Loading...
1356 Easter LaneCITY OF EAGAN Remarks Addition Wilderness Run 5th A ddition Lot 20 Blk 3 Parcel 10 84354 200 03 Owner4L,,,, 6 SU/L?iC? Street 13 SE aster T•n- State Eagan, MN 55123 Improvement Date Amount Annual Years Payment Receipt Date STREET SURF. STREET RESTOR. GRADING SAN SEW TRUNK 1973 $132.60 $6.63 20 PAID SEWER LATERAL WATERMAIN WATER LATERAL WATER AREA 9/75 STORM SEW TRK sfy^v STORM SEW LAT CURB & GUTTER SIDEWALK STREET LIGHT WATER CONN. $320.00 1148 9-18-75 BUILDING PER. #3682 1148 9-18-75 SAC 1148 9-18-75 PARK VILLAGE OF EAGAN 3795 Pilot Knob Road Eagan, MN 55122 Zoning: PTT WATER SERVICE PERMIT PERMIT NO.: 1832 DATE: No. of Units: Owner: 99 rr?? Address: -?) ) -\? Lam /x/JP0.4 IJRO /C?a /7 Site Address:1356 Easter Lane Plumber: ThomPson Plumbing Co. _ osy?? s- Reader No.: l .1,.7 / 0 1 a o amply with the Village of Eagan Ryr%. Date of Insp.: Connection Charge320.00 Pd Account Deposit: Permit Fee: 10.00 billed Surcharge: .50 billed Misc. Charges: Total: Date Paid: Insp.: - VILLAGE OF EAGAN SEWER SERVIGt YLKMI I 379S.Rilot•Ygeb Road PERMIT NO.: Eagan, MN SS122 DATE: a/lR/7s Zoning: RTT No. of Units: 1 Owner: MarPll .., nst Address: Site AddreW56 Faster Lane Plumber: Thompson Plumbing Co 425. 00 Pd I agree to comply with the Village of Eagan Connection Chazge: Ordinances. Account Deposit: 10.00 1 e Permit Fee: 1 e Surcharge: Hy: Misc. Charges: Date of Insp.: Total: Insp.: Date Paid: CITY of EAGAN BUILDING PERMIT Owner Address (present) ...l..oov.... ................. il Builder ....... ....................................................... ...... ... Address DESCRIPTION A i• N2 3682 3795 Pilot Knob Road Eagan, Minnesota 55122 454-8100 Date ...G...-=`.•?•.•.-.,1.-. Stories To Be Used Fo ,°26 < 3? cdL aaec?o ? ? ? Front ??? Depth .26 Height Eel. Cos! Permit Fee ?dSor?' 9? o Remarks This permit does not authorize the use of streets, roads, alleys or sidewalks nor does it give the owner or his agent the right to create any situation which is a nuisance or which presents a hazard to the health, safety, convenience and general welfare to anyone In the community. E THE WORK IS IN PROGR?Esg/g. THIS PERMIT MUST BE PT HE 05n This is to certify, !bet... as pesmissto21 !o erect a.......6 G•• ..... ....... ............................. _upon the above descri premise subject to e p pplicable ces for the city o .............:1,<.Y.':::.......................................... Per ...... ..... . Mayor Building Inspector ac- 3 -5 Gtr/?? CITY OF EAC:?N 3795 Pilot Knob Road Eagan, Minnesota 55122 PER'NaT NO.: 719 The City of Eagan hereby grants to p,y m it-o. sroa+-ing & 7.4C Of 4x17 rhi g Ave- Sn Marell Construction a Permit for: (Owner) wind-a r ron= rnrrinn Easter Lane at22gti niarx sr_ , pursuant to application dated q/i5/7a . Fee Paid: 40.00 dated this j3 day of Smt- , 197s . 1.00 s/co Building Inspector Mechanical Permits: Bid Total: i? ? ?35s? ?2w ? 3 CITY OF Ell i1N 3795 Pilot Knob Road Eagan, Minnesota 55122 PERMIT NO.: 605 The City of Eagan hereby grants to Thorinson P1 mt_L 'nc- Of Minnetonka a nr.r,Marur_ _ Permit for: (owner) Marell Const 1377 E. Sigfzid, aL35G ?'ster .T.?, 1335-37 Easter, 1339-41 Faster, 1343-45 Easter, at 1747-49 Faster x. 1751-57 Eag*X4x keto application dated 9/18 Filled Fee j,k. _ V4o_n0 dated this j?L_day of Sept. 19 75 u,nn sic Pilled on Statements -n. 154 and 158 Building Inspector Mechanical Permits: Bid Total: CITY CF E SG.6,q / D ts?3T? ) d ? 73.-n._ Pilot Knob Foad Ea.-an, Minnesota 55122 J PEMET No.: 27 The City of Eagan hereby grants to Coi=ers Soft Water Co. of Minneapolis a Water Cnft-nnpr_ Permit for: (Owner)_ Robert S. Peterson at _- 13;6 Easter Tana _ , pursuant to application dated 4/7/76 Pae Paid: $a_nn dE.ted this -9 day of April 19.76` .50 s/o DuiiJing Insp°O ia,, Mechnrical Permits: Sid Total: MASTER CARD LOCATION L 0.f" / (j.? h 012 jo 2S STRUCTURE AND) r r LAND USED AS VV Y T!/ C?.Q'?I -/?JQ Permit No. Issued Issued To Contractor Owner BUILDING 6.1p2l 3 p 7s- r PLUMBING CESSPOOL - SEPTIC TANK / WELL ELECTRICAL HEATING ??- GAS INSTALLING SANITARY SEWER OTHER OTHER Items Approved (Initial) Date Remarks Distance From Well FOOTING • If- 7 SEPTIC FOUNDATION - CESSPOOL FRAMING TILE FIELD FT. FINAL ELECTRICAL HEATING 7 / - 17 - -7 DEPTH OF WELL GAS INSTALLATION SEPTIC TANK CESSPOOL DRAINFIELD PLUMBING WELL SANITARY SEWER Violations Noted on Back COMMENTS: COMPLIANCE INSPECTION REPORTS TO BE USED ONLY IN EVENT OF OBSERVED VIOLATIONS NO. DATE OF INSPECTION CONDITIONS OF CONSTRUCTION AT THIS INSPECTION NO EVIDENCE OF NON-COMPLIANCE OBSERVED. 1:1 ACCEPTABLE SUBSTITUTIONS OR DEVIATIONS. ? NON-COMPLIANCE. BUILDER WILL COMPLY WITHOUT DELAY. ? NON-COMPLIANCE. BUILDER DOES NOT INTEND TO COMPLY. COMPLETION OF CERTAIN IMPROVEMENTS WILL BE DELAYED BY CONDITIONS BEYOND CONTROL. ITEMIZED AND DESCRIBED AS FOLLOWS: REINSPECTION REQUIRED DATE OF REINSPECTION REINSPECTION REVEALED CERTI FI CATION -I certify that I have carefully inspected the above in which I have no interest present or prospective, and that I have reported herein all significant conditions observed to be at variance with ordinances of the Town of Eagan, approved plans and specifications, and any specific require- ments for off-site improvements relating to the property inspected. ? ALL IMPROVEMENTS ACCEPTABLY COMPLETED EWL-OING INSPECTOR DATE COMMENTS:      ÷ï÷    î û  ÿ þýý  üúÿüú     ùýý  ðýø ô  øýï ôô   þý÷  þýüûúù  ñý   Ý õ  ûúù â í   ùñý   Ý õ Üý        ù ë òý ë   ïýü   ä  ÿþ      ù  ÿàß  ý  ä æèè öù  þý ï ñê æèè ç ý ìÿÞè  õððó ÷ òñ ùù  á Ûøú  å ú  ãâü  ö ïí úôôì    ý  î äâôôÞ äâÞô àßÞìÞ ï üú í  ï ï î  ï  ùù     ï ï ÷ ë     ëùúíï  ùù ü þ   ÷ä  þ ý  õú÷ ð   è ùù é  ý úþ  ý City of Raps. 3830 Pilot Knob Road Eagan MN 55122 Phone: (651) 675-5675 Fax: (651) 675-5694 Use BLUE or BLACK Ink For Office Use 11 1j lis a�� Permit #: Permit Fee: Date Received: Staff: Z 7 2013 RESIDENTIAL BUILDING PERMIT APPLICATION Date: .J /In /13 Site Address: /35G Ga.5Tr/ Unit #: CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.gopherstateonecall.orq I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. Exterior work authorized by a building permit issued in accordance with the Minnesota State Building Code must be completed within 180 days of permit issuance. x,Gf " �2Gfi Applicant's Printed Name ApplicSignature Page 1 of 3 Name: d" kr 5f� r'Sah Phone: 6 5`"l— 4%-'24-2 Z Re '►de wne ;�.,,fr, / Address / City / Zip: ,i31 --6R5 G G. -f c! 14, Applicant is: Owner Contractor Y ork Description of work: ee-'(37,f Construction Cost: its 0 Multi Family Building: (Yes / No ) v ' o t Coracor Company:l �ut'd'�✓S ...).. -2 G Contact: %eor_ 7/4 �-e-G r . Gj 1�i it �✓1 -car - Address: Z2 62( Le tr'r -A off ,vc /1/ */Da City: j2,c�5? t (l C State:`�I %� /U Zip: M 3 Phone: a' Ci ' 4-03 " 91.f License #: g e:' 2.$ 1 ' Lead Certificate #: If the project is exempt from lead certification, please explain why: (see Page 3 for additional information) In the last 12 months, No If COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING has the City of Eagan issued a permit for a similar plan based on a master plan? yes, date and address of master plan: _Yes Licensed Plumber: Mechanical Contractor: Sewer & Water Contractor: Phone: Phone: Phone: NOTE Pl417,1* supporting doc :fl enyou submit,are considered o° • . 1 � fo a#a' ®n ort the i for ati n . y be cla l e as on ubl c au-' ®rov ` '01 0: so : i • the. Y conclude t at h y arestradese re CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.gopherstateonecall.orq I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. Exterior work authorized by a building permit issued in accordance with the Minnesota State Building Code must be completed within 180 days of permit issuance. x,Gf " �2Gfi Applicant's Printed Name ApplicSignature Page 1 of 3