1579 Cliff Rd - Final Plan Review Memost 5-8r THoMks tAXEcaW
MEMO T0: JAY BERTHE - POLICE DEPT.
ED KIRSCHT, SR. ENGINEERING TECH.
CRAIG KNUDSEN, ENGINEERING TECH.
TOM COLBERT, DIRECTOR OF PUBLIC WORKS
JIM STURM, PLANNING DEPT.
JON HOHENSTEIN, A?MINISTRATION
BILL AKINS, ELECTRICAL INSPECTOR
JOE CONNOLLY, WATER DEPT.
FROM: DOUG REID, CHIEF BUILDING OFFICIAL
DATE: SEPTEMCjER Z I) I968
'Ihe preliminary construction ^
plans for COlJVENIENCE STORE e GAS SiAT7oN AT THOMAS L4KE CENrER (YDCUM (3IL.)
are in our plan review section for your review and comments.
Please return this form to Joe Merchak with your initialed comments and the
date of review. Failure to return form to Joe vithin five (5) days will be
considered your approval. If you have any ob3ections to approval oY these
plans, it is your responaibility to notify this department and resolve any
problems.
Thank-you.
/JS
F? U// qvipHJ 1-r7nc
,?.
?
ME??SO T0: JAY HERTHE - POLICE DEPT.
ED KIRSCHT, SR. ENGINEERING TECH.
CRAIG KNUDSEN, ENGINEERING TECH.
TOM COLBERT, DIRECTOR OF PUBLIC WOHKS
JIM STURM, PLANNING DEPT.
JON HOHENSTEIN, ADMINISTRATION
HILL AKINS, ELECTRICAL INSPECTOR
JOE CONNOLLY, WATER DEPT.
FAOM: DOUG REID, CHIEF BUILDING OFFICIAL
DATE: SCPTEMl3El2 Z!) I9gB
12ie preliminary construction ^
plans for CONVENIENC6 STORE E GAS STATION <4T THOM[wS LAKE CENrER 610CUM
are in our plan review section for your review and comments.
Please return this form to Joe Merehak with your initialed comments and the
date of review. Failure to return form to Joe within five (5) days xill be
considered your approval. If you have any objeetions to approval of these
plans, it is your responsibility to notify this department and resolve any
problems.
1Ytank-you.
V4" I,' ? y ??dc aA Dl K ,
/JS
/?b A
IG????
? ? U / / qVdPP 4'IAc w••a1
MEMO T0: JAY BERTHE - POLICE DEPT.
ED KIASCHT, SR. ENGINEERING TECH.
CRAIG KNUDSEN, ENGINEERING TECH.
TOM COLBERT, DIRECTOR OF PUBLIC WORKS
.TIM STURM, PLANNING DEPT.
JON HOHENSTEIN, ADMINISTRATION
BILL AKINS, ELECTRICAL INSPECTOR
JOE CONNOLLY, WATER DEPT.
FROM: DOUG REID, CHIEF BUILDING OFFICIAL
DATE: SEPTEMBER Z I) I98?'3
1he preliminary construction
plans £or CONVENIENC6 STORE ? (7AS c
are in our plan review section for your
x
AT THOMt`S LAKE
Please return this form to Joe Merchak with your initialed comments and the
date of review. Fa3lure to return form to Joe within Pive (5) days will be
considered your approval. IP you have aay objections to approval oP these
plans, it is your responsibility to notify this depar nt and resolve any
problems.
lhank-you. ??-
.?? /
%
v,L)
/JS
?? U/ /qU/?/R_? 4rlAc?uv•??
MEMO T0: JAY HERTHE - POLICE DEPT.
ED KIRSCHT, SR. ENGINEERING TECH.
CRAIG KNUDSEN, ENGZNEERING TECH.
TOM COLBERT, DIRECTOR OF P LIC WORKS
JIM STURM, PLANNING DEPT. ,
JON HOHENSTEIN, ADMINISTRA ON?
BZLL AKINS, ELECTRICAL INSPECTOR
JOE CONNOLLY, WATER DEPT.
FROM: DOUG REID, CHIEF HUILDING OFFICIAL
DATE: SEPTEML3El2 Z1) 1968
ltie preliminary construction
x
plans for CONVENIENCE STORE f GAS STqTION AT TNOMCS L4KE CEN7j5R
are in our plan review section for your rev3ew and comments.
Please return thid form to Joe Merchak with your initialed comments and the
date oF review. Failure to return Porm to Joe within five (5) days will be
considered your approval. IP you have any objections to approval of these
plans, it is your responsibility to notify this department and resolve any
problems.
Thank-you.
v,?}
/JS
•- ? o I / qvalHJ c.07nF
MEMO T0: JAY BERTHE - POLICE DEPT.
ED KIRSCHT, SR. ENGINEERING TECH.
CRAIG KNUDSEN, ENGINEERING TECH.
TOM COLBERT, DIRECTOR OF PUBLIC WORKS
JIM STIIRM, PLANNING DEPT.
JON HOHENSTEIN, ADMINISTRATION HILL AKINS, ELECTRICAL INSPECTOR
JOE CONNOLLY, WATER DEPT.
FAOM: DOUG REID, CHIEF BUILDING OFFICIAL
DATE: SCPTEM13El2 Z l,I9HE3
1he preliminary construction
plans for
are in our
x
fkT THOMOS LAKE
section for your review and comments.
Yocum 01cl
/
Please return this form to Joe Merchak with your initialed comments and the
date of review. Failure to return form to Joe within five (5) days will be
considered your approval. If you have any objections to approval oP these
plans, it is your responsibility to notify this department and resolve any
problems.
1lzank-you.
[3 g C1j°'?
?T-tk-
/JS