Loading...
2040 Cliff Rd - 2002 Soils Testing - Braun IntertecAUN I NTE RTEC lLlvs"!1 16 An Excavation Observation, Compaction Testing and Special Inspection Report for Magnum Development Corporation Hadler Park Building 2040 Cliff Road Eagan, Minnesota ? 15 C foH 1 2 zoo2 Providing engineerzng and environmental soludons since 1957 Professional Certification: I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Engineer under the laws of the State of Mmnesota. Associate Principal Regisuation Number: 24017 Project BODX-02-171 C December 10, 2002 Braun Intertec Corporation BRAUN Bwun IMertec Corporation Phone 952 431.4493 I NTERTEC 6950 West 1461h Sfreet I Fox. 952 437 3084 Surtel37 Web brauninfetleccom Apple Volley, MN 55124 December 10, 2002 Mr. John Hughes Magnum Development Corporation 3023 South 83`d Plaza ? Omaha, IVE 68124 Dear Mr. Hughes: Project BODX-02-171C Re: Excavation Observarions, Compaction Testing and Special Inspection Report, Hadler Park Building, Eagan, Minnesota This report summazizes the results of our excavation observations, compaction testing, and special inspection observations performed from August 1, 2002 to September 30, 2002, at the Aadler Park Building in Eagan, Minnesota. The purpose of the excavation observations was to evaluate the suitability of the excavation bottom soils for support of the proposed building. The purpose of the compaction testing was to evaluate the suitability of the fill placed for building support. The observations and testing were performed to meet the general requirement of the 1997 edition of the Uniform Building Code (UBC) Secrion 1701, Special Inspections and the projects specifications by an International Conference of Buildmg Officials (ICBO) certified special inspector and engineer in training (EM special inspector. The work was done under the direcrion of a professional engineer registered in the State of Minnesota. Available Infarmation GME Consultants, Inc., performed soil borings for the proposed Hadler Pazk Building. The results were submitted in their "Geotechnical Evaluation RepoR" dated Apnl 10, 2002 under GME project number 9871. We were provided with a set of plans ritled, "Hadler Park", which were prepared by C.M. Architecture, P.A., and were dated April 15, 2002. Offset staldng of the building comers were set in the field by Dazland Construcrion. Braun Intertec excavarion oversizing measurements, bottom of excavation elevations and compachon test locarions and elevations were referenced to those stakes. The exact location of the building is the responsibility of others. Providing engineertng and environmental soiuaons since 1957 Magnum Development Corporation Project BODX-02-171C December 10, 2002 Page 2 Excavation Observations The excavation observarions were conducted by a Level II Engineering Technician under the direct supervision of the project engineer. The excavation observations consisted of observing the soils exposed in the bottom and sidewalls of the excavation. The approximate density or consistency of the soils encountered in the excavation bottom were judged by the force required to advance random, shallow (about 1 to 3 feet deep) hand auger probes. Soil classifications were determined in the field using the American Society for Testing and Materials (ASTM) procedures by examining the hand auger probe cuttings. A backhoe and dozer was used to excavate the foundation area. About 1 foot of topsoil and existing fill soils were removed from the building. The depths of the fill soils ranged from about 6 to 9 feet. The soils encountered in the excavation bottom were silty sand judged to be in a mediwn dense to dense condirion. Poorly graded sands were placed in thin lifts and then compacted with a lazge vibratory compactor. Based on the offset staking, it appears the excavation was adequately oversized. Based on the results of the borings and excavarion observations, it is our opinion the excavation bottom soils are suitable for fill and building support. Compaction Testing Project specificarions required that the engineered fill used to backfill the foundafions, walls, and foundation subgrades throughout the site be placed in thin lifts and thoroughly compacted. Fill placed £or foundation support was to be compacted to a minimum of 98 percent of standard Proctor maximum dry density (ASTM D 698), During this period, 25 compaction tests (1 to 25) were performed. The compaction test results are attached to this report for your records. Concrete Reinforcement The concrete reinforcement observations were conducted on an as-needed basis by an ICBO certified special inspector for reinforced concrete or an American Concrete Institute (ACn certified level II technician. To conduct the observations, the special inspector reviewed the project structural drawings and the available shop drawings. The information included bar size, 6ar length, bar spacing and bar locations. Other items such as clearance, splice length and dowel placements were also included. The information was then used in the field to document the "as-6uilt" canditions. Magnum Development Corporation Project BODX-02-171C December 10, 2002 Page 3 As azeas of work were reviewed, various items were compared to the struchual drawings. If the area of observed reinforcement did not conform to the structural drawings, the contractor was notified of the required additions and/or concems. Based on the results of our observations and available plans, it is our opinion that the reinforcement observed has been placed in general accordance with project plans and specifications. Concrete Testing and Observations The concrete tesring and ohservations were performed by an ICBO certified special inspector for reinforced concrete or an American Concrete Institute (ACI) certified level II technician. Observarion and testing of the footing concrete was performed on August 8, 2002, and consisted of determining slump, temperature and air content as the concrete was discharged from the truck. We also observed the contractor's concrete placement procedures for compliance with industry standards. Concrete test cylinders were cast by the contractor for the slab-on-gade concrete pour. A total of 2 sets of concrete test cylinders were cast for evaluation of compressive strength of the concrete. Review of the 28-day test results indicate the concrete represented Uy these cylinders has met or exceeded the specified minimum 28-day compressive strength. The concrete tested should be considered acceptable based on the requirements of the plans and specifications. The results of the compressive strength tests were previously forwarded and are attached to this report. Structural Steel Observations Observations of the shuctural steel construction were performed by an ICBO certified special inspector for structural steel or a level II technician qualified in accordance with American Society for Nondestructive Testing (ASIVT'), publication SNT-TC-lA. Based on the results of our observations, it is our opinion that the smzctural steel ohserved is in general accordance with project plans and specifications. General Remarks This report contains only findings and results arrived at after employing specific test procedures and standazds listed herein. It is not intended to constitute a recommendation, endorsement or certification of the product or material tested. Services performed by Braun Intertec for this project have been conducted with that level of caze and skill ordinarily exercised by members of the profession currently practicing in this area under similar budget and time restraints. No warranty, expressed or implied, is made. If you have any questions regarding this report contact Rob Golish or Greg Bialon at (952) 431 Sincerely, Braun Intertec Corporation ( "Ze/X4 ?' Robert A. Golish, ETl' Staff Engineer Grego Zn, P?? Associate Principal Mr. Craig Novacyk; Eagan Building v Mr. D.J. Heinle; C.M. Architecture, P. Attachments: Excavation Observation Sketch 1 Report of Field Compaction Tests, Reports 1 tku Proctor Curve, P-1 Compressive Test of Concrete Cylinders, Sets 1 Daily Observations Reports, 1 and 2 Special inspector Daily Reports, 1 and 2 Certified Mill Test Report rag/gjb:skg\02171cUpt Magnum Development Corporation Project BODX-02-171C December 10, 2002 Page 4 if we can be of further assistance to you, please ??' r15 Fee Overs i ize . tv Oversize `-- 903 f 0 j ?908 10 JP i PROPOS M BUI -ii'DING ? , , 850 - 5 SF ? I 916.0 , i 904 i 905 i 908 10 i , i ? i d ? I 1 ?? qe << 1 1 1 j k? I 1 ? I = i a lo i ?. 906 ? 905 lk 1908 Q 10 Feet i ? . . Oversize 0 Feet o rsize i? DRIVE --?HRU ? ; ? 915 c UPAWN BV? RAG 12 6/02 Excavation Observation Sketch BRM V p![ i? ° ? Hadler Park Building ?? ? APP'0 BY: ?$ 2020 Cliff Road ,oB No. BoDX-02-171C ' I NTE RTEC DWG.Na. SNEET or IDagan, Minnesota , SGI.E ],"=20' 1 1 BRAUN Bwun Inhrfee Corpowtien Phone: 952 431.4493 6950 West 146ih Sheet I Fax952 431 3084 INTERTEC $uiVe131 Web' brauninlertec.com Apple Valley, MN 55124 Report of Field Compaction Tests Date: December 5, 2002 Project: BODX-02-171C Report: 1 Client: Mr. John Hughes Magnum Development Corporation 3023 South 83rd Plaza Omaha, NE 68124 Project Description: Consiruction Materials Testing Aadler Pazk Retail Building 2020 Cliff Road Eaean_ Nlinnesota est ate ype Soil ID and Classification Oprimum Moisture* (°/a) Max. Lab Dry Density* (Std.Proc.) (pcf) Inplace Moisture (%) Inplace Dry Density (pcf) Rela6ve Compacrion (%) Specified MInimum Compact. (%) omments 1 8/7/02 N P-1: SP 15.0 108.3 6 106 98 98 A 2 8/7102 N P-1: SP I5.0 1083 6 106 98 98 A 3 8/7/02 N P-I: SP 15.0 1083 5 106 98 98 A 4 8/7/02 N P-I: SP 15.0 1083 6 108 100 98 A- 5 8/7/02 N P-1: SP 15.0 1083 5 107 99 98 A Key: N= Nucleaz, ASTM D 2922 SC= Sand Cone, ASTM D 1556 *= O.M. and M.L.D.D. rounded to nearest 0.1 A= Test results comply with specifications. B= Test results do not comply with specificarions. C= Test results meet zero air voids critena. Test Test Location Elevation 1 15'S, 10'E of NW building comer 905 2 20'E of NVJ building corner 905 3 35'S, 5'E ofNW building comer 907 4 10'N, 20'E of SW building comer 907 5 25'N, SS'E of SW building comer 908 Braun Intertec Corporarion ?? Robert A. Golish, El Staff Engineer Providing engineeTing and envrronmental soLutions since 1957 sRAUN BwunlnfedecCorporalien Phone 952 4314493 6950 West 146ih Street Fax 952.431 3084 INTERTEC Sude131 Web 6?auninterteccom Apple Volley, MN 55124 Report of Field Compaction Tests Date: December 5, 2002 Project: BODX-02-171C Report: 2 Client: Mr. John Hughes Magnum Development Corporafion 3023 South 83`a Plaza Omaha, NE 68124 Project Description: Conslruction Materials Testing Hadier Paxk Retail Building 2020 Cliff Road Ea2an, Minnesota est ate ype Soil ID and Classification Opfimum MoisWre* (%) Max. Lab Dry Density* (Std.Proc.) (pc]) Inplace Moisture (%) Inplace Dry Density (pcf) Relative Compaction (%) Speci£ed Minimum Compact. (%) omments 6 8/8/02 N P-1: SP 15.0 1083 6 109 101 98 A 7 8/8/02 N P-1: SP 15.0 1083 6 107 99 98 A 8 8/8(02 N P-1: SP 15.0 108.3 7 107 99 98 A 9 8/8102 N P-1: SP 15A 1083 7 108 100 98 A 10 8(8(02 N P-1: SP 15.0 1083 6 108 100 98 A Key: N= Nuclear, ASTM D 2922 SC= Sand Cone, ASTM D 1556 *= O.M. and M.L.D.D. rounded to nearest 0.1 A= Test results comply with specifications. B= Test results do not comply with specifications. C= Test results meet zero air voids criteria. Test Test Location Elevation 6 25'S, 60'E ofNW building comer 909 7 15'N, 45'E of SW building comer 909 8 5' S, 25' W of NE building comer 911 9 10'N, 20' W of SE building comer 911 10 20'N, 30' W of SE building comer 911 Elevation Reference: Braun Intertec Corporation 20?/ fz I Robert A. Golish, ETT Staff Engineer oznto\Css-z Provzding engineering and environmensal solutions since 1957 BRAUN INTERTEC Bwun Interfec Corporalion 6950 West 146ih 5lreet Surte 131 Apple Valley, MN 55124 Phone 952 431 4493 iox952.4313084 Webbraunintertecmm Report of Field Compaction Tests Date: December 5, 2002 Project: BODX-02-171C Report: 3 Client: Mr. John Hughes Magnum Development Corporation 3023 South 83`' Plaza Omaha, NE 68124 Project Description: Consh-ucrion Matenals Testing Aadler Park Retail Building 2020 CliffRoad Eaean, Minnesota est ate ype Soil ID and Classification Optimum Moisture* (%) Max. Lab Dry Density* (Std.Proc.) (pcf) Inplace Moisture (%) Inplace Dry Density (pcf) Rela6ve Compaction (%) Specified Minimum Compact. (%) omments 11 8/9/02 N P-1: SP 15.0 1083 7 106 98 98 A 12 8/9102 N P-1: SP 15.0 1083 7 106 98 98 A 13 8/9/02 N P-1: SP 15.0 1083 7 109 101 98 A 14 8/9/02 N P-1: SP 15.0 1083 6 107 99 98 A 15 8/9/02 N P-1: SP 15.0 1083 7 107 99 98 A 16 8/9/02 N P-1: SP 15.0 1083 6 106 98 98 A Key: N= Nuclear, ASTM D 2922 SC= Sand Cone, ASTM D 1556 "= O.M. and M.L.D.D. rounded to nearest 0.1 A= Test results comply with specifications. B= Test results do not comply with specifications. C= Test results meet zero au voids criteria. Test Test Location Elevation 11 15'S, 30'W of NE building comer 913 12 35'S, 50'W of NE building corner 913 13 10'N, 25'E of SW building comer 913 14 5'S, 10'E ofNW building corner 915 15 25'S, 30'E of NW building corner 915 16 40'S, 20' W of NE building corner 915 Elevation Reference: Braun Intertec Corporation Robert A. Golish, EI'I' Staff Engineer 02171cku3 Providing engineering and environmental solutions since 1957 sRAuN INTERTEC Report of Field Compaction Tests Date: December 5, 2002 Client: Mr. John Hughes Magnum Development Corporation 3023 South 83'd Plaza nmaha NE 68124 Bnun Interlec Corporalion 6950 West 146ih Straet Suite 131 Apple Valley, MN 55124 Project: BODX-02-171C Project Description: Construction Materials Testing Hadler Park Retail Building 2020 C1iffRoad Eaean: Minnesota Phone' 952 431.4493 Fax9524313084 Web. braunintertec rom Report: 4 est ate ype Soil ID and Classification Optimum Moisture* (%) Max. Lab Dry DeusiTy* (Std.Proc.) (pcf) Inplace Moisture (%) Inplace Dry Density (pcf) Relafive Compaction (%) Speci£ied Minimum Compact. (%) omments 17 9/5/02 N P-1: SP 15.0 1083 7 105 97 95 A 18 9/5/02 N P-1: SP 15.0 1083 6 107 99 95 A 19 9/5/02 N P-1: SP 15.0 108.3 6 104 96 95 A 20 9/5/02 N P-1: SP 15.0 1083 6 105 97 95 A 21 9/12/02 N P-1: SP 15.0 1083 6 104 96 95 A 22 9/12/02 N P-1: SP 15.0 1083 5 104 96 95 A 23 9/12/02 N P-1: SP 15.0 1083 5 106 98 95 A Key: N= Nucleaz, ASTM D 2922 SC= Sand Cone, ASTM D 1556 *= O.M. and M.L.D.D. rounded to nearest 0.1 A= Test results comply with specifications. B= Test results do not comply with specifications. C= Test results meet zero air voids criteria. Test Test Location Elevatiou ll Interior wall backfill, Cmd C.S, 1 914 18 Interior wall backfill, Grid A, 2.4 914 19 Exterior wall backfill, Gxid A.3, 1 974 20 Exterior wall bacldll, Grid A, 5 914 21 Intenor wall backfill, Grid B, 6 915 22 Interior wall baclill, Grid D, 4.5 915 23 Interior wall backfill, Grid D, 2 915 Elevatian Reference: Braun Intertec Corporation ? Robert A. Golish, EI'I' Staff Engineer 02171c\cts-4 Providing engneering and environmental solutions sin, BRAUN 8wunlnferle<Corporation Phone: 9524374493 INTERTEC avsowest iaerhso-eer I Fax: 952.4313084 Surte 731 Web. bmunintertecmm Apple Valley, MN 55124 Report of Field Compaction Tests Date: December 5, 2002 Project: BODX-02-171C Report: 5 Client: Mr. John Hughes Magnum Development Corporation 3023 South 83rd Plaza Omaha,lVE 68124 Project Description: Construcrion Materials Testing Hadler Pazk Retail Building 2020 Cliff Road Eaean. Minnesota est ate ype Soil ID and Classification Optimum Moisture* (%) Max. Lab Dry Density* (Std.Proc.) (pcf) Eaplace Moisture (%) Inplace Dry Density (pcf) Relative Compaction (%) Speci£ed Minimum Compact. (%) omments 24 9/12/02 N P-1: SP 15.0 1083 6 106 98 95 A 25 9/12/02 N P-1: SP 15.0 1083 5 105 97 95 A Key: N= Nuclear, ASTM D 2922 SC= Sand Cone, AS'I'M D 1556 *= O.M. and M.L.D.D. rounded to nearest 0.1 A= Test results comply with specifications. B= Test results do not comply with specifications. C= Test results meet zero air voids criteria. Test Test Lacation Elevation 24 Exterior wall backfill, Grid D, 3.5 915 25 Exterior wall backfill, Grid C, 6 915 Elevation Reference: Braun Intertec Corporation , Robert A. Golish, ETT Staff Engineer azt7lckts-5 Providing engineering and environmental sotuttons since 1957 MOISTURE-DENSITY RELATIONS OF SOILS 109 I 107 I ZAV for Sp.G. _ 2 45 105 . U a N C ? ? a ? 103 I I I I 101 I I I 99 I I 12 13 14 15 16 17 18 Water content, % Test speafication: ASTM D 698-91 Procedure C Standazd Elev/ Classification Nat. %> %< Depth USCS AASHTO Moist. Sp.G. LL P? 314 in. No.200 SP 2.45 TEST RESULTS MATERIAL DESCRIPTION Maximum dry density = 108.3 pcf Optimum moisture = 15.0 % SP-POORLY GRADED SAND, FINE GRAINED, BROWN Project No. BODX02171CCIient: HADLER PARK, EAGAN, MN. Project: • Location: EAGAN, MN Remarks: MOISTURE-DENSITY RELATIONS OF SOILS BRAUN INTERTEC Figure P_1 BRAUN Broun InMrtec Corporafion Phone: 952 431 4493 6950 West 146th Streel Fox- 952 431 3084 INTERTEC Smfe131 We6 braumnferteccom Apple Valley, MN 55124 Compressive Test of Concrete Cylinder Test Method: ASTM C 39, 6" x 12" Cylinder Date: December 6, 2002 Client: Mr. John Hughes Magnum Development Corporation 3023 South 83' Plaza ProjectNumber: BODX-02-171C Project Description: Construction Materials Testing Hadler Park Retail Building 2020 Cliff Road Nh b251L4 ;LD DATA: Number: e Cast: ie Cast: asured Slump: asured Air: icrete Temperature: Temperature: inder Cast By: uid Added at Site: ;mle Location: 1 8/13/02 1:OD p.m 3Yz" . 1.9% 83°F 74°F BDN None Footings, Grid 6, A to C * Damaged in field rvnnnesow IIGN DATA: Design: ied Air: ied Strength: or Ticket No.: lers Per Set: 303N1 Aggregate Indushies None Specified 3000 205 4 Date Test Field Lab Test Max Load Gy1 Area Cornpressive Remazks SazrroleNo Recvd Date Clue Ore Aee (nounds) (sain) S4enethnsi Code(s) lA 8/15 8/20 2 5 7 28.27 * * 1B 8/15 9/10 2 26 28 137670 28.27 4870 E 1C 8/15 9/10 2 26 28 139090 28.27 4920 E ID 81I5 9/10 HOLD Specified Strength at 28 Days (psi)• 3000 Remarks: E: The average 28-day tes[ results meets or exceeds the specified strength. Braun Intertec Corporation ? 32obert A. Golish, ETT Staff Engineer 02171acoric-1 Providing engineenng and environmental solunons since 1957 BRAUN INTERTEC Compressive Test of Concrete Cylinder Test Method: AST'M C 39, 6" x 12" Cylinder Date: October24, 2002 ProjectA'umber: BODX-02-171C Client: Project Description: Mr. John Hughes Construction Matenals Testing Magnum Development Corporation Hadler Park Retail Building 3023 South 83"' Plaza 2020 C1iff Road Phone 952 431 4493 Fax952 431 3084 Web 6rounlniertec com Omaha, NE 68124 Eagan, Minnesota IELD DATA: ESIGN DATA: Set Number: 2 ix Design: Not given ateCast: 9/24/02 Supplier: NoTgiven Tune Cast: Not given Specified Air: Not given easured Slump: Not given Specified Sfrength: 3500 easured Air: Not given mck or Ticket No.: Not given Concrete Temperature: Not given Cylinders Per Set: 3 Air Temperature: Not given Cylinder C`ast By: Contractor iquid Added at Site: Not given Saznple Location: S]ab-on-gade ield Notes: Date TesY Field Lab Test Max I.oad Cy1.4iea Compressive Rexnarics Sample Iv'o. Recvd Date (,lire C,lire Age (pounds) (sq in) Sfreneth, osi Code(s) 2A 9/25 10/1 1 6 7 118380 2827 4190 D 2B 9/25 10/22 1 27 28 153540 2827 5430 E 2C 9/25 10/22 1 27 28 15519 28.27 5490 E Specified Strength at 28 Days (psi): 3500 Remarks: D: The 7-day test result meets or exceeds the specified strength. E: Tle average 28-day test results meets or exceeds the specified strength. 02171c?conc-2 Braun Infertec Corpomfion 6950 West 146th Streel Smte 131 Apple Valley, MN 55124 Bmun Intertec Corporarion Robert A. Golish, ETl' Staff Engineer Pravidrng engineering and enviTOnmental solutions since 1957 s Rau N=M INTERTEC DAILY OBSERVATION REPORT Project #: &L C1?G 2-1 '1I L Report#: sfl I ir 5 ( 1) Locat9on: NF}Dt.-t_ PR2-K Date: ??- (z, ' oZ- EA6&-.5 , Mr.S Personnel Classification Regular Hours Overtime Hours t2- . -T'C Areas and work performed this day: n C3=StR-Vd? L3 c;.LT?M SD i LS fw- P(z-OPDSe?D 94411-Dla/fs MP. StattS C.a3rsSlS'f"C? P1(,l"R4W G?F s,Lcy SRnrps rN .4 T-E) DErJ..SJ5' C?as??rrnn?. I?UfG T af 7y?PSoiL i?ILc- d-)2y-s Q-t??/I-zr>vE0 E2-fl/tn E&r .Sl!)f? nF qLli LD/.i1is tlr'Afi 70 g ?E? ? Qc ?D/SO/L r1 t- [, oN T?/E wCST S%po. &5-xG4vA Ti p.cJ t,/,9-S L,tY?E JnIiTd A' "1<1106 rbyO AqzE;? Arvv1? WA5 f%?-t??4t? 0119?SIZeo ?6 A 7YJlWI~/YI f f/ //Awp AL1fs6f? I-OXV/SK5 W4;q,6 &r1,0kGT9b O.v 92778M SoILS &vQ ! fe?y f'?Lx+?- fl"?Tilgo- Sk I7-ARL.'er- ?L*L1L0>/?G- ? ??'?T ?'? ?K? Weather: ?L?.? ?'if?S Performed B,v?? Submitted To: F: DAILY 1 DOF-01 s Rau N=M INTERTEC DAILY OBSERVATION REPORT Project #: &Q4Xp 2-f? 1e- Report #: ZFI1O6Di?JitT?- 1,2? Location: 11A21-Eti' ,?'/}/eYC Date: 17Ls5L02 ??d?, m?? ? , Personnel Classification Regular Hours Overtime Hours L?JI? . T Areas and work performed this day: &1W11LW 60o ri??e- s ??' ? D S f} ! ?1 -? AEiA/I`DRC?n/fr 04 f-/Z/sn& Ts? N L- , , ? fl 4 X I"Z. p vJ f-rr? 40?T ei>,cr7- 1?q.ns : Ey , rd -7*S e • W• F5 ? 54- & X/ Z " y?? ?, v? ? C"e ? ? B?;i? rb h/???n?F??c ?.v c.. ? AL 1- REi.vroACiNlr AAcEn iiv 6€NY?AC- ??Goas-rA>VL? 1411 v-i?/ t'l.?AvS A SAEC' S Weather: Pc, 70c5 Performed By: ? Submitted To: PAW L w' F: DAILY 1 DOR-01 f B RA V N y Special Inspector Daily Report Page l of I NTE RTEC City of Report Number. 5Q?1*1 Date of This Report: 17- (a ??. 0 Projec[ Name: Project No.: ?oDX?ol. Project Address: ClienC Client Project No.: Weather: Temperature: X%C Type of Inspection: Inspection Coverage: ? Continuous ? Masonry ? Rebar Placement ? Foundations ? Periodic Vf Weiding ? Concrete Placement ? Fiteproofing 16 Boltin ? Tendon Placement ? Other Did the architect or en ineer authorize chanes to cit a roved lans? Yes ?(Listed Below) No ? De,CC?ription and location ef work completed: V (? D4I' 1,01.v 11- p %X\9,j' v.Te.Qs) wA' '9 t7J- If'J'p- Q?1 ?- `? TeN..si --, 13o t)t G,; ak A- c r. c? R_ ? Cu_ +- Llr rl..---r IC' o ?2 C.E,y% u6-2 I?,. ,,,?r c en= ?e I h Pj Pd ? t)Pr~?. ???.,r. 7.il s'!-eP 1 1'io l ds are A 30-7 3(.k51_ - J 6? • Are there any'discrepancies noted from this day's o6sernations? Ye^s? N?? ? • Are there any outstanding discrepancies on this project? Yes l_)" No ? • If yes, see attached Summary Sheet. To the be.et of our knowledge, work inspected was done in xccordance with the approved plans, specifications and applicable workmanship provisions of the UBC, except as noted ahove. Signed: Date: Print Full Name: t.D. fYumhar. _ ?C)';-t4 L1"??a _ (White copy to Braun Intenec file. Yel(ow copy to General Contractor. ) Gm\specrosp 4 112?5795 B RA`1 N'° INTERTEC Report Number: Project Name: Projea Address: Client: W eather: Specia( Inspector Daily Report Page ` of ? -, City of L C, 5 ou-. _ 5.?.,-up}2,,,G ( S t-?,Q_k"" ,)- Date of This Report: q_i&- a Z Project No.- R?i DtC^a?- 17 t L Client Project No.: Tempecature: Type of ]nspection: Inspection Coverage: ? Continuous ? Masonry ? Rebar Placement ? Foundations ? Periodic JZ Welding ? Concrete Placement ? Fireptoo£ng ? Boltin ? Tendon Placement ? Other Did the azchitect or en ineer authorize chanes to cit a roved lans? Yes ?(L.isted Below) No ? Description and location ef work completed: o`-1- -fl ?-t.. - J Fu. c,l\ Z. (3l Aacv pVS7 , ptd b Rz W.._k-?O. List tests performed: • Are there any, discrepancies noted from this d3y's observatiuns? Ye,s ? Nn • Are there any outstanding discrepancies on this project? Yes ? No • If yes, see attached Summary Sheet. To the bes[ of our knowledge, work inspected was done in accordance with the approveci plans, specifications and applicable workmanship provisions of the UBC, except as noted ahove. Signed: - 1?Date: Print Full Name: (.D Numher. tSN U4 S'-?'b (White copy to Braun Intertec fi1e. Yellow capy to Generat Contractor.) Crm\spccinspA I/25ry5