Percolation Rate 2.7 Minutes Per Inch
Percolation Test Readings made by Tom Klanchnik on May 10, 2009 starting at 4:40 pm.
Test Hole Location: 3344 Sibley Memorial (Hwy 13), Hole Number: P1, Date hole was prepared: 5/10/09.
Depth of hole bottom is 24 inches, Diameter of hole is 6 inches.
Soil data from test hole:
PERCOLATION TEST DATA SHEET
Depth in Inches
0 -8"
10 18"
18" 24"
Soil Texture
10 YR 2/2 Sandy Loam
10 YR 3/3 Medium Sand
10 YR 4/4 Medium Sand
Method of scratching sidewall is 2 x 2 with nails. Depth of gravel in hole is 2 inches
Date and hour of initial water filling 5/10/09, 4:05 pm. Depth of initial filling is 12 inches above hole bottom.
Method used to maintain at least 12 inches of water depth in hole for at least 4 hours is 12" drop in 10 minutes,
Presoak is Not Required. Maximum Water depth above hole bottom during test is 8 inches.
Time
Time Interval,
Minutes
Measurement,
Inches
Drop in Water
Level, Inches
Percolation Rate
Minutes Per
Inch
Remarks
4:40
7"
8" Water Head
4:41
1 Minute
6 5/8"
3/8"
2.7
Refill to 8"
4:42
1 Minute
6 5/8"
3/8"
2.7
Refill to 8"
Refill to 8"
4:43
1 Minute
6 5/8"
3/8"
2.7
4:44
1 Minute
6 5/8"
3/8"
2.7
Percolation Rate 2.7 Minutes Per Inch
Percolation Test Readings made by Tom Klanchnik on May 10, 2009 starting at 4:40 pm.
Test Hole Location: 3344 Sibley Memorial (Hwy 13), Hole Number: P1, Date hole was prepared: 5/10/09.
Depth of hole bottom is 24 inches, Diameter of hole is 6 inches.
Soil data from test hole:
PERCOLATION TEST DATA SHEET
Depth in Inches
0 -8"
10 18"
18" 24"
Soil Texture
10 YR 2/2 Sandy Loam
10 YR 3/3 Medium Sand
10 YR 4/4 Medium Sand
Method of scratching sidewall is 2 x 2 with nails. Depth of gravel in hole is 2 inches
Date and hour of initial water filling 5/10/09, 4:05 pm. Depth of initial filling is 12 inches above hole bottom.
Method used to maintain at least 12 inches of water depth in hole for at least 4 hours is 12" drop in 10 minutes,
Presoak is Not Required. Maximum Water depth above hole bottom during test is 8 inches.
Soil data from test hole:
Percolation Rate 2.7 Minutes Per Inch
PERCOLATION TEST DATA SHEET
Percolation Test Readings made by Tom Klanchnik on May 10, 2009 starting at 4:30 pm.
Test Hole Location: 3344 Sibley Memorial (Hwy 13), Hole Number: P2, Date hole was prepared: 5/10/09.
Depth of hole bottom is 24 inches, Diameter of hole is 6 inches.
Depth in Inches
0" 8"
10 18"
18" 24"
Soil Texture
10 YR 2/2 Sandy Loam
10 YR 3/3 Medium Sand
10 YR 4/4 Medium Sand
Method of scratching sidewall is 2 x 2 with nails. Depth of gravel in hole is 2 inches
Date and hour of initial water filling 5/10/09, 4:05 pm. Depth of initial filling is 12 inches above hole bottom.
Method used to maintain at least 12 inches of water depth in hole for at least 4 hours is 12" drop in 10 minutes,
Presoak is Not Required. Maximum Water depth above hole bottom during test is 8 inches.
Time
Time Interval,
Minutes
Measurement,
Inches
Drop in Water
Level, Inches
Percolation Rate
Minutes Per
Inch
Remarks
4:30
7"
8" Water Head
4:31
1 Minute
6 5/8"
3/8"
2.7
Refill to 8"
4:32
1 Minute
6 5/8"
3/8"
2.7
Refill to 8"
4:33
1 Minute
6 5/8"
3/8"
2.7
Refill to 8"
4:34
1 Minute
6 5/8"
3/8"
2.7
Soil data from test hole:
Percolation Rate 2.7 Minutes Per Inch
PERCOLATION TEST DATA SHEET
Percolation Test Readings made by Tom Klanchnik on May 10, 2009 starting at 4:30 pm.
Test Hole Location: 3344 Sibley Memorial (Hwy 13), Hole Number: P2, Date hole was prepared: 5/10/09.
Depth of hole bottom is 24 inches, Diameter of hole is 6 inches.
Depth in Inches
0" 8"
10 18"
18" 24"
Soil Texture
10 YR 2/2 Sandy Loam
10 YR 3/3 Medium Sand
10 YR 4/4 Medium Sand
Method of scratching sidewall is 2 x 2 with nails. Depth of gravel in hole is 2 inches
Date and hour of initial water filling 5/10/09, 4:05 pm. Depth of initial filling is 12 inches above hole bottom.
Method used to maintain at least 12 inches of water depth in hole for at least 4 hours is 12" drop in 10 minutes,
Presoak is Not Required. Maximum Water depth above hole bottom during test is 8 inches.
Soil data from test hole:
Percolation Rate 3.2 Minutes Per Inch
PERCOLATION TEST DATA SHEET
Percolation Test Readings made by Tom Klanchnik on May 10, 2009 starting at 4:20 pm.
Test Hole Location: 3344 Sibley Memorial (Hwy 13), Hole Number: P3, Date hole was prepared: 5/10/09.
Depth of hole bottom is 24 inches, Diameter of hole is 6 inches.
Method of scratching sidewall is 2 x 2 with nails. Depth of gravel in hole is 2 inches
Date and hour of initial water filling 5/10/09, 4:05 pm. Depth of initial filling is 12 inches above hole bottom.
Method used to maintain at least 12 inches of water depth in hole for at least 4 hours is 12" drop in 10 minutes,
Presoak is Not Required. Maximum Water depth above hole bottom during test is 8 inches.
Depth in Inches
Soil Texture
Time Interval,
Minutes
Measurement,
Inches
Drop in Water
Level, Inches
0"
8"
10 YR 2/2 Sandy Loam
10"
18"
10 YR 3/3 Medium Sand
18"
24"
10 YR 4/4 Medium Sand
1 Minute
6 5/8"
3/8"
2.7
Refill to 8"
Soil data from test hole:
Percolation Rate 3.2 Minutes Per Inch
PERCOLATION TEST DATA SHEET
Percolation Test Readings made by Tom Klanchnik on May 10, 2009 starting at 4:20 pm.
Test Hole Location: 3344 Sibley Memorial (Hwy 13), Hole Number: P3, Date hole was prepared: 5/10/09.
Depth of hole bottom is 24 inches, Diameter of hole is 6 inches.
Method of scratching sidewall is 2 x 2 with nails. Depth of gravel in hole is 2 inches
Date and hour of initial water filling 5/10/09, 4:05 pm. Depth of initial filling is 12 inches above hole bottom.
Method used to maintain at least 12 inches of water depth in hole for at least 4 hours is 12" drop in 10 minutes,
Presoak is Not Required. Maximum Water depth above hole bottom during test is 8 inches.
Time
Time Interval,
Minutes
Measurement,
Inches
Drop in Water
Level, Inches
Percolation Rate
Minutes Per
Inch
Remarks
4:20
7"
8" Water Head
4:21
1 Minute
6 5/8"
3/8"
2.7
Refill to 8"
4:22
1 Minute
6 11/16"
5/16"
3.2
Refill to 8"
4:23
1 Minute
6 11/16"
5/16"
3.2
Refill to 8"
4:24
1 Minute
6 11/16"
5/16"
3.2
Soil data from test hole:
Percolation Rate 3.2 Minutes Per Inch
PERCOLATION TEST DATA SHEET
Percolation Test Readings made by Tom Klanchnik on May 10, 2009 starting at 4:20 pm.
Test Hole Location: 3344 Sibley Memorial (Hwy 13), Hole Number: P3, Date hole was prepared: 5/10/09.
Depth of hole bottom is 24 inches, Diameter of hole is 6 inches.
Method of scratching sidewall is 2 x 2 with nails. Depth of gravel in hole is 2 inches
Date and hour of initial water filling 5/10/09, 4:05 pm. Depth of initial filling is 12 inches above hole bottom.
Method used to maintain at least 12 inches of water depth in hole for at least 4 hours is 12" drop in 10 minutes,
Presoak is Not Required. Maximum Water depth above hole bottom during test is 8 inches.
End of Boring at 5.5
Standing Water Table:
Present at
feet of depth,
hours after boring.
Not Present in boring hole X
Mottled Soil:
Observed at 5.0�� feet of depth.
Not Present in boring hole
LOG OF SOIL BORINGS
Location of Project: 3344 Sibley Memorial (Hwy 13)
Borings made by Tom Klanchnik Date: May 10, 2009
Classification System: AASHO USDA -SCS X Unified
Auger Used (check two): Hand _X Power
feet.
Flight Bucket X Other
End of Boring at 5.5_
Standing Water Table:
Present at feet of depth,
hours after boring.
Not Present in boring hole X
Mottled Soil:
feet.
Observed at 5.0 feet of depth
Not Present in boring hole
Other
Depth
In
Feet
Boring Number B 1
Depth
In
Feet
Boring Number B2
Surface Elevation
Surface Elevation
10 YR 2/2 Sandy Loam
10 YR 2/2 Sandy Loam
10 YR 3/3 Medium Sand
10 YR 3/3 Medium Sand
2
2
3
3
4
4
5
10 YR 4/4 Medium Sand
5
10 YR 4/4 Medium Sand
10 YR 5/4 Fine Sand
10 YR 5/4 Fine Sand
6
6
Mottled at 60"
Mottled at 60"
7
7
8
8
End of Boring at 5.5
Standing Water Table:
Present at
feet of depth,
hours after boring.
Not Present in boring hole X
Mottled Soil:
Observed at 5.0�� feet of depth.
Not Present in boring hole
LOG OF SOIL BORINGS
Location of Project: 3344 Sibley Memorial (Hwy 13)
Borings made by Tom Klanchnik Date: May 10, 2009
Classification System: AASHO USDA -SCS X Unified
Auger Used (check two): Hand _X Power
feet.
Flight Bucket X Other
End of Boring at 5.5_
Standing Water Table:
Present at feet of depth,
hours after boring.
Not Present in boring hole X
Mottled Soil:
feet.
Observed at 5.0 feet of depth
Not Present in boring hole
Other
Location of Project: 3344 Sibley Memorial (Hwy 13)
Borings made by Tom Klanchnik Date: May 10, 2009
Classification System: AASHO USDA -SCS X Unified
Auger Used (check two): Hand X Power
End of Boring at 5.5
Standing Water Table:
Present at
feet of depth,
hours after boring.
Not Present in boring hole X
Mottled Soil:
Observed at _5.0 feet of depth.
Not Present in boring hole
LOG OF SOIL BORINGS
feet.
feet.
Flight Bucket X Other
End of Boring at 5.5
Standing Water Table:
Present at feet of depth,
hours after boring.
Not Present in boring hole X
Mottled Soil:
Observed at 5.0 feet of depth
Not Present in boring hole
Other
Depth
In
Feet
Boring Number B3
Depth
In
Feet
Boring Number B4
Surface Elevation
Surface Elevation
10 YR 2/2 Sandy Loam
10 YR 2/2 Sandy Loam
10 YR 3/3 Medium Sand
10 YR 3/3 Medium Sand
2
2
3
3
4
4
5
10 YR 4/4 Medium Sand
5
10 YR 4/4 Medium Sand
10 YR 5/4 Fine Sand
10 YR 5/4 Fine Sand
6
6
Mottled at 60"
Mottled at 60"
7
7
8
8
Location of Project: 3344 Sibley Memorial (Hwy 13)
Borings made by Tom Klanchnik Date: May 10, 2009
Classification System: AASHO USDA -SCS X Unified
Auger Used (check two): Hand X Power
End of Boring at 5.5
Standing Water Table:
Present at
feet of depth,
hours after boring.
Not Present in boring hole X
Mottled Soil:
Observed at _5.0 feet of depth.
Not Present in boring hole
LOG OF SOIL BORINGS
feet.
feet.
Flight Bucket X Other
End of Boring at 5.5
Standing Water Table:
Present at feet of depth,
hours after boring.
Not Present in boring hole X
Mottled Soil:
Observed at 5.0 feet of depth
Not Present in boring hole
Other
SEPTIC SYSTEM DESIGN
DESIGN CRITERIA;
Existing 4 bedroom type 1 single family home, without a garbage disposal. Has
been remodeled to a 3 bedroom type 1 single family home, without a garbage
disposal. Customer requests additional capacity for possible addition of detached
garage with guest bedroom and bathroom. Design as a 4 bedroom type 1 single
family home, with a garbage disposal
WATER USAGE;
600 gallons per day maximum.
PERCOLATION RATE;
3.2 minutes per inch.
SEPTIC TANK;
Pump, Collapes, and fill existing tanks. Install one 1,500 gallon double
compartment septic tank. Please see detail. Note: tank requires pumping once
every three years.
DRAINFIELD; S
Drainfield trenches,)Fflsquare feet required square feet proposed. Each
trench is 36 inches wide with 6 inches of rock below the pipe. ineal feet of
trench proposed. 9 ,00
GENERAL CONSTRUCTION PRACTICES;
Divert all surface water away from the drainfield area. Do not disturb the
drainfield area during construction. Fence off the drainfield area before permit
application. If there are any questions regarding this design please contact Tom
Klanchnik at (952) 461 -2356.
Gtt y T
On
°a 11e
Number
Bedrooms
-1� itrim>ttn Li
1,
d
Liquid qty
'V
with
C aty
g ge dis
lift insi
2orleas
50
1125
3 or 4 i
1000
1540
5 or 6 3
1 500
2250
f, 8 or g
r
2000
3000
Trench and Bed Worksheet
All boxed rectangles must be entered, the rest will be calculated.
1. AVERAGE DESIGN FLOW
A. Estimated I 600 gpd (see figure
or measured x 1.5 (safety
B. Septic tank capacity 15001 gallons
2. SOILS (Site evaluation data)
C. Depth to restricting layer 5 Meet
D. Maximum depth of system Item C 3 ft 2 feet
E. Texture Sand
Percolation rate 3.2 MPI
F. SSF 0.83 ft (see figure D-15)
3. TRENCH OR BED BOTTOM AREA
H. For trenches with 6 inches of rock below the pipe:
A x F 600 gpd x 0.83 ft/gpd 498.0 ft
I. For trenches with 12 inches of rock below the pipe:
AxFx0.8= gpd ft/gpd x 0.8
J. For trenches with 18 inches of rock below the pipe:
A x F x 0.66= gpd x ft/gpd x 0.66
K For trenches with 24 inches of rock below the pipe:
A x F x 0.6= gpd x ft/gpd x 0.6
L. For gravity beds with 6 or 12 inches of rock below the pipe;
1.5xAxF =1.5x gpdx ft/gpd
For pressure beds with 6 or 12 inches of rock below the pipe;
A x F gpd x ft/gpd
4. DISTRIBUTION (Check all that apply)
Bed <6% slope)
Drop Boxes (any slope)
Pressure
gpd
X Drop Boxes (any slope)
Distribution Box (<3
X Gravity
1 1: E iimak d SewageRom in Gallons pa Day
amber al
bedtoorrs
2
3
4
6
7
8
Class I
300
450
boa
no
900
1050
1200
Oassi1
300
375
450
525
600
tss111
218
256
294
70
408
D-15: SoB ataractedatics and Soil gulag
Factor (SS) 0 3 separtirnt)
Ferro
7 4 :r. cs per
f= r thArio.r
Fila Sr.} 5
.s
Coarso twat
Addedruaf sood
Rae as,d
t ady ioara
%t loam
Sat 1
(.0 City loara
d
Silty
e: 41 to 1.10"" of Coy
Sandy dy
*.r
ax e.; •..4,._.
�sq othte Of pea:4m ,-system rassihs v ,1
Use 600 Sq Feet
on than Imo'
X
Rock
Chamber
Gravelless
ASS
w
2.20
OW
of the
vanes
the
Oax L
II, a
cairn.
'5.. SYSTEM WIDTH, LENGTH AND VOLUME
M. Select width 1 3.0 1 ft
N. If using rock, divide bottom area by width: (H, 1, J or K) divided by P lineal feet
ft 3.0 ft 200.0 lineal feet
Rock depth below distribution pipe plus 0.5 foot times bottom area:
(Rock depth 0.5 foot x Area (H, I, J, K, L)
0.5 ft 0.5 ft) x I 600.0 I ft 600.0 ft
Volume in cubic yards volume in cubic feet divided by 27
600.0 27= 22.2 yd
Weight of rock in tons cubic yards times 1.4
22.2 x 1.4= 31.1 tons Use 33 Tons
0. If using 10" Gravelless Pipe, length Flow A x Gravelless SSF (see figure D -9)
gpd x f ft/gpd lineal feet
P. If using a Chamber (H, 1, J, K [based on height of chamber slats] divided by width of chamber in ft)
ft2 ft lineal feet
7. LAWN AREA
1 600.0 I
Q. Select trench spacing, center to center 1 3 feet
R. Multiply trench spacing by lineal feet R x Q sq. ft. of lawn area
3 x 200.0 600 ft
8. LAYOUT
Select an appropriate scale; one inch 40 1feet
Show pertinent property boundaries, rights -of -way, easements.
Show location of house, garage, driveway, and all other improvements, existing or proposed.
Show location and layout of sewage treatment system, well and dimensions of all elevations, setbacks and separation distances.
I hereb l :t I have completed this work in accordance with all applicable ordinances, rules and Taws
(signature) 2656 (license
5 -11 -09 (date)
D -+3: Soil Charaetv.:.t:es and Soil sizing
factors tSSP) for Gravelless Pipe
irttirnr ,'trert4i) soil to ure
lineal l n a:}
g atWn, }stay
Fasts* than O 1 CORM Sethi
0.1 toy MedhtmSand
01 to 5 S e r
S to t 3 5at4 Irian
tt
t6to30
31 to 45 Sit Want
46 to60 Oa Loan ttCLt
0.
sto it than 60"(
Silty Clay
0.24
0.6
0,42
0.56
0.67
0.74
•Sral rozretrarse tar sew treatment.
"Serf having 30% r it ne send wry rie sand. permeable sans
"'.Sal with tw high a cf d to-
ina d a standard ingrc ind system
main. 1 Zr h. 4101,rii7 1 C P 10 i Gem 0s a .t• Sues= imir.Wirri llrLar s
PRQ'U R&D INFORMATION Check boat if completed:
0 North strew Lakes, rivers, streams, wetlands
0 Designated soil treatment area Q airline:7 hide meter level of public waters
Alternate sail tesatm ant area 0 Ten -year Hood elevation
0 sail boring i pare test locations with
korkisrtnl in vertical reference point
Walls *thin 100 feet
sewer Lees witisln 30 feet amens
Directlsn of slope($
deeding potential eaves
Location of disturbed or oosapaatad arias
O Location of run-on potential areas
O non of bettor: of soil treatment area
Q Access route for task maintenance
0 std
Lot lines
Lot dimensions
O Lot ease
mocks ems building
Proposed le existing baildinii
with foundations
(n
l
SCALE 1 inch v
R,
•+itT a;f a itmb:e. utEetoOttt$of CSi Sy to pis!! 7100*- ?i
PD roc 42tnaetou wales Chapter ?USO 7 tie
:4t dot at t t bot= OVALS MM.. 5,27 he s?a idenCfid in 41ia repo Na det aisation offature
sine to f.aniw Veer imams ever of ex sysrr.
i �Fg a
1
v
gIR
ar
ctgl
vial
444 M
T, -o
441 -T. Pz9 3
g !.Q
9
Sto 34"K?t 3,2y
TRENCH CROSS SECTION
Original Grade
Maximum Trench Depth
24 Inches
g 9 w 6
p,-
FINISHED GRADE
2 Inches of
Backfill Over Rock
Nonwoven Geotextile Fabric
2 Inches of Rock Over Pipe
4lnch Pipe
Inches
of "to2'' /Z"
Washed Sewer Rock
Below Distribution Pipe
ate INCH WIDE TRENCH
1
Original Grade
Fill Soil to a Minimum
of 6 Inches Over Rock
4" Distribution Pipe
6 to 24 Inches of
Washed Sewer Rock