2105 Cliff Rd - Final Inspection MemoLeaar 1,1i f-} l:omm.
• Pk.
MEMO T0: TOM COLBERTt DIRECTOR OF PIIBLIC WORI{S
JIM STIIRM, PLANNING DEPARTMENT
SILL AKINS, ELECTRICAL INSPECTOR .
CRAIG KNUASEN, ENGINEERING TECH
SIIE SAERIDAN, DTILITY BILLING CLERR
FROM: DOQG R$ID, BUILDING INSPECTIONS DEPT
DATE:
The Protective Inspections Department will be performing a final inspection
for occupancy of o9lQ,rj C(i-PP RoQQ on
9/0?9/8o T"ire5 -plue and Gf;dc?en _Paivl %enQnf"
Spaces Q., y.
Please return within 48 hours with your approval or denial. Failure of
response within that time frame will be determined as approval. It will be
each departments responsibility to contact the construction firm with
necessary requirements before final inspeetion and notifying the Building
Inspections Department when all requirements have been taken care of.
Thank-you.
DR/Js
APPROVAL: DENIAL:
(S?yI?GNATURE & DATE) (SIGNATURE & DATE)
y?
`V 1? ec;? ? l /?J
•-, ??? Ledar Comm.
? k. 14*-
MEMO T0: TOM COLBERT, DIRECTOR OF POBLIC WORIGS
dIM STURM, PLANNING DEPARTMENT
BILL AKINS, ELECTRICAL INSPECTOR
CRAIG IQJUDSEN, ENGINEERING TECH
SQE SHERIDANg IITILITY BILLING CLERK
?-? ?835
FROM: DOQG REID, BDILDING INSPECTIONS DEPT
DATE: ^7AW8'8`
The Proteetive Inspections Department will be performing a final inspection
for occupancy of alQ,rj C [i-pp ?Oac-1 on
949 9/8'? TireS {1u5 nnd 61;dc?en ?aiv? ie.?an?
. /
SPases QnfJ.
Please return within 48 hours with your approval or denial. Failure of
response within that time frame will be determined as approval. It will be
eaeh departments responsibility to contaet the construction firm with
necessary requirements before final inspection and notifying the Building
Inspections Department when all requirements have been taken care of.
Thank-you.
DR/js
9PPROVA . DENIAL: -
(SIGNATU E & DATE) ( IGNATURE & DATE)
N ?
. ??
? N
?
???
MEMO T0: TOM COLBERTt DIRECTOR OF PUBLIC WORRS
JIM STURM, PLANNING DEPARTMENT
BILL AKINS, ELECTRICAL INSPECTOR
CRAIG KNIIASEN, ENCINEERING TECA
SQE SHERIDAN, OTILITY BILLING CLERK
FROM: DOUG R£IDO BDILDING INSPECTIONS DEPT
DATE: 5/aa/?g
?t k.
The Protective Inspeetions Department will be performing a final inspeetion
for occupancy of a105 C(; -p-p /'SOCId on
9?aq?gg Tireb _Plus Gnd Gl;dclen ?Aint ?enant
SPaces Coy.
Please return within 48 hours with your approval or denial. Failure of
response within that time frame will be determined as approval. It will be
each departments responsibility to contact the construction firm with
necessary requirements before final inspection and notifying the Building
Inspections Department when all requirements have been taken care of.
Thank-you.
DR/Ss
YENIAL:
(SIGNATURE & DATE)