Loading...
4388 Malmo CirGITY OF EAGAN Remarks Additio?Wilderness Run 4th Additian Lot 19 eik 3 Parcei 10 84353 190 03 Eacran, MN 55123 Owner bt)GL?-f?- -??-f [k?d(N EAi'r Street 4188 Malmo Cr_ State Improvement Date Amount Annual Years Payment Receipt Date STREET SURF. STREET RESTOR. GRADING SAN SEW TRUNK 1973 $163.26 $8.16 20 .46 A003888 4=20-7 SEWER LATERAL WATERMAIN WATERLATERAL 1972 $584.91 $38.99 15 • 4-ZU-77 WATER AREA S70RM SEW TRK 570RM SEW LA7 CURB & GUTTER SIDEWALK S7REET LIGHT WATER CONN. $320. 00 490 6-26-75 BUILDING PER. 6-26-75 SaC 490 6-26-75 PARK VICLApI OF EAGAM WATER SERVICE PERMIT 3795 Fiiot Nnob Road PERM[T NO.: 1783 Eogon,MN 55124 DA'fE: 7/24/75 Zoning: RI No. of Units: 1 Owner: Address Site Adc Plumber: Weie_r]ce Merer No.: 91'e Connection Charge•320 nn pel Size: Account Deposit: Reader No.: 631YS- S Permit Fee: 10.:_0_0 bi112d I agree to comply wifh the Village o! Eagon Surchazge: • 50 billed Ordinawcas. Misc. Charges: 60-00 pd Total: y?-- By _F__?1?.??? DntePmd: Ua[e of Insp : Insp.: . YILLAO@ OF EAOAN 3795 Pilof Knob Road SEWER SERVICE PERMIT PERMIT NO.: 2543 Eayan, MN 55II3 DATE: Z/2d??r Zorting: Rl No. of Units: 1 owner: Develoaers Const. for Fnbert Lynch Addrees: si[e Addmss: 4388 Malmo Cirfile, Eagan 55123 Plumber: w iorko 1 agree ro eomply wifh ehs Vflbge 04 Eogan Connection Chazge: 425.00 pd 6/26/ Ordinonua. ay: Date oF Insp.: Inep.: - Account Deposit: Permit Fee:10.00 billed Surchuge: • 50 billed Misa Chazges: Total: Date Paid: - CITY of EAGAN ti UILDING PERMIT Owas: ! Ia N2 3620 3795 Pilo! Knob Road Eagan. Minnesola 55122 454-8100 Hufldex Addzau a.:. ...-??..?....,?2.(:...,l.7l.17 Sioriee To Be Uaed For Front Depth Heigh! Esl. Coef mi! e Aemuks I ??1 f G..?C)u.w 9 ? S? 3917V- This permit does not authorisa the use of siseels, roada, alleps or sldewalks nor does it gSva !6e owaer ot 6L agen! the righ!!o creale any sifualioa whieh is a nvisance or whieh pseseals a ha:ard !o the hsallh, safety, coavenieace and general welfare !o aapone in the communifp. THIS PERMIT MUSTcp?7r- EPT pN HEn PREMISE WHILE THE WORR IS IN PR r4i. TLis is !o ceefifp. !hal?lt/.?t_..AA?-----°--...--°........haa permisaion !o e:act a....R .... ........................... . upm the above desc 'bed premisa subjeei !o the provisions of all ap ' e r ces for !h of Eagen. ?---?--•°---- .ri-`--°-°-----.....°---°°°---° ............. Per .... .. ....- ---n:'?..........------.....__---.......-__'- ? Mayor SuSldinq Inupeelor ?q7& CITY OF PAG3N 3795 Pilot Knob Road Eagan, IvIinnesota 55122 ?vve-a ? PERNtLT NO.: 582 The City of Eagan hereby grants to Spetz & aerg inc. sf 6417 Penn Ave So 55430 a pr.rrnmarxc Permit for: (Owner) Develoners const. Inc, at 4388 Malmn c1rcle p pursuant to application dated 7/23175 Fee Paid: 820.oo dated this25_day of Julv , 19 75 . .50 s/c Building Inspector N'.echanical Permits: Bid Total: 41 ' .`' / CI'L'Y OF EA'aN 3795 Pilot Knob Road Eagan, A'Iinnesota 55122 PERNiIT N0. • 70'4 The City of Eagan hereby grants to 8oae H9atina &Ac. sf 4805 Dominick Dr., Minnetonka 55343 aHEATING Permit for: (Owner) Mr. Robert Mcltinserv ? at 4388 Naimo Circle , pursuant to application dated 7/21/75 1 Fee Paid: $20.00 dated this 21 day of July , 19 75 .50 s/c Building Inspector N:echanical Permits: Bid Totale E\ISTIN( bRADEEL EZU] FIN.GRADE EL. LOT LINE ? ? I ?- ? N W il ? v u := ? ( Ui i ? Q L ? ? , V? ? W Z J ? O EXiSTI GRADE EL. FIN. - OE EL. F1N G«ADE EQ r ??J _jOb?7 ( ./_Q5l --? - 58 y?? 2y x zy FIN. f ; , . E EX iSTING lGk.?DE E L. H 1 //O FIN V3RADE EL ? ; EkIJING GRADE EL FIN. GkADE EL. ESTAB. EL 1 /60 -?I EXISTING EL. fIY. GRADE EL. 3 - ----- -- - -..?'--r? Ex15T W Z J ? 9 GR4DE cL EXISI'INV 4A'lE EL ?\LGI rD3 1N, t RADEEI_. l.E-? ; ----- - - ? ' `_? - - -- Jr 7 F-? PUBLIC WALK LINE?- -----t------- - ----- - PUBLIC ?EWER-" ? INVERT EL. AT CONNEC TiCN CF PUBLIC SEWER --{?}-- -- ---------- - = " ? - - - --?- - ? - _-/I'Lf}--?,IN,O_ _ C/_?P.C LE NAME CF STREET ESTaB EL. ? fv F.H.A. PLOT PLAN REQUIREMENTS & INST'RJCTIONS rur cni i nwING INFOF'"IAiION MUST BE BY INDIVIDUAL APPLIC,ANT oF L-or CT10N :NSiONS; SIZE S LOCATION OF STOOPS FROM FRONT LpT LINE ROM SIDE LOT LINF RoM LoT IINE To cRo55 STRCEr R WALKS? DRIVEWAY IF AlIY LIC WqLK '7ER LOCqTION /ATION9 AESTABLISHED 57REET EL. qT EDGE OF LoT LINE,?', GRADE EL. qT EACN GGRNER OF LoT A.Df EL OF pUBLIc NJALK 4T FRO*AT COPJJEP oF LOT & fiNISH GRADE EL. AT EAGH >F pWELLING gIIC SEWER A7 POINT OF CONNEC7ICN , $iZE OF GARA6E iF ANY H, tiLncK NUMBEk, E NiaraE OF _Uts•"oIvlS1ot4 BER & 5"rREET NANE£ TY, TOWAI, JILLAC-E & ST-{YE SING PHIVATE WELL d 7epTIC TANK INOICATr Ot;AT10N OF EAC.H 8. DkAi'v P,EG TAYK DIREC710A1 RF pFtAi;4A,r^. "N F: ^T pt.PN _OT NC. __/-?-6L0CI; NG. _3 WllD?KNESS RUN :,UB-DIV ISIG V -?JouR.zTl_A-D-2l-T.o.?__- dQU`E NC. iudf_---- -- -ITY 6,46AA? ; 1A1 E ?HA( PLC:T PLA?J . ? . .. Wlk , . ,. ..?r. . -•, . . , . DELMAR H. SCHWANZ LANDSVRVEYOR ? J Re9ii[ereC Under Laws of the S[ate of M,nnesota i} I 1 h MAIN STREET P. . BOX M • ROSEMOUNT, MINNESOTA 55068 • PHONE 612 423-1789 3o ? SURVEYOR'S CERTIFICATE ? \ ? I ? I 10 ?'i ? " °' ??' - I' , .\ \ Pd I I /. ...?. ? ;? • `? i - h - ? ? - - °- ? -?'•ti, t. t r ^ .. . r . - o, p . . . ?.•_ , - ? , I. ?.. ? . , ? .? `: f . ?. . . . .. } ?.. ? . r DC-VEL0Pe5:)es c?nlsT /?/c. q3 F8 17?74L AIo C/RCL? E/1- GRA/) /WIrJ. 5?/z 3 ., ? MINNESOTA REGISTRATION N0.8625 ( ? MASTER CARD Permit No. Issued Issued To Coniractor Owner 6UIlDING • w OW • PLUMBING i CESSPOOL - SEPTIC TANK \ WELL ElEC7RICAl HEATING GAS INSTAILING ?Jr7 ?i{ -f--e? lLwto SANITARV SEWER OTHER OTHER I ITems Approved (Initial) Date Remarks Distance from Well FOOTING ? SEPTIC FOUNDATION ,- ZQ° 7f CESSPOOI FRAMING TILE FIELO FT FINAL ELECTRICAL HEATING _ DEPTH OF WELL GAS INSTALLATION SEPTIC TANK CESSPOOL DRAINFIELD 7LUMBING 5! WELL SANITARY SEWER Violations Noted on Batk COMMENTS: LAND USED ASV %f7r x QL L>iIll ar- 42 IC r e a. Lomas Loan #02-22-27569 EASEMENT THIS EASEMENT, made this 25th day of August , lggg, between THE LOMAS AND NETTLETON COMPANY, a Connecticut corporation, Y,erein referred to as "MORTGAGEE" and the CITY OF EAGAN, a municipal corporation, organized under the laws of the State of Minnesota, rereinafter referred to as the "CITY". 6ITNESSETH: 7hat the Mortgagee, in consideration of the sum of One Dollar ($1.00) &nd other good and valuable consideration, the receipt and :ufficiency of which is hereby acknowledged, does hereby grant and convey unto the City, its successors and assigns, a temporary construction easement for roadway purposes, over, across and under the following described premises, situated within Dakota County, P:innesota, to-wit: That part of Lot 19, Block 3, WILDERNESS RUN FOURTH ADDITION, according to the recorded plat thereof, Dakota County, Minnesota, lying 20.00 feet on each side of a centerline described as beginning at the most northerly corner of Lot 18, Block 3, WILDERNESS RUN FOURTH ADDITION; thence South 48 degrees 44 minutes 26 seconds East, assumed bearing, along the northeasterly line of said Lot 18 a distance of 112.54 Eeet; thence South 51 degrees 59 minutes 52 seconds West a distance of 121.32 feet to the south line of said Lot 18 and said centerline there terminating. The sidelines of said easement are to be extended or shortened to terminate at the south, northeast and northwest lines of said Lot 19. The Temporary Construction Easement shall expire: June 1, 1989. The grant of the foregoing temporary construction easement for roadway purposes includes the right of the City, its contractors, agents and servants to enter upon the premises at all reasonable times to construct, reconstruct, inspect, repair and maintain pipes, conduits, mains or ponds and the further right to remove trees, Lcush, undergrowth and other obstructions. After completion of such construction, maintenance, repair or removal, the City shall restore the premises to the condition in which it was found prior to the commencement of such actions, save only for the necessary removal of trees, brush, undergrowth and other obstructions. The Mortgagee, its heirs and assigns, does covenant with the City, its successors and assigns, that it is the owner of the Fremises aforesaid and has good right to grant and convey the easement herein to the City. IN TESTIMONY WHEREOF, the Mortgagee has caused this easement to :;e executed as of the day and year first above written. THE LOMAS AND NETTLETON COMPANY, A Connecticut Corporation ??ip? By:?' I ??Yt ?tic.vl/? ???? ?y j Nancy . Jel nski ItS: Assistant- Vice President :>TATE OF TEXAS ) ) SS. COUNTY OF DALLAS ) The foregoing instrument was acknowledged before me this 25t1? day of August , 1988, by The Lomas and Nettleton Company, a (:onnecticut corporation, on behalf of s'd corporation. N ary Public Carolyn Gossett `:HIS INSTRUMENT WAS DRAFTED BY: `tcMENOMY & SEVERSON, P.A. 7300 West 147th Street .0. Box 24329 :+pple Valley, MN 55124 612) 432-3136 i lGD -2- VI?VVI\11 I IVIV VI\L.IV?1 1 VI1 CITY OF EAGAIV \ MALMO 1 I ??1?, (? •` ? J?? ._ S 81? ^ ? 15 784 I 4 , . -- 6• - ? MOST N'LY CpR ? OF LOT IB \ ! ? . : . • ?vn ?? I. . ?4r r O p e .p ??? N ?O'?1 w O O V: i e j `? 03 0 alsersTrNeier+ronawwe e vmm Z54 Z55 ----- 243.21 N 890 59 55' W -.. --- L s urEoF Lor ie SCALE: I INCH = 30 FEET PROPOSEU TEHPORARY CONSiRUCTIOh EASEMENT A temporary eesement over, under and across that part af lots 18 and 19, Block 3, MILDERNE55 RUN FOURTH AUOIiIUN, according ta the recerded plat thereof, Dakota County, Minnesota, lying 20.00 feet on each stde of a centerline descrtbed as beginning at the mo5t nartherly corner of Satd Lot 78; thence South 49 degrees 44 mtnutes 26 seconds East, assumed bearing, atong the northeasterly line of satd Lot 18 a distance of 112.59 feet; thence South 51 degrees 59 minutes 52 setonds Ilest a dl5tance of 121.32 feet to Lhe south llne of sald Lot 18 and sald centerllnethere terminaNng. . The sldeHnes of said easement are to be extended or shortened to terminate a[ the south, northeast and nortlmest Hnes of said Lots 18 and 19. Satd tempa- rary easement 1s to eMpire on I hereby certi(y that this sketch, D1an or repo*t was prepared by me or under my direct suDervtsion and that 1 am a duly Ne9lsterEd Land SUrveyor under tM1e laws vf the State o! Mlnnesota. Oated tMs 6M day of duly , 1988 SUMDE 1AN0 SURVEYING, INL. BY: ? K. ? - • Edward R. un e, R.L.S. eg. o. 89 I Rnnde lLwnd Rnrs•eying lnc. }A? E Mvnnbq?en [rt?wry IA'MI BMOmeplrn 4M fL]0 le?xl u?a+ff DoG ? 8?oc?65 Lomas Loan y02 Z?5 EASEMENT THIS EASEMENT, made this 25th day of August _1 1988, :etween TtiE LOMAS AND NETTLETON COMPANY, a Connecticut corporation, ierein referred to as "MORTGAGEE" and the CITY OP EAGAN, a municipal corporatiott, organized under the law's of the State oi Minnesota, iereinafter referred to as the "CITY". t ITNESSETH: `.hat the Mortgagee, in consideration of the sum of One Dollar ($1.00) znd other good and valuable consideration, the receipt and :ufficiency of which is hereby acknowledged, does hereby grant and konvey unto the City, its successors and assigns, a temporary construction easement for roadway purposes, over, across and under the following described premises, situated within Dakota County, iinnesota, to-wit: That part of Lot 19, Block 3, WILDERNESS RUN FOURTH ADDITION, according to the recorded plat thereof, Dakota County, rlinnesota, lying 20.00 feet on each side of a centerline described as beginning at the most northerly corner of Lot 18, Block 3, WILDERNESS RUN FOURTH ADDITION; thence South 48 de9rees 94 minutes 26 seconds East, assumed bearing, along the northeasterly line of said Lot 18 a distance of 112.59 L-eet; thettce South 51 degrees 59 minutes 52 seconds West a distance of 121.32 feet to the south line of said Lot 18 and said centerline there terminating. The sidelines of said easement are to be extended or shortened to terminate at the south, northeast and northwest lines of said Lot 19. The Temporary Construction Easement shall expire: June 1, 1989. The grant of the foregoing temporary construction easement for LDadway purposes includes the right of the City, its contractors, ugents and servants to enter upon the premises at all reasonable times to construct, reconstruct, inspect, repair and maintain pipes, (_)nduits, mains or ponds and the further riyht to remove trees, lrush, undergrowth and other obstructions. After completion of :;uch cDnstruction, maintenance, repair or removal, the City shall restore tne premises to the condition in which it was found prior to the commencement of such actions, save only for the necessary removal oF trees, brush, undergrowth and other obstructions. The Mortgagee, its heirs and assigns, does covenant with the City, its successors and assigns, that it is the owner of the i:emises aforesaid and has good right to grant and convey the c-isement herein to the City. IN TESTIMONY WHEREOF, the Mortgagee has caused this easement to e executed as of the day and year first above written. THE LOMAS AND NETTLETON COMPnNY, A Connecticut Corporation a c,-4 ? Sy: Nancy . Jel nski Its: Assistant Vice President TnTE OF TEXAS ) ) s5. OONTY OF DALLAS ) The foreqoing instrument was acknowledgeci before me this 25L:L day of August , 1988, by The Lomas and Nettleton Company, a ,'onnecticut corporation, on behalf of s'd corporation. kd)zh N ary Publ ic Carolyn Gossett {lIS INSTRUMENT WAS DRAFTED BY: 'cMENOMY & SEVERSON, P.A. 300 West 147th Street 1.0. Box 24329 pple Valley, MN 55124 612) 432-3136 lG U -2- Lei I Y vr tAvAIv MALMO ? - S 626 CV ,Z.E K CIRCL?? --" r ` . '•. n. s6>s,as. I rnosr N'ir cori ? 01' Lor ie \ I I i ` i '-' .... : O N 'O '! } b O O V: M '- `? ? ;). ( N ?YJ ( ,( J/? M `c o :m \ I AJ 243.21 ! LS IINE OF L07 18 SCaLE: 1 INCH = 30 FEET ?_ lSZ84 . ?? . ? ,. 9q1 . uimM oaaiwwe a unurr EASEM1ENT N 89° 59' 55' W ?-> . ? 3 N O O O O ? M m Z54 t55 PROPOSED TEMPDRRHY CONSTNUCIION EllSEHENT A temporary easement over, under and across that part o/ Lots 18 end 19, Blotk ], NILUERNESS PUN FOURTH ADOIiIOH, according to [he recorded pla[ thereo(, Uakota County, Minnesota, lying 20.00 feet on each side of a centerline described as be9inning at the most nartherly corner of said Lot 19; thence South E8 degrees 99 minutes 26 seconds East, assumed bearing, along the northeasterly Ilnc of said Lot 18 a dlstance of 112.59 feet; thence South 51 degrees 59 mfnutes 52 setonds West a dlstance of 121.32 feet to the south llne of said lot 18 and said centerNne there terminating. The sldeHnes of said easement are to be eztended or shortened to terminate at the south, northcast and northwest llnes oT said Lots 78 and 19. Sald tempo- rary easement ts to eMpire an , I hcreby certify tha[ this sketch, plan or repvrt was prepared by me or under my dfrect suDervislon and that 1 am a duly Reglstered Land Surveyvr under the laMs of the State of Minnesota. Dated tMS 6rn day of July , 1988 SUNOE U1H0 SURVEYIMG, IB? " 0Y: ?c.d...--? -l, war , un e, R.L.S. eg. a. 861 !iondc Cend !9orve7lng Onc. mI e m.. ro. r...«v Ixiwi Mmm11'm MN f.P ryql p1.Nff 88 -211 .Al T 2T P 23 5 2) ???G1&_D SASSMSNT THIS EASEMENT, made this ___ day of 1988, between HOWARD L. BOSMA and GERALDINE BOSMA, husband and wife, herein refexred to as "LANDOWNER" and the CITY OF EAGAN, a municipal corporation, organized under the laws of the State of Minnesota, hereinafter referred to as the "CITY". WITNESSETH: That the Landowner, in consideration of the sum of One Dollar ($1.00) and other good and valuable consideration, the receipt and sufficiency of which is hezeby acknowledgedt does hexeby gxant and convey unto the City, its successors and assigns, a temporary construction easement for roadway purposes, over, across and under the following described premises, situated within Dakota County, Minnesota, to-wit: That part of Lot 191 Block 3, WILDERNESS RUN FOURTH ADDITION, according to the recorded plat thereof, Dakota County, Minnesota, lying 20.00 feet on each side of a centerline described as beginning at the most northerly corner of Lot 18, Block 3. WILDERNESS RUN FOURTH ADDITION; thence South 48 degrees 44 minutes 26 seconds East, assumed bearing, along the northeasterly line of said Lot 18 a distance of 112.54 feet; thence South 51 degrees 59 minutes 52 seconds West a distance of 121.32 feet to the south line of said Lot 18 and said centerline there terminating. The sidelines of said easement are to be extencied or snortened to terminate at the south, northeast and northwest lines of said Lot 19. The Temporary Construction Easement shall expire: June 1, 1989. The grant of the foregoing temporary construction easement for roadway purposes includes the right of the City, its contractors, agents and servants to enter upon the premises at all reasonable times to construct, reconstruct, inspect, repair and maintain pipes, conduits, mains or ponds and the f uzther right to remove trees, brush, undergrowth and other obstructions. After completion of such construction, maintenance, repair or removal, the City shall restore the premises to the condition in which it was found prior to the commencement of such actions, save only for the necessary removal of trees, brush, undergrowth and other obstructions. The Landowner, its heirs and assigns, does covenant with the City, its successors and assigns, that it is the owner of the premises aforesaid a d h4s good right to grant and convey the 8asement herein to t?e City. tiw z7 .? I I? I? OFFICE OF THE COUNTY MN N . TY, RECORDER-DAKOTA CAU CERTIFIED THAT THE WITHIN I INSTRUMENT WA5 FILED FOR I RECORO IN THIS OFFICE I ON AND AT Oet 11 3 30 PM '88 e ?; U w? Z7-) DOC. NO JAMES N 0 N, COUNTY REC,QADER W DEPUTY FEE CASH ? CHECKX CHARGE ? CHARGE WHOM REFUND DO NOT REMOVE ? ?/?. ?.6,i J(,d7 ? ???/°.,1•? ? 'haaefwSntereaTMe dqyof 19 Co=fy Auditw,DekotaCa ,?-g ci rY oF EAGAN ? I MALMO , ' • s 82° 09. . K CIRCL?---" E l2 r p.bo . '•. G. 5 15784 > ` 4 -b ? C•S & • I MOSf N'lY LIXt. ? OF lAT IB \ J ? ? i \ . ??a ' . i -'.--- ---, r c° 'R ro > `? o+ cns o ? j'Oe'? - ? b =J FQF.09 p m l: W ? X / " p" f-\ _ . . . IXISlIN6 ORAIW?GE B UtILITY FASEMENT .. 243.21 N 890 59' 55' W L S LIN E OF LOT IB SCALE: I INCH : 30 FEET PROPOSEU TEMFORARY CONSTRUCTION EM1SEMENT A temporary easement aver, under and across that part of lots 18 and 19, Block 3, WILDERNESS RUN FOURTH ADDITION, accarding to the recorded D1at tAereof, Dakota Lounty, Ninnesafa, lying 20.00 feet on each side of a centerline described as beginniag at the most nartherly corner of satd Lot 78; thence Sauth 46 degrees 49 minu[es 26 seconds East, azsumed bearing, along the northeasterly line of said Lot 18 a distance of 112.54 feet; thence Sou[h 51 degrees 59 minutes 52 seconds Mest a distance of 7T1.32 feet to the south llne of sald Lot 18 and said centerlinethere terminating. The stdelines of said easement are to 6e extended or zhortened to terminate at the zouth, northeast and northwest linez of sald Lots 18 and 19. Said tempo- rary easement is to ezpire on ?.?T. r? <f?-? I ' • . i 3 N 0 b 0 I O N 1A m Z54 255 ?--- I hereby certlfy that this sketch, plan or report wat prepared by me or under my dlrect SuDervlslan and that I am a duly Registered Land Surveyor under the laws of the Sta[e of Mlnnesota. Dated thls 61h day of Juty , 7986 $UNOE LAND $URVEYING, INC? BY• ce8..??- v.. ?5? Mar H. un e, R.L.S. eg. No. a6lT I qnnde LHnd 9urveyln9 Inc. 1m? E bmmipan r?w.ry ?]aM bmmnplm MN SY30 H1]IM\.l?f! 98-211 .lL. T 27 R 23 521 2004 RESIDENTIAL MECHANICAL PERMIT APPLICATION City Of Eagan 3830 Pilot Knob Road, Eagan MN 55122 Telephone # 651-675-5675 Picase complere for: singlc family dwellings & townhomes/condos when permits are required for each unit -Ab 3o.s6 Date 5 / 10 ? 04 Site Address *alt"-almo Circle Unit # Ea an. MN 55123 PropertyOwner !'.oward Aosma Telephone#( 651 ? 452-7797 Contractor Apple-Lake Heating & Air Conditioning, Inc. StreetAddress 207 Cty Road 42 City Apple Valley State MN Zip 55124 Telephonetf ( 952 ? 431-4328 Bond #: 69579111 Expires: The Applicant is _ Owner X Contractor _ Other Add-on or alteratlon to existing dwelting unit $ 30.00 X furnace _Additional X Replacement air exchanger air conditioner _New _ Replacement other State Surcharge $ .50 Total MAY Y 2 ?,??+ i, 30.50 1 hereby apply for a Residential Mechanical Permit and acknowledge that the infox?? xrismple4e and jurate; tUat the work cvill be in conf'ormance with the ordinances and codes of the City of Eagan and with the Mechanical Codes; that I understand this is not a pemnt, but oiily an application for a permit, and work is not to start without a permit that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. Applicant's Printed Name J ApplicanYs Signa PERMIT City of Eagan Permit Type:Mechanical Permit Number:EA112985 Date Issued:08/27/2013 Permit Category:ePermit Site Address: 4388 Malmo Cir Lot:019 Block: 003 Addition: Wilderness Run 4th PID:10-84353-03-190 Use: Description: Sub Type:Residential Work Type:Replace Description:Air Conditioner Comments:Questions regarding electrical permit requirements should be directed to State Electrical Inspector, Mark Anderson at (952) 445-2840. Janel Behrends 122 West 3rd S Fee Summary:ME - Permit Fee (Replacements)$55.00 0801.4088 Surcharge-Fixed $5.00 9001.2195 $60.00 Total: I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Contractor:Owner:- Applicant - David R Coward 4388 Malmo Cir Eagan MN 55123 Haley Comfort Systems 122 West 3rd St Hastings MN 55033 (651) 437-0338 Applicant/Permitee: Signature Issued By: Signature 4,1/i' City of Eaau 3830 Pilot Knob Road Eagan MN 55122 Phone: (651) 675-5675 Fax: (651) 675-5694 RECEIVED FEB 0 8 2016 Use BLUE or BLACK Ink For Office Use Permit #: 'jL (C W Permit Fee: Date Received: Staff: L. 2016 RESIDENTIAL PLUMBING PERMIT APPLICATION Date: 2'/3 16 Tenant: Site Address: 1f3E? �� Lr -7C C, c J Suite #: Name: ,k Er L L y g o L. e r Phone: I63 -2. v6 -9362 Address / City / Zip: 1./35 / f c L n'1 o c r e Cas Ce. h , /7?/� .S ��oZ 7 Name: //h? S L+%U6.L 1-7 /y t el rn b , n,s License #: Li /0 fill Address: AD. -5- Coo �y r c( g ( City: 06..S LO State: MAIAD.-5-n Zip:f�/r36? Phone: "263- 4/. Contact: //#2 �-/r/CLAO Emaiisiee-cIy/° G©mc.&S?. /(167— New (1T New 'A Replacement Ale _f Rebuild _ Modify Space _ Work in R.O.W. Description of work:jn�S��LL Ale 6) %'c ,4d ar3rigiea.1;-514uYc P/"VaLvc-5 RESIDENTIAL Water Heater Lawn Irrigation ( RPZ / _ PVB) Septic System New Abandonment _ Water Softener ( Add Plumbing Fixtures ( 1 Main / Lower Level) Water Tumaround RESIDENTIAL FEES: $60.00 Water Heater, Water Softener, or Water Heater and Softener (includes State Surcharge) $60.00 Lawn Irrigation (includes State Surcharge) $60.00 Add Plumbing Fixtures, Septic System Abandonment, Water Turnaround* (includes State Surcharge) *Water Tumaround (add $280.00 if a 3/4" meter is required) $115.00 Septic System New (includes County fee and State Surcharge) TOTAL FEES $ (9 ®. CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. CaII 48 hours before you intend to dig to receive locates of underground utilities. www.gopherstateonecall.orq I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not start vyifhout a it; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plan x.5arvL AfGfaase Applicant's Printed Name Applicant's Signature PERMIT City of Eagan Permit Type:Building Permit Number:EA157935 Date Issued:09/16/2019 Permit Category:ePermit Site Address: 4388 Malmo Cir Lot:019 Block: 003 Addition: Wilderness Run 4th PID:10-84353-03-190 Use: Description: Sub Type:Reroof Work Type:Replace Description:Does not include skylight(s) Census Code:434 - Residential Additions, Alterations Zoning: Square Feet:0 Occupancy: Construction Type: Comments:Please print pictures of ice and water protection and leave on site. Carbon monoxide detectors are required within 10 feet of all sleeping room openings in residential homes (Minnesota State Building Code). Valuation: 5,000.00 Fee Summary:BL - Base Fee $5K $118.00 0801.4085 Surcharge - Based on Valuation $5K $2.50 9001.2195 $120.50 Total: I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Contractor:Owner:- Applicant - Joseph Boler 4388 Malmo Cir Eagan MN 55123 (763) 286-9362 Northland Construction 4389 Malmo Circle Eagan MN 55123 (651) 274-9777 Applicant/Permitee: Signature Issued By: Signature