Loading...
01/03/1985 - Advisory Parks & Recreation Commission TENTATIVE AGENDA ADVISORY PARKS RECREATION COMMISSION EAGAN, MINNESOTA EAGAN MUNICIPAL CENTER 7:15 P.M. JANUARY 3, 1985 1. CALL TO ORDER AND PLEDGE OF ALLEGIANCE. 2. APPROVAL OF AGENDA AND MINUTES OF DECEMBER 6 AND DECEMBER 13, 1984. 3. DEVELOPMENT PROPOSALS a. Eagan Woods Office Park Trammel Crow b. Rahncliff Second Addition M.G. Astleford c. Lemay First Addition 4. OLD BUSINESS None 5. NEW BUSINESS None 6. PARKS DEVELOPMENT PROGRAM a. Coat Hill Park (Capricorn) plan revisions b. Schwanz Lake Park c. Architectural programs d. Project time line: January March 7. OTHER BUSINESS AND REPORTS a. Community room report b. Recreation Committee meeting set date 8. ADJOURNMENT l MEMO TO: ADVISORY PARKS RECREATION COMMISSION X FROM: KEN VRAA, DIRECTOR OF PARKS RECREATION DATE: DECEMBER 31, 1984 RE: JANUARY 3 ADVISORY COMMISSION MEETING The organizational meeting of the Advisory Commission will be deferred until the first meeting in February to coincide with the appointment /reappointment of members to create a full Advisory Commission. There are three development proposals before the Advisory Commission. The first two are commercial properties which would require the cash dedication requirement. The third proposal is a resubmission of the Lemay First Addition. The Advisory Commission has already made a recommendation regarding this plat, but because there have been some revisions, staff felt it would be appropriate for the Commission to again review it. There are no old or new business items for the Commnission to consider at this time. Under the Parks Development Program, there are four items which staff would like to review with the Commission. The first item is relative to some necessary plan revisions to Goat Hill Park (Capricorn). Park development is entering into the final detail work in preparation of the bids and specification documents and therefore, review by the Advisory Commission guiding these changes is felt appropriate and necessary. Items B and C refer to the architectural programs necessary for the buildings and shelter within the parks plan. Staff will hand out the work that was completed by the Advisory Commission at its December meeting for review and time permitting, proceed with the drafting of architectural programs for Goat Hill and Rahn Park. Staff also has developed a project time line from January through March regarding parks development and major agenda items for the Advisory Commission. Under "Other Business and Reports" staff has included an updating on the community room usage at the Fire Administration Building. Staff would like to briefly review this with the Advisory Commission relative to our existing policies and procedures for use of this facility. Finally, a meeting date should be set with the Recreation Subcommittee in order to consider the review of the concessions /beer policy for parks. Members will immediately note that this is a relatively light agenda and certainly a rare occurrence for the Advisory Commission. As always, should you be unable to attend, we do appreciate you calling and letting us know. CITY OF EAGAN SUBJECT: PRELIMINARY PLAT EAGAN WOODS OFFICE PARK APPLICANT: TRAMMELL CROW COMPANY LOCATION: PART OF THE NEk OF THE NEk, SECTION 4 EXISTING ZONING: PLANNED DEVELOPMENT -WITH AN UNDERLYING ZONING OF RB (ROADSIDE BUSINESS) DATE OF PUBLIC HEARING: DECEMBER 20, 1984 DATE OF REPORT: DECEMBER 13, 1984 REPORTED BY: PLANNING ENGINEERING DEPARTMENTS PROPOSAL SUMMARY: The application submitted is a request for a Preliminary Plat, Eagan Woods Office Park, which would consist of 6.60 acres and contain one 4 story office bldg., containing 72,000 sq. ft. The second portion of the application is the concept approval for the total 18.8 acres to constitute the landuse plan for the Eagan Woods PD. The total plan consists of 2 office buildings either a hotel or office which would contain approx. 160 rooms, or 55,000 sq. ft and be multi level. This has been the concept for the overall 18 acres and should be reviewed required to be attached in the Planned Develop- ment Agreement. BACKGROUND: As you may be aware, this parcel has been reviewed in the past and there was much discussion regarding uses how they related to safety zones created by Mpls. /St. Paul International Airport. As a result of this review process, the City and airport initiated the airport safety zone ordinance and also due to the uncertainty regarding safety, the City denied the original application. The applicants then brought litigation against the City and utimately received the PD zoning on the property. The applicants also challenged the underlying zoning and ultimately were also granted an RB (roadside business) underlying zoning with the PD overlying which allowed for 2 office buildings hotel /restaurant as the uses allowed within the PD. There are now new property owners who have purchased the site and are proposing the same uses which have been allowed in the PD. This application would consist of 2 office buildings a potential third office or 160 unit hotel. The uses conform to what had been allowed in the PD and a Planned Development Agreement will now be entered into with the new property owners and the plan submitted for the Dec. 20, 1984 APC meeting. SITE CHARACTERISTICS: Presently the total site consists of 18.87 acres -of which the first phase would consist of 1 lot, containing 1 office building on 6.60 acres. The property abutts I -494 on the north Pilot Knob Rd. on the east is directly on line of the runway of the Mpls. /St. Paul Airport. The site is heavily wooded and there's topographic relief throughout the site. The major topographic feature is a ravine which basically runs east /west separating office bldg. #1 from #2. In review of the overall site, the appli- cants have spent a great deal of time doing actual tree surveys to identify and mark the larger tree stands and trees with larger diameters on the site and are designing the plan around the existing vegetation, preserving as much EAGAN WOODS OFFICE PARK DECEMBER 20, 1984 PAGE 2. of the vegetation as possible on the site. Access to this development will be across from Eagandale Ind. Blvd. The state has provided a stub street to the property to provide the major access to the parcel. The applicants have reviewed this access and are working with the property owners to the south to obtain easements in order to get a more gentle curve to provide for better traffic movement. The applicants are also proposing this road to continue along their southern property in order that an overall loop system could be designed when the property to the south develops. There would be a stub street providing access to office bldgs. #1 partially to the hotel or office bldg. #3. The applicants are proposing -that a stub street and a turn around for snow plowsbe provided within the parking lot of the area for office bldg. #1 to reduce the amount of asphalt and site grading for this development. PRELIMINARY PLAT: The Preliminary Plat proposed consists of 1 lot containing 6.6 acres and 2 outlots which would be phases 2 3 of this development. There would be a dedicated street right -of -way, Eaganwoods Dr., which would provide access to Lot 1. In review of the overall site plan, the applicants have met all setback requirements according to the zoning ordinance. The building coverage alotted is 20 the actual site plan submitted is proposing 6.3 maintaining as much of the surrounding topography as possible. The one area of difference is that the applicants are proposing a reduction in the number of parking spaces per sq. ft. In review of the Eagan ordinance, the applicants would be required to provide 360 spaces and they are proposing 280 which is based off of 1 space per 250 sq. ft. of leased floor area. The total difference between the City's calculation and applicant is approx. 80 spaces. The applicants have provided an additional site plan increasing the total parking area to an additional 72 spaces attached to their existing parking, if the parking spaces would be needed. Therefore, there is adequate room to add these additional spaces, however, the applicants feel they, would not like to put these in until these spaces are warranted by the use or tenants in this bldg. The second issue is parking space size. The applicants are proposing to provide 6 handicap spaces 12 visitor spaces which would have a dimension of 10 x 20 parking space size. The rest of the building is proposed to have 9 x 20 spaces or 9 x 18 and would be employee spaces for the building. The employee parking lots have been allowed with a 9' x 20' dimension for 3M and other major tenant users for strictly employee parking. In review of the site plan, the one issue that Staff uncovered in the review process is that the proposed building is to consist of 4 stories plus underground parking. Therefore, the building exceeds the height which would be allowed in the commercial district. To exceed a 3 story building, a Conditional Use Permit would have to be obtained. In review of the Cond. Use process, the applicants are meeting exceeding all of the additional criteria for height and additional setbacks due to the size of the site. This additional height should not be a problem for this particular lot. The total height elevation .would be 4 stories and still not encroach on any of the height limitations set forth by Mpls. /St. Paul Intl Airport. Staff will, however, review this with the MAC office to make sure there have not been any issues overlooked for safety or height of this parcel. EAGAN WOODS OFFICE PARK, DECEMBER 20, 1984 PAGE 3. GRADING /DRAINAGE: This existing topography consists of very rugged and wooded terrain. The distinguishing feature within this parcel is a very large and well defined ravine running in a northwesterly direction and approx. bi- secting this proposed development. Generally, the drainage pattern over this development also follows this ravine in a NW direction. These slopes, adjacent the ravine, approach 40 A field inspection revealed severe erosion occuring along the base of the ravine from existing storm water runoff. The most severe erosion was located near the westerly end. Due to the ruggedness of this site, a proposed grading plan depicts several retaining walls. It appears the retaining walls will be of two types. One type will be the conventional retaining wall, built with a vertical face, while the other is being proposed as a reinforced enbankment at a one to one slope. Staff will. require that detailed plans and specs for this type of reinforced embankment be submitted so that we may review the viability of this type of retaining wall. Other grading indicates filling the easterly one third of the ravine from approx. 100' west of Eaganwoods Dr. to the realign- ment of Eaganwoods Blvd. Some of this grading will require obtaining permission or easement from the parcel immediately south of this proposed development. Because of the ruggedness of the existing topography, strict adherence to an approved erosion control plan is recommended. As previously mentioned, drainage over this proposed development follows the ravine to the NW. Although this development does not propose any changes in the existing drainage patterns, it will result in increased volume of runoff due to the increase of impervious area, i.e. roofs and parking lots. Staff would recommend that storm sewer be constructed from this development to the Minnesota River Valley. This is necessary due to the existing erosion problems resulting from the natural runoff. This may be deferred until subsequent phases of this development have been completed, if the developer can show that sufficient onsite ponding can be provided with a controlled outlet to reduce the downstream flow rate to a point where erosion wii11 notbe a_ problem. Staff will require the calculations used to determine the ponding and outflow rate be submitted for review. If it is necessary to construct a storm sewer outlet to the Minnesota River Valley, then it will be necessary to obtain a permit from the Minnesota River Watershed District. UTILITIES: Sanitary sewer service can be provided to this proposed development by constructing laterals and connecting into the 21" trunk sanitary sewer located around the north and northwesterly boundary of this development. This trunk sanitary sewer line is owned and maintained by the Metro Waste Control Comm. and will require permits from them. This development shall adhere to the requirements as designated by the MWCC. A 12" watermain is in place at the intersection of Corporate Center Dr. Pilot Knob Rd. This can easily be extended northerly into this proposed develop- ment. Staff recommends this northerly extension be a 10" diameter waterline. Staff recommends each building should have an individual service off the 10" main to it. Hydrants and hydrant leads shall be placed in locations so that the front and back of all buildings are adequately protected. It is Staff's understanding this development will petition for installation of utilities under City Contract. If so, then the Council must approve the utility construction project prior to or concurrent with the Final Plat approval. EAGAN WOODS OFFICE PARK DECEMBER 20, 1984 PAGE 4. STREETS: The existing access to this proposed parcel is off of a MnDot service road constructed with the upgrading of Pilot Knob Rd. the 494 intersection. This service road is 36' wide with concrete curb gutter and bituminous sur- facing and built to a 9 ton road status by MnDot. This development proposes relocating the alignment of this road near the south property line of this proposed development. This will require an easement be obtained from the parcel south of this development. This easement must be obtained prior to Final Plat approval. The internal public streets, Eaganwoods Blvd. Eaganwoods Dr., shall be a minimum of 34' wide and constructed to City standards for a 9 ton roadway. RIGHT -OF- WAYS /EASEMENTS: This proposed development indicates platting a 50' wide right -of -way for the public streets. Staff recommends this right -of -way be increased to a minimum of 60'. This will provide for 13' boulevards thus providing more room for snow storage. In this instance, adequate room for snow storage is essential since it is Staff's understanding this development will be requesting a Variance from the 20' green space between right -of -way and parking lot. The easements of sufficient width will be required to be provided over all City utilities not located within public right -of -way. These easement widths shall be determined by Staff. Also, a ponding easement will be required to be dedicated to encompass the high water elevation, when ultimately determined. ASSESSMENTS: In researching our assessment records for the existing parcel, 01- 00400 010 -02, we found that this development is responsible for upgrading the trunk area water assessment from residential to industrial, for trunk area storm sewer assessment at the industrial rate and lateral benefit for trunk sanitary sewer. These assessment obligations, as they apply to this proposed development, are outlined in the following table. Assessment Summary Table Description Quantity Rate Amount Trunk Area Water Upgrading 5.97 Ac (1) $2,450/Ac (2) $14,626 Trunk Area Storm Sewer 260,050 S.F. (1) $0.068 /S.F. $17,684 Lateral Benefit From Trunk .270 F.F. $13.10 /F.F. 3,537 Sanitary Sewer TOTAL ESTIMATED AMOUNT $35,847 (1) Net Area 6.6 Ac 0.63 Ac (Street) 5.97 Ac (2) Commercial Rate Residential Rate Assessed $2,830/Ac $380 /Ac EAGAN WOODS OFFICE PARK DECEMBER 20, 1984 PAGE 5. The final amount of assessment obligation for this proposed development will be determined by the rates in effect at the time of final platting and the net area calculations based on the final plat. All other costs for the installation of streets and improvements for this proposed development shall be the sole responsibility of this development. The exception being the cost for the downstream storm sewer to the Minnesota River Valley which will be distributed based upon benefitted area. RECOMMENDATIONS EAGAN WOODS OFFICE PARK 1. A Planned Development Agreement shall be entered into for the overall plan as submitted with this planning report. 2. An architectural design shall be established in order that all of the build ings will have a common architectural theme. 3. Acoustical treatment shall be provided within the bldg. in order to minimize any noise impacts of this site from the planes overhead or I -494 to the north. A timeframe of approx. 5 yrs. should be attached to the PD and a determination should be made that either the PD woud include the height of the bldg. to allow 4 stories or separate Cond. Use Permits shall applied for each building. PRELIMINARY PLAT COND: 4. The plat shall be reviewed and subject to MnDot's comments Dakota County Plat Commission's comments because the plat abutts state county right -of -way. 5. The building shall be designed to take into account the Fire Dept. comments regarding the 4 story building. This will meet all of the criteria of a Cond. Use portion for exceed height in a comm. district. 6. A detailed lighting landscape plan shall be submitted an adequ ate bond shall be required and not released until 1 year after the landscaping has been completed. The plat shall be subject to the Park Comm. park dedication fees for commercially platted land. 7. Only 280 parking spaces will have to be provided at this time but the other 72 spaces shall be provided at the request of the City. ENGINEERING RECOMMENDATIONS 8. Detailed plans specs for the reinforced earth retaining walls shall be submitted for review. 9. Calculations used to determine storm water ponding area shall be submitted for review. 10. This development shall be responsible for all costs associated with obtaining the necessary MWCC permits shall abide by MWCC requirements related to these permits. 11. A public improvement project for streets utilities must be approved by Council, including the storm sewer outfall to the Minn. River Valley, if necessary. EAGAN WOODS OFFICE PARK DECEMBER 20, 1984 PAGE 6. 12. A minimum 60' right -of -way shall be dedicated for public streets. 13. This development shall be responsible for obtaining the necessary easement for Eaganwood Blvd. from Parcel 01- 00400 060 -02. 14. This development shall be responsible for all costs associated with obtaining the necessary MnDot permits to work within their right -of way. 15. This development shall be responsible for trunk related assessments for trunk area water upgrading, trunk area storm sewer and lateral benefit from trunk sanitary sewer at the rates in effect at the time of final platting. 16. This development assume full responsibility for all costs of public improvements for streets, sanitary sewer, watermain internal storm sewer. u JAIL M r 1 idiol !III i_,_. SUBJECT PAR EL 77 I T NT T V S T —ST SPUR I�I' cotm q CLUB �i I•Iq /t ti e E 1 V Q I i 3 Ll )L AKE VIE v/ r I PA R 1% A, Y/1 I I D 10- y ry g I& E A AC R S I 6� RIDE' l I SUBD E IN ER FIGURE 'OPPI �Rl i Y� JW 11 10N1 D t :n /l.' V !.i I v I II..I _JI 1 1I I II 11 \1 I O 'u 3 MENDOTA HEIGHTS NSP t G- G-- G G G 494 .z °C f'`TERSTATE 494 Q INT RSTA I a EJECT ER re. I �i b LOST 3 I ^1 rr i SPUR O i• 2 COUNTRY 536 CLUB 0. U JECT PARCEL I M r s• :E N IND LVD 535 lL. Q Hro. e G.v 92 9 534 FI GURE 2 82 AVALOq AVE 133 I �14I w 0 *LOST SPUR COUNTRY CLUB �s /11�l�lIAA�i'IIIIII" ���ii�if�WYr IsomI� 'rF, OST NO 3 i PIE th 41 dog Eft 1111 SEEN EASTBOUND 1.494 w i it arela+eur�ess la,r e 1{ `�h�` yy C vt•, Jf ��ila2 +�'�'4, `s., +v r,� .t P 4,Y ''L tt, Y ��s �p M.11. fir`s +`zt+ tt a i i z ;••:.t i ll. Sh O to F k C� Nk.th �y lF� n. M a F K F VA l i '`hK tf f.ilr.S' Jt OR t e E� y S t� S 4 �d'QeZ .t�vgSt1�•y �h� '`'v� 4�4 OFFICE r Rol 6W 44� j e C t itl/ �'C i T 4 �12F} C`4 r4 r� q f yrr k 7• c'Y4,4?Y'lN f M l'd G(`� t 3 tI 5 t _vt� 4 yy l r t y t taiG. F' t F•s lsd f 16 Yt i fs,' V`"'cR3it" e�r.• ���Ll� o r t �7• t �k, �.�it s)p11�� wr7s .n... tK+ T .`7F b ar S tl4rf F TAAMMFI �'i <F CRIMEN K 030Q noowll a1Fa 01x11[ R� r 4 L1 5 9i J 1 Wileonl,lenkine C�p co S a161,,.0 tilt/ }.1:. A�.er lr a SITE PLAN REVIEW B� SUBMITTAL STATISTICS: �p uorw aueawTa DEVELOPMENT CONCEPT PLAN Site Area 18. 87 acres/821,904st OFFICE BUILDING •1 30 Building Type Area No.StOrles or►lca PA/1K 1 Office 72,000ef 4 DEVELOPMENT 2 Office 72,000ef 3 or 4 CONCEPT PLAN 3 Hotel 160 Room Hotel Multi Level EAOAN or or INDUSTRIAL Office 66.00081 Office BLVD. A 64s66�l1 w r OLP INTERSTATE HWY. #494 TAI( Ar4P 02.09- a�nw.�.IrwnQrastr ';I, I LOT. l C) BLACK l /v k t r7 o 0 1 �r IIr I a� fJ j i -�:e� OUTLOT A T CROW o0. I000.worawmelwle �OUTLOT. g �IAREA• M AIWI) 3 Hansen Thorp 1� I FF I :p•...1 M.Y. ".'I Pollinan Olson Inc. m WileunlJenkins ;Y'� •h Ik .1.1...1.. 7 SBS 38 6 W- 1240.12' R 11ljW 1, IRE PLAN REVIEW I EAGAN WOODS BLVD.' I DUAL l,Gl w ft.I 1110 EAGAN f/egeeTA I )Ml art. 1 l.1 J tM W ft". IW.W 1.1 .r f.r.,w.l l.t,. tall. 1. a7,r M vm., e.w., met. twNp, A1w...u, MprIM1 U 1.11— OFFICE BUNJ) M #1 t.�.MIM .l M. Mn..•.l pros .1 1.11 f.ctlw at 1.1.. MIM IM M. tor" W r ,t 11 S.w,wn1 lat 11: tMM. S.O -pJ -IS •Ion, tM Ent 11M .r "'d [AeAM wOOee ,,=t at 1 1a UM• IIJ).1) IMt a tM tp.np,t tam•. a11•11 OfflCa PARR 111 51 4 1 let 1: tMnn S. -11 l t. tM Uft 11M M U11 6....sNnt 1.1 1UU�N• s t IfO.W In U tM Inempctlp NiM tM Palo IIM .I U11 I IM,w8l CJIOw CC,VM,f 19. W 1..a IMZe -J' -51 Y.In, tale twin IIM W.W Ipl Is IM �I.00I�gTON INEJOIA Inlenlztlp .IM tM wanly rl„t•s, IIM 1 Tcl) M. 01 MIM U pINNUU p.l.rbent .I )r.n,rort•Ilsn IIStnnt .I 1.1 II.t b.0 IIIt0.0. J. 11.1 M lJl p III• .M .p•M I• M. sllln .I Ue (.pl) M[OrMr. 0.•V>f mel. tpnln IIInMnt•. pU roMl .f 1 Mrtetlta Nlq tM plot .I M.IN.In, PRELIMINARY 1 9r 1110,11 feee U�lM wtl 11 ei H J IM FIY ,.v IMrc• .J II.0 -ri -1J Y. 4l..1.1# w.t IIM U0.0 Trot U M• Inler,ztl.n .I1, tM .11 PLAT tl.f..11 lar f.r lIM (•a• M I. tM w.urly IIM •I tale G.n_.nl I.a 1 M.M• ..N- w-tJ S. •l t•le w.t.r IIM r O.•rMent tra tat s eMaz. of 111.9 a•1 1. lM Inlvatllp lu lM twu..ry rl,nt I y IIM sI )rp1 NI,M> b. U• .n 1.11 M.,.tl.l. 11.1 U -]t: lMZ. •.S M yy N r..�. PRELIMINARY PLAT ;,;.J.,. J..I.n,,.Ie.IMt wy tll.w ,pt:tn.nt. .I M, .IM4I MI •n np- a.ronll0 JLW).0 fpl nA•t t.n.. cazae U M. �•7 ���Z 11 M0. UN I U, unlnl .MI. O-SJ -9. cMM e Mole ntl M.M. s.Jru -m 1 l •.fa) /as e0 •Iw, Ule .I,nl•.I+U /J).01 IMI 1. M. plot •I I.,IMIZ •M lMn UnlMlln,. NT.O Y tti.l EASTBOUND 1 -494 P� M JA I i�L.A1i.JfARIW S�911 �i /Q!� 664 E616T FLOOR •dot J �!V? B62 LOWER LIEVIE X Vs C TRAMMlLLCROWCQ r f�� 1.1 ti� 6,66 N66N.N 4NA...U6 TJ...- ,I.� S L S Ii,.1.vY ai'�/ �yawlaa6>Nasn •nasn Thorp 666 MET FLOOR r J p sllinen Ol Ogg V.O tEV F Wilsonllenkins 6TO SITE PLAN REVIEW SUBMITTAL lAOAN 16166:6OTA OFFICE BUILDING #1 EAOAN WOOD@ OFFICE PARR TRAMM CROW COmlP 6LOOMMO1001 6W6E60TA GRADING PLAN GRADING PLAN EASTBOUND I -494 8P TK L a gyp A r' c O ix Cr' O o i z —s Y d lJ L• {'4.i U TRAMMELL CROWCQ caiu Devi Mart :ale d- ■aaulElol,w000 Hansen Thorp li s p y Q Pellinen Olson Inc. Mzmr W WilwanUenkins F.Lr /AJi�1 A�....r he 1x1u1nr SITE FILM REVEW SUBMITTAL LEGEND �`O 1 A EAOAII ISISlSOTA PROPOSED SANITARY SEWER OFFICE BUBAINO 1 PROPOSED STORM SEWER NAG WOODS I PROPOSED WATERMAM OFFICE PARK nKOShc CROW COW#" SLOOMPOWN Meson". rr UTILITY PLAN UTIL PLAN r„�, c_ I Vi SO' I L of M Wi t 7� tl 9v a���. �,Itp ��p�?j �'�La 'f�f u w 7 r t ��;a•`/� °w is ljai i u33��:i Y '"a,Y •ra', TRAP 000 IWIUYI CORGI ON[ -s. 3' t i ✓sd�1j L r,�� i� �`rl iP3' is '�i "yk J I un no s• 1 3 f��+.��Y uJ"�'�°,ia�Jr i�ir J `f�,' aaaw+lo�r�a� ���s �,�,'.+�LP..i�,��s'�� s sfy�y��.iV+ �3� •G Vf �j� ,(1 +,3s�,� o!f'3;,. �f;,: a`Y �C I� y t v 3 y�i"'3�''� aa• �{j l r v'.�.i� u J �$Jr _Hrt7� ..I+. Y S}' i •�7�iJ J�� �ia� ��'R71i d/d +YJIt 7i Sit i'� J '�l� s�� t� r je,�• �,y'Jt�'ailp S a r N a �a sa r,X r a {{y e J'' J .hL• r 4 il� �t. a rif' �S Jr t 4'ti �4 4�•. J Y i E s t a 'J 7.✓a+ a 7 a t ppt, j n 3' s•�t y i p J'S t s h-!� 7Ya u0!.' i aaY' S x "i'sti� �.�.>.�7 r as r.•.� 3� i 3s.: r i. r i3a', r i.�. T ���a :,i_ J f}y'-,��2 �'r ��f vi47S'Y 4 A'� y?'yt�at.a �ty� -sue." =,f'' ?�}f`m e�ay U�° •c tcoG�.'t ;..yf ;Y d�' t'�',y'�"�'�'�a4•.� i-� "d'r��s'r T.j r �l ,a�,,�,�' •3'u I `r�'�'k.,Y c F l• i Ss3y�r., .y J' _�i ;1:'�''' d? �L, y �r ,�1 d�.rL1x+•'`. y �3d a y ,",}y�� ,�v ,s✓,,j3!'+?fJ 7,7t`,.'j�� �..y'.� �h 7 f� i f ro yr :dam e,;} d4�eGU:•+ L' i, ✓.�'�y J if �i ✓i �}'J y; (1 WilsonlJ eokine j �;.r K I s r. N.�. SITE PLAN DATA k�J .Y' iJ as ti' sfa�"'•� r .S` luw ILI., t.Ir3L 'frP .�.c' W AR! DATA N.rf.M.�Itul�bslNN aj "F' INSI01 -1fN 4�'� 3 �a�3AL'+++c j J�1Y� lil';�:��ti snf a4 ,I.w w[sl N).rN N IRU b141N A nONS r U,NA N/1l /[.ON SI pRf ntsf Y4 (VA) /l.lN sr LEL l l RM M4 ILIA) ITE PLAN �w ZONING DATA S r w IlA1K :!Ilan yll NUUlanY �ff AL IMIRfrot[ w OMM If1fr0TA ffAlf YIWYf b R b R SITE PLAN r�T1 IIN 11, UK I. R b R DFRM BURMIM #1 o ,o sort runty utu4 d011r WIM911 ARK HN[ Mlit [fN[lf N n N n 01 /k■ AMR flw N Alu LR 11Y1 R R .Rol. mt." NI G.N IYIIIIN x1100 b If ATE PLAN MIlIN 3wcR NI It m m lI L'AI runb futtf asnN u41N IR• -r 11.1 a w.n lr. Ana mluAA u'.r Y.1 n 4 unortt vuu Ir l• Y. Rr.l [a rsrr rs. f� rota rrA.lYi nul. NY 94SWAIN A... r Y. Y! PwxM ICJ M'/ M u r v�3 fi��+) W 33t:�y a.'cmJr<.ar sr =:y- 1 .y xl J fyri i >ti a k f r_3src- i'rscia: 'd �i}.f� Y +y ;f� �Z�y ✓,ICJ }r a J �Ga 1 'Ya .i9 J a p •S�j A� i�l d�ff 5 i!'f���> ?5 r� J �"��7-v:, O FIN a J id1, o 'y9J;. ab j�u,"Si3 A,3y�a f a o Yf y .J: /d•': YfS Y WTI M TRAMM CROYICO. ,i� f yy 'jM ✓,;a sa %,f s'� 's�L4 r.'•y i t'I� j uoo xowu/anr!!olly! J a.r"�Yi S f ,r .IJ,,,,f '''JS�'y�s1+tyJ 'f✓` a'x,, J a�3 di• llnONNY)a1.rYCwn �iL' a ��9 W�y 3 1a�1 {y�t >•4�i��3''.Sa` ".o u' y J J3 Y 3 a' r 3' )d d'L q�• dtj>�aJ ?'i yJ t 4 t. i i �i3' I�l•1� 4 Z•"`. •s•� 33 Jr ;•J yr+ tw s' iJ ..J+ r m J :i,+, �a° v .v D 1 r i F`� Yf) �a'aYr )fJ u. 5 1 i aJ yy JJ y a r i �s� J ,LV a,.�y a'S tJS v. s r .sSi'.•. t sc YJ i. J�; a7 .Y j• t ,y a ,rlW •4q t 4 t yw i t V4 tT� f' -O ry n' a;5a 5 JA 7Yd 3 r d' i:i.". y is d a b•r t �i�f }s :b V %J '39a YJ y r s �1 r :ti:Y.3 -l p +r `4tir 4')` �J�y ���x fJr ,Jr� !rf'�j,;,��"Lsj .,r'! v •�'i 1 r+�s ryx .,P,";�.s? s J 1 s I 9s t v a.•, r d9 a? iJ ,J� y v J>a� 1 M ilmml enkins Y46� JJ+�'� �.�}M• ..1 yJ; '.Y R'� .4��'Y Y fSi:." 2' ",,�i I iJ �'.'Y I�VJ�� 3 y ;J b 3 Sys t ra�..,k.r..x x.....w.l... �J�, !)uxl4rw.. fwur0n..,S.n.isr PLANTING LEGEND UTE KM REVIEW P PRESERVATION errTAL /jam M�CIIM YIIIU.0 rN10[. Mp1( CMYCII. OA�OY I�MWr� OFFICE EUE.OMNi 1 LANDSCAPE CONCEPT PLAN F FOCAL /FEATURE "'BAN SIIYCCc 0 20 40 00 rf IwlI1M. AC(Inl 41x Ix 14x((5 Ir SII( office I-Ont 4x INAx Ix11n�A1 INIIx1l IIIYf C CIRCULATION x IOlnw: VM IZI MA KFIK ClKW?l= LANDSCAPE xnx x4cw c+wr4cs or IY11 CONCEPT PLAN V VISUAL RELIEF /SHADE 10111(01 I/YIY It— A/x "W11CAI I-I( IO lY4[ xMAf 01 xllwlxr,f SYI/Lf In py rr/ B 111 lSlf BUIL DING PERIMETER 7 runu�Yl nonY awu nun to wuslxc 4 84856 -#M Y.. YE n', M J M 1 i J LJJ.r+�.�' y t 3 t: i .J 1+ +y jS .,..�s,r 3y�iiii' I .r...— _'scai i> dJ !Y. y� 1 :Y Yl f{'fi s� 4� p '•L4 7 y am Z .�:s, 1 lL i a o.. i a y l J TRA MMEL y >e 7y S i ay „i 3• ,t3 •3' J TRAMMELL CROW C mmYUl o=.nT[” o WTI mvE !^l7 ,i a y. ���Y pia° JS�3:t�}. L �y �',ff( ,y WTI xio ,�w 1. y YDl1Y�TTOI,NM1EtOTA y,M D v f y i t� 'i:Y, r c y w ry� fir✓ ,�i.. L eJ' yf Y' .+,i.T,,,•��t'.di'� y Y' R Y. L p� ar'il .+''�r t v ,�J� ,N �1T>> l eru �'JY3.'r )"O� a �,rjb,.a.. aS yu,° Y k4 Y.N; i ;1•!2' y i s M'M f� t W St 4 s i�.9>�' fr d'L 7 )�yv'_ i) 1� x �i N iS9 5 +r "i's!•7 i ,s �3 '�i•i r'' f fi ac f t, iii 3 r re i' ,ii or. ii -bwb fit, •t�I t ;r%a?iJirx� r I 8 '".ssY e> 4.;r• i"d As idsts,�dv�iw. 3,rs J1y u�`>� Y 3'+ayu ysri 4r r� t yj rs 3 rJ i ��'il.imlJi•nkins Y 2 w.,.l.,u,........v.l,.. ON SITE PLAN REVIEW SUBMrrrAL "am E[OTA PROOF OF PARKING PLAN OFFICE BUILDING ♦1 10 0 .0 00 FT EI1011N W000[ OFFICE PAR[ 380 STALLS (1 Per 200of GFA) PROOF OF PARKING PLAN 12!111 4 8 04856 CITY OF EAGAN SUBJECT: PRELIMINARY PLAT RAHNCLIFF 2ND ADDITION APPLICANT: M.G. ASTLEFORD LOCATION: OUTLOT B, RAHNCLIFF, PART OF THE NWk OF SECTION 32 EXISTING ZONING: R.B. ROADSIDE BUSINESS DATE OF PUBLIC HEARING: DECEMBER 20 984 DATE OF REPORT: DECEMBER 13, 1984 REPORTED BY: PLANNING ENGINEERING DEPTS PROPOSAL SUMMARY: The applicant is requesting Preliminary Plat approval of Rahncliff 2nd Addition consisting of one 5.7 acre lot for a 65,000 sq. ft. 3 story office building. ZONING LAND USE: Presently the parcel is zoned R.B. (roadside business). The applicant is currently pursuing a rezoning to L.B. (limited business). That rezoning request was recommended for approval by the APC on November 27, 1984. The City Council will be considering the rezoning on December 18, 1984. The parcel is bordered by Rahncliff 1st Addition on the north, I -35E to the east south vacant limited business land is to the west. Rahncliff 1st Addition consists of a hotel site, restaurant service station parcels. The property has no significant vegetation since it has been graded previously. CODE COMPLIANCE: The proposal meets all the setback lot coverage requirements of a limited business district. SITE PLANNING: The site plan shows 305 surface parking spaces 70 underground parking stalls which exceeds the 347 spaces required City code. Due to the close proximity of I -35E (175' from building to the south bound lane), extensive noise control methods should be utilized. Berming, landscaping architectural'design can help lessen the noise impact. The site plan presented with the Preliminary Plat application is not sufficiently detailed. It is the Staff's understanding that the applicant is in the process of revising the site plan and will have it available for the December 20th meeting. GRADING /DRAINAGE: Some site grading over this proposed development has been accomplished under Excavation Permit #32 -011 in accordance with the approved grading plan accompanying the permit application. As it exists, the drainage over this proposed development is southerly to a low area located near the SE corner of this proposed development. This area is located within MnDot right -of -way of I -35E. RAHNCLIFF 2ND ADDITION DECEMBER 20, 1984 PAGE 2. The proposed grading over this site proposes to collect all runoff generated by this site into internal storm sewer which in turn will be conveyed to the existing trunk storm sewer line located adjacent the NW boundary of I -35E. The eventual discharge of this storm water runoff will be into Boesell Pond (AP -11). Although this pond does not have a permanent overflow outlet construct- ed from it, a temporary outlet is in the process of being constructed at this time. If this development is approved, consideration for installing a permanent downstream outlet from this pond should be undertaken. The majority of the drainage from this proposed development is to be contained within the boundary of the development, some runoff will undoubtly occur onto MnDot right -of -way. Subsequently, prior to Final Plat approval, written approval from MnDot should be obtained regarding the final site grading plan for this proposed development. UTILITIES: Sanitary sewer watermain of sufficient size, capacity and depth exists within the proximity of this proposed development to provide service to it. Figure 2 illustrates the location of the existing City utilities with respect to this development. As a requirement of the Rahncliff Addition, a public improvement project for the extension of the 16" trunk watermain and laterial sanitary sewer and water main would be required prior to Final Plat approval. The only utilities required for this development will be water and sewer services and hydrant leads. STREETS: Access to this proposed development will be by way of Rahric1iff Ct. Rahncliff Ct. is to be constructed with the Rahncliff Addition and will be a loop street connecting to Rahn Rd. To facilitate the looping, Rahn Rd. will have to be extended approx. 200' south. These streets will be constructed to City standards for a 9 ton collector street status. RIGHT -0F WAY /EASEMENTS: Right -of -way, as indicated on the Preliminary Plat, shall be dedicated for the half right -of -way for Rahn Rd. and the full right -of- way for Rahncliff Ct., if the entire right -of -way for Rahncliff Ct. is not dedicated with the Rahncliff Addition. The utility easements shall be dedicated as shown on the plat adjacent the NE, SE, southerly westerly borders of this proposed development. All other easements shall be dedicated as required by code. ASSESSMENTS: Trunk area water and sanitary sewer have been assessed over the existing parcel 00320 010 -27. Also, lateral benefit for trunk sanitary sewer has been assessed along with a portion benefit for trunk watermain along Rahn Rd. (Project #370). The remaining obligation for lateral benefit from trunk watermain will be assessed upon the extension of the 16" trunk along this proposed development. In addition, trunk storm sewer area assessments were also levied under Project 9370. All trunk area water, sanitary sewer storm sewer assessments have been levied over this parcel and all costs for future lateral public improvements and lateral benefits from trunk watermain will be the sole responsibility of this development. RAHNCLIFF 2ND ADDI'T'ION DECEMBER 20, 1984 PAGE 3 RECOMMENDATIONS RAHNCLIFF 2ND ADDITION 1. Concurrence from MnDot regarding drainage onto I -35E right -of -way. 2. A public improvement project shall be approved prior to Final Plat approval. 3. All costs for future lateral public improvements and lateral benefit from trunk watermain shall be the sole responsibility of this development. 4. A detailed landscaping plan shall be submitted for Staff approval prior to any construction, showing plant species, size location. Special attention should be paid to I -35E buffering interior /exterior screening of the parking lot. 5. All other City ordinances shall be adhered to. /jbd =ti�3, Z�. v s t• Swl Mm ai ���II �1��j�11� 0 4k SO V ��j 1�� ♦��j� III♦ 'l M OJChM11u NA C LL m■ MOB Em oil ■�B ■t.�t�tr,■ �rr.�1- mot) 4 `i �ii�rj �%��i� X111► a ►r� AN mining gill MW x .11 ■ri�i L ►.fir„ In a Iw mot. �ai N 1 LOCATION MAP ma 1—,r 1V6 I I 1.. MIA-- WYI uMul ee I Vi I i1iIllll H MIA` M AMU OLUT, .1? r[t Y11 •••••••••111 AL o' i /MUM 0 1 1►1 \1 i carol r1 101411 TV ji 1 •Y11 IYOran P 1 I r'•/ 1 m t3 .4 O OUTLOT A I I ►V1'r1Y1 I I WI i_p_ j I tl r UTILITIES LEGEND I d 1 I +gar I.rIr1 nrlur u.0 f 1/j1 r. BI-K Z I rl s *-3y- 11x1 ■1 u1.r Inu I ►v1 WN I 1111. M. 1 I rr r -+-r r� Ilrlrl YU11 O/� 1 IYa D'� r` 1(t �F 1.+.1� /1/11111 Y1111 Y.■ IOY N I 1. n� w l /.�IOr\ �1 .T'.r� paa71u-. �...1 1/MN /NYU 111/W D1 r.r 11 1 IIIN ..y OHN NniI �.vID I l0 0111 RAM MIND �rru r.. YI r1110Y1 N I a t oT 1 1 ewc I ��I r 1 RAHNCLIFF Z NO ADD. 1C4 100. I I.,x /nl[T 1 /0O /111LL LOT 1- w Haut w M IOU AVOk Ill N r11 iNlf 1 p I Y. Wr•rNY.1 Yy 1u1c1 q Irr L�.1r RAHNCLIFF 2ND ADDITION IN 1 1 M N. I rr.w 71T(l w T .0 1/1' I/ ✓1 I MrFe NG!• r!I a N YW Ali no of 1.111 /6111111, real YtbrrL OF Y Mn \I ap111r WI r W rr N ILr1 to Fier LrM.t 111W 411 NII r141'I W N.II111r 11 114 N 11 ul I.IIFIM YI111MI IIN It Old 11 W IM.l1 .1 W.11, 11tu 1111WN4, 11 rill 1.111. IIrr41. 11/IN.1 tall 0111. j iiM �:w.w tiri S .1 e. l a1111 111 ta 6. rI 9-11 II t1 M INUM 1111 Y•M W.4 to I LrN1, Ir. Irr.I r 11WN4. .N N IM N YIwM W 11.11" OF ell CINr WY14111 tr /YIIIY W Y W.1 1+111 IN 4.1144 I G I u W 4.111. IN MII. •N 41.NI W MIYIN [I I1� �1 1YU.MNII•.WIINWIIIUIy..Ir. 11 h W r1•. .1t.ta4111 kill. W I IM.. N YII Iu1 Iw r11W1 I4. .11111" FINN. 661.4 LW LYrrl 1111 1111"66., 6611 1 ,1' i'1 ,V 1 Li elf LJb'X III f♦ Ylr, 1r 111. Wlt.l. 4 w.11 4N11 I4. IN 11.11 r/ 466 /Nr.. M MII NII 1 /',L A 4 11WNU W IIr11 N /N.111. 111.. N 41. 11.t' 1 r 1'.�` I. •11.\11 -1 N14 L 1. 11111.14 I 11WN11 NrINIY 11 /.1 14.1N WY N.N.I. Y Y IIIY /e 1 III.", MI.1. Lr.l1 bINN I,r w '1/ Ilw/ 4 111 11•NI NrW; 11Y��_rr r w r r "4q, kept$ Lr111 11.1 LIl,a 1'1` I is 7 I. 1. /1611011 LIMIN I. 1111 d IrrY 111 I4. 66111111• rl t♦..•N P. N v...N 1 1 -Iv N W 1r1. P. I {41.14 111111/ MI Ir r W a I 1 IIIU1 {MII (Nllllwl IIII IIIINy. W INw." 11 •1 In I W~ "41.1166 11 IN 16611 Ir1111W11 II 1N.11 LFN/, 6 1 Ir•III Filling of NI/ 11'^_6611 J V 1' 1. J 1' 1 i' IILL11 N 7 11 I, Y n1 INMIIr N4 Ir.1 rl IUrLrN MeN• B L 0 C K 1 •I 1 1 1 I IIIII IIi� Ii..1. 1 IIIWYU NItrIM11. r 11411 Wolf 11 W 1.11W1111. {•ri{� 611 lot t r X y 411111 N11 W 111 1141 Ir W 4r II y I 11 IIY MIIIIW be 411 1111 11 1�111Y 111 l w- 1. A ly,` 1 11 I.4ry Ir1Y LrM11, IIrrM III bell IYI 411 Y 1_, Y/ II RY 1"1101 1 1 1( I MINI 1.11 WI I (ItAl1 Irnryl i 1.WII YNII11 r W I..1 N Wra 111 i 4/11166, 4144 {MI •1r YY 1'k ;.YRtiJI Y ;i hLV 411 ta'1 114 b 1 W I N.411N N Y. r.N1. 1". Af ::1] will 111 111 "T"0111 1 Wm 114 4.,r r IM oil, 1. fi IIII I4. II 11 1 1.11. MIS .11 tr -1. 4.. Y Yllr/YI 4111 M W 1.WIr 466.4 YII \J, MN (""1111 IIUN u W N♦../ 4 .1.•., WI W MI II 11�• 1 MII IM IIrr11 IIr1 141 NIIr IIr ""P. N w V: 1 111 IN 411 1111/ 1, r 411 W. r 411..11...0 M 11111 "111 11"11 6611 At w... G ri1"Ir« r will Lal r/IW 1i•lW MWI 1 011 MY IIIir1N ylW�n•Ir 166".1 LM/ 1 1.111/ $111111 MIS tall I.Ilnw.l r1 111.1 N W III Y 11111 WII 11111 of 1" b111 16666661 I4. --1 Sell 111 1IY1111 1�11�,� YI ri L�Ir 4004 4 M I/rINLy IYr•IM'1 4"1111.4 r/ Wr1.11.e 1111 11 Y 11p 111411 Y tall r_ 4.111 �IWNY lTirw 11 Y"le Y 1111. (Y:II l.Vri 11411 ►Lail, IIW66Y INN 1 IIN" wrlll Ir1 1UIVI11 MII ry ��.•�M,N"WIr.Y 14. L".Nllr w1n1 .61L n. 166/ Mr111 1 /l• 1 W Iwl "IVI II NI Cr 0111111 M. 1111 0 r IM IOO1w 1rr w IN ..-op I'd No r�11 w N Nr. r INr w r.►rr 4►Wl♦ 1•.WI I..Irr! we •11`NII'1 N. .�r., r♦Y111r.+NI tiYA I. JAMES R. HfLI: INC Sn 1 >S `..r 540 c,, r1 I(ticti {1llltl 0 Z IT F -r� 1 1 oU7 —-1 �c` /v U p rw Y J CL I�E R 4.,t RT I A �2 I &R�2 �;u4'�28 A_ it i r A -27�� lCLE 5 i 3 c— I I I A- 51 IESf s I I A J� I CEN -T-Y— r ,rr, 7-:T', ADDITION I iLj �j A7-68 L- 66 I L A DAKOTA COU Y PARK IS 7 1 1, A -46 x,_ s a n L- 67 FIGURE 1 i SEE SHEET 10 i a U I i a o 42 -C m CLIFF ROAD 16 ie^ e 462 579 -x999 a 969 W RAHN AY SUBJEC ;PARCEL U HYD.aGV X T p 964 n 800 W 966 �68 =MYD8 V T acv Y �V�Dy C �6 LWI 7 3 W I r. `L 1869 9 o41 82 89 a, 604 FIGURE 2 x. U� A epos• J NOT- a i0 d7- MEMO TO: CHARLES HALL THE ADVISORY PLANNING COMMISSION FROM: DALE C. RUNKLE, CITY PLANNER DATE: DECEMBER 12, 1984 SUBJECT: UPDATE ON LEMAY LAKE 1ST ADDITION The Advisory Planning Commission reviewed Lemay Lake 1st Addition at the September 25, 1984 Planning Commission meeting. This item was then scheduled for the October 16, 1984 City Council meeting. At this City Council meeting, the Council had issues concerning this development in regard to adjacent property to the east. They wanted an overall concept plan as.to how this access to Lemay Lake would tie in to the property to the east. The applicants have worked with the adjacent property owners to provide an overall circulation pattern as to how the property to the east will develop. In this concept plan, there are three (3) commercial buildings abutting Lone Oak Rd. and I -35E. The applicants have illustrated two restaurants and a car service facility. To the south, the applicants are proposing two (2) additional office buildings with a circulation pattern of either a "Y" design, with two cul -de -sacs looping the cul -de -sacs through private drives, or it could be potentially converted into an overall loop street, whichever the City would require. Also, there have been a number of concept plans showing either two smaller office buildings or one larger office building which could develop on the site and still provide adequate circulation. In review of this concept, the zoning is not exactly as what is being proposed. Therefore, if the City agrees with the concept, the applicants should then request a zoning to conform with this use if the City agrees with the proposed concept in use in this location. The second issue was regarding access to this development. In reviewing this proposal again, it has been determined the major access will -be the extension of Eagandale Blvd. to the south as proposed. There would be one minor access, or right in, right out to the west of Eagandale Blvd. and between Poplar Dr. The minor access would be a right in, right out and would provide additional circulation to the development. However, another major access, or looping a minor access through this development, does not appear to be feasibile for the layout of this particular site. The applicants have reviewed this proposal with Dakota County and it is the City's understanding that Dakota County will allow a secondary access, however, not a second major access to this development proposal. Another issue the Council had was with density of this development request. Staff has recalculated the density of this development and it was determined that the net developable acres of the site was 17.71 acres and the applicants, according to their mix of dwelling units, were 15,752 sq. ft. over the allotted square footage for the 1/3 or 96 one bedroom and 2/3 two bedroom units or 192 units. In changing this mix, by reducing the number of 2's and adding it to the number of 1's, the applicants can come within the square footage of the ordinance for developable density. In review of the total site density, APC UPDATE ON LEMAY LAKE 1ST ADDITION DECEMBER 12, 1984 PAGE TWO the applicants are at 16.2 units per net acre. Even though these units do meet the ordinance criteria, the City -has indicated that this density is high and would like to potentially negotiate a reduction in units. If the applicant reduced the site density by 24 units, it would then have a net density of 15 units per acre which may be more attractive to the City for a development proposal. The last item that Staff would like to mention is that since the time this application had been reviewed by the APC and City Council, the City has adopted the Shoreline Zoning Ordinance. Staff is reviewing this development against the shoreline criteria and has also scheduled a meeting with the DNR to review this site plan in regard to the Shoreline Ordinance criteria. Staff will update the APC as to the outcome of the meeting with DNR and hopefully have letters from them regarding their concerns of this development proposal. This meeting has not taken place, but will have occurred prior the Public Hearing of November 20, 1984. Staff has included the original Staff Report dated 9/18/84 for your review because the site plan has not changed substantially and only minor revisions have been made in access off of Eagandale Blvd. The proposed development will consist of the 3 buildings and are in the same locations as was originally proposed. Therefore, the Staff report will give background information on density, setbacks, etc. in review of this request. If you have any questions or would like additional information, please contact me at the City Hall. Sincerely, X leC. Runkle DCR:jbd ENGINEERING COMMENTS LEMAY LAKE 1ST ADDITION The major revision from the September 18, 1984 plan, is the alignment of Eagan dale Place. Rather than dead ending into the property to the east of this proposed development, it now has a reverse curve which places one half of the street right -of -way on this development with the other half of the street right -of -way to be located on the parcel to the east. Staff has no problem with this alignment as proposed. This alignment will provide excellent access into the parcel between this development and I -35E. Staff prefers the looped public street alternative over the 2 cul -de -sac alternative from a maintenance and public safety standpoint. As for the physical construction of the street, Staff would recommend that Eagandale P1. be a minimum of 40' wide between Lone Oak Rd. the proposed north extension of Eagandale P1. to the east. This width will provide for two -way traffic with turning lanes. The right -of -way being proposed to be dedicated for Eagandale P1. is 60'. Staff feels that where the wider street will be required, also a wider right -of- way should also be required. Therefore, this development shall either increase the right -of -way width to 80' for Eagandale P1. where the above referenced 40' wide street will be required or provide a 20' utility easement adjacent the right -of -way in lieu of the normal 10' utility easement required. In addition, the half right -of -way for Eagandale P1., located on the parcel east of this development, should also be included on the final plat. All remaining information pertaining to this proposed development as reported in the September 18th Engineering Report to the APC remains the same. RECOMMENDATIONS (Revised) 1. No additional storm water runoff be added to the existing 48" storm sewer, unless the existing storm sewer is increased in size accordingly. 2. Public improvements shall be petitioned by the developer and ordered in by Council prior to final plat approval. 3. This development shall be responsible for constructing a 5' concrete walk along its Lone Oak Rd. frontage. 4. A minimum 50' half right -of -way shall be dedicated for Lone Oak Rd. 5. If a 60' right -of -way for Eagandale Pl. is dedicated, then a 20' utility easement will be required to be dedicated adjacent to public right -of -way as required by Staff. 6. This development shall be responsible for its trunk storm sewer area and final benefit from trunk watermain assessments at the rates in effect at the time of final platting. 7. Easements for ponding, watermain and sanitary sewer shall be dedicated on the final plat. 8. All costs for public improvements associated with this development shall be the sole responsibility of this development. 9. The access driveway to the southwesterly 114 unit complex will be required to be a minimum of 32' in width. F i F�'I E :..`J i i Fi Fi i h PRELIMINARY PLAT OF: EAGANDALE LEMAY LAKE ISTADDIT10t nrm- ernrr- r N99 4VIIYE 29 6 3. LL PROPOSE 35E- Rt1 B E S.A. A I I f t; e6i 'p'- /�r H OGP' ,I 11 fi 1 's. I 2 LOT 3 (PROPOSED/ ED% i f y- tPROF?G 7 I I' I L. i i i <r. 'r '��wnu:wr. iLin :w »rr,.» i::,.•r w..»wi w ,wm x. r »r w♦..»: ;Ilr�i I, It i I i j t� i r 1 i t I LOCATION MAP zz ICA 0i, I it i {(i i I i 1, yL Ilt 1111; 1 I i I I 4K I ap I 4 1 1 1 I l,IUO11e Leek Nuf't.eylr\ nag. 919- 49'04'W M 9.09 i i f r 1 1 '`T I .r wrw.w�•�':,�w NIB son Boom ism- 1 MCII FOO lb rw NNW �1 11 11 e rr jl� S� iii 1111 �Ir t Ilfc� p 20 f�►r1rr P� 1• I I I Y c Lemay Lake A 8 Units J Q sK Restaurant F K Restaurant 100K o 17K Auto Service X33 F OPUS Lemay Lake Development Concept Plan Alt. L 0 100 200 400 North Lemay Lake cc Apart� 0 2 Units 88 C O Restaurant Irmn Restaurant 0 e 8K 7 200K IL �I I I 17K _I Auto Service OPUS Lemay Lake Development Concept Plan -Alt. 1 0 100. 200 400 Nortt, v+Crw. rl s• .......n.�,.eri.�r.. r r• .i.,nu, r+ r ;fir... 1 r t r 'ttr (4..i: 7. t yr .ae -w Flo u uL. f t y h 4e..- -tr e+a +r-c.s ".r' at t. fr. 7 �z f k r•:: �..wu ,•tb.:�x�'� ti�;�. i X -j r •1 fi r' i�- ��I Q 1 A, a�� a �l 0. 'R i �e 2 f ��Ga r �j `r i ji Y G y,. 9 4.: ice' a.?.k rK'. T 1 I .F r 1 1J 1 �r.f�� 7rr� tl s 4y .,.f z .f I J' r� sr t;�f.' f,, c j�- r ��Y�aat u r..r 4y' 1 f j �rr r� �,.,ye t•d.;f �r iu r� i /r t�' �•s$ l7r'lC'1�.. �t' 1 •iw l r 1 ti Z 1 `j E t y \mss •+.....e C5.- .•�-s...• t r y F" j i.%r•.� 1 .;u 1 1: r r r 'b• 5' 1 i P �k Y t t n,r�' i 1 i .k i,. s Sn..r t a 1� i may i i C• t y' 1 cF t o I r a �M Vi 4a y ,�y,,,� r s,.: s i l Et'tW. Y�' r,i y .i .wF "'Y• S,r a Yr},y L L Ate x.,'41 t` ti .rte^- f i Sfcf�"• t K ;:'h`' 7 a .�qsa y���. .n r ••e3 t T i r t \d� i t ti u a t�; h a t r. Ali a l i R t R"' 'Yr. w rtiY 1Y1r41A M �Y vllr v• !r r 4 'a' Nft is .4i TI i -t•. 1 M ,s" �r� t r f t J!� l 1t��.•' s'Y�` 't ta" �'�`�i��. :e i-:e. z F,�S t.+l .j I I 4t.- ....a/K�lv:- '�'T`• �d t��- }�'r��i•! �or- j.. j �.c.`� CITY OF EAGAN SUBJECT: PRELIMINARY PLAT— LEMAY LAKE 1ST ADDITION APPLICANT: BOB WORTHINGTON TOM HEALEY LOCATION: PART OF NEk OF THE NW'k OF SECTION 10 EXISTING ZONING: R -4 (RESIDENTIAL MULTIPLE DISTRICT) DATE OF PUBLIC HEARING: SEPTEMBER 25, 1984 DATE OF REPORT: SEPTEMBER 18, 1984 REPORTED BY: DALE C. RUNKLE, CITY PLANNER APPLICATION SUBMITTED: An application has been submitted for Preliminary Plat approval for Lemay Lake 1st Addition consisting of approximately 17.7 acres and containing 288 dwelling units located in the NE'k of the NWk of Section 10. ZONING LAND USE Presently the property is. zoned R -4 (Residential Multiple) and would only allow high density multiple development on the parcel. The Comprehensive Guide Plan designates this parcel as an R -3 (Mixed Residential) with 6 to 12 dwelling units per acre. The development proposal consists of 16 units per acre which is slightly higher than the Comprehensive Guide Plan, however, it is within the guidelines of the R -4 zoning district. COMMENTS In review of this development proposal, there are two people that should be mentioned. The first person is Mr. Robert Worthington of Opus Corporation. This parcel has been owned by Opus for a number of years and has had a multiple zoning on this property during that time. Opus Corporation's involvement is to plat the property in order that the multiple would be allowed as proposed. Mr. Tom Healey, President of Healey Ramme Company, are the developers of the proposed development project. They have built multiple projects in Minnetonka and Bloomington and are now proposing development in the City of Eagan. The proposed development consists of 3 multiple buildings; one building contain- ing 60 dwelling units and the remaining two containing 114 dwelling units each. It is Staff's understanding that the mix within the project will be, 1/3 of the units having 1 bedroom and 2/3 of the units having 2 bedrooms for a total of 288 dwelling units. The development will be a 3 story apartment complex with each of the buildings having underground parking. The applicants are proposing to have 288 underground parking spaces and 288 surface parking for a total of 2 parking spaces per unit. This has been permissible with the understanding and condition that each of the garage spaces be part of the rental price of the dwelling unit. The applicants have indicated that this will be incorporated into their rental package. PRELIMINARY PLAT LEMAY LAKE 1ST ADDITION APC SEPTEMBER 25, 1984 PAGE 2. In review of the site plan, all buildings meet and exceed all of the setback requirements from all property lines. Access to this development is proposed from Lone Oak Road. They are proposing to extend Eagandale Blvd. to the south and loop this street easterly to provide access to the property to the east. Access would be taken from this extension of Eagandale south of Lone Oak Road. The applicants are also proposing one additional access from Lone Oak Road on the west side of the property. This would be a private street or drive which would provide access to approximately 1 to 1/2 buildings. The most northerly building would have access either the proposed private street and the access from Eagandale extension. The site plan has been designed in order to provide as many views to Lemay Lake as can be obtained on the site. The buildings are angled slightly in order to maximize the number of views to Lemay Lake. The development is also proposing an amenity package which would include a pool or central amenity feature and pathway to Lemay Lake. They are also working with the Park Department in order to essentially dedicate some trailway easements around Lemay Lake. This item will be before the Park's Commission on October 4 for .their review. In reviewing the outside parking, it appears that the 288 spaces would be the number required. In scaling these dimensions, it appears that these spaces have been laid out at a 9 foot width and the ordinance would require that these be expanded to a 10 foot width by either an 18 or 20 foot dimension in order to come into conformance with the Eagan parking requirements. If approved, the Preliminary Plat should be subject to the following conditions: 1) The plat be subject to Dakota County Plat Commission's review and comments because of the acres onto Lone Oak Road. 2) A detailed grading, drainage and erosion control plan shall be submitted and approved by City Staff prior to final plat review. 3) A detailed landscape plan shall be submitted and an adequate landscape bond shall be required and not released until 1 year after the landscaping has been completed. 4) Prior to conversion of these units for condominium or owner occupancy, a Homeowner's Association shall be established and a copy of the Declara— tion and Covenants be reviewed by the City prior to the condominiumizing of the units. 5) The private drive shall be reviewed by the City Engineer and these drives shall meet the specifications of the City for private drives. The parking lots shall have asphalt surfacing and concrete curbing around the peri— meter where parking will not be expanded. 6) The parking stall dimensions shall be a minimum of 10 feet in width. 7) The plat shall be subject to the Park Commission's review comments for park dedications. 8) The garage space shall be attached in the rental structure of the the dwelling unit. PRELIMINARY PLAT LEMAY LAKE 1ST ADDITION APC SEPTEMBER 25, 1984 PAGE 3. Conditions (continued) 9) The trail system between the 214 unit buildings shall be maintained and snow plowed in order that adequate fire protection can be provided to each of the buildings. 10) All other City ordinances shall be adhered to. i J I I 1` lit ,,,7. ILJ 1' I 1 I I 1 I 1, em' iii k• v% ,1 T I I I 1 i ea 1 ILG nu a amoa. v 0 1 I i r- `ice it 0% 6 F AV an, T iiii��rl t '0 1 i i•nabi _s,�," Vi i' ��.a`,1��'�i�+� T U r i rxvuoreR�i 'u" "m FLJ unur CAFf�i [OM \,1 y1+\�,'7I/ C.� �1 L V �pryol JoUIM LCOOF IM'Y LWO v p b M.Mi'WI.1•. uINMMOF ?I1.1� ll.•l'..�T•t yppy 'b P mvmw M 04 i fttG vereirnou: �t+IEC e -q cn.><:rry Du�WINV LovtrtPGG �.11L /,OVtFD!/'. n,ouw• v»d uJ- r eana wt L I.oi 1 /IN•. A :a W'K u•I,.agA: i,ii ft. MS 1K pkIA.4 .•G,, r1•- uwwm nuns W •11'rls L r"N4 1L4 MW D IN Yw1► ,••.•eo •us a a[e wl y0. Ix w•alwr ewcw+ w na waw+«.n Dena a >a•a n. tvtat 16►i�gl sab( c) Rwuv wM•. I I ?,'15Q r,R. +w•rr n ,om, c,.ae. I> r••. ..u.ow ro ti w+wrwn St0(ar kw. L. 14 ON- +wro- •..Ik. eu► c �s,o.d "o rs•1 we.r. ••ert x W. rai L.m.rf ,urn• w vel. 110,'i'll y M. rer.ucb In•.R�••l ,wo CMf -•s u.+r cw- •Irata •oast. ?ALL rls.an yw. •ou wa.or.1 �..IT w 1'1.11 w. lm.f ra Luawdl m�. u+� Wowrel[6 rsteq> M. LLO••M6 NK �4OO `e '7 IV f. WM ra wt. u 1 IN �1 il�riillla�illllh�l ►�li�,lll�l,ll�l_i''lllll a- I 1 v v f• Q `v II I,I I 1 I I ..F��j" se 0 3 1 1 aW. }d1 j V '1 I'' ..wn 1 I I I I Ivv _c'.� 1 J 1 I I' I I {'I,f•1� C�l:f 1" I I 7 CCCI I 111 i �i ?t i��i ti' "I I�1�'Ci I I I Q i w••ol•od c rnaes f^ OP ov I 1 n D m v ll A T I P M HUO GeVGi 01'CFh Aeu MM I I U I C.=. A �S �1 wftu•Y cu►.IC 40mmuY R I y I 1•WS'DMta.. W N yt•�•r I,•n �OwGI•� Stl7R7C.lYrY�l7 wow r •o g.. IYLVr>eo w M M ADVISORY PLANNING COMMISSION SEPTEMBER 18, 1984 PAGE 2 the south side of Lone Oak Road across the entire northerly boundary of this proposed development. An 8" stub has been provided in the location of the Eagandale Boulevard and Lone Oak Road intersection. This development is proposing on extending the 12" sanitary sewer through to its easterly property line with services branching from it to handle each building. The water main layout and number of hydrants as proposed is adequate with the exception that the water main stubbed at the fire hydrant northeast of Building A should be continued northerly to complete an 8" loop with the 8" stub which was mentioned previously. Also, the water main on the west side of Building B should be extended from the termination point at the fire hydrant to the west and continue into the dead -end water main in place along Poppler Drive. Finally, the water main located east of Building C should be stubbed out to the east property line to provide future looping to the adjacent parcel. It is staff's understanding this development proposes to install these utility improvements under City contract. Subsequently, it shall be the responsibility of this development to petition for these improvements. These improvements must be ordered in by Council prior to final plat approval. STREETS Lone Oak Road consists of the only existing street providing access to this proposed development. Lone Oak Road is under the jurisdiction of Dakota County and is presently built to a four -lane rural section adjacent this development. It is anticipated that the ultimate development of Lone Oak Road' will incorporate a concrete median with full turning access only at the Eagandale Boulevard intersection. The internal access to this development is being proposed by providing a public street under the name of Eagandale Place. This proposed street will have to be in alignment with Eagandale Boulevard. Internal access to the apartment buildings will be by way of private drives. The private drives shall be a minimum of 28 feet wide with bituminous paving and concrete curb and gutter. However, staff would recommend that the private drive proposed onto Lone Oak Road to service Building B shall be a minimum of 32 feet wide to the north underground garage entrance since this is the only access to this apartment building. The petition for utility improvement shall also include a request for installing Eagandale Place under City contract. RIGHT -OF- WAY /EASEMENTS A minimum of a 50 -foot half right -of -way shall be dedicated adjacent this development for Lone Oak Road. A 60 -foot right -of -way shall be dedicated for Eagandale Place. ADVISORY PLANNING COMMISSION SEPTEMBER 18, 1984 PAGE 3 Easements of sufficient width shall be dedicated over the sanitary sewer, water main and storm sewer. Also, a ponding easement will be required to encompass the high water elevation of 877. In addition, a 10 foot utility easement will be required to be dedicated adjacent all public right -of -way with a 5 foot drainage utility easement being dedicated adjacent all remaining lot lines. ASSESSMENTS Trunk area water and sanitary sewer have been previously assessed over this existing development, parcels 10- 01000 010 -25 and 26. This leaves trunk area storm sewer and lateral benefit from trunk water main assessments as the responsibility of this development. The following table summarizes these assessment responsibilities of this development. ASSESSMENT SUMMARY TABLE Trunk Storm Sewer Area 774,000 S.F. $0.057 /S.F. $44,118 Lateral Benefit from Trunk Water Main 663 $10.84 /F.F. 7,187 TOTAL ESTIMATED ASSESSMENT $51,305 Final amounts will be determined based upon final plat net area, excluding public right -of -way and dedicated ponding easements, and at the rates in effect at the time of final platting. All costs for public improvements shall be the sole responsibility of this development. I will be available to discuss any aspect of this report in detail with the Advisory Planning Commission at the September 26, 1984, meeting. Respectfully submitted, G(, Richard M. Heft', P.E. Assistant City Engineer RMH /jj MEMO TO: ADVISORY PARKS RECREATION COMMISSION FROM: RECREATION SUPERVISOR, PETERSON DIRECTOR OF PARKS RECREATION, VRAA DATE: DECEMBER 28, 1984 RE: COMMUNITY ROOM 1984 BACKGROUND In January of 1984 guidelines were established for the use of the community room. The basic categories of users identified were City departments, community youth organizations, community non- profit organizations and profit making organizations. The basic directions given for acceptance or denial of requests for the use of the community room this first year were: 1. outside of City departments, accept no regular weekly or monthly requests from community groups. 2. Assess a fee of $15.00 to profit making organizations. 3. Assign a building supervisor to be present for all events at which City staff is not in attendance. a. Supervisor assists with set up and take down of tables and chairs. 10E BY CITY DEPARTMENTS The community room is reserved for fire department training every Monday evening of the year. The police department has used the community room for its gun safety and snowmobile classes. These reservations require 5 8 evening dates within a 1 3 week period of time. The Parks Recreation Department has programmed activities such as Tiny Tots, dance lessons, managers meetings, senior citizens, special events and dog obedience classes into the facility. All events, with the exception of dog obedience, occur during the day. The community room served as a polling site for three elections in 1984. The police and fire auxiliaries each held one evening meeting at the site and the fire auxiliary held its Christmas party in the facility. USE BY OUTSIDE ORGANIZATIONS Examples of one time uses by outside, non- profit organizations at which the b ,,41 -ling supervisor was present, include: League of Women voters E.A.A. registration Independent School District 196 bond referendum informational meeting. Twelve reservations were accepted for which the $15.00 fee was assessed. These reservations were usually made by homeowner management corporations for homeowners association meetings. The building supervisor was present at all of these events. DENIED REQUESTS BY OUTSIDE ORGANIZATIONS Six requests by outside organizations were denied. Two were church groups seeking weekly access to the community room. One scout troup was seeking space for a weekly Monday evening meeting room. Two 4 -H inquiries were received. One was for a monthly evening meeting site; the other was in regard to practice space for a BB gun shooting team. The final denied request was from the South of the River Women's Club for a monthly meeting site. BUDGET: COST 1984 REVENUE 1984 10 folding, adjustable height tables $1,000. $180. Building Supervisor to date: 190. A bulletin board was budgeted for, but has not been purchased to date. Revenue is slightly less than the $200 estimated. Building supervisor costs are less than the $540 budgeted as outside use is not yet at four events per month as was projected. IMPROVEMENTS The 1985 budget provides for the installation of a serving counter /sink which would facilitate senior programs and large group activities. Plans are already underway for completion of this work in January. A chair replacement program should also be considered. Many of the existing chairs are in poor, unstable condition. Stacking chairs, similar to the style at the Municipal Center, are strongly suggested. PROBLEMS Satisfactory storage space is not available. Consequently, the west wall becomes a random area for collection of chairs, tables, etc.. This presents a visual obtrusion and occasional programming conflict. Mq ance of the building, on a routine and as needed basis, has been 6�Effi,,ult to achieve. The addition of a one -half time maintenance employee to the Protective Inspections Department promises to be the solution to current problems which are attributed to lack of staff time. SUMMATION /COMMENTS The_ number of use inquiries denied access are fewer in number than what was b,.,,,el gated at the beginning. Increased public awareness of the room is anticipated with slowly increasing use expected. Users of the facility are generally cooperative in setting up and taking down chairs /tables. Improvement amongst City departments is expected. The installation of the serving cabinet and sink will increase the room's versatility and increase its acceptability for group usage. New chairs and resolution of storage problems would go a long way towards improving the facility, as well as resolving the cluttered, disorganized appearance. Improving attention to maintenance of the facility is expected with the addition of a one —half time individual.