Loading...
1323 Easter LaneCITY OF EAGAN Remarks Addition Wil derness Run 5th Addition Lot 9 Blk 5 Parcel 10 84354 090 05 owner'' Q? Street 1323 Easter Ln. State Eagan, MN 55123 J ass n„nl. Y Improvement Date Amount Annual Years Payment Receipt Date STREET SURF. STREET RESTOR. GRADING SAN SEW TRUNK d 1973 132.60 $6.63 20 A005682 3-10-78 SEWER LATERAL WATERMAIN WATER LATERAL WATER AREA / 1977 160.00 10.66 15 138.68 A00S682 3-10-78 STORM SEW TRK 8 9153 STORM SEW LAT CURB & GUTTER SIDEWALK STREET LIGHT WATER CONN. 0.00 8011 1_7-77 BUILDING PER, #4560 8011 1-7-77 SAC 4 5-00 8011 01-7-77 PARK CITY OF EAGAN 3795 Pilot Knob Rood Eagan, MN 55122 N2 4560 PHONE: 454-8100 BUILDING PERMIT ; Receipt # t To be used for p =,' Date 19 Site Address Erect ? Occupancy Lot - Block Sec/Sub. Alter ? Zoning Parcel # J _ Repair ? Fire Zone _ Enlarge ? Type of Const. a Name Move ? # Stories Z O Address Demolish ? Front ft. Grade ? Depth ft. City Phone p Name nlr-:'anm ?t1 r? jn; wpprorals ~ U Address - Assessment - ? ~ Water & Sew. City Phone Police Ud Name Fi F W Xa Address re Eng. ct? Q W Ci Phone Planner Council hereby acknowledge that I have read this application and state that Bldg. Off. - the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances- APC Signature of Permittee - A Building Permit is issued to: all work shall be done in occo Building Official Fees Permit Surcharge Plan check SAC Water Conn. Water Meter Total 1 -- on the express condition that State of Minnesota Statutes and City of Eagan Ordinances. b Permit # Data ll wed Peredttee Plumbing ?- Mechanical INSPECTIONS DATE INSP. Rough-In Final Footings Date Insp. Date Insp. Foundation _ Plumbing Air& Frame/ins. r Mechanical Fina l" Remarks: CITY OF EAGAN 27" Pilot Knob Road Eagan, Minnesota 55122 Phone: 454-8100 HEATIi" C" _ PERMIT Dote: January 19, ';7, Site Address: 1323 Easter Lane Lot Block 5 Sub/Sec WR 5th Name Address City Apple Valley Phone: Name Fredrickson Heating & Aic g Address? p "' P•r.?rt} ;i' t, Pr-. v City Phone: THi§,,Permit is issued on the express condition that all work sholl be Minnesota Statutes and City of Eagan Ordinances. No. Receipt No.: Single I Residential :'. New /Alter. /Repair Cost of Installation Permit Fee nn Surcharge Total done in accordance with all applicable State of Building Official CITY OF EA"H 3795 Pilot Knob Road ` Eagan, Minnesota 55122 Phone: 454-8100 n U M R 3W C, _ PERMIT Date: 1,ecember 15, 11977 Site Address: 1 7 a. s t:, _ La n E- Lot Block Sub/Sec. Name Tollefson Builders ¦ 3 Address 13`:-_.G aolyo::e Lane O City Apple Valley 5512' Phone: Name Genz-Ryan Plumbing F, Heating Address = `= Robert Trail e 0 City Phone: This Permit i ued on the express condition that all work shall be Minnesot atutes and City of Eagan Ordinances. No. c) R 2 Receipt No.: C Single ` Residential Multi Res.; Comm./Ind. New/Alter:/Repair Cost of Installation Permit Fee Surcharge I Total done in accordance with all applicable State of Building Official i ilot Knob Road MN 55122 WATER SERVICE PERMIT f PERMIT NO.: DATE: No. of Units: Site Address: tAnF' Plumber: Meter No.: - Size: Reader No.: agree to comply with the City of Eagan Ordinances. By Date of Insp.: - _ Connection Charge: Account Deposit: Permit Fee: Surcharge: Misc. Charges: K' Total: Date Paid: Insp.:- CITY OF EAGAN 3795 Pilot Knob Road " Eagan, MN 55122 Zoning: Owner: Address: _ Site Address: Plumber: 1 agree to comply with the City of Eagan Ordinances. By Date of Insp.: SEWER SERVICE PERMIT PERMIT NO.: DATE: No, of Units: Connection Charge:?-' Account Deposit: Permit Fee: Surcharge: Misc. Charges: Total: RESIDENTIAL BUILDING PERMIT APPLICATION f CITY OF EAGAN 3830 PILOT KNOB RD - 55122 651-681-4675 New Construction Requirements Remodel/Repair Requirements ----I C 3 registered site surveys showing sq. ft. of lot, sq. ft. of house; and all mofed areas • 2 copies of plan (20% maximum lot coverage allowed) • 1 set of Energy calculations for heated additions 2 copies of plan showing beam & window saes; poured found design, etc.) • i site survey for exterior additions & decks 1 set of Energy Calculations • Indicate if home served by septic system for additiOns • 3 copies of Tree Preservation Plan if lot pfaded after 111193 Rim Joist Detat Options selection sheet (bldgs with 3 or less units) DATE 2/ VALUATION t('e m. on JOB SITE ADDRESS 43.?;tz aJ76X 2_4.c)F IF MULTI-FAMILY BUILDING, HOW MANY UNITS? PROPERTY TYPE OF APPLICANT FIREPLACE(S) _ 0 _ 1 _ 2 .9G PHONE# ADDRESS /? (;gP7x2 /a-/6 ZIPCODE t i r (,(,jt'.EAAGER # j2?!..-X-.&.?4/CELL PHONE # 6 Z e2 e - 7i4?2_ FAX # }S -6z - (27& NIEW RESIDENTIAL BUILDING ONLY - FILL OUT COMPLETELY Energy Code Category _ MINNESOTA RULES 7670 CATEGORY 1 (check one) Residential Ventilation Category 1 Worksheet Submitted Energy Envelope Calculations Submitted _ MINNESOTA RULES 7672 - New Energy Code Worksheet Submitted Plumbing Contractor: Al 1A Phone Plumbing System Includes: Water Softener _ Lawn Sprinkler Fee: $90.00 _ Water Heater _ No. of R.I. Baths No. of Baths Mechanical Contractor: I i /9 Phone # Mechanical System Includes: Air Conditioning ?} Heat Recovery System I ?I ! r? n Sewer/Water Contractor. AJ.19 Phone All above information must be submitted prior to processing of application. I hereby acknowledge that I have read this application, state that the" >a or ation is correct, and agree to comply with all applicable State of Minnesota Statutes and City of Eagan din nces. Signature of Applica Certificates of Survey Received _ Tree Preservation Plan Received _ Not Required _ Updated 1101 OFFICE USE ONLY ? 01 Foundation ? 07 05-plex ? 02 SF Dwelling ? 08 06-piex ? 03 01 of - plex ? 09 07-plex ? 04 02-plex ? 10 08-piex ? 05 03-plex ? 11 10-plex ? 06 04-plex ? 12 12-piex 31 New ? 35 ? 32 Addition ? 36 ? 33 Alteration ? 37 ? 34 Replacement 00 Valuation Census Code SAC Units Nbr. of Units Nbr. of Bldgs Type of Const ? 13 16-piex ? 16 Fireplace ? 17 Garage P8 Deck ? 19 Lower Level Plbg_Y or_ N ? 20 Pool ? 21 Porch (3-sea.) ? 22 Porch/Addn. (4-sea.) 23 Porch (screened) ? 24 Storm Damage ? 25 Miscellaneous ? 30 Accessory Bldg ? 31 Ext. Alt - Multi ? 33 Ext. Alt - SF ? 36 Multi Int Improvement ? 38 Demolish (Interior) ? 44 Move Bldg. ? 42 Demolish (Foundation) ? 45 Demolish (Bldg)' ? 43 Reroof ? 46 'Demolition (Entire Bldg only) - Give PCA handout to applicant Occupancy MC/ES System Zoning -? City Water Stories Booster Pump Sq. Ft. PRV Length Fire Sprinklered Width REQUIRED INSPECTIONS Footings (new bldg) J Final/C.0. Final/No C.O. Footings (deck) Footings (addition) _ Foundation Drain Tile Roof Ice & Water Final Other Framing- - Fireplace _ R.I. _ Air Test _ Final Insulation Siding Fire Repair Windows/Doors Pool _ Ftgs _ Air/Gas Tests _ Final Siding _ Stucco _ Stone Windows (new/replacement) Approved By L{,K1 , Building Inspector Base Fee I a S- Surcharge 3 Plan Review MC/ES SAC City SAC Water Supply & Storage S&W Permit & Surcharge Treatment Plant Plumbing Permit Mechanical Permit License Search Copies Other _ Plumbing HVAC 5CR66;vE1j PokjC# -/ a)- k20 -31 -7 SID ?b ?m s, 7sb Total I ?? CITY OF EAGAN ' 3795 Pilot Knob Road Eagan, MN 55112 N2 4560 PHONE: 454-8100 ' BUILDING PERMIT APPLICATION Receipt # 8011 $38,000. To be used for Sing. Fam Dwlg. * Garg. Date Nov... 7, 19 77 __ Site Address 1323 Easter Ln - Erect ff Occupancy 1 Lot 9 Block_ 5 Sec/Sub. WR_5 th Alter ? Zoning Rl Repair ? Fire Zone 3 Parcel # 10 R 4154 090 05 Enlarge ? Type of Const. -_- W Name Robert DraRer Move ? # Stories 1 z Address 3396 Yankee Doodle Rd. Demolish ? Front 62 ft. 3 o Eagan 454-7707 Grade ? Depth 26 ft. City Phone 'Y N T-11 fcnn Rldre Tn Approvals _ Fees p amen , C 0? Address 13816 Holyoke Ln r Apple Vallga( „- 454-6873 Name _ Address hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Signature of Permittee A Building Permit is issued to: To 1 fso 1 r all work shall be done in accor a wit all icable State of Building Official Assessment _ Water 8 Sew. Police Fire Eng. Planner Council Bldg. Off. _ APC Permit LLV.7V Surcharge 19.00 Plan check SAC 475.00 Water Conn. 230.00 Water Meter 60.00 Total A94,5n on the express condition that Statutes and City of Eagan Ordinances. REQUEST FOR ELECTRICAL INSPECTION Aalk ER 000O7-01 L I) , S. instru<rians W, ero Ieti.g this tmm to bad of Ys' a -- /)-1? 3 Y 0683 --x-- Be/ow work Covered by This Bequest iOm Ada Bap. Type of Suildia, Appliances Wired Equipment Wintat XX Home Range Tengorary Service Duplex Water Heater Lighting Fixtures Apt. Building Dryer X Electric Heati 0011 rD Commercial Bldg. Furnace Silo Unloader Industrial Bldg. Air Conditioner Bulk Milk Tank Farm Other pecr Othen IsmCifirl r ecity Or r OtMr Compute Inspection Fee Below B Fee Service E. trance Size a Fee Feedms/Subteedars p Fee Circuits 0 to 200 0 to 30 Amps r O to 30 A . Above 200 Am - 31 to 100 Amps L . 00 31 to 100 Anws Swimming Pool Above 100 Affws Above 100 Antl:isl Trarstormers Imgat.on Boorrs Partial: Other F Silts Special Inspection $13. 00 TOT L FFEE IlM ks Ilauph-in Date 1 EtscU 7 y i1Y that Pn Date pectian L .y n.da. Uft eald18otu , tram 1-) 0 (r-,) 3 9y Street Address, Box or Route No_ City 1323 Easter Lane Eagan Section No Township Na. or No. Range No_ County I Dakota Occupant IPRINT) Mr. R.J.Drager Ph No 4 4-7707 Power Supplies Address D.E.A. Farmington Electrical Contractor (Conoany Namgl Contractor's License No. Corrigan Electric Ca. 0 39549 8 (failing Address (Contractor or Owner Making Installation) P.O. Sax 475 Rosemount, Minn. 55068 Au ized Signature ( ntract /Owner Making Installation) Phone NonBer 42381131 v MINNESOTA STATE BO OF EIECTRICRT THIS BE ACCEPTED BY INSPECTION THE REQUEST STATE WILL NOT BOARD rriggeJlid.ray Bldg. - N-191 UNLESS PROPER IM8IECTION FEE 6 1@7 University Ave.. SL Paul, YN 55106 Php.e IB121 29721H ENCLOSER NO Licensed Electrical Contractor 1 hereby request insPeetion of above ? Owner electrical work installed ac This request void 18 months from a,5 ,S S d Date of this Request Oda" J q P 31835 I, as Lricensed Electrical Contractor Owner, do hereby request inspection of the above electri- cal wiring installed at: ayo9 S ??! ,f ?? I/ ,r Street Address or Route No. ? +x 'Z 1,2? CitYA Section Which is occupied by Range County Is a roughin inspection required on this job? No ? Yes CD,' Ready Now 0 Will Call BY Power Supplier ZVA,:!& 426:j0 Address cl? d'Fillr?sY" ` Electrical Contr t rr;? DC? Contractor's IAfm S - ( o'hipa My, Mailing Address +10 '3 u i c_ u r? n I2"I_ R I 1iWhi i r_ iE ecbl al rector or Ow 'M3k h1 nihllatlon) Authorized Signature r;,?,.R,Y KE??f1R?(K PhoneNq,o` r9°C- [(???(r®ontractor or?wna®r Making This Installatlon) STM Minnesota State Board of Electricity 1954 University Ave., St. Paul, Minn. 55104-Phone 645-7703 - REQUEST FOR ELECTRICAL INSPECTION ECK LOW WORK COVERED BY THIS REQUEST v9J?- se p 31835 Type of Building New Add. Rep. Check Appliances Wired For Check Equipment Wired For Home ? ? Range Temporary Wiring ? Duplex ? ? ? Water Heater ? Lighting Fixtures Apt. Bldg. ? ? ? Dryer ? Electric Heating ? Commercial Bldg. ? ? ? Furnace R Silo Unloader ? Industrial Bldg. ? ? ? Au Conditioner ? Bulk Milk Tank ? Farm 0 List ) List O her ? ? ? p } D W Herers) - p Hehreers COMPUTE INSPECTION FEE BELOW Service Entrance Size: # Fee Feeders&Subf # ee Circuits: # Fee 2.1 o 0 _ s. 0 to 30 Ampere t Amperes 01 to 200 Am . 31 to 100 Am t 0 Amperes A ove ZOUE?_Amps. Above 100 A s. 100 Amps. Transformers Remote Control Circ. Partial or other fee Signs Special Inspection Minimum fee $5.00 Remarks T s f C? e I, the Electrical Inspector, hereby certify (Final) This request void 18 months from Date /y2 a.-? Date <f 6 - 7 DATE C/ L .2 BUILDING PE MIT APPLICATION Include 2 sets of plans, 1 site plan w/elevations and 1 set of energy calculations. To be used for / i _ J&lr / j i J Valuation Site Address: Lot Block Sec./Sub. 9 5 4), ld e e u?ss 'XIu A-? OwnereJ]I?I?PMo? Z / Jo e ` _ Address 35!? + f r- lZd U A Contractor , Ile -is n .J Q/d cs 'fur Address 13,,31& 14G Arch./Eng. Address _ Erect Alter Repair Enlarge Move Demolish Grade OFFICE USE Date of Approval & Initial Assessment 7 Water/Sewer Police Fire Eng. Planner Council Bldg. Off. A.P.C. Parcel Number - /Q b ?35 P ?e PS Telephone ?7-;'?- 7 Telephone el-s- `-f - (J S- 2 Telephone i OFFICE USE Occupancy _ Zoning Fire Zone Type of Const. # of Stories Front Depth FEES Permit Z/5 Surcharge Plan Check SAC Rater Conn. Water Peter e CITY OF EAGAN L B /J MECHANICAL PERMIT SUBD. (612) 681-4675 RESIDENTIAL RECEIPT # c5?? DATE f i?a - c?/i s//9 3 . PLEASE COMPLETE UPPER PORTION ONLY FOR SINGLE FAMILY DWELLINGS. ALSO, COMPLETE FOR TOWNHOMES/CONDOS WHEN SEPARATE PERMITS ARE REQUIRED FOR EACH DWELLING UNIT. OWNER S S _Fatj y -y 2 t SITE ADDRESS: 3 e r iL ADD ONMEMODEL (EXISTING CONSTRUCTION ONLY) $ 15.00 INSTALLER 4 ,5 S p HVAC: 0.100 M BTU 24.00 PHONE -7 o 29' ADDITIONAL 50 M BTU 6.00 ADDRESS: 76?c Co /VL5-4-16 $ j , GAS OUTI.I,1S • MIND?fUM L Q $3 EA CITY: /? ZIPS$!? SURCHARGE I s .50 SIGNATURE ( TOTAL $ !- COMMERCIAL ?7[6 0"&',17 '? , PLEASE COMPLETE ;HIS PORTION FOR ALL COMBiERCIALINDUSTRIAL BUILDINGS. ALSO COMPLETE FOR APARTMENT BUILDINGS OR OTHER MULTI-FAMILY BUILDINGS WHEN SEPARATE PERMIT'S ARE NOT REQUIRED FOR EACH DWELLING UNIT. WORK DESCRIPTION: CONTRACT PRICE: 1% OF CONTRACT FEE. FEES STATE SURCHARGE IS $.50 FOR EACH $1,000 OF PERMIT FEE. $ PROCESSED PIPING • $25.00 MINIMUM FEE - $25.00 a OWNER: TOTAU $ SITE ADDRESS: TENANT- SUITE #: INSTALLER: ADDRESS: CITY. ZIP: PHONE #: CITY SIGNATURE: SIGNATURE `h Q 4 July 09, 1990 City of Eagan City Clerk Ref: Notice of Special Assessment, Project No. 1OP466 We are opposed to the special assessment for the property located at Lot 9, Block 5, Wilderness Run 5th Addition, for the following reasons; 1) In 1986, the feasibility study on the reference project was estimated to be approximately $700.00. According to the present notice, the assessment had been changed due to a change in plans and specifications for this project to $1425.00. The assessed taxpayers were not notified of the change in specifications or a new feasibility study, with in the past 4 years. 2) Resodding the right of way was to be done, due to the sod sliding down the hill when it was watered by the landscape contractor, per the project engineer. 3) Water flow problem was not corrected by the County. We requested the County correct said problem dating back to May 4, 1989. To the present time this has not been corrected. 4) Weeds on the road right of way have never been cut, and are presently at approximately 4 to 5 feet tall. The slope of said hill is at such a degree, making it next to impossible to mow by hand. These particular problems and others have been discussed on May 4, 1989, a letter dated August 15, 1989, and another call on August 23, 1989 to Roger the project engineer. Also, a meeting with Don Chapdelaine at my property, who also showed concern over the problems stated. fully, /pv sell A. S J ?r L n tauffer Dakota Oounty HighYwk Dept. Roger / pilot knob Project Rinser 1560 Hwy. 55 W? Hastings, 0. 55033 Dates August 15, 1989 Net Ounitment to verbal agg+sement dated My 4, 1989. Dear Sire Regarding our phone oomersation an My 4, 1989p you inforo d as you would see to that 2 at sp mW oonoerns would be resolved. Neither of which have occured. I figure that since I have to pay the special assessment, I should have the right to be satisfied as a resident property Wner. I was advised to direct wp cane ne in writing and request a satisfactory settlement. You agreed with ay concerns, and quoted. *1 would be rather upset if that was or backyard alse.e Ten advised me that i could fill the gully left is y backyard left free the construction of Diffley Road, after ssntaeting the proper utility eompanies to avoid oosplloatiae. Which I did by eantaetiog oo*w One Call. I then have been digging since May, by hand (about 20 hours a week). about 400 to 500 yatds of dirt to create a yard my kids could ply in. I fu l„» ed sy . personal objective, but as I stated you did not l r» your verbal agrss. sent. the following is a list of concerns that I dissonusd with your 1) The grads be brought up to the first row of landscape tubers already rmoved by somebody. You stated that was up to the contractor. I did east of it already by syself. 2) The County to restake the road right of^ way and property line. Agreed. 34 The Oonnty to contact the L dsespe oentaaeter to finish sodding and to repair the sod on the hill or slope which was act staked by the sontrastor, resulting in the sod sliding down the hill the first to the said aeA etor watered it. Agreed. 4) It is believed that with substaaaial rain fall, that the water will reams in sass of our ba iWards. Dan ChapdeLine agreed. 5) The slops of the hill is so greet. that it makes it net! to impossible to mov, I would appreciate your pro* attention to this matters because it it is going to -soft u ncaq dawn the road I will tend not to ever fbrget it, and let it just fade away. _Si-leerailp r?Tours. ?yzrlrz div. -- . L wr 9, ?3 K 6v:`O??NesS 1L?? s-? 7/4 - fravG_.?n?_-?i_C?-..?/_r?z,'_c?'.._..Uc?,_.ficauQe.? ?' - 19. 70 ?G .oe-_._ _ s ---- ----- ---- - ?/.D1Y ---- -QQ ?7r G?6 ?_city of saga 3830 PILOT KNOB ROAD THOMAS EGAN EAGAN, MINNESOTA 55122 1897 Wyof PHONE (612) 454-8100 DAVID K GUSTAFSON FAX (612)454-8363 PAMELA McCREA TIM PAWLENTv THEODORE WACnTER Council wmoers September 27, 1990 THOMAS HEDGES ON A6minis(ra!or EUGENE VAN OVERBEKE CM Ci MR RUSSELL A STAUFFER 1323 EASTER LANE EAGAN MN 55123 Re: Project 466 (Pilot Knob 6 Diffley Road Improvements) Objection To Special Assessments Parcel 10-84354-090-05 Dear Mr. Stauffer: On September 10, the City received your letter dated August 20 where you identified several concerns associated with the special assessments levied against your property under the above-referenced project as well as the completion and restoration of the project itself. In relation to your special assessments, the public hearing to consider the adoption of the final assessment roll was held on July 10, 1990. The City Council took into consideration your written objection of July 9 as well as your comments submitted during the public hearing pertaining to the proposed assessments. As a result of this discussion and response from staff, the City Council adopted the final assessment roll as originally presented. Subsequently, with no specific modification to the assessment roll as it pertains to your property, the final assessment obligation has been certified to the Dakota County Auditor's office for collection through your property tax statement. This assessment will be spread over 10 years with the first installment being due with your 1991 property tax payment schedule. Your other concerns pertaining to the quality of the restoration of the back slope within County Road 30 as well as the drainage across your property has been reviewed with you by Mr. Bob Egan of the Dakota County Highway Department who is the jurisdictional authority for these issues. As a result of that discussion, it is my understanding that the County has agreed to work with you to ensure that the drainage and restoration issues are properly resolved. THE LONE OAK TREE ...THE SYMBOL OF STRENGTH AND GROWTH IN OUR COMMUNITY Equal Opportunity/Affirmative Action Employer MR RUSSELL STAUFFER SEPTEMBER 27, 1990 PAGE TWO We regret the frustration that you have incurred as a result of this project and hope that this information and proposed assistance in resolving these outstanding issues will meet your satisfaction. Sincerely, /r< "J ??S? E homas A. Colbert, P.E.? Director of Public Works TAC/jj cc: Mayor & City Council Thomas L. Hedges, City Administrator Bob Egan, County Maintenance Engineer . RECEIVED SEP 10 1990 City of Eagan P.O. Box 21-199 Eagan, ION- 55121 DATE: August 20, 1990 RE: Special Assessment Project #10P466 10-84354-090_05 Dear Sir / Ma'm; It's been well past 30 days and the payment date, and I have yet to hear one word regarding my objection of the special assessment.. After 2 phone calls to the lady in special assessments, the last one being August 8th, she promised me that someone from the public works dept. would return my call that day. After sitting home all dqy waiting and ;waiting, no calll I shouldn't have to call hastling you people to get an answer. To refresh your memory; 1) The meeting was July 10. 1990. 2) Sometime between November of !986 and June 1990 the feasibility study for the above mentioned project changed. causing the assessment to double.After specs changed, a new feasibility study should have been done.,and those involved should have been notified. 3) County has not fulfilled their obligation regarding completion of my yard. 4) Dilater flow problem, which must be corrected. 5) Weeds on the road right of way. County should be responsible to cut the hill on the right of way, since the slope is a death wish to cut. If someone gets hurt cutting that slope it will cost the city and county millions. 6) The city engineer was to come out and inspect my property before the council could make a decision. He never did. This is my first encounter with city officials, and I am very disappoint in the professionalism and lack of co Aunication or follow through. Therefore, it is my opinion; 1) The people involved in the feasibility study back in 1986, were in over their heads and should have requested outside counseltation. Mr. Colbert kept on stating this was the first major project for Eagan. 2) Someone is trying to hide. Because I have not gotten a responsb. 3) Since nothing has been done, I'm assuming my objection was approved and there is no special assessment due.,. -- Respectfully Yours, CC: Mayor T. Egan Mr. T. Colbert Mr. T. Hedges Mr. D. Gustafson Mr. T. Pawlenty Mrs. P. McCrea Mr. T. Wachter Russell A. Stauffer 1323 Faster In. Eagan, MN. 55123 + 452-1274 July 09, 1990 City of Eagan City Clerk Ref: Notice of Special Assessment, Project No. 1OP466 We are opposed to the special assessment for the property located at Lot 9, Block 5, Wilderness Run 5th Addition, for the following reasons; 1) In 1986, the feasibility study on the reference project was estimated to be approximately $700.00. According to the present notice, the assessment had been changed due to a change in plans and specifications for this project to $1425.00. The assessed taxpayers were not notified of the change in specifications or a new feasibility study, with in the past 4 years. 2) Resodding the right of way was to be done, due to the sod sliding down the hill when it was watered by the landscape contractor, per the project engineer. 3) Water flow problem was not corrected by the County. We requested the County correct said problem dating back to May 4, 1989. To the present time this has not been corrected. 4) Weeds on the road right of way have never been cut, and are presently at approximately 4 to 5 feet tall. The slope of said hill is at such a degree, making it next to impossible to mow by hand. These particular problems and others have been discussed on May 4, 1989, a letter dated August 15, 1989, and another call on August 23, 1989 to Roger the project engineer. Also, a meeting with Don Chapdelaine at my property, who also showed concern over the problems stated. Respectfully, Russell A. Stauffer Lynn M. Stauffer Tollefson Builders Inc. lc? ivy \rO1 I1? 0 3 0 F. C. JACKSON LAND SURVEYOR .frn - aj r, II b ? ' c ? a tParbepor'o dectiWtt •--Iran I __ II II Or.10750 ' 183-10 i 3 I 0 C C 1 HERESY CERTIFY TNAT THE ABOVE Ia A TRUE AND CORRECT PLAT OF A SURVEY OF REGISTERED UNDER LAWS OF STATE OF MINNESOTA LICENSED BY ORDINANCE OF CITY or MINNEAPOLIS Sale EAST seTN STREET 55417 727-3484 Lot 9.,Block 5,Nildernes Run Fifth Addition, Dakota County,Hinneaota. As SURVEYED BY ME THIS 13th' DAY OF qct. ?.U 1977 bl 1 Ilk ?\I. I I r. I Z JJ '\ \ r.. A ?l F. C. JACKSON. MINNEWA REGIaTRATION. No. 5600 f CO. ROAD N89°54'03 "E r- /0000-- a, 1z . 1 ?N {(inure i Z NO. `--- /400.00 - - N89°54'03 "E EASTER LANE O Denotes Iron Monument 30 I hereby certify that this is a true and correct representation of a survey of the boundaries of: Lot 9, Block 5, WILDERNESS RUN FIFTH ADDITION, Dakota County, Minnesota As surveyed by me this 29th day of Jul 19 \ ? n Thomas S. Bergquist Land Surveyor. Minn. Reg. No. 7725 McCOMBS-KNUTSON ASSOCIATES, INC. ,b]- CNNGUE TING ENGINEERS ¦ LANG SURVEYORS ¦ SITE PLANNERS MINNEAPOLIS. HUTCHINSON and MARSHALL. MINNENOTA WEaa, CERTIFICATE OF SURVE X PAGE for la 21 b,8 RobeErf Dr'oge/' Use BLUE or BLACK Ink r For Office Use ti 'r City Ol Ea r) Permit#: l 1 1D's~ I Permit Fee: 3830 Pilot Knob Road I I Eagan MN 55122 Date Received: I I Phone: (651) 675-5675 Fax: (651) 675-5694 I Staff: I I I 2013 RESIDENTIAL BUILDING PERMIT APPLICATION Date: 1-6- t3 Site Address: 13 213 L7-)C 3 L-N] Unit Name: Phone: 6 sl -zz;7- S7y? Resident/ L J B3 L-tJ Owner Address/ City !zip: Applicant is: Owner Contractor Type of Work Description of work: Construction Cost:4-- ~UD Multi-Family Building: (Yes ! No I Company ' CeSIA33 ~ t Contact: Address: SI~(S t City:~,1' K~"I.PC e~ Contractor I State: Zip: Phone: V72- License c ~ 61~'6p Lead Certificate A If the project is exempt from lead certification, please explain why: (see Page 3 for additional information) I COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING f In the last 12 months, has the City of Eagan issued a permit for a similar plan based on a master plan? _Yes No If yes, date and address of master plan: Licensed Plumber: Phone: Mechanical contractor: Phone: t I Sewer & Water Contractor: Phone: NOTE: Plans and supporting documents that you submit are considered to be public information. Portions of the information maybe classified as non-public if you provide specific reasons that would permit the City to conclude that the are trade secrets. CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.gopherstateonecall.org I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. Exterior work authorized by a building permit issued in accordance with the Minnesota State Buildi g Co m st be completed within 180 days of permit issuance. x x Ap licant's Printed Name Applicant's Signature Page 1 of 3 PERMIT City of Eagan Permit Type:Mechanical Permit Number:EA169737 Date Issued:06/08/2021 Permit Category:ePermit Site Address: 1323 Easter Lane Lot:009 Block: 005 Addition: Wilderness Run 5th PID:10-84354-05-090 Use: Description: Sub Type:Residential Work Type:Replace Description:Furnace Comments:Carbon monoxide detectors are required within 10 feet of all sleeping room openings in residential homes (Minnesota State Building Code). Questions regarding electrical permit requirements should be directed to State Electrical Inspector, Pete DeGrood at (507) Fee Summary:ME - Permit Fee (Replacements)$59.00 0801.4088 Surcharge-Fixed $1.00 9001.2195 $60.00 Total: I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Contractor:Owner:- Applicant - Hennepin Rp Funding Llc 1323 Easter Ln Eagan MN 55123 4front Energy Solutions 3230 Gorham Avenue, Suite 1 St. Louis Park MN 55426 (952) 933-1868 Applicant/Permitee: Signature Issued By: Signature