12/06/1984 - Advisory Parks & Recreation Commission MEMO TO: ADVISORY PARKS RECREATION COMMISSION
e FROM: KEN VRAA, DIRECTOR OF PARKS RECREATION
DATE: DECEMBER 10, 1984
RE: MEETING REMINDER DECEMBER 13, 7:00 P.M.
Just a brief reminder that the Commission will be meeting on December 13 at
7 :00 P.M. at the Eagan Municipal Center.
The agenda will focus on the development of an "architectural program" for
park shelter buildings.
1) Schwanz Lake
2) Northview
3) Rahn
4) Capricorn
The worksheet outline that was reviewed at the December 6 meeting will be
used.
KV /js
CC: Tom Hedges, City Administrator
AGENDA
ADVISORY PARKS RECREATION CONNISSION
EAGAN, MINNESOTA
EAGAN MUNICIPAL CENTER
7:15 P.M.
DECEMBER 6, 1984
1. CALL TO ORDER AND PLEDGE OF ALLEGIANCE
2. APPROVAL OF AGENDA AND MINUTES OF NOVEMBER 1 AND NOVEMBER 15, 1984
MEETINGS
3. DEVELOPMENT PROPOSALS
a. C.T.C. Business Campus Scott Anderson
b. Royal Oak Circle Richard Asp
c. Whispering Woods Hilla Construction
d. Pilot Knob Shopping Center Federal Land Co
e. Eagandale Industrial #7 Alscore N.W. Mutual Life
4. OLD BUSINESS
a. Annual review of parks dedication from November 1, 1984
b. Blackhawk Park Blackhawk P.U.D.
c. System Plan updating
5. NEW BUSINESS
a. Eagan Snowmobile Club trail request
6. PARKS DEVELOPMENT PROGRAM
a. Construction project update
b. Building structure analysis
C. Park planning progress
7. OTHER BUSINESS REPORTS
a. Fall /winter recreation programs Dorothy Peterson
b. Maintenance report
c. E.A.W. Pilot Knob Road
MEMO TO: ADVISORY PARKS RECREATION COMMISSION
FROM: KEN VRAA, DIRECTOR OF PARKS RECREATION
DATE: DECEMBER 3, 1984
RE: DECEMBER 6, 1984 COMMISSION MEETING
Before discussing the content of the December 6 Advisory Parks Recreation
Commission meeting, staff would like to remind the Advisory Commission members
to have their comments prepared relative to updating of the Parks System Plan.
This item will be called for under "Old Business."
The second item to bring to your attention is relative to the Schwanz Lake
Park grant application. Staff has been informed that the City's application
is one of only two in the state which has already received local approval
The L.C.M.R. has now forwarded our grant application to federal Lawcon
officials. It is anticipated that federal officials may act on our
application as early as January next year. Assuming approval in January, it
is likely that contract documents can be completed within a 30 -45 day
turnaround time, allowing the City to proceed with the development of Schwanz
Lake Park. This early approval process moves up the time line for development
of Schwanz Lake Park by approximately three months.
In addition to the advanced schedule for approvals, the federal share of the
project was increased by approximately $10,000. The net effect is that both
the City and state share for the participation in the cost will be reduced by
$5,000.
After the "Call to Order "Pledge of Allegiance" and the "Approval of the
Agenda and Minutes of November 1 and 15, 1984 there are five development
proposals for review by the Advisory Commission.
As with all development proposals, the Planning and Engineering Reports are
included for your review. The first development is the C.T.C. Business Campus
by Scott Anderson. Members will recall that this proposal was preliminary
reviewed at the November 1 Commission meeting. No action was taken on the
item at that time because the Advisory Planning Commission had deferred it
from its October to November agenda pending revisions to the plan. The
Planning Commission has reviewed the proposal and forwarded to the City
Council. A portion of the development site falls within the Blackhawk Park
P.U.D.. It would appear, however, that this portion of the site will be
outloted for a proposed future residential development. The remaining portion
of the site is to be used for commercial purposes. Therefore, staff would
recommend a cash dedication requirement for the commercial /industrial area and
that the proposed outlot be reviewed at time of preliminary plat for park
related issues. (There will be no parks dedication for this outlot as part of
the Blackhawk P.U.D., but Commission members may have concerns relative to the
need for tot lots and other amenities).
The second development item is for Royal Oaks Circle as proposed by Asp
Construction and Richard Asp. The development consists of 297 apartment units
on approximately 21 acres of land located in Park Service Section 416. This
service area is to be serviced by the proposed Blue Cross /Blue Shield Park.
In actuality, this development will be closer to the proposed quarry
(Coachman) Park located north of this development than it will be to Blue
Cross /Blue Shield Park. The City's long —range Comprehensive Trails System
Plan also indicates potential access to Blackhawk Park via the extension of
Violet Lane and a non right —of —way trail.
In the preliminary review of the site plan, need for a tot lot was noted to
the developer. A revised plan indicates providing this as well as a swimming
pool and open space area. Staff is also suggesting that consideration be
given for an unimproved looped trail in the open space and ponding area.
Members will note that a large portion of the site is dedicated towards this
purpose because of difficult topography. However, it may be suitable for
trail usage.
The department also notices that improvements have been made in the green
space around the building for landscaping purposes. The inclusion of center
landscape islands has been made from the first plan submitted. A review of
the detailed landscaping plan should be submitted and reviewed at time of plat
approval.
The third development proposal is for Whispering Woods by Hilla Construction.
This development is located in Park Service Section #31W. Its proximity is
very close to the proposed Jackson Parka This application proposes ten single
family lots or, 3.8 acres adjacent to Slaters Road. Staff would recommend a
cash dedication requirement.
The fourth item is the rezoning of approximately 20 acres of land from R -4 to
community shopping center. This site is immediately adjacent to the proposed
Pilot Knob Shopping Center location. This is a rezoning application without a
preliminary plat. Therefore, the Advisory Commission will be reviewing at
time of plat application. It would be appropriate, however, for the
Commission to make the developer aware that a cash dedication requirement will
be forthcoming at the time of plat application for this parcel.
The next application is from Alscore and Northwestern Mutual Life Insurance
Company, for rezoning of four lots from research and development to light
industrial, a request for preliminary plat. It would be appropriate that as a
condition of the rezoning and plat approval, a cash dedication requirement be
a condition of approval.
OLD BUSINESS
The first item under "Old Business" is the annual review of the parks
dedication. Commission members will recall that this item was deferred to the
December meeting to allow additional time for information to be collected on
recent land sales. Staff is currently collecting this information which will
be provided to the Advisory Commission Thursday evening.
The second item under "Old Business" pertains to Blackhawk Park. Included in-
the packet is a separate memorandum regarding this item. A verbal
presentation will also be made at the Commission meeting.
The final item under "Old Business" is the Systems Plan updating. As
previously mentioned, comments regarding portions of the plan which need to
be updated will be taken at this time.
NEW BUSINESS
The Eagan Snowmobile Club has again approached the staff requesting trail
crossings within the Highline Trail and Johnny Cake Ridge Road. A separate
memorandum has been prepared regarding this item. Staff anticipates members
from the snowmobile club to be present to explain their request.
PARKS DEVELOPMENT PROGRAM
The status report on the construction projects which have now come to an end
because of weather will be given. Time permitting, staff would also like to
embark upon a brief work session relative to the development of architectural
programs. Included in the packet is an explanation of how this process would
work along with two worksheets which will be utilized. Staff will also update
the Commission on planning activities in preparation for spring and summer
construction projects for 1986.
OTHER BUSINESS AND REPORTS
Now that the Advisory Commission has gone to twice a month meetings, there
will be sufficient time to review recreational programming efforts at
Commission meetings. Therefore, Dorothy Peterson will be at the December
meeting to review and report upon fall programs and activities, and to
highlight many of the winter programs to be offered.
Included in this packet is a report on maintenance activities which have been
completed during the last month. Time permitting, staff would like to explain
some of these activities as well as other projects and work items within the
department.
i
Direc Parks Recreation
KV /js
SUBJECT TO APPROVAL
MTNUTES OF A SPECIAL MEETING OF THE
ADVISORY PARKS RECREATION COMMISSION
EAGAN, MINNESOTA
NOVEMBER 15, 1984
A special meeting of the Advisory Parks Recreation Commission was called to
order by Vice —chair Carolyn Thurston at 7 :05 P.M.. Members in attendance were
Fedde, Alt, Carroll, Ketcham, Thurston and Bertz. Members Martin and Masin
had notified the Commission they would be late. Commission member Kubik was
absent. Parks Recreation Director, Ken Vraa, Landscape Architect, Steven
Sullivan, and Administrative Assistant, Liz Witt, were also present.
The special meeting was called to address various program objectives and
policies of the Advisory Parks Recreation Commission.
LANDSCAPE /SCREENING STUDY
Parks Director, Vraa, briefly described the preliminary study, copies of which
were distributed as handouts at the meeting. Steve Sullivan then reviewed the
study in more detail. He listed seven (7) objectives previously discussed by
the Commission's "Special Issues" Subcommittee, in establishing minimum
requirements and standards:
1. Establish and maintain forestation of the City.
2. Provide a required minimum amount of landscaping.
3. Preserve significant existing plant material.
4. Provide design guidelines for quality.development.
5. Provide plant material specifications.
6. Achieve screening and buffering of undesirable visual elements.
7. Provide ground cover requirements to control soil erosion.
LANDSCAPE GUIDELINES
The guideline categories addressed by six (6) metro area communities surveyed
were presented. Mr. Sullivan went through each category and discussed how
each of the communities addressed each area. Members expressed their
preference for how it'was handled.
1. Minimum number of deciduous overstory and evergreen trees.
2. Minimum size requirement for plant material.
3. Minimum amount of landscape area within a parking lot.
4. Credit for preservartion of significant onsite trees.
5. Provide screening of parking lots, loading docks and outside storage
areas.
6. Provide buffering and /or screening between residential and differing
adjacent land uses.
7. Irrigation
8. Maximum coverage of impervious surface on a site.
Adv Parks Rec Comm
November 15, 1984
In response to a question, Parks Recreation Director, Vraa, noted the
present ordinance does not carry much clout, hasn't established a formal
policy for review, and has no specific standards either. He said the
Commission could set a landscape policy which requires the developer to submit
a plan to be approved with the final plat.
Landscape Architect, Sullivan, also provided a matrix of activities practiced
by the metro communities. He observed that most communities control
activities through ordinances, although Coon Rapids and Eden Prairie have
formal policies. The approaches used by communities differed, e.g. Coon
Rapids lists every tree which can be planted, while Edina lists those trees
which can't be planted.
The Commission discussed the guidelines at length as well as the form they
should take. It was the consensus that ordinances are more enforceable. The
Commission also felt that the wording must be flexible so that adjustments can
be made to fit the specific plat. Commission member Carroll said landscape
maintenance, rather than irrigation, should be addressed in an ordinance. He
said the developer must be responsible for maintaining a healthy plant growth
beyond just one or two years.
Director Vraa said the maintenance requirement could be enforced must like the
weed ordinance. A warning would be issued and if ignored, the City does the
work and charges the developer. He suggested the possibility of a performance
bond which would be released only when the developer had completed the
landscape requirements and they were healthy within a year's time of planting.
Chairman Martin liked the flexibility in height and number of trees. He felt
the City should include the guidelines in an ordinance. Carolyn Thurston said
the safety of access to parking lots must also be considered when doing the
landscape plan. Other members commented that it was important to screen
parking lots, loading docks and outside storage from public view which means
residential areas and nearby public roadways.
Dick Carroll said that long low structures should be screened by clusters of
trees or planting to mitigate the appearance of the building. One Commission
member wanted to provide a list of trees the City doesn't approve, while
another had reservations about outlawing any type of tree. Carolyn Thurston
commented that there are plenty of tree species available, so eliminating a-
few should not cause a problem.
Director Vraa asked Commission members to determine the Commission's
responsibility in the reviewing of a landscape plan. Should the Planning or
the Parks Recreation Commissions be the responsible arbiter? He reminded
the Commission that the landscape plan is often not provided until final plat
approval. There was discussion about who should review final landscape
phases, the review process, and the timing.
Adv Parks Rec Comm
November 15, 1984
Chairman Martin.noted there would be no decisions made at this meeting
regarding this issue. He said that both Advisory Commissions must use the
same ordinance regarding any landscape plan, but the Parks Recreation
Commission should have the last approval before going to the City Council.
There was discussion by Commission and staff regarding landscaping, with the
Commission providing direction to staff.
Ken Vraa summarized the Commission's direction by providing for mitigation of
monotonous structures through plantings, be easy for the developer to
understand, be enforceable, and the items addressed in the matrix. Staff will
review maximum lot coverage in more detail and come back with recommendations.
There will be no irrigation guideline, but there will be one on plantings
maintenance /perpetual care.
PARKS DEVELOPMENT PROGRAM
Steve Sullivan distributed a paper which listed areas of review for park
buildings and structures. Staff is setting up an analysis process which would
review the use of the building, the building design, the site, the material
and building system and features. Commission member Thurston asked to have
experts come in to brief the Commission on buildings and structures. Members
<w might also take a tour to look at other communities' buildings. After
discussion, it was the consensus of the Commission to be wholly involved in
the buildings /structures study rather than a subcommittee. Periodic reports
to the Council are to be made.
BEER /FOOD CONCESSION POLICY
The Recreation Subcommittee will review policy alternatives and bring
recommendations to the full Commission.
BLEACHERS
The bleacher vendor had not contacted Director Vraa so the item was continued
to another meeting date, as yet unspecified.
Parks Recreation Commission members were in favor of purchasing a chuckwagon
and wanted it identified as sponsored by the Eagan Parks Department.
Commission member Masi_n moved, Fedde seconded, to recommend the purchase of a'
chuckwagon. All voted in favor.
ADJOURNMENT
Chairman Martin moved, Thurston seconded, the meeting be adjourned. Time of
adjournment was 9:15 P.M..
Dated:
Advisory Parks Recreation Secretary
SUBJECT TO APPROVAL
MINUTES OF A REGULAR MEETING OF THE
ADVISORY PARKS RECREATION COMMISSION
EAGAN, MINNESOTA
NOVEMBER 1, 1984
A regular meeting of the Advisory Parks Recreation Commission was called to
order by Chairman Martin at 7 :15 P.M.. Members present were Alt, Thurston,
Carroll, Ketcham, Martin, Masin, Kubik and Fedde. Commission member Bertz
notified the Commission she would be unable to attend. Park Recreation
Director, Ken Vraa; Landscape Architect, Steve Sullivan; Planning Assistant,
Greg Ingraham, and Administrative Assistant, Liz Witt were also present.
AGENDA
Two items were added to the agenda. 2b Minutes Of A Special Meeting,
October 11, 1984, and 7c City Code Requirements Recreation Space.
Commission member Masin moved, Kubik seconded, the agenda be approved as
amended. All voted in favor.
MINUTES OF SPECIAL MEETING DATED OCTOBER 11 1984
Commission member Carroll moved, Fedde seconded, the minutes of October 11,
1984 be approved as presented. The motion carried.
MINUTES OF REGULAR MEETING OF OCTOBER 4, 1984
Commission member Kubik moved, Carroll seconded, the minutes of October 4,
1984 be approved as presented. The motion was approved.
DEVELOPMENT PROPOSALS
A. LUNKA ADDITION ROSE LUNKA
Planning Assistant Ingraham was present and explained the development
proposals. The Lunka proposal is for a split of a one -acre lot. There is a
home on one lot so a cash dedication would be appropriate for the new lot.
Commission member Fedde moved, Thurston seconded, to accept cash dedication
for the lot. All approved..
B. OAKWOOD ADDITION VINCE KENNEDY
Fourteen single family units are proposed on 7.5 acres near the Pilot Knob
Lone Oak intersection. All of the lots meet the square footage requirement.
There are already three homes on the parcel. A cash dedication would be
required for eleven lots. On a motion by Thurston, seconded by Fedde, it was
recommended to accept cash dedication for eleven lots. All voted in favor.
C. BLACKHAWK TOWNHOUSE APARTMENTS DOUG JOHNSON
The proposed apartment complex calls for 168 units located east of Blackhawk,
just south of Diffley. There will be 21 eight -unit buildings. The developer
plans to have a commons building, a tennis court, and perhaps a pool.
ADV PARK REC
NOVEMBER 1, 1984
Commission members discussed trail requirements and the proposed amenities.
There was concern about the proposed location of the tennis court and whether
the subbase material would be adequate to support the amenity. The Commission
felt there would be many children living in the complex, and a tot lot should
be provided.
Commission member Carroll moved, Fedde seconded, the following
recommendations:
1. Accept cash dedication for the units.
2. The tennis court construction should be monitored by staff to assure it
meets required specifications. A $20,000 bond should be required for the
tennis court with 25% withheld for one year after construction is
completed.
3•. A tot lot, to be reviewed and approved by the staff landscape architect,
would be required plus a $5,000 bond to insure its construction.
4.. Trail easement should be given for the sections abutting Blackhawk Road.
The motion carried unanimously.
D. JOHANNES ADDITION JOHN TRAPPER
The proposed development is part of the Gopher -Eagan P.D. and no dedication is
forthcoming. The site is located near Elrene Road, north of Windtree
Addition. There is a trail along the east side of Elrene. Discussion focused
on the possibility of a trail along the north line of the development as
proposed in the System Plan. After review and discussion, Chairman Martin
moved, Kubik seconded, to recommend a one -half (15 trail easement along the
north lire of the development for a possible future trail. All voted in
favor.
E. CEDAR SPACE CENTER ADDITION NORSE DEVELOPMENT
The developer proposes three lots two of which a're to be placed in outlot
status and the third to be the site of ten self storage buildings. Commission
member Kubik expressed dislike for the plan, explaining the amount of
blacktop, number of buildings and the general layout did not appear to be
aesthetically pleasing. Commission members noted that this is another of
several proposals that has a high percentage of impervious surfaces. It was
noted that the plan meets lot coverage requirements, but members disliked the
uneven distribution of green space and concentration of hard surfaces. The
consensus of the Commission was to not recommend approval of the development
as proposed.
Commission member Thurston moved, Fedde seconded, to recommend commercial cash
dedication if the Council approves the development. The motion carried.
F. C.T.C. BUSINESS CAMPUS SCOTT ANDERSON
A 72,000 square foot high tech production building is proposed on a 6.6 acre
parcel. An additional thirteen acres was outloted for future residential
development. The Planning Commission expressed concern with grading and
access and the item was continued to their next meeting. No action was taken.
The proposal will be on the Commission's December agenda.
ADV PARK REC
NOVEMBER 1, 2984
G. NORTHWESTERN BELL
The proposed structure is similar to the building requested at ChesMar Park,
but later dropped. The location presently requested is north of Diff ley on
Lexington Avenue. As it is part of the Lexington South P.D., no park
dedication is forthcoming and no action was required.
OLD BUSINESS
A. SYSTEM PLAN STUDY UPDATING SYSTEM PLAN
Ann Devring of Erkkila Associates reviewed techniques which could be used to
update the System Plan. Such techniques included annual addendums on a
section by section basis, page revisions, charts updated and a five —year
update. A chart covering these techniques was included in the packet.
Ms. Devring suggested the Commission decide when and how often they would like
to- update the plan. Chairman Martin liked the proposed techniques and thought
a special meeting in January should focus entirely on the System Plan update.
The Commission expressed the desire to have the revision date placed on all
revised pages. After discussion, Chairman Martin moved, Carroll seconded, to
accept the update plan methodology. The January meeting was set as the annual
review meeting. All voted in favor.
B. KEHNE PARK COUNCIL ACTION
Chairman Martin reported the Special Issues Committee prepared a report which
included a security report from the police department, and presented it at the
October 30, 1984 City Council meeting. The Council approved Phase I (making
necessary repairs and making the structure more energy efficient), and Phase
II, upgrading the facility for use by the Parks Recreation Department in
three to four years time, or at such time as the Commission recommends its
need.
Parks Recreation Director, Vraa, will work with Architect, Roger Sjobeck, on
the plans and specifications. Realistically, the only work which could be
accomplished in 1984 will be the fireplace ad bathroom'repairs. Director,
Vraa, was asked to notify the renters of the approved plan of action.
C. NATURAL RESOURCES AMENITIES
Chairman Martin reported that the City Council has directed the Advisory Parks
Recreation Commission to gather information on natural resources to develop
guidelines and then meet with the Council to review and plan a course of
action.
Parks Recreation Director, Vraa, suggested that Steve Sullivan, and Greg
Ingraham of the Planning Department, collect information for a preliminary
report which will show impact of specific developments on natural resources.
Chairman Martin wanted a matrix of activities undertaken by other cities.
Planning Assistant, Ingraham, said he will apply other community guidelines to
various development proposals in Eagan. A November 15 meeting is planned.
3
ADV PARK REC
NOVEMBER 1, 1984
NEW BUSINESS
A. ANNUAL REVIEW PARKS DEDICATION
After discussion, the' item was tabled to the December meeting in order to get
additional information "-on North Park costs and any other costs which could
affect park fund monies.
B. BEER /FOOD CONCESSION POLICY DISCUSSION
Director Vraa included policies of various metro area communities in the
packet. Generally, beer is restricted or allowed only on weekend tournaments.
The Commission raised the following issues they would like reviewed:
1. A policy for neighborhood.parks vs. community parks.
2. Who can be a vendor?
3. What would the fees be?
4. How about a clean -up deposit?
5. Should the present policy be retained or should beer be disallowed
altogether?
The Recreation Committee will review these concerns and come back with
recommendations to the whole Commission.
PARK BOND DEVELOPMENT PROGRAM
A. ACCOUNTING AND COMMISSION REVIEW PROCESS
Director Vraa briefly reviewed accounting procedures and fund allocations for
the Parks Development Program. He explained how the review process could
work, explaining the Advisory Parks Recreation Commission may have to make
some decisions for cutting back or expanding projects, based on detail plans.
The Commission discussed the need to develoop contingency plans for such a
possibility. The Director responded to several questions, after which it was
decided that a policy need not be drafted. Mr. Kubik concluded by saying that
it appears the Commission would prefer to make a case by case decision
recognizing some flexibility must be built into the system for staff and
Commission. Members expressed agreement with what had been presented.
B. UPDATE ON CONSTRUCTION PROCESS
Steve Sullivan said the lighting fixtures have been delivered to Northview
Park and work is still projected to be completed by the end of the month. The
ball fields have been realigned and graded. Backstops, posts, fencing and
benches are being installed. The parking area has been enlarged by 20 spaces.
Tennis courts at Country Home and Pilot Knob Parks have been color coated.
Others will be done when the temperature is above 55 degrees. Play equipment
is being installed in a couple of parks. Parks Department personnel will
install equipment as it comes in. Much of the heavy grading has been done at
Rahn Park and fill is going in in the parking lot area.
4
ADV PARK REC
NOVEMBER 1, 1984
C. PARK STRUCTURE.-COMNITTEE
Parks Recreation Director, Vraa, would. like the Commission to establish a
reviewing committee for investigating design and material alternatives for
building for Eagan's parks. There are sun shelters, warming houses and
enclosed buildings which various functions. The Director stated that
with so many variables involved, the Commission will need to be deeply
involved with this process. Members discussed the need for a Study Committee,
its role, and what its purpose would be. A member from the Council was also
suggested. This item will be on the November 15 agenda for additional
discussion.
OTHER BUSINESS AND REPORTS
A. DISCUSSION OF TWICE A MONTH MEETINGS
Director Vraa suggested the Commission consider two meetings a month. Regular
business, such as recommendations on development proposals, could be conducted
at the first meeting and policy decisions /related business, will be discussed
at the second meeting. Members agreed that there should be two meetings in
order to get its work completed one meeting in December and two a month
scheduled, as needed, in the coming months.
B. NATIONAL RECREATION PARKS ASSOCIATION CONFERENCE
Director Vraa was very impressed with the annual conference. He noted that
playground equipment is constantly changing. He did see more emphasis on
water activities. He was enthusiastic about the possibility of a water
playground at Schwanz Lake. He looked at bleacher seating and was approached
by a vendor to show his bleachers in Eagan and then sell them to Eagan at the
"reduced" price.
C. RECREATION SPACE REQUIREMENTS
Chapter 11 in the City Code spells out design and construction requirements
for multiple zoning districts. Developers must provide an open recreational
area in a ratio to the number of dwelling units. Such requirements will give
the Commission leverage to obtain recreational space for multiple dwelling
residents. Planning Assistant, Ingraham, will provide Commission members
copies of the pertinent code sections. He will also provide copies of the
Shoreland and Boating Ordinance recently approved by the City Council.
ADJOURNMENT
Commission member Ketcham moved, Fedde seconded, that the meeting be_
adjourned. Time of adjournment was 11 :15 P.M..
Dated:
Advisory Parks Recreation Secretary
5
MEMO TO: CHARLES HALL, CHAIRMAN, THE ADVISORY PLANNING COMMISSION
FROM: DALE C. RUNKLE, CITY PLANNER
DATE: NOVEMBER 20, 1984
SUBJECT: UPDATE ON CTC BUSINESS CAMPUS
Since the October 23, 1984 meeting, the Planning Commission addressed a number
of concerns regarding this development proposal.
1) The first concern was access of this development. Since the October 23, 1984
meeting, the applicants have submitted the revised site plan which shifted the
building easterly and is proposing to allow their major access from the north
off of Violet La. Presently the applicants are proposing a private street,
there is adequate right —of —way and the street will be designed to City standards
and could possibly be dedicated in the future and dedicated a City street. There
is adequate room to continue this road southerly in order to make a full loop
or service road going to Englert Rd. on the south. The applicants have also
provided a concept plan as to how the area to the south could develop in regard
to the R -2 land use density as proposed in the Comprehensive Guide Plan. A
secondary access to CTC would be from Pilot Knob Rd. which the applicants have
proposed as a right in /right out across from Crestridge La.
2) The second concern the Commission had was meeting with adjacent neighbors regard—
ing this development request. The revised site plan showing access on the west
side of the parcel shift the building easterly. This shift now encroaches into
the property of the three (3) residents to the east. The only feasible way now
to develop this parcel is that these residents be removed and the property to
the east be incorporated into expansion plans for CTC. Presently, the applicants
are meeting with the adjacent property owners an as of the date of this report,
there has not been a conclusion or settlement met regarding acquiring these
parcels. Negotiations are still going on and hopefully a decision will be made
prior to the November 27th meeting.
3) The applicant provide a sketch plan as to how the southerly portion of the
property would develop. The applicants have provided a concept of townhouses
and two 8 12 unit buildings which would provide the residential density to
the property to the south and with Staff review it appears that the density does
fall within the 3 6 or R -2 land use and would then be the transition area to
the property to the south.
4) The City Staff has tried to inventory various parcels as to where this develop—
ment would be allowed within existing zoning districts. There are approx. 6
7 locations that this developer could seek rather than this particular parcel.
Three of the locations would be in already industrially zoned areas such as Cedar
Industrial Park, Eagandale or the Gopher Eagan and there would also be approx.
four commercial of which nothing has really developed where this facility could
be a buffer or a pheriphal with other commercial activity. Staff has also asked
John Voss to address this zoning request and what impacts he would foresee that
this development would have in this general location.
UPDATE ON CTC BUSINESS CAMPUS
NOVEMBER 20, 1984
PAGE TWO
5) The APC had a concern regarding the comments from Dakota County. The applicants
have met with the County and have submitted a letter reviewing this proposal
and their concerns regarding access onto Pilot Knob Rd. As you can see, the
letter primarily addresses access to the south on Englert Rd., however, it is
suggested the access now go north to Violet La., which will be the first signal-
ized intersection, and would be the major access into this development proposal.
6) The Staff shall meet with Ed Dunn and review the exhibit and redo Exhibit "E"
of the Planned Development for Blackhawk Park showing the proper alignment of
I -35E. Staff is in the process of reviewing all of the PD's and hopefully this
will be accomplished in the PD review in January. This parcel is isolated by
I -35E and other than this specific plan, there should be no impact with this
plan to the rest of the Blackhawk Park PD.
7) Regarding landuse and changes within landuse to the property to the south and
north. Reviewing the parcel to the north, it is the City's understanding the
8) applicants, ADI, Anderson Development, Inc., have acquired an option to purchase
the remaining approx. 4 acres on the north. This now allows the major access
to the development to go north, or to Violet La., where the major intersection
will be between Duckwood Violet La. There would also be additional acreage
for development in this 4. some acres. Staff suggests that this be limited to
non retail uses, such as office, support or high tech facilities versus any type
of retail use. The proposal for either high tech or limited businss should be
designated on this parcel to the north. Reviewing the property to the south,
the applicants are not changing from what has been approved in the Blackhawk
Park PD. Their proposal consists of a townhouse /very low density multiple de-
velopment, consisting of 8 12 unit buildings which would be within the density
of the R -2, 3 6 dwelling units per acre. This would be consistent with both
the Blackhawk Park PD and the Comprehensive Guide Plan. The transistion from
this request to change to commercial and work down to a residential use, have
been buffered within the property purchased or proposed to be purchased with
this development.
Hopefully this addresses the issues and concerns from the last meeting. Attached
are revised site plans showing the shift of the building and access to the north.
Also, attached is a report from John Voss and letter from Dakota County Plat
Commission as it pertains to this development request. If anyone would like
additional information, please contact me at City Hall.
Sincerely,
Dale C. Runkle
City Planner
DCR:jbd
attachments
Memo To: Advisory Planning Commission
From: Dale Runkle, Planner
Date: November 17, 1983
Subject: Lan d Use Study of Area Bounded by I -35E on the West,
Deerwood Drive on the South and Pilot Knob Road on
the East.
I BACKGROUND INFORMATION
A. Existing Land Use: The Study Area comprises approximately
190 acres. After right -of -way is taken for the development
of I -35E, there will be approximately 16 single family homes
remaining in this area. The only other development is the
existing City Hall facility located on Pilot Knob Road.
The remainder of the area is vacant with some farming activity.
B. Topography: The topography varies a great deal over
the 190 acre area. The northern portion of the Study Area,
in the vicinity of Violet Lane, is gently rolling with only
a few scattered clusters of trees. This generally characterizes
the area as you proceed south to the location of the existing
City Hall. South of this area, the topography is considerably
more rugged and more heavily wooded. There are several
slopes in this area which exceed 30%. There are also many
small depressions or low areas. As you approach a point,
approximately 4 mile north of Deerwood Drive, the area again
can be characterized as gently rolling with a few isolated
exceptions where there are very steep slopes. Overall the
area is not uncharacteristic of vacant land which exists
in the City of Eagan with the exception of some of the very
steep slopes which exist over the central portion of the
Study Area.
C. Zoning: The existing zoning over the approximate 190
acres is as follows:
Blackhawk Planned Development 65 acres (R -3)
Agricultural 110 acres
R -1 15 acres
The Blackhawk Planned Development Agreement was signed in
June, 1977. The Planned Development does not show the existing
alignment of I -35E. With the new alignment, approximately
65 acres will remain east of I -35E. These remaining properties
were designated for Residential R -1 and R -3 and an area
west and south of the existing City Hall was designated
as a civic center /park. The Planned Development also shows
a north -south collector street running through the property
from Pilot Knob Road, just south of the Violet Lane intersection
to Deerwood Drive. This internal collector street could
not be developed along the proposed alignment because of
the new alignment of I -35E.
Advisory Planning Commission
Page 2
D. Comprehensive Plan: The Land Use Guide Plan Map contained
in the 1980 Eagan Comprehensive Guide Plan designates the
entire Study Area for residential R -11 development with
the exception of the existing City Hall. site. The R -11
designation permits residential development within a density
range of three to six units per acre. After land is deducted
for the existing City Hall, this would permit a total number,
of units ranging from 540 to 1080.
No park land was proposed to be dedicated in the Study Area.
The park land serving this neighborhood will be located
to the south across Deerwood Drive and east, across Pilot
Knob Road. Redevelopment of the existing City Hall site
may also offer some potential for recreation.
The Test of the Comprehensive Plan singled out the Study
Area for special consideration. Page IV -29 of the Land
Use Section of the Comprehensive Plan states:
"a. Blackhawk Lake /I -35E: There has been considerable contro-
versy over the routing of the future I -35E in the vicinity
of Blackhawk Lake. More recently, the City approved a route
along the easterly edge of Blackhawk Lake after a Minnesota
State Supreme Court decision blocked the City's preferred
route of bridging I -35E over Blackhawk Lake. As such, the
new alignment was reviewed by the Eagan City Council in
March of 1980 and the City has not had a great deal of opportun-
ity to study the resulting land use implications for the
area which lies generally within the boundaries of Pilot
Knob Road, the I -35E route and Deerwood Drive. This area
is designated for low density -mixed residential uses, however,
more detailed planning for I -35E and the corresponding effects
of drainage, ponding and noise and vision impacts upon the
area may cause the City to revise the Comprehensive Plan
accordingly. This is expected to be an area of high noise
impact because of the narrow configuration between Pilot
Knob Road and I -35E. Land use planning will have to mitigate
these adverse effects as much as possible."
E. Interstate 35E: The grades and right -of -way limits
for I -35E, as it affects the Study Area, have been established.
The net effect in terms of noise that the interstate highway
will have on adjacent properties requires a detailed area
to -area study. The proposed grades on property to be developed
and the proposed siting of structures would be needed in
order to determine detailed noise impacts. In a more general
way, however, the noise impacts can be determined from the
Environmental Impact Statement (EIS) prepared for I -35E.
It appears that, where possible, McDOT recessed the highway
or provided earth berms to reduce noise impacts. In fact,
Advisory Planning Commission
Page 3
the Study Area may be more adversely affected over the long
term by noise from Pilot Knob Road than from I -35E. In
any instance, the Study Area which averages approximately
4 mile in width between I -35E and Pilot Knob Road, has the
potential for high noise impacts at certain locations from
these two highways. As such, the selection of the type
of land use that is permitted and the siting of buildings,
will be of particular concern.
F. Municipal Utilities: Municipal sanitary sewer and water
is located along the periphery of the Study Area and would
be available for development which occurs within this area.
II LAND USE STUDY
As noted above, this is a particularly difficult area in
which to properly plan for land uses. The routing of I-
35E, approximately mile away from a very major highway,
creates land use problems because of the potential for high
noise levels and the inability to provide for an internal
collector street. This is further complicated by the rugged
topography located iin•the center of the Study Area. As such,
some of the more finite decisions related to land use would
best be made when detailed plans are brought forth by developers.
The Comprehensive Plan, through the designation of R -11
for the entire area, appears to be an oversimplication.
This was recognized in the text of the Eagan Comprehensive
Plan wherein it called for a more detailed study of this
area after the alignment of I -35E has been established.
DEVELOPMENT AREAS:
The Study Area, because of topography, may be divided into three
areas. The first would be the area north of existing City Hall,
the second would extend from the existing City Hall to a point
mile north of Deerwood Drive and the remainder would be the
southern portion of the Study Area.
STUDY AREA I
As previously stated, the northern portion of the Study Area,
which extends from the existing City Hall north, is generally
characterized by the development of a few single family homes
with a large amount of vacant land which is generally rolling,
with scattered stands of trees. The only major vehicular access
to this area is Pilot Knob Road. At present there are two inter-
secting streets; Violet Lane and Engelhard Road with some additional
private accesses directly onto Pilot Knob Road. The existing
intersecting streets are spaced about 4 mile apart. It would
Advisory Planning Commission
Page 4
be desirable to maintain this spacing so that in this area the
only three direct accesses would be Violet Lane, Engelhart Road
and the City Hall access. It would also be desirable to create
an internal local street connection between these three accesses.
The single family homes which exist in the area, generally average
from 10 to 20 years of age and are expected to exist for the
next several years. As such, it again would be desirable to
have residential development as the predominent use in this
area which would be compatible with the existing single family
homes. The R -11 designation appears to be correct for this
area since it would permit the clustering of low density residen-
tial development or additional single family homes. Also, if
proper access could be provided there may be some potential
for Limited Business use along Pilot Knob Road. Other types
of commercial, however, should be resisted; particularly that
which would generate high volumes of traffic.
STUDY AREA II
Study Area II includes the property south of the existing City Hall
to 1/4 mile north of Deerwood Drive. In review of this particular
area, it appears the topography is the most rugged of the entire
study area. The topographic relief and heavy vegetation would ap-
pear to make area the most difficult to develop within the en-
tire study area. Again, this parcel abuts I -35E to the west and
Pilot Knob Road to the.east. There will be some noise impacts gen-
erated from.I -35E and Pilot Knob Road. Therefore, proper planning
and placement of units should be considered in regard to minimizing
the noise impacts generated from the two roadways. Along with berms
and proper screening; noise reduction could be accomplished in the
development of this proposed site.
In reviewing the land use for this particular area, it appears that
the R -II designation, the Mixed Residential with a density of 3 -6
dwelling units per acre appears to be appropriate for this area.
The R -II density would allow a mixture of single family and town-
house units and could allow clustering of the lower density in or-
der to maximize the development and preserve the natural environ-
ment which exists on the site.
Presently, there exists two single family homes and a mixed residen-
tial of 3 -6 dwelling units per acre could incorporate these single
family homes into the development of this entire parcel.
Again, as stated in Study Area I, there may be some areas of this
study area which could be looked at for Limited Business use or
clustering of low volume commercial activities. In review of this
particular use, it appears that some clustering of Limited Business
could occur along the Pilot Knob Road area. This would provide a
buffer area from Pilot Knob Road when upgraded and also from the
municipal center which is developing on the east side of Pilot Knob
Road or directly across from the property Mr. Horne is proposing to
develop. Again, the Limited Business use should be clustered as
not to promote strict development from occurring along Pilot Knob
Road.
Advisory Planning Commission
Page 5
STUDY AREA III
The last area to be reviewed is the area located 1/4 mile north of
Deerwood Drive running south to Deerwood Drive. In review of this
parcel, it appears that the topography is less severe than the pro-
perty directly north. The hills are more rolling and less severe.
There are clusters of vegetation, however, not as much as what is
on the property directly north.
In reviewing the land use for Study Area III, it appears that the
R -II designation of Mixed Residential with a density of 3 -6 dwelling
units per acre would also be appropriate for Study Area III. This
would allow a continuation and continuity of the two study areas
mentioned above and provide for a homogeneous neighborhood. In
developing this parcel, there should be an internal street network
with as few connections to Pilot Knob Road and Deerwood Drive as
possible, and hopefully, interconnections to properties to the north
if feasible to provide a good circulation pattern.
In conclusion, it appears that the original analysis made in pre-
paring the Comprehensive Guide Plan when designating this District
or development area as R -II (Mixed Residential) with a density of
3 -6 dwelling units per acre appears to be the same conclusions that
staff came up with in re- reviewing this development area in regard
to topography, vegetation and other site restraints.
It appears, however, there could be some clustered areas where Limit-
ed Business could occur within this study area. The potential for
some clusters of Limited Business use could be incorporated in the
northern two study areas, and these businesses should be geared to
types of business which would generate low volumes of traffic, or to
restrict left- turning movement as much as possible along Pilot Knob
Road. These limited business areas should be clustered to prevent
strip development and also in locations where buffering from higher
intense uses such as the commercial areas in the north of this study
area and areas directly west cf the City Hall complex.
Since this study was initiated because the City has received.a devel-
opment request for a 38 -acre tract of land within this study area
and the proposed development was of a higher intensity than what was
designated on the Comprehensive Guide Plan, the applicant should dem-
onstrate to the City that his development proposal is less detrimental
to the topography than what the City is proposing for land uses with-
in this study area. If the developer can prove that his development
proposal creates less impact to the topographv, consideration should
be given to his request. However, this will have to be proven by the
applicant if he is proposing a change to the Comprehensive Guide Plan.
f
Advisory Planning Commission
Page 6
III LAND USE PRINCIPLES GUIDING DEVELOPMENT
The following Land Use Principles should be used by the
City to guide development in the Study Area.
1. It would be an objective of the City to sever all private
accesses and to only have access occur to Deerwood Drive
and Pilot Knob Road from local streets which are spaced
at least 4 mile apart.
2. Existing Single Family
The existing single family uses in the Study Area should
be protected as much as possible by providing compatible
development. Most of the existing single family homes
are expected to continue in use for the next several
years. As such, low density residential on adjacent
properties would be the most desirable use.
3. Residential Development
The general pattern of development in the Study Area
is expected to consist of low density residential develop-
ment. The housing that is expected would be single
family homes, townhouses, quads or coach homes and some
apartments or condominiums. It is expected that as
many as 1000 new residential units will be developed
over the Study Area.
4. Commercial
The only commercial development that would be permitted
is Limited Business. Limited Business uses could be
developed along Pilot Knob Road in areas which are exposed
to high activity such as commercial uses in the vicinity
of Violet Lane or the Eagan Civic Center in the Wescott
Road area. Where Limited Business is allowed to develop
it should be a "clustered" development with access occuring
form a public street which is properly spaced along
Pilot Knob Road.
"Strip" commercial development should not be permitted;
rather, small, commercial clusters should be the pattern
where and if any commercial is permitted. In particular,
retail commercial or commercial which generates a high
volume of traffic,should not be permitted.
5. Planned Development
It would be desirable to have most of the development
in the Study Area occurring through an approved Planned
1
Advisory Planning Commission
Page 7
Development. This would allow for the planning of a larger
area which may develop over an extended period of time.
The existing Blackhawk Planned Development needs to
be revised because of the dramatic impact that the rerouting
of I -35E has on the approved Blackhawk Planned Development.
6. Park /Recreation
It would be desirable to provide a small, neighborhood
recreational area in the vicinity of the existing City
Hall in order that residential development in the Study
Area would have better access to recreational uses.
As currently planned, the only recreational areas would
occur to the east across Pilot Knob Road or to the south
across Deerwood Drive. If the anticipated 1000 dwelling
units are developed in the Study Area, this would lend
further support for the development of a small recreational/
municipal park area.
7. Adverse Noise Effects
As previously stated, this area is expected to experience
high noise levels from I -35E and Pilot Knob Road. Noise
attenuation is expected to result from proper planning
such as providing proper grades, providing the proper
siting of structures, providing noise berms and barriers,
providing vegetative screens and similar man -made means
for providing attenuation. This can best be accomplished
at the time individual development plans are brought
forth for review by the City. Only through this method
will a desirable living environment be created in the
Study Area.
In summary, this Study has pointed out many times that the Study
Area will be very difficult to properly develop because of
the adverse external influences. As such, the City will have
to pay particular attention to the individual development plans
brought forth to assure these adverse impacts are mitigated
to the greatest possible extent. Pre planning at this time
cannot deal with all of these matters because of the lack of
sufficient detailed development information. This only can
be accomplished as individual plans are brought forth. The
general guidance, however, is to develop the area with low density
residential use as the predomi.nent land use with the opportunity
for small clusters of Limited Business developments along Pilot
Knob Road in areas where high adverse impacts may occur.
e�
WE
�r
b
Q
Q
-9
Op
E
r
o
A
J
V
Q i
v :fir.....
BERNARD H.LARSON
A K p', TA COUNTY aT �T T �j DAKOTA COUNTY SURVEYOR
i t� d t t 1 .iH' TELEPNONF.:
*DAKOTA COUNTY GOVERNMENT CENTER 612.437 -0250
1560 HWY. 55 HASTINGS. MINNESOTA 55033
October 23, 1984
City of Eagan
3830 Pilot Knob Road
Eagan MN 55122
Att: Dale Runkle, City Planner
Dear Mr. Runkle:
The Dakota County Plat Commission met on October 23, 1984 to
consider the proposed plat of CTC BUSINESS CAMPUS./ Said plat is
adjacent to County Road #31 'or L ilot Knob and 4 is, therefore,
subject to the Dakota County Contiguous Plat Ordinance.
After review of the plat, it was the consensus of opinion of the
Plat Commission that said plat does agree with the provisions of
the Ordinance with the following exception: The access required
onto County Road #31 is designated on the proposed plat as being
opposite Crest Ridge Lane. If this is in fact the case, the Plat
Commission has no objection. If, however, the access must go
southerly of that through the strip designated as being part of
this platted property, than the Plat Commission, upon
recommendation of the County Highway Engineer, must deny that
access. It is suggested that any access from this property go
southerly and exit out onto Englert Road as the most ideal and
best alternative to this proposed subdivision.
If you have any further questions please let us know.
Warson urs,
y Surveyor
BHL:vf
COMMISSIONERS
1ST DISTRICT 2ND DISTRICT 3RD DISTRICT 4TH DISTRICT 5TH. DISTRICT
JOSEPH A. HARRIS GERALD E. HOLLENKAMP JOHN S. VOSS STEVE LOEDING RUSSELL STREEFLAND
HASTINGS SOUTH ST. PAUL BURNSVILLE INVER GROVE HEIGHTS BURNSVILLE
MEMORANDUM
TO: Dale Runkle, City Planner
FROM John S. boss
SUBJ.: Appropriate Land Use at Violet Lane /Pilot Knob Road Area
CTC Business Campus and Anderson Development Application
DATE: November 21, 1984
BACKGROUND: At the October 23, 1984 Planning Commission meeting, an application
from CTC Business Campus for a Preliminary Plat and rezoning were considered.
At that time, the Planning Commission raised questions related to the appropriate
land use in Violet Lane /Pilot Knob Road area. Also, the Planning Commission re-
quested the staff to look at the overall inventory of commercial and industrial
land that would be suitable for corporate headquarters. This memorandum is in
response to those concerns.
APPROPRIATE LAND USE AT VIOLET LANE /PILOT KNOB ROAD: In November of 1983, a
Planning Study was made of the triangular area bounded by I -35E on the west,
Deerwood Drive on the south and Pilot Knob Road on the east. In the Study,
this area was generally divided into a north, central and southern area.
Comments from that Study, related to the northern area which would include
the,Violet Lane /Pilot Knob Road area, were in part as follows;
The noxthexn poxtion of the study area iz genexaUy chatactvri.zed
by the deve-opment o f a hew single Samity homey with a Zatrge amount
o6 vacant .-and which is g enexaUy xoZZ ng with s cat tviced stands o b
txees The o n.-y ma j on veh ica-ax access to this atce a iz Paot Knob
Road. At pxezent, thvice aAe tuo .intersecting atxeets V.ioZet Lane
and Engethat,t Road with some additional, pkivate accesses d.itcect-y
onto Pilot Knob Road. The existing .inters ecti.on stxeets cute spaced
about one- gaaAtvc (1 /4) mi-e apaAt. It wou, -d be de 6iAab.-e to main-
tain this spacing so that in this axea, the on-y thAee d.iAec t ac-
cesses would be VioZet Lane, Enge.-hant Road and the City I- LU accu.b.
It wou, -d a so be desitbaZe to cAeat&. an .intvcna- tocat street connec-
t.Zon between these thxee accebses. The a.ingZe jamiZy homes which
exist in the atcea g envca U y avvcag e Jxom 10 to 20 yeatr s in age and
axe expected to exist box the next z evv at yeaA s As such, it again
wou, -d be dedi)tabZe to. have tez identia- development as the pxedomixent
use in this arrea wh,i,c.h woatd be compatible with the exi sting s.ingte
jamity homes. The R -II designation appeaAs to be coxnect box this
area since it woa-d permit the c-uatening o f .-ow-density xes identi.a-
Memorandum to: Dale Runkle
From John S. Voss
November 21, 1984
Page 2
deve2opmewt on addit i,ona,Z z ingte 6amity homes. AZ6 o, .is proper accebz
cooed Be provided, there may be some potentiae. 6or Limited Bu mess
ode along Pitot Knob Road. Otken. typea o6 commerc i.ae, however, .6houed
be resisted; parti.caZaA4, that which woof -d generate high votm,ez o�
trab jic.
Since that time, additional information has been provided by the Minnesota Depart-
ment of Transportation. Additional homes have been taken for I -35E right -of -way
over that which was anticipated a year ago when the above report was drafted.
Now, only one Cl) residence will exist on the north side of Violet Lane and this
would be located at the intersection of Violet Lane and Pilot Knob Road. This
lot would be the only private property north of Violet Lane. All of the other
property has been taken for interstate right -of -way. Also, this general area
will be impacted by noise from Pilot Knob Road and Interstate 35E. An exit
ramp will be located near the northern boundary of the private property that
will remain. Also, Pilot Knob Road will be "bridged" over I -35E and the eleva-
tion of Pilot Knob Road will be very near the elevation that exists today. This
exposure to high. volumes of traffic and high noise levels indicates that this
would not be a particularly desirable area for residential development. The
proposed CTC Business Campus development, which is a high -tech industry, could
be a suitable use for this area if it was properly developed. This use would
be in keeping with the Limited Business type of use that was alluded to in the
above report. The remaining property along Violet Lane then also could be con-
verted, in time, to other Limited Business uses. In this regard, the area north
of the pond would be developed with Limited Business uses and the area to the
south would be developed with residential uses wherein the ponding would gen-
erally be the area where the transition would be made from Limited Business to
the north to residential development to the south.
In. addition, a traffic study should be done to insure that the volume of traffic
generated by the CTC Business Campus could properly be channelled onto Pilot
Knob Road. The CTC plan proposes an access to Crestridge Lane. It may be
better to exit this property at Violet Lane wherein a traffic signal will probably
be installed at some future date because this is also the Pilot Knob Road inter-
section with Duckwood Drive which is expected to serve a major shopping center.
OVERALL INVENTORY OF COMMERCIAL AND INDUSTRIAL LAND SUITABLE FOR CORPORATE HEAD
Q UARTERS: A general survey of land suitable for corporate headquarters reveals
that there is a considerable variety of commercial and industrial land avail-
able in the City for corporate headquarters. Some of the locations that were
considered by COMSERV included the area across Diffley Road from Metcalf Junior
High School and the northwest quadrant of I -35E and Cliff Road. Other areas
include portions of the Gopher Smelting property, east of Elrene Road and the
Dayton- Hudson property which is located at the northeast boundary of the City.
The proposed CTC campus site would be well- suited for a corporate headquarters,
however, it should not be rezoned solely because there is not other suitable
land available in the City. To the contrary, there are considerable amounts
Memorandum to: Dale Runkle
From: John S. Voss
November 21, 1984
Page 3
of suitable commercial and industrial land,either zoned or designated on the
Comprehensive Plan,which would suit this purpose very well.
JSV
r
CITY OF EAGAN
SUBJECT: Commercial Rezoning
APPLICANT: Federal Land Company Vern Martin Colon
LOCATION: Northwest Quadrant of Duckwood Lane and Denmark Avenue
West 1/2 of Southwest 1/4 of Northwest 1/4 of Section 15
EXISTING ZONING: Multiple Residential R -4
DATE OF PUBLIC HEARING: November 27, 1984
DATE Of REPORT: November 20, 1984
REPORTED BY: John S. Voss, Planning Consultant
PROPOSAL SUMMARY: The applicant is requesting the rezoning of an approximate 18 acre
area from Multiple Residential R -4 to Community Shopping Center District (CSC). The
property is located viest of Denmark Avenue and north and south of the future exten-
sion of Duckwood Drive, west of Denmark Avenue.
COMPREHENSIVE PLAN: The Comprehensive Plan designates all of the property that lies
north of Duckwood Drive and west of Denmark Avenue in this area, extending to I -35E,
as Community Shopping Center (CSC). Therefore, the proposed rezoning is consistent
with the land use designation in the Comprehensive Plan.
PLANNER'S COMMENTS
1. The applicant is acquiring both the Hillcrest property and the Pilot Knob Asso-
ciates property north of Duckwood Drive. Therefore, Federal Land Company
would own all of the land that would be bounded by Duckwood Drive on the south,
Pilot Knob Road and I -35E on the west, Yankee Doodle Road on the north and
Denmark Avenue on the east. The Sketch Plan submitted with the rezoning appli
cation generally illustrates a proposal to develop a Community Shopping Center
over these combined properties. A purchase of the property is contigent upon
the rezoning. If the property is rezoned, Federal Land Company has indicated
that they would proceed in the spring of 1985 with the first phase of the
Community Shopping Center. This would require a Preliminary Plat and detailed
review by the Eagan Planning Commission and City Council., The only application
that has been submitted at this time is for the rezoning of the approximate
18 acre area so that all of their land holdings in this area would be zoned
for a Community Shopping Center.
2. In the past, Hillcrest Development Company and Pilot Knob Associates have
prepared individual plans for the development of their individual properties.
1
City of Eagan
Federal Land Company Rezoning November 20, 1984
Prepared by: John S. Voss, Planning Consultant Page 2
The City always has been concerned about the coordination of the development
of these two properties. Combining the two properties by Federal Land
Company is very desirable in that it insures the City's objective of coordin-
ating commercial development in this very important quadrant.
3. Federal Land Company is not acquiring any property south of Duckwood Drive.
This would be retained by Pilot Knob Associates. Therefore, a portion of
the existing R -4 District which lies south of Duckwood Drive is not pro-
posed to be rezoned by the applicant. However, the City's rezoning adver-
tisement included this property so that it could be rezoned if that were
the desire of the City. A portion of this area south of Duckwood Drive,
which encompasses approximately one Cl) acre, probably would be utilized
for ponding. The property backs upon an existing townhouse development.
The property could remain in the R -4 zoning category and as such, would
be consistent with the Multiple Residential R -III designation in the City's
Comprehensive Plan.
4. In summary, the proposal to combine the HillCrest Development Company and
Pilot Knob Associates properties for the development of a Community Shopping
Center appears to be very desirable. Also, in the future, prior to the de-
velopment of the property, the applicant will be required to prepare and have
a Preliminary Plat approved wherein the City will review the overall develop-
ment of a Community Shopping Center and establish appropriate requirements
related to traffic circulation, pedestrian circulation, architecture, land-
scaping, parking and similar details.
MEMO TO: ADVISORY PLANNING COMMISSION
FROM: RICHARD M. HEFTI, ASSISTANT CITY ENGINEER
DATE: NOVEMBER 20, 1984
SUBJECT: CTC BUSINESS CAMPUS PRELIMINARY PLAT TRAFFIC REVIEW
I have reviewed the traffic concerns this proposed development poses, as request-
ed. Specifically, the impact on Englert Rd. and the possibility of a connection
to Violet La.
The original proposal had all traffic for this development accessing from Englert
Rd. It was estimated 600 trips per day would be generated by Check Technology
alone. While this alone would probably not be a significant problem, one must
consider the R -3 area of this development and the area south of Englert Rd. must
also be serviced by Englert R. Staff estimates this would add an addition 1,200
trips per day provided R -2 development south of Englert Rd: as suggested by the
City's Comprehensive Guide Plan. Staff feels these traffic volumes could pose
hazards, especially since sight stopping distance at the Pilot Knob Rd. inter-
section with Englert Rd. is not very good.
The area south of Englert Rd. will probably have to be serviced by some sort
of "U" shaped streets connecting to Englert Rd. Staff doesn't feel a safe access
point along Pilot Knob Rd. exists between Englert Rd. Wescott Rd. due to the
horizontal vertical alignment of the existing Pilot Knob Rd. Besides, Dakota
County requires a minimum separation of access points along its roadways of 1/8
mile. This would place it approximatlely 200' north of the old City Hall side.
A north -south parallel street between I -35E and Pilot Knob Rd. would not be
feasible due to the limited distance between I -35E and Pilot Knob Rd. Also,
the topography is not condusive to extending a street south from Englert Rd.
It was suggested at the last Planning Commission meeting to have access to this
proposed development via Violt La. This would be feasible, however, since this
development does not have any access to Violet La, sufficient right of way would
have to be obtained. This should be the responsibility of this development.
This would remove about 1/3 of the traffic volume from Englert Rd.
Although Staff does not feel a through street from Violet La. to Englert Rd.
is necessary, it is recommended a connection be made to the R -3 parcel to aid
emergency vehicle access. This can be made by connecting parking lots with a
fire lane or some other approved means.
In summary, Staff recommends the access to Check Technology be made available
to Violet Lane. The remaining parcel maybe serviced from Englert Rd. Finally,
Staff feels a north -south roadway between Pilot Knob Rd. I -35E is not practical
due to the limited space between the new I -35E alignment Pilot Knob Road and
also the topography.
I will be available to discuss any aspect of this memo with the APC at the Nov.
27, 1984 meeting.
Respectfully submitted,
R���MJ efti
RMH:jbd
I -55 E R. O W 1
r Ivc
Mx
r Ivc am i
falrts
L
O
s•Ix uxrts t
Ir
xm
a v
Z c^
trco
e
ERErosxo wafaME
elEV..
"so
a
,WEE EM
RIIREI
POND
A IT
SITE MIA
9
LET E Attie—Ill 51711
Let Errt 11.51 /¢rn
R t°n0 T wmtw:::e, 11.o1 km O ti,
O
IEt lmE (1,11 At— t VL
1.61 A,- 713,15E S.F.
All —biA EEllt "I ES.E MIt.
0 DID
f o
1
x Tti.eYvnfr�TVt CTC BU:
PROGRESS ENGINEERININC. 14051 RNNaVEN DRIVE Ra
a.. ,nx, Ml•.vina, �a P fwT 1 w. all ,e11tu•ed T.al�ee• SUITE 103 P I L 0 T wt. "°T' CONSULTING ENGINEER BURNSmLLE, MN 55337 PREL LAND
SURVEYORS EAGAh 16121435 -6555 NO'
3
1
aso
l
CRESTRIDGE LN.
PON
Y
I
SCALE IN FEET
I hrcEy eertl[y lh[ t�l. pl.n .as prcprcd
ett<tt .w<tw<ta, ..,a PROGRESS ENGINEERING, INC. wsi BURNH4VEN DRIVE R AW AO I
the 1 r<. AdY rc6l.tercd FIreer �.d.Y DATE IOi22.8.
CONSULTING ENGINEERS I REVISIONS CTC BUSINESS CAMPUS
e
CITY OF EAGAN
SUBJECT: Preliminary Plat Royal Oak Circle
APPLICANT: Richard Asp Asp Construction
LOCATION: Part of the NEk of Section 16
EXISTING ZONING: R -4 (Residential Multifamily)
DATE OF PUBLIC HEARING: November 27, 1984
DATE OF REPORT: November 20, 1984
REPORTED BY: Greg Ingraham, Assistant Planner
REVIEWED BY: Dale Runkle, City Planner
PROPOSAL SUMMARY: The applicant is requesting Preliminary Plat approval
of Royal Oak Circle consisting of 297 apartment units on approximately 21
acres. The project is located north of Violet Lane and West of Federal Drive.
ZONING LAND USE: The property is zoned R -4 (Residential Multifamily District).
Surrey Heights townhouses border the site along the north while undeveloped
agricultural land lies to the west and south. Undeveloped R -4 land is across
Federal Drive to the east. The site is covered by grasses with a line of
deciduous trees along the north property line.
CODE COMPLIANCE: The proposal meets all the density, setback and parking
requirements of an R -4 district.
SITE PLANNING: The applicant wishes to construct three two —story 22 —unit
buildings and seven three —story 33 —unit buildings on the eastern two— thirds
of the site. The western third of the site will remain open due to the
difficult soils and slopes encountered there. Nine of the buildings are
grouped around a private loop circulation system. One building would have
access directly off of Federal Drive.
All buildings have underground parking and gable roofs with cedar exteriors.
The two —story buildings are located adjacent to the Surrey Heights townhouses.
The lower buildings should help smooth the transition from townhouse to
three —story apartment buildings.
A community room /office and a pool is planned for the central portion 'of
the site.
The project is planned to be constructed in two _phases. An initial phasing
line is shown on the site plan, however phasing would be dependent on extension
of utilities.
MEMO TO: Advisory Planning Commission
c/o Dale C. Runkle, City Planner
FROM: Robert W. Rosene, Consulting City Engineer
DATE: November 19, 1984
SUBJECT: Royal Oak Circle Development Preliminary Plat
The Engineering Division of the Public Works Department has the following
comments regarding this proposed development for the consideration of the
Advisory Planning Commission and City Council.
GRADING /DRAINAGE
The existing topography varies from gently rolling in the eastern portion
to steep slopes in the western portion and a low water holding area in the
southwest corner. The grading plan provides that approximately 2/3 of the
area will drain to the low area at the southwest corner and the remaining area
will drain to Violet Lane along the southeast portion of the development.
This drainage plan is basically in conformance with the existing natural
drainage pattern.
Internal storm sewer installed for this development will carry the storm
water to the low area near the southwest corner. This low area forms a natu-
ral pond. It is not a pond required by the Storm Sewer Master Plan but should
be encouraged to be used as a ponding area for this development. It has no
natural outlet at this time. It should be the responsibility of this develop-
ment to provide an outlet from this low area to Pond CP -1 to the northwest of
this addition. Pond CP -1 has a recently constructed outlet through the Public
Works Area to Pond JP -1.
Storm sewer shown to be installed for this development on Federal Drive
and Violet Lane will need to be extended as a responsibility of this develop-
ment to Pond JP -2. An outlet for this pond has been provided for with the in-
stallation of storm sewer under Federal Drive and Interstate 35E as a part of
the current MnDOT construction project.
The preliminary grading plan basically shows adequate site drainage con-
forming to city standards. Final grading plans must show slopes not steeper
than 3' horizontal to l' vertical and with proper erosion control methods to
meet City standards. Section A -A of Sheet 3 of the preliminary plans will
need to be modified to meet these requirements.
UTILITIES
Sanitary Sewer service will be provided by extending the 8 lateral sani-
tary sewer from the south edge of the Development south to Englert Road to
connect to the existing 15" trunk sewer which is designed to serve this area.
This sanitary sewer lateral extension will be the responsibility of this
development.
Water service can initially be provided along the north edge by connecting
to one existing 6" water main in Federal Drive and one existing 6" water main
at the south edge of Surrey Heights Second Addition. This will provide a
looped water supply for Royal Oak Circle and improve the looping within the
Surrey Heights area. A future connection can be made at the southeast corner
Page 1
4605c
of the development at Violet Lane and Federal Drive when the proposed 30" di-
ameter major trunk water main is installed. It is recommended that approxi-
mately 350' of 6" water main along the west side of Federal Drive shown on the
preliminary utility plan be increased to 8" to provide better fire protection
for this development. Additional strengthening of the water supply system can
be provided when the area along Violet Lane west of this Addition is devel-
oped. Static water pressure of from 70 psi to 80 psi will be provided in this
development.
If the utilities are to be installed privately, the plans and specifi-
cations shall be prepared by a registered engineer and submitted to the Engi-
neering Department for review and approval.
STREETS
Federal Drive along the east side of this proposed Addition will provide
access for the development. This street has been constructed by MnDOT through
a joint construction agreement with the City of Eagan as part of the I -35E
construction project. It is 44' wide with B -618 concrete curb and gutter and
bituminous surfacing and was designed to 9T load standards.
Access from the multi family units to Federal Drive will be provided by
private drives within the development. No public streets are proposed within
the development. Violet Lane is proposed as a public street along the south
edge where there is an existing 60' right -of -way but no access is taken from
the development to Violet Lane. In final design, all private driveways must
meet City standards.
Violet Lane adjacent to this addition will need to be upgraded to City
standards for a minor street 32' wide with concrete curb and gutter and bitu-
minous surfacing as a part of this development or the future anticipated as-
sessment for this street prepaid.
RIGHT OF- WAY /EASEMENTS
The 100' wide right -of -way for Federal Drive and 60' wide right -of -way for
Violet Lane have previously been obtained and dedicated by MnDOT.
As a condition of final platting, this Development will be responsible for
obtaining the easements required to extend the storm sewer lines to Ponds CP -1
and JP -2 and the sanitary sewer to the existing trunk sewer in Englert Road.'
Temporary construction easements and possibly small permanent easement exten-
sions will be required for the water main connections at Surrey Heights Second
Addition.
A ten -foot utility easement will be required to be dedicated adjacent to
all public rights -of -way. In addition, a 5 foot drainage and utility easement
will be required adjacent to the other exterior boundaries of the Addition:
Easements of sufficient width will be required over all sanitary sewer, water
main and storm sewer lines to be constructed within the Addition and a ponding
and drainage easement will be required over that portion of the low area in
the southeast corner of the development which is to be used for ponding storm
water.
Page 2
ASSESSMENTS
In researching assessment records for this proposed development it was
found that this area has paid the trunk area assessments for water, sanitary
sewer, and storm sewer. The proposed development does not abut any major
trunk systems, therefore, no lateral benefit from trunk will be required.
Construction of lateral utilities will be the responsibility of this develop-
ment for which they serve.
Street improvement assessments for Federal Drive are pending as a part of
Project 372, I -35E Street Improvements.
Street improvements associated with Violet Lane will be required as part
of this Development. The cost of this street improvement will be shared by
this Development and the abutting property to the south.
A representative of the Engineering Department will be available to dis-
cuss any aspect of this report in detail with the Advisory Planning Commission
at the November 27, 1984 meeting.
Respectfully submitted,
BONESTR00, ROSENE, ANDERLIK ASSOCIATES, INC.
Robert W. Rosene
Consulting City Engineer
RWR:sas
Paoa "2
RECOMMENDATIONS
ROYAL OAK CIRCLE
1. The existing woods along the north property line are to remain intact.
2. The building heights are to conform to the heights shown on the site plan.
3. If the parking ratio is reduced to a 2— per —unit ratio, then each unit's
rental shall be tied to a specific indoor stall.
4. A detailed landscaping plan showing plant species, size and location
plus the provision of recreational facilites, shall be submitted for
staff approval.
5. The preliminary plat approval is subject to the filing of an approved
Environmental Assessment Worksheet.
6. All surface water drainage generated from this development shall be
conveyed by way of a storm sewer system to Pond CP -1 (northwest) or
JP -2 (south) as a condition of final plat approval.
7. The finished grading of this development shall not result in slopes
steeper than 3:1 and an adequate erosion control /restoration plan must
be approved prior to final plat approval. All parking lots must provide
an access to the internal loop private drive with internal raised concrete
curbed medians being constructed where required by staff.
7. This development shall be responsible for the acquisition /dedication
of all required utility easements necessary to service this development
with the required utilities in addition to the normal lot line utility
easement dedications.
8. Violet Lane must be upgraded to its ultimate City standards from Federal
Drive to approximately 300' west adjacent to this development, or its
future projected assessment liabilities must be prepaid as a condition
of final plat approval.
jj
moon I
coo E�
KI
i
i
a
w
im
t
PF
Cl 11�
N IN
o
goo
fir• '1
T7�
u1i f
lion
ZZ�
F logm "801 1 3 AIP I Wthir7 MAP
I r•1. /1 r111Y 11 .1•a•
A
W.. w. I N 11- If V
Al
1 'r .00 a
1/
rr/ 1 I
I
IY Irm w.•w 0 .•..I.n 1�
H TT
1
wren •aw 1 w i
N•IfYafIM' 1 w i
.al• Ir W
Y /1•ANY Ir •1N• IYYL•♦ 1 I I ,,I 1 l J
J
•••.••4u•• •4P •gY•uN I 1 �11 11 I I\ Y.
u +r•.•IN 11•.111 r, 11, 1••1111 alrllrl 1 V
YIJ�r Mill Il /,lq r. II. I rII r. 1 1 1 1 I I I i l l
a rr•wl N.41 r. Il, 1 Y 1
Pu. r mM W.w r• ill, I= 1 1 •...1 1 1 1 H
lul MI.110 r. ill. IW 1, two Watt. 1
cc
11 YIP ■V/Y I•rr 1Ya1 1111r11r laar ll I 'Ir
al+•1pJ1 w Irrll•rawlPNiN1•
I r w1rv11Nw a'wnnm Iw/I
Pq: •M 1 l Z
1
ru.,o: JII wa 1 WY rua ill•
Nl EEE i
M all rill I M YI+ r1 I IN I W1r r J
1 I M IO
Y M rill n: rrN YI Wa1I IM a•nr• Yu u O
W 1 rt r• P11 —1Y IUr Iwl J r P ILI.m III 'c r 'M
Ic
W
r L.I w.w mur .ill
r a•, lu+nr lrrrY +ill rP1�a w+Io
rr., t •IP19�+•1 ara•11 1 •Ir rr• arrlr•1
w� i �II.N 116.11 rN N oP.1m •r NI N. 11 P I IJ w I a1+� r
.r IN IIIN I M /y1+ 1rr•, Yw1• fir++. rr. I
r� Wf1 illN Y ra N.M r1•,••.•r .r
N'N MS to
IN vlDl.tt w•le
aw w 11.1 I/rllYll a11P 1 .1. I
�1 Il y l ,IIrr11r[ Pra. Ilr 1
IIY rql
ar•w.
am
M
rlwc+w rrrr I
rN 1 1• ra N•/+ y
r I MOM Ir MAP
0 u to f) It)
Y Of
v so 2.0 Put
of
.1 9 411"
TL
j.
X
:7
t
r
0 0
IL
U
—It a 4 saute.
Wtu.
1. INI atift
19 z
44
100. WON
ow"'will OWN.
AU gel I OU09 KIN g i g a
I M Y 1,
M 14.IT Y�rYI WII. I Y!1 V M NI\ ir/ I
0
:EGEND [;Ln
I.ft
E CI`1
M 1-1-ma
W0114,11.11, 1=
tl kl'
WIN. u
&up
r,•LAY 1]f.
I 4r• Nraw uwp uww
:h Y. �I. N w� w. •f•. %MG If Ir: M. •f r' U'
La
Ln
IL a
LU
I.11 I�'� �1�
1 NIYT A.MrI► -4? f•iw 1 I 11 1, l
tiww _7 r.l• p
u y o
u.
Mrt•r
oft— M
Il. C. y
MH
r
1
1
1 1 �Ir I i t 1 F 2 M.
�r;.r wr•rl a n: 1I :r 1 Q
IL
.MY r.r• a ar
u rrl Y/. r• a I, W 1. 1/ ►.rlr
1 I�.raW Y.W a n. L•r .•rr aw •r .r
r "Y 11 w•..•fa1 r wlrl rwrr. t
Y rr r.a rw•r w .fir r /Lr,�.y11
t L_
Y1411LL .Iit L sn rla 1 .i fr IfIL
M {gym Y 1
rrn .•/.•r .MMNI1iL1�.1
j Lr•rr r Frl rN M rr r Y e
111 •17•r• ,y�f••r •rwf r1 r a/•.Y LM L' �f►
•rr 1�r 1. w.r- 11•��•rr•�1�Jyy- o. wl. rru t..0o rY4 �L
r r
nn
r r w N• r n NLMY.f111L0� VN11 i -',j. °rr rlr Y'• v u y n 1 N_ W NM 1,
YIL1011 ►lar rLrn q s p.orr Ir.r� r.r .r.,r
.r...• .war .....rr..r.•.......
W n r Ii.M �K 1 M r M r, rr� •n�• Y• �T' 1 I
j 1 I nr. wu., rru rorrl�N 1 1 resin. {rlHUnl
C a I u.�, r..�rr rrrrl Irl r Y w �.,w+L .r M YJL /IW
ws ri r. III N� ±i YO LY..Y I r•t roH0 1'.
Ir. w Y'd vr•,,wf. i I /r0.i1 w
wrwr r pL•.YI 'w� 'F •r irl�.r 1 u,a iw .0 as a IiLI
MII Yr M fL. 1 1 Wr1 WIII 4n11r r.
h.
to ai L aw...r rf. 1.., k,f'•. Poll w1
wl nY n rnr�r In. 1
t r •e L U' r.r, r ..rr
.y{' r•11 I fy
c f t
fit
Fij cat 6i? r F pFitiz G r x
PFFFFF
pi ig 6 5511
vi tre '�s _[6Es`eS �2' r -r ',ys+, k I
i =r =d3 -•1-
rte I 4 1
is
wiz
JI�I Na i C
CD t
ter
Ti
Id
I t.
I� j I -y am
•FAFRALa t 'Rwf. c a i
v ti_ t a a a
j
t ROYAL OAK CIRCLE James R H1 inn-
o PRELIMINARY GRADING PLAN
I< A S P CONSTIIUCTION PLANNERS /ENGINEERS /SURVEYORS
rcc •L .a.e Qm ramA s.�ms.a. r�yaf.v�.
e
8:80.0 D p_ 2
X8 8 9
AL
C H N�Slw C C -k
Up '14
47 87
715.;0 82 7.7
1` 878.0
7 19i7`` j L .S. 4 842.6•
:Y T�2MINAlI
J L CP -5
*"+0
841.9 N
.850.5 v 873.0
875.9 r
flDGE
790.0 874.8
802 1
I 823.5 s
829.7 rp
o 2 4 C
J 1
882.0
C P 12 P ='I 886.0 It
826.5 825.0
829.6 D-
C P 6
790.7 �7 P-6�
806.0 871 .0
j i 880.0
I ENTER
:rt I �.Of-
CP- 11 l 844.0
_874.5
795. 0 88t�.0
808. JP
2 84T.2 U:.FE
t:r JHt:: 844.0
ti B P��',r•� 8 44
HILLS
T
1 JP -4
a ep 1 84a.5
A 790.3
801.0 J p c
n23.8
34.0
FIGURE
STORM SEWER LAYOUT
CITY OF EAGAN
SUBJECT: REZONING, PRELIMINARY PLAT VARIANCE
APPLICANT: HILLA CONSTRUCTION WHISPERING WOODS
LOCATION: PART OF THE SWk OF SECTION 31
EXISTING ZONING: A AGRICULTURAL DISTRICT
DATE OF PUBLIC HEARING: NOVEMBER 27, 1984
DATE OF REPORT: NOVEMBER 20, 1984
REPORTED BY: GREG H INGRAHAM, ASSISTANT PLANNER
REVIEWED BY: DALE C RUNKLE, CITY PLANNER
PROPOSAL SUMMARY: The applicant is requesting rezoning of approximately
3.8 acres from A Agricultural District to R -1 Residential Single Family
District, and Preliminary Plat approval of Whispering Woods consisting of
10 single family lots. The variance request is to allow a 30' setback to
Slater Road and a 20' front setback along the proposed cul -de -sac. The
project is located east of Slater Road and south of James St.
ZONING AND LAND USE: The land is currently zoned A Agricultural District.
The Comprehensive Guide Plan designates the parcel as Residential with a
density range of 3 -6 units per acre. Single family lots border the site
on the north and east while undeveloped agricultrual land is across Slater
Road to the west. The triangular parcel is a heavily wooded knoll which
slopes steeply to the west and northeast.
CODE COMPLIANCE: The proposal meets all the density, lot size and setback
requirements of a R -1 District except for the variance requests for setbacks
to the cul -de -sac and Slater Road. A 10' front setback variance is requested
for Lots 1 -6; the variance would allow less slope and vegetation disturbance.
A 20' variance is requested to allow a 30' setback to Slater Road for Lots
1, 8, 9 10. The 30' setback would place the homes 80' from the Slater
Road centerline.
SITE PLANNING: Eight of the lots have driveways off the proposed cul -de -sac
while two lots have direct access off Slater Road. Given the wooded topography
and triangular shape of this parcel, the proposed layout provides an efficient
utilization of the area.
TOPOGRAPHY /DRAINAGE: This proposed development is located in the southwest of
Section 31, east of Slater road and south of James Street. This property
-is currently heavily wooded with a hill located approximately in the center
of the property. The drainage pattern will stay the same except that the
new proposed street will be picking up the surface run off from the front
yards, and said new street is proposed to drain to Slater Road and then
will drain to existing storm sewer at the intersection of Slater Road and
WHISPERING WOODS
PAGE 2
James Street. This proposed development is located within the A major
storm district as defined by the Master Storm Sewer Plan. (See attached
Figure 1.)
WATERMAIN, SANITARY SEWER AND STORM SEWER: Watermain, sanitary sewer and
storm sewer of sufficient size and capacity exist within the proximity of
this proposed development to provide service to it. The City will require
a petition to construct the necessary utilities or, if utilities are installed
under private contract, then the plans and specifications shall be prepared
by a registered engineer and submitted to the City for approval.
STREETS: Access to this proposed plat is by Slater Road.
EASEMENTS /RIGHT -OF -WAY: The City will require utility and drainage easements
ten feet (10 in width adjoining all streets and five feet (5') in width
adjoining side and rear lot lines. The City will require utility easements
a minimum of fifteen (15') in width for all public utilities not constructed
within the street right -of -way. This item will be reviewed again when the
utility plans for this subdivision have been submitted along with the final
plat.
EROSION CONTROL PLAN: The developer shall submit an erosion and sediment
control plan to the City for review and approval. The City will require
an Enviro filter fence be placed and maintained along the north and east
sides of the outer boundary of the proposed grading area to prevent sediment
from washing into the remaining wooded areas and onto private property.
PLAT: The City will require that Outlot A be platted as part of Lot 4
of proposed Whispering Woods.
ASSESSMENTS: As a condition of final platting, this development shall be
responsible for trunk area storm sewer. The assessment rate for trunk area
storm sewer will be the rate which will be ineffect at the time of final platting.
At this time, the trunk area storm sewer assessments would amount to 3.8
acres x 43,560 sq. ft. x $0.045 per sq. ft. $7,448.76.
All future costs for public improvements shall be the sole responsibility
of this proposed development.
RECOMMENDATIONS WHISPERING WOODS
1. A detailed grading, drainage and an erosion and sediment control plan
shall be submitted to the City for review and approval by city staff.
2. Outlot A shall be platted as part of Lot 4.
3. This development shall be responsible for the trunk area storm sewer
area assessment at the rate in effect at the time of final platting.
4. The City will require utility and drainage easements ten feet (10
in width adjoining all streets and five feet (5 in width adjoining
side and rear lot lines. The City will require 20' wide utility easements
for public utilities not constructed within the street right -of -way.
5. The grading limits and area of woods to be preserved shall be adjusted
as per the setback variance allowances.
6. No driveway access shall be allowed onto Slater Road for Lots 1 -8.
jj
;JENUO T,4
RB
EkG ANDAkE•--r Ind.
VN15111 fS. iC
GUN CLUB' 1 5'°' 1
LaXE C r In
J,�� f R I Ind.
C i' l•=EEfIE PCPES R 1 L f aN0 ,r I.TF1r
.•.I f -Ind
E
_RaU Ind.
'r R'�� -'m9 i -a.a• No 7
7 3 R N E
Ind.
..51Xi.W "NOWC R&D_; R -IV ••T. i •F.IER
R-111
Ind N roll, R R I I RII
LB 4 t�
o.,
LB CSC
rvi R -II an� HEN a �n
is
LB R91 s R -I
r RII fi r,
x
R-111
R -11 j R- RII
I N R -IV r
R -111
i HALL R-1 R II R -I
Ind. R
I
CSG
i RII R -I 3
IF GB R IV
GB
R -II R
1
11i
I LB N
E P
LNI�
R -I R411 RB RIII c q r s sd
R_Ilf CSC B
G t6�
R -Ilh R I r E R -III
I% R- 111 2.
csc
R -11 can• 4t .r i I Ew?
NB
CSC -J.
w LB R -III Lg
Z LB D LB R' R- 111 R -I 'Q
m R
GWN7t p
R -1 R -11 i
R -11
R -F' R -II
P R-11 7rzOH COUMT' k
tCi DAwSM rP ry•,wiw
J
I c
APPLE ROSEMOUNT
VALLEY r
now
RUN
alm-
7 -1111 a.
i C:uJ�L�ai�C�� ■/u r.1 mom
•1\■
♦I�.-
:1:
J
f W
1 P 1 7
liming
WIWLER /JA 111111
Iloilo
PD
aim
17x1 1.11 rl,a
J
I: oaT It
6
oIiwT
41•
If
MW Lk
lo 14.1f
79 14
ILA #4-6 PAJLY
-*;be ".A. .sr cues
10
J" L .0 ♦jVjj%T
T__ b"►
1 1
c1s.411TY
2.6. urffl Po.-"
L A P" we V�
--or
I:
Ilk
AD
it i I, 1 t .r r I
1 Ti r YAM
1
4NOIIM •WI A tYlRtius7
CITY OF EAGAN
SUBJECT: REZONING APPLICANT
APPLICANT: FEDERAL LAND COMPANY MARTIN COLON
PILOT KNOB SHOPPING CENTER
LOCATION: PART OF THE SOUTHEAST k OF THE NORTHWEST, SECTION 13
EXISTING ZONING: R -4 RESIDENTIAL MULTIPLE DISTRICT
DATE OF PUBLIC HEARING: NOVEMBER 27, 1984
DATE OF REPORT: NOVEMBER 20, 1984
REPORTED BY: PLANNING ENGINEERING DEPARTMENT
REVIEWED BY: DALE C RUNKLE, CITY PLANNER
P ROPOSAL SP14MARY An application has been submitted requesting rezoning of
approximately a 20 acre parcel located north of the alignment of Duckwood Drive
and west of Denmark Avenue. The parcel is presently zoned R -4 Residential
Multiple. The application submitted is a request to change the zoning CSC
Community Shopping Center to tie in with the existing zoning to the west of
this particular parcel.
ZONING LAND USE Presently the parcel is zoned R -4 Residential Multiple and
there was an application submitted in 1979 -1980 for rezoning which was denied.
The Comprehensive Guide Plan designates this particular parcel as CSC Community
Shopping Center and the rezoning request would be consistent_ with the Comprehen—
sive Guide Plan.
CODE COMPLIANCE Presently the application is only for rezoning and not
preliminary plat. It is staff's understanding that the applicant has a
contingency to purchase this 20 acre parcel subject to the zoning be changed
from R -4 to CSC Community Shopping Center district. Once the zoning has been
obtained the applicants will then submit a preliminary plat and site plan for
the entire tract of land which lies north of Duckwo'od Drive and west of Denmark
Avenue.
SITE PLANNING The City has reviewed this general area a number of times and
has tried to work with a number of different landowners to provide an overall
development plan. In the past, a piece —meal plan was the way this area had
been proposed to be developed. The application submitted now requesting the
rezoning of the 20 acre tract would then be followed by a preliminary plat
tying the entire 70 —acre tract of land north of Duckwood into one development
proposal. It is staff's understanding that the application would consist of
approximately a 300,000- 450,000 square foot community shopping center being
constructed on the west side of Denmark Avenue with some peripheral lots being
developed at a later phase. In conjunction with the shopping center development,
Federal Land Lompany also owns 100 acres east of Denmark Avenue which would
also start development in the office and limited business types of uses which
would compliment the retail being constructed on the west side of Denmark Avenue.
FEDERAL LAND COMPANY
NOVEMBER 27, 1984
PAGE TWO
The applicants have indicated that the overall platting, site planning and
purchasing of this property is contingent on the zoning and that if the zoning
is not acquired, the applicants are not purchasing the southerly property and
therefore would go back to the type of development which had been proposed in
the past, separating the parcel into different ownerships.
The chairman of the Advisory Planning Commission has requested that the impact
of the zoning request be reviewed by the Planning Consultant, Mr. John Voss, in
order to address any impacts that this zoning request may have on overall land
use and surrounding area. Mr. Voss is preparing a report which is attached
with this report for your review. Again, the details which accompany the
zoning request have not been submitted or the preliminary plat has not been
submitted at this time. Therefore, the detailed site plan review cannot be
addressed until the request for platting has been submitted. If there are any
concerns or issues that the Commission would like the Planning staff to study
or address in review of the anticipated preliminary plats, we will be glad to
take these into account and address them in the detailed plan review.
Therefore, there are no conditions to be placed on this zoning request at this
time other than it is anticipated that only one major shopping center will be
developed on the west side of Denmark Avenue and that there will be peripheral
lots for support development surrounding the shopping center proposal.
sl /jj
GB.
Ind.
r+,..,. EY TER .OSk
C v cwa
LAKE Incf
£Pe rw�
JP
R'�':
;ELE :EPEE- R�'.•' _'.`0 jI�d.
Ind
RIII
F', RIII Ind.
R•II RM ocaE Po n i G
•t inSTN_ I I
R -N Ind
R&D R -IV
R
E
D P III
J C
f E
Ind. NB LB RIII R-111
p R -I1
LB II
R -II R �T T
II R I P
I
R -91
LB r l�, R -I
R11"
4 RIII Pa« R -I R I
R -II R-11
R -IV r
y R
CIT
-II
HALL R
R
Ind. FBI
1�
C p
R -II R 1
B R -IV 4
3/C F R -II R -Q
,t,• x
R-
4 GB P R -II P*
I_� ��j R -II LB Ali
I E P:
A
N �P+` RIII RB RIII e
t= R-I R -Ilt R -III i 6 to "E C SC GB/
R -ill R I b '1 RIII_ -FBI
c E p R #I R II'.a t. t .r•
R -I I
NB
LB R -III
LB CSC
I
LB z. D MR- R -I
R -I 0 R -II
R -II �I
R I I ,,..o CouN,r F..£' 1.
R-II p
i
o..nr.' r F s
w
u f•
�ROSEMOUN
I .PPI E "ALLEY I L,
all
PILOT 1"
CENTJ
AM
I'L1 h
IM
Z
loll V!
N
CITY
HA
V 11�
UNIV a C 1
G6 NORT
SCALE I 0
YANKEE bOOOLE ROAp-
Re I I Imo.
YANKEE SQUARE
-i
a
DEVELCFM1;LNT
PROPOSED EAGAN HEIGHTS COMMERCIAL PARK
z f I s
z I
T
c z z W
W mow_
PARK i>
P' R'
t I, I✓ ate.
>INGLn; r 1
�j'� C FA MILY'� LAKE 1 II i COI
PROPOSED
MULTIPLE 1W1
I APOPOVE(' I b L I 1 MULTI IMPROVED
I L 'y I `r MUL7IPLE
I MS7 =F.i F.0 I:.IL `t. I f J
v
D UCKWO OD DRIVE
FGtt) I I OFF.CL TOw•IHOUSES (EXISLI APPROVED
111 r.'_� MULTIPLE J i
APPROVED
---J I -J -t
FAMILY MULTIPLE
CR ESTRIDGE LANE
-.1 r (EXIST) i
i (EXIST) i I
i QUADS QUADS,
COMPOSITE MAP OF OVERALL DEVELOPMENT
SHOWING EXISTING AND PROPOSED USES
LYING IN SECTION 15, T.27, R.23, EAGAN, MINN.
i
CITY OF EAGAN
SUBJECT: REZONING PRELIMINARY PLAT-
APPLICANT: ALSCOR /NORTHWESTERN MUTUAL LIFE INSURANCE
COMPANY
LOCATION: LOTS 1 7, Block 4, EAGANDALE CENTER INDUSTRIAL
PARK
EXISTING ZONING: RD (RESEARCH DEVELOPMENT)
R1 (LIGHT INDUSTRIAL DISTRICT)
DATE OF PUBLIC HEARING: NOVEMBER 27, 1984
DATE OF REPORT: NOVEMBER 19, 1984
REPORTED BY: PLANNING ENGINEERING DEPARTMENTS
PROPOSAL SUMMARY: The application is two part where the rezoning proposal
does not exactly conform to the replatting application. Therefore, each
application should be reviewed on its own merits. The first application,
zoning request is proposing to rezone Lots 2 7, Block 4, Eagandale Center
Industrial Park from RD (Research Development) to Ll (Light Industrial
District) The second application is a request for Preliminary Plat which
would consist of approx. 13 acres and contain 3• lots of which lot 1 would
be the expansion of Elliot Auto, Lots 2 and 3. This would be new office
warehouse facilities which would consist of approx. 86,000 S.F. per lot
for lots 2 3, Eagandale Industrial Park #7.
ZONING LAND USE: Presently the parcel is zoned RD (Research Develop—
ment District) and L1 (Light Industrial District) whereby the first 360
370 ft. abutting Burnside Av. Country Home Hts. have been set for
RD in order to buffer the existing residential neighborhood from the in—
dustrial use to the east. The applicant is proposing a site design and
traffic circulation to create a buffer for use by eliminating all industrial
traffic from Burnside Av. to Eagandale Ind. Blvd. In return, the applicant
is requesting the L1 zoning on this parcel in order to recieve a little higher
lot or building coverage for the consideration of site design. The rezoning
request stems all along the east side of Country Home Hts. and the Preli—
minary Plat is being considered for the north half of this development re—
quest.
CODE COMPLIANCE: Presently Eagandale Ind. Park #7 would consist of
two (2) new building lots and one (1) expansion lot. On lots 2 3, the
applicants have sketched a site plan for approx. an 85,800 S.F. office ware—
house of which 20% of the facility would be office 80% warehouse. The
applicant has met all setback requirements for the L1 (light industrial
Dist.) and has met all setbacksof either the RD (research development
dist.) and the L1 (light industrial dist.). The only major issue is that
the RD allows only a 20% lot coverage. The proposed office warehouse covers
approx. 29.5 or 30% of the site versus the 20% in the RD zoning district.
SITE PLANNING: In review of this development plan, the applicant is re—
questing the rezoning from RD to L1 and the corresponding Preliminary Plat
has taken a great deal of site planning dealing with the existing resi—
dential neighborhood to the west. In requesting the L1 district, the
ALSCOR /NW MUTUAL LIFE INSURANCE CO.,
NOVEMBER 19, 1984
PAGE 2.
applicants have developed their site plan that access would be restricted
along Avalon Ave. from Burnside to Corporate Center Dr. Also, restricted
access to these two lots would be requested along Burnside Av. Thus, all
traffic entering these two buildings would be from Corporate Center Dr.
The applicants have designed parking around the building which would
be limited strictly to car traffic and very light trucks. There was also
proposed berming and landscaping adjacent to Avalon Av. Burnside it
order to create the maximum amount of buffer possible from the residential
to the industrial development. The buildings are set back 100' from the
westerly property line making the mass of the building less obtrusive.
The second and main consideration in the design of these buildings, is
that the truck docks and all larger trucks entering this building would
be on the east side of the building, screening any docking or large trucks
from the residential area. The quiet side of the building will also be
the side facing the residential neighborhood. This same design holds true
for the building proposed on Lot 2, which is laid out in the same configura-
tion for parking and setbacks, etc. as the proposed building on Lot 1.
The applicants have taken everything into consideration in designing the
buildings in the buffer area between Country Home Hts. Eagandale Ind.
Park.
The applicants have also indicated a sketch plan as to how the southerly
portion of the development would develop if the L1 zoning would carry all
the way from Avalon Av. to Lone Oak Rd. They have taken into considera-
tion the same concerns as what they now have in the existing development
plan. They are also proposing all access to these lots from Eagandale
Blvd., backing parking between the westerly lot line and the building
keeping truck traffic to the east side internally minimizing as many
of the impacts as possible to Country Home Hts. Conceptually, the appli-
cants have shown 6 buildings being constructed south of Eagandale Center
Ind. Park #7 to Lone Oak Rd. Buildings could be put together, making
some different configuration. However, the main issue is if the zoning
is granted that this site plan should be attached and followed for develop-
ment.
GRADING/ DRAINAGE: The existing and proposed grading plan shows a
continuous and gentle slope from the intersection of Avalon /Burnside Av.
to the SE towards Eagandale Blvd. There presently exists a 15" storm sewer,
which provides drainage for Burnside Av. around the north end of the exist-
ing Elliot Auto Supply into the storm sewer system of Eagandale Blvd.
This development proposes to connect into a portion of this system and
abandon /bypass the other portion with an iternal storm sewer system to
handle the rooftop and parking lot drainage associated with this develop-
ment. However, they have proposed a temporary retention pond to the south
(immediately west of Elliot Auto Supply) with a future outlet to Eagandale
Blvd. to be constructed with the future phase development in this area.
This required storm sewer extension to Eagandale Blvd. must be completed
with this proposed first phase development.
Due to the fact that this proposed first phase is located in the highest
portion of this drainage area, extensive erosion control and restoration
measures will have to be implemented during construction.
ALSCOR /NW MUTUAL LIFE INSURANCE CO.
NOVEMBER 19, 1984
PAGE 3
UTILITIES: Sanitary sewer and watermain of sufficient depth and capacity are
immediately available to service this proposed development from Burnside Av.
The existing storm sewer, located within Eagandale Blvd., is of sufficient size
and capacity to handle the surface water runoff generated from this proposed
development.
STREETS: This development proposes to take its access from the recently upgraded
Corporate Center Dr. with a future internal loop connection to Eagandale Blvd.
which will be constructed with subsequent phase development to the south.
With the replat of a portion of the Industrial Park under Eagandale Office Park
in 1983, Eagandale Industrial Rd. was renamed as Corporate Center Dr. and re-
aligned to provide the major access into the Industrial Park. With this
replatting and realignment of the major- access road, there was discussion of
the potential of closing off Avalon Av. from Burnside Av. to the new Corporate
Center Dr. with the future development of the adjacent properties to eliminate
any industrial traffic from using Avalon Av. as an ingress /egress. With the
only access to this proposed develoment coming from Corporate Center Dr., the
elimination of the adjacent portion of Avalon Av. could be incorporated with
this development. However, it is desirable to maintain alternative access routes
for better circulation of emergency and maintenance vehicles. The attached map
shows the relationship of this proposed development to the realignment of
Corporate Center Dr. to illustrate these concerns.
EASEMENTS /RIGHTS -OF -WAY: Sufficient right -of -way has previously been dedicted
for Burnside Av., Avalon Av. and Corporate Center Dr. The internal loop movement
would be a private drive and no public right -of -way dedication is necessary.
Specific cross easements between the various lots must be dedicated with the
original plat to protect the integrity of the loop system and accessability for
the future lots.
The acquisition /dedication of all required utility easements for the extension/
connection of the storm sewer system to Eagandale Blvd. must be the responsi-
bility of this development as a condition of this plat approval.
ASSESSMENTS: All streets and utilities, servicing and providing benefit to this
subdivision have previously been assessed in total at their appropriate zoning
rates. No additional assessment obligations are associated with the propsed
development except for those related to any future improvements to be installed
under a City Contract.
OVERALL SITE PLAN /LAYOUT: The internal connector road must be constructed to
a minimum 28' wide with concrete curb and gutter. All other parking lot con-
struction must comply with existing City ordinances.
/jbd
RECOMMENDATIONS
EAGANDALE CENTER INDUSTRIAL PARK
ALCSOR /NW MUTUAL LIFE INSURANCE CO.
1) That the concept Preliminary Plat, showing the building locations on the
north and proposed development to the south, should be attached with both
the Rezoning Preliminary Plat applications and that no deviations be allow-
ed except as approved by the City of Eagan.
2) A detailed landscape plan shall be approved and reviewed by the City and
representatives of Country Home Heights. Also, an adequate landscape bond
be submitted and not relea ;:icil one year after the landscaping is
completed.
3) A detailed lighting plan shall be submitted and reviewed by City Staff in
order that the lighting is non intrusive to the exising residential neighbor-
hood.
4) All other City ordinances shall be adhered to.
5) Existing storm sewer system servicing Burnside Av. and the proposed future
development must be extended and connected to the existing system in Eagan
dale Blvd. All costs associated with the storm sewer extension shall be the
responsibility of this development.
6 The acquisition /dedication of all required utility easements for the storm
sewer system extension to Eagandale Blvd. shall be the responsibility of
this development. In addition, all other required standard easements shall
be dedicated on the final plat.
7) A cross easement for the common driveway shall be approved by the City and
recorded at the County providing full rights to all benefitted lots as a
condition of final plat approval.
8) Detailed erosion control /restoration plans and specifications shall be ap-
proved by the City prior to the issuance of any building permit.
ll' I I j T 4 i
LOT
O CK i I E r
L I I l i I00,05gSQFL
Ee I .4. I INDUSTRIAL j
UTILITY EASEMENT
u. r•. I I I� 36JB81 SO. FT, I I Iz
onnl4u+Ee PAR e
MTI TY E0.SETFliT i
.CORPORATE INDUSTRIAL ROAD
f— WMA• O
un UTT (EASEMENT
i
LOT I I LOT 2
LOT I LOT 1 2 I I
B L K
E A AN DA E Bi o e K I I '�q
CENTER INDUSTRIAL PARK 4
III 3 I
t 1 RD n M I I
LOT 3 1 opt LOT "3
4LON AV�NSI
NUE
r• e a
W o, 07 c
i J I •y,
s s 's q
01 -07 o IW••,• Q f.
8 c s:::'
CITY I I I E 2
OF
080
-08 ::j: I F s.�
00 08 x c
I
I
T I 2 a 4
20-06,
10 z
a�
Im 5
y 6
i r 1 1 w�NN DEn M TNMB
EST SE ROAD Y
4
i4 ,S F
3 a
i ,�NL`OPa itb. IE
RB e,' sow —AO
GB
COMMERCIAL
In PLANNED DEVELOPMENT
R I I Ind E� I•'`"
Ind
R III
R' Rau Ind.
R.n —K NO 3 G8
R•N
Ri v, Ind.
.N.w/VN R&D R-IV R4 R III ...N.�
RL I D Q Ind.
NB LB R -III R -II1
R -II P R -II R IY F
LB C
R -II R II E.- P GOLF R
P H R-01
LB R NI 4R
R P i
T R -I Rif Ind. W
41 J Y e
R-11 R I P R -I
n R -II
L:
R- z HALL R -II
-t f.:
R-11 R-11 N
E�l�. R -II HS
R I P
R -II 8 R A y
�nayavcw
R -11 R -I`
R -II R -II LB m NS
R-1 RB R-111 3c:;a. ham' N...
R 111 R -11f -'_E x:•e .t� i CSC /GB /L RE
R -11t
RL'' R -III
RAI
.a V
R,fl t`t••: 7. R 1 R -II /Y�s ts�. �;.t R -II'
pRI
CSC
P w I a
R -I R -I I i s
R -I R -I P
n DAKOTA
PT R 1 ►Axq 1 Ra R -11
R-I' R -II y R -II
P
o
ROSEMOUNT"
^Il tJ
■iiliflWY�i�i
IIPIPIIINI Will
PENN
—MEN 8
Ai
Ell
MIS
111•
�,r;� �ii mot ��Y
Ii�i�llryt,.� x !11
IN WIN
MESSES ME■/%;
-i-�; via
J
iK 1 •r
RD err -ir.a S
r w
I
i
EAGAN INDUSTRIAL RD.
009 l
9
T
Z A
9 1
/0
AVALON AVE.
rr
1
O W. SERVICE RD.
O ILLUSTRATIVE PLAN
Eagandale Center
EAGAN.MNNESOTA
EfEi YJ'+
o L
LONE OAK ROAD
F
IEaeo
O .mwss,�. rx,r 7
QWVW0A lb
wrw.k. vealnArM ..».+.nc
s -0,e a—",.wr.� swM.
...r.N -J a, Wm" ni
we •swe a►w
0;
L'
I I
I I
I
I
p 1 1 I i l� f i 3 !g
PROPOSED OFFICE/WAFOICUM OLLONO �.t PROPOSED OiFICE/WAIF]fOUSE llYlJ1IVS q I 1
9 RASE PASE 2
dl
MMW TO IlIMiN I
8 !l/HSWE AVBIYE r
kJ
E r A WALKr 1 J
Q
a• s w� r ri m w'� ww
mss.
eraa9M AvBaE Fl10►Om YA4 D
C PAROq OOUR
0 SECTION CD W N
W-e ••'I td.0 WI .4
i �i4,�A:S�,Y y� u r
MOST 10
FE9�CE ■rN9OE AVENUE 1110® RiaO s
►ewva oalR
S
0 SECTION AS
Y
1q
�J
MEMO TO: ADVISORY PARKS RECREATION COMMISSION
FROM: KEN VRAA, DIRECTOR OF PARKS RECREATION
DATE: NOVEMBER 26, 1984
RE: EAGAN SNOWMOBILE CLUB TRAILS REQUEST
BACKGROUND:
The Advisory Parks Recreation Commission has annually reviewed a request
from the Eagan Snowmobile Club regarding the use of portions of the Highline
Trail corridor and the boulevards on Johnny Cake Ridge Road south of Cliff for
snowmobile use. Once again, the department has received a letter from Maynard
Ohm representing the Eagan Snowmobile Club for similar trail usage in the
1984 -85 season. (See attached letter).
REQUEST ANALYSIS:
Again this year the snowmobile club is requesting Johnny Cake Ridge Road from
Cliff Road to the Eagan border. This involves the snowmobile club utilizing
the boulevard areas on both sides of Johnny Cake Ridge Road south of Cliff.
Utilization of these trails provides access to the entrance into the Dakota
County Regional Park and its snowmobile trails. Staff received no complaints
relatives to last year's use of this trail segment.
The second request by Mr. Ohm is to again use the Highline Trail from Rahn to
Pilot Knob. Unlike previous years, however, the construction of I -35E has
substantially changed the former routing of snowmobiles at the intersection of
Blackhawk Road, I -35E and the Highline. During the 1983 -84 winter, MnDot did
allow snowmobiles to cross through the I -35E right -of -way in the general
vicinity of the Highline corridor This was because the only construction
going on at the time was the Blackhawk Road bridge which was well out of the
alignment of the snowmobile trail. This year, however, MnDot has indicated
that it would not permit, and in fact is opposed to any crossing of I -35E
roadbeds to accomodate snowmobiles. The reasons for this objection is that
the property is still under the control of the contractor. There are numerous
construction stakes, culverts and construction materials in the general
vicinity which, when covered with snow, presents a hazard to snowmobiles.
MnDot and the contractor are not willing to assume this liability exposure and
therefore, will not permit a trail crossing as it did last year.
As an alternative to crossing the I -35E construction area, Mr. Ohm is
suggesting crossing on Blackhawk Road. (See graphic). As the graphic
depicts, snowmobiles proceeding from the east to west would follow the
existing snowmobile alignmment to the bituminous trail to Blackhawk Road. At
this intersection the trail would proceed south along the Blackhawk Road
alignment on the 8' wide trail to approximately the intersection of Blackhawk
and Beecher Drive. Here the trail would cross Blackhawk to Beecher. The
snowmobiles would then proceed north along Clover and Beecher Drive to an
existing trail connection in the Eden Addition and then to the Highline Trail.
Here snowmobiles could proceed further to the east and Johnny Cake Ridge Road
and south to the regional park.
Snowmobile users going from east to west would remain on the east side of
Blackhawk when crossing I -35E, remaining on a 5' wide concrete sidewalk. Once
over I -35E snowmobilers would cross Blackhawk to make the connection to the
Highline Trail.
Staff did receive several calls and complaints regarding the use of the
Highline Trail for snowmobiles last year. The majority of the complaints came
from residents at the intersection of Rahn Road and Shale Lane. In
particular, residents on the east side of Rahn Road reported numerous
crossings of snowmobiles through the backyards of these homes. A complaint
was also registered by the Rahn School principal who reported numerous
crossings on school property. The only other complaints or inquiries
regarding snowmobiles were near Wilderness Run Road, Peridot Path Park and
Pilot Knob Road south of County Road 30.
The request by the snowmobile club to utilize the trails on Blackhawk Road for
snowmobiles raises several issues of concern.
The first concern is relative to the responsibility for assuring a safe trail
for snowmobile users if a trail is identified. A trail crossing on Blackhawk
Road has restricted site lines for vehicular traffic because of road curvature
and height differentials. There are no street intersections, exposing car and
snowmobile to increased risks. Use of signs to alert motorist of the crossing
may reduce the risk. A second concern is that after heavy snowfalls and
street maintenance crews have plowed Blackhawk, it is likely that snow will
pile into the proposed trail area. This could also present a hazardous
situation for snowmobile users as snow accumulates and an embankmment is
created.
The third concern is relative to potential conflicts with other trail users
who may be utilizing the trail along Blackhawk Road. Designation of the
snowmobile trail on the sidewalk and bituminous trail will cause a conflict
between uses.
SUMMATION•
The snowmobile request is similar to last year. Because of the new I -35E, the
snowmobile trail at this intersection presents a new situation of risk and
liability to be incurred by the City. Potential conflicts of use by trail
users is also possible.
COMMISSION REVIEW:
The Advisory Parks Recreation Commission is requested to review the request
by the snowmobile association in making its comments and recommendation to the
City Council regarding the 1984 -85 snowmobile trail request.
4
Director of Parks Recreation
November 20, 1984
Ken Vraa
Eagan Park Dept
Ken,
This letter is to confirm our conversation of a few days ago. In behalf
of the Eagan Snowmobile Club we are asking for the use of the boulevards
along Johnny Cake Ridge Road from Cliff Road to the Eagan border. The
Apple Valley snowmobile club is asking their City Council for the use of
Johnny Cake form the Eagan border to County Road #42. Also, we are asking
for use of the boulevard on'Blackhawk Road as a way to connect the Power
line Trail. By using Blackhawk Road, Beecher Drive and Clover Lane we
can connect the Powerline Trail which was cut in half by 35E.
Thank you
Sincerely,
Maynard Ohm
�9
SAN C L( v=f: �l
2rd ebb
IIPIAJL W V ej2A,�.&S
151NP
TC)
ct
p 50' 150' 35C>�
MEMO TO: ADVISORY PARKS RECREATION COMMISSION
FROM: KEN VRAA, DIRECTOR OF PARKS RECREATION
DATE: NOVEMBER 26, 1984
RE: BLACKHAWK PARK BLACKHAWK PARK P.U.D.
BACKGROUND:
At the time of the preliminary plat applications by Mr. Peter Stalland for the
Blackhawk Lake /Blackhawk Oaks Additions, an access study was performed by
Consulting Parks Planner, Tim Erkkila. In the resolution of the access
problems associated with those preliminary plats, a number of other issues
were discussed and brought to the attention of the Commission and Council.
Direction was then given by both the Advisory Commission and the Mayor and
Council to continue the park study in further detail and in particular, review
the acquisition of property along the proposed south access and the resolution
of the parkland to be received via the Blackhawk Park P.U.D.. Members will
recall that the Blackhawk Park P.U.D. has been changed from its original
application as a result of the changing of I -35E requiring the redefinition of
parkland. Changes in parkland dedication elsewhere within the P.U.D. will
have also impacted acreage calculations.
STATUS REPORT:
Mr. Dunn, owner and developer of the Blackhawk Park P.U.D., has indicated his
desire to also resolve the parkland issue within the P.U.D.. He has offered
his assistance and willingness to cooperate relative to settling this issue.
Staff has performed a preliminary review of the P.U.D. and has calculated that
there is approximately 12 -14 acres of parkland due the City to be acquired
adjacent to the existing Blackhawk Park. (The figure of 12 -14 acres may
increase somewhat and is dependent upon final platting of Thomas Lake
Addition, etc..)
Members will recall at the time of the review in July, the issue of additional
acquisition was discussed. On the review by the Parks Planner and staff, it
still appears that park acquisition will be necessary. We also agree that
additional acquisition of land is desirable to service the overall purpose of
the park. Staff and consultant are continuing to review that parkland which
must be acquired and that which is desirable to acquire, the amount and
priority of acquisition, as well as importance to the overall park plan.
Because the preliminary review indicates that acquisition beyond the P.U.D. is
necessary, the Director has informally approached state officials relative to
a future LAWCON /L.C.M.R. acquisition grant (Fiscal Year 1986). Although the
review is informal and unofficial, their response was generally positive
towards the City's proposal for such a grant. Staff is sufficiently
encouraged by the response to recommend continuation of the parkland issue
study by the Consulting Park Planner and for the Advisory Commission to become
better informed.
Staff will be reviewing for the Commission, the current issues and thinking of
the Consultant Parks Planner and staff relative to this topic. A more formal
presentation is anticipated for the January Commission meeting regarding this
item, assuming the study progresses smoothly.
SUMMARY:
In summation, staff has continued the study of the Blackhawk Park issue
relative to necessary and desirable land acquisition and access from the
south, preliminary concept study on park utilization, and availability of
Lawcon /L.C.M.R. unding to acquire additional parkland.
Director of &Recreation
KV /js
MEMO TO: ADVISORY PARKS RECREATION COMMISSION
FROM: KEN VRAA, DIRECTOR OF PARKS RECREATION
DATE: NOVEMBER 26, 1984
RE: BUILDING /STRUCTURES ANALYSIS
At the December 15 meeting, the Commission agreed to be involved in the
building /structures study and analysis. At the request of the Director of
Parks Recreation, Dale Peterson, Chief Building Official, has agreed to be a
resource person and will be available to the Commission to discuss building
code requirements, materials and construction techniques.
Staff has previously outlined the areas for study by the Advisory Commission.
We are now proposing the following general steps in this study and analysis.
Please bear in mind that these areas will overlap on each, but they are being
identified as a means of establishing a process.
1. Development of first draft of architectural program and general statement
of building objectives.
2. Alternative materials, construction techniques and building codes.
3. Relationships and review of other communities structures.
4. Completion of architectural program.
These four steps will then serve as the chronological order for the review
process.
To begin the study, staff has attached two proposed worksheets to assist in
the preparation of the architectural program. The first worksheet will be
used to establish building objectives and purposes for each specific park
structure. Programmed spaces or activities, i.e. bathrooms, warming areas,
shall also be included on this worksheet. Worksheet #2 will be used to
examine thee items as identified by worksheet #1 and focus on specific design
qualities and needs. Members will note that the two pages go from a general
observation about the building to a more specific and identifiable design
criteria. After the completion of the first draft, the Commission will then
look at different types of materials and other structures and be informed of
the necessary code requirements. Finally, a final draft will be completed of
the architectural program. This will serve as a design standard whether the
Commission determines to utilize prefab buildings or architecturally designed
buildings.
COMMENTS:
As mentioned in the packet cover memo, it appears as if the Lawcon /L.C.M.R.
grant for Schwanz Lake is headed for early approval. Should this early
approval become a reality, this would present an opportunity for the City to
move up its development time line for the development of Schwanz Lake Park.
This would include the possibility of having a park structure under
construction in 1985. Staff feels that this is indeed feasible, assuming the
Commission will be able to complete its study by April /May.
A second comment is that staff has, except for some slight modifications, used
a similar architectural program study process. It is felt that this process
should be particularly adaptable to Eagan. Please be aware that members will
find themselves struggling with issue overlap. This is neither bad nor good;
it happens and should be recognized so as not to cause you concern.
The third and final item is that in order to expedite the development of an
architectural program, staff will begin to identify items in each of the
worksheet categories. These comments will be general in nature and not
intended to be all inclusive. It is hoped that the Commission will be able to
generate most of the material recorded on these worksheets and to then
prioritize them as may be appropriate.
FOR COMMISSION REVIEW AND ACTION:
Staff would like to present the process to the Commission and, time
permitting, begin work on the architectural programs.
Direct ?arks Recreation
KV /js
WORKSHEET #1
BUILDING TITLE:
GENERAL STATEMENTS OF BUILDING OBJECTIVES, PURPOSE ACTIVITIES:
WORKSHEET #2
1) ACTIVITY
2) SPACIAL CONSIDERATIONS /DESIGN CRITERIA
3) RELATIONSHIPS
4) SUGGESTED MATERIALS
5) CODE REQUIREMENTS
MEMO TO: DIRECTOR OF PARKS RECREATION, VRAA
FROM: RECREATION SUPERVISOR, PETERSON
DATE: NOVEMBER 16, 1984
RE: FALL RECREATION PROGRAM REPORT
SENIOR CITIZENS:
Over 50 senior citizens attended the November pot luck lunch. The lunch
itself was delightful with an interesting variety of food and more than enough
for all. The department had arranged for the Rosemount Seniors Kitchen Band
for entertainment. Their performance was enthusiastically received.
The seniors mailing list has grown to 90 households, with names added monthly.
As with any group, there is a regular nucleus of 20 -25 people. Events as
successful as the luncheon will be a positive influence on the program.
SEVENTH ANNUAL HALLOWEEN PARTY:
This year's Halloween Party was held in the Community Room on Saturday,
October 27. Approximately 175 youngsters attended, which was capacity for the
room.
Neighboring communities are moving toward events on Halloween night. The size
and scope could be enormous. It is an alternative to be seriously considered.
CHILDRENS PROGRAMS:
Tiny Tots Recreational Activities: Five sections of Tiny Tots are being held.
The special event for this session is a field trip to the Bell Museum of
Natural History.
Dance For Children: Thirty youngsters are registered. Feedback from parents
is positive in nature.
Fall Rollerskating: Twenty —seven children took advantage of this chaperoned
trip during M.E.A..
ADULT PROGRAMS:
Dog Obedience: Twenty—five individuals are participating in dog obedience
training.
Volleyball League Play: Six teams are included in this new activity.
Trips Tours: Sixteen Eagan residents went on the two day excursion to
Duluth. Another 27 went on the Betty Crocker Tour. To date, ten individuals
will attend the Chimera Theatre performance of the Wizard of Oz.
Plans for winter are beginning to take shape. The skating program has the
largest scope. Other activities will range from cross country ski lessons to
adult basketball leagues to special events such as the introduction to Schwanz
Lake sliding party and picnic.
MEMO TO: ADVISORY PARKS RECREATION COMMISSION
FROM: KEN VRAA, DIRECTOR OF PARKS RECREATION
DATE: DECEMBER 3, 1984
RE: PARKS MAINTENANCE ACTIVITIES
Activities in the Parks Maintenance Division have been very ambitious and
productive over the last several weeks. The seasonably warm temperatures
during the early part of November allowed the department to embark upon
additional projects for the fall.
Over 100 new and transplanted trees were disbursed to many neighborhood and
community park areas. The primary focus of the tree planting program was City
Hall. Other trees were planted at Cedar Pond Park, Northview, and Lexington,
just to name a few locations. In addition to the transplanting of these
trees, nearly all trees have been wrapped and staked at the time of this
writing. Staff believes that we were able to plant a larger number of trees
this fall over previous years in part because of the better temperatures but,
more importantly, because of the availability of the City's own tree spade.
Availability of this unit has allowed the "Forestry Department" to be flexible
and react efficiently and effectively to weather allowing trees to be
transplanted at appropriate time periods. Plans are underway to move
additional trees from nursery areas into park locations next year, assuming
seasonable spring temperatures.
Routine parks maintenance work has been nearly completed this fall. A late
October mowing of major parks areas was completed. Aerification to the ball
field areas such as Blue Cross /Blue Shield, Rahn, etc. was also done. This
complemented the earlier fertilizer program and should provide for good spring
growth on these heavily used park areas.
In anticipation of winter, the hockey rink at Lexington was reinstalled and
many of the hockey areas were either leveled or filled in as part of our
continuing program to slowly improve drainage and ponding problems associated
with our hockey rinks. Unfortunately, Carnelian is one location in which
major regrading will be necessary. All other hockey rinks have been checked
for hockey board replacement and repair where necessary. Only minor work
remains to be done before the rinks can be declared "ready" for winter use. A
pesky problem with electrical lines to the rinks at Rahn Park has also been
repaired.
Despite late shipments of playground equipment, the department was able to
install equipment at Lexington Park and is currently finishing the,
installation at Peridot Path. Installation of play equipment at Lexington
Park consisted of Type II Play Boosters. Staff had not installed this type of
equipment before, but quickly became familiar with it to provide for a smooth
and safe installation process. The main structure at the Peridot Path Park is
now in place. Play elements, i.e. swing, slide, etc. need only to be hung off
the main structure. Staff fully intends to try and complete this work before
heavy snowfalls prohibit this work from being completed. The play perimeter
will be added at the first opportunity in the spring.
Miscellaneous work completed throughout the park system includes such things
as sod at Gold Trail Park for slope stabilization, repair the Cedar Pond light
and timer, repair of equipment, painting red and blue lines on hockey rinks,
removing broken play equipment at Rahn Park, hauling in picnic tables, seeding
at City Hall, berming of open skating areas, etc..
Also recently completed is the conversion of park vehicles from summer usage
to winter. Much of this equipment has been winterized and placed in storage
until its needed in the spring. Other pieces of equipment have been checked
over and prepared for snow plowing, rink clearing, etc..
The department also has planned several alternative work projects for the
parks maintenance crew when their efforts are not involved in rink
maintenance. Typically maintenance crews encounter work periods, both in the
fall and spring~ in which crews are not directly working on street or ice rink
maintenance. During these time periods, the department has scheduled
alternate work. The alternate work schedule for this year includes
refurbishment of approximately 35 picnic tables, construction of six sets of
soccer goals, replacement of hockey goals and assigned construction. It is
expected that these projects will more than cover any expected "slack periods"
generally encountered in the spring and fall.
With the "skating rink season" fast approaching, members are reminded of the
maintenance and clearing priorities for streets and rinks. Parks maintenance
staff will again help plow streets for "snow emergencies" usually four men.
(More men from Parks may result if their is sickness, etc). Remaining
department staff will begin with clearing of Class A rinks, then "B" and
finally "C With three men, Class A rinks should be open within a work
day. Remaining sites on day 11 after a snow storm. Base ice making
already underway will follow the same priorities for flooding A, B and C.
Again this year, a night shift will be used during base ice making. This
beg -ins Sunday, December 9.
Directo of Parks Recreation
KV /js
AGENDA
ADVISORY PARKS RECREATION COMMISSION
EAGAN, MINNESOTA
EAGAN MUNICIPAL CENTER
7:00 P.M.
NOVEMBER 15, 1984
1. LANDSCAPE /SCREENING STUDY
Discussion of objectives.
Review of other communities policies.
2. PARKS DEVELOPMENT PROGRAM
Discussion of Building and Structure Committees
3. CONTINUED DISCUSSION BEER /FOOD CONCESSION POLICY
4. BLEACHERS
MEMO TO: ADVISORY PARKS RECREATION COMMISSION
FROM: STEPHEN SULLIVAN, LANDSCAPE ARCHITECT /PARK PLANNER
DATE: NOVEMBER 12, 1284
RE: PARK BUILDINGS
The current construction of Rahn Park and the scheduled spring start of
grading for Capricorn and Schwanz Lake Parks marks the beginning of the park
construction process. These sites will be ready for surface development
within a year after grading is complete. It will be necessary for the City to
have determined the type and quality of building to be set within these parks.
In order to provide the most cost efficient, durable, maintenance free,
aesthetic and functionally adequate building, it is necessary for the City to
evaluate building alternatives. Staff believes the evaluation /analysis process
should begin soon and is asking the Commission for direction as to who,
besides staff, should or wants to be involved in this process. Major
categories „;here decisions need to be made include:
1. FACILITIES AND USE OF THE BUILDING
The primary functions of the structure need to be determined. Building
functions include storage, warming area, restrooms, program space, shelter
and concession.
2. BUILDING CONCEPTS /ARCHITECTURAL PROGRAM
It is important to consider conceptual systems of order for the park
structure prior to determining the physical system of construction early
in the analysis and design process. Items for evaluation include:
spacial organization: size
scale
proportion
relationships
hierarchy
4 functional organization
circulation systems
context: building as integrated element within natural and manmade
environment
I physical imagery: form
space
light
color
texture
pattern
Park buildings are viewed and interpreted as symbols of a park system.
Repetition of design elements amongst the different park buildings can provide
unity and an image throughout a city, giving the buildings and the parks
system an identity.
3. THE BUILDING SITE
Before one begins to design and construct a building, one should carefully
consider the implications of its proposed physical context, the building
site. Its geographical location, topography, climate, orientation, and
peripheral conditions should influence the overall building form, its
orientation and relationship to the ground plane and its interior space
design and layout. These factors affect the choice of a building's
structural system and the materials and construction. The correct siting
of a building can also help to control natural light, heat, view, noise
and other environmental elements by providing the building and its
occupants with access to desirable elements and absorbing or shielding the
building from these elements which may be undesirable. While most of the
siting issue has already been determined by park plans, there still
remains a great degree of flexibility in choosing sites.
4. BUILDING TYPE
There are two alterative processes to evaluate when choosing a park
structure. Factory manufactured buildings are available from numerous
suppliers. The consumer is able to choose a structure from a catalog and
locate walls, windows, doors, fixtures and utilities according to the
design needs. The consumer is generally limited by the type and quantity
of custom options available. The second alternative is custom
architecturally designed buildings. It is necessary for an architectural
firm to be hired, objectives and standards analyzed, concept sketches
prepared, building design approved and construction drawings completed.
Custom buildings provide the client the ability to explore numerous design
options. This process, unlike the manufactured building, will generally
cost more because of architectural fees.
5. BUILDING SYSTEMS FEATURES
A building is a physical embodiment of a number of related, coordinated
and integrated systems. It is important to select the correct system for
the park buildings. Each system interfaces with other systems, effecting
the function and final form of the building. Major building systems and
features include:
structural system
foundation system
floor system
wall system
roof system
mechanical and electrical systems
doors and windows
materials
moisture and thermal protection
fire protection
FOR COMMISSION ACTION
The importance, complexity and cost of a park building warrant the necessity
for detailed analysis of the aspects previously listed. In order to insure
that no items are lost within this complexity, it is necessary to first
determine the approach and strategy to be taken. Staff feels that before it
can proceed in this analysis, direction from the Commission as to its
involvement is necessary. Staff is prepared to work with the Commission as a
whole or a subcommittee, and as deep into the analysis that the Commission is
willing to.
Landscape Architect /Park Planner