Loading...
4070 Rahn RdPERMIT City of Eagan Permit Type:Building Permit Number:EA148760 Date Issued:04/19/2018 Permit Category:ePermit Site Address: 4070 Rahn Rd Lot:9 Block: 4 Addition: Cedar Grove 5th PID:10-16704-04-090 Use: Description: Sub Type:Siding Work Type:Replace Description: Census Code:434 - Residential Additions, Alterations Zoning: Square Feet:0 Occupancy: Construction Type: Comments:Please leave printed pictures of house wrap on site for the final inspection. When installing ventilated soffit material, remove existing material (i.e. debris that could block vents) and take steps to ensure maximum ventilation to attic. Call for final inspection after installation. Valuation: 4,000.00 Fee Summary:BL - Base Fee $4K $103.25 0801.4085 Surcharge - Based on Valuation $4K $2.00 9001.2195 $105.25 Total: I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Contractor:Owner:- Applicant - Janine Hudson 4070 Rahn Rd Eagan MN 55122 (651) 253-1642 Budget Exteriors 8017 Nicollet Avenue South Bloomington MN 55420 (952) 887-1613 Applicant/Permitee: Signature Issued By: Signature INSPECTION RECORD CITY OF EAGAN PERMIT TYPE: ? P r+ ??v?, ' 3830 Pilot Knob Road Permit Number: Eagan, Minnesota 55122-1897 Date Issued: (651) 681-4675 SITEADDRESS: APPLICANT: PERMIT SUBTYPE: TYPE OF WORK: INSPECTION D. . D• ? ----- - - - - - - - Permit Holder Date Telephone # SEWER/ WATER PLUMBING HVAC Inspection Date Insp. Comments FOOTINGS FOUND FRAMING ROOFING ROUGH PLUMBING PLBG AIR TEST ROUGH HEATING GAS SVC TEST INSUL GYP BOARD FIREPLACE FIREPLACE AIR TEST FINAL PLBG FINAL HTG ORSAT TEST BLDG FINAL DOMESTIC METER IRRIGATION METER FLUSH MAINS CONDUCTIVITY TEST HYDROSTATIC TEST BSMT R.I. BSMT FINAL DECK FTG DECK FINAL CITY OF EAGAN Remarks * Cedar Grove Acquisition Addition CEDAR GROVE #5 Lot 9 Bik 4 Parcel 10 16704 090 04 Owner Street 4 070 Rahn Road State Faqanr. MN 55122 Improvement Date Amount Annual Years Payment Receipt Date STREETSURF. 3 1967 475.00 47.50 10 Paid STREET RESTOR. GRADING SAN SEW TRUNK * SEWERLATERAL ( 1972 1,304.00 52.16 2$ Paid WATERMAIN * WATER LATERAL 1972 WATER AREA STORM SEW TRK 2 1974 70.00 4.66 15 Paid STORM SEW LAT CURB & GUTTER SIDEWALK STREET LIGHT WATER CONN. BUILDING PER. #19-45 March 19 67 SAC PARK EAGAN TOW'N SH 1 P BUILDING IaERMIT Ownei ..... .1, _.._..r ..?.--- ............ Address (Present) --. #Az?? --•-•---O.2?c??z---?---•-•-••------.. Builder ................. .'_....-•--••-•--••-.....---•••-••--------------------•--- --- II Address -•-•---•-••-•------••------••-••----•--••-•------••-•-••--•--•••---•----••-------•-----•--••-- DESCRIPTION N° 1643 Eagan Township Town Hall Dais ..___?i-.???? _ 53ories To Be Used For Fronf DepYh Heighf Est. Cosi Permi! Fee Remarks ?'-q? A 'L 3 ? i ° e.hr 1,.?.c?? LOCATION Sireet, Road or other Description of Location I Lo! I 133ock I Addition or Trac! This permii does not authoriae the use of streets, roads, alleys or sidewalks nor does it give the owner or his agenf the right to creafe any situation which is a nuisance or which presenis a hazard to !he health, safefy, convenience and general welfare to anyone in the community. THIS PERMIT MUST BE=PT, N THE PREMISE WHILE THE WORK IS IN PROGRESS. This is to cerfify, iha!_._. ___ :._:??..• ...................:..............:??........ has permission to esect a........ .? ___................ upon ........... April 11, 1955. /??..,, <Zz ?? •----• ? ..--•----- ._..--•-•-----°•--°----•-r --- "-----?-??--•--------•--••-.. Per ----------- - --° '' Chairman of Tnwn Board d Building Inspecior-------•--• ...... i•? > PERMIT PTO. IG ..... Eagan 'I'ownship . ? Dakota County, Minnesota . Date • ?:'e-• ---•--- - --°----...-- Applacation fog Bualding Pegmit Type of building or work contemnlated. Circle correct de scriptions. Residential Commercial Industrial Other---------------- -------------------------------------- ..----- -•-----•----•--------•--••-------------°•----•-••---•-----•-- Euil Enlargp Alter Repair Instali Mave Wreck Ofher------------------------------------------------ •------------•--------- . 00 Dimensions._,?_ .................. Cost -1_7Q0 -------------- Details or remarks-------------------,----- - --?f?? _- . -----------------------------•---------------------•--------•--•--•--------------•-----••-•--•°-•--------••-•••--•----•--------•- Location Number Sfreet F3etween whaY cross s4reets Size Est. Valuatian D 7? l??QCa? ?e.h n n 1 P aaXa 70 D , p 6 Lot Block I Addifaon Rearrangement or Tract ? ? ( ?a.r (s?r0l?(?° ?YO.S ?c Ll??c? bun ZL?-d ,--r- ---- ? .............. Owner... _. e !' ?. _ ?S .......... Address _ ?b _ 7U.._... /1_-a-=/_J-?-•-----•-'---' `?? Contractor ---`?-t?----??---??- ---••---.............. Address --•----••--•----------•---------------•------•---•--•-------•--------•--•-•----•--••--•---•-° . _..._k ._. . The undersigned hereby makes application fer a permit to $ do work as herein specified, agreeing to do all work in strict Total fee collec4ed. accordance with the building ordinance adopied April 11, 1955 by the Eagan Township Board of Supervisors. , Permi4 fees are not ? 1 refundable. ?????-.--??????!???--••- ---•--; ---------••--•-- ??- ? ?" "t`7.?„"' .'"??`"G":??.? ' Signed EAGAN TOWNSHIP BUILDING PERMIT Owne: ---..?.%4_.,-? ...?-. ..-•--.L- ".. ?-. ...-•-- . e-°-............ --• Address (Preseni) .................... -........................................ -................ Builder -•-•-•---...•------•------•-•----------••-•--•••-••-•--•••-•-----•••-•---•-•-•--------•---•• --- Address _._..._....•--••--••------•----•-••-•----•---•--•--•--•-•---------•-•-•--•-••-•-•-•-•----•-•-- DESCRIPTION N° 1535 Eagan Township Town Hall Date . °._7'?/qAz ....................... 5tories To Be Used For Froni Depth Heighf Esi. Cos3 'Permii Fee Remarks '?! ":?o-?-q?Qe„ d? •c.?tia.?1° ? t) I I /S ? ?"?. °a?- . _ LOCATION Sireei, Road or other Description of Location I Lo! Slock ' Addition or Trac2 This permit does noi su2horize the use of streeis, roads, alleys or sidewalks nor does it give the owner or his agent the right to create any situation which is a nuisance or which presents a hazard to the healfh, safety, convenience and general welfare to anyone in the communiiy. THIS PERMIT MUST BE KEPT ON THE PREMISE WHILE THE WORK IS IN PROGRESS. P This is to certify, 44-4p ................has permission to erect a.__4__ :.._ ..._.` .?_..g ........ . __upon the above described premise subject fo the provisions of the Building Ordinance for Eagan . wnship adopted April 11, 1955. ............... ..•-•-•-• •-- ?--.._.._/.'?!c'."`.._._.....•-•--••--• Per ............... •••-••-••-•,??_?f---•----?-?.'--e-=............._......•--••----------•-- Chairman of Tnwn Board ? Building Inspector ?? ?. -,.--- _,....- ?. -? 30 ? ?- , s ? ? , ?- , ? , .? ? a??i ?' ?? ? ? . ? a . ? ?°i C?- i j ? ? ?a r r? E'_, I I c?- r) i ? ?. LOk- h e, --?-. ? PERMIT CITY OF EAGAN 3830 Pilot Knob Road eagan; tViinnesota 55122-1897 (651) 681-4675 SITE ADDRESS: PoT?Ne e 10--16704--090--04 4m?? ???? ?D LoTe ? BLacK: A ce?AR GROvE #5 PERMIT TYPE: Permit Number: ? ?a ?- ?- t? x tV ? 0a4J.:1& Date Issued: 11/24/98 DESCRIPTION: " R._ R Cl CI F sTaRM DAMArE REPAzR 434 ALTa ReSI??ENrxAL ?? t 'g????gtl a??? rs &w REMARKS: FEE SUMMARY: CONTRACTOR: - A.pp1, icant -- s Te Lz c e OWNER: Ac???? ??ALuE ExrERxaRS zNc 14539177 20098419 'rExCHERr TaNY 7 SIGNF,L H1:LlS 4@70 (";61NN FiCI W S°1` PAllL MN 55118 EAGAN P+IN 55122 (612) 453-9177 (651 ) 45:i-4703 APPLICANT/PERMITEE SIGNATURE Q:i?, - C ?, ?- - d--,; ?, c, ISSUED BY: SI NATURE 1998 BUILDING PERMIT APPLICAT " CITY OF EAGAN 3830 PII.OT KNOB RD - 55 681-4675 New Construdion Requirements ? 3 registered site surveys ? 2 copies of plans (inGude beam 8 window sizes; poured fnd. design; etc.) ? 1 energy calwlations ? 3 copies of tree preservation plan if lot platted after 7H/93 required: _ Yes _ No DATE: DESCRtPTION OF WORK: ??'?? ?STREET ADDRESS: "-t 0 ) d (RESIDENTIAL) `? ? • 2 cooes of plan ? 2 site surveys (exterior additions 8 decks) ? 1 energy caiculations fqr heated additions COST; ?c?r = I?. ? ? ?( YVZ k -\? t'?-oz LOT: ? BLOCK: ? SUBD.lP.I.D. -p- :&e- PROPERTY OWNER Name: i C h.4-t-T Last First Street Address: H 0? P- C4 City 0Q State: _ Zip: J Company: L 6 ?hone CONTRACTOR Street Address: -- C I?At4icense # ? ?00',Y&y /2 ? City U./caS+ State: ?'??s?-'t?-_ Zip: ? / E- ARCHITECT/ I ENGINEER Company: Name: Street Address: City State: Sewer 8 water licensed plumber (new construction only): and lot change is requested once permit is issued. I hereby acknowledge that I have read this application and state that the State of Minnesota Statutes and City of Eagan Ordinances. Phone #: L( 7 j ? q )d ?!-) Signature of Applicant: OFFICE USE ONLY Certficates of Survey Received Yes No Tree Presenration Ptan Received Yes No Phone #: Registration #: Zip: Penalty applies when address chang is Rect and agree to comply with all applicabl OFFICE USE ONLY BUILDING PERMIT TYPE ' O 01 Foundation O 06 Duplex IK 02 SF Dwelling O 07 4-plex 0 03 SF Addition O 08 8-plex 0 04 SF Porch ? 09 12-plex 0 05 SF Misc. ? 10 = plex WORK TYPE 0 31 New ? 33 Alterations ? 32 Addition 0 34 Repair GENERAL INFORMATION Const. (Actual) (Allowable) UBC Occupancy Zoning # of Stories Lertgth Depth APPROVALS ? 11 Apt./Lodging ? 16 Basement Finish 0 12 Multi Repair/Rem. ? 17 Swim Pool ? 13 Garage/Accessory ? 20 Public Facility ? 14 Fireplace ? 21 Miscellaneous ? 15 Deck ? 36 Move ? 37 Demotition Basement sq. ft. Main level sq. ft. sq. ft. sq. ft. sq. ft. sq. ft. Footprint sq. ft. MC/WS System City Water Fire Sprinklered PRV Booster Pump Census Code. SAC Code Census Bldg Census Unit Planning Buiiding Engineering Variance Permit Fee Surcharge Plan Review License MCNVS SAC City SAC Water Conn. Water Meter Acct. Deposit S/V1/ Permit S/W Surcharge Treatment PI. Park Ded. Trails Ded. Other Copies Total: Valuation: $ % SAC SAC Units ? I w.,,?I?? iIY> y , w? MEMO _ cky of eagan TO: DIANE DOWNS, UTILITY BILLING CLERK FROM: ED KIRSCHT, SR. ENGINEERING TECHNICIAN DATE: AUGUST 23, 1993 SUBJECT: STREETLIGHT ENERGY COSTS-CEDAR GROVE NO. 5(208 LOTS) This memo is to inform your department to begin to invoice the energy costs at the singie family rafe effective August 1. 1993 to the property owners in Cedar Grove No. 5 Addition. Block 1, Lots 1-22 22 Block 2, Lots 1-19 19 Block 3, Lots 1-11 11 Block 4, Lots 1-16 16 Block 5, Lots 1-25 25 Block 6, Lots 1-22 22 Block 7, Lots 1-25 25 Block 8, Lots 1-5 5 Block 9, Lots 1-2 2 Block 10, Lots 1-23 23 Block 11, Lots 1-14 14 Block 12, Lots 1-9 9 Block 13, Lots 1-15 15 208 The City is currently being billed by Dakota Electric for streetlighting in the above listed subdivision. ? v? /'Q- Edward J. irsc t Sr. Engineering Technician cc: Mike Foertsch EJK/je MEMO T0: Mark Bliss, 4070 Rahn Road - , file no.: 90-04 FROM: Craig W. Larson Bonestroo, Rosene, Anderlik & Assoc. DATE: June 8, 1992 Re: Settlement of service trench ------------------------------------------------------------- The contractor has been notified of the settlements in your yard and has indicated that he plans on performing the corrective work this week. In the event that he cannot make it this week, he will be in the following week to complete the work. If you have any questions, you can cantact me at 636-4600. 1o CE@L?DWC /0 D i Lqgo ? March 5, 1990 Thomas Hedges Eagan City Administrator 3830 Pilot Knob Road Eaaan, MN 55122 Dear Tom: I am writing this letter to follow up our telephone conversation on February 21, 1990. First of all I would like to thank you for your time and assistance regarding the Rahn Road project. I appreciate your bringing our concerns to the city council. I would like to readdress our concerns and provide you with some new facts. As I indicated, we are not in favor of any trailway system on Rahn Road. Since it has been decided that we are going to have a trail run through our front yard, we would like to have the council consider some possible improvements to the current trail plan. It is our understanding from the City Council's motion at the public hearing & from subsequent letters that the 36 foot road width will be maintained, no parking lanes will be provided (north of Diffley), a bituminous trail will be constructed on the east side and no trail construction will occur on the west side of the road. In addition the road will be shifted to the west 3-4 feet and the boulevard between the trail and road will be reduced to 4 feet. There are 2 issues we would Iike to have addressed regarding the trail. ¦ Replace the bituminous surface with concrete ¦ Reduce the width of the proposed 8 foot trail First, we would like to point out the advantages of a concrete versus a bituminous surface. ¦ Concrete is longer lasting material than bituminous. ¦ Concrete would require lower maintenance. ¦ A sidewalk surface will cater to the current pedestrian traffic on Rahn Road--walkers, many of whom walk out of necessity. ¦ It is much more likely that residents would shovel snow from a concrete surface than a bituminous one. This would provide a four season path for pedestrians. ¦ Bicyclers can also take advantage of a concrete trailway. ¦ Concrete is more aesthetically pleasing. This would make it easier for us to live with as well as not affect the resale value of our homes. After speaking with Ken Vraa a few weeks ago, we have discovered that concrete was used in place of bituminous on the east side of Nichols Road beginning at Cliff Road and going north approximately 200 feet. As I understand, the concrete was used in place of bituminous at the developers request. Secondly, we would like you to consider a reduction in the width of the trail. This would take up less of our yards and possibly save some trees and shrubs. Please bring this proposal to the attention of the city council. Thank you in advance for your consideration of this matter. Please feel free to contact us with any questions you may have. Sincerely, ? Peter & Diane Whebbe 4070 Rahn Road Eagan, MN 55122 688-6029 dc: Ken Vraa          íü  ÿ ÿþþ  ýüûýüú     ùþþ øíë áï ÷ð÷à âë Þá   ÿþõ  þýüûúù  õó é÷ ï ÷ýûúù  õ÷ûúù õó é÷ ô óéø ù ê   ÷ùòý ï  ý ï  ýùú î  þíý÷ ì  êù÷à ê  ë ëê ÷ íý÷  ê   ÷ ü ÷ê èö ÷ óóù  ÿö÷ö÷ê   þ  ù èïö÷ö ù ö ÷ è ï÷üêç   ÷ ÷ ÷ íý÷ üúó   öêúëê è  ì åäåããèâãèãâ òù  þý÷ë÷  æýåäåèâáè áâ æýÿè  ñð õ ôï ùù ð÷  õóñþ ß òý  Þâð ÷øëø ùù æ úôââ  ôââ Ýáâ Üãá ë ÷ üúó  ëëà ÷ ë ùù  ëë ö÷ê ÷÷  ÷ êùúóëùùü þ  ö þý ïúö  ÷ è ùùé ÷ê þ ý÷  ý úþ ý÷ 41/11 City of Eaali Date: 3830 Pilot Knob Road Eagan MN 55122 Phone: (651) 675-5675 Fax: (651) 675-5694 RESIDENT / OWNER Use BLUE or BLACK Ink For Office Use Permit#: Permit Fee: 3/ Date Received: Staff: 3-I� 2012 RESIDENTIAL BUILDING PERMIT APPLICATION Site Address: 24-0-7 A- iz nl L J Unit #: Name: 7vriv&' n.) Phone: 65/-4-SZ'-2ai2 Address / City / Zip: 40->0'244w Applicant is: Owner A Contractor TYPE OF WO! Mozmasyffeasieziessmemn Description of work: p ( ttf. lArcto.�-ts 41-17'"S54f4s Construction Cost e2.7 3 e Multi -Family Building: (Yes / No ) CONTRACTOR Company:C JL4 -L GtiojcLoS 5 nU Contact:. 'Z f, d, Address: /46 yD City: 41 / 144-4-0-7 State: Yid Zip: 5572 - Phone: ? J� —cis 7/ 3 4 v License #: )42._'7 Lead Certificate #: If the project is exempt from lead certification, please explain why: (see Page 3 for additional information) COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING In the last 12 months, has the City of Eagan issued a permit for a similar plan based on a master plan? _Yes No If yes, date and address of master plan: Licensed Plumber: Phone: Mechanical Contractor: Phone: Sewer & Water Contractor: Phone: NOTE, Platys and supporting documents that you submit are considered to be public information. Portions of the information may be classified as non-public if you provide specific mastiffs that wouk petmit die City to conclude that the are trade secrets. CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. CaO 48 hours before you intend to dig to receive locates of underground utilities. www.000herstateonecall.orq 1 hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. Exterior work authorized by a building permit issued in accordance with the Minnesota State Building Code must be completed within 180 days of permit issuance. fid /i("/ Applicant's Printed Name --,. (0 pplicanYs Signature Page 1 of 3 PERMIT City of Eagan Permit Type:Building Permit Number:EA113834 Date Issued:09/09/2013 Permit Category:ePermit Site Address: 4070 Rahn Rd Lot:9 Block: 4 Addition: Cedar Grove 5th PID:10-16704-04-090 Use: Description: Sub Type:Reroof & Siding Work Type:Replace Description: Census Code:434 - Zoning: Square Feet:0 Occupancy: Construction Type: Comments:If there is no ice protection inspection prior to final, the contractor must meet the inspector w/ a ladder and flat bar. Pictures are not acceptable in lieu of inspections. When installing ventilated soffit material, remove existing material (i.e. debris that could block vents) and take steps to ensure maximum ventilation to attic. Call for final inspection after installation. Valuation: 8,000.00 Fee Summary:BL - Base Fee $8K $162.25 0801.4085 Surcharge - Based on Valuation $8K $4.00 9001.2195 $166.25 Total: I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Contractor:Owner:- Applicant - Janine Hudson 4070 Rahn Rd Eagan MN 55122 Amek Construction 9555 James Ave S #228 Bloomington MN 55431 (952) 888-1200 Applicant/Permitee: Signature Issued By: Signature _ • Use BLUE or BI.ACK Ink � For Office Use +�r ^ I ' j Permit#: �� �� I Cl�y of�a�a� , � �� ; ! Permit Fee: � 3830 Pilot Knob Road � „�,�,� � Eagan MN 55122 . � Date Received: � Phone:(651)675-5675 I (' I Fax:(651)675-5694 i Staff: �� � '..����������.��.�r�.��J � � � � 2014 RESIDENTIAL BUILDING PERMIT APPLICATION ���( ��� "`� -� /- ��3' Date: � � /� Site Address: � 7� J��� �f i<d� Unit#• � Name:��'��. /��c�c�3�'� Phone: lr°�)-�Z�"�p�? Resident! �y�/n�� Address/City/Zip: �'►� ' Applicant is: Owner �Contractor � �.'� Description of work: �-�'-.� �\ �.�%t� �� � Type o#Work � ����"vrr�,J.0 �i�a�- Construction Cost: � �l�-��� Multi-Family Building:(Yes /No�) / f �j Company:��'f�-`�"�,r[�:�l�i�c��% t`�i���Confiact:��'fT ��.�,.�__.._ C+Dntractor: ' Address:I`E��!� �i�Y-�� �� E;ty: �� �i����.'Y 1 � �,.�.�/ �', State: 1ht'Zip: J� /�-�I" Phone: 1'�'"�l���DEmaiL�T��-'�J�F+�C�ftkl�I�r��`� License#:�,�'C����-� L.eed Cert�ca�#:_. ���.�f �'- � If the project is exempt from lead certification, please explain why: (see Page 3 for additional information) COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING In the tast 12 months,has the City of Eagan issued a permit for a similar plan based on a master plan? _Yes �IVo If yes,date and address of master plan: Licensed Plumber: Phone: Mechanical Contractor: Phone: Sewer�Water Contractor: Phone: N07 E:Plan�and supporting alacuments that yau submit are consider�l'tt�tre public information. Portions of the;rrformation may�+e classit'ietl as nan public if yau';prov�c�e spec�c r�asans that w+ould permit the�ity ta °: conclude that i`he 'are fra+ale�ecrets. ' CAI.L BEFORE YOU DIG. Cal1 Gopher State One Call at(651)454-0002 for protection against undergrouhd utility damage. Call 48 hours before you interM to dig to receive locates of underground utilities. www.aoaherstateonecatl.ora I hereby ackn�nrledge that this iriformation is complete and aa;urate;that tt�work will be in�nfamance with the ordinances and codes of the City of Eagan;that 1 understand this is not a permit, but oMy an application for a permit, and work is not to start witfwut a permit;that the work will be in accordancz with the approved plan in the case of work wt►ich requires a review and approval of plar�. Exterior work authorized by a buiMing permit issued in accordance Mrith the Minnesota S Buil Cade must be completed within 180 days of permit Issuanc . X . _�T� I�C��� �L � x � Applicant's Printed Name IicanYs Signature Page 1 of 3 " " DO NOT WRITE BELOW THIS LINE ( SUB TYPES �✓ `� h✓� _ Foundation _ Fireplace _ Porch (3-Season) _ Storm Damage � Single Family _ Garage _ Porch (4Season) _ Exterior Alteration (Single Family) _ Multi _ Deck _ Porch (Screen/Gazebo/Pergola) _ Exterior Alteration (Multi) _ 01 of_Plex _ Lower Level _ Pool Misceilaneous _ Accessory Buiiding WORK TYPES �-cnlr'� Su.c�Y� ��t�-�a _ New _ Interior Improvement _ Siding _ Demolish Building* _ Addition _ Move Building Reroof Demolish Interior � Alteration _ Fire Repair _ Windows Demolish Foundation _ Replace _ Repair _ Egress Window _ Water Damage _ RetBining Wall `Demolition of entire building—give PCA handout to applicant DESCRIPTION Valuation ��P d � Occupancy �� � MCES System Plan Review Code Edition �(�' �. SAC Units (25%_ 100%� Zoning � City Water Census Code Stories Booster Pump #of Units Square Feet PRV #of Buildings Length Fire Sprinklers Type of Construction �T Width REQUIRED INSPECTIONS Footings (New Building) Sheetrock Footings (Deck) Final/C.O. Required Footings (Addition) � Final/No C.O. Required Foundation HVAC Drain Tile Other: Roof:_Ice &Water _Final Pool:�Footings +Air/Gas Tests Final Framing Siding: _Stucco Lath _Stone Lath Brick Fireplace:_Rough In _Air Test _Final Windows � Insulation Retaining Wall: _Footings_ Backfill Final Meter Size: Radon Control Erosion Control Reviewed By: Building Inspector RESIDENTIAL FEES Base Fee Surcharge ��(� � �41� ���k-�'U'"�l � Plan Review MCES SAC City SAC Utility Connection Charge S8�W Permit 8� Surcharge Treatment Plant Copies � TOTAL Page 2 of 2 Use BLUE or BLACK Ink For Office Use �y z_ „_ , - , ,,,, Permit#:Cityofaaa Permit Fee: !b 5,3;) 3830 Pilot Knob Road ACu t 1 2017 Eagan MN 55122 Date Received: 'd1'1 7 Phone:(651)675-5675 buildinginspectionsOcitvofeagan.com Staff: _. 2017 RESIDENTIAL BUILDING PERMIT APPLICATION L Date: S 14' ( Site Address: LID TO 1Gl,1 I A 21 Unit#: Name: 3(71I\ts(\e— C06t-SO'N- Phone: L051 -14509-L920/ 7 , eslidentl ,Qer Address/City/ZipT V O R041,1 Ac tcl ,/V1 537,2 a va. Applicant is: Owner A Contractor Description of work: f1 l(LQa5 `t Q ri th'it O'�2h 3 Type of Work. , V ~—� Construction Cost: l'i1-0Multi-Family Building:(Yes /No Company: C)re- La.Les �i,ihc cb'OiGC,i Contact: t')ri-hc y imeak �- Address: I�(o/Q ( 74/ XI e fi/t, l# oy o City: W ��ontractor /31)Pti " State: IZip:330ii Phone:q5-0 o - �'3�o� Email: r,(?�� �Iw�C� �,l�/.&,- License#:SC 0 (.Q`+` -I 9- Lead Certificate#: A-T 'a'3acl "-p2 If the project is exempt from lead certification, please explain why: COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING In the last 12 months,has the City of Eagan issued a permit for a similar plan based on a master plan? Yes No If yes,date and address of master plan: Licensed Plumber: Phone: Mechanical Contractor: Phone: Sewer&Water Contractor: Phone: Fire Suppression Contractor: Phone: NO - OS • sup =rt►r'►8 documents er t you submitarelteonside„,le"; q, blic in on "Portions the, r ktnfo tion r� ybe•ci ed es nan—pu lic"if you provide specific reatsnst� would p`�.d'the City t lude that they tradeecets You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's website at www.citvofeagan.com/subscribe. Exterior work authorized by a building permit issued in accordance with the Minnesota State Building Code must be completed within 180 days of permit issuance. CALL BEFORE YOU DIG. Call Gopher State One Call at(651)454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.aonherstateonecall.orq I hereby acknowledge that this information is complete and accurate;that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. x �1t /I' iN1vh(7 x Lf/C� 0 / i/" Applicant's Pri ed Name Applicant's Signature Page 1 of 3 , r For Office Use ; •° .4' Permit#: /- ..-6--------doi----''..-- / CC_ ‘......,. .0 ..- ...., ,„„0,7, E 6 ..,...., ..- Permit Fee: /c2--- -S0 40.-..,....-:-......."-"*. Date Received: 3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810 (651)675-5675 I TDD:(651)454-8535 I FAX:(651)675-5694 Staff: huildinginsoectionsOcitvofaagan.com 2019 RESIDENTIAL BUILDING PERMIT APPLICATION .15/6/19 4070 Rahn Rd ' Data: Site Address: Unit*: ,... Name: Hudson, Phone:Janine (651)452-2017 Address/City/Zip: 4070 Rahn Rd Applicant is: Owner Contractor Description of work: Replacing 2 Window in existing openings (Pre-1978 building) . Construction Cost: 3000 00 Multi-Family Building:(Yes /No V ) ,.- Contact CompanyGreat Lakes Windows & Siding Danielle Sime : Address14690 Galeode Ave. Apple Valley : City: State: MNZip: Phone:55124 952Email:-8913400 DanielleS.Grealiakes@gmail.com _ BC060427 NAT - 23297-2 License#: Lead Certificate#: If the project is exempt from lead certification, please explain why: COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW IiI4ILDING In the last 12 months,has the City of Eagan issued a permit for a similar plan based on a master plan? Yes _No No If yes,date and address of master plan: : Liceined Plumber Phone: Mechanical Contractor Phone.. Sewer&Water Contractor: Phone: Fire!Suppression Contractor: Phone: You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's website at www.citvoteaaan.com/subscribe. Exterior work authorized by a building permit issued in accordance with the Minnesota State Building Code must be completed within 180 days of permit Issuance. CALL(BEFORE YOU DIR. Call Gopher State One Cali at(651)454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. ww.coopherstateonecallorg I hereby acknowledge that this information is complete and accurate;that the work will be in conformance with the ordinances and codes of the City of Eaga ;that I understand this is not a permit,but onty an application for a permit, and work is not to start + • a pewit that the work will be in accordance with the approved plan in the case of work which requires a review and ,•• • -, • . ans. /if % Danielle Sime X X Applicant's Printed Name Applicant's Signature PERMIT City of Eagan Permit Type:Mechanical Permit Number:EA155459 Date Issued:05/16/2019 Permit Category:ePermit Site Address: 4070 Rahn Rd Lot:9 Block: 4 Addition: Cedar Grove 5th PID:10-16704-04-090 Use: Description: Sub Type:Residential Work Type:Replace Description:Furnace & Air Conditioner Comments:Questions regarding electrical permit requirements should be directed to State Electrical Inspector, Mark Anderson at (952) 445-2840. Please call Building Inspections at (651) 675-5675 to schedule a final inspection. Fee Summary:ME - Permit Fee (Replacements)$59.00 0801.4088 Surcharge-Fixed $1.00 9001.2195 $60.00 Total: I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Contractor:Owner:- Applicant - Janine Hudson 4070 Rahn Rd Eagan MN 55122 Hero Plumbing Heating & Cooling 3110 Washington Ave N, Suite 100 Minneapolis MN 55411 (612) 827-4674 Applicant/Permitee: Signature Issued By: Signature PERMIT City of Eagan Permit Type:Plumbing Permit Number:EA166427 Date Issued:01/08/2021 Permit Category:ePermit Site Address: 4070 Rahn Rd Lot:9 Block: 4 Addition: Cedar Grove 5th PID:10-16704-04-090 Use: Description: Sub Type:Residential Work Type:Replace Description:Water Softener Meter Size Meter Type Manufacturer Serial Number Remote Number Line Size Comments:Carbon monoxide detectors are required within 10 feet of all sleeping room openings in residential homes (Minnesota State Building Code). Please call Building Inspections at (651) 675-5675 to schedule a final inspection. Fee Summary:PL - Permit Fee (WS &/or WH)$59.00 0801.4087 Surcharge-Fixed $1.00 9001.2195 $60.00 Total: I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Contractor:Owner:- Applicant - Ryan Caneff 4070 Rahn Rd Eagan MN 55122 (612) 298-5298 Dean's Professional Plumbing 7400 Kirkwood Court N Maple Grove MN 55369 (763) 428-1321 Applicant/Permitee: Signature Issued By: Signature