1579 Cliff Rd - Final Inspection Memos
1, 5A, ? rrra s,? K• C?r.
MEMO T0: TDM COLHERT, DIRECTOR OF PIIBLIC WORKS
JIM STDRM, PLANNING DEPARTMENT
BILL A%INS, ELECTRICAL INSPECTOA
CRAIG SNIIASEN, &NGINEERING TSCH 9
SDE SHERIDAN, DTII.ITY HILLIHG CLERB
JDE MERCHAK, CONSTRDCTION ANALYST
FROM: DOIIG REID9 BIIILDZNG INSPECTIONS DEPT
DATE: . jl/I3I o C?
The Protective Inspections Department will be performing a final inspection
for oceupancy of 151?9 e 1• ?P --Roaj on
y ai/89 ()/oc. u m C7 i 1
Please return within 48 hours with your approval
response within that time frame will be determined
each departments responsibility to contact the
necessary requirements before final inspection and
Inspections Department when all requirements ha,
Thank-you.
DR/js
APPROVAL:
(SIGNATDRE & DATE)
or denial. Failure of
as approval. It will be
construction firm with
notifying the Building
re been taken care of.
DENIAL
(SIGN RE & DATE)
1hom4s
MEMO T0: TOM COLBERT, DIRECTOR OF PQBLIC AOR%S
JIM STORM, PLANNING DEPARTMENT
BILL AKZNS, ELECTRICAL INSPECTOR
CRAIG KNIIDSEN, ENGINEERING TfiCH
SIIE SHERIDAN, DTII.ITY BILLING CLER&"
JOE MERCHAg, CONSTRIICTION ANALYST
FROM: DOUG RfiID, BIIILDIHG INSPECTIONS DEPT
DATE: 11/I3I o ?
The Protective Inspeetions Department will be performing a final inspeetion
for occupancy of I5 ,?4 C(. ?P --RQ Qj on
yai/89 (yotum (7i1
Please return within 48 hours with your approval or denial. Failure of
response within that time frame will be determined as approval. Zt will be
each departments responsibility to contact the construction firm s.dth
necessary requirements before final inspection and uotifying the Bu::ldi.^,g
Inspections Department when all requirements have been taken care of.
Thank-you.
DR/js
.,
APPROV-AL.? DENIAL:
` (SIGNATURE & DATE) (SIGNATURE & DATE)
SAr-- Acr %AhF r- eAzF 0r_
?"'hlL Cfi
? ?
?(, ?'? /,? /, ? rn a 5 ? K ? C-?r.
MEMO T0: TOM COLBERT, DIRECTOR OF POBLIC WORKS
JIM STIIEtM, PLANNING DEPARTMENT O
BILL AgINS, ELECTRICAL INSPECTOR
CRAIG BNOASEN, ENGINEERING TECH
SIIE 3HERIDAN, DTILZTY BILLING CLERg
JOE MERCHAK, CONSTRDCTION ANALYST
FROM: DOUG REID, BIIILDING INSPECTIONS DEPT
DATE: .?/I3/ O ?
The Protective Inspections Department vill be performing a final inspection
for oceupancy of ???? (,:. 1• T? I '1 ? Q? on
y a?/Sq ??/oc, u m b i??
Please return within 48 hours with your approval or denial. Failure of
response within that time frame will be determined as approval. It will be
each departments res ponsibility to contact the construction firm with
necessary requirements before final inspection and notifying the Building
Inspeetions Department when all requirements have been taken care of.
Thank-you. -
DR/?s
APPROVAL: ? ?? DENIAL:
(?G ATUR & DATE) (SIGNATURE & DATE)
1?2??0?
???}???
e?- i n,? , ? .?,: _.._
? ????`?