1975 Rahncliff Ct41/''
City of Evan
3830 Pilot Knob Road
Eagan MN 55122
Phone: (651) 675-5675
Fax: (651) 675-5694
Use BLUE or BLACK Ink
Permit #: q 0
Permit Fee: On
Date Received:
Staff:
L
2010 COMMERCIAL PLUMBING PERMIT APPIpCATI9N
Date: ✓ IS V Site Address: 1 C -CC 1-,= Cr NMI
2O1)t2'7
(471Y1 6—A4/4214-••
Tenant:
Suite #:
PROPERTY
OWNER
� (`%
F d� 6-4-S-0-4------
Name: �'C.��t 'X-0-4--- �- ne:
1411-A
CONTRACTOR
Metro I e5ilny , / 7 Petit
_
Name: License #: C ,_ `'f
fiord
..:, nary
Address: ='a) 31222 Cedar Creek 1�®ad State: Zip:
►r>,tkle�/, CMN 5O
Phone: (t ( Z.— 22_� ` 5 `, < Email:
TYPE OF
WORK
New IV -Replacement Repair Rebuild Modify Space _ Work in R.O.W.
_ _ _
Description of work:
PERMIT TYPE
COMMERCIAL
New Construction Modify Space
Public Works)
meter.
_
Irrigation System (_ yes / no) ( I RPZ / PVB)
_ _
• Rain sensors required on irrigation systems
• Avg. GPM (2" turbo required unless smaller size allowed by
Meters Call (651) 675-5646 to verity that tests passed prior to picking up
Domestic: Size & Type Fire:
1
Yes _No
Avg. GPM High demand devices? _No Flushometers
COMMERCIAL FEES:
$55.00 Minimum (includes
_Yes
State Surcharge) OR Contract value $ x 1%
Required
- If the Permit Fee is less
= $ Permit Fee
on ALL new buildings and boulevard irrigation systems 4 = $ Radio Meter Read
than $10,010, the surcharge is $5.00 = $ Meter(s)
- If the Permit Fee is > $10,010,
the surcharge increases by $.50 for each $1,000 Permit Fee
Permit Fee requires a $5.50 surcharge) = $ State Surcharge
(i.e. a $10,010-$11,000
Following fees apply
Call the City's Engineering
when installing a new lawn irrigation system. $ Water Permit
Department, (651) 675-5646, for required fee amounts.
$ Treatment Plant
$v_
/ J
% v Water Supply & Storage
$
State Surcharge
TOTAL FEES $
CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility
damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.gopherstateonecall.orq
I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I
understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be inordance with the approved
plan in the case of work which requires a review and approval of plans.
2-6 X
x �a
Applicant's Printed Name
Applicant's Signatu
FOR OFFICE USE
Approved By:
Date;
Required Inspections: _Under GroundRough-In Air Test _Gas Test _Final PRV Required: _ Yes
Page 1 of 3
H1 LTON . . t? .
. •
M ?.
C,eL`tttiCQte Of CCCIipQIiC?
U91tv of Cfagan
Mepartraeut of zsi[bittg attf3pection
This Certificate issued pursuant to the requirements of the Uniform Building Code
certifying that at the time of issuance this structure was in compliance with the various
ordinances of the City regulating building constructiort or use. For the fo!lowing:
? ?1L
USC CliSSlflpLlon: yOMM 1•EW Bldg. Permit No. 30785
?upawy Tra A3 R1 yoning Disuict PD Type Consc V 1 Hr NUE & TORGERSON lI 335 S F1 BENSON AVE.,;WILLMAR MN
owwr or suiiaing „ naa.? 1975 :.Ll FF ::T L , B , NGLIFF RD
BuiWing Address Lacdiry D81e: ?^?
?? ?
i. Wilding Ofricial -
POST IN A CONSPICUOUS PLACE
SITE ADDRESS Unit # Permit #
L / B ? Sect./Sub.
INSPECTION INSPECTOR DATE COMMENTS
/A ?? • IO- • .1 t
?. .
13A?Yi'1 10-23=?? 3? G d- ?Sa 11 ,i
?
T
?
- G
. ra x ?S
e
'9 z?-9
? Pg??tsJ ci ?
p
' ?/ ?f rN 'B
.
? ? `?? ? ? ??
? ? aa
? a
P?,n NW
INSPECTION INSPECTOR DATE COMMENTS
?.? X Q 41s y c ?-? - f df
~ ?
'
? ! ??CJ
?
•? r? a. r n,
??
?_;? ?-? ?
? 2?s ? - ne?r S?^o Ke, Pc ?? r?„ ,,.-'- 5.
? -`l -
- ?o l t?
, z??- ?' ? ?INSPECTION RECORI)
,??°` ,Ct1rY OF EAGAN PERMIT TYPE:
. 3830 Pilot Knob Road Permit Number:
Eagan, Minnesota 55122-1897 Date Issued:
(612) 681-4675
SITE ADDRESS: APPLICANT:
PERMIT SUBTYPE:
a M1 I. I1- f i' . r.
• rtf Fti 1it?'•, tlY+? . r:
TYPE OF WOrRK:
t!I 31 P? t iVli
"iih/ tit+
i&4fifT14I
INSPECTION D. . D•
. .?<:
J
Permit No. Permit Holder Date Telephone #
ELECTRIC
u-6.
PLUMBI
HVAC
Inspection Date Insp. Comments
FOOTINGS
(
FOUND o`
/o(
FRAMING
ROOFING
ROUGH
PLUMBING y
PLBG
AIR TEST
- p-r
ROUGH
HEATING
GAS SVC
TEST
7 /
INSUL
GYP BOARD
FlAEPLACE
FIREPLACE
AIR TEST
FINAL PLBG i ?
FINAL HTG
ORSAT
TEST
E3LDG FINAL
BSMT R.I.
BSMT FINAL
DECK FTG
DECKFINAL
., / "
?. r.
7-
v -• . %--
?
?
Mike Maguire
MAYOR
Paul Bakken
Cyndee Fields
Meg Tilley
COUNCIL MfMBERS
Thomas Hedges
CITY ADMINISTRATOR
MUNICIPAL CENTER
3830 Pilot Knob Road
Eagan, MN 55122-1810
651.675.5000 phone
651.675.5012 fax
651.454.8535 TDD
MAINTENANCE FACILITY
3501 Coachman Point
Eagan, MN 55122
651.675.5300 phone
651.675.5360 fax
651.454.8535 TDD
www.cityofeagan.com
THE LONE OAK TREE
The symbol of
strength and growth
in our community.
September 12, 2008
Commonwealth Land Title Insurance Co.
8500 Normandale Lake Blvd.
Minneapolis, MN 55437
Re: Landscape Deposit
1975 Rahncliff Ct., Eagan MN 55122
Lot 1, Block 1, RahnCliff 3ra Additlon
Dear Sir or Madame:
Commonwealth Land Title Insurance Co. submitted a landscape security deposit to the
city in conjunction with the building permit for the facility 1975 Rahncliff Ct. in the
Rahncliff 3ra Addition in October of 1997.
After inspecting the site we found the landscaping to be in satisfactory condition.
Consequently, the deposit can be released. The refund will be forwarded to you under
separate cover.
While we are releasing the security deposit, please note that the property owner continues
to be responsible for maintaining the health of all plantings on the property, and must
replace any plants that die or are removed due to disease.
If you have any questions, please call me at 651-675-5684 or Sarah Thomas at 651-675-
5696.
Sincerely,
,. ,
1
FrarX Doherty --'"?
Planning Department
cc: HGIE LLC, PO Box 1020, Willmar, MN 56201
Sarah Thomas, City Planner
??/,
?
2006 C OMIVIERC.IAL YL U MKIN Ex PERMI'I' APPT,ICATION
CITY OF EAGAN
3830 PILOT KNOB ROAD, EAGAN MN 55122
651-675-5675
V:D C3)
Da#e c
?-
l
j Site Address _ Unit #
? Tenan# Name ?. Former Tenant Name
Property Qwner Teleghone # ( )
Contractor ??'`?'`s" V? ???.-?5'?r ? ?
Address ? 12- 21-2--
Teteghane # ( ?j(
Zi
p
State
License # ?1 ? ?s= ?'?
The Apglicant is Ovvner Contractar Other
Modify Space _ Irrigatian System** _ Yes _ No Work in pubiic r-o-w 1 easement?
New Bidg
E'Vork Type
_
_
RPZ PVB: ivew _ RepairlRebuild _ RepEace _ Remove
? Rain sensors are re aired on irri ation s stems
f Work
ti
i
D
on o
escr
p
To inquzre if Pressure Reducing Vatve is required on new seivice, ca 1651-675-564fi
s
Meters - Call 65 t-675-53Q0 to verify that hydmstatic, conductivit}>, and bacteria Eests passed prior to picking up ccxeter.
Irrigation Size & Type Av- GPM 2" turbo req'd unless smalier size ailowed by Public Works ,
Fire Size & Price 3/4" meter 167.00
Domestic Size & Type Avg GPM Inetudes high demand devices? _Yes ! No
Flushometers _ Yes ` No PRV Required ? Yes , NQ
Permit Fee $50.5(} minimum (incivdes State Surcharge)
? Gontract Va1ue s x l% _ $ Permit Fee
? Meter(s)
Required on all new buitdings & boulevard irriQation svstems $ Raciio Meter Read
g State Surcharge
Ff vermit fee is less than S1,000, surc6arge is S.SQ
3#'aennit f? is more than $1,000, sarcharge is S.SU for each 51,000 orved.
N^? ?
----------------- - --- - -
Water Permit
Fofiowing fees apptS when installing new lawn irrigation spstem $
Cali the City's Engineering Department, 651-675-5646, for required fee amounfs
$ Treatment Flant
? Water Suppiy & Storage
? DD'""'4"State Surcharge
,. . ...,... ..,., ? ?? ? Total Fee
I hereby apply for a Commercial Plumbing Permit tund acknowledge that the infQrmation is cc;mplete and accurate; ti?at the work wili be in conformance with the
ordinances aod codes of the CiLy of Eagan with il)e Piambing Codes; that I nndersiand this is not a permet, but oniy an app[ication for a permit, and w?ork is not to
start withont a Dermit; t?+ark «?itt tseacco?attce with the approved ptan in the case of wor1: cvhich requires a revie« and approval of plans.
IV . -
CTFY USE QNLI'
REQUIRED PNSPECTIQNS; ? U.G. _ Air Test _ Gas Test _ Rough In Final
PLAN3 SUBA'IITTED APPROVED BY: , BUILIJI3tiG IlVSPECTOR
Generai Iuformation
• Radio Meter Read (required on all new buildings. BouEevard irrigataon systems may require a radia read - $I41.00
• RPZ's rriust be tested every• year and rebuilt every five years. Test resuIts shoutd be maifed to Paui Heuer at the City of Eagan.
• A minimum fee permit per address is required forthe foliawing.RPZ°s: new, rebuild, repair, rsmcsve.
• Water meters include copper hornlstrainer, remote wire; and lauch-pad meter.
NiETERS REQUIRIltiG 4-Ht3UR ADVANCE NQTICE PRIOR TO PICK UP
GPM
METERS
USE
-
PRICE
GPM
METERS ?
USE --
--
PRICE ,
1-20 5I8" residential $130.00 4-120 l-1/2" irrigation syst ? 827.00 C
displacement or _ turbine** Public Works ?
maximum small coanmercial must approve ?
continuous meter size
10
2-30 3f4" Iawn irrigatign $I67.00 4-160 2" turbine Iarge irrigation S 1,040_00
.
maximum displacement residential system &
continuous or production lines j
15 sma11 commerciai (
3-50 I" displacement large residential S210.00 1/4 to ibfl 2" compound bldgs over $ 1,962.00 i
i bldg to 24 units 65 units ?
? maximum ? . smatl eammereia4 &
continuous & , targe corr?m btdgs
25 irrigation s}'stetns
5-100 1-112" 25-64 unitbidgs $515.00 l
maximum displacetnent & ;
continuous most camm blcigs
50
METERS REt}UIRII'dG 30-DAY ADVANCE N4TICE PRIOR TE} PICK UP
GPM METERS USE PRICE GPM NiE''ERS U8E PRICE
5-3i0 3" turbine very (arge irrigation $1,394.f10 6-SOQ 4" coFnpound --30(1 unit bldgs $3,864.00
system & praduetian & verY l?'ge
iines eomm_ bldgs
112-320 3" compound +200 unit bldgs $2,516.00 10-I000 6" cornpound +400 unit bldgs $6,436.00
very large very large
comm bld'as comm bldgs
I 5-1400 4" turbine very large $2,495.00
irrigation systems
& production lines
C:omments
_ _......_...... ....:.........
? To scFsedute inspeetion of the inside water [ine and backflow preventer, ealt 65 }-675-5675.
• To anange for water Eurn-an, 6aI1651-675-5200.
cc: Utilit} Division Systems Analyst
January 2006
ro zp3
FIRE SUPPRESSION SYSTEMS
Permit Application
City Of Eagan
3830 Pilot Knob Road, Eagan Mn 55122
Telephone # 651-675-5675 FAX # 651-675-5674 `L ? - ?
Requirements: -- 2 complete sets of drawings and specifications- ' ? - -
cut sheets on materials and comuonents to be used
Date 0
Site Address: 7 S
Tenant / Building Name:
The Applicant is: Owner ? Contractor Other
PROPERTY OWNER
Address:
City: State: Zip:
CONTRACTOR MN License No. G?o sCs
Address: City:
?
State: ,?i?? Zip: '2?/ 3 Phone #:
ESTIMATED COMPLETION DATE:
FIRE PERVIIT TYI'E: ? Sprinkler System (# of heads Fire Pump Standpipe
Other:
WORK TYPE: New Addition ? Alterations _ Rer`r"iodefi ..---~?
,
Other: ? r
.
4
L?;t
.. ._. ..- -- ._._ ... .. _ .. , - - -
DESCRIPTION'OF WORK: KCommercial Residential ? BY---?ducational ?
- - ----,.,
Other:
PLEASE COMPLETE REVERSE SIDE
PERMIT FEE:
Contract Value $ In x .01% _ $ sz:). 'T-D Permit Fee
• If Permit Fee is $1,000 or less, add $.50 =:> $ • 5M State Surcharge
If Permit Fee is over $1,000, add $.50 per
$1.000 Permit Fee
3/4" Displacement Fire Meter - $156.00 $
TOTAL FEE: $50.50 Minimum Fee (includes State Surcharge) $ J? •?'J
I hereby apply for a Fire Suppression System permit and acknowledge that the information is complete and
accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan and with the
Minnesota Building/Fire Codes; that I understand this is not a permit, but only an application for a permit, and
work is not to start without a permit; that the wark will be in accordance with the approved plan in the case of
work which requires a review and approval of plans.
`
- ---.,
Applicant's Printed Name Applicant'srSignature
.(c?i ???,o.?
--T
Date
DO NOT WRITE BELOW THIS LINE
REQUIRED INSPECTIONS
Hydrostatic Flow Alann Drain Test 80v9?i
1 rip Pump 1 est Central Station Final
Conditions of Issuance:
? ? . _ ... , . ,
.. . i
Permit Approved by. -. .. , . - . . Date::
CITY USE ONLY
1 '1 " ? C)
PERMIT #: RECEIPT DATE:
COMMCUL PLUMIN6 PFJtM1T A&PLICAITON
? crryoFEAGM
s$so PH= KNOB ltD
_ RAGM,MN55122
e51-681,4675
lNCOMPL APPLICATIONS WILL NOT BE PROCESSED
Date: a - 19 -01
WORK TYPE New Bldg Add-on Repair X RPZ _ PVB ' Irrigation system
* Must complete reverse side of application also. Required meter size is 2" turbo unless smaller size permitted by Public Works
DESCRIPTION OF WORK ?hu.t1d- (_'?:&Q ajj&CtLQCi
To inquire if Pressure Reducing Valve is required on new service, ca11651-681-4646
METERS - Ca11651-681-4300 to verify that hydrostatic, conductivity, and bacteria tests passed nrior to nicking up meter
Irrigation Size & Type _
Fire Size & Type _
Domestic Size & Type
Does this include high demand devices?
FLUSHOMETERS _ Yes -No
Avg GPM
Avg GPM
Avg GPM
.PRV REQUIRED _ Yes _ No
SiteAddress: 19-t5 h4.hACl4 k?_ lac'ktA,MW ?Aa:-??`?? , .
, . ,. .
Tenant Name: ?bli0 Y\ n ' Telephone #: kp ?9U0S
. ? ... .. . , _ __ _ .._ _ __.
_. _ _ . . _ c . . . .. ._ . _ .. . _ (Area Code)
Was there a previous tenant in this space? _ YN. If Yes, Name:
Installer Name: fk16,rS MPGhLQ.ni [ud ?Q rU i[?s, 1-nc . Telephone #:
(Area Code)
Installer Address: ,AtX-) t.Caa st ?Ict-h N i??
City: St. 1 011 ? State: (y1 ? Zip Code S 5 t 07
FEES Contract price $
x 1 % ($50.00 minimum)
Required on all new buildings & bouievard irrigation systems (Acct # 9220-4509)
Surcharge: $.50 Minimu ntxact.fae.,ex.ceed:
50 cents per $1,000 contr?e
FEB 1s zool
I+m
I hereby acknowledge that I have read this application,
ordinances. It is the applican@ yPCnnnc.rhilitvtn nntifvth
-`..s"?'.?.?..._.?.?.?;
during its norxnal operarional and mamtenance activities
calculate at
From Reverse
Contract Fee $
Meter(s) $
Radio Meter Read $
State Surcharge $ N SD
New Service $
UI Tota? $ tDD . z?
stat that the informarion is correct, and agree to comply with all applicable City of Eagan
?-rqperty owner that the City of Eagan assumes no liability for any damages caused by the City
to the facilities constructed under this permit within City property/right-of-way/easement.
SIGNATURE OF PERMITTEE
CITY USE ONLY
REQUIRED INSPECTIONS: _ U.G. _ Air Test Gas Test _ Rough In _ Final
I - z° 14-" B( I
I PLANS SUBMITTED APPROVED BY: BUILDING INSPECTOR
_ Yes _ No
?
IRRIGATION SYSTEM (CONT) r -
Service: _ existing (if coming off domestic line) OR - new
If "new service"; contact Jerry Wobschall, Finance Consultant, to confirm adding fees for:
Water Permit & Surclxarge - $ 50.50 $
Water Supply & Storage - $ 860.00 $
Water Treatment Plant Charge - $516.00 per SAC unit $
Fees to be added to front side of application $
GENERAL INFORMATION
• Radio Meter Read (required on all new buildings & boulevard irrigation systems- $153.00 (Acct Code # 9220-4509)
• Water mQtee s,inclucte copoerhorn/strainer, remote wire, and touch-pad meter
GPM METERS USE PRICE GPM METERS USE PRICE
1-20 5/8" displacement residential $115.00 4-120 1-1/2" irrigation syst $ 727.00
smcommercial turbine** **mustreceive
maximum approval from
continuous Public Works
10
2-30 3/4" displacement lawn irrigation $149.00 4-160 2" turbine lg irrigation syst $ 899.00
maximum residential &
continuous sm commercial production lines
15
3-50 1" displacement very lg res $194.00 1/4:to 160 2" compound bldgs over, $, 1,757.00
bldg to 24 units 65 units
maximum sm commercial &
continuous & lg comm bldgs
25 irri ation s stems
5-100 1-1/2" bldgs 25-64 units $428.00
maximum displacement &
continuous most comm bldgs
50
METERS RFOUIRING 30-DAY ADVANCE NOTIC PRIOR TO PICK UP
GPM METERS USE PRICE GPM METERS USE PRICE
5-350 3" turbine very lg irrigation syst $1,184.00 6-500 4" compound +300 unit bldgs 8c $3,476.00
& production lines very lg comm bldgs
1/2-320 3" compound +200 unit bldgs $2,212.00 10-1000 6" compound +400 unit bldgs $5,711.00°
very lg comm bldgs very lg comm bldgs
15-1000 4" turbine . very lg irrigation sysf $2,132:00
& producrion lines
Comments
• To schedule inspection of the inside water line and backflow preventer, ca11651-681-4675.
• To arrange for water turn-on, ca11651-681-4300.
cc: Kris Forster, Maintenance Division Clerical Technician Updated 1/01
?
?
::?.?:. i,•.'."i{`;:J{`..?r:.??i:iC?;ry!ii'..`?:.N.:j:??'.:"r?i?::? :rn. ;: ;E?;.fi"??.?i:%t.i{;?j'::i::ji!{f{;;y'..;: ;;.%(•,:?i
'_• t. 1 ki! l..JF ?::.i-! ::r p???'•'
..v i_'i (... ' f. .....:..t..?\l'? ?.1 1 !...r..;•! :.?.1(•?t_. fi?':+::i?i, +'l.t
l.,Pi;:;,-? :.{-:;:i;; ..1;=? . ?.
Dc.•, ? r!:?:. ?, ,r,._? .......
?? :I. t.l%t' { ; i .., r .s. i•1 En W`"". 0i:s
.
:•h•i ?i... ? ?.::?Tf?'I?.:l?;p?iC:.fi?... k ?°?
-,:. ?. ? .?.?....._
,
•??.7?:: ._..,:';s i875
i::.r::...!F? :::t.'t.: ?. ??.;??.I"1!?.i.:?._ :.t° ?- 105,193.76
r,?::...:? +:: r _, , ._?:_?1._?.i. i875 ,.,. .... .
,. . ..\? 1 1•r.:•. I+.t••?I ll ??4.?c....;.? , :: .
2C:.•_! ? 5,000.00
... • . .... ,... .;. ft _ .?. .?.t.?... . „ 03.76
1 t;.'?:.a}.l. :`•'.?ii:'F:'f?•i7:l.r.?.?; t?Hi!.J=.;i'? ?:
F_
,
tr`? "?''.?'?. ?:: •1 t:i
l,,,ci .t St:.....
USE`'.. .j. & :.i AN
yfj•l; •?ir?i?'?: •.Ir.,??.t: ?i?•.4???i/ ?t?:f:•v:.?..y.J:•.1:?.?:•t:.,t _?r......i:.??..?...•-?t??:': ;t:??a:.•?I?v'\.?i??'.4?t
.;
? CITY OF EAGAN
3830 Pilot Knob Road
Eagan, Minnesota 55122-1897
(612) 681-4675
PERMIT '
PERMIT TYPE: B U I L D I N G
Permit Number. 030785
Date Issued: 10/07/97
SITE ADDRESS:
P.I.N.: 10-62727-010-01
1975 RAHNCLTFF CT
LpTs 1 BLOCK: 1
RAHIdCLIFF 3RD
DESCRIPTION:
HTLTON
armit Type
Type
COMP9, /INp.
NEW
A3 R1
V-1 HR
pD
226
124 ;
q
16,646
213 HqTELiMQTEL
-0
? ?v ?op??? ? ppa w.
?? ? if_
REMARKS:
FEE SUMMARY
vAt,UaTIvN $295.00,00e
Base Fee
Plan F2eview
Surcharge
SAC
J Ci {.r %
SAC Units
Subtatal
$66,476.46
CITY SAC
5&W PERMIT
5&W 5URCHARGE
TREATMENT PLAPdT
PARK pEqIGATION
TRAIL DEDICATIQN
LANDSCAPE 6UAf2
Total Fee
CONTRACTOR: _ Ap p 1 i c a n t-
TECH BLDRS ING ' 22355561
410 DOWN7pWN PLAZA
FATRMONT MN 56031
(507) 235-5561
APPLICANT/PERM
$9,137.25
$5,939.21
$1,050.00
$50,350.00
100
53
$5,300.00
. $100.00
$.50
$GL q 260 • ?JeJ
$8p.V7 2. GYJ
$2,384.80
$5.000.0fb
$110p 193. 7'6
OWNER:
NUE &'f06ERSON TI, L L P
335 5 W BENSON AVE
WILLMAR MN 66021
(320)235-7207
1(pin bUf Mg
ISS EDt. SIG ATORE k
.
j ? - -- \
Y 1997 BUILDING PERMIT APPLICATION (CO ,°-°=?°?----?? ----_ -
CITY OF EAGAN
681-4675 _-
ii: !l ? 193,76
2
7?
? 7AVG..
The following are required with appropriate oertification for all r? construction:
• 2 each: architectural plans; mech. 8 elec. plans; fre sprinkier plans; structural plans; site plans; landscaping plans;'grading/dr ia nage/erosion control
plan; utility plan
• 1 each: set of specifications; set of energy calculations; electrical power 8 lighting form; Special lnspedions & Testing Schedule
? Letter from MC/WS (phone #222-8423) indicating SAC determination
• Code analysis indicating: codes used; occupancy Gassffications; setbadcs; maximum allowable area as per Building and City Codes along with sq.
ft. per floor; type of construction (synopsis of construction components) & any occupancy or area separation walls;
occupancy loads; exit synopsis with a diagram indicating exiting loads from each room or area, travel paths & all rated
corridors; plumbing flxtures; and paricing.
DATE: 8-21-97
WORK TYPE: X NEW _ REMODEL
DESCRIPTION OF WORK: -Gene-ral Construction
CONSTRUCTION COST: $2,500,000 TENANT NAME: Hi 1 ton
SITE ADDRESS:
„ V
.,tm .,..
LOT l BLOCK 1 gUgp. Rahncliff 3rd Addition p.I.D.#
10-62727-010-01
PROPERTY Name: NuE AN[LTLLr.,FRSnN T T, i_ i_ a_ Phone #: '12n_2-15_7207
OWNER L„s, FIaST
Street Address: 335 S.W. Benson Avenue
City: Wi l lmar State: MN Zip: 56021
CONTRACTOR Company: Tech Bu i l ders I nc . Phone #: 507-235-5561
Street Address: 410 Downtown. P1 aza
City: Fairmont, MN Zip: 56031
ARCHITECT/ Company:Johnson,Sheldon&Solenson Architectsphone#: 320-235-7775
ENGINEER
Name: John Hafner Registr8tlon #: 22890
Street Address: 201 S.W. 4th Street
City: Wi l lmar State: M?v Zip: 56021
Sewer & water licensed plumber (only if installing sewer & water): Unkn?ian t;11 h; rl
1 hereby acknowledge that I have read this app{ication and state that the informaX( is correct and agree to comp?y with all
applicable State of Minnesota Statutes and City of Eagan Ordinances.
Signature of
OFFICE USE ONLY ` Y
BUILDING PERMIT TYPE
0 01 Foundation ? 19 Comm./Ind. Misc. 0 21 Miscellaneous
,a" 18 Comm./Ind. ? 20 Public Facifity
WORK TYPE
0' 31 New ? 33 Alterations o 35 Tenant Finish
? 32 Addition ? 34 Repair ? 37 Demolition
GENERAL INFORMATION
Const. (Actual) ;v,- 1 H-ra Basement sq. ft. MC/WS System ?l
-
(Qllowahlo) i _ i ,.+ 2 ?'isct FI,+nr gM. f#. [':i±y !f1/?lar i
UBG Occupancy .43 2 i sq. ft. Fire Sprinklered
Zoning sq. ft. Census Code zl3
# of Stories ? sq. ft. ' SAC Code
-
Length sq. ft. Census Bldg. ?
Depth Footprint sq. ft. ? Census Unit ?-
APPROVALS
Planning Building Engineering Variance
Permit Fee / 1,3 7a ? 'Valuation: $ o ° °
Surcharge j,D S`Za • 6D
Rlan Review S, aA
MC/WS SAC ?o } 3s ?-S-3X jS o
City SAC ?' 30 ? ? ?,
Water Conn.
S/W Permit
S/W Surcharge . So
Treatment PL 2Z, 2?,s S 3 k- Y
Ruaa-?hnit-
Park Ded.
f) Z '3 7?? I nr ecYP
Trails Ded.
Water QuaL
- Other ?`-?-
? o o a 4,cO.Syi
Copies J
Totai: _!13< ` -
% SAC
SAC Units
. ?
Meter Size ?
- -` -
-- y, ?
031? 6
?
C[TY USE ONLY
L BL RECEIPT #:
SUBD. RECEIPT DATE:
1998 PLUMBING PERMIT (CODDMERCIAL)
CITY OF EAGAN
3830 PILOT EINOB RD
EAGAN, NN 55122
(612) 681-4675
Please complete for: all commerciaUindustrial buildings
multi-family buildings when separate building permits are not required for each dwelling unit
backflow preventer to be installed in commercial areas or residential boulevards
Date: Work Type: _ New Bldg. _ Add-on _ Repair U.G. Sprinkler _ RPZ
Description of Work:
Is Water Meter Required? ? Yes _ No Water Flow s GPM
To inquire if Pressure Reducing Valve is required on new service, ca11681-4646.
FEES
1% of contract price or $25.00 minimum Contract Price: $ x 1% _ $
Service: _ Existing (if coming off domestic line) OR _ New
Backflower Preventer Permit Fee g-) I.O?D
Water Meter 1" @ $-f0y---00 01' 2" Turbo @$04*10
` g?,_
If "new service" add Water Permit $ 50.00 =
WAC $ 780.00 =
Water Treatment $ 420.00
City Installed Tap $ 300.00
Permit Fee $
State surcharge is $.50 per $1,000 of ep rmit fee or minimum of $.50 per permit State Surcharge $
_ •? ? 9`V.. '-J?
Total Fee $
I hereby acknowledge that I have read this application, state that the information is correct, and agree to comply with all applicable City
of Eagan ordinances. It is the applicant's responsibility to notify the property owner that the City of Eagan assumes no liability for any
damages caused by the City during its normal operational and maintenance activities to the facilities constructed under this permit within
City property/right-of-way/easement.
SITE ADDRESS:
TENANT NAME:
???
INSTALLER NAME: AAU\g?? p 4
STREET ADDRESS: / (411c) b? 3 Ab
CITY: STATE:
ZIP: :??
SIGNA
TELEPHONE
V' `-'l\
RE OF PERMITTEE
CITY USE OIYLY
COMMERCIAL PLUMBING PERMIT - 1998
METER S[ZE
Domestic
Irrigation
V
2
UTILITY CONNECTION (APPLIES TO NEW SERVICE ONLY)
REVIEWED BY:
2a
Building Inspector
To determine meter size
PRV Yes _ No
Date
* See if it is indicated on back of Building Inspections card
* Enter address in PIMS Screen 301 to obtain S&W permit #
* Check PIMS Screens 110 (Remarks)
* If gallons per minute are less than 25, a 1" meter will be required. If gallons per minute are more than 25, a 2" turbo with strainer
will be required. This information is to be supplied by the designer of the system. Consult with Plumbing Inspector if Licensed
Plumber does not know GPMs.
Before selline meter
* Check PIMS Screen 320 for approvat of inspection results. No meter will be sold before all sewer and water inspections are complete
on a new service. If new service lines are not required, one check may be written for meter and permit costs. Write meter type and
size on receipt, code to 3716-9220 (meter portion only), and forward copy to Utility Billing Clerk.
* Enter meter size, type, receipt #, date & amount paid on PIMS Screen 110. Copy of receipt should be given to Utility Billing Clerk.
Miscellaneous Information
* The installer is to contact Building Inspections at 681-4675 for inspection of the inside water line and backflow preventer. The Cenoral
Maintenance Division may be reached at 681-4300 for water turn-on. ,
* ff ineter is over 5/8", notify Central Maintenance so they can tell you if there is one in stock before plumber goes over there.
JS/Forms.bid/plbg permit (comm) 1997
?
L BL
?
SUBD.
CITY [JSE ONLY Q o
RECEIPT #: P?? 7
RECEIPT DATE:
1997 PLUMBINfi PEftM1T (COMME$CIAL)
CITY OF EAfiAN
3$30 PILOT KNO$ RD
EACAN, MN 55122
(612) 681-4675
Please complete for: all commerciaUindustrial buildings
multi-family buildings when separate building permits are not required for each dwelling unit
backflow preventer to be installed in commercial azeas or residential boulevards
Date: D /17 Work Type: A New Bldg. _ Add-on _ Repair _ U.G. Sprinkler
Is Water M ter Required? _X Yes No Water Flow GPM
?'?E
vO
1% of contract price or $25.00 minimum Contract Price: $ Z OD ?`? x 1% _ $ Z DDD
COMPLETE THIS AREA IF INSTALLING UNDERGROUND SPRINKLER SYSTEM
Service: Existing (if coming off domestic line) OR ! New
Backflower Preventer Permit Fee $ 25.00
Water Meter 1" @ $185.00 or 2" Turbo @$846.00
$
$
If "new service" add Water Permit $ 50.00 = $
WAC $ 780.00 = $
Water Treatment $ 420.00 = $
City Installed Tap $ 300.00 = $
A
To inquire if Pressure Reducing Valve is required on new service, ?S ca11 681-4645.
INSTALLER NAME: ?f i it//f/eSD, lU 4P,0&? `ELEPHONE 2- C yl!;Oe
Permit Fee $ ;..000
J
State surcharge is $.50 per $1,000 of ep rmit fee or minimum of $.50 per permit State Surcharge $ 1
Total Fee $ 0?
I hereby acknowledge that I have read this application, state that the information is correct, and agree to comply with all applicable City
of Eagan ordinances. It is the applicant's responsibility to notify the property owner that the City of Eagan assumes no liability for any
damages caused by the City during its normal operational and maintenance activiries to the facilities constructed under this permit within
City property/right-of-way/easement.
siTE aDDxESS: 197S &NcLa'?'
OWNER NAME: k ?'r-4- 7h,0_,qezj_,5 a/J ,. L- LA
STREET ADDRESS: Gt/?vfi 3 2d p V2 ---
CITY: S?A K t7 Inn " Nl 0 STATE: ? ZIP: ..3
SIGNATiCIWO'F PERMITTEE
CITY USE ONLY
COMMERCIAL PLUMBING PERMIT -1997
METER SIZE
PRV Yes No
Domestic 12
?i
Irrigation
UTILITY CONNECTION (APPLIES TO NEW SERVICE ONLY)
$
REVIEWED BY:
1-31,?
Building Inspector
/(?'
Date
To determine meter size
* See if it is indicated on back of Building Inspections card
* Enter address in PIMS Screen 301 to obtain S&W permit #
* Check PIMS Screens 110 (Remarks)
* If gallons per minute are less than 25, a 1" meter will be required. If gallons per minute are more than 25, a 2" turbo with strainer
wili be required. This information is to be supplied by the designer of the system. Consult with Plumbing Inspector if Licensed
Plumber does not know GPMs.
Before seliinQ meter
* Check PIMS Screen 320 for approval of inspection results. No meter will be sold before all sewer and water inspections are complete
on a new service. If new service lines are not required, one check may be written for meter and permit costs. Write meter type and
size on receipt, code to 3716-9220 (meter portion only), and forward copy to Utitiry Billing C1erk. I
* Enter meter size, type, receipt #, date & amount paid on PIMS Screen 110. Copy of receipt should be given to Utility Billing Clerk.
Misceilaneous Information
* The installer is to contact Building Inspections at 681-4675,for inspection of the inside water line and backflow preventer. The Central
Maintenance Division may be reached at 681-4300 for water turn-on.
* If ineter is over 5/8", notify Central Maintenance so they can tell you if there is one in stock before plumber goes over there. °
JS/Forms.bld/pibg pcrmit (comm) 1997
v./ CITY USE ONLY
?
L ? BL
r
SUBD. &??
RECEIPT #:
RECEIPT DATE:
1997 MECHANICAL P£RMIT (COMMEftCIAL)
CITY OF E4CAN
3$30 PILOT KNO$ RD
EAfiAlv, MN 55182
(612) 6$1-4675
Please complete for: all commercial/industrial buildings
multi-family buildings when separate permits are not required for each dwelling unit
DATE: (? ? CONTRACT PRICE: "7 00
WQRK TYPE: NEW CONSTRUCTION INTF.RIQR IMPROVEMENT
DESCRIPTION OF WORK: A-41, c, v1d Q < A., le /
FEES: 1% of contract price OR $25.00 minimum fee, whichever is greater.
Processed piping - $25.00
CONTRACT PRICE x 1 % _
PROCESSED PIPING
PERMIT FEE
STATE SURCHARGE /. ?0 ($.50 per $1,000 of permit fee due on all permits.)
TOTAL - /. 60
-------------------------------------------------------------------------------------------------------------------------
SITE ADDRESS: I a?'?15 1? ?-,?S??c?? ?--?
OWNERNAME: PHONE #:
TENANT NAME (IMPROVEMENTS ONLY):
INSTALLER: 'Ele, 1 IUL_MUlAkM L
?0_? ??_Z PHONE #:
ADDRESS: ? 60)?? t -,--
??aS-?M-7
STATE: im ZIP: 15,5V L._
a
CITY INSPECTOR
CITY USE ONLY
LOT BL RECEIPT #:
SUBD. RECEIPT DATE:
1997 MECHANICAL PER1VIIT (RESIDEN'1'IAL)
crrY oF EAsAv
sgso PiLOT xrro$ ftn
EAsAv Mrr 55122
(618) 6$1-4675
Date: _ Complete this section only if you aze installing HVAC in single family, townhomes or condos under
construction and not owner /occupied
• HVAC: 0-100 M B T U $ 24.00
ADDITInNAL 50 M BTU 6.00
• Gas outlets (minimum of one required @$3.00 ea.)
• State Surcharge:
• TOTAL:
.50
Complete this section onlv if you are remodeling, adding to, or repairing existing single family dwellings,
townhomes, or condos. Note: Mechanical permit is not required for alteration/add-on to ductwork in
existing- residential units; but is required for the following:
Install furnace
Install air exchanger, i.e. Vanee system, etc.
Minimum fee applies to all remodel or add-ons of existing residences
State Surcharge
SITE ADDRESS:
Install air conditioning
Other
$ 20.00
- .50
Total: $ 20.50
OWNER NAME: PHONE #:
INSTALLER NAME: PHONE #:
STREET ADDRESS:
CITY: STATE: ZIP:
JS/FORMS BLD/MECH PERM[T (RES) - 1997
SIGNATURE OF PERMITTEE
//, ,C3/, a1?'(4?
Department of Administration
.?b..?_
June 1, 1998
Nue & Torgerson
335 Benson Ave. S.W.
Wilimar, MN 56201
RE: Hydraulic Passenger
Site: Hilton Garden Inn, Car #2
1975 Rahn Cliff Ct
Eagan, 55122
Dear Sir/Madam:
- Elevator ID# -04355PT97-01
Minnesota Statutes Chapter 16B provides that the Department of Administration, Building
Codes and Standards Division, Elevator Safety Section, inspect and approve elevators and
manlifts (endless belt lifts) before they can be legally used in Minnesota. An Inspector from
the Elevator Safety Section recently inspected your facility and determined it meets
requirements of the Minnesota Elevator Safety Code.
NOTE: Compliance with Minnesota Ru1es and the ANSI/ASME A17.1, Safety Code for
Elevators and Escalators does not necessarily assure compliance with the
Americans With Disabilities Act of 1990.
Sincerely,
BUILDI G COD S D STANDARDS
John P. Roche
State Elevator Inspectar
jr/rkr (CE-2)
c: Reid, Douglas Michael, BO, City of Eagan
Schindler Elevator Corp.
Tech Builders
'Frd
ElFormCE2
Building Codes and Standards Division, 408 Metro Square Building, 121 7th P1ace East, St. Paul, MN 55I01-2181
Voice: 612296.4639; Fax: 612.297. (973; TTY: 1.800.627.3529 and ask for 296.4639
- city of eagan
MEMO
TO: DALE SCHOEPPNER, SENIOR INSPECTOR
DALE WEGLEITNER, FIRE MARSHAL
PAUL OLSON, SUPERINTENDENT OF PARKS
PUBLIC WORKS/ENGINEERING DEPARTMENT
MIKE RIDLEY, SENIOR PLANNER
DIANE DOWNS, UTILITY BILLING CLERK
ROD JOHNSON, UTILITIES
FROM: BILL BRUESTLE, SENIOR INSPECTOR
DATE: May 1,1998
SUBJECT: FINAL INSPECTION OF HILTON HOTEL
L1, B1, RAHNCLIFF 3RD The Protective Inspections Division will be performing a final inspection of 1975
Rahncliff Ct on May 27, 1999.
If you are requesting that the Certificate of Occupancy be held, please fill out the proper
hold request form. Failure to return the hold request form will be considered your approval. The
person, or department, requesting the hold is responsible for notifying and resolving any
problems with the affected parties.
/j s
CD/bldg insp//final insp - comm bldgs
a
city oF eagan
THOMAS EGAN
Mayor
PATRICIA AWADA
BEA BLOMQUIST
SANDRA A. MASIN
September 12, 1997 THEODORE WACHTER
Council Members
THOMAS HEDGES
City Administrator
MR JOHN HAFNER E. J. VAN OVERBEKE
JOHNSON, SHELDON & SOLENSON ARCHITECTS Ciiy Clerk
201 S W 4TH ST
WILLMAR MN 56021
RE: . HILTON
`-LOT 1, BLOCK 1, RAHNCLIFF 3P-D
Dear Mr. Hafner:
We have completed our review of the construction documents submitted in pursuit of
obtaining a building permit for the above referenced project. This review is not intended
to be an exhaustive and comprehensive report. It is our goal that this review will help
you in complying with the applicable codes and we are, therefore, requesting that the
following items be addressed:
Submit a completed Special Inspections and Testing Schedule.
2. Submit energy calculations.
3. As per our conversations, we are requesting that the corridor/elevator lobby
design be revised to reflect compliance with U.B.C. Section 1005.10 which states
in part "......the lobby shall completely separate the elevators from the corridor
construction conforming to Section 1005.7.....". This section further states, "In
fully sprinklered office buildings, corridors may lead through enclosed elevator
lobbies if all areas of the building have access to at least one required exit without
passing through the elevator lobby." As you can see, this provision is allowed
only for office buildings. It is our position that Space 139 is a corridor.
MUNICIPAL CENTER
3830 PILOT KNOB ROAD
EAGAN, MINNESOTA 551 22-7 897
PHONE: (612) 681-4600
FAX: (612) 681-4612
TDD: (612) 454-8535
THE LONE OAK TREE
THE SYMBOL OF STRENGTH AND GROWTH IN OUR COMMUNITY
Equai Opporfunity/Atfirmative Action Employer
MAINTENANCE FACILITY
3501 COACHMAN POINT
EAGAN, MINNESOTA 55122
PHONE: (612) 681-4300
FAX: (612) 681-4360
TDD: (612) 454-8535
4. Our occupant load calculations for Room 152 indicate that Door 152 should
swing in the direction of travel. Please revise while taking into consideration,
corridor obstructions from the door swing - U.B.C. 1004.2.
5. Provide details on how you are designing handicapped accessibility for the pool
and hot tub - M.S.B.C. 1105.4.9.
6. U.B.C. Section 708.3.1.2.2 requires draftstopping in the attic. The area between
draft stops may be 9,000 square feet and the greatest horizontal dimension may be
100'. Any openings in the draft stops must be protected by self-closing doors
with automatic latches.
7. Provide two copies of the revised sheets indicated in Addendum No. 1 as they
were not received.
8. Provide attic access as required in U.B.C. Section 1505.1.
9. Verify the roof ventilation complies with U.B.C. Section 1505.3 which requires
the net free ventilating area of not less than 11150 of the area of the space
ventilated.
10. Revise the south elevation of Sheet A3.1 to reflect a revised clearance. U.F.C.
Section 10.204 requires a minimum clearance of 13'6". We are requesting a 14'
clearance for our fire apparatus.
11. Provide tested assemblies that indicate not less than an S.T.C. rating of 50 for the
floor/ceiling assemblies and wall assemblies - U.B.C. 1208.2.
12. Verify that the entrance doors from interior corridors have an S.T.C. rating of not
less than 26 - U.B.C. 1208.2.
13. U.B.C. Section 1208.3 requires an IIC of not less than 50 for the floor-ceiling
assemblies. Provide a tested assembly verifying this.
14. No openings in the rated ceilings are permitted other than Exceptions 1 through 6
in U.B.C. Section 710.2.
15. Provide a space at the front desk that complies with M.S.B.C. Section 4.3.1.5. for
the checkout counter.
16. M.S.B.C. Section 1103.1.2,9.3 requires that in addition to the accessible
guestrooms required in Table 11-D, you must provide four rooms for persons with
heazing impairments. These rooms shall be provided with visible and audible
alarm-indicating appliances activated by both the in-room smoke detector and the
building fire-protective signaling system.
17. Provide an analysis showing that shrinkage of the wood framing will not have an
adverse effect on the structure or any plumbing, electrical, or mechanical systems
or other equipment installed - U.B.C. Section 2318.
18. U.B.C. Section 504.6.4 prohibits roof openings within 5' of an area separation
wall. Verify that the ridge vent complies.
19. Be advised that any underground ducts such as detail 5/M-2 would require an
additional drainage system - M.S.B.C. Section 1346.1009.
20. Verify that all accessible restrooms have vertical bars. Revise 7/A-7, 33/A-7, and
any remaining details.
21. U.F.C. Section 11.302b prohibits the placement of any dumpsters within 5' of
combustible walls - add ballards, or revise as needed.
If you have any questions or concerns, please contact me at 681-4699.
Sincerely,
Dale Schoeppn
Senior Inspector
DS/js
TO: PAT GEAGAN, CHIEF OF POLICE
JON HOHENSTEIN, ASSISTANT TO THE CITY ADMINISTRATOR
DALE WEGLEITNER, FIItE MARSHAL
ELECTRICAL INSPECTOR
PUBLIC WORKS/ ENGINEERING DIVISION /UTILITIES/STREETS
GENE VANOVERBEKE, FINANCE DIRECTOR
RICH BRASCH, WATER RESOURCES COORDINATOR
MIKE RIDLEY, SENIOR PLANNER
GREGG HOVE, SUPERVISOR OF FORESTRY
FROM: DALE SCHOEPPNER, SENIOR INSPECTOR
DATE: e .2- "Z -?j- ?
l
?
The _ preliminary construction plans for e?Z Z /7'0 h
aze in our plan revie section for your review and comment.
Please return this form to Dale Schoeppner with your signed comments and the date of
review. If you have any concerns with these plans, please so indicate on this form and notify and
resolve these issues with the affected parties. If you are requesting that issuance of the building
permit be held, please fill out the proper "hold" request form.
Comments:
Indicate any fees that are to be collected with the building permit:
AMOUNT
? Yes ? No
? Yes ? No
? Yes ? No
? Yes ? No
? Yes ? No
? Yes ? No
Signature
landscape security required
water quality dedication
park dedication
trail dedication
tree dedication
Date
ZONING?
JS/FORMS-BLD/PLAN REVIEW/DALE S
Metropolitan Council
Working for the Region, Planning for the Future
Environmental Seruices
August 21, 1997
Joe Voels
Construction Analyst 1 Q
City of Eagan ? p
3830 Pilot Knob Road
Eagan, MN 55122
Dear Mr. Voels:
2 Q,-4 h C l; '1` 1' &I
3 0 ? 'R ?
The Metropolitan Council Environmental Services Division has deternuned SAC for the
Hilton Garden Innflocated within the City of Eagan.
This project should be charged 53 SAC Units, as deternuned below.
Charges:
Guest Rooms
100 rooms @ 2 rooms/SAC Unit
Dining
40 seats @ 22 seats/SAC Unit
Meeting.Rooms
1,456 sq ft@ 1650 sq ft/SAC Unit
If you have any questions, ca11 me at 602-1113.
Sincerely,
Jodi L. Edwards
Staff Specialist
Municipal Services Section
JLE:bw
970821 S l.doc
cc: S. Selby, MCES
Carolyn Krech, Finance Department, Eagan
Jeff Greischar, Tech Builders, Inc.
SAC Units
50.00
1.82
0.88
Tota1 Charge 52.7 or 53
230 East Fifth Street St. Paul, Minnesota 55101-1633 (612) 222-8423 FaY 229-2183 TDD/TTY 229-3760
An Equn1 Opportunity EmpLoyer
TO: PAT GEAGAN, CHIEF OF POLICE
JON HOHENSTEIN, ASSISTANT TO THE CITY ADMINISTRATOR
DALE WEGLEITNER, FIRE MARSHAL
ELECTRICAL INSPECTOR
PUBLIC WORKS/ ENGINEERING DIVISION /UTILITIES/STREETS
; GENE VANOVERBEKE, FINANCE DIItECTOR f
RICH BRASCH, WATER RESOURCES COORDINATOR
MIKE RIDLEY, SENIOR PLANNER
GREGG HOVE, SUPERVISOR OF FORESTRY
4.4ti c /,'7/( 3rc(i'
FROM: DALE SCHOEPPNER, SENIOR INSPECTOR
DATE: e
l
?
The _ preliminary construction plans for f? h
are in our plan revie section for your review and comment.
Please return this form to Dale Schoepuner with your signed comments and the date of
review. If you have any concerns with these plans, please so indicate on this form and notify and
resolve these issues with the affected parties. If you are requesting that issuance of the building
permit be held, please fill out the proper "hold" request form.
Comments:
J
,r? Gr/,
X 7
Indicate any fees that are to be collected with the building permit:
AMOUNT
? Yes 0 No
? Yes ? No
? Yes ? No
? Yes ? No
? Yes ? No
? Yes ? No
landscape security required
water quality dedication
park dedication
trail dedication
tree dedication
I I '1? wl???
Sig re
ZONING?
I - st.-Ql
Date
JS/FORMS-QLD/PLAN RGVIEW/DALE S
¦ ,
archiplan international, Itd.
ARCHITECTURE • PLANNING • INTERIOR DESIGN
April 29, 1997
City of Eagan
3830 Pilot Knob Road
Eagan, Minnesota 55122
Attn.: Dale Schoeppner
Senior Building Inspector
Re: Homestead Village
3015 Denmark Avenue
Eagan, Minnesota
Froject No. 97009
Dear Mr. Schoeppner,
? -?
r'
?
At your suggestion, our firm called IBCO and spoke with Paul Armstrong regarding
UBC Section 1005.10 requiring a separation befinreen the elevator lobby and the exit
corridor. He basically agreed that the exit corridor should not pass through the elevator
lobby. We then discussed whether or not the main entry also had to serve the function
of an exit. Paul Armstrong indicated that the main entry did not have to act as an exit if
we had sufficient exits throughout that floor level.
Based on our conversation with Paul Armstrong, we will remove the exit sign directing
the occupants to exit through the main entry. In addition, we will swing the inside doors
of the Lobby/Reception 170 the opposite direction and direct the occupants to exit
down the corridor, on the opposite side of the building, through Vestibule 198.
Archiplan International, Ltd. would appreciate your confirmation and acceptance of this
solution as defined. Thank you for your prompt response to this issue.
Si
Ar iplan International, Ltd.
ames E. Sparesus ARA, NCARB, RA
President
lab/cs
cc: Brad Brakhage - Homestead Village
955 n, plum grove rd.
s!aite e. (847) 619-95?=
schaumburg, illinois 601 73 fax N(847) 619-1 ::C
city oF ecigan
POSt-ito Fdx NOt2 7671 Date
p s?
ag°e
To From
Co./Dept.'??;tl, Co.
Phone # ' Phone #
7-
Fax # Fax #
PATRICIA AWADA
BEA BLOM9UIST
SANDRA A. MASIN
THEObORE WACHTER
Council Members
May 6, 1997
THOMAS HEDGES
City Adminimator
E..1. VAN OVERBEKE
C:ty Cierk
1VIR JAiMES E SPARESUS
ARCHIPLAN INTERNATIONAL LTD
955 N PLUM GROVE RD SLTITE E
SCHAIJMBURG IL 60173
RE: HOMESTEAD VILLAGE
3015 DENMARK AVENUE
Dear NIr. Sparesus:
Thank you for your correspondence dated April 29, 1997. We agree that the e.citing system
could be designed to minimum standazds without using the vestibule or reception azea as a
re uired exit.
We do not believe that U.B.C. Section 1005.10 gives us the flexibility to eliminate this major
portion of the exiting system from the elevator lobby requirements.
This code section states in part ". ... Elevators opening into a comdor serving agroup R-1....
shall be provided with an eievator lobby ...". Since this section does not staze corridor serving as
a required exit as U.B.C. Section 1005.1 does, we believe that any comdor in an R-1 occupancy
is subject to elevator lobby requirements.
If you have any questions or concerns, please contact me at (612) 681-4699. Thank you.
Sincerely,
Dale Schoeppner
Senior Inspector
DS/js
MUNICIPAL CENTER
3830 PILOi KNOB RCAD
tiAGAN. MiNNESOTA ;5122-1897
aHONE: (612) 081-1600
FAX: (bl 2) 68I-Jb i 2
iDD: (612) 454-8535
THE LONE OA.K TREE
THE SYMBGL OF STRENGTH AND GROWTH IN OUR COMMUNITY
c ,ucl Qpportunity/Affirmative Action Employer
MAINTENANCE FACtUTY -
3501 COACHMAN PC:Ni
EAC-AN. MIMNESOTA 5_9 122
aHONE. (612) 681-4300
,
FAX (612) 681-4360
TDD (612) 4`4-853.`.
TO: PAT GEAGAN, CHIEF OF POLICE
JON HOHENSTEIN, ASSISTANT TO THE CITY ADMINISTRATOR
DALE WEGLEITNER, FIRE MARSHAL
ELECTRICAL INSPECTOR
PUBLIC WORKS/ ENGINEERING DIVISION /UTILITIES/STREETS
GENE VANOVERBEKE, FINANCE DIRECTOR
° RICH BRASCH, WATER RESOURCES COORDINATOR Lo jL
C_MIKE RIDLEY, SENTOR-PLANNER 1
GREGG HOVE, SUPERVISOR OF FORESTRY
FROM: DALE SCHOEPPNER, SENIOR INSPECTOR
DATE:
l
?
The _ preliminary construction plans for
aze in our plan revie section for your review and comment.
Please return this form to Dale Schoeppner with your signed comments and the date of
review. If you have any concerns with these plans, please so indicate on this form and notify and
resolve these issues with the affected parties. If you are requesting that issuance of the building
permit be held, please fill out the proper "hold" request form.
Comments: 4_A H °'
?'-?_-.
Indicate any fees that are to be collected with the building permit:
AMOUNT G??.9, fo
s cxgo P ar W',' kto?-
?
Yes
V
?
No Ov
)D
landscape security required Q?i I I?Z O N I N G?
? Yes A( No water quality dedication
Yes FD No c
(Q
park dedication (
IRC)
? Yes D No J
D
,
trail dedication
? Yes / No tree dedication
? Yes
? ? No
(,7
,
Signature ,
?
Date
JS/FORMS-E3LD/PLAN RGVIEW/DALE S
??; ,,??' ?• ?v? ? ???? ? ???:
ol
September 16, 1997
johnsan,sheidon,sorensen
ARCBMCTS, Inc.
201 sw 4th street
willmar, mn 86201
Mr. Dale Schoeppner, Senior Inspector
City of Eagan
3830 Pilot Knob Road
Eagan, MN 55122-1897
Re: Hilton Garden Inn
Eagan, Minnesota
Dear Mr. Schoeppner:
Thank you for your timely review of the contract documents for the above-mentioned project. We are
currently putting together a response to items raised in your letter of September 12, 1997, and will be
forwarding information that you requested.
As discussed in previous phone conversations, we do not concur with your position, stated in Item No. 3 of
your review letter, that Space 139 is a corridor rather than an elevator lobby. All areas of this building are
provided with required exits without exiting through this space, and this space is separated from the required
exit corridors by either walls conforrning to Section 1005.7, or by doors complying with Section 1005.8. This
space meets the requirements of an elevator lobby stated in Section 1005.10. Therefor is is our continued
position that Space 139 is an elevator lobby as indicated on the original plans.
Due to this difference of position in regards to this plan review item, and also because any plan change at
this area will adversely effect the normal day-to-day use of these elevators by both hotel employees and
guests, we respectfully request an additional interpretation of this code item as it applies in this particular
case. As indicated earlier, we have been in contact with Mr. Jay Woodward of the ICBO in Whittier,
Califomia in regards to this issue, and he indicated that any formal review by his office would need to be
initiated by your department. We ask that you begin this process as soon as possible, and we will abide by
their decision.
Construction on this projed is currently scheduled to begin shortly after the loan closing, which is scheduled
on September 29, 1997.
Thank you again for your prompt assistance in this matter.
Sincerely,
Ohnson, Sheldon 8 Sorensen
CHITECTS, Inc.
? 4
ohn D. Hafner
JDH/smb
cc: Tom Torgerson
Enclosure
1972-1997 Celebrating 25 Years of Progessyoazal Service to our Client
arinneton&a office: Ph: 812-938-6337 Fag: 612-935-0878 wlllmar aPfice Ph: 820238=7775 Faa;: 320236-8873
lemSele johnson,sheldon,sorensen
ARCMTECTS, Inc.
201 aw 4th street
wilirrtar, mn 66201
September 24, 1997
Mr. Dale Schoeppner, Senior Inspector
City of Eagan
3830 Pilot Knob Road
Eagan, MN 55122-1897
9
Re: Hilton Garden /nn
Eagan, Minnesota
Dear Mr. Schoeppner:
I neglected to enGose the two copies of the kitchen equipment plans along with my response letter
to your plan review. Those plans are enclosed. I apologize for the oversight.
I've also enclosed a copy of our post-bid Addendum No. Two. The city plan review items are
addressed in this addendum, along with several items generated by the Hilton Hotel Corporation
Plan Review, and some Owner-initiated changes. Please review this addendum as soon as
possible, and let us know if it meets with your approval.
The final remaining issue from your review is the first floor elevator lobby design. Please let us
know if there has been any action on our request for ICBO interpretation.
The Owner is planing on closing on his financing on Friday, and he would like to know the status
of the building permit application prior to this closing. Please give us a call if there is any further
information necessary to obtain the building permit.
Sincerely,
Johnson, She/don 8 Sorensen
A H/TECTS, Inc.
?•
John D. Hafner
JDH/smb
cc: Tom Torgerson, Tech Builders
Enclosure
1972-1997 Celebrating 26 Years of P'rmfessional Service to our Client
minneton&8 offlce: Ph: 812-935-B337 Fas: 6I2-985-0878 willmar afflce Ph: 320236-7778 Fas: 320236-8873
J?
?s ? ..
MEMO
- city of eagan
TO: BILL BRUESTLE, BILL ADAMS, DALE WEGLEITNER, DIRK HOUSE,
JOE VOELS, MIKE BARCK, FRANK MARTIN
FROM: DALE SCHOEPPNER, SENIOR INSPECTOR
DATE: SEPTEMBER 23,1997
SUBJECT: HILTON INN
ELEVATOR LOBBY
We have received a design in which I questioned the elevator lobby/corridor separation. Both Jay
Woodward of I.C.B.O. and Scott McClullen of the State of Minnesota have indicated that they would accept
the layout as is for the following reasons:
l. Neither of them thought this lobby was a corridor; the spaces on each side of the lobby can act
independently.
2. They said that even if you consider this a conidor, it still is not a required corridor. This entire
section of 1005 is requirements for required corridors. Scott elaborated with an example of a
building having a corridor for convenience that did not have to conform to the construction
requirements for a rated corridor since it was not a required corridor for exiting.
Scott said that if this was an office building, they could put a lobby in the required corridor with
only one additional exit. With this design, you completely separate the different conidors and you
have three means of exiting from the top corridor. With an R-1 occupancy, you have smoke
detectors in the corridors and the bedrooms which you would not have with an office building.
4. Jay stated that with this design, they are in a way using Exception No. 3 that would allow the doors
to be placed on the bulk-head of the elevator openings. Instead of putting the doors on the bulk
head, they are moving the doors out in to the lobby. I realize that the State of Minnesota would not
allow the application of this type of a door on the bulk-head.
After reviewing these arguments, I am suggesting that we accept this design. Please give me your opinions.
Thanks.
t)j
- ?:I?
SeniorInspector
DS/js
cc: Doug Reid, Chief Building Official
?:\1991\91-034\FLPLAN-] Tue Sep 16 09:24:34 1997
, . . - - ? . ; •,
?I
a
F
rt.
-n
r
O
0
?
?
r
d
z
U
r
z
j I ?ILLiI
I ?II?
i ?I 1 I ?I
Ll
?-------?
? -?
i ?
?
? fif??ll I I i
I
?
L -------?
?
??? IN U ?@
8 =?
, ?
A d ki
ao
{
E ? Ittj?f
l? ?I1 {!
- - ---- --
1?
? ??cl
-
.
?
• o•so
I •/•/
john5on, gheldon & 5oren5Cn
ARCNITECTS, fnc.
2015w 4th 5trees
willmar, mn 56201
Phone: 320-235-7775 Fax: 320-235-8673
Fax TranSmittal No.of page5 including coversheet: ?
If you do not receive all pages, please contact this office Phone: 320-235-7775 Fax: 320-235-8673
Date: cl/?sO Re:Vit LTt9N --- EAG%14+j
To: C/ I T%( From ,] O k*j ? 61Z-•
Attention: DA1.6 ><Hard Copy of follow C] No Hard Copy to Foilow
.W?
0
- WEPo mdr ?crunw ? tlo nk TRu ss C'-64nlZ„
_ UU t(A- 6C A-r Vh5 7lM E. Ars Sovti! 14S WE
.
- ? `'ed1j .4k. "W bII?N? t?OP`f
° L4inx mow%. LaNpcu, 6?jc,10MIzc" MAIZ0164t?
-__?Sh"r-h. S 20,14N?ro Ac.WtfAab6M PsUIt,br 624
Saglmj N??" 6-
0
coo & 5re.- ff=!?n_N !; .
Additiional Copies to:
, SEP 30 '97 13:07 BRAUN INTERTEC P.2
Sep-30-97 11:05A JSS Wi77mar 1 320-235-8673 P.02
• ?''?-'?' 14:44 EAGA" 040-*C= D&V -P 1ZZFJ ?M 8673 NQ.263 P8Q2
. '
' i??C2?L t1tYl?'Y011 ? '?'p'!'tM0 lC?eDOL?
(ro be vMd la aeaoc"? wuA the •atWaIInes, !er 8peeiai Yarpeetion and nslin4-)
S'bts schadnie, !O IM tiilaa out ard lnc3novd in the r=aSeCt apecitiCACiOA- Snlolmition
a"avtl16ble at th$t tift !d bi t'illad eut when applytnq for t bu3ldiRg pssiait.
(3) PfmL! lfa. !p bo prbvided by the Sulidieg ottleial.
t2? U*! 400690tl0nG p6r U.S.C. 8aetiOn /yD/.S
t3l Speetal ZeoSectos. Z'a*tfnv AQeak os FaerseRtor.
(+) Pfta? COhtraeted !4 pltterm •vsvlCYO.
AcKwOMLED0E11l1?'?s
eiet? apptope??e? s?ntat?v? n?uat stQn Dolow;
Ca1tC?rsa?or: ste:
iirIN s
/ DlkCMs .
A:eh14eOts ritms ate: q
oaCe:
?? Stn .
rtr?,
? ostv?
.
j
?'llAls ?.. ?_._
Oale:
A
flrma
.
sA: ?trmv aste:
p Pirs:
Date.
.
pJ • BiYAte Osta:
, - .?...._ .
'=he 104loldua4 eYOa at a12 pe0406etive syactai inspectora ae4 the work it„pY intsnd to
oba9tve best be identitied an the zeverss oLd• ms this totn.
Legend- stft - Sltiwotycal an9lneor ot Record SS ? spscial Inepactor
TA • Tootin0 Agenti r ? sabsiesttir
AeeNptOd tor tko auliding a.partuwns 9y baca:
sROSSC? wws Ftf+- 40?-j /r+rv DOwscr No.
s?oc???so? -_?
sMi: ra.
.?..._..?
0913011997 08:58 612-542-9214 LIPJDELL ENGINEERING PAGE 01
LINDELL ENGlNIEERING, INC.
3411 KtuyttL't Lp,Ns N.
MtNrrF-Apvus, MN 55441
(612) 542-9163
FAX (612) 542-821 4
30 Sep 97
Mr. Pau! Reeb
7ohnson, Sheldon & 5onenson
201 5outbtwest Fourth Stxeet
Willmar, MN 56201
Subject: I?'itton Garden Inn
Eagan, Mannesota
Aear Paul:
The following system desxgn has taken into account that there is approximately a/s"
vertical shrinkage of the four-story wood structurai buUding:
Mechanical Systems
• Ptumbing
. Heating
. Ventilation
. Fire Sprickling
EIectrical Systems
d- Telephone
• Cable TV
• Fire Alarm
• Electfical Distribution
Yours tpily,
Richazd A. Lindell, P.E.
RALlcjn
00i26i97 , 09:41, 0713 387 4218 FFEYCO STEAM THRU
- Inchcape Testing Services
i? ETL Testing Laboratories
Order No. 1 1 4072-47 1
REPORT NO. 564767
SOUND TRANSMISSION LOSS TESTS
AND CLASSIFICATION OF TWO DOORS
RENDERED TO
WEYERHAEUSER
INTRODUCTIQN
Q002/007
ETL restia= Iaboratoria,tac.
3933 U.S. Rt 11
P.O. s= 2040
Cordand, lYY 1304S-0954
Date: June 3, 1996
This report gives the results of Sound Transmission Loss tests and the
determination of the Sound Transmission Class on twa doors. The doors were
selected and supplied by the client and were received at the t3boratories on May
13, 1996. They appeared to be in new condition upon arrivai.
Purchase Order No. 4845 from Warnoclc Hersey, Inc.
The specimens'were tested in accordance with the American Society for Testirtg
and Materials designation ASTM E90-90, "Standard Test Method for Laboratory
Measurement of Airborne Sound Transmission l.oss of Building Partitions", and
classified in accordance with the American Society for Testing and Materials
designation ASTM E413-87, "Classification for Rating Sound Insulationp.
Art independent orQnnaatan testing far salety, per[ommnce, end oertification.
/UI servicea undertaken subjed to the foltowing ganeral pollcy: Re rts xe svbm[tted fol extluslve use er ene cflerrts
towAom they are addressed. 7heir 3i9nit[cance is subjecL to fie ed queCy anQ representatire charoc[ei ol the samples
and to the comprEhensiveneSS ot the tBSTS, exsminatlons or sunreys made. No quoWtlans irom fcpoRS Of usE ot ETL'S fWme is
permitted except as expressly authori2eG by ETL in wrlting.
0-9/26i97 , 09:31, 0713 387 4218 WEYCO STEAM TffiSU Q11003f007
lnchcape Testing Services
Report No. 564767
2.
The sound-insulating property of a partition element is expressed in terms of the
sound transmission loss. The procedure for determining this quantity is to mount
(and perimeter sea1) the test specimen as a partition between two reverberation
rooms. Sound is introduced in one of the rooms (the source room) and
measurements are made of the noise reduction between source room and
receiving room. The rooms are so arranged and constructed that the only
significant sound transmission between them is through the test specimen.
A test vpening is constructed such that it is approximately one inch larger in size than
the test specimen. The tes# specimen is placed in the test opening on a half-inch bead
of "DUX-SEAL", a dense, non-hardening, clay-like material, to isolate it from the
supparting base. The space befinreen the test specimen and the wall opening is sealed
on both sides employing the same sealing material. The test specimen is perimeter
sealed (both sides) with the same material between the two reverberation rooms.
The purpase of the Sound Transmission Cfass (STC) is to provide a single figure
rating that can be used for comparing the sound-insulating properties of partition
elements used for general building design purposes. The higher the rating (STC)
the greater the sound-insulating properties of the parti#ion,
OEfiCBIPTION OF TEST SPECIMENS
Door "A": Classique
Door "B": Masonite Ctassique
Both doors were constructed with particleboard core (approximately 33 pounds
per cubic foot), wood stiles and rails iapproximately 1-1/8" in width and molded
hardboard faces (approximately 70 pounds per cubic foot). They were 1-314"
thick, 3'0" x 6'8" in si2e and weighed about 104-1/2 pounds each.
The description of the test specimens was supplied by the client.
0S!26i97 09:42, 12713 387 4218
-Report No. 564767
RESULTS OF TEST
REYCO STEtiM TffiZLT 1?1004/007
Inchcape Testing Services
7 /3 Octave Band
Center Frequency
Hz
80
100
125
160
200
250
315
400
500
630
800
1000
7250
1600
2000
2500
3150
4000
5000
Sound Transmission Loss in dB
„___ n,?» r+--- nr%«
19
22
24
26
27
28
29
30
31
32
33
33
31
30
29
30
32
34
36
20
21
25
26
27
28
29
30
31
32
33
32
30
30
29
30
33
35
37
3.
Sound Transmission Class 31 31
09"26/97 09:42, 'a`713 387 421$ fFEYCO STEAM TffitU Q005J007
Report No. 564767
SOUND TRANSMISSION LOSS
Door "A"
a.
o,
5(
m
?
' 40
N
?
O
?
z
O
m
CD
30
?
Z
Q
?
F-
G
Z
=) 20
O
N
10
Q
. , , . . . ST1G 31 ? . , . . . ? . .
- -.- - . - ,
---.......
I . . . . - .
....
. . - . - . .
.------
. . . ; . , . , . , . , . . ? . , . , . ; . ..
-----•----------------•-----..
. . . . . . . . . .
G IS? O O O IA o O O O O O C O 4 O O
O N D O t!f r q p M O C w O O O W O
er av C+f v uO Qo O N 0 b w O
FREC2UENCY IN HERTZ
-Sound Trans. Lass + STC Cantour
May 23, 1996
Q.Ai26%97 . 09:42, 0713 387 4218 tiEYCO STEAM TffitU IZ006!007
Repon No. 564767
SOUND TRANSMISSIOPI LOSS
Door "B"
5.
eq
sc
m
-a
<o
?
?
0
?
z
4
?
? 30
N
z
Q
o?
?-
O
z
M Zo
0
(n
10
0
. , . , . . STC- 31 . . : : : . .
------ ----------
. . . . . . . . . . . . . . . , .
O N tpo ? 0 61 O O O C C Q p O O O O
o a •- o o M o a m o 0 o in o
? ?- - N c?l t? c? ?tf ?p oD O? N t0 O U1 O
FREQUENCY IN HERTZ
Sound Trans. Loss + STC Contour
May 23, 1996
Q9i26!97 09:42, 12713 387 4218 REYCO STEAM TffitU Q007i007
' Inchcape Testing Services
Report No. 564767 6.
PRECIStON
For any pair of roorns and microphone system, the 95% confidence intervat QTL,
for transmission loss must be less than the foltowing.
Range of
Qne-Third Octave
' Bands. Hz
125 and 7 60
200 and 250
3'15 - 4000
Transmission Loss
Uncertainty, dB
Required actual
3 <'1.5
2 <1.5
1 <1
REMAHK.S
1. Aging Period: None
2. Ambient Temperature: 73°F
3. Refative Humidity: 42°i6
CONCtUSlON
The test method employed for ihis test has no pass-fail criteria, therefore, the
evaluation of the test results is lefc to the discretion of the client.
Date of Test: May 23, 1996
. Report Approved by:
Norman H. Bay, Manager
Acoustical Testing
WP60/mee
city oF eagan
tHON1AS EGAN
Mcyor
PATRICiA AWADA
BEA BlOIV162UIST
September 12, 1997 T EODO E WAC TER
Councif Members
THOMAS HEDGES
City Acministrctcr
MR JOHN HAFNER E. J. VAN OVERBEKE
JOHNSON, SHELDON & SOLENSON ARCHITECTS c'ty C1e"`
201 S W 4TH ST
WILLMAR MN 56021
RE: HILTON
LOT 1, BLOCK 1, RAHNCLIFF 3RD
Dear Mr. Hafner:
We have completed our review of the construction documents submitted in pursuit of
obtaining a building permit for the above referenced project. This review is not intended
to be an exhaustive and comprehensive report. It is our goal that this review will help
you in complying with the applicable codes and we are, therefore, requesting that the
following items be addressed:
1. Submit a completed Special Inspections and Testing Schedule.
2. Submit energy calculations.
3. As per our conversations, we are requesting that the corridor/elevator lobby
design be revised to reflect compliance with U.B.C. Section 1005.10 which states
in part "......the lobby shall completely separate the elevators from the corridor
construction conforming to Section 1005.7.....". This section further states, "In
fully sprinklered office buildings, corridors may lead through enclosed elevator
lobbies if all areas of the building have access to at least one required exit without
passing through the elevator lobby." As you can see, this provision is allowed
only for office buildings. It is our position that Space 139 is a corridor.
MUNICIPAL CENTER
3830 PILOT KNOB ROAD
EAGAN. MWNFSOTA 551' Itl`i,'
PHONE, (612) 681 -4600
Fnx: (612) aa i-nn 12
TDD: (612) 454 8 ; ?5
TFIE LONE OAK TREE
THE SYMBOL UF STRENGTH AND GROWTH IN OUR COMMUPIITY
Equal OpE.ortunity/Affirrnative Action Employer
MAINTENANCE FACILIN
3501 coacHM,a?I ?oIr;-
EAGaN. MirdrJESC,7A. 5c 2=
FHONE (612) 681-43G0
F AX: (612) bd 1-43 ??';
iD0 (612) d54-8?;c
4. Our occupant load calculations for Room 152 indicate that Door 152 should
swing in the direction of travel. Please revise while taking into consideration,
corridor obstructions from the door swino - U.B.C. 1004.2.
5. Provide details on how you are designing handicapped accessibility for the pool
and hot tub - M.S.B.C. 1105.4.9.
6. U.B.C. Section 708.3.1.2.2 requires draftstopping in the attic. The area between
draft stops may be 9,000 square feet and the greatest horizontal dimension may be
100'. Any openings in the draft stops must be protected by self-closing doors
with automatic latches.
7. Provide two copies of the revised sheets indicated in Addendum No. 1 as they
were not received.
8. Provide attic access as required in U.B.G. Section 1505.1.
9. Verify the roof ventilation complies with U.B.C. Section 1505.3 which requires
the net free ventilating area of not less than 11150 of the area of the space
ventilated.
10. Revise the south elevation of Sheet A3.1 to reflect a revised clearance. U.F.C.
Section 10.204 requires a minimum clearance of 13'6". We are requesting a 14'
cleaxance for our fire apparatus.
11. Provide tested assemblies that indicate not less than an S.T.C. rating of 50 for the
floor/ceiling assemblies and wall assemblies - U.B.C. 1208.2.
12. Verify that the entrance doors from interior conidors have an S.T.C. rating of not
less than 26 - U.B.C. 1208.2.
13. U.B.C. Section 1208.3 requires an IIC of not less than 50 for the floor-ceiling
assemblies. Provide a tested assembly verifying this.
14. No openings in the rated ceilings are permitted other than Exceptions 1 through 6
in U.B.C. Section 710.2.
15. Provide a space at the front desk that complies with M.S.B.C. Section 4.3.1.5. for
the checkout counter.
16. M.S.B.C. Section 1103.1.2,93 requires that in addition to the accessible
guestrooms required in Table 11-D, you must provide four rooms for persons with
hearing impairments. These rooms shall be provided with visible and audible
alarm-indicating appliances activated by both the in-room smoke detector and the
building fire-protective signaling system.
17. Provide an analysis showing that shrinkage of the wood framing will not have an
adverse effect on the structure or any plumbing, electrical, or mechanical systems
or other equipment installed - U.B.C. Section 2318.
18. U.B.C. Section 504.6.4 prohibits roof openings within 5' of an area separation
wall. Verify that the ridge vent complies.
19. Be advised that any underground ducts such as detail 5/M-2 would require an
additional drainage system - M.S.B.C. Section 1346.1009.
20. Verify that all accessible restrooms have vertical bars. Revise 7/A-7, 33/A-7, and
any remaining details.
21. U.F.C. Section 11.302b prohibits the placement of any dumpsters within 5' of
combustible walls - add ballards, or revise as needed.
If you have any questions or concerns, please contact me at 681-4699.
Sincerely,
?'t
Dale Schoeppn
Senior Inspector
DS/j s
?w
September 22, 1997
jahnson,sheldon,sorensen
AR.CBITECTS, Innc.
201 aw 4th atreet
W111TilAX', Iilri 562io1
Mr. Dale Schoeppner, Senior Inspector
City of Eagan
3830 Pilot Knob Road
Eagan, MN 55122-1897
Re: Hilton Garden /nn
Eagan, Minnesota
Dear Mr. Schoeppner:
We have reviewed the issues raised in your review letter dated September 12, 1997 and provide
the following responses, numbered to correspond to your letter:
Excavation observation; compacted fill testing, and concrete testing will be performed by
Braun Intertec in Minneapolis. The structural engineer designed the concrete and masonry
to preclude any special inspections on this project.
2. See attached for energy calculations.
3. Refer to correspondence dated September 16, 1997 regarding this item.
4. Will comply.
5. Pool accessibility will be accomplished by the use of a portable handicap lift provided by the
pool contractor. Floor insert locations for this lift will be coordinated with this contractor.
6. We will provide one additional draftstop in the attic of the northern portion of the Building to
comply. An opening will be provided in the draftstop, with self-closing and self-latching
access door.
7. Two copies of final kitchen equipment plans are enclosed.
8. Will comply.
1.1
1972-1997 Celebratirag 25 Years of P'rofessioazai Service to our Client
nvnnetonka office: Ph 8I2-936-=7 Faa: 612-938-0879 wfllrrrer affiae Ph: 320235-7776 Fas: 320 236-8878
9. Attic ventilation calculations:
a. Attic Area =- 13, 511 s.f.
1. Required ventilation area = 90 s.f.
b. Ridge vent: 200 ft. X 17 sq. In./ft = 3,400 sq. In. = 23.6 s.f.
c. Gable vents: 112 s.f. x.60 (60% free area) = 67.2 s.f.
d. Total vent area provided = 90.8 s.f.
10. Refer to Addendum No. One, item No. 13b.
11. Sound tests of flooNceiling and wall assemblies are enclosed.
12. S.T.C. rating or corridor entrance doors is 31. (See attached letter from door manufacturer).
13. Refer to attached sound tests for floor/ceiling IIC rating.
14. Will comply.
15. Refer to elevation No. 4 on Sheet No. A7.2 of the drawings.
16. Will comply.
17. Refer to structural calculations enclosed.
18. We will have contractor interrupt ridge vent for 5 feet of either side of the area separation.,
19. Will comply.
20. Will comply.
21. Will comply.
If you have any further questions or comments, please contact our office as soon as possible.
Thank you again for all of your assistance on this project.
JDH/smb
cc: Tom Torgerson, Jeff Greischar
Enclosure
1.2
8.61
M
? ??-
i
}t ?
O
?? wam
?- e
?
@1
ld ld
Post-it' Fax Note 7671 Date /
To SC a ?e From Peg°eS? (
Co./Dept. SCfo ?
co.
Phone #
Phone # p q
, . Fax# f_
t2
x
AID
POSt-It' F1X NOte 7671 Date
l Pagesl,? ?
To From
G C a? tilj^
Co./Dept.
C ?Q CO. / ^ e,
Phone # Phone #!/ 2 J ,, d A Q
10 ii / /
Fax # 5 - 4
l0(
?
-- ?!
0.11 ?
P ?
-AA F ---- ---
? .
i
? -----?
? II I
? ? -- -_ _-?
?
? I
? I
.
z
J
?
z
Q
a
?
O
J
u- 9
!? 3
?
?
?
i
i
i
i
69I2211937 08s01 612-542-9214 LIhlDELL ENGINEERING PAGE 61
_ . :.`?;r .. ..ir;,u`,? T :r.`i?K-' :'?-,. •..,?...? ,,.Y.?,.
- . ? ? ...,
.,........_,?,. :... v.... . .... . _:.
?
?'{'?!xKr'F?a_i • -r r-...?..i?N;,->;t^'r."_? G,e-?.r?-;.C]I't :{.e(??
..... .. . .. . t: .... ,. , c.. . :: i:?'r..•?_. '?" ;i, o=i 1. .^. i'::.,. * : ' IVi- C:RT'!Fh'f `I' fl; !
i:: .t f1 f C, r?- ?c i:_2 n:
t-jz;_.TUN cr,a*..i
F:in: . i7j'Au.lp ^?tijLEhdL:E 3 (3l
.?.;:;?%i:i4?r16?i"r'1.=.-?t??,F,.• d??:;?:t}Y ,T.#"?t'(?;J'f4i1'r.l'?]tC?:t;
Iq I) A, r•a['.I:.l..I...
Ye.t. n (612) 54.i_.:') 16.,_
9': t;¢±:?M'
r•r?:sr??r .•..r.i::i-<?;?;?ti
. ,.:. Y
?
T c- ,:::? --- ?
: ; :..,.",... •E.?- „6-..
p ..y.c.?°•:;.F..7??-:?'a•,a-,..
'C? :: r" fi?
------------------
?.?-___
; --_? f-- ?lxi;
'. T '
's 1_??'lY?` ?:v=t:imh f i Dc2te i
-----------------
Post-it° Fau Note 7671 Dof1- I
To p L From ]7 H
co.?. SS Vl/ '1 ?f c?'` LL ?N .
Pno? a Ph°na p?! 2 s?i2 - 9f
Fa7c r `. „? ?' ,? Faic R
~?? ? -,•,
?• ;.;cN€_PAt.. T NF'C15.11AT :E t.iiyJ
,., ? ?..
?._..t?. _..
F.{iid:r:Yi L. C1 i.: a '!; i ,ra f•lai sj ;"SnnRs,=,'f
1 Ri a 'w f. .y ?,: i 15
;-{r?.?+.,? Z rfj j.??'fC!` ?,-pre 1.?;-iy< _: :'tt::tSif? ?:.`,.i 4?EbP?Y' ?•r??> 1?.' 1.
.?i"If_i?'i?lC? ???'1'?'='?f.? .!:?lf?.: ?l:c'?. L-? .... '_.f ?G?Ci.S
L: .?1: •
1..'.,!i.rtr ?i?yF3r?: 1-lrtf;!1/M(.'.?teY.
74
Ea c3:.`:
f` 7 n, _ . A1' ... c . 17671
. ?.l .... .-.c.? :_ ! ?- s?.:^ a •i;,:;f-s
rc;,=: ? .??.L .,. i..?.:. ,-, ,?i('1!;5'?;F"t.li_'??.?_};? ?:ir,j:.q-.,i .......,w?; r?1-.... .
iw•.
: . . ... . . .e..
?Ir?ron^.3i.#;7.or:t-^::'1 ?-ib'tei7, F'.lP.. Afi3f.i.'iv+.'C)
..._..... .. ?. i?. t ??.: i-..tc ., t.. ... . . ?... M..:. . ... .: F-i r,.::.. t+.. ?... .. ,..>
,
,?. r a'c[If] .f ri=.F:? e?.-. ta :7s? =:r??+r r-,. : ?*?i ]: r i;:i fi .
. _. . , .....? .. . .,.._ . .
T.?die ?.Y/N.%
,Jf)?,r,'`;,:. ;'i p r,r'ia trat.i i.l1s f.: i::.r.!.!).k edy ria:{-FaYF..?S??
-
. .. r, . ?., ? ? ? w ^ r .. _.,,,...
c ... ?. c ?-,. .. ?•, , ... r,t:c r w i. t:?;? .sr?A :l na?! - - - - - - - - -__ _____
_ ,...... r. . .- ,..
c?i:c t ! f:i ?_! _ :`• .... . .a = . t" E_. ... W l^ '!: I. "? T. . . ?:.
ua? i:lf::?=:?;?:i1?S 7?,:t::c'.??•,^ ;fc?C:;Lt`.: <:?mr'.;?n'?:°..
t:re:r?67C:?naanr; c.>._.vc'alurs ?; ;f-...s•%iC'tr?Y"?? StJ.h?-?.ed ?s C?1"rtfli.-??C? --_......,........
VP.C<±• Y.N_h: 3e -J PP r 1, r:`;{;;z I I F'!Ci _
?
Er`+.t ;.f'rf"!7 .l7 .i7n E-s y_ , l.rl t..,s m;l'FC. ::} St 1`,...., d" Ct<? .
t."??.... ?!. Frf A. T!:--'-r?raf-f ? T. F i' C.: V%sE 0. j FI R 'F' }"tEF'.}T 9
.
.
?
_?w _
._.:.,...,,,.._---__._....-'---'---....._..___...----._.........,......,.,..,,__.._..__..._.._..._.._•--- --_.._ ............:.......:...,. ..._._
...._.._._._.__.
[:;a v i.ty ...
..
.
_:on t:.
.,W.e;r.Ea''.y ,
Bud•-»,.
1-?crr ... ., ' a rtf' a. {;tn
?..
._ .._ E`.k'r:.a
? r
F?--?:1.......?_?? N
.--.,!a.lutP
.
LS.._4ti._ ?i.n;-
?C
._._._._.._.__...._.........,.w...._?__..--..__.__---- ....___.___.,,,......_,_...----.___..._...--
Rfit'?"» n..l J,'-41o,r.?ci ?'ui, si,;JTrt.asc.i - ......... .... ....e.....u,.w.__
17 n'71 __,.__._..__..__.
% ... ?
_.__....
n. 0
0 , [;?2
t;,_ 0 :}7.
mtrp F:!'t'y' .6??,_i.ng
i,i_i_z ?.?-??2.. ?, -? Frr
;?'•1. t:: ?k
? ?
? c?
('?.C,%
G .
'' ? ?
Q71
+•
W l:r,li?. :Le%i:,3.,-M.?t t';k»IGM., i:lPF,;,r) 5090
-_.
.......
v.bL.J:'>
.?..? ..
Y y? +
'
)I,.?J.:f:
t.
I ?.?lr.a?..?
'
i?:14?'
.._,...
?.....
. i..
,
?"I„i;ly;li?, = .?.
c°!?li.:i?_}C'!
? 22. O : 4 r%
-.. •
Sn?. AG;' tlr,?.yIR R *m d, «i'a..;? :Jti:r't :..-e;i:l.
?--- _'-
?'.:':`. DE?_.iC:n :I.:...:X !.".t}?.. th°,.-an ri:r}{a
vicxCC'i .^,fT a; (::SN!rr.zi._..z:'-s"?C:E=
Fs'?rVE^,le_ipe C}E=s7.gn .d.e`1rC.CL(1tj'.f'I '{I'1 'i;t'.es:a do:aS,Sme:lts ie+ i_t:.C?s7.ske7i':; ia:i,ih .
.. , -:
i Fti?3a '._ a r rl ._ '., .. ?Y .. ? :1x tT .'?" q._:?'??;,;f.;:E;i wit}'i ',?'i:i.`?
_... .
n,..,.?Y;A "' ::x?1;i?1. ?•'rif? e':3C't> r 1hF: r"1S'"".r..,_?;-:?rri>>r?uc,1 n??F.x? 'S??,?';e_Cfi hiac c:iF y?.Cltlef.': i:.(?r a ..,).._c..}:
.. . ?
. . ,:.
Priri.=in;3;: F.:,r:yWops: i'ia t 4,t.1^pi'. ?"av :
a
Richasd A__Lindeli -----______ _?...; ------ ------- - ?-7.,f_..
tJote„
LABORATORIES, INC.
*411-
?
April 20, 1983
Gyp-Crete Corporation
900 Hamel Road
Hamel, MN.
This is in response to your request for an acoustical per-
formance opinion on the following floor/ceiling construction:
- 1" Gyp-Crete 0
- 3/4" Thick T&G Plywood Subfloor
- 12" Deep 2" x 4" Open Parallel Chord Trusses - 24" o.c.
- RC-1 Resilient Channel
- 5/8" Type X Gypsum Board
We field-tested a construction of this type with the only exception
being 3/4" Gyp-Crete was used instead of 1". The F-STC obtained
on this test was a 58.
E-+
c'n
An additional 1/4" of Gyp-Crete would result in a slight improve-
ment in the F-STC and can be reliably predicted by what is known
as the "Mass Law". •
The "Mass Law" formula is as follows:
TL = 20 log w+ 20 log f- 33
where - TL = Transmission Loss (dB)
w = Surfac2 Wt. (Pounds Per Sq. ^t. )
f = Frequency (Hertz)
The approximate weight of the proposed system would be 17.0 pounds
per square foot. The weight of the actual system in which the 58
STC was obtained was 14.8 psf. Taking the difference of 2.2 pounds
and plugging it into the formula results in an approximate 2 d3
increase in performance.
There are some other considerations, but suffice it to say an
F-STC of approximately 60 could be expected.
V truly urs,
? -
?
R. 0. Thomalla
Manager
f
2820 ANTHONY LANE SOUTH • MINNEAPOLIS, MINNESOTA 55418 • 612-781 -2603 • TWX (910) 563-3555 • CABLE: INTEST
A wholly owned subsidiary of Conwed Corporation.
GYP-CRETE SOUND TESTS
5-761-1 5/8" gypsum board, 2 X 10's, channel & R-11 Batts, 3/4" Gyp-Crete,
no floor covering - December 5, 1977
Rating: FSTC 60
5-761-2 5/8" gypsum board, 2 X 10's, channel & R-11 batts, 3/4" Gyp-Crete,
carpet & pad - December 5, 1977 - Rating: IIC 79
5-761-3 5/8" gypsum board, 2 x 10's, channel, 3/4" Gyp-Crete, no floor
covering - December 5, 1977 - Rating: FSTC 55
5-761-4 5/8" gypsum board, 2 X 10's, channel, 3/4" Gyp-Crete, carpet and pad
- December 5, 1977 - Rating: IIC 75
5-896 8" precast, no ceiling, 1/2" Gyp-Crete, no floor covering -
November 16, 1978 - Rating - FSTC 58
5-896-1 8" precast, no ceiling, 1/2" Gyp-Crete, cushioned vinyl -
November 16, 1978 - Rating: IIC 66
5-896-2 8" precast, no ceiling, 1/2" Gyp-Crete, carpet direct -
November 16, 1978 - Rating: IIC 75
5-905 5/8" gypsum board, Trus Joistg with channel, 3/4" Gyp-Crete, no floor
covering - December 12, 1978 - Rating: FSTC 62
5-905-1 5/8" gypsum board, Trus Joist@, ceiling nailed direct, 1" Gyp-Crete, no
floor covering- December 12, 1978
Rating: FSTC 51 .
5-905-2 5/8" gypsum board, floor Trus Joist@ with channel, 3/4" Gyp-Crete,
cushioned vinyl - December 12, 1978
Rating: IIC 61
5-905-3 5/8" gypsum board, Trus JoistO, ceiling nailed direct, 1" Gyp-Crete,
cushioned vinyl - January 10, 1979 - Rating: IIC 52
6-019-1 1/2" gypsum board, 1/2" asphalt impregnated sheathing over plywood,
2 X 10's, ceiling direct, 1" Gyp-Crete, no floor covering - January 18,
1980 - Rating: FSTC 50
6-035 1/2" gypsum board, 1/2" asphalt impregnated sheathing over plywood,
2 X 10 's, ceiling direct, 1" Gyp-Crete, carpet and pad, f
February 21, 1980 - Rating: IIC 75
Addendum to Intest Report No. 6-442-2, 6-442-3 and 6-442-5
6-442-2 5/8" gypsum board, floor trusses with channel, 3/4" Gyp-Crete,
cushioned vinyl - February 23, 1983 - Rating: IIC 53
6-442-3 5/8" gypsum board, floor trusses with channel, 3/4" Gyp-Crete, carpet
& pad - February 16, 1983 - Rating: IIC 74
6-442-5 5/8" gypsum board, floor trusses with channel, 3/4" Gyp-Crete,
no floor covering - February 23, 1983 - Rating: FSTC 58
?
?
Above by Intest Laboratories, Inc.
aklEnt6 CRNInI6
!
• P1SER9[4Ass 8477:5
?
Sitgle WoOd StIM wlth Rralltent Channd Illtall System
S1'C Teat No. Constumm Desaipdon Fire Test Fue Rating
6a WQi69 Single Nrooa awdc, reaMsne etunnel; aouels ltys?'!,'tY? •?t OSU T-3127 'f Hr. 4 ?
pI?m drywall sech side; ons shickness. 3'' ttick Wood
m?n0 HBLL 111S?AB??
sZ YVQS89 Single WCOd S[YOl. ?By1N9m ChBrni91; sho6"r Yt* 1YPB X N./k.
gypaum one tide. doude ?yar oet+er aide: a?s g?kk-
nsss. 3+,' 'ck Waod Frrmir?g Bon Insule[ion
? 50 MYP$230 t Single wood szuds, resicrent channei: e'v,g1e r,?,•rype 'x 08U 1•8l27 1 Nr.
gypaum arywau esen siEe: orte tltieknasa. 3'stuck Wood
Faminp Saa lnsuktion
46 W0769 Single wood swds, resRient ci+ennel, 5inG1e IeYer h• tYpo x' ? N.A
f•ram?q ?8?'= ; one inickrross, 3'/i tt? wooC
SiMgts Wood Stud Wall Systsnn
STC Tem No. Construc0ort Descripaim Fre Test F'rca Rating
45 W2869 SmqM wooa sn,ds t8? a.e.• douDie Wsr'h'iypmx' qyASUm tJ4 U305 1 Hr. •
dMeli ?ch side: one tfric?+ese. 3'h' d?ic£ Wood frsrt+'a+9
Bat[ Insaiation
40 W3469 Single wood stud9 t 8' o.e.: doubia laYer y,' typs'x' gypswri ? NA.
arywau or,e s;d.: engrelftw oa,er s;ee: aa,s tnidcr+ess. 3W
g+11c WooO Pramms ent (nsukton
99 MY2069 Single wood studs 16' o.c, air4e k? '/, type '' gypsum N.A
drywalt ea?echoon side; ons tnicknsas, 3'l??thiek Wood Fnminy mmai
Ben Insu
98 OCF42$ 5np1e wooa amea tB' o.e.: srt+yb Iavet Y,' eype'x' Qvpwm UL U308 1 M?.
Orywetl eech si0s: one tA+Ckne9a, 3'/,' dddc Wood Prmning
san insufation
' aaarng is asamer•d frvm tes?s wa+p ar?su+er eesen?e++ea a fs..a+ ?ere ot pype?u+? ary?riVr.
Soocrlie wr relera?w ero ?widobm &d ?vi0 m aob+ar0 war+ nvunr.
t tiatee m rne 3416um Aeeeeietbn 'Fee Rsemrsnee OsW Msnwl'
?
tc
zOd 1:0 N Z 3QIA&1i.ySo -w- ini-,;r ir T : 60 2- 6 '92 '80
; QUICK SELECTpR FOR SUUND ANQ
; FiRE RATED ASSEII+IBLtES
NOTES FOR USE OF QUICK SfIEGTOR
The consmxzion systems shown here are representadve ot the
many Gold Bond Orywatl p,zrtitions and ceilings that are perfor-
mante-verified by laboraoory cests. For a given Fire Resistance
Rating or Sound isolation va[ue, sim ty scan the appcopriate
columns. Design references pcefixe?by "Based on..." are exvap-
olations from test data on similar assemblies. tn all cases, the
variation does not diminish its fire resisNve qualides below Its
autgned tating.
IR the drawings, in meta!-stud parriuons where insularion ts shown
in half of the partition cavity, the insulatiort is required ?or sound
radn¢s only. Where shown across full cavity, insulation is
required for rir@ reting.
In the foltowing Quick Selector, Factory Mutuai Oesign Numbers
aro the Consuuction Oesignations shovn in the FM
"Specifcat;on Tested Procfucta Gutde.` Numbecs shown in
parentheses arc FM Design ntumbers shown in FM test reports
and on the Factory Mutuai labets imprPnted on Gold Bond Fire-
Shielc! Wallbosrds.
In the following lisangs,? 5/8° Fire-Shield G Gyfrsum Wallboarcd may
be substitueed ior 5/8" Fire-Shield in all designs listed [or 5/$"
F;rc-Shiefd. 5/e" Fire-Shield C must be used in designs (isted for
S!8° Fire-Shieid C.
GENERAL
REFEREiVCE
pescrtptions in rhe Quick Selecror tables are resumes. For copies of
tests and /or for detaited inFormadon, consuit your CoId Bond
representative or local district sales office.
Kfl' TO ABBltEVIATIONS:
U.L - Underwriters Laboratories, inc.
OS.U.- Building Research Laborarortes.
The Ohio State Univetsity
F.M. - Factory Mutual Research Corporation
GA- Gypsum Association
O.C. - Owens-Coming Fiberglas Cocp.
(Tests by Geiger & Hamme)
BBIY - Bolt Seranek & Newman
TL - InciicaEes oescs for Goid 8ond Building ProducLS,
A Nationat GYpsum QivEsion by Riverbank
AcousricalLaboratories
NCC - Coid Bond euild[ng Products, A Nationat
Gypsum Division
WHt - Wamoc&-Hersey tntemationat, Inc
U. of Cat. - Univeniry of Caitfomia
PFS - PFS Corporation
. ?rx?s:.:r.?.??-r?- = __-- =•-:._-. i=_ ___ . _ . ... _ _. .. - =-----
QUICK 8ELECTOR FOR SOUND AND P1RE RATED ASSEM8UE8
PariltlooVWaod framing (load-hearinp)
Na. Flre Rating Ret. Des[pn No. Desoriptloa 8TC Te:t Ne.
$iN6LE tAYER
1 45 min. UL U317 1f2' Fire-Shield G GYpsum Waliboara nailed bath sides 2 x 4 34 NGC 2761
stuQs.16' D.C.
FM W1-45 min.
1 hr. UL t1305 5/8' Fite-Shfeld Gypsum Wallboard or Fre-Snield MR 8aard 35 NGC 2403
4. nailed on botlt sidBS 2 z 4 w0od siuds,l6` O.C.
FM W18A-1 hr.
GA N+P 3605
3 1 hr. UL U3b9 518' FKe-Shiel4 Gypswn W8liboard or 5/S' Fire-Shietd MR Board 38 NGC 2404
..
4 sNds, 24' o.c.
nailed bnlh sidas 2 x
FM
' W168-1t?r.
GA IMP 3510
SINGLE LAYER (reSilient)
4 1 hr.
Ul BESed on
U305 5/8` Fite-$hield Gypsum YYallboard, scraw applied ro Gold Bond 43 NGC 2367
Re
ide anl
Chatnal
aced 24` o
c
on 2x4
ili
nt F
nln
s
R
} n
8
d y
,
g
p
.
. o
?
e
u
s
s
aced 1B' o
C
OUter side 5!6' Flre-Shtstd G
sum
f
d
' FM ase
o
W16A-1 hr, p
.
.
yp
s
u
5
Wallboard or 5(8' F+re-$hield Ma Board nailed direCt to studs.
5 1 hr, W1il 694-0200 5/8' Fire-Shield 6 Gypsum Wallboard, screyv ap0I?eG to Goid 50 8asad aa
GA 8ased on
WP 3230 6prid Resi[ient Futring Channal spaced 24' Q.c. ona Side OnEy,
on 2 z 4 stUds spaced 24' o.c. Other side 5/8' Fite-$nield 6 Tt 7T-138
? Gypsum WallbarQ screrr attacW dlrect to sluds. 3' m ineW
woa? (3 pcf} in stud ravity.
D4U8lElAYEH
8 S hr. FM W8-1 Ar. 1/2' Fite-ShielO G WallCoard or Fire-Srtiela G Durasan !aminated 45 NGC 232'
-
' (WP-141) to 1/4' gyPsum sound deadening wallpoard nailed to battt sides
GA wP 3341 2 x 4 swds. soaced 16" o.c.
7 2 hr. FM W8-2hr. 5/8' Fire-Shield Gypsum Wallboard bdse layer nail applled ta 40 Based on
? .(WP-360} both sides 2 x d wood sluds, spaced 24' o.c. Face layer 518" NGC G?63
GA YYP 4135 Fire-Shieid Gypsum Wai?baard nail applied.
8 est. Based on Two larers 5/8' Fre-Shie1Q Csypsum WaUCaard na+Jed ons side ta
' 50 NGC 2368
2 hr. FM W&-Z hr. 2 x 4 wood sfuds,l6
a.c. Two 12yers other side screw 2pp11ed to
? {WP-361) Gold 8ond Resi(ient Furring channels spaced 24' o.c.
GA WP 4135
INTROOUCTION 9
c 0 d '?14 I 3QI1SAIL,I.1 0? 7nZbfii L: 6 O 2-6 '9 2 '80
Weyerhaeuser
ugust 28, 1996
Mr. Rick Hill
Premdor/American
P.O. Box 218
- North Platte, NE 69103-0218
Dear Mr. Hili:
Composite Products Division
505 Sauth 336th, Swte 100
federal Way,'Nashington 98003
Toil Free (500) 458 7180
?
w?'•?.
.?• ?
..
1996 has been an interesting year for our Weyerhaeuser Marshfield Steam=Thru mill.
? j We appreciate all of your cooperation and itexibility. Here is an update for your
. ?. ;s.
information:
:?.-a: • Air Permit - during the last couple of months we have curtailed production to stay
within our air permit limit for gas usage. We have received our preliminary approval
for a new level that will permit our mill to maximize production. So, bring on the
,. -
. winter cold (but not to soon.) We're ready!
Sound 7esting Profiled Door Core - we have tested several doors with the Warnock-
ta, : Hersey labs to be able to provide you with data to put in your sales promotion
literature. Here's the results on the sound transmission loss (STC) on the
Weyerhaeuser 1-3/4" profiled solid particleboard core door- W-H STC rating of 31.
When you offer your customers molded skin doors with solid profiled door core, you
are offering them the opportunity to provide popular style doors at a attractive price
point under a solid wood door. And now the 1-3/4" finished door carries the highly
desirable fire resistant and sound deadening benefits. -
Ve thank you for your business and appreciate every time your customers "Ask for the
foor wifh the Weyerhaeuser core". Please think of us each time you use the mug
,nclosed
iince?rely ?. _
)ave Led?ng Karen Locke Thoms Denny Martinson
? =°?ae?o,.. . •
Genera lVfanager Region Sales Manager Mill Sales Manager
;:.
?;.
?V;:'
LARSON ASSOCIATES 612-682-9531
I.arson A,r,yuc.iairs, lne
ArcLiuayc and i?ngine<;r:
2:181 IzAru Rvanae N.i.:..
hulLdo. A•finnrs<tit.ry 51.11 :t
"lci. i612! 692 9530
Fax (61'?)614a 95:+ i
Septetnbcr 22, 1497
Mr. Paulltccb
Jahnson, Sheldoll, & Sorettscn Arcliitects
201 S. W. 4' Strcct
Willmar, MN 56201
)te: Niltnn (iardcn Inn
L"agan, Minnesnta
I)car Paut:
09-23-97 09:21 g.ei
This lctte" is in response to the F'lan Revicw compleied t,y the C:ity oi'
Lagan conccrning the above rcferenccd project. i have aitached my
catculations crf the shrinkage of the wood i'ramc strueturc. The tatal
shrinkage of the structure f'tom the rQOf tausses cinwn to the level of the
niain floor is 0,49". I feel that iliere will be na detrimernal ciTccts to the
structure due to shrinkage.
!f you have any questions please feel frce to c;all me.
Sinccrcly:
)a ?d K. l so , P.F..
.. ruc.-tural Engrncer
innesota Rcg. No. 15847
9788h1
.tkl-wd
LARSON ASSOCIATES 612-602-9531
?? 4. L.--'R?F.i r.'+t?,?,?--?.r ??.?N
?"?`7 IaQ?
09-23-97 49:22 P.02
uJUclO
. ..? ...-- - . .. . ...
4f9,aM MG `Tv Mr t g,°1,
,
d?11 ir'u D
??-
??r?r..?
r
„
d, 15? ?? a, ooq l
K I
I
f1Mr--
?.
O, 009 I= D, c?d,
fl7U f'y'?
-------------
1-7,) f--eDUPOITF l Z''N .?l 0149
??? L ,,hA,y rLiptt
-s-o
aor- -?-
V Oh
s fi,d9,19v ? , ??"Ld
? ? , r¢, g fa ?;??? ???µ?fl°
!
. b. ..?. .t ... .. ,
fc 11 ( -d' ` l0
BUILDI G INSPECI'IONS DEPT.
?
a
O
?
5/8' TYF'E'X' 6YP.50.
(2 LAYERS)
GAP BY LINEN
GHUTE SUPPLIER
90 MIN. 'B'
LABEL DOOR
? SPRINKLER HEADS
STFEL Gt?JTE SUPPORTS AT ROOF
AND EAGH FLOOR - BY GHUTE
SUPPL I ER ?FAB. LAUNDRY
6' SaM NSMATM rrP• GHUTE ASSEMBLY -
SEE SPEGIFIGATIONS
FOURTH FLOOR LEVEL
REYISED LINEN GHUTE GAP DETAIL
3/8' = I'-0'
.)l
-? nwiHILTON GARDEN INN II%25/q1 • ,oi• ?,46 ??
DRM PLR ? •,?, ??'?'
=-a"°"'
? EAGAN,MINNE50TA
from: B?14 ? 1?
PRO TFC T/VF /NSPECT/ONS
Date: - b/-- l ? -4)
? Bi1/Adams, P/um6ing /nspectvr Jan SevMon, Secretaiy
i Bi1/ Bryestle, Seniar InspectD? !0 ??ae Voels, 0.0,7strrFcti0n Ana/yst ?
! j?1 I Oa/e Schoeppner, Senior /Nspectai I Mai/yno Greenwood, Cterica/ Tech '
Da/e WegIehner, fire Marsha! - I Mike BaicIt, BUildiny /nspector ;I
I L'` Dirk House, P/umbing /nspectoi I Nancy Severs017, C/eiica! Tech
--
After revisw, p/ease initia! next to yaur name and pass on. Retuin tv me MtCC sveryose has examined. Thank you
? ?
Nov'°=,l4 "-'67 12: 56P JSS Wi l lmar
, f ohneon, aheldon, moa•ensen
201 uw 4th stvet
wilhMr, mn 6M1
November 14, 1997
Mr. Date 5choeppner, Seniar Inspedor
City af Eagan
3830 Pilot Knob Road
Eagan, MN 55122-1897
Re: Hilton Gardvn inn
Eagttn, Mlnnesota
1 320-235-8673 P.01
Pursuant to our phone conversetion, we are requesting approvel to modify the linen chute
terrnination datait per the attached sketch. Please let me know if this revised detail rneets with
your approval. Thank you for yaur assistance in thi5 matter.
sinc$reiy,
Jahnson, Shetdo» 8 SaleItsen
ARCHITECTS, Inc.
PCVJ t 4tL
Pau! L. Reeb
PLR.smb
Enclosure
1972-1897 Celebrating 26 Yean of FrofessiamLal8erv'fce to our Clieat
Adnneran" offfce: pl.: s7g-saw-6W17 ipim 6I84W6-aB7g ,vilhnur arrrce Plir asa9M 7T16 jrazr. 8901,Wl6eT9
R=96% 1 320 235 8673 11-14-97 02:01PM P001 #12
NoA/-14-97 12:56P JSS Willmar 1 320-235-8673 P.02
G,4P 5'f
GH4l1'E 5UF
?
foo
WaNr FRAME Rc7oF
A5 R.F-GUIREI7
-ffT
er
fJ P?r,?t/l
° 114514j"14-AV? A'?' ?
KTk? D? L?J
?'
?STE? GHt1TE SUPPORTS AT RDOF
AND) 916-H FLaOR - By rHUrE
f
?
5? ?wBv. 6?,Q c ?00?
??,?p l-L
?? K
9C7 MIN. B. ?,o?
U4BEL 1?OOR
SPRINKLEIZ IiEApr
FnP,BFA5. L.AUly17RY
GI-UTE A55EMBL1' -
SEE SPEciFicArIonS
FOURTH FLOQR LEVEL
(;? YI??t7 L1N?N GHUT? GAP DETAIL
> ..__ ?ILTt?N C?,?RI7E1? 1NN i%i4/91 ?? "•°?••?
v? EA6AN,MlNNE507A PLF, ? •r?? ??? ? ?,?
R=96S6 1 320 235 8673 11-14-97 02:01PM P002 #12
MON 02;4:' f'i :, SUPERIOR TRUSS FAX N0, 5078725185 P. ''
& Components
Hwy, 68 S. P.O. Box 366
Minneota, MN 56264
1-507-872-5195 Nat'l.1NATS:1-800-658-2566 Fax: 1-507-872-5185
4
March 2, 1998
Tech 8uilders .
Box 317
Fairmont, MN ,5603"
°? - -- - , ? ? -- .?--:
RE: NIL701V GARDFN I?l?I in EAGAN, lvlN G51"
_---- - //
t _
Nr. Mitoh Hilc4e,
in respvrise Co aur phone canversation on 3l2198 reguarding bearing condition on the roof trusses that bear on the
flush beams 3t the unit entries, my resear•ch shows that these trusses were designed with a 2x6 upright aver the bearn to
afiow a talereqc13 :or passibfe beam width variai'ion, The gap between the beam and the truss bottom chord does not
create a prot=iern kn #he structural integrity of thesta trusses to carry the design loads as spelled aut in the job specs andior
the building p+ans.
If yo? hav e any questions or concerns, please ftgl free to give me a call, (800) 658-2568
Thank yau.
Sincerel ,
?
Michael J. Snycier
Job Supervisnr
SUFERIdR TRIJSS & COMPONENTS
Mar-16-98 08s45R,J55 Willmar 1 320-236-8673 P.01
LRR90N A980(:TATrS 612-682-9531 - 09-15-99 W55 P161
4TMI gvo
6v? C?
Larsoa A=4dAlEss Ieee.
AnMods:nd gnRioecra
23$1 Ts6n Avomrc N,E,
hrA'a1n, Mienaapto SS311
Zei. (612)ldS2.y4V}
1''wt {tr)2?AN?•?i?Al
March 14, 199$
IVIr. Pal Reeb
Johnson, Sheldon, & Soressen ArChiteaa
201 S.W. 4+` stfm
WiAmer, MN 56201
Re: Hitwn Garden Inxt
E4gan. Mimpesata
Uear Psul:
TU parpoae Of this krta is to discuss the colum supportiag the two
W 12 x 26 ned beam dkectay cast of the ekvator 9haft, wtuch snppon
the fAoor of the adrotrd L-vei. Oae beam beers iutc the rxcerior wall
totm 4t the South od urd framc3 irto the seco1ld stet1 be= at its
apposiie emd. 7'he south ecd is nww auppaetad by 4- 2 x6 studs. The
other lae4m vvhich rms east-uvpt is auppotW by 4- 2 x 4 studs directay
adACent to the maaonry eievtRor sbaft. You askad that i verify the
struatutaJ adequacy of the twv bwa'lt-up vaaad caluams.
1 Lave rcviewed the loads af theae two bcaas bevmg on the multipde
wood studs. Both coluams will adequal}y aupprt the supeimWsal
ba&
If you have any quescioas please feei frcC to c&ll me.
Sincerely:
J K. P.E,
truwtural Bagioeer
MinrMta Rog. No. 15847
97tiHh?.
}kl
PpO-itO F9x IVGte 7671
?//(r 9°ey
Date .?/
4461,
Y° he 3 1c-? I From OV.- I`"%
ca.roem. 1-1 tw rua,;,c co. J. s."l .
Phona n PhonD *
FaK ?! Fax 0
? r
? ...
Department of Administration
July 2, 1998
Nue & Torgerson
335 Benson Ave. S.W.
Wilimar, MN 56201
RE: Hydraulic Passenger - Elevator ID# -04354PT97-01
Site: Hilton Garden Inn, Car #1
1975 Rahn Cliff Ct
Eagan, 55122
Dear Sir/Madam:
The Minnesota Elevator Safety Code provides that the Minnesota Department of Administration, Building
Codes and Standards Division, Elevator Safety Section issue a letter of approval for all elevators,
dumbwaiters, escalators, moving walks, wheelchair lifts and manlifts (endless belt lifts) before they can
be legally put into service in Minnesota.
We received a letter stating that all recommended corrections have been addressed. We will
acknowledge that certification. This letter will serve as official approval for you to operate your elevator.
If at any time we find that the recommendations were not corrected, we will take action to assure
compliance with statute, rules and adopted codes.
NOTE: Compliance with Minnesota Rules and the ANSI/ASME A17.1, Safety Code for Elevators and
Escalators does not necessarily assure compliance with the Americans With Disabilities Act
of 1990.
Sincerely,
BUILDI G CODES AND STANDARDS
J hn P. Roche
State Elevator Inspector
jr/rkr (CE-4)
c: Reid, Douglas Michael, BO, City of Eagan
Schindler Elevator Corp.
Tech Builders
ElFormCE4
Building Codes and Standards Division, 408 Metro Square Building, 121 7th Place East, St. Paul, MN 55101-2181
Voice: 612.296.4639; Fax: 612297.1973; TTY: 1.800.627.3529 and ask for 296.4639
" ??_.,_?- ? ???? $M
1 NTE RTEC
May 21, 1998
VIr. Tom Torgerson
Torgerson PropeRies, Inc.
335 Benson Avenue Southwest
Willmar, MN 56201
Dear Mr. Torgerson:
Broun Intertec Gorporation
6950 West ldbth Sfraet, Suite 131
Apple Valiey, Minnesota 55124-8520
612-431-4493 Fax:431-3084
Engineers and Scientrsh Serving
the Built and Nafvra! Environmenh
Project BODX-97-313C
Re: Construction Observations and Materia]s Testing Sezvices, Hilton Garden Inn, Eagan,
Minnesota
This report summarizes the results of our construction observations and materials testin' for
the Hilton Garden Inn located in Ea;an, Minnesota.
The services provided included test pit observations, excavation observations, compaction
testing during the site 3rading, concrete testing and test roll observations of the pavement
subgrade.
Our services were performed in ;eneral accordance with our cost estimate dated Septem6er 8,
1997, (proposal BABX-97-7404).
Geotechnica! Report
Soil borings were performed by American Engineering Testing, Inc. (AET) from 7une 23 to
lune 25, 1997, for this project. Results of the soil borings were included in AET's
Geotechnical Exploration and Review dated June 27, 1997, presented under job number AET
#97-2041. The review ?ave a summary of the soil conditions encountered at the site and
recommendations for building subgrade preparation and pavement preparation. The soil
borings encountered existin; fill soils which were generally considered suitable for support of
the proposed buiiding.
Proposed Construction
The proposed building will be a slab-on-;rade, four-story, 100-unit hoteL The building
footprint is about 16,600 square feet with iinish tloor grade at elevation 929.0 feet. The
building will be supported by rypical spread footings designed with a soil bearing pressure not
exceeding 2,500 pounds per square foot.
I/
Torgerson Properties, Inc.
Project BODX-97-313C
May 21, 199$
Page 2
Associated with the building construction will be site utilities and asphalt pavement
construction.
Test Pit Observations
TesC pit observations were performed by a senior engineering assistant on September 10,
1997. The test pits were performed to a depth of approximately 5 to 6 feet with a backhoe.
Soils encountered in the test pits were previously placed till soils primarily consisting of
clayey sand and silty sand that were judged to be in a loose to medium dense condition. On
the north end of the proposed building, the upper 3 to 4 feet of the existing fill was in a loose
condition and contained a layer of topsoil till with some vegetation. We recommended
subcutting the north end of the proposed building about 3 to 4 feet to approximate eievation
924 and reestablish grade with engineered fill. Attached is the Daily Observation Report
submitted to Mr. Mitch Hilte of Tech Builders, Inc. after the test pit observations.
Excavakion Observations and Compaction Testing
The excavation observations were conducted by a senior engineering assistant on September
13, 1997. The excavation observations consisted of observing the soils exposed in the bottom
and side walls of the excavation. The approximate density or consistency of the soils
encounteretl were judged by estimating the force required to advance random, shallow (about
1 to 3 feet deep) hand auger probes. The soil classifications were determinetl in accordance
with the American Society for Testing and Materials (ASTM) procedures while examining the
hand auger probe cuttings.
The layer of topsoil till was removed from the north end of the proposed building with
dozers. The bottom of the excavation ranged from about elevation 924 on the north end to
about eievation 925 on the south end. Soils encountered at the excavation bottom were
previously p(aced till soils primarily consistin- of silty sand and clayey sand that was judged
to be in a medium dense to dense condition.
Approximately 2 to 3 feet of engineered fill was placed in the building area to establish
subgrade elevation of 927. The till soils were on-site silty sands that were placed in about
8-inch to 12-inch thick lifts with a dozer then compacted with a large, vibratory, sheepsfoot
roller. A total of four compaction tests were performetl in the engineered till placed for
building support. All tests met or exceeded the minimum density requirement of 95 percent
of standard Proctor density (ASTM D 698). The compaction test results and Proctor curve
have been previously submitted and are attached to this report.
Torgerson Properties, Inc.
Project BODX-97-313C
May ZI, 1998
Page 3
Prior to concrete placement, the soils at footing subgrade were also observed. The soils
mainly consisted of previously placed silty sand and clayey sand till that were judged to be in
a medium dense to dense condition.
Concrete Testing
Concrete testing was performed by an American Concrete Institute (ACI) certified Level I
technician. The testing consisted of determininb the slump, temperature and air content, as
weil as casting test cylinders (sets 1 through 5) for evaluation of compressive strength of the
concrete. The concrete was tested as it was discharged from the truck for footings, walls and
slab-on-grade. Review of the 28-day test resuits indicate the concrete represented by these
cylinders has met or exceeded the specitietl minimum 28-day compressive strength. The
concrete test results have been previously submitted and are attached to this report.
Test Roll Observations
Test roll observations of the pavement subgrade soils were performed between May 7 to May
18, 1998, by a senior engineering assistant. The test rolls were performed with a loaded
double aacle tandem and a rubber tired loader with a full bucket. The subgrade soils primarily
consisted of silty sand and clayey sand. Various areas of unstable pavement subgrades were
observed. Due to the construction schedule the asphalt pavement was placed. It should be
anticipated, that there will be some pavement areas that will require more then normal
maintenance and a shorter pavement life. Attached are the Daily Observation Reports that
were submitted to Mr. Hilte of Tech Builders, Inc. after each test roll.
Conclusions
Based on the results of our test pit observations, excavation observations and hand auger
probes, it is our opinion the soils encountered in the excavation bottoms are suitable for
support of the proposeti building.
Based on the results of our compaction testing, it is our opinion the engineered till placed was
adequately compacted for building support.
Based on the results of our concrete testing, the concrete tested has met the 28-day
compressive strength requirements.
Based on the results of our test roll observations, it should be anticipateri that some of the
pavement areas will require more then normal maintenance or a shorter pavement life due to
the unstabie subgrade.
Targerson Properties, Inc.
Project BODX-97-313C
May 21, 1998
Page 4
General Remarks
Services performed by the geotechnical engineers for this project have been conducted with
that level of care and skill ordinarily exercised by members of the profession currently
practicing in this area. No warranty, expressed or implied, is made.
It has been a pleasure providing these services for you on this project. If you have any
questions regarding this regort or the attachecl results, please contact Dave Youngstrom or
Greg Bialon at (612) 431--493.
Sincerely,
--
David T. Youngstrom
Senior Engineering A si ant
Professional Certitication:
I hereby certify that this plan, specification or report was
prepared by me or under my direct supervision and that I
am a duly Registered Professional Enaineer under the laws
of the State of Minnesota.
?
4mr
Gregory . Bialon, PE
Project Engineer
Registration Number: 24017
Attachments:
Report of Field Compaction Tests, Tests 1 to 4
Proctor Curve, P-1
Compressive Test of Concrete Cylinder Results, Sets 1 through 5
c: Mr. Jeff Greischar; Tech Builders, Inc.
Building Inspection Department; City of Eagan
dty\gjb:skg\97313c\cpt
U SM
i NTE RTEC
DAILY OBSERVATlON REPORT
Project #: ?0? q?- ??3C Report #: f
?ocation: ?0 ?/'t?G???vr ? 0. Date:
6
Personne!
Classification Regular
Haurs Overtime
Hours
m, r U ,1so el
,
/
v?. ?'?? ' ?;??
Areas and work performed this day:
,?'??-r/?/?
? r
;?, ?? ,1????`?J?, ?-??. .
CZpprT J4f? ?? GctGS oa-h924 /60,17'?
' r? O? ??/?a' -% l ,5?•? ? ?'? ??r? ?GG?' /?'.?o . ??`? i
/t t
i. f ?
? ?ai?1 .'?u?{?' '?'?s."???j??f?? , ?? ???r/G?O?t ?Z?, ??r???r?cr? ?4?G?.?
A ?r?A /4?4 74 '24 ? rX1/? T? i /s eA601JI ?rcr? in '
j
7 'f' 7
..r?l? LTd??? I'?L•`? ''?i ???.?L ?' t71 s ?t i 7?-
( ?-
? ?????qz9
Weather: .? 0 ? ??,aAl Performe ?
Submitted To: ?`?IIS??! AKIi F: DAILY 1
ooR-o,
BRAUN$M
INTERTEC
DAILY OBSERVATION REPORT
Project #: Y 2? XT I -?k-S C- Report #: P1Q,
Location: ?Al ?vA Date: 5 - -7 ~ ? g
r
_>?? N GAn I tMv?
Personnel
Classi#ication Regular
Hours Overtime
Hours
ykq! F>oq , r i. C.?. J.?
J ..
Areas and work performed this day:
S1" ?o?? wC?S
S t?1?`;'L1 ;AAAN. ?,J
??? WY ?.v1 ' S 1 ??
-?? 'S ? 1\
?v 1° ? ,.s,z.w'?.Y?,/l.'Lt/(/? L?-?'`- ?
C?Q',
?titG'vY'?e?f CJrn.?`?`?`?-?-? wC.
?? t f eC,?PIA ",-,0-E-(p. vw5 .Lat,,e r,;?-e? s ? ?ubCti-? o?
? y
I
"Ct.o
a ?
Weather: Performed By: 1 ` t 1
Submitted To: V?J+)A_ w F: ILY 1 I f-T" DOR-01
BRAU SM
I NTE RTEC
DAILY OBSERVATION REPORT
Project #: Report #: R- (S A , ?z
L ocation: Date: 3--?'iL
Personnei
Ciassification Regular
Hours Overtime
Hours
Areas and work performed this day: 5?" waS ?.(6S-f1^^10 q
csv\k?..?. U G
-6b V C?.
?C'i k tn.Z'i?'-C'2 v ?fcsvv` ?J?a_e 1?.?? S Crnu t.evt Ut
? t?.. C?M,?C" f 0. i? S. ? 2 ? 2C?N?? ?? ???" Gc,V''?. ?2.
?11
CO?S?v C-T? ??('C?. nC ? Cc I, l? `(?C?,YQU ? - C?? ?iv`E?(
?c. la!?z C?CL ol r? ti
s ca;ti ? aUA 6,(Vf
pAat 11 -
(? 6
Weather: Performed By:
F: AILY 1
Submitted To: W
U
DOR-01
BRAUN$M
i NTE RTEC
DAILY OBSERVATION REPORT
Project #: .??StXq?-313L Report #:
Location: Date: SJ ? ?- ? $
Personnel
Ciassification Regular
Hours Overtime
Hours
4cu 4? ?-- `? G
Areas and work performed this day:
A s? lbu - av e I
? a
La.v L-e.o,
J
?sf ?? . s?? ? -?(A" C-??? ?,e,A?d
,,,a ?`? ???? a?2?s a?- ? v-? C f?' -?-o Z'`? a??' C?r?'ac?: ? (J-e
??.u-?; T LZ ?? c ?
?s -tfA
\r.Q v 1 cM'C'2 --?? V\ kl? 6\C VA ?. ? w?a, I ti?4 ??.?-?f
c,vv( r,5i .Qtl iAz244 4? 1-2 r-2 maq,? w?evc C,6v rre
tS ??aCl?o? . --
c? <
Weather: Performed By: , - '
Submitted To: F: AILY 1
ooR-oy
• ?
. . , • B RAU NSM
I NTE RTEC ?
Report of Field Compaction Tests
Date: October 20, 1997
Client:
Mr. Tom Torgerson
Torgerson Properties
335 Benson Avenue Southwest
Wilmar MN 56201
Project: BODX-97-313C
Project Description:
Construction Testing Services and
Special Inspections
Hilton Garden Inn
EaQan_ Minnesata
Report• 1
?I
est
ate
ype
Soil
ID and
Classification
Optimum
Moisture*
(%) Max. Lab
Dry Density*
(Std.Proc.)
(pcf)
Inplace
vioisture
(%) Inpiace
Dry
Density
(pcf)
Relative
Compaction
(%) Sperified
btinimum
CompacY.
(%)
omments
1 10/16/97 N P-1: SM 101/z 126 11 124 98 95 A
2 10/16/97 N P-1: SM 10'/z 126 11 122 97 95 A
3 10/16/97 N P-1: SM 10'/? 126 13 121 96 95 A
4 10/16/97 N P-1: SM 10'/z 126 12 120 95. 95 A
Key: N = Nuclear, ASTM D 2922 A= Test results comply with specifications.
SC = Sand Cone, ASTiVi D 1556 B= Test results do not comply with specifications.
* = O.M. and M.L.D.D. rounded to nearest 0.5
Test Test Location Elevaiion
1 40'S, 13'W of NE building corner (below floor slab) 927
2 75'S, 15'E of W buildin; corner (below tloor slab) 927
3 5'N, 10'E of SE building corner (below tloor slab) 926'/z
4 30'N, 20'E of SW building corner (below floor slab) 9261/2
I
i
Elevation Reference:
c: Mr. Jeff Greischar; Tech BuiIders, Inc.
Braun Intertec
M. Samuelson
Manager
973 13c\cu.l
v'
, B RAUH5M
1 NTE RTEC
Laboratory Compaciion Characteristics of Soil (Proctor)
Date: October 20, 1997 Project: BODX-97-313C
Client: Description:
Mr. Tom Torgerson Construction Testino Sarvices and
Torgerson Properties Special Inspections
335 Bzuson Avenue Southwest Hilton Garden Inn
Wilmar, MN 56201 EaQan, Minnesota
Fie1d Data:
Date Sampled . 10/10/97 Test Number . P-1
Samplzcl By . JMS Location Sampled .
Classification . SM: Silty Sand, fine- to medium-rained, brown
Laboratory Data:
ASTM D: 698-91 Procedure: standard B Date Testerl; 10/13/97
As Received Water Content: Prep. Method: wet Rammer Type: manual
Sieve Data, % on 3/4": 0 3/4"-3/8": 9'0 3/8" -#4:
Size of "Oversize": Percent Oversize: Spec. Gravity: 2.65
r`.,.t,P Vah,ec C nrrPr.terl Values (ASTI?f D 4718)
Maximum Dry Unit Weight, pcf
Optimum Water Content, ?'o
128
126
•? 1224
G
.v=o
3
? 122
?
G
120
118
Water Content, ?'o
126 cf f
10'fz % %
Z--ro Air Voids
Qme
S.G. =2.65
(Assumzrl)
9'7313c\p-1
( g 10 12 14 lb
.. . . . . - . . - . . . ?, V J
,. ?. . . . : , l. ? . . ? . . . . _
. ?. . u,? , ...-_ . . , . .. : . - - ?
' SM . ... , y _ _
I NTE RTEC - -
Compressive Test of Concrete Cyiinder
Test Method: ASTM C 39, 6" x 12" Cylinder .
Date:
November 20, 1997
Project Number: BODX-97-313C
Client;
Mr. Tom Torgerson
Torgerson Properties
335 $enson Avenue Southwest
Wilmar, MN 56201
Project
Description-
Construction Testing Services and
Special Inspeciions
Hilton Garden Inn
Eagan, Minnesota
A:
Number. 1 Miz Design: 3000 #1
e Cast: 10/23/97 Supplier, AVR
ie Cast: 8:20 a.m. Specified Air: none specified
asured Slump: 1'fi" Specified Strength: 3000
isured Air: 3.1 % Truck or Ticket No.: 136
icrete Temperature: 62°F Cylinders Per Set: 3
Temperature: 35 °F
inder Cast By: JDF
uid Added at Site: none
iple Location: Footings: 60'S, 10'W of NE footing comer
ield Notes:
Sample Date Test Fieid Lab Test Max Load Cyl Area Compressive Remarks
No. Recvd Date Cure Cure Age (pounds) (sq in) Strength, psi Code(s)
lA 10/27 10/30 4 3 7 96140 28.30 3400 F
1B 10/27 11/20 4 24 28 122560 28.30 4330 K
Specified Streugth at 28 Days (psi): 3000
Remarks:
F: The specified 28-day strength was met at the 7-day age according to the above test results.
K: The above 2$-day test result meets the required design strength.
c: Mr. Jeff Greischar; Tcch Builders, Inc.
Braun Intertec Corporation
w
M. Samuelson
Branch Manager
973 23c\coric.l ?
0:? ??*? : ? . ? ?•<. ?y????? ???,?
? '
? ,', . ... ? . . .. . .
? U ?
?
~
...'fi??T?.??
.?
Client:
Mr. Tom Torgerson
Torgersan Properties
335 Benson Avenue Southwest
Wilmar, MN 56201
Project
Description:
Construction Testing Services and
Special Inspections
Hilton Garden Inn
Eagan, Minnesota
Temperature: 40°F
inder Cast By: JDF
uid Added at Site: none
iple Location: Footings: SE comer to SW comer
,LD DATA: DESIGN DATA:
Number: 2 Miz Design: Miz #1
? Cast: 10l23/97 Supplier: AVR
e Cast: 9:15 a.m. Specified Air: noae sQecified
isured Slump: 3'fz" Specified Strength: 3000
isured Air: 3.2 % Truck or Ticket No.: 175
icrete Temperature: 64°F Cylinders Per Sei: 3
Notes:
Sample
No. Date
Recvd Test
Date Field
Cure Lab
Cure Test
Age Maz Load
(pounds) Cyl Area
(sq in) Compressive
Streagth, psi Remarks
Code(s)
2A 10/27 10/30 4 3 7 89360 28.30 3160 F
2B 10/27 11i20 4 24 28 113960 28.30 4030 K
Specified S treugth at 28 Days (psi): 3000
Remarks:
F: 'I'he specified 28-day streaath was met at the 7-day age according to the above test results.
K: The above 28-day test resuit meets the reqnired design strength.
c: Mr. Jeff Greischar; Tech Buiiders, Inc.
Braun Intertee
k.?,
?? .
???_
v
B RA $M
I NTE RTEC Compressive Test of Concrete Cylinder
Test Method: AS'TNI G 391 6" x 12" Cylinder
Date:
December 4, 1997
Ciient:
Mr. Tom Torgerson
Torgerson Properties
335 Benson Avenue Southwest
Wilmar, MN 56201
Project Number: BODX-97-313C
Projecs
Description:
Construction Testing Services and
Special Inspections
Hilton Garden Inn
Eagan, Minnesota
FIELD DATA: DESIGN DATA:
Set Number: 3 Mix Design: 4000
Date Cast: 10/29/97 Supplier: AVR
Time Cast: 3:10 p. m. Specified Air: 6%
Measured Slump: 41k" Specified Strength: 4000
Measurerl Air: 6.3 % Truck or Ticlcet No.: 118
?Concrete Temperature: 75°F Cylinders Per Set: 3
Air Temperature: 50°F
Cylinder Cast By: JDF
Liquid Added at Site: none
Sampie I.ocation: Wall 50'N of SW corner of buildin-
z
Notes:
Sample Date Test Field Lab Test Max Load Cyl Area Compressive Remarks
No. Recvd Date Cure Cure A;e (pounds) (sq in) Strength, psi Code(s)
3A 10/30 1115 1 6 7 107990 28.29 3820 B
3B 10/30 11/26 1 27 28 155950 28.29 5510 K
3C 10/30 HOLD
Specified Strengtb at 28 Days (psi): 4000
Remarks:
B: The 7-day test result projects that the specified strength will likely be met at the 28-day age according to
a typical strength age relationship.
K: The above 28-day test result meets the requirerl design strength. c: Mr. Jeff Greischar; Tech Builders, Inc
97313c1conc.3
Braun Intertec C,
J es M. Sa e
ranch Manager
k _.
:
. °f
, i.
? ? . .• _'.. . , .. .. :,. ' " . ` . `
.. . ... . _.._ C' .. .. ?. .'_ . ' ' _ _ . . - . .. ? . ??? .. , . .
Date:
May 19, 1998
Project Number: BODX-97-313C
Client:
Mr. Tom Torgerson
Torgersoa Properties
335 Bensan Avenue Southwest
Wiimar, MN 56201
Project
Description:
Coastructioa Testing Sarvices and
Special Lispections
Hilton Garden Inn
Eagan, Minnesota
FIELD DATA:
Set Number: 4
Date Cast: 12/23/97
Time Cast: ' 8:45 a.m.
Measured Slump: 6"
Measured Air: not determined
Concrete Temperature: 75°F
Air Temperature: 28°F
Cylinder Cast By: DMR
Liquid Added at Sike: noae
Sample Location: Slab-on-arade:
Notes:
Mix Design: 5.5 B6
Supplier: AVR
Specifieii Air: none specified
Specified Strength: 4000
Truck or Ticket No.: 140
Cvlinders Per Set: 4
72'S of NW envelope comer
Sample Date Test Fieid Lab Test Max Load Cyl Area Compressive Remarics
No. Recvd Date Cure Cure Age (pounds) (sq in) Strength, psi Code(s)
4A 12J26 12/30 3 4 7 106310 28.27 3760 B
4B 12/26 1/20 3 25 28 168560 28.27 5960 L
4C 12/26 1/20 3 25 28 167570 28.27 5930 L
Specified Strength at 28 Days (psi): 4000
Remarks:
B: The 7-day test result projects that the specified strength will likely be met at the 28-day age according to
a typicai streflgth age relationship.
L: The average 28-day test result meets the required design strength.
c: Mr. 7eff Greischar; Tech Builders, Inc.
Braua Intertec
i?
ranch Manager
91313c1conc.4
?
Client:
Mr. Tom Torgerson
Torgerson Properties
335 Benson Avenue Southwest
Wilmar, MN 56201
Project
Description:
Construction Testing Services and
SpecialInspecrions
Hilton Garden Inn
Eagan, Minnesota
FIELD DATA: DESIGY DATA:
Set Number: 5 Mix Design: 5.5 B6
Date Cast: 12/23/97 Supplier: AVR
Time Cast: 9:10 a.m. Specified Air: none specified
Measured Siump: 4'/a" Specified Streagth: 4000
Measured Air: not determined Truck or Ticket No.: not given
Concrete Temperature: 70°F Cylinders Per Set: 4
Air Temperature: 28°F
Cyiinder Cast By: DMR
Liquid Added at Site: none
ISample Location: Slab-on-grade: 50'S of NW envelope comer
IField Notes:
Sample
No. Date
Recvd Test
Date Field
Cure Lab
Cure Test
Age Max Load
(pounds) Cyl Area
(sq in) Compressive
Stren;th, psi Remarks
Code(s)
SA 12/25 12/30 3 4 7 104900 28.27 3710 B
SB 12126 1/30 3 S 28 179400 28.27 6350 L
SC 12/26 1/20 3 25 28 162280 28.27 5740 L
Specified S trength at 28 Days (psi): 4000
Remarks:
B: The 7-day test result projects that the specified streugth will likely be met at the 28-day age according to
a typical strength age relationship.
L: The average 28-day test result meets the required design strength.
c: Mr. Jeff Greischar; Tech Builders, Inc.
Braun Intertec
M. Samuelson
i Manager
91313c\cone.5
.?
.«;.
-,
. .. „? . .. - . • , _ . _ =°'. x . -..
1 t
CROSS PARKING EASEMENT AND ACCESS EASEMENT AGREEMENT
THIS EASEMENT AGREEMENT entered into this _,_?S ?day of July,
1989, by RAHNCLIFF CROSSINGS, INC., a Minnesota corporation,
("RAHNCLIFF"), witnesseth the following:
R E C I T A L S
WHEREAS, RAHNCLIFF is the fee owner of real property located
in the City of Eagan, County of Dakota, State of Minnesota, lega2ly
described as:
Lots One (1) and Two (2), Block Three (3), Rahncliff 2nd
Addition, and
Lot One (1), Block One (1), Rahncliff 3rd Addition
("RAHIdCLIFF PROPERTY"), see also Exhibit "A" attached hereto, and
WHEREAS, RAHNCLIFF is executing this Easement Agreement to
fulfill the access and parking requirements of the City of Eagan
made in conjunction with the development of the RAHNCLIFF PROPERTY.
NOW, THEREFORE, in consideration of the foregoing facts,
RAHNCLIFF does hereby agree as follows:
1. RAHNCLIFF as the fee owner of the RAHNCLIFF PROPERTY for
itself, its successors and assigns hereby agrees that if at any
time in the future any portion of the RAHNCLIFF PROPERTY is
conveyed to a separate owner, RAFNCLIFF, its successors and assigns
agrees tv grant perpetual non-exclusive easements for cross parking
and access over, across and between the three lots comprising the
RAHNCLIFF PROPERTY.
2. The access and cross parking easements contemplated in
this Agreement embrace both the right to park vehicles in certain
designated portions of the easement tracts and the right to reach
those portions by travel over the remaining portion of the easement
tracts which remaining portions will remain open so as to allow
this access. The easements contemplated herein shall be subject to
review and approval by the City of Eagan. Notwithstanding anything
herein to the contrary, no transfer of any portion of the RAfIlNCLIFF
PROPERTY shall take place without the approval of the City of
Eagan. This approval will be conditioned on the grant of the
easements described herein.
3. This Agreement shall be recorded with the Dakota County
Recorder so as to provide notice to the owners and future owners of
the RAHNCLIFF PROPERTY. The owners shall provide and execute any
and all documents necessary to implement the recording of this
Agreement.
4. RP.HNCLIFF mutually recognizes and agrees that all terms
and conditions of this recordable Agreement shall run with the land
herein described and shall be binding upon the heirs, successors,
administrators and assigns of the owners referenced in this
contract.
IN WITNESS WHEREOF, we have hereunto set our hands.
RAHNCLIFF CROSSINGS, INC.
A Minnesota Corporation
By: B. Buric Smith
Its: Vice-President
-2-
STATE OF MINNESOTA)
)SS.
COUNTY OF DAKOTA )
The foregoing instrument was acknowledged
Public, on the 75 day of 1989, by
Vice-President of RAHNCLIFF CRO SINGS, INC., o
corporation. n
?nnnn?,n?nnnnnnnnnnn1
nn ??1M/V?MMA w
JCSEP;-;' P. EkRLEY
MIQ7A i: Y F
U!'LIC-Mlii}jEscra
' DAY,:;,-.4 COUt:.TY
? wrCo-'^m. Exp7rF5 qy3• 3, 1994
tbVMey17:^w'.
yr
v J'?YVY'?VV?.•,?V,?'?V'?VVVVW 1
THIS INSTRUMENT WAS DRAFTED BY:
McMENOMY & SEVERSON, P.A.
7300 West 147th Street
P.O. Box 24329
Apple Valley, NIId 55124
(612) 432-3136
JPE
-3-
before me, a Notary
B. BURICH SMITH, the
n behalf of said
EXHIBIT 9. : DE ?ELOPMENT PLAN' ? I
.
A SKETCH PLAN • ?
PRIOR TO AMENDMENT
. • . '????' • ? •
.? •r
. ? ' • •
• ' . • ? ? ~`?'
• , 1?rr v? • ?I
' • . . . . r??• . ?A
• • • ? , • l ? Oi? ? ,` , • '/ • r M
? ? ? ? / I~NMI
, . T3 ?
. / '
. / ? ,• ? ?
. . 0 ` ? .. ?
? • ? ?`?r
• I ? • • ? ` ' , ? '•• • ^?
/
?
,
/ )001
• ?
? ? / . ??
?
?
? ? . . ,
?
i %
•
. ; . ' ? ,'
? .: . . ?: . .,._,_.. ? ? .:. . ? ?. ..
MI•
I ! E: ?? . ;t? I OUTLOT A
?
.
` •
? • r=
• ?F
?
F 1 ?
,
. , ?,
•.
h
E: ?•-_,; r. ., .-
?
I; E= ' h`
' :' I.
•
, •?
.
:i _
?,y?' ? ? :? ? s'
? .
l
• ' =
?
t3 I »i i
i ? 1
?....!
' ,
OT ?
I; .....,
1?•••• vV
4
•
, o
i
I1
• ?•.?r 1
? •?---• ?_? ?
`1 . . r -?
..
- .. '17
..
. . . .
? 1 1 1
I
M ? ??? . •?ww 1r? `,'
.r.J ? • ?p\ • Y.d ? M _- R (
r. W. / r ?.?. • ?? Y? r (
y .? W. ? ?+? ?.? • ' ? ?.r ? : , ¦ ??1 A ?
?wV ? w?M . I ?.? • ? M ?' \ I
?. . .... • ?.?..r ?.+. y ? ?
b. 1 w. • wr• r P. ? r N ?
V
CI
I ? Z
Yai?
W ?
~ \
c ~ I
.0004
r ? ?.r.. w.a?? tr?. ...?. ?.... ?. ? ?' 'I?
• ?l
•???/Y ?? ???M ?/? ^? r?ti • ? 'I?
?/? Mr ? w?? ? 1 ? ?
NtN?? ?.4? • y
Aq?? ? • N ??J
tiM???? N?• . p! C
???MN1Y . A
? so* nKA ? .'
?/ O??s4r M?uMR •t
?rA
?A.t71?'? i? ?++1(M M f1. ?JII.) : ?
f' 04 F.p IKX+tAAL 11690 1.OpSr ?
?. ;
w
iL .
r.a1
?w.MOHUMENT `
,...?.. ,
. ?
•
j
w
?fu ?.... ?.
ti?W •?•
?„`,.,,ti_ ? • ? ...
PIAZA PTION
??..?
• ..,.?.
? .:..
•
Myi? \ •
•
` O T
1 .
I•
I? • '
, T
9LK-!
?
1
CROSS PARKING EASEMENT AND ACCESS EASEMENT AGREEMENT
?-
THIS EASEMENT AGREEMENT entered into this Z-;? day af July,
1989, by RAHNCLIFF CROSSINGS, INC., a Minnesota corporation,
("RAHNCLIFF") and M.G. ASTLEFORD COMPANY, a Minnesota General
Partnership, ("ASTLEFORD"), witnesseth the following:
R E C I T A L S
WHEREAS, RAHNCLIFF is the fee owner of real property located
in the City of Eagan, County of Dakota, State of Minnesota, legally
described as:
Lots One (1) and Two (2), Block Three (3), Rahncliff 2nd
Addition, and
Lot One (1), Block One (1), Rahncliff 3rd Addition
("RAHNCLIFF PROPERTY"), see also Exhibit "A" attached hereto, and
WHEREAS, ASTLEFORD is the fee owner of real property located
in the City of Eagan, County of Dakota, State of Minnesota, legally
described as:
Lot Two (2), Block One (1), Rahncliff 3rd Addition
and
Lot One (1), Block Tao (2), Rahncliff 2nd Addition
("ASTLEFORD PROPERTY"), see also Exhibit "A" attached hereto, and
WHEREAS, the parties are executing this Easement Agreement to
fulfill the access and parking requirements of the City of Eagan
made in conjunction with the development of the RAHINCLIFF PROPERTY
and the ASTLEFORD PROPERTY.
NOW, THEREFORE, in consideration of the foregoing facts, the
parties do hereby agree as follows:
1. RAHNCLIFF as the fee owner of the RAHIdCLIFF PROPERTY for
itself, its successors and assigns hereby grants ASTLEFORD, its
successors and assigns perpetual non-exclusive easements for cross
parking and access over, across and between the three lots
comprising the RAHNCLIFF PROPERTY.
2. ASTLEFORD as fee owner of the ASTLEFORD PROPERTY for
itself, its successors and assigns hereby grants RAHNCLIFF, its
successors and assigns perpetual non-exclusive easements for cross
parking and access purposes over, across and between the two lots
comprising the ASTLEFORD PROPERTY.
3. The access and cross parking easements created in this
Agreement embrace both the right to park vehicles in certain
designated portions of the easement tracts and the right to reach
those portions by travel over the remaining portion of the easement
tracts which remaining portions will remain open so as to allow
this access. Each party will, at its own expense, maintain, repair
and keep free from ice and snow the property subject to the
easements created hereby. In the event of a breach of an obligation
imposed upon one of the parties, the non-breaching party shall have
the right upon giving ten (10) days written notice (or if an
emergency existed, such shorter as is reasonable under the
circumstances) to enter upon the breaching party's property to
gerform, at the breaching party's expense, the work required to
keep the easement tract maintained, repaired or kept unobstructed.
4. The easements and covenants granted herein shall be
subject to amendment, release or termination only by mutual
-2-
agreement of the parties and in the absence of such amendment,
release or termination shall remain in effect perpetually.
Notwithstanding anything herein to the contrary, no amendment,
release or termination of any of the easements and/or covenants set
forth herein shall be effective or may be filed of record unless
the City of Eagan consents to the amendment, release or
termination. Such consent must be evidenced by a resolution duly
approved by the City Council, or successor body, unless the City
Attorney for the City approves in writing an alternative format to
evidence that consent. The parties expressly acknowledge and agree
that the City has no obligation whatsoever to approve or act upon
any proposed amendment, release or termination, and may withhold or
delay consent for any reason or no reason whatsoever, or may
condition consent upon such terms as the City deems desirable, it
being the City's absolute right and prerogative to insist that the
easements and covenants granted herein remain in effect and
unaltered and to permit amendment, release or termination only at
such times and under such circumstances, if any, as the City deems
desirable in the exercise of its unfettered discretion. Each party
further agrees and covenants, consistent with this acknowledgment,
not to institute any legal proceeding against the City of Eagan on
the grounds that the City failed to respond appropriately to a
proposed amendment, release or termination, and to indemnify the
City of Eagan against any expense, including litigation costs,
which the City incurs as a result of any violation by that party of
this covenant. The City may, at any time, give up the right of
-3-
?
w
approval granted hereunder, said action to be evidenced by City
Council resolution or other format approved by the City Attorney.
Notwithstanding anything herein to the contrary, the easement
areas shall not be deemed dedicated to the public or otherwise
public land, and the City of Eagan shall have no obligation and no
right, not otherwise existing, independent of this Agreement, under
the ordinances, statutes and other laws under which the City
operates, to maintain or administer the easement areas.
5. The parties mutually recognize and agree that all terms
and conditions of this recordable Agreement shall run with the land
herein described and shall be binding upon the heirs, successors,
administrators and assigns of the owners referenced in this
contract.
IN WITNESS WHEREOF, we have hereunto set our hands.
RAHNCLIFF CROSSINGS, INC.
A Minnesota Corporation
y: . Buric Smith
Its: Vi ce-President
M.G. ASTLEFORD COMPANY
A General Partnership
)?'o
62
By: .G. Astle o
Its: Managing Partner
-4-
s
STATE OF MINNESOTA)
)SS.
COUNTY OF DAKOTA )
The foregoing instrument was acknowledged before me, a Notary
Public, on the ? day of v , 1989, by B. BURICH SMITH, the
Vice-President of RAHINCLIFF CRO SINGS, INC., on behalf of said
corporation.
¦nnnnnnnnnnnnnn?;.nnn".r.\nn^.nnnnnnnnN
`< JG::EFH P. EP,?LEY
<_,
?NGT?:Y PuB?IC-l;iR«ESOTA
< DAf<07A CCU74iY
My Comm. Era; , ^s Au;. 3, 1994
1 VVWb'Vy?NVV'c', vJVl'WVVVV`JV':VVVVJ'JVV ¦
STATE OF MINNESOTA)
)SS.
COUNTY OF DAKOTA )
l
Not y lic
F 7- j
The foregoing instrumer,?t w s acknowledged before me, a Notary
Public, on the ? day of ? y?? , 1989, by M.G. ASTLEFORD, the
Managing Partner of M.G. ASTLEFO? RD`COMPAN'Y, on behalf of said
partnership.
ONp f,A. Wt?L?A?S ,
_ AaINNEfYTA
KJ , i A cDU' ? 3,. 1992 tar Pub ic
??` `? D A ?«s a?
is.io^ EX?
"fty cor,m
' ?..-
THIS INSTRUMENT WAS DRAFTED BY:
McMENOMY & SEVERSON, P.A.
7300 West 147th Street
P.O. Box 24329
Apple Valley, NN 55124
(612) 432-3136
JPE
-5-
.
.. , ? .
.
EXHIBIT 9. DE .?LOPMENT PL.AN)f
A SKETCH PLAN
, •' ` / •
• . t. `
. . ? oT ?
, ILK 7
M M
• , 1?I? NJ
' ' . . . M?1?
1?.? ?1
• ' ' ' ? ?'?
? '
. , i? , ?
. ? •• ? ?
i
•• • . O /
'
I
. ? ,
. ? .
• ? ?? ?
• I ?
• '
? ?
?
, . ,
? ' • /
i
, ? /
. •. ? . ?
?
( , •
•
• ?= . .t.?1??. `
1
' ? ?
? ? ?
( ? ?
I : E= _? • ?? ?
? '? I ; ? • • y`?
?
?
.
:
;,,
?
'1 == ' ',?j'••, :? ';
I' , . , t3' ? ' •? I
I t .? ?.•..? 7
?
*
t
a
L
i
?
E.? ?Z...?
_ ...... .
I
?
[;?_-•? i'? I
9 PRIOR TO AMENDMENT
• A,,,y.• . '?,`?J,.,
. • r
N?M
??.?M M 1
•? -???? 1,7
'~i+wa YI
.? ?..
??.N MI•
. OVTlO? A
•-
. f
Y~.N
IrvMMI
•\,
t
?
i?
?
r N ?M
1 w,?w •
1 I
`O
• ?` 1
. ?
I \`
\
. ?/
... . w. i ... ?... . .? .? ? i
.? •. .?.. ? ?..... . u... . ? ? I
?r ?? W. ? I?1? ?.? I 1 w ? ? , ? • :....? C G?i
rV ? ?? I M.? ? ? M ' \ I
V ? ? ??ww ?.?r • ?\ ? ?
a. . w. a?.?..r ... . y I I
y?... ..? ? I
y?y? W
\ •
M !. Y: ? •? M. C ~* ? ? ? '
?. 1 r.
F?r?Y?. M• ? 1 ^-? ? f
? ,? • • • ?'
r+r rw ? w?? i? ?II?1 ?Id+
? Nh?n ?,b? • M f?J ?
•??N?4Y • M
?.t?r nNA ?
??. . ? Mn?rsa ?
..»
... awa it?u?.r ??
I ?0???"? 11M?dMI/f1.?/IL) ;!
f` MS NA? ??+tJK I?M 1aOr '
?
Ju w
rrrl ? ? ? t
? ?r,MMt MOHUTAENT (
,.? .?.. ? i
T ' ? • t
K? ;
An
, .?. ..... ,.
IC?VW ???
4?wrtl ?•r•??
- . .,?...?
PLAZAPTLON
' .. _. w•h • w i*? w
?.r u ,r .
? ? • _ ?
? . I r_____- _--------- i
? FOf OfflC'@ USe .? I
Permit #:
City 1 Eaian O f
3830 Pilot Knob Road i Permit Fee: ?
Eagan MN 55122
Phone: (651) 675-5675 I Date Received: ?
Fax: (651) 675-5694
? Staff:
L -----------------?
2008 COMMERCIAL"iPLUMBING PERMIT APPLICATION
Date: 0 t Site Address: I ? -? Ck?till?-t
Tenant: 14aAiy1 Suite #:
PROPERTY ??"fr Phone:
?? ?iL?:!???
?
"
OWNER -
Name: ?
Y ?J
-
CONTRACTOR Name: MetroT?st'ng License #::
arY rti 0 SB c(7& .. _
31222r State: Zip:
Address: d?r Cfe2???
ct7 P
iZ 22 - HincEcl?N?
rson: ?
nV
e
6
a
Phone
TYPE OF New _ Replacemen?t _ Repair k:,"Rebuild _ Modify Space _ Work in R.O.W.
WORK _
Description of work:
PERMIT TYPE COMMERC/AL !
New Construct6on Modiry Space
Irrigation System (_ yes /? no) (-L4PZ PVB)
• Rain sensors required on irrigation systems
. Avg. GPM (2" turboi required unless smaller size allowed by Public Works)
Meters Call (651) 675-5646 to +;verity that tests passed prior to pickin4 uo meter.
Domestic: Size & Type Fire: Size & Price 3/4" meter 183.00
Avg. GPM High demand.c?evices? Yes No Flushometers _Yes _No
COMMERCIAL FEES:
$50.50 Minimum (includes State Surcharge) OR Contract Value $ X 1%
= g Permit Fee
,
i
Required on ALL new buildings and boialevard irrigation systems 4 _$ Radio Meter Read
- If Permit Fee is less than $1,000, surcharge is $.50 =$ ' Meter(s)
,
- If Permit Fee is > $1,000, surcharge increases oy $.50 for each $11,000
_$ State Surcharge
'
,00 surcharge).
$1,000 Pertnit Fee (i.e. a$1,001-$2,000 Pertnit Fee requires a$1,
Following fees apply when installing a new lawn irrigation system. $ water Permit
Call the City's Engineering Department, (651) 675-5646, for required fee amounts.
$ ! Treatment Plant
$ , Water Supply & Storage
g ? State Surcharge
;
TOTAL FEES
..,ioti ttie .,.Ai.,n., . s and r.ndes of the Citv of Eaaan: that
I h8f8Dy aucnowiea einai inis mwnnauvil w w111Nlcac -.. aw...o,.... ......... ......"'... __ ... __...-------- -,-- -
I understand this is not a peRnit, but only an application for a pertniQ, and work is not to start without a permd; that the work will b n accordance with the approved
plan in the case of work which requires a review and approval of plans. ,
Yr n.-f? X 9?a"
Applicant's Printed Name
Appncanrs aignaxure
FOR OFFICE USE Approved By: Date:
Required Inspections: _Under Gcound ._Rough-In _Air Test I Gas Test _Final
PRV Required: _ Yes _ No
Page 1 of 3
ity of EaQali
3830 Pilot Knob Road
Eagan MN 55122
Phone: (651) 675-5675
Fax: (651) 675-5694
AUG - 1 2011
Use BLUE or BLACK Ink
For Office Use
Permit #: /0)5 G /
Permit Fee: *I • v
Date Received:
Staff:
4
2011 COMMERCIAL BUILDING PERMIT APPLICATION ' 6-1
i t4
Date: &1 t k,1 Site Address: IT15 n"WW4U Q 1 3 t MK) 55l- 1
` 4 `'
Tenant Name: ATL -TON Gts .N N (Tenant is: New / X Existing) Suite #:
Former Tenant:
Name cZGE- Jn% Q [ S Phone: (D6t GIGO—Oil 5
Address / City / Zip: In 15"- N0E- N *LW
Applicant is: Owner Contractor
Description of work: `—=_wrv...2.,(O' . CA ROCON
Construction Cost: 10 )Wtil
NameNLY--W6 CC'aV`J12.1)atCm• IIVC . License #: 2.(032.522..
Address:%1�LL-Cittyy:: a PA�.
,v
L�
State: `NI Zip: 55n2_ Phone: V L: (0.
5
Contact: K)TJ
Registration #: 10V3`C
Address: 1 / ".> GI�W ' Jl(E City: ST PAUL N11.155109
State: Mei Zip: SJf Phone: (051-155-9V3 yy-
Contact Person: GLF�5pr.9 Email: a dhifats evot T;qi (Om
Licensed plumber installing new sewer/water service:( j
CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage.
Call 48 hours before you intend to dig to receive locates of underground utilities. www.aopherstateonecall.ord
I hereby acknowledge that this information is complete and accurate; that the work will be in onformance wi��he ordinances and
codes of the City of Eagan; that I understand this is not a permit, but only an application for •ermit, and wor not to start without a
permit; that the work will be in accordance with the approved plan in the case of wo . quires - -vi - nd approval of plans.
N i 82ja Mui.
Applicants Printed Name
x
Applicants
Page 1 of 3
/q75
Rair)a
DO NOT WRITE BELOW THI LINE
SUB TYPES
Foundation
Apartments
Lodging
Miscellaneous
WORK TYPES
New
Addition
Alteration
Replace
Retaining Wall
DESCRIPTION
Valuation
Plan Review
(25%_ 100% ✓)
Census Code
# of Units
# of Buildings
Type of Construction
Public Facility
/Public
/ Industrial
Greenhouse / Tent
Antennae
Interior Improvement
_ Exterior Improvement
Repair
Water Damage
t y600g‘e;'
D
REQUIRED INSPECTIONS
Footings (New Building)
Footings (Deck)
Footings (Addition)
Foundation
Occupancy
Code Edition
Zoning
Stories
Square Feet
Length
Width
Drain Tile
Roof: _Decking _Insulation _Ice & Water
VFraming
Fireplace: Rough In Air Test _Final
Insulation
Meter Size:
Final
(66s*q/
Accessory Building
Exterior Alteration -Apartments
Exterior Alteration -Commercial
Exterior Alteration -Public Facility
Siding _ Demolish Building*
Reroof _ Demolish Interior
Windows Demolish Foundation
Fire Repair Salon Owner Change
*Demolition of entire building - give PCA handout to applicant
A.3, 2 -*t
✓ Sheetrock
MCES System
SAC Units D/NI ahibvi.0 iNWM OA Oge.. Lp.
City Water ✓
Booster Pump
PRV
Fire Sprinklers ✓
r/
mal / C.O. Required
Final / No C.O. Required
Other:
Pool: _Footings Air/Gas Tests _Final
Siding: _Stucco Lath ,Stone Lath _Brick
Windows
Retaining Wall
Erosion Control
Final CIO Inspection: Schedule Fire Marshal to be present: Yes No
Reviewed By: GA % , Building Inspector Reviewed By:
, Planning
COMMERCIAL FEES
Base Fee
Surcharge
Plan Review
MCES SAC
City SAC
S&W Permit & Surcharge
Treatment Plant
Treatment Plant (Irrigation)
Park Dedication
Trail Dedication
Water Quality
5 .os
114.6+
Water Quality
Water Supply & Storage (WAC)
Storm Sewer Trunk
Sewer Trunk
Water Trunk
Street Lateral
Street
Water Lateral
Other:
TOTAL
321.31
Page 2 of 3
City of Eagan
Eagan,
PERMIT
City of Eaan
Permit Type: Plumbing
Permit Number: EA100819
Date Issued: 09/01/2011
Permit Category: ePermit
Site Address: 1975 Rahncliff Ct
Lot: 1 Block: 1 Addition: Rahncliff 3rd
PID: 10-62727-01-010
Use:
Description:
Sub Type: e - Fixtures
Work Type: Remodel
Description: Removed 1 toilet & tub, capped piping
Meter Size Meter Type Manufacturer Serial Number Remote Number Line Size
Comments:
Greg Nase
110 Sycamore St W
St Paul, MN 55117
651-387-6792
Fee Summary:
PL - Permit Fee (miscellaneous) $50.00
Surcharge -Fixed $5.00
0801.4087
9001.2195
Total: $55.00
Contractor:
Cities Plumbing & Heating
110 Sycamore Street West
St. Paul MN 55117
(651) 274-6547
- Applicant -
Owner:
Hgie LLC
PO Box 1020
Willmar MN 55201
I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State
of Minnesota Statutes and City of Eagan Ordinances.
Applicant/Permitee: Signature
Issued By: Signature
CityofEaau
3830 Pilot Knob Road
Eagan MN 55122
Phone: (651) 675-5675
Fax: (651) 675-5694
cvacf--
Use BLUE or BLACK Ink
Permit #: /CC 9
Permit Fee: 0
Date Received:
Staff:
2011 FIRE SUPPRESSION SYSTEMS PERMIT APPLICATION*
Date: Q- q - l l Site Address: 1115 LA../Lf
Tenant: i itar-tom Aril erg lu�rt �-y InQ ^j_
Suite #:
PROPERTY OWNER
Name: ArAJL_ Phone:
Address / City / Zip:
Applicant is: Owner Contractor
TYPE OF WORK
Description of work: Woe ox-� E...-. S d,Pr i121 Q %Qsaf:.0 .60i CCTt7e4 C<irQ
Construction Cost: .6�}' Estimated Completion Date: 9- /S- //
CONTRACTOR
Name: ,SLI/ i— crP Pit±ecc-_- License#: (-i:Y)5
Address: nrn ( L if p iNcx1,0,...
, U )City: at., PaL/4
State: ./ 3 Zip: S.S /63 Phone: (L7 c7 I .S/ /WO
0 0
Contact: MC oe LS Email:
FIRE PERMIT TYPE
'Sprinkler System (# of heads
WORK TYPE
_ New
_Alterations
Addition
(_ Fire Pump
Standpipe
Other:
_Remodel
_ Other:
DESCRIPTION OF WORK:
r Commercial Residential Educational
_ _
FEES
$55.00 Minimum (includes
State Surcharge) OR Contract
$10,010, surcharge is $ 5.00
surcharge increases by $.50 for each $1,000 Permit Fee
Fee requires a $ 5.50 surcharge)
Value $ <500 x 1%
- If the Permit Fee is less than
= $ Permit Fee
= $ Surcharge
- If the Permit Fee is > $10,010,
(i.e. a $10,010-$11,010 Permit
$ TOTAL FEE
3/4" Displacement Fire Meter - $204.00
*oe......�..,.,..a... 2
$ Fire Meter
$ TOTAL FEE
complete sets of drawings and specification, cut sheets on materials and components to be used
I hereby apply for a Fire Suppression System permit and acknowledge that the information is complete and accurate; that the work will be in
conformance with the ordinances and codes of the City of Eagan and with the Minnesota Buildin /Fire Codes; that 1 understand this is not a permit, but
only an application for a permit, and work is not to start without a permit; that the work will be irdance with the approved plan in the case of work
which requires a reviewviland approval of plans.
x'_J; Gt P I a JI"\ i t -e -
Applicant's Printed Name
, ur
Appl cants Signature
CALL BEFORE YOU DIG. Call Gopher State One CaII at (651) 454-0002 for protection against underground utility damage.
Call 48 hours before you intend to dig to receive locates of underground utilities. www.aogheretateon®call.ora
REQUIRED INSPECTIONS
A�.
Hydrostatic ,° Flows Alarm rain Test
Trip:; Pump Test < Central Station
Date:
City of Ea�ail 1'
3830 Pilot Knob Road
Eagan MN 55122
Phone: (651) 675-5675
Fax: (651) 675-5694
Use BLUE or BLACK Ink
For Office Use
Permit Fee: 7 3 . 00
(9-712,
Permit #:
Date Received:
Staff:
2012 COMMERCIAL BUILDING PERMIT APPLICATION
6/7/12 Site Address: 1975 Rahncliff Court
Tenant Name: Hilton Garden Inn
Name: Torgerson Properties
(Tenant is: New / X Existing) Suite #:
Former Tenant: -
Address / City / Zip: 103 15th Avenue North West
Applicant is: Owner
X Contractor
Phone: 651-260-6418
Description of work: Replace damaged front doors
Construction Cost:
15,000.00
Name: Viking Construction, Inc
Address: 871 Jefferson Avenue
State: MN Zip: 55102
Phone:
License #: BC332522 xp 3/31/14
city: St Paul
651-222-3065
Contact: Ron Henchen Email: rhenchen@viking-constructioninc.com
Name: None
Registration #:
Address: City:
State: Zip: Phone:
Contact Person: Email:
Licensed plumber installing new sewer/water service:
N/A
Phone #: N/A
CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against undergro nd utility damage.
Call 48 hours before you intend to dig to receive locates of underground utilities. www.gopherstateonecall.orq
1 hereby acknowledge that this information is complete and accurate; that the work will be in conforman ' with the ordinances and
codes of the City of Eagan; that I understand this is not a permit, but only an application for, a permit, an. "'fork is not to start without a
permit; that the work will be in accordance with the approved plan in the case of wor. - `requires a ew and approval of plans.
,11/
x Ron Henchen - Project Manager
Applicant's Printed Name
Applic
Page 1 of 3
•
DO NOT WRITE BELOW THIS LINE
SUB TYPES
Foundation
Commercial 1 Industrial
Apartments
Miscellaneous
WORK TYPES
New _ Interior Improvement
Exterior Improvement
Repair
Water Damage
Public Facility
Accessory Building
Greenhouse / Tent
Antennae
Addition
Alteration
Replace
Salon Owner Change
DESCRIPTION
Valuation Occupancy
Plan Review kt Code Edition
(25%_ 100%_ C`Zoning
Census Code Stories
# of Units Square Feet
# of Buildings Length
Type of Construction Width
REQUIRED INSPECTIONS
Footings (New Building)
Footings (Deck)
Footings (Addition)
Foundation
Drain Tile
Roof: _Decking _Insulation _Ice & Water _Final
Framing
Fireplace: _Rough In _Air Test _Final
Insulation
Meter Size:
Exterior Alteration -Apartments
_ Exterior Alteration -Commercial
Exterior Alteration -Public Facility
Siding
Reroof
Windows
Fire Repair
_ Demolish Building*
_ Demolish Interior
Demolish Foundation
Retaining Wall
*Demolition of entire building - give PCA handout to applicant
MCES System
SAC Units
City Water
Booster Pump
PRV
Fire Sprinklers
Sheetrock
_ Final / C.O. Required
?c,
Final / No C.O. Required
Other:
Pool: _Footings Air/Gas Tests _Final
Siding: _Stucco Lath _Stone Lath _Brick
Windows
Retaining Wall
Erosion Control
Final CIO Inspection: Schedule Fire Marshal to be present: Yes No
•
Reviewed By: Ai 100 , Building Inspector
Reviewed By: , Planning
COMMERCIAL FEES
Base Fee
Surcharge
Plan Review
MCES SAC
City SAC
S&W Permit & Surcharge
Treatment Plant
Treatment Plant (Irrigation)
Park Dedication
Trail Dedication
Water Quality
Water Quality
Water Supply & Storage (WAC)
Storm Sewer Trunk
Sewer Trunk
Water Trunk
Street Lateral
Street
Water Lateral
Other:
TOTAL
Page 2 of 3
CityofEaall at/
3830 Pilot Knob Road
Eagan MN 55122
Phone: (651) 675-5675
Fax: (651) 675-5694
Use BLUE or BLACK Ink
For Office Use
Permit #: I I0 1rb
Permit Fee: `t() 9°
Date Received:
Staff:
Lf
,j 2013 FIRE SUPPRESSION SYSTEMS PERMIT APPLICATION*
`t
Date: '72 (3 Site Address: C ` 15
Tenant: I—t 4--r47 1-1 �� � i I`1
Suite #:
Name:
Phone:
Address / City / Zip:
Applicant is: Owner XContractor
Description of work: ge—e 1 i)e..,e_wege. kie.AT7e G. MI FWE- ti. -15i<-" -X1
Construction Cost: At LPSV.. Estimated Completion Date: 5' 1®-13
Name: l.— OA. (.- R1 e.. License #: 2 -
Address: /0673 &V 6 ® City: LSM tT .12... L44-. .
State: f` I Ili Zip: 5 511 47 Phone: 4751 4
Contact.erez.:(±fr^1li�
541.3
FIRE PERMIT TYPE
99
X Sprinkler System (# of heads jf )
Fire Pump Standpipe
Other:
DESCRIPTION OF WORK:
XCommercial
FEES
$55.00 Minimum
*If the project valuation is over $1 million, please call for Surcharge
3/4" Displacement Fire Meter - $245.00
WORK TYPE
New
Alterations
Addition
Remodel
X OthergEA-14446. F!
Residential Educational
Contract Value $ 5� x 1 %
_ $ 5 . —Permit Fee
= $ 5.00 Surcharge*
_ $ G�✓. "-TOTAL FEE
= $ Fire Meter
= $ TOTAL FEE
*Requirements: 2 complete sets of drawings and specifications, cut sheets on materials and components to be used
I hereby apply for a Fire Suppression System permit and acknowledge that the information is complete and accurate; that the work will be in
conformance with the ordinances and codes of the City of Eagan and with the Minnesota Building/Fire Codes; that I understand this is not a permit, but
only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work
which requires a review and approval of plans.
x .-1/‘7"• F6R-1 ' l►T
Applicant's Printed Name
oz.-3��2'
x
Appli
It'S i
n
g(
re
FOR OFFICE USE
Hoy
REQUIRED INSPECTIONS
Hydrostatic
Trip
Conditions of Issuance:
Flow Alarm
Pump Test
Drain Tost Rough In
Central Station r/ Final
-BLUE or BLACK Ink
Use-
-
For Office Use j
:~~r I 1
it /S 1
Perm
City of Eapfl
RECEIVED I Permit Fee:
3830 Pilot Knob Road ~3
Eagan MN 55122 Date Received:
Phone: (651) 675-5675 MAY 1 3Cl~~, I I
j
Fax: (651) 675-5694 Staff: C/V
2014 COMMERCIAL PLUMBING PERMIT APPLICATION
❑ Please submit two (2) sets of plans with all commercial applications.
Date: ;1-611 q -T Site Address: 10r7 5 :Pa{ lh C (4 L C -7t
Tenant: 66-crcl er) I /I l Suite
Property
Owner Name: Phone:
Name: RHr(7 'RSfi r'7ct 0-6L, 4tYl 1lwiat l P6*16,kpkApnse PC (ILf &9/,1: p fP CSC t17,b
Contractor Address: ~jl .22 Oeciar C✓-eee 1Zcl City: f-hrl(:.Ki-cc l State:ft 1 Zip: 5037
Phone: lQ(2-221- S91KT Email: Wf-ho-tCSfii)nI . LC C ce G/Yk r` [D~7
r
Type Of Work -New _Replacement _Repair ~ Rebuild - Modify Space - Work in R.O.W.
Description of work:
COMMERCIAL New Construction _ Modify Space
V Irrigation System C.L_ yes no) (_r_ RPZ / k PVB)
i`^! • Rain sensors required on irrigation systems
Permit Type . Avg. GPM (2" turbo required unless smaller size allowed by Public Works)
_ Meters Call (651) 675-5646 to verity that tests passed prior to picking up meter.
Domestic: Size & Type Fire: 1
Avg. GPM High demand devices? Yes No Flushometers Yes No
COMMERCIAL FEES Contract Value $5 x.01
)
$55.00 Permit Fee Minimum
= $ t55.06 Permit Fee
)
*If contract value is LESS than $10,010, Surcharge = $5.00 $ Soo Surcharge*
1 **If contract value is GREATER than $10,010, Surcharge Contract Value x $0.0005
***If the project valuation is over $1 million, please call for Surcharge = $ Coo (,C. TOTAL FEE
Following fees apply when installing a new lawn irrigation system $ Water Permit i
Contact the City's Engineering Department, (651) 675-5646, for required fee amounts. $ Treatment Plant
$ Water Supply & Storage
$ State Surcharge
- TOTAL FEE
CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. \
I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of
Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in
accordance /with the approved plan in the case of work which requires a review and approval of plans.
x C,a, x JI-A A. L
Applicant's Pri ted Name Applicant's Signature
OR OFFICE USE Approved By. Date:
Required Inspections: -Under Ground Rough-in Air Test -Gas Test Final PRV Required: _ Yes _ No
Meter Related Items: Meter Size Radio Read Manometer Staff:
Page 1 of 3
06/05/2014 13:42 6514071552 GREG P�GE 02l04
t��ll u.s� cr,ed�.k ea� .
Use BLUE or BLACK Ink
-- __,
� Fcr Office U9e (,(°� �
C• ' I � / G� "�/_.J �
��� O� ���n� i Permit#. �� I
Q , Perm��Fee: � 1• �
3830 Pilot K�ob Road
�
Eagan MN 55122 � Date Received: j
Phone: {651)67S-S675 I
Fax: (651)675-5694 I Staff: �
L___— -----�.�__�
2014 C4MMERCIAL BUILDING PERMIT APPLICATION�
Date•t���"' (� Site Address ��l 1� �.rT .
Tenanr Name: ����V�f l l�QIr'rlQ t�l �Yl Yl (Tenant is:_New/ Existing) Suite#:
Forrner Tenant:
� �?�1�7f�r('���'�n�'1 �P�m��-h l��I� 21�l� �q�
Name:
�Propeity Owner:'� �q'�.�_�C�..�11'1(',� I�,t � .
Address/City/Zip:
,. �
Applicant is: Owner Cont�aCtor •
, .; : � Description of work: � �(,�\
�7ype of WQ.rk� ���
. Construction Cost: � �
� . /�
� Namet � ense#: f�l_. �
� 7�?�OL�
.CO�t[dCfO� Address: City: �_(� ';��' � l(,�.�
State;��Zip: ����� Phone:�Q��l.i���_p�'.
.. Contact 1"\(�(`�T► Email' ►� � m
° �:� Name: Registration#:
A�Chit��;t7E'tlgine.er. Address: c�ry;
- - - State: Zip= Phone: '
........... . .. :....
: . .... . �. � .
. . "_P..'.. . .. ..;..�
� Contact Person: Email:
Llcensed plumber Installing new sewer/water senrice: Phone t�:
NOTE::Plans and�suppo►ting:documents;that you submit ar+e,cons►dered:`to be public infnrma�dn. ;Portfons'of
the inforniat�on'iAay,be class%f/eol�s non:public if you pr`ovide specrfid reasons�fryat.w,ould pe'rm�t,t`he City to.
_. : ,.. �
,.. ,� - ..: ,
;, ,
�, : conc/ud�;that the =a:re trade:-secreEs:;= .� ,>.:, . ..� .
CALL BEFORE YOU D1G. Call Gopher State one Call at(651)454-0002 for protection against underground utility damage.
Call 48 hours before you intend to dig to receive locates of underground utilities. www.qopherstateonecall.orq �
I hereby acknowledge that this inforrnation is eomplete and accurate; that the work will be in conformance ' �.the ordinances and
codes of the City of Eagan;that I understand this is not a pe►'mit,but only an application for a permit,and rk is ot to start without a
permit;that the work will be in accordance with the approved pldn In the case of work which requir a rev w a approval of plans.
X__�1 o�i. l��c� X
Applicant's Printed Name Applica t's igna ure
� Page 1 of 3
JUN/11/2015/THU 10, 39 AM PINNACLE AOOFING SYS FAX No, 763-477-5611 P, 002
. ,
R •
• � • �.Use.BLUE or'BLACK Ihk
- ' • ' . 1----��_�.--�------�—j •
• � For Office Use
. / /
C�U .O��� �11 �I Permit�l:_.��/ .��(c� I
I ' / � �
• :3830 Rilot Knob'Road I Rermit.Fee: ��l� -�� I �
. Eagan'MN.55'�.a2 � i � /���"" ,S �
�a- , < `i*,R-3� � Date Received•(fi �
, . Phohe:(661)675-567.5 �`��� . � j
.. `FBX: (661)'67.5;5694 'j ' ' • I
�{�t� ,� , �f�({*[ � Staff: I
. � ' � � aa}t T.Y '���'������ �������J •
� �o�s�COMMERCIAL:BUI,LDING�PERMITAPPLICA"TInIV
.Uate: �� � ;SI Address: � l "r"J ��nGIIt�- t,o��� �
Tenant Name: I � � �Cil�` (Tenant is:• New 1 v Existing) Suite�#:
• • • � Fonner"Tenant:
. ;, ��, �� -»,;•�::�� .
s;+���'�t.���.,C.�,.�..g:a��13 . + r'
wf�, u c�•; � 'r . G✓ "lli�lil ��
r ��''"'-
r �!f�" ;r�;��;,���+f��,.�.t��py�.� �Name: �. � � �, Phone: � t � �
;;��.'X��f�"�,'+a.`�;.e.,`,��'.�1'','i�i.�`'�1''�?13i��$�y�' �t . �(
�"r P.If�;p�y,aA�,y.�,Q��@�j��. � � /L � V�� � � .
�� r r' � �r � J Address/Clty LZIp:
• r.� �'�' �M�;�;i.R�}j;�%c' ,
,���.��,��y � �, c�����,.
. � .��••� � ,�. ,�' u ..:, ,
; �4'�'���'!�•���"� '�a,� �! m,� . ,
a
' ���',r',`'s•� �3�'�i'���"`ra°�. Applicantis: ' Owner Contracfor �
}_ f,li;,Y�i:1.4�.!;.����.'.A�:��f��'�
;t;i<rI�fM 1k{'�°�i:lY'-y`a,e'�',. �ir�r�?s`" .
�j. �$'•�w (y���,��V �1 �� GI.T �b,/,J �� .
�� '��"`����yv'�''���'° �• Description of work;
a�'`p��of�l,u�°���� �
'..,6�'>��1�,t�•y:���� �:y����1'�.j�.�.i�� �.F: ��
�f�1Yj�'C•�i,�l� y'u�"'$ �
., �;, 1��Of. t qa� .; Construction Cost: .
;e.i ��'.;;,*.ti °I�t!i�a�r w �` .
� B!: ,,,.. �. �/,r�,�
'���i'�'����u;,ti,�',�,;'�,is���•�'
���, '1 +��i�c��'.'p'�,-
i's �fy�' ,',r+�,���''"i`;';����,i,��,��1� ,"� Name: N Y�� Ife-� License#: ����7"d`7�Q
9•� 4 ,�:i:•r�'3�7 V?�n�f�
'y�c�,`b'•!t'• �"% ?i:{"'l���a;V� r� (� �'''j�� ��/ J� I, ��^///���
7� r�t ���„rE+`,J� ! a.•
��,.�,, a����;a���y.��F�.�o^.d�t������'r+i!a.���1 ..i�'JC O I 17� �W� � C.It �V�.�L/���-
, ?i!�Y �' �,;;,;1:H`;:'a'r�:�;��= .'t;"r Address: r v
� i'���'�",�iC!;T,itf?�C�.o�'- ' , y' ' ,
!�f+ +��'tiN�� �t,-��i�{s; a � �'S N ,� c� ��r ( I !
> �.�:,�::'•�p'�:»>�-4���',�'"��t�!;1�.... • "� 2 �
�. �(:r:'!��✓Y•V. 1�.t: /:• w.• �
�l����•t�.�:�;Y;;i�f!��x�;�s����'y��F:!����K�a State: 1 v1.�.Zip: ,l"J�J Phone: I
1,.�,�'M y ht��u 7:i V «R;M.
�w Y�... ^taryr.�M'�ji�'yi'�tf���:i�R3,f'�!t�,•�� �I ''.
���. �i%t!"�pp}�d:z�4i„�.i.t�d.G��.&9�"•�i /� �1��y�,� iA In/�/�/f/� /�,/� �/�y//�
�".�y,j�,j�,�,,�m;,�.�:p�:�wt A�it1rl�ay;L7%���+a�f�� CiOt1�Ct: �Vh/M4.� Vv �mail: � I'I/(/�t�(Y�W �.ry///�, I
w.,,:
�..d"Y
"��'!9 /�f�Yi;M1vy.17�'1{� i:'BP'�a !�
{�.., , !.' �E�.'r6'4res�+f E"'. 7 . I
���riy�,�N�� i:�l��.?�.i�v��lii:�ilen�i'�{�jM • .
`�i�"q'��':��''i ,`o��r��;�F'�st •Name: ' Registra4lon#:
� ,�;.!�.�;�•+�;,ty{,;,r;d���,�;��;,,� �'.q•Hi:��a
�A �k:+�°t;Vt�l6�tb.�11`�',�i���i !
.. ,''��,��"i;.y,.,,t'�;,,,; �(���E�yg;frr�?{�,�1 . , ,
�� ( ,c�.. .,��'�'3;�',:,'',,
� G U.}I�:.Ye°t�p'A I V���e�'/(i�%�A1��ipyre• �
;,^�t � � �....:. Address• City:
a�;A;r�'�it�'�E'nginee , �
; y.A�,��.;s•."r.^.� � .� },•���'W'�'
- �':�f���i .� �ir+;vs��,;:$.+i„n. , .
'.;e.::"•.fr•i{�!ij6�,,,u a;.ck'li�D'��r�'S
+��.^:��;� rr.���,n'�Y?r��,;,',.+ r��+.�•f1 State� Zip: Phone:
,.� i F�•n Y.�:w;• ,�i: ;`..
r�;�i'.��t,i�::^�`y!•��f,�4:�i'tl'�'a�;'yYF,;+'��`�,���
;:::- r.isr�-0 � , .
1 .+::���,.:�'c,..,�.:�".,�:rih��.!`!hj✓�h�Y��1� � .
��`'�'r�i'� ;,,j:ci;:��,n�«��.?ij4,.,P�l��. •
rfi;�:;'.�;:�u'�;r;;s.�•�,'E;�.;,,q;,�;;,;;,.�:�,x ContactPerson: Email:
.L.icensed plumber Instaliing�seweN.water service: Phene�:
'�i .. 1 .iu:l�t,y�:::•�li �..:.uu�.i�1.,.:.:...r.J�nr:1.��d:�w I..:ni.y�... pr`�.>M�. 1" fu1.�Nr..r af4•M '�)�:' rYln.vN JI 4
;t�rN,OTE��Plans�;ancY,su�f•nrhn•�doi�uir�:�it��`°�i��y�iJ�'i��ii�'r`.1�i��.►'a��'cdns�i���ed .�b°',, lili��iif,Q"`}'i�n�"!'i,�n��r�P'Qt`fip�'s�`f
'�':a '��+,: .I;Prw'<'aa.`�:ql:"`���t91�'�l::Ai'!ySI�;!d�tryl',' ��Y .:,1yaa,'V �i � n.�.� 4.�� �. .r:i� " Z(. 3b �L3 a1f��.,�,:^ a,• �
..� �M .b" n'"f.�n'v i .S�Su1 X frY ad�b Y�" kY",y��. *%'7 D�1��H1. J °A?S bq'���"�,q?�
•.��.�� . n�c•...,:
•:�th.e;inforni�it�o►f��ill��tic�cy,as��,�ed°as=rr;on u• �c l�' a� ��,,J�► ��iticc�"�reas�i+s,�h�t�"wou�''`�er�rn�t�„;e�C�ity�fo. >�
-���w., ,.,,. �:;:. � A. �,,;�.,�1�. .�P� I�.,�. �., „�
'^'�n�i;d;'�:;i;(;i�:',, I;�;,.;i1.��:;.i.�.•:-;y '�'�'N�u`q�. [�:tp9;Si .fi'k^e.�."'a':6Rr•w!1J��,tY.•< <�,u�� .aY:.r�,7re"a�v ,�T` '4i."{,n,N,!'r:;�l,R.���. �� ,°" Sm4,y> (`.n�;� .r .t�.
m.�:n �.,
,....,,..�� ,,,.:,;:-.: i,.>...«.,r,K� ��i��;'� �a�:.�,, �;n.r�'�o�,c�.ur�e�th�'t�'t��`e. :��,�e.�'���`r�� �,;��t,,: ��'.��,�y�;�,7,�; �� ;a � �''.� ..,
��.... ..:.,.:.:.:..::....::...: ,,: �' �.�, � �.�. �..�.�.:�. .:�,.� �...���.,....��..�' ...a
...:.:::..::... .. ,.�.;:...,,.:.. ....-,� . , ,...;
.
.�::
�'CALL BEFORE YOU'DIG. Call Gopher'State iDne Call at(661).454�002 for protection against underground utiiity damage.
Call�46 hours before you i�tend to dig to receive locates of.underground utiliGes. www.gooherstateonecell.or� '
I hereby ecknowledge that this informallon is complete and accurate; that the work will b In co ancs with the ordinances and
codes•of the City of Eegan;•that I understand�this is not a permlt,but onty an application�f .a pe it, nd work is no ta�t without a
permlt; at the work will.be in a rdance with the pproved plan in�the case of work w ic requ'es reviev�u�.r�J a I of plans.
l�
.x ac �
�Appilcant's•Printed Name • Applica 's�Sl, nature
' P�age"I.of.�
�� .
��j t'tC,�� � ��DO NOT WRITE BELOW THIS LINE J �� .���
l�i
SUB TYPES
Foundation Public Facility Exterior Alteration-Apartments
fommercial/Industrial _ Accessory Building _ Exterior Alteration-Commercial
Apartments Greenhouse/Tent Euterior Alteration-Pubiic Facility
Misceilaneous Antennae
WORK TYPES
_ New _ Interior Improvement Siding _ Demolish Buiiding*
_ Addition _ Exterior Improvement �eroof _ Demolish Interior
_ Alteration _ Repair _ Windows _ Demolish Foundation
_ Replace _ Water Damage _ Fire Repair _ Retaining Wall
_ Salon Owner Change *Demolition of entire building-give PCA handout to applicant
DESCRIPTION
Valuation � Occupancy MCES System
Plan Review iL�j Code Edition SAC Units
(25%_100%� Zoning City Water
Census Code Stories Booster Pump
#of Units Square Feet PRV ,
#of Buildings Length Fire Sprinklers
Type of Construction Width
REQUIRED INSPECTIONS
footings(New Building) Sheetrock
Footings(Deck) Final/C.O. Required
Footings(Addition) �inal/No C.O. Required
Foundation Other:
Drain Tile Pool: Footings Air/Gas Tests Final
✓ Roof:_Decking _Insulation _Ice&Water �Final Siding:_Stucco Lath _Stone Lath _Brick
Framing Windows
Fireplace:_Rough In Air Test _Final Retaining Wall
Insulation Erosion Control
Meter Size: Concrete Entrance Apron
Final C/O Inspection: Schedule Fire Marshal to be present: Yes �No
Reviewed By: /��c� L- . Building Inspector Reviewed By: , Planning
COMMERCIAL FEES
Base Fee /7'�: ��' Water Quality
Surcharge �` 5 d Water Sampling Fee
Plan Review Water Supply 8 Storage(WAC)
MCES SAC Storm Sewer Trunk
City SAC Sewer Trunk
S�W Permit&Surcharge Water Trunk
Treatment Plant Street Lateral
Treatment Plant(Irrigation) Street
Park Dedication Water Lateral
Trail Dedication Other:
Water Quality TOTAL� j . .j �
Page 2 of 3
Dale Schoeppner
From: Bjorklund, Gary(DU) <Gary.Bjorklund@state.mn.us>
Sent: Friday, February 03, 2017 6:10 AM
To: 'lisa.mellen@us.schindler.com'; 'Iisa.mellen@us.schindler.com'; Dale Schoeppner;
DU.EIevator.ETrakit
Subject: Final Approval for Permit Work at 1975 Rahn Cliff Ct, EAGAN
SCHINDLER ELEVATOR CORPORATION:
The ELV ALTERATION permit work has been completed and approved for the following project:
Permit Number: ELV1701-00232
Project Name: HILTON GARDE AR
Site Location: 1975 Rahn Cliff Ct, • AN
The Department of Labor and Industry is required to inspect and provide approvals on elevator related devices
prior to allowing them to be placed into service.
An Inspector from the Elevator Safety Section recently performed an inspection of the work performed under
the permit listed at the site above. The alteration is in compliance with the Department rules for elevators.
CONSTRUCTION CODES & LICENSING DIVISION
Elevator Section
Dale Schoeppner
From: Bjorklund, Gary(DLI) <Gary.Bjorklund@state.mn.us>
Sent: Friday, February 03, 2017 6:10 AM
To: 'lisa.mellen@us.schindler.com'; 'lisa.mellen@us.schindler.com'; Dale Schoeppner;
DI1.EIevator.ETrakit
Subject: Final Approval for Permit Work at 1975 Rahn Cliff Ct, EAGAN
SCHINDLER ELEVATOR CORPORATION:
The ELV ALTERATION permit work has been completed and approved for the following project:
Permit Number: ELV1701-00233
Project Name: HILTON GA ,N R
Site Location: 1975 Rahn Cliff Ct, EAGAN
The Department of Labor and Industry is required to inspect and provide approvals on elevator related devices
prior to allowing them to be placed into service.
An Inspector from the Elevator Safety Section recently performed an inspection of the work performed under
the permit listed at the site above. The alteration is in compliance with the Department rules for elevators.
CONSTRUCTION CODES & LICENSING DIVISION
Elevator Section
Use BLUE or BLACK Ink
411 For Office Use -
CItyof EaaaIi :::::.
y f
�53
3830 Pilot Knob Road t3d I
Eagan MN 55122
Phone:(651)6754675 Date Received:
Fax:(651)675-5694 i
Staff: I
2017 COMMERCIAL BUILDING PERMIT APPLICATION
cR2
(lid
Date: LIl I cl/ l') Site Address: ) "� ') fj 2 c41111 ( 1 i
/44
Tenant Name: A.1T on
(Tenant is: New i Existing) Suite#:
�—r- Former Tenant
Name: 1 ?1 et',`
Property Owner - ad
Address/City/Zip:1 d3 1 trot. t 1/4,3 20e t >htir lb/0 < $2b 1
Applicant is: Owner Contractor
Type of Work
Description of work: j bo c v3 qk J c cc, hi co I
Construction Cost: SZ
Name: 115S RN i ► p s&s e- License#: C-16.rtic4(03 7 9
Contractor Address: )30
e5 s - Q 51.E ?o �4 +r City: &c Eco C »r►G;,
State: 1V\T Zip: 5 a(41- Phone: (Q5 ) ' 7.1)
qq 11
Contact:l. sJ2 incd RC owl.)Email: t et,4 'ZIcl s a,.,.r.� �;c SPS c 7 al : Col
Name: 13 /-k Registration#:
Architect/Engineer Address: City.
State: Zip: Phone:
Contact Person: Email:
Licensed plumber installing new sewer/water service: Phone#:
NOTE:Plans and supporting documents that You submit are considered to be public Information inns of
the information may be classified as non-public If you provide specificnsasons that would permit'the CRY lo
conclude that they are trade secrets,
CALL BEFORE YOU DIG. Call Gopher State One Call at(651)454-0002 for protection against underground utility damage.
Call 48 hours before you intend to dig to receive locates of underground utilities. www.aopherstateonecall.ory
I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and
codes of the City of Eagan;that I understand this is not a permit,but only an application for a permit,and work is not to start without a
permit;that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans.
Applicants Printed Name Applicants Signature
Page 1 of 3
.. / /-75— gq 11,c iiff'' Or
DO NOT WRITE BELOW THIS LINE / -2f.X
SUB TYPES
✓ Foundation ___ Public Facility Exterior Alteration Apartments
_ Commercial/Industrial — Accessory Building _ Exterior Alteration-Commercial
_ Apartments _ Greenhouse/Tent _ Exterior Alteration-Public Facility
_ Miscellaneous Antennae
WORK TYPES
New Interior Improvement _ Siding Demolish Building*
_ Addition Exterior Improvement _ Reroof ^ Demolish Interior
Alteration — Repair _ Windows Demolish Foundation
_ Replace _ Water Damage Fire Repair Retaining Wall
— Salon Owner Change *Demolition of entire building-give PCA handout to applicant
DESCRIPTION
Valuation 3/1'O t . ' Occupancy g- Z MCES System AVA-
Plan Review V~' Code Edition Zc/S,04f34 SAC Units
(25% 100%_L) Zoning ,Cf• 7 City Water
Census Code Stories Booster Pump
#of Units D Square Feet
PRV y
#of Buildings i Length Fire Sprinklers
Type of Construction V''A-- Width
REQUIRED INSPECTIONS
Footings New Building Deck Addition w Drain Tile
Foundation Foundation Before Backfill Retaining Wall
Vapor Barrier Erosion Control
Framing 30 Minutes 1 Hour Steel Reinforcement
Insulation Concrete Entrance Apron
Sheetrock Other:
Roof: Decking _insulation Ice&Water Final Meter Size:
Siding:_Stucco Lath Stone Lath _Bricck_EFIS Electronic As-Built Plans Required
Windows
Fireplace: Rough In Air Test _Final Final/C.O.Required
—
Pool: Footings Air/Gas Tests ,Final V Final I N .O.Required
Final C/O Inspection:Schedule Fire Marshal to be present: Yes v/ No
Reviewed By: A/A- ,Planning New Business to Eagan: °`i a
Reviewed By: &.1-2!'l° ,BuildingInspector
pector
FEES Water Quality
Base Fee ek-re Storm Sewer Trunk
Surcharge 1•ro Sewer Trunk
Plan Review 57.53 Water Trunk
MCES SAC `" " Street Lateral
City SAC Street
S&W Permit&Surcharge Water Lateral
Treatment Plant Other:
Treatment Plant(Irrigation)
Park Dedication �`
Trail Dedication TOTAL:17 /'/7.5-3
Page 2 of 3
�J Q tJ n Use BLUE or BLACK Ink
` C tl�L For Office Use�/ �� t
("A"( � Permit#: /`/. 7O
Clty of�a�a� �°�
Permit Fee: /0(9' '
3830 Pilot Knob Road
Eagan MN 55122 JUN0 8 2016 Date Received: e —"iC'I 7
Phone:(651)675-5675
Fax:(651)675-5694 Staff:
2017 COMMERCIAL PLUMBING PERMIT APPLICATION
❑ Please submit two(2)sets of plans with all commercial applications.
Date: f Q (t( 11- Site Address: ( 11-s iIN(Aire- C4 url- -Rib-.(bCiAI'lfos `f
t'`h
Tenant: +1-116th Ciiiki 41 (AA Suite#:
Property
Owner Name: I V/ £tSa. Ivo PZrh 41 (rn) Phone: ti A�ww. .. m I
I tkita-�-a T�, i-ice LLQ License#:`�
Name: 4� atiteeti$
Contractor Address:`?112J)AVthpori di- 1\/>E, City: 81A1he State: MN Zip:&c/t(l9 i
I
i
Phone: 612 221 TS' ' Email mefrof e//ihj•<<< 6h/tr1 Ca"-,
New Replacement —Repair Rebuild —Modify Space Work in R.O.W.
Type of Work — — ,�' / —
Description of work: Yv Afev N��'er 114VAI
COMMERCIAL New Construction _Modify Space
_Irrigation System( yes I no)( RPZ I PVB)
o • Rain sensors required on irrigation systems 1
Permit Type 4 • Avg.GPM (2"turbo required unless smaller size allowed by Public Works)
t Meters Call(651)675-5646 to verity that tests passed prior to picking up meter,
Domestic:Size&Type Fire: 1 I
Avg.GPM High demand devices? Yes No Flushometers Yes No
COMMERCIAL FEES Contract Value$ 6---0- 6 O x.01
$60.00 Permit Fee Minimum ,`
$60.00 PVB/RPZ Permit(includes State Surcharge) _$ r'7�V Permit Fee
=$ 4.'2 ) Surcharge
Surcharge=Contract Value x$0.0005 5
I If the project valuation is over$1 million, please call for Surcharge =$ l �� ' � TOTAL FEE
Following fees apply when installing a new lawn irrigation system $ Water Permit
I Contact the City's Engineering Department,(651)675-5646,for required fee amounts. $ Treatment Plant
$ Water Supply&Storage
$ State Surcharge
=$ TOTAL FEE
CALL BEFORE YOU DIG. Call Gopher State One Call at(651)454-0002 for protection against underground utility damage. \
I hereby acknowledge that this information is complete and accurate;that the work will be in conformance with the ordina s and codes of the City of
Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a p it; that the work will be in
accordance with the approved plan in the case of work which requires a review and approval of
x_lri1V fA i x
Applicant's 9rinted Name Applicant's Sig ure
FOR Of FIC By: O
- _raae,,_e Inspections: _UnderGround _Rough-in _ Gas TeFine PRV RRequired: Yes No
m
Meter -< a r •4 a a,+ ite ". , r Meter SizeRadio "' Ce: t{a3-, .'{ar- - St '
Page 1 of 3
-0,7,^';‘•:,1:0T'' •••• w„7---',.r 1,..,,,, ,..--','"Te4C,‘'-'-',E Iiivo.-4,'7"'--I,4t--:1 it '7 ..S''''' ' '''' ,.‘ I I
"„*'4'...C.• :4r.. 1°'!,j',1;ttillil'.41•74Pitif4.4M:,:t ,V1i.:0:%"...:':.:,te::1';',X:1***,;'"';i4if:"...t1':'-'1.:;%g' r.' ,4'-''"t-f-t--,',.:g ,-..44.4,'''''''''*!:";' '''''4' L II AAU
1 le ,4,4 glAbK iiik
.,,,,t • ,.,,,,,,,,,,-.:,..: 0,,,,,,..t.;.En-„,,,,,,. .i.,,,„. ,:. 4: --,-t- ,-,:; ,- 9'--' ._-, ,, ' ,....._ '' - ,,,, - ,' ' usa D._
if,.,::.:,..-:\'-‘ -7;-'4::frij.".1;i-ilir:';5,•;-„:Y::!lr;:-dir.,2;::;.: .,... ,.., :,-,5,,,,,:.:.!:••!ii,:,..--7:_„,:,1,_,,,, .,737,,,,f;,,...;'7, 7 -747.*7,;.,: ' ;777- ___-;;;;------i I,
' '
1 I '
Poi/rill N. ,1
I t
qe5 .
Z City Of lii
it , i_ _....„-- 3
. pai lit Poo' L --
_in , ......„).,,,..../.
3330 Pilot Knob Road i ' -
1 Ciotti fte .
essitn MN 55122. ,
i
ceived. 4 i
Phone (651)673;36'75 RECEIVED 1 - • _
Fax (851)075,4694 . , ,. I Stuff. *- - „ 1
Jilt,.IJ 32017
i a.,,s- i ,,i;
LICA 1 iljni
2017 COMMERCIAL BUILDING fiERmii AF
06-28-2017
1975 Flahncliff CT Eagan, MN
Date; Site Aridress;
Garden inn
TonatIt Name: Hilton Gard (Tenant le: New t Existing) Stilts I:
Fortner Tenant: ,.. . • .•, --,-- '''. ..- ' '•'" '
, .
, - - 320-235-767
I
Name: TPI Hospitality Phone:
---._
Property Owner Address/City/Zip. 103 15th
Ave NW Suite g0Oi Willmar, MN i 56201
X
Apicertt is: ,w, Owner . Contractor ---_
Interior Remodel
Typo of Work
Descriptiort of work:
$ 500,000 _77 .
Construction Cost:
Name:
TBD ./--k-'
..--,
c„. ---tIIlf- 1'1 '-"Tii , *
C License*
1 r
'-' Address: 1k:;)/ ..e..,",'Silt -•-)014' ,:c1,.. City:
• ,
Contractor
State: .- ,,i- Zip: b'... f i ''t Phone: .'."' • - ,' „1/4„, „„ ,.., -- .**. •„-*..„
, I-% 1,1. 96'>.c,:,i- K''T f26)6.-'- •-•:-*--‘4)(:::).:.-.) .: 4,1s!te.' ' *4::?::
Contact: 1' ' - i A r e- Email:
, .
Cities Edge Architects ,
IName: Registration#:
Address: 103 15th Ave NW Suite 300
City: Wilirriar
Architect/Engineer
State:
MN Zit): 56201 Phone: 608-643-4100
Kevin Hanson kittiriSori @rtiiiiaker.Ooffi
Contact Person: Email:
,,.,
Licarised plumber installing tlew sewer/water service: - hon. C: - -,-
NOTE:Plans and supporting documents that you submit sire considered tr3 be Oilkiffi inif3irriatioti, iiiiiii8i3i 4
the itttemte . may be classitiOd as nottl)ublic II you provide specific MIS-Oita thee kiat:t14 Pemiii the City to
c.0_41.0141.#1_t.h4t!ti,.0!*,!!!*Race sed-.010; -- ,
,gAt,t, BEFORE yl;Iti 0(0.. Calf Gopher State One Call at(651)454.4)66i for protection against underground utility damage.
Call 48 hours before you intend to dig to receive locates of underground utilities. l 1 ?-t, - t. -
I hereby ick • ••- that this iriforrnatiort Is complete and accUrille; that the work will be in conformance with the ordinances and
codes of the City of Eagan;that t • ("stand this Is not a permit,btit only art application kir - permit,and work is not to start without a
;),amilt,that the work will be in a... 'arc.with the approved plan litSie case of work vahl•h -•uires ri review and approval of plans.
4it :...„... .,.:', wiliV1011111''
Kevin Hanson ,
L„,
Appilearit's Printed Name Apollo/trill ' •it ,Uri,
4111.
.0„ J. ,Tt..:f,‘„,‘,A5.e(z._ --- .,_... ....., diiiii,.........,
. ,, ,, ,,
i.,...1•,...iiiriov—Aor ("ate 1 of
/9 7.S 411111C DO OT WRITE BELOW THIS LINE /4/5000
SUB TYPES
t Foundation _ Public Facility _ Exterior Alteration-Apartments
Commercial I Industrial _ Accessory Building _ Exterior Alteration-Commercial
Apartments _ Greenhouse/Tent _ Exterior Alteration-Public Facility
Miscellaneous Antennae
—
WORK TYPES /
New _ Interior Improvement Siding — Demolish Building*
_ Addition _ Exterior Improvement Reroof Demolish Interior
Alteration _ Repair Windows _ Demolish Foundation
Replace _ Water Damage Fire Repair _ Retaining Wall
Salon Owner Change *Demolition of entire building-give PCA handout to applicant
DESCRIPTION
Valuation 500/DGO.op Occupancy n- ' I MCES System / t/Plan Review I/ Code Edition 20/.5 mac_8G SAC Units O MA-n_.
(25% 100% ") Zoning City Water
Census Code Stories T Booster Pump
#of Units /' Square Feet PRV
#of Buildings / Length Fire Sprinklers
Type of Construction V. A Width
REQUIRED INSPECTIONS
Footings_New Building Deck_Addition Drain Tile
Foundation Foundation Before Backfill Retaining Wall
Vapor Barrier Erosion Control
/ Framing 30 Minutes 1 Hour Steel Reinforcement
Insulation Concrete Entrance Apron
Sheetrock ✓Other: fat `571,f//I17
Roof:_Decking _Insulation Ice&Water Final Meter Size:
Siding: Stucco Lath Stone Lath _Brick_EFIS Electronic As-Built Plans Required
Windows
Fireplace: Rough In Air Test _Final /Final/C.O. Required
Pool:_Footings _Air/Gas T-sts Final / Final I No C.O. Required
✓
Final C/O Inspection: chedule Fire ,.arshal to be present: Yes No Y
Reviewed By: , Planning New Business to Eagan: lY
Reviewed By: C Al (64 C4P+' , Building Inspector
FEES Water Quality
Base Fee 3,434.7c Storm Sewer Trunk
Surcharge Z.50. an.&Sewer Trunk
Plan Review Z.,Z at f.,89 Water Trunk
MCES SAC Street Lateral
City SAC Street
S&W Permit&Surcharge Water Lateral
Treatment Plant Stormwater Performance Security
Treatment Plant(Irrigation) Landscape Security
Park Dedication Other:
Trail Dedication TOTAL: - 59 S3 . G Y
Page 2 of 3
Craig Novaczyk /1/5C 00
From: Peggy Fleck
Sent: Wednesday,August 02, 2017 6:52 AM
To: Craig Novaczyk; Michael Grannes
Subject: FW: Hilton Garden Inn - 1975 Rahncliff Ct
Attachments: Hilton Garden Inn.pdf
FYI
From: SACProgram [mailto:SACProgram@metc.state.mn.us]
Sent: Wednesday, August 02, 2017 6:47 AM
To: Dale Schoeppner
Cc: Peggy Fleck; Amy Griffin; khanson@ramaker.com
Subject: SAC: Hilton Garden Inn - 1975 Rahncliff Ct
We have reviewed the SAC determination application for the above project and location and have concluded a
determination will not be required. It is the Councils understanding that the scope of work for this hotel lobby and
bathroom remodel project will not be changing the use or size of chargeable spaces from those spaces previously
charged in 10/1997.There will be no increase to room count.Therefore, a determination will not be required nor will
SAC be due.
Thanks,
Cory McCullough
SAC Technician I MCES Finance
Cory.McCullough@metc.state.mn.us
METROPOLITAN P. 651.602.11181 F. 651.602.1030
0 ° u c
i 390 North Robert Street I St. Paul, MN 155101 I metrocouncil.orq
Please visit our SAC website by clicking: www.metrocouncil.orcl/SACDroclram
1
�nFor Office Use I
YlochEC,� / -/ l
��„„ i i •�• 0/2- �/ .S Permit#: l /41
�� �� ','_ E AGA N
ermit Fee: Y.I.� . //,- 's li '
� , mug `'
Staff: C C
PILOT KNOB ROAD I EAGAN, MN 55122-1810 ecvd�� Y No
(651)
I
(651)675-5675 I TDD:(651)454-8535 I FAX: (651)6
r-
3830 Payment Recvd: Yes No i
ErvE I
Email: buildinginspections(a�citvofeacian.com I
Plans:_Electronic Paper I
Plan Submittal: eplans(ftitvofeaaan-cam MAY 0 1 2019 J
2019 COMMERCIAL ifE=CHAtNmAk PERMIT APPLICATION
❑ Please submit two(2)sets of paper plans with all commercial applications as well as an electronic set of the
submittal, submitted via email, CD or flash drive
Date: � drrTenant: / 7 ' Icliii !/‘. y'` 4 in Suite#:
r
Owner Name: 1V 1- t_.t`5 17
t i_a(, } Phone: 1 — 2 i t7 `/ 7 �5---
Address/City/Zip: 1'1 �2uvt rt.,l;� i/ C fi•` ��c1 4/ rt J'`?1t% ) ) i �" -
Name: i i" 1 111(..4g) jrcr( \ '"1. v Lcense#:
AvA
Address: 7t'C >v r 1,7 C� L I v. 1J Or 11;�_ City: )'.4 c'-'t 7'/r'cr/1/K)...
Contractor /
State: i `11v Zip: )5 -3(i�'7 Phone: 1 Z'` -' fir' "- / 5-9 Cc
Contact 17� c' 'law✓1`v�r`f: Email: Pat.) l�4-q ,,' "414-1✓rte. r'7L`•t (yl • <.�->. v)
New )6 Replacement Additional Alteration Demolition
Type of Work Description of work \L.I \.% QC ' i9()./ !1I ` ./c /_'�
� 1
mac.C ,�� � �.--.
NOTE Roof mounted and ground mounted mechanical equipment is required to;�be screened.by City
Code. Please contact the Mechanical Inspector for information on permitted screening methods.
COMMERCIAL 0A6-1-1U0t 6CAI , U,
New Construction Interior Improvement
Permit Type Install Piping Processed
Gas 7 Exterior HVAC Unit
—y
Under/Above ground Tank ()Install I,Remove)
COMMERCIAL FEES fl
$60.00 Permit Fee Minimum Contract Value$ ,i 1 )(-1� x.015
$75.00 Underground tank removal, includes State Surcharge =$ /''/ S D Permit Fee
Surcharge=Contract Value x$0.0005 =$ yi/ S Surcharge
If the project valuation is over$1 million,please call for Surcharge / /=$ /`-�'`7-/- TOTAL FEE
You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's
website at www.cityofeagan.com/subscribe.
I hereby acknowledge that this information is complete and accurate; that the work will be in confon7e with the •inances and codes of the City of
Eagan;that I understand this is not a permit,but only an application for a permit,and work is not tQstart out a • rm' that the work will be in accordance
with the approved plan in the case of work which requires a review and approval of plans. 7 f
x f G J
Applicant's Printed Name Appl s gn- ure
FOR OFFICE USE - _.
Required Inspections: Reviewed.By: Date:5r 1 )(f r
•
Underground
Rou h In
1
g Air Test Gas Service Test In floor Heat Flnal HVAC Screening