Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2235 Liberty Lane
? 8?55 Mike Maguire MAYOR Paul Bakken Peggy Carlson Cyndee Fields Meg Tilley COUNCIL MEMBERS Thomas Hedges Cm AoriwsrnaTOn MUNICIPAL CENTER 3630 Pilot Knob Road Eagan, MN 55722-1870 651.675.5000 phone 651.675.5012fax 651.454.8535 TDD MAINTENANCE FACILITY 3501 Coachman Point Eagan, MN 55122 651.675.5300 phone 651.675.5360 fax 657 454.8535 TDD www.cityofeagan.com THE LONE OAKTREE The symbol of strength and growth in our community January 29, 2007 BILL DIEDRICH DIEDRICH BUILDERS 13320 CEDAR AVE 5 APPLE VALLEY MN 55124 RE: INCOMPLETE PERMITS AT EAGAN HEIGHTS TOWNHOMES Dear Bill, Enclosed is a list of 10 addresses at Eagan Heights with permits (some over three years old) that have not been finalled, including the inspection record and correction comments. These units are in various stages of completion. We have information alleging that 2220 Liberty Lane has been occupied since December 15, 2006 without passing a final inspection or a temporary Certificate of Occupancy as of that date. This is in violation of the Minnesota State Building Code. A Temporary Certificate of Occupancy was issued on 1/23/07. The residence at 2247 Liberty Lane has no siding on the back side. The gyp sheathing has been exposed to the weather since July 2003. Please provide an affidavit from the gyp sheathing manufacturer stating if the Gyp sheathing is still adequate. The 3 units (4169 - 4177) on Old Sibley Memorial Highway currently do not have valid mechanical permits. Piease familiarize yourself with the excerpts from the Minnesota Building Code below and respond accordingly: Minnesota Rutes Chapter 1300.0120 Permits Subpart 11 Expiration Every permit issued shali become invalid unless the work authorized by the permit is commenced within 180 days after its issuance, or if the work authorized by the permit is suspended or abandoned for a period of 180 days after the time the work is commenced. The building official may grant, in writing, one or more extensions of time, for periods not more than 180 days each. The extension shall be requested in writinq and iustifiable cause demonstrated. Minnesota Rules Chapter 1300.0130 Construction Documents Subpart 9.(C) C. Work regulated by the code shall be installed according to the reviewed construction documents, and anv chanqes made durinq construction that are not in compliance with the approved construction documents shall be resubmitted for aqproval as an amended set of construction documents. Minnesota Rules 1300.0220 Certificate of Occupancy Subpart 1 Use and Occupancy No buildinq or structure shall be used or occupied, and no change in the existing occupancy classification of a building, structure, or portion of a building or structure shall be made until the buildinq official has issued a certificate of occupancv for the building or structure under this part. Issuance of a certificate of occupancy is not approval of a violation of the code or other ordinances of the municipality. Certificates presuming to give authority to violate or cancel the code or other ordinances of the municipality are not valid. Minnesota Rules 1300.0220 Subpart 6 Temporary Occupancy The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that the portion or portions shall be occupied safely. The Buildinq Official shall set a time period durinq which the temporarVi certificate of occupancv is valid. Minnesota Rules 1300.0140 Violations It is unlawful for any person, firm, or corporation to erect, construct, alter, extend, repair, move, remove, demolish, or occupy any buildinq, structure, or equipment regulated by the code, or cause any of those actions, in conflict with or in violation of the code. The building official may serve a notice of violation or order on the person responsible for the erection, construction, alteration, extension, repair, moving, removal, demolition, or occupancy of a building or structure in violation of the code, or in violation of a permit or certificate issued under the code. The order shall direct the discontinuance of the illegal action or condition and the abatement of the violation. Minnesota Rules 1300.0150 Violations, Penalty A violation of the code is a misdemeanor under Minnesota Statutes, Section 1613.69. Please respond in writinq by Februarv 15, 2007 with vour plan for brinqinq these ermits into compliance. If you have any'questions regarding the above information, please do not hesitate to contact me at 651-675-5680. Sincerely, ? Jeffrey T Wheeler Building Inspector cc: Dale Schoeppner, Chief Building Official MN Department of Labor & Industry, Residential Building Contractors, 443 Lafayette Road N., St. Paul, MN 55155 Sharon Hills, City Attorney Date: 01/26/2007 City of Eagan Page: 1 PermFRes.rpt pERMIT FIND RESULTS Permit # Type Sub Type / Description EA059928 S W Residential R# 40885/ 4-Plex EA058061 PL Residential 4-Plex EA058060 ME Residential 4-Plex EA058059 BL Ol of_-plex Work Type I Valuation Issued Final Address New 06/25/2003 07/17/2003 2247 Liberty Lane $ 0.00 New 02/27/2003 03/31/2004 2247 Liberty Lane $ 0.00 New 02/27/2003 2247 Liberty Lane $ 0.00 New 02/27/2003 2247 Liberty Lane 4-P1ex/Hicludes Deck/Retain Wall $ 115,000.00 PermAddrlRes.rpt City of Eagan Date: 01/26/2007 ADDRESS INSPECTION RESULTS Address: 2247 Liberty Lane Permit Type Date Inspection Type Inspected By EA058059 BL 07/08/2003 insulation Jeff Wheeler BL 07108/2003 Framing Jeff VJheeler BL 07/02/2003 Framing Terry Zelenka BL 06/30/2003 Fireplace Rough-In Tom Miklya BL 06/25/2003 Fireplace Rough-In Tom Miklya BL 06123/2003 Insulation Jeff Wheeler BL 06/18/2003 Framing Jeff Wheeler BL 06/I1/2003 Footings Jeff Wheeler BL 06/11/2003 Framing Jeff Wheeler BL 06/02/2003 Framing Terry Zelenka BL 05/16/2003 Fireplace Rough-In Tom Miklya BL 05/12/2003 Fireplace Rough-In Tom Miklya BL 04/23/2003 Footings Tom Miklya BL 03/18/2003 Foundation Jeff Wheeler BL 03/14/2003 Foundation Craig Novaczyk BL 02/28/2003 Footings Jeff Wheeler EA058060 ME 09/16/2003 Air Test Scott Peterson ME 06/0912003 Rough In Scott Peterson EA058061 PL 03/31/2004 Final Scott Peterson PL 01/26/2004 Final Scott Peterson PL 07/01/2003 Visua] Scott Peterson PL 06/02/2003 Underground Swtt Peterson Resul[ Comments PAGE Pass Pass Correction i firestop dead space Pass both fire places Fail Partial Inspt see remarks Correction i see remarks Pass deck footings pass as per TM Correction i see remarks Not Ready plans have not been approved Correction i see comments Correction t see commenu Partiaf Inspa see comments Pass draintile in - will drain to interior sump Correction i SEE REMARKS Pass footings for 1/2 of a fourplex Pass manometer Pass Pass Not Ready Pass L.L. Partial Inspa need good fill under pipe (its all mud) PL 06/02/2003 Rough In Scott Peterson Pass EA059928 SW 07/17/2003 Sewer and Water Bob Kriha Pass Inspection #99 SW 07/17/2003 Sewer and Water Lane Wegener Pass 1 0 4 - ' Date 01/26/2007 Page Permit Inspections Entry Comments ldentification: EA058059 - 2247 Liberty Lane Comments: FOUNDATION 3/14/03 CN : - INSTALL EXTERIOR DRAINTIAL AS PER CODE TM4/23/03 3000 (3) pads --- porch??? TM5/12/03 cant see in fue box --• opening looks to small for F.P no man. specs to look at TM5/16/03 lid not sealed--franung under sized for unit--- sheehock at header to close for clearances 06-11-03 J'TW Framing - approved plan must be on the job site - add lateral bracing to all A-SW roof trusses as per truss spec - does not have 5/8" rock on trusses within 5' of the common wall as per the approved plan - remove roof vent within 5' of the common wall - provide spec &om floor truss mfg for carrying the load of the hand frame floor at the stair openning - add ventilation at fust floor bath - can lights in lhr ceiling must be lhr rated 06-18-03 JT'W framing 1 sf floor - lhr boxes at can lights require 2layers of 5/8" gyp DONE - any penetrations in the 1 hr ceiling (including the can light boxes) require fue caulk DONE - add a protector plate at plbg stack cut out in the top plate DONE '•• OK to insulate first floor, check correcrions at insul inspection*** Lower level - provide spec for supporting cantilevered floor at the fireplace OK'd by 7 T'W - provide spec from the floor truss mfg for alterastion in the designed floor huss layout and use of the wrong huss at the change in direction OK'd by TTW - fueblock the lid at all dead spaces DONE - seal penetrations in the draft sropping at the floor trusses DONE 06-23-03 JTW partial insulahon - OK to drywall lst floor and garage - framing corrections remain on lower level DONE 07/25/03 JTW deck footings - footings are NOT as per the approved plan - there are (3) 18" dia sonotubes and (3) 12" sonotubes a1142 " deep no belled bottoms pour at your own risk submit a new plan for approval - footing for front pcivacy wall also NOT as pec the approved plan 07/30l03 JTW deck footings - addendum to the porch and deck plan submitted - footings are not adequate - add two foorings (at the deck next to the porch and at the center deck footing) Date 01/26/2007 Page 2 •- .. ? Permit Inspections Entry Comments Identification: EA058059 - 2247 Liberty Lane Comments: - provide design spec for cazrying roof load at the porch on cantilevered beam Address: 2239 Liberty Lane Zip: 55122 Lot: 3 Block: 2 Subdivision: Eagan IIeights Townhomes 3rd TIIE FOI,I.ON'ING ITCMS WF,RE/N'ERE NO'P COMPLETF, A'P FINAL INSPF.CI'ION ON i',? ?Q Yes No Comments Final grade - 6" from siding ? Pemianent steps - garage ? Permanent steps - main entry Yermanent driveway Ycrmanent gas Sod/Seeded lawn TraiUcurb damagc ? Porch Lower level finish llcck Pireplace • Verify with your builder that rooftest caps from the plumbing system have been removed. ."I'um off water supply to the ou[sidc lawn faucets before freeze potential exists. • Call the City's Engineerine Department at 651-675-5646 prior to working in right-of-way or installing irrigation system. ? RUILDINGINSPF,f.'I'OR: 1'Lv"s l-enG2' CON'PRACTOR: Diedrich Quilders 13224 Grand Oak Ct Applc Valley MN 55124 January 29, 2007 Mike Maguire MAYOR Paul Bakken Peggy Carlson Cyndee Fields Meg Tilley COUNCIL MEMBERS Thomas Hedges CT' ADMiNISTRATOf1 MUNICIVAL CEMEfl 3830 Pilot Knob Road Eagan, MN 55122-1810 651.675.5000 phone 657.675.5012 fax 651.454.6535 TDD MAINTENANCE FACILITY 3501 Coachman Point Eagan, MN 55122 651.675.5300 phone 657.675.5360fax 651.454.8535 TDD www.cityofeagan.com THE LONE OAK TREE The symbol of strength and growth in our communiry. BILL DIEDRICH DIEDRICH BUILDERS 13320 CEDAR AVE S APPLE VALLEY MN 55124 RE: INCOMPLETE PERMITS AT EAGAN HEIGHTS TOWNHOMES Dear Bill, Enclosed is a list of 10 addresses at Eagan Heights with permits (some over three years old) that have not been finalled, including the inspection record and correction comments. These units are in various stages of completion. We have information alleging that 2220 Liberty Lane has been occupied since December 15, 2006 without passing a final inspection or a temporary Certificate of Occupancy as of that date. This is in violation of the Minnesota State Building Code. A Temporary Certificate of Occupancy was issued on 1/23/07. The residence at 2247 Liberty Lane has no siding on the back side. The gyp sheathing has been exposed to the weather since July 2003. Please provide an affidavit from the gyp sheathing manufacturer stating if the Gyp sheathing is still adequate. The 3 units (4169 - 4177) on Old Sibley Memorial Highway currently do not have valid mechanical permits. Please familiarize yourself with the excerpts from the Minnesota Building Code below and respond accordingly: Minnesota Rules Chapter 1300.0120 Permits Subpart 11 Expiration Every permit issued shall become invalid unless the work authorized by the permit is commenced within 180 days after its issuance, or if the work authorized by the permit is suspended or abandoned for a period of 180 davs after the time the work is commenced. The building official may grant, in writing, one or more extensions of time, for periods not more than 180 days each. The extension shall be requested in writina and iustifiable cause demonstrated. Minnesota Rules Chapter 1300.0130 Construction Documents Subpart 9.(C) C. Work regulated by the code shall be installed according to the reviewed construction documents, and any chanpes made durinq construction that are not in compliance with the approved construction documents shall be resubmitted for approval as an amended set of construction documents. Minnesota Rules 1300.0220 Certificate of Occupancy Subpart 1 Use and Occupancy No buildinq or structure shall be used or occupied, and no change in the existing occupancy classification of a building, structure, or portion of a building or structure shall be made until the buildina official has issued a certificate of occuqancv for the building or structure under this part. Issuance of a certificate of occupancy is not approval of a violation of the code or other ordinances of the municipality. Certificates presuming to give authority to violate or cancel the code or other ordinances of the municipality are not valid. Minnesota Rules 1300.0220 Subpart 6 Temporary Occupancy The building official is authorized to issue a temporary certificate of occupancy before the completion of the entire work covered by the permit, provided that the portion or portions shall be occupied safely. The Buildinq Official shall set a time period durinq which the temporarvi certificate of occuqancv is valid. Minnesota Rules 1300.0140 Violations It is unlawful for any person, firm, or corporation to erect, construct, alter, extend, repair, move, remove, demolish, or occupy any buildinq, structure, or eqwpment regulated by the code, or cause any of those actions, in conflict with or in violation of the code. The building official may serve a notice of violation or order on the person responsible for the erection, construction, alteration, extension, repair, moving, removal, demolition, or occupancy of a building or structure in violation of the code, or in violation of a permit or certificate issued under the code. The order shall direct the discontinuance of the illegal action or condition and the abatement of the violation. Minnesota Rules 1300.0150 Violations, Penalty A violation of the code is a misdemeanor under Minnesota Statutes, Section 1613.69. Please respond in writinq by Februarv 15, 2007 with vour qlan for brinqinq these ep rmits into compliance. If you have any questions regarding the above information, please do not hesitate to contact me at 651-675-5680. Sincerely, ? i ? i ? ;i.? ?Z l Jeffrey T Wheeler Building Inspector cc: Dale Schoeppner, Chief Building Official MN Department of Labor & Industry, Residential Building Contractors, 443 Lafayette Road N., St. Paul, MN 55155 Sharon Hills, City Attorney .. ,' . Datr. 01/26/2007 City of Eagaa Page: ? PermFRes.rpt pERMIT FIND RESULTS Permit# Type SubType/Description WorkTypelValuation Issued Final Address EA059925 SW Residential Neµ. 06/25/2003 07/18/2003 2239 Liberty Lane R# 42886 / 4-Plex $ 0.00 EA058072 PL Residential New 03/24/2003 01/26/2004 2239 Liberty Lane 4-Plex $ 0.00 EA058069 ME Residential NeW 03/24/2003 2239 Liberty Lane 4-Plex $ 0.00 EA058067 BL 01 of= plex NeW 03Y24/2003 2239 Liberty Lane 1 of 4 units w deck/retaining wall $ 175,000.00 PermAddrlRes.rpt City of Eagan PAGE nate: 01/26i2007 ADDRESS INSPECTION RESULTS Address: 22 39 Liberty Lane Permit Type Date Inspection Type Inspected By Result Comments EA058069 BL 07/15/2005 Framing Jeff Wheeler Correction i see remarks BL 08/27/2004 Footings Jeff Wheeler Pass deck footings - see remarks BL 02/27/2004 Fina] - C.O. Required Mike Lence See Correc See Remarks BL 01/28/2004 Fireplace Air Test Mike Lence Not Applic BL 01/28/2004 Fireplace Final Mike Lence Pass BL 01/28/2004 Footings Mike Lence Pass based on discussions with inspector's dealings w/ Bill Dietrich (builder) I'm signing off on footings. BL O 1/28/2004 Final - C.O. Required Mike Lence Temporary f expires 2/28/04 ' BL 01/28/2004 FireplaceRough-In MikeLence NotApplic BL 1 UI4/2003 Insula[ion Jeff Wheeler Pass lower level and garage OK to 8L 1 U12/2003 Sheetrock Mike Lence Pass cover BL 11/05/2003 Insulation Terry Zelenka Partial Inspc main & upper floors only no fireplace no base nogarage BL 11/04/2003 Framing MikeLence Pass BL ] 0/24/2003 Framing Jeff Wheeler See Correc see remarks BL 07/25/2003 Footings Jeff Wheeler Correction t deck footings - see remarks BL 04/02/2003 Foundation Jeff Wheeler Pass BL 03/24/2003 Footings JeFf Wheeler Pass does not include deck footings EA058069 ME 01/28Y1004 Gas Service Test Scott Peterson Pass ME 10/24/2003 Rough In Scott Peterson Pass EA058072 PL 01/26/2004 Final Scott Peterson Pass PL 10/10/2003 Rough In Mike Lence Pass PL 10/10/2003 Air Test Mike Lence Pass PL 10/03Y2003 Underground Mike Lence Pass EA059925 SW 07/18/2003 Sewer and Water Bob Kriha Pass Inspection #100 SW 07/18/2003 Sewer and Water Leon Weiland Pass t Date 01/26/2007 Page Permit Inspections Entry Comments [dentification: EA058067 - 2239 Liberty Lane Commen[s: 07/25/03 Tf W deck footings - foorings are NOT as per the approved plan - there aze (3) 18" dia sonotubes and (3) 12" sonotubes a1142 " deep no belled bottoms pour at your own risk submit a new plan for approval - footing for front privacy wall also NOT as per the approved plan 07/30/03 JTW deck footings - addendum to the porch and deck plan submitted - foorings aze not adequate - add hvo footings (at the deck next to the porch and at the center deck footing) - provide design spec for carrying roof load at the porch on canhlevered beam 10/24/03 JTW framing - footings are not signed off - pcovide approved plan ( lhr ceiling ?) - provide access to the front and attic space - provide adequate attic venting ( only 2 roof vents visible ) - complete lhr assembly at the laundry (washer box) - firecaulk penehations in the top plate of the lhr walls - provide Ihr assembly for ABS pipe penetrarions at the kitchen - complete the Ihr wall at the decorauve 2X12 rim added at the 1 hr wall - righten the anchor bolts - complete the lhr assembly at the lower level rimjoist on the east side 01/21/04 JTW Addendum - addendum approved for adding a 3' X 3' landing and stairs with the addition of one 12" dia footing - addendum must be attached to the approved plan FINAL CO 1/28/04 ML: - DECK GUARDRAIL TO BE INSTALLED. TEMP CO ISSUED, EXPIRES ON 2/28/04 FINAL FOLLOW-UP 2/28/04 ML: - DECK NOT COMPLETE- EXTEND TEMP TO 3/28/04** ** EXTEND TEMP TO 4/28/04** 08/27/04 ]TW deck footings - OK to pour 2 footings 12" diameter for the landing at the deck stavs [as per the revision to the addendum to the revision to the plan that was not supposed to have stairs where the stairs landed in the easment (I think)] 07/15/05 JTW framing - check braced wall line as per new engineering (see pazcel file) ?\ock a- `?3f? s???a.(o 6P- T3?6073 '-tgo I RESIDENTIAL BUII.DING YY1 P - ? ? • Permit Application ? ? - 5 SS(? `-? S q 0, r,-b City Of Eagan _ 3830 Pilot Knob Road, Eagan Mn 55122 ?? v(,a D sry Telephone # 651-675-5675 FAX # 651-675-5674 New Construction ReawremenCs 3 registered sile suneys showirg sq. ft. of bt, sq. ft of house; and all roofed areas (20% maximum lot coverage allowed) 2 copies of plan slwwing beam & window sizes; poured found design, etc. 1 set of Eneigy Calculations 3 copies of Tree Preservatlon Plan H bt plafled after 711193 Rim Jo'st Dehail Options selection sheet (bldgs with 3 or less uniLs RemodeVReoair Reauiremenls ORce Use OnN 2 copies of plan Cert of Survey Recd 7 set of Energy Calwla6ons for heated additions Tree Pres Plan Recd i site survey for additions & decks Tree Pres Not Reqd Add'dion-irMicateiton-sttesepficsysfem _On-siteSepticSystem Date Site Address a Construction Cost Q y? G/jzq?Tle Lr9?/? UniUSte # Description of Work Property Owner Telep6one # ( ) Contractor Address State C;,"C 5?pA/E CitY Zip ??D6? Telephone # ( ,?p?J 3z2-6?? COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING Minnesota Rules 7670 Cateeorv 1 Minnesota Rules 7672 Enefgy Code Category . Residential Ventilation Category 1 Worksheet • New Energy Code Worksheet submissiontype) Submitted Submitted . Ene . nvelope Icufations Su6mitted Licensed Plumber Mechanical Sewer/Water Telephone Telephone #??? Telephone I hereby apply for a Residential Building Permit and acknowledge that the information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan and the State of MN Statutes; I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of?pl?ans. Applicant's Printed Name._-7_-s?- Applicant's Signature ;ay OFFICE USE ONLY Su b Types ? 01 Foundation ? 07 05-plex ? 13 16-plex ? 20 Pool ? 30 Accessory Bldg ? 02 SF Dwelling ? OS 06-plex ? 16 Fireplace ? 21 Porch (3-sea.) ? 31 Ext. AIt - Multi )< 03 01 of -? plex ? 09 07-plex ? 17 Garage ? 22 Porch/Addn. (4-sea.) ? 33 Ext. Alt - SF ? 04 02-plex ? 10 OS-plex ? 18 Deck ? 23 Porch (screen/gazebo) ? 36 Multi Misc. ? 05 03-plex ? 11 10-plex ? 19 Lower Level ? 24 Storm Damage ? 06 04-plex ? 12 12-plex Plbg_Yor_ N ? 25 Miscellaneous Work Types X 31 New ? 35 Int Improvement ? 38 Demolish (Interior) ? 44 Siding ? 32 Addition ? 36 Move Bldg. ? 42 Demolish (FOUndation) ? 45 Fire Repair ? 33 Alteration ? 37 Demolish (Bldg)* ? 43 Reroof ? 46 Windows/Doors ? 34 Replacement •Demolition (Entire Bldg) - Give PCA handout to applieant Valuation 5 L? Occupancy MC/ES System ? Census Code Zoning ?Q City Water SAC Units I? Stories Booster Pump Nbr. of Units ? Sq. Ft. q PRV . ? Nbr. of Bldgs Fire Sprinklered Length -? Type of Const v Width REQUIRED INSPECTIONS Footings(new bldg) ? FinaUC.O. _ Footings (deck) FinaUNo C.O. Footings (addition) Plumbing ? Foundation HVAC _ Drain Tile _ Other Roof Ice & Water ? F Final Pool F[gs Air/Gas Tests _ Final . ranring _ Siding Stucco Stone Fireplace _ R.I. Air Test Final Windows (new/replacement) ? Insularion ? Retaining Wall Approved By L , Building Inspector ----- ------- ------- --- -- ----------------------------------- --------------- ---°--------------------------------------------------------- - Base Fee U ni ?-gs?16 bf q 3 1;4 (a Surcharge y Plan Review (? 'J MGES SAC yYJYYL-? I? X S^'Q? City SAC Utility Connection Charge /0(5 v ,/„ /? V/ 5&W Permit & Surcharge v y? TreatmentPlant r'J "/ License Search vV 0 copies Other A Total I LOT SURVEY CHECKLIST FOR RESIDEMIAL BUILDING PERMff APPUCATION PROPERTYLEGAL: LotiC, I - DATE OF SURVEY: m ? c W t U Ya v OZ Q ?? ? ? ? ? CD? ? ? C) ? ? do 0 ?/? ? d.? 0 [3/ ? ? ? ? [a' ? ? ?/ ? W ? ? C?' ? LATEST REVISION: DOCUMENT STANDARDS • Registered Land Surveyor signature and company . Building Pertnit Applicant . legal description . Address . North arrow and scale . House type (rambler, walkout, split w/o, spiit entry, lookout, etc.) • Direc6onal drainage arrows with slope/gradient °/a • Proposed/existing sewer and water services & invert elevation • Street name • Driveway • Lot Square Footage • Lot Coverege ELEVATIONS fd ? ? ?? n ? Cd? ? ? G ? / ? I?' ? P4/ ? ? Cy ? ? r,d/ ? J ? V ? v? ? ExisUn • Sewer service (or Proposed) . Property comers • Top of curb at the driveway and property line extensions . Elevations of any existing adjacent homes • Adequate footing depth of structures due to adJacent utility trenches • Waterways (pond, stream, etc.) Prooosed • Garage Floor • Basement floor • Lowest exposed elevation (walkouUwindow) • Properry comers • Front and rear of home at the foundation PONDING AREA (if applicable) ? ? 111/ • Easement line ? / p' ? . NWL ? 0/ ? • HWL 0 V ? • Pond # designation ? t?/ ? • Emergency Overflow Elevatlon ? C ? • Pondl+Netland buffer delineation d/o 0 L? ? ? ? ? ii ?,/ ? il I R'/ IJ I I IA' ? ? DIMENSIONS 3 . Lot lines/Bearings 8 dimensions • Right-of-way and street width (to back of curb) • Proposed home dlmensions including any proposed decks, overhangs greater than 2', porches, etc. (i.e. all struclures requiring permanent footings) • Show all easements of record and any City uNlitles within those easements • Sethacks of proposed structure and sideyard setback of adjacent existing structures • Retaining wail requireme Reviewed: G:lFORMS18uilding Permit Applicatlon 3rw O17E C PLANNR S ar?d ? Il D SURVEYORS VCyINEERING COMPRNY, INC. 3:1 MwdnvUPV1 bia or Rataining Wall Be RecAuired 1000 EAST 146th SiREET, BURNSVILLE, MINNESOTA 55337 PH 432-3000 CERTIFICATE OF SURVEY Legal Description: LoT _1, 2, 3, & 4 BLOCK 2 EAGAN HEIGHTS TOWNHOMES 3RD ADDITION, DAKOTA COUNTY MINNESOTA. , SCALE : 1" = 30' ADDKfSSE$ : LoT ! - 2247 LoT 2 - Zz43 LoT 3 - 2239 LoT4 - 2235 DIEDRICH BLDRS. ? PROJECT N0,- 11400.00 0q[-,27Y LRNE LI9ER7Y I/IetE LIXR"M LANC LIBE27Y LANE VLAT LiNE 8-m ? ? o• F ?893,? °o Nu(?843.59 0+ Fviuae s Sfl 16 13 o` ?I 0 0) 0 001 ? T, 5 DENOTES EXISTING ELEVATION ,b DENOTES PROPOSED ELEVATION 00 INDICATES DIRECTION OF SURFACE DRAINAGE = 3 ? FlNISHED B GARAGE FLOOR ELEVATION ., L = ASEMENT FLOOR ELEVATION 43 = TOP OF FOUNDATION ELEYATION _PROO0SE0 SAN/TA/!Y 5-EW6e SERY/CE /NVEQT ELeI1471oA15 LoT / - /Nli = 8B7, 9 407 2 - /N?. = 889. l 1,07 3 - /N?. = 887• 6 !pr 4 - !M! = 8873 E•D. F C892,7) - E {' -1f 42./00 PORCH" 1 ??• 26.00 = o 26.00 ? e ?00 §ORCH 8?' P ` %w N 12.00 12 00 ? : w % o 11 37.00 74.00 0 0 14.00 37.00 i ? o 0 1 PROPOSED w PROP. PROP.w PROPOSED ? HOUSE m w HSE w HSE w ? HOUSE ? C. 0o V . . m -,I e J p? ? o W r - - r - _ - _ - - ? - _ , w A o GAR. GAR. GAR. s' GAR. o , 04. O ? N N -+ 400 O ?1 12.04 N ?? 0 20.33 20 33 12.00 ? 21 00 ° o . 00 0 21 . 0 6 ' 42 00 Iv ?900 00 °' 99 . 42 0 `? • . e? . a . ST-M!f ?0 i9. ? ca46,q? e.?,?. 1 D S8 °53'S2" IV, 1; I 8 ??rto ?--• / NI?Pf.?_.....? ?......? X- LIBERTY LANE UNOeR ConiSTF_UGTiDN" ? , f9.ou) ? h . sl L?' ?EAACd I hereby certify that this is a true and correct representation of o tract as shown and described hereon. As prepared by me this ?E` day of Jk?ARY , 2043. Re+/. /-8--03 : nrarE 8?6, /.of7.' Sor7N A? A?Re-TSEf, 59+??y /f • ?ivE2 scev?? inni's, 5e"x4cr5" sr. u.,o;W, ?a 1484s 0 / A?Minn. Reg. No. 19086 N4271/ p447' G/NE, BOOK PAGE .13 .o ? 2) 1 o cJc r? - S?C l,"i ?SIDE TIALBUII.DING ? Permit Application City Of Eagan 3830 Pilot Knob Road, Eagan Mn 55122 Telephone # 651-675-5675 FAX # 651-675-5674 New ConsWdion Reauirements 3 registered stte surveys showing sq. ft. of lot, sq. ft, of house; and all roofed areas (20% mazimum bt coverage allaxed) 2 copies of plan showing beam & windax sizes; poured found dasign, etc. 1 setof Energy Cakulations 3 copies oiTree Preservation Plan if bt pWtted afler 7/1193 Rim Joist Detail Options selection sheet (61dgs wiN 3 or less units RemodeUReoair ReauiremenLs 2 copias of plan 1 set of Energy Calalations for heated addi0ons 1 site survey for additbns 8 decks Addifion • indicete 'rf onsRe septic system ? rs, ? ONice Use OnN Cert of Survey Reod Tree Pres Plan Recd Tree Pres Not Reqd _ On-site Septic System Date / / 3 Site Address I ?3 Construction Cost Unit/S[e # Description of Work ?2 ? ??2?I?7??/c 1?'/ D? Property Owner Die dl,-Ich Telephone #((o,T-I ) 3Z Z"?° 9'3 U Contractor E / e d vi -C h gvi %?e `s' Address lS 8`?? Ll State - ?? ?-P yyt p?2 ? GPvDn2_/ ?CZ ?-G7 City ?ry Zip $'S 0&e Telephone #(Co.r7 COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING - Minnesota Rules 7670 Cateeorv 1 Minnesota Rules 7672 Energy COde Category , Residential Ventilation Category 1 Worksheet • New Energy Code Worksheet (J submission rype) _submitted Submitted • Energ' nvelope Calculations Submitted Licensed Plum r Telephone #((a/ZJ S(o / - ?/ ? Mechanic C or - Ul???//?I'/??° Cl?/?GL Telephone#FI'S? 22t°/ Sewer/Water ej#ract L?,n Telephone #W,TZ) y -,?/ ?lGI ? 311 y -D,.? ??LA_ A)t,?, d h I??s ?Sdu?s.? I hereby apply for a Residential Building Permit and acknowledge that the informa ion is complete and accurate; that the wark will be in conformance with the ordinances and codes of the City of Eagan and the State of MN Statutes; I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and app roval ofplans ? [?ndv?Gh z`?vr%dPVs . ...? , h5/ "Gc/il,uM E_ D,`, ?:pplicant's Printed Name/fS ApplicanYs Signature ? /- ---- OFFICE USE ONLY Sub Types ? 01 Foundation ? 07 05-plex ? 13 16-plex ? 20 Pool ? 02 SF Dwelling ? 08 06-plex ? 16 Fireplace ? 21 Porch (3-sea.) ?( 03 01 of plex T ? 09 07-plex ? 17 Garage ? 22 Porch/Addn. (4-sea.) ? 04 02-plex ? 10 OS-plex ? 18 Deck ? 23 Porch (screen/gazebo) ? 05 03-plex ? 11 10-plex ? 19 Lower Level ? 24 Storm Damage ? 06 04plex ? 12 12-plex plbg_Yor_ N ? 25 Miscellaneous Work Types x 31 New ? 32 Addition ? 33 Alteration ? 34 Replacement ? 30 Accessory BI ? 31 6ct. Alt - Multi ? 33 Ext. Alt - SF ? 36 Multi Misc. ? 35 Int Improvement ? 38 Demolish (Interior) ? 44 Siding ? 36 Move Bldg. ? 42 Demolish (Foundation) ? 45 Fire Repair ? 37 Demolish (Bldg)' ? 43 Reroof ? 46 Windows/Doors •Demolition (Entire Bldg) - Give PCA handout to applicant Valuation 5,- Uta'lD Occupancy jj?-af, Census Code 101- Zoning a_ SAC Units cl 4 Stories _2? Nbr. of Units y Sq. Ft. ??. Nbr. of Bldgs Length Type of Const V N Width q7e Footings (new bldg) _ Footings(deck) Footings (addition) ?. Foundation Drain Tile Roof _ Ice & Water Final ? Framing Fireplace _ R.I. _ Au Test Final Insularion 4% Base Fee Surcharge Plan Review MC/ES SAC City SAC Utility Connection Charge S&W Permit & Surcharge Treatment Plant License Search Copies Other Total MC/ES System City Water Booster Pump PRV Fire Sprinklered REQUIRED INSPECTIONS Finavc.o. FinaUNo C.O. _ Plumbing HVAC Other _ Pool Ftgs Air/Gas Tests _ Final _ Siding Stucco Stone Windows (newlreplacement) ? Retaining Wall Approved By , Building Inspector ------ ------------ ------------------------------------------------ ------- u"'l l S? • S"x 2?332 ?[? ?,. ? p O x 5 Sc?c? l1-L-?t,j (9X ?U,O loqv y Sll - a.???.?.. T-1- 272- ?? ? ? 7 y,6-Iz A LOT SURVEY CHECKUST FOR RESIDENTIAL BUILDING PERMIT APPLICATION , • PROPERTY LEGAL: L V l$ I-''?' NI D &K-Z r< DATE OF SURVEY: LATEST REVISION: 0 ? c W t U Q O `z ? Q DOCUMENT STANDARDS v p ? • Registered Land Surveyor signature and company EV ? ? • Building Permit Applicant p/ ? ? • Legaldescription [Il/ ? ? • Address d ? ? • North artow and sple / m? ? ? • House type (rambler, walkout, split wlo, split entry, lookout, etc.) q? ? ? • Directional drainage arrows with slope/gradient % / p?/ ? ? • Proposedlexisting sewer and water services 8 inveR elevation ? ? • Sheet name Cf p/ ? • Driveway ? g /? • Lot Square Footage ? p @' 0 • Lot Coverage ELEVATIONS / I? ? ? • Existin Sewer service (or Proposed) ? p ? . Property comers ,? p? . Top of curb at the driveway and property line exRensions ?(d? ? • Elevations of any existing adjacent homes ?? ? • Adequate footlng depth of sWCtures due ro adjacent utility trenches p ? ? . Waterways (pond, sVeam, etc.) Prooased Ld n ? • Garage floor [y ? C • Basemen[ floor la/ ? G • Lowest exposed elevation (walkoutlwindow) ? V ? • Property comers v? ? • Fmnt and rear of home at the foundation PONDING AREA (if applicable) ? ? ? • Easement line ? ? ? • NWL 0 • HWL ? m/ ? . Pond # designation [I U/ / ? • Emergency Overflow Elevation p ?§' ? • Pond/lNetland buffer delinea6on 9.0 ? ? ? 7? I ] IG,/ ? fl 19 ? ? ?? ? DIMENSIONS • Lot IineslBearings 8 dimensions • Right-of-way and street width (to back of curb) • Proposed home dimensions including any proposed decks, overhangs greater than 2', porches, etc. (i.e. ali structures requiring permanent footings) • Show ali easements of record and any City utilities within those easements • Setbacks of proposed structure and sideyard setback of adjacent existing sWCtures • Retaining wall requirements, " Reviewed: G:/FORM5IBullding Pertnil ApplicaUon 3rW coNSULnNC ENcINEERs, IlO17E PLANNERS and IAND SURVEYORS 4G1NEERING COMPRNY, INC. DIEDRICH BLDRS. ? PROJECT N0. 11400.00 BOOK 1000 EAST 146th SiREET, BURNSVILIE, MINNESOTA 55337 PH 432-30 CERTIFICATE OF SURVEY Legal Description: LoT 1 2 3& 4 BLOCK 2 EAGAN_ HEIGHTS TOWNHOMES 3RD ADDITION, DAKOTA COUNTY MINNESOTA C97?g DENOTES EXISTING ELEVATION NDICA ESPDIRECTION OFVSURFACE DRAINAGE ,00 = FlNISHED GARAGE FLOOR ELEVATION 8111 = BASEMENT FLOOR ELEVATION 733 = TOP OF FOUNDATION ELEVATION SCALE : 1" = 30' ADDfZc5SC5 : L0T 1 - 2247 0$E97-Y LqNE Lo7 2- 2243 L19ER7Y lAX LoT 3- ZZ39 LI6ER7Y CANe LoT4 - Z235 LIgE,e711 LAIIP PRoPOSED ?701r4.ev SEWIFA? SE2Y/CE /NVE27 &-E1471,9,VS Z-07 / - /N!/. = 887, 9 LOT 2 - /Nt! = 888. l 1107 3 - /NY. = 887 6 La7 4 - /NY, = 887.3 3:9 RAexin9um Slopes or Re4aining bNall Wi1 Be Raquired , S/L'r ? "A-4c r ST 01 (asb,957) as,.a1 _ LIBERTY LANE " UNOEfC CpJ57k'.uCTlDIJ " t? , i 1-__1- 2' ,?1) 3 - , ... .._..il.iy."„aiuxl.'St.S'Ni?•.c , ? ? ? I hereby certify that this is a true and correct representation of a tract as shown and described hereon. As prepared by me this ?n day of Jawarzv 2003. Reti 14-03 :Na?E BW6. /.aFT s6t7# Rm AAiR%E,r, !Wigry rv?a s?v.? i,v+I 's, w/d ?r 5W? ?/l d se?acKS sr, lr ?-Minn. Re No. l9086 Na¢rq PtAT LINE. ? , .aNa /LUBp Y F' , 9 PAGE '.-?- 2- C31 a cL? RESIDENTIAL BUILDING ?,Q ??so b a Permit Application 9 0 Sb , • City Of Eagan 3830 Pilot Knob Road, Eagan Mn 55122 Telephone # 651-675-5675 FAX # 651-675-5674 ' New ConsWdion Reauiremen5 RemodeVReoair ReauiremeMS Office Use Onlv 3 registered sde surveys showing sq %. of IoL sq• it of house; and all mofed areas 2 copies of plan Cert of Survey Recd (20°h meximum lot coverage allowed) 1 set of Energy Calculations for heated addilbns Trce Pres Plan Recd 2 copies of plan showing beam 8 window sizes; poured found design, etc. 1 site survey for addNons 8 decks Tree Pres Not Reqd 1 set of Energy Calcula6ons Additbn - indicate Hwrsite sepBc system _ On-site SepGc System 3 wpies of Tree Picservahon Plan if lot platted after 711193 Rim Joisl DeWil Options selection sheet (bldgs with 3 or less unils 2. ?v Date 3 / O 3 Site Address Construction Cost UniUSte # Description oF Work A/e W C 4/? Sh'vc. Gia PropertyOwcer L?ve-dr?'ch fjv?Idei-S Telephone#((o5/) 322 -(:"930 COlltl'BCtOi l? ? L c3. r: L j? &/!' lU C 1-3 Address G?Gtronc l?a. f-Gt. City y? 0 State /?!i SG iylDvrc ? 1A /1/ . Zip AOESS D(o8Telephone # (los/ ) 3Z2 - (a q eLgO COMPLETE THIS AREA ONLY IF Energy Code Category Minnesota Rules 7670 Cateeorv 1 • Residential Ventllation Category 1 Wwksheet (J submission type) Submitted • Energy Envelopa Calculations Submitted Licensed Plumber tAif f k.-,-,p? l??vrn h"? Mechanical Contractor ?) ?v??s? c?e ?« ? ?i ri Sewer/Water L plr?rn hY/2 A NEW BUILDING Minnesota Rules 7672 • New Energy Code Worksheel Submitted Telephone #(612) el'6 Telepnone # (fS"21 y3? " ? U g Telephone # VT2) / y ? ? `" P.z? R, l? ?Ye.el?v", S\,(>,)ld ? U1,ov" SDA?-tL, I hereby apply?or a Residential Bui]ding Permit and acknowledge that the information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan and the State of MN Statutes; I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accardance with the approved plan in the case of work which requires a review and app roval ofplans. L?iec?i'? y f3v?'/devs Aoby Cv,11,aA-7 E. J?iedv?ch -- ApplicanYs Printed Name pvesi d?-12 f Applicant's Signature ? ?•-- - ^. ? ? ^ L - -- -- L? -I OFFICE USE ONLY Sub Types ? 01 Foundation ? 07 OS-plex ? 13 16-plex ? 20 Pool ? 02 SF Dwelling ? 08 06-plex ? 16 Fireplace ? 21 Porch (3-sea.) `j< 03 01 of4 plex ? 09 07-plex ? 17 Garage ? 22 Porch/Addn. (4-sea.) ? 04 02-plex ? 10 08-plex ? 18 Deck ? 23 Porch (screen/gazebo) ? OS 03-plex ? 11 10-plex ? 19 Lower Level ? 24 Stortn Damage ? 06 04-plex ? 12 12-plex Plbg_Yor_ N ? 25 Miscellaneous Work Types x- 31 New ? 32 Addition ? 33 Altera6on ? 34 Replacement ? 30 Accessary Bidg ? 31 Ext. Alt - Multi ? 33 Ext. Alt - SF ? 36 Multi Misc. ? 35 Int Improvement ? 38 Demolish (Interior) ? 44 Siding ? 36 Move Bldg. ? 42 Demolish (Foundation) ? 45 Fire Repair ? 37 Demolish (Bldg)• ? 43 Reroof ? 46 Windows/Doors 'Demolition (Enqre Bldg) - Give PCA handout to appliwnt Valuation C.I?d? Occupancy "Ky Census Code Zoning po SAC Units Stories 9- Nbr. of Units Sq. Ft. Nbr. of Bldgs / Length ? Type of Const I4A%,L widm r Lj 7 Footings (new bldg) _ Footings (deck) Footings(addition) ?C Foundation Drain Tile Roof Ice & Water Final _Y? Framing F'ueplace R.I. Au Test Final ?C Insularion Base Fee Surcharge Plan Review MC/ES SAC City SAC Utility Connection Charge S&W Permit & Surcharge Treatment Plant License Search Copies Other Total MC/ES System City Water Booster Pump PRV Fire Sprinklered REQUIREDINSPECTIONS FinaUC.O. FinaUNo C.O. _ Plumbing _ HVAC Other _ Pool F[gs Air/Gas Tests _ Final _ Siding Stucco Stone Windows (new/replacement) ? Retaining Wall Approved By _1- Z , Building Inspector ---------------------------------------------------------------------------------------- ,?J 1 5y, 5'Y Y Jl?}5? rrrn? 40DO X?? ? / a ? t7?? a? Y sN a4??/ (,a - ??2 6712' . MNcherk COMPLIANCE REPORT Minnesota EnErgy Code MNcheck Software Version 3.0 COUNTY: Dakota STATE: Minnesota ZODIE : 2 CONSTRUCTION TYPE: Multifamily DATE: 1-3-2003 TITLE: EAGAN HEIGHTS FROSECT INFC7RMATION: PLAN Jt02-0801Y2 COMFANY INFORMATION: DIEDRICH BUILDERS NOTES: LOTS 1-4 COMPLIANCE: FASSES F.equired UA = 993 Your Home = 871 12.358 Better Than Code Permit # Checked by/Date Area or Cavity Cont,. Glazing/Door Perimeter R-Valu e R-'Jalue U-Value UA ---------------- CEILINGS: Raised ---------------------------- Truss 4942 -------- 44.0 ---------- 0.0 ------------ ---- 109 WA.LLS: Wood Fram E, 16" O.C. 3913 19.0 2.0 219 TOtsr 1;Q.£Fr : 642 10.0 2.0 52 BSMT: Conc. 8.3' ht/7.8' bq/8.3' insul 1909 10.0 0.0 111 BSMT: Conc. 3.5' ht/3.0' t,g/3,5' insul 991 10.0 0.0 39 GLAZING: WindoHrs or poors, Abave Grade 891 0.350 294 DOORS 148 0.350 52 ------------ COMPLIAD7CE STATE -------------------------- MENT: The proposEd building ------ design ------- described -------- here is ---- consistent with the,building plans, specific ations, and other calculations su6rnitted with t he permit application. The proposed building has been designEd to meEt the requirements of the Min t nesota E nergy Code . Builder/Designer,;5 Date ?'zL -U2 Minnesota Energy MNche'ck Software EAGAN NEIGHTS DATE: 1-3-2003 Code Version 3.0 PLAN REVIEW AND INSFECTION ISSUES This list of items may be helpful for Plan Reviewers and Building Inspectors t use as a guide for enforcing the Minnesota Energy Code. The items apply to Group R, Division 3 Occupancies, one- and two-family residential dwellings. The iterns marked with * apply only to detached one- and two-farnily residential dwellings. PLAN REVIEW ISSUES FOUNDATION INSULA.TION - foundation wall insulation R-5 minimum - foundation insulation extends from top of wall down to top of the footing - exterior foundation insulation is covered by a protective coating finish CONCRETE SLAB OR UNDER-SLAB INSULATION - slab on grade perimeter insulation R-5 minimum - slab insulation extends from top of slab to design frost line or top of footing - floors over unheated space R-30 minimum WINDOWS / DOORS / SKYLIGHTS - average U-value is 0.37 maximum foundation windows) - window U-value consistent with - window and dour area consistent for windows and glass doors (excludes building plan and MNcheck Report with building plan and MNcheck Report MECHANICAL VENTILATION ISSUES - residential mechanical ventilation systEm provides adequate ventilation per code requirements* - furnace efficiency is consistent with MNcheck or building design plan - protection against eYCessive depressurization is installed per code requirements* ENVELOFE INSULATION FOR PLAN RE`JIEW - intErior basement insulation k-5 minimum (if no exteriar insulation) - ceilings with attics R-38 or consistent with building plan and MNcheck Report - wall franting and insulation level is cansistent with building design and M1qcheck Report INSPECTION ISSUES CONCEALED INSULATION FRAMING Ah1D SHEATHING - wind wash barrier installed at attic edge - exterior wall carners framed so that insulation can be installed after exterior sheathing is installed - intersections of interior partition walls and exterior walls are framed : that insulation can be installed between the partition and exterior sheathing after exterior sheathing is installed - gaps between framing less than one-half inch arE eliminated by securing framing together or are insulated at the time of assembly - all penetrations between conditioned and unconditioned spaces made prior to framing inspection are sealEd INTERIOR AIR SARRIER - all fire stops are air sealed - pipes, ducts, wires, equipment and flues and chimneys through the interic air harrier are sealad - a sealed continuous interior air barrier is installed on the warm side oJ the building envelope at ceilings, walls, and floor rim joist areas* - air barrier behind tub and shower is sealed and protected - recessed light fixtures are sealed ENVELOPE INSULATION - basement insulation R-5 minimum - wind wash barrier on wall separating house and garage is sealed - loose fill insulation is prevented from entering the eaves - insulation on skylight shafts and walls exposed in attics is supported on the unconditioned side ATTIC INSULATION - attic access panel insulated to R-38 for ceiling panel and R-19 for wall panel - attic card attached to framing near access opening - notification of attic R-value and date of installation posted near bui permit inspection card This is a summary only. Other requirements may apply. See the Minnesota Energy Code. Questions? Call the Department of Public Service Information Center at 651-296-5175 or 1-800-657-3710. VLV lL Vl 111U lV ,LY .- ?- ' ° : HEATLOSa-MEA PGAIN ANALYSIS REPQR7 DC SALES iAMPAPiY, INC. 2700 4AlANcHAkA AVE M!!:NFAFf k15, MN ; f8t2)728-8"OG FAX (612)728-A778 CUSTOMER NAh1E , SOU77iSiDE HEATMG ? flaating Coolir.g FIAN Iv'1M JM: 6Ep1CH SUIiDERS 4utside e5 -20 95 JUB ApRR?coS ?___ ?? L7T 2'3 - Instde db 70 75 oeslgn 30 90 20 GALCI±;A7ED BY: iE ._?_ . qaily Raryje - M DATE: t)acenioTsr-12-204Z v. Insida Hrmd - 50 Grains VVtr - 3a ._ti-F_..s-? TVPE .CF I i. 7YPE Tlvl AREA OR BTUN EX,c Q5! ?? I OR R VALUE ? HTG CLG LENGTM HTG ? CLG LIlit?SS )Above Grode F,19 ! 1278 EXF'QSED (D)Beiow Grade Mo Ine } 0 I WALLS ,(E)EWowGrade k•11 i 451 VtiIMppWS 3A DWe Gr Wood 49.6 175 ? 8690? v & GiASS 12A 1 F'ar-e storm Waod 42.8 0 ; UOOR& h"1 G ..?.? _?.y.,.._' 50 T la trnv e Wuod .?._ ? .J......_..........,. 28.1 ? .,... ? L ? wINWws ? NORTH i 1 19.0 za j asa & GLAuS ? EAST! WES'C 86.0 0 j 0 DOOkS {0.G) ' SOIIT,y ; 32.0 149 ? 476$ . ..._-- - - _? ._;? .,....._ ? .,..... ...... ...._ ...?.. _ ... E]OiIkS . ME7l4 28 8 ? 7 6 ? 4 . 1 3 ? ? . . . 2 2t0 ?3 ? h? ' {C)Above G?adB R78 5.4 1.4 1059 ? . -?? ...ru 57ig ? 1483 K?(PQSFC (D)RetawCirade No Ins 0.7 f 0 0 i G WAi.LS ? _? M - (E?BelrwvGrade R-11 ?..??._ 4.8 0.0 452 2079 ? 0 - y ? Cci?:llJC? (L) N44 2.1 110 1722 16 1722 ? UjR19 ? -.- 4.8 - 2.3 ? 0 0 (S ? (IN) P,SAAT FLODR 1 22 682 1500 0 FI UOfitS (N) A&JVE GARAGE ' 4.3 i 0.7 358 1539 251 ` (O) SLAR bN GFtADE 0 0 ? IItifiILTRAF10N ??-?.-? ? ? ? -??.--_ _ - - - - - - - ?. 6904 4 1651 --°_ - BiiB-TOTAI.HEATLpSS81MATGAlN ...__..__.. _.. •. -•.-.._..-_-__^..__..__...---- _----- ?1247 °--_----_?._.________...,._r_......_---.-._^ - 70687 VE'NTIWTH)N/COMBUSTIONAlR _-------------------_.___---__.__..__..--'----- .____ -- - 3277 _._._ .._ . . . .. . - 727 _ - • rora? H??rLoss-aruH . . _ ............ .. . .. arsR ._--' --- FEDPIE A-, 300 BTiJk 6 ? 0 L!G;- f, EI'C a 1200 B7UH ..._ .............._.._.....-.?.,?_...._.._.__°.___...,_ __....._?-----° t --?----°----...__.....__.....____?._......_. ..__ iypp . _ _ ._ NET SEPrS13i F B7Utf GAIN ....__ . }441q OL3Cf BiUIUFRcSMAIR GAIPf ._.._.,.-•"-......-._...._---------- ...,_..._...."'".... '?- _..,_ ___.?_•"'---"-.•-'--•,... p .... - I'O7AL SEPiSS8L.E.GP.IN 14614 7"tyTALGOOUAIGGAIFE-BTIfH(SE.NSIBI.E+lATENT) L ..r_.=8ota iliU IV-LY V. v. ,---" " HEATI.OSS44EATGAIN ANALYSiS REPORT SOc17NS1t.E hIEATING UIEpR!CH BUJL.DERS tCAT6,0M ? t3ASElu4ENT b'IAI9f F! O?ft 2NC FICC,R ROOM 4 ' ftOOM .5 , ROOM 6 ROOM : aooM a ROOM a rtWM 1G RC06A 1'I R0OM i7 ROOM 13 ? ROOM :w •rOrqLs ti,?,A_Tszr,41N , F3ASF-MEN'r irtA1N FLOC>R iNU FLQCR ROOM 4 ROOM 5 ftOOM o ; Rarias / u ROOiM 8 ? ROOP!19 kOQM tD ? RooMi l R'JOM 12 ROOM 13 - ROOM ?Q j Tt)7AI..S t?ASEldF"M Ir:AlN fIOOR 2ND FICOi: ROOM 4 ii'JOM S ROOM 6 ROOM 7 Rth'7M 8 fiOpNi 9 ROOM 70 F?OOM; i ? ROOM i2 RAOM 13 ROOM 'id T U7At_5 YrALLS WIAiDOWS 7.5T1 1637 2587 2728 2641 4315 0 0 0 0 0 0 U 0 0 0 0 0 o 0 G 0 0 0 Q 0 7798 6600 WALLS vv'iNDOWS 127 1tri8 671 t't80 Ei85 2446 6 0 0 0 0 0 0 0 D 0 0 0 9 0 1q83 6262 5EFi51BLE "TFNT 15= 380 4239 1060 5G53 1413 0 9 0 J 0 D :, D 0 0 0 4 0 0 Q 14414 D 0 0 e D 0 G n 3E0rt DOGR& CEIUNG FLOCR INFiUVSNT TQ7ALS 0 0 1500 1722 7429 1210 1432 C 4536 12493 0 2184 1539 6977 17567 0 0 0 0 0 0 D 0 0 0 0 0 G 0 0 0 0 D 0 U 0 0 0 0 0 0 0 0 0 0 0 0 0 D U 0 0. o 0 0 0 0 Q C 0 0 0 0 0 0 0 0 0 0 0 1210 3616 3040 13775 37519 DOORS CEILIMG FLOOi2 SNFiWENT TOTAtS 0 0 6 338 1522 319 B82 0 808 4238 0 1040 257 1232 5853 0 0 0 0 G 0 0 0 0 0 0 0 o a o 0 0 0 o u 0 0 0 0 0 D 0 0 0 0 0 0 o e o 0 o c o 0 0 0 0 0 0 0 0 0 0 U 0 0 U 0 0 379 1722 251 2378 14414 =70TAL (SENSIBLE S LATEPtI) SENSIDLE 1902 5299 7068 0 0 0 0 0 0 a 0 i 0 '. Q 0 • 180i8 HEATLOSS-HEATGAIN ANAl.YSi3 REPORT SOUTiISfiiF- FIEP,TING LNEt)F2!CH BJiLOEk5 itWM NAWE EXF' WALL 8G WALL BG WL IIVS CEtI HT BASEMFNT ; 15.5 0.0 $8.5 8.0 MAA1H FI,ODR 72.0 0.0 0.0 6-G 2N0 F!.OCR 72,0 0.0 0.0 8.0 ROOM a 0.0 0.0 0.0 0.0 RO(:NtS 4.0 0.0 0.0 00 fi()OAA 5 0.0 0.0 0.0 0.0 ROOM 7 0.0 0.0 0.0 00 ftOp618 0.0 0.0 0.0 0.0 ROOM 9 0.0 0,0 0,0 0.0 ROOM SO 0.0 0.0 0.0 0.0 ROOM 71 00 0.0 0.0 0.0 FtOUM 12 0.0 OA UA QO ROOM 13 4.0 0.0 0.0 0.0 F!OOM 14 d.) 0,0 0.0 014 k0CTM NA;47E ht WIND E VYIND W VJIND S 4VINO BASEMENs 0,0 0,0 0.0 310 MAtN fLGOR U.p 0.0 0.0 55.0 2NG FLOC fi 28.0 0.0 0.0 51.0 ROa1J1 ? 0.0 0.0 0.0 00 ROOM 5 QO 0.0 0.0 00 FROGU! S OA 0.0 O.tl 0.0 ROOM % 0.0 0.0 0.0 0.0 ROOM b . 0,0 0.0 0.0 0,0 ROOM 5 910 0.0 0.0 0.0 ROOM 10 0.0 0.0 0.0 00 !iGOM ? 1 4.0 0.0 0.0 0.0 ROOM 12 0,0 0.0 0.0 0.0 ROOM 13 6.0 0.0 0.0 00 ROqV, 74 0.0 0.0 0.0 O.U R ?rUM hlP?ld? Crll CF BSMt FL OBSMT/GA 511+9/GRO BP.SEMetr 0 682 0 0 AAAiN FL03R 862 0 0 t? 2NU FCUCIR 1040 358 0 FtOOM 4 0 p 0 RQpM 5 0 D 0 ROOM 6 0 0 0 ROOM 7 ? 0 0 0 ROOM E o 0 0 uooM ?i e o 0 ROOPA 10 0 0 0 RC>pM 71 0 0 0 ftOdM 12 G 0 Q ,kOJM 13 0 0 0 RCYJM 14 D 0 0 DOORS 42 a 0 0 0 0 0 0 r e 0 D 0 INFIL SF 15Q 882 1040 0 0 0 0 PEOPLE 2 0 4 0 0 D D 0 U 0 0 0 0 C LOT SURVEY CHECKLIST FOR RESIDENTIAL BUILDING PERMIT APPLICATION m rn c m L U OZ Q vn ? L9/ ? ? [9? CI ? m/ ? ? W? ? ? f9/ p ? q/? ? ? 0 ? ? L? ? ? ? ? ? ? PROPERTY LEGAL: L o1 ; I- DATE OF SURVEY: LATEST REVISION: DOCUMENT STANDARDS • Registered Land Surveyor signature and company • Building Permit Applicant . Legal description • Address • North arrow and scale . House type (rambler, walkout, split w/o, split entry, lookout, etc.) • Directional drainage arrows with slopelgradient % • Proposed/existlng sewer and water services & inveR elevation • Street name . Driveway • Lot Square Footage • Lot Coverage ? J ELEVATIONS H/ 0 ? d 0 ? GA? ? ? ? fd? ? ? ? ? ? r ? 6' LI ? 4/ ? ? G? ? ? ? /rik? ? f?' ? ? Existin • Sewer service (or Proposed) • Property corners . Top of curb at the driveway and property line extensions • Elevations of any existing adjacent homes • Adequate footing depth of structures due to adjacent utility trenches • Watenvays (pond, stream, etc.) Prooosed . Garage floor • Basementfloor . Lowest exposed elevation (walkout/window) • Property corners . Front and rear of home at the foundation PONDING AREA (if applicable) ? [4'/ ? • Easement line ? (? ? • NWL ? fp? ? • HWL ? d ? • Pond # designation ? 19?' / 0 • Emergency Overtiow Elevation c [§' 0 • Pond/Wetland bufferdelineation r?? u ?n ? r? ? F] ? ? n r9? ? ? r?? ? DIMENSIONS • Lot Iines/Bearings & dimensions . Right-of-way and sVeet width (to back of curb) • Proposed home dimensions including any proposed decks, overhangs greater than 2', porches, etc. (i.e. all structures requiring permanent footings) • Show all easements of record and any City utilities within those easements • Setbacks of proposed structure and sideyard setback of adjacent existing structures . Retaining wall requiremer'' "--" Reviewed: G:/FORMS/Building Permit Appliption -z,y/ cOnsuLnNO ENaNMRs, DIEDRICH BLDRS. RUf3E ' PLANNERS and LAND SURNEYORS PROJECT N0. 11400A0 IMOENGINEERING BoOK COMPANYS INC. PAGE ?_ 1000 EAST 146th S7REET, BURNSNLLE, MINNESOTA 55337 PH 432-3000 . CERTIFICATE OF SURVEY Legal Description: LoT 1, 2, 3, & 4. BLOCK 2 EAGAN HEIGHTS TOWNHOMES 3RD ADDITION, DAKOTA COUNTY MINNESOTA. 8971,5 DENOTES D(ISTING ELEVATION ($98,6? DENOTES PROPOSED ELEVATION INDICATES DIREC110N OF SURFACE DRAINAGE -199, = FlNISHED GARAGE FLOOR ELEVATION = BASEMENT FLOOR ELEVATION -321133 ' 3 = TOP OF FOUNDATION ELEVATION SCALE : 1" = 30' A0012-e55K : PROGOSEO SAN/TA/IY SErNfQ SERY/LE /NVERT ELEli9T/OA/S L-OT 1 - 2247 GIIJERrY LqNE Z-0 T / - (Nl4 = 8879 L07 Z- 2243 L18E27Y U4NE Lo7 2- /N?. = 889 / LoT 3- 2239 LIBERTY 1-4146 L07" 3- /NY. - 8876 LoT4 - Z235 L19E27`I LAIJE L,07- Q' '/N. _987.3 3:9 AAa?xztntum Skqm or Re4aining WaE9 Ei13 PLAT L/NE Be iiBqU1P0d P[AT L/NE E.o. F t? ,vn'i ?89Z,o) w ?893,? F ? ??fi •• ? ) C89ZJ? w C6?84lZ.o? .v?"i ? 3159- l6 3 m Fv7UOE STOKM 5 ? ??`?? ?pt89 .83 ° °i w ? m L4 16.13 ? 42.00 ? 26.00 ? 26.00 8 00 ? PORCH? 1(894'1 ? w I w CB?? ?Of2CH ;p ? 5.00 TLILEagwl N [oiqe 12.00 12.00 o ^ ? 37.00 14.00 0 0 14.00 37.00 1 .? PROPOSED w PROP. PROP. PROPOSED? HOUSE m u HSE. w? HSE. w? HOUSE Q m V + J .1 prn o " ?-- F - - - - - - - - * o o GAR. 5' GAR. GAR. 67 GAR. w ? . O¢. O 400 O ?I A C I2.00 m ! C 8J b °0 21.00 d ?0 20.33 20.33 a0 21 00 0 12.00 ' 42.00 899.00 99.ob ?- 01° azo ??iUL? N ?9.D0 6.00 S8 °53'S2" ?."' ? . ST n?ii ? ? 6.90 CUKB ?897? ?89'1,8 ?891.4 [897,2 G(3 „ H" Pr. 897.41_ (?q?j LIBERTY LANE UNVE2 CoN57RuGTlON_ ? t ? ; I hereby certify that this is a true and correct representation of a tract as shown and described hereon. As prepared by me this 39D day of JX4IARY 2003. REV. i-a-03 :II iaFr. 5,90n; ,om a??s 5*+19"y ? LP IP ?ir?tr?,?,- cv?R sezv?? i,w?, se?9?s, sr k.,d7y, hwv n Minn, Reg. rvo. 11086 ,vaen/ pur GiNe. o??y?e? T?wv?6tova?3?iS c?F?.K i3v 5?0 ?3 RESIDENTIAL BUII.DING Y?'` ? ? Permit Application -- City Of Eagan 3830 Pilot Knob Road, Eagan Mn 55122 Telephone # 651-675-5675 FAX # 651-675-5674 New Consiruction Reauirements 3 registered si[e suneys showing sq. ft of lot, sq. R of house; and all roofed areas (20°,6 mauimum bt coverage allawed) 2 copps of plan showing beam & window sizes; poured found design, etc. 1 set of Eneyy Calculatlons 3 apies of Tree Preservation Plan'rf bt platted aker 711193 Rim Joisl Delail Opti?ons selection sheet (bldgs with 3 or less units SFs(D (?D RemodeVReoalr Reauirements 2 apies of plan 7 set of Eneigy Calculations for heated additions 7 site survey (or addifions 8 decks AddPo'on -lndicafe il on-sife sepfic system :? a-I Yl0 .tz?b 9b.So ^ ?'? ??rJ c- INfice Use Oniv CeA of Survey Recd Tree Pms Plan Recd Tree Pres Not Reqd _ On-site Septic System Date Site Address y 03 Construction Cost ? 1//7d5;?, Unit/Ste # Description of Work ?`vs>SQU?-Tidti? Property Owner Z;?/L Telephone #65/ ) 322- 0730 Contractor Address > State City -O > Zip ---;:5-Telephone #((?S? COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING - Minnesota Rules 7670 Cateeorv 1 Minnesota Rules 7672 Energy Code Category . Residential Ventilatlon Category 1 Worksheet • New Energy Code Worksheet (4 su6missiontype) Submitted Submitted • Energy Envelope Calculatlons Submitted Licensed Plumber Telephone #(6/24 5-61I9J7 Mechanical Contractor Telephone Sewer/Water Contra or ??? ??? • Telephone #(??-' FS i11 s?.-o'b?r5 I hereby apply for a Residential Building Permit and acknowledge that the informationis comp ete and a? ccurate; that the work will be in conformance with the ordinances and codes of the City of Eagan and the State of MN Statutes; I understand this is not a permit, but only an application for a pemut, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and ap roval? ]o,gf p^l/an/s. 0// L?/GL /.QsLS C_ ApplicanYs Printed Name,,,- ApplicanYs Signature ?, ? OFFICE USE ONLY Sub Types ? 01 Foundation ? 07 05-plex ? 13 16-plex ? 20 Pool ? 02 SF Dwelling ? 08 06-plex ? 16 Fireplace ? 21 Porch (3-sea.) y? 03 ? ` 01 of?plex O 09 07-plex ? 17 Garage ? 22 Porch/Addn. (4-sea.) ? 04 02-plex ? 10 OS-plex ? 18 Deck ? 23 Porch (screeNgazebo) ? 05 03-plex ? 11 10-plex ? 19 Lower Level ? 24 Storm Damage ? 06 04-plex ? 12 12-plex PI6g_Y or _ N ? 25 Miscellaneous Work Types x 31 New ? ? 32 Addition ? ? 33 Alteration ? ? 34 Replacement Valuation i ? 0 L9 0 Census Code SAC Units ? Nbr. of Units Nhr. of Bidgs Type of Const V rN)_ ? 30 Accessory Bldg ? 31 Ext. Alt - Multi ? 33 E#. Alt - SF ? 36 MuIG Misc. 35 Int Improvement ? 38 Demolish (Interior) ? 44 Siding 36 Move Bldg. ? 42 Demolish (FOUndation) ? 45 Fire Repair 37 Demolish (81dg)* ? 43 Reroof ? 46 Windows/Doors "Demolition (EnGre Bidg) - Give PCA handout to applicant Occupancy 12..3 - lUk MC/ES System Zoning _ PO City Water Stories _I Booster Pump Sq. Ft. -qj 147 PRV Length Fire Sprinklered Width ? Footings (new bldg) _ Footings (deck) Footiugs(addition) ? Foundation _ Drain Tile Roof Ice & Water Final Framing ? Fueplace _ R.I. _ Air Test Final ?C Insulation 1- REQUIRED INSPECTIONS FinaUC.O. FinaUNo C.O. _ Plwnbing HVAC Other _ Pool Ftgs Air/Gas Tests _ Final _ Siding Stucco Stone Windows (new/replacement) Retaining Wall Approved By , Building Inspector ._---------- -- -------------- -- ----=------------------ --------------- r-:?,??? c?5"1 x )-s' (11 y-7 < Base Fee Surcharge Plan Review MC/ES SAC City SAC Utility Connection Charge S&W Permit & Surcharge Treatment Plant License Search Copies Other Total U i?('y-?..9?'lf' ???'1 /? ? a--9 G?'?`? J? 4, `? ?`? G*.?i U`yLL/(? 0 Od,.k- L?o ?- x (? _ ly9 X ?-y" 4 r 544 ?/r ll? ? UtU-IC-UL IHU Iti:Yd U.U,SHLt5 hHR NU, b1Z 1'Cd tlllU N.UL/U! FlEATLGSS-HEATGAIN ,ANALYSIS REPORT Dc: SAt,ES COMPANY, INC. 2100dINNEfi4HAAVE MINNFJIPOi.IS, MN (612)7294'00 FN( (812)728-8778 CUSTOMEl2 NAME: SOUTH61pE HEATING Q1.AN N/1Mr.'S. DiEDRlCH BUILD£RS 4 PLEX'Y JOBqCDREESS. T ? u _-LOT i,4 ` C.Ai CUiAI FD 8Y: DATE: itr -F '?p?ci XPOS T:URI ars; GRO55 tSPQSc'.O WALI.S NiINL7UN/S d CLASS -pGQRS(Hl W tN¢Ov'JS & CLA58 DGURS (CI oaoFis ? ?.._._. .__._ NF.'i. EXApyEp Wki.l S bif UNG' - F:aOas INFIL7RpTfOH YT' S118-7'OTNi. 2ILATLOSS 8? HEA7 GAIN 37279 .___., ......... __._ .--------•--° •-___ .............---- -?----- --°----°---?--- ---- ---------------•--__ -__ - 12245 - __ ?/E?:T1IqT1UP?ICUMBJSTtONA1R 3288 .__......,-°--... --------_-. _».. 730 --°--.._..........?.--------- '----- -? ..........-------- __....___ •_- Tt:TAL HEA1'LG3S.STUH - . r F'FOI°LE A'"i0C [iTl1H - ANPi. Li-F T, ErC @ 7200 ?UN "" ........ .............,.................. "" ."'- '. ?._...- ...--_-'._.. NE1' SENSl9LE B'TUIi OAlN DUCT F?TUIi;FRESii AIR GA1N T'07AL SEll618LE GAiN hieatlng Ouiside db -20 In9ide db 70 Design TD 90 Datly Ranfle . Inside HumO - Groinrt 1AHr . Cooling 95 75 20 M ? ?N?T T?'? HTM AREA R- ?? BTUH :a_r..?• _. QR H VALUE HTG CLG LENGTH HTG CLG '(C..bove Grode R18 734e ? (D)Rek,w Grade No Ins ? 0 i - I(E)Below Gr&de R-91 ' ? M 1076 ? 3A Obie Cir Wa+A ? 49.6 222 tiD11 ? 2A t I?'?E 5trxm YJOCd 42.8 ?'t....._. 5D Trpla Low-e Waoti 28.1 p NOkTH 79.0 65 M ? 1235 F_qST! WESi ? 56.0 57 ' 3192 V) _.._.._..j SOUTii _..__.. . 32.0 100 ? 3200 _._..______.... M?? (C?,bwe Grade R19 ? 28.8 54 7.6 1 4 42 1084 --1 ?1210 ? ?gy{ ----- 318 1518 .- -- • (D)[ielaw Graie No Ina I , 6.; . 0 G (E)Below Gra?a R-11 4.8 f 0.0 1076 495 0 p .... ?._. .. / . _ _ I2?!/ ? (U)kt9 4.8 1 2.3 -- 0 0 0 (M) $$i?AT FLOOR 2.2 ! 1133 2493 0- (N) A$qVE GFiRAGE 4.3 1 1 0.7 149 641 ' 1?4 (O) SLAB Oh GRADE 38.9 D 0 ? 0 _ J_ I 0 .._.__.?; °f J• 837 S Z?Y.LS' 3g6 t 1800 1200 75075 0 15975 1'OTRL COQLiNG GAIN-BtUH (gEN3lBi,E + L.qTEkT) --------• M utc-12-ul rnu ib:23 D. U. skrs FAX NU. 612 128 8DU P.03/07 HEATLOS3-MEATGAIN ANAt,Y31S FtEPORT SOUTHSiUE MEATING DIEORICH BUIIDER$ a PIEX K-41,,0§4 WALi-5 WINDdWS DUORS CEILING FIOOR INFIWENT TOTALS 6ASEMEfV f $508 2232 0 0 2483 3129 13359 TNiin F+oor 5297 8779 1270 2892 841 8627 27148 RGOM ;i 0 0 0 0 0 D 0 ROOM 4 0 0 0 0 C G p ROOM 6 p a 0 U D 0 0 ROOM 8 0 0 0 0 0 D 0 : ROOM 7 0 0 0 0 0 0 0 ROOM 8 0 0 0 0 0 p p ROOM 9 0 0 0 0 p p 0 ROOM 10 " U G 0 0 0 0 0 lk ?Vm » 0 0 0 D 0 0 0 ROOM 12 0 0 0 0 0 0 0 ROOM 13 0 0 0 0 0 9 0 ROOM 54 ? D 0 D 0 U p p TG7ALS 10803 11011 1270 2892 3133 14656 40505 F?.,?AI!:LAty ' " WAILS WINQpWS DOORS CElIING FLOOR INFlUVENT TO7ALS 9ASkMFh 1144 1410 0 0 0 607 2161 M9in Floor 4.373 6217 318 1282 104 1548 10814 ROOM 3 0 D 0 0 p p p ROOM A 0 0 0 0 6 0 0 ROOM 5 G G D 0 0 0 p Ficiom e 0 Q 0 0 0 0 0 ROOM 7 0 0 0 0 0 0 0 P,'JOA7 8 0 0 0 0 G 4 0 ROCM 9 6 0 0 0 D 4 0 ROOM 1C G 0 0 0 0 0 0 ROOM 11 0 0 0 0 o G 0 ROOM 12 0 0 0 0 D 0 C RfK)M 13 6 0 0 0 4 0 0 ROOM 14 Q 0 0 0 0 0 0 1qTp1_a 15'8 7027 319 1282 164 2125 15975 3ENSi8LE+lA'f kNT =TOTAL (SENSIBLE 8 LATENi) SENSIDLE 8R5EMEM'1 2181 540 2702 Main Flaor 10814 2703 13517 .RUOM:3 0 0 0 •fi00Ad a G G 0 ROOM 5 0 U 0 ROOM 6 0 0 0 RCKJA6 t 0 0 D Rt)oBn e G o a k'30M 9 p q p 'aoOM ?0 0 0 0 ROOM t 1 0 0 p F?40M 92 0 A p ROOM 13 0 U 0 P.OOM 14 p q p TC1TAi.5 55975 3994 19989 ? UtC-IL-UZ INU Ib:24 U, G SHLLS rRH N0. e12 iza arru P.04i07 ' HEATLOSS-tiLATGAlN ANALYSIS REPORT crQUi'HSICE fiENTI:JG lJIEDRfCH I3UILfJERS 4 FLEX ROOM NA14E EXP WAi.4 BG WALL 8G WL iNS CEIL Fi7 Bi43EMSNY 18.5 0.0 134.5 8.0 MAin Flrxw 100.0 0.0 0.0 8.0 ROOM ` 0.0 0.0 0.0 0.0 fd00M 4 QO 0.0 0.0 0.0 ROOM 5 iK0 0.0 0.0 0.0 1200M 6 0.0 0.0 0.0 0.0 f1bom ? 0.0 0.0 0.0 0.0 ROOM 3 0,0 0.0 0.0 0.0 ROOM 6 0.0 0.0 0.0 0,0 ROOM 1o 0.0 0.0 0.0 00 ROOM I 1 0.0 0.0 0.0 00 ROdM 72 0,0 0.0 0.0 0.0 aoowr +, 0.0 0.0 0.0 0.0 koonn 14 0.0 o.o 0.0 0.0 ROOM NAAIC N 4VINp E WIND W WIND S W:ND OoORs PASEhSEM 30.0 16.0 0.0 0.0 0 !o}ain Ftm 35.0 0.0 42.0 :00.0 42 fi00M 3 0.0 0.0 0.0 0.0 0 ROOM 4 0.0 0.0 0.0 0.0 0 ROOM S 0.0 0.0 0.0 0.0 Q ROOM tl 0.0 0.0 0.0 oA p i2U0id 7 0.0 0.0 0.0 0.0 0 ROOM e 0,0 0.0 0.0 0.0 0 kOOm H 0.0 0.0 010 0.0 0 ROOM 70 C.0 OA 0.0 0.0 4 RDOM 17 G n 0.0 0.0 0.0 D ROOM 72 0.0 0.0 0.0 0.0 0 ROUM ?3 0.0 0.0 0.0 0.0 L ROOM SA 00 0.0 O,U 0.0 0 ROOM NAAiF. CE4L SF BSMT FL PBSMT/GA SLAE/GRp INFIL SF PEOPLE AASEN{EM 0 7133 0 0 300 2 1618in F!cor 1282 0 149 0 1282 4 ROOM 3 1) 0 C 0 0 rtocM 4 u o 0 0 0 ROOM fi 0 0 0 0 0 ROOM 6 0 0 0 0 0 ROOM 7 1) 0 0 0 0 Rt1OM $ 7 0 0 0 0 ROOM 9 D 0 0 fl C ROOM 10 0 0 fl 0 0 POOM 1! 0 0 0 G 0 ?OOM 12 0 0 0 0 0 ROOM 13 0 0 o tl 0 ROOM 14 f) 0 0 0 0 hiNcheck COMPLIANCE REFOF,T hlinnesota Energy Code MNcheck Software Version 3.0 CDUNTY: Dakota STATE: Minnesota ZONE: 2 CONSTRUCTIOtd TYPE: Multifamily ?ATE: 2-3-2003 TITLE: EAGAN HEIGHTS PROJECT INFORMATION: FLAN #02-0801Y2 COMPANY INFORMATION: DIEDP.ICH BUILDERS NOTES: LOTS 1-4 COMFLIANCE: PASSES P,equired UA = 993 Your Home = 871 12,3% Better Than Cade Permit # Checked bj/Date Area or Cavity Cont. Glazing/Door ---------------- Berirneter ------ R-Valu e R-Value U-Value UA CEILINGS: Raised ---------------------- Truss 9942 -------- 94.0 ---------- 0.0 ------------ ---- 109 41ALLS: 4Jood Fram e, 16" O.C. 3913 19.0 2.0 219 701Sr P.2eR- : 642 10.0 2.o 52 BSMT. Conc. 8.3' ht/7.8' bg/8.3' insul 1909 10.0 0.0 111 BSMT: Conc. 3.5' ht/3.0' bg/3.5' insul 991 10.0 0.0 39 GLAZING: Ldindaws or Daors, Above Grade 891 0.350 299 DOORS 198 0.350 52 - ------ ------ COMPLIANCE STATEMENT: The proposed building ----- design ------ described ----------- here is --- consistent with the building plans, specific ations, and other calculations submitted with t he permit application. The proposed building has been designed to meet the requiremenrs rf the Min nesota E nerg;i Code . Builder/Desiyner -:F- Da te _?? 0'u?? Minnesota Energy Code MNcheck Software Version 3.0 EAGA.N HEIGHTS DATE: 1-3-2003 PLAN RE`JIEW AND INSFECTION ISSUES This list of items may be helpful for Plan REViewers and Building Inspectors use as a guide for enforcing the P9innesota Energy Code. The items apply to Group R, Division 3 Occupancies, one- and two-family residential dwellings. The items marked with * apply only to detached one- and two-farnily residential dwellings. , PLAN REVIEW ISSUES FOUNDATION INSULA.TICN - faundatian wall insulation R-5 minimum - foundation insulation extends from top of wall down to top of the footing - exterior foundation insulation is covered by a protective coating finish CONCP.ETE SLAB OR UNDER-SLAB INSULATION - slab on grade perimeter insulation R-5 minimum - slab insulation extends from top of slab to design frost line or top of footing - floors over unheated space R-30 minimum LJINDOWS / DOORS / ShYLIGHTS - average U-value is 0.37 maximum for windows and glass doors (excludes foundation windows) - window U-value consistant with building plan and MNcheck Report - window and door area consistent with building plan and MNcheck Report MECHANICAL VEDITILATION ISSUES - rESidential mechanical ventilation system provides adequate ventilation per code requirements* - furnace efficiency is consistent with MNcheck or building design plan - protection against excessive depressurization is installed per code requirements" ENVELOFE INSULATION FOR PLAN REVIE6J - interior basement insulation Ft-S minimum (if no exterior insulation) - ceilings with attics R-38 or consistent with building plan and Mr]check keport - wall framing and insulation level is consistent raith building design and MNcheck Report INSPECTION ISSUES CONCEALED ID75ULA.TION FRAMIh1G AND SHEATHING - wind wash barrier installed at attic ed7e - exterior wall corners frarned sc+ that insLilation can be installed after exterior sheathing is installed - intersections of interior partition walls and exterior walls are framed that insulation can be installed between the partition and exteriur sheathing after exterior sheathing is installed - gaps between framing less than one-half inch are eliminated by securinq frarriing toyether or are insulated at the time of assembly - all penetratiuns between conditioned and unconditioned spaces made prior to framing inspection are sealed INTERIOP. AIR BARRIER - all fire stops are air sealed - pipes, ducts, wires, equipment and flues and chimneys through the interi air barrier are sealad - a sealed continuous interior air barrier is installed on the warm side r_, the building envelope at ceilings, walls, and flour rim joist areas* - air barrier behind tub and shower is sealed and protected - recessed light fixtures are sealed ENVELQFE INSULATION - hasement insulation R-5 minimum - wind wash barrier on wall separating house and garage is sealed - loose fill insulation is prevented from entering the eaves - insulation on skylight shafts and walls exposed in attics is supported on the unconditioned side ATTIC INSLiLATION - attic access panel insulatEd to R-38 for ceiling panel and R-19 for wall panel - attic card attached to framing near access opening - notification of attic R-value and date of installation posted near bu permit inspsction card This is a summary only. Dther requirements may apply. See the Minnesota Energy Code. Questions? Call the Department of Public Service Information Center at 651-296-5175 or 1-800-657-3710. EAGAN HEIGHTS TOWNHOMES 3RD 22427 PERMIT DATE & TYPE \ LOT BL ADDRESS 010 Ol 4177/ OLD SIBLEY MEMORIAL HWY 020 01 4173/ 030 01 4169 040 01 4165/ OLD SIBLEY MEMORIAL HWY 050 01 4161/ 060 01 4157/ 070 01 4153 ?-- -- ------- - 010 02 2247/ LIBERTY LANE 020 02 2243/ 030 02 2239/ 040 02 2235 050 02 2231/ LIBERTY LANE 060 02 2229/ 070 02 2225/ 080 02 2221/ 090 02 2217/ 100 02 2213 110 02 2209/ LIBERTY LANE 120 02 22051 130 02 2201/ 140 02 2197 150 02 2196/ LIBERTY LANE 160 02 2198/ 170 02 2200 180 02 2204/ LIBERTY LANE 190 02 2208/ 200 02 2212/ 210 02 2216/ 220 02 2220/ 230 02 2224 240 02 2228/ LIBERTY LANE 250 02 2232/ 260 02 2236/ 270 02 2240/ 280 02 2244 290 02 2248 10 APPROVED 2003 LOT SURVEY CHECKLIST FOR RESIDENTIAL BUILDING PERMIT APPLICATION m rn c ro t v Q ? 02 Q q? ? ? ?? a CD/ ? ? 4/0 ? do 0 ?/? ? Cy/ ? ? C3/ ? ? ?/? ? C?' ? ? ? ?/? ? C?' ? PROPERTY LEGAL: L o"ItC I' DATE OF SURVEY: _?'i=D3 ELEVATIONS fL/ ? ? ?f 0 ? ? [a/ e ?/ C ? ¢' G Prooosed [4' ? C • Garage floor q/ ? ? • Basement floor ? ? ? . Lowest exposed elevaGOn (walkouUwindow) ? W/ ? • Property comers v? 0 • Front and rear of home at the foundatlon PONDING AREA (if applicable) M/ • Easement line ? / W ? • NWL ? W ? • HWL ? m/ ? • Pond # designatlon ? IH?/ 0 • Emergency Werflow Elevation ? ?§' ? • PondNVetland buffer delineadon /? ? ? ? r? ? n id? ? iI iq? U ? ?? u LATEST REVISION: DOCUMENT STANDARDS • Registered Land Surveyor signature and company • Building Permit Applicant • Legaldescription . Address • North arrow and scale • House rype (rambler, walkout, split w/o, split entry, lookout, etc.) • Directional drainage arrows wHh slope/gradient % • Proposedlexisting sewer and water services 8 invert elevatlan • Street name • Driveway • Lot Square Footage . Lot Coverage Existln • Sewer service (or Proposed) . Property comers • Top of curb at the driveway and property line eMensions • Elevations of any existing adjacent homes • Adequate footing depth of structures due to adjacent ufility trenches • Waterways (pond, stream, etc.) DIMENSIONS • Lot Iines/Bearings 8 dimensions • Right-of-way and streetwidth (to back of curb) • Proposed home dimensions including any proposed decks, overhangs greater than 2', porches, etc. (i.e. all sWCtures requiring permanent fooGngs) • Show all easements of recorcl and any City utilities within those easements • Setbacks of proposed sWCture and sideyard setback of adjacent existing structures • Retaining wall requirements, '" any Reviewed: G:JFORMSlBuilding Pertnit Application ?rg? 017E CONSULTING P NNRS and LEp? 17 ND SURVEYORS VGINEE(iING CoMrANY, l1000 EAST 146th DIEDRICH BLDRS. ? PROJECT N0. 11400.00 BOOK INC . STREEI', 6URNSVILLE, MINNESOTA 55337 PH 432-3000 '?" CERTtFICATE OF SURVEY Legal Description: LOT 1, 2, 3, & 4, BLOCK 2, EAGAN HEIGHTS TOWNHOMES 3RD ADDITION, DAKOTA COUNTY, MINNESOTA. C?7?? DENOTES EXISTING ELEVATION ($98,6 DENOTES PROPOSED ELEVATION INDICATES DIRECTION OF SURFACE DRAINAGE ,00 = FlNISHED GARAGE FLOOR ELEVATION 891,33 = BASEMENT FLOOR ELEVATION -919133 = TOP OF FOUNDATION ELEVATION SCALE : 1" = 30' ADDKKS65 : LOT ! - 2247 LOT Z - 22-43 LoT 3 - 2239 LoT ¢ - 2235 pROP05E0 S4411TAR'1 5-Et*/E2 SERY/CE /Nl/E,PT E?1147129,c/S L!$PRTY LRNE Z-07- ? - !N!/, - 8879 / 07 2- /,vv - 888. ( L19E27Y lJlnle L?o 7 3- /NS' = 8$76 L(6E2"ry LfrNE L oT 4- lNY = 887. 3 L19E2-7`/ LAeIE 3:9 PAatirnurin or Re#aining Wa&B WM Be r(equired S/c.'r FM?;r S7 mif LIBERTY LANE UNOE2 CaN57KUGTiOn! ° t S q ?+?0? ?-, d --- ___?, _ , i..':'1?'f .. I hereby certify that this is a true and correct representation of a tract hereon. As prepared by me this 3l) day of JANUA2V , 2003. qeu. /-9-03 : rrravE 8/-U6, /,oFT Sorrl? 40 AovA?3w , Ss6di?y SEwE? StRVi?E /M/$, SE?AcKS? ST. /,ui07H, sWd f"rMinn. NAe?H plAT G/NE PAGE as shown and described Reg. No. 19086 *-22-43 r~ 224'1 LI ftl?'4Y L-*rN 'E. MESSAGE CONF I RMAT I ON 03i14i2006 15:14 ID=ERGRN ENG+COM DEU DATE S,R- TIME DISTRNT STATION ID MODE PRGES RESULT 03i14 00' 51" 6513226940 CRLLING 02 OK 0000 03i14i2006 15:12 ERGRN ENG+COM DEV a 93226930 FAX COVER SHEET Ciry of Eagan 3830 Pilnt YCnOb RqBd Eagan, MN 55122 Phone: (651) 675-5600 Fax: (661) 875-5694 TO: 51(.E,1 'D FROM: Craig Novaczyk qATE: J S4 • 03 Re: j>.r.4-1,v-,?7c-?-- •?sv?r.x+? ?rnr??xwsrcw:sn.r.rw+wr ..vrww?w_.?.wnw Fax#: C&S"1) 32,2- Fax #: (651) 675-5694 9890 PILOT KNOB HOAO EAGAN. MINNE50TA 55122-0897 FN(: (851) 875-5894 TDo (e51}454-e535 a4mall: dqvaGZyN@aNclesBa^.oDm To N0.683 (P01 G43o , cRaIc niovaczvK ? seNOr Inspectw : (657)675-56&3 city oF eogan a?cmng caa tss,} s7s-sVs FAX COVER SHEET City of Eagan 3830 Pilot Knob Road Eagan, MN 55122 Phone: (651) 675-5600 Fax: (651) 675-5694 TO: 51(„AL, D/V--MlG{-{-- Fax#: C&t;-1) 3 Z2 •49 3 0 FROM: Craig Novaczyk Fax #: (651) 675-5694 DATE: ?? PILOT KNOB ROAD EAGAN, MINNESOTA 55122-7897 FAX: (651) 675-5694 Pi??1 N7'7 C-? roo: cssiJ 454-e535 RE: e-mail: rnovaczyk@ciryoteagan.com CRAIG NOVACZYK i Senior Inspec[or j , (651) 675-5683 i .. city of eagan inspections: Call (651) 675-5675 Appendix Chapter 18 is printed in its entirety in Volume 2 of the Unijorm Building Code. Excerpfs from Appendiac Chapter 18 are reprinted herein. 1997 UNIFORM BUILDING COOE EXCERPTS FROM APPENDIX CHAPTER 78 Excerpts from Appendix Chapter 18 WATERPROOFING AND DAMPPROOFING FOUNDATIONS r ? SECTION 1820 - SCOPE Walls, or portions thereof, retaining earth and enclosing in[enor spaces and Floors below grade shall be waterproofed or damp- proofed according ro this appendix chapter. EXCEPi'ION: Walls enclosing crawl spaca. SECTION 1621 - GROUNDWATER TABLE INVESTIGATION 1814.3 Dampproofing Materials. Wall dampproofing shall consis[ of a bituminous ma[erial, acrylic modified cement base coating, any of the materials permit[ed for watelproofing in Sec- tion 1828.4, or other approved methods or materiafs. When such materials ace not approved for direc[ application to umt masonry, the wali shall be parged on the ex[erior surface below grade wi[h not less than 3/g inch (9.5 mm) of portland cemen[ moHar. SECTION 7825-OTHER DAMPPROOFINCa REQUIREMENTS ??. A subsurface soils invesriga[ion shall be made in accordance wi[h Section 18043, Item 3, [o detertnine the possibility of the ground- water table rising above the proposed elevation of the tloor or floors below grade. The building official may require that this de- [ermination be made 6y an engineer or architect licensed by the state co practice as such. EXCEPTIONS: I. When Foundation wareryroofing is provided. 2. When dampproofing is provided and the buildmg oflicial finds tha[ there is smisfactory data from adjacen[ areaz co demonsira[e that groundwa[er has not beeo a problem. SECTION 1822-DAMPPROOFING REdUIRED Where the groundwater investiga[ion required by Section 1821 in- dicates that a hydrostatic pressure caused by the water table will no[ occur, tloors and walls shall be dampproofed and a subsoil drainage sys[em shall be instafled in accordance with [his appen- dix chapter. EXCEPTION: Woad foundanon sys[ems shall be constmcted in accordance wifh Chaprer 18, Division II. SECTION 1823 - FLOOR DAMPPROOFING 1823.1 General. Dampproofing ma[erials shall be ins[alled be- [ween the tloor and base materials required by Section 1825.2. EXCEPI'ION: Whem a separate Floor is pmvideA above a coo- c¢re slab, the damppmofing may be installed on top of the slab. 1823.2 Dampproofing Materials. Dampproofing installed be- neath the slab shall consist of not less than 6-mil (0.152 mm) poly- ethylene, or other approved me[hods or materials. When permitred [o be installed on [op of the slab, dampproofing shall consist of not less than 4-mil (0.1 mm) polyethylene, mopped-on bitumen or o[her approved methods or materials. Ioints in mem- branes shall be lapped and sealed in an approved manner. SECTION 1824 - WALL DAMPPROOFING 18741 GeneraL Dampproofing materials shall be installed on the estenor surface of walls, and shall extend from a pomt 6 inches (152 mm) above grade, down to the top of the spread portion of the foo[ing. 181A.2 Surface Preparation. Prior to apphcation of damp- proofing matenals on concrete walis, fins or sharp prqechons that may pierce the membrane shall be removed and all holes and re- cesses resulting fmm the removal of form ties shall 6e sealed with a dry-pack mortar, biwminous material, or other approved meth- ods or materials. 1825.1 Subsoil Drainage Sys[em. When dampproofing is re- quired, a base matenal shall be installed under the Floor and a drain shall be installed around the foundauon perimeter in accordance with [his subsec[ion. EXCEPCION: When the fimshed ground level is bebw the floor level for more Lhan 25 percent of the perimeter of the bwlding, the base malerial required by Section 18252 need no[ be provided and the foun- dauon drain requved by Secuon 18253 necd bc providcd only around [hat portion of the building where the ground levcl is above the Floor level 1825.2 Base Material. Floors shall be placed over base ma[erial not less than 4 inches (102 mm) in thickness consisfing of gravel or crushed stone containing not more [han 10 percent ma[erial that passes a No. 4 sieve (4.75 mm). 18253 Fouodation Drain. The drain shall consist of gravel, croshed stone or drain tile. Gravel or crushed stone drains shall contain not more than 10 percen[ matenal that passes a No. 4 sieve (4.75 mm). The drain shatl extend a minimum of 12 inches (305 mm) beyond the ourside edge of the footing. The depth shall be such [hat the 6o[tom of the drain is not higher than the boltom of the base material under the floor, and the top of the drain is not less [han 6 inches (152 mm) above the spread portion of the foo6ng. T'he top of the drain shall be covered with an approved fil[er membrane material. When drain tile or perfora[ed pipe is used, the inveR of the pipe or tile shall be not higher than the floor elevation. The [op of joints or the rop of perforations shall be pro[ected with an approved filter membrane materiaL The pipe or tile shall be placed on not less than 2 inches (51 mm) of gravel or croshed stone complying with this section and covered wi[h not less [han 6 inches (152 mm) of the same material. 1825.4 Drainage Disposal. The floor base and founda[ion pe- rimeter drain shall discharge by gravity or mechanical means into an approved drainage system. EXCEPTION: Where a site is laca[ed in well-dtained grevel or sand-gravel mixeure soils, a dedicared drainage system need not be pro- vided. SECTION 1826- WATERPROOFlNG REQUIRED Where the groundwarer mvestigation required by Secuon 1821 in- dicates [hat a hydrostatic pressure caused by the water table dces exist, walls and floors shall be waterproofed in accordance wi[h this appendix chapter. EXCEPTIONS: I. When the groundwater table can be lowercd ;md mainmined m an elevanon mt less than 6 incha (152 mm) below 7-343 Siteaddress: 4?2?s ber4'\I ho..V1,e_ Lot± BlockjDZ Subd. Fanan Wttnl,-ks +ownhowits 3'°' On April 15, 2000 the Minnesota Energy Code, Category I Building Requirements for insulation protection, air tightness, and ventilation, was adopted. As a result, the City of Eagan is requiring that the following information be submitted prior to issuance of a Certificate of Occupancy. ? This structure: is consUucted to meet minimum requirements of the Mn Energy Cade, Chapter 7670 OR _ This sWcture: will be consWcted to meet more restricfive requirements of Chapters 7672 or 7674 APPLWNCE G ELEC MANUFACTURER MOOEL BTU'S VEMING TYPE Water Heater ? #1 a c,? C--. Fumace L.? c c33- - zF Dryer DJ6ir900\ MbP 't5Q T S.S$ LL,.uj 1010 vemed EXHAUST SYSTEM LOCATION TYPE MODEL CFM's VENTED YES No Kitchen kitchen f4 J.ey?No')( /-f & ?(-( S U i/ 8athroom t WRIL/ L0JMa ' E.( (C 1-15`a ? 8athroom 2 UWNoX f/k ? I-1 Sd ? Bathroom 3 Bathroom 4 othe?h- p DIZ d-(R v Lt? nx !k(R v/- J5Z3 r/ FIREPLACE S LOCATION GAS WOOD MANUFACTURER MODEL BTU'S VENTING DIRECi AiM05 17P)?- d 4 . 14ecL}• N= -L F- C?.;n,; ?'sh ? s ?- ? - - ? MAKE-UP AIR MODEL TYPE CFM's Fk </ I hereby acknowledge that the above informaGon is correct and agree to comply with the Minnesota Energy Code and City of Eagan fequirements. Sig ture Date r?a? Company Name Ae This form is the responsibility of the General ConUactor. Address: 2235 Liberty Lane Zip: 55122 Lot: 4 Block: 2 Subdivision: Eagan Heights Townhomes 3rd Tlil? F'OLIANING 1'IEMS WER6/WN;RE YOT COMYI,ETE AT FINAI. INSPECTION ON -9-- o Yes No Comments Final grade - 6" from siding Yermanent steps - arage Permanent steps - main entry Permanent driveway Permancnt gas Sod/Seeded lawn Trail/curb dama e 1'orch ?j - $rZr?sri.?v Lower level finish Deck Pireplace jC . Vcrify with your builder that roof test caps from the plumbing system have been removed. •"I'urn off watcr supply to [he outside lawn faucets before freezc potential exists. • Call [hc Cit}%s Engineering Department a[ 651-675-5646 prior to workina in righriof-way or installing irrigation systcm. ? 6UILDINGINSPECTOR: CONTRACTOR: Diedrich Builders 13224 Grand Oak Ct Applc Valley MN 55124 ?p?6-7 7une 30, 2005 ZTASCA ENGTN?'ERZl?TG, Irrc. P.O. BOX 616 SHAKOPEE, MN 55379-0616 952-445-7993 Mr. Bilf Diedrich Diedrich Builders, Inc. 13223 Cnand Oak Court Apple Valley, MN 55124 Re: Townhouse Residence,2216 Liberty Lane, Eagaci, MN Dear Bill: On May 240', I reviewed the townhouse residence at the above address, and find the following. The header for the double gazage doors was a 6B 16# Light Beam (steel) that provided approximately 10,000 plf support for the floor above. The beam was also laterally supported and encased in'/, " plywood. I consider this proper support fo- the structure above. The ends had adequate support on at least three studs. The transferred load to the footing below would be spread over more than three feet of 20 wide footings which would also give adequate support assuming a minimum soil bearing pressure of 2,000 #s per squaze foot of footing.area. A question of corner bracing was considered. I determined the following: • The plywood facing on the beam (above) gave the comer some support. • I recommended that the comer be sheathed with'/a" CDX plywood from the door jamb to the comer and for 18" to 24" on the return wall. This would give the corner adequate support for wind loads. • Considering wind loads, the townhouse grouping of 2 story structures was so close as to negate most side wind loads. In other words, the wind forces will be broken by the adjacent units and construction and will be significantly diminished by the next-door houses. The wind forces against the front facewill be taken by the sidewalls of the garage. X x ? I noticed that similar situations were found at 2212, 22251 223 and 2243 Liberty Lane. The above considerations would apply to those units as well. Two photos o the garage door lintel are enclosed With this plywood correctioq the townhouses are, in my opinioq are adequately suppoRed by the reviewed construction details. THIS IS NOT A GENERIC RECOMMENDATION OR APPROVAL AND DOES NOT APPLY TO ANY OTHER LOCATION QR INSTALLATION. I hereby certify that this report has been prepared by me or under my direct supervision and fhat I am a duly registered Professional Civil Engineer under the laws of the State of Minnesota. If you have any further questions or if I can be of any further assistance, please do not hesitate to phone or write. Sincerely, 4.;:t F \ ITAS?A .N0?.~? IP1\ »: .. Lawrence r\. S*??tad?.P?F?., Ci?i['?i3gineer, Minn. Reg. No. 6220 Encl: Brief ?'---? ?- 5 T ? 71-'? 5 ZooS 3?A June 30, 2005 ITASCA ENGZNEERZNG, INC. P.O. BOX 616 SHAKOPEE, MN 55379-0616 952445-7993 Mr. Bill Diedrich Diedrich Builders, Inc. 13223 Grand Oak Court Apple Valley, MN 55124 Re: Townhouse Residence,2216 Liberty Lane, Eagan, MN Dear Bill: On May 24h, I reviewed the townhouse residence at the above address, and Snd the following. The header for the double garage doors was a 6B 16# Light Beam (steel) that provided approximately 10,000 plf support for the floor above. The beam was also laterally supported and encased in 3/4 " plywood. I consider this proper support fo* the structure above. The ends had adequate support on at least three studs. The transferced ]oad to the footing below would be spread over more than three feet of 20 wide footings which would also give adequate support assuming a minimum soi] bearing pressure of 2,000 #s per squaze foot of footing.area. A question of comer bracing was considered. I detemuned the following: • The plywood facing on the beam (above) gave the comer some support. • I recommended that the corner be sheathed with'/a" CDX plywood from the door jamb to the corner and for 18" to 24" on the retum wall. This would give the corner adequate support for wind loads. • Considering wind loads, the townhouse grouping of 2 story sttuctures was so close as to negate most side wind loads. In other words, the wind forces will be broken by the adjacent units and construction and will be signi&cantly diminished by the neat-door houses. The wind forces against the front face will be taken by the sidewalis of the garage. X I noticed that similaz situations were found at 2212, 2225, 2239 and 2 Liberty Lane. The above considerations would apply to those units as well. Two photos of the gazage door lintel are enclosed With this plywood wrrection, the townhouses are, in my opinion, aze adequately supported by the reviewed constniction details. THIS IS NOT A GENERIC RECOMMENDATION OR APPROVAL AND DOES NOT APPLY TO ANY OTHER LOCATION QR INSTALLATION. I hereby certify that this report has been prepared by me or under my direct supervision and that 1 am a duly registered Professional Civii Engineer under the laws of the State of Minnesota. If you have any fuRher questions or if I can be of any further assistance, please do not hesitate to phone or write. Sincerely, E. ITAS,CA r,/N? ? , , ?. ., P> ?, . Lawrence T'? S4xh Encl: Brief C+LiI'E?gineer, Minn. Reg. No. 6220 c+ ? 7 fil _,ui_ 1 5 2005 Address: 2243 Liberty Lane Zip: 55123 Lot: 2 Block: 2 Subdivision: Eagan Heights Townhomes 3rd THF. FOLLOWING ITEMS WERE/WERE NOT COMPLATE AT FINAL INSPF,CTION ON D'?;) / '0/? Yes No Comments Final ade - 6" from siding Permanent ste s - arage Permanent steps - main entry Permanent driveway Permanent gas / Sod/Seeded lawn ? TraiUcurb dama e Porch I/ Lower level finish Deck Fire lace • Verify with your builder thht roof test caps from the plumbing system have been removed. • Tum off water supply to the outside lawn faucets before freeze potential exists. • Call the City's Engineering Department at 651-681-4645 prior to working in righ[-of-way or mstalling irrigation system. BUILDMG INSPECTOR Ake- I-e fC e-e i 4 cd/bldgmsp/fortns/2002/final inspechon ohecklis[ Use BLUE or BLACK Ink I For Offtco Use l hh I j Permit ~ 5 'A I City f Eap I , Permit Fee: ©d , 3830 Pilot Knob Road j Q I Eagan MN 66122 i Date Received: 1 Phone: (661) 6765676 C1.Q I Fax: (651) 6765694 1 Staff: b U 2013 RESIDENTIAL BUILDING PERMIT APPLICATION Date: I Site Address: Unit Name: 2 S- [ Phone: e t ant 17 i a H ),2 131 Z~ 2235 Address /City 1 Zip; win. .::.;;::i;;::. Applicant is: owner Contractor ' Description of wo Construction Cost, Mufti-Family Building: (Yes / No ) .........Company: 'Tns Contact: CV7 Address: City. ~ - ' ► L I 1 Zip: Phone: State: tLr O ( (D L l!r' License #:Lead Certificate If the project is exempt from lead certification, please explain why_ (see Page 3 for additional information) COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING In the last 12 months, has the City of Eagan Issued a permit for a similar plan based on a master plan? _Yes _No If yes, date and address of master plan: Licensed Plumber: Phone; Mechanical Contractor: Phone: Sewer Sr Water Contractor: Phone: f ` ts ahaJi. • ars: c d (tl~red to .be trbiic alit at+i7ti P:. ..0W. ons ort.n °Wocueh you.s~rl4 riirt. p Q7~.:-Pia a p I fo;" . u rrtlJalt:s~eCJiic;ieasoils..thafwltiGlrL-o et~fft0. e >~he f~rfaimab~►l„;m~1y tte..Cl,~~s(fJed ubtr.~:•~ yo . P, . _ be/utle:tl>iaR:~t►e. CALL BEFORE YOU DIG. Call Gopher State One Call of (651) 454-0002 for protection against underground utility damage. Call 48 hours before you Intend to dig to receive locates of underground utilities. www.oooherstateonecall.orn I hereby acknowledge that this information Is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this Is not a permit, but only an application for a permit, and work is not to start without a permit: that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. Exterior work authorized by a building permit isauod In accordance with the Minnesota state Building Code must be completed within 180 days f elt issuance. qq ~ t Applicant's Printed Name Applicanfs Signature Page 1 of 3 *City of Eapa 3830 Pilot Knob Road Eagan MN 55122 Phone: (661) 6765676 Fax: (651) 6755894 Use BLUE or BLACK Ink For Office Use Permit #: 0°1 Cl gq Permit Fee: Date Received: 311 I I (t.' Staff: rf 2014 RESIDENTIAL BUILDING PERMIT APPLICATION a Date: l Site Address: 9\9•3 `1\DC nr \ \Q / Unit #: 9.a LA Resident!.,'.;,;,., „:,.. ,tiBF''': l':'?!! ;,;, .::,r, .,,, ?,i `, Name: \4)`..\(\;-5 eLb60 `Q Phone:lO' ' E.9(.0,-(9-19 { Address /City /Zip: is. A .. la Applicant is: Owner Contractor ;; ,;P:,i,a i;,.i.•'.:.,:;, ;.. " Description of work: J\ M✓ Construction Cost: ( • 66 Multi -Family Building: (Yes / No _) s:; :::::: ,i.....................:.: ' i:..:: �; � s G is e: i; r.:.: � �;: ;.., '; ;Grob i t;7 r - ;;;;;: "ii l":..' :;,;,,:,':,..i:.i Company: -5\e, kContact: I 0 0 .)va Address: 9\ c J�' City: I. Ra J \ Q 1 1 State: lu �\ \ Zip: ,' Phone: (6\ + (01Q- b99\. License #: l/C1 J Lead Certificate #' OM-- 9. l -- If the project is exempt from lead certification, please explain why: (see Page 3 for additional information) In the last 12 months, _Yes If COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING has the City of Eagan Issued a permit for a similar plan based on a master plan? yes, date and address of master plan: _No Licensed Plumber: Mechanical Contractor: Sewer & Water Contractor: Phone: Phone: Phone: NOPE 'plan tr � � d SppIRoK/►1 docu tM �,that yctu subhrrt'sre considered �C�O C1e,p0�lle %nfb'irriratrbn> Portions � the infOr>raatlan may he classed as 04.6 40014 if you provide * ecific reasons that %Mild -permit the,City tb : co ncliude.that the erre tiat secrets ' CALL BEFORE YOU DIG. Call Gopher State One Call at M1)454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.00pherstateonecall.orq I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances end codes of the City of Eagan: that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit: that the work will be in accordance with the approved plan In the case of work which requires a review and approval of plans. Exter • rwort authorized by a building permit issued in accordance with the Minnesota S_te Building Code must ' . • animated within 180 days permit Is x Ap I cant's Printed Name x Appl c. nt's Signature Page 1 of 3 PERMIT City of Eagan Permit Type:Plumbing Permit Number:EA126538 Date Issued:08/28/2014 Permit Category:ePermit Site Address: 2235 Liberty Lane Lot:4 Block: 02 Addition: Eagan Heights Townhomes 3rd PID:10-22427-02-040 Use: Description: Sub Type:Residential Work Type:Replace Description:Water Heater Meter Size Meter Type Manufacturer Serial Number Remote Number Line Size Comments:Please call Building Inspections at (651) 675-5675 to schedule a final inspection. Thomas Joshua Peine 780 Iglehart Ave St. Paul, MN 55104 Fee Summary:PL - Permit Fee (WS &/or WH)$55.00 0801.4087 Surcharge-Fixed $5.00 9001.2195 $60.00 Total: I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Contractor:Owner:- Applicant - David R Anderson 2235 Liberty Lane Eagan MN 55122 (651) 686-8599 Urban Pine Plumbing & Mechanical 780 Igelhart Ave St Paul MN 55104 (651) 888-2275 Applicant/Permitee: Signature Issued By: Signature