Loading...
1642 Diffley RdCity of Eapn Mike Maguire MAYOR Paul Bakken Cyndee Fields Meg Tilley COUNCIL MEMBERS Thomas Hedges CITY ADMINISTRATOR MUNICIPAL CENTER 3830 Pilot Knob Road Eagan, MN 55122-1810 651.675.5000 phone 651.675.5012 fax 651.454.8535 TDD MAINTENANCE FACILITY 3501 Coachman Point Eagan, MN 55122 651.675.5300 phone 651.675.5360 fax 651.454.8535 TDD www.cityofeagan.com THE LONE OAK TREE The symbol of strength and growth in our community. September 12, 2008 Oak Trust Credit Union 15450 Summit Ave Suite 290 Oak Brook Terrace, IL 60181 Re: Landscape Deposit 1642 Diffley Rd., Eagan, MN 55122 Lot 7, Block 1, Diffley Plaza Dear Sir or Madame: Oak Trust Credit Union submitted a landscape security deposit to the city in conjunction with the building permit for the facility 1642 Diffley Rd. in Diffley Plaza in August of 2006. After inspecting the site we found the landscaping to be in satisfactory condition. Consequently, the deposit can be released. The refund will be forwarded to you under separate cover. While we are releasing the security deposit, please note that the property owner continues to be responsible for maintaining the health of all plantings on the property, and must replace any plants that die or are removed due to disease. If you have any questions, please call me at 651-675-5684 or Sarah Thomas at 651-675- 5696. Sincerely f?/LyNI Fran Doh Planning cc: Sarah Thomas, City Planner 2006 COMMERCIAL BUILDING PERMIT APPLICATION City Of Eagan 3830 Pilot Knob Road, Eagan Mn 55122 't'elephone # 651-675-5675 FAX # 651-675-5694 1(2 - • structural Plans (2) sets • Architectural Plans (2) cola • Arcrla ural rlans tAl sole • (evil Plans (2) . Structuml Plans (2) . Code Analysis (1) '" • Certificate of Survey (1) Civil Plans (2) . Project Specs (1) . Code Analysis (1) Landscaping Plane (2) . Key Plan (1) • Project Spatz (1) . Code Analysis (t) . Master Eidt Plan (1) • Spec. Insp.& Testing Schedule" Certificate of Survey (1) . Energy Calculations (1) not always" • Sills Report (t) Spec. Insp. & Testing Schedule (1) " • Sac. Power & Lighting Form (1) not always" • Mater size must he established Meter size must ba established . Meter size must be eslablighed+f applicable J • Nrijacl ° ace 0) J Energy Calculations (1) ^• J J Electric Power a Lighting Form 0) J • Master Exit Plan (1) ) _ J . Emergency Response Site Plan (1) "- ) J • Soils Report (1) J • SAC delNminaeon - cell 653-602-1000 • SAC damrminaaon-mU651.602.1 000 SAC datenninadon - call 651.602-1000 . File Stopping Submittals CaU MN Dept of Health at 651-215-0700 for details regarding food & baverage or lodging facilities. •• Comae Building Inspections for sample sad ifrequired :., Permit for new building or ad lane will not be processed without Emergmry Respoau Site Play. Date 4 / 7 1 06 Construction Cost $549,990.00 Site Address 1642 Diffley Road , Raaan, MN uniUSte # Tenant Name Oak Trty,At (`rpd„ip [Tninn Former Tenant Name FE Q? F9 H \\Y [E R 2006 Description of Work 2500 sa ft credit union blda Property Owner Jim Dean Telephone # (6 3 0) 7 A ? -? C ? 4 Applicant is: _ Owner Contractor COatact #: ( 507) _A5 -99:75 Contractor Nni-i-Vifijeld rnnS tCj,GtjniA CC In- Address 1600 Riverview Lane - PO Box 652 City Northfield State Minrigcnta Zip 55057 Telephone#(507) 645-Rg75 Arch/Eagr Lucachick Architecture, Inc. Registration# 18738 Address 481 Hag c v Cou rt c' r ire City Be1aid3 i State Kinneset:a VP 56601 Telephone#(218) 59 2305 Jim or Pa rumnsedplumberinstallingnewaewertwatwaarvicia Keith Pumper phone 4, ( 507 ) 663-7870 I hereby apply for a Commercial Building Permit and acknowledge that the mlormanon 1s complete ana accurate; ruar arc wu,a w,a av ,,. conformance with the ordinances and codes of the City of Eagan and the State of MN Statutes; I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work?vr(' be in accordance with the approved plan in the case of work which requires a review and approval of plans. / ?ftiS r Applicant's Printed Name Applicant's Signat= II 11 . I nl•1. Ail Ilnl inn l Minn 11,, ill,." UJUA1•II Onn7 .I ? IAU DO NOT WRITE BELOW THIS LINE Sub Types C 01 Foundation ? 26 Public Facility ? 30 Accessory Building 0 14 Apartments e27 Comoner62.14adustriat ? 32 Ext Alt-Apartments 0 15 Lodging ? 28 Crreenbouse 0 34 Ext Alt-Commercial ? 25 Miscellaneous 0 29 Antennae ? 35 Ext Alt-Public Facility C 37 Nail Salon Work Tylm e'' 31 New ? 35 Int Improvement ? 38 Demolish (Interior) ? 44 Siding ? 32 Addition ? 36 Move Bldg. ? 42 Demolish (Foundation) ? 45 Fire Repair ? 33 Alteration ? 37 Demolish (Bldg)' ? 43 Reroof ? 46 Windows/Doors ? 34 Replacement 'Demolition (Entire Bldg only) • Give PCA handout to applicant Valuation 9 % Type of Const V S Width V Plan Rev 100% _f 25% Occupancy G' MCES System _ 4-f-S SAC units Zoning _ City Water _VJ 5 Nor. of Units Stories I Booster Pump - Nbr. of BIdg6 ) Sq. Ft. S PRV Length 19 Fire Sprlnklered rip Required Inspections _? Footings (new bids) Footings (deck) _ Footiogs(addition) Foundation _ Dram Tile ? Driveway Apron Roof ? Ice Pr Declgng _ Insul Final ?? Ftamidg Fireplace ,_ R.I. -Air Test -Final i/ Insulation _ Sheenock Final/C.O. _ Final/No C.O. Otha Pool _ Ftgs - Air/Gas Tests _ Final Siding , Smcco Lath _. Stone Lath _ Final Windows Final CIO Inspection, Schedule Fire Marshal to be present. _Yes ? No Approved By: Planning M1, Building Inspector Base Fee surcharge Plan Review SAC-MCES SAC-City SAN Permit SAN Surcharge Treatment Plant Treatment Plant (Irrigation) Park Dedice6on Trail Dedication Water Quality Water Supply & Storage (WAC) 4?7 . S ? ,995. oo a,a5G.31 ? ?Isso, oo ?? t00. op /00.00 ? Financial Guarantee' l0 3 (,. 0 0 r Storm sewer Trunk Sewer Lateral Sewer Trunl Street Water Lateral Water Trunk Odrer Lti4se'ppC. 'J, ? ecurtk / fo?525 0(? Total lswo, 2006 COMMERCIAL PLUMBING PERMIT APPLICATION 23 25.00 CITY OF EAGAN 3830 PILOT KNOB ROAD, EAGAN MN 55122 3 ?3Z r 0 89 yS 651-675-5675 Dated/_/ Site Address l0 Ll Z 1J t 0 Unit # Tenant Name diD, Fr-?(I il7s? ?R `O ti? O v?3 W Former Tenant Name Property Owner y? 75i c ,AE Telephone # ( ) Contractor 1 `e 1 -,-v, -41,j6 iT=LNj r" Address 11jo S ?arll ;1 cSv(Z 04 city .,_0tjw'Ot4? \T?Ustate jtj zip 5-]SZ l`i Telephone#(JOch o3- ?S2C? License # .1-31 Expires: Z t OL The Applicant is Owner Contractor Other Work Type !*New Bld _ Modify Space Irrigation System" _Yes _ No Work in public r-o-w / easement? _ RPZ PVB: New _ Repair/Rebuild _ Replace _ Remove Rain sensors are required on irrigation systems Description of Work 2 S ??? ?J\ ?1 ?? To inquire if Pressure Reducing Valve is required on new service, call 651-675-5646 Meters - Call 651-675-5300 to ven?that hydrostatic, conductivity, and bacteria tests passed prior to nicking up meter. Irrigation Size & Type ?Ys Avg GPM 2" turbo req'd unless smaller size allowed by Public Works Fire Size & Price 3/4" meter $167.00 Domestic Size & Type e4?g GPM Includes high demand devices? _ Yes`gNo Flushometers - Yes ?4- No PRV Required _Yes o Permit Fee $50.50 minimum (includes State Surcharge) Contract Value $ x 1% _ $ 50• Permit Fee Meter(s) Required on all new buildings & boulevard irrigation systems $ 141 • DO- Radio Meter Read $ ..50 State Surcharge if permit fee is less than $1,000, surcharge is $30 If Permit fee is more than $1,000, surcharge is $.50 for each $1,000 owed. Following fees apply when installing new lawn irrigation system ??? $S? • Qo Water Permit Call the City's Engineering Department, 651-675-5646, for required fee amounts i Treatment Plant ?- - $ * p 3 ?' Water Supply & Storage $ . SO State Surcharge $ Z 3'L Gj 00 Total Fee I hereby apply for a Commercial Plumbing Permit and acknowledge that the information is complete and accurate; that the work will be in conformance with the ordinances and codes ofthe City of Eagan and with the Plumbing Codes; that I understand this is not a pemut, but only an application for a permit, and work is not to start c 'thoutt a permit; that the work will be in accordance with the approved plan in the case of work )which requires a rreeviieew) and approval of plans. i l•? v l C?h/bi???- 1 SL?Q `t / ???+ licaat's Signature pp lcanfs Printed Name A-- 2006 COMMERCIAL PLUMBING PERMIT APPLICATION CITY OF EAGAN 3830 PILOT KNOB ROAD, EAGAN MN 55122 AG1_K74_rK75 ? D Date Site Address ??'? h) L Unit # Tenant Name ?AK?c CQ ?ssZ ?'¢ L i : Jest c-v ' _ Former Tenant Name Property Owner Telephone # ( ) q? Contractor `-F"" "` Address ? rz d s'? ! uxa city ' I Lrjll ? State MA) Zip Telephone # (Wj) ViA?AZ License #f Expires: 2.% ado The Applicant is Owner Contractor Other Work Type New Bldg _ Modify Space -Irrigation System** -yes -No work in public r-o-w /easement? _ RPZ ' PVB: _ New _ Repair/Rebuild _ Replace _ Remove Rain sensors are required on irrigation systems Description of Work To inquire if Pressure Reducing Valve is required on new service, call 651-675-5646 Meters - Call 651-675-5300 to verify that hydrostatic, conductivity, and bacteria tests passed Prior to picking up meter. irrigation Size & Type Avg GPM 2" turbo req'd unless smaller size allowed by Public Works Fire Size & Price 3/4" meter $167.00 Domestic Size & Type t t 6) ($PL < Avg GPM Includes high demand devices? -yes-No Flushometers _ Yes jx?No PRV Required _ Yes No Permit Fee $50.50 minimum (includes State Surcharge) Contract Value $ D' a x 1% Permit Fee $ Q I D .cb Meter(s) Required on all new buildings & boulevard irrigation systems $ Radio Meter Read $ ISO State Surcharge if Permit fee is less than $1,000, surcharge is S.50 If permit fee is more than $1,000, surcharge is S.50 for each $1,000 owed. Following fees apply when installing new lawn irrigation system $ Water Permit Call the City's Engineering Department, 651-675-5646, for required fee amounts $ Treatment Plant $ Water Supply & Storage $ State Surcharge $`? , 'JO Total Fee .?._ ..ork Pan be onform_ a with the I hereby apply for a Commercial Plumbing Permit and acknowledge that the intornanon is compicm anu a„cw a.e, .,,o...•....?•? ^••• be °. ---_....__ ordinance and codes of the City of Eagan and with the Plumbing Codes; that I understand this is not a permit, but only an application for a permit, and work is not to start with ape it; that the wo yert* w? in accordance with the approved plan in the case of work which requires a review and approval of plans. C 1<Q t'? V v T 1 \If?Ilf__ A plicant's Printed ante Applicant's Signature CITY USE ONLY REQUIRED INSPECTIONS: U.G. Air Test - Gas Test Rough In Final PLANS SUBMITTED APPROVED BY: h 9 G ?~ * BUILDING INSPECTOR General Information • Radio Meter Read (required on all new buildings. Boulevard irrigation systems may require a radio read - $141.00 • RPZ's must be tested every year and rebuilt every five years. Test results should be mailed to Paul Heuer at the City of Eagan • A minimum fee permit per address is required for the following RPZ's: new, rebuild, repair, remove. • Water meters include copper horn/strainer, remote wire, and touch-pad meter. METERS REQUIRING 4-HOUR ADVANCE NOTICE PRIOR TO PICK UP GPM METERS USE PRICE GPM METERS USE PRICE 1-20 5/8" residential $130.00 4-120 1-1/2 irrigation syst $ 827.00 displacement or turbine** Public Works maximum small commercial must approve continuous meter size 10 2-30 3/4" lawn irrigation $167.00 4-160 2" turbine large irrigation $ 1,040.00 maximum displacement residential system & continuous or production lines 15 small commercial 3-50 1" displacement large residential $210.00 114 to 160 2" compound bldgs over $ 1,962.00 bldg to 24 units 65 units maximum small commercial & continuous & large comm bldgs 25 im on stems 5-100 1-1/2" 25.64 unit bldgs $515.00 maximum displacement & continuous most comm bldgs 50 METERS REQUIRING 30-DAY ADVANCE NOTICE PRIOR TO PICK UP GPM METERS USE PRICE GPM METERS USE PRICE 5-350 3" turbine very large irrigation $1,394.00 6-500 4" compound +300 unit bldgs $3,864.00 system & production & very large lines comm. bldgs 1/2-320 3" compound +200 unit bldgs $2,516.00 10-1000 6" compound +400 unit bldgs $6,436.00 very large very large comm bldgs comm bldgs 15-1000 4"turbine very large $2,495.00 irrigation systems & production lines Comments • To schedule inspection of the inside water line and bacldlow preventer, call 651-675-5675. • To arrange for water tam-0n, call 651-675-5200. cc; Utility Division Systems Analyst January 2006 _?_ ? 7H0 2006 COMMERCIAL MECHANICAL PERMIT APPLICATION City Of Eagan 3830 Pilot Knob Road, Eagan MN 55122 Telephone # 651-675-5675 Please complete for: commercial/industrial buildings multi-family buildings when separate permits am not required for each dwelling unit ?z?s.99 Date (/j / _? /_0 1 Site Street Address fVL/? Unit# Tenant Name (if applicable) Previous Tenant Name Property Owner ot uo'f oo Telephone #(&0 )?)3a Contractor ? ( ?f1G ? r ?/r?('7 7o - dy (l S ? ? Dr _(?y s ? ?l ' treet Address ? (,((,t City p ? 1 1 ? 1 State Iv Zip 5 D["t / / Telephone# (G?) Ur4c, qO / y ? ? , J? Bond #: '1_f/7?'rtYi? Expires: 6 4l o The Applicant is Owner Contractor O ther jlj? Work Type V/ New Construction -Interior Improvement -Install P iping -Processed -Gas Under/Above ground Tank Install Remove When installing/removing tank(s), call for inspection by Fire Marshal and Plumbing Inspector Nature of Work: Permit Fees: $70.50 Urdervrowttl tank installation/Nmoval $50.50 Minimum uneludcs State Surcharge) Contract Value or S .00 s ?°%, _ $ permit Fee $ L) :/ V State Surcharge If e? nnit fee is less than $1,000, add $.50 If ep rmit fee is more than $1,000, surcharge is $.50 for every $$11,000 owed. Total Fee I hereby apply for a Commercial Mechanical permit and acknowledge that the information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan and with the Mechanical Codes; that 1 understand this is not a permit, but only an application for a permit, and work is not to start without a pe -t; that the work will be in accordance with the approved plan in the ease of work which requires a review and approval of plans. , Applicants Printed Name App cants Sign ur Approved By: 6 P (v l '?- -,7 ill, ,Inspector Date: Required Inspections: _ U.G. I! R.I. -AirTest _YGasService Test -In floor Heat Final April 24, 2006 Pat Geagan MAYOR Peggy Carlson Cyndee Fields Mike Maguire Meg Tilley COUNCIL MEMBERS Thomas Hedges CITY ADMINISTRATOR MUNICIPAL CENTER 3830 Pilot Knob Road Eagan, MN 55122-1810 651.675.5000 phone 651.675.5012 fax 651.454.8535 TDD MAINTENANCE FACILITY 3501 Coachman Point Eagan, MN 55122 651.675.5300 phone 651.675.5360 fax 651.454.6535 TDD www.cityofeagan.com THE LONE OAK TREE The symbol of strength and growth in our community. Chris Smisek Northfield Construction Co., Inc. 1600 Riverview Lane PO Box 652 Northfield, MN 55057 RE: OAK TRUST CREDIT UNION 1642 DIFFLEY ROAD Dear Chris: We have completed our review of the construction documents submitted in pursuit of obtaining a building permit for the above- referenced project. This review is not intended to be an exhaustive and comprehensive report. Unless otherwise noted, all references are to the 2000 I.B.C. It is our goal that this review will help you in complying with the applicable codes and we are, therefore, requesting that the following items be addressed. ? Provide an accessible parking space complying with MN Rules 1341.0403, Item E, Subitem (2) and 1341.0428 Subpart 4. i Side transfer in restrooms does not comply with MN Rules 1341.0448, Subpart 2. Clear space of 42" is required from center of water closet to edge of lavatory. Toilet paper dispenser is to be located 7"-9" from toilet to leading edge of dispenser. MN Rules 1341.0448, Subpart 6. > Front approach to entrance door requires a minimum 18" clear space adjacent to door on the pull side. MN Rules 1341.0442, Subpart 6. Drinking fountain is shown on code analysis and on fixture branch schedule but not on floor plan or sheet M-2. Please identify location. 7 Egress doors to comply with sections 1003.3.1.8 and 1003.3.1.8.1. If you have any questions please call 651-675-5676 or e-mail mlenceQcityofeagan.eom Sincerely, Mike Lence Senior h-ispector cc: Pit Bradley, Lucach ck Architecture, Inc. Dale Schoeppney, City of Eagan Chief Building Official ML/jh LUCACHICK ARCHITECTURE, INC. 481 MAG 5EYEN COURT, 51.1ITE #9 - DFMIDJI, MN 56601 City of Eagan Mike Lence 3830 Pilot Knob Road Eagan, MN 55122 27 April 2006 RE: Oaktrust Credit Union- Response to letter dated April 24, 2006 1642 Diftley Raod mo 01 2006 Mike. The following is a response to the items you have indicated in your letter dated April 24, 2006. The owner is providing all signage for both interior and exterior. Per Mn Rules 1341.0403, Item E Subitem 2 and 1341.0428 Subpart 4- a handicapped sign with "van accessible" sign below the symbol of accessibility will be placed in front of the head of the handicapped parking stall at a height mounted 48 to 60 inches above the paring surface. See enclosed site plan with proposed location of accessible sign. Per Mn Rules 1341.0448, Subpart 2- The addition of 2 inches with an angled lavatory in the bathrooms will give sufficient clear space in bathrooms to allow for 42" of clearance between the center of the water closet to the edge of the lavatory. Please see enclosed plan revisions. Per MN Rules 1341.0448, Subpart 6 the toilet paper dispenser will be relocated. Please sec enclosed detail. Per Mn Rules 1341.0442, Subpart 6 the entry sidewalk will allow for 18" clear adjacent to the pull side of the doors. Please see enclosed detail. There will be a water cooler in lieu of a drinking fountain. Due to accessability issues, we usually recommend an owner supplied water cooler with access to flat bottom paper cups (for single hand usage). The location of the cooler is located per attached revised bathroom plan. Please respond is this is unacceptable. Per IBC Section 1003.3.1.8 and 1003.3.1.8.1 All Egress Doors will have a readily durable sign posted on the egress side or adjacent to the door stating "THIS DOOR TO REMAIN UNLOCKED WHEN BUILDING IS OCCUPIED" The sign shall be in letters 1" high on a contrasting background. MAIL TO: P.O. BOX 219 - 5EMIDJI, MN 56619-0219 PHONE: (218) 759-2305 FAX: (218) 759-0407 EMAIL ADDRE55: lukearch®psulknyanxet As for other issues-1 have forwarded a revised landscape plan to Eric Slettedahl providing more plantings between the easement road and Diffley Road-Creating some screening. I am also sending a revised trash enclosure detail providing face brick in lieu of concrete block at the trash enclosure. Eric stated that finishing the enclosure would suffice for the enclosure to match the building. Please feet free to call if you have any questions, concerns, or comments. ) you- 9WII Patrick Bradley Lucachick Architecture, Inc. 218-759-2305 TREATED 2 X 8- ATTACH W/ EXPANSION ANCHORS 24 ga. FLASHING- COLOR TBD- 2" REVEAL yam N TOP 6" CMU CRS-BOND BEAM W/ 2 05 BARS r`vm e N r? STNDRD FACE BRICK TO MATCH BUILDING 6" ABDVE GRADE CMU HORIZ. JNT REINF. ® ALT. CRS. & #4 VERT. BARS 0 4' CNTRS. 100' FINISHED FLOOR ELEVATION SIDEWALK BEYOND 1/2" EXPANSION JOINT '=A i SLOPE SLAB TO BITUMINOUS 99'-6" nnj 4" CONC. SLAB W/ #3 BARS ® 2' CNTRS. E.W. BITUMINOUS ELEV. 10" BELOW GRADE CMU HORIZ. JNT REINF. ® ALT. CRS. & J4 VERT, BARS ® 4' CNTRS. 1'-8" X 1' X CONTINUOUS 2 -#5 BARS LONG AND ¢'4 DOWELS ® 4' CNTRS. ? ? o 0 2 TRASH ENCLOSURE DETAIL $ SCALE: 1"=I'-O" DINT \ WORK ROOM 0J SELF CONTAINED WATER BOTTLE 9 W/ FLAT BOTTOM CUPS cc) z ? F.E. i? ? M CH/ N 1 ns J ITOR Q A5 un WOMEN MEN ° E E C T J as uPPUeR I R O O M ?. PROVIDE FACE BRICK Q w 5 9'-8" 12'-4" Q Q I _43" 7'-11. 8 8 4 4'-4" 8 47" 47,47" 47" 47 71" 48" 8 8 8 8 8 LI SWING GATE SEE 1 Al 4 MAIN FL00 PLAN 12' 11'_4" Al SCALE: 1/4"=1'-O° l L c c H' CAP g H'CAP SINK FORESHORTENED / @45 H' CAP GB T??- M-1 4' HIGH PE-3 MESCOT TPH-1 4' HIGH PL-3 WANESCO - GB N 3" BY SECT 10800 GB r (U I N TPH-1 FORESHORTENED BY SECT 10800 y I (SEE PLAN FOR DIMENSION) (SEE PLAN FOR DIMENSION) BATHROOM ELEVATION 2 BATHROOM ELEVATION ; A5 SCALE: 1,/4"=1'-0" AS SCALE: 0" r I' SINK ELEVATION STRAIGHT ON : ?euisc? Jul ? l ?b EAGAN REVIEWED D,'TE s a o BU!LGi ?G INSPECTIONS' bLPT. 16'-68" PDF created with pdfFactory trial version www.pdffactory.com LUCACHICK ARCHITECTURE, INC, 481 MAO 5EVEN COURT, 5UITE #9 - 5EMIDJI, MN 56601 City of Eagan Mike Lence Building Official/ Inspections 3830 Pilot Knob Road Eagan, MN 55122 Phone: 651-675-5675 Fax: 651-675-5694 7 April2006 MAIL TO: P.O. BOX 219 - DEMIDJI, MN 56619-0219 PHONE: (218) 759-2305 FAX: (218) 759-0407 EMAIL ADPRE55: lukeamhOpsulbunyan.net RE: Oaktrust Credit Union- Application for Building Permit Mike, Enclosed, please find the following: Application for permit 1 copy of the Soil Report for the proposed site 1 copy of Master Exiting Plan 1 Copy of Emergency Response Plan I copy of Certified Survey You should have already received (bidding documents): 2 copies of Architectural, Structural, Civil, and Landscaping plans 2 copies of Code Analysis and Energy Calculations 2 copies of Project Specifications I am forwarding information to Roger Janzig concerning SAC Determination. There will be no fire stopping items to be submitted. As I see it, 1 will need to submit the Electrical Power and Lighting Form. Let me know if you need any additional information. an you- Pa rick Bradley Lucachick Architecture, inc. 218-759-2305 LUCACHICK ARCHITECTURE, INC, 481 MAO SEVEN COURT, 5UITE #9 - BEMIDJI, MN 56601 City of Eagan Building Official/ Inspections 3830 Pilot Knob Road Eagan, MN 55122 Phone: 651-675-5675 Fax: 651-675-5694 15 March 2006 RE: Oaktrust Credit Union- Bidding Documents MAIL TO: P.O. BOX 219 - BEMIDJI, MN 56619-0219 PHONE: (218) 759-2305 FAX: (216) 759-0407 EMAIL AVDFE55: Iukearchmpaulbunyan.net Enclosed, please find two (2) copies of the bidding documents for the above mentioned project. From discussions with the building department, It appears that plan review can take place bctnrc a permit is applied or a plan review fee is accepted. Our Mechanical Engineer has sent plans to the state for plumbing review, which in turn were. sent back. The state stated that the city would be reviewing the plumbing plans. I am still waiting on clarifications on Emergency Response Site Plans and a Soils Report from your department. Please review the plans and note any items which are in need of attention. I feel that this project will want to start as soon as possible. T h a k y0u- Patkick Bradley Lucachick Architecture, Inc. 218-759-2305 MPR 1 ? ZDOF it Metropolitan Council Environmental Services April 24, 2006 Dale Schoeppner Building Official City of Eagan 3830 Pilot Knob Road Eagan, MN 55122 Dear Mr. Schoeppner: The Metropolitan Council Environmental Services Division has determined SAC for the Oaktrust Credit Union to be located at 1642 Diffley Road within the City of Eagan. This project should be charged 1 SAC Units, as determined below. i? Charges: Office 2,376 sq. ft. @ 2400sq. ft./SAC Unit If you have any questions, call me at 651-602-1119. Sincerely, /) Roger Janzi Senior Planner Municipal Services Section EAS: 060424S4 cc: S. Selby, MCES Carolyn Krech, Finance Department, Eagan Pat Bradley, Lucachick Architecture ..metrocouncil.org SAC Units 0.99 or 1 ?CGFfJM APR 2 7 200F LU) Metro Info Line 602-1888 230 East Fifth Street • St. Paul, Minnesota 55101-1626 • (651) 602-1005 • Fax 602-1138 • TrY 291-0904 An Eqw Opportunity EaWWyer Pat Geagan MAYOR Peggy Carlson Cyndee Fields Mike Maguire Meg Tilley COUNCIL MEMBERS Thomas Hedges CITY ADMINISTRATOR MUNICIPAL CENTER 3830 Pilot Knob Road Eagan, MN 55122-1810 651.675.5000 phone 651.675.5012 fax 651.454.8535 TDD MAINTENANCE FACILITY 3501 Coachman Point Eagan, MN 55122 651.675.5300 phone 651.675.5360 fax 651.454.8535 TDD www.cityofeagan.com THE LONE OAK TREE The symbol of strength and growth in our community. May 8, 2006 Mr. Chris Smisek Northfield Construction VIA FACSIMILE: 507-663-0315 Re: Oak Trust Credit Union Dear Mr. Smisek, As we discussed, I am forwarding a copy of Section 11.70, Subdivision 12-B-3 of the City's landscape ordinance regarding the performance guarantee. The performance guarantee is required in the amount of $7,500 and can be provided either as a cash escrow deposit, or as a letter of credit. In addition to the ordinance, I have attached a sample letter of credit for your reference. Please provide this sample to your bank if you choose to provide a letter of credit rather than a cash escrow deposit. If you have any further questions, please contact me at 651-675-5691. Sincerely, 99 Pamela Dudziak Planner cc: Building Inspections FROM: TOM STRUVE, SUPERINTENDENT OF STREETS & EQUIPMENT LEON WEILAND, CONSTRUCTION INSPECTOR DALE WEGLEITNER, FIRE MARSHAL ERIC MACBETH, WATER RESOURCES COORDINATOR GREGG HOVE, CITY FORESTER JOHN GORDER, ASSISTANT CITY ENGINEER KENT THERKELSEN, CHIEF OF POLICE MARK ANDERSON, ELECTRICAL INSPECTOR MIKE RIDLEY, SENIOR PLANNER PAUL HEUER, SYSTEMS ANALYST SCOTT PETERSON, BUILDING INSPECTOR DAVE WESTERMAYER, ENGINEERING TECHNICIAN MIKE LENCE, SENIOR INSPECTOR DATE: APRIL 13, 2006 RE: PLAN REVIEW FOR OAK TRUST CREDIT UNION 1642 DIFFLEY ROAD The plans are in our plan review section for your review and comment. Please return this form to my attention with your signed comments and the date of review within seven days. If you have any concerns with these plans, please so indicate on this form and notify and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please fill out the proper "hold" request form. Comments: Indicate any fees that are to be collected with the building permit: AMOUNT ? Yes ? No landscape security required ? Yes ? No water quality dedication ? Yes ? No park dedication ? Yes ? No trail dedication ? Yes ? No tree dedication ? Yes ? No PRV Required Signature ZONING?_ METER SIZE Date CD/FORMSBLDG INSP/PLAN REVIEW /MIKE LENCE REVISED 02/04 TO: TOM STRUVE, SUPERINTENDENT OF STREETS & EQUIPMENT LEON WEILAND, CONSTRUCTION INSPECTOR DALE WEGLEITNER, FIRE MARSHAL ERIC MACBETH, WATER RESOURCES COORDINATOR GREGG HOVE, CITY FORESTER JOHN GORDER, ASSISTANT CITY ENGINEER KENT THERKELSEN, CHIEF OF POLICE MARK ANDERSON, ELECTRICAL INSPECTOR MIKE RIDLEY, SENIOR PLANNER PAUL HEUER SYSTEMS ANALYST SCOTT PETERSON, BUILDING INSPECTOR DAVE WESTERMAYER, ENGINEERING TECHNICIAN FROM: MIKE LENCE, SENIOR INSPECTOR DATE: APRIL 13, 2006 RE: PLAN REVIEW FOR OAK TRUST CREDIT UNION 1642 DIFFLEY ROAD The plans are in our plan review section for your review and comment. #4 Please return this form to my attention with your signed comments and the date of review within seven days. If you have any concerns with these plans, please so indicate on this form and notify and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please fill out the proper "hold" request form. Indicate any fees that are to be collected with the building permit: AMOUNT ?(¢y .Trrifa-fto+? - TreafH,?,f 7/rn.f $(03(0-'-'' ? Yes ? No landscape security required ? Yes ? No water quality dedication ? Yes ? No park dedication ? Yes ? No trail dedication ? Yes ? No tree dedication ? Yes 0'?No PRV Required gnature ZONING? METER SIZE Jf" .?2 _a 6 Date CD/FORMS/BLDG INSP/PLAN REVIEW /MIKE LENCE REVISED 02/04 8(03.°-" Tfr??'rs><?c? r e ta 6e ?o/%?-t? 'r'; .. ??Y?Y. f??d d ??? ??rU?' __ yhb ?/y,?????y 0 ? ??dy ? ??j???b ? TO: TOM STRUVE, SUPERINTENDENT OF STREETS & EQUIPMENT LEON WEILAND, CONSTRUCTION INSPECTOR DALE WEGLEITNER, FIRE MARSHAL ERIC MACBETH, WATER RESOURCES COORDINATOR GREGG HOVE, CITY FORESTER JOHN GORDER, ASSISTANT CITY ENGINEER KENT THERKELSEN, CHIEF OF POLICE MARK ANDERSON, ELECTRICAL INSPECTOR MIKE RIDLEY, SENIOR PLANNER PAUL HEUER, SYSTEMS ANALYST SCOTT PETERSON, BUILDING INSPECTOR DAVE WESTERMAYER, ENGINEERING TECHNICIAN FROM: MIKE LENCE, SENIOR INSPECTOR DATE: APRIL 13, 2006 RE: PLAN REVIEW FOR OAK TRUST CREDIT UNION j 1642 DIFFLEY ROAD ! The plans are in our plan review section for your review and comment. #4 Please return this form to my attention with your signed comments and the date of review within seven days. If you have any concerns with these plans, please so indicate on this form and notify and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please fill out the proper "hold" request form. Comments: WtP (yil' JkU ?0 tB 40 (1&1)IC@e/ L"Te? Y/pmt-+'l. 'Trc? ?'?yy?a,?e+?ufc.II.. Sl??,?? l?f..la? ??we.. ?y-?.I-;®r" ?m-?sr acre{ ,W?? tit j-1cA. `• Indicate any fees that are to be collected with the building permit AMOUNT 19 Yes ? No landscape security required '7? 5-co °O ? Yes ? No water quality dedication ? Yes ? No park dedication ? Yes ? No trail dedication ? Yes ? No tree dedication ? Yes ? No. _ PRV Required Signature == CD/FORMS/BLDG INSP/PLAN REVIEW /MIKE LENCE 14/?1, ?1 S-'_t.et f'V ?l r)cr?f-rr c'1.?..p ,rtL /3 n`<nf ZONING? NiT METER SIZE Date y41 y le REVISED 02/04 FROM: TOM STRUVE, SUPERINTENDENT OF STREETS & EQUI LEON WEILAND, CONSTRUCTION INSPECTOR DALE WEGLEITNER, FIRE MARSHAL ERIC MACBETH, WATER RESOURCES COORDINATOR GREGG HOVE, CITY FORESTER JOHN GORDER, ASSISTANT CITY ENGINEER KENT THERKELSEN, CHIEF OF POLICE MARK ANDERSON, ELECTRICAL INSPECTOR MIKE RIDLEY, SENIOR PLANNER PAUL HEUER, SYSTEMS ANALYST SCOTT PETERSON, BUILDING INSPECTOR DAVE WESTERMAYER. ENGINEERING TECHNICIAN MIKE LENCE, SENIOR INSPECTOR DATE: APRIL 13, 2006 RE: PLAN REVIEW FOR OAK TRUST CREDIT UNION 1642 DIFFLEY ROAD The plans are in our plan review section for your review and comment. Please return this form to my attention with your signed comments and the date of review within seven days. If you have any concerns with these plans, please so indicate on this form and notify and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please fill out the proper "hold" request form. Comments: / any fees that are to be collected with the building permit: AMOUNT ? Yes ? No landscape security required ZONING? - ? Yes ? No water quality dedication METER SIZE ? Yes ? No park dedication ? Yes ? No trail dedication ? Yes ? No tree dedication ? Yes ? No PRV Required Signature 1 ?f) oG Date CD/FORMS/BLDG INSHPLAN REVIEW /MIKE LENCE REVISED 02/04 TO: TOM STRUVE, SUPERINTENDENT OF STREETS & EQUIPMENT LEON WEILAND, CONSTRUCTION INSPECTOR DALE WEGLEITNER, FIRE MARSHAL ERIC MACBETH, WATER RESOURCES COORDINATOR GREGG HOVE, CITY FORESTER JOHN GORDER, ASSISTANT CITY ENGINEER KENT THERKELSEN, CHIEF OF POLICE MARK ANDERSON, ELECTRICAL INSPECTOR MIKE RIDLEY, SENIOR PLANNER PAUL HEUER, SYSTEMS ANALYST SCOTT PETERSON, BUILDING INSPECTOR DAVE WESTERMAYER, ENGINEERING TECHNICIAN FROM: MIKE LENCE, SENIOR INSPECTOR DATE: APRIL 13, 2006 RE: PLAN REVIEW FOR OAK TRUST CREDIT UNION 1642 DIFFLEY ROAD The plans are in our plan review section for your review and comment. #4 Please return this form to my attention with your signed comments and the date of review within seven days. If you have any concerns with these plans, please so indicate on this form and notify and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please fill out the proper "hold" request form. Comments: Indicate any fees that are to be collected with the building permit: AMOUNT ? Yes ? No landscape security required ? Yes ? No water quality dedication ? Yes ? No park dedication ? Yes ? No trail dedication ? Yes No tree dedication ? Yes ?I No PRV Required Signature ZONING? METER SIZE L( -?17'l7 Date REVIEW /MIKE LENCE REVISED 02/04 S,S%qsD wV,II l t 4 bq TO: TOM STRUVE, SUPERINTENDENT OF STREETS & EQUIPMENT LEON WEILAND, CONSTRUCTION INSPECTOR DALE WEGLEITNER, FIRE MARSHAL ERIC MACBETH, WATER RESOURCES COORDINATOR GREGG HOVE, CITY FORESTER JOHN CORDER, ASSISTANT CITY ENGINEER KENT THERKELSEN, CHIEF OF POLICE MARK ANDERSON, ELECTRICAL INSPECTOR MIKE RIDLEY, SENIOR PLANNER PAUL HEUER, SYSTEMS ANALYST SCOTT PETERSON, BUILDING INSPECTOR DAVE WESTERMAYER, ENGINEERING TECHNICIAN FROM: MIKE LENCE, SENIOR INSPECTOR DATE: APRIL 13, 2006 RE: PLAN REVIEW FOR OAK TRUST CREDIT UNION 1642 DIFFLEY ROAD The plans are in our plan review section for your review and comment. #4 Please return this form to my attention with your signed comments and the date of review within seven days. If you have any concerns with these plans, please so indicate on this form and notify and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please fill out the proper "hold" request form. Comments: Indicate any fees that are to be collected with the building permit: AMOUNT ? Yes ? No landscape security required ? Yes )k No water quality dedication ? Yes ? No park dedication ? Yes ? No trail dedication ? Yes ? No tree dedication 0es ? No P V Required Sign ur ZONING? METER SIZE s(! 77e?G Date CD/FORMS/BLDG INSP/PLAN REVIEW /MIKE. LENCE REVISED 02/04 City of Eapn ?cmo TO: DALE SCHOEPPNER, CHIEF BUILDING OFFICIAL DALE WEGLEITNER, FIRE MARSHAL PAUL OLSON, SUPERINTENDENT OF PARKS MIKE RIDLEY, CITY PLANNER CAROL TUMINI, UTILITY BILLING CLERK TIM PAHR, ENGINEERING TECHNICIAN LEON WEILAND, CONSTRUCTION INSPECTOR TOM COLBERT, PUBLIC WORKS DIRECTOR JOHN GORDER DEVELOPMENT/DESIGN ENGINEER TOM STRUVE, SUPERINTENDENT OF STREETS & EQUIPMENT PAUL HEUER, SYSTEMS ANALYST ERIC MACBETH, WATER RESOURCE COORDINATOR MARK ANDERSON, ELECTRICAL INSPECTOR SCOTT PETERSON, PLUMBING INSPECTOR CRAIG NOVACZYK, SENIOR INSPECTOR OR MIKE LENCE, SENIOR INSPECTOR FROM: TERRY ZELENKA, COMBINATION INSPECTOR DATE: AUGUST 21, 2006 SUBJECT: FINAL INSPECTION FOR 1642 DIFFLEY RD LEGAL: LOT 7 • BLOCK 1 • DIFFLEY PLAZA The Protective Inspections Division will be performing a final inspection at 1642 Diffley Rd on September 51h, 2006. If you are requesting that the Certificate of Occupancy be held, please fill out the proper hold request form. Failure to return the hold request form will be considered your approval. The person, or department, requesting the hold is responsible for notifying and resolving any problems with the affected parties. CD/bldg insp/misc/final insp - comm bldgs Structural Testing and Special Inspection Program Summary Schedule Project Name Oaktrust Credit Union Project No. Location 1642 Diffley Road Eagan, MN 55122 Permit No. Technical 2) Type of Report Assigned Section Article Description (3) Inspector (4) Frequency (5) Firm (6) TA on per T 1 03300 Concret Material Anal - . TO* per 25 ds 1 t a h I' Notes: This schedule shall be filled out and included in the Structural Testing and Special Inspection Program. (1) Permit No. to be provided by the Building Official. (2) Referenced to the specific technical scope section in the program. (3) Use descriptions per IBC Section 1704, as adopted by Minnesota State Building Code. (4) Special Inspector - Technical, Special Inspector- Structural, Testing Agency. (5) Weekly, monthly, per test/inspection, per floor, etc. (6) Firm contracted to perform services. ACKNOWLEDGEMENTS Each appropriate representative shall sign below: Owner: Firm: QW_iGJ:;7 ("cT Date: Conte Firm: ?stic Id ?? - Date: Architc Firm: Wt? wy- Date: 4 ? [l h)c2 S Firm: Jonas drek Ein Date: 4-11( ](? Sl-S: Firm: Date: TA: Firm: _.!. l NOr"fht*} `C6kR 6/?tBS ?iL. Date: F: Firm: Date: If requested by engineer/architect of record or building official, the individual names of all prospective special inspectors and the work they intend to observe shall be identified. Legend: SER = Structural Engineer of Record SI-T = Special Inspector- Technical Sl-S = Special Inspector- Structural F = Fabricator Accepted for the Building Department By Date TA = Testing Agency CASE/MN page 1? City of Eagan 3830 Pilot Knob Road Eagan MN 55122 Phone: (651) 675-5675 Fax: (651) 675-5694 MAY 37 2613 r Use BLUE or BLACK Ink For Office Use Permit #: ‘ Permit Fee: S-40,33 a-- 5 id- -/3 , Date Received: Staff: 2013 COMMERCIALBUILDING PERMIT APPLICATION Date: '' /�' /^? 3Site Address: / �j / /p //T�E7 lidl9D Tenant Name: /9.77/41/71/ / '/4%/7y Pi (/s (Tenant is: New / Former Tenant: Name: fFf%N/ PG US f� Address / City / Zip: Existing) Suite #: Applicant is: X Owner Contractor Description of work: //V 7D/ / a‹. RIDDin Construction Cost: 7a i JL MT.%TTL g nov,40 35; coo ---- Name: ,O ? 1 LS License #: Address: 536 121 40 STT City: / yAP-AV State: 10-12-: Zip: c5VOZ, Phone: 71C' 339--77 I' -. /4 ' :./ // . 4,4 Address: � / j ,Q //) ,t P City: IZ ✓ State: 41A1 V Zip: Y7 Phone: 93 " 1-257‘g. Contact Person: %%Z`f-re /C16.4rN% Email: Licensed plumber installing new sewer/water service: Phone #: CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.qopherstateonecall.orq I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an applicatio .r a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work h requires a review and approval of plans. ES hi k)Ail Applicant's Printed Name x Appl1"'s Signature Page 1 of 3 / D P1/eM Wcf DO NOT WRITE BELOW THIS LINE SUB TYPES foundation Commercial / Industrial Apartments Miscellaneous WORK TYPES New Addition Alteration Replace Salon Owner Change DESCRIPTION Valuation Plan Review (25% 100% ✓ ) Census Code # of Units # of Buildings Type of Construction Public Facility Accessory Building Greenhouse / Tent Antennae %/ Interior Improvement Exterior Improvement Repair Water Damage 3000'"' D YB REQUIRED INSPECTIONS Footings (New Building) Footings (Deck) Footings (Addition) Foundation Drain Tile Roof: _Decking Insulation 1/ Framing Occupancy Code Edition Zoning Stories Square Feet Length Width Ice & Water Final Fireplace: Rough In Air Test Final Insulation Meter Size: Exterior Alteration—Apartments Exterior Alteration—Commercial Exterior Alteration—Public Facility Siding Reroof Windows Fire Repair Demolish Building* Demolish Interior Demolish Foundation Retaining Wall *Demolition of entire building — give PCA handout to applicant TS"/ S� MCES System V SAC Units OM • atid446 t.J us bt. DCL. L Aj) City Water Booster Pump PRV / Fire Sprinklers Sheetrock t/ Final / C.O. Required Final / No C.O. Required Other: Pool: _Footings Air/Gas Tests _Final Siding: Stucco Lath _Stone Lath Brick Windows Retaining Wall Erosion Control Final CIO Inspection: Schedule Fire Marshal to be present: Yes /No Reviewed By: C/!/ , Building Inspector Reviewed By: , Planning COMMERCIAL FEES Base Fee 570 • $ O Surcharge 17 • 5-17 Plan Review 330.13 MCES SAC City SAC S&W Permit & Surcharge Treatment Plant Treatment Plant (Irrigation) Park Dedication Trail Dedication Water Quality Water Quality Water Supply & Storage (WAC) Storm Sewer Trunk Sewer Trunk Water Trunk Street Lateral Street Water Lateral Other: TOTAL 076.33 Page 2 of 3