Loading...
2105 Cliff Rd - Final Inspection MemoLeaar 1,1i f-} l:omm. • Pk. MEMO T0: TOM COLBERTt DIRECTOR OF PIIBLIC WORI{S JIM STIIRM, PLANNING DEPARTMENT SILL AKINS, ELECTRICAL INSPECTOR . CRAIG KNUASEN, ENGINEERING TECH SIIE SAERIDAN, DTILITY BILLING CLERR FROM: DOQG R$ID, BUILDING INSPECTIONS DEPT DATE: The Protective Inspections Department will be performing a final inspection for occupancy of o9lQ,rj C(i-PP RoQQ on 9/0?9/8o T"ire5 -plue and Gf;dc?en _Paivl %enQnf" Spaces Q., y. Please return within 48 hours with your approval or denial. Failure of response within that time frame will be determined as approval. It will be each departments responsibility to contact the construction firm with necessary requirements before final inspeetion and notifying the Building Inspections Department when all requirements have been taken care of. Thank-you. DR/Js APPROVAL: DENIAL: (S?yI?GNATURE & DATE) (SIGNATURE & DATE) y? `V 1? ec;? ? l /?J •-, ??? Ledar Comm. ? k. 14*- MEMO T0: TOM COLBERT, DIRECTOR OF POBLIC WORIGS dIM STURM, PLANNING DEPARTMENT BILL AKINS, ELECTRICAL INSPECTOR CRAIG IQJUDSEN, ENGINEERING TECH SQE SHERIDANg IITILITY BILLING CLERK ?-? ?835 FROM: DOQG REID, BDILDING INSPECTIONS DEPT DATE: ^7AW8'8` The Proteetive Inspections Department will be performing a final inspection for occupancy of alQ,rj C [i-pp ?Oac-1 on 949 9/8'? TireS {1u5 nnd 61;dc?en ?aiv? ie.?an? . / SPases QnfJ. Please return within 48 hours with your approval or denial. Failure of response within that time frame will be determined as approval. It will be eaeh departments responsibility to contaet the construction firm with necessary requirements before final inspection and notifying the Building Inspections Department when all requirements have been taken care of. Thank-you. DR/js 9PPROVA . DENIAL: - (SIGNATU E & DATE) ( IGNATURE & DATE) N ? . ?? ? N ? ??? MEMO T0: TOM COLBERTt DIRECTOR OF PUBLIC WORRS JIM STURM, PLANNING DEPARTMENT BILL AKINS, ELECTRICAL INSPECTOR CRAIG KNIIASEN, ENCINEERING TECA SQE SHERIDAN, OTILITY BILLING CLERK FROM: DOUG R£IDO BDILDING INSPECTIONS DEPT DATE: 5/aa/?g ?t k. The Protective Inspeetions Department will be performing a final inspeetion for occupancy of a105 C(; -p-p /'SOCId on 9?aq?gg Tireb _Plus Gnd Gl;dclen ?Aint ?enant SPaces Coy. Please return within 48 hours with your approval or denial. Failure of response within that time frame will be determined as approval. It will be each departments responsibility to contact the construction firm with necessary requirements before final inspection and notifying the Building Inspections Department when all requirements have been taken care of. Thank-you. DR/Ss YENIAL: (SIGNATURE & DATE)