Loading...
850 Lone Oak Rd use BLUE or BLACK Ink t 1 For Offlco use I 1 Permit I City of Ea dR Permit Fee: I 3830 Pilot Knob Road I Eagan MN 55122 I Date Received: 1 Phone, (651) 675-5675 Fax: (651) 675-5694 AUG , I01Z s`~`~. 4 2012 COMMERCIAL BUILDING PERMIT APPLICATION \ S pate Site Address: Tenant Name (Tenant Is: New Existing) Suite Former Tenant: • ame: Phone: - 9KP_ N ?'R pE~t aVM . Address / City / Zip: - s Applicant is: Owner Contractor Description of work: ~ if r rn i ~0 1YPE''O'11Vt3RK' Construction Cost: License _ C Name: Address ~ T City: _ " cd~lYaa~r'aa 0 0 State: Zip: Phone: t D C~ I lL! Contact Email: ampask, CO Name: Registration At'HI'EIC'/ ; Address: City: ENOINEER':::..' State: Zip: Phone: Contact Person: Email: Licensed plumber installing new sewer/water service: Phone AfOTE:Rgris',arizfsuppdrpng itr»i~n( :'thb>c'y~usub►nff'ar¢°iironsoY F pl:td:°iib~tubliciitift~ i_ai n: Partidfl :af' ti~e.in er ~tfon°m'a b °cl~s iFi d CIS narnpu lic if WPM 1 01406010ic~rnaisnrfs, ~hatt vvbu#d perfrf►t the pity--try.. r CO hd di that>tne -94d s~cilt' . CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 4540002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities, www.gouherstateonecall.oEg. I hereby acknowledge that this information Is complete and accurate: that the work will be in conformance with the ordinances and codes of the City of Eagan: that i understand this Is not a permit, but only an application for a permit, and work Is not to start without a per , at the work will be 1 accordance with the approved plan in the case of rk which requires a review and approval of plans. x Applicant's Printed ame Applicant's Sign to Page 1 of 3 DO NOT WRITE BELOW THIS LINE SUB TYPES foundation Public Facility Exterior Alteration-Apartments _ Commercial I Industrial _ Accessory Building Exterior Alteration-Commercial Apartments Greenhouse I Tent _ Exterior Alteration-Public Facility Miscellaneous Antennae WORK TYPBS Now Interior Improvement Siding _ Demolish Building _ Addition Exterior Improvement ✓Reroof Demolish Interior Alteration Repair Windows Demolish Foundation _ Replace _ Water Damage Fire Repair _ Retaining Wall Salon Owner Change "Demolition of entire building give PCA handout to applicant DESCRIPTION c4~ Valuation ,L occupancy MCES System Plan Review Code Edition ;;7Ge ? 1Y'5,e6. SAC Units (25%_ 100%_) _ Zoning City Water Census Code Stories Booster Pump # of Units Square Feet PRV # of Buildings < ' - Length Fire Sprinklers Type of Construction Width REQUIRED INSPECTIONS Footings (Now Building) Sheetrock Footings (Deck) Final I C.O, Required Footings (Addition) Final I No C.O. Required Foundation Other: --,,Drain Tile Pool: Footings Air/Gas Tests ,Final i Roof: -Decking ,,,,,,Insulation -Ice & Water Final Siding: Stucco Lath -Stone Lath -Brick Framing Windows Fireplace: ,Rough In -Air Test -Final Retaining Wall Insulation Erosion Control Meter Size: Final C/O Inspection: Schedule Fire Marshal to be present: Yes No Reviewed By: k , Building Inspector Reviewed By: , Planning COMMERCIAL FEES Base Fee 75Water Quality Surcharge w5 , 5~G> Water supply & Storage (WAC) Plan Review Storm Sewer Trunk MCES SAC Sewer Trunk City SAC Water Trunk S&W Permit S Surcharge Street Lateral Treatment Plant Street Treatment Plant (Irrigation) Water Lateral Park Dedication Other: Trail Dedication Water Quality TOTI, Page 2 of 3 i I BLDG. PERMIT NO. _ 01-3210 Bidg. Permit _ 01-3422 Plan Check 01-3445 Surch./Adm. 01-3446 SAC/Adm. 01-2155 Surcharge 75-3860 Road Unit 20-2E75 SAC 20-3865 Water Conn. 20-3868 Water Trmt. 20-3716 Water Meter 20-2252 Acct. Dep. 20-3713 Water Permit 20-3743 Sewer Permit 79-3866 Sewer Conn. 28-3855 Park Ded. ' ? / Ci :? I ) . „ _ 1 ?OO 00 6, Y/3 00 TOTAL ,? Y CASFI RECEIPT CITY OF EAGAN 3830 PILOT KNOB ROAD EAGAN, MINNESOTA 55122 DATE ? 1g ? r qELENED f? AMOUNT a ? ? O O N4 & ??4 VVhke--Peyam Cop, Yeibw-POSNng Copy Pink-Flb Copy 8 DOLLARS ,m Thank You , BY SEWER & WATER PERMIT CITY OF EAGAN 3830 Pilot Knob Rd. P.O. Box 21199 Eagan, MN 55121 OFFICE USE ONLY PERMIT DATE WATER PERMIT # SEWER PERMIT # METER # B.P. RECEIPT # ?9334 READER # B.P. RECEIPT DATE METER SIZE `'t : ?• 1 ' ; ISSUE DATE - PRV - BOOSTER PUMP SITEADDRESS LOT LOCK v " __L-SEC/SUB ? ? ?'?`'?• APPLICANT: ADDRESS: CITY, STATE ZIP - PHONE; a PLUMBER: - ADDRESS: CITY, STATE ZIP PHONE: OWNER: ADDRESS: CITY, STATE ZIP PHONE: PERMR REQUESTED L SEWER - WATER - TAPS X COMM/IND _ NEW _ RESIDENTIAL _ EXISTING 1 AGREE TO COMPLY WITH CITY OF EAGAN ORDINANCES: ?- ' SIGNATURE WHEN METER ISSUED PLEASE ALLOW TWO WORKING DAYS FOR PROCESSING. FOR STORM SEWER PERMITS, CONTACT ENGINEERING DEPT. SEWER & WATER PQRMIT C9'1'Y OF EAGAN 3830 Pilot Knob Rd. P.O. Box 21199 - Eagan, MN 55121 SITEPUDRESS K?, ar PERMIT REQUESTED `? LOT'`' LOCK ?SEC/SUB _ EfJAI!-?L'?CII?p w? APPLICANT: ! •,v X SEWER ti'C ` < , _ <:, ADDRESS: =5?? Af L ? COMM/IND CITY, STATE S Zlp PHOIVE;, 3- 0 7 i 3 ?$C NEW PLUMBER: ADDRESS: r? s a ra, ?.= CITY, STATE ZIP PHONE: OWNER: ADDRESS: CITY, STATE ZIP PHONE: OFFICE USE ONLY PERMIT DATE 6/ 5/ 89 WATER PERMIT # 10480 SEWER PERMIT # , METER # y07 700 _5-7 B.P. RECEIPT # 89334 6-2 B.P. RECEIPT DATE 11 22 # 12/ ?/Z? METERSIZE ? ROM S&i' Recoip.. ,',:: ;; 147t, ISSUE DATE f 7?T - PRV _ BOOSTER PUMP _Z_< WATER _ TAPS - RESIDENTIAL - EXISTING I AGREE TO COMPLY WITH CITY OF EAGAN ORDINANCES: n SIGNATURE WHEN METER ISSUED PLEASE ALLOW TWO WORKING DAYS FOR PROCESSING. FOR STORM SEWER PERIIAITS, CONTACT ENGINEERING DEPT. • - ..? ? ?? ?..,b (l{2 3 ?? 7 SITE ADDRES- 4Q, 1-0h Fcak IJr', Unit # Permit L B Sect./Sub. INSPECTION DATE INSPECTOR OTNER FflAMIN6 , BOIIfiH Pt86. ROU6H HT6. 44z? INSUL flBEPLACE FINAL HTB. FINAL PLBG. UNIT FINAL CERT/OCC INSPECTION DATE INSPECTOR COMMENTS a-/ - e9 -? ` „ - ,11 - !j - ?° i Gc? D< < ??7-? G1? a? s- S oGO ?-/GOOU GS 2_ /O? O d .r 1 Z y ? y..?ota? ? Iz,? Aft ? S, . ? X ? ;. , CITYOF EAGAN 3830 Pilot Knob Road, P.O. Box 21-199, Eagan, MN 551 21 ?j ? PHONE:454-8100 SUILDING PERMIT Receipt# 9[, To be used for Est. Value ? Date ,19 Site Address OFFICE USE ONLY ?L :,%l Lot Block Sec/Sub On 5ite Sewage _ Occupancy . ip, MWCC System _ Zoning Parcel No. ? On Site Well (Actueq Const a Name Ciry Water ! (Allowable) W ; Address - PRV Required # of Stories ? City Phone ?osterPump Length ? ?'- Depth ¢ .o Name 'U,A1G I.A1R*5?01) S.F.Total i ' o i Address Footprint S.F. UP City Phone Z,-v5 12 pppROVALS FEES ? a VW Name Engr./Assess. Permit ?= _ Address Planner Surcharge ., u= < W City Phone Council Plan Review Bldg. Off. SAG City I hereby acknowledge that I have read this application and state that the Variance SAC, MWCC information is correct and agree to comply with all applicable State of Water Conn. Minnesota Statutes and City of Eagan Ordinances. Water Meter Signature of Permittee Road Unit A Building Permit is issued to: Treatment P1 on the express condition that all work shall be done in accordance with all Parks applicable State of Minnesota Statuies and City of Eagan Ordinances. Building Official TOTAL C=.(i'c? '??,...-,,, f#f?i/?c?? - .?yrrnJ.?r+??f??.,,?,r,•?? IWY W " Permit No. Permit Holder Dats Telsphons # Plumbing r L 2 H.V.aC. !J?s1?- ?Ga's5 , ? ?. ?, 3rl?i/pg cr '.???z ` Electric ^ ??(F ? ? ;?t ,?.•1 ? ?? a c?? aZ' -Sefte"r- iT-)9 V/9&,Z, Inspection Date InaP• ?.? I '"? v$9 CO nt? Footings I Footings II Foundation Framing Roofing Rough Plbg. 1204 , Rough Htg. 4/iq?a Isul. Fireplace Final Htg. Final Pibg. f? . l/ 81dg. Final cert. occ. Temp. LP Deck Ftg. Deek Final Well 75b"? ck `=ct" ?? L - Pr. DisP• e-,_1 d?lJ Rsr.feUi,t O'?- /cf/4?O jfp. ??51t?'9 PERMIT # MECHAWICAL PERMIT . RECEIPT # CITY OF EAgAN ` , 3830 PILOT KNOB ROAD, EAGAN, MN 55122 DATE: CONTRACT PRICE: PHONE: 454-8100 For Office Use Only: Site Address ?4DG. TYPE WORK DESCRIPTION Lot Block Sec/Sub ? ` - Res. New Mult. Add-on y Name Comm. Repair ? Address c City Phone aher FEES ? Name RES. HVAC 0-100 M BTU - $24.00 ; Address ADDITIONAL 50 M BTU - 6.00 p City Phone (RES. HVAC INCLUDES A/C ON NEW CONSTRUCTION) GAS OUTLETS (MINIMUM - 1 PER PERMin - 1.50 EA. TYPE OF WORK COMM/IND FEE - 1% OF CONTRACT FEE ForCed Air M BTU APT. BLDGS. - COMM. RATE APPLIES TOWNHOUSE & CONDOS - RES. RATE APPLIES Boiler M BTU MINIMUM RESIDENTIAL FEE - ALL ADD-ON & Unit Heater M BTU HEMODELS - 12.00 Air Cond. M BTU MINIMUM COMMERCIAL FEE - 20.00 STATE SURCHARGE PER PERMIT - .50 Vent. CFM $ (ADD $.50 S/C IF PERMIT PRICE GOES Gas Piping OuHet3 k BEYOND $1,000) omer R FEE: -- ? ? " S/C: SIGNATURE OF PERMITTEE • ' . TOTAL• FOR: CITY OF EAGAN : •".-h1 F?? LI??E I??YU?/iJ(? ?N? PLUMBINGPERMIT CITY OF EAGAN 380 PILOT KNOB ROAD, EAGAN, MN 55121 CONTRACTPRICE??NOO, Z)o PHONE:454-8700 Site Lot. ? Name 'ia Addre c City _ Name c Address ??on L ^1 O Cit1/ FEES COMM/IND FEE - 1% OF CONTRACT FEE MINIMUM - RESIDENTIAL FEE - $10.00 MINIMUM - COMM/IND FEE - 20.00 STATE SURCHARGE PER PERMIT - .50 (ADD $.50 S/C IF PERMIT PRICE GOES BEYOND $1,000.00) OF FOR CITY OF EAGAN PERMIT # RECEIPT # DATE: I BLDG. TYPE WORK DESCRIPTION Res. New ? _- Mult Add-on Comm. ? Repair Other NQ FIXTURES ? TOTAL Water Closet - $3.00J? ? ^ Bath Tubs - $3.OQ? ? ?`- T-Lavatory - $3.00 I ? ` 00 =Shower - $3.00 !' Z Kitchen Sink - $3.00 •J/ - Urinal/Bidet - $3.00 Laundry Tray - $ ? ?-Floor Drains - $ 4 _-L-Water Heater - $1. 0 ' - Whirlpool - $3.00 _*3 Gas Piping Outlets - $1.50 _Softener - $5.00 -Well - $10.00 =Private Disp. - $10.00 ` Rough Openings - $1.50 4?_, ;_l. .. ti. i -;t ,w' ? FEE STATE S/C ?ll? GRAND TOTAL• ? = " . .. , . , I CONTRACT PRICE: " f ,S7 Site Address Lot Block y Name m Address c City ? Name _ c Address 0 Cih' - PERMIT # MECHANICAL PERMIT RECEIPT It CITY OF EAGAN - 3830 PILOT KNOB ROAD, EAGAN, MN 55122 DATE: PHONE: 454-8100 For Office Use Only: BLDG. TYPE WORK DESCRIPTION ?ec/Sub )yA?s. New Mult Add-on Comm. Repair Other ine -;. .... .?..??%' .. Phone TYPE OF WORK Forced Air ? M BTU Boiler M BTU Unit Heater M BTU ' Air Cond. M BTU , Vent CFM I, Gas Piping OuUets # Other FEE: S/C: ?.' TOTAL• FEES RES. HVAC 0-100 M BTU -$24.00 ADDITIONAL 50 M BTU - 6.00 (RES. HVAC INCLUDES A/C ON NEW CONSTRUCTION) GAS OUTLETS (MINIMUM - 1 PER PERMIT) - 1.50 EA. COMM/IND FEE - 136 OF CONTRACT FEE APT. BLDGS. - COMM. RATE APPLIES TOWNHOUSE 8 CONDOS - RES. RATE APPLIES MINIMUM RESIDENTIAL FEE - ALL ADD-ON & REMODELS - 12.00 MINIMUM COMMERCIAL FEE - 20.00 STATE SURCHARGE PER PERMIT - .50 (ADD $.50 S/C IF PERMIT PRICE GOES BEYOND $1,000) ? . OF "'9 I FOR: CITY OF EAGAN DART TRANSIT CO CITY OF EAGAN 3830 Pilot Knob Road, P.O. Box 21-199, Eagan, MN 55121 N? 15886 ILDING PERMIT PHONE:454-8100 ?I1 Receipt # 0 ! To be used for SERVICE BLDG/ WAREHOUSE Est. Value $750.000 Date NOV 22 ,1988 Site Address 850 LONE OAK RD Lot 1-10 glock 1 Sec/Sub.FAf;ANnATF. (?M INp pK 2-05 1 EA{'1MALE CNIIt IrID pK Parcel No. olName DART TRANSIT CO I Address 2102 UNIVERSITY AVE City ST PAUL Phone 645-0323 (DON, DAN, ¢ Name (1PiIS CORP(IRATTON (CRA7C' T.ARSON) 0 oa Address 99(1(1 RRFN Rn F. ? City MTKA Phone 936-4-5J1- WW Name SAME ? Address U ¢ZW City Phone a I hereby acknowledge tha have read this a lication and state that the information is correct an ree So c ply th all applicable State of Minnesota Statutes and it of Eaga 0 diR nc s. Signature of Permittee _ __---_- A Building Permit is issued to:- _SQRP_ORATIDN on ihe express condition Ihat all workshall be done in acwrdance with all applicable State of innesota Statu[es and CAity of Eagan Ordinances. Building Official??,Q}tiA1.?_ -- -- OFFICE USE ONLY On Site Sewage OCCUpancy a-1 B-2 H-4 MWCC System 7C Zoning I-1 On Site Well _ (ACtual) Const V-N City Water X_ (Allowable) V-N PRV Required # of Stories 1+ MEZZ Booster Pump _ Length 335 Depth $6 S.F. Total 27T39z- Footprint S.F. 24,340 APPROVALS FEES Engr./Assess. Permit 2,600 Planner Surcharge 375 Council Plan Review 1,300 Bldg. Off. SAC, City _ 12$00 Variance SAC, MWCC 9?? 900 Water Conn. Water Meter Road Unit L -6y_630 Treatment P1 ` 3,672 Parks 6,813 'TOTAL 33,090 8co 1_?(W 2007COMMERCIAL BUILDING rERn-riT nrrLic.aTioN City Of Eagan 3830 Pilot Kno6 Road, Eagan Mn 55122 Telephone # 651-675-5675 l Plans are considered public information unless you state they are trade secret and why. 4> L4 56g ,(, y • Stnictural Plans (2) sets • Civil Plans (2) • CertifcateofSurvey (1) • CodeAnalysis (1) •* • Project Specs (1) • Spec Insp d Testing Schedule (1) " • Soils Report (1) • Meter size must be established • Soils Report (1) • Certificate of Survey (1) • Structural Plans (2) • Architectural Plans (2) sels HVAC units req'd. on bldg elev. / site plan • Civil Plans (2) • Landscaping Plans (2) • CodeAnalysis (1) •* • Energy Calculations •' (1) • Emergency Response Site Plan (1) • Spec. Insp. 8 Testing Schedule (1) " • Electric Power & LighUng Form (1) " • Project5pecs (1) • Master Exit Plan (1) • SAC delermination - call 651-602-1 000 • Fire Stopping Submittals • Fire Suppression/Aiarm Fortn • Meter size must be estahlisheA • Architeclural Plans (2) sets • Code Analysis (1) " • ProjeclSpecs (1) • KeyPlan (1) • Master Exit Plan (1) • Energy Calculalions (1) not ahvays" • Elec. Power & Lighting Fortn (1) not always" • Meter size must be established-if applicable • SAC determination - call 651-602-1000 Call MN Dept of Health at 651-20 details regarding food & beverage or J J J J J • SAC detertnination - call 651-602-1000 --°..w?• --u•-..s w sec ic n is reqmrca ana tor a sample. **' Permit for new building or additian will not be processed without Emergency Response Site Plan. uate s i Is--/ c? -? c 5r?ccian co5c '1 3 9 0, oao Site Address (.. ?QK, j?,a,d gsl? Unit/Ste # Tenant Name Dar-}- I_ ?"s ?-?- Former Tenant lYame ln,+ ?j?u„ 5it Description of Work Prn S-{apS Property Owner Dr&, }- T4 ? t- Telephone #1((?,51 2 OVv Applicant is: _ Owner X Contractor Contact #: ( &Sl ?_ 36s - 7«.?q T«<.xv Tka&?5 CODtYBCtOC gis wR Address l/to M ?. c PV kfs Rc? d City ke-i'Joi4 State Nl Iv Zip SSI? p Telephone #((.S-() ? g( -0 2 ac, Arch/Engr "ml2e,,4 A(-Lk?+cc1"s Registration# Address \ 3 9 37 A) tt? City hqM 1-als'p State 1?W Zip SS3o Telephone #( 74 .3) 7 SS -/2// Licensed plumber installing new sewer/water service: Phone #: -••--, ?rrv - ??m==u=•w?,ai U,,,iuu,g rerma ana acxnowieage that the mYormation is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan and the State of MN Statutes; I understand this is not a pemut, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval ofplans. ?? Applicant's rinted Name Applic s Si tur 1 ? ? F p 1 4? 2007 City of Eagan TO: Scott Peterson, Building Inspections /Mike Ridley, Planning Dale Wegleitner, Fire Marshal Tom Colbert, Engineering John Gorder, Engineering Dave Westermayer, Engineering Leon Weiland, Engineering Tom Struve, Maintenance Eric Macbeth, Maintenance Gregg Hove, Maintenance Jim McDonald, Police Department Mark Anderson, Electrical Inspector FROM: Craig Novaczyk, Inspector DATE: 9/12/2007 RE: Plan Review For: 850 LONE OAK RD. DART SAFETY LANE ADDITION The plans are in our plan review section for your review and comment. #2 Please return this form to my attention with your signed comments within 7 days. Please indicate any concerns you have with these plans and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please submit the proper "hold request" form to me. Comments: Indicate below. any fees that are to be collected with the building permit. Amount ❑ Yes No landscape security required Zoning? J-- t ❑ Yes ❑ No water quality dedication ❑ Yes ❑ No park dedication ❑ Yes ❑ No trail dedication ❑ Yes ❑ No tree dedicatioq ❑ Yes ❑ No PRV Required Signature Meter Size Date CD/Bldg Insp/Forms//Plan Review For REVISED 2-07 City of Eagan TO: Scott Peterson, Building Inspections Mike Ridley, Planning Dale Wegleitner, Fire Marshal Tom Colbert, Engineering John Gorder, Engineering Dave Westermayer, Engineering Leon Weiland, Engineering Tom Struve, Maintenance ric Macbeth, Maintenance Gregg Hove, Maintenance Jim McDonald, Police Department Mark Anderson, Electrical Inspector FROM: Craig Novaczyk, Inspector DATE: 9/12/2007 RE: Plan Review For: 850 LONE OAK RD. DART SAFETY LANE ADDITION The plans are in our plan review section for your review and comment. #2 Please return this form to my attention with your signed comments within 7 days. Please indicate any concerns you have with these plans and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please submit the proper "hold request" form to me. Comments: Indicate below any fees that are to be collected with the building permit. Amount ❑ Yes ❑ No landscape security required Zoning? ❑ Yes ❑ No water quality dedication Meter Size ❑ Yes ❑ No park dedication ❑ Yes ❑ No trail dedication ❑ Yes No ree dedication ❑ Yes i No ' RV Required A �� y`0 Signature CD/Bldg Insp/Fo n Review For Date REVISED 2-07 City of Eagan TO: Scott Peterson, Building Inspections Mike Ridley, Planning Dale Wegleitner, Fire Marshal Tom Colbert, Engineering John Gorder, Engineering Dave Westermayer, Engineering Leon Weiland, Engineering Tom Struve, Maintenance /Eric Macbeth, Maintenance Gregg Hove, Maintenance Jim McDonald, Police Department Mark Anderson, Electrical Inspector FROM: Craig Novaczyk, Inspector DATE: 9/12/2007 RE: Plan Review For: 850 LONE OAK RD. DART SAFETY LANE ADDITION The plans are in our plan review section for your review and comment. #2 Please return this form to my attention with your signed comments within 7 days. Please indicate any concerns you have with these plans and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please submit the proper "hold request" form to me. Comments: Indicate below any fees that are to be collected with the building permit. Amount ❑ Yes ❑, No landscape security required Zoning? ❑ Yes No water quality dedication Meter Size ❑ Yes ❑ No park dedication E Yes ❑ No trail dedication ❑ Yes ❑ No tree dedication ❑ No PRV - - s uired Signatu 8/ / Date f CD/Bldg Insp/Forms//Plan Review For REVISED 2-07 City of Eaall 01110 TO: Scott Peterson, Building Inspections Mike Ridley, Planning Dale Wegleitner, Fire Marshal Tom Colbert, Engineering John Gorder, Engineering Dave Westermayer, Engineering Leon Weiland, Engineering Tom Struve, Maintenance Eric Macbeth, Maintenance Gregg Hove, Maintenance Jim McDonald, Police Department Mark Anderson, Electrical Inspector FROM: Craig Novaczyk, Inspector DATE: 9/12/2007 RE: Plan Review For: 850 LONE OAK RD. DART SAFETY LANE ADDITION The plans are in our plan review section for your review and comment. #2 Please return this form to my attention with your signed comments within 7 days. Please indicate any concerns you have with these plans and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please submit the proper "hold request" form to me. Comments: Indicate below any fees that are to be collected with the building permit. Amount ❑ Yes ❑ No landscape security required Zoning? ❑ Yes ❑ No water quality dedication Meter Size El Yes ❑ No park dedication ❑ Yes ❑ No trail dedication ❑ Yes ❑ No tree dedication ❑ Yes ❑ No PRV Required Signature Date CDBIdg Insp/Forms//Plan Review For REVISED 2-07 City of Eagan demo TO: Scott Peterson, Building Inspections Mike Ridley, Planning Dale Wegleitner, Fire Marshal Tom Colbert, Engineering ✓John Gorder, Engineering Dave Westermayer, Engineering Leon Weiland, Engineering Tom Struve, Maintenance Eric Macbeth, Maintenance Gregg Hove, Maintenance Jim McDonald, Police Department Mark Anderson, Electrical Inspector FROM: Craig Novaczyk, Inspector DATE: 9/12/2007 RE: Plan Review For: 850 LONE OAK RD. DART SAFETY LANE ADDITION The plans are in aur plan review section for your review and comment. #2 Please return this form to my attention with your signed comments within 7 days. Please indicate any concerns you have with these plans and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please submit the proper "hold request" form to me. Comments: 0l4- g.rkeel' . Indicate below any fees that are to be collected with the building permit. ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes L' No Amount landscape security required Zoning? water quality dedication Meter Size park dedication trail dedication tree dedication PRV Required -13-0 nature Date CDBIdg Insp/Forms//Plan Review For REVISED 2-07 A Non -Structural Steel Special Inspections Final Report Dart Safety Lane Addition 650 '8130 Lone Oak Road Eagan, Minnesota Prepared for R.J. Ryan Construction, Inc. Project BL -07-04801 Braun lntertec Corporation BRAUN INTERTEC January 8, 2008 Mr. Brian Filkins R.J. Ryan Construction, Inc. 1100 Mendota Heights Road Mendota Heights, Minnesota 55120 Braun Intertec Corporation 1 1001 Hampshire Avenue S Minneapolis, MN 55438 Project BL -07-04801 Re: Non -Structural Steel Special Inspection Procedural and Final Report Submittal Dart Safety Lane Addition 800 Lone Oak Road Eagan, Minnesota Dear Mr. Filkins: Phone: 952.995.2000 Fax 952 995.2020 Web: braunintertec.com Please find attached to this procedural report the Non -Structural Steel Special Inspection Final Report for the Dart Safety Lane addition, and the supporting Special Inspection Daily Reports for your review and records. Special Inspections and Testing Procedures The special inspection services were provided by a qualified engineer or International Code Council (ICC) inspectors in accordance with the requirements of Chapter 1700 of the International Building Code (IBC), the Special Inspection and Testing Schedule and/or the project plans and specifications. The purpose of special inspections is to provide a review of the contractors work designated by the project structural engineer as needing special inspection under the guidelines of the IBC to determine compliance with the approved construction documents. The special inspector does not have the responsibility or authority to, nor is it the intent of special inspections to have them, judge, or modify the construction documents. Only the structural engineer of record can do this. As the special inspections were completed, a Special Inspection Daily Report was prepared to summarize the results of our inspections and testing. A copy of this report was provided to the contractor's site representative for their review and records. As part of this report, items needing correction or discrepancies observed from the approved construction documents were noted. As needed, we also contacted the project structural engineer for additional clarification on specific issues related to the drawings or discrepancies observed. Plans and Specifications The provided plans and specifications or the plans available at the site were used for our inspections. Observation and Testing Summary Soil Evaluation and Testing Soils exposed at structure subgrade elevations and in excavations were visually evaluated, while those below subgrade elevations and excavation bottoms were evaluated using hand auger borings. These tasks were performed to determine if the observed and tested soils were suitable for support of the design structural loads. Celebrating 50 years of growth through service and trust R.J. Ryan Construction, Inc. Project BL -07-04801 January 8, 2008 Page 2 The hand -auger borings were drilled with a 1 1/2 -inch -diameter hand auger. The hand -auger borings were advanced in 2- to 4 -inch increments to depths of 2 to 4 feet below subgrade elevations or excavation bottoms (shallower penetrations typically occurred where larger gravel, cobbles and boulders were present). The auger was then withdrawn from the borehole to obtain cuttings. The soils encountered in the hand - auger borings were classified in general accordance with ASTM D 2488, "Description and Identification of Soils (Visual/Manual Procedures)." Preliminary estimates of soil consistency and density were also evaluated based on resistance to penetration of the hand auger, and the turning resistance. Based upon the results of the hand auger borings, the soils at subgrade elevations were deemed suitable for the design bearing capacity with the exception of a small area near grids B.7-3 to C-3, where soft soils were encountered in the upper 6 inches. These soils were removed exposing soils suitable to support the design bearing capacity. Five compaction tests were taken during the subgrade preparation for interior and exterior slabs. One compaction test failed to meet the project specifications for exterior subgrade support. A concrete slab was poured over the subgrade so it was not possible to conduct retest. The remaining compaction tests or retests met or exceeded the minimum density requirements. Concrete Reinforcement We initially reviewed the reinforcement and dowel requirements on the project structural drawings and shop drawings, if available. Information reviewed included bar size, bar length, bar spacing, bar location, splice lengths and dowel placement. This information was then used to determine if the in-place reinforcement was placed in accordance with the requirements of the project plans and specifications. We also noted if the in-place reinforcement was free of rust, scale and soil. Concrete Placement Observations Concrete placement observations were performed to monitor the procedures being used by the contractor and to determine if they were consistent with typical industry standards. Fresh Concrete Testing Routine tests to determine the plastic concrete's slump, temperature and air content were done during each pour. In addition, concrete cylinders were cast at rates specified in the project specifications to evaluate the concrete's compressive strength. Concrete Compressive Strength Testing The cast concrete cylinders were temporarily stored at the site and then returned to our laboratory for moist curing and testing. The results of the concrete compressive strength testing were forwarded to the interested parties under a separate cover as they became available. They are also attached to this report. Structural Steel Observations Visual weld examinations, bolted connection observations, deck weld observations, anchor bolt observations, and adhesive anchor observations were conducted as part of our special inspection services. A separate report was generated detailing these services and was sent under separate cover on December 11, 2007. General In performing its services, Braun Intertec used that degree of care and skill ordinarily exercised under similar circumstances by reputable members of its profession currently practicing in the same locality. No warranty, express or implied, is made. BRAUN INT ERTEN` R.J. Ryan Construction, Inc. Project BL -07-04801 January 8, 2008 Page 3 Thank you for the opportunity to provide the special inspection and testing services for this project. After review of the attached Special Inspection Final Report, if you have any questions or require additional information, please call Josh Kirk at 952.995.2222, or Greg Bialon at 952.995.2380. Sincerely, BRAUN INTERTEC CORPORATION Xhua L. Kirk, PE roject Engineer Gregorx4 Qi PE Principa ng eer Attachment: Special Inspections Final Report c: Mr. Dale Schoeppner; City of Eagan Inspections Department Mr. Bernie Stroh; Stroh Engineering BRAUN Braun Intertec Corporation 11001 Hampshire Avenue S Minneapolis, MN 55438 BRAUN INTERTEC Non -Structural Steel Special Inspection Final Report City of: Project: Eagan Dart Safety Lane Addition Date: January 8, 2008 Phone: 952.9952000 Fax: 952.995.2020 Web: brauninterteccom Attention: Mr. Brian Fiikins 800 Lone Oak Road Eagan, Minnesota Braun Intertec Project: BL -07-04801 In accordance with Section 1704 of the International Building Code and the agreed upon scope of services, the required special inspections and testing has been provided for the following items: Soils. The required testing in the field and laboratory has been completed. The compaction testing done during placement of backfill and additional required fill indicated the procedures used by the contractor were adequate to compact the backfill and fill, and meet the project requirements. Observations and testing of the structure subgrades and excavation bottoms indicated that the exposed soils were capable of supporting the design bearing capacity. One compaction test failed to meet the minimum density requirements beneath the exterior slab. Concrete. The required testing in the field and in the laboratory has been completed. The results have been forwarded under separate cover. The compressive strength testing indicates the concrete placed has met the project requirements. The placement procedures used were judged to have met the project requirements. There are no outstanding or unresolved concrete -related issues. Reinforcing Steel. The reinforcement placement detailed in the attached Special Inspection Daily Reports was observed according to the requirements of the project plans and specifications. There are no outstanding or unresolved reinforcing steel -related issues. Conclusion Based upon the inspections performed, the testing completed and the attached Special Inspection Daily Reports, it is our professional judgment that, to the best of our knowledge, the inspected work was performed and completed in accordance with the approved plans, specifications, and applicable workmanship provisions of the International Building Code. Inspecting Firm: Braun Intertec Corporation 1 hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. ``N\ SEBA i. 1. j ///. shua L. Kirk, PE LICENSED Project Engineer = • PROFESSIONAL: License Number: 40ENGINEER January 8, 2008 % N• 45005 Attachments:/'• ..•••`y����` Non -and Special lnspectl6h4iti*I s dated October 15, 2007 through November 14, 2007 Soil Compaction Tests Reports 1 and 2 (Tests 1 through 5) Compressive Strength of Concrete Cylinder Reports 1 through 3 - Celebrating 50 years of growth through service and trust A Structural Steel and Precast Welding Special Inspection Final Report Dart Safety Lane Addition 800 Lone Oak Road Eagan, Minnesota Prepared for R.J. Ryan Construction, Inc. Project BL -07-04801 December 11, 2007 Braun intertec Corporation BRAUN INTERTEC December 11, 2007 Mr. Brian Filkins R.J. Ryan Construction, Inc. 1100 Mendota Heights Road Mendota Heights, MN 55120 Braun Intertec Corporation 1 1001 Hampshire Avenue S Minneapolis, MN 55438 Project BL -07-04801 Phone: 952-9952000 Fax: 952-995.2020 Web: brounintertec.com Re: Structural Steel and Precast Welding Special Inspection Procedural and Final Report Submittal Dart Safety Lane Addition 800 Lone Oak Road Eagan, Minnesota Dear Mr. Filkins: Please find attached to this procedural report the Structural Steel and Precast Welding Special Inspection Final Report for the Dart Safety Lane Addition and the supporting Special Inspection Daily Reports. Special Inspection and Testing Procedures The special inspection services were provided by International Code Council (ICC) certified special inspectors in accordance with the requirements of Chapter 1700 of the International Building Code (IBC) and the project plans and specifications. The purpose of special inspections is to provide a review of the contractors work designated by the project structural engineer as needing special inspection under the guidelines of the IBC to determine compliance with the approved construction documents. The special inspector doesn't have the responsibility or authority to, nor is it the intent of special inspections to have them, judge, or modify the construction documents. Only the structural engineer of record can do this. As the special inspections were completed, a Special Inspection Daily Report was prepared to summarize the results of our inspections and testing. A copy of this report was provided to the contractor's site representative for their review and records. As part of this report, items needing correction or discrepancies observed from the approved construction documents were noted. We also summarized the discrepancies documented in a Discrepancy Log. Plans and Specifications The plans and project documents available at the site were used for our inspections. Visual Examination of Field Welds Visual examination of the field welds was conducted in general accordance with American Welding Society (AWS) D1.1-2006, Figure 5.4 and Table 6.1 requirements and the requirements of the project plans and specifications. Bolted Connection Observations Bolted connection observations were conducted to determine if the bolt holes were filled and if the splined end of the tension control bolts had separated from the body of the bolt. Removal of the splined end is a direct indicator the bolt has been torqued to the minimum snap -off Toad. At connections where the splined ends were not, or could not be removed, the torque applied to the bolt by the contractor was determined using a hand-held torque wrench. In addition, each connection was observed for fit -up and to determine if the various plies were in contact with one another. • Celebrating 50 years of growth through service and trust R.J. Ryan Construction, Inc. Project BL -07-04801 December 11, 2007 Page 2 Deck Weld Observations Deck weld observations were conducted in general accordance with AWS D1.3-1998, Section 6.0 requirements and the requirements of the project plans and specifications. In addition, the Location and the completeness of the side lap fasteners were observed and evaluated. Anchor Bolt Observations The anchor bolts were observed to determine if they were in place, and if the nuts were installed, fully engaged and snug tight. If required by the construction documents, we also observed if the plate washers were installed. Adhesive Anchors The placement of the drilled -in-place, epoxied anchor bolts was observed after the installation to determine if they were located as shown on the construction documents. The nuts were observed to determine if they were fully engaged and snug tight. General In performing its services, Braun Intertec used that level of care and skill ordinarily exercised by reputable members of its profession currently practicing in the same locality. No warranty, express or implied, is made. Thank you for the opportunity to provide the special inspection and testing services for this project. After review of the attached Special Inspection Final Report, if you have any questions or require additional information, please call Dan Graham at 952.995.2524 or Mary Denne at 952.995.2510. Sincerely, BRAUN INT _'TEC CORPORATION Daniel P. Graham ICC Certified Special Inspector-StruS;turat Steel and Welding ichael M. He -r, PE Vice Presid= t-Principa ngineer Attachment: Structural Steel and Precast Welding Special Inspection Final Report c: Mr. Dale Schoeppner, City of Eagan Inspections Department Bernie Stroh, PE, Stroh Engineering Mr. Josh Kirk, Braun Intertec SS Final Rpt Dart Safety Lane Addition BRAUN INTERTE City of Eaaall Mike Maguire MAYOR Paul Bakken Peggy Carlson Cyndee Fields Meg Tilley COUNCIL MEMBERS Thomas Hedges CITY ADMINISTRATOR MUNICIPAL CENTER 3830 Pilot Knob Road Eagan, MN 551 22-1 81 0 651.675.5000 phone 651.675.5012 fax 651.454.8535 TDD MAINTENANCE FACILITY 3501 Coachman Point Eagan, MN 55122 651.675.5300 phone 651.675.5360 fax 651.454.8535 TDD www.cityofeagan.com THE LONE OAK TREE The symbol of strength and growth in our community. December 17, 2007 Brian Filkins RU Ryan Construction 1100 Mendota Heights Rd. Mendota Heights, MN 55304 RE: SAC Determination Letter for the Dart Safety Lane Dear Mr. Filkins: Per our phone conversation on 12/17/07, a mistake was made concerning the SAC determination for the Dart Safety Lane addition project. The Metropolitan Council charged three (3) additional SAC units for this project. The letter dated September 17, 2007, was misplaced by me. The SAC charges were not included with permit fees, which is our normal procedure. Below, I have itemized the additional charges that will have to be collected prior to issuing a final inspection and a Certificate of Occupancy. Three (3) units for 6 bays @ 2 bay / SAC unit: - SAC - MCES - $1,675.00 x 3 = $5025.00 SAC - City - $100.00 x 3 = $300.00 - SAC - Treatment Plant - $660.00 x 3 = $1980.00 - Total = $7305.00 Thank you for your attention to this matter. We are sorry for any inconveniences. If you have any questions concerning this letter, please call me at (651)675-5675. Sincerely, ""‹.-g Craig Novaczyk Senior Building Inspector Cc: Dale Schoeppner, Chief Building Official Mike Lence, Senior Building Inspector j Metropolitan Council 44 Environmental Services December 18, 2007 Dale Schoeppner Building Official City of Eagan 3830 Pilot Knob Road Eagan, MN 55122 Dear MY. Schoeppner: The Metropolitan Council Environmental Services (MCES) Division has reviewed the SAC assignment for the Dart Transit addition. The original letter for this determination was dated September 17th, letter reference 070917A1. This project is located at 800 Lone Oak Road within the City of Eagan. This project_should be charged no additional SAC Units, instead of the 3 units originally. assigned. The SAC review is based on new information. This determination follows: Charges: Service Bays (major) 6 bays @ 14 bays/SAC Unit SAC Units 0.43 or 0 The business information was provided to MCES by the applicant at this time. It is the City's responsibility to substantiate the business use and size at the time of the final inspection. If there is a change in use or size, a redetermination will need to be made. If you have any questions, call me at 651-602-1378. Sincerely, Jessie Nye SAC Technician Environmental Services Division JN:kb: 071218A3 cc: S. Selby, MCES Carolyn Krech, Finance, Eagan Brian Filkins, RJ Ryan Construction www.metrocouncil.org 390 Robert Street North • St. Paul, MN 55101-1805 • (651) 602-1005 • Fax (651) 602-1477 • TTY (651) 291-0904 An Equal Opportunity Employer r? ? March 4, 2002 MR GARY SANTOORJIAN DART TRANSIT AND COMPANY P O BOX 64110 ST PAUL MN 55164-0110 RE: 850 LONE OAK ROAD Dear Gary: This letter is meant to advise you that if the food service Dart wishes to make available at its pro-stop facility is limited to food items that are prepared off-premise, purchased prepackaged, and contained in separate coolers (one containing bottle beverages, one containing prepackaged food), this use would be consistent with the existing Limited Industrial zoning of the property provided the level of service does not exceed the parameters described herein. Feel free to contact me at 651-681-4689 if you have any questions regarding this information. Sincerely, Michael J. Ridley Senior Planner MJR/j s oaRr DART TRANSIT COMPANY 800 Lone Oak Road, Eagan, MN 55121 • Mailing Address: P.O. Box 64110, St. Paul, MN 55164-0110 • Office: 612-688-2000 • 800-366-9000 February 22,2002, Mike Ridley City of Eagan 3830 Pilot Knob Road Eagan, MN 55122 Dear Mike, I'm writirig in regards to oiu- conversation yesCerday wherein I described our dcsire to enhance the food services we offer at our Pro Stop facility located at 850 Lonc Oak Road. Presently we have only one pop machine and nothing else. We would like to replace the pop machine with a glass front cooler containing bottled beverages (bottled soda, juice) and add a second cooler for the sale of prepackaged food items. There would Ue no food preparation whatsoever on the premises. All food items would be purchased prepackaged. T3ecause the food itenis will be sold out oPa cooler rather than from a vending machinc tlie State will requirc; us to obtain a grocery store C lieense. As part of thc license application we miist subiiiit a zoning permit or statement of approval fi-om the local uvit of government for the intended land use (sce enclosed state plan review check I i st). lf our intended use meets with City approval, please provide us with a statement to that effect. Tharilc you for your consideration of this request. I can be reached at 651-683- 1406 Regards, Gary Santoorjian Real Estate Mamager Affiliated With Fleetline Inc. and Dart Intermoda(, 1nc. To avoid unnetESSary c???a-v df vour faod and beverag'2 project, please inciude the following: 0 Two se#s of plans (one se# of plans is sent to the piumbing unit far review); O The name and address of projeci location. O A cher-k for $150 made pagabie to #he Minnesota Depar#ment ofHealth; 0 A zoning permit or statemeut of appraval fram the lacal uuit of gnvexnment for the in#ended land use• P-- ? ',?^..r?.,.JA - El A praposed menu; O A Iayaut of the eqwipment and sinks and the floor, wall and ceiling f nishes; and O An equipment list.(induding model numbers of the nesv and used equuipment). Submit the complete sets of plans to : En`'u'anmental Heaith Services Minnesota Department of Health Metro Square Buiiding, Suite 220 121 East Seventh Place SL Paul, Minnesota 55101 (651) 215-0870 ?J?, 0112001 O: E-T=S\cQNCVIWOrin,ginal DrawerlPlan Review Chec;list MEMORANDUM TO: CUP 11-CU-18-8-88 Parcel File, 850 Lone Oak Road FROM: Cynthia Kirchoff DATE: November 8, 2001 RE: Dart Transit Property, 850 Lone Oak Road I received a telephone call from Dave Hausch of the "Pro Stop" requesting approval to sell pre-packaged food at the above referenced address. He stated that the business is a"truck stop" and is open to the public. After researching the CIJP file it was determined that a truck stop was not approved by the City Council. In 1988, the City Council approved a conditional use permit for the outdoor storage of trucks and trailers. According to the staff report, no freight is handled at this facility, only the pick up and drop off of trailers. There was no mention of fuel bays or the maintenance faciliry in the report; however, the site plan attached to the report shows the fuel area. On November 6, 2001, I inspected the property and found fuel service, maintenance, and truck wash bays. Staff was under the impression that the Pro Stop facility was for their drivers only (Dart fleet), not the general public. The property is not permitted to operate a truck stop, therefore, no pre-packaged food is permitted to be sold on the premise. I told Mr. Hausch that only vending machines were permitted on the site. 1988 BUILDING PERMIT APPLICATION - CITY OF EAGAN SINGLE FAMILY DWELLINGS 1 .0 ? 00 '0 9 ? . K ? INCLUDE 2 SETS OF PLANS, 3 CERTIFICATES OF SURVEY, 1 SET OF ENERGY CALCULATIONS NOTE: ADDRESSES FOR CORNER LOTS - CONTRACTOR/HOMEOWNER MUST DESIGNATE WHICH ADDRESS IS DESIRED. NO CHANGES WILL BE ALLOWED ONCE BUILDING PERMIT IS ISSUED. MULTIPLE DWELLINGS RENTAL UNITS FOR SALE UNITS # OF UNITS INCLUDE 2 SETS OF PLANS, CERTIEICATE OF SURVEY - CHECK WITH BLDG. DEPT., 1 SET OF ENERGY CALCULATIONS CONIMERCIAL INCLUDE 2 SETS OF ARCHITECTURAL & STRUCTURAL PLANS, 1 5ET OF SPECIFICATIONS AND 1 SET OF ENERGY CALCULATIONS DART TRANSIT C0. T1501000" '01 To Be Used Eor: SERVICE BLDG. Valuation: $-9Date: 11-3-88 Site Address 850 Lone Oak Road Lot Block (SEE BELOW) Parcel/Sub Owner ')A.':'.i -'PAidSIT COMPANY Addre95 2102 Universitv Avenue City/Zip Code St. Paul, MN 55164 Phone r /J Contraetor OPUS CORPORATION(CRAIG LARSOI Address 9900_Bren Road East City/Zip Code Minnetonka, MN 55343 Phone 936-4512 Areh./Engr. OPUS CORPORATION Addre99 9900 Bren Road East City/Zip Code Minnetonka. MN. 55343 I Phone l1 936-4512 OFFICE USE ONLY On site sewage _ Oceupaney 5"11 B'Zi H°H , MWCC system ? Zoning I-I On site well Actual Const •-ff-N City water _ ? Allowable y-h? PRV required _ # of stories ? t 6 1Ezz, Booster Pump _ Length `13tr Depth p(o S.F. Total 2r73R2 Footprint S.F . a0340 APPROVALS FEES I)Engr/Assess Permit Planner Sureharge SRs Council Plan Review 1300 ' Bldg. Off. SACP City lgkbo_ Variance SAC, MWCC % D0- Water Conn - Water Meter - Road Unit ? s ? Treatment Pl 3672_ Parks (0913- Copies TOTAL LEGAL DESCRIPTION: Lots 1-10, Block 1, Eagandale Center Industrial Park No. 3 and Lots 2-5, Biock 1, Eagandale Center Industrial Park No. 4, Dakota County, MN . "? ?/AL?a, ?..? ? y ?C? O, r?OtiJ "° ? ..5? ? t? t?'J ISr2y ?sd rn x 2. 5'ca m `? ZS' Su, ?c N a?.G?' a 6 o c? REviEw Fte e ? p 6 p,-C !?, Cr' -- ? I Do X ? ?_ Y= 1 ' \w C-L T?°?, PLMfi, ? 2 o ?CwvAe% I &OU ?? /? I{J v 1 9 9ov 3 ?7 L - f . , ... AS?c,t?NlG ,?j0 °?, Sf?F? LAM? ?r? ASS ..e.m.?.. H?RD Cxt.4-t?TEk Bul c Di? ot F'A12? D'G-b,??,?Ttc?nJ " G, 9 ?-?,1?5 /5; 9 .??ae? ?t X I ?= G 6 30 6 e % X L-1 356 0 - ?q G7Q e Sr X , 0 L3 = 6 813 CITY USE ONLY L ? BL ? RECEIPT #: ? SUBD. l.e e J I? RECEIPTDATE: , APPROVED BY: , INSPECTOR MECHANICAL PERMIT#: . 1999 M£CHANICAL PERMIT (COMMEftCIAL) CiTY UF EAfiAeN 8$30 PILOT KNOB RD EAWkN, MN 55188 (651) 681-4695 Please compiete for: ali commercial/industrial 6uildings multi-family buildings when separate permits are not required for each dwelling unit DATE: \Qc?°t CONTRACT PRICE: 7 S, 4 y -1, OO WORK TYPE: New construcrion Install U.G. Tank _ Interior Improvement Remove U.G. Tank (Minimum Fee) Plocessed Piping (Minimum Fee) **NOTE: When installing/removing underground tank, ca11651-681-4675 for inspection by fire marshal and plumbing inspector. DESCRIPTION OF WORK: 1ctc,Q, 9L hS% S-w?s? w e no-W S ss !)If +h5 , tbla A.sQ-e,v?ber c'-%ncQ FEES: 1% of contract price PR $30.00 minimum fee, whichever is greater. C.,,,A S?S?aw+• SI k-e- ??'?a.y?? ?++.?e c+r??ers?nc.? 5? Swi?? wt1? ?u??? ??Sd b e u s?ed ?_•- ?? ??,a?ew?, CONTR.ACT PRICE x 1% PERMIT FEE STATESURCHARGE TOTAL -? LF7 ,"Jv ?115q'ql ($.50 per $1,000 of DermiY fee due on all pemuts.) SITE ADDRESS: i tb OWNER NAME: ? , TENANTNAME (IMPROVEMENTS ONLI): PHONE #: - (AREA CQD6) INSTALLER: tTke?v,% " ADDRESS:' ??v So }?u?.,, 6 S 'NE PHONE #: b l'1- _'?$Q S 1e1 J (AREA CODE) CT1'Y: STATE: M R Zrn: 5 S 43 2. ?/ Deen ? ? ? %GNATURE OF PERMITTEE ? CONTRACTOR'S MATERIAL & TEST CERTIFICATE PARTS A& C- SPRINKLER & WATER SPRAY AgOVEGROUND PIPING (Fill Out Separete Certificate For Each Riser) PROCEDURE . UPON COMPLETION OF WORK, INSPECTION AND TESTS SFIALL 8E MADE BV THE CONTRACTOR'S REPRESENTATIVE AND WITNESSED BV AN OWNER'S REPRESENTqTIVE A . LL DEFECTS SHALL BE CORRECTEO AND SVSTEM LEFT IN SERVICE BEFORE CONTRACTOR'S MEN FINALLV LEAVE THE JOB. . A CERTiFICATE SHALL BE FILLED OUT AND SIGNED BV BOTH REPRESENTATIVES. COPIES SHALL BE PREPARED FOR APPROVING AUTHORITIES, OWNERS AND CONTRACTOR IT ' . IS UNOERSTOOD THE OWNER S REPRESENTATIVE'S SIGNATURE IN NO WAV PREJ- UOICES ANV CLAIM AGAINST CONTRACTOR FOR FqULTV MA TERIAL, POOP WORKMANSHIP, OR FAILURE TO COMPLV WITH AP- PROVING AUTMORITV'S REQUIREMENTS OR LOCAL ORDINANCES. PROPERTY NAME OATE i' + ? r Y?a,V%4!51 6_ad _ PROPER7V AODRE55 960 c. a v?? o k goacP ? ?,,?r YYI,` vL ACCEPTEO BV APPROVING AUTHORITY(•S) NAMES ADDRESS PIANS r ? 1 ? /?? ??{ `J" ?7?J? INSTALLATION CONFORMS TO ACCEPTED PLANS: VES NO ? X EQUIPMENT USED IS APPROVED YES NO ? IF NO, STATE DEVIqT1pN5 FiAS PERSON IN CHARGE OF FIRE EQUIPMENT BEEN INSTRUCTED AS TO LOCATION OF CONTROL VqLVES AND CARE OF THIS NEW EQUIPMENT? YES? NO ? IF YES, GIVE NAME. IF NO, EXPLAIN. INSTR UC- TIONS HAVE COPIES OF qPpROPR1ATE INSTRUCTIONS AND CARE ANO MAINTENANCE CHARTS AND NFPA 13A BEEN LEFT ON PREMISES? VES NO C iF VES, GIVE NAME. IF NO, EXPLAIN. ?. F+MDRGSTATIC: Hyarosta[ic tests 5hall be maCe at not less than 200 PSI (13.5 bars) fof two hour5 or 50 PSI (3.4 bars) above static pressure in excess of 150 PSI (30.3 bars). DilferentWl tlry-pipe valve ctappers shall he left open Ouring test to TEST Prevent tlamage. AII abovegrounG plping IeaKage shall be stopped. DESCRIP- TION PNEUMATIC: EStabifsh 40 P51 (2.8 bars) air pressure and meesure Arop whith Shall not exceetl 142 PSI (0.1 bars) in 24 hours. Test pressure tank5 at normal water level and air pressare and- measure air pressure tlrop which shall noF exteetl 14: P51 (0.1 bars) in 24 hours. TESTS HYDROSTATIC: ALL PIPING. FfEQUIRED ? PNEUMATIC: DRV PIPING DRAIN EQUIPMENT OPERATION: ALL, SERVES BLDGS: - ' LOCATiON MAKE MODEL SIZE qUANTITY TEMPERATURE RATING SPRINKLERS ? ) Z? 4 f7 16S OR Pi ? \ ? Z ?tFJ SPRAY NOZZLES PIPE AND MATERIAI AND KIND CONFORMS TO % STANOARD IF NONE, EXPLAIN FITTINGS A L A R M D E V I C E MAXIMUM TIME TO OPERATE TNROUGH TEST PIPE ALARM VALVE TVPE MAKE MOOEL MIN. SEC. OR FLOW INDICATOR ? ? -- .-- ?--- •?? ?-•- --•+ rn??vi cu Irv V.b.A. rVK IVHS & FGH, ING.. P.O. tlVIC /19, M1. KISCO. N.Y. 10549 OPERATING TEST qE5VLT5: O MAKE MOOEL SER. TIME TO TRIP THROUGH TESTPIPE WATER AIR TIP ppINT TIME WATER REACHED ALARM ' RY PIPE NO. WITHOUT Q. O. D. WITH Q. O. D. pRE55. PRE55. AIR PRE55. TEST OUTLET OPERATED pROPERLY MIN. SEC. MIN. SEC. P.S.I. P.S.I. P.S.I. MIN. SEC. VES NO VALVES IF NO, EXPLAIN O'PERATION PNEUMATIC ? ELECTRIC ? MYDRAUIIC ? - PIPING SUPERVISED: VES ? NO ? DETECTING MEOIA SUPERVISEO: VES ? NO 0 DELUGE DOES VALVE OPERATE FROM TNE MANUAL TRIP AND/OR REMOTE CONTROL STATIONS? VES ? NO ? & IS TNERE AN ACCESSIBIE FACILITV IN EACH CIRCUIT FOR TESTINGT YES 0 NO ? IF NO, EXPLAIN PREACTION VALVES Does Eaeh Clrcuit ooerete Does each Circuit Operate Maximum Time To MAKE MODEL SupCrvisiOn LOSS Alarm? Vatve Release? Operate Release: VES NO VES NO MIN. SEC. AlL PIPING HVDROSTATICALLr TESTED AT Zwo P51 . FOR?MOURS ORY PIPING PNEUMATICALLV TESTED: . YES NO ? EQUIPMENT OPERATES PROPERLY: VES NO ? TESTS .. IF NO, 57ATE REASON . DRAIN TEST: REAOING OF GAGE LOCATED R551DUAL PRESSURE WITH VAWE IN NEAR WATER SUPPLV TEST PIPE: T_EST PIPE OPEN WIDE STATIC PRESSURE P51 ? . '7SP51 NUMBER VSEO LOCATIONS NUMBER REMOVED TEST BLANKS . WELDED PIPING VES NO ? IF YES... DO YpU CERTIFY AS THE SPRINKLER CONTRACTOR TMAT WELOING PROCEDURES COMPLV W H THE REQUIFE- MENTS OF AWS 030.9, LEVEL AR-3? YES NO 0 WELDING DO VOU CERTIFV THAT THE WELDtNG WAS PERPORMEO BY WElDERS OUALIFIED IN COM I,ANC£ WITH THE ??- itEpVIREMGNTS OF AWS D30.9, LEVEL AR-3' YES NO ? DO YOU CERTIFY THAT WELDING WAS CARRIEO OUT iN COMPLIANCE WITH A-DOCUMENT D QUAUTY CON- TROL PROCEDURE TO INSURE THAT ALI. DISCS ARE RETRIEVED, THAT OPENINGS IN PIPING ARE SMOOTH; THAT SLAG AND OTHER WELDING RESIDUE ARE PEMOVED, AND THAT TME INTERNAL /.+pIAMETERS OF ?, PIPING ARE NOT PENETRATED? VES L7` NO ? / DATE LEFT IN SERVICE WITH ALL CONTROI VAlVES OPEN: REMARKS NAME OF SPRINKLER CONTRACTOR L? I,? l e f` FOR PROPERTV NER (SIGNED) TITLE SIGNATURES FORSPRINKLER CONTRACTO ( NE ) / TESTS WITNESSED BY TITLE DATE- DOITIONA 010 ATIONS AND NOTES ? ?p SIIBD (Q.G'uC ,-?_"_ NEW RECEIPT Il 7D? RECEIPT DATE TO JOB OW N D?TE , SHORTACE MUST BE PAID WHITHIN 14 DAY5. RF.?1AR1{5 y`?dr -' 0 to 30 amp. circuits= &??I0??? o 31 to 100 amp. ciccuits= 'o ?v 0 to 100 amp service= z&Y f f (//f // v?QVY ?_ 101 to 200 amp. service= L1.? qto v TOTAL FEE DUE= LESS FEE RECIEVED TOTAL FFR SHORTAGE' DUE = I?Y D? PEBMITltJ??i.L?.1? ? F/ • ORIG. ?tE,r.EIPT# BECEIPT DATE_?f, 7/tl'(p RETU?tN A COPY OF THIS FORM WITH REMITTANCE. Jlt?'f- lll / - /y . 61 6; ?U??? l (-/ , 4(.; 41Q' ? 7r , ?c _ ? ?. . -, , ; LARRYS.SEVERSON JAMES F. SHELDON MICHAEL G. DOUGHERTY* MICHAEL E. MOLENDA SEVERSON, SHELDONg DOUGHERTY & MOLENDA9 P.A. A PROFESSIONAL ASSOCfATION ATTORNEYS AT LAW 19S5. 'November 14, 1995 SUITE 600 7300 W EST I47TH STREET APPLE VALLEY. MINN8S0'CA 55124•7538 (612) 432-3136 LOREN M.SOLFEST ANNETTE M. MARGARIT SHARON K. HILLS ROBERT B. BAUER CHRISTOYHER A. GROVE TELEFAX NLIMBER 432-3780 VIA CERTIFIED MAIL Ed Kirscht, Senior Engineering Technician City of Eagan 3830 Pilot Knob Road ; Eagan, MN 55122 i Re: Lot ljand Outlot B,? Eagandale Center Indnslrial Park No:. 3 ___ Our File No. 206-12602 Dear Ed: Enclosed for your reference is a copy of a letter from James L. Tucker to Mike Dougherty, dated October 30, 1995, together with copies of the documents referenced therein. I may have already provided you with copies of some of the enclosed documents. Also enclosed for your safekeeping, is Owner's Duplicate Certificate of Title No. 102279, issued to the City of Eagan with regard to Outlot B in Eagandale Center Industrial Park No. 3, which was also forwarded to Mike Dougherty. As you know, this document will be needed in the future, so it should be placed in a safe-deposit box or other place of safekeeping. Please note that the miscellaneous enclosed documents have been memorialized upon said Owner's Duplicate Certificate. Should you have any questions in regard to these enclosures, please feel free to contact Mike Dougherty or me. Very mzly yours, /0G? 12, Darlene A. Jenison Legal Assistant DAJ/wkt Enc. cc: Mike Dougherty, City Attorney INDIVIDUALATTORNEYS AL50LICENSED IN 1OWA OR WISCONSIN -CERTIfIGD REAL PROPfRTV LAW SPECIALIST, MSOA aa soa o?'j - / o ; C, / MEMO TOt DIANE DOWNS, UTILITY BILLZNG CLERR FROM: ED RIRSCHT, SR. ENGINEERZNG TECH DATE: JANUARY 31, 1992 SUBJECTS REF COMPUTATIONS FOR PARCELS LOTS 1 THROUGH 10, EAGANDALE CENTER INDUSTRIAL PARR NO. 3 AND LOTS 2 THROUGH 5t EA(3ANDALE CENTER INDUSTRIAL PARR NO. 4 AND VACATED APOLLO ROAD EAST OF CHICAGO, MILWAUREE, ST. PAUL AND PACIFIC RAILROAD. OWNED BY DART TRANSIT - 850 LONE OAR ROAD I have computed the REF's for Dart Transit located at 850 Lone Oak Road. The total REF's are 67.5. My computations are based upon a site plan dated October 31, 1988 prepared by Opus Corporation and a site plan dated February 2, 1989 prepared by Pump and Meter Service, Inc. The total area of the Dart Transit site is 22.40 acres. There is a 1.70 acre credit for a ponding area which leaves a net area of 20.7 acres of which 10.1 acres is considered impermeable surface. cc: Michael P. Foertsch Rich Brasch EK/ j f Sr. Enqineering Technician Z- MEMO TO: TOM COLBERT, DIRECTOR OF PUBLIC WORRS ED KIRSCHT, SNGINEERING TECHNICIAN CRAIG ICNUDSEN, ENGINEERING TECHNICIAN JIM STURM, CITY PLANNER BILL ARINS, ELECTRICAL INSPECTOR JOS MERCIiAR, CONSTRUCTION ANALYST UTILITY BILLING CLERR FROM: DOUG REID, CHZEF BUILDING OFFICIAL DATE : Co/(y/$'g The Protective Znspections Division will be performing a final inspection for occupancy of FJ"r0 Lon e (JAk on Please return this form within 48 hours indicating your approval or denial. Failure of response within that time frame will be determined as approval. It will be each department's ? responsibility to contact the construction firm with necessary requirements before final inspection and notifying the Building Inspections Division when all requirements have been met. Thank- you. DR/j s APPROVAL: DATE: DENIAL: _ DATE: ?oa0-??r, BUBJECT: APPLICANTs LOCATION: ESISTING ZONING: DATE OF PUBLIC HEARINGs DATE OF REPORTt COMPILED BY: APPLICATION SUMMARY CITY OF EAGAN CONDITIONAL U8E PERMIT HIGHWAY SALES, INC., JOHN SEIBEL ?.?. ?Qk• 74? ?`j' 800 LONE OAR ROAD `/-eP _ LZ, -k- fi ? ? LI (LIGHT INDUBTRIAL) AUGUBT 22t 1989 AUGIIBT 11e 1989 PLANNIN(i DEPARTMENT An application has been submitted requesting a Conditional IIae Permit to allow Highway Sales, Inc. to lease and sell tractors. COMMENTS Highway Sales, Inc. is located in the new Dart Transit building located at 800 Lone Oak Road. They have recently moved their business from St. Paul to Eagan. Highway 5ales is in the business of leasing and selling tractors; one of their larqest clients is Bart Transit. The Conditional Use Permit has been applied for in order to acquire the necessary dealers license from the State of Minnesota, primarily for the activity of leasing tractors. Highway Sales, Inc. has a fleet of bver five hundred tractors; however, the applicant stated the average number of lease and sale items which will be located at the Eagan site at any given time will be between four and seven. If approved, this Conditional Use Permit shall be subject to all applicable Code regulations. CONDITIONS 1. No more than seven tractors shall be located at this site for leasing or selling at a time. 2. No automobile leasing or selling shall be allowed. DART OFFICE BUILDING FLOOR PLAN - FtRST FLOOR INSUNANCE CART TRANSIT CO. V FLOOR PLAN 8001ONE OAK R0. 15T FLOOR 19,952 S0. F7. EAGAN, MINNESOTA , SITE PLAN ?C J.r ?- • ^'? %'?? =+?•'' °t ," _r-r „"`e ?:?`:a \ \\ ? ? ??: _.?,?;e^.' -` ? ?'' ?? f_- W ? _,?. ?_, ? ? } \ ItI?NU:AY SpL65 ' . ??1 ?i •y`t? TR?Ctn? Pa2Y?1N?o ? G t O `. q c.-0./?l?? \(\?\\\ M?a,` O Y t? ?- ? ^? ? \ \ ? O O Ct. X /.? 0?O 0 ? -, , ? . ?o. Y --? CC) ccv / C 1 \\,... ? (^ y? ?Y ` ? G J a O ?1 i ?. , Talked rith 1// // ,11V- p•?_e or :%/ EcZPhone Ilo. R. -1-r.?..t_?? - Go ?-I??,c, 4=-' ?rz?. ? 1 placed call C:] Partr ealled Ib 0 mssa9e [:] reDlr ? -) G 2E7E Jr4??.?-?F?U i" G1.C`F r 77-1672 G,45 ? i f}7/OirJ-057 ,iQ 7 P.rty's p .e:saye ?zPty ? Actior. or follw-up necessaryet);5 W144, • ?'tJ?.' G[>/GL T??G/,D? ?tJGCJ %c?.t? ?d.C? S?i?G?' f /i' Refer to ' File ? 5igned Copies OSCA2. 1?C? OPUS CORPORATION ' DESIGNERS • BUILOERS • DEVELOPERS MMEAo0lI5 0 C"CA60 0 PHOENiX 9 WNr.ucEf _ ?, ?? , MEMO TO: DALE RIINRLEi, DIRECTOR OF COMMiJNITY DEVELOPMENT FROM: DOUG REID, CHIEF BUYLDING OFFICIAL DATE: JUNE 8, 1989 RE: DART TRANSIT SERVICE BIIILDING 850-:IANE'.7OAR:-ROAD ? Dart Transit Company must vacate their current premises on approximately June 15, 1989. We have been advised the office building will not be completed on time due to a labor dispute with the fire sprinkler companies. The sprinkler pipefitters are also on a two week "cool off" period pending negotiations on a new contract. At the end of two weeks, if an agreement has not been reached, the sprinkler fitters will go on strike. For this reason, Dart Transit may have a problem trying to relocate their equipment and parking their vehicles. In an attempt to bring Dart into our City, I am recommending that we allow them to park equipment on their parking lot if completed. I have talked with the superintendent representing Opus Corporation who has stated that the site parking lot and landscaping should be completed next week, weather permitting. The service building/warehouse area should be completed before then, with the exception of the office building. I will keep you advised as to the progress on this facility and alert all concerned with the typical five-day notice for final inspection. If you have any questions, please advise. ? Chief B41ding Official DR/js CC: TOM HEDGES, CITY ADMINISTRATOR GENE VAN OVERBEKE, DIRECTOR OF FINANCE TOM COLBERT, DIRECTOR OF PUBLIC WORKS KEN VRAA, DIRECTOR OF PARKS & RECREATION JIM STURM, CITY PLANNER 5TEVE HANSON, ASST. BUILDING OFFICIAL ? OPUS CORPORATION DESIGNERS•BUILDERS•DEVELOPERS 800 Opus Center 9900 Bren Road East Minnetonka, Minnesota 55343 (612) 936-4444 November 2, 1988 Mr. Joe Merchak Building Inspection Dept. City of Eagan 3830 Pilot Knob Road Eagan, MN 55121 RE: Dart Transit Company Service Building Dear Joe: ' ?a 2 y?o3 o Za ?ea?'?a D ? Mailing Address If iI ? ti P.O. Box 150 Minneapolis, Minnesota 55440 Enclosed are tne following materials for a building permit for the service building for Dart Transit. 1. Building Permit Application 2. Energy Calculations (1 copy) 3. Architectural & Structural Plans (2 sets) 4. Specifications (1 copy) We had intended that this submittal would be for a"Structural Shell" permit and that we would submit a final sub;nittal, including complete mechanical and electrical plans in mid to late December. After you have had a chance to review these materials I would be glad to discuss this with you. We had planned to submit a similar "structural she11 permit" package for the office buiLding in late November and a"final permiP" package in mid to late December. I have forwarded plans for both buildings to the Metro Waste Control Commission. Let me know if you need any additional information help with this project. Sincerely, OPUS CO.2PORATION Craig A. Larson Senior Yroject Manager CAL:dan encls. Opus and Afflliates In Minneapolis • Chlcago - Phoenix - Milwaukee • Tampa • Pensacola I appreciate your MINNESOTA STATE CODE COMPLIANCE CALCULATIONS PROJECT: ?Acf`Zj I,?FchJc.1;? ?il LIk}j6 DATE: ? ?% 3i I88 1. Average Thermal Transmittance of Proposed Suilding 1. Net Va11 Below x "ll" _ Grade 2. Net Wall Area x "U" _ F x „u" 0.?.<S = 52i Pl??T ?9uGZS ? 3. Door Area 3,?Sf'x "U" 4. k'indow Area x "U" p,I/ _ 20 x "u" _ 5. Net Roof Area a0,-2,5-0 Ox "U" 0.06 = /'5 6. Sky Light Area x"U" _ TOTAL : `T4z? Code Requires: Total k'all Area x "U" .23 - Total Roof Area 00 ?250? x "U" .06 = !? Z?S TOTAL : 7, 7 Oi? DO 1Jl TIL• LT TIIE CODE? YES x NO `7/, -% " ?5, 97e MIXED OCCUPANCY CALCULATIONS U.B.C. Sec. 503(a) "The area of the building shall be the sum of the ratios of the actual area for each separate occupancy divided by the total allowable area for each separate occupancy shall not exceed one." u ? i ? ;--?. i 11 5-1 1 Nou f? oGGU ?"'ANGY BLDG. A Proposed Sq, B-1 5,925 H-4 8,025 J 2 ?ocJ? p-RE,D. . Allowable Sq. Ft. Ratio 12,000 x 2 = 24,000 .247 7,500 x 2 = 15,000 .535 Combined Ratio = .782 BLDG. B B-1 12,000 x 2 = 24,000 .280 6,724 Total Combined Ratio = 1.062 (Exceeds allowable for single building, therefore an area separation wall is required.) TK:cw 11-3-88 OPUS CORPORATION DESIGNERS- RUILDERS•DEVELOPERS 80D Opus Center 9900 Bren Road East Minnetonka, Minnesota 55343 J612) 936-4444 Mailing Address P.O. Box 150 Minneapnlis, Minnesota 55440 October 7, 1988 Mr. Da1e Wegleitner Fire Inspector City of Eagan Fire Administration 3795 Pi1ot Knob Road Eagan, Minnesota 55122 ocr 1988 RE: Proposed Dart Transit Facility Eagan, Minnesota Dear Da1e: In the next several days we will be submitting a grading/utility plan to the City Engineer's Office to obtain a grading permit for the Dart project. Before they review our utility plan, I wanted to confirm the hydrant locations with you. On the enclosed plan I've redlined the hydrant locations as we discussed them by phone a couple of weeks ago. Please review this layout and let me know if you approve or would like to see any revisions. I would also appreciate it if you would notify Mr. John Wingard in the City Engineering Department regarding your review of the plan. This would be very helpful in expediting their approval of the plan and issuance of a grading permit. Thanks for your prompt attention to this matter. Sincerely, 0 US CORPORAT N ? ig A. Larson Senio oject Manager CAL:rem Enclosure Opus and Affillates In Minneapolls - Chlcago • Phoenix • Mllwaukee - Tampa • Pensacola , 3? ?b?!! , ?3 ° ?.?3 ?? ' . ?? e ? 9_ n/ 3 ;?_.. . . ?: , OPUS CORPORATION DESIGNERS- BUILDERS- BEVELOPERS 800 Opus Center Mailing Adaress 9900 Bren Road East P 0- Box 150 Mlnnetonka, Minnesota 55343 Minneapohs, Minnesota 55440 (612) 936-4444 October 21, 1988 Mr. Gary Stark Starks Halfway House Saloon 3125 Dodd Road Eagan, MN 55121 Dear hir. Scark: I am writing this letter on behalf of Alscor Investors Joint Venture and The Northwestern Mutual Life Insurance Company. Recently our surveying company, Sunde Land Surveying, was checking property corners within Block 1 of Eagandale Center Industrial Park #4 subdivision and reported to us that the parking lot on the west and north of your facility is encroaching upon Lot 2, Biock 1, Eagandale Center Industrial Park #4 owned by Alscor Investors Joint Venture and upon a portion of Apo11o Road both which are shown on the attached drawing. Apollo Road has been vacated to and is in the ownership of The Northwestern Mutual Life Insurance Company. Please be advised that your encroachment onto these properties are not acceptable and cannot be allowed to continue. We ask that you vacate the property immediately, remove the paving that you instailed on these properties and respect the normal parking setback as required by the City of Eagan's zoning codes. Should you have questions in this regard, I would be happy to discuss it with you further. My direct phone number is 936-4570. Sincerely, OPUS CORPOR TION Vv? M rc S. Anderson Director Real Estate DeveLopment MSA/ck cc: Marc Kruger Jim Sturm, City of Eagan Dan Oren \ ? Opus and Affiliates in Minneapohs • Chicago • Phoenix • Milwaukee • Tampa • Pensacota ` E VACATED ) _ p n n n 1.06 A?' O?RS . ? . \ `i. • ? - N N I ?•_ ? Q o ? ? <'??? ?. ? ? ? ? ??, C.` ? ? '?-a (D o ? ?l (V a i i i \? I ? W b 283 Ac' ' a o ? fn PaF " " I N I ' - N89°58'30"W 286.60- - - ? L SOUTH LINE OF THE NW I/4 OF 7ME NW li OF SEC. 12, T 27, R.241AL50 S LINE OF 0 I, EAGANp4LE CENTER INDUSTRIAL PARK BASED ON PO51?ION OF E I!4 CORNER OF AS ACCEPTED BY THE COUNTY SURVE' "E%ISTANT CORNER"-MARCH, 1983 i ? December 14, 1988 Mr. Joe Merchak Asst. Chief Building Inspector City of Eagan 3830 Pilot Knob Road Eagan, Minn. 55122 Dear Mr. Merchak: Metropolitan Waste Control Commission Mears Park Centre, 230 East Fifth Street, St. Paul, Mianesota 55101 612 222-8423 This letter is to inform you that the Metropolitan Waste Control Commission has made a SAC determination for the Dart Tran sit Company to be located at 800/850 Lone Oak Road within the City of Eagan. It has been determined that 28 SAC Units should be assign ed to this project. This determination was made as follows: SAC Units Charges: Service Bays 39 people @ 14 people/SAC Unit 2.79 Wash Bay 25 trucks x 90 gallons/truck @ 274 gal./SAC Unit $•21 Showers 5 showers @ 1 SAC Unit/shower 5.00 Warehouse 12,700 sq. ft. @ 7000 sq. ft./SAC Unit 1.81 Safety Lane Building Total Charges: 17.81 or 18 Office Building Office 21,033 sq. ft. @ 2400 sq. ft./SAC Unit 8.76 Conference Room 2565 sq. ft. @ 1650 sq. ft./SAC Unit 1.55 Office Building Total Charges: 10.31 or 10 Total Charges: 28 Aw ? .? . . 1. . ... ' ? ?? . Metropolitan Waste Control Commission Mears Park Centre, 230 East Fifth Street, St. Paul, Minnesota 55101 -- - - - ------- 612 222-8423 December 14, 1988 If you have any questions, please call. rely, Donald S. Bluhm Staff Engineer DSB:RWJ cc: S. Selby, MWCC Craig A. Larson, Opus Corp. , ? _ . . -t ? CONDITIONAL USE PSRMIT/OPOS CORPORATION/DART TRANSIT City Planner Dale Runkle informed the Council that after reviewing the purpose and intent of the conditional use permit process and meeting with the developer, City staff and the City Attorney, it may not be appropriate to include proposed conditions one and three if the application were approved by the Council. Bob Worthington introduced the proposal to the Council. Don Orin, Dart Transit, provided a history of the business and the number of employees. He explained how Dart Transit differed from other trucking firms. He also explained the site layout. ? The architect described the project, including the storage, layout, access, building design, and landscape plan to the Council. Mayor Ellison questioned if ther expansion. The developer stated there time and that they would not know for the developer to describe the outside setbacks. The developer explained the Lone Oak expansion. e were plans were no def five years, storage and storage and for future inite plans at this Mayor Ellison asked variances for setbacks for future There was a discussion regarding the setbacks. Howard Knutson, a representative for the neighbors, stated they had concerns regarding the two-toot setback and felt there was a need for some type of easement. He f urther stated he was unsure what the County would do regarding purchasing the property. Councilmember Egan stated he felt there was no rationale for the variance as it did not have a significant hardship. Mr. Worthington stated they would prefer a 10-foot setback. Councilmembei Wachter stated that if the neighbors had concerns, the problem should have been addressed before the meeting. Egan moved, McCrea seconded, the motion to approve a conditional use pecmit to allow Opus Corporation/Dart Transit an outside storage building in an LI district and a pylon sign f or Lots 1 and 10, Block Page 15/CITY COUNCIL MEETING MINUTES October 18, 1988 1, Eagandale Inaustrial Park No. 3 and Lots 2-5, Block 1, Eagandale Center Industrial Park No. 4, subject to the f ollowing conditions: 1. This development shall dedicate, provide or financially guarantee its proportionate share of the acquisition costs of additional drainage, ponding and utility easements as required by the alignment depth and storage capacities of all required public utilities and streets beyond the boundaries of this proposed development, or outside of dedicated public right-of-way as necessary to service this development. 2. This develop?nent shall dedicate adequate drainage and ponding easements to incorporate the required high water elevation as necessitated by the City's storm water storage volume requirements. 3. All public streets and utilities necessary to provide service to this development shall be designed by a registered professionai engineer in accordance with the City Codes and engineering standards and policies that have been approved by staff prior to building permit issuance. 4. A detailed grading, drainage, erosion and sediment control plan must be prepared in accordance with current City standards and approved by staff prior to issuance of a grading permit or building permit issuance, whichever occurs first. 5. If any public improvements contract, that appropriate project prior to building permit issuance. are to be installed under a City must be approved by Council action 6. The development shall be responsible for acquisition of all regulatory agency permits in the time frame required by the affected agency. 7. The development is required to submit detailed plans and specifications for the proposed retaining wall construction for staff review and approval prior to building permit issuance. 8. The development will be responsible for lowering the existing water main as necessitated by the proposed site grading to maintain a minimum 7.5 feet of ground cover. 9. The development will be responsible for the adjustment of all existing utility appurtenances as necessitated by the site development. 10. All site generated storm water runoff is required to be conveyed by storm sewer system to Pond EP-4A prior to discharge into the existing City storm sewer system. Page 16/CITY CODNCIL MEETING MINUTES October 18, 1988 11. Additional catch basins are required for the south parking lot for the headquarters building and the south parking are for the safety lane building. 12. All signage shall be subject to the one time sign fee of $2.50/sq. f t. 13. A landscape plan provided on a grading plan shall be appcoved prior to the issuance of a building permit. 14. The parking amount shall be approved as per the site plan. 6 All voted in favor. Egan moved, McCrea seconded, the motion to approve a variance for a building setback on Lots 1 and 10, Block 1, Eagandale Industrial Park No. 3 and Lots 2-5, Block 1, Eagandale Center Industrial Park No. 4, subject to a signed agreement letter from both owners. All voted in f avor. TRAILWAY MAINTSNANCE POLICY City Administrator Tom Hedges introduced the next item regarding the trailway maintenance policy. Public Works Director Tom Colbert summarized the background and the issues regarding the trailway maintenance policy. He stated that he felt plowing would be a dangerous precedent and that the City could not maintain that type of plowing with their present resources. He felt that the School District should be responsible for their own transportation. The committee recommended no winter maintenance and there were concerns regarding liability. He reported that the original policy was proper in omitting the winter maintenance. Kathy Robertson supported Mr. Colbert's analysis and stated she r preferred busing. Zelma Meyer also concurred with Mr. Colbert's presentation and ' stated she was against the children walking to school.' Wachter moved, Gustafson seconded, the motion to re-affirm the current policy regarding maintenance of sidewalks and trails within the City. All voted in favor. CONDITIONAL USE PERMIT/PROEX PHOTO SYSTEMIS Assistant City Attorney Mike Dougherty recapped Ray William's presentation. There was discussion regarding the retail uses and the viewing of the tapes. Mayor Ellison requested that legal counsel provide written documentation to the Council =egarding the matter. OFFICE USE ONLY L ? BL ? RECEIPT #: SUBD. ? . c.%ti• . ?e.`? DATE: 1996 PLUMBING PERMIT (COMMERCIAL) CITY OF EAGAM 3830 PILOT KNOB RD EAGAN, MN 55122 (612) 681-4675 , Please complete for: ? all commercial/industrial buildings. ? multi-family buildings when separate permits are D_Qt required for each dwelling unit. 2 y 2- ? ':?' DATE: CONTRACT PRICE: ' WORK TYPE: NEW CONSTRUCTION _X ADD ON REPAIR DESCRIPTION OF WORK: IS WATER METER REQUIRED7 _ YES ? NO. IF SO, PLEASE PROVIDE THE FOLLOWING: WATER FLOW: GPM. ARE FLUSHOMETER:i TO BE INSTALLED? _ YES ? NO. FAILURE TO PROVIDE THIS INFORMATION WILL RE5UL7' IN A DELAY OF METER ISSUANCE. WILL YOU BE INSTALLING A METER FOR A FUTURE U.G. SPRINKLER SYSTEM? _ YES _ NO. IF SO, YOU MUST APPLY FOR A SEPARATE U.G. SPRINF:LER PERMIT. FEE: $25.00 minimum fee or 1% of contract price, whichever is greater. State surcharge of $.50 per $1,000 of pg.ii' fee due on all permits. CONTRACT PRICE x 1% STATE SURCHARGE TOTAL ?s';?D S? - SITE ADDRESS: TENANT NAME: STE. # OWNER NAME: INSTALLER: l e ADDRESS: cJ ?? I??U CITY: ?? l t STATE: ZIP: 3p PHONE #: SIGNATURE: ' APPLICANT OFFICE USE ONLY ? METER SIZE: " DATE: INSPECTOR: ? ?"000 *citV oF eagan PATRICIA E. AWpDA Mayor PAULBAKKEN PEGGY CARLSON CYNDEE FIELAS MEC TILLEY cot,ndl Members THOMAS HEDGES Ciry Adminisvacor Municipal Cen2er: 3830 Pilot Knob Road Eagan, MN 55122-1897 Phone: 651.68 ] .4600 Fax: 65 L681.4G 12 TDD: 651.454.8535 Maintenance Faciliry: 3501 •^,oachman Poinc Eagan, MN 55122 Phone: 65 ] .681.4300 Fax: 65! .G81.4360 TDD: 551.454.8535 www.cityofeagui.com THE LONE OAKTREE The symbol of strengrh and growth in our March 4, 2002 MR GARY SANTOORJIAN DART TRANSIT AND COMPANY POBOX64110 ST PALTL MN 55164-0110 RE: 850 LONE OAK ROAD Dear Gary: This letter is meant to advise you that if the food service Dart wishes to make available at its pro-stop facility is limited to food items that are prepared off-premise, purchased prepackaged, and contained in separate coolers (one containing bottle beverages, one containing prepackaged food), this use would be consistent with the existing Limited Industrial zoning of the property provided the level of service does not exceed the parameters described herein. Feel free to contact me at 651-681-4689 if you have any questions regarding this information. Sincerely, Michael J. Ridley Senior Planner MJR/j s . community 2007 COMMERCIAL MECHANICAL PERMIT APPLICATION City Of Eagan 3830 Pilot Knob Road, Eagan MN 55122 Telephone # 651-675-5675 Please complete for. commercial/industrial buildings multi-family buildings when scparate permits are not required for each dwellinr unit Cheryl Hein I hereby acknowledge thai this information is complete and accuratc; that the work will be in conformance with the ordinances and codes of thc City of Eagan and with the Mechanical Codes; thai I understand this is not a permit, but only an application for a permit, and work is not to start without a pemtit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. -X.sd Date 7. / 9 / 2007 Site Street Address 850 Lone Oalc Rd Unit # Tenant Name (if applicabie) Pro Stop Previous Tenant Name Properh, Owner Dan Flanqan/Tim MOL'erio Telephone #( 651 ) 688-9299 Contractor Pump & Meter Service, Inc. Street Address 11303 Excelsior Blvd City Hopkins State MN Zip 55343 Telephone #( 952 ) 933-4800 Bond #: Expires: The Applicant is _ Owner X Contractor _ Other Work Type New Construction _Interior Improvement _Install Piping _ Proccssed _Gas Exterior HVAC Unit** **HVAC units musl be screened ",UndcrlAbove ground Tank X Install Remove . i__ When install ing%removing tank(s), call for inspection by Fire Marshal and Plumbina Inspector Naiure;of:?&-ork: Tnstall Underground E-85 fuel system ; permitJ?ees ?nderground tank installation/rcmoval $50.50 Minimum (includes S[ate Surcharge) or cohtracf Value $ x 1% Permit Fee , -'i y; $ State Surcharge ' To calculate surcharge lf Permit Fee is ?ess than $1,000, surcharge is 50 cents. If Permit Fee is >$1,OU0, surcharge increases by $.50 - for each $1,000 Permit Fee (i.e. a$ I,00142,000 Permit Fee requires a $1.00 surcharge). S ? C) • JM Total Fee ApplicanPs Printcd Name Approved By: ?- ApplicanPs Sig ture Required Inspections: ? U.G Inspcctor . ? ?R.I. V'-.-Air Test Gas Service Test Infloor Heat mal Date: CityofEaali 3830 Pilot Knob Road Eagan MN 55122 Phone: (651) 675-5675 Fax: (651) 675-5694 r Use BLUE or BLACK Inkb/l For Office use /J IgvQ O_5 1/-67`/f Permit #: Permit Fee: Date Received: Staff: / UL 2016 COMMERCIAL BUILDING PERMIT APPLICATION k /9)/(0 Site Address: gSLO>— Oa\K � t GA'l 1� � I J '5 \2 I Tenant Name: 7c-r.n (Tenant is: New / /Existing) Suite #: Former Tenant: Name: Qt(k n S IT Phone: 651 - ( — L000 Address / City / Zip: Cbt° Lam - aAt✓ 19-1/ 'r� , PAN Applicant is: Owner )( Contractor Description of work: —\--eir* j eW1 - MO 5P (2.01} 4-ta > Construction Cost: Name: J'-1"1 9 &i License #: Address: (00 0 Aot-- State: Zip: S G til t -j City: M tv\ twirl i S Phone: (p IL- 3 - 3oM Contact: J(k l —1-Q( v °v Email: \yo (6e/Yx1c)r v.¢- - m n . 4.4.) in Name: N Address: City: State: Zip: Phone: Contact Person: Email: Registration #: Licensed plumber installing new sewer/water service: Phone #: CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.ciopherstateonecall.orq I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. x Vi O\(A T0 r6'fiti''1 Applicant's Printed Name x Appl Page 1 of 3 '/019 o(-2-6 Lit( oiliz 1,4(2A— ( (2-gf"el • 1 DO NOT WRITE BELOW THIS LINE SUB TYPES Foundation _ Public Facility _ Commercial / Industrial Accessory Building Apartments i< Greenhouse / Tent Miscellaneous _ Antennae WORK TYPES New Addition Alteration Replace Salon Owner Change Interior Improvement Exterior Improvement Repair Water Damage DESCRIPTION Valuation Occupancy Plan Review Code Edition (25% 100% ) Zoning Census Code Stories # of Units Square Feet # of Buildings Length Type of Construction Width REQUIRED INSPECTIONS Footings (New Building) Footings (Deck) Footings (Addition) Foundation Foundation Before Backfill Drain Tile Roof: _Decking _Insulation _Ice & Water _Final Framing 30 Minutes 1 Hour Fireplace: _Rough In Air Test _Final Insulation Sheetrock Windows Final CIO Inspectio Reviewed By: _ Exterior Alteration -Apartments _ Exterior Alteration -Commercial Exterior Alteration -Public Facility Siding Reroof Windows Fire Repair _ Demolish Building* _ Demolish Interior _ Demolish Foundation Retaining Wall *Demolition of entire building - give PCA handout to applicant MCES System SAC Units City Water Booster Pump PRV Fire Sprinklers Final / C.O. Required Final / No C.O. Required Other: Pool: _Footings Air/Gas Tests Final Siding: _Stucco Lath Stone Lath _Brick EFIS Retaining Wall Erosion Control Concrete Entrance Apron Meter Size: Electronic Plans Required hedule Fire Marshal to be present: Yes No Building Inspector Reviewed By: COMMERCIAL FEES Water Quality Base Fee Storm Sewer Trunk Surcharge Sewer Trunk Plan Review Water Trunk MCES SAC Street Lateral City SAC Street S&W Permit & Surcharge Water Lateral Treatment Plant Other: Treatment Plant (Irrigation) Park Dedication Trail Dedication TOTAL: ' ' S , Planning Page 2 of 3 Use BLUE or BLACK Ink CityEaEall * of For Office Use Permit*: Permit Fee: , 3830 Pilot Knob Road Eagan MN 55122 ,,• : • to -(0 -(7 Phone:(651)675-5675 Date Received Fax:(651)675-5694 -------- 2017 COMMERCIAL BUILDING PERMIT APPLICATION Date: 6/14/17 Site Address:aSDfiOtrLone Oak Road Tenant Name: Dart Transit Company x(Tenant is: New/ Existing) Suite g.. Former Tenant: Name: Dart Transit Phone: (651) 688-2000 Property Owner 800 Lone Oak Road Address/City/Zip: Applicant is: Owner Contractor Zt . Tent Installation at Dart Transit Company Apo s F. — Description of work: __ , Type of work ) $6,000.00 St-r-uP Dig-rE. 15 oce- 13- 17 - Construction Cost: Name: Ultimate Events License#: N/A Address13405 15th Avenue N City: Plymouth : Contractor State: MN Zip: 55441 Phone: (763) 559-6213 Contact: Olivia Brion Email: obrion@ue-mn.com Name: Registration#: Architect/Engineer Address: City: .,. State: Zip: Phone: Contact Person: Email: Licensed plumber installing new sewer/water service: . Phone#: .,.,., NOTE Plans and aupportingdocaments that you are considered to be public informatiOni'kirti:Portions' ,classifiedr as non-public iffyaiirovide specific reasons that would permit„i the City., d; the Information mayAbe, -P.,A,,- that i they _ ,concludelhare trade secrets. , . CALL BEFORE YOU DIG. Call Gopher State One Call at(651)454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities, wwvv.qooherstateonecall.ora I hereby acknowledge that this information is complete and accurate; that the workwill be in conformance with the ordinances and codes of the City of Eagan;that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit;that the work will be in accordance with the approved plan in the case o ,orkwhich requires a revie and approval of plans, Olivia Brion x Applicant's Printed Name .%ay.n s Signature Page 1 of 3 VD L_Irc C)0--k-Z-J -14- it/3 3 SY DO NOT WRITE BELOW THIS LINE SUB TYPES Foundation Public Facility Exterior Alteration-Apartments Commercial/industrial Accessory Building Exterior Alteration-Commercial Apartments Y..._ Greenhouse/Tent Exterior Alteration-Public Facility Miscellaneous Antennae WORK TYPES New Interior improvement Siding Demolish Building* _____ Addition •14 Exterior improvement Reroof Demolish Interior _ Alteration - Repair Windows Demolish Foundation Replace Water Damage Fire Repair Retaining Wall Salon Owner Change *Demolition of entire building-give PCA handout to applicant DESCRIPTION Valuation eile-ct Csc, 6°l35) Occupancy MCES System Plan Review Code Edition SAC Units (25% 100% ) Zoning City Water Census Code Stories Booster Pump #of Units Square Feet PRV #of Buildings Length Fire Sprinklers Type of Construction Width REQUIRED INSPECTIONS Footings New Building Deck Addition Drain Tile Foundation Foundation Before Backfill Retaining Wall Vapor Barrier Erosion Control Framing 30 Minutes 1 Hour _ Steel Reinforcement Insulation Concrete Entrance Apron Sheetrock Other Roof: Decking Insulation Ice&Water Final Meter Size: Siding: Stucco Lath Stone Lath Brick EFIS Electronic As-Built Plans Required Windows Fireplace: Rough In Air Test Final Final/C.O.Required Pool: Footings Air/Gas Tests Final *--K Final/No C.O.Required Final C/O Inspection:Schedule Fire Marshal to be present: Yes X No Reviewed By: $' i, ,Planning New Business to Eagan: I Reviewed By: 4 44,........_ ,Building Inspector FEES Water Quality - Base Fee Storm Sewer Trunk _- Surcharge _- Sewer Trunk ._ Plan Review _- Water Trunk --- MCES SAC - Street Lateral - — City SAC Street — S&W Permit&Surcharge — Water Lateral - Treatment Plant _ Stormwater Performance Security — Treatment Plant(irrigation) - Landscape Security Park Dedication — Other: Trail Dedication — TOTAL: 4/ ,, Cri*eg ree-i Page 2 of 3