Loading...
1579 Cliff Rd - Final Inspection Memos 1, 5A, ? rrra s,? K• C?r. MEMO T0: TDM COLHERT, DIRECTOR OF PIIBLIC WORKS JIM STDRM, PLANNING DEPARTMENT BILL A%INS, ELECTRICAL INSPECTOA CRAIG SNIIASEN, &NGINEERING TSCH 9 SDE SHERIDAN, DTII.ITY HILLIHG CLERB JDE MERCHAK, CONSTRDCTION ANALYST FROM: DOIIG REID9 BIIILDZNG INSPECTIONS DEPT DATE: . jl/I3I o C? The Protective Inspections Department will be performing a final inspection for oceupancy of 151?9 e 1• ?P --Roaj on y ai/89 ()/oc. u m C7 i 1 Please return within 48 hours with your approval response within that time frame will be determined each departments responsibility to contact the necessary requirements before final inspection and Inspections Department when all requirements ha, Thank-you. DR/js APPROVAL: (SIGNATDRE & DATE) or denial. Failure of as approval. It will be construction firm with notifying the Building re been taken care of. DENIAL (SIGN RE & DATE) 1hom4s MEMO T0: TOM COLBERT, DIRECTOR OF PQBLIC AOR%S JIM STORM, PLANNING DEPARTMENT BILL AKZNS, ELECTRICAL INSPECTOR CRAIG KNIIDSEN, ENGINEERING TfiCH SIIE SHERIDAN, DTII.ITY BILLING CLER&" JOE MERCHAg, CONSTRIICTION ANALYST FROM: DOUG RfiID, BIIILDIHG INSPECTIONS DEPT DATE: 11/I3I o ? The Protective Inspeetions Department will be performing a final inspeetion for occupancy of I5 ,?4 C(. ?P --RQ Qj on yai/89 (yotum (7i1 Please return within 48 hours with your approval or denial. Failure of response within that time frame will be determined as approval. Zt will be each departments responsibility to contact the construction firm s.dth necessary requirements before final inspection and uotifying the Bu::ldi.^,g Inspections Department when all requirements have been taken care of. Thank-you. DR/js ., APPROV-AL.? DENIAL: ` (SIGNATURE & DATE) (SIGNATURE & DATE) SAr-- Acr %AhF r- eAzF 0r_ ?"'hlL Cfi ? ? ?(, ?'? /,? /, ? rn a 5 ? K ? C-?r. MEMO T0: TOM COLBERT, DIRECTOR OF POBLIC WORKS JIM STIIEtM, PLANNING DEPARTMENT O BILL AgINS, ELECTRICAL INSPECTOR CRAIG BNOASEN, ENGINEERING TECH SIIE 3HERIDAN, DTILZTY BILLING CLERg JOE MERCHAK, CONSTRDCTION ANALYST FROM: DOUG REID, BIIILDING INSPECTIONS DEPT DATE: .?/I3/ O ? The Protective Inspections Department vill be performing a final inspection for oceupancy of ???? (,:. 1• T? I '1 ? Q? on y a?/Sq ??/oc, u m b i?? Please return within 48 hours with your approval or denial. Failure of response within that time frame will be determined as approval. It will be each departments res ponsibility to contact the construction firm with necessary requirements before final inspection and notifying the Building Inspeetions Department when all requirements have been taken care of. Thank-you. - DR/?s APPROVAL: ? ?? DENIAL: (?G ATUR & DATE) (SIGNATURE & DATE) 1?2??0? ???}??? e?- i n,? , ? .?,: _.._ ? ????`?