Loading...
03/01/1984 - Advisory Parks & Recreation CommissionAGENDA ADVISORY PARKS & RECREATION COMMISSION EAGAN; MINNESOTA EAGAN MUNICIPAL CENTER 7:00 P.M. MARCH 1, 1984 1. CALL TO ORDER AND PLEDGE OF ALLEGIANCE. 2. APPROVAL OF AGENDA AND APPROVAL OF MINUTES FROM MEETING OF FEBRUARY 2, 1984. 3. DEVELOPMENT PROPOSALS a. Holmes Addition - Paul Holmes b. Rose Hill Addition - Kyllo Development c. Safari Estates 2nd Addition d. Oak Cliff - Richard Winkler e. Lexington Square - Northland Mortgage Company 4. OLD BUSINESS a. Meadowland Park - Concept Plan Review b. Park Names 5. NEW BUSINESS a. LAWCON/L.C.M.R. - Fiscal Year '85 Grants b. Parkland Review - Section 14 c. '84 Commission Objectives 1. Tour of "Special Use Facilities" 2. Recreation Program Plan 6. OTHER BUSINESS & REPORTS a. Citizens Task Force on Parks - Progress Report b. Report on Sperry Fields c. Sub -Committee on Special Issues - Report of Meeting of 2/23/84 d. Recreation Sub -Committee Report - Meeting of February 16, 1984 e. Review of Field Use Policy and Field Use Fees 7. ADJOURNMENT MEMO TO: ADVISORY PARKS RECREATION COMMISSION FROM: KEN VRAA, DIRECTOR OF PARKS RECREATION RE: MARCH 1ST ADVISORY COMMISSION MEETING February 24, 1984 The first item of business on the March 1, 1984 Advisory Commission Agenda will be the approval of the minutes from the February 2 meeting. There are five development proposals for the Advisory Commission to review. A Planner's Report is included for each of these proposed developments. The first development, Holmes Addition, is for the platting of a one acre parcel into two single family lots. It is recommended that a cash dedica- tion requirement be a condition of plat approval. Rose Hill Addition is in Park Service Section #16 and is north of Blackhawk Lake. It is also recommended that a cash dedication requirement be a con- dition of plat approval. Safari Estates, Second Addition, is in Park Service Section 32. This pro- posed addition is immediately south and adjacent to Berkshire Ponds. Again, a cash dedication requirement should be a condition of plat approval. The fourth development proposal is entitled Oak Cliff Addition. Oak Cliff is within the Winkler Jackson PUD located in Park Service Section #31W. This PUD agreement will require a parkland dedication of approximately 4.4 acres of land which will be combined with a turn back arrangement of property now owned by MnDot. The park land dedication and turn back will form a neighbor- hood park within this park service section. The proposed Oak Cliff Develop- ment, as noted in the Planner's Report, consists of single family homes in an area which was previously zoned for multiple residential. As outlined in the PUD Agreement, this park land shall be dedicated with the plat approval of the first development within this PUD. The fifth and final development proposal is for Lexington Square by North- land Mortgage Company. A separate cover memo regarding park land issues with this proposed development is included in the packet. OLD BUSINESS The first item under "Old Business" is the second review of the Meadowland Park Concept Plans. The department staff has made several revisions which were suggested at the February Advisory Commission Meeting. These revisions MARCH 1ST ADVISORY COMMISSION MEETING PAGE TWO FEBRUARY 24, 1984 will be reviewed with the Advisory Commission to determine a preference so further work can continue. At this time, cost estimates have not yet been calculated for the difference in grading as was previously requested. It is hoped that these figures will be available at the time of the Commission meeting. The second item under "Old Business" is park names. The City Council has reviewed the Commission's recommendations for park naming at its February 7 meeting, accepting the majority of the Commission's recommendations. There were several park names, however, which were set aside with the Council requesting additional information. Included in this packet is a memorandum from the City Administrator relative to this issue which requests additional comments from the Advisory Commission. Members should be aware that at the time the names were presented to the City Council on the evening of February 7, Director of Parks and Recreation was not available to relay the Commission's reasons for name selection. NEW BUSINESS The first item under "New Business" is the termination by the Advisory Commission of its priorities for Fiscal Year '85 grant application. A separate memo reviewing potential park sites to be considered for application is included for your review. The second item under "New Business" is review of Section #14 park land. With the impending developments of Lexington Square, areas to the east of this development can now be accessed to major utility lines. Staff has already received two inquiries as to the desired park area west of Wescott Road in Park Service Section #14. Staff would like to review with the Advisory Commission, the issues involved with this potential park location so response can be given to the developers who are currently looking at the land parcels involved. Commission members should be aware that the City will need to acquire through purchase, additional land to fulfill the basic neighborhood park needs. The third and last item scheduled for "New Business" is the discussion of the '84 Commission objectives. Each year the Advisory Commission has determined several of its objectives which it would care to work on during the year. With the possibility of the park bond referendum, it is conceivable that the condit- ion objectives will be all consuming in this one item. However, staff would like to suggest that the Commission consider two additional objectives. The first would be a tour of special use facilities available in other communities. Previously the Advisory Commission has discussed visiting these facilities in conjunction with its tours of parks in Eagan and elsewhere. Staff is suggesting that if there is an interest in seeing special use facilities, one or two tours could be arranged during the spring and summer months. The second item for Commission consideration is a recreation program plan. The recreation sub committee has met during the month of February to begin this process. The concept of the recreation program plan would be to assess the needs for recreational programs and develop a planned approach to fulfilling the recreational needs. MARCH 1ST ADVISORY COMMISSION MEETING PAGE THREE FEBRUARY 24, 1984 OTHER BUSINESS REPORTS There are four items under "Other Business Reports" for Commission dis- cussion. The first is a progress report on the Citizen's Task Force which will have met the Monday preceding the Commission Meeting. The second item is a report on Sperry Fields. As members are aware, the City has been utiliz- ing the four softball fields at Sperry for a number of years for its adult softball program. Recently department staff has been informed that the growth of softball in the Sperry leagues may require them to restrict the City's usage of these fields should their expected growth materialize into the number of teams they anticipate. Staff has met with the representative of Sperry in regards to this issue and a brief report will be presented to the Commission. The sub committee on special issues met on Thursday, February 23, to review the work of Mr. Roger Sjobeck who is a resident of Eagan and an architect with the Adkins Associates Inc. which is an architectural firm. Mr. Sjobeck has done a review of the Kehne House and made a presentation to the sub- committee concerning the alternatives available for the use of this house. The sub committee on special issues also reviewed the draft of a policy for tot lots and play areas which had been previously requested by the Advisory Commission. The sub committee suggested that the entire Commission discuss this item and therefore, encloseiwith the packet is a memo addressed to the sub committee on special issues relative to this item. The fourth item is the report of the recreation sub committee which met on February 16. The sub committee made some progress into reviewing currently offered programs and will again be meeting on March 14 to continue its pro- cess. A brief report on that meeting will be presented to the Advisory Commission. The last item for the Advisory Commission is a review of the field use policy and field use fees being used by the department. Members may recall that in March /April of 1983, staff presented modifications to the field use fee schedule and the field use policy for the Commission's review. At that time, the Advisory Commission approved of those policies and fee schedules, but requested that staff place them on the agenda in 1984 to determine if modifications should be made. The department has not received any objections to these two documents and therefore, does not see the need to make any modifications at this time. As always, should members of the Advisory Commission be unable to attend the scheduled meeting for Thursday, a call to the office would be appreciated. KV /js Encl. CITY OF EAGAN SUBJECT: PRELIMINARY PLAT HOLMES ADDITION APPLICANT: PAUL HOLMES LOCATION: PART OF THE NA OF THE NA OF SECTION 10 EXISTING ZONING: R -1 (RESIDENTIAL SINGLE DISTRICT) DATE OF PUBLIC HEARING: FEBRUARY 28, 1984 DATE OF REPORT: FEBRUARY 21, 1984 REPORTED BY: DALE C. RUNKLE, CITY PLANNER APPLICATION SUBMITTED: An application has been submitted requesting preliminary plat approval, Holmes Addition, consisting of approximate- ly 1 acre and containing 2 single family lots located in part of the NWT of the NWT of Section 10, Parcel 10- 01000 020 -29 north of Quarry Lane and Towerview Road. COMMENTS This parcel has been zoned previously to R -1 (Residential Single Dis- trict) and would allow only single family homes to be developed. The applicant has submitted an application to split this 1 -acre parcel in- to two single family lots of which each lot would exceed the 12,000 square foot minimum requirement. Lot 1 would have a 90' lot width and contain 15,888 square feet net area and Lot 2 would have approx- imately 174' of frontage and contain 18,780 square feet of net area. In review of this particular parcel, there appears to have been a high- way easement granted across this property to provide access to the pro- perty further to the east and south. In accordance with this easement, it appears to encumber a 20' area across the front of the property and run diagonally across the property on the westerly edge. To the south of this property is a platted subdivision of which Towerview Road has been dedicated as a half right -of -way. In review of this particular subdivision, it appears that only a 50' right -of -way would be needed because the street would only service one or two other properties due to the location of LeMay's Lake. Therefore, this road is never expect- ed to be upgraded past a residential street. Consequently, additional right -of -way would not be required. In review of this particular subdivision, there appears to be two is- sues which should be reviewed in relation to this preliminary plat. The first issue is in regard to a proposed shoreland ordinance. The shoreland ordinance which the City has been working on for a number of years is presently up for review by the Advisory Planning Commis- sion. In this ordinance, it classifies LeMay's Lake as a recreational development body of water and would require a 75' setback from the CITY OF EAGAN PRELIMINARY PLAT HOLMES ADDITION FEBRUARY 28, 1984 PAGE TWO high water elevation once the ordinance is adopted. Presently, due to the configuration of the property and the dedication of the road and setbacks from the road and the lake, the applicant can only obtain a 50' setback vs. a 75' setback which would be required once the ordi- nance is adopted. The City has been informed by the property owner that they have reviewed this with the Department of Natural Resources, and the Department of Natural Resources does not see a problem with the 50' setback requirement as proposed. The other issue regarding setbacks is in regard to the right -of -way for Towerview Road. If the applicant dedicates the additional 20' of right -of -way for Towerview Road, the applicant can then only meet a 20' setback requirement instead of the required 30'. The proposed house is drawn in accordance with what is proposed to be built, and a 10' setback variance would be required from this particular set- back requirement. The last issue in regard to this plat is that it is the Planning De- partment's understanding that Lot 2 would require a lift station or pump in order to get access to sanitary sewer for this particular lot. The applicant is aware of this, and this would be a requirement if the plat is approved. Also, presently Towerview Road is not up- graded to its potential, and the one additional house requires that the applicant petition to upgrade Towerview Road to its ultimate de- sign as a residential street, or since only one additional dwelling unit is being constructed, that the upgrading would not have to occur at this particular time. This will be an engineering decision and .a recommendation as to how this street should be addressed. If approved, the preliminary plat should be subject to the following conditions: 1) Adequate rights -of -way be dedicated for Towerview Road. 2) A 10' front setback variance be granted for Lot 1 and 2 of the proposed plat. 3) The plat be reviewed by the Department of Natural Resources for their comments. 4) A park dedication shall be required as requested by the Advisory Park Commission. 5) All other applicable ordinances be adhered to. DCR /jach CITY OF EAGAN PRELIMINARY PLAT HOLMES ADDITION FEBRUARY 28, 1984 PAGE THREE ENGINEERING RECOMMENDATIONS 6) A detailed grading and erosion control plan will be required to be submitted for approval. 7) Public improvements shall be extended along Towerview Road east of Quarry Lane. 8) A turnaround shall be provided at the end of Towerview Road. 9) The existing 20' easement shall be dedicated as public right of -way for Towerview Road. 10) A ponding easement shall be required to be dedicated to en- compass the high water elevation of LeMay's Lake. 11) This development shall be responsible for trunk area water and storm sewer assessments at the rate in effect at the time of final platting. 12) All costs associated with public improvements shall be the sole responsibility of this development. 13) All easements shall be dedicated as required by staff in the Engineering Report. RMH /jack MEMO TO: THE ADVISORY PLANNING COMMISSION, C/O DALE C. RUNKLE, CITY PLANNER FROM: RICHARD M. HEFTI, ASSISTANT CITY ENGINEER DATE: FEBRUARY 23, 1984 SUBJECT: HOLMES ADDITION PRELIMINARY PLAT The Engineering Division of the Department of Public Works has the following comments regarding this proposed development for consid- eration by the Advisory Planning Commission and City Council. TOPOGRAPHY /DRAINAGE The existing topography over this proposed development consists of a side hill sloping to the northeast and LeMay's Lake from an ele- vation of approximately 908 at the southwest corner of this propos- ed development to a normal water level of 873 at LeMay's Lake. This amounts to an average slope of 18 Subsequently, drainage over this development is to the northeast towards LeMay's Lake. LeMay's Lake is designated as Pond DP -2 on the City's Master Storm Sewer Comprehensive Plan and also has a positive outlet control. Further- more, LeMay's Lake is designated as a DNR protected water. Subse- quently, staff recommends a detailed grading and erosion control plan be submitted for approval. UTILITIES Sanitary sewer and water main are located within the intersection of Towerview Road and Quarry Lane. However, due to the drop in ele- vation resulting from the existing topography, it is not possible to serve Lot 2 with a gravity sanitary sewer service line. There fore, it will be necessary for the owner of this lot to provide a pump to overcome the elevation difference to dispose of his waste water. Gravity sanitary sewer service can be provided for Lot 1 provided the basement elevation is no lower than an elevation of 901. In accordance with City policy, this development will be required to extend sanitary sewer and water main to the east end of Towerview Road. This work shall be accomplished in accordance with the City's Engineering Guidelines. STREETS Existing streets providing access to this development consist of Towerview Road. Towerview Road is a City residential street which has not yet been improved to City standards east of Pilot Knob Road. Subsequently, as a condition of final platting, this development shall provide for the upgrading of Towerview Road to City standards ENGINEERING REPORT HOLMES ADDITION PRELIMINARY PLAT FEBRUARY 23, 1984 PAGE TWO east of Quarry Lane. Furthermore, since right -of -way has been dedi- cated by easement to the City, a cul -de -sac should be provided for turn around purposes at the end of Towerview Road in order to pro- vide for City maintenance vehicles and emergency vehicles. Unfortu- nately, in this instance, no feasible method of looping this road- way exists which necessitates the cul -de -sac. RIGHT -OF- WAY /EASEMENTS The current 20 -foot highway easement for Towerview Road over this parcel shall be dedicated as public right -of -way. A 10 -foot utility easement will be required to be dedicated adjacent all publicly- dedicated right -of -way with a 5' drainage and utility easement being dedicated adjacent all lot lines. In addition, a ponding easement shall be dedicated to encompass the high water ele- vation of LeMay's Lake. An additional easement will be required to provide the cul -de -sac at the end of Towerview Road. ASSESSMENTS This development will be responsible for trunk area water assess- ments and trunk area storm sewer assessments. These amounts shall be determined by applying the area rates for each in effect at the time of final plat approval times the net area of this development. At 1984 rates, based on net area as shown on the preliminary plat, this would amount to the following: Trunk area storm sewer 30,000 sf X $0.045 /sf $1,350.00 Trunk water main 0.69 acres X $1,120 /Ac 773.00 The final assessment amount will be determined from the net area of Block 1 on the final plat using the rates in effect at the time of the final plat approval. All costs associated with installing the public improvements will be the sole responsibility of this development. I will be available to discuss any aspect of this report in detail with the Advisory Planning Commission at the February 28, 1984 meet- ing. Respectfully su• itted, Richard M. Hef P.E. Assistant City Engineer RMH /jack SPUR COUN Y CLUB Subject Parcel ADDITIO U.S. POSTA SERVICE D -I3 F IST 2ND a FIGURE 1 L-0 V 7 'S r D -15 D -I4 ifitarcipm D-21r T elgi r i r A kap •I■f7C•Id \Do D 1 D 19 r" 5.1-67 i to N W W N W W N TOWERVIEW t2 0 0 cr 0 U —b WET TAP ft- 0 911 9 4 7 QUARK 22 UR FIGURE 2 SEE E CZ r Towerview Road House corners 'staked (6) 1•1 LA 1 ale: 1" 20' Soil Bo Location Bench lark: il in tree south of proposed ho e Elevation 906.0 GEC JOB NO: 3588 n F THE �3. sw 3o z J L MN 2 to Top 909.:6 iN J. a 99 .1,1.7 9 0 T i 0 -a 5cL 004.cy TOWERVkEW ROAD, i 1 0 0 n189 44' 2 2 4) 4. oo 1 j 2 (04. oo 5 89°44' 2.2)"N.4 t,k re.: 6a» r12-.3/... ...I a TN t I to 12At_1 B/\ S 5. -{aa.L 4 3C 1�Lgc..tD EGoSIO N N I 1 1 1'7d.,o01 m 8 a- GRADING PLAN HOLMES ADDITION l0 2.51 LE MAY'S LAKE J I og co S Hlc,11 wnrER t 4 L.Jan<.1 R1 3. CLLJ, 'aye .c 1 I o oa No ,Q 8 1 'w[ r k 0 0 O ss w i w w 0 00 LO f; ^Pr ,r HI(I-1\I TOWERVIEW ROAD 4I� 84 44' ZS" E 2 (o 4.00 a a i 4 4 T Jr 5]t0 Z1n4. SAT' 44' W 174 HOLMES DDITION k �1t.1A(E A iD Or%LIT`( EAf.CME►JT LOT 2 4-11 sc1 Fr, 4 A 441. z.5i EMAY'S LAKE. \I\ to 0 0 '(1 0 O 4 0 4 CITY OF EAGAN SUBJECT: PRELIMINARY PLAT ROSE HILL ADDITION APPLICANT: HOWARD KYLLO, KYLLO DEVELOPMENT LOCATION: LOT 1, BLOCK 1, BLACKHAWK HILLS ADDITION LOTS 1 -4, JON CROFT ACRES SECTIONS 16 17 EXISTING ZONING: R -1 (RESIDENTIAL SINGLE DISTRICT) DATE OF PUBLIC HEARING: FEBRUARY 28, 1984 DATE OF REPORT: FEBRUARY 23, 1984 REPORTED BY: DALE C. RUNKLE, CITY PLANNER APPLICATION SUBMITTED: An application has been submitted request- ing preliminary plat approval, Rose Hill Addition, consisting of approximately 12.4 acres and containing 14 single family lots lo- cated on Lots 1 -4, Jon Croft Acres and Lot 1, Block 1, Blackhawk Hills Addition in Sections 16 and 17. COMMENTS Presently, Mrs. Kyllo lives on the property where proposed Lot 3 of the Rose Hill Addition is located. It is staff's understanding that Mrs. Kyllo can no longer maintain the property and wishes to subdivide the property into single family lots. The application submitted consists of a preliminary plat which would contain 14 single family lots. Access to 13 of the lots would be off of Kyllo Lane, via a cul -de -sac constructed on the existing drive- way. This cul -de -sac would be upgraded to a fullsize City street and meet all the standards of City street requirements. There is one lot which is accessible from Blackhawk Hills Circle. The only issue which may come into effect is that the street or grade is steep, and it is staff's understanding that the street will be ap- proximately 8% or less therefore meeting all of the requirements. All lots exceed the R -1 zoning requirements. They run approximate ly 1/2 acre or larger. There are only four that are under the half acre lot size in the proposed plat. The applicant is also proposing to plat Lot 9 of Rose Hill Addition because it is property that he does own and did acquire when Black hawk Hills Addition was constructed. He acquired Lot 9 to make sure he was able to get sanitary sewer from Blackhawk Hills Addition to this particular development. Therefore, he is requesting to plat Lot 9 also in regard to this development request. It is staff's understanding that there is a covenant in Blackhawk Hills Addition that all lots must meet 1 acre lot size requirement. The applicant CITY OF EAGAN PRELIMINARY PLAT ROSE HILL ADDITION FEBRUARY 28, 1984 PAGE TWO has replatted Lot 9 even though it is an odd shaped configuration of a parcel, but nevertheless does meet or exceed the 1 -acre lot size requirement. In looking at the plat, there are a number of 40' wide strips which abut the southerly line of the plat. These 40' strips are platted in order to give different lots access to Blackhawk Lake. That is the reason for the platting of this configuration. If approved, the preliminary plat should be subject to the follow- ing conditions: 1) The grade of Knoll Ridge Drive should be within City standards. 2) All other City ordinances shall be met. DCR /jach ENGINEERING RECOMMENDATIONS 3) A detailed grading and erosion control plan shall be submit- ted for approval. 4) The water main shall be looped from Kyllo Lane to Blackhawk Cove. 5) If installed privately, plans and specifications for utility installation shall be in accordance with the City's Engineer- ing Guidelines and prepared by a registered engineer. 6) A ponding easement shall be required to incorporate the high water elevation of Blackhawk Lake over Lots 1 -9. 7) All easements shall be dedicated as required by staff in the Engineering Report. 8) This development shall be responsible for the deferred storm sewer assessments as mentioned in the Engineering Report. 9) This proposed development shall be responsible for trunk area water main and sanitary sewer assessments as a result of cre- ating 10 additional lots with respect to the original parcel. 10) All costs associated with the installation of public improve- ments for this development shall be the sole responsibility of this development. RMH /jach MEMO TO: THE ADVISORY PLANNING COMMISSION, C/O DALE C. RUNKLE, CITY PLANNER FROM: RICHARD M. HEFTI, ASSISTANT CITY ENGINEER DATE: FEBRUARY 22, 1984 SUBJECT: ROSE HILL ADDITION PRELIMINARY PLAT The Engineering Division of the Public Works Department has the following comments in regard to this proposed development for con- sideration by the Advisory Planning Commission and City Council. GRADING /TOPOGRAPHY This site borders Blackhawk Lake on the south and Blackhawk Hills Addition on the east, and subsequently, is situated over some of the more rugged terrain in Eagan. The entire site slopes steeply towards the south and Blackhawk Lake. Slopes over this parcel range from 100 -30 An elevation difference of approximately 90 feet exists from Kyllo Lane to the normal water level of Blackhawk Lake. In addition to the rugged terrain, much of this site is covered by evergreen and hardwood trees. In grading the lots to provide for buildable sites, several back- yard slopes will approach 2 :1. Since these slopes are the maximum allowed by code, staff will recommend strict adherence to an approv- ed erosion control plan submitted as a condition of final plat ap- proval. This plan should also incorporate methods of anchoring vegetative material to prevent washouts prior to the vegetative materials' growth. Examples of stabilizing these slopes would be staking and sodding, placing erosion mats such as plastic netting or wood fiber blankets over seed and mulch or other acceptable methods of slope stabilization. Meanwhile, all drainage over this proposed development will remain towards Blackhawk Lake. Street drainage will be directed to an in- ternal storm sewer which will be discharged into Blackhawk Lake. Although Blackhawk Lake is DNR controlled, no permits will be re- quired as long as the storm sewer outlet is above the normal ordi- nary high water elevation. UTILITIES Utilities of sufficient size, capacity and depth exist within the proximity of this proposed development to provide service to it as shown on Figure 2. This development has access to an 18" trunk water main to the north located within Kyllo Lane and a 6" water main located within Blackhawk Cove. Access to sanitary sewer will be provided from the existing manhole located within Blackhawk Cove. This entire area will have to be served by the existing lift sta- tion in Blackhawk Cove which pumps waste water to the northeast along Blackhawk Cove to where it discharges to a gravity sanitary sewer line. This existing sanitary sewer lift station is capable ENGINEERING REPORT ROSE HILL ADDITION PRELIMINARY PLAT FEBRUARY 22, 1984 PAGE TWO of directing the additional flow from this proposed development to the gravity sewer within Blackhawk Cove. Staff recommends the water main be looped from the existing trunk water main within Kyllo Lane to the existing 6" water main within Blackhawk Cove as proposed by this development. If installed privately, plans and specifications for utility in- stallation shall be in accordance with the City's Engineering Guide- lines and prepared by a registered engineer. No construction may begin until final plat approval. STREETS An existing street providing access to this parcel is the intersec- tion of Kyllo Lane and Knoll Ridge Drive. Both streets are under the jurisdiction of the City and are built to their ultimate design section of 32' wide bituminous surfaced with concrete curb and gut- ter. The access to the interior of this development would be obtained by extending Knoll Ridge Drive to the south and terminating it by way of a cul -de -sac. The length of this cul -de -sac is approximately 540 feet which is just under the allowable 550 -foot length as de- termined by code. The street would be constructed to City standards. If this street is to be installed privately, then plans and specifi- cations shall be prepared by a registered engineer in accordance with the City's guidelines and submitted to the Engineering Department for approval. RIGHT -OF -WAY /EASEMENTS The 50' right -of -way being proposed for the public street will be adequate as long as this development adheres to its proposed grad- ing plan. For a 50' publicly- dedicated right -of -way to be feasible within this rugged topography, it is essential the 10' utility ease- ments adjacent the right -of -way be graded and cleared of trees as proposed in the preliminary grading plan. The reason for this is to provide adequate room for utilities such as gas, electric, tele- phone and cable television. In addition to typical dedicated easements along the platted right of -way and all lot lines, right -of -ways of sufficient width will be required over all utility lines not located within public right -of- way. Staff recommends a minimum of a 15' wide easement over all utility lines except where they are combined as the water and sani- tary sewer cross the southern boundary of Lot 9. In this instance, staff recommends a 30' easement be dedicated. ENGINEERING REPORT ROSE HILL ADDITION PRELIMINARY PLAT FEBRUARY 22, 1984 PAGE THREE In addition to the utility easements, a ponding easement will be required to incorporate the high water elevation of Blackhawk Lake as it affects Lots 1 -9. ASSESSMENTS The assessments which will be required to be collected at the time of final plat approval include storm sewer trunk assessments which were deferred over Parcels 011 -00, 020 -00, 030 -00 and 040 -00. These are summarized in the following table: PARCEL 10- 18600 011 -00 020 -00 030 -00 040 -00 Respectfully s bmitted, Richard M. He i, P.E. Assistant City Engineer RMH /jack DEFERRED ASSESSMENT SUMMARY TABLE ASSESSMENT AMOUNT Trunk storm sewer area $2,339.37 1,525.92 964.92 605.88 In addition, Lots 1 -4 of Jon Croft Acres were initially assessed on a per lot basis for trunk area sanitary sewer and water main. City assessment policy requires that each subsequent subdivision result- ing in an additional lot be required to pay a per lot assessment for trunk area water main and sanitary sewer. Therefore, since this pro- posed development consists of 14 lots, the trunk area sewer and wa- ter assessment shall be levied over 10 lots (14 minus 4). These assessments shall be determined at the rate in effect at the time of final plat approval. Presently, the 1984 rate on a per lot ba- sis for these trunk area assessments are $535.00 both trunk san- itary sewer and trunk water main. The above referenced assessments will.be the responsibility of this proposed development and may be either paid at the time of final platting or spread as a special assessment over this development. Nonetheless, all costs required for installation of public improvements for this proposed develop- ment shall be the sole responsibility of this proposed development. I will be available to discuss any aspect of this report in detail with the Planning Commission at the February 28, 1984 meeting. C -6 \C-8 rp►ivZ &Mg 1 Ar AN! 1 1 f 0 la mirws11 Wi I NO& --11.4 4u I��: 4 11111 1n1 ■�C 4 ail. ■�ii; a mipiIhda IIIMMeip 11■i .a,��t:>i in= al ,.4 1.4. nlP1111. +1:: r mi. i iii Ai3 a 1111111 ■nt i g 1�1aa r r i mi 1=. ��''a= =c. II I•■■■■■■■ ■i1w t cliiiiiimm ILIsmummi MI Bub ilia um sil imam mu CARNE nO- I.LIAN um MI PARK timamr- Lay SUBJE B BLACKHAWK PARK HI LANDAI FIGURE 1 1 ST 2ND c lo PJI31C WO KS 3 DG di J -I X X J 1 1 S U i 36 L■4 i inet J P L— I B -6 B-5 KVL I,Q rn IC I V r_ 110 ut KM1e1 e UITTT/ kW 000011& [O7[•■IT MIST 01K11wa woo, 01. 11001.0001 O10 AMU 11U1rC7, To rwu PLAT. f� VACPTEE I II BIACKHAWK If�KC 1 v J /•rw aMssi e. 1410310 M O r oN lw� e a w 00 MOPOMSJl1 100 !11 COTTA Kl D101Y•O.0 00[01 TO St $I(C*0 010 ru.000.0, 1.1 0.010 TO Be 10000). LOCATION MAP Q a S J a o r =i 2 W 4 a CC S. O O —I. IC Oar.. OT C W 6 08T/ 1 to 111711100$ 0100 /PDX P5OACT 10. 3143 n1 00 s0e1T 1 Or [1 IV IV 7 ILL 04104001 410 tot MLN 1u04CT TO 1444. OUT, nD I ID u41 eel 'R tYT15 0450 sr 1 �D s 4100 0f 1 Q 7 13 lu 1450 01 I L also a S 12 ,1W T'- 10100 01 I F r 456pis6 e 0 11 Ilei Ip 0= -1/1. .1#' 3 1 0dM 01100 1f SI 11 1 7 I 44000 17 111711 II IV s r't1 I I q 1j1 tC!' d I i 4 I 1400 a n• 1rllelo ID 1•. I I O'T `S OS JI L /�1 NM 0 mkt .e0q T{ 11100 1 p 44e000 u i 1 50100 10 T I \1 1 1 1 1411u 1 1 41t/ 11 e0 1 40 40 1 210 110_ e0 fOJK:K LAKE UTILITIES LEGEND .144TI56e //5610411 11611 1n5Tr1 510114 55 010 -4 1141441 x•404 414 0 1 110w221 "WW1 um 01010111 1T01 4 11 6 N 10.1411162•1 •11414144 LOCATION MAP 064■56 27 _c_W6 04470 f=e M 111 V1510440 0140.EC7 b• 50117 3 01 3 i r [1 ILL 04104001 410 tot MLN 1u04CT TO 1444. OUT, fOJK:K LAKE UTILITIES LEGEND .144TI56e //5610411 11611 1n5Tr1 510114 55 010 -4 1141441 x•404 414 0 1 110w221 "WW1 um 01010111 1T01 4 11 6 N 10.1411162•1 •11414144 LOCATION MAP 064■56 27 _c_W6 04470 f=e M 111 V1510440 0140.EC7 b• 50117 3 01 3 MINI/ ��Irj f �D� 42 NW HINIMAIIIII •..410 �i 41 'UIIU, fir i i 1`I��� �1 4 �4 iliiii ■wisraim ward•%: v a N■■■■m vit ulI /1 i "rte i 1i 1CIfi■ a moms Mein- 015.1111111 i -.i4 .■■a■Ir■■■u• p ima I /Iiiv X11► ien i �i rA, .1111 INN .auisa■ r ow HILLA DALE r--_Z RIDGE IL BELL =NT Pa 77-2 A A APPLE VALLEY V J iC) tzst 21G t 1 M r L L, 40 f L 10 KYL49 LAN r 234- 11100 1/ 2 VINO 11 F_- 3 57300 It 4 35400 Sr 5 44000 IN 510 7 IC 1:1 t> 1 I I I II I li W 1 11000 if 1 J tr 6 625 111150111 5' 6.411'6 NO PINNACE (111(5130 41151 0111110606 >100N NL OM /*11061 ANO 1.0T ARIAS 5UOJ(CT TO 111161. KIT. VACATED 13 11� NIO U i- =--t01 14 12 16100 II 11 14200 A. No r 10 I NTl 51 I 6 60100 51 1 16 I f I la e (.0 1 'c b I 1 9 11000 11 E ACKr44WK LA112 (1 MUM 11.415.5 $1101 1.11 11111/411. N.111I11.11 11■11 IM111 15.10011..... 11.4 N. 1.0.11.•.,• III. $111 11,11 ■t 1.1. 115. 1111 16,111 ■I /.1. 1111111.1 INN N' *I. 115 005 )1' 1 EXISTING 11 -1 ZONING LANK 16101101! IN 1. J0 (1111 M411 1101510 11 M MIM (O1 KAI NNW. Wall (Satt,. 160 1111 11110 !15 /MIN M AN 11 /Or M 411(01 11111 161 M 1 114 ill* 0.0 1111 1!0101 M II N11'11 /110111(611 II, W /1111111 1111. 1 160 11661111 it 161111 1* 41111 at tN 007600 (15NI M IN I MIA J5 1b/ Koff, INNS laws 11. II 11t VIM 14 .1111 IM 5 11 1151 111111? 15 TO 411 tilt 11•/11101115 111.01 1(11 M 1J 1151 11111 M 114111111 IN (IV 11 N 116 INNS 0016!11111 II A NM 14 IM WAN 1101 411 lel I 111111 6 0.1/ 1111 OSI 411 WANNItI CNN. AN MM IIMIMI111. 1012141 1111 115 I, 5 0011 6111, !*(110101 M M 150110 NM 14110, 66.011 (OOn, /15141/10111 Mt /Mt 411 111 1111111111 11 101111/1 it 14 601,0161 1•011 M 411110 1 sort 1511 10* M 0111 115 151111 14 M (Iftl I1■Nf Oft It IINI 16111 Ti 410 411 111611111 1141 114.5 1111 11111 041144311111 Ni 1 11111 N M MN 11.1 MI WIT C 1 1111 II it 1116°11 11 X11 7N1114111N 1411 PMl M 141 I. J5 4111 1(156 5101111 11 M 1110165 POI 141101. 51M11 Matt, 411041416 11101 11415111 M O NNt IN 011111 415 III 1. TOWN. 4110 tot tut W 101 1, NI CNN Sal. 153001115 11 M 111301 ■I1 141111. W011 Oat!. .100151 lrl* /0t1N1 M M 00111111 IN N 1111 M 410014. I01II41 oils tit 1, 1151 I, 6111•1 .n(/. *1611101 5 M NtO 11 NAI 11.101. 4154 Matt. 116044 111111 INI Tilt MIA UN I. 11111 (WI* N1 (00 I14 11,1•146 11611611116: 1615111* 1l M *.111411 001111 6 LM 115 14 114111 1041 1 61511 n .111111 01 61601 Oil 1111 14 *N 1101 M 415 I0l I I 11111151 11 /0 N 1111 10 11 NUN 10111 M 5111110 5 11 VIN N N 5611104 11451 flAN. tl N4111 Ill A MINN 116.14 1111 N IN UII 1115 151 1St 1 IN I14O IlNlwn•. LOCATION MAP ;I;i1l J I OR AWN ■v C 16) OIr( to-r0 REVISIONS ■(VI /IONS 400 /060 1010.107 b 3153 R! 110. 506 I Or 3 4 S 7,71, R 6 O/0 -75 %7 6 Donna ✓4 hn L u/he M• a 41dry K /dnd o,'C -"7 c .5ur S O /.ion Ati c, 3 1/ :a �d a ?J A c eaymor S Mark L Bra w /7 �7c 75 The /ma 1 a"- /0 2 .r 7 2 ''4. it 7z r? a v T 1 j1 N 3D ,J• I i 4 '3 T s ytv T ,4 /ice M. 5a/"t;1 /3 Ac IC -7i a. 010 D N N.- CITY OF EAGAN SUBJECT: REZONING PRELIMINARY PLAT SAFARI ESTATES SECOND ADDITION APPLICANT: GERALD PEARSON AND BILL DIEDRICH LOCATION: PART OF THE NA OF THE SA OF SECTION 32 EXISTING ZONING: A (AGRICULTURAL) DATE OF PUBLIC HEARING: FEBRUARY 28, 1984 DATE OF REPORT: FEBRUARY 23, 1984 REPORTED BY: DALE C. RUNKLE, CITY PLANNER APPLICATION SUBMITTED: The first application submitted is a request to rezone approximately 23.5 acres from A (Agricultural District) to R -1 (Residential Single District) located in part of the NWT of the SW d of Section 32. The second application submitted is a request for preliminary plat approval, Safari Estates Second Addition, consisting of approximate ly 23.5 acres and containing 41 single family lots located in part of the NWT of the SW' of Section 32. ZONING AND LAND USE Presently, the parcel is zoned A (Agricultural) and has not had any request for zoning in the past. The Comprehensive Guide Plan desig- nates this particular parcel as R -II (Mixed Residential with a den- sity of 3 -6 dwelling units per acre). The proposed development con sists of single family homes which is on the very low end of this density range. COMMENTS The proposed plat is an undeveloped wedge of property between Berk- shire Pond on the north and existing Safari Estates on the south. Safari Pass is the access road that this subdivision would use to gain access to this development. Safari Estates is zoned R -1 (Resi- dential Single District) and the property to the north is zoned R -1 PD which would allow single family homes which deviate from the nor- mal single family lot size requirements. Therefore, this proposed development is a transition between the smaller lots to the north and the larger lots to the south in this general area. The one issue which may be brought out is Safari Estates was one of the last subdivisions that could use the name "Estates" and not have the Estate zoning. This is the second phase of that, and it may questioned if the word "Estates" can be used in this Second Addition if the zoning is R -1 vs. the Estate zoning. Therefore, there may be CITY OF EAGAN REZONING PRELIMINARY PLAT SAFARI ESTATES SECOND ADDITION FEBRUARY 28, 1984 PAGE TWO some question as to the name of this plat or what name could be used other than "Estates" in this platting process. The proposed plat consists of 41 single family lots of which all meet or exceed the R -1 zoning requirements for lot width and square foot- age with the exception of three lots. The plat is proposing to have direct access onto Safari Pass and one cul -de -sac off of Galaxie Avenue. The second phase will have a road proposed from Safari Pass running northwesterly to provide access to the property to the west. In review of this plat, this appears to be the only place where access can be obtained to the property to the west to allow for future development. The applicant is also provid- ing the connection of the street to the north which was platted in the Berkshire Pond preliminary plat. Therefore, the plat does pro- vide continuity to this abutting property. It appears that the main issue is the depth of sanitary sewer and being able to provide proper sewer connections to the lots cn the cul -de -sac off of Galaxie Avenue. I believe Engineering is working with the applicant to provide adequate sewer connections. If approved, the preliminary plat should be subject to the following conditions: 1) All lots meet or exceed the R -1 zoning criteria for square footage and lot width. 2) Determination shall be made if "Estates" can be used in the Second Addition of this proposed plat. 3) All other City ordinances shall be adhered to. 4) If the proposed development is zoned R -1 (Residential Single District), all lots shall meet the minimum lot size of 12,000 square feet. ENGINEERING RECOMMENDATIONS 5) An overflow outlet from the proposed detention pond within Block 3 of this proposed development shall be constructed prior to or concurrent with phase two of this proposed de- velopment. 6) A detailed grading and erosion control plan shall be submit- ted for approval by staff. 7) Water main shall be looped from Galaxie Avenue to Safari Pass through the cul -de -sac. MEMO TO: THE ADVISORY PLANNING COMMISSION, C/O DALE C. RUNKLE, CITY PLANNER FROM: RICHARD M. HEFTI, ASSISTANT CITY ENGINEER DATE: FEBRUARY 22, 1984 SUBJECT: SAFARI ESTATES SECOND ADDITION PRELIMINARY PLAT The Engineering Division of the Department of Public Works has the following comments regarding this proposed development for consid- eration by the Advisory Planning Commission and City Council. DRAINAGE /TOPOGRAPHY The existing topography consists of rolling terrain with two inun- dated depressions. One depression is located in approximately the center of this proposed development while only a portion of the other depression is located along the westerly boundary of this proposed development. The latter depression is designated as Pond AP -17 in the Master Storm Sewer Plan as shown on Figure 1. Cur rently, this pond does not have a controlled outlet. This pond accepts runoff from storm sewers servicing the Safari Estates area and a portion of Galaxie Avenue. When constructed, the outlet for this pond will be to Pond AP -30 which presently does have a con- trolled elevation. However, most of the drainage over this propos- ed development will be into the low area located within Block 3. Subsequently, it will be the responsibility of this development -to provide a storm sewer outlet to their north line prior to comple- tion of the development within this area. At this point, it will connect to a storm sewer constructed by the Berkshire Pond devel- opment. Subsequently, this low area in Block 3 will eventually be connected to Pond AP -30. The proposed grading will not alter the drainage patterns. A de- tailed grading and erosion control plan shall be submitted prior to final plat approval for approval by staff. UTILITIES Utilities of sufficient, capacity and depth exist within the prox- imity of this development to provide service to it. Water and san- itary sewer services are in -place along Safari Pass, or Lots 7 -16 of Block 3. A 20" trunk water main is in -place along Galaxie Ave- nue to provide service to the cul -de -sac. Sanitary sewer service will have to be provided from the sanitary sewer constructed with- in the Berkshire Pond Addition. It will have to be extended south along Galaxie Avenue to this proposed development. The timing for installation of utilities for this proposed develop- ment will depend upon the Berkshire Pond development to its north. Coordination will be required for the sanitary sewer and also for the subsequent storm sewer construction for the pond. Water main constructed for the cul -de -sac will be required to be looped to the CITY OF EAGAN REZONING AND PRELIMINARY PLAT SAFARI ESTATES SECOND ADDITION FEBRUARY 28, 1984 PAGE THREE 8) If installed privately, plans and specifications shall be pre pared by a registered engineer in accordance with City design- ed guidelines. 9) No direct access will be allowed for Galaxie Avenue. 10) An additional 17' of right -of -way shall be dedicated for Gal axie Avenue. 11) A ponding easement will be required over Lots 21 -23 to encom- pass the high water elevation of this pond when determined. 12) All utility and drainage easements shall be dedicated as re- quired by staff. 13) All costs associated with this development will the sole re- sponsibility of this development. RMH /jach ENGINEERING REPORT SAFARI ESTATES SECOND ADDITION PRELIMINARY PLAT FEBRUARY 28, 1984 PAGE TWO south to the existing water main within Safari Pass. If installed privately, plans and specifications shall be prepared by a register- ed engineer in accordance with City design guidelines and reviewed by staff. STREETS Galaxie Avenue borders this proposed development along the easterly boundary and Safari Pass borders this proposed development along its southerly boundary. Galaxie Avenue is presently a community col- lector street constructed to its ultimate design section of 44 feet, while Safari Pass is a 32 -foot wide residential street constructed to its ultimate design section. Access to Lots 17 -26 of Block 3 will be by way of a cul -de -sac off of Galaxie Avenue. The cul -de -sac is well within the allowable length as defined by City Code. It will be required to be construct- ed to City standards for a 32 -foot residential street. RIGHT -OF- WAY /EASEMENTS This proposed development will be required to dedicate 17 feet of additional right -of -way for Galaxie Avenue to provide for a 50' half right -of -way. In addition, a public right -of -way will be required to be dedicated for the cul -de -sac street. Safari Pass right -of -way has already been acquired. In addition to the regular utility easements adjacent public right of -way and adjacent all lot lines, a ponding easement will be re- quired over Lots 21, 22 and 23 to encompass an elevation of approx- imately 930. ASSESSMENTS All trunk related assessments have been assessed for this proposed development. Subsequently, all costs for installation of future utilities and streets will be the sole responsibility of this de- velopment. I will be available to discuss any aspect of this report in detail with the Advisory Planning Commission at their meeting of February 28, 1984. Respectfully subm tted, g -.6k°14€"( Richard M. Hefti, P.E. Assistant City Engineer RMH /jach 9 ADDITION 35 1:It4vg tricro 411••■••■••••■• A 30 .777171764, 4 A Ii APPLE V A- 27 A-33' VALLEY 29 Subject Parcel nAiaTrA I rnt i TY FIGURE 1 t fiAbtx. L- 66 PARK kJ 46 1 X PRELIMINARY PLAT OF SAFARI ESTATES SECOND ADDITION P R O P O S E D i<SH RE 1ST PHASE r 1231.30 G a C. PO !N! S .0 7 1'l III SCALE I INCH 100 rEET Pea nano, Fortune Realty Inn, and the rotate or Darrell Natenhke hove lopera, Dlodrloh Inn, (Dill Diedrich) 0056 174th St. M. Apple Volley, Mn. 55124 411 -229! Oarold D, Poltroon 11670 leleton Ave. M. L.krvllle, Mn. 4)0 61.1 Legal Deenriptl and That port of the North Half or the Soothvnnt Ouerter of Seotlon 12, Township 27, tango 23, Dakota County, Ml nnenota, lying north or I•.T•O.T. Porno. road (Solari Pose) and sect of Oelaele Ave. Except that portion taken by Norlhwo ^ter„ Poll oat or the northeast corner of aetd property, Present Zoning, An.rleulture Proposed Zoning, M -1 Arena Total Plat 11,706 An, Anode 2.0 Ao. Individual lots 20.79 Aa. Penalty, Ihtlio par sore for total plat 1,0 Unit. per nor, lee. road P/N 1.97 Prepared Py, Delmar H. Scheana n 0...1 X• A Land Surveyor �d Minn, Hes. Nu, 0625 Addreeo, 1 So, Hobert Tr, Hn.nnnunt, Mo. 55060 rote or Preparation, dannnry 11, 1904 DELMAR H. SCHWANZ LAND SURVEYORS, INC. City of Apple Valley FIGURE 2 SEE SHEET WM 894 SUBJECT: APPLICANT: LOCATION: EXISTING ZONING: DATE OF PUBLIC HEARING: DATE OF REPORT: REPORTED BY: CITY OF EAGAN PRELIMINARY PLAT -.OAK CLIFF RICHARD WINKLER, WINKLER DEVELOPMENT CO PART OF THE Wh OF THE NWT OF SECTION 31 PD (PLANNED DEVELOPMENT DISTRICT) FEBRUARY 28, 1984 FEBRUARY 22,'1984 DALE C. RUNKLE, CITY PLANNER APPLICATION SUBMITTED: An application has been submitted request- ing preliminary plat approval, Oak Cliff Addition, consisting of approximately 33 acres and containing 75 single family lots and 9 twinhome lots (18 dwelling units) in part of the WZ of the NWT of Section 31 lying westerly of Slater's Road. ZONING AND LAND USE: Presently, the parcel is zoned PD under the Winkler- Jackson Plan ned Development. The total acreage in this planned development is approximately 90 and has a maximum number of dwelling units of 460 to be allowed within this planned development. There is also some commercial approved on the east side of Slater's Road and just south of Cliff Road. The Comprehensive Guide Plan designates this entire tract as R -II (Mixed Residential) with a density of 3 -6 dwelling units per acre. In review of this particular plan, there is proposed 96 dwelling units on 33 acres, or a gross density of 2.9 dwelling units per acre. Therefore, this particular plan is within the guidelines of the R -II, however, the Winkler Jackson Planned Development would supersede the Land Use Plan because', of the contract in effect with the City for this particular area. COMMENTS In July, 1982, the applicant entered into a planned development agreement, the Winkler- Jackson Planned Development which consisted of approximately 90 acres and allowed some Limited, Commercial and Neighborhood Business use along with a maximum density of 460 dwell- ing units to be constructed in this 90 -acre tract. This planned development is in effect for five years and will terminate in 1987. In review of this particular agreement in regard to the density factor as to whether this revised site plan requires an amendment to the planned development or whether this be permitted within the CITY OF EAGAN PRELIMINARY PLAT OAK CLIFF FEBRUARY 28, 1984 PAGE TWO context of the development agreement, in the density section of Paragraph 6 of the planned development agreement, it relates to the maximum density allowed of 460 dwelling units which cannot be exceeded within the Winkler- Jackson Planned Development. The last paragraph in the density section of the planned development agree- ment states that the developer has the sole discretion to develop at a lower density than what has been approved in the planned de- velopment agreement. Therefore, it is staff's interpretation that the planned development spells out the option that the developer is developing at a lesser density, therefore, no amendment to the planned development agreement is required. As you may recall in 1983, there was a preliminary plat submitted for a small portion of this area to be developed as townhouses and an overall concept as to how this outlot could develop in an over all townhouse theme and shifting the balance, or the 102 -104 dwell- ing units not constructed (the maximum allowed), to Outlot A for a garden apartment condominium. This concept was approved with the details to be reviewed when that phase of the plan develops. It is staff's understanding that the plan mentioned in the paragraph above is no longer the intention of the applicant or developer. Since the plan was approved, it had been determined that the pro- ject is unfeasible to construct due to the costs of the project. Therefore, the applicant has withdrawn the original preliminary plat and has now submitted a new preliminary plat changing the use and developing at the lower density than what was originally approv- ed. The plat submitted for the February 28, 1984 Advisory Planning Com- mission meeting would consist of approximately 33 acres and would contain 75 single family lots and 9 twinhome lots (18 units) for a total of 96 dwelling units. The applicant has also submitted in concept form that an additional 34 townhouse units be constructed north of the existing plat and also that Outlot A remain as a 102- 104 dwelling unit garden apartment area. The total density for this plat would now be at 231 dwelling units, or 77 dwelling units less than what was originally approved. In review of the single family portion of the development, the ap- plicant is proposing to construct 75 single family lots of which all lots meet the minimum 12,000 square foot lot size requirement and a minimum of 85' lot width at the 30' setback. Therefore, the single family portion of the plat meets all R -1 zoning standards and conformswith the R -1 lot size requirements. The applicant has also met all of the square footage and lot width requirements for the R -2 lots which would be 9 lots or 18 dwelling units. These lots would be at the very northerly edge of the plat being a buffer between the townhouse or higher density and the single family de- velopment. CITY OF EAGAN PRELIMINARY PLAT OAK CLIFF FEBRUARY 28, 1984 PAGE THREE The applicant is proposing to provide a curvilineal loop street de- sign to provide access to the single family lots. The applicant is proposing two accesses to Slater's Road one stub street connection to the south and one cul -de -sac which would separate the single fami- ly use from the townhouse use on the very northwesterly portion of the plat. There has been some discussion in regard to connecting this cul -de -sac and providing a looped street north and running through the townhouse portion to Slater's Road. However, due to the topography or elevation difference and land use difference, it appears that it would be more suitable to provide the cul -de -sac than to provide the through street Connection. In reviewing this preliminary plat, there appears to be one factor which becomes a problem in platting this particular property. Pre sently, the property is recorded under the Torrens system, and once you begin to plat Torrens property, you have to convert the entire tract from the Torrens description into outlots in order to keep track of the entire parcel. Once the outlots have been establish- ed, then each of the outlots can then be resubdivided into a lot and block configuration. However, you cannot take just a portion of this plat and convert it to lots and blocks and leave the rest as Torrens or unrecorded property. Therefore, the applicant is platting 14.58 acres into lots and blocks which would consist of the first phase of the development containing 31 single family lots and 8 twinhome lots (16 dwelling units). Even though the entire tract is being set up in outlots, the plat is only consisting of the lots and blocks mentioned in this paragraph. The second phase would be the remainder or 50 single family lots and one twinhome lot (2 dwelling units) which would be Outlot A of the proposed plat. Outlots B and C and F are the other outlots which have been estab- lished and would develop in the townhouse or higher density as agreed to in the planned development agreement. Outlots D and E are the two commercial outlots which would then be replatted once the applicant starts the commercial portion of the development plan. If approved, the preliminary plat and planned development shall be subject to the following conditions: 1) The total density on the planned development shall be reduced by 77 dwelling units for the Outlot B portion or the area west of Slater's Road. The new density number for this area west of Slater's Road should be 231 dwelling units total vs. the 56.56 acres X 5.5 dwelling units per acre. 2) All lots being platted shall meet the minimum R -1 and R -2 zoning standards. 3) The 34 townhouse units proposed on the north be approved only in concept and that a detailed review will be done at the time this area is platted. CITY OF EAGAN PRELIMINARY PLAT OAK CLIFF FEBRUARY 28, 1984 PAGE FOUR 4) The applicant shall meet all other obligations of the Winkler Jackson Planned Development in regard to dedication of park- land and the grading or escrowing money for grading of the parkland to a suitable condition. 5) A homeowner's association or common maintenance agreement shall be required for the 8 twinhome lots. 6) All other City Code requirements shall be adhered to. DCR /jach ENGINEERING RECOMMENDATIONS 7) A detailed grading and erosion control plan will be requir- ed to be submitted for approval by staff. 8) Overflow outlets shall be provided from the two proposed de- tention ponds into Pond AP -10. 9) There shall be no dead -end water mains unless they will pro- vide future service to adjacent property. 10) A cul -de -sac should be eliminated with a public street being extended through the townhouse development to connect to Slater's Road. The minimum street right -of -way to be dedicated shall be 60 feet. 11) Ponding easements shall be dedicated over the proposed deten- tion ponds located in Block 2 and Block 4. 12) Utility and drainage easements shall be dedicated as requir- ed by staff. 13) All costs for internal utilities and streets will be the sole responsibility of this development. RMH /jach MEMO TO: THE ADVISORY PLANNING COMMISSION, C/O DALE C. RUNKLE, CITY PLANNER FROM: RICHARD M. HEFTI, ASSISTANT CITY ENGINEER DATE: FEBRUARY 22, 1984 SUBJECT: OAK CLIFF ADDITION PRELIMINARY PLAT The Engineering Division of the Public Works Department has the following comments regarding this proposed development for consid- eration by the Advisory Planning Commission and City Council. DRAINAGE /TOPOGRAPHY The existing topography of this proposed development is very hilly and wooded. Slopes range from 2% to 25%. Most of this area is well drained with the general drainage being towards the north in- to Pond AP -10 as shown in Figure 1. However, due to its hilly na- ture, there are two small depressions located in the proximity of Lot 9, Block 2 and Lot 5, Block 4. Presently, Pond AP -10 does not have any outlet to control the water elevation. The Master Drain- age Plan indicates a lift station will be required to pump excess storm water to the southeast into Pond AP -19 which does have a positive outlet. The proposed grading for this development will not significantly alter any existing drainage patterns. It will, however, utilize the previously mentioned depressions as storm water detention ponds. This is acceptable providing outlets to these ponds are constructed. Furthermore, due to the steep slopes found over this area, a detail- ed grading and erosion control plan must be submitted for review and approval by staff. UTILITIES Utilities of sufficient size, depth and capacity exist within the proximity of this proposed development to service it. A 12" trunk water main is in place along Slater's Road from Cliff Road midway to this property where it then turns into an 8" water main along the remaining portion of this property. Sanitary sewer is repre- sented by an 8" line in place along Slater's Road from Cliff Road to approximately the midpoint of this parcel. Also, an 8" sani- tary sewer is available at the intersection of James Street and Slater's Road. Storm sewer is provided along Slater's Road from the south boundary of this proposed development to approximately 600' north. The relationship of these existing utilities is more clearly illustrated in Figure 2. It should be noted that the storm sewer previously mentioned is designed to handle only the runoff for Slater's Road, and it does not include runoff from this devel- opment. ENGINEERING REPORT OAK CLIFF ADDITION PRELIMINARY PLAT FEBRUARY 22, 1984 PAGE TWO All internal utilities will be the responsibility of this develop- ment to provide. In addition to the sanitary sewer and water main, it will be this development's responsibility to install storm sewer outlets to the previously mentioned depressions they are intending to utilize as detention ponds. The outlets for these ponds must be directed towards Pond AP -10 since the storm sewer in Slater's Road is not sized to accommodate any additional flows other than off the immediate roadway. STREETS Slater's Road is the existing street which provides access to this parcel. It is under the City's jurisdiction and has been construct- ed to its ultimate 44 -foot wide community collector street design. Cliff Road (County Road 32) borders the northern boundary of this parcel and is under the jurisdiction of Dakota County. Subsequent- ly, no access would be provided off of it. Access to the residential portion of this proposed development is via internal streets off of Slater's Road. The internal street layout is well conceived to provide for traffic movement and future access to the south. However, in our never ending quest to elimi- nate all dead -end streets such as proposed for the townhouse area, staff recommends eliminating the cul -de -sac in the residential area and extending the street to the north through the townhouse area and subsequently connecting to Slater's Road. Although the topogra- phy between the townhouse development and the residential develop- ment is rather difficult, it would not be prohibitive from making this connection. Subsequently, staff believes any disadvantages caused by construction would outweighed by the advantage of provid- ing two accesses to the proposed townhouse development, since it would eliminate an approximately 1,000 -foot dead -end private street. RIGHT -OF- WAY /EASEMENTS All right -of -way has been provided for Slater's Road and Cliff Road. Right -of -way shall be dedicated within this plat for all public streets and shall be a minimum of 60 feet. In addition to the regular utility easements adjacent public right- of -way and lot lines, a ponding easement shall be dedicated for Pond AP -10 and the two small detention ponds previously mentioned. A 20 -foot utility easement will be required to be centered over the lot line between Lots 1 and 2 of Block 4 and a 15 -foot utility ease- ment to be centered over the lot lines between Lot 5 and 6 of Block 6 should the extention of the public street not be approved by the Planning Commission. In addition, utility and drainage easements of sufficient width shall be provided over the lot lines which are utilized for the installation of storm sewer laterals for this de- velopment. Subject Parcel i: A -39 FIGURE 1 A -64 4 -66 (1 A -4 -37 I J A -43 1 4 A'‘f`'4* •„tt r -r‘v;-*14' Wire NW ft li A 7 APPLE i VALLEY lll�ll ADDIT DAKOTA CO U Y PAF A -46 L 6. °sow* ammo am ENGINEERING REPORT OAK CLIFF PRELIMINARY PLAT FEBRUARY 22, 1984 PAGE THREE ASSESSMENTS All trunk related assessments have been levied over this parcel. However, the trunk area assessment for storm sewer was assessed at the single family rate and should be upgraded to the multi family rate for the townhouse portion. This may be accomplished at the time of development of phase three. Otherwise, all costs for internal utilities and streets will be the sole responsibili- ty of this development. I will be available to discuss any aspect of this report with the Advisory Planning Commission at their meeting of February 28, 1984. Respectfully submitted, Richard M. Hef i, P.E. Assistant City Engineer RMH /jack O• CONSISTING OMNI sad SOWN wevevoss p ROBE ENGINEERING COMPANY. INC. 1--.--,. WOO WIT MO SWIM SYNONYMS!. SINIONSOTA IIINST PK 4111•0000 PROM 7•1117 tttttt ION •YILDING PM/ 10M MoCt MIRA AAAAAA 10M A INDICATES INV. ttttt CI OR WIDIC•TIS AAAAA CI MIASMAS( 1.•100, NOW% OM, Ow. A. 64 060 0•11•0•1111 Ir• •14. 40 eon. MO 0.4 4.0.0•■••■• •••0 1001. Ow, 1144.0.4•40 *le 4•41 OP 4.4 111•44 OP MONONA ONO 011 i.. OP HOY 04■111.041, 0•0 I I\ 4 STRAW V STOMA 0MAI0A0( P0770 00. *P-$0 NORM•s *ATER AAAAAA ION •10.70 I Oslo wATIN AAAAAA ION 074.00 1 i PRELIMINARY GRADING AND DRAINAGE PLAN OAK CLIFF I 1 I I SLATERS ROAD Z. WENT I 1 l k Subject ParcE L ii................ 1 1::: 1\11 Ii .i. Itlik 1:.:::::::: 1::.::.:::: i:•::.:• i::::::::: 1.•::.:••••••.:••••••:•::•:.::::•:.::•:•::.:.:::: CI RD. 11-t-t-t.• FIGURE 2 Ui u SE SPIT 12° PRESSURE REDUCING STATION --WET TAP BURIED WET TAP BUR 1E_ WET P NA I 12 E Er14., 3 r t GENERAL INFORMATION' yid .11.9.• P.P. Ploy. ►•9..r• If Y 1•.y w •r••••W<Y y1 W I W. r..i• l.li Y y 1r• 9..11 N•• Y 1•.• rid i• u.n_ yids Y ..r Awry Sy. 1.111 w r 1• Y.r1 r Y. MI MAY ••.11 Mu Y r rid•• Ir w9. •r••• rrl• IrY r .w I I 1 nrs ,I>r 1 I I 1 I I I .NORTH I I r SCALE 1 %100' I L_____ Q INDICATE. TYIM 5055 LOT P RODE EONSUtTINO 111.01111011111 w ISIS 10.110011 N GINEERING C OMPANY INC. OM a.L•••••..i L 1.00 WI .44. NSVlL •M Ll. N1WTA STTPT .N .11.1000 N•1 In J PRELIMINARY PLAT Or OAK CLIFF L LEGAL DESCRIPTIONI WI N r y of Y•1• N. t•.NI. II. !T W YOU rid... Il+n \1i n•s....rr •I 1 Al ••M• •1 1 n•• r. 1.1. 111. r N••• r••1 N y:•r M 11 1� 10 OW *M r dye. r• 1• dy w•• r*• .1 r1 •1r r. t •••�l yv 9.N N ••1 l N Pair N rid• Wr N yl• N. Illy•• Il. L••r ID. SUMS .y.. Ryarh ay• Ow W l N YEN.. r• N� ••.N ••r. Yr rrpn o. r•r.•W w1 y Y.• N .N -ll1 At awe N r i s rim r. r•.... 1•• r• N y.i• W ••1• ft... r N 1i w. M WI N r r.•N Y•. Nw•••I •••NO. W r..1. 1 YJ rid 14• II yid N 1 r• yYw w1 IN.L� t1•! a� s IOO- I.. aaa :.....1 MI 1•• R -III APPLE W LLEY GJ.4 CL.'JB ,4Y'F R B II R a Ind r.LL3TC, RNI R -I Ind. Inc DAKO.a RK R-I ROSE MC:!. 6 SUBJECT Ind. R R- CSC /GB /LB, TRAILS ISSUES: PARK RELATED ISSUES: February 24, 1984 MEMO TO: ADVISORY PARKS RECREATION COMMISSION FROM: KEN VRAA, DIRECTOR OF PARKS AND RECREATION RE: PRELIMINARY PLAT APPLICATION LEXINGTON SQUARE The City staff has received a preliminary plat application for Lexington Square from Northland Mortgage Company. (See attached planner's report). Lexington Square is part of the Lexington South Planned Unit Development and therefore, there shall be no park dedication required. However, there are a number of issues within the proposed development which bear review by the Advisory Commission as it relates to trails and the developments impact upon Northview Athletic Fields. Consistent with City policy, with the upgrading of Wescott Road a bituminous trailway and sidewalk shall be installed along Wescott Road. Northview Park Road is proposed as being a neighborhood collector street. The Engineering Department has determined that this road width will re- quire a 70' road right -of -way with a 44' wide street. In addition, there shall be an 8' wide bituminous pathway on the south side of the road within the road right -of -way. The Eagan Park System Plan identified a trail connection within the 50' wide north -south NSP trail easement. Therefore, it would be appropriate as a condition of plat approval to require a 20' wide trail easement within the NSP powerline easement for a possible future trail. This trail easement may not be necessary dependent upon future road construction. The City's comprehensive guide plan for major thoroughfares indicates that there should be a north -south roadway east of the NSP powerline sometime in the future. Should this roadway actually come about, a trailway may be extended along this new north -south roadway, thus eliminating the need for the trailway being required with this plat. The Director of Parks and Recreation, reviewing the proposed plat, has several concerns as it relates to the impact upon Northview Park. These concerns have been discussed with the Director of Public Works who has taken steps to mitigate these impacts. The first concern was relative to the alignment and road right -of -way requirements for the Northview Road. Currently there is a 66' road right -of -way which ends at the northwest corner of the park. From this point to the east, there is only a 33' half right -of -way which lies entirely within the proposed Lexington Square Development. Northview Park has not dedicated any roadway easement at this time. Consequently, a road PRELIMINARY PLAT APPLICATION LEXINGTON SQUARE PAGE TWO FEBRUARY 24, 1984 right -of -way will be required from the City parks to facilitate the construction of Northview Park Road along the entire north boundary line of the existing park. Northview Park Road will be designated as a neighborhood collector street. Originally, a 40' half road right -of- way would have been required. Thus, the City would have had to dedicate 40' of roadway which would have placed the outfield fences of the softball field complex approximately 1.9' away from the road right -of -way or approxi- mately 19' from the back of the curb. It is now the understanding of the Director of Parks and Recreation that the road right -of -way required will be 70', thus requiring a 35' roadway dedication by the City Parks Department. Further, the roadway will be shifted 10' to the north to accomodate the 8' wide bituminous trailway. This reduction in road right -of -way and shifting of the road to the north by 10' will place the outfield fences approximately 30' back from the road curb. The 8' bituminous trail will be within this 30' space. There remains some concern, however, for the amount of space available for plant and screening material. Inasmuch as homes will now front Northview Park, reasonable steps to screen the ballfield fences and the activities of the park from these homes with plant material should be taken. The second concern staff has with the preliminary plat is with the storm water drainage from the plat. Drainage with the first two phases of the proposed plat would drain to the north and not affect the City park. How- ever, with the development of the third phase as is currently shown, a drainage from a portion of this development is shown to go north to North view Park. As members know, the small pond within the park area is currently flooded during the spring snow melt and rain. With the addition of additional runoff being directed to this pond from the development, it is likely that this pond would be in a state of constant flooding rendering the parking area useless until a storm water lift station could be constructed. The Director of Public Works has indicated to me that the third phase of the development will be required to divert its storm water runoff to the north, rather than through the park property. The staff would review the areas of concern previously mentioned as well as other factors which will impact the final development of Northview Athletic Fields. After discussion, it would be appropriate for the Commission to make its recommendations to the City Council relative to trails as a con- dition of plat approval and its concerns relative to this plat. KV /js CITY OF EAGAF SUBJECT: PRELIMINARY PEAT LEXINGTON SQUARE APPLICANT: RONALD C. HELlER, NORTHLAND MORTGAGE CO. LOCATION: PART OF THE NW4 OF SECTION 23 EXISTING ZONING: PD (PLANNED DEVELOPMENT UNDER THE LEXINGTON SOUTH PLANNED DEVELOPMENT) DATE OF PUBLIC HEARING: FEBRUARY 28, 1984 DATE OF REPORT: FEBRUARY 22, 1984 REPORTED BY: DALE C. RUNKL,E, CITY PLANNER APPLICATION SUBMITTED: An application has been submitted request- ing a preliminary plat, Lexington Square, which consists of approx- imately 132.11 acres and would contain 372 single family lots which deviate from the R -1 zoning standards located in part of the NW4 of Section 23 south of Wescott Road, east of Lexington Avenue (County Road 43) and north of Northview Park Road. ZONING AND LAND USE: Presently, the parcel is zoned R -II (Mixed Residential) with a density of 3 -6 dwelling units per acre under the Lexington South Planned Development. This parcel was amended for a change from R -III (Mixed Residential with a density of 6 -12 dwelling units per acre) to R -II (Mixed Residential with a density of 3 -6 dwelling units per acre)in February, 1984. The proposed Land Use Guide also designates this parcel as R -II (Mixed Residential with a density of 3 -6 dwelling units per acre). The proposed plan contains 2.82 dwelling units per gross acre and 3.72 dwelling units per net acre. Therefore, the proposed plan is consistent with the low range of bdth the existing zoning and the proposed Land Use Guide Plan. COMMENTS The application submitted is a preliminary plat of 372 single fami- ly lots. The proposed single family lots deviate from the R -1 zon- ing standards. The smallest lot size proposed is 7,000 square feet and the average lot size is 11,707 square feet. There are 25 lots which meet both the R -1 square footage requirement and lot width requirement at the 30' setback line. Therefore, there are approxi- mately 350 single family lots which deviate mostly in lot width and slightly in lot area from the R -1 !zoning standards. TRAFFIC CIRCULATION As stated earlier, the plat abuts Lexington Avenue on the west and Wescott Road on the north. Both roads are major collector streets and would allow limited access to this development. The proposed CITY OF EAGAN PRELIMINARY PLAT LEXINGTON SQUARE FEBRUARY 28, 1984 PAGE TWO plat contains a curvilineal design where lots have double frontage on Lexington Avenue and Wescott Road. The Northview Park Road on the south was originally proposed to also have double frontage or limited access. However, due to definition, it is suggested that Northview Park Road be a neighborhood collector street which would allow direct access to this particular road. In review of the Sub- division Ordinance, this road then could have a proposed right -of- way of 66 feet vs. the 80 feet being dedicated. Also, in review of the definition of roads in the plat, Savannah Road could also be reduced from a 60' right -of -way to a 50' right of way which would define a local interior street. The applicant is proposing two access points off Lexington Avenue and one access point off Wescott Road. The internal circulation is a curvilineal design that loops 6 cul -de -sacs to provide access to the 132 acres. The applicant is also providing two stub streets to the east. Staff may suggest that an additional stub street be provid- ed south of Kettle Creek Court for development opportunities for the property to the east. The one item staff would like to point out at this time is again in regard to Northview Park Road. In the past, the City has been requiring that an 80' right -of -way be dedicated and limited access to this road be the standard for the community or interior collect- or. This road would provide the same function as Wilderness Run Road, Covington Lane, and Thomas Lake Road which have all been con- structed to these standards with limited or restricted access. This Northview Park Road provides the same spacing requirement as in the past, however, we are now indicating that this road be defined as a neighborhood collector and would allow direct access to this type of roadway. The benefit in allowing direct access to this neighbor- hood collector is that it eliminates approximately 30 lots from hav- ing double frontage or constructing a road which cannot be used by a particular subdivision. Therefore, a policy question is being reviewed and looked at, and it is suggested that the half mile, or interior collector streets, be labeled or defined as neighborhood and would allow direct access to these collector streets. Also, ac- cording to Chapter 13 of the Eagan City Code, a neighborhood collect- or would only then require a 66 -foot right -of -way dedication vs. the 80 feet which is being proposed. ADDITIONAL COMMENTS In this proposed plat, there were two exceptions. The first excep- tion was in the approximate center of the development proposal. This exception has now been changed to an outlot, or labeled Outlot A in the plat. The applicant has worked with the property owner of Outlot A and has determined how Outlot A could be developed in the future in accordance with this development plan. As you can see, a sketched in area as to how Outlot A could be subdivided has been shown to maximize the use and conform with the surrounding develop- ment. CITY OF EAGAN PRELIMINARY PLAT LEXINGTON SQUARE', FEBRUARY 28, 1984 PAGE THREE The second issue is in regard to the exception in the northwest cor- ner of the plat. It is staff's understanding that this exception has been sold to a church and would', develop at a later date. At the present time the zoning or use has ',not been approved by the City, but the acreage has been sold to the church prior to platting the property. Secondly, is if and when the church does propose devel- opment, we will seeing direct access from Lexington Avenue and Wes- cott Road to this facility. Therefore, the use would be isolated from this particular development. In review of the topography and vegetation, the area has a fairly flat or barely rolling topography which would allow for the smaller lot configuration. Also, the veget tion on the site is farmland which has been farmed, and that iegetation or trees are scarce or scattered slightly throughout the development. Therefore, topog- raphy and vegetation would not be a hindrance to this type of devel- opment request. In regard to this proposed plat, the Planning Commission will have to review this plat in regard to the criteria set up for reviewing the smaller lots or lots which deviate from the R -1 standards in regard to topography and vegetation general location and surround- ing land uses, and the proposed grading plan showing the type of unit and unit elevation on each of the lots noting that each lot will support a dwelling unit. It should be noted that if this plan is accepted, that this grading and house -type plan will be part of the development contract and held to in regard to type of house on the lots proposed. If approved, the preliminary plat should be subject to the following conditions: 1) The plat should be subject to Dakota County Plat Commission's review and comment because the plat abuts a County road. 2) No variances for setback or lot', coverage shall be allowed ex- cept for topographic and vegetation reasons. 3) The City approve the policy on neighborhood collector streets. 4) Lot size deviations be approved'in accordance with the prelim- inary plat submitted. The proposed building plans meet all of the setback requirements of the R -1 zoning district. 5) An additional access be provided to the east somewhere south of Kettle Creek Court or extend Kettle Creek Court east for an additional access. 6) All other City Code requirements shall be adhered to. DCR /jach CITY OF EAGAN PRELIMINARY PLAT LEXINGTON SQUARE FEBRUARY 28, 1984 PAGE FOUR ENGINEERING RECOMMENDATIONS 7) A detailed grading and erosion control plan be submitted for approval by staff. 8) All drainage over this proposed development shall be di- rected to the north. 9) If installed privately, plans and specifications for pub- lic improvements must be prepared by a registered engineer in accordance with City- designed guidelines. 10) All lateral water mains shall be looped unless they will be utilized for future extensions. 11) The cul -de -sacs for Danbury Court and Kettle Creek Court shall be eliminated and substituted with through streets. 12) This development shall be responsible for an 8' bituminous trailway along Wescott Road and Northview Park Road. 13) Right -of -way shall be dedicated as referenced in the Engi- neering Report for Wescott Road, Lexington Avenue, North view Park Road and as further required in the Engineering Report. 14) All utility and drainage easements shall be dedicated as referenced in the Engineering Report and required by staff. 15) A 25' slope easement will be required adjacent Lexington Avenue. 16) A 15' trailway easement will be required within the 50' NSP easement. 17) Trunk area sanitary sewer, water and storm sewer assess- ments shall be this development's responsibilities at the time of final platting unless projects for these improve- ments have been approved by Council. 18) The costs of all public improvements, with the exception of trunk related improvements, shall be the sole responsi- bility of this development. 19) A 5' sidewalk along the east side of Lexington Avenue shall be the responsibility of this development. MEMO TO: FROM: DATE: FEBRUARY 23, 1984 SUBJECT: LEXINGTON SQUARE ADDITION PRELIMINARY PLAT The Engineering Division of the Department of Public Works has the following comments regarding this proposed development for consid- eration by the Advisory Planning Commission and City Council. TOPOGRAPHY /DRAINAGE THE ADVISORY PLANNING COMMISSION, C/O DALE C. RUNKLE, CITY PLANNER RICHARD M. HEFTI, ASSISTANT CITY ENGINEER This proposed development is located east of Lexington Avenue and south of Wescott Road in Section 23. The existing topography con- sists of rolling farmland. The slopes over this topography range from 2% to 40%. Subsequently, grading affecting any of the steep slopes must strictly adhere to a grading and erosion control plan submitted to and approved by staff. This proposed development is located within Drainage District J which is further subdivided in- to minor drainage districts as depicted in Figure 1. Drainage from approximately the northern 2/3 of this proposed development is to be directed into trunk storm sewer which eventually outlets into Pond JP -11 (Hurley Lake). A positive outlet control is presently being constructed for this pond. Since no trunk storm sewer fac- ilities exist within this proposed development, it will be neces- sary to construct the necessary trunk lines east from Lexington Avenue to Pond JP -30 which is located within the northeast portion of this proposed development. According to the Storm Sewer Master Plan, approximately the southern 1/3 of this proposed development is to be drained to the south. How- ever, this proposes a problem since the pond which is to accommodate this runoff is located within the City park as Pond JP -34. This pond presently has no positive outlet and floods during heavy rainfalls. Therefore, staff does not recommend adding any additional runoff from future developed areas to this pond until an outlet for this pond is constructed. At this time, there are no plans for such construction. Subsequently, in order to develop phase two and three of this propos- ed development, the drainage water will have to be redirected to the north and to Pond JP -30, if this development wishes to pursue its aggresive development schedule. Other than possibly adjusting the outflow from Pond JP -30, this redirection of runoff will not cause any downstream problems since JP -11 is its ultimate designation. UTILITIES At this time, the only utility existing in proximity of this pro- posed development is a 12" trunk water main at the intersection of Wescott Road and Lexington Avenue. However, Project 361 has been approved and bids will soon be accepted for construction of a trunk ENGINEERING REPORT LEXINGTON SQUARE PRELIMINARY PLAT FEBRUARY 28, 1984 PAGE TWO sanitary sewer to the west line of the Westbury Addition, west of Lexington Avenue. Project 396 has been approved and plans and spec- ifications are being prepared for bidding purposes to extend this sanitary sewer trunk line to Lexington Avenue to provide service to this proposed development. In addition, Project 396 also provides for trunk storm sewer from JP -11 (Hurley Lake) to Lexington Avenue to provide for trunk storm sewer facilities for this proposed de- velopment. All internal utilities, with the exception of City installed trunk water, sanitary sewer, and storm sewer, will be the sole responsi- bility of this development. If these utilities are to be install- ed privately, then plans and specifications must be prepared by a registered engineer in accordance with City design guidelines and submitted to staff for approval. As per City policy, all interior water mains shall be looped. No dead -end water mains will be allowed unless they will be utilized for future extensions. STREETS Wescott Road borders this proposed development along the north, Northview Park Road borders the westerly half of this proposed de- velopment along the south, and Lexington Avenue borders this pro- posed development along the west. Wescott Road is presently a gravel surfaced road 24' wide. In the City's Master Thoroughfare Plan, Wescott Road is designated to be a minor arterial road, 52' wide with no direct access. Northview Park Road is designated on the Master Thoroughfare Plan as a neighborhood collector road. Presently, it is gravel road with a thin layer of seal coat over it. As a neighborhood collector street, Northview Park Road will be 44' wide. Staff recommends revising the internal street layout to eliminate the Danbury Court cul -de -sac and extend it through to Stony Point Road. Similarly, the Kettle Creek Court cul -de -sac should be elim- inated and extended to the east property line to provide the access point requested by the City Planner in his report. The remaining cul -de -sacs appear to be necessary evils since they are not as read- ily adaptable into through streets as the two previously mentioned cul -de -sacs were. All interior streets shall be constructed to City standards for a 32' wide residential street. Due to the status of Wescott Road and Northview Park Road as minor arterial and neighborhood community streets respectively, City policy will require this development to be responsible for construction of both trailways. The bituminous pathway required for Lexington Avenue is the responsibility of the development to the west, Westbury Addition. Also, a 5' concrete sidewalk along the east side of Lexington Avenue will be the responsibility of this development. ENGINEERING REPORT LEXINGTON SQUARE PRELIMINARY PLAT FEBRUARY 28, 1984 PAGE THREE RIGHT -OF- WAY /EASEMENTS A 50' half public right -of -way will be required to be dedicated for Wescott Road. A 55' half right -of -way will be required to be dedi- cated for Lexington Avenue. A 35' half right -of -way will be requir- ed to be platted for Northview Park Road. Savannah Road and Danbury Trail shall have 60' platted right -of -ways while the remaining streets shall have 50' platted right -of -ways. In addition to the regular 10' utility easements adjacent public right -of -way and the 5' drainage and utility easements adjacent all lot lines, a ponding and utility easement will be required over Pond JP -30 to incorporate the high water elevation. Also, 20' utility easements will be re- quired over all utility lines not within public right -of -way. Furthermore, a 25' slope easement will be required adjacent Lexing- ton Avenue to incorporate any future grading limits required as a result of the upgrading of Lexington Avenue. Finally, a 15' trail way easement shall be provided within the 50' NSP easement along the east boundary of this proposed development. ASSESSMENTS No trunk area assessments have been levied on this parcel as of yet. Subsequently, unless a pending assessment is initiated by Council action in approving -a project to provide this proposed development with trunk utilities prior to or at the time of final platting, then it shall be this development's responsibility to pay those trunk re- lated assessments. Likewise, if the improvements of Northview Park Road and trail are not initiated by Council action prior to final platting, then this development shall be responsibility for those assessments. Nevertheless, this development shall be responsible for the assessments for the trail along Wescott Road at the time of final platting. All assessments shall be determined at the rate in effect at the time of final plat approval. The costs of all public improvements, with the exception of trunk related improvements, shall be the sole responsibility of this de- velopment. The costs for improving Wescott Road will be the re- sponsibility of the major street fund for the reason that City assess- ment policy does not allow for assessing single family residential areas for streets on which no direct access is granted. I will be available to discuss any aspect of this report in detail with the Advisory Planning Commission at their meeting of February 28, 1984. Respectfully subrnj tted, Richard M. Hefti P.E. Assistant City Engineer RMH /jach 3 �i t 32 t 56 L -7 A .l —F�� �L_ cam +5 HILLS GOLF RSE J -67 FIGURE 1 J -0 J 2 Subject Parcel J -32 J -3 k k J -48 11 J-4 Y �i r .Ib wm i 0 Mlr. 1 IL L I I I� �4 oo I II ma: m i V e. I ;1e0 n 4rNl ,o I r l Cy/4/4/4 TT r igo q w es' re r.o I, .o x •0 9 .o l o n Loo ea a mN 22 8 4 3! 22 II SS 1 ]a i R: 3fl f 11141 I it rr M 7a n n 9 w m ni 70 L� .._ii. L n m f.. f� ,L11.42_41. 1 11 N g N N I) 3 11 10 9� 1 1 k 1 SAO .190 •Ma IL MO .CM �rw I I .,7w 9MOM ry M 01 M. COO Imo. 1 a I� �..__I1. 21..}R s hoo vw .,..0 9.709 MIN MOT n110•1 o ..'.O CMG o o 20 r io .:.o� .,no 7o a. M 7 0 3 2 �7 3 y )0 ]I Y X ]S ]6 1 xl i. f� 21 I- r, L2�1fL29 7 -1 �I ��Ir I� _,.,,T If 1,.1 1 2 it u 14 14 34 37 0111 11 my uN m. M..1 U11W I.m u1fYN .011111 Iu1 Mil M+ 1 •AU —1.71 a.u.l1 Wf tpa N II Cl an wl r m mllr,a w+r m Wr 1n1s s w1 i m it u' wmul ro w m 1Y. Ywm m N Mn, ruur.n re lawu w41 wnn Y •4411 i 1 n My VIM.. 1m 1. n11�1r s lr f� M! I d1 d1 W PNN K11 4[.70::11 riuwm'111 IMOD MO 170 (11.11 I PRELIMINARY PLAT LEXINGTON SQUARE NORTHLAND MORTGAGE COMPANY 3500 WEST 80TH STREET BLOOMINGTON, MINNESOTA 812- 893 -7500 SITE DATA ell lag IMO arm w94 nw>b so– MU a MIS IM MIS .Y:.IYn1a WW1/ MI 170 .mi m n ara MT n oar. 1. NI mrn mM 7074 a ,cm 470) .IYw m mnN9. i n' m*n nun IOW.. WY N 1 414 1 1ros Nn 1111017•11.0 i N7m MOM wn4nal MI Nn m mown. I n AIM N. 470 Im N 7014 1 ...OW. T9TYII m'MOWN 1 Ma TM MIn P 1N f1Y1 9.r mw WIN 1111 WO a1. LP p WO LEGAL DESCRIPTION fe Y .r.I w .i 14 •107.17 wv4. 1 w.1 °u iYlY7 lnw: MI 14 ow.in W1 i r w W i ii i :°.Lu fir 1711.1 IV al I, TO LW OW WWI 1111.1 a vm it �IY 6 a i yi Pwll MO 1•101 ww�a. lal 141 711.1 �Y r: r y in wi w nln Ir, 741 Of am dra.n owlu 1N.1'.1'11� 4•• f w.ii ihY2 l NI :i 1 howl I:ro. m 19111•41 N4 t 1 I11 N I4 M1.1 LEGEND 411170 1117, NII71r Imm NN71• MT Mr Nova N1 OW N1�1 lIr [UMW 1 LOCATION MAP _r— blscs4l.i W YT9m. Lot onto WW1 IOU 140 Wvm 11114 Imron9 OM yar Y is-"land Was amended in February, 1984 to "R -II _.(Mixed .Residential with '3-6' dwelling ;f units per acre) ;114 i Dw NO T, of SUBJECT PARCEL Lexington South 1 orth 1983 Annual PUD Review PHASING 1. 1978 -198, 2. 1983-19E35 3..19E5 1988 �...4: 19E58-1992 =Land Sold /Developed__, t EXHIBIT LB ltd. bus- GB gen.bus. CSC c.ornm.shpng.cnlr. _i dedicated Tf3 parks -open apace r.•• hiking trail all purpose trail bikes Land Use Plan Rt (2un, c)R1- E(tun,ac) R2 mi=.res.(J- 6un.,ac) R3 mis.res.(6.12un -lac.) R4 multiple 02+un. /ac) r.�r -rrr� r /L j r T L-' EJECT ARC III, P r S;p444, 111z'��� g';':u A. ���i►J:�4R IN/ e 4,44„ ►��nn A cy H A B Vt.LLE 6 ,T MENDOiA P R-11 I AaJE CT PARCEL DA fc'3. TA C0i., ry ri ROSEMOIX.7 COMMERCIAL PLANNED DEVELOPMENT MEMO TO: KEN VRAA, DIRECTOR OF PARKS AND RECREATION FROM: THOMAS L. HEDGES, CITY ADMINISTRATOR DATE: FEBRUARY 24, 1984 SUBJECT: NAMING OF PARK LANDS /CITY OF EAGAN In official action that was taken by the Eagan City Council at a regular meeting held on Tuesday, February 7, 1984, 14 parks were renamed in accordance with the recommendation for renaming the parks as set forth by the Advisory Parks and Recreation Commission. Those parks include: Oak Chase Park, Thomas Lake Park, Carnelian Park, Cinnamon Park, Country Home Park, O'Leary Park, Fish Lake Park, Berry Patch Park, Pilot Knob Park, Ridgecliff Park, Walnut Hill Park, Wescott Station Park, Woodhaven Park, and Meadowland Park. The City Council excluded from their official authorization of park names six (6) other park lands and are suggesting to the Parks and Recreation Commission alternative names for those parks. The following lists the park land names as recommended by the Advisory Commission, immediately followed by a new name as a suggestion from the City Council: 1) Downing Athletic Fields 2) Stonecutter's Park 3) Robber's Ravine Park 4) Barley Corn Park 5) Logger's Trail 6) Trapp Farm Park Northview Athletic Fields Quarry Park Ravine Park Moonshine Park Highline Trail There was no recommendation, however, the City Council felt there might be family tension if Schwanz, Trapp, or some other family name is used for this property. If a family name is to be used, it should clearly be the name of the family who either originally settled the property or has had ownership to the property longer than any other family.) The City Council appreciates the work the Advisory Parks and Recreation Commission has put into the renaming of the park land and was especially excited about the creativity in using unique names. The main reason for changing two of the park land names back to the original, Northview and Highline, is due to the community -wide name recognition of those two parks, much the same as Carnelian Park. The reason for changing Robber's Ravine Park was basically a feeling that the word, "Robber's might not provide a good connotation throughout the community and, furthermore, the name is quite lengthy. The reason for changing Barley Corn to Moonshine is one of identification. The City Council concluded that a majority of people using the park might not associate Barley Corn with the making of alcohol, whereas, Moonshine more clearly defines historical significance of an activity that once occurred in that park. CITY ADMINISTRATOR /DIRECTOR OF PARKS RECREATION February 24, 1984 Page 2 The minutes that were drafted by the Assistant City Attorney at the February 7 City Council meeting are in error and will be corrected at the next City Council meeting. The City Council is suggesting that the Parks and Recreation Commission re- examine the naming of the six (6) parklands that were not changed by official action of the City Council. Please make that correction to the Parks Recreation Commission members at your next regular meeting. City Administrator TLH /kf MEMO TO: ADVISORY PARKS RECREATION COMMISSION FROM: KEN VRAA, DIRECTOR OF PARKS RECREATION DATE: FEBRUARY 23, 1984 SUBJECT: FISCAL YEAR 1985 LAWCON /LCMR PARK GRANTS At the February meeting of the Advisory Parks Recreation Commis- sion, staff made a brief presentation on possible changes for the fiscal year 1985 LAWCON /LCMR Grants program. Although the Metropolitan Council has not adopted its final review criteria, it would be appropriate for the Advisory Parks and Recreation Commission to determine its priorities for grant applications to insure that these applications can be submitted on a timely basis. Therefore, staff has prepared the following information relative to potential park sites for your consideration. 1. Coachman Park In 1979 the City received an acquisition grant to acquire a portion of now Coachman Park. This grant was awarded to the City under the entitlement of a community athletic complex for Section 9. The amount of the grant award to the City was for $99,000. Of this amount approximately $33,000 was of state LCMR funds. Because there is a $200,000 maximum award for LCMR funds to any single project, there remains at least $170,000 of funding which can still be sought for development of the this park area. The working proposal currently being reviewed for a possible park bond referendum, indicates that Coachman Park's development would cost approximately $220,000, thus making it eligible for the funding under the LCMR /LAWCON cost haring formula. 2. Schwanz Lake Park The designation of Schwanz Lake Park as a community park may give this park area some priority for grant funding. However, there are three identifiable problems at this time which may affect the awarding of funds to the City for this park. These three problems are as follows: 1) the City does not currently own the property although it has been designated for acquisition under the Lexington South PUD. Assuming that Mr. Curry follows through with his intentions of deeding this property to the City by October of 1984, this concern will be eliminated; 2) there remains approximately 1.4 acres of additional shoreline aquisition from three private property owners whose lot lines touch upon the south shore of Schwanz Lake. This aquisi- tion was noted in the systems plan study. Should the determination be made that a grant should be submitted for Schwanz Lake Park for development, direction should be given to the City Attorney's office to proceed with negotiations for purchase of this land. Acquisition costs could become a part of the grant application under a combined development /acquisition proposal; DIRECTOR OF PARKS RECREATION /ADVISORY COMMISSION February 23, 1984 Page 2 3) Access to Schwanz Lake Park is to be from the proposed future South Wescott Hills Drive. Because the timing of this road construction is uncertain, it may affect the ranking of the grant. This can be somewhat mitigated by the inclusion of a temporary access road on the alignment of the future road bed. Including the optional shelter building for Schwanz Lake, development costs are estimated at $390,000. Under current formulas and at this grant maximum, the City could receive a total of $150,000 assuming sufficiently high rankings. 3. Capricorn Park Capricorn Park has been designated as a quasi community park facility under the park system plan. Estimated cost for the development of this facility is $460,000. Like Schwanz Lake, assuming high enough grant ranking, the City could expect to receive as much as $150,000 toward these development costs. Capricorn Park, because of its size, service area, accessibility by major roadways, as well as site suitability, lends itself toward being ranked as a significant project. 4. Rahn Park Staff has considered the Phase 2 approach to the development of the athletic fields at Rahn Park. However, the City has already received, under the previous acquisition and Phase 1 development grant, $170,000. Current guidelines prohibit more than $200,000 maximum for any single project and, therefore, would limit the City to receiving only an additional $30,000 toward the Phase 2 development. 5. Thomas Lake Park /Blackhawk Park The Director of Parks and Recreation has been approached by Mr. Ed Dunn to determine the interest of the City in acquiring, through purchase, the parkland designated under the existing PUD's for dedication, and in the case of Blackhawk Park, the offer to sell additional land to the south of Black hawk Lake. Under the proposal to acquire through purchase parkland shown to be dedicated under the PUD agreement, the City would acquire the land with a grant application allowing the City to have earlier control of the property and then reinstating a cash dedication requirement on the adjacent land parcel which would generate future cash dedication fees exceeding the City's share in the cost acquisition procedure. This would be similar to acquisition of designated park property along Blackhawk Lake. Staff has a concern for the rankings of acquisition applications at this time as the ranking criteria is now heavily weighted toward development type projects. Staff has been considering DIRECTOR OF PARKS RECREATION /ADVISORY COMMISSION February 23, 1984 Page 3 a possible development project for Thomas Lake Park but without acquisition of the property or acquisition pending, it is very unlikely the City would receive approval of a grant application. The Advisory Commission should make a determination of which grant applications it would like to have submitted for the fiscal year '85 grant cycle. Members should keep in mind that it may now submit more than one grant application. Members must also keep in mind that matching funds will be required by the City should the grants be awarded to any one or all of the projects submitted. There is insufficient funding within the park site fund to cover these matching costs and could only be made available through a successful parks bond referendum or special assessment levy. ACTION TO BE CONSIDERED ON THIS ITEM: Advisory Parks and Recrea- tion Commission is asked to select for recommendation to the City Council,, grants to be submitted for 1985. Director of Parks and Recreation KV /j j /kf MEMO TO: Subcommittee on Special Issues, Advisory Parks and Recreation FROM: Ken Vraa, Director of Parks and Recreation DATE: February 22, 1984 SUBJECT: Tot Lots /Play Areas Background The Advisory Parks and Recreation Commission on February 2, 1984, requested that the Subcommittee on Special Issues review and /or develop a policy for tot lots and play areas in condominiums and multiple housing areas. The staff has initiated a preliminary study of the issue and has the following information to report. A review of the District #196 population statistics indicates that there are 3.4 individuals per single family home, duplex 2.4, and quads /townhomes at 1.9 individuals per residence. In addition, these school census figures indicate that there is approximately .65 children of pre and school age for multiple dwelling units. There are no records which indicate number of children by the number of bedrooms per living unit. Staff has also conducted informal telephone survey of developments within Eagan. Duckwood Trails apartments, Coachman Oaks and Carriage Hills resident managers were contacted to ascertain the makeup of its residents. Resident managers indicated that they did not have an accurate count of the number of children within their living units. Most, however, cited "very few children" were in their complexes. Contact has also been made with nearby communities inquiring if they had a policy or practice for requiring tot lots or play areas in multiple dwelling units. These communities indicated that they have not approached the multiple dwelling units with such a practice or policy. Issues To Be Considered It would seem that the Advisory Commission should consider the following issues when determining whether a tot lot or play area should be required in multiple dwelling areas. 1. Total number of units 2. The number of bedrooms within the units 3. Proximity to neighborhood park facilities 4. Type of ownership (rental unit, condominium unit, homeowner's association, etc.) The Subcommittee should discuss other issues involved with the consideration of the needs for tot lots or play areas. This would include the discussion of the purpose of a tot lot in relationship to the distribution of neighborhood park facilites. Memo to Subcommittee February 22, 1984 Page 2 There has also been the concern expressed that tot lots, while important to the health and happiness of younger children, if they are not maintained or properly developed by the homeowners association or developer they fulfill no purpose whatsoever. Another concern involves creating a play space which best fits the needs of the residents. If a tot lot is required when the predominance of residents is adults, it may actually take away from the open space necessary for adult type activities. This being the case, Commission may wish to consider the possibility of requiring the developer to provide a common space designated for open play with the homeowners associations making the determina- tion of what occupies that space once the development has been completed and occupied. There is also the recognition that the larger multiple dwelling units, for example Carriage Hills, Coachman, and Duckwood Trails apartments, have generally included recreational activities as an amenity to their development. Tennis courts, pool areas, and play apparatus are generally included in these developments to enhance their value to potential buyers. Members may note the marketing techniques now being used by Orrin Thompson Homes with Lexington Place. Here they are emphasizing the fact that a separate facility is being planned to accommodate adults in a year -round setting. This memo is provided as background for discussion purposes only w h4 the intention that additional direction to the staff will b: q' en. Direc Parks and Recreation KV/jj MEMO TO: ADVISORY PARKS RECREATION COMMISSION DIRECTOR OF PARKS RECREATION, KEN VRAA FROM: RECREATION PROGRAMMER, DOROTHY PETERSON RE: REVIEW OF POLICY FOR ISSUING PERMITS FOR SOFTBALL AND BASEBALL SCHEDULED ON CITY FIELDS AS ESTABLISHED, 1983 REVIEW OF FEE SCHEDULE FOR THE USE OF NORTHVIEW ATHLETIC FIELDS FOR WEEKEND TOURNAMENTS 1. POLICY FOR ISSUING PERMITS: March 1984 The policy instituted in 1983 requiring game schedules prior to issuing permits was partially successful. E.A.A. provided the department with all of their game schedules for City fields. A comprehensive maintenance schedule was estab- lished from the game schedules. Important information learned included items such as only three games were scheduled on the Rahn 90' for the entire season. E.A.A., R.A.A.A.: The information received regarding school fields for which the department has joint maintenance agreements was far too general. It consisted of a copy of the permit the association received from the school district. For the Thomas Lake Elementary School fields, for example, the permit reads Mondays through Fridays 4 9 P.M.; Saturdays 9 A.M. 9 P.M. and Sundays noon 9 P.M.. The fields were not, in fact, used that heavily. MEND EAGAN: Sent no game schedule, only a projection on the number of teams and where they wished to schedule them. Despite efforts to be sent specific game schedules and not the "wish list none were received. No permit was written. They used the fields! Adult organizations requesting fields by specific dates included the Burnsville -Eagan Women's Church League and the Knights of Columbus. Their needs were accomodated. The policy worked well when followed. Improved cooperation is needed from the Athletic Associations. With the field crisis in 1984, direction is needed as to the use of some neighborhood fields, in particular Woodhaven Beryl and the two fields at Carnelian. Should they be scheduled: 1. Youths Only 2. Youths and /or Adults 3. Not at all SOFTBALL BASEBALL PAGE TWO MARCH 1984 2. The fee schedule for the use of Northview Athletic Fields was not severely tested. One, one day outside tournament was held. All other events were City sponsored. E.A.A. has inquired regarding the availability of the fields for one day in July. More information will be necessary in order to determine whether fees are required. It appears that no fee adjustments are necessary. DP /js BEA BLOMOUIST MAYOR THOMAS EGAN JAMES A. SMITH JERRY THOMAS THEODORE WACHTER COUNCIL MEMBERS March 1, 1983 CITY OF EAGAN 3795 PILOT KNOB ROAD P.O. BOX 21199 EAGAN, MINNESOTA 4 55122 PHONE 454 THOMAS HEDGES CITY ADMINISTRATOR EUGENE VAN OVER BEKE CITY CLERK Softball /Baseball Leagues: The City of Eagan Parks and Recreation Department has established a new policy in issuing permits for scheduable softball and baseball activities on City fields. With the increase in City population, the growth in the popularity of softball /baseball, the emergence of RAAA teams and the limited availability of field space; change in procedure is necessary. To permit will be written prior to the department receiving a copy of your game schedule. Since the last step in preparing a schedule is assigning games to fields, field permits may he specifically addressed. The City and school districts share joint maintenance agreements. It is therefore necessary for the parks and recreation department to receive schedules for age groups that use school fields in the City so that timely maintenance can be scheduled. EAA: Schedules for school fields at Metcalf, Cedar Elementary and the 3 Rahn School fields are required for maintenance purposes. Schedules for age groups that might use the Rahn6O!, Rahn 90' Carnelian or Woodhaven are needed to issue a permit. MEMD- FAGAN: The schedules for age groups that might use Pilot Knob School fields, McKee and the Northview 90' are required for maintenance scheduling and permit. The availability of Blue Cross field 2 is highly unlikely due to an increase in adult teams. RAAA: For maintenance purposes the schedules for fields at Thomas Lake and Northview Elementary Schools are required. The schedules for age groups that need access to a City 90' diamond are required for permit. Adult organizations, that include teams from other communities, should not request a disproportionate number of fields from the City of Eagan in relationship to the number of teams from Eagan. THE LONE OAK TREE THE SYMBOL OF STRENGTH AND GROWTH IN OUR COMMUNITY. Softball /Baseball Leagues March 1, 1983 Page 2 The use of practice fields has not changed. The policy that remains is a first come first served basis. A scheduled game or a special event group, carrying a permit, have precedence over a practice. It is anticipated that by mid to late April you will be prepared to schedule your fields. Direct any questions you might have to the Parks and Recreation Department 454 -7802. nP:bp Sincerely, norothy Peterson Fagan Recreation Programmer TO: ADVISORY PARKS AND RECREATION COMMISSION FROM: KEN VRAA, DIRECTOR OF PARKS AND RECREATION RE: FEE SCHEDULE NORTHVIEW ATHLETIC FIELDS April 1983 In March of 1980 the City established the following fees for the use of the Northview Athletic Fields for week -end tournaments: Class One: Eagan Adult Leagues 1. $50.00 per week -end for trash pick up and extra service on toilet facilities. 2. $100.00 damage deposit, refunded if no damage occurs. Class Two: Tournaments that include non resident teams. 1. $100.00 per week -end for trash pick up and extra service of toilet facilities. 2. $100.00 damage deposit, refunded if no damage occurs. 3. $5.00 per team basic charge. Maintenance: If maintenance is desired, payment shall be made by the tournament sponsor for actual pay and actual fringe benefits for equipment at actual rental rates. All Eagan adult leagues are now directed by the City. In addition, be- ginning in 1983, the softball fields will have permanent base anchors in place which requires different procedures for installing. Therefore, a change in policy, procedure and fee structure appears necessary at this time. The suggested changes are as follows: 1. Eliminate the class one category as it no longer applies. 2. Adjust the field use fees to reflect maintenance costs. Proper maintenance of the fields during the course of a tournament is necessary now that permanent equipment is in place. 3. In essence, more than one category of user fees is no longer required. The suggested new fee scale is: Tournament fees for Northview softball fields. 1. $125.00 for a one day tournament. 2. $150.00 plus $5.00 per team for a two day tournament. 3. $150.00 damage deposit, refunded if no damage occurs. The City will drag the fields and set out the permanent bases for the tournament sponsor each day. An additional cleaning of satellites and trash pick up will also be scheduled. To cover these additional costs to the City, an increase in field use fees seem appropriate. Fee Schedules Northview Athletic Fields Page 2 Staff has reviewed fees charged by other communities and found a wide variation in fee structures. For example, Plymouth charge $35.00 per field per day; plus $6.00 per hour to have a staff person present. Eden Prairie does not allow non -City leagues or teams to use its fields. Charge to City teams is $50.00 per day. St. Louis Park charges $30.00 per day /per field. There are additional charges made for use of the shelter and lights. The City provides one drag of the fields; no outside teams may use the fields. FOR COMMISSION ACTION To review the rate structure for charges made for the use of Northview Athletic Fields and recommend a fee structure for immediate implementation. Staff would also like to retain discretion for charging a lessor fee for youths and instances in which a limited one drag event is requested.