar; www.pca.state.mn.us Equal Opportumty Employer • Printed on recycled paper containing at Ieasl20% fibers from paper recycletl by consumers ? Minnesota Pollution Control Agency PERMIT FOR THE CONSTRUCTION AND OPERATION OF A DISPOSAL SYSTEM CTl'Y OF EAGAN Dakota County Pursuant to authorization by the Minnesota Pollution ConTrol Agency (MPCA), and in accordance with the provisions of Minn. Stat. chs. 115 and 116, plans are approved and a permit is hereby granted to the above-referenced Permittee for the construction and operation of a sanitary sewer extension in Eagan, Minnesota. The facilities aze further described in the application designated as: "Lebanon Hills Regional Pazk", which was received at the Agency on July 29, 2002, and proposed by WSB & Associates, Inc. It is the Permittee's responsibility to assure compliance with any special conditions and the general conditions that are required by this permit. This includes taking all necessary measures needed to comply, including, but not limited to, the notification of contractors or others who may be carrying out this work. PERMIT NUMBER: 37811 DATED: i" ?% A August 12, 2002 Michael J. Tibnd Manager Majors Water Facilities Section Majors & Remediation Division 520 Lafayette Rd N.; St. Paul, MN 55155-4194; (651) 296-6300 (Voice); (651) 282-5332 (TTY) St. Paul • Brainerd • Detroit Lakes • Duluth • Mankato • Marshall • Rochester • Willmar; www.pca.state.mn.us Equal Opportumty Employer • Prmted on recycled p2per containing at least'LO'6 libers irom paper recycled by consumers r. f P7IAn`IESOTA POT T? I?ON CONTROL AGENCY ('FNERAT CONDITIONS FOR SANITARX SEWER EXTENSION AtaT) OR CI-LANGES PERMIT 6ENERAL CONDITIONS: 1) Material, labor and equipment for temporary erosion control measures and the acceptable maintenance thereof shall be provided during the life of the project, to effectively prevent water pollution througfi the use of berms, dikes, dams, sediment basins, fiber mats, netting, gravel, mulches, grasses, slope drains, and other erosion control devices or methods. Surface cover materials shall be anchored to reasonably prevent their entering waters of the State by erosion or rising water levels. 2} Temporary pollution control measures shall be included for all construction activity associated with the project where such work is necessary, for example borrow pit operations, haul roads, equipment storage, and plant or waste disposai sites: 3) The temporary pollution control provisions contained herein shall be coordinated with any permanent erosion features to the extent practical to assure economical, effective, and continuous erosion controi throughout the construction and post-construction period. 4) The surface area of erodible earth material exposed by clearing and grubbing, excavation, borrow and fill operations shall be minimized and irrunediate permanent or temporary control measures shall be taken to prevent contamination of adjacent streams and other water courses, lakes, ponds, and areas of water impoundment. Cut slopes shall be stabilized by methods such as seeding and mulching as the excavation proceeds to the extent considered practicable. Slopes shall be graded properly to minimize erosion. 5) The Applicant will be required to incorporate all permanent erosion controT features into the project at the earliest practicable time. Provisions should be made for continual checking and maintenance of all control measures, particularly during periods of rainfall, to ensure maximum effectiveness. Temporary pollution control measures will be used to correct conditions that deveTop during construction that were not foreseen during the design state; that are needed temporarily to control erosion that develops during normal construction practices, 6ut are not associated with the permanent control features on the project. 6) The Applicant will control the area ef excavation, borrow and embankment operations cormiensurate wfth his progress with finish grading, mulching, seeding, and other such permanent erosion control measures. Should seasonal iimitations make such coordination unreallstic, temporary erosion control measures shall be taken to the extent feasible. 7) Oil and other liquid substances capabie of polluting water of the State will be stored in accordance with the requirements nf MPCA Miscellaneous Water Quality Rules Chapter 7100.0010 - 7100.0090 (formerly Minnesota Code of Agency Rules 6 MCAR 4.8004) (formerly WPC-4). -Z- 8) Stream Bank Stabilization shall be utilized if it is needed to prevent erosion, and shall be constructed of materials which will not pollute waters of the State. g) If an effluent will result from the project the Contractor shall submit to the MPCA plans, for approval, to provide for the following: a} Water from dewatering operations including effluents from construction activities sha71 only be discharged when the effluent complies with the applicabie water quality and effluent standards. Dewatering shall be performed using well points where feasible and practical, all other dewatering shall be performed so as not to result in increased turbidity in the receiving water. This may require the use of desilting ponds to reduce suspended solids. When the•MPCA requires, permits must be obtained. b} A Disposal System Permit shall be obtained by the Contractor from the MPCA prior to any hydraulic dredging or tunnel{ng, or other activity including an effluent which may contain potential pollutants. 10) This permit shall not release the pertnittee from any liability or obligation imposed by Minnesota or Federal statutes or local ordinances and shall remain in force subject to all conditions and limitations now or hereafter imposed by law. The permit shall be permissive only and shall not be construed as stopping or limiting any claims against the permittee for damage or injury to persons or property, or any waters of the state resulting from any acts, operations or omissions of ?h?epi?ioreforiany agents, contractors or assigns for damage to state p PeY. violation of the terms or conditions of this permit. 11) No assignment of this permit shall be effective until it iS executed he writing and signed by the parties thereto and thereafter app Agency. 12) No major alterations or additions to the disposal system shall be made without the written consent of the Agency. 13) The use of the disposal system sha11 be limited to the treatment and/or disposal of the sewage, industrial waste, other waste materials or substances described in the plans and/or permit application and associated material filed with the Agency. 14) The Agency may modify, suspend, or.revoke in whole or in part, this permit after giving notice and providing an opportunity for a public hearing or by taking direct enforcement action, or any just cause including failure: (a) to comply with the terms stated herein, or (b) to comply with Agency water quality regulations and standards presently in force. Nothing herein shall prohibit the Agency from exercising its emergency Powers. ?.i , , -3- 15) The permittee acknowledges that nothing contained herein shall prevent the future adoption by the Agency or its predecessors of any pollution control regulations, standards, orders or statutes more stringent than those now in existence or prevent the enforcement and application of such regulations, standards, orders or statutes to the permittee. 16) 7he Agency, its officers, employees and agents review and correnent upon engineering reports and construction plans and spec-ificetions regarding this permit solely for the limited purpose of determining whether such report, plans and specifications will enable the facilities subject thereto to reasonably comply with the regulations and criteria of the Agency. 17) This permit has not been reviewed by the U. S. Environmental Protection Agency and is not issued pursuant to Section 402 of the federal Water Pollution Control Act Amendments of 1972. 18) The pla s for the project have been approved with the reservations stated on the a?tached sheet entitled "Information Relative to Review of Plans and Permit Application." 19) The permittee shall comply with all rules, regulations and requirements of the Minnesota Environmentai Quality Board prior to construction of the proposed project. This permit is not effective until the permittee completes all applicable environmental review (Environmental Impacts Statement or Environmental Assessment Worksheet) which may be required for the project. 20) This permit authorizes the Holder to perform the activities described herein under the conditions set forth. In issuing this permit, the state/agency assumes no responsibility for any damage to persons, property or the environment caused by the activities of the Holder in the conduct of its actions, including those activities authorized, directed or undertaken pursuant to this per-nit. To the extent the state/agency may have any liability for the activities of its employees, that liability is explicitly . limited to that provided in the Torts Claims Act, Minnesota Statute § 3.736. k HZNNESOTA POLLUTION CONTROL AGENCY i7aier puality Division INFORHATZON RELATZVE TO REVZEW OF PLANS AND PERHIT APPLICATIONS Febraary 1, 1998 The review of plans and specifications for sevage, industrial vaste or other vaste disposal systems and application for permits fs made in accordance vith the authority conferred by lav (see HS, Section 115.07). Approval of plans and permits is based upon the assumption that the information provided by the applicant is correct and that all necessary legal requirements have been or vill be satisiied. Plans for sewage, industrial waste or o[her vaste disposal sys[ems are examined vith regard io the design features vhich apply [o operaiion and maintenance of the treatment vorks or sever system, the degree of treatment to be provided, Che effectiveness and reliability,of the system or methods employed, and compliance vith applicable standards systems. The bulletin entitled Recommended Standards for Vasievater Facilities, 1997 Edition, and supplemen[s [hereto, as vell as other information are used in examination of the design, operation and maintenance aspects of the proposed system. Sewer plans are recommended for approval on the basis that the system is to collect only domestic sevage and such industrial or o[her waste as may have been provided for in the design. Foundatio? or footing drains to collec[ ground va[er and roof drains or o[her surface Water conduits should not be connected to the sanitary sever system. Adequate field supervision and inspection by a qualified represen[ative of the ovner should be provided at all times during construction to assure that the project is constructed in compliance vith the approved plans and specificaiions. The Agency assumes no responsibili[y for the integrity of structures or physical features, or for the reliability, durability or efficiency of specific items of proprie[y equipment or material. All applicable federal, state and local lavs, regvlations or ordinances must be folloved in the design, loca[ion and construction of proposed sever systems or trea[ment vorks. The Agency reserves the right to vithdrav its approval of plans if construction is not undertaken vithin a reasonable period after issuance of the permit. 612 341 2124 w7f./202 15:22 612-341-2124 FAX MEMO TRANSMITTA,L To: Craig Novaczyk City o£ Eagan 3830 Pilot TCnob Road Eagan, MN 55122-1897 t1Q• nsl .4U14 SIRNV ARCHITECTS a r c h i t e c t s Date: 09 July 2002 Subject: L.ebanon Hills Visitor Center & Trailhead RE: Additional Submittals Number: 2111.00 From: Tim Jordan Pa.zes: 2 + covet Craig, T'er your comments, please see the attached AST #1, with revised floor pian for Lebanon Hills Regional T'ark - Visitor Center & Trailhead. The janitor's closet has been separated from the ships ladder landing. Tim Jordan cc: Shawn Markham, LS Black PAGE 01 1 DO Union Plaza 333 Washinglon Avenue North Minruapolis. Minnesota 55401 612, 341.1070phone 612.341.2124faz simftartnersandsirny.com city oF eagan P:CI'RICLA E. AWADA \t.n•or PAUL 13AFKEN PEGGY (:AFt1SON CYNUEF. FIELDS .MEC IILLEY Counnl iv[einbers THOtvL4S HEDGES CiryAdministraror Municipal Centcr: 3830 Pilot Y•nab Road Hagan, MN 55122-189' Phone: 651.681.4600 F:ix: 651.681 4612 TDD: 651.454_3535 Meintenance Faciliry: 3501 Coachman Paint Eagan, MN 55122 Phone: 651.681.4300 Fu: 651.68 L43G0 'I DD: 65 1.454.8595 vnvw.ciryoteagan.cnm THE LUNf:OAKTREE "Ilie rymhoI of itrcngth and grnwrh in uur <ummimary May 7, 2002 MR TIM 70RDAN PARTNERS & SIRNY ,aRCHITECTS 100 LNION PLAZA 333 WASHINGTON AV"E N MrN`NEAPoLis 'vIr; ssaoi RE: DAKOTA COUNTY VISITOR CENTER & TRaILHEAD 860 CLIFF ROAD Dear Ivlr. 7ordan: We have started our review of the construction documents submitted in pursuit of obtaining a building permit for the above-referenced project. This review is not intendzd to be an exhaustive and comprehensive repoR. Unless otherwise noted, aIl references are to the 1997 U.B.C. It is our goal that this review will help you in complying with the applicable codes and we are, therefore, requestin; that the following items be submitted: 1. Two sets of plans (one received to date). 2. SAC determination letter 3. Special Inspections and Testing Schedule 4. Set of Energy Calculations 5. Electric Power & Lighting form 6. Please provide a fire protection plan on an 8-1/2" x 11" sheet of paper and a floppy disk - dxf Auto CAD release 14. All drawing objects associated with this plan should be sent as one drawing file. This will assist emergency personnel responding to the site. 7. Bui]din-, permit application signed by designated contractor If you have any questions, please contact me at 651-681-4683. Sincerely, J. Craig Novaczyk Seniorlnspector JCN/js 763 542 9163 FRONi :LINDELL ENGINGEERING, INC. FRX N0. :763-542-9163 Rpr. 01 2002 11:18RM P1 <3, u c) C4t ce a--Q LINDELL. ENGINEERING, tNC. 3411 Kifiner Lane Minneapolis, Minnesota 55441 Phone (763) 542-9163 Fax (763) 542-8214 info@lindellen .gcom FAX TRANSMITTAL COVER SHEET Date 1-Apr-02 Project No. 0201 Projact Name Lebanan Hills Visltor Centar Eagan, MN Fax Message 70: Scott Fax Number: 651-681-4694 Message From: Sandy Koop Company: City of Eagan Number of pagos transmftted7_, including thfa transmittal fdrtn: If transmission received is poor quality, or is not eomplete, please notify the cantact-- above immediately. If you have received this fax in error, pleese notity us lmmadiately . by telephone by calling us collect. - Message: I am sending 2 manufacturera for yoar revlew in rega?ds to clearances bahind the boiler. Option A would be for the Lochinvar boller whfch has a 1" rear clearance (whlch 1 spoke to you about). Option B would be tor the Slant Fin Bolier which has an 8" rear clear8nce. Aiter revlevWng aquipment costs-0ption B Is a better value-so this would ba our 1' choice. We are requeating approvaf of a rear bd(er cJearance of rtot lese than 8". We look forward to your response, and if you have any questions, please call. Thank You, Sandy Koop 763-642-9163 Lindell Engineering Inc. FROM :LINDFLL ENGINGEERING, INC. FAX N0. :763-542-9163 Rpr. 01 2002 11:16RM Thermal Efficiency-Your Most Relia6le Ynrdstick Por Savings P2 N ffrrinrq ? h,u ??mnI ?uhu? erimd ., F4 imn anr f m.7'_/ud?n7lxr.arc xud ?a.nwn Iw.l. I)11x+r/Jirk*l wiioF..wn 1t M...k.,AreFw?,AninG.ranefia.ln lu,cL.n?iuXr Ideal For Rndiant Heating If you'rc using radianc hraring, chis is che Lxiikr to buy. It's spccially designecl co mnximizx che efficiency nf rediant heanng sysrnms. ? Lfficiency+ is euy to adapt to the low wserr tcmpencures rypicxlly Lucd in tadianc hcacing. A[I you neecl is a simple, low-coxt 6ypacc. And the unit c Inw-macs design mrxns rhat wacer Aecs hrattd yuick[y. EiTicieney+ delivers a yuicl:cr response to aemand-and chnt can mean signifiwnt spvings! 1Musf :he Hydronics Leader . For more chan 75 years, Locliinvar luu been manuCacruring boilers for homes just likc yours. Wc havc onc of the rrxxr ambitious reseazch & deve(npment pmgrams in the business...and chec's why Efficiency+ incorporntes advanctd feacures mclay rhac the rompetirion .von i unveil Ecrc a decade. Efficienry+ tnkes mmforr and sevings to the nexc levrl. Fvr more infarmetir,n, call your Inchinvar dcalcr coday. Venting Opfions • Com?enAo?7 VtnfS inlo comrnllnxul JJur nr Nxf hmithing uslnR 71yrr A douAle w,oll wnl. • FJJfcirnqw 1'rnt D.eux ftah mmMmWn alY finm ?n oqsiek wvN h?..?.v,r lp?. nnd ?rnn mmAn<Nnrtb) prodmys rkrwgh a ianira7fh+e ' Dim7 Vme 1'erXca! Ormts finh ronrMaV6an oirjrom aialdt. o,Mmnt m+MMrvin+r 7ny+r`nhn I, IhVINIgh 0 iYrtICC(AIL. * u.M. Ka,lraiunra ARpM, dmxSjrrRlr rrunMMGnn air jronr m2tide, ihen vrntr AwproAw? lhrmi,¢h a Sldt nm!!. • Aefn m 7nuJluwm vrd ape.inn ?d kr dedde. Cornbustion Effi<iency Thcrmai Eflicieney Lahin?wl,r FrgiwaiugYrsh Carelrr FROM :LINDELL ENGINGEERING, INC. FRX N0. :763-542-9163 Rpr. 61 2692 11:19RM P3 Eiliaienc +W Boiler Di ensions & S ecifi<afionz 0 6° f9N100 100,000 B4,000 44" 19K'. . 7_ FBN150 150,000 176,000 W" ...19wc 4- 1012110 199,949 188,000 3'i 1311hi y fBN250 7SO,WO 210,000 ?- '/f 17 ?Ai 5- " fBM300 30000 254,000 Yi° 31 i5i S" Aar.'N' panG N,rruml rar, f/r,un,?r'N'te'C fw Gy.?d PrqMiw A:.;nln J:wrmimn ?gxdG iru+di?m/n Stnndard Features: • Buma flnme Observaticm PoA • High EtTiciency Srainless Stccl Bumecs • Two-SWge Firing (M9) • Two Adjustabie Operntors (High and Low Fire, M9) • FixeA 1{igh Limit • Hot Surface lgnition • Terminal Sfip • Gaaket•Iesc Heat Exchangcr • 30 PST Pressmx Retief Valve • Pump Relay • Galvenized Smcl Jackct • Conventional Vent ]ncreaser • Air inlet Cover • ASME Certified to 160 PSI Worlang Pressure • National Board Certified • AGA Desigii Certified for Closet Tnstallation - - 7 p' ?-- ??--' 6W' 7N 61/4* 945C dVi - - 10iMr . . - 6?R I751_ Optional Equipment: • VcRicat Direct Vertting- 50 equivalent fea • Horizontai Direct Venting- SO cquivalent feet • Multi-Stack Frame (see acrexsnries seciirnt) • Low Waler Cln-Ofi'(probe ty{+e) ? Flow Switch • Manual Rese111igh Limil • I'ump Detay Switch • j(11CR1Lflent Pump • Alarm Bell ? Indnor/Outdoot Contcol us..xd 4" 1W" 189 - ... ?--- iS?Sti S' 20 ..-- 203 -._'-.- ._ lqW S" !SS 13W _ 8- 1" 146 -- .. ann. 6' _?' .... 2ee FOII EIISE IN ORUEWMG 6Y AAOA[t pYM6ER R B N Ii0 ,%3 c k 150.oar n?•cr ?,,.?.r?: itn'wrn. nak. ?U?? • Hlgh EffMeray WaterHeacrsMd BoJers ? The Buih-Tn Advamage ,?,I ""!=?'" (B LOChinvu Corporotion • 2005 Flm Hill Pike • Na.hville, IN 37210 • 6151889-8900/Faz 615/8954403 . t..a.t. . G gnm . C? FROM :LINDELL ENGINGEERING, INC. FRX N0. :763-542-9163 0 This appliancc mects the safc lighting perFocmance criteria wtth the gss manifold and cOntrol asscmbly prmidcd, as specified in the ANSi s[andards fOr gas-firtd units, ANSi Z21.13. IlVSTALLATIONPROCEDURE LOCATION OF UNIT 49- ? 1. Locare thc unit so that if watcr connettions should leak, wnter damage will not occur. When such l ocations cannot be avQided, it is rccom- mended that a suitablc dram pan, adequately draincd, be installcd under the unit, The pan must not restrict eomhustion air flow. Under no circumstnnces is the manufacturer to 6e held responsiblc for watcr damagc in connection .vith this unit, or any of its components. 2. The unit must bc installad so that the ignidon sysum componenu are pratccted from water (driPpin&> SPraYing, rain, cu.) ducingappliance operation and scrvice (circutator replacement, control replacement e[c.) 7. Units located in a residcntial 9-krage shall be instailed so that all burners and burner ignition devices have a minimum clearance of 18" (46cm) abovc the floor. The unit shatl be lxatcd or protccted so that it is not subjcct to physicaf damage by a moving vchiclc. 4. The appliancc mU.St bc installed on a Ievc1 Iloor. A combustible wood floor may bc uscd without additional bascs or special floor builQup. Main- cxin rcquired elcarances from combustible surlaccs 5. The appiianec must not be installed on caryet or ? othcr canbus[ible rtatcrial other than wood floorinfi. ? -1 COMBUSTIBLE CLEAAANCES: RIGHTSIDE • t" REAR - 1' LEFT S10E • 8" TOP - 3" FRONT • 3" i I ` ? \ \ I ? ? FIG.1 qpr. 01 2002 11:19RM P4 CS,EARANCE3 FROM CoMBIISTIBL£ CONSTRUCTION Clcaranecs from Combustible Constmction Right Side - l" Rear- I" L.cR Sidc -6" (24° suBgested for service) Front - 3" (24" suggesred for service) sui[ablc for elosct inst8111tion Top - 3" p11ow suffuient space for scrvicing piPc connedions. pvmp and other auriliary cquipment, Ts wcll as the appliance. COMBU5TION AND VENTTLATION AIIt REqpTREMENTS FOR CONV£NTIONALLY VENTED APPLiANCE3 Provisions for combustion and ventilation air must be in aaordance with Sectian 5.3, Air for Cortbustion and Ven- titation. oFthc latest edition of the National Fuet Gas Code, ANSI Z223.1, in Canada, the late.a cditian of CGA Stan- dard B149 lnstallation Codc for Gas Burning Apptiances and Equipment, or applicablc prwisiotu of the local build- ing eodes. Thc equipmcnt room MUST be provided with propcrly sixed opcnings [o assLire adequate combustion 1ir and propcrven- tilation ahen the unit is installed with convcnuonalventing. CLEARANCES FRQM COMBUSTBLE GQNSTRUCTIQN ' `.24. ? Y 3' SUOOESTEP SEFNICE a.EaRaNCe FRON7• 24" LEFTSIDE • 24' Anio Ra4inos far tiIrect Yent and Catenonr IY ApplieeNona ? i Model Input AGA Input DOE Capaciry Nat I,B=R AFUE Number Setting (Btu's) (6tu's) (Btu's) 76 Min 34,000 30,000 26,000 CB-45 Nom 45,000 39,000 34,000 85.6 Max 52,000 44,000 38,000 Min 68,000 60.000 52,000 CB-90 Nom 90,040 77,000 67,000 85.4 Max 104,000 88,000 77,000 Min 101,000 88,000 77,000 CB-135 Nom 135,000 176,000 101,000 85.2 Max 155,000 731,000 114,000 Min 735,000 719,000 103,000 - CB•180 Nom 180,000 154,000 134,000 85.0 Mdx 207.000 175,000 752,000 Bollere are shipped e! "nomioal" Mput settiag anA roay be field edJusled ap or qown wimin tae ranpe snown. 49eu•._'. __--r A , AV' 31 20 112, i Gas B DO ? 1 ? LEC7 SIDE s+ue,c a¢ Eunk s.nncwA ?tNn 1996 ?. . . ...,?'fi •.7,.,j::•h'n..r . , .. FRONT Dimensions (Inehes) Shipping Weight gol,a. Water Volume Mode1 Numhor A B C D E (lbs,) (gals,) CB•45 20 14 5 18 10 3rn 192 CB-80 23 17 8112 21 13 314 246 1 CB-135 26 20 8 24 76 314 312 11iz CB-180 29 23 91r2 27 19 % 368 2 U}etime iimited warraaty. COnceDi 21 hoilers are Dratected with 2 SfaMlFin IitelimB limdetl warranty. J$A ;?,88 PublicaHon c8-10 ? HTl?1N CpRVORATI ,r?n .a.?"waw.slantlin.com • Pat: - " ?;t::,?''';?Jp'? ?-••w?' a. gl RIGHT SIpH FROM :LINDECL ENGINGEERING, 1NC. FRX N0. :763-542-9163 Apr. 01 2002 11:20AM P6 . ,... -a.. .?.c?; : - A DIMENSIONS _ ,. .. . F/gure 1. V/ews - Dlme»alona - Ueta WiTEA&APl ? vv HPT T VEen ou. FOp AlL VENTiNo. /1L MOOF.43 0 ? rAIpINTANC o ( cquUgr ? E H? L ? wAi[qR6TURN 1 IN•HPi ? eew? L ? ? L iE - p--i r ---I--,?, 1 I I ? I PUMP ? ?1 I I I - I I 1? _ L__J r--iL . ? J K i -ti?.J J e o a ?-?--,1 0u55l1VPLY L 1@'NVT. I.EFf SIDE V1EW F40NT yIEW piwT $IDE VIEW Boller DIMENS10N5 lNCNES Model A' 8 C D E F G FI I J K L M N CB-45 291r4" 20' 311i4" 20314" 11.. 5" 14" 5„ 8„ 18" 181/q" 103/q" 33rp' 26" CB-90 291i4" 23" 311/y' 203/4" ii" 5" 17° 61r2" e., 21" 161/4" 133rq" 3314" 26" CB-135 291>a" 28" 311r4" 20314" 11° 5. 20. 8" 8° 24" 761i4" 1634 " 3314' 26° CB•180 291iy" 29" 31 Iiy" 203/4, 11,. 5'. 23" 9112' 8.' 27" 161i4" 193iq" 33iq" 26" * 'A' dlm9n6ion teken wlitl Tjco 007 Cvculator, stqndard suppliotl pan vrith bpilBr (not mwnlg0 fpr 9hlpplnp), Gss Supply Gas Oriflce Alr Oriflce ShlpplnA Holler Bolter qas Input pressure Diametar Oiameter Walght WatBr Mode1 rype BTUH Max Min (lnches) (inches) (Ibs) Volume CB-45 Natural 45,000 9" " 3.5 0.219 0.917 192 '12 gai. CB•45 Pro ane 45,000 14 11" 0.175 CB-90 Natural 90,000 9" 3.5 0.300 1.215 246 1 gal. 08-90 Propane 90,000 14" 11" D.232 CSI-135 Natural 135,000 9" " 3.5° " 0.384 1.440 312 1112gal. CB-135 Pro ane 135,000 14 11 0.290 [ C8-180 Natural 180,000 9" " 3.5" O.4s5 1,650 368 2gal. C6-180 Propane 780,000 14 11" 0.365 2 . . . O&Z FROM :LINDELL ENGINGEER(NG, INC. FAX N0. :763-542-9163 Rpr. 01 2002 11:20AM P7 al I ATIOfV RF_QUIFi NOTICie: INSTALLATIONANA SERVICE MUST BE . pERFOAMEU BYA OUAL1F7E0 ME'ATINQ CONTRACTOR The instaHatlon must conform to the requirements of the National Fvel Gas Code ANSI Z223.1 and the requlrements of the authority having Jurisdiction as well as the requirements in thls instruction manual. In additlon, where required 6y the authority having jurisdiction, Installation must coniorm to ihe Standard for Controls and Safety Devicss for Automatically Fired 9oilers, ANSI/ASME CSD-1. If there is any contlict in the above requiremenis, then the more stringent requirement will apply. Wall through which venting wili pass must be tree and clear for opening (I.e. no hidden conduit, telephone cables or othar obstructions). 8oller location should be such that the gas ignition system components are protected irom water (dripping, spraying, rain, etc.) during appliance operation and service (circulator replacement, condensate trap, control replacement, etc.). For a closet installation, ventiiatfon openings must be provided through a door or wall to prevent excessive • heat huild-up. Two openings, one near the fioor and one near the ceiling, should be sized to assure sufticient air circuiation in tha closet (minimum 100 sq inches each). collect- Appliances so fueled shall not be installed in an abova-grade under-tloor space or basement unless such location is provided with an approved means for removal of unburned gas." Consult Chapter 5 of the 1994 UNIFORM MECHANICAL CQDE for design criteria of the "approved" means for removal of unburned gas. SAFE7Y- KEEP THE BOILER AREA CLEAR AND FREE FROM COMBUSTIBLE MATERIALS, GASOLINE AND QTHER FLAMNIABLE VAPORS AND LtQUfDS. BOILER FOUNDATION A. Provida a solid, level foundation, capable of supporting the weight of the boiler filled with water, and extending at least 2" past the jacket on all sides. See dimensions ot boilers, page 2. B. Boiler can be installed on both comhustible and non- combustible floors, but must NOT be insTalled on or above carp6ting. C. It boiler is ta be located over buried conduit containing electric wires or talyphone cables, mnsuR local codes or the National 8oard o1 Fire Underwriters for speci}ic requirements. MINIMUM CLEARANCES A. Minimum clearances to the exterior suHaces of the boiler shall ba as follows: MINIMUM ALCOVE AND CLOSET CLEARAMCE. WARNING LIOUEFIED PETROLEUM (L.P.) PROPAME FIRED GAS BQILER LOCATION REQUIRES SPECIAL ATTENTION Liqueflad Petroleum (L.P.) propane gas is heavier than a1r. Therefore, propane boilers, piping, valves must NOT be instelled in locations where propane feaking trom defective equipment and piping will "pool" in a basement or other space below the leak. A spark or ttame from tha boiler or other source may ignite the accumulated propane gas causing an explosion or fire. Provide a level, solid toundatian for the holec Locatwn should be as near the vent terminal as possible so that the flue plpe from boiler to outside is Short and direct. The UNIFORM MECHANICAL GODE may be in eflect in your geographic area. The following precautions are cited by the 1994 UNIFOfiM MECHANICAL CODE, section 304.6: "LPG Appllances. Liquafied petroleum gas-buming appliances shall not be Instafled in a pit, basement or similar location where heavter-than-air-gas might I0 SMrfa.a Cons truction Front Z" Rear 2" I.eft Side 2" RighT Side 2" Top 101, Fiue Connector 3" for Service 18" 8" 1 S" 18" 10" 6" 9. Provide 18" on sides used for passage. 0. All minimum clearances shown above must ba met. This may result in Increased values of some minimum clearances in order to maintain the minimum clearances of others. D. Clearance 4rom hot water pipas shall be 1 inch'*, •' A1 points where hot water pipes emerge from a flpor, wall or ceiling, the clearance at the opening through the Imished floor boards or wail or ceiling boards may not ba less than 1/2 inch. Each such opening shall be covered with a plate of noncombustibl0 material. 003 3 CITY USE ONLY PERMIT #: s "I I _D-'._-1 RECEIPT DATE: APPROVED BY: Lj _ G f I ' 2S , INSPECTOR 8008 COMMMCIAL MECHi4MCAI. PERM1T i4PP11CATION C1TY OF EAfiRN S$SO PILOT KAOB gD EALsAN, Mv 55i s$ 651-6$1-4675 Please complete for: all commercial/industrial buildings multi-family buildings when separate permits are not required for each dwelling unit DATE: I?) I 'A Ie) Z SITE ADDRESS: OWNER NAME: D P<I'?OTk L"r'a, PRiZK 5 rxorrE #: TENANT NAME (IMPROVEMENTS ONLY): WAS THERE A PREVIOUS TENANT IN THIS SPACE? Y N. NAME: C-,3.-x irrsTaLLEx: V ccs E l. 51l?,E ETM E`Th L 11J G, sTREE'r aDDREss: t o 6 0 4 LFFN S 11J C- aV G, No, ciTY: ST( LA- W k_ri5_k sTnrE: M N zIP: S"S 0 S Z TELEPHONE #: (o S?? A"' 3 Q-Q ?l q 2 WORK TYPE: ? New construction Install U.G. Tank _ Interior Improvement _ Remove U.G. Tank _ Processed Piping Specify Nawre When instaUing/removing underground tank, call 651-6814675 for inspection by Fire Marshaf and Plumbing inspector. ---?'--- - fn r ;. n ? I ?Fees: 1% of contract price OR $50.00 minimum fee, whichever is greater. Underground tank removaUinstallarion = minimum fee ? 1 I .i'J'/ z 2 2,?2 i ? ? Contract price: $ S x 1°o =$ C 7 7 7, 4" o (Base Fee) L' L IB"- State surchazge tsb calculate at $.50 for each-$1-;OOb-Base_Fee --- ToTni. $ 57 7, 9 O SIGNAT F PERMITTEE Updated 1/02 CITY USE ONLY PERMIT #: '?;- LI a 9 .? RECEIPT DATE: APPROVED BY: S f '5-12-O? , INSPECTOR 8008 COMMEftCIlkl. MEGHi4NICih1. PEiiMIT APPLICATIOR CITY Of EASAN 3$30 P1LOT KftOB {iD EAsAx, Huv 55 i s a 651-6$1-4675 Please complete for: all commercial/industrial buildings multi-family buildings when separate permits are not required for each dwelling unit DATE: p k-D Z SITEADDRESS: ?Lv C??"f RD OWNER NAME: GZ84SOv //SUf PHONE #: TENANT NAME (IMPROVEMENTS ONLY): WAS THERE A PREVIOUS TENANT IN THIS SPACE? Y P(N. NAME: INSTALLER: V/IL&,?L STREET ADDRESS: dG D CDrJAKr? A?E. CITY: oC0 041? STATE: le;y ZIP: ?S ?s-e- TELEPHONE #: ?7SZ- y9Z, -Z ( 2 ? WORK TYPE: ? New construction Install U.G. Tank _ Interior Improvement _ Remove U.G. Tank _ Processed Piping Specify Nature of Work: 14~6 ;T0 11? p'?K `SmLifX When installing/removing underground tank, call 651-681-4675 for inspection by Fire Marshal and Plumbing inspector. Fees: 1% of contract price OR $50.00 minimum fee, whichever is greater. Underground tank removaUinstallation = minimum fee Contract price: $? a 730,"Ox 1%_$ :3 0 ' J0(Base Fee) State surcharge 'V calwlate at $.50 for each $1,000 Base Fee TOTAL $ 3 07 SIGNA,TURE OF PERMITTEE Updated 1/02 Contractor's Material and Test Certificate for M boveground Piping Procedure Upon Completion of work, inspection and tests shall be made by the contractoYs represenha6ve and witnessed 6y an owner's representative. All defects shall be corrected and system left in service before contractor's personnel finally leave the job A certficate shall 6e filed out and signed by both representatives. Copies shall be prepared for approving authorities, ownere, and coMratoc It is understood the ovmer's representative's singalure is no way prejudices any Gaim againt contractor for faulty material, poor workmanship, or faiWre to comply wfth approving authoriry's requirements or local ordinances. PROPERTY NAME LEBANON HILLS VISITORS CENTER AND TRAILHEAD oaTE 3114103 PROPERTY ADDRESS 860 CUFF ROAD, EAGAN, MN 55123 . ACCEPED BY APPROVING AUTHORITIES (NAMES) CITY OF EAGAN ADDRESS PLANS INSTALLATION COFORMS TO ACCEPTED PLANS X YES NO EQUIPMENT USED IS APPROVED X YES NO IF NO, EXPLAIN NSTRUCTIONS HAS PERSON IN CHARGE OF FIRE EQUIPMENT BEEN INSTRUCTED AS YES NO TO LOCATION OF CONTROL VALVES AND CARE AND MAINTENANCE OF THIS NEW EQUIPMENT? Will Provide As Needed IF NO, EXPLAIN At Gloseout HAVE COPIES OF THE FOLLOWING BEEN LEFT ON THE PREMISES? 1 SYSTEM COMPPONETSINSTRUCTIONS 2 CAREAND MAINTENANCE INSTRUCTIONS 3 NFPA 25 YES YES YES NO NO NO LOCATION OF SYSTEM SUPPLIES BUILDING MAKE MODEL YEAR OF ORFICE QUANTITY TEMPERATURE SPRINKLERS CENTRAL PEND K=5. BVQR 2002 112" 19 155 CENTRAL UPRIGHT BVQR 2002 112" 11 200 CENTRAL UPRIGHT BVQR 2002 112" 15 155 CENTRAL SW K=8.0 MODEL B 2002 314" 20 155 CENTRAL SW K=5.6 BVQR 2002 112" 9 155 PIPE AND TYPE OF PIPE SCH 40 8 SCH 10 FITTINGS TYPE OF FITTINGS C.I.S AND GROOVED ALARM ALARM DEVICE MAXIMUM TIME TO OPERATE VALVE POttEI' THROUGHTESTWNNECTION OR FLOW TYPE MAKE MODEL MIN SEC INDICATOR Vane Potter 0 Q.O.D. MAKE MODEL SERIAL NO MAKE MODEL SERIAL NO. T co 4" DRY PIPE OPERATING TIME TO TRIP THROUGH TEST CONNECTION WATER PRESSURE AIR PRESSUR TRIP POINT AIR PRESSURE TIME WATER REACHED TESTOUTLET ALARM OPERATED PROPERLY TEST MIN SEC PSI PSI PSI MIN SEC YES NO WITHOUT QOD. W ITH Q.O.D. IF NO EXPLAIN DELUGE 8 OPERATIOI NOf1B PNEUMATIC ELECTRIC HYDRAULIC PREACTION PIPINGSUPERVISED YES NO DETECTING MEDIA SUPERVISED YES NO VALVES DOES VALVE OPERATE FROM THE MANUAL TRIP, REMOTE, OR BOTH YES NO N/A CONTROL STATIONS . ,.. . . IS THERE AN ACCESSIBLE FACILITY IN EACH CIRCUIT FOR TESTI YES NO IF NO, EXPLAIN DELUGE 8 MAKE MODEL DOES EACH CIRCUIT OPERATE DOES EACH CIRCUIT MAXIMUM TIME TO PREACTION SUPERVISION LOSS ALARM? OPERATE VALVE RELEASE? OPERATE RELEASE VALVES None YES NO YES NO MIN SEC CONT. N/A PRESSURE LOCATION MAKE & SETTING STATIC PRESSURE RESIDUAL PRESSURE FLOW RATE REDUCING & FLOOR MODEL (FLOWING) N/A VALVE INLET (PSI) UTLET (PS INLET (PSI) OUTLET (PSI) TEST NJA HYDROSTATIC Hydrosiatic tests shall be made at not less that 200 psi (13.6 bars) for 2 hours or 50 psi (3.4 bars) above static TEST pressure in excess of 150 psi (10.2 bars) for 2 hours. Differentlal dry-pipe valve clappers shall be left open during the test to DESCRIPTION prevent tlamange All a6oveground piping leakage shall be stopped PNEUMATIC Eslablished 40 psi (2.7 bars) air pressure and measure drop, which shall not exceed 1 112 psi (0.1 bars) in 24 hours test pressure fanks at normal water level and air pressure drop, which shall not exceed 1 112 psi 0.1 bars) in 24 hours. ALL PIPING HYDROSTATICALLV TESTED AT 200 PSI BARS) FOR - 2 HR IF NO, STATE REASON DRV PIPING PNEUMATICALLY TESTE N/A YES NO EQUIPMENT OPERATES PROPERLY YES NO DO YOU CERTIFY AS THE SPRINKLER CONTRACTORTHAT ADDITIVES AND CORROSIVE CHEMICALS, SODIUM SILICAT OR DERIVATIVES OF SODIUM SILICATE, BRINE, OR OTHER CORROSIVE CHEMICALS WERE NOT USED FOR TESTING SYSTEMS OR STOPPING LEAKS? - X YES F I NO DRAIN READING OF GAUGE LOCATED NEAR WATER SUPPLY TES ESIDUAL PRESSURE WITH VALVE IN TEST TESTS TEST I CONNECTION / PSI ( BARS) CANNECTION OPEN WIDOP51 ( BARS) UNDERGROUND MAINS AND LEAD IN CONNECTIONS TO SYSTEM RESIERS FLUS HED BEFORE CONNECTION MADE TO SPRINKLER PIPIG. Not Applicable 11 YES F-I NO VERIFIED BY COPY OF THE U FROM NO. 85B By Others OTHER EXPLAIN FLUSHED BY INSTALLER OF UNDERGROUND SPRINKLER PIPING. YES NO IF POWDER-DRIVEN FASTNERS ARE USED IN IF NO, EXPLAIN CONCRETE. HAS REPRESENTATIVE SAMPLE El YES El NO NotAppllcable TESTING BEEN SATISFACTORILY COMPLETED? None Used BLANK TESTING NUMBER USED LOCATIONS NUMBER REMOVED GASKETS None NfA N!A WELDED PIPING X YES NO IF YES.. DO YOU CERTIFY AS THE SPRINKLER CONTRACTOR THAT WELDING PROCEDURES COMPLY WITH THE REQUIREMENTS OF AT LEAST D10.9, LEVEL AR-3? X YES NO WELDING DO YOU CERTIFV THAT THE WELDING WAS PERFORMED BY WELDERSQUALIFIED IN COMPLIANCE WITH THE REQUIREMENTS OF AT LEAST D10.9, LEVEL AR-3? X YES NO DO YOU CERTIFY THAT WELDING WAS CARRIED OUT IN COMPLIANCE WITH A DOCUMENTED QUAIITY CONTROL PROCEDURES TO ENSURE THAT ALL DISC ARE WELDING RESIDUE ARE REMOVED. AND THAT THE INTERNAL DIAMETERS OF ?X YES ? NO PIPING ARE NOT PENETRATED? CUTOFFS DO YOU CERTIFY THAT YOU HAVE A CANTROL FEATURE TO ENSURE THAT ALL (DISCS) CUTOFFS (DISCS) ARE RETRIEVED? X YES NO HYDRAULIC NAMEPLATE PROVIDED IF NO, EXPLAIN DATA NAMEPLATE X YES NO REMARKS DATA LEFT IN SERV ICE W ITH ALL CONTROL VALVES OPEN NAME OF SPRINKLER CONTRATOR Superior Flre Protectlon, Inc. -150D NE Jackaon St. Minneapolis, MN 55473 TEST WITNESSED BY SIGNATURES F PRO ER OWNE ( GNED) / TIT DATE l " 0 ORSPRINK ER CT R D) TITLE DATE 74 ? ADDITIONAL EXPLANATION AND NOT e6/08/92 14:sF D174:O1El COUJTV-4ESTE}ZIJ SERV. C oei ??, 13 /, ? j15 Ordinoncc No. 114: WL'1_I_ AND WAl'GIl SUPPLY MANAGL'MCNT MUNICIPAL NOTICE OF WEI.L PERMIT APPLIGJ4TION DAKOTA COUNTY ENVIRONMENTAI MANAG[MENT D[PARTMENT WATEA AND LAND MANAGEMENT SECTION 14955 Galaucle /lvenue Wost, AppIe Valley, MN 55124 Telephone (012) 591-7011 racsimlle (812) 891-7031 UATE: 616 9L TIME: {3:30 µ,rwrM SENT: Fax ?MailOther 70: T m Col6F.,-t e';,,,, 8?11./. 06 FROM: {3EFERENCE: NOTICE: The Water and I..and Managemern Section oi the Dakota County Envlronmentat Management bepartment has received the followinq permtt application(s) for tYte weli(s) described. IF you require further review of this application(s) or if you liave any questians or concerns abuut It, contact the Environmental Speclalist Ilsted above or our nlfica at tefephons (612) 991-7011. If there is no response iram your oftiaa.within 24 hours (exGuding weekends and holidays), Water and Land Menagoment ataff will assume that you iTave no vbjectiona issuance of iha permit(s). Please note that permlt Issuance is always cvndhloned on the permlt appiieanYS nnsorvance of and compliance with all epplioable laws and codes. A copy of ihe well parmit(s) will be forwarded to your oflice when completed. • DESCFiIPTION: PROpER1Y:OWNEIi D4Uk0'/A I:OLN9J Diti'1C,7 ?WELLploxterony -- LOCA710N OF WELL(S); ADGRESS 8¢-Z Clirti` Ruad , PUBUC LAND BUfiNEy COORDINATES:LOF I?A MUNIGIPAIJTY; _ - Lua,yi- WELL CON7'RACTOR: qhe*- A14P-11,[} h11,!7 LICENSE NO. /930 I APpLICATION RECEIVEO 6 B Jz 3UBCONT'fiACTED T0: PFpMIT IYPFt; NE1N CONS'?RUCT70N RECONSTRUCTION REPAIp(rto PEFlMANENT SEALINO_K ANNUAL MAINTENANCE: 7EMPOfiARY CP?PPINQ F REdIBTEHED-U9E_ PRIMARY USE OF WELL(S) Ayw. a{OMefl7[ 6wtl7g, CASINQ DIAMETER Z INCHES; GENGTH ?- FEET; WELI DGPTH FEET; AQUIFeR S-owdO-Yi1v'PiI COMI'LETF_b: OPEN HOIE? SCREENED_X; 6<91-461 -gZ--9/Z4 /1N71CIPqTEU URILLINQ/SEAIING DATEpI lcaown)1 t?u4`Ll .g? I.?.9 zJ 169 ; OO 4M GUMMENTS: W&+J? , vvN.A----j+ '?-? 3 CI USE ONLY PERM[T #: ?? -)- 1) ?) RECEIPT DATE: EOOE COMMP.l:CIAL PLUM81NG PERMIT RPPIICATION - CfiYOFP.14&fklV 3$30 PILOT KNOB 1iD f.A8Rft, MN 5518E 881-681-4678 INCOMPLETE APPLICATIDNS WILL NOT BE PROCESSED ? ?-o?- WORK TYPE -,,?-,NewBldg _ Add-on _ Repair O?e- RPZ _ PVB X, ' Irtigation system ' Jerry Wohschall to calculate fees. Required meter size is 2" turbo unless smeller size permitted by Public Works DESCRIPTION OF WORK To inquire if Pressure Reducing Valve is required on new service, ca11 6 51-6 81-4 646 METERS - Call 651-681-4300 to verify that hydrostatic, conductiviry, and bacteria tests passed prior to oickine uo meter Irrigation Size & Type i Avg GPM Fire Size & Price 3/4" disnlacement $152.00 Domcstic Size & Type I I 12!, Avg GPM Dces this include high dcmand dcvices7 _ Yes _ No FLUSHOMETERS OC Yes _ No Site Address: ,?G a GCafF 2 D, p Rfdaov,uC f,91ZK Tenant Name: G?Q,?/.rv 14-& PRV REQUIRED _ Yes _ No Telephone #: Was there a previous tenant in this space? _ Y oL N. If Yes, Name: InstallerName: /71,M y fL4e;, (Area Cade) Telephone #: 9SZ - 99z - z/zr od ?} l9 0 Installer Address: a(/?,f.llQ ?lf• (Area C e) City: State: /VA/- ZipCode 5SD-Sz FEES Contract price $_? x 1% ($50.00 min) Plbg Permit Meter(s) Required on all new buildings & boulevard irrigation systems Radio Meter Read Swchazge: $.50 Minimum. If base fee exceeds $1,000, calculate at Sta[e Surenarge 50 cents per $1,000 base. Sub TotaU7'otal $ $ - 5? Supplementary fees for new irrigation system: Contact Jerry Wobschall at (651) 681-4624 regarding fees Water Permit $ 50.00 Treatment Plant $ 540.00 Water Supply & Storage $ .9B ? State Surcharge $ Total $ I hereby acknowledge tha[ 1 have read this application, state that the information is correct, and agree to comply with all applicable CiTy of Eagan ordinances. It is the applicanYs responsibiliry to norify the property owner that the Ciry of Eagan assumes no liability for any damages caused bythe Ciry during its normal operarional and maintenance activities ro the faciliaes conswcted under thryis fpejanit within ?CiJry pro erty/right-of-way/easement. ^ SIGNATIJ RE OF PERMITTEE y CITY USE ONLY REQUIRED INSPECTIONS: a U.G. Air Test _ Gas Test d? Rough In ? Final $- Il^o z PLANS SUBMITTED APPROVED BY: C y_? , BUILDING INSPECTOR GENERAL INFORMATION • Radio Meter Read (requ'ued on all new buildings & boulevard irrigation systems- $157.00 (Acct Code # 92204509) • RPZ's must be rebuilt evcry five years. A minimum fee permit (per address) is required for RPZ rebuilding or repairing. • Water meters include copper hom/strainer, remote wire, and touch-pad meter GPM METERS USE PRICE GPM METERS USE PRICE 1-20 5!8" displacement residential $118.00 4-120 1-1/2" irsigation syst $ 745.00 sm commercial turbine•* "'must receive mauimum approval from - continuous Public Works 10 2-30 3/4" displacement lawn irrigation $152.00 ? 4-160 2" turbine Ig irrigation syst $ 923.00 maximum residential • & continuous sm commercial production lines IS 3-50 I" displacement very ]g res $199.00 1/4 to 160 2" compound bldgs over .$._1,798.00 bldg to 24 units 65 units maximum sm commercial & -- - continuous & Ig comm bldgs - ' 25 im tion s stems 5-100 1-1/2" bldgs 25-64 units $439.00 maximum displacement & t continuous most comm bldgs 50 METERS REOUIRING 30-DAY ADVANCE NOTICE PRIOR TO PICK UP GPM METERS USE PRICE GPM METERS USE ERiCE ' 5-350 3" turbine very Ig irrigation syst $1,214.00 6-500 4" compound +300 unit bldgs & $3,562.00 & production lines very Ig comm bldgs 1/2-320 3" compound +Zpp unit bidgs $2,264.00 10-1000 6" compound +400 unit bldgs $5,900.00 very Ig comm bldgs very lg comm bldgs 15-1000 4" turbine very Ig irrigation syst $2,184.00 & ptoduction lines -?- "' i,ommencs • To schedule inspection of the inside water line and bacldlow preventer, ca11 65 1-68 1-4675. • To arcange for water tum-on, call 651-681-4300. cc: Kris Forster, Maintenance Division Clerical TecMician Updated i/02 CITY USE ONLY PERMIT #: ? ?? (,e' RECEIPT DATE: EOOE COMMEfiCIiRL PLUM$llV6 P£ftMiT APPLICATION CITY OF ERfiRP S$SO £ILOT KNOB RD fiJ4sAP, b!A 55122 e51-881-4675 INCOMPLETE APPLICA7fONS WIU. NOT BE PROCESSED Date: ? / I 2' / (U -)' WORK TYPE D( New Bldg Add-on Repav RPZ PVB • Irtigation system ' Jeay Wobschall to calculate fees. Required meter size is 2" turbo nu lesa smaller size permitted by Public Works DESCRIPTION OF WORK To inquire if Pressure Reducing Valve is required on new service, ca11 651-68 1-4646 METERS - Ca11 65 1-681-4300 to verify that hydrostatic, conductivity, and bacteria tests passed nrior to oickina uo meter Irrigation Size & Type Avg GPM Fve Size & Price 3/4" disolacement $152.00 Domestic Size & Type i' ? 0l!?j2?Lc VYL(-vX79GPM Does this include high demand devices? _ Yes _ No FLUSHOMETERS ?- Yes _ No r, n pI1 ? Site Address: 751c (?_ _ ? k- PRV REQUIRED _ Yes _ No Tenant Name: ?- _60 0. v\_ u V? r/? Telephone #: Was there a previous tenant in this space? _ Y_ N. If Yes, Name: (nrea Code) Insraller Name: V, iAj? I, v ? Telephone #: ot 'S `t oi a - a 124 (Acea Code) Installer Address• ' l_a-?ti <- City; '?CU',( C? C?V_? State: VVl rJ Zip Code ? 3Sa- ?o FEES Contract price $?_`? , G?' ° x 1% ($50.00 min) Plbg Permit $ " Meter(s) $ `1 C)? Required on all new buildings & boulevard irrigatioo systems [tadio Meter Read $ 1 S?. GC) - S? Swcharge: $.50 Minimum. If base fee exceeds $1,OOQ calculate at S[ate Surcharge $ 50 cents per $1,000 base. ' Sub TotaUTotal $ Supplementary fees tor new irrigation system: Contact Jerry Wobschail at (651) 6814624 regarding fees Water Permit Treatment Plant $ SG,-@(F $ ?0 Water Supply & Storage $ Stste Surcharge $ Total $ Is u I hereby acknowledge that I have read this applicarion, state that the infortnarion is correct, and agree to comply with all applicable Ciry of Eagan ordinances. It is the applicanYs responsibility to notify the property owner Ih the City of Eagan assumes no liability for any damages caused by the City during its normal operational and maintenance ac[ivities to the facilrtie on?sytru ed undert?hyjis? pe it wrthin proper[y/right-of-way/easement. J? ? / JY :i?;'?/?? • ? I I ln hr??,?? SIG ATURE OF PERMITTEE FIRE SUPPRESSION SYSTEMS Permit Application City Of Eagan y o 3830 Pilot Knob Road, Eagan Mn 55122 Telephone # 651-675-5675 FAX # 651-675-5674 Requirements: 2 complete sets of drawings and specificarions cut sheets on materials and wmponents to be used Date C7 I / 22 /n2> Site Address: $cvo C L T?? R?? Tenant / Building Name: (_Q,6a,rov-, u ill< e to?a l? The Applicant is: _ Owner s,/ Contractor Other PROPERTY OWNER Address: `b S-6O I 2 7? ?`.?- EG-S-? City: /-7Gt5?'_??C State: MN Zip: -55033 CONTRACTOR MNLicenseNo. Address: !.Sc70 n/? .?a ? kccr? ?. City: i'Y7 nn PC-,? i? State: Zip: 55 q ! 3 Phone 6!Z- 78 Z- S? S ESTIMATED COMPLETION DATE: FIRE PERMIT TYPE: Sprinkler System (# of heads Fire Pump _ Standpipe Other: WORK TYPE: S? New Addition Alterations Remodel Other: DESCRIPTION OF WORK: ? Commercial _ Residential _ Ed ucational Other: PLEASE COMPLETE REVERSE SIDE pERMIT FEE: $50.50 Minimum Fee (includes State Surcharge) Contract Value $ 2-J4 03C),(X:) x.Ol % _$ Permit Fee • If Permit Fee is $1,000 or less, add $.50 ? $ ?.,sC) State Surcharge If Permit Fee is over $1,000, add $.50 per 1 D00 Permit Fee 3/4" Displacement Fire Meter $ $ 156.00 TOTAL FEE: $ yQ?'j. SQ I hereby apply for a Fire Suppression System permit and acknowledge that the information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan and with the Minnesota Building/Fire Codes; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the wark will be in accordance with the approved plan in the case of work which requires a review and approval of plans. Kc\JGi irx- Applicant's Printed Name ApplicanYs Signature OJ-22-03 Date AO NOT WRITE BELOW THIS LINE REQUIRED INSPECTIONS Underground Pipe --X Hydrostatic ? Flow Alarm __x Drain Test ? Trip Pump,Test _ Central Station ? Final Conditions of Issuance: Permit Approved b -" Date: ? ?__ /? ..I-IANDSCAF'PED PARKTNCs ONLY" STGN DISPLAYIAIrs IN1EfdRATIONAL srrreoL oF accESSYSILrrr aND REQUIRED FINE hlOT2CE (MnDOT S7AlCARD HANDIGAP 51'MC30LS R71-8a WPITE ON sLUE) PAIN7EP IN LOGATION .QS SHOUN? "YAN ACCE551BiE" SIGN ADDED (BLUE BOX lUZTF-I WNJTE EMBLEM) ! A7 APPROPRIATE LOCATIONS CMriP07 R7-Sb WHITE ON BLI.ND - GOMPLEI E U-SNAPED GHANNEL - 1vr LSShT. GALVAN17cD $tEEL 2 -0 5d( YP) ll II?II?II? IEII \ II=U,1; IJI?I I??HIl I I 3 vAN lsGGE55IBLE-, `-4" WIDE S7RIP1TlCs STALL HL. f'Ai2KINCs SIGNACsE HANDIGAP PARKINC's, SICrtNACsE, 4 ,4ISLE DETAILS FoR TRAILHEAD PARKING I-oT NOT TO SCALE RECEIVED JUL 2 2 2003 032303 o xi?D°il Request Date Flre No Rough-ln Inspection Reqwretl (VOV must cali msoector hen reatly) Inspectwn Otler Th n Fough-ln 0 Ready Now ?WAI Notity Inspector n Yes o Date Reatl IOicensed wntractor ?owner hereby request inspection of above electrical work at Job Adaress (SVeel, Box or Rome No ) Ciry ?(b 0 l. ' ? A 6,AN Section No Township Name or No Range No County 1?.?koTA Occvpant(PRMT) PM1One No St}ju?TZ ,?F+4Gl? DAR• CG. PIRY6 - Power Supplier AOdress Elecincal Conimctor (COmpeny Name) Conlractor's L¢ense N. cA 6 o4tzz Malling Adtlress (COntraclor or Owner Makmq Installation) ? D ? ? Au z Signawre (Conirad rl wner kmg Installalion) Phone Number c 1-1a3 -l 13 MINNESOTA STqTE BOAFd?FELECTRICITY n Grigga-Mltlway Bltlg. - Hoc??S-148 1 / 1821 Univereity Ave., St. Paul, MN 55104 V Ghone(612) 642-OB00 003230311, REQUEST FOR ELECTRICAL INSPECTION See instruc0ons br compleling this form on back of yellow copy, THIS INSPECTION REOUEST WILL NOT BE ACCEPTED BY THE STATE BOARD UNLESS PFOPER INSPECTION FEE IS ENCLOSED "X" 8e/ow Wark Covered by This Request Ee-oooo,-os ???S ? e A ep. Type of Building Appliances Wired Equipment Wved Home Range Temporary Service Duplex Water Heater Electric Heating Apt. Building Dryer Load Management Comm./Industrial Furnace Other (Specif Farm Air Conddioner r ( fy Contmctor's Remarks U Campute Inspechon Fee Below # Othar Fee # Service Entrance Size Fee # Circuiis/Feeders Fee Swimming Pool 0 to 200 Amps / 0 to 700 Amps Transformers Above 200_Amps Above 100 -Am s Si ns insPmtors use onry --- TOTAL Sa Vrigation 8ooms /t 11 ^j r ?O S ecial Ins ection ?c? ? AlarmlCOmmunication THIS INSTALLATIONMAV BE ORDERE DISCONNECTED IF NOT Other Fee , 5o COMPLE7ED WI7HIN 18?MOPtTH6. I, the Electncal Inspector, hereby Ro°9°-'" ? oate certify that the above mspedion has been made Final • 1ef-? `?) OFFICE USE ONLY This requast voitl 18 months imm RE: HOUSE/GARAGE MOVE I guarantee I will repair any and all damage to local roadways, utilities, and public right-of-way that may be damaged by this moving operation. 2 "? ?? Date • e - e D E r • • ? /? ?YfN` TA I o .? w ? ? p a ? E/6NTS F ? . , ? • J ?0 / i t' ?. . ?j ??. ` .v Yi f? ?* /Je ? i-? i F ? •?' ! r ?\ _ a - •?' , C . .. _ . . q ? \? a? . , ' •• ' ?t '2Y ?< _ ???E_ `? ?' ?'R ? ? ? ? ?? ? ? V? ??` l` __ ?\ 1{ • `?I ? ? .? ? • I ? \ '\ ? = S ,1D ? ? ? ? ? ? f \ ` P _ 4111? ? - ' ? ? r ? ? ? ? ... . ' ?' ° .? •. ? , ? ; '.. . 71 , ?? _ ? - , ? .,?,? ' ? ? . ? 'i ?„ p"'"":` : '?'`' • / °i? , ? ; 1 • - ? , '? I ? ' I ? ? u.??? ?1I ? 1 ?! j / r `?•• , e ? . ? µ , n ? ..5? ? . ,L . - S ? ! • „?4', . ? ?' ?? ?1`.'?...? I t% i ! ?' ! ?l ? 0 + 0Q '' ? w. 1 ? "_ ?:/ '?? ' '? . .• ; .. Y ? r , J i ? ?? J A ?` /3 c PS r8 ? ? ? • ?.. ^'+ B?, R°'1 - ;i ' ? r - - ? y ' • ; ? ;??xo = ? i ? - o ? ? •• I - a ? , ' ? ' IPPL[ y1 VALLEY + Vl' • I? e •?y ?u e i FOSE ? NTf ? i , I ?.Y?h? • L I Ordimnu No. 114: NVELL AND WATER SUPPLY MANAGENIENT WELL PERMIT AT{OTA COUNTY ENVIRONMENTAL MANAGEMENT DEPARTMENT WATER AND LAND MANAGEMENT SECTION 16955 Goluie Avmue, App1e Vallry, h1N 35124 Sdcphooe (612) 891•7011 Permit No. 92-0033 iQgEREAB,, the NON-TItANBFERABLE PERMITTEE/DBA: Maher Well Drilling, Inc. ISSIIED TO 119301 ADDRSSB: RT-1 REVIEWED BY Berhane W. Hastings, MN 55033 has submitted a permit application, has paid the sum oP one hudred and five($105) dollars to the County of Dakota as required by Ordinance Number 114 and has complied with all of the requirements of said Ordinance necessary for obtaining this permit to construct the well(s) described herein: A private water supply well will be constructed with a finished casing diameter of 4 inches, drilled to a depth of approximately 200 feet, and terminating in an unconsolidated formation aquifer. The well shall be properly casad, grouted with bentonite slurry (at least 10% bentonite) to seal off overlying unconsolidated formations, and completed with at least a 5-foot screen in the aquifer provided the water quality is acceptable. The well is located in the municipality of Eagan as follows: Aell Location: Propertp Owner and Aell Owner and Address (if different) Address (if different) 842 Cliff Rd. Dakota Co. Parks Dept. Eagan, MN 8500-127th St.E. Hastings, MN 55033 NOA, THEREFORE, Maher Well Drilling, Inc. is hereby permitted and au*_horized to construct the well described and located above for the period May 1992 to May 1993 subject to all provisions of said Ordinance, the Minnesota Water Well Construction Codes and any conditions attached on the reverse side of this permit. Given under my hand this 5th day of May, 1992. -1 /dn ATTEST ENVIRONMENTAL SUP RVISOR ENV2BONMEN L MANAGEMENT DIRECTOR LAVp USG PLINNING.WU Dk51G\ Project Memo - Requested Amendment 10417 Excelsior Boule%ard • Surte One • Hopkms, Mmnesota 55343 • Phone 952-238-0831 • fax 952238-0833 • www.brauer-Itd.wm Date: August 29, 2002 To: Craig Novzcyk, Building Inspedor City of Eagan From: JeffSchoenbauer, ProjectManager Re: Amendment to the Canoe Deck Structure at Lebanon Hills Regional Park Attached are revised drawings for the canoe deck located at Lebanon Hills Regional Park. As you may recall, we discussed these revisions and you requested revised plans for review and approval. Note the following changes made: ? The joists were changed from 2 x 8's to 2 x 10's to provide greater span between beams and still maintain 100 Ibs/s.f. As shown on the attachment, 2 x 10's will allow us a span of 10'-3", which is greater than the 8'-9" longest span shown on the drawings for the deck. ? With the extra span, we eliminated one row of footings, which is the middle row of the mid section of the deck. This was done to reduce overall costs. ? Also note that GME, the county's soils engineer, recommended that the first two rows of footings near the lake be 48" deep to get into solid load burying ground. The new drawings reflecCS that recommendation. Note also that we shifted the location of the deck a few feet to avoid impacts to trees. Othervvise, the plan remains the same as the approved plan. Your expedient review and approval of these changes would be greatly appreciated. With the weather this summer, time is slipping by for the contractor? Please call me at 952-238-0831 Ex. 13 with questions and verbal approval. Thank you. Jeff Schoenbaper, Pro}ed Manager : •, ? ?EVI??+I???°? 1 AuG '2 s z002 ? , - ----- ?_;??_-- / FLOOR JOISTS 80# LIVE LOAD 25# DEAD LOAD Lf360 78b1e fJ-17 Oesign Cri[eria Svengtn - 80 lbs per sq h Irve load yus 251bs. pe1 sq ft. OeaO batl OC/k+ctnn - Wutetl in span in inche5 dMMetl by 360 fp Gve batl oNy. Span (feet and InchBS) 218 I 2x10 2x12 ? 2=10 Soecies .y.... 01 rifOUp Grede 12' 1C 79.7 74' 17 tC 18.2' 2P 1T 18' 19.T' N 12` 18' 18.7 ZP DouglasFir- Stl.Sttuc 11.11 10J0 10d 9-4 75.2 13-9 12?8 11-4 78-5 16.1 11-9 73d 20-10 18-0 16-5 14-8 Lamh Nol & Bv. 77-8 104 9-4 8.4 14-4 12-5 11.4 10-2 16-8 14.5 13.2 11-9 18-7 16-1 14-8 73.2 No,1 10-9 9.4 8-6 7.7 134 17-4 10-4 93 15-2 13-2 12-0 10-9 17-0 14.8 13-5 12.0 No 2 10-2 8-10 8.1 7-2 12-5 10-9 9-10 B-10 14.5 12-6 11-5 10-2 76m1 13-71 12-9 11.5 No.3 7-9 6-9 6-2 5-6 9-6 8-3 7-6 6-9 11-0 9.6 8-8 7-9 72-e 10.8 9.9 8-8 Dpglas Fir- SN. Swc 10-9 9.9 9-2 8-6 13?8 17-5 77-8 10-9 76-8 15-2 14-0 12-6 19-7 17-1 15-7 13-11 $oWh Na 7 10.4 6-11 8-2 7.4 12-7 10-11 10.0 6-11 14-7 12-8 11.7 10-4 16-4 14d 1241 11.7 No2 9.11 8.7 7-10 7-0 72.1 10-6 94 8.7 14.0 12-2 11-1 9-11 15.8 13J 12-5 11.1 No 3 7-7 6-7 6.0 5-4 9-3 8-0 7-4 6-7 10-9 9.4 8-6 7-7 12-0 10-5 9-6 8-6 Hem-Fir SH. Swc 11?3 70-2 9.7 8.17 14.1 13-0 12.7 11.0 17-5 15-7 143 12-9 20a 17-5 15-11 14-3 No1&Bo- /1-0 9-9 8.11 7?11 13.9 11-11 1040 9-9 15-11 13-10 12.7 11.3 1740 15-5 11-1 72J No 1 10.7 9Q 8.5 7.6 12-11 11-3 10-3 9-2 15-0 13.0 11-70 10-7 16-9 14-6 13-3 11-10 No2 9.11 8?7 7-10 7-0 12.1 10-6 9?7 8-7 ? 14-0 12-2 11-1 9-11 15-8 13-7 12-5 11.1 No 3 7-7 6-7 6-0 5.4 9-3 8-0 7-4 6-7 10-9 9.4 8-6 7J 72-0 10-5 46 B-6 Sprvce- Sel. Stmc 70-6 9-6 847 8-< 13•4 12-7 i7-5 10-7 76-3 7M8 13-8 12•3 794 78•9 15-4 73-e Pim-Fir Na1 10-0 8_8 7-11 7.1 12?3 tOd 9?8 8?8 14.3 12?4 11-3 10-7 15-11 13-9 12?7 11•3 (SwN) No2 9-5 8-2 7.6 6.8 11-6 10-0 9-1 B-2 ? 13-5 71.7 10-7 9-6 14?11 12-11 1L10 10-7 No3 7-2 6-3 5-8 54 I 8-10 7?7 6.11 63 ? 10-2 8?10 8?1 7?3 11-5 9.10 9-0 8-1 Westem Sel.Swc. 10-2 8-10 8-1 74 12-5 10-9 9.10 8-10 14-5 12-6 1L5 1P2 I 16-1 13-11 12-9 11-5 Woods Na 1 8-10 7-8 7-0 6-3 10-9 9-4 e.6 7-I I 12-6 70-10 9-10 8-14 13-11 12.1 11-0 940 Na 2 8-10 7-8 7-0 6-3 10.9 9-4 8-6 7-7 12-6 70-10 9-10 840 13-n 12-1 1t-0 940 No 3 6-7 5-6 5-2 4.0 8-0 6-11 6-4 5-8 9-4 8.1 7?4 6-7 10-5 9-0 8-3 7-4 FLOOR JOISTS 100:a uve Lonn 10# UEAD LOAD usso Tabie FJ-18 Gsign CAterir St/ength 100 Ibs pCr sq. R 6ve batl. plus 1010s. per sq ft Oeatl baC. Dellecnon - Limrtetl in span m viches drvide0 by 360 for 6ve batl ony. Span (feet and inches) Soeciet crosrr? or Group Grade ir ir wx :r ir ic ie.r ur ir ir iex u• +r ir i9.r zr DwglasFir- SeI.SVUC 77?0 10-0 9?5 89 74.7 12-9 72-0 11-1 77.1 75J 14.5 12-70 70-2 17-7 164 14.4 LLKh No 1& BV 1040 9.10 9-1 8-1 13-10 12-2 174 9-11 16-3 14-7 12-10 11-6 18Q 75-9 14-4 12-10 Na 1 10.6 9?1 83 7.5 12-10 71-1 10-1 94 1440 12?10 11-9 10-6 16-7 14-4 734 11.9 Na.2 9-11 8-7 7-10 7-0 12-2 10-6 9.7 8-7 144 12-2 11-2 10-0 15-9 13-8 12-5 11-2 No 3 7?7 6-7 6-0 54 9-3 8-0 7-4 6.7 10-9 9-4 8-6 7-7 12-0 10-5 9-6 6.6 Dauglas Fir- Sei Swc 70-0 9.1 8-6 7a7 71?8 17-7 70-10 10.7 1 15-5 74.0 13-1 12-2 78-1 76-6 15.3 13-8 SauN No 1 9.9 8.9 8?0 7.2 12-4 70-9 9.9 8-9 14-3 12?4 113 10-1 15-11 13-10 12-7 11-3 No1 9-6 H-4 7.8 6d0 11-10 10-3 9-4 8.4 13.8 11-10 10-10 9-8 15-4 13-3 12?1 10-10 No 3 7?5 6-5 5-10 5-3 9.7 7-10 7.2 6-5 10.6 9.1 8-4 7.5 11.9 10.2 9.7 8.4 Hem?Fir $el Svuc 10-5 9-6 8-17 gJ 17.3 72-1 1/.4 70-7 16d 14-8 13-70 12-5 19-0 77-0 75-8 13-11 Na 1& BV 70.2 9-3 8-8 7.9 73.0 11-8 10.7 9-6 15-1 13-6 12-4 71-0 17-5 15-1 13-9 12-4 No 7 70-2 , 9q 6-2 7.4 12-8 10-11 10-0 8-11 14-e 128 11-7 10-4 16-5 14.2 72-11 77-7 No 2 9.6 I 8.4 7-8 6-10 17-10 103 . 9-4 8-4 13?8 11-10 10.10 9-8 15-4 133 Ra 10-10 No3 ? 7.5 6-5 540 53 9.1 7.10' ? 7-2 6-5 10-6 94 8-4 7-5 11-9 10-2 9-3 8.< Spnce. Sel SUUC 9-9 '8-10 8-4 7.9 72.5 71.3 10-7 9.70 I I5-1 17.8 12d1 12-0 1 ? 7-9 762 14-11 73-5 PinaFir Nol 9.6 8-6 7?9 6-11 72.0 10-4 9.6 8-6 1341 12-0 11.0 9•10 15?6 13.5 12-3 11-0 (SwN) Na 2 9?2 9.0 7-4 6-6 Ii 3 9-9 8?11 10 13-1 11-9 10-4 9.3 14-7 12-8 11-7 10.4 NO 3 7.0 6.1 5-7 5.0 8-7 7?5 6-9 6-1 10-0 B-8 7-11 7-1 11-2 9.8 8-10 7-10 Weslem Sel Sttuc 9.6 8?7 7-10 7.0 I 12.1 10-6 9' e-7 ! 14-1 12.2 11-2 10-0 15-9 !3-8 12-5 11.2 Woads No 7 8.7 7-6 6-10 6-1 i 10-6 9-1 8-4 1?5 I 12 Z 10-7 9-8 8-8 13-8 11-10 10-9 9-8 No 2 8.7 7-6 6.10 64 ? 10-6 9-1 8?4 7-5 ? 12?2 10J 9-8 8-8 13-8 11-10 10-9 9-8 No 3 6.5 5-7 5-7 0.6 I 7-10 6-9 6-2 54 ? 9.1 7?11 7-2 6-5 70.2 8?10 8-0 7.2 18 - - b . SEEPAOE2E5 re . 1\ / ' ?? - - - ? Gross Area 79.7 Acres 3,471,732 Sq Ft Water Area 40.7 Acres (1 772 892) Sq Ft , , Chazgeable Acres 39 Acres 1,698,840 Sq Ft ?- ? - Charge at .045/Sq Ft I \ ,I Charge $76,448 LMN \ ? ` 1 , , .. . LEBANON OIONALMLLSPARK 1 / SECTION W?F UTILITY LOCATION PLANS o 200 400 ? STORM SEWER WATER F t SECTION ?ltii 3 ?vN . SANffARV SEW ER. ?o ee Prepared By: City of Eagan, Public works Dept. cm oF EncaN, MN Dafe Prapared: March 2002 S ? EXIST. WATERMAIN EXIST. WATERMAIN CLIFF ? RO D /? ? / ? HOLLqND McDONOUGH , LAKE Gross Area 79.7 Acres 3,471,732 Sq Ft Water Area 40.7 Acres 1,772,892 Sq Ft LAKE Chargable Acres 39 Acres 1,698,840 Sq Ft o Charge at 045/Sq Ft . Charge $ 76,448 , SCNULTZE LpKE 8-13-02 UIOODEN 1'1ATERIALS: EXPOSED MATERIALS: DECKIK'a 1%b 545 SELECi GReDE LL£STEfA R£O CEDAR tGRd'lE STGHPEDI FLSCIA ]xip. Sa5 SELECI GF.4pE LLE5IEFN !dD GEDAR GRN' E SIMPEpI FRAMING MATERIALS (JOISTS 4 BEAMSJ 1XI0 MEFI-FIR -> GR BEiTER (GRGDE STnMPEDl iREdtEC dLQ PfESERyE GRqMD TREAi£D KSLN DRY AiiER TREdTMErvi TO d MdX i91?ISiTURE CONIEM ?: ia lCE? Y?X ?QG E4RHtn ?a 3 x 10 FNt wseF_ ;.?v.? 010161 ? iTG "._ nLoS "____ Cwe ra?rar.me. _ ?mw ?`?IEMaR ar?o ?>KIP / ) x i0 e[a'? ? tp?( stG ?cC?C4[LY??O??_ ___ i,a- rc c? a qu Ail I ?I ? v x?n 4 zx,o y 3?? nscie 3 J' /11 DECK AfEA AND FR4MIN6 DETAIL (PLAN) 5C4E 114' n moe nxw.cav eavsne xu I+we..imi-e?.wsm,m ? ??.?..?,TO.,m UC.IOP„ M1M-CGR ]rD.eiR1E6 JIHi? ?Ulfi l/?E %14. yCIE ]pO pµ . xnr rx r,?a em?u..cu? ..?_ 4 NOE 5'lIL rPNdTR4 LK1EM IpiIL I I carEn?umicuv-?? nG11NYWI14NINry! M1YVE150?EL ??v? f DM-LQ[??N.6i.l'I?60?N6`b PP' .1 ? . LPG?OYin6W?C[F %ERl.V4 ei '??193AT.+CUiWl4 .1.1/l' W ? n ? 1S.Iw 51Lt5.a5MR • • nlru.CLC McmcdrlpG . • L •.. ?? DECK1Wa PLAN KnLE V<" . v ? \ • \ \- 9 D ^ ?\? \• . \\? x r .? . ? ? aeiou i ' ?{TY " \ ? / [%RNG `KKVi , ?csvoc ?aro aan ?e t J 3 ?G' 3 VJ" 1'LGFf N'JLE i0 LLGEPI JiB' OL. cIR¢]e4E m.? :rCAOEC . ?.1 P C ILf11R'OD) ?, SREL Plf£ /M31xfi I ? F ?1lEL VI?F)POl1 3a ,.. @? lll?'lWLK62ELM1G?F CMfD9?W5 UE1010 4l? WSE iLNY6 SIEEL PIfE FC?i-11T M' GE?FL LLL MOHJ P05T BGSE DETGIL s..?a cartnaaueueic + x en. rwa iLp pa9E p?etE r)x6 MfX?y' Y Lp'lu1G[ P')ncM1 6nY nm[ ^ STAIRf, IUITN NANpRAIL pETAI1 eAse PLa.e coNNecrzor? petaiL 17 scue r . i? Q a ?; TO r1F £n: ?r ? a ?_. a ?O ? r? l6 I? ? ? Sqm ?- . \ m ? ? U wWN: `'w J r ? :,za ? a,; LLI' ' 0? ? V7" 0 C Q 0 C ? a m ? sn..r . L12 ? f??woiw } ? m m• ? L? 1 ?. ? y jS n lyie- { 'T .b ?i z _ Yi rt ? . ed .. : ? .:? ?.?.?_.?•?W'r?l+?"??.<'Y N) ?t /LNHCt((M w ceuc p ? y ?.O ? iGmM:4M GM uulEaEtEv ry? M]9NTi?4 W?EREtEv .•I •I ? i/I'?iYV OlC? nr? x w ceCRD!) --r:..-- - I ? I ? ? F ?>f r?auL 8 r I ' .-.1 yrt y rtA4lv ' - I I - "II ?y L I ? lAeRLTEPlELSE? 1. ? I Of ? !MO I ? ? ? 1? - r. t? t I ? ??•oucac.rw. L J ??' :- I' r LCO AI t?r 61.A? .1'D]A[C1CFi0.• ??J. I•• T .. -.??•: WLI.^E-ML.IYI? manir?e•auow " ? ' - - ?wace. nnu. nr 11I - . /51 DECK AREA GROSS SEGiION "B" (RM[L?6<! G--l ? . e« ee1e = L J ? a]'OIACaGRC• ?' .- - - - ? "1 •• ' ?' DI4 GL 1L. FiG • LRMEryM1M/?re1Y?? -? ? ? G?en? mQ > Y 1 Y.Y /'-l1 DECK AREA CRO55 SECTION "G" 13?/ xPLE ,/2•- I ?? $[?4LE I/1? I 1RdCN[4LRlOW!/lNi1WMMMpfE1XE1lLfT r.._...__. .. M9 ROdTpL L'?X EtEr ? IY .0.°PS N.S'4L Y4iER ELC?IiIp ?pRE ]?bl?? ORM?i / %FG('Nl YR9/ S e ? <iICMCiCKM Wln).iT44vGlQ lOiNM1(ITR?'1 %lR1N ? ?lFR.4 AIf?GPYtG11W )??0?? MCwc ? `?r • • ? ' ? - ? %RYE11lri '?? ? ? ` OGCM?rtR?ll-\ %E GimR e i ? ? " 1 ? 1 :; ,_ aocca oY0? +y ?6 ? ]M10? 4f 1 ? / ? \ I ?SG(ID414? L . H 6 L LJ i 1 l I- 1. I'- _ I I ? 1 4 _ 1 L I .. :1? ' r i ? L J m..,c+oeac x am•cc?? smwnrv? y- rtetqE>OY • ° R'JEIX 9a. WI'x rN a0 LY 4!R CPKCi1P1 dLCSFI SEE a1?LL ei > 9NiWOR4• ?-...,. _ • i BM6 LWJ M3GY .u+cRaew ? ? ? 4-- -? ?ii L • L ? iuicv?vN? . Ybo 1CP R LlfJ[ a{siEP V? M? REv WnRPWT?4? eieI s DL ?M ? 11 Y1Cl?.VI]i9 • ,..?? CE?I - ?plptE Li61I Yeonna 1 _? L ) W I \ nve e WG2YFLEv _ _ _ _ _ 'I. f-F -- __ - - - - ?4A?..1__? l1 _ _ f-•` ? I ^ y L 6 r II _ I ? . _ ? CLa4 ??Id'fl ? I } y 10 xc.sc n?sis _ - _' _ _. ' - 4vu1IECH[ELXILfT lE -7-?--- ----? ' ?.J I'.'? •?`?.cwv?i.ciwLid:; ?.j ? ?m?u?oc i ? ? nr i >nFi e.uo i i i ae[crIGM?lRiReir1'? -•.- ? I I I I?,?, I ! .i cwic? ?u wic.,ei , ano cx 4[IXIn6. i _I _:_-? I? ?:^?.'.? . L-.!2lCEFGMOCwr-.: ? fiLYnDa I I I , . n' ou cc?c 4 ; _ I M ? ??_ - _ ? SEGTZON t? ? ? c ELEVATIGN ? JOIST CONNEGTION TD 6EAM (TYPE 402) pETAIL OMI?TEp CONNECTION BRACKET DEtAIL SGGLE i in^ . i• 13 rmTO scn?e xn?e a• . r?o. ya0 rq' i.g' i YK'CD blfl] ? i1• OG?[6 XYFO qMt! ? iff JG ?FO?fO?-EO?EO EO-?-lG+EO?FO-?-FO?EO e ]???' „?- ;,e , xo A - ? I ?- o ? DFC?j?G , I R Rrw M ? `?e tTR?E `ix?OMAA I t 1 - -1 I:_ - 1 1 )O CPC -I I ' 1'.. 1 g I ? DI C(MC G I. ' 1? 6w9n[?a ' I ? I 1 ? I_ _ I 9 I 1 '1'= 1 I ? [ 1 i?_I I i ' I _ •I_ _ ' I l' ? _ lCLQU OIIYOE P ' ? 1 ' 1 F ? LrJ . . t J - _ f. ,/ . • ?- ?CIECK ARfA C12055 SECTIGN pELK Af?A GROS5 SEGTION "E" scaLLe I:• . r 13 sca?e?n' . r 1413 -a. q Wa ??. 2 N °?d. R u 6 O ?Z ?a S y r pkl 1?= i ??Vnrn Sqmv \ m ? ? W ? U V? ? ? ? C Q C 4? W a0 ? =? W ; =o ? C 0 C V s/1??? • L13 ___ •?e _ ? ?N' iY1R >IEEL . ~ ~ , ~ ~ . ; ; ~ ~ i ~I ' 1 , ? Q~ ~ ~ f / , , ~ ~ ~ ` t~ ~ , ~ i ~ ~ ~ ! ' \ ~ ~ ~ , S ~ ~ . ~ ~ ; ~r , ~ ~ . _ . , ~.~J ~ _ _ . _ y. ~ ~ _ , ~ r~ u, ~ . . . . , _ _ _ _ ~ ~ _ . ~ _ ~ ~ ~ ~ . ~ ~ ' , . , , ; ~ c,, ~ ~ , ~ q - ~ ` . ~ , , , _ , ~ ~ ~ , . ~ . r . ~ ~ , ~ ; ~ ~ , - , ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ l t ! 3 , o , ~~~N~ , ll ; ; ~ . - o p z~ , , ~ ~ . . . ~ , ` . . ~ ~ . . ~ ~ ~ . . . : ~ ' ~ : 'io.~.. , . . . ' . . ~ ~ . . . . . ~ . ~ . ~ ~ ~ . . . . . . L ~ . . . . . . . ~ ; l . . . ` . . . . . ` t . . . . . ~ ~ . . . . . ~ t . . . . . ~ . . . . . . ~ . ~ ~ ~ ~ . : . . . ~~~~~~~E~ ,IUL ~ 2 0~ 'a . N = 7 r 3d v 3 ) ~ • - ~ , ~ - , , , , . _ _ . _ : _ _ . _ ~ _ ~ - . . . ~ . . . . r 4 . . . . . t . ~ . . . ~ ~ . . . . . ~ . . Jan,25. 2011 12:22PM Champion Plumbing 1-651-365-1332 No. 2481 P. 13 Use BLUE or BLACK Ink / I------------ for Office Usk I City of Eajan I Permit _ I I SS>< I Permit Kee: 3830 Pilot Knob Road I I Eagan MN 56922 Dole Received: I I Phone: (651) 675-5675 I Staff. I Fax: (651) 675-5694 ! ---Z-------- 2011 COMMERCIAL PLUMBING PERMIT APPLICATION Date: Site Address: ,40 01 PP' 9-6ec!_ C41 Z KCB isi Tenant: Suite PROPERTY OWNER Name: Ckk+lk u~ Phone: CONTRACTOR Name. f - 1.11 1~1~ License I Address: -~3~U City: State ZPhone: 1Y , Ema{I: CIA r~ f G(">Ci 'r8.+ da i.~ TYPE OF _New Repiacement _Repair -Rebuild - Modify Space _ Work in R.O-W. WORK Des criptlon of work: LICO-. M -f N L- J COMMERCIAL PERMIT TYPE _ Now Construction _K Modify Space Irrigation System L_ yes I _ no) RPZ 1 _ PVB) Rain sensors required on Irrigation systems • 'Avg. GPM (2' turbo required unless smaller size allowed by Public Works) _ Meters Call (651) 675-5646 to verity that tests passed prior to picking vp meter. Domestic: Size & Type Fire: 1 Avg. GPM _ High demand devices? Yes No Flushometers Yes -No COMMERCIAL FEES: $55.00 Mlnlum (includes Slate Surcharge) OR Contract Value $ x 1% Permit Fee Required on ALL new buildings and boulevard irrigation systems 4 = $ , ZLA _ Radio Meter Read If the Permit Epg Is less than $10,010, the surcharge Is $5.00 Meter(s) If the Permit Fee is:, $10,010, the surcharge increases by S,5o for each $i,000 Permit Fee AD (i. B. a 510,010-511,000 permit, Fee requires a $5,60 surcharge) US 61 State Surcharge Following fees apply when Installing a new fawn Irrigation system. Water Permit Cail the City's Engineering Department, (851) 8.75-5640, for required fee amounts. $ Treatment Plant Water Supply & Storage g State Surcharge TOTAL FEES $-_2 Q, 6G► CALL BEFORE YOU DIG. Call Gopher State One Calf at (651) 454-0002 for protection against underground utility damage. Cell 48 hours before yoU Intend to dig to receive locates of underground utliflles. www.gophersWeonecall.org I hereby acknowledge that this information is complete and accurate; that the work will be In conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work Is not to start without a permit that the work will be in accordance with the approved plan In the case of work which requires a review and approval of plans. X Gl•>r`t s ICr~ ~,d~ x Appllcant's Printed Name App tcant's Sl natur bate • = Approved BY FOR OFFICE USE Under Grcund _Rotrgh-In Air Test Gas Test ^Flnal PRV Required: Yes No Re441red Inspections: Page 1 of 3 Use BLUE or BLACK Ink L-------- .-----j t For office We i f Permit # My of Ea n 'q-70, 6 t Permit Fee: l 3830 Pilot Knob Road ` I t Eagan MN 55122 t t 1(- I ate Received: Phone: (651) 675~5675 /D t Fax: (651) 675-5694 t staff: t t 2011 COMMERCIAL BUILDING PERMIT APPLICATION CA Date: 09-14-11 Site Address: 860 Cliff Road, Eagan MN 55122 Tenant Name: Dakota County (Tenant is: New i X Existing) Suite LG hq am ~i Il Former Tenant: PROPERTY OWNER Name: Dakota County - Bruce Blair Phone:952-891-7990 Address /City iziA4955 Galaxie Ave. Apple Valley, MN 55124 Applicant is: X owner Contractor TYPE OF WORK Descttption ofworh: Temporary Beach Building Shade Construction Cost: $16,000 CONTRACTOR Name: Jeremy Janson Inc. License Address 9003 Mayhew Lake Rd. N. E. city: Sauk Rapids State: M N zip: 56379 Phone: 320-980-0972 Contact: Jeremy Janson Email: jerjanson@aol.com ARCHITECT I Name: SI1 Recreational Enterprises Registration ENGINEER Address:201 Adamson Industrial Blydaty:Carrollton state: GA zip: 30117 Phone: 678-839-5700 Contact Person: Kelly Scogin Email: kellysQbuysii.com Licensed plumber installing new sewerlwater service: Phone NOTE: Plans and supporting documents that you submit are considered to„ be public lnformadon. Portlons of the 106r atfan may lie classified as non-public if you provide spee#lc reasons that would permit the City to donclud@ thatthe are trade secrets: CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. rn .gopheE%gj* rt Nora I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of w hick requires a w and approval of plans. x Bruce Blair X r Applicant's Printed Name Applicant's Signature Page 1 of 3 i DO NOT WRITE BELOW THIS LINE 101365 SUB TYPES _ Foundation Public Facility _ Accessory Building Apartments Commercial 1 industrial _ Exterior Alteration-Apartments _ Lodging Greenhouse / Tent _ Exterior Alteration-Commercial Miscellaneous Antennae Exterior Alteration-Public Facility WORK TYPES _ New Interior Improvement Siding _ Demolish Building" - Addition Exterior Improvement Reroof Demolish Interior _ Alteration _ Repair Windows _ Demolish Foundation _ Replace _ Water Damage Fire Repair _ Retaining Wall Salon Owner Change Vemoliition of entire building - give PCA handout to applicant DESCRIPTION A& - / Valuation G O~0 Occupancy LI/ MCES System A, Plan Review ✓ Code Edition 2601 A4 SAC Units ZXT• //rl/°. (25% 100%_i6 Zoning 7 City Water Census Code Stories / Booster Pump # of Units Square Feet PRV # of Buildings a Length Fire Sprinklers Type of Construction _ Width REQUIRED INSPECTIONS Footings (New Building) Sheetrock Footings (Deck) Final / C.O. Required Footings (Addition) V Final / No C.O. Required Foundation Other: Drain Tile Pool: -,Footings -Air/Gas Tests Final Roof: -,Decking -Insulation -ice & Water -Final Siding: -Stucco Lath -Stone Lath -Brick Framing Windows Fireplace: ,Rough In -Air Test .Final Retaining Wall Insulation Erosion Control Meter Size: Final C/O Inspection: Schedule Fire Marshal to be present: Yes VINO Reviewed By: w Building Inspector Reviewed By: r-'-57 Planning COMMERCIAL FEES Base Fee 7-30 .Z~ Water Quality Surcharge S{. bt, Water Supply & Storage (WAC) Plan Review ~/s 2 . JJi► Storm Sewer Trunk MCES SAC Sewer Trunk City SAC Water Trunk S&W Permit & Surcharge Street Lateral Treatment Plant Street Treatment Plant (Irrigation) Water Lateral Park Dedication Other: Trail Dedication Water Quality TOTA 70 Page 2 of 3 D 305 Advice No. 1221348 Dakota County Financial Services AP Account Date 10/05/2011 1500 Highway 55 ACH Effective Late 10/11/2011 Naatingc, MN 55033-2343 DCAP 2000024862 CITY F EAGAN - DIRECT DEP. 3830 PILOT KNOB RD EAGAN MN 55122-1810 Date Invoice/Credit Memo Description Gross Amount Discount Net Amount Paid 100511 BUILDING PERMIT $470.41 $0.00 - $470.41 BUILDING PERMIT SHULZE BEACH CANOPY ~`ae/~ X195 Direct Deposit to Acct: )oocx02l239 Grand Totals $470.41 $0.00 $470.41 Trans ID: 096015232 Page 1 of 1 DAKOTA COUNTY Wells Fargo Bank, N.A. AP Account Advice No. 1221348 Financial Services 115 Hospital Drive 1590 Highway 55 Van Wert, OH 45891 Date 10/05/2011 Hastings, MN 55033-2343 56-382/412 ACH Effective Date 10/11/2011 navce rv~~~rn PAY 110,7D tides 109V V09D V09V $ .`«`"470.41 TO THE CITY OF FAGAN - DIRECT DEP ORDER 3830 PILOT KNOB RD Void after 120 days OF EAGAN MN 55122-1810 NON-NEGOTIABLE City of Eagan Cash Receipt Receipt Date 10/11/2011 DIRECT DEPOSIT ADVICE Receipt Number 173065 DAKOTA COUNTY 0801.4085 280.25 BASE FEE 0720.4222 182.16 PLAN REVIEW 9001.2195 8.00 EAGAN - DIRECT DEP SURCHARGE )T KNOB RD IN 55.122-1810 Total Receipt Amount 470.41 104037 15:52:20 Use BLUE or BLACK Ink For Office Use Permit / (✓L~CI City of EaRan I- i rte r tip 1 I 2 -3• I i u I Permit Fee: 3830 Pilot Knob Road V' I Eagan MN 55122 T:T) I I Phone: (651) 675-5675 I Date Received: Fax: (651) 675-5694 j I Staff: I L-----------------I 2012 SEWER AND WATER CONNECTION AND AVAILABILITY CHARGES EXISTING COMMERCIAL PROPERTY Date: FOR OFFICE USE ONLY Property Owner: M PRV required Q } tG-'M l° City R-O-W Permit Address: f~( Phone Number:/ 1 ✓7 , Ak, County R-O-W Permit Plumber: v Cc(ntact Name: f~ SEWER WATER Sewer Service ' D ^ er Service Sewer lateral charge d- Water al charge Sewer trunk _ X Water trunk City SAC @ $100/unit Water supply storag MCES SAC @ $2,365/unit co Receipt Receipt Date.. Treatment Plant @ $7 nit Septic abandonment $55.00 permit Fee $55.00 Permit Fee $55.00 - State S arge 0 State Surcharge $5.00 P bing Permit Required - water meter to be TOTAL: acquired with building permit TOTAL: SEWER & WATER 7Sewer Service Water Service S er lateral charge Wate ateral charge Sewer tr k Water trunk City SAC MCES SAC Receipt # Date Water supply & s ge Receipt Date Treat plant S is abandonment 55.00 Permit Fee $1 0 State Surcharge $5.00 'Plumbing Permit Required - water meter to be acquired with building permit TOTAL: Number of SAC units is determined by the Metropolitan Council Environmental Services (651) 602-1000. CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.gopherstateonecall.org Cc: City of Eagan Finance Department f *1A Metropolitan Council = It " Ii Environmental Services May 21, 2012 Dale Schoeppner Building Official City of Eagan 3830 Pilot Knob Road Eagan, MN 55122 Dear Mr. Schoeppner: The Metropolitan Council Environmental Services (MCES) Division has determined the SAC to be charged for the wastewater capacity demand for the Lebanon Hills / Schulze Beach park building located at 860 Cliff Road. within the City of Eagan. The City will be charged 1 SAC Unit for this project, as determined below. SAC Units Charges: Park Building 41 £u. @.17 f.u./SAC Unit x 25% 0.60 Showers 6 showers x 17 f.u./stall @ 17 f.u./SAC Unit x 25% 1.50 Total Charge: 2.10 Credits: SAC Paid 9/83 1.00 Net Charge: 1.10 or 1 The business information was provided to MCES by the applicant at this time. It is the City's responsibility to substantiate the business use and size at the time of the final inspection. If there is a change in use or size, a redetermination will need to be made. If you have any questions, call me at 651-602-1378 or email jessica.nye@metc.state.mn.us. Sincerely, Jessie Nye SAC Program Administrator Environmental Services Division JN:kb: 120521C6 Determination expiration: May 21, 2014 cc: File, MCES Peggy Fleck, Eagan (email) Dennis Freiermuth, Dakota County Parks (email) www.metrocouncil.org 390 Robert Street North • St. Paul, MN 55101-1805 . (651) 602-1005 Fax (651) 602-1477 • 'PTY (651) 291-0904 An Equal Opportunity Employer Peggy z_ Fleck C~ From: John Gorder Sent: Tuesday, May 15, 2012 10:29 AM To: Freiermuth, Dennis Cc: Mike Lence; Peggy Fleck; Dale Schoeppner; Leon Weiland Subject: RE: Water for Lebanon Hills beach building Dennis, I reviewed the sewer connection timeline with our Chief permit and the corresponding Met Council SAC determination Building Official. To help meet your schedule, we agreed that you can proceed with the installation of the beach building sewer service (with City inspection) prior to payment and issuance of the City permit, at your own risk. However, the final sewer service pipe connection at the building should not be made until Met Council makes the SAC determination and you pay for the City permit. Hopefully, this will help you meet your schedule. Please contact Leon Wieland (651-675-5649) for inspection of the line. i Also, we agreed that the your well can be metered for determination of sanitary sewer discharge, in lieu of a sewer meter. However, please keep in mind that Dakota County will be solely responsible for all future maintenance of this meter, including removal and storage for the winter season, and replacement for the summer months. Please let me know if you have any questions. John Gorder Assistant City Engineer City of Eagan Phone: 651-675-5645 istorder@cityofeastan.com From: Freiermuth, Dennis [mailto:Dennis. Freiermuth@CO.DAKOTA. MN.US] Sent: Tuesday, May 15, 2012 9:29 AM To: John Gorder Subject: FW: Water for Lebanon Hills beach building From: John Gorder [mailto:JGorderacityofeagan.com] Sent: Monday, September 19, 2011 1:24 PM To: Freiermuth, Dennis Cc: Blair, Bruce Subject: RE: Water for Lebanon Hills beach building Dennis, The estimated charges look about right. Of course, they are subject to change with future fee schedule updates. You can install the 1.5" line and not incur charges, as long as it's not connected to the building. The charges would be due at time of connection. The City does wish to inspect the water line installed. There is no City permit to cover this installation. Please contact me to schedule an inspection. Thanks, i . John Gorder, P.E. Assistant City Engineer City of Eagan Phone: 651-675-5645 Fax: 651-675-5694 ieorder@cityofeagan.com From: Freiermuth, Dennis [mailto:Dennis. FreiermutW)CO.DAKOTA. MN.USJ Sent: Monday, September 19, 2011 10:22 AM To: John Gorder Cc: Blair, Bruce Subject: Water for Lebanon Hills beach building John, Thank you for your quick response on Friday regarding the possibility for city water service to the Lebanon Hills Schulze Beach facility. I have calculated the possible city fees for this project as: Trunk charges: $3060.00 (This is based on our phone conversation of $765.00 per SAC unit as dictated by the met Council, the facility has 66 Fixture Unit Values divided by 17 = 3.88 or 4 SAC units) Meter cost $1767.00 Permit fee $90.00 We are strongly considering not making the final connection to the facility at this time. Our main objective is to install the 1 water line from the existing 6" main, under the soon to be constructed new parking lot and to a location near the beach building. Could these fees be paid to the City at a later date when the final connection is made to the facility? Are there permit requirements if we install the 1 water line without a final metered connection? Dennis Freiermuth Dakota County Parks Facilities Development 14955 Galaxie Ave AppleValley, MN 55124 651-438-4672 Cel. 651-707-2014 Fax. 651-437-3125 dennis.freiermuth@co.dakota.mn.us 2 ~ i f f r m Y aY~ Z O R c (600 07, Uwl i QJQ Jon ~ n 7, Zyu t f V):' o i i/ w Wit,I J O O 3 oc 9 p= S Lam./ ad o J g1a° fl~ r ®s& z f awz 46 0 of J w ~ o $$js C ~-,E i# C a n I~ 1 9 --_T - - I~ j ~~II Itl I + ~cn_x I S z7 z s z,5s ,I y w°°~= iT T z ,i+ , w.; I ! 1 2 d _~2__ -1 - ~S Ell ! MM SIN 6s I S z ri P --J I I Cl O ! Iee,~` _ wiC)N ! I 1 cw!n -PPEB ~i.., W ol~ 1 t - -1n -0 0-Iw x 10 -!z ~ i I I t, i ,o - y. I t~~N~ l I I t t i z z w m'O d 1 I I I ~ / J I' J - _I IN uwj I z i W X (n~ W I L ( I l i to --7i T 1 -1+ y J t l1 / I Qj ( t ' O \ w \ I q+ F- J 1 n~ r- I I I I - Ul mi two I lo. o o o l W S22 CL o - o v) - I+ L,j > i t rnacp I--- ---o t 0 - ! I m io i F I I 1 1 LS'=_=- i I { Use BLUE or BLACK Ink 1-----------------~ I For Office Use 1 Permit M I City of Eap ; 1 Permit Fee: 1 3830 Pilot Knob Road I I Eagan MN 55122 - }Y`:7 1 ; Date Received: ' Zv / Z ; Phone: (651) 675-5675" 1 1 Fax: (651) 675-5694 APR 2 p 2012 ; staff- l 1 2012 COMMERCIAL BUILDING PERMIT APPLICATI ( lpoD ' Date: Z Z i Z Site Address: Tenant Name: (Tenant is: New / X Existing) Suite Former Tenant: Name:' t Phone: 9QK-2 9 1 PROPERTY OWNER ~X 14i rTU fl f V fem. j Address / City / zip: .....(.4 Applicant is: Owner Contractor c TYPE OF WORK Description of work: c4Gxt2 Construction Cost. . Name Pe fo be -r C0( ,416's- License CONTRACTOR Address: IV ( City: I ° lG/1.C) ✓n6u - } L State: WT Zip: Y_ 7S Phone: ~/S a3S a f~ Contact: UG Email eMTC m 2:~ C!N1 Name: Registration / p 2, ARCHITECT/ ? Address: City: es T',t-3 ENGINEER i State: t"N Zip: 512'2.. Phone: 6 S(,-.. 4 - 5 +q~ 2-- s 5( i Contact Person: f F!C->41 Email: ° vJ ``4 t2f , CZ ,11 Licensed plumber installing new sewer/water service: Phone NOTE. Plans and supporting documents that you submit are considered to be public information. Portions of the information may be classified as non public if you provide specific reasons that would permit the City to conclude that they are trade secrets. CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www. herstateonecall.orig hereby acknowledge that this information is complete and accurate; that the wo ill be in conformance ith the ordinances and codes of the City of Eagan; that 1 understand this is not a permit, but only an appli ' n a per it, and vj6A i of to start without a permit; that the work will be in accordance with the approved plan in the case of w whic qui revi an pproval of plans. xcJ fl x < A licant's Printed Name _ Appl cant's Signature r l `1 t~ ~ le~~ Page 1 of 3 DO NOT WRITE BELOW THIS LINES ` SUB TYPES A Foundation Public Facility Exterior Alteration-Apartments Commercial / Industrial Accessory Building Exterior Alteration-Commercial Apartments - Greenhouse / Tent - Exterior Alteration-Public Facility Miscellaneous _ Antennae WORK TYPES 1, 0 1 -1' New - Interior Improvement _ Siding _ Demolish Building* Addition - Exterior Improvement Reroof - Demolish Interior - Alteration - Repair Windows - Demolish Foundation - Replace - Water Damage Fire Repair - Retaining Wall Salon Owner Change *Demolition of entire building - give PCA handout to applicant DESCRIPTION Valuation Occupancy MCES System Plan Review Code Edition ! SAC Units (25%100% ) Zoning City Water Census Code Stories Booster Pump # of Units Square Feet PRV # of Buildings Length Fire Sprinklers Type of Construction Width REQUIRED INSPECTIONS Footings (New Building) Sheetrock Footings (Deck) Final / C.O. Required Footings (Addition) Final / No C.O. Required Foundation Other: Drain Tile Pool: -Footings Air/Gas Tests -Final Roof: -Decking _tnsulation -Ice & Water ,Final Siding: -Stucco Lath -Stone Lath -Brick Framing Windows Fireplace: -Rough In Air Test -Final Retaining Wall Insulation Erosion Control Meter Size: Final C/O Inspection: Schedule Fire Marshal to be present: Yes No Reviewed By: Building Inspector Reviewed By: , Planning COMMERCIAL FEES Base Fee Water Quality Surcharge Water Supply & Storage (WAC) Plan Review Storm Sewer Trunk MCES SAC Sewer Trunk City SAC Water Trunk 4y pr S&W Permit & Surcharge Street Lateral Treatment Plant Street Treatment Plant (Irrigation) Water Lateral Park Dedication Other: Trail Dedication Water Quality TOTAL Page 2 of 3 1 Atlas Foundation Company C* A L ~SF£IGB 1912 11730 Brockton Lane N. Osseo, MV 55369 (763) 428-2261 • Fax: (763) 428-4754 Helical Pier Certified «'cnsite: ~~.~~~.arlas~c~undat~on.c~~n' Installation Contractor Project: 12124 Customer: Pember Companies V ! Lebenon Hills Boardwalk Start Date: 5/30/12 Foreman: Sam Dakota County, MN Finish Date: 5/31/12 Estimator: Ben Base Length, ft. 7.0 Installation Information: All vertical foundations are CHANCE® RS2875.203 Round Shaft Helical Piers terminated with galvanized beam seat brackets. All battered tiebacks are CHANCE@ SS5 - 1 W Square Shaft Helical Piers terminated with galvanized threaded rod adapters. Lead section helix configurations are 10"-12"-14" diameter, with a 7' nominal base length. All foundations were installed using a 4,000 ft-lb torque head. All material is galvanized per ASTM A153. Previous testing and factory recommendations assume a ratio of ultimate capacity to torque of 9:1 for the RS2875.203 Piers and 10:1 for the SS5 piers. Helical Pier Extensions No. of Final Final 3' Total Cut Off Final Ultimate Allowable Torque Length (ft) Length Capacity Capacity No. Size 5' 10' Helix PSI ft-lbs kips ~ ) (ft) (ft) (kips) 1A 27/8 1 3 1800 2600 17 0.3 16.7 23.4 11.7 1B 27/8 1 3 1800 2600 17 0.8 16.3 23.4 11.7 1C 1 1 /2 1 3 1800 2600 17 0.0 17.0 26.0 13.0 2A 27/8 1 3 1800 2600 17 0.5 16.5 23.4 11.7 2B 27/8 1 3 1800 2600 17 0.7 16.3 23.4 11.7 2C 11/2 1 3 1700 2400 17 0.0 17.0 24.0 12.0 3A 27/8 1 3 1800 2600 17 0.6 16.4 23.4 11.7 313 27/8 1 3 1800 2600 17 0.6 16.4 23.4 11.7 3C 11/2 1 3 1600 2300 17 0.0 17.0 23.0 11.5 4A 27/8 1 3 1800 2600 17 0.8 16.3 23.4 11.7 46 27/8 1 3 1800 2600 17 0.5 16.5 23.4 11.7 4C 11/2 1 3 1600 2300 17 0.0 17.0 23.0 11.5 5A 27/8 1 3 1800 2600 17 0.3 16.8 23.4 11.7 5B 27/8 1 3 1800 2600 17 0.2 16.8 23.4 11.7 5C 11/2 1 3 1600 2300 17 0.0 17.0 23.0 11.5 6A 27/8 1 3 1800 2600 17 0.8 16.3 23.4 11.7 6B 27/8 1 3 1800 2600 17 0.6 16.4 23.4 11.7 6C 1 1 /2 1 1 3 1500 2100 22 0.0 22.0 21.0 10.5 7A 27/8 1 3 1800 2600 17 0.9 16.1 23.4 11.7 713 27/8 1 3 1800 2600 17 0.3 16.8 23.4 11.7 7C 11/2 1 1 3 1500 2100 22 0.0 22.0 21.0 10.5 8A 27/8 1 3 1800 2600 17 0.4 16.6 23.4 11.7 8B 27/8 1 3 1800 2600 17 0.7 16.3 23.4 11.7 8C 11/2 2 1 3 1600 2300 27 0.0 27.0 23.0 11.5 9A 27/8 1 3 1800 2600 17 0.2 16.8 23.4 11.7 9B 27/8 1 3 1800 2600 17 0.9 16.1 23.4 11.7 9C 1 1 /2 2 1 3 1500 2100 27 0.0 27.0 21.0 10.5 1 of 2 Helical Pier Extensions No. of Final Final 3' Total Cut Off Final Ultimate Allowable Torque Length Length Capacity Capacity No. Size 5' 10' Helix PSI (ft-lbs) (ft) (f t) (ft) (kips) (kips) 10A 27/8 1 3 1800 2600 17 0.5 16.5 23.4 11.7 10B 27/8 1 3 1800 2600 17 0.7 16.3 23.4 11.7 10C 11/2 1 2 3 1500 2100 32 0.0 32.0 21.0 10.5 11A 27/8 1 3 1800 2600 17 0.7 16.3 23.4 11.7 11B 27/8 1 3 1800 2600 17 0.3 16.7 23.4 11.7 11C 1 1 /2 2 3 1500 2100 27 0.0 27.0 21.0 10.5 12A 27/8 1 3 1800 2600 17 0.3 16.8 23.4 11.7 12B 27/8 1 3 1800 2600 17 0.5 16.5 23.4 11.7 12C 11/2 1 1 3 1500 2100 22 0.0 22.0 21.0 10.5 13A 27/8 1 3 1800 2600 17 0.8 16.3 23.4 11.7 13B 27/8 1 3 1800 2600 17 0.9 16.1 23.4 11.7 13C 11/2 1 1 3 1500 2100 22 0.0 22.0 21.0 10.5 Summary: No. Size 5' 10' Average Length Total Length Final Length 13 1 1 /2 9 15 22.0 286.0 286.0 26 27/8 0 26 17.0 442.0 427.7 39 Total 9 41 18.7 728.0 713.7 2of2 City of Eagan 3830 Pilot Knob Road Eagan MN 55122 Phone: (661) 675-5675 Fax: (651) 675-5694 Date:be Use BLUE or BLACK Ink ci oFor Office Usli Permit #: Permit Fee: f c5 5 Date Received: 12.0 3— IL. Staff: 2012 COMMERCIAL BUILDING PERMIT APPLICATION 201 Z Site Address: U)0 at;442 Vfoct 5-V2 Tenant Name: (Tenant is: New / Existing) Suite #: Former Tenant: PROPERTY OWNER TYPE OF WORK Address / City / Zip: VC) Applicant is: Owner Description of work: '1 C v CONTRACTOR Construction Cost: (,, Name: �IT1 v\Ac 4e U.eiv+ 3 Address: State: Zip:559 1 Phone: ContactyiC 0LeV ( Email G iJU Name: ARCHITECT/ Address; ENGINEER State: Zip: Phone: Contact Person: Email: License #: City: 1 \1 IM Ou04A g 3108' Registration #: City: Licensed plumber installing new sewer/water service: Phone #: NOTE Plans and supporting documents that you submit are considered to be public information. Portions o the information may be classified as non: public If you provide specific reasons that would permit the City to conclude that the are trade secrets. CALL BEFORE YOU DIG. Call Gopher State One Cali at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.gooherstateonecaliorg I hereby acknowledge that this information is complete and accurate; that the work will be in confor ce with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an appli - 'o r for = permit, a workis not to start without a permit; hat the work will be in accordance with the approved plan in the case of wo' ' ich and approval of purrs: z Applicant's Printed Name DO NOT WRITE BELOW THIS LINE SUB TYPES Foundation Public Facility Commercial / Industrial Apartments Miscellaneous WORK TYPES %/New Addition Alteration Replace Salon Owner Change DESCRIPTION Valuation Plan Review (25%_ 100%) Census Code # of Units # of Buildings Type of Construction Accessory Building Greenhouse / Tent Antennae Interior Improvement Exterior Improvement Repair Water Damage REQUIRED INSPECTIONS Footings (New Building) Occupancy Code Edition Zoning Stories Square Feet Length Width Footings (Deck) Footings (Addition) Foundation Drain Tile Roof: _Decking Insulation Ice & Water Final Framing Fireplace: Rough In Air Test Final Insulation Meter Size: Exterior Alteration -Apartments Exterior Alteration -Commercial Exterior Alteration -Public Facility Siding Reroof Windows Fire Repair Demolish Building* Demolish Interior Demolish Foundation Retaining Wall *Demolition of entire building - give PCA handout to applicant MCES System SAC Units City Water Booster Pump PRV Fire Sprinklers Sheetrock final / C.O. Required Final / No C.O. Required Other: Pool: _Footings Air/Gas Tests Final Siding: Stucco Lath _Stone Lath Brick Windows Retaining Wall Erosion Control Final CIO Inspection: Schedule Fire Marshal to be present: /Yes No Reviewed By: C►'I1/41� COMMERCIAL FEES Base Fee Surcharge Plan Review MCES SAC City SAC S&W Permit & Surcharge Treatment Plant Treatment Plant (Irrigation) Park Dedication Trail Dedication Water Quality , Building Inspector Reviewed By: Water Quality Water Supply & Storage (WAC) Storm Sewer Trunk Sewer Trunk Water Trunk Street Lateral Street Water Lateral Other: TOTAL 1 /5f. 4'4) , Planning Page 2 of 3 Mary Granley g(,a CI .fik I� From: Pata, Katie [Katie.Pata@co.dakota.mn.us] Sent: Monday, December 03, 2012 3:42 PM To: Mary Granley Subject: Commercial Building Application for Tent Rental at Lebanon Hills Visitor Center Attachments: 6m Multiflex Roof Cover - Verseidag.pdf; 2.5m x 3m Solid Sidewall Verseidag.pdf; CityofEaganApp..pdf; UltEvtsCertificate.pdf; Eventlayout.pdf Hello Mary, Attached is the application for commercial building for the 20 x 40 rented fully enclosed heated tent from Ultimate Events. We are renting two sets of double "French" style doors that will be placed at the center of each 20 foot side of the tent. This tent will be staffed by a park staff member or volunteer at all times to monitor traffic and heat. We will have two fire extinguishers available inside the tent --accessible at each end. This tent will be weighted on an asphalt surface in our parking lot. You requested the fire retarding information from Ultimate Events --I have attached that to this email as well. Ultimate events is scheduled to arrive between 8-11 AM on Monday, December 31, 2012 to deliver and set up both tents. You mentioned we would need to coordinate a city inspection that morning as well. We are also renting a 10 x 10 tent that will only be enclosed on three sides, t }eil—w-i-th— ' This tent lJ will be weighted on a concrete picnicking pad J• uin, I've attached our quote from Ultimate Events that itemizes this information as well as their insurance certificate which meets our requirements for this contract: i surface in our picnic area. * $1.5 million for general liability naming Dakota County as additionally insured * $1.5 million for auto liability naming Dakota County as additionally insured * MN workers compensation coverage Also attached is the site plan for locating both tents. Please email me or call me and let me know you received this and if you need anything else. Thank you Mary! Katie REVIEWED PLANS MUST REMAIN ON JOB SITE EAGAN REVIEWED DATE- " /17' BUILDING fZ- BUILDING INSPECTIONS DIVISION 1 CALIFORNIA DEPARTMENT OF FORESTRY and FIRE PROTECTION OFFICE OF THE STATE FIRE MARSHAL REGISTERED FLAME RESISTANT PRODUCT Product: Registration No. DURASKIN FA -53001 6m Multiflex Roof Cover Product Marketed By: VERSEIDAG INDUTEX GMBH INDUSTRIESTR 56 47803 KREFELD GERMANY This product meets the minimum requirements of flame resistance established by the California State Fire Marshal for products identified in Section 13115, California Health and Safety Code. The scope of the approved use of this product is provided in the current edition of the CALIFORNIA APPROVED LIST OF FLAME RETARDANT CHEMICALS AND FABRICS, GENERAL AND LIMITED APPLICATIONS CONCERNS published by the California State Fire Marshal. Deputy State Fire Marshal CALIFORNIA DEPARTMENT OF FORESTRY and FIRE PROTECTION OFFICE OF THE STATE FIRE MARSHAL REGISTERED FLAME RESISTANT PRODUCT Product: Registration No. DURASKIN FA -53001 2.5m x 3m Solid Sidewall Product Marketed By: VERSEIDAG INDUTEX GMBH INDUSTRIESTR 56 47803 KREFELD GERMANY This product meets the minimum requirements of flame resistance established by the California State Fire Marshal for products identified in Section 13115, California Health and Safety Code. This fabric meets all NFPA 701 standards. The scope of the approved use of this product is provided in the current edition of the CALIFORNIA APPROVED LIST OF FLAME RETARDANT CHEMICALS AND FABRICS, GENERAL AND LIMITED APPLICATIONS CONCERNS published by the California State Fire Marshal. AlltejAC Deputy State Fire Marshal BAGR allW'CDPIZEr --- CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DDYYY) /Y12/3/2012 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER (952) 945-0200 Associated Financial Group 12600 Whitewater Drive Minnetonka, MN 55343 CONTACT NAME: PHONE Ext): FAX (AIX, No): E-MAIL PRODUCER CUSTOMER ID #: AARCPAR-01 INSURER(S) AFFORDING COVERAGE NAIC # INSURED Ultimate Events, Inc. 13405 15th Avenue North Plymouth, MN 55441 INSURER A : Auto -Owners Insurance X INSURER B : 114606-08676716 INSURER C : 1/1/2013 INSURER D : $ 1,000,000 INSURER E : DAMAGISEES ( l O Ea RENTEoccurrenceD ) PREM INSURER F : COVERAGES CERTIFICATE NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR LTR TYPE OF INSURANCE ADDL INSR SUBR WVD POLICY NUMBER POLICY EFF (MM/DD/YYYY) POLICY EXP (MM/DD/YYYY) LIMITS A GENERAL LIABILITY COMMERCIAL GENERAL LIABILITY OCCUR X 114606-08676716 1/1/2012 1/1/2013 EACH OCCURRENCE $ 1,000,000 X DAMAGISEES ( l O Ea RENTEoccurrenceD ) PREM $ 100,000 CLAIMS-MADE X MED EXP (Any one person) $ 5,000 PERSONAL & ADV INJURY $ 1,000,000 GENERAL AGGREGATE $ 2,000,000 GEN'L T1 AGGREGATE LIMIT APPLIES PER: PRODUCTS - COMP/OP AGG $ 2,000,000 POLICY PF� LOC $ A AUTOMOBILE LIABILITY ANY AUTO ALL OWNED AUTOS SCHEDULED AUTOS HIRED AUTOS NON -OWNED AUTOS X 4867671600 1/1/2012 1/1/2013 COMBINED SINGLE LIMIT (Ea accident) $ 1,000,000 X BODILY INJURY (Per person) $ BODILY INJURY (Per accident) $ PROPERTY DAMAGE (Per accident) $ $ $ A X UMBRELLA LIAB EXCESS LIAB X OCCUR CLAIMS -MADE • 48-676716-01 1/1/2012 1/1/2013 EACH OCCURRENCE $ 4,000,000 AGGREGATE $ 4,000,000 X DEDUCTIBLE RETENTION $ $ $ A WORKERS COMPENSATION AND EMPLOYERS' LIABILITY ANY PROPRIETOR/PARTNER/EXECUTIVE OFFICER/MEMBER EXCLUDED? (Mandatory in NH) If yes, describe under DESCRIPTION OF OPERATIONS Y / N N / A 111706-08075120 1/1/2012 1/1/2013 WC STATU- OTH- X TORY LIMITS ER E.L. EACH ACCIDENT $ 500,000 E.L. DISEASE - EA EMPLOYEE $ 500,000 below E.L. DISEASE - POLICY LIMIT $ 500,000 A Property 114606-08676716 1/1/2012 1/1/2013 Deductible 5,000 DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (Attach ACORD 101, Additional Remarks Schedule, if more space is required) CERTIFICATE HOLDER Da Da Cliff cunt kota County Parks 86Eagan, MN 55123-1904 SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE ACORD 25 (2009/09) © 1988-2009 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD Use BLUE or BLACK Ink i__-______.....__-_ For Office Use ! I t l -101 I permit [ 19 City of Eantdon I 3~ . i 3830 Pilot Knob Road Permit Fee: I l Eagan MN 55122 I Date Received: ~2'b2-13 Phone: (651) 675-5675 i Fax: (651) 675-566+4 I Staff- I 2013 COMMERCIAL BUILDING PERMIT APPLICATION [late; i Site Address: [ l t A Tenant Name: (Tenant is: _ New i Existing) Suite Farmer Tenant: Name; o tl ,n r tc S Phone (61-55 -&532. Property Owner Address t City / Zip: i, L-F 1 Applicant is: Owner _ Contractor Type of Work Description of work: 4 of X Construction Cost: i ~ t [ Name: ° icense Contractor Address: Lt 1 City: jtila State: Zip:i Phone: L - ' ? c l Contact 1 Rio maii:, ' # l t t.Vti t A A , C r Name: Registration Architect/Engineer r Address: City: State: Zip: Phone Contact Person: Email: Licensed plumber installing new sewer/water service: Phone NOTE. Plans and supporting documents that you submit are considered to be public information. Portions of the information may be classified as non-public if you provide specific reasons that would permit the City to i _ _ conclude that they are trade secrets. CALL BEFORE YOU DIG. Cali Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www,ao•r)herstateonec all.org I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that 1 understand this is not a permit, but only an appli f n for permit, a 'work is not to start without a permit; t t the work ill be i ace rdance with the approved plan in the case of wo k ich qui s a iew and approval of plans. X X Applicant's Printed Name Applic 1*1 Sign bAkt -(-A Cc, G. 1U~ ~ 9, t4s Page 1 of 3 DO NOT WRITE BELOW THIS LINE SUB TYPES - Foundation Public Facility _ Exterior Alteration-Apartments - Commercial I Industrial X Greenhouse Building _ Exterior Alteration-Commercial Apartments XGreenhouse I Tent Exterior Alteration-Public Facility Miscellaneous Antennae WORK TYPES New Interior Improvement _ Siding _ Demolish Building* Addition Exterior Improvement Reroof i Demolish Interior Alteration _ Repair Windows Demolish Foundation Replace Water Damage Fire Repair Retaining Wall Salon Owner Change 'Demolition of ensue building - give PCA handout to applicant RESCRIPTION Valuation Occupancy MCES System Plan Review ' Code Edition SAC Units (250k_ 100°!0_) Zoning City Water Census Code Stories Booster Pump I#of Units Square Feet PRV #lof Buildings Length Fire Sprinklers Type of Construction Width REQUIRED INSPECTIONS Footings (New Building) ____,fteetrock Footings (Deck) v'" Final i C.O. Required Footings (Addition) Final / No C.O. Required Foundation Other: Drain Tile Pool: ,-Footings -Air/Gas Tests -Final Roof: ,Decking ,_,,,_Insulation -ice & Water -Final Siding: -Stucco Lath -Stone Lath -Brick Framing Windows Fireplace: -Rough In -Air Test -Final Retaining Wall Insulation Erosion Control Meter Size: Final C/O Inspection: Schedule Fire Marshal to be present: Yes ✓ No Reviewed By: A==,~--._. Building Inspector Reviewed By: Planning COMMERCIAL FEES j da Base Fee ! '77 Water Quality Surcharge Water Supply & Storage (WAC) Plan Review Storm Sewer Trunk MCES SAC Sewer Trunk City SAC Water Trunk S&W Permit & Surcharge Street Lateral Treatment Plant Street Treatment Plant (Irrigation) Water Lateral Park Dedication Other: Trail Dedication Water Quality TOTAL Page 2 of 3 Mary Granley From: Darrin Bramwell Sent: Wednesday, December 11, 2013 7:31 AM To: Mary Granley Subject: RE: Commercial Building Application for Tent Rental at Lebanon Hills Visitor Center Mary, That will work, thanks. -----Original Message----- From: Mary Granley Sent: Wednesday, December 11, 2013 7:06 AM To: Darrin Bramwell Subject: FW: Commercial Building Application for Tent Rental at Lebanon Hills Visitor Center Darrin, in follow up to our conversation yesterday on my email to Katie re: the requirement that the heaters should be on the exterior of the tent. Please see below on her comments. I am attaching the Apres quote she references. I'm not seeing anything about spacing from the tent the 3' you mentioned. Let me know what you think. Thanks, Mary Mary Granley I Senior Code Enforcement Technician ( City of Eagan City Hall 13830 Pilot Knob Road I Eagan, MN 55122 1 Phone (651) 675-5690 1 Fax (651) 675-5694 1 mgranley@cityofeagan.com THIS COMMUNICATION MAY CONTAIN CONFIDENTIAL AND/OR OTHERWISE PROPRIETARY MATERIAL and is thus for use only by the intended recipient. If you received this in error, please contact the sender and delete the e-mail and its attachments from all computers. -----Original Message----- From: Pata, Katie [mailto:Katie. Pata@co.dakota.mn.us] Sent: Tuesday, December 10, 2013 2:22 PM To: Mary Granley Subject: RE: Commercial Building Application for Tent Rental at Lebanon Hills Visitor Center Hi Mary, can answer those questions. There are no sunflower heaters at all this year anywhere, I remember you telling me last year they weren't allowed in any tent. - - 1 The type of heating for the 30 x 40 is the same as last year--two 170,000 BTU heaters using propane--all outside the tent and vented inside via heat duct work. See the detail on the puote. if you need more specifics about the heaters other than what's on the Apres quote, or specifics about the propane tanks and duct work (it's all the same as last year), I can have Apres provide that to you just as Ultimate Events did last year. Just let me know! Thanks, Katie -----Original Message----- From: Mary Granley [mailto:MGranley@cityofeagan.com] Sent: Tuesday, December 10, 2013 1:21 PM To: Pata, Katie Subject: RE: Commercial Building Application for Tent Rental at Lebanon Hills Visitor Center Thanks Katie. I'd just like to check with you on the heater situation. I know last year it was proposed to use sunflower heaters, and those are not allowed. There is a requirement concerning the heaters being outside the tent and vented into the tent. Can you tell me what you propose for this year? I'm not seeing a detail on that. Thanks, Mary Mary Granley I Senior Code Enforcement Technician I City of Eagan City Hall 13830 Pilot Knob Road ( Eagan, MN 55122 1 Phone (651) 675-5690 1 Fax (651) 675-5694 1 mgranley@cityofeagan.com THIS COMMUNICATION MAY CONTAIN CONFIDENTIAL AND/OR OTHERWISE PROPRIETARY MATERIAL and is thus for use only by the intended recipient. If you received this in error, please contact the sender and delete the e-mail and its attachments from all computers. -----Original Message----- From: Pata, Katie [mailto:Katie. Pata@co.dakota.mn.us] Sent: Monday, December 09, 2013 3:40 PM To: Mary Granley Subject: FW: Commercial Building Application for Tent Rental at Lebanon Hills Visitor Center Hi Mary, Attached is the fire retardant information from Apres. Thank you, let me know if you need anything else, Katie -----Original Message----- From: Michael Feldbaum [mailto:Mfeldbaum@apresparty.com] Sent: Monday, December 09, 2013 3:27 PM To: Pata, Katie 2 Subject: RE: Commercial Building Application for Tent Rental at Lebanon Hills Visitor Center Katie- Attached are the flame retardant certificates. I was unsure if you wanted them to go to Mary as well so I only sent them to you. Let me know if you need anything else. Thanks, Michael -----Original Message----- From: Pata, Katie [mailto:Katie. Pata@co.dakota.mn.us] Sent: Monday, December 09, 2013 3:13 PM To: 'mgranley@cityofeagan.com' Cc: Michael Feldbaum Subject: Commercial Building Application for Tent Rental at Lebanon Hills Visitor Center Hello Mary, Attached is the application for commercial building for the 30 x 40 rented fully enclosed heated tent from Apres Party and Tent Rental We are renting two sets of double "French" style doors that will be placed at the center of each 30 foot side of the tent. This tent will be staffed by a park staff member or volunteer at all times to monitor traffic and heat. We will have two fire extinguishers available inside the tent--accessible at each end. This tent will be weighted on an asphalt surface in our parking lot. Fire retarding information from Apres has been requested by me--I'll forward to you once I receive it. Apres is scheduled to arrive between 8-11 AM on Monday, December 30, 203 to deliver and set up the tent. I've attached our quote from Apres that itemizes this information as well as their insurance certificate which meets our requirements for this contract: * $1.5 million for general liability naming Dakota County as additionally insured * $1.5 million for auto liability naming Dakota County as additionally insured * MN workers compensation coverage Also attached is the site plan for locating the tent. Please email me or call me and let me know you received this and if you need anything else. I've copied my contact at Apres, Michael Feldbaum, on this email. I will contact the fire marshal to schedule inspection on Dec. 30 or Dec. 31. Thank you Mary! Katie 3 Certificate of Flame Resistance ISSUED BY AMERICAN PAVILION REGISTERED 1706 Warrington Avenue Date of Manfacture APPLICATION Danville, IL 61832 NUMBER NUMB R MANUFACTURERS OF THE FINISHED Mar-1 3 13-03-05 TENT PRODUCTS DESCRIBED HEREIN This is to certify that the materials described are inherently nonflammable and were supplied to: NAME Michael Feldbaum, Apres Party and Tent Rental CITY Edina STATE Minnesota Certification is hereby made that the articles described on this Certificate were manufactured with a flame-retardant approved chemical and that the application of said chemical was done in conformance with Federal Specifications. Type, color and weight of vinyl: 502 White blackout coated Description of item certified: 3M X 3M clear span tent sidewalls Flame Resistant Process Used Will Not Be Removed By Washing Duraskin/Verseidag 6L~i/t~"w' ~t2'' Signed: Name of Applicator of Flame Resistant Process AMERICAN PAVILION !U x 0 11101 Certificate of Flame Resistance ISSUED BY AMERICAN PAVILION REGISTERED 1706 Warrington Avenue Date of Manfacture APPLICATION Danville, IL 61832 NUMBER NUMB R MANUFACTURERS OF THE FINISHED Mar-1 3 13-17-05 TENT PRODUCTS DESCRIBED HEREIN This is to certify that the materials described are inherently nonflammable and were supplied to: NAME Michael Feldbaum, Apres Party and Tent Rental CITY Edina STATE Minnesota Certification is hereby made that the articles described on this Certificate were manufactured with a flame-retardant approved chemical and that the application of said chemical was done in conformance with Federal Specifications. Type, color and weight of virryl: 502 White blackout coated Description of item certified: 9M clear span tent gable end Flame Resistant Process Used Will Not Be Removed By Washing DuraskinNerseidag Signed: ax4oll~ Name of Applicator of Flame Resistant Process AMERICAN PAVILION '~c ! Certificate of Flame Resistance ISSUED BY AMERICAN PAVILION REGISTERED 1706 Warrington Avenue Date of Manfacture APPLICATION Danville, IL 61832 NUMBER NUMB 11 MANUFACTURERS OF THE FINISHED Jul-13 TENT PRODUCTS DESCRIBED HEREIN This is to certify that the materials described are inherently nonflammable and were supplied to: NAME Michael Feldbaum, Apres Parry and Tent Rental CITY Edina STATE Minnesota Certification is hereby made that the articles described on this Certificate were manufactured with a flame-retardant approved chemical and that the application of said chemical was done in conformance with Federal Specifications. Type, color and weight of vinyl: 502 White blackout coated Description of item certified: 9M X 3M clear span tent top Flame Resistant Process Used Will Not Be Removed By Washing DuraskinNerseidag Signed: a4low Name of Applicator of Flame Resistant Process AMERICAN PAVILION ACORO® DATE (MM/DDNYYY) ~ CERTIFICATE OF LIABILITY INSURANCE 12/6/2013 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER NOANTACT Cathy Rarid, CISR Mt. Bearence Management Group PHONE (651) 379-7800 FAX Noll, . (651) 379-7801 2010 Centre Pointe Blvd E-MAIL ADDRESS: Grand@bearence.com INSURERS AFFORDING COVERAGE NAIC # Mendota Heights MN 55120 INSURERA:Re ent Insurance Company 4449 INSURED INSURERB:General Casualty Company of WI 4414 Apres, Inc., DBA: Apres Party and Tent Rental INSURERC:SFM 0023 7625 Cahill Road INSURER D INSURER E Edina MN 55439 INSURER F: COVERAGES CERTIFICATE NUMBER:CL1351622052 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDL SUBR POLICY EFF POLICY EXP LIMITS LTR POLICY NUMBER (MWDDfrfYY) (MMIDDIYYYY) GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 X COMMERCIAL GENERAL LIABILITY P EMI ET Ea orcur ence $ 300 , 000 A CLAIMS-MADE Fx-]OCCUR X C1O266671 6/1/2013 6/1/2014 MED EXP (Any one person) $ 5,000 PERSONAL & ADV INJURY $ 1,000,000 GENERAL AGGREGATE $ 2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER PRODUCTS - COMP/OP AGG $ 2,000,000 X POLICY PRO LOC $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT Es ccidan 1 000 000 B X ANY AUTO BODILY INJURY (Per person) $ ALL OWNED SCHEDULED BA0266671 6/1/2013 6/1/2014 BODILY INJURY (Peraccident) $ AUTOS AUTOS NON-OWNED PROPERTY DAMAGE $ HIRED AUTOS AUTOS Per accident PIP $ X UMBRELLA LIAB OCCUR EACH OCCURRENCE $ 5, 000 , 000 B EXCESS LIAB CLAIMS-MADE AGGREGATE $ 5,000,000 DED X RETENTION 10,00 CU0266671 6/1/2013 6/1/2014 $ C WORKERS COMPENSATION X WC STATU- 0TH - AND EMPLOYERS' LIABILITY TORY LIMIT FR ANY PROPRIETOR/PARTNER/EXECUTIVEYL_j /N E.L. EACH ACCIDENT $ 500,000 OFFICER/MEMBER EXCLUDED? N / A (Mandatory in NH) 8678203 6/1/2013 6/1/2014 E.L. DISEASE - EA EMPLOYE $ 500,000 If yes, describe under DESCRIPTION OF OPERATIONS below E.L. DISEASE - POLICY LIMIT $ 500,000 DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (Attach ACORD 101, Additional Remarks Schedule, if more space is required) Lebanon Hill Visitors Center and Dakota County are Additional insureds with regards to General Liability and Auto Liabiity per General Casualty form #CG8155 and #CA7910. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Lebanon Hill Visitors Center ACCORDANCE WITH THE POLICY PROVISIONS. C/O Dakota County 860 Cliff Road AUTHORIZED REPRESENTATIVE Eagan, MN 55123 C Rand, CISR/CATRAN ACORD 25 (2010/05) ©1988-2010 ACORD CORPORATION. All rights reserved. INS025 i9moo,) m The AR('1Rr1 name and Innn arc renicfcrcrl mnrlrc of ArnRn OUCTATIUti $D92Gi 'a Michael Feldbaum } Entered by MSF on 12-05-I3 .-PARTY AND TENT RENTAL i.-= - 7625 Cahill Road • Edina, Minnesota 55439 (952) 942-3399 • tax (952) 942-5118 ;033803 1 :`a 12-30-13 QUOTE BILL TO. Lebanon Hills Visitors Center PHONE DAY 651 554-6532 T 860 Cliff Road NUMBER(S) EVE. 651 01-02-14 Eagan, MN 55123 CONTACT tt. PHONE _ SAME NUMBER EVENT I DATE & TIME New Years Eve Part CITY, ECUIPMENT I! t x s DESC:RIPTIONOFITEM 1-s D 1200-6403 1 9M x 12M CLEARSPAN (30'x401) 1020,00 1,020.00 1250-0185 14 Tent Weight, 675 LB Concrete 25.00 350.00 1250-6095 12 Sidewall, White 3m X 3m 15.00 180.00 1250-6090 2 Sidewall, White Door 3m X 3m 15.00 30:00 1250-0490 2 Clear Glass Tent Door 350.00 700.00 1275-0010 140 Tent Lights, Italian - Per Ft. 0.90 126.00 1250-0134 2 Heater, 170,000 BTU 200,00 400.00 1250-0150 2 Heater Duct Work 1250-0153 2 Air Diffuser For Heater 1250-0148 2 Thermostiat Egr Heater APRES, INC. appreciates your patronage and we will do everything we can to ensure your event is a success. We pride ourselves on our quality.. service, and reliability. CUSTOMER is fully responsible for the care, use, security & return of all equipment- EQUIPMENT is to be stacked in it's original delivery area. Dishes and glassware need to be rinsed and in their original containers or there will be added labor charges. CONTINUED ON NEXT PAGE SHORTAGES will result in extra charges (inc. boxes and crates) equal to the replacement coast of the shortages. If you have any questions, please call I HAVE READ AND I AGREE TO THE CONTRACT TERMS ON THIS DOCUMENT. THOSE TERMS CONSIST OF OUR ENTIRE AGREEMENT. NO ONE HAS ANY ORAL OR OTHER WRITTEN REPRESENTATIONS OR PROMISES NOT VICI-W ED IN THIS CONTRACT. I FX1 s -TUnE HEREBY ACKNOWLEDGE RECEIPT t'r "PY OF THIS CONTRACT ~,z tJ a•~ ~ -,~s; - - ~ p ~.P~t 1 ft~l.riri :17rr• 1 r 5P~ir,.G~ }t tt„° l.E ~6Y . a t t 1 s_.Y...x~tl s nt- sl.tuu a. M ,r ti tt C r, t{ tr} . z1': .i(i, v.X'f (~c~i,,i t#:,". .~-~Yse wit i 01A a!*, trail i ti . E "rr 30 rr VS tr(41) crate, fit ii 1'/t:'IGF?, HOURS: Monday - Friday 8:00 AM - 5:00 PM Saturday gam - Noon CLOSED SUNDAY r QUOTATION 809261 w Lam.------ Michael Feldbaum Entered by MSF on 12-05-13 I-PARTY AND TENT RENTAL 7625 Cahill Road a Edina, Minnesota 55439 (952) 942-3399 • fax(952)942-5118 - 1033803 QUOTE I 12-30-13 Lebanon Hills Visitors Center _ 651 554-6532 BILL TO: 860 Cliff Road PHONE DAY tr NUMBER(S) EVE. 651 1 ixt 01-02-14 Eagan, MN 55123 CONTACT i~(tttRf € t7it , - - PHONE NUMBER ;SAME EVENT I DATE & TIME New Years Eve Fart - Et?tAIPMEti # 17, ' Ti#u#'{!f? ? QTY. DESCRPTK)N OF ITEM 1-3 D 8000-0084 4 Propane Tank, Quality 100 Lb 0500-0500 2 ***HAZARDOUS MATERIAL*(942-3399)*** 1900-0380 3 Extension Cord--100 Ft. White 9100-0054 UNIT 1 Fuel Surcharge 13.60 13.60 DELIVERY / PICKUP CHARGE 80.00 80.00 RESERVATION TERMS: A 501: Deposit Is Required To Reserve Any Rental Items. If We Do Not Receive A Signed Agreement And 50% Deposit Within 7 Days Of Receiving This Document, Your Order May Not Be Processed. We Accept Cash, Check, Visa Or MasterCard As Forms Of Payment. **NOTE-By Signing This Agreement, You Also Agree To Our "Conditions Of Rental" Portion Of Our Agreement. C ELLAT ON POLICY: APRES, INC. appreciates your patronage and we will do everything we can to ensure your event is a success. We pride ourselves on our quality, service, and reliability, CUSTOMER is fully responsible for the care, use, security & return of all equipment. EQUIPMENT is to be stacked in it's original delivery area. Dishes and glassha, iu need to be rinsed and in their original containers or there will be added labor charges. CONTINUED ON NEAT PAGE SHORTAGES will result in extra charges (inc. boxes and crates) equal to tt,< re,;i rent cost of the shortages~ It you have any questions, :lease call. I HAVE READ AND I AGREE TO THE CONTRACT TERMS ON THIS DOCUMENT. THOSE TERMS CONSIST' OF OUR ENTIRE AGREEMENT. NO ONE HAS ANY ORAL OR OTHER WRITTEN REPRESENTATIONS OR PROMISES NOT INCLUDED W THIS CONTRACT. I - HEREBY ACKNOWLE GE REGOPT eA6 OF A COPY OF THE ~:....__ti ....:.1. r' A, Vic, >t:r~ZK: t.tft~ ycTtt iw: 4,tt ti,Alifl - I?2 t;i fli r, 9/'.1 (G-rTl stair:; W I HOURS: Monday - Friday 8:00 AM - 5:00 PM Saturday gam - Noon CLOSED SUNDAY QUOTATION 809261 ► } `Michael Feldbaum _ Entered by MSF on 12-05-13 _i~_'_PARTY AND TENT RENTAL _ 7625 Cahill Road Edina, Minnesota 55439 (952) 942-3399 * fax (952) 942-5118 f DOTE 12-30-13 Lebanon Hills Visitors Center 651 554-6532 BILLTa: 860 Cliff RoaduasER{s}vE. 65iz' 4tl,ire;t; i O1-02-14 F~ 5 ,Eagan, MN 55123 CONTACT i i ! ¢'~tt: - - - - - PHONE SAME NUMBER EVENT ! DATE & TWE New Years Eve Part EQUIPMENT # ~ ~ ~litu i .:L ~ QTY. i ILLL " :aE11117 3+., ..itM17-7; DESCIR PTION OF ITEM J tE 1-3 D Outside Of 30 Days Prior To Delivery - Forfeit 25% Of Current Order Amount Within 30 Days Prior To Delivery - Forfeit 50% Of Current Order Amount Within 72 Hours Prior To Delivery - Forfeit 100% Of Current Order Amount FINAL REVISIONS: Final Revisions And Balance Of Payment Must Be Made AT LEAST 72 HOURS Prior To Delivery. Reductions To Your Order Total Within 72 Hours May Not Be Accommodated Or Will Incur A 20t Restocking Fee. IF YOUR TENS' IS BEING STAKED PROPERTY OWNER Is Responsible For Marking All PRIVATE Underground Utility And Irrigation Lines. Apres Is NOT RESPONSIBLE For Hitting Any Unmarked Lines. Apres Will Make Sure That All PUBLIC Utility Lines Are Marked Prior To Your Tent Installation. IF YOUR TENT IS BEING WEIGHTED Tent Manufacturers Require Securing ALL Tents With Stakes. If The Customer Requires Weights, The CUSTOMER Assumes All Responsibility And Damages. PERMITS: Apres In NOT Responsible For Pulling Any Permits, Customer Is Responsible For Obtaining Any J All Permits. Assistance In Permitting Is Available At An Additipnal Cost B a I l d In The Basic Rena Cost. APRES, INC. appreciates your patronage and we will do everything we can to ensure your event is a success, Vie SUB TOTAL 2,899.60 pride ourselves on our duality, service, and reliability. CUSTOMER is fully responsible for the earn , security & return of all equipment. EQUIPMENT is to be stacked in O's -i9inar 'r,Ir e,-!, Gch„r and glassware ate d to be rinsed c'--' in their TAX 206.62 original containers or there Mil be adG SHORTAGES will result in ex' 3 ct It- the replac:emectt cost oft if ESTIMATED 3,106.22 you have any questions, please t HAVE READ AND I AGREE TO TI :)N T n.:C7 E r,.'"S ON T I II$ rOCUMENT. THOSE TERMS CONSIST Or C UR ENTIRE AGREEMENT. NO OUE H- ' .,rdY C+?A.t OR 1JH i' 1VH tEN REPRESENTATIONS OR PR 7t%tSES NOT t* CLUDED IN Th"t C^!tTR, i - H REBY AC#N04 LEU"E REt r ° SAIJIJUM DUR 3,106.22 OF A COPY OFTIOS (1OK!TR; i T DELIVER ON 12-30-13 A.M. • PICK UP 01-02-14 P.M. ttt,rr+. i t it! n ,Lt,.:. HOURS: Monday - Friday 8:00 AM - 5:00 PM Saturday gam - Noon CLOSED SUNDAY 24 HR EMERGENCY EVENT CALLS: 952.942.3399, Ext.334 REVISION 1 PAGE 3 OF 3 - t IVAV 0 Apr 47> z v C ~ d S o n rn zm ~v q O Z Q C} u S m r m 70 K r a, c- ~b L L,, PT. J � Use BLUE or Bi�ACK Inl� j�ForOfficeuse _____— --� I � { [ � Rermif#: �� 1 ���� �� ������ j , ��t � Perr�at Fee: { 3830 Pi(at Knab Raad � i Eagan MN 55122 t � Phone.{651)675-�a67$ � Date Received: � �ax:�ss��s�s-�ssa ; s��.: � !________________,;�� yu�`� 0 2014 CC'}NIMERGIAL BUILDING PER�IfIT APPL.ICATIQN � c�-� ,+� j (`�`_ t�-- � l �� ' � Date:��',�..���2�I�F Site Address: ��Q � l..f#[ T T ��. � ��� �[v J'J���.� 7'enant Ma�ne: {Tenant is:�tJew f,,,�Existing} Suite#: ,���. �; �ormer Tenant; � t f�t� *� � Na�rte: �C�,�__GI�'�, ���,,i�1�1! ""�C1�.t`�,',� Phane: ��{'��t'�,'"�37�L. � � �_ ;�� ' ` qL Address!City t Zip: � �� � � ; � , � ��, ApAlicant is: Qwner Contracfar � 3 y Descriptian af wo�lc: '� � 1' � �C �rl,'�` °�� �� �. ___,�;�� �- _'�����% x'��� Construction Cas#: Z.�7��"�a �� ��� � /� ��� �� �% tdame;� �'��L�':���17` ,�#++��ICicense#. ��� �=��// ""��rt� ,,t��1 i�� � �r. ._.,,,�t� � c'� .�, 6i-'< �� � � Address; Gi l,t� �� � o '= ����� . �� �t'S`�-� '� �#�.-� �3�f`� ''�, � � % ,��� State• Zip: Phone: �� ��� ��� � � �i��� ��i���� � �� ���,��,�- Contact: � A.� EmaiL t�1 �'�� � ����� �: ��� � ��o;. � � ����� / � Narne: Rc�gistration#: ��������, �����,� ��i��vi Address: City: �� ����,o�ii���j��' % ��y����!����� State: 23p: Phone: �//ii� yi� j� '��/j�%i%i%�jii �- �` �,��a � �� Cantact Person. Emait. � � � . �,, i.icensed plumber instaHing e�w sewer/wafer service: Phane#: ��3�����I�s�i�#��t �$�'cct�t����tt�# � � ������������f�a,��r�F�'��� �r � � I}��' � % % r �i� �,� , /o�-�/i�-�ii iii e/�� � ���� ��/. �he��n�atrr���1o���,��t����1�� ��o�t� � ��i��t�v�a�t�( �1`�' ���:� ' i o � .� .% �� ��� � �% s�jj� � i� /� �/i�e y� ,�% .-.' ,�„, „.,;,. ���:����+�� _8 ��` ... s o�' „ .z i .,; _���' ��., ' i�i CALI BEFQRE YtJU DIG. Catl Gopher State One Call at(651}454-0002 for protection against underground utility damage. Cal(48 hours before you intend to dig to receive locates of underground utilities, wu+w qopherstateonecall,org t hereay acknowledge that this informatian is camplete �nd accurate; that#he wnrk will be in coniormance with fhe ordinances and codes of#he Ciry of Eagan;that I understand this is not a permit,bu#onEy an applicafian fora permit,and work is not to start without a perroit;that#he work will be in accordance with fhe app�oved plan in the case of o which r 'res a w and approval of plans, �_�.�-�`�.��.-��. X Appllcant's Printed Name Appl s Signa re Page 1 af 3 �� c��r�= ,� DO NQT WRI7�B�LC?1lV THIS L�NE ��0 ` �"� su��r��s � Faunctatinn � Pubiic Facility , � Exterior Alterati�n-Apartments _ Commerciat t Industrial Accessory Building � E�sterior Alteration-•Gommeeaia! � Apar#ments � Greenhouse 11'ent � Exterior Alteration-Public Faa�lity MisceNaneous . Antennae WQRK TYPES �C New _ tnteriar�mprovement �, S�d�n� �„ �emolish 8ui�ding• � Add�tion ____ Exterior lmpravemen# � Reroa# _ Dematish tnteriae � Aiteratian i Repair � Windaws � demalish Foundatian � Rsplace v Water Damage � Fire Repair � Ftataining Watl _ Salon t?Wnet Change 'Demofition af enfire building—give PCA handout ta applicant DESCRIPT{ON Valuat�on �L�C� F� Occupancy (� MCES System �t � § Plan iteview �►J�� Code Edition 20p Y1�I.S�G. SA�Units {26°lo�,1QQ°la� 1 NLLI)� Zoning �._ City VYater ' Ce�sus Code 8faries l Booster Pump ' #af Units Square Feet � PRV �, #af Buitdings I �,��qt� p� Fire Sprinklers I'� Type of Canstr�ctian �(•$ Width 24 ' I � REQUIRED INSPECTIONS I Footings(New Building) �Shee#rosk Foatings{Deck) � Final/C.Q.Requir�tl �ootings(Addition) Final l No C.O.Required Foundatfon Other: Drain Tile Paol:„�,.Foatings AirtGas Tests �,,,Final tioaf:�,Decking �Insula6on ,�ice&Water _Frnal Siding.�Stucco Lath _„Stone Lath �Bnck Framing Windaws Fireptace.,,,_Rough tn Air Test ,�Final Retaining Wa11 InsuEafion Erasion Cantrol Mete�Size: Concrete Entrance Apron Final Clt?Inspect�an: Scheduie Fire Marshal to be present: x Yes No Reviewed By: �-I��t? ,Building Inspsctor Reviewed By: Pianning COMMERCIAL FEES Base Fee 'F IX£?� �£ Water Quality Surcharge � Water 8ampling Fes Plan Review ��/�� • i Water Suppiy 8 Starage{VYAC) MCE�SAC 3form Sewer 7runk City SAG Sewer Trunk S&W Rermit&Su�criarge Water firunk TreatEr�ent PEant S#reet Lateral 1`reatment Plant(Ir�igatlon) Street Park Dedicatian V1/ater Lateral Trail Dedication O#her. Water ttuality TQTAI� � 135 .BZ7 Page 2 af 3 ��� Use BLUE oc BLACK Ink� , �;f5 � r�---�..�.....�...,..,,�.._--�.�—:—�--� �i� � �Of�IC$USb � + � 7,7y i f�BTt1"Ilt#: �i �j� � ((/'' \J�� ���[l ���i � . � ,�1 � �"' �. � � � Perntit Fe�: , ,� -� --�"�%� i 3830 Pilot Knob Ftoad 1 � Eagan MN 55122 � Photte: (651�$75-5675 � Date Received: i Fax: (651}67�v-5694 j staf�; i �--------____......_..._.1 2015 GUMMERCIAL BUILl�ING PERIV�IT APP�ICATIt?N ..�c� , Date: � (" �� (� Site Address: �lf1 V � �I�°'� •^ �� �L�'l 1�.f�1�, �'�'1��1 7���� � Tenan#tVame: {Tenant is: New/ Existing) Saite#: Farn�e�Tenant: � �� ��. c>�t t�t��it✓�� --� .�k....� Pnor►�: ��l-�`5 LI-1�.�3 ��* � Name: _ � c�... � Prop��i��f�y Address 1+City J Zipc � �, �� _f�� � lt�'1� ` G� ���� r�/1� S_``Sr'.�"...� ,4pplicant is: Owner Contractor Description of work: �v'!�' F'C" ��'T.:�I �t'�L`'��I�.! �f..,G�l�� ` TYpe��1�r�� , 30 x �O }��� # Consfruction Gost: ' , ,�,.. � Name• �,� ��.� t�d'�`. �-E'�t:� ��+i�icense#: .. �` J� J� 1 . C�? #�±�x% Address: ��p�? C. GL Yl1 f 1 �� , City: ���✓"��. �_ ��= State:�Zip: ����� Phonet ( �� "� 1 �!� � ��! �t , � �.Y' Contact; f v I�� t t�� �� mail: '� � � IA.� t� l��'.� GTl' -��� x w� J Nam�: Registratian#: �: v �1t'CI���@G#/E#1g�11@@t v Address: City; ��� StatB: Zip: Phone: # .�r= ; Co�tac#Persan: Email: Licensed plumFs��instalEi�g new s�werlwater serv�ce: Phone#. NOTE:�lans��n�up ng�bci►tri�»ts,tt� ��ri�v su�`°' ` �o��tibi�c � ` th���r�form�'on may����s� as�+��trbtfc if ya r �c#lt+��e�r��#� � � � ,�r�r ��: �}���:. � �, �� .�. x��. ��... �tde th�#. �� �x �� � �ecn�e#,s :. � � r,- , �. t x. � ., CALL BEF(3RE YOU DIG. G�11 Gopher State�ne Call at(651 j 454-0002 for protection agai�st undergrou�d utiiity d�ma�e. Gall 48 haurs befare you intend to dig to receive loca#es of underground utilities. wuvw. a herstateon�call.a 1 hereby acknowledge that this information is complete and accurate; that the w�rk will be in canformance with the ordinances and codes af the Gity of Eagan;that 1 undsrstand this is nok a permit,but Qnly�n applicat' for a peRnit,a�d wcxk is not to start without a permit;that#fie work wili be in accardance with the approved plan in the case of wq which req ' s v��nt and approval of plans. �_���i��. +���� X Appticant`s Printed Name App Ys i ature Page 1 vf� ` ��\ . ��, � �(,LJ� 1..,�� � �� DO NOT WRITE BELOW THIS LINE ��,.�5�L SUB TYPES _ Foundation _ Public Facility _ Exterior Alteration-Apartments _ Commercial/Industrial Accessory Building Exterior Alteration-Commercial _ Apartments �Greenhouse/Tent Exterior Alteration-Public Facility Miscellaneous Antennae WORK TYPES _ New Interior Improvement Siding Demolish Building* _ Addition ✓Exterior Improvement _ Reroof _ Demolish Interior _ Alteration _ Repair _ Windows _ Demolish Foundation _ Replace _ Water Damage Fire Repair _ Retaining Wall _ Salon Owner Change *Demolition of entire building-give PCA handout to applicant DESCRIPTION Valuation FlXED � Occupancy U MCES System �,��4 Plan Review Code Edition Zo/�M6G SAC Units (25%_100%� Zoning � City Water Census Code Stories Booster Pump #of Units o Square Feet ��L ee pRV #of Buildings � Length 30X�f'e� Fire Sprinklers Type of Construction V•d Width REQUIRED INSPECTIONS Footings(New Building) Sheetrock Footings(Deck) Final/C.O. Required Footings(Addition) ✓Final/No C.O. Required Foundation Other: Drain Tile Pool:_Footings _Air/Gas Tests _Final Roof:_Decking _Insulation _Ice&Water _Final Siding:_Stucco Lath _Stone Lath _Brick Framing Windows Fireplace:_Rough In _Air Test _Final Retaining Wall Insulation Erosion Control Meter Size: Concrete Entrance Apron Final C/O Inspection: Schedule Fire Marshal to be present: � Yes No Reviewed By: (.���v , Building Inspector Reviewed By: , Planning COMMERCIAL FEES Base Fee �3 S•'"�' Storm Sewer Trunk Surcharge /N�t..D • Sewer Trunk Plan Review i�r��.-D � WaterTrunk MCES SAC Street Lateral City SAC Street S&W Permit�Surcharge Water Lateral Treatment Plant Other: Treatment Plant(Irrigation) Park Dedication Trail Dedication Water Quality TOTAL: �3� ` Page 2 of 3 Use BLUE or BLACK Ink -------———— --— For Office Use City of Ealan Permit*. /i/o17r -2( Permit Fee: 3830 Pilot Knob Road Eagan MN 55122 Date Received: Phone: (651)675-5675 Fax: (651)675-5694 Staff: 2016 COMMERCIAL BUILDING PERMIT APPLICATION 12/1/16 860 Cliff Road, Eagan, MN 55123 Date: Site Address: Tenant Name: Dakota County (Tenant is: New/ Existing) Suite#: Former Tenant: Name: Phone. County-Parks Dept. 651-554-6532 651-554-6532 4 , "2,12 Property owner Address/City/Zi 860 Cliff Road, Eagan, MN 55123 X Applicant is: Owner Contractor Description of work; Tent Rental for Special (public) Event 301x1-104:: 1240 SP type of Work Construction Cost: j, 4 Ultimate Events - Name: License#: 13405 15th Ave. N Plymouth Contractor Address: City: State: MN Zip: 55441 Phone: 763-559-8368 Contact: David Downey Email: ddowney@ue-mn.com Name: Registration#: Architect/Engineer Address: City: State: Zip: Phone: Contact Person: Email: Licensed plumber installing new sewer/water service: Phone#: NOTE:Plans and supporting documents that you submit are considered to be public information. Portions of s o file Information may be classified as non-public if you provide specific reasons that would permit the City to conclude that they are trade secrets. CALL BEFORE YOU DIG. Call Gopher State One Call at(651)454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.qopherstateonecall.org I hereby acknowledge that this information ismpleta eandaccura ; that the work will be in conformance with the ordinances and codes of the City of Eagan;that I understand thiscnotispermit,butonly an appli,,-tion f r a permit,a'• work is not to start without a permit;that the work will be in accordance with the approved plan in the case of • whic r • s a r• iew and approval of plans. Katie Pata,Visitor Services Coordinator Agg Applicant's Printed Name Appill'Arrre Sig a re Page 1 of 3 */c I‘Oc\i4 C-6?tc 0 0-cc VEA /46 LLY,S DO NOT WRITE BELOW THIS LINE SUB TYPES Foundation Public Facility Exterior Alteration-Apartments _ Commercial I Industrial Accessory Building _ ___ Exterior Alteration-Commercial Apartments _ 7'Greenhouse I Tent Exterior Alteration-Public Facility Miscellaneous _ Antennae WORK TYPES INew Interior Improvement Siding _ Demolish Building` Addition Exterior Improvement Reroof Demolish Interior Alteration Repair Windows Demolish Foundation _ Replace ___ Water Damage Fire Repair Retaining Wail Salon Owner Change `Demolition of entire building-give PCA handout to applicant DESCRIPTION Valuation Fireto Pee Occupancy MCES System Plan Review M/t4-6 Code Edition SAC Units (25%_100% ) Zoning City Water Census Code Stories Booster Pump #of Units Square Feet PRV #of Buildings Length Fire Sprinklers Type of Construction Width REQUIRED INSPECTIONS Footings(New Building) Final I C.O.Required Footings(Deck) V Final/No C.O.Required Footings(Addition) Other: Foundation Foundation Before Backfill Pool: Footings Air/Gas Tests Final ____ _ _ Drain Tile Siding: Stucco Lath Stone Lath Brick EFIS Roof; Decking Insulation Ice&Water Final Retaining Wall Erosion Control Framing 30 Minutes 1 Hour _ Fireplace: Rough In Air Test Final Concrete Entrance Apron Insulation Meter Size: Sheetrock Electronic Plans Required Windows Final CIO Inspection: Schedule Fire Marshal to be present: "Yes No CO*14. Reviewed By: , Building Inspector Reviewed By: TAI1-4 ,Planning COMMERCIAL FEES Water Quality Base Fee /35'a.* Storm Sewer Trunk Surcharge Plgilor Sewer Trunk Plan Review /Alb Water Trunk MCES SAC Street Lateral City SAC Street S&W Permit&Surcharge Water Lateral Treatment Plant Other: Treatment Plant(Irrigation) Park Dedication r•di-o Trail Dedication TOTAL: /3 Page 2 of 3 I. Use BLUE or BLACK Ink '��( —;--p For Office Use� /a �� Y �1 / CityOl :::: �`� /-c)(- 41111A Eaaali : /,, Q0/7 . (1�� � / 3830 Pilot Knob Road Eagan MN 55122 Date Received: \`'11' I tP Phone: (651)675-5675 Fax: (651)675-5694 ,,, �# Staff: AC1 J 2016 COMMERCIAL BUILDING PERMIT APPLICATION Date: 111 't)7 CA(o Site Address: 8W CLI fF R04 t> * V bm w tTT' cfF WEST skip 0 1200"sr w 1� " aG4u ,nm S51z3 Tenant Name: ct<c3'A C�7-J I ( (Tenant is: New/ Existing) suite#: Former Tenant: Name: Ti • \awl'A C1)(..) 1-\ ( Phone: -i 5Z-C1 t - 7c)1 , Property Owner Address/City/Zip: ' 'to t+W l. 5, e f k 511 t, (1S , tit.) 033 Y Applicant is: Owner Contractor Type of Work Description of work: C 4NSTR U CI 10 N or (2) Tw O 04(z�W 1, q Construction Cost:44-6 8 9 Name: f CIw ‘t c Go s,r,,-;45 7,.., License#: Contractor Address: /� �V`� /6 9 City: /d12„c 4..%o,n:C- State: Zip: .07 S1 Phone: 71 5 - Z?.S- 03 L6 (.2T'/ ` Contact: b - g 0' 1A, iEmail: ' 6ft.tin 6e.r- Gioem et..-co /ow..rev.cdon-, Name: V c.50 N 40 N E. Registration#: Architect/Engineer Address: 70 5 RJ�ti'1'yloop Av})fr�cty: SA-1NT P4UL 9 State: f t`J Zip: b5 it tt Phone: C051~2 Lt 0' ~ 1 5 5 Contact Person: .16_NW J ON E. Email: .14V4 E R.AT L*7 J1)ARC,. C06-7 Licensed plumber installing new sewer/water service: Phone#: NOTE:Plans and supporting documents that you submit are considered to be public information. Portions of the information maybe classified as non-public if you provide specific masons that would permit the City to conclude that they are trade secrets. CALL BEFORE YOU DIG. Call Gopher State One Call at(651)454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.00pherstateonecall.orq I hereby acknowledge that this information is complete and accurate; that thek will be in conformance with the ordinances and codes of the City of Eagan;that I understand this is not a permit, but only an ap the; tion for a permit, nd work is not to start without a permit;that the work will be in accordance with the approved plan in the case c` - ._.' -- dress view and approval of plans. tjx L U je) L 6 _ Xis —t Applicant's Printed Name Appli•• is Signature Page 1 of 3 ftDOL-7O 7 1111, ( . i NOT WRITE BELOW THIS LINE �' SUB TYPES Foundation _ Public Facility _ Exterior Alteration–Apartments X Commercial/Industrial _ Accessory Building _ Exterior Alteration–Commercial _ Apartments _ Greenhouse/Tent _ Exterior Alteration–Public Facility Miscellaneous Antennae WORK TYPES New _ Interior Improvement Siding _ Demolish Building* Addition XExterior Improvement Reroof _ Demolish Interior Alteration Repair Windows Demolish Foundation Replace _ Water Damage Fire Repair _ Retaining Wall Salon Owner Change *Demolition of entire building—give PCA handout to applicant — DESCRIPTION Valuation II Coe Z4 9 Occupancy !A MCES System Plan Review I Code Edition 7p/S 11RG SAC Units (25%_100% 14 Zoning City Water -- Census Code Stories Booster Pump #of Units Square Feet PRV _ #of Buildings Length Fire Sprinklers — Type of Construction iI'5 Width REQUIRED INSPECTIONS Footings(New Building) Sheetrock "X Footings(Deck) Final/C.O.Required Footings(Addition) 7{ Final/No C.O.Required Foundation Other: Drain Tile Pool:_Footings _Air/Gas Tests _Final Roof:_Decking _Insulation _Ice&Water _Final Siding:_Stucco Lath _Stone Lath _Brick XFraming Windows Fireplace:_Rough In _Air Test Final Retaining Wall Insulation Erosion Control Meter Size: Concrete Entrance Apron Final CIO lnspectio / edule Fire Marshal to be present: Yes )( No Reviewed By: L.1 , Building Inspector ector Reviewed By: , Planning COMMERCIAL FEES Base Fee 1 `7!d01� -75 Storm Sewer Trunk Surcharge ' 3oV. ' Sewer Trunk Plan Review 4 Z6' 0/. !� Water Trunk MCES SAC Street Lateral City SAC Street SSW Permit&Surcharge Water Lateral Treatment Plant Other: Treatment Plant(Irrigation) Park Dedication Trail Dedication 39, Water Quality TOTAL: 6-9 07 Page 2 of 3 (til Use BLUE or BLACK Ifikc -)I For Office Use l � �� :::: " ��4,11 Cit of EaaI _ �. .3C. cc 3830 Pilot Knob Road Eagan MN 55122 Date Received: . " '7� a Phone: (651)675-5675 /� Fax: (651)675-5694 Staff: , r") .(D O V 2016 COMMERCIAL BUILDING PERMIT APPLICATIdN Date: 12-20-2016 Site Address: Vacinity,of 220t# arrcrBtItvvir1 "a Tenant Name: Dakota County 6 0 C�i 111:0‘ lc � �-. OT WRITE BELOW THIS LINE SUB TYPES _ Foundation 'X Public Facility _ Exterior Alteration-Apartments _ Commercial/Industrial _ Accessory Building _ Exterior Alteration-Commercial Apartments _ Greenhouse/Tent _ Exterior Alteration-Public Facility Miscellaneous Antennae WORK TYPES New _ Interior Improvement Siding _ Demolish Building* Addition _ Exterior Improvement Reroof Demolish Interior _ Alteration _ Repair Windows _ Demolish Foundation Replace _ Water Damage Fire Repair _ Retaining Wall Salon Owner Change *Demolition of entire building-give PCA handout to applicant DESCRIPTION Valuation i# Zsy�/ooa Occupancy IA MCES System Plan Review ✓ Code Edition ZD J S. /lit L SAC Units (25%_100% 14 Zoning City Water Census Code Stories Booster Pump — #of Units Square Feet PRV #of Buildings Length Fire Sprinklers Type of Construction 'V/6 Width .REQUIRED INSPECTIONS Footings(New Building) Final/C.O.Required Footings(Deck) )( Final/No C.O.Required Footings(Addition) Other: Foundation Foundation Before Backfill Pool: Footings Air/Gas Tests _Final Drain Tile Siding: Stucco Lath Stone Lath _Brick_EFIS Roof:_Decking _Insulation _Ice&Water _Final Retaining Wall Framing 30 Minutes 1 Hour Erosion Control Fireplace:_Rough In Air Test _Final Concrete Entrance Apron Insulation Meter Size: Sheetrock )( Electronic Plans Required Windows Final C/O Inspectiony /dule Fire Marshal to be present: Yes No Reviewed By: LA - , Building Inspector Reviewed By: , Planning COMMERCIAL FEES Water Quality Base Feeit �s 1984. Storm Sewer Trunk li Surcharge 12-7. - Sewer Trunk Plan Review 4r IZ$ �, Water Trunk — MCES SAC — Street Lateral City SAC — Street S&W Permit&Surcharge — Water Lateral — Treatment Plant — Other: Treatment Plant(Irrigation) Park Dedication — i Trail Dedication TOTAL: 3595. Page 2 of 3 r. `�. Use BLUE or BLACK Ink 1cU r For Office Use C!tyof EaaallI I)3830 Pilot Knob ad ` 2017 Permit Fee: 06 / 0 MAR Eagan MN 55122 Date Received: 3-.3/-- 7 Phone: (651)675-5675 Fax: (651)675-5694 L Staff:__Ir.__ 2017 COMMERCIAL PLUMBING PERMIT APPLICATION ❑ Please submit two(2)sets of plans with all commercial applications.ic Date: -3/,_�O/ 7 Site Address: 1l 1 t r Tenant: Suite#: „.,,.. .-,.,...., .M,. ,_,,, ,.,.W .. ,,.�«.,,,..�„- ,..:,„,.vim w..�...,,,:,., ,«xv,,.,.M..F „.�,.,. ..,,.,:,,® :�.., .W,,., >,,,.,,,,,,,,,,., ,. ,.,,...»...,:.,,:,...«..«,,.«,..w»�,,...<..,,�,�.,«�.. .. Property Lam- i /dive n ° Owner ¢ Name: ('L�,, C P �. Phone: Name: �J�-c� J� c� V + � License#: r°i`� 0S '�°`t Contractor Address: (2 —3 y: ,j- 69P'J State:�1/t Zip: ST 02 ' ; Cit /r�iK i Phone: 4 s' Y‘ 7/"L-? '” Email: er� cC ��cc > (A__5 i Type of Work 'I )(New _Replacement _Repair _Rebuild _Modify Space _Work in R.O.W. ypi I // i Description of work: 0 1'cl�.� ! 5-A ”)wyC> p I I)-a , —1� 7`��i•t rS w..��..�,�. ..,.,� ��� _ -,w. .v,�.w�.,.... P COMMERCIAL New Construction Modify Space _Irrigation System( yes/_no)(_RPZ/_PVB) • Rain sensors required on irrigation systems I Permit Type . Avg. GPM (2"turbo required unless smaller size allowed by Public Works) Meters Call(651)675-5646 to verity that tests passed prior to picking up meter. 1 ` Domestic:Size&Type Fire: 1 ' Avg.GPM High demand devices? Yes No Flushometers Yes No f COMMERCIAL FEES __ Contract Valu-e-$ (�v7O ,w x.01 $60.00 Permit Fee Minimum =$ 'J o✓ `d CD Permit Fee I $60.00 PVB/RPZ Permit(includes State Surcharge) /� =$ "/ - t9Surcharge n Surcharge=Contract Value x$0.0005i If the project valuation is over$1 million, please call for Surcharge =$ 4' 7'6) TOTAL FEE I Following fees apply when installing a new lawn irrigation system $ Water Permit Contact the City's Engineering Department,(651)675-5646,for required fee amounts. $ Treatment Plant I $ Water Supply&Storage $ State Surcharge , _ _ _ _ _ __=$ TOTAL FEE r CALL BEFORE YOU DIG. Call Gopher State One Call at(651)454-0002 for protection against underground utility damage. \ _ I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. /r r ?�/ x y ‘•erx - Applicant's Printed Name Applicants Signature FOR OFFICE USE 7 Approved By: Date: /'/)7 Required Inspections: _Under Ground ' Rough-In it Test _Gas Test Final PRV Required:_Yes No Meter Related Items: Meter Size Radio Read Manometer Staff. Page 1 of 3 Use BLUE or BLACK Ink , For Office Use AA OF eii 140V 30 2017. . , , Permit#: i 41 ‘21. I 6- . b : 'f, 7 ..,,... .,., 2. ) glicirAlloBi) Permit Fee: 1 3 5. 0 0 „,,,, ........., ..... .....„/ Date Received: i t I S 4) 1 17 3830 Pilot Knob Road 1 Eagan MN 55122 Staff: Phone:(651)675-5675 l Fax:(651)675-5694 L ... buildinginspectionsecitvofeaaan.corn CaitittPL Ovl, 2017 COMMERCIAL BUILDING PERMIT APPLICATION 12,113 /F7 Date: 11/28/2017 Site Address: 860 Cliff Road, Eagan, MN 55123 Dakota County Tenant Name: (Tenant is: New I Existing) Suite#: Former Tenant: Phone: Name: Dakota County Parks Dept. 651-554-6532 .--,, Property Owner Address/City/Zip* 860 Cliff Road, Eagan, MN 55123 ' Applicant is: Owner Contractor Tent rental for special (public) event. TEAT 1/0511ILL ON Description of work: Type of Work 'PRA Pt& 2:1. Ev KT a iv CIE.-0_,31 FROM 6-2 p m. Construction Cost: a ' : i .. 1 • k Ultimate Events Name: License#: 13405 15th Ave. N. Plymouth Contractor. :;actorAddress: City: ,-' • MN 55441 Phone: 763-559-8368 ,%'-- State' Zip: Email: Contact: David Downey ddowney@ue-mn.com Name: Registration#: City: Architect/Engineer Address: . ... ..., State Zip: Phone: Contact Person: Email: Licensed plumber installing new sewer/water service: Phone#: be NOTE:Plans and supportingdocurifOlithatY.WsubmitaristOtailedhid tot*io:1040*foillar tion, -'' :1::'' -..#/heinformation- 77,5i...0,47 classified as non-public yet,provide'specific reasons that WO/AI permit the CO to conclude Oat 41.04.40* secrets. v % .,. You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's website at www.citvofeaoan.comisubscribe. CALL BEFORE YOU DIG. Call Gopher State One Call at(651)454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities, www,qopherstateonecaltorq I hereby acknowledge that this information is complete and accurate;that the work will be in conformance with the ordinances andcodeswork of thweinCbitey in Eagan; that f understand this is not a permit, but only an application for a permit, and work is not to start with. t a permit; thatn accordance with the approved plan in the case of work which requires a review and ap ogal of plans. 1 x Katie Pate,Visitor Services Coordinator t. x Applicant's Printed Name App icant's Signe e Page l of 3 `"• \ DC\ DO NOT WRITE BELOW THIS LINE SUB TYPES Foundation _ Public Facility Exterior Alteration-Apartments _ Commercial I Industrial _ Accessory Building _ Exterior Alteration-Commercial Apartments /Greenhouse!.Tent,, _ Exterior Alteration-Public Facility Miscellaneous Antennae WQRK TYPES V New Interior Improvement — Siding Demolish Building` _ Addition _ Exterior Improvement Reroof Demolish Interior Alteration _ Repair Windows _ Demolish Foundation _ Replace _ Water Damage — Fire Repair Retaining Wall Salon Owner Change *Demolition of entire building-give PCA handout to applicant DESCRIPTION Valuation 1=fXf t Pee". Occupancy kA MCES System I4 p. Plan Review INU.A Code Edition lb(S MISC. SAC Units (25%_100% ) Zoning 17.(^. City Water Census Code Stories Booster Pump #of Units Square Feet PRV #of Buildings I Length Fire Sprinklers Type of Construction V PS Width REQUIRED INSPECTIONS Footings_New Building_Deck_Addition Drain Tile Foundation _Foundation Before Backfill Retaining Wall Vapor Barrier Erosion Control Framing 30 Minutes 1 Hour Steel Reinforcement Insulation Street/Curb Cut Inspection Sheetrock Other: Roof:_Decking _Insulation _Ice&Water _Final Meter Size: Siding:_Stucco Lath _Stone Lath _Brick_EFIS Electronic Set of Final Revised Plans Windows Fireplace:_Rough In _Air Test _Final inal I C.O.Required Pool•_Footings _Air/Gas Tests _Final - nal I No C.O.Required Final CIO Inspection: Schedule Fire Marshal to be present: "Yes No Reviewed By: f ih.q Iii Planning New Business to Eagan: Reviewed By: 06, , Building Inspector FEES Water Quality Base Fee i'SS•bp Storm Sewer Trunk Surcharge IIINiGL b Sewer Trunk t Plan Review I NC.L.0 Water Trunk MCES SAC Street Lateral City SAC Street S&W Permit& Surcharge Water Lateral Treatment Plant Stormwater Performance Security Treatment Plant(Irrigation) Landscape Security Park Dedication Other: Trail Dedication TOTAL: li 8 3‹' Cr O Page 2 of 3 -1 /4/7/V/ Mary Granley From: Pata, Katie <Katie.Pata@co.dakota.mn.us> Sent: Monday, December 11, 2017 10:16 AM To: Mary Granley Subject: RE: Commercial Building Application for Tent Rental at Lebanon Hills Visitor Center Hi Mary, I sent your note on to the tent rental company. Here is his reply: Good morning Katie, The tent on your order is 30'x40',which has 8 legs. Our plan would be to use our 700#weights on the corners(at least), and use at least 2 of the 55#weights on each of the remaining legs. We are always going to err on the side of caution— so we'll have at least 3240 lbs of weights to secure this tent.Thank you! Would Craig be able to review? Thanks, Katie From: Mary Granley [mailto:MGranley@cityofeagan.com] Sent: Monday, December 11, 2017 6:58 AM To: Pata, Katie Subject: RE: Commercial Building Application for Tent Rental at Lebanon Hills Visitor Center Hi Katie, I heard back from Craig this morning. He reviewed the application and the proposed weighted tie downs with the MN Building Code. Would you please contact the tent supplier and let them know that in MN the design is for 90 mph wind gusts to prepare for the worst? Craig suggests 2-55#weights be used at the indicated locations, rather than one. Would you please get something from them indicating they will change that.so they will pass inspection, and provide it to me? Thanks Katie, Mary E ' Mary Granley °+ % .+ 'T ', Senior Code Enforcement Technician 4' 3830 Pilot Knob Rd I Eagan, MN 55122 Office:651-675-5690 ,. httos://www.citvofeagan.com File Copy 1 tti Mary Granley ' /7/ From: Pata, Katie <Katie.Pata@co.dakota.mn.us> Sent: Wednesday, November 29, 2017 11:13 AM To: Mary Granley Subject: RE:Commercial Building Application for Tent Rental at Lebanon Hills Visitor Center Mary, Here is the information from the tent company re:the tiedowns/stakes: The tent will be secured with weights. There will be large concrete 700 lb. weights on the corners and smaller 55 lb. metal weights on the other legs of the tent. There are straps that go from the corner of the tent to the large weights, and the metal weights sit on the base of the other tent legs. There is a total of 10 legs on the tent. Let me know if you need anything else, �Rflo� Katie LT rite A)OU) t IS 15 SuFFIC,IG�Tlr OR.... Meg-I3 From: Mary Granley [mailto:MGranley@cityofeagan.com] Sent: Wednesday, November 29, 2017 8:52 AM T To: Pata, Katie IYti U L, Subject: RE: Commercial Building Application for Tent Rental at Lebanon Hills Visitor Cente Yes, this is a new requirement. I think that's all I'll need. I'm almost through with review but if anything else comes up I'll be back in touch. .` 0C. ,6Mary Granley ;` • i r Senior Code Enforcement Technician .� .. 3830 Pilot Knob Rd I Eagan,MN 55122 41.4, + ' Office:651-675-5690 ''fiq`�'=" * %` https://www.citvofeaaan.com � ctsws. From: Pata, Katie [mailto:Katie.Pata@co.dakota.mn.ust Sent:Wednesday, November 29, 2017 8:49 AM To: Mary Granley<MGranley@cityofeagan.com> Subject: RE:Commercial Building Application for Tent Rental at Lebanon Hills Visitor Center Mary, I can get that information from the company. I haven't in years past—is this a new requirement? Is there anything else you need to know? Thanks, Katie 1 Mary Granley • 4— I Li7I ` 1 From: Pata, Katie <Katie.Pata@co.dakota.mn.us> Sent: Wednesday, November 29, 2017 11:13 AM To: Mary Granley Subject: RE:Commercial Building Application for Tent Rental at Lebanon Hills Visitor Center Mary, Here is the information from the tent company re:the tiedowrstakes: The tent will be secured with weights. There will be large concrete 700 lb. weights on the corners and smaller 55 lb. metal weights on the other legs of the tent. There are straps that go from the corner of the tent to the large weights, and the metal weights sit on the base of the other tent legs. There is a total of 10 legs on the tent. Let me know if you need anything else, aRitUo, Katie 1, .T(46 lLAJO U.) t F kL'15 baFAct Cr From: Mary Granley [mailto:MGranley@cityofeagan.com] Sent: Wednesday, November 29, 2017 8:52 AM 7 61J To: Pata, Katie - Subject: RE: Commercial Building Application for Tent Rental at Lebanon Hills Visitor Cente Yes, this is a new requirement. I think that's all I'll need. I'm almost through with review but if anything else comes up I'll be back in touch. ; t :11.40 '., Mary Granley • 4 `g' `, Senior Code Enforcement Technician # s 3830 Pilot Knob Rd I Eagan,MN 55122 4" i Office:651-675-5690 ' . �'` https://www.citvofeagan.com From: Pata, Katie [mailto:Katie.Pata@co.dakota.mn.us] Sent:Wednesday, November 29,2017 8:49 AM To: Mary Granley<MGranley@cityofeagan.com> Subject: RE: Commercial Building Application for Tent Rental at Lebanon Hills Visitor Center Mary, I can get that information from the company. I haven't in years past—is this a new requirement? Is there anything else you need to know? Thanks, Katie 1 Mary Granley I(' From: Pata, Katie <Katie.Pata@co.dakota.mn.us> Sent: Wednesday, November 29, 2017 11:13 AM To: Mary Granley Subject: RE: Commercial Building Application for Tent Rental at Lebanon Hills Visitor Center Mary, Here is the information from the tent company re:the tiedowns/stakes: The tent will be secured with weights. There will be large concrete 700 lb. weights on the corners and smaller 55 lb. metal weights on the other legs of the tent. There are straps that go from the corner of the tent to the large weights, and the metal weights sit on the base of the other tent legs. There is a total of 10 legs on the tent. Let me know if you need anything else, amtuo, l�,T rn6 K.NO w t F Katie 1H15 15 SOFFIC.UG From: Mary Granley [mailto:MGranley@cityofeagan.com] 70 Sent: Wednesday, November 29, 2017 8:52 AM `= 6 To: Pata, Katie m,A (YRL - Subject: RE: Commercial Building Application for Tent Rental at Lebanon Hills Visitor Cente Yes, this is a new requirement. I think that's all I'll need. I'm almost through with review but if anything else comes up I'll be back in touch. 3 ` :414 0 Mary Granley f 911, ' Senior Code Enforcement Technician _... �.. I 3830 Pilot Knob Rd I Eagan, MN 55122 k Office:651-675-5690 '44 https://www.cityofeagan.com •ctswa9 From: Pata, Katie [mailto:Katie.Pata@co.dakota.mn.us] Sent:Wednesday, November 29,2017 8:49 AM To: Mary Granley<MGranlev@citvofeagan.com> Subject: RE: Commercial Building Application for Tent Rental at Lebanon Hills Visitor Center Mary, I can get that information from the company. I haven't in years past—is this a new requirement? Is there anything else you need to know? Thanks, Katie 1 l9 .ILII From: Mary Granley [mailto:MGranley@cityofeagan.com] Sent: Wednesday, November 29, 2017 8:46 AM To: Pata, Katie Subject: RE: Commercial Building Application for Tent Rental at Lebanon Hills Visitor Center Hi again, Please send tent installation instructions how tent is held down (i.e. indicating number of tiedowns, number of stakes for each tiedown). Thanks. 4 t $ h , Mary Granley ( k414, fr Senior Code Enforcement Technician ,I. 3830 Pilot Knob Rd I Eagan, MN 55122 1, , � Office:651-675-5690 • d https://www.citvofeaaan.com From: Mary Granley Sent:Wednesday, November 29, 2017 7:36 AM To: 'Pata, Katie' <Katie.Pata@co.dakota.mn.us> Subject: RE: Commercial Building Application for Tent Rental at Lebanon Hills Visitor Center Hi Katie. Just to confirm, this is a New Year's Eve event and will be held on Sunday, Dec 31. Can you please provide me the time period this event will be open? Will the tent be installed on that Sunday, or the previous Friday, Dec 29? Thanks. °qFt :6,40.\\\ Mary Granley , Senior Code Enforcement Technician 3R4 ..ryl „„,.1- 3830 Pilot Knob Rd I Eagan,MN 55122 a Office:651-675-5690 ` https://www.citvofeagan.com From: Mary Granley Sent:Wednesday, November 29,2017 6:31 AM To: 'Pata, Katie' <Katie.Pata@co.dakota.mn.us> Subject: RE: Commercial Building Application for Tent Rental at Lebanon Hills Visitor Center Thanks Katie. I will review this and get back to you asap if anything else is needed. Mary 2 1Li7I ) /..1 or '4 Mary Granley . # 'F ', Senior Code Enforcement Technician t % ° 3830 Pilot Knob Rd I Eagan, MN 55122 0 d ` Office:651-675-5690 _.;,, •#.t`' https://www.cityofeagan.com From: Pata, Katie [mailto:Katie.Pata@co.dakota.mn.us] Sent:Tuesday, November 28, 2017 3:50 PM To: Mary Granley<MGranley@cityofeagan.com> Cc: Building Inspections<buildinginspections@cityofeagan.com> Subject:Commercial Building Application for Tent Rental at Lebanon Hills Visitor Center Hello Mary, I was able to find the 2017 application online and completed it(attached). I've also attached the map with tent layout, interior tent layout,as well as information from the tent rental company re: certificates of flame resistance. Katie (0%44T. eiri forever wild PARKS Katie Pata Visitor Services Coordinator Dakota County Parks Department Lebanon Hills Visitor Center 860 Cliff Road Eagan, MN 55123 651-554-6532 katie.pata@co.dakota.mn.us www.dakotacounty.us/parks fFollow us on Facebook! Note: This email and its attachments may contain information protected by state or federal law or that may not otherwise be disclosed. If you received this in error,please notify the sender immediately and delete this email and its attachments from all devices. 3 Mary Granley From: Mary Granley Sent: Friday, December 1, 2017 9:01 AM To: 'Pats, Katie' Subject: RE: Commercial Building Application for Tent Rental at Lebanon Hills Visitor Center Hi Katie, I'll send it through to building inspections and they'll let me know if it provides the info they are looking for. Thanks Katie. y p .Z,410\,, Mary Granley • . $ '9` Senior Code Enforcement Technician : r; I 3830 Pilot Knob Rd I Eagan, MN 55122 o ' Office:651-675-5690 https://www.cityofeagan.com From: Pata, Katie [mailto:Katie.Pata@co.dakota.mn.us] Sent: Friday, December 1, 2017 8:53 AM To: Mary Granley<MGranley@cityofeagan.com> Subject: RE:Commercial Building Application for Tent Rental at Lebanon Hills Visitor Center Hello Mary, Will this be sufficient? Thanks, Katie From: Mary Granley [mailto:MGranlev@cityofeagan.com] Sent: Thursday, November 30, 2017 3:25 PM To: Pata, Katie Subject: RE: Commercial Building Application for Tent Rental at Lebanon Hills Visitor Center Thanks Katie. If they have it in electronic format that could be emailed to that would be great. If they want to supply a paper copy instead, that works also. „.41;\\, Mary Granley t� . *#• � Senior Code Enforcement Technician „ ,W, I 3830 Pilot Knob Rd I Eagan,MN 55122 Office:651-675-5690 *+r ti* , https://www.cityofeagan.com 1 From: Pata, Katie [mailto:Katie.Pata@co.dakota.mn.us] Sent:Thursday, November 30, 2017 2:59 PM To: Mary Granley<MGranley@cityofeagan.com> Subject: RE: Commercial Building Application for Tent Rental at Lebanon Hills Visitor Center Mary, Ultimate Events replied with: We do have a manual for the tent installation—it is about 60 or 70 pages long.Would you like me to mail it to you (or them)? It's not a building or a structure tent, it's a frame tent—so I'm not sure why building inspections needs to be involved? Let me know what you want me to do—thank you! Let me know what you'd like me to do, Katie From: Mary Granley [mailto:MGranley@cityofeagan.com] Sent: Wednesday, November 29, 2017 12:10 PM To: Pata, Katie Subject: RE: Commercial Building Application for Tent Rental at Lebanon Hills Visitor Center Hi Katie, Would you please ask the tent supply company to forward the installation instructions for the tent they are using? I appreciate the info they provided, but building inspections needs to see the actual manual. Thanks, Mary.�af ;� Mary Granley Senior Code Enforcement Technician I 3830 Pilot Knob Rd I Eagan, MN 55122 a o `' Office:651-675-5690 NMp,•« httos://www.cityofeagan.com From: Pata, Katie [mailto:Katie.Pata@co.dakota.mn.us] Sent:Wednesday, November 29, 2017 11:13 AM To: Mary Granley<MGranley@cityofeagan.com> Subject: RE: Commercial Building Application for Tent Rental at Lebanon Hills Visitor Center Mary, Here is the information from the tent company re:the tiedowns/stakes: 2 1 i4/ The tent will be secured with weights. There will be large concrete 700 lb. weights on the corners and smaller 55 lb. metal weights on the other legs of the tent. There are straps that go from the corner of the tent to the large weights, and the metal weights sit on the base of the other tent legs. There is a total of 10 legs on the tent. Let me know if you need anything else, Katie From: Mary Granley [mailto:MGranley©acityofeagan.com] Sent: Wednesday, November 29, 2017 8:52 AM To: Pata, Katie Subject: RE: Commercial Building Application for Tent Rental at Lebanon Hills Visitor Center Yes, this is a new requirement. I think that's all I'll need. I'm almost through with review but if anything else comes up I'll be back in touch. • 4,44. Mary_.: Mary Granley •** * Y Senior Code Enforcement Technician Ci ` # # x 3830 Pilot Knob Rd I Eagan, MN 55122 o Office:651-675-5690 # fa 04th �'RO * https://www.cityofeaclan.com From: Pata, Katie [mailto:Katie.Pata@co.dakota.mn.us] Sent:Wednesday, November 29, 2017 8:49 AM To: Mary Granley<MGranley@cityofeagan.com> Subject: RE: Commercial Building Application for Tent Rental at Lebanon Hills Visitor Center Mary, I can get that information from the company. I haven't in years past—is this a new requirement? Is there anything else you need to know? Thanks, Katie From: Mary Granley [mailto:MGranley@cityofeagan.com] Sent: Wednesday, November 29, 2017 8:46 AM To: Path, Katie Subject: RE: Commercial Building Application for Tent Rental at Lebanon Hills Visitor Center Hi again, Please send tent installation instructions how tent is held down (i.e. indicating number of tiedowns, number of stakes for each tiedown). Thanks. 3 { , \; Mary Granley / t�• a k Z 7 \ Senior Code Enforcement Technician ,.. . , 0 3830 Pilot Knob Rd I Eagan, MN 55122 i +a Office:651-675-5690 to e,* https://www.cityofeagan.com From: Mary Granley Sent:Wednesday, November 29, 2017 7:36 AM To: 'Pata, Katie'<Katie.Pata@co.dakota.mn.us> Subject: RE: Commercial Building Application for Tent Rental at Lebanon Hills Visitor Center Hi Katie. Just to confirm, this is a New Year's Eve event and will be held on Sunday, Dec 31. Can you please provide me the time period this event will be open? Will the tent be installed on that Sunday, or the previous Friday, Dec 29? Thanks. EqC Mary Granley *.+74 4*_ . � 1 Senior Code Enforcement Technician *. *� .,,. 0 I 3830 Pilot Knob Rd Eagan, MN 55122 s .mss �„ Office:651-675-5690 '",r ,* https://www.citvofeagan.com From: Mary Granley Sent: Wednesday, November 29, 2017 6:31 AM To: 'Pata, Katie'<Katie.Pata@co.dakota.mn.us> Subject: RE: Commercial Building Application for Tent Rental at Lebanon Hills Visitor Center Thanks Katie. I will review this and get back to you asap if anything else is needed. Mary '444��..�4 Mary Granley * f %. "F` ` Senior Code Enforcement Technician ... 3830 Pilot Knob Rd I Eagan, MN 55122 4 a J Office:651-675-5690 = ` ` https://www.cityofeagan.corn From: Pata, Katie [mailto:Katie.Pata@co.dakota.mn.us] Sent:Tuesday, November 28, 2017 3:50 PM To: Mary Granley<MGranley@cityofeagan.com> Cc: Building Inspections<buildinginspections@cityofeagan.com> Subject:Commercial Building Application for Tent Rental at Lebanon Hills Visitor Center Hello Mary, 4 . , ,.. / 7 N I was able to find the 2017 application online and completed it(attached). I've also attached the map with tent layout, interior tent layout, as well as information from the tent rental company re: certificates of flame resistance. Katie „,,,,„1 , forever is PARKS Katie Pata Visitor Services Coordinator Dakota County Parks Department Lebanon Hills Visitor Center 860 Cliff Road Eagan, MN 55123 651-554-6532 katie.pata@co.dakota.mn.us www.dakotacounty.us/parks Follow us on Facebook! Note: This email and its attachments may contain information protected by state or federal law or that may not otherwise be disclosed. If you received this in error,please notify the sender immediately and delete this email and its attachments from all devices. 5 ' ., I ci/i Lii French-style 8, 8-foot picnic double door ' tables with full- length, clear glass that t swings both directions, worst labeled with . q` EXIT sign Photo booth 4ovarea #00, French-style � - double door with full- length, clear {. glass that litt lifiiiiit swings both directions, labeled with 40, EXIT sign _nom File Copy 4. 1 til 1 til . Of Flame 41414\".• eel ISSUED BY: -C9‘'4,.. 4 • EUREKA!TENTS I a div_of Johnson Gear LLC 1/4;41:: r Nair BIIVGHAt�ITCIN, NEWYORK 13902 C., rs oft e Eeriest 1/171 ?, Teri is Described Hereto : : *. , }* .,'Z.4 DEALER NAME Ultimate Events ADDRESS: 8933 Lyndale Ave. S. CITY: Bloomington STATEIZp: MN 55430 This is to certify that the products herein have been manufactured from material inherently flame retardant as here atter specified by the inaterial supplier. Certification is hereby made that The athletes&scribed an this cerfficate have been manufacired with an approved flame r ardant cherriced that was ieded and passed the folleraithg codes:California State Fre Marshal Code, A-701,Underwiers Laboratory of Canada(ULC-S109-M81)and(ULLC-S109-2003). 20' x 10' frame mid section white Desaipisn of inn waist Flame Retardant Process Used Will Not.Be Removed By Washing Arid Is Effective For The Lite Mlle Fabric IENTDEPARTIENT,Ja nsc 01.44. -GEM le . R File Copy 4, 1q, , , ) -,„ cA Flame VA\ We/ :'h ISSUED BY: ett, ,„ • EUREKA!TENTS I a+div_of Johnson r LLC t C BINGHAMTON, NEW YORK 13902 Manufacturers of the f` t . eli;,....0.psi v,� Teri c $r$ Herein - .k* , S :;:14 DEAER NAmE Ultimate Events ADISS: 8933 Lyndale Ave. S. CITY: Bloomington STATEIZPi MN 55430 This is to certfy that the products herein have been manufactured from material inherently"! retardant as here after specked by the aerial supplier. Certification is hereby made that The aides described an this certificate have been with an retardant the,;;�'that s and passed the fellow codes:(:lIC.ate State Fre Marshal Code, A-701, erwiims Laboratory of Cauda(ULC-3109-M87}and( -5109- 20' x 10' frame end section white Flame Retardant Process Used Will Nat Be Removed Bywashing And Is Effective For The Life Of The Fabric 'ice, ► IENTEERUMENT, *.•kzikiii -:GEM LLC File Copy --4 I GI-1 i Li) .. ,,,,,,70,' , 1 ' v L''''.;;,.:4,-- � ` 'i J..'g * ;-fe .- 2L2 i w ,T__ r iIrt ---11-_-_, INI;' 4x •.. ._Ci a " - 1� � • F Eureka! FRAME TENT WORKBOOK www.eurekapartytents.com I Customer Service: 800.235.2607 1 Fax: 607.779.2291 Revision B June 09 File Copy Eureka! FRAME TENT WORKBOOK Introduction and General Product be returned with a Return Authorization Number. Statement: An estimate for the repair work will be developed on a time and material basis and will be presented Eureka! has designed and manufactured tents to the customer. Actual repair work will only for well over 100 years. Since our beginning in begin once the customer has approved the repair 1895, tent designs have evolved considerably in estimate. The actual repair cost may vary. Tents shape, form and overall capabilities. Nevertheless, must be returned FULLY DRIED. Eureka! reserves throughout this period, tents have remained the right to refuse tents that are badly soiled,wet, temporary structures whose integrity depends abused or deteriorating. Repaired items must be upon design, manufacturing, maintenance and picked up or shipped back to the customer upon proper installation, completion of the repair. Tents that are not picked Eureka! products will perform best when installed up within 10 working days after a repair will be within the parameters of their instructions. It is shipped back to the customer freight collect. imperative that these instructions be understood Repairs are limited to Eureka! products only. and followed for each installation. Installation Assistance Limited Warranty Installation assistance is available through Eureka! Eureka! Tents warrants to the original purchaser for new customers or existing customers that that its products are free from major defects in purchase new products. Eureka! needs at least 30 materials or workmanship. Upon receipt of your days notice to schedule the training session. Also, product (s), if such a defect is found, call our please note that the training session should be a Customer Service Center at 1-800-235-2607 for practice installation and not a rental job.Afee may a return authorization. If, after inspection, we be necessary based on the setup. Please call 1-800- find that the product was defective in material or 235-2607 for more information on installation workmanship, we shall, at our option, either repair techniques. or replace it without charge.We are not responsible for normal wear and tear or for damages caused Blockout Fabric by shipping, accidents, misuse, alterations, or Blockout vinyl laminate fabrics may contain slight improper installations. Additionally, although we imperfections. Although the highest quality manufacture Eureka! products with quality fabrics, control and inspection processes are used to we are not responsible for the negative effects of manufacture this material, the possibility remains climates, pollution, acts of God,terrorism and long that light may penetrate or pin holes may appear or semi-permanent installations. Because tents in the body of your tent. This may also be are temporary structures, it is necessary that apparent in dark colored or translucent fabric. any Eureka! product be installed and maintained Should pin holes be discovered, call the Eureka! according to the manufacturer's instructions. The Customer Service phone number at 1-800-235- use of commercial washing and drying machines 2607 and request a blockout vinyl touch up kit. will void this warranty. This kit will enable you to quickly and easily seal or close up these small pin holes. Directions will Non-Warranty Repair be provided with each kit. If your tent has an Eureka!Tents will give estimates and repair tents that excessive amount of light leaks, contact a Eureka! were damaged by normal wear or use. Tents must Customer Service representative for assistance. Eureka! FRAME TENT WORKBOOK Mildew • The use of proper safety equipment is required The fabric used in Eureka!tent products represent the for each tent installation. Hard hats, gloves, safety latest in mildew prevention techniques. However, it shoes, safety glasses and other protective gear is virtually impossible to prevent mildew fungus should be used at all times during the installation from forming in moist or damp environments. It and take down of Eureka! products. is the owner's responsibility to inspect tents on • Before installation of your tent, inspect the tent top a regular basis for mildew. If mildew is detected, to make sure there are no holes, rips or tears in the brush or wipe it off immediately. Never store tents fabric and web belts. Inspect all hardware, plates, wet or damp. Be sure to store tents off the ground grommets and other fittings for signs of fatigue, in a cool, dry area. wear and tear, or breakage.Also inspect ropes and guy lines for general overall condition and wear and Water Resistance tear. Inspect poles, frame components, crowns and Tent fabrics cannot be guaranteed to be waterproof. stakes for fatigue, splintering or breakage. • Repair or replace any item as needed. Failure to do so will compromise the overall integrity and Warning ! performance capabilities of the tent. Continue to Eureka! commercial tent products are inspect and review all components throughout the manufactured for use as temporary set up and during maintenance checks while the protection from sun and light rain. For the safety of all occupants, it is required that tent is installed. a complete evacuation of the tent takes place in threatening or severe weather. Important Notice The tent should also be evacuated if there is any doubt concerning the safe • The installer or installation company is responsible use of this product. for the proper and safe installation of each tent. Careful analysis of all possible obstructions Cold Crack/ Cold Weather Use (overhead and underground) must be made in Vinyl materials used in the manufacturing of party advance to determine the type or style of tent that is appropriate for this location and event. Staking tents and sidewalls are treated to tolerate some requirements must be determined on site for each cold weather. However, party tents are intended installation. The installation company or individual to be used in mild weather conditions. Care should installer must follow the manufacturer's guidelines be taken to prevent cracking or shattering of vinyl and procedure to secure each tent adequately for when temperatures reach 32°F or colder. Tent the site. Some sites may require additional staking vinyls are not intended for use in extreme cold or or anchoring methods other than those provided winter applications. with the tent. Eureka! responsibility is limited to General Safety Considerations the construction of the tent. Eureka! shall not be liable in a tort or in contract for any loss or damage, • Modern tents have become more sophisticated direct, incidental, or consequential arising out and more complex. A proper and safe installation of the use of or the inability to use the product. requires continual maintenance of the tent top We cannot be responsible for the methods that and all supporting members (poles, frame, stakes, installers may use to anchor their tents or the anchoring devices, sidewalls, etc.), adherence to results of such anchoring. the manufacturer's instructions and the proper • Good judgement and common sense must be experience and training of your tent installation used for each tent installation. Since weather is crew. unpredictable, it is the responsibility of the installer Eureka! FRAME TENT WORKBOOK to determine the proper time and method to install, around the tent. Sidewalls need to be installed secure and dismantle tents. A complete evacuation accordingly. of the tent is recommended if the weather becomes Hang sidewall sections on the sidewall rope inside threatening or if there is any doubt concerning the the perimeter of the tent. Sidewalls should be safety or integrity of the tent. installed on the outside of the side poles. Sidewalls • Always use a drop cloth the protect the tent while attach to each other by fastening the buckles from it is on the ground. Never drag the tent across one section to the buckles of the next section. concrete or asphalt for this action would abrade Drive a small stake through the web loops on the the coating from the tent. bottom of the sidewall to secure the sidewalls to • When the tent is installed and in use: the ground. * check that no stakes are pulling out of the ground Take Down and Storage * check and make sure the knots are tight Completely remove all peripheral items from under * check for slack in the guy lines or webs the tent — lights, electrical cords, furnishings, * check the tent top for bagging decorations, people, etc. Place a drop cloth under * Inspect the tent regularly and as needed with the tent,and remove the sidewalls.Inspect sidewalls changing weather conditions for any signs of wear or damage. • In addition, look for: Release tension on the side poles, create slack in the * slack in the guy lines or webs ropes or loosen the web straps. Untie center pole * rips or tears in the tent fabric jump ropes and remove any additional stakes and * signs of vandalism ropes used to anchor the center poles. Remove center poles in sequence. Start at one end of Site Survey the tent and work towards the opposite end. A site survey should be conducted by a qualified sales Untie jump ropes at each side pole and remove the or tent installation professional. All information side pole. Do this one side pole at a time, until all of should be given to the foreman of the installation the side poles are removed. Inspect all side poles crew. It is the responsibility of the installation for signs of wear or damage. company to ensure that the tent installation adheres Untie all ropes from stakes and/or unfasten all web to local building code and fire regulations. belts from the tent fittings. Inspect ropes and webs Be certain that the proper tent (size and type) is for any signs of wear or damage. specified for the location and function. Evaluate Unlace tent sections. Inspect for holes, rips, damage, the overall location -- inspect for overhead and wear, dirt or stains. Make sure the tent sections are underground obstructions.Determine the exposure clean and dry. Roll,fold and place in tent bags. to wind. Test for anchoring stability and ground conditions. Determine the method and type of NOTE:Tent sections that need to be removed from staking that will be suitable for the tent and the the site while they are still damp or wet must be site. dried as soon as possible. Tent sections that are It helps to draw diagrams of the location of the event, allowed to remain damp or wet are susceptible to tent placement(noting overhead and underground mildew and fabric deterioration. obstacles), type of ground (asphalt, grass, sand, Remove the drop cloth from site. Keep the top side etc.), nearby buildings and other circumstances of the cloth as clean and dry as possible. Remove that may require special tools, labor or techniques. all the stakes and stake plates, ratchets, or other anchoring devices. Sidewalls Patch or repair stake divots as needed. Determine where entrances and exits will be Store tent sections in a cool, dry, ventilated area. Eureka! FRAME TENT WORKBOOK 30' x 30' Standard Frame with 2" Diameter Tube 0 0 0 0 0 0 13, =ORANGE 2" diaO 0 0 2E dia V0 � 0 = BROWN 2" dia 0 0 PARTS TUBING: 8 14'4" RED PERIMETERS 2" DIA 0 4 16'1" BROWN RAFTERS 2" DIA 0 4 21'10.5" ORANGE RAFTERS 2" DIA 0 8 LEGS 8 BASEPLATES CROWNS: 1 UNIVERSAL CROWN BRACKETS: 4 CORNER BRACKETS 4 INTERMEDIATE BRACKETS PINS: 40 SILVER PINS =� 8 FAST PINS ADDITIONAL: 4 CORNER BRACES 1 30' CABLE 3 CANOPY JACKS 12 ROPES 12 CARABINERS , - /Li"7 /Li ) F r Heated PROPANE - V 30'x 40' ATANK Warm-up Tent • Heat- CONES fav DOOR , PROPANE r e A ", ".,, TANK .,, A 'v +r; .r N,'Na.it 4,,,, - 860 Cliff Road ',''' ell , Heater del. ``":-. `fit x 5 ', ., :1111b � .r'� DOOR 4, 1 dr . , ' , * i — „;, 401 , 4, ,, igkAbli 1 - '-.k. . .- .,ijr- . ,,-.- .:2;:,31... te• , . ' * .., ,. '4....4..-, A - - 'A , , z� 4 d + e+ ;5pw.. ,.„ ;.tae...__ .i°' v;, New Year's Eve Party Event Layout 2 = Lebanon Hills Visitor Center 4.4.- ' t.. . ♦'�, . ' 860 Cliff Road, Eagan, MN 55123 , ,,;,e 1�, > i %s ib..A 'AI. y ' t y w :” Katie Pata, 651-554-6532 (office) ,„ , 612-868-0375 (cell) ``" MAINTENANCE STAFF: (call to coordinate delivery/set up: � ` Ben Humlie 952-237-8781 (cell) +� a r�"" Tent/Canopy Requirements: minimum setback 20'from`JkHICLE ;' property lines&structures; provide interior plan showing exit signs,stage location &size,ABC type fire extinguishers,trash collection,seating,electrical/exit lighting, heating&floor covering; tents/canopies must be of an approved type& conform to MN Fire Prevention Code, CH 6,ARTICLE II. Smoking is NOT permitted in tents, canopies or membrane structures. Approved NO SMOKING signs shall be conspicuously posted in accordance with SEC 310 of the International Fire Code. The tent/canopy area&surrounding 30' must be clear of combustibles. All tents/canopies require a certification of flame retardant that meets NFPA 701& it should be permanently affixed to the tent or canopy;two exits required based on occupant load of 10-199. Maximum travel distance to an extinguisher is 75'. Call Gopher State One Call at 651-454-0002 for utility locates before staking. Call Building Inspections at 651-675-5675 in advance of setup to schedule final inspection. ALL polyethylene greenhouse structures require a certificate of flame retardant that meets or exceeds NFPA 701 & it shall be provided to the City with Building Permit application. File Co pY i For Office Us "�(�, Permit#: /J�"/ ii I „4 . � : , , . d Permit Fee: �l 7 . •i"'‘11 .°°di"' EAGAN ()O -, )) ,,,,,,,),/,)/,,,, Staff: 1�If�.� V Payment Recvd: _Yes _No 3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810 f710EIE, (651)675-5675 TDD: (651)454-8535 FAX: (651)675-5694 ,:. FEB 0 1 2019L plans: 2 Electronic Paper Plan Submittal: eplans(cilcityofeagan.com 2019 COMMERCIAL BUILD PERMIT APPLICATION Date: //31//4 Site Address: 860 Cliff Rd Tenant Name: Dakota County (Tenant is: New/ ✓ Existing) Suite#: Former Tenant: Name: Dakota County Phone: 651-438-4375 Property Owner Address/city/zip: 1560 Hwy 55 Hastings, 55033 Applicant is: Owner ✓ Contractor Type;of�Work Description of work: Lebanon Hills Park Improvements Construction Cost: $337,975.00 r'I$ d Pember Companies Inc. 358678 Name: p License#: N4449 469th St Menomonie ntract�►r a. Address: City: state: WI Zip: 54751 Phone: 715-235-0316 o Contact: Dave Webb Email: dwebb @ pembercompanies.com . . Name: Damon Farber Landscape Architects Registration#: 50575 Archltect/Engiineer Address:401 North 2nd Avenue, Suite 410 City: Minneapolis State: MN Zip: 55401 Phone: 612-332-7522 u , Contact Person: Chuck Evens Email: cevens@damonfarber.com Licensed plumber installing new sewer/water service: Phone#: NOTE;Plans and supporting documents that`you submit ere considered to'be public information Portions of'the information m be: classified asfnn'on public if you provide specific reasons,that'would permit the City to conclude that they are trade secret's ,, ` You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's website at www.citvofeaaan.com/subscribe. CALL BEFORE YOU DIG. Call Gopher State One Call at(651)454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.gopherstateonecall.orq I hereby acknowledge that this information is complete and accurate;that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. x David Webb x%-..— Applicant's Printed Name Applicant's Signa ure DO NOT WRITE BELOW THIS LINE SUB TYPES _ Foundation _ Public Facility _ Exterior Alteration–Apartments ‘,/ Commercial/Industrial _ Accessory Building _ Exterior Alteration—Commercial Apartments _ Greenhouse/Tent _ Exterior Alteration–Public Facility Miscellaneous _ Antennae WORK TYPES _✓ New _ Interior Improvement Siding _ Demolish Building* Addition _ Exterior Improvement Reroof _ Demolish Interior _ Alteration _ Repair Windows _ Demolish Foundation Replace _ Water Damage Fire Repair _ Retaining Wall Salon Owner Change *Demolition of entire building—give PCA handout to applicant DESCRIPTION Valuation 3301 00044, Occupancy MCES System N!A Plan Review ✓ Code Edition 2O(5 0466 SAC Units (25%_100% `/) Zoning f City Water Census Code Stories 1 Booster Pump #of Units V Square Feet ¢3$ PRV #of Buildings ( Length Fire Sprinklers Type of Construction V-B Width REQUIRED INSPECTIONS V Footings ✓New Building ✓Deck_Addition Drain Tile Foundation Foundation Before Backfill ✓ Retaining Wall ,Vapor Barrier Erosion Control Framing 30 Minutes V1 Hour Steel Reinforcement Insulation Street/Curb Cut Inspection Sheetrock / Other: ./ ✓Roof:_Decking _Insulation Ice&Water Final /Meter Size: v/Siding:_Stucco Lath _Stone Lath _Brick_EFIS V Electronic Set of Final Revised Plans Windows Fireplace:_Rough In _Air Test _Final ✓ Final/C.O.Required Pool:_Footings _Air/Gas Tests _Final Final/No C.O.Required Final CIO Inspection: Schedule Fire Marshal to be present: Yes ✓No Reviewed By: Si-t-,41N ?'. Planning New Business to Eagan: A/O Reviewed By: Gtt'!G , Building Inspector FEES Water Quality Base Fee 2 lig$•TSS Storm Sewer Trunk Surcharge /b 1• a-o Sewer Trunk Plan Review 1, 4/S. O f Water Trunk MCES SAC "— Street Lateral City SAC Street S&W Permit&Surcharge Water Lateral Treatment Plant Stormwater Performance Security Treatment Plant(Irrigation) Landscape Security Park Dedication Other: ./ . Trail Dedication TOTAL:$. 4"2-411 of/ Page 2 of 3 ,