The preliminary X construction
plans for N,w. 13ELt- -REMO7CTERMt4vAL 'guiLDENG, 1440 CLIFF RoAD
are in our plan review section for your review and comments.
Please return this form to Joe Merchak with your initialed comments and the
date oF review. Failure to return form to Joe vithin five (5) daYs will be
considered pour approval. IP you have any objeetions to approval of these
plans, it is your responsibility to notify this department and reaolve any
problems.
Thank-you. ? 8' g g
J
?
/JS
L o f-
N.e u. d 5, ?l+7 ? K
/ < 1 ?,e`
.SAow J0.n• ?4r
?RL ? t0 1/?
--,
MEMO T0: JAY BERTHE - POLICE DEPT.
CRAIG KNODSENg ENGINEERING TECft.
TOM COLBERT, DIRECTOR OF PUBLIC WORKS
JIM STUAM, PLANNING DEPT.
JON HOHENSTEINt ADMINISTRATION
BILL AKINSt ELECTRICAL INSPECTOR
(JOE CONNOLLYp WATER DEPT.
FROM: DOUG AEID9 DEPARTMENT OF PROTECTIVE I
DATE: 311'?316b
The preliminary construction ?
plans Por HOZTHk,i 3TE2Q L?1-L eQuiPrAF..NT_ _ R_t..04. -U4 GUFr-e?D.
are in our plan review section for your review and comments.
Please return this Form to Steva-Hansoa with your initialed comments and the
?
date of review. Failure to return Porm to Steve vithin five (5) days vill be
considered your approval. IY yoa have any objections to approval oY these
plans, it is your re9ponsibilitq to notify this department and resolve any
probleas.
Thank you.
/JS ?
MEMO T0: JAY BERTHE - POLICE DEPT.
CRAIG KNUDSENv ENGINEERING TECH.
TOM COLBERT, DIRECTOR OF PUBLIC WORRS
JIM STURM, PLANNING DEPT.
'JON HOHENSTEIN, ADMINISTRATION
BILL AKINSp ELECTRICAL INSPECTOR
JOE CONNOLLYo WATER DEPT.
FROM: DOUG REID9 DEPARTMENT OF PROTECTIVE INSPECTIONS
DATE: 311516b
The preliminary construction ?
plans for WOZTH?-)ST_F_?Q _13E].V eQutpMEWT ?LpCa, _- 1446 GUFw? e?o.
are in our plan review section for your review and comments.
JaE. M.
Please return this form to Steve-Ranson with your initialed commeats and the
?
date of review. Failure to return Yorm to SteQe vithin Pive (5) days srill be
considered your approval. If you have any objections to approval of these
plans, it is your responsibility to notify this department aad resolve any
--,
MEMO T0: JAY BEATHE - POLICE DEPT.
CRAIG KNODSEN, ENGINEERING TECFi.
TOM COLBERT, DIAECTOR OF PUBL WORI
?JIM STURMt PLANNING DEPT. ?
JON HOHENSTEINg ADMINISTRATI
BILL AKINSt ELECTRICAL INSPECTOR
JOE CONNOLLYs WATER DEPT.
FROM: DOUG REIDt DEPARTMENT OF PROTECTIVE INSPECTIONS
DATE: 3/15/86
The preliminary construction ?
plans Por 1Scp-TH1.Ie5TF_2?.I ?eLt- I?-quiPMENT
' are in our plan review section for your review and comments.
Please return this form to Steve-iianson with your initialed comments aad the
date oP review. Failure to return form to SteYe vithia five (5) days vill be
considered your approval. If you have any objections to approval of these
plans, it is your respoasibility to notifq this department and resolve any
probless.
Thank you.
/JS
I
,...:,:
MEMO T0: JAY BERTHE - POLICE DEPT.
ED KIRSCHT, SR. ENGINEERING TECH.
CRAIG KNUDSEN, ENGINEERING TECFt
TOM COLBERT, DIRECTOR OF PUBL KS
JIM STURM, PLANNING DEPT.
JON HOHENSTEIN, ADMINISTRATI
HILL AKINS, ELECTRICAL INSPECTOR
JOE CONNOLLY, WATER DEPT.
FROM: DOUG REIDp CHIEF BUILDING OFFICIAL
DATE: MIiRCF{ IOi 1958
7he preliminary X construction
plans £or N.w' BEI.L ' REMOI'CTERMINAL lBUi?DING, 1440 CLIFF RoqD
are in our plan review section for your review and comments.
Please return this form to Joe Merchak with your initialed comments and the
date of review. Failure to return form to Joe within five (5) days will be
considered your approval. If you have any objections to approval of these
plans, it is your respoasibility to notify this department and resolve anq
problems.
lliank-you.
/JS