Loading...
06/02/1983 - Advisory Parks & Recreation CommissionJune 2, 1983 5:00 P.M. EQUIPMENT DEMONSTRATION NORTHVIEW ATHLETIC FIELDS 7 :00 P.M. REGULAR MEETING EACAN CITY HALL 4. OLD BUSINESS 5. NEW BUSINESS 6. OTHER BUSINESS /REPORTS 7. ADJOURNMENT TENTATIVE AGENDA ADVISORY PARKS AND RECREATION COMMISSION EAGAN, MINNESOTA 1. CALL TO ORDER AND PLEDGE OF ALLEGIANCE 2. APPROVAL OF AGENDA AND APPROVAL OF MINUTES OF MAY 5, 1983 3. DEVELOPMENT PROPOSALS a) Duckwood Trails 2nd Addition b) Parkcliff 2nd Addition c) Sunset 2nd Addition d) Robin Lane First Addition e) Blackhawk Acres f) Mallard Park 2nd Addition Replat a) Easement Request Oak Chase Park b) Systems Plan Study Park Plan Review c) a) Policy Statement Unauthorized Park Usages a) Willmus Family Properties; Letter of Response b) Department Intern June 2, 1983 5:00 P.M. EQUIPMENT DEMONSTRATION NORTHVIEW ATHLETIC FIELDS 7:00 P.M. REGULAR MEETING EAGAN CITY HALL 4. OLD BUSINESS 5. NEW BUSINESS 6. OTHER BUSINESS /REPORTS 7. ADJOURNMENT TENTATIVE AGENDA ADVISORY PARKS AND RECREATION COMMISSION EAGAN, MINNESOTA 1. CALL TO ORDER AND PLEDGE OF ALLEGIANCE 2. APPROVAL OF AGENDA AND APPROVAL OF MINUTES OF MAY 5, 1983 3. DEVELOPMENT PROPOSALS a) Duckwood Trails 2nd Addition b) Parkcliff 2nd Addition c) Sunset 2nd Addition d) Robin Lane First Addition e) Blackhawk Acres f) Mallard Park 2nd Addition R Replat a) Easement Request Oak Chase Park b) Systems Plan Study Park Plan Review c) a) Policy Statement Unauthorized Park Usages a) Willmus Family Properties; Letter of Response b) Department Intern SUBJECT: APPLICANT: LOCATION: EXISTING ZONING: DATE OF PUBLIC HEARING: ZONING AND LAND USE BACKGROUND CITY OF EAGAN PRELIMINARY PLAT SUN CLIFF ADDITION ADVANCE DEVELOPERS INC. DATE OF REPORT: JUNE 23, 1983 PART OF THE NW4 AND PART OF THE NE4 OF SECTION 29 EAST OF BEAVER DAM ROAD MEDIUM DENSITY (9 -12 UNITS PER ACRE) UNDER EAGAN HILLS WEST PLANNED DEVELOPMENT JUNE 28, 1983 REPORTED BY: DALE C. RUNKLE, CITY PLANNER APPLICATION SUBMITTED: An application has been submitted for a pre- liminary plat, Sun Cliff, consisting of approximately 89.1 acres con- taining 277 dwelling units of which 191 are proposed for small single family lots in part of the NW4 and part of the NE4 of Section 29 ly- ing south of Diffley Road and between Beaver Dam Road and Blackhawk Road. Presently, the property is zoned PD (Planned Development District) in which the planned development agreement was entered into April 3, 1979. According to the planned development, it is designated a medium density ranging from 9 -12 dwelling units per acre. The Comprehensive Guide Plan designates this parcel as R -3 (Mixed Residential) with a density of 6 -12 dwelling units per acre. In reviewing this particular development proposal, one has to go back to the history and review of the Eagan Hills West Planned Development which was approved April 3, 1979. The first phase of the Eagan Hills West Planned Development is the Meadowlands Addition which is a small- er single family subdivision between Rahn Road and Beaver Dam Road south of County Road 30. The minimum lot size in the Meadowlands Addi- tion is 75' width by a 125' for an area of 9,375 square feet. The area east of Beaver Dam Road has been established according to the planned development as a medium density site with a density range of 9 -12 dwelling units per acre. The application submitted is a request to lower the density and provide a smaller lot single family and du- plex subdivision with an overall net density of 5.39 dwelling units per acre. The proposed plat will contain approximately 89.1 acres which includes the portion to be dedicated for parkland and a 14 -acre outlot at the quadrant of Diffley Road, Beaver Dam Road, and Black hawk Road to be developed at a later date at a higher density. There- fore, the net developable land including streets is 62.6 acres. The applicant is proposing 191 single family lots and 43 duplex lots for a total of 277 dwelling units. CITY OF EAGAN PRELIMINARY PLAT SUN CLIFF ADDITION JUNE 28, 1983 PAGE TWO In the Sun Cliff preliminary plat, the applicant is proposing to con- struct a minimum single family lot which would have the dimensions of 60' lot width by 125' lot depth or a total of 7,500 square feet. The average single family lot in the development is 9,200 square feet. The minimum duplex lot would have a dimension of 80' lot width and 130' lot depth for a minimum square footage of 10,400. The average duplex lot would contain 12,070 square feet. Enclosed is an exhibit listing the lot and block with square footages of all lots within the proposed Sun Cliff Addition. This proposed subdivision is below mini- mum standards for R -1 and R -2 zoning. However, single family lots and duplex lots of this size have been approved in the past by the City. When reviewing this particular plat, one has to review the planned de- velopment agreement which has some different criteria for setbacks and regulations for the planned development instead of just referring to the Eagan City Code. Staff has also included a copy of the Eagan Hills West Planned Development agreement for your review. In reviewing the setback issue on this particular development, staff would like to point out and make one recommendation regarding this preliminary plat. On the west side of Beaver Dam Road or the lots accessing Beaver Dam Road in Meadowlands Addition, presently there are 30' setbacks from the right -of -way line. The City Code would re- quire that the setback from Beaver Dam Road would be 40'. However, for the consistency of the development and setback on Beaver Dam Road, staff suggests that the lots on the east side of Beaver Dam Road also have a 30' setback instead of the required 40'. The 30' setback should also be on corner lots with street accesses onto Beaver Dam Road. The applicant has proposed on interior streets that a 20' side setback be allowed on corner lots or interior streets. This provision is spelled out in the planned development agreement, however, it is at the build- ing inspector's discretion. Therefore, this should be reviewed on an individual basis. Another item in regard to the planned development agreement is that the developer has the sole discretion to reduce density within the planned development. Normally, staff would have processed an amend- ment to the planned development for a lesser use. However, the plan- ned development states that this is allowed, therefore, the planned development states this is a permitted use at the discretion of the developer. In the planned development agreement, there could be some flexibility to discuss densities and number of lots within the Sun Cliff Addition. The developer has provided a lot dimension and has structures which can be built meeting all other ordinance requirements. As stated earlier, this preliminary plat also includes a 12.5 acre parcel which will be dedicated to the City for parkland. The Park Commission is in the process of reviewing this particular parcel as it relates to the overall park dedication and will be providing com- ments to the City Council regarding size dimension and how this par- ticular parcel will fit in to the neighborhood park system. It is CITY OF EAGAN PRELIMINARY PLAT SUN CLIFF ADDITION JUNE 28, 1983 PAGE THREE staff's understanding that this neighborhood is in particular need for a neighborhood park and is on one of the top priorities for providing parkland for this particular neighborhood. The developer is ahead of the park dedication requirements for the planned development, however, understanding the need of the City; there may be some negotiation is as to when the City will receive this dedication of parkland. The applicant is proposing to phase this particular development start- ing on the west side of Beaver Dam Road. It is staff's understanding that the applicant is looking at trying to get some grading done this fall and surfacing the streets early spring. Therefore, the first phase of the development should be in the construction stage early 1984. The applicant is proposing to provide a curvilinear street design with two streets having through access to Beaver Dam Road and Blackhawk Road. The applicant is only proposing two cul -de -sacs in the develop- ment proposal which is reasonable in this large tract development. Therefore, the access looks adequate to handle this proposed subdivi- sion. If approved, the preliminary plat should be subject to the following conditions: 1) Deviation from lot size shall be in accordance with the exhibit in this report stating all lot sizes within this development. 2) The 30' setback be allowed on Beaver Dam Road. 3) The parkland be reviewed by the Park Commission and subject to their recommendation. 4) A development agreement be signed prior to the application of final plat. 5) The plat be reviewed by the Dakota County Plat Commission because it abuts a County road. 6) All other applicable ordinances be complied with. 7) All easements be dedicated as requested by City staff. DCR /jach CITY OF EAGAN PRELIMINARY PLAT SUN CLIFF ADDITION JUNE 28, 1983 PAGE FOUR ENGINEERING RECOMMENDATIONS 8) A detailed grading and erosion control plan shall be submitted for approval. 9) Public right -of -way for Sun Cliff Road and Bear Path Trail shall be dedicated at 60' in width. 10) A ponding and utility easement shall be required around Pond AP -7 encompassing the high water elevation of 894.4. 11) The costs for all public improvements, with the possible excep- tion of some storm sewer, shall be the sole responsibility of this development. RMH /jach MEMO TO: THE ADVISORY PLANNING COMMISSION, C/O DALE C. RUNKLE, CITY PLANNER FROM: RICHARD M. HEFTI, ASSISTANT CITY ENGINEER DATE: JUNE 23, 1983 SUBJECT: SUN CLIFF ADDITION PRELIMINARY PLAT The Engineering Division of the Department of Public Works has the following comments for consideration by the Planning Commission and City Council regarding this proposed preliminary plat. DRAINAGE /TOPOGRAPHY The existing topography over this proposed development consists main- ly of rolling grassland with numerous small hills and depressions. Even so, the general slope of this parcel is towards the southwest to Pond AP -22 with a normal water elevation of 873. In addition to this Pond, Pond AP -7 is also located within this proposed development to the northeast of Pond AP -22 providing storage for storm water runoff with a normal water level of 885.8. Presently, neither pond has a positive outlet. As a result of the rolling topography, the proposed grading plan will require taking excess material from the hills to fill in the depres- sions to provide for buildable lots. Subsequently, roughly 50% of this proposed development will be excavated while the other 50% of this development will be filled. The proposed grading will drain ap- proximately 40 acres of this parcel into Pond AP -7 and the remainder of this parcel with the exception of the proposed parkland will be collected by an internal storm sewer discharging into an existing 27" trunk storm sewer located at the intersection of Bear Path Trail and Beaver Dam Road. Meanwhile, the park is being proposed to be left in its natural condition. UTILITIES Existing utilities located within Beaver Dam Road to provide servi- cing this proposed development include an 8" water main and an 8" sanitary sewer. Sanitary and water services were also constructed to proposed lots along the east side of Beaver Dam Road along with water main and sanitary sewer stubs to proposed street locations as a part of Improvement Project 236 and was completed in 1980. These utilities are of sufficient size, capacity and depth to service this entire development. The utilitiesfor this proposed development are planned to be install- ed under City Contract. This will require the developer to petition for the necessary public improvements, such as sanitary sewer, water main, storm sewer and street construction. In addition to the normal lateral improvements to be provided, an outlet to Pond AP -7 should be provided in conjunction with the internal storm sewer for this pro- posed development. ENGINEERING REPORT SUN CLIFF ADDITION PRELIMINARY PLAT JUNE 28, 1983 PAGE TWO STREETS Access to this proposed development can be accomplished off of either Beaver Dam Road along the west boundary of this proposed development or Blackhawk Road located along the easterly boundary of this propos- ed development. Access from County Road 30 to this development should be restricted. Currently, Beaver Dam Road is constructed to its ulti- mate design section of 44 feet wide with bituminous pavement and con- crete curb and gutter, while Blackhawk Road is in the process of.being upgraded from a gravel road to a 48' wide bituminous surface street with concrete curb and gutter. The proposed internal street configuration contains only two cul -de- sacs which are both within the maximum length for cul -de -sacs as re- quired by the City Code. Meanwhile, the remainder of the streets pro- vide for excellent traffic flow as they are all interconnected. RIGHT -OF- WAY /EASEMENTS Right -of -way for the internal streets shall be dedicated with the fi- nal plat. The developer has elected to incorporate 50' right -of -ways for the public streets with the exception of Sun Cliff Road which is proposed to be 60'. This is in order to accommodate a trailway which was proposed as a part of the planned development agreement to connect Pond AP -7 with the parkland in the southwest portion of this proposed development. However, the circumstances requiring this trailway have now been changed in reducing the densities from multi family residen- ces to single family residences. The trailway was originally intend- ed to be a division between high and low density multi family resi- dences. Subsequently, a trailway will not be required and the right of -way width for Sun Cliff Road may be reduced to 50'. On the other hand, since Deer Hills Trail and Bear Path Trail connect to collect- or streets in Beaver Dam Road and Blackhawk Road, the right -of -way for these streets should be a minimum of 60'. This extra width will improve visibility by increasing setbacks. A ponding and utility easement will be required around Pond AP -7 en- compassing the high water elevation of 894.4. This should be dedi- cated as a condition of final plat approval. Additional easements to be dedicated shall include a 10' utility easement adjacent to all publicly dedicated right -of -way, a 5' utility and drainage easement along all exterior lot lines, and a 10' utility and drainage ease- ments centered over all interior lot lines. It should be noted that a small segment located along the southern boundary of this proposed development is City property and is not shown on this preliminary plat. The approximate location of this is along the backyards along Fox Ridge Court and encompasses a por- tion of the Hi -line bike trail. ENGINEERING REPORT SUN CLIFF ADDITION PRELIMINARY PLAT JUNE 28, 1983 PAGE THREE ASSESSMENTS All trunk area assessments have been levied over this proposed devel- opment. Consequently, with the exception of some obligation for the construction of an outlet to Pond AP -7, all other costs for the instal- lation of utilities and streets shall be the sole responsibility of this development. The amount of the City's obligation will be deter- mined with the preparation of the feasibility report for the construc- tion of public improvements within this proposed development. For assistance with any questions regarding this matter, please do not hesitate to contact either Thomas A. Colbert or me. Respectfully submitted, Richard M. Hef )0 P.E. Assistant City Engineer RMH /jach AP -20 A kk AP -8 869.0 876.0 A ry 4 S4' A-II A wi-=1, p'st 1'DRIV :AP- 13 S 906.2 r 9/2.0 -N 1 71 NI� 12 AP-19 93 .0 rL'r A P=29 '916O. AP -30 ��$4t0� 923.Oi ri 922.0 t.' 1/ z �7 9260 925 Sj 928 00 v �i'� 9380 AP 17 9440 9300 J DAKOTA' COUNTY 938.4 y�+ A-YY A tiy -s L Ao� AP i..l•hYY j,, NDUSTRIAL� \'ARKS A b A A 7, i�VA0 A -er A-bbb A -f bp.,/ A- f AC AP-38 8380 A V .OAN AP ^5CENTER8400 k c BP -1 p.r- 816.5 _t 7913 7990 s '8. 8 0 BELV R,O T' `14.14 797. GR l O/2 AP 8LACKHAAIK 15 803.6 rf r ..'1 b.Lt SANK 808.0 I1 ��X\ t- AP 2r 7 /f. 656 6 8 660� f,' 11 7-- Tl f, t rt A 3 r A 9 `^GDAR OVE Ate f v -i F 1 r ,ice 1 E '1 2i 21 A -cc AP -24 872.0 eeH r AP -26 AP -9 878.5 VAS 892.3 888.0 898.0 L AP -25 880.5 885.0 925.0 AP -I1 889.2 893.0 885.3 bb 29896°.' 12 AP -23 i p. 9,3 8 i r 6 n JP -1 45 JP-2 7"'/ 7 c795.0 a 843.7 i AP. e 7 806.0 8500 80 O oC A cK* 4t 7963 AP 2 8 909 1 920 O A45.:7:, It BP-82 1 -931.0 9340 CP -6 8 0 y- 4. 06 0 1 30 8 4/. 39. 0 p 8 ao20 y... 1 r J J a CT 8P -26'. Y Z7 T AND4L A P PAR 893 5 90/5 1 I LP_3 AP-33 s RCA r 980.0 EsrAtE a F 1 9840 t 1 77 -4 k iii i Lr 905.0 ill I 9/0 O ji APPLE VAL LEY BP -29 808.0 8/4.0 BP -3 881 3 8930 BP -27 B c 882.0 it 886.0 1„ 8 880 0 o xi op 1 ti BP -6 P-12' 880.3 905.0 -1B BP�10 'B g.., 27' �LS43lu�.r BPi BP T3 J 9/9 x9150:' 8 h 9210 s 9260 BP ZI 916 _tijl'7 ,1 31 2ep- BP LItl7 1 931 0 f 938 cal L- fry 911 9/9 RI a. ICI H AP -14 i 90 0 j m� 9I AP-I6, 919.8 894.2 I L.S. -20 AP 15 2___ 0 9 g /20 00 A -bbb 7uu 32 LP P-2 ,`"0 TA 1. 22 LP -8 9490 912 8 -f 434 LP-58 0 912.0 9/50 5 918.0 92/.0 2.4 JP5 1 8250. ,828 SKV0D4 1 E 8P -28 ,I JP l /8 862.0 g B -a 866 J` 49 i OVDALE LP -60 9600 962.0 BP-18 882.7 888.0 LP 7 9188 938.0 4 BP -16 898.0_ 9010 BP- 154/1 898.0 _a 902,0 0 1 902.0 g 01 8f c "9065 1 90 4 8 1 0 2 -1 JP-36 c 870.6 JP 873.2 869.4 2 872.4 8 L.S. -2` moo. LP- 6`' .04 92. 0 1 f LP 9 83 0= w 8390, x LP-I0 D -c 4 JP 7- L.S. JP-37 JP J 8i 87 0 8 1 LP 63� 856.0 858.0 r 1 ,7- r 8 4O_� ;r 8534 c"�.t*�. C: S36 8860 89.0 �a� n 1 :8.42 r-, C 277 q 4r, t t 1-1390P'727-8-.-3-'1 8P- �I 9023' 907C1-. a 906.54 L P a 92 `t 7 i 8 'P 8 2' LP -56 9640 970 V DA KO IA _JU r •s I F1 T 14. 416 672 CHIPMUNK ;I gi I i 660 N S WET TAP 1 WET TAP i 7.7_ ji: I., CHURCH 1 41 F 1 (,11 2 I -\TIt.+ABERWOLE I :668 's1 I _,If II cr i 7-11 A 1 o 669 o i---,!:—.p■ •',.'-N k., 1 .1 i r 7—E--- -1",., I 7 K i 4 5 1 4 T 66' 1 C T. j i' r 6 04 _Y f 1 0 E4 C).‘ T s. 24'! /64Y N- K iTh 4 4- Z 4 l 'eQ C l 1 --.—i 662 1_ 's 1 1 4 o DIFFLEY RD ,8- KIM wornimialrel sins motimnommummummummalt EASEMENT i 1 SEE SHT iO Block 1 2 Lot 1 duplex 16,060 2 duplex 10,400 3 duplex 11,840 4 dup. 15,370 5 dup. 13,970 6 dup. 10,650 7 dup. 10,625 8 8,000 9 7,500 10 78,5000 11 12 500 13 9,375 14 9,375 15 7,500 16 500 17 7, 00 18 7,50 19 7,500 2� 7,500 21 7,500 22 dup. 11,410 23 dup. 11,910 1 2 3 4 5 6 7. 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 SUN CLIFF Sq. Ft. 9,375 7,500 7,50 7 0 900 7,900 7,750 7,750 7,500 7,500 7,500 ,500 9,. 0 9,69 7,500 7,500 8,000 8,000 7,500 8,350 7,78$ 8 ;T410 7,500 7,500 10,000 Block Lot So. Ft. 3 9,1 2 8,22u 3 7,880 4 7,500 5 7,500 6 7,500 7 7,500 8 7,500 9 8,120 10 8,290 11 8,290 12 8,220 13 7,590 1 7,500 15 7,500 16 7,500 17 9,375 4 1 14,750 2 8,290 3 9,260 4 11,640 5 11,910 6 13,360 7 13,150 14,7? 9 16,1't 10 11,150 11 7,500 12 8,125 13 7,500 14 :,400 15 10 20 16 8,470 17 8,380 18 7,750 19 8,000 8,000 7,500 2 8,000 23 8,560 8,600 25 10,430 26 10,380 27 8,640 28 8,410 29 8,250 30 8,250 31 10,010 32 10,930 33 15,95" 34 35 36 13,1 15,540 10,500 EAGAN HILLS WEST PLANNED DEVELOPMENT AGREEMENT CITY OF EAGAN DAKOTA COUNTY, MINNESOTA THIS PLANNED DEVELOPMENT AGREEMENT, made and entered into this 3rd day of April 1979, by and between the CITY OF EAGAN, Dakota County, Minnesota, (Eagan) and CLIFF ROAD PROPERTIES, INC., with address at 21 Harrison Avenue North, Hopkins, Minnesota 55343 (Owner) and DUNN CURRY REAL ESTATE MANAGEMENT, INC., with address at 4940 Viking Drive, Edina, Minnesota 55435 (Developer). W I T N E S S E T H: WHEREAS, Developer proposes a Planned Development in Eagan to be known as Eagan Hills West (the Development) more particularly described in Exhibits attached hereto and incorporated herein by reference (the Exhibits), containing three hundred eighty four (384) acres of land more or less, said land legally described in Exhibit "A" (The Subject Land); and WHEREAS, Developer and Owner have agreed that Developer may proceed with the Development and the terms of this Agreement; and WHEREAS, it is the intention of Developer to proceed with the Development whereby the Subject Land will be subdivided pursuant to Minnesota Statutes, Chapters 505 and 462, and the Subdivision Ordinance of Eagan providing for the platting of land and to obtain final approval from Eagan for plats as the Development progresses; NOW, THEREFORE, it is hereby agreed by and between the parties hereto as follows: 1.) Development Owner intends to have Developer develop the Subject Land substantially in accordance with the general plans shown on the Exhibits and Eagan agrees to permit the Development subject to obtaining final approval for each plat of the Development from Eagan before proceeding with any work on said plat, unless otherwise agreed to by Eagan. Plats reasonably consistent with the Exhibits shall be approved by Eagan. In the event that the agreement between the Owner and Developer relating to the development of the Subject Land is terminated, and this Agreement has not been terminated, then wherever Developer is designated herein Owner shall, upon written notice to Eagan, be automatically substituted to and for Developer and be subject to all obligations, conditions, requirements and provisions of Developer, and be entitled to all rights and benefits herein relating to Developer. 2.) Exhibits The Exhibits attached hereto, incorporated herein by reference and made a part of this Agreement are: Exhibit "A" Legal Description Exhibit "B" Sketch Plan Exhibit "C" Parks, Wetlands and Circulation Plan Exhibit "D" Land Use Plan Exhibit "E" Zoning Map Exhibit "F" Dedicated Areas Requirements and Credit Exhibit "G" Street Access Map Exhibit "H" Density Chart (Eagan Ordinance 52.07, Subd. 5B) Exhibit "I" Eagan Zoning Ordinance Exhibit "J" Staging Plan 3.) Approval by Eagan Eagan hereby approves the Development as shown in the Exhibits; provided, however, that insofar as the Exhibits may vary from the written terms of this Agreement, said written terms shall govern. 4.) Term of Planned Development Developer represents that it intends to complete the Development within fifteen (15) years from the date hereof, so long as Eagan grants timely approval of each plat of the Development. Eagan limits its approval to said fifteen (15) year period; provided, however, Developer may request two (2) five (5) year extension periods of this Agreement by submitting a written request to Eagan on or before one hundred eighty (180) days of the anniversary date of this Agreement, occurring at the expiration of the initial fifteen (15) year term and the first five (5) year extension. Eagan may approve or deny, in its sole discretion, by a simple majprity vote of all members of the City Council and without a public hearing, the requested five (5) year extensions. 5.) Rezoning On or before December 31, 1978, Eagan agrees to rezone the Subject Land to Planned Development District pursuant to the current Eagan Ordinance No. 52, as amended to August 17, 1976, attached hereto as Exhibit "I governing Planned Development Districts. Such rezoning shall be supplemental to the present zoning of the Subject Land now in effect as evidenced by the zoning map which is attached hereto as Exhibit "E Any removal of the superimposed Planned Development District zoning or termination of this Agreement shall automatically result in the Subject Land being zoned only as the present zoning classification as shown on Exhibit "E 6.) Density Density of housing units (Units) in the Development shall be as more particularly shown in Exhibit "D provided, however, that the following specific conditions shall apply with respect to density: (01) Three thousand two hundred seventy -eight (3,278) Units shall be allowed in the Development; (02) Units in "high density" areas as identified on Exhibit "D" shall not exceed maximum densities now permitted under the Zoning Ordinance No. 52.07, Subd. 5B (Density Chart), shown on Exhibit "H and (03) Subject Land east of proposed I -35E shall not exceed six (6) Units per acre. The number of units specified in this paragraph is a maximum; less density shall be permitted in Developer's sole discretion. 7.) Major Street Dedications Owner and Developer agree to dedicate as part of each plat all streets within such plat; provided, however, that no dedication shall be made for rights of way for contemplated Interstate Highway I -35E, its access ramps or the rerouting of Blackhawk Road. The width of major thoroughfares within each plat shall be as shown on the Eagan Major Street Plan dated January, 1976. Dedication shall be made for streets within a plat upon recording of the final plat. Eagan's approval of a final plat shall include an assumption of the public duty to maintain the dedicated street or streets when construction is completed and accepted according to plans approved 2. 11.) Sidewalks Concrete sidewalks, in such widths and in such location as required by the applicable ordinance of Eagan in effect at the time of final plat approval, shall be constructed for lands within a. plat contemporaneously with the improvement of streets within the plat and be assessable to Developer. Eagan will consider reasonable exceptions to sidewalks as a plat is presented, and decisions as to said exceptions shall be within the reasonable discretion of Eagan. 12.) Street Lights Developer agrees to provide and Eagan agrees to accept a street lighting system for each plat pursuant to the applicable ordinance in effect at the time of a final plat approval. 13.) Building Setbacks Building setbacks shall be those established by the Eagan Zoning Ordinance in effect at the time of final plat approval, except that the following deviations shall be permitted: (01) Setbacks along all public streets, except major thoroughfares, shall be at least thirty (30) feet from the abutting right -of -way line except where topography or the location of existing trees require a lesser setback, in which case the setback may be reduced upon written authorization of the Building Inspector to twenty (20) feet. Any additional setback of less than twenty (20) feet shall require the approval of the Eagan City Council. (02) Sideyard setbacks may be reduced to a minimum of three (3) feet by the Building Inspector under conditions contained in 13 (01) provided that a minimum of fifteen (15) feet is maintained between adjoining (structures). Any sideyard setbacks of less than three (3) feet shall require the approval of the Eagan City Council. 14.) Preservation of Trees Developer agrees to comply with Eagan ordinances currently in effect related to preservation of trees and specifically will exercise reasonable efforts in residential areas to save mature, undiseased trees on the Subject Land which do not have to be removed for reasonable installation of buildings, streets, sidewalks, utilities or drainage improvements and construction activities related thereto. Developer agrees to mark trees to be saved over six (6) inches in diameter as measured at a point two (2) feet above grade that are adjacent to construction areas with a red band prior to any excavation, and to protect such trees by snow fences or other suitable enclosures and notify Eagan when the enclosures are completed prior to any excavation, if required by Eagan. Eagan recognizes that development of those areas designated for non residential use on Exhibit "D" will require extensive grading, filling and removal of trees. All diseased trees shall be removed according to City ordinance requirements. 15.) Retaining Walls Parts of the Subject Land are very uneven with respect to topography and it is generally the intent of both Eagan and Developer to reasonably retain the existing topography consistent with normal construction practices and necessities and Developer agrees to build retaining walls pursuant to reasonable requests of Eagan as the development progresses. 16.) Screening Coincidental with the submission of each plat for final approval, Developer shall submit a landscape and screening plan for any residential lots with a side yard or rear yard abutting a major or minor arterial or collector street. Eagan may require reasonable landscaping and screening of said lots abutting on such public streets at the expense of Developer and where said screening is required, it shall be a part of the Developer's Agreement required by Eagan for the plat. 4 by Eagan. At the time of final plat approval, Developer shall dedicate such part of the Subject Land as necessary to provide the following widths for that portion of the following major thoroughfares lying within the approved plat: (01) County Road #30 100' (02) County Road #32 150' (03) Rahn Road 80' (04) Internal Collector Streets 80' (05) Blackhawk Road 100' In the event any of the above major thoroughfares abut land not subject to this Agreement, the Developer shall only dedicate one -half of the necessary right -of -way to provide the above stated widths. Street widths not described above shall comply with applicable provisions of the Eagan Subdivision Ordinance at the time of approval of the appropriate preliminary plat. Eagan, Owner and Developer acknowledge that the streets identified in (02) and (05) of this section specify widths in excess of that required of standard minor streets or that necessary to provide reasonable ingress and egress to the lot owners and users of the particular subdivisions within Eagan Hills West (Excess Width); the Excess Width is fifty (50) feet as to (02) and twenty (20) feet as to (05) of this section. Eagan agrees to provide written certification to Owner and Developer at the time of final plat approval that the Excess Width is required for governmental purposes and that specifies the fair market value of the land within the Excess Width. 8.) Major and Minor Street Access Developer shall have access to major thoroughfares abutting platted lands as agreed upon between the parties at the time of each plat. Approval of a final plat shall permit access to major thoroughfares only as shown on Exhibit "G" or, in the alternative, the Developer shall deliver to Eagan recordable covenants restricting access for the particular plat to those locations shown on Exhibit "G However, if subsequent events, particularly development on the opposite sides of said major thoroughfares, indicate that additional accesses are advisable based on sound planning practice, Eagan agrees to reasonably consider Developer's application for said additional access. 9.) Assessments The parties mutually agree that all public improvements required and installed by Eagan related to the Development shall be assessed pursuant to Chapter 429 of Minnesota State Statutes. 10.) Park, Trail and Pond Dedication Developer and Owner will dedicate to Eagan at the time of final plat approval certain parts of the Subject Land as public parks, trail easements or storm water holding areas (collectively, Dedicated Areas). The Dedicated Areas are shown generally on Exhibit "C The total acreage of Dedicated Areas, manner of dedication and credit given pursuant to Eagan ordinances for required dedication are specified on Exhibit "F Developer and Owner will make such dedication for lands included within a plat at the time of final plat approval by Eagan. If the dedication made at the time of final plat approval exceeds the dedication requirements of Eagan Ordinances for a particular plat, then the Developer shall receive credit for such excess dedication to satisfy dedication requirements for subsequent plats. 3. 17.) Commercial Overall Plan As required by the Eagan Zoning Ordinance, specifically Section 52.07, Subdivision 11 B1, prior to any platting or construction in the Commercial csc -rb -lb area on Exhibit "D the Developer will present an overall plan for said area. The allocation within the area to uses permitted and conditionally permitted within zoning district csc -rb -lb as described in the Eagan Zoning Ordinance shall be reasonably defined at that time and development of each area shall reasonably be in accordance with those uses. 18.) Developer's Interest in Property Developer hereby warrants and represents to Eagan, as inducement to Eagan's entering into this Agreement, that Developer has an interest in the Subject Land as a developer and Owner, by executing this Agreement, acknowledges and consents to Developer entering into this Agreement. 19.) Compliance with City Ordinances Developer and Owner agree to comply with all Eagan City Council Ordinances consistent with this Planned Development Agreement which may affect the Development. 20.) Buffer Area The Developer shall submit to Eagan for approval prior to the final approval of each plat bordering existing single family development North of County Road #30, a detailed plan for buffering and landscaping the setback area between the single family and the non single family area. 21.) Notices Whenever in this Agreement it shall be required or permitted that notice or demand be given or served by either party to this Agreement to or on the other party, such notice or demand shall be delivered personally or mailed by United States mail to the addresses hereinafter set forth by certified mail (return receipt requested). Such notice or demand shall be deemed timely given when delivered personally or when deposited in the mail in accordance with the above. Notice sent by one party shall be sent to the other two (2) parties. The addresses of the parties hereto are as follows, until changed by notice given as above: If to the City, at: If to the Developer, at: If to the Owner, at: City of Eagan 3795 Pilot Knob Road Eagan, Minnesota 55122 Dunn Curry Real Estate Management, Inc. Attn: Rodney D. Hardy, Vice President 4940 Viking Drive, Pentagon Office Park Minneapolis, Minnesota 55435 Cliff Road Properties, Inc. 21 Harrison Avenue North Hopkins, Minnesota 55343 22.) Binding Agreement This Agreement shall be binding upon the Owner and Developer, their successors and assigns and upon the City of Eagan until terminated. The rights and remedies granted to Eagan herein shall be enforceable only by Eagan and not by other persons or parties. 5. IN WITNESS WHEREOF, the parties hereto have executed this Agreement as of the day and year first above written. 6. CITY OF EAGAN By: Attest: Leo MS phy, Mayor Alyce Bolke, Clerk DEVELOPER: DUNN URR REAL ESTATE MANAGEMENT, INC. By: OWNER: T� CLIFF OAD PROPERTIES, I C. �i� By: Its: ts: Preliminary Plat SUN CLIFF M1.n ADVANCE DEVELOPERS INC. 71100 *.1.11• AV•. Ea. 111 11•, MIS.. Watt! 1• sae 5.54un1s at DOOM. of O. .r.r..a 5rflaf S. a/r 1. .w. w r5 f...0•. W ar N C.ual aold W If w 5 r r of .1 *Mot 5.0.5. 4w w W. 11 x 1 a„ 1.1 1.1 of 11 O... ii u Ila Mo t. omen. r r■ r. 114 too. Ohm. Zook .01 W aorta w e •w u t r /slat ea. owass. 111 ya• 51M 111 0WY ffrlf N. 101 115 •••I■•• f.... •nw ff•a 1 rr••. fro— 1 Era 41 5r W «N 1151 ...r w 1 1441' N awl r fry r 5.1 51 .1 for. rr 1 r..4.:f nom-. -.at ii. i arm. 1w I. .f W wn.I 11...10..4 5.15 �..ur.. si.�i1 i r 1.0,1 5. C —S uw 5r� w 0 1 O r a S y1 as 1 a1 1 w�— 5• rplooe G LOP POND .t.l Al 14 Imo 4 41 f' 1 ft..". 11 f 1 1, 1 f 1 L 'to 1 1i RppD P° '55 R OAD a cs i�' 3 Preliminary Drainage and Grading Plan SUN CLIFF Eag•n, Minn ADVANCE D(VEL °PERS INC 7000 8 Av• 1. Minn v VC D•10. 1 ■77.700 r(8 V•elle•1 0•1■“0 0.V.O. 1•011 0,1•1100 C 000 A a goo 5'1 R0,46 e c T\ 1 f f 5 ;IX. =r 40 10 10 1=3 FP o Y Nolo AzEtc 24' n 20! e .V Li et. Li 1 F P 101 et' 4.0 0 3. WO.t./1 OUT' g. 14 34' "Th F.. 0 114.4-rv.v 111■11 C. $4. r,k 1G1.1r...p.a f to 40• 10 40 tf‘. 00 0 P IA e Eroalon Control Plan SUN CLIFF AVVANCE OEVILOP(IIE INC. T000 X .ua. A11, E.. 4■0n••p0110. Minn. SC.0 L i WO. 4 .04.4 41 E•O•n. 41n0. 1 1 1 fir• A- 1 11 L .r .1 I I l T.,";:!. -L l e pGK N PW K :ii h.1rP 06.1..11 11•..1..1 p•1.• 11.•.11.0. 1 --0 11.1•1140 0. ....1. i iirr /M• 1 1 r 1 111•. MN rr 0 p 11 i Rog 141; 114%pr Rpgd N POND 1 l 1n._.,. 101 .414 1 �j f we 1 1,,, 111111111M1111111111111 pima imam r����v Co n ..t. any warm ir RIVER TEST ENTER A D SC,r r f1 C. S. A. H. r 7 31 SAFAR AT E i iplus /Mow A*1 Irma ..i. ...tto, sup% 4 Ira NE tsia Milos Etti .4„, IS /7401..iis �i 1 (MVO' 4 't; R-II .i; w -J CC 6 7 APPLE aun 8 VALLEY OAK." p M ri TC B- ind GE 74144 R- CS.C/GB/LE P ROSEMOU I 1 1:7, /5, t I r '9 ..1 i c...-- I I ,C, z C (/0 ts I 1--4- i•-,- 1- 7-1 -2 .77- 5,7 1. '0''' ic ftemes.... Id II t I.. I 1 1 i -...-..-4-. i. p ...-.1 i oo...._..--.----k t- it l'%. Q--- -11 A1v/ i- i I r r --I t r■-• ilrICitogi 7 i y i 5" t• -i--..-, 1 ---e 1. II 1.:••• V i 4 e,f ii.....: i .1! 1 I 1/ t IOW ClertSitSr --7 I .k .i.-_- v C s ti....,.... ...L._L 1 :,`,..._i),. .1- 1 i. "1 ri-:7,4f., _f- 1 ea :--f- ,rtecit dem 4 u rd ensity— 1•!.;-- 7 7 -AFL „I fs r W \S\ C e 4 1 :::7!: rrri erRct--3 11.* 0 41•11■ 414 ,..:i..... i T =-5 i 1:; r *1'1 4 4* t __4 4 I i ,/,•.-7- '1.VZ:\ 1-- Ai..„..-d-• -2 ..xi.r ,..,..r.":•*: ----1.... J i•-i---'•)t i tt .4'. i. V t 1 Cs h y... f:, '-_1!'"; •I'lt 7 .V.....7..-..,-- 4 •-f .il ..4.... .......i.a f.•;,;. 4.91c:' l'A-Ilf":-.7\;n?4 r; .11;" e -L 1 0■1.•:....,...- ‘..i....., A it... ..-.--g-- •_.%7 1 'Northam Slides Parse OA NA' ".1 r .0 0 C r VGA I 1 I S 1 I IC. I I I I A pt./in ,1 6E/TV 'f' 141 tpc si,e7G„,per WEST A Ptanrved Uritt DevIeloon-teent 'NU Own. 4 Cum." 14411 441144s a•■••■■••••■••■■•1. le■ 21/ 4.p yaw,. Dew. Molora.. 64.4.114 3. Park and Circulation Plan P *AS se ACME PARK p.,..pAssivE P. Total Dr.rlt S Coen Some 42 52 OCre-5 11 0% of tOt01 OrA0 war. dam I k 1/ I J I I 1 "........1zz,Z1.7.7. ,/„.,,\I) p: c.;_.,7, ,L i;,,- i )s,. 6.,.. ,,..7...• 1 ir—t 1 ,L e 1 •••••ew t .-:.,,N 4 _,_1,- 1- '1..„, -t )A 7t P .4 i ',.."z, \l'''..: t 1-•s7 1 igif 1.r'" i 1 ,vr,-„'..) r•: ;...2 ''',..,-41':. 1 _4 \-7_ ..16, ,...a., s i.,-__ I i \Z" I s' '7% L. )/i( 1 L( r I4Orthliffl SU6111 Pe•Wg 4 iy ":7:( c Dunn .5, (-Lary Cummunir‘ 1 j WEST A Fotanrwe-ci Unit Development or -AN Cahawn Cwiry 1•114amd 11.14•■■• via: .a varane Om.. 011/....„, Minn. 1144.1111 4. Land Use Plan 1••••••■••• P.1 .11•10 ••■mo INC mom 111 iii1T s „ak 1.11 '7 4/ ,r l I RIR LI ADtT? IL-CEDAR Arc 46 i.._ 441611 1n i /4 4/f �y d h ii�M� Am r. 4,44 L i i -4 1 r- F72 I ail 1111 an o Na w. 'l' \n R 4 31 PO I il APPLE fI VALLEY `••L1Ara1pL •][t 4 ZONING LEGEND 1-1 AGRICULTURAL DISTRICT euauC FACILITIES DISTRICT Lk! 1 RESIDENTIAL SINGLE DISTRICT U12 1 RESIDENTIAL DOUBLE DISTRICT Dm RE SIOENTIAL TOwNNOUSE DISTRICT Ellm RESIDENTIAL MULTIPLE DISTRICT DC MOBILE NOME DISTRICT J LIMITFO BUSINESS D151R r= NEIGHBOR BUSINESS DISTRICT I:ENERAL BUSINESS DISTRICT 22M RoAD51OE BUSINESS DISTRICT L_] GMMUHITY SNopprhr, Cf NTER DISTRICT REGIONAL S.ICPp,NG CENTER DISTRICT Cott T 'N DuS•R -AL 0.5TR.CT .EAJT NOW TR. AI 3 STR.C' Rf SEARcri V :t JF L'iPMENT PARK CISTP,CT rf3) PLAYhED DErf 7i5TR.CT C C I-000 FLAW ■<_TPICT Lr EXHIBIT 5 O •.'...LL .LYNn I Wit. t` 5. ZONING MAP CITY OF EAGAN vyv 1 i ."4 -1 1):I /V, A C :ITn• Commnrun U- WEST 4 lint/ Derv., looment w... C.a.., j i•..r .A. v.....a.� M. :MI ••■o Vv.,. Orw.. Yawns. trines. Y4A& J CITY OF EAGAN SUBJECT: REVISED PRELIMINARY PLAT KNOB HILL OF EAGAN APPLICANT: EDMUND B. DUNN LOCATION: SEQ OF THE SE; OF SECTION 21 NORTHWEST QUADRANT OF PILOT KNOB ROAD AND DIFFLEY EXISTING ZONING: LIMITED BUSINESS UNDER A PLANNED DEVELOPMENT DATE OF PUBLIC HEARING: JUNE 28, 1983 DATE OF REPORT: JUNE 22, 1983 REPORTED BY: DALE C. RUNKLE, CITY PLANNER APPLICATION SUBMITTED: An application has been submitted requesting a revision to the commercial portion of the Knob Hill of Eagan prelim inary plat. The proposed revision would contain approximately 12.9 acres and contain 14 commercial lots. ZONING AND LAND USE Presently, the property is zoned PD (Planned Development District) with an approved Limited Business use on the 12+ acres. The Comprehensive Guide Plan also designates this parcel as LB (Limited Business District) for this particular location. COMMENTS In 1981, an application was submitted requesting a planned development on approximately 40 acres located in the northwest quadrant of Pilot Knob Road and Diffley Road. The preliminary plat and planned develop mentwere approved in 1982 consisting of 150 townhouse units, 78 condo- minium units and 5 lots for commercial office which could contain ap- proximately 160,000 square feet of gross rental area. The applicant has proposed to revise the 5 lots in the 12 -acre Limit- ed Business area to allow 14 smaller lots in the same acreage. The 14 smaller lots would create more buildings on the site, however, the total square footage which had been approved would be reduced because of additional setbacks and lot coverage criteria. The proposed street access would remain basically the same with in- gress and egress on Pilot Knob Road and Diffley Road. The change oc- curs in the site on Knob Drive; the applicant is proposing a private cul -de -sac which would provide access to 4 smaller lots. The applicant is not requesting any change in use from the Limited Business District. However, the concept of the Limited Business will be changed if approving the smaller lots. Instead of the 5 lots which would contain larger buildings and possibly 2 -3 stories, the new con- cept is to create approximately 1/2 acre lots which could be sold CITY OF EAGAN REVISED PRELIMINARY PLAT KNOB HILL OF EAGAN JUNE 28, 1983 PAGE TWO individually for small limited business uses. Therefore, the concept has changed in the type of limited business use than what was origi- nally proposed. In reviewing these smaller lots, it appears that all but two lots contain approximately 1/2 acre in size. In these 1/2 acre lots, an average building would range around 5,000 square feet. Therefore, the scale of the development would be downplayed, however, there would be more buildings in this particular development proposal. The second question regarding this preliminary plat is the applicant has a proposed buyer for Lot 8, Block 1. The applicant is a veteri- narian and would like to set up a small veterinary clinic on Lot 8. It was staff's understanding that this building would have no outside uses associated with kennels or clinics and that it would be a very low volume use in regard to traffic generation. In reviewing the or- dinance under Limited Business, a veterinary clinic is not a permit- ted use or a conditional use within the Limited Business District. Since the veterinary clinic would not have any kenneling in or out- side of the proposed facility and there are no residents within the close proximity, the Planning Commission may want to deem this a per- mitted use or review the potential to include this as a permitted or a conditional use within the Limited Business District. The appli- cant would like a clarification as to the proposed use from the Ad- visory Commission. If the preliminary plat is approved, it should be subject to the fol- lowing conditions: 1) Since there are going to be many individual buildings in this revised preliminary plat, the Advisory Planning Commission may want to request that an architectural theme be established and followed for all of the buildings in this particular commercial district. 2) The Advisory Planning Commission review all site plans for the individual lots in order that the owner of the lot is conform- ing with the architectural control. 3) The plat should be reviewed officially by Dakota County Plat Commission because the proposed replat abuts two County roads. 4) All buildings proposed must meet all of the criteria establish- ed in the LB (Limited Business District) of the Eagan City Code. 5) All other City ordinances shall be adhered to. 6) The plat shall be subject to the new commercial /industrial park dedication requirements. DCR /jach MEMO TO: FROM: DATE: SUBJECT: THE ADVISORY PLANNING COMMISSION, C/O DALE C. RUNKLE, CITY PLANNER RICHARD M. HEFTI, ASSISTANT CITY ENGINEER JUNE 23, 1983 KNOB HILL OFFICE SITES PRELIMINARY PLAT The Engineering Division of the Department of Public Works has the following comments for consideration by the Planning Commission and City Council regarding this proposed development. DRAINAGE /TOPOGRAPHY Existing topography consists largely of hilly grassland with a high elevation of 954 located at the southeast corner of this proposed de- velopment to an elevation of 894 located in the northeast corner of this proposed development. Correspondingly, the slopes associated with this vast drop in elevation range from 5-30%. Consequently, the drainage is generally northerly. However, approximately 40% of this area lies within the drainage basin J and drains into Pond JP -37 while the remaining portion lies within drainage basin B and drains into Pond BP -27. Pond BP -27 is provided with a positive gravity out- let. On the other hand, Pond JP -37 does not contain a positive out- let at this time. Nevertheless, it is not anticipated to require one to be constructed as a result of this development. It is being proposed to collect some of the runoff which would even- tually end up in Pond JP -37 with storm sewer and discharge it into the drainage basin for Pond BP -27. The parking areas behind build- ings on Lots 1 -5, 10 and 11 of Block 1 will require grading to enable parking lots to be constructed on their steep slopes. Subsequently, a detailed grading and erosion control plan should be submitted for review and approval by the Engineering Department. Otherwise, the proposed grading and drainage appear to be adequately considered. UTILITIES Water main of sufficient size and capacity exist as a 12" trunk water main along the west side of County Road 31 (Pilot Knob Road) and the southside of County Road 30 (Diffley Road) to provide service to this proposed development. Although the sanitary sewer is not as easily accessible as the water main, since the existing 27" trunk sanitary sewer is located approximately 265' north of the north property line of this proposed development. Nevertheless, it is of sufficient size, capacity and depth to provide service to this proposed development. Figure 2 illustrates this more clearly. The proposed utilities to service this development include looping the water main from the trunk on the northside of County Road 30 to the trunk on the west side of County Road 31. The sanitary sewer is being proposed to be extended south from the previously mentioned 27" trunk line into this proposed development to provide service to all the lots. CITY OF EAGAN REVISED PRELIMINARY PLAT KNOB HILL OF EAGAN JUNE 28, 1983 PAGE THREE ENGINEERING RECOMMENDATIONS 7) A detailed grading and erosion control plan shall be submitted to the Engineering Department for approval. 8) If the public improvements are to be constructed privately, the plans and specifications shall be prepared by a registered engi- neer and submitted to the Engineering Department for approval. 9) The minimum width for the public street shall be 34'. The mini- mum width for the private drive shall be 28' and the minimum di- ameter of the cul -de -sac shall be 47'. 10) The private road shall be dedicated as an easement for utility purposes. 11) Adequate utility easements shall be dedicated as required by this report. 12) This development shall accept its responsibility for lateral benefit from trunk water main at the rates in effect at the time of final plat approval. 13) All costs related to internal public improvements shall be the sole responsibility of this development. RMH /jach ENGINEERING REPORT KNOB HILL OFFICE SITES PRELIMINARY PLAT JUNE 23, 1983 PAGE TWO STREETS County Road 31 (Pilot Knob Road) borders this parcel on the east side and County Road 30 (Diffley Road) borders it on the south. Both roads are under the jurisdiction of Dakota County and are presently two lane rural sections. The proposed internal street for this development would provide ac- cess to both County Road 30 and 31. In addition, a private street would provide access to Lots 9, 10 and 11 off of the proposed internal public street. The minimum width for the public street shall be 34' and the minimum width of the private drive shall be 28' with the cul- de -sac at a minimum diameter of 47'. Both streets shall contain con- crete curb and gutter and bituminous pavement designed to City stan- dards. In either case, no on- street parking should be allowed. RIGHT -OF- WAY /EASEMENTS Public right -of -way for Knob Drive is proposed to be the minimum of 60'. Additional right -of -way for County Road 31 (Pilot Knob Road) has been dedicated as a part of the Knob Hill of Eagan plat. Meanwhile, Outlot B and C of the Knob Hill of Eagan plat have been set aside to be dedicated as additional right -of -way for County Road 30 (Diffley Road) when it will be required with the upgrading of County Road 30. The private road shall be dedicated as an easement for utility pur- poses. The standard 10' utility easement will be required to be ded- icated adjacent to all public right -of -way. In addition, a 10' drain- age and utility easement shall be required over all interior lot lines and unplatted property. Otherwise, a 5' drainage and utility easement will be required adjacent to all exterior lot lines bordering platted property. The exceptions to the above include a 20' utility easement between Lots 4 and 5, 7 and 11, 8 and 9 and 9 and 10. In addition, a 20' easement will be required along the north lot line of Lot 9 for utility purposes. ASSESSMENTS Although trunk area storm sewer and trunk area water have previously been assessed, they were assessed at lesser zonings. Therefore, this development shall be responsible for additional assessments resulting from the upgrading and zoning for trunk area storm sewer and water. The following is a breakdown of these additional assessments. Trunk area storm sewer 11.6 acres X 43,560 sf /acre X 2.160 per acre $10,914.00 Trunk area water 11.6 acres X $1,290 /acre 14,964.00 ENGINEERING REPORT KNOB HILL OFFICE SITES PRELIMINARY PLAT JUNE 23, 1983 PAGE THREE In addition to the doove trunk area assessments, this development shall also be responsible for its lateral benefit from trunk water main for the frontage abutting County Road 30 and the 12" trunk. This may be determined by applying the lateral benefit rate in effect at the time of final plat approval times the front footage affected. Currently, this amount would be calculated as follows: Lateral benefit (water) $19.40 /ff X 753 front feet $14,608.00 Furthermore, all costs associated with the construction of the inter- nal utilities and streets shall be the responsibility of this devel- oper. If there are any questions relating this matter, please do not hesi- tate to contact either Thomas A. Colbert or me for assistance. Respectfully submi ted, Richard M. Hef P.E. Assistant City Engineer RMH /jach 0 4 8 30 C•1 C -o CP 8 715.0 7 7/8.0 ':Y...,TytMINAI/. '......r. 1� J_ CP -3 I r i t FOX 8500 s. L 'AsifxN RIDGE •1 I it_ -i 7CP -for j DP-5 N. 8 e E -c ti DP-4 2' 1 868.0 L.S. -7 1 c +K'c_1 874.0. (31,1 .p? at ?r) E 1 e_J DP oTT 848.0 10 `7 1: 860.0 Q 1 o -w 1 3� Y� DP NESCOTT' 1 1 -4 a1 85H I a6• Lo i ''..:.'-‘--11r/ J-e 8803 i GARDEN i 806.0 y: 1 880.3 87010 /444.00°N, 8 877.0 820 J P I JP 2 -j r"��v_� 7950 843.7 P "j rS 1 5 e� JP -13 14 .----4 806.0 50.0 L 866 0 ��JP 4 n8 922 87 2 0 89900 li 42`, >'DI r r" CP -2 7 /.,1 8200 8250 Y 4K L- it CP -6 v P-20 ?4 ago, BP 19 e4' C -k 5 9/9.0 9260 °160 920.0 r I 2 4 7e BP 31 33 /2 JP -3 9540 JP 47 Y 8470 \r„, I i/ JP L.S 85/.0 •J 1:9181:1 8 T.5=14 2 2' r �,JP40 J� 32 ��1 8 86. 3 J8390 1 9 887.0 CITY 8440 8P57 1 T JP 44 J J 3f 830.0 89-0: 8 770 _36_ J fi :8 t i I 1 J -q BP-1 yti 7913 797 0-• v 24 HEIGHTS C-9 r L j CP -I 822 f 2ND --r Al 8280 /`J- Dc DP 8 8810 8P -2 792. 794. 8P -29 0 8 o .0 .I.i_ 1Li T' A =e a\ 9370 "1a:8 BP-6 9050 1 G 2y. 310 8- OIL S-3 7 7 40 .Aly 9- DP -17 8 78.0 8805 LS-4 DP 14 DP 19 i 1 t 875.0 884.0 O Be/ r 890.0 1 827 9k,,,,,,...' d� �7 yl ..I .(r� D 8400 c „c D 857.3 871.7 Dr 869.0 876.0 825.0'p \8 862.0 8 -o 866.0 1 48 8_ r O SJ<'VD.".LE `JP -36 i 870.6 8694 C 8P-3 42 32 .8 72. 4 il, 881.3 nNDaL/ 893.0 BP 8 A p_ g 882.0 2.0 2 r .1 4i, J a 1 886.0 i, BP -25 i 4 8 9300 1 870 80 0 o F. "Q B BP -24 30' 918.0 4' 924.0 BP 8 8740 7 BP -17 111 1, 835.0 LP -42 8860 �i8890 rI 1,7 8 4 2 0 E 1 u rratra 44^L -27 •sI BP -14+ .858! 48.. 901.8-D. 5- 12 8P -12 1 r j L t LP 7 I DP 2 874 0 877. 0 DP -6 CP -5 JP- 6 8 12 L.S. -6 f r' 'cot JP -10 f 820.8 -.,Sh1YDaLE 827.8 6' I 812.3 f BP 8/8.0 (.F L.S. -12 43 0.8 3.0 L d i LP 4f 884 O 888.0 LP 5 8820 '8900 LS: 26 JP-3872 7 J87P-48 4 47 JP-7- I) PATRICK 1459.4: 875.0 8750 12 1Gd`v 864,0 Jp 8 /7"., 8172 8 R56 0 1"; 7� I 6u.5jCt ,-r aae.c-EL. LP -54 1 8 BP 1 L1 id e 90651 907 0 --a1 909.0 wiZs 2JA 38 '816.6 8200 4 D -m J DP -13 882.0 884.0 L5J3 JP -9 817.0 822 .0 36� O L P -39 895.5 898.5 L_ E o �ijY )ALL- LE YEF lritJJ iAL Ptv"0 24 48' DP -11 855.7 862.0 LP 40 898.0 9030 JP 29 925.3 940.0 2,LP 51 p f 6 86e 0 25 _149780 se rte 12 872.7 882.0 J= 1P -38 961.3 8750 ;'ARK 3 1 JP -30 23 ,e JP -34 884.0 890.0 D J t 'N' EP -1 816.7 850.9 JP 886.3 8870 48 JP -19 870.2 874.0 E JP-2C 852.0 8550 J -s 3 r J bJP -28 77 77 9560 968.0 a88-99-2450: LP 884 61 4 880 LP 46 8792 L BB2r�36LP-35 862 0 863.0 8670 8640 LP -45 878 3 882 G 2 1 •t. W. /ILO NNESSUNE fit OUCiNG STATrON HEUNIE C1E[RWOOD G CO RO LAKE 145 G G 1N 1011E$T100, YI1EIE, IIOEILIC A MU, IIC. 27" C 4 27 27" 1 DRIVE l7• 41111MI MN WET TAP 1 WET TAP BURIED StAEJECr f tVAacE L 307 11�I�fii�■���� EAGAN, _MINNESOTA G r WET TAP CHURCH 1 CHURCH BERRY_ RIDGE RD. 1 0 100 200 300 410 500 SAN SE. +E_12 LOCATION PLAN i.2V WATER MAIN ca •us 0. '6 cc .06 6.• 1,6 66. 7.. ITT w ,2 r./ 0 0 LOT 3 NOTES 10••■••.06.. •Cf. *C•6-4L0 064.6/ LoTici,/ •coo (+••••04 C 4..6, 6, 10..no..0 466 ••06...40 1.64.66, •••■••0060 •■TV 41“.• wa...oc•rreo.6 1•0 •C COUNTY ROAD 30 (WILD WOOD LANE 2 .4—...-- co.., •...oirm •ssoc..1( ...c s I r I r Le= 6,... .Ir: 7" 7 7:::: 7" 6 •04/Tla L•alt oc 4444 44 t oc 44.44 4c S4 oc 444 4,4 11. e Is LOT 4 iciptopd- ;x■-4/7 Pk& P CC L ar00, PL AT I4NO 8 LOT 5' 4 W012 TL1 0 0 El I 4 I CK.144n1 CC AL STAY MANAl...CMCP4T u 1.1 va i R Q A.) _LOT 2 28 i ui i 2 ru.■•••••■•■•.; CO i) 1 111L-Li 0 P a-(3,601jCT LT 1 IJ 48 UNITS BLOCK 2 LOT1 26 UNITS BLOCK 2 LOT 3 COUNTY 30 1111 `=2.5 3 STORY BLOCK 2/LOT I '41 111111111U1 t.‘ 11.!1!1 I (r A 3 OtT r. q B .3 F BLK 2 LOT 4 2 STOrir BLOCK 2/LOT 5 B 1 ST0Fly r Fm TbaidK 3/LOT ,1 12.000 S F. 5 0 S.F 1 STORY BLOCK 3 J u LL 2 3 1 1 r z NORTH NOTES .r Cay COUNTY STATE AID 1- 11(71-1WAY NO. 31 (PILOT KNOB 2OAD) I4 4L PE f !P_TIQN AREA 1522 AK DOWN dr cCOMBS- KNUTSON ASSOC 1 PRELIMINARY PLAT KNOB 1-IILL OFFICE SITES CITY OG •aw.., Mw.a•oT• PRIPARLP GOR. DUNN REAL ESTATE l MANIA! EMENT INL. 3 1 itaj 7 ,O£ I.ViV1119iF'1 -fli'v' 3.12d15 AiMr10'7 grr 1 LI 1 LipLi2+NP 6+ ch ZOO -POOR FAXGLING WiTiCIA■11.1 e-oorqwe, ,NIECOBS KNUTSON ASSOCIATES INC —6-- OltOrtlii4 GAGAITGAv ...wsa antorod0 WI,. PRELIMINARY UTILITIES PLAN KNOB 1-11LI- OPPILE SITES CFI!! (PLot 1 NO5 _,O GANITAIGG• Nifer•-■ OG ndirru FicOrGirl, i-avGAZT a 0,40 I I PICKFT.11,,LT Fc.TEZ. MANAL/EMENT DUNN ZEAL ESTATE 5 Ind. ,7ErA. 0.611410. Ls f:EAYICA Ind. AT, AT AAN• 7 LOCATION: PART OF THE W2 OF THE Wz OF SECTION 14 EAST OF LEXINGTON AVENUE EXISTING ZONING: R -4 (RESIDENTIAL MULTIPLE DISTRICT) DATE OF PUBLIC HEARING: JUNE 28, 1983 DATE OF REPORT: JUNE 23, 1983 REPORTED BY: DALE C. RUNKLE, CITY PLANNER APPLICATION SUBMITTED: An application has been submitted to revise the Lexington Place preliminary plat north of the proposed alignment of Duckwood Drive. The preliminary plat would reduce the density from 312 dwelling units to 240 dwelling units located in the Wz of the W2 of Section 14. ZONING AND LAND USE Presently, the parcel is zoned R -4 (Residential Multiple) and would allow only multiple development. The Land Use Guide divides the pro- perty with two uses. To the north of Duckwood Drive the Comprehensive Guide designates this particular tract as R -3 (Mixed Residential) with a density of 6 -12 dwelling units per acre and south of Duckwood Drive R -2 (Mixed Residential) with a density of 3 -6 dwelling units per acre. The Comprehensive Guide Plan also states that existing zoning does supersede the Comprehensive Guide Plan. Therefore, the R -4 zoning sup- ersedes the uses proposed in the Comprehensive Guide Plan. COMMENTS CITY OF EAGAN SUBJECT: REVISED PRELIMINARY PLAT LEXINGTON PLACE APPLICANT: U. S. HOMES CORPORATION, CHARLES WINDEN The Advisory Planning Commission reviewed the original plat submitted by U. S. Homes in February, 1982. The total plat consisted of approx- imately 84.62 acres and contained 28 condominium buildings for a total of 672 dwelling units. The revision to the preliminary plat is occur- ring only north of Duckwood Drive. The original plat consisted of 13 24 -unit buildings for a total of 312 dwelling units. The applicant is now proposing to reduce the density, and instead of providing thirteen 24 -unit buildings, is proposing to construct 12 two story, 16 -unit buildings with detached garages, two 12 -unit buildings with detached garages and three 8 -unit buildings with detached garages for a total of 240 dwelling units. The proposed revision would be a reduction of 72 dwelling units in the north z of the proposed plat. The southern half of the proposed plat will remain the same. The original proposal was to have 15 24 -unit buildings for a total of 360 units south of Duckwood Drive. The total density on this site will be 600 dwelling units over the entire 84.62 acres. The net density for this develop- ment will be 8.19 units per acre vs. 9.16 units per acre according to CITY OF EAGAN REVISED PRELIMINARY PLAT LEXINGTON PLACE JUNE 28, 1983 PAGE TWO the original plan. Therefore, the development is well below the maxi- mum density allowed in an R -4 (Residential Multiple District). The proposed access and traffic circulation will remain the same as was originally approved in the Lexington Place preliminary plat. Duck wood Drive will continue to bisect the property and have an 80' right of -way for an interior collector street. The applicant is proposing a looping street to the north and also looping south and connecting to Lexington Avenue. Therefore, the circulation appears to be adequate for this development proposal. The Advisory Planning Commission and City Council requested that the southerly two units in the southerly portion of the plat be platted as an outlot to review access to the units at a later point in time. The developer is in agreement with this recommendation and will con- tinue to leave the southerly two units out of the preliminary plat un- til such time that detailed plans can be worked out as to how access will service these units. The original plan submitted called for 28 24 -unit buildings which were to be 3 -story with 12 covered parking spaces attached to each end of the building. The applicant has now changed the style of the plan to the north where he is requesting to construct 2 -story buildings with detached garages for the north half of the site. The southerly half will still remain 15 24 -unit buildings with three stories. The applicant is proposing that he provide one parking space and one garage space per unit. It is staff's understanding that the applicant is proposing to have a condominium project vs. a rental project which means each of the individual units will be for sale vs. for rent. The parking would then be one garage space and one outside space per unit for the condominium project. The applicant has proposed one garage space and,one outside parking space plus additional guest parking with this development proposal. One major issue with the original proposal of this preliminary plat was the applicant was proposing to construct efficiency units within the original development plan. The applicant has indicated in the north half with the new design, there will be no efficiency units. All of the 240 dwelling units north of Duckwood Drive will be one bed- room, two bedroom and two bedroom with two bath. Therefore, the is- sue regarding efficiency units will not pertain to the area north of Duckwood Drive. In reviewing the site plan, the applicant meets all ordinance require- ments for setback of buildings and garages. The only setback that is not in conformance is the 20' setback before any parking area from a public street. Therefore, the green area between the street and park- ing should be increased from 10' to 20'. In reviewing the plan, this adjustment should not be difficult to meet. CITY OF EAGAN REVISED PRELIMINARY PLAT LEXINGTON PLACE JUNE 28, 1983 PAGE THREE If approved, the revision to the preliminary plat shall be subject to the following conditions: 1) Cross easements and parking easements shall be granted on the lots which are served by common access with more than one dwell- ing unit. 2) The outside parking spaces shall be 10 X 20 feet and that park- ing area shall be surfaced with concrete curbing around the'per- imeter of the parking area. 3) Homeowners association and bylaws shall be submitted and review- ed for development prior to the final plat of the first stage. 4) The applicant has submitted a typical landscape plan for a unit. This landscape plan shall be adhered to and an adequate landscape bond shall be required and not released until one year after the landscaping has been completed. 5) The preliminary plat shall be reviewed by the Eagan Park Commis- sion and subject to their recommendations. They should also re- view the proposed amenities the developer is proposing to install for this development proposal. 6) The preliminary plat shall be subject to Dakota County Plat Com- mission's review and comment because the development abuts Lexing- ton Avenue. 7) The green area between the parking area and rights -of -way shall be increased to 20' vs. the 10' proposed. 8) All other City ordinances shall be adhered to. DCR /jach z et m 1 m z —4 z ION son- ti, oaNO DUCKWOOD ii1 irti e r „ONO POND DRIVE y 0 u 0 A A R -4 DEVELOPMENT PLAN OF: LEXINGTON PLACE FOR: U.S. HOME CORPORATION 71.21 Sot nun, r r ii ,per.. r, neru aP.11! t e *true Meer.. ..ate Street* 11 time SO. yard: Sear w..a. a w e wt� r�•• OA we a4 feu. off Street ,..S .t On t... Isseuenante i «t .r wua.... 43.2? ro 1 1 4 p prabvECi P( w1 ;N19 1 ��Rt l C R. WINDEN ASSOCIATES, INC LY.° S.Mrt,o. iar (VW% S'.ttT ST r•q. .toC T. SUSS CARRIAGE HILLS GOLF COURSE PF 404 0111 "q 3C MEMO TO: ADVISORY PARKS RECREATION COMMISSION FROM: KEN VRAA, DIRECTOR OF PARKS RECREATION DATE: JUNE 30, 1983 SUBJECT: PARK NAMES COMMITTEE REPORT The Sub Committee on Park Names met to review the list of submitted name suggestions for parks on June 29, 1983. In reviewing the submitted names, the Committee's intent was to review each name for appropriateness, discarding those suggestions which did not "fit the site." No judgment was made as to a pre- ferred or suggested name. The Committee was of the opinion, how- ever, that in some instances better name suggestions might be found and therefore, is recommending that the Commission not feel obli- gated to adopt names for the parks at this time. Parks, whose names do not appear to be of a satisfactory nature to the Commission could be tabled for additional study or until such time as further development of the park area is underway and a better name is ad- vanced. The Sub Committee is recommending the Commission briefly review the names now being suggested for parks. Then after the review, fliers will be prepared and distributed to neighborhoods near each park asking for comment, additional suggestions, and name prefer- ence. Following neighborhood comment, the Commission can then make the final selection for the park's official name. The attached is the list of names reviewed by the Sub Committee. Director of Parks Recreation Attachment KV /kf Currently Known As: Oak Chase Northview Thomas Lake Carnelian Carlson Lake Capricorn Coachman Ches Mar Cinnamon Ridge Country Home Heights DeBoer /O'Leary Lake Donnywood Fish Lake Hill Top Lakeside Peridot Pilot Knob PARKS TO BE NAMED Trilogy East Triad East Edgewood Downing Thomas Lake Red Rock Carlson Lake Kettle Goat Horn Black Hill Canupa Crooked Knife Tahasaka Prickly Ash Robber's Ravine Cinnamon Spice Park Manor Maewatonka Bridgewood Barley Corn Telesphore Keystone Distillers Immersion Fish Lake Berry Patch Canupa Lakeside Peridot Path Sorghum Mill Pilot Knob Seven Counsels Suggested Names Oak Chase Decathlon Amberwood Carnelian Traid North Trilogy North Walnut Hill Ohmann William's Coachman Rawhide Robber Path Arrowood Piquant Wanditonka Country Home /Hgts. O'Leary Lake Duckwood Revenuer's LeMay Stonecutters Cornwoods Fathom Auge Cranberry Mooney Lake Ontario Parody Mary Brown Buckskin PARKS TO BE NAMED (continued) Ridge Cliff Black Strap Pancake Hill Ridge Cliff South Oaks (official) South Oaks Wedgewood Cannon Edgewood Wedgewood Peace Pipe Well Site Precipice Triad South Moraine Claimjumper Trilogy South Ravine Windtree Wescott Station Stagecoach Brown Bow Hidden Pond Windtree Ridgewood Woodhaven Woodhaven Louis Martin Indian Village PARKLAND PROPOSED TO BE RECEIVED THROUGH FUTURE DEDICATION: HiLine Loggers Trail Vienna Woods Winkler /Jackson Blue Cross /Blue Shield Windcrest Meadowlands Schwanz Sect. 24, Dodd Road Pin Oak Pond Moccasin Meadow Pointer White Cedar War Shield Skyline Sunset Skyhill Spy Glass Civic Run Blue Sky Prairie Meadowlands Fox Hill Schwanz Lake Trapp Farm Capt. Dodd MEMO TO: ADVISORY PARKS AND RECREATION COMMISSION FROM: KEN VRAA, DIRECTOR OF PARKS AND RECREATION RE: NORTHVIEW ATHLETIC FIELD PERMANENT FENCE PROPOSALS JULY 1983 Background: Over the past several softball seasons, department staff has received inquiries from softball players and team managers concerning the potential for permanent fences at Northview Athletic fields. The response from staff has always been that it is probable that permanent fences would be installed at Northview, but such installation would have to be some time into the future. Presently, outfield fences consist of a temporary snow fence instal- lation. These fences have been out since 1980 and are rapidly deteriorating as the result of being in place throughout the year. Fence Proposal: A proposal has been advanced and discussed among staff for the installation of permanent fence at Northview Athletic fields. It is estimated that fence installation at the four -field complex would cost approximately $12,000. This includes all post, fabric, and installation by a contractor. The proposal being ad- vanced would ask that each of the ball players who utilize Northview Athletic fields pay a fee up to $6 over a two -year period as a share of the fence installation cost. With over one thousand soft- ball players, this per player contribution would amount to $6000. This would then be matched with an equal contribution from the City of $6000. This money would come from the City's Parks Acquisi- tion Development fund. The players' contribution, combined with the $6000 from the Park Site Fund would then be sufficient to cover the cost for fence installation. There have been various modifications to this base proposal which suggest both a higher fee, a lower fee, and the timing of payment of the fee by the players. However, each proposal has been predi- cated on the fact that the City would provide an equal match from the Park Site Fund. Matching Gifts Policy: In 1981, the Advisory Commission discussed, and eventually adopted, a Matching Gifts Policy for neighborhood groups. This policy was specifically adopted with the intent that neighborhood requests for matching funds from the Park Site or General Fund would be reviewed under a set of specific guidelines. These guidelines did not address requests for matching funds for community parks or athletic fields. In reviewing the guidelines which were adopted for matching gifts, the guidelines included the following: 1. That each request should be reviewed on its merit and those requests be consistent with the established park develop- ment plan or CIP. NORTHVIEW ATHLETIC FIELD MEMO Page 2 2. That any such matching money should be provided so as not to take away from financial commitments made to other parks or developments budgets for the year. 3. Than an understanding that the matching gift is seen as something that may have to be changed, removed or modified as future park development occurs or ceases to provide the type of use originally intended. 4. That the gift is consistent with the City -wide systems priority. 5. That a limit on the amount the City would be willing to match for any one neighborhood group be reviewed. The Commission may wish to use these guidelines for reviewal of this proposal for Northview Athletic fields. Issues to be Considered: In reviewing the fence proposal, the installation of permanent fences at Northview Athletic fields would be one of the next improvements to these fields. It has generally been assumed by the City that the Northview Athletic field complex shall become the City's premier athletic field complex. As such, the fields would merit the installation of permanent fences. At this time, the proposal has not been reviewed by the entire league leadership committee or all team managers. Presentation to the entire group concerning this proposal of player cost partici- pation is contingent on an indication from the Advisory Commission and City Council whether such a proposal would be reacted to favor- ably. If the Commission and Council are receptive, this proposal will be brought to the attention of all the team managers for com- ment and adoption /rejection. The Commission, in reviewing this proposal, should consider its actions as it relates to future requests for field improvement at Northview or other community parks. This would assist staff in dealing with other requests which could come in future years. Action to be Considered: The Advisory Commission should review the suggested proposal that has been discussed for the installation of permanent fences at Northview Athletic fields; and provide an indication to staff on how it would react to a formal proposal. MEMO TO: ADVISORY PARKS RECREATION COMMISSION FROM: KEN VRAA, DIRECTOR OF PARKS RECREATION SUBJECT: PROPOSED BICYCLE ROUTE RAHN ROAD, JOHNNY CAKE RIDGE ROAD, AND BEAU D'RUE JULY 1983 Background: In August of 1981, after several months of review and study, the Eagan Bicycle Trails Plan was accepted and adopted by the City Council upon recommendation of the Advisory Commission. The Trails Plan contained a five -year program for trails develop- ment and improvement based on trail type, location and priority. Within this five -year program, several C -3 type trails have been proposed for installation. (Type C -3 is a shared street right of -way for bicyclists so designated by Bike Route signs on vertical posts or stenciled on the pavement). Bike Route Designation: The Eagan Bicycle Trails Plan has identi- fied the following segments as bike routes to be completed in 1982: Rahn Road; from Cliff to Beau D'Rue, Beau D'Rue; from Rahn Road to Silver Bell to Highway 13; Johnny Cake Ridge; from High Line Trail to Cliff Road. These individual trails would serve as con- nector links from the Cedar Avenue bridge underpass to Bloomington as well as the zoo in Apple Valley. Attached is a map showing these trail linkages combined into a regional link along with the High Line Trail and the existing trail on Cliff Road. Staff is proposing that City forces be authorized to implement the bike route designation along the routes previously mentioned in order to institute this trail system. These trail routes will link up existing bicycle trails and in addition will provide directional and informational signs at key locations. As has been mentioned, the routes recommended for signs will provide the link for the bike riders to go to and from the Minnesota Zoo, Cedar Avenue Bridge, as well as providing linkages with the High Line Trail, Cliff Road, local residential feeder streets and the Cedarvale shopping area. Funding and Cost: The 1983 Operational Budget provided approximate- ly $600 for bicycle trail route signs. The most recent estimate for material costs for directional signs and route signs has been placed at approximately $500. A second attachment for your review has been included indicating the approximate location for these trail route informational signs. There are approximately 28 signs proposed over the three -mile route designation. For Commission Review: Staff has brought this to the Advisory Commission for review for several reasons. While staff has contin- ued to work towards the implementation of the Bicycle Trails Plan PROPOSED BIKE ROUTE MEMO Page 2 while reviewing residential and commercial plats, implementation and designation of bicycle routes has not previously been imple- mented. Because this is the City's first route designation, Staff feels that it would be appropriate for the Commission to have final review of the bike route designation before installation is pur- sued. After review by the Advisory Commission, appropriate approval, modification or rejection, and recommendation to the City Council should be forthcoming. Should approvals be given, it is estimated that it would take approximately three to four weeks for materials to be ordered and furnished. Installation would take approximately two days and would be done by City crews. Additional Comment Concerning the Bicycle Trails within the Commu- nity: The Department of Parks and Recreation currently has an intern assigned to the Department to do graphic work. It is the intent that this individual would complete a bicycle pamphlet com- plete with trails map for distribution. The graphics will indicate all existing bicycle trail routes along with those which are under immediate plans for development. This brochure will then be made available for distribution through City Hall and other appropriate distribution centers. OFf 5 6YCtClt writ. ctof Rd. MRTH Regional' Link z T '$OlkN'Y CAKE P-1PXE ROAD •T0 MAIN ENTRANct: of MN• Zoo Q- dEL� INLOOh1 T.N VerOIR- PMK Pathway 4 8r1dg.e- unclerpass co fl i ON PARKwAXs oN-silmeT Bycyde, path tgRN6l.14N DIrF Rem• fgk r� d Signage I'OCabOfl3. NINON XIS'f1Nh 61 Pro 56 6 CA -IRN ►o ff Rd. do 4 Alb pirne`( Rc•••a MEMO TO: ADVISORY PARKS AND RECREATION COMMISSION FROM: KEN VRAA, DIRECTOR OF PARKS AND RECREATION RE: LAWCON GRANT APPLICATION JULY 1983 Background: Staff has received the informational packets and forms from the Metropolitan Council for Fiscal Year 1984 LAWCON /LCMR Grant applications. These preliminary grant applications are due in the offices of the Metropolitan Council by August 5, 1983. In order for Staff to prepare the necessary materials for the grants submission, it will be necessary for the Advisory Commission to make a final determination at the July 7th meeting for the park site to be designated for grant assistance. Review: In reviewing the various park parcels that would be suit- able for grant application, it would be the recommendation of Staff that a grant be submitted for the development of Fish Lake Park. Other grants considered were for aquisition around Thomas Lake Park, the second phase development of Rahn Park, and development of Capricorn. While all these parks have potential for grant appli- cations, it is the opinion of Staff that grant application for Fish Lake Park would receive a higher priority for Commission re- view. After review by the Advisory Commission, it would be appro- priate for the Committee to adopt a resolution or motion to the effect that the Advisory Commission has recommended and supports a grant for Fish Lake Park. The motion should read to the effect that "whereas the City of Eagan has a five -year plan for parks development, and whereas the Advisory Commission has recently re- viewed its five -year program for updating its park development and whereas the Parks Systems Plan Study currently being prepared by the City has identified Fish Lake Park as its highest priority for community improvement; now, therefore, be it resolved by the Advisory Parks and Recreation Commission that the City of Eagan pursue financial assistance through the appropriate State and Feder- al agencies for the development of Fish Lake Park." Staff will provide additional information and discussion concerning the alternatives for grants submission at the July 7th meeting. 3795 PILOT KNOB ROAD, P.O. BOX 21199 EAGAN, MINNESOTA 55121 PHONE: (612) 454 -8100 June 20, 1983 Dear Resident: KV:bp city of =man Resident 2254 Clark Street Eagan, MN 55122 It has come to the attention of the Parks and Recreation Department that you may be utilizing public property for personal usage; as a wood pile and /or storage area. The Advisory Parks and Recreation Commission has recently reviewed this type of non conforming park usage and adopted a policy to prohibit further utilization of parkland in this manner because of certain legal and implied implications. You may have until October 15th to remove your wood pile, or other items. Please do not initiate any new or additional activities in the park area betwee n v and the October 15th removal deadline. Your anticipated cooperation is ap Director Parks and Recreation THE LONE OAK TREE...THE SYMBOL OF STRENGTH AND GROWTH IN OUR COMMUNITY BEA BLOMQUIST Mayor THOMAS EGAN JAMES A. SMITH JERRY THOMAS THEODORE WACHTER Council Members THOMAS HEDGES City Administrator EUGENE VAN OVERBEKE City Clerk 3795 PILOT KNOB ROAD, P.O. BOX 21199 EAGAN, MINNESOTA 55121 PHONE: (612) 454 -8100 June 20, 1983 Dear Resident: It has come to the attention of the Parks and Recreation Department that you may be utilizing public park property for personal usage; as a garden plot and /or storage area. The Advisory Parks and Recreation Commission has recently reviewed this type of non conforming park usage and adopted a policy to prohibit further utilization of park land in this manner because of certain legal and implied implications. In as much as many residents have again planted gardens for this year, as they have in the past, you may have until October 15, 1983 to remove any produce, or other items. Please do not initiate any new or additional activities in the park area be- tween now and the October 15th removal deadline. KV :bp city of aagan Your anticipated cooperation is appreciated. Ken irector r s` and Recreation City of Eagan BEA BLOMQUIST Mayor THOMAS EGAN JAMES A. SMITH JERRY THOMAS THEODORE WACHTER Council Members THOMAS HEDGES City Administrator EUGENE VAN OVERBEKE City Clerk THE LONE OAK TREE THE SYMBOL OF STRENGTH AND GROWTH IN OUR COMMUNITY 0 2't 7 C lac 4 S4 g8d a1 4 s4-, .:/Q q Clack sf. ga68 clad 426a atc easy C s2 51; as 416 Okt< st, alas 5kJe kn. Stele L n She L. all a. siu.le- fin, a /68 skJe- L n a o4 sLk 4n. 21 06 s,Qk Ln �qb sQ i. A 7/ s/ade .2066 sL.le L o�Do2� S�� Ln Sfe Ln aoi mit 1 q8 cl .S,L e L1 `973 s Ue Ln 197b RA)ex iA 1) 0 mo43S D v.( /0,0,8 ?olden 9a cckr garden cio T Keit n€ S/o I„,)e.r ?ctiCien 4..,v0d PI le, 14)00CL P/ /e_ a sw)ny 5J€r, sw s cap St tk(�S a b411e� 4X MEMO TO: TOM HEDGES, CITY ADMINISTRATOR FROM: KEN VRAA, DIRECTOR OF PARKS AND RECREATION DATE: JUNE 16, 1983 RE: ADVISORY PARKS AND RECREATION COMMISSION TOM GUSTAFSON Roger Martin, Chairman of the Advisory Parks and Recreation Commission and myself have had several conversations regarding the continued absence of Tom Gustafson from the Advisory Commission meetings. Tom had indicated to this office serveral weeks ago, in a discussion with the secretary, that it was his intent to resign from the Advisory Commission. As of yet however, I have not received a letter from him stating that he would be resigning. Despite a letter to him sometime ago and several telephone attempts to make contact with him, I still have not had a response re- garding his intentions. The attendance records indicates that Tom has attended only one meeting since October 1982 to the present. This includes all special and regular commission meetings. Today I have sent another letter to Tom requesting'a letter from him indicating his resignation or desire to continue on the commission. However, because of his absences the last eight (8) months perhaps we should assume that he is no longer able to serve on the commission and should seek a replacement. In as much as we are seeking a replacement for the position vacated by Donn Schumaker, filling the position for Tom Gustafson, would seem to be appropriate for timing purposes. /bp 3795 PILOT KNOB ROAD, P.O. BOX 21199 EAGAN, MINNESOTA 55121 PHONE: (612) 454 -8100 June 16, 1983 Mr. Tom Gustafson 4822 Dodd Road Eagan, MN 55123 Dear Tom• I've been unable to contact you regarding your status on the Advisory Parks and Recreation Commission. My last understanding was that you had intended to resign from the commission because of your schedule and inability to make scheduled meetings. I still have not received an official resignation from you and I would appreciate you letting us know what your intentions are. Donn Schumaker has recently had to resign from the Advisory Commission and the City is currently seeking applicants for the position. If it is your intent to resign from the Advisory Commission, knowledge of a second opening /appointment could be facilitated at the same time. Assuming that it still remains your intent to resign from the Advisory Commission, I would appreciate your submitting the Systems and Guide Book to the City so it may be reassigned to a new member. KV:bp Thank you for your prompt attention. Sincerely, Ken.Vraa, Director Parks and Recreation City of Eagan THE LONE OAK TREE ...THE SYMBOL OF STRENGTH AND GROWTH IN OUR COMMUNITY BEA BLOMQUIST Mayor THOMAS EGAN JAMES A. SMITH JERRY THOMAS THEODORE WACHTER Council Members THOMAS HEDGES City Administrator EUGENE VAN OVERBEKE City Clerk f MEMO TO: ADVISORY PARKS F, RECREATION COMMISSION FROM: KEN VRAA, DIRECTOR OF PARKS AND RECREATION RE: JUNE 2, 1983 COMMISSION MEETING June 1983 The June Advisory Parks and Recreation Commission meeting will be pre- ceded by an equipment demonstration by the parks and maintenance staff. This equipment demonstration will take place at Northview Athletic fields beginning at 5:00 P.M. The demonstration will concentrate primarily upon the equipment the department uses in the summer. It is anticipated that this demonstration will last approximately one hour in length. Staff will demonstrate the equipment, explain its uses, advantages, answer your questions; and if you would like allow you to try your hand at operating a groundsmaster. To accommodate the dinner hour, staff will be picking up sandwiches from Carbone's. Your requested to call the department by 10:00 A.M. Thursday morning to place your order. This will give sufficient time to staff to place the order for pick up that evening. The regular meeting of the Commission will commence at 7:00 P.M. at City Hall. The first subject of business is development proposals. The first item will be that of the Duckwood Trails 2nd Addition. The Duckwood Trails Addition is for a preliminary plat consisting of approximately 19 acres located on outlots A, B, C, D Duckwood Trails. The applicant is seeking an amendment to the Duckwood Trails Planned Unit Development that was to provide for a 90 unit condominium and a 58 unit townhouse. The amendment seeks to change the development to consist of two 81 unit apartment buildings. Although the parks land dedication has previously been satisfied with the conveyance of. DeBoer Park to the City, the developer is proposing to donate to the City Outlot A and B(hereafter referred to simply as Out lot A) to the City for park purposes. This is an area of approximately 8 acres in size. The additional 8 acres would be combined with DeBoer Park which is immediately north of this proposed development. In the System Plan Study, members will recall that a problem of providing a neighborhood park in service section 15 has previously been identified as being a significant problem. Several options were reviewed by the Consultant with the Commission which included; the purchase of additional park land in the southeast quarter of the section and /or expanding DeBoer Park with dedication from the Eagan Heights Commercial development at some time in the future. A third alternative was the utilization of the exist- ing DeBoer Park and seek additional acquistion at another location within this service section to compliment the existing DeBoer Park. The Commission will be asked to review the proposal of accepting the additional 8 acres for public park purposes. The Commission will want to consider this proposal as it relates to the park; overall section needs and the potential for acquisition in the Eagan Heights Commercial Park. Staff has directed the Systems Plan Consultant to prepare a base map and concept plan in conjunction with the existing park land, to assist June 2, 1983 Commission Meeting Memo Page 2 the Commission in assessing the value of this 8 acre parcel for park purposes. Mr. Ron Erickson from Korsunsky, Krank and Erickson architects will be available at the June meeting to present the proposed amendment to the Duckwood Trails Planned Development and the proposal by the developer for the transfer of this land. Enclosed for your review is the planners report concerning this development. PARK CLIFFE ADDITION: The Park Cliffe Addition is for rezoning residential single to R -1 planned development to allow for deviation of the R -1 zoning requirements. The Park Cliffe Second Addition would consist of 39 single family lots. This development is in park service section #34 which shows potential park acquisition in the future, west of the present Parkview Golf course. Therefore, this proposed development should be subject to a cash dedication requirement. One other item for consideration by the Commission at this time is the consideration of a 10' trailway easement between lots 11 and 12. This 10' trailway easement was originally requested by the Commission when it first reviewed the proposed Park Cliffe Addition in 1978. At the time, the proposed trailway would have connected the residential develop mentinto the Dakota County Parks trail system. However, the Dakota County trail systems plan has been changed and access to the trail from this easement appears doubtful. Therefore, the Commission should consider whether it still wishes to require this easement as part of the re- quirements for the final plat. SUNSET 2nd ADDITION: Sunset 2nd Addition consists of approximately 5 acres of 12 single family lots. This proposed development is located in park service section 26 and will eventually be serviced by Wedgewood Park and Schwanz Lake Community Park. It is recommended that a cash dedication be required. ROBIN LANE 1st ADDITION: This development consists of approximately 9.6 acres in park service section 17. This development would consist of two apartment buildings with 112 units plus 10 townhouse units. The Commission should review the need for a tot lot to be provided within the development. The developer is contemplating installation of a tennis court and outdoor pool facility too with these units. Staff would also recommend a cash dedication at the time of final platting. BLACKHAWK ACRES: This development is approximately 2 acres in size and is located in service section 17. This development is adjacent to the proposed Robin Lane 1st Addition and consistsof 25 townhouse units. Staff will he recommending that a cash dedication he required for this development. MALLARD PARK 4th Addition: Mallard Park 4th Addition is a replat of Mallard 2nd Addition located in section 28. The park land dedication for Mallard Park 2nd Addition consisted of a land dedication which has been received by the City. Members will recall that at the previous Commission meeting, there was a reviewal of the Mallard Park 1st Addition replat now entitled "Tiberon At the time of the review Commission members recommended that a letter from Willmus Family Properties be received stating the intent of the Willmus Family Properties to follow through with the land dedication June 2, 1983 Commission Meeting Memo Page 3 and a clarification of the acreage to be received. In response to a letter from staff, a letter has been received stating the agreement with the City's contribution regarding the amount of park land owed by Wilimus properties. Therefore, the replat of Mallard Park 2nd Addition to Mallard Park 4th Addition is not subject to additional dedication. OLD BUSINESS: A letter was sent to Mr. Mrs. J.H. O'Brien of 4434 Oak Chase Road regarding the Commission's discussion and decision regarding their request for an easement over a portion of Oak Chase Park. A reply was received on May 11, from Mrs. O'Brien giving additional information concerning the cost for relocation of utilities. A copy of the letter is enclosed for your review. The O'Briens are asking the Commission to again review their request with this additional information in mind. SYSTEMS PLAN STUDY: Staff will review with the Advisory Commission a concept plan for Pilot Knob Park and potential revisions to Capricorn and Wedgewood Park sites. Comments regarding these park sites will be for- warded to Mr. Erkkila who is now preparing the Implementation Section of the Systems Plan Study. Staff will be reviewing a portion of the Implemen- tation Section prior to the Commission meeting Thursday evening. However, it is not expected that the first draft will be completed for Commission's reviewal until mid -June. Staff will also be prepared to answer any questions that the Commission may have in regards to the study materials to this date. It is hoped that a meeting date might be established for later in June for the consultant to meet with the Commission to review the system study. NEW BUSINESS: A draft policy statement has been prepared by staff regard- ing unauthorized and unacceptable usage of park land for private benefit, in response to the Commission's directive at the May meeting. Please find enclosed this policy statement for your review and modification as is necessary. OTHER BUSINESS /REPORTS: Staff will present a letter from Willmus Family Properties in regards to their response to staff's letter requesting affirmation of their intent to dedicate park land in the Mallard Park Additions. CITY OF EAGAN SUBJECT: REVISION TO A PLANNED DEVELOPMENT AND PRELIMI- NARY PLAT DUCKWOOD TRAILS 2ND ADDITION APPLICANT: RON ERICKSON, KORSUNSKY,KRANK ERICKSON ARCHITECTS LOCATION: LOT 2, BLOCK 1 AND OUTLOTS A, B, C D, DUCKWOOD TRAILS EXISTING ZONING: PD (PLANNED DEVELOPMENT DISTRICT) DATE OF PUBLIC HEARING: MAY 24, 1983 DATE OF REPORT: MAY 18, 1983 REPORTED BY: DALE C. RUNKLE, CITY PLANNER APPLICATION SUBMITTED: The first application submitted is a request to amend the Duckwood Trails Planned Development. This amendment is pro- posing to change the 90 -unit condominium and 58- townhouse units to al- low two 81 -unit apartment buildings and dedicate land to the City of Eagan for parkland purposes. The second application submitted is a request for preliminary plat and detailed site plan approval for the two 81-unit apartments and an out lot which will be dedicated for park purposes. ZONING AND LAND USE: Presently, the zoning of the property is PD (Plan- ned Development District) and would allow an overall density of 310 units. The proposed amendment would increase the density to 324 dwell- ing for a net increase of 14 dwelling units. The Comprehensive Guide Plan designates this particular parcel as R -3 (Mixed Residential) with a density of 6 -12 dwelling units per acre. With the increase of the proposed 14 units, the overall density of the devel- opment would be approximately 9 units per acre or in the mid -range of the proposed Land Use Guide. COMMENTS: The original planned development for Duckwood Trails was in- itiated on May 20, 1980. This overall planned development consisted of 33.5 acres and contained a total of 310 dwelling units. This mixture is a 162 -unit apartment which is presently constructed, a proposed 90- unit condominium and 58 townhouse units. Enclosed is a sketch of the original planned development concept. The applicant had submitted a new request for an amendment which would change the 90 -unit condominium and 58 -unit townhouse. The applicant is proposing to construct two 81 -unit apartment buildings for a total of 162 units which is 14 dwelling units above the original proposal. In return, the applicant is proposing to dedicate approximately 8 acres to the City for parkland. This 8 acres would be a buffer area between Duckwood Estates and the multiple units. CITY OF EAGAN DUCKWOOD TRAILS 2ND ADDITION AMENDMENT TO A PLANNED DEVELOPMENT MAY 24, 1983 PAGE TWO In reviewing this proposal, staff sees some merits in this proposed revision. The City will receive approximately 8 acres of parkland having fee title to and can begin to resolve the parkland issue in Neighborhood 15. This proposed 8 acres will tie in to the DeBoer Park which is north of this development proposal and ultimately tie in to some additional land in the Eagan Heights Commercial area. In the combination of land, the City will then have obtained enough land with- in Section 15 to provide adequate land for a neighborhood park. There- fore, the proposal to shift or modify, the planned development and in- crease the dwelling units by 14 is an equitable trade off for the de- dication of parkland. The proposed development will consist of two 81 -unit apartment build- ings of which 57 units will be 1- bedroom, 99 units will be 2- bedroom and 6 units will be 3- bedroom. The proposed building will have 162 underground parking spaces or one parking space per dwelling unit. The applicant is proposing 166 surface parking which is just over one outside parking space per dwelling unit. The applicant is proposing to reduce the outside parking spaces if they require a garage space to be rented as part of the total price for dwelling unit rent. This has been proposed by the Planning Commission in the past and feel this would be adequate parking for their proposed facility. The applicant is proposing to locate the buildings as far east as possi- ble on the site to create as much buffer and open space between Duck wood Estates and the proposed development. The access would be off of Duckwood Trail; the applicant is looking at a secondary access onto Lex- ington Avenue to provide a better circulation. The Engineering Divi- sion has reviewed this and will comment regarding this secondary ac- cess. Lot 1, Block 1, where the two buildings are proposed, contains 374,121 square feet or approximately 8.5 acres. The proposed buildings contain approximately 64,000 square feet for a lot coverage of 17 The pro- posed land or Outlot A to be dedicated to the City will contain 408,147 square feet or 9.3 acres. If the two buildings are averaged for den- sity over the two parcels, the lot coverage would then be 8.3%. Either way it is calculated, the two buildings are within the 20% lot coverage requirements of the City Code. If approved, the planned development and preliminary plat should be sub- ject to the following conditions: 1) A revised planned development agreement or amendment to the plan- ned development agreement shall be entered into and signed by both the City and the developer. 2) A development agreement shall be entered into prior to the final plat. 3) Outlot A be transmitted to the City as parkland. CITY OF EAGAN DUCKWOOD TRAILS 2ND ADDITION AMENDMENT TO A PLANNED DEVELOPMENT MAY 24, 1983 PAGE THREE 4) The underground parking space be required with the rental of each dwelling unit in order to allow only one outside parking space per unit. 5) The plat be subject to Dakota County Plat Commission's review and comment because the plat abuts a county road. 6) A detailed landscape plan shall be required and an adequate land- scape bond be submitted and not released until one year after the landscaping has been completed. 7) The architectural scheme and materials shall be included with this planned development amendment to insure the buildings are construc- ted in accordance with the proposed plan. 8) A 20' green area shall be provided from the right -of -way of Duck wood Trail and the beginning of the parking lot area. ENGINEERING RECOMMENDATIONS 9) The existing storm sewer outlet for O'Leary Lake must be relocat- ed at the developer's= expense in accordance with City approved plans and specifications. 10) All necessary additional drainage, utility and ponding easements must be dedicated on the final plat. 11) Any existing drainage, utility or ponding easement that must be vacated must be done so prior to or at the time of final plat approval at the expense of the developer. 12) The access onto Lexington Avenue shall be eliminated and the nor- therly parking lot redesigned to provide for a cul -de -sac turn- around. 13) This development shall be responsible for any additional assess- ments associated with lateral benefit from trunk water main along Lexington Avenue. 14) This development shall pay in full all outstanding assessments which are the responsibility of the land to be dedicated to the City as park property. -15) Concrete curb and gutter shall incorporate all hard surfaced parking lot and driveways. 16) Parking lot stalls shall be a minimum of 10' X 18'. 17) Appropriate permits from the DNR and Army Corps of Engineers necessitated by the filling of O'Leary Lake must be obtained prior to final plat application. CITY OF EAGAN DUCKWOOD TRAILS 2ND ADDITION AMENDMENT TO A PLANNED DEVELOPMENT MAY 24, 1983 PAGE FOUR ENGINEERING RECOMMENDATIONS continued 18) Detailed grading, drainage and erosion control plans with detail- ed plans and specifications for internal storm sewer design shall be reviewed and approved by staff prior to final plat application. 19) Outlot A shall be graded by the developer as approved by the City within 30 days of final plat approval. MEMO TO: ADVISORY PLANNING COMMISSION, C/O DALE C. RUNKLE, CITY PLANNER FROM: THOMAS A. COLBERT, DIRECTOR OF PUBLIC WORKS DATE: MAY 18, 1983 SUBJECT: PRELIMINARY PLAT DUCKWOOD TRAILS 2ND ADDITION The Engineering Division of the Public Works Department has the following comments pertaining to the above proposed subdivision: UTILITIES Sanitary sewer and water main facilities of sufficient size, depth and capacity to handle this proposed development have previously been installed under Project 308 for the Duckwood Trail apartment complex immediately to the south. In addition, there presently exists an 18" trunk water main located on the west side of Lexing- ton Avenue adjacent to this proposed subdivision. The proposed buildings will only have to provide individual service connections to these existing utilities. GRADING AND DRAINAGE The topography generally slopes from Lexington Avenue and Duckwood Trail at 914.0 towards O'Lear_7 Lake which has a controlled water elevation of 822.2. This controlled water elevation for O'Leary Lake (DP -7) is maintained by a gravity storm sewer outlet construc- ted under Project 322 in 1982. This provides drainage from O'Leary Lake to the east side of Lexington Avenue into Pond DP -18 which is presently having its gravity storm sewer outlet installed under Pro- ject 362 (Tomark 2nd Addition) to Pond DP -10 located in the south- east corner of Yankee Doodle Road and Lexington Avenue. Further downstream, storm sewer improvements will be installed as develop- ment and drainage requirements dictate. It is not anticipated that the development of these proposed apartment complexes will acceler- ate the need for further downstream storm sewer improvements at the present time. Enclosed as Exhibit A is a map showing the relation- ship of this proposed development to the City's trunk storm sewer plan. O'Leary Lake (DP -7) is a protected wetland under the jurisdiction of the Department of Natural Resources (DNR). The grading plan submitted with the proposed development shows encroachment into the protected wetlands area of this lake which will require the issuance of a DNR permit and possibly one from the U. S. Army Corps of Engineers based on the City's past experience in constructing the outlet for O'Leary Lake in 1982. In any event, extensive erosion control measures will have to be implemented during the construction phase of this process and maintained until all erosion susceptible surfaces have been estab- lished with hard surfacing or sod. ENGINEERING REPORT DUCKWOOD TRAILS 2ND ADDITION MAY 24, 1983 PAGE TWO In addition, as a condition of this preliminary plat approval, the developer should complete the unfinished grading over Outlot A which is proposed to be dedicated as park property. The present uncompleted grading within Outlot A was deleted from the City con- tract at the request of the developer due to their previously pro- posed condominium building construction to occur within that out lot two years ago. STREETS Access to this site will be by way of Duckwood Trail which is pre- sently constructed to its ultimate design section to handle the anticipated traffic volumes to be generated by this development. The development provides for two entrances onto Duckwood Trail with a third entrance onto Lexington Avenue at the north end of the pro- posed development. The staff recommends that this connection to County Road 43 (Lexington Avenue) be deleted from the site plan and that an internal cul -de -sac area be constructed at the north end of Building 2. Lexington Avenue (County Road 43) will be upgraded in the future to a 4 -lane major thoroughfare. With the existing intersection of Duckwood Trail and the proposed future intersections of Golfview Drive (Tomark 3rd Addition) and the access to the 100 acre Eagan Heights Commercial Park to the north, this driveway ac- cess does not conform to City or County guidelines pertaining to spacings of access onto County roads. RIGHT -OF -WAY /EASEMENTS All right -of -way necessary for Duckwood Trail and Lexington Avenue have previously been dedicated under the Duckwood Trail plat. How- ever, this proposed development has Building 2 located over the existing storm sewer outlet from O'Leary Lake which is located with- in a 20' drainage and utility easement. This storm sewer outlet for O'Leary Lake will have to be relocated around the north end of Build- ing 2 with a new drainage and utility easement to accommodate the relocated alignment. In addition, the existing easement under Build- ing 2 will have to be vacated. All costs associated with this re- location, vacation of easements and new dedication shall be the re- sponsibility of the developer in conformance with approved City stan- dards. In addition, the proposed development shows Building 1 encroach- ing within the dedicated ponding easement.for O'Leary Lake in addi- tion to additional fill being placed within this ponding easement. If the buildings cannot be relocated to avoid a conflict with the existing ponding easement, sections of it will have to be vacated and rededicated with the final plat. Any final ponding easements to be dedicated shall incorporate the 885.0 contour elevation. ENGINEERING REPORT DUCKWOOD TRAILS 2ND ADDITION MAY 24, 1983 PAGE THREE ASSESSMENTS 556 1.f. X $19.40/1.f. $10,786.40 Respectfully submitted, Thomas A. Colbert, P.E. Director of Public Works TAC /jack Outlots A, B, C and D have previously been assessed for all relat- ed assessment responsibilities under Project 308 (Duckwood Trail Apartments). However, there is a deferred assessment for lateral benefit from trunk water main for the existing 18" trunk water main located on the west side of Lexington Avenue that was previously deferred until the development of this adjacent outlot. This de- ferred assessment would be levied at the rates in effect at the time of final plat approval. It would incorporate the frontage along Lexington Avenue which is approximately 556'. Based on this information, the additional assessment responsibility would be as follows: In addition, present City policy requires that all land to be de- dicated for City park purposes must have all past levied or pend- ing assessments paid for by the developer prior to transferring the land to the City. Under the original Duckwood Trail subdivi- sion and subsequent public street and utility improvement contract, the assessments associated with Lot 2, Block 1 were to be the re- sponsibility of Outlot A. Therefore, this development will be re- sponsible for paying in full the assessments associated with Out lot A, Outlot B and Lot 2, Block 1, Duckwood Trail Addition as a condition of their park dedication requirements. ADDITIONAL COMMENTS /CONCERNS Parking lot layout as proposed provides adequate access to both apartment buildings. Parking stall dimensions shall be 10' X 18' minimums with concrete curb and gutter incorporating all hard sur- face paving areas. Additional questions or concerns by the applicant or the Planning Commission can be discussed at the Planning Commission meeting to be held on May 24, 1983. y "L C-b LL. i CP- 9 698 0 700.0 v J 24 •OP -I6 b y A 92C O AP-7 -23 885 t/T q31 BP S v J 89 .0 i` e y. 3.7�z0,. P 22 1 i 730 AP -I2 d` '770 885.3 .49c0 i 10 y- -bb 510 ,D-d vE D(u ■181■ d 1.(. r 1 l,�H� rl w II f .L., :;1.•Jr..Y4f rafw t,D 0 _iC EF :893 O t--- t) a G /YI 1 P I y RIJLEY I 1 8 0'n. 1- su6D'. ZEh' +MFR' I`,� 466. D -9 I L, xT L.S. 5 CHC°11 l 24' '3 3 i- LL -1 ;.DP -1 7 878.0 8605 1 874.0 L 877.0 875 0 0 J 'I 1 8-k 1:L FOX 7 LP =7 r i2• 765.0 I 42 i 769.0 n CP -2 t4 820.0 J e Ia s I s f DC. l 1/4 e. ADC. aRn C -k RIDGE 881 3 AND+LLE BP 27 .-A-9 8820 .:Y .100 -I i/ iZ�J 7 866.0 6 r 1L�, i/i 886.3 BP ?5 9245 80 0 890.0 1 //j r i x.. 'j 8400 P-35 i i f i I'z a l, 1 9097 BP -2• 918 0 924.0 8P -6 f 880 3 905.0 7 J tt -4 1 1. C -A 24' C •TH 7 HEIGHTS 822. 'i 828.0 h o: e x> Ie tT A BP -16 .69.. 8 9020 571 1 DP -12 868 -E-s E -r 2' U.S. PO DP -19 SEP .vDP -3 884.0 8700 890.0 8700 77 82 v' 8400'' i F I NZ XJHG fl 1R' r3DDITIC 1 DP-6' l) DP-13 LE I BP 886 j t`LP-42 882. i y B890 f •o 1 1 1 Tv r 842.0 sago 1 M7 .ii.a i I 8- 12 Dr 86957.3 1_871.7• 0 r 8750- L.S. -6� I (1 ,._/0 84 2 0 1 v 1 832.0 DP-4 q. 1 868.0 L.S7 I 874.OL£ ROAD D-p ,v it 0. P7 II 27' l OM, A' l D r i Slf7J :[I a 648.0 ...t,„ 860.0 1 1; I J 14• -b 0 i 1, 680.3 COW. 0, 1 r 0 CCP 6.. o f aVi J-e r o� 9. a L 80 I it l I I r 1 va s 80.3 c{ CE N L Z I ,iDC r?Z.� e f__ JP -I C 69: JP 2 d 15 '�s• Ta- i `1� 795.0 8437 °I LJt'7 .72 4'fS 'f e ro_1i 817 0 I 1 1 1 t, ',.e...„`1: 7 I I 17 839.0-.:.- .1P i5 .44440- JP-11 /I 794.0 7 JP -10----.'i 14 z i i .4a.jj 808 0 ..r 8 B 6 2 L_. 1 1 i::::::;j8E/Plei°36 V L.S.-12 r L .5d 3 1 -b v Y' 1 JP-36 ^�JP 38 8270 L 9166 �6_ i� I OP -3 4z' I dd -1- I 2' 6910 B c 'I -1) :8 JP-35 2 8694 t JP P O g d JP r7?5. 664 8 7 17 18 3 8 856 f 1 858 0 L.. .1 JP-8„, 817 2 8200 L P 44 _A:.848 8 UU?? 83.10 •4IRICK LP -43 850 8 853 0 L-d 1 1 L-F L• -u 1 ar10a1 Y ".£a IS- P.16>- DP -18 870.0 877.0 E_ E DP -1 855.7 862.0 l JP -2 940 0 J -es 1 11 1 1 11 1 i L.P•40 a a r OUTLOT B BP fr ff ES k,ES 11 I) tOMf01I1 4.01 RODE 11M0 1vwlrou 1..• ENGINEERING COMPANY INC. 000 1411T #4116 110111. 1u1M411 r, f.IMMU01• 11111 0M 411•1000 Y,f •,f r r •..f.a.f BLOCK 1 DUCIMOOD DRIVE PRELIMINARY PLAT DUCKWOOD TRAI L 2ND ADD. NORTH SCALE 1. 100' t....n 1 u.o.• w... r•.• I..... M..rw ti.t a� arr- 1 .0 (G- /SA 1 i l v'• 1 MOotfN L 1 r '.1. R B A, tSC CENT /RD 3IRC SUR &IA A /1 11/ 1/ 1' CITY HAL P F r A U.S. POSTAL SERVICE L I 7 ROR.DUNSAY RNANK EkoCASON ARCHII Ler% INC. me... Yams sr ...ma arm. awes PREPARED FOR: O'Leary take e.e.e nr..oe. ars DUCKWOOD TRAILS TWO OUCK W000 117/1 14 leo.4.41 1 4. I1[1.....11.4 N■ )t Sol1N1 .1 7••• •:16%.••• gem F.: f 0 tYPICAL CURB ()HANDICAPPED RAMP SITE PLAN ea aim A 1,4 t A\ A i 3 Nee, 0 SITE DATA Ictrons•40 Plan C)e.ek4oteere SI A LINIIS at 700 ST NeI 99 8 UNIIS et 940 SI Net 14 UN 6 C UNITS at 1041 SE Net 162 107.33 UNITS 101 Al CROSS 11U110ING AKRA 109.33 NIT RENTARL1 AREA PAPKiNG tTita=lel 128 TOTAL SPACES PROVIDI 1. 408 PARKING SPACES RIOU■KRU VIE AREA 594:21 BUILDING COVERAGE inthcates reared contu., indicates e■nlong 4r: a r e t osi d i i b d o 4 nA 0 1 1 3 0 3 ,:•1, by Sulatertanean 1fl31. I, 31/11DINC ELEVATIONS No. 1 C 15° a r id kg 'n e ll lIoO, 5144 e he., flout e‘,1 Second floor lhad fL.or fle 9 auddati No 2 Gerale floor Stab hot Floor Second flow 141.4 flout audd■ng Heoghti :neir of roof t 52.10 grade varies around bldg. oe.1“4:e Rlajln 111 4:J 11 119.219 64 G.* S 1,1/44 lion, 1, Ae ”naa, Catch LocADoN MAP ROAN {••••••11•6 ...SEMI 11•■•• MN. 11 i 9,•■ t11: 7 BENSHOOF AND ASSOCIATES TRANSPORTATION PLANNING AND ENGINEERING CONSULTANTS 7901 FLYING CLOUD DRIVE, SUITE 119 EDEN PRAIRIE. MINNESOTA 55344 (612) 944 -7590 May 12, 1983 MEMORANDUM TO: Cheryl Zinter Barrett Construction FROM: James A. Benshoof SUBJ: Trip Generation and Distribution Characteristics for Proposed Duckwood Trails Two Development BACKGROUND This is to provide in- formation requested by the City of Eagan regarding your proposed Duckwood Trails Two development. Specifically, this memorandum documents the trip generation and distribution characteristics expected for the development. The Duckwood Trails. Two development addressed in this memorandum, would consist of two buildings, each with 81 apartment units. The development site is located on the north side of Duckwood Trail just south of O'Leary Lake and west of Lexington Avenue. Primary access would be to /from Duckwood Trail, with a secondary access point for one building proposed to be located on Lexington Avenue about 550 feet north of Duckwood Trail. TRIP GENERATION REFER TO FILE: 83 -34 -18 The purpose of trip generation information is to understand the amount of traffic that the development would generate. The Institute of Transportation Engineers has published a document entitled, "Trip Generation," which provides infor- mation on trip generation rates for different types of deve- lopment, based on traffic counts at existing developments throughout the country. Applying these trip generation rates to the proposed Duckwood Trails Two development, the resultant trip generation projections on a daily basis and for the a.m. and p.m. peak hours are as shown in Table 1. CITY OF EAGAN SUBJECT: REZONING AND PRELIMINARY PLAT PARKCLIFF 2ND ADDITION APPLICANT: PARKCLIFF DEVELOPMENT CO., RICHARD WINKLER LOCATION: PART OF THE NWQ OF THE NEQ OF SECTION 34 PARKCLIFF 2ND ADDITION EXISTING ZONING: R -1 (RESIDENTIAL SINGLE DISTRICT) DATE OF PUBLIC HEARING: MAY 24, 1983. DATE OF REPORT: MAY 17, 1983 REPORTED BY: DALE C. RUNKLE, CITY PLANNER APPLICATION SUBMITTED: The first application submitted is a request to rezone Parkcliff 2nd Addition from R -1 (Residential Single District) to R -1 PD (Residential Single District Planned Development) to allow deviation from the R -1 zoning requirements. The second application is a request for a revised preliminary plat, Parkcliff 2nd Addition, consisting of 39 single family lots. ZONING AND LAND USE: Presently the parcel is zoned R -1 (Residential Single District) and would allow only single family lots which would have a minimum of 12,000 square feet. The Comprehensive Guide Plan also designates this parcel as R -1 (Residential Single District) with a density of 0 -3 dwelling units per acre. COMMENTS: As you may recall, Richard Winkler made a short presentation to the Advisory Planning Commission and City Council on April 12, 1983. In this appearance, Mr. Winkler had requested that a hardship be look- ed at in regard to the 60% bond requirement for the extension of utili- ties. In this meeting, the City Council gave the indication that Mr. Winkler should submit the preliminary plat, and the City Council would then consider the hardship for the bonding for utilities. Parkcliff phase one and phase two originally were proposed to contain a total of 66 single family lots. The first phase of Parkcliff which has been constructed contains 25 single family lots. The second phase which is under consideration at this time is proposed to contain 49 single family lots. This would be a net increase of 8 single family lots above the original proposal. These 8 lots have been added in the northeasterly portion of the plat. Lots 9 -13, Block 1 were originally proposed as one single family lot and the lots on the east side of Parkridge Drive have been reduced from 112' lot widths to 95' lot widths to add an additional few lots on the east side of Parkridge Drive. In reviewing the net density, the proposed original plat consisting of 66 lots contained a net density of 2.03 dwelling units per acre. The 74 lots being proposed at this time now has a net density of 2.3 CITY OF EAGAN REZONING AND PRELIMINARY PLAT PARKCLIFF 2ND ADDITION MAY 24, 1983 PAGE TWO dwelling units per acre. Therefore, the overall density is still with- in the guidelines of the R -1 land use for 0 -3 dwelling units per acre. The reason the application for rezoning to the R -1 PD is that on the south and east side of Parkridge Drive, the applicant has reduced the lot widths from 100' widths to 90' and 95' lot widths. The depths of the lots is the reason why the application for rezoning is requested. The width from Parkridge Drive and the boundary of the property is 110', thus the applicant is providing adequate width but cannot get the depth to be able to obtain the 12,000 square foot per lot. The square foot- age on Lots 12 -19, Block 2 drop to 10,450 square feet. However, the lot width is 95'. Hence, the applicant cannot meet the square foot- age requirement and therefore the applicant is requesting the planned development zoning to allow a deviation from the lot size requirement. In reviewing this plan, it was stated earlier in this report that the applicant is proposing an increase of 8 single family lots. If the applicant would reduce the increase to 7 lots, he could then meet the square footage requirement and width requirement for R -1 zoning. How- ever, the applicant has requested that the City review the potential for the 8 additional lot due to the fact that there will never be development to the south or to the east of this proposed plat because it abuts a County park. In the original review of the Parkcliff preliminary plat, there is an exception for a parcel which Mr. Winkler does not own. In the original proposal, staff had suggested stubbing a street to this exception which could then eliminate one direct access onto Cliff Road in the future. However, the party who owns the exception wanted nothing to do with this stub street to provide access, so the City and County in the fu- ture will have to allow a second access onto Cliff Road in the future. Since the special meeting of the Advisory Planning Commission held on May 10, 1983, staff has requested that the applicant prepare a grading plan and show how the houses can be constructed on the lots which do not meet the 12,000 square foot requirement. Because of the short no- tice to the developer, it was unable to be attached to this packet, but the developer has indicated that he will have this ready to review with the Advisory Planning Commission on May 24th. If approved, the preliminary plat should be subject to the following conditions: 1) A developer's agreement be prepared and signed prior to final plat approval. 2) A planned development agreement be prepared and signed prior to final plat approval. 3) All easements be dedicated as requested by City staff. CITY OF EAGAN REZONING AND PRELIMINARY PLAT PARKCLIFF 2ND ADDITION MAY 24, 1983 PAGE THREE 4) All other City ordinances must be adhered to. 5) The plat should be subject to the Park Commission's review and comment regarding the 10' trailway easement between Lot 11 and 12, Block 2. 6) The plat be subject to Dakota County Plat Commission's review and comment because the plat has access on Cliff Road. DCR /jach ENGINEERING RECOMMENDATIONS (None) MEMO TO: THE ADVISORY PLANNING COMMISSION, C/O DALE C. RUNKLE, CITY PLANNER FROM: .THOMAS A. COLBERT, DIRECTOR OF PUBLIC WORKS DATE: MAY 19, 1983 SUBJECT: PRELIMINARY PLAT PARKCLIFF 2ND ADDITION The Engineering Division of the Public Works Department has the fol- lowing comments pertaining to the above referenced application: UTILITIES Trunk water main of sufficient size and capacity to handle this pro- posed development is immediately available to this subdivision locat- ed on the south side of Cliff Road. In addition, sanitary sewer can be extended into this plat from the existing manhole on the south side of Cliff Road at the intersection of Oak Chase Road. However, because the developer has not submitted a grading plan delineating the propos- ed elevations of the lots within the 2nd Addition, the Engineering Di- vision is uncertain whether the elevations of this sewer will be ade- quate to handle the low lying lots within the 2nd Addition. Based on the elevation of the existing sanitary sewer, only those lots above a 965.0 surface elevation could adequately be serviced by this existing sanitary sewer. However, we cannot determine if there are any lots below this restrictive elevation at the present time. GRADING AND DRAINAGE The general topography of this subdivision slopes from the west at an elevation of approximately 1045.0 to the east plat line at an eleva- tion of 930.0 All surface drainage would be directed to the east into the Dakota County Regional Park and ultimately into Holland Lake. The attached trunk storm sewer map shows the relationship of this sub division to the drainage within the Dakota County Park. When the Parkcliff 1st Addition was processed in 1978, Dakota County had serious concerns pertaining to the drainage from this subdivision through park property and ultimately into Holland Lake. The original plat for this area provided for a detention storage pond to be locat- ed in the center of the proposed Block 1 with a controlled storm sewer outlet discharging into Dakota County property. A review by the Da- kota County Plat Commission required that "the proposed overflow must have an agreement with the County before constructed into County owned property. In this agreement, the size of the pipe, the elevation of the inlet and outlet must be designated; and also stipulated as to maintenance and upkeep of said structure." as per a letter dated April 10, 1979. The staff has not received any detailed grading, drainage or erosion control plans that delineate the proposed storm sewer, pond ing areas or downstream drainage requirements by the County. Subse- quently, the staff cannot make any recommendations pertaining to the feasibility of the development of this 2nd Addition until these de- tailed drainage and erosion control problems are satisfactorily re- solved. ENGINEERING REPORT PRELIMINARY PLAT PARKCLIFF 2ND ADDITION MAY 24, 1983 PAGE TWO STREETS The proposed subdivision of the 2nd Addition provides for a connection to the existing streets constructed under the 1st Addition with a con- nection to Cliff Road which would provide two entrances into this sub- division from Cliff Road. However, because of the steep topography of this property, it is unlikely that the development will be able to meet the Subdivision Ordinance requirement of a maximum street grade of 8% or less. However, staff has not received any grading plans to indicate the proposed grades or elevation of the streets within the 2nd Addition. Therefore, no comment can be offered at this time per- taining to the feasibility of this subdivision in relationship to ac- cessibility. The Dakota County Plat Commission has previously concurred with this second access onto Cliff Road as being acceptable. However, they have indicated that in the future, if and when Cliff Road is ever upgraded, one of the two entrances may be restricted to a right -in right -out only. EASEMENTS /RIGHTS -OF -WAY A 75' half right -of -way shall be dedicated for County Road 32 (Cliff Road). Due to the topography and heavy trees in this subdivision, it is recommended that a 60' right -of -way be provided to incorporate all necessary utilities within the boulevard areas that would normally go within a 10' easement outside of the dedicated right -of -way. Without the ability to review a grading and drainage plan detailing surface water and storm sewer management, the staff is unable to recommend a storage capacity, location or elevations for any internal required ponding areas. All typical common lot line drainage and utility easements shall be dedicated on the final plat in addition to whatever subsequent pond ing easements may be determined to be necessary. ASSESSMENTS This property has not been assessed for any lateral benefit from trunk water main associated with the 24" trunk water main installed under Project 261 along the south side of Cliff Road. In addition, there have been no trunk area storm sewer, sanitary sewer, or water area assessments levied which should be a condition of final plat approval. All trunk related assessments should be at the rate in effect at the time of final plat approval and based on final dimensions and area calculations as defined by the final plat. Based on the preliminary plat information and 1983 rates, these trunk assessment obligations are summarized as follows: ENGINEERING REPORT PRELIMINARY PLAT PARKCLIFF 2ND ADDITION MAY 24, 1983 PAGE THREE SUBTOTAL $75,621.93 These additional assessments associated with the development of this property will be due and payable with final plat approval unless they are listed as a pending assessment under some subsequent future City project or a. "Waiver of Hearing Consent to Assessments" is executed prior to final plat application. All costs associated with the installation of streets and utilities to service this subdivision must be the entire responsibility of this development. OTHER CONCERNS /COMMENTS Again, because staff did not receive adequate information pertaining to proposed elevations, we cannot comment as to certain critcal lots and their ability to be developed based on elevations in relationship to sanitary sewer or access from the internal streets. In addition, staff experienced difficulties with this applicant in controlling erosion during the development of the 1st Addition. Ex- tensive erosion, siltation and sedimentation occurred with poor re- sponse from the developer regarding the required cleanup as requested by the City. This second phase, with its more extreme and difficult topography, is more susceptible to severe extensive erosion. There- fore, a very detailed erosion control plan and implementation sched- ule will have to be reviewed and approved prior to final plat appli- cation. Due to the many concerns of the Engineering Division pertaining to sanitary sewer service, storm sewer ponding areas, drainage impact on County Park, street grades, erosion control, etc., the staff is recommending that this preliminary plat application be continued at least 30 days to require the applicant to submit the necessary in- formation to allow an adequate review by the Engineering Division so that proper recommendations can be made for consideration by the Planning Commission. 1) Trunk area sanitary sewer: 18.4 acres (net) at $1,070 /acre $19,688.00 2) Trunk area water: 18.4 acres (net) at $1,070 /acre $19,688.00 3) Trunk area storm sewer: 801,750 square feet (net) at 4.31 /sf $34,555.43 4) Lateral benefit from trunk water main: 105 1.f.(corner lot credit applied) at 16.10 /1.f. 1,690.50 ENGINEERING REPORT PRELIMINARY PLAT PARKCLIFF 2ND ADDITION MAY 24, 1983 PAGE FOUR The staff will be available to discuss these concerns in further de- tail at the meeting of May 24, 1983. Respectfully submitted, r Thomas A. Colbert, P.E. Director of Public Works TAC /jach .11 2' 'S 7_ .1 87 o,., -d Dor' 3f 1,91_40. n1 d/: I 878 0 11 427' r E.1 4P1, k .0-, .D /it 860 0 1 11 13.‘%3. 1 1 t-g I 1 All' /7 ri WU:C.071 8 t• OP8 J-4 0-c ti 892.0 880 3 DP-I9 I Eh i GArDEN /v) II 8°8073 j ,9 8P 4 3 -3 6 1 .0 4 V .9 877.0 870.0 1 JP-I6 Lot Nrr.•••31.0 I jil 'iT P1 jp:33 875 0 NO 878 0 ,TT,•„;/, „,r_v-tv J P 4 5 j 6 P 9 2 4 2 6 .95-40 JP-17 r Il ll 1111 _1 rAl- 8390 839.0-, 7? L '"1 1'32 •er) zr•••••• •_Sha,y0aLE 8I23 8/8.0 i.NOyDNNLE i LE? i 870.6 OP-35 8200 869.4 ii\ 872.4 I so- 7 -37 JP-48'i 7 JP 20-874.0 859.4: s.0 8750CP 12- c :..864.0. d„ ..t■:.;,e,S7 °1 ----P. lil 856.0 858.0 7 Frrrr7 iL 8530 ;.835.0 T 8420 LP-5 1 •1 N-• 74 84 70 85/0 I JP 8 627 8 LS.-12 LP-56 is 4, r I r 0 j• 8 8P-II v. 1-N- 11-n 92651,7,0;g•:. 1, r 742: :174 h r..- 7 1 :0 1 ....9200 7.-1 94'40 4;CA 8- P B-r 42 0 850.8 LP 8 53.0 I 8480 1 8560 0 86 5 832 0 886.3 8260 .1_1 8 9 7 0 8 6 4 3° 1;S:ie.' 54?-1 j8222.111\1‘ 887.0 J JP-11 1. 1900 1 4 JP-39 J-1'7 1 '36 0 INL 8960 An J T i 'N., 8300. 1 JP-44 I i Jp_31 1 ci 8 9 O. 7 r i .K 41.1... 8770 i I J-9 Iff'• P741 JP-I9 870.2 N. N 1 J-p rl 0 872.7 882.0 N, 41, JP-20 852.0 N 8550 L.S-17 2 JP-2, jP L 8170 '8970 40 JP-42 cr 8871 2 i 888.0 5860 12 7 884.0 8 400 1 JP_ 815.3 JP-22" 1321 .0 836.0 s N. i ',N.I \v• s s y JP-29 ti s 940.0 VA 1 925.3 sr! J-ee •;:.-1 J-t .1 1 vt. f *rut I I I I 4 1 I r r• I 0' Z. Ldi 774 IL ;CP: si 1.. ,74 I I 9 8 0 4 884 0 nz,), L-5-28 8218.0 LP- 20 914 2 9/7 J LP 861 3 8750 1" TA t l. 'A LP-21 coJr, 7-y 1 1 902 5 PIA i'i r■ A 9040 __I-- t. LP-I3 920 4 92' 0 2 LP-45 878 3 881.5 J 900 2 9030 fl JP-28 9560 968.0 a- -50 -1-8138-641 r,70,7.7:;322)-4"/4 LP 882D, "0 -24 32 60 h JP 896.0 900.0 sA00.. 7.7 HORN 1 LP-33 886 2 8880 tP 868.0;: LP-32 0' 8770 9730 P-411C 9180 LP•25 926 0 92(0 mit -I( LP726 970 ti 7 0. 4 .4 0 2 I) Nyi LP-22 LP-31 4 4L rts APO P 9"4 LP-27 922 0 9260 r GP I 883 0 I I No" JP-23\ 852_2 8553 JP-24 817.0 a 8/9. qe• I J-4.411-035 s4:2. No. 41 I L- 1 GP 6 CC 907.0., 902 .0. LP-47 9060 Lp 1 9070 1.5.11 9120 I LP-?9 9110 9130 i 1 CCC CwCCT 70 r;7 1 :1 1 r----r---- 1 i z -46c:t 7 N -4 --z:-.., 4, 7 1 THE NORTH !.4 CORNER eg SIC. 3w, T.JJ R.Z 3 w. PARKCLIFF 2ND ADDITION COUNTY ROAD NO. 32 /7 4 cLi• ROAD A D 7 NORT 14 LINE OF SEC 34, i'VAL,RZ31 1 39 EXCEPTtON L 144.7AI a 1 4 1 SA* %2. I IS 1 10 1 1 5 t 14 If 44. tt is) II I It.s. z a 4 C o. so 46. A I 114 .e.ss. I I 4...ssA 14 JTh Lite Cr nAC f4062 OF TYE Nowt,' •St 54 z11 :F GB R -III Ind. •Et• a SJS.• so. e aoe i t`. 4 '1 Rill tiK 1t J 1 „1 COMMERCIAL r PLANNED DEVELOPMENT 0 tr PARKVIEW GOLF COURSE ROOL '.SETMENT r pl4Fr 111111 -7 4NiL tilb tat las- P ormwasis 14 11. vappamunt 1111 Am I ED r) 'Sk .4 .3 .7: j••• r W. .41 <4, ..7„..1,1.tAl 4 we •'-jl J' .0- --1.- 1. A .)-1* y )1 i :".;,.\..1..).‘■-) ,..47:„):••I :1 6.-- ,.3 !j.,,;..-).,.:,.i..- .6-f. 7 ....,.1•••>.; 0 i....1.; a-• .1 k 1-•• 1...Yi r ,...1,,,, ,;,,,,..,7„?• .0...,..1:. J <,(iz -1- ...is 4 .„2: ',1 7-r? :.1,./ C): 1 L! s ..k il J 3' 04.) _,.4.....yy ).......;v. 1 .7 i s 4 '7 --A 1.)4 2 -I 4 i 1-..... J ,,,.,<C"A t 1,.. t y 1., z '''•5* 'i .0 /..).i 1:, .1'''.■ 1.1. „)..5* i. ),-...1 11•.•-•.4.-) .;'••.r. 5 •-•:.f' ..f... I s ..P.L., 1.0 l v i -I i 47,. Y I :„,y -:.t 4 (0, L.) ''.1... 1-) J 1 --.:1,--.,,y, t .,,x.),-.7..,•.- 4, .I,j ..I■ A 1 1 p A C CITY OF EAGAN SUBJECT: REZONING AND PRELIMINARY PLAT SUNSET 2ND ADDITION APPLICANT: ARLENE KRECKLAU LOCATION: PART OF THE SZ OF THE NW4 SECTION 25 EXISTING ZONING: A (AGRICULTURAL) DATE OF PUBLIC HEARING: MAY 24, 1983 DATE OF REPORT: MAY 19, 1983 REPORTED BY: DALE C. RUNKLE, CITY PLANNER APPLICATION SUBMITTED: The first application submitted is a request to rezone approximately 5 acres from A (Agricultural) to R -1 (Resi- dential Single District). The second application submitted is a request for preliminary plat approval, Sunset 2nd Addition, which would consist of approximately 5 acres and contain 12 single family lots. ZONING AND LAND USE: Presently, the parcel is zoned Agricultural and would only allow one home per 5 acres. The Comprehensive Guide Plan designates this parcel as R -1 (Residential Single District) with a density of 0 -3 dwelling units per acre. COMMENTS: During the past month, the City had received an applica- tion for Sunset 1st Addition which is located just north of the exist- ing property. One of the conditions of the Sunset 1st Addition was that adequate access for right -of -way be obtained for Hackmore Drive. The application now submitted, Sunset 2nd Addition, will be providing the 25' half right -of -way for Hackmore Drive. Access to this development is by a cul -de -sac, Kirsten Court, which would extend 450' in to the property. The applicant is proposing to plat 12 single family lots of which all lots meet minimum R-1 zoning standards. In reviewing this particular subdivision, staff was looking if access had to be provided to adjacent properties. The parcel directly south where the road could continue on abuts Golden Meadow Road on two sides. Therefore, the property to the south has adequate access for develop- ment in the future. The applicant presently has a house on the 5 -acre parcel. This house is located on Lot 5 of the plat. In review of this lot, the house would meet all setback requirements and conform with all regulations of the new plat and zoning standards. The question may be raised, since the house is presently on a septic system and well, that at what point the house would have to connect up to City services. CITY OF EAGAN REZONING AND PRELIMINARY PLAT SUNSET 2ND ADDITION MAY 24, 1983 PAGE TWO If the rezoning and preliminary plat ject to the following conditions: 1) No variances be allowed for side or vegetation reasons. are approved, it should be sub- setbacks except for topographic 2) The plat should be subject to the Park Commission's review and recommendations. 3) A development agreement shall be entered into and signed by the applicant prior to final plat application. ENGINEERING RECOMMENDATIONS 4) An approved detailed erosion control /grading plan shall be receiv- ed prior to final plat approval. 5) Storm sewer be required to be extended from the trunk storm sewer within Golden Meadow Road to provide for drainage for this devel- opment. 6) The water main shall be stubbed to the south boundary line of this development. 7) If installed privately, the plans and specifications for the util- ities and streets shall be prepared by a registered engineer and approved by the Engineering Department. 8) If previously not dedicated, the 25' half right -of -way for more Drive shall be dedicated as a part of this final plat with the right -of -way for Kirsten Court. 9) Sufficient easements shall be dedicated along all property and right -of -way lines. Hack along lines 10) This development shall accept its responsibility for trunk area storm sewer assessments at the rates which are in effect at the time of final plat approval. 11) All costs for installing the internal utilities and streets shall be the sole responsibility of this development. MEMO TO: THE ADVISORY PLANNING COMMISSION, C/O DALE C. RUNKLE, CITY PLANNER FROM: RICHARD M. HEFTI, ASSISTANT CITY ENGINEER DATE: MAY 19, 1983 SUBJECT: SUNSET 2ND ADDITION PRELIMINARY PLAT The Engineering Division of the Department of Public Works has the following comments for consideration by the Advisory Planning Commis- sion and City Council on this development. DRAINAGE /TOPOGRAPHY The existing topography consists of two small knolls at an elevation of approximately 937.0. Meanwhile, the slopes associated over this parcel generally do not exceed 8% with the exception of the extreme southwest corner of this parcel where the slopes exceed 16 Corres- pondingly, the drainage from this parcel is to the north, west and south. Furthermore, this parcel is situated with the drainage basin for Pond LP -32 (Schwanz Lake). Presently, this pond has no outlet, however, the City's consulting engineering firm is in the process of studying this pond and several others within the City to determine when it would be appropriate to construct the controlled outlet ele- vations. Figure 1 more clearly illustrates the relationship between this parcel and the drainage area. In order to contain the drainage from this development from impact- ing adjacent land, storm sewer should be extended from the trunk within Golden Meadow Road to the north to service this property. At the same time, this storm sewer can be extended north to serve the Sunset 1st Addition thereby eliminating the necessity of utilizing Lot 1, Block 1 for ponding purposes. UTILITIES Utilities of sufficient size, depth and capacity exist within Hack more Drive to the east line of this property. The sewer and water within Hackmore Drive are to be extended west as a part of the Sun- set 1st Addition. Existing utilities are shown in Figure 2. If con- structed privately, the plans and specifications for the utility and street construction shall be prepared by a registered engineer and submitted to the Engineering Department for approval. As for the proposed utility layout, the water main should be extended to the south property line between Lots 6 and 7 to facilitate future ex- tension. STREETS Access to this development will be off of Hackmore Drive when it is extended to the west. Hackmore Drive shall be a 32' face -to -face wide street with concrete curb and gutter and bituminous surfacing. This street is scheduled to be completed with Sunset 1st Addition. ENGINEERING REPORT SUNSET 2ND ADDITION PRELIMINARY PLAT MAY 24, 1983 PAGE TWO The proposed street is to be a cul -de -sac off of Hackmore Drive. This cul -de -sac is within the 550' limit as set by City code. The internal street should be 32' wide face -to -face with concrete curb and gutter and bituminous surfacing. RIGHT -OF- WAY /EASEMENTS Presently, the right -of -way for Hackmore Drive has not been dedicated. However, the entire 50' right -of -way for Hackmore Drive is intended to be dedicated with Sunset 1st Addition, but if it isn't, it should be a requirement of this plat to dedicate a 25' half right -of -way for Hackmore Drive. In addition, the proposed 60' right -of -way for Kir- sten Court shall be dedicated as a part of this plat with the align- ment the same as for the street to the north within Sunset 1st Addi- tion. Since storm sewer will be required for this plat, an easement of suf- ficient width will be required for the storm sewer line as it crosses the property immediately south of this proposed development. This will be required to be obtained prior to final plat approval. In addition, a 10' utility easement should be required to be dedicated along all publicly- dedicated right -of -way with a 5' drainage easement being dedicated along all exterior lot lines and a 10' utility and drainage easement to be dedicated and centered over all interior lot lines with the exception of the lot lines between Lots 5 and 6 and between Lots 6 and 7. In these cases, the utility easements should be 20' in width. ASSESSMENTS Trunk area assessments for sanitary sewer and water have previously been assessed for this parcel. However, storm sewer trunk area assess- ments have not been levied, and therefore should be considered as a part of this final plat approval at the rates which are in effect at that time. Currently, this would amount to $7,960 (4.24 acres X 43,560 square feet per acre X 0.0431 dollars per square foot). All costs for installing the internal utilities and streets shall be the sole responsibility of this development. I will be available to discuss any aspect of this report with the Advisory Planning Commission at their meeting on May 24, 1983. Respectfully submitted, Richard M. Hefti; P.E. Assistant City Engineer RMH /jach 1 ('2 1 868 0 LS-, 1. V•I 87 t •,•cl or' e .i E-d E:- e 1•1 1 I ;r r, r t t e 85/ 1 %N IV I. I I I eso.o 7 2 gfaT 1 1, ;111 ;I! 866 0 '877 0 DP:8 880 3 DP-18 JP- 16 E-h 6 ;I 882.0 T273 87 7.0 870.0 67.1,0C!1 L;yr 14 cy 8460 J-e t 1; 882.0 7 875 0 48 J -d 878 0 '4' •777-. 1177'15 1 16 i E. 872.0 866 0 JP-45 890.3 JP-41 8.540 892.2 848 0 r• 832 0 j 7.°0 i 7 1 11- PI, 3't .1t6.- 1 31•155 I st JP-13 JP-46 12 8970 7 0 _:85/0 JP 42 88887603 L.S. P /.0 e6 1 1 8260 L.5.-14 1 1 888.0 2 to "JP f 6900 1 8390 886.0 41.JP-15 Jb•r1.7.5 4 Et IN 830.0. ,Knan/ J.h, (880 0 I 9890 7 jn27. 8920 8 4 6440 JP I r 839.0.. N 815 7 JP-44 0 j8 4 Elsa o .4 8208 827.6' .8123 ...I.... 1 ..-I e19.° 1 -.S. -1 2 1, r_.,... i S'KOVOC:LE I JP .:36 jp-35 38 8706 816.6 3 2 8200 869.4 Y. \t..-4 4 872 It -37 JP-48 ie., JP-7- ,72.0-874.0 859.4: ?75.0 875 of C 2 ,r.86,4.0. 1 1-- -7 7,1..... ,..N.; t I s "'_s_VV-.-_,.., L 63 7 3•1;:"•....71;';'.... y 856.0 J --e I 5'58.0 I 4 -34 8530 4 8410 .835.0 -8 7 If '4-Ar' t 71' (r1 1 41)t JP-10 t 11-4.44.. h LP•54 14900 8-. 9065 •'N 7 -'7-77 4 LPT-5 892D 8 u p. 11 -4. 4. ^I, -4 .1 t oo., ti L• i I/ JP 9 H 817.0 1 V-dd PATF8CK E JP-8, 817.2 8200 L P 4 e2. 8 4 8.8 LP- 43 850.8 853.0 J- e e t t 2 14 6- 1 1 vr 1 I i z r-. 6 11 g I 1 't z 1 1 666 ..:),1 ';-t-1 1 s !,1 i Er! -....a...W.% AT.F.: z0-us -7-r....- ;osax.-_-..:..1j11_1, J-e I L.- 8 P 8 4 4 j 8890 895 5 898.5 1 i;•=9 r .e.&..,9 k .r 9200 .41, !C111..: ■.4,;•• r..1 94 0 .0, r z 4 868.0 r-` i; rui!F k LP- 20 914 2 9/73 1 I to ..■1 )!:3 JP■19 N J JP 874.0 872.7 882.0 z 0/2 sy JP-29 925.3 940.0 P- 36 861.3 4750 LP-21 902 5 'e 9040 1 ;70 -1 4 3 -----1- .1 se ...t 1 0 1" 21 JP-- 34 884.0 1....• 8400 8P153 -2 f 1 Ve• 8900 J-s S -5 .--e r j_, r f(s JP I II I 621.0 (d._\:•. \e t c. 836.0 1 1 .e.1 FIGURE 1 LS-18 re I ----7 804 L1 I 1 1-8/80 ‘..-1 1-- i j-1 ti..ESJE .1 1 PARC_L. 41- JP-28 968.0 9560 j" _898.0 a: 1 50 LP- 61 9030 Q92 0 884 4 I 6 8940 L 0 I' LP-52 898 0 900.0 LP-4G 43792 88/ 0,x0 -25 88 3 7 Lep6.72036 63..6 "878 4c 8670 8640 LP-45 878 3 882.5 LP 900 2 9030 J-p JP 852.0 855.0 LP-34 8 790 88.50 14 LP-24 8812 886 0 L.S.-24 LP-33 886 2 8860 LP-32 9730 8770 LP-22 ,90, JP-25. I i Y i 8/9.3 817.0 8/ 1-_..t I, v Jo JP 896.0 il J'",4,0170Pi skr. NO. 611 9000 1 .0 L 4 1 A --1" LP 25 926 0 927 1 J-x ,'7 7 JP-231 652.2 8553 1 i 4 '21 LP 907.0 909.0 JP-24 r--1. J-bb 29 1- 9:04 .0 0 7 9 9 1 1 1 12 r LP-28 911 0 9150 LP-27 922 0 I 9260 1 P-•23 1 CO. R0.30 DIFFLEY RD VICosiV YAP SECTION 2S, l at S 2 SCALI 1'. 40' PRELIMINARY. PLAT: SUNSET. 2nd ADDITION EXISTING CONTOURS- VICINITY MA► N- scut 1•• 4p. PRELIMINARY PLAT: SUNSET 2nd ADDITION HACKMORE so0oo DR. 11.640 00 7 T t I b 1 1 25.00 f 7 r-/ 12a00- -1 4 1 1 It,766. 60 I T1 N 10 00' 12.004 71 FYI 4 12 r 0 0 X/ zoom). o07i o toA0000 R i o1 8 267 00— J 242.00— 634 60 SITE DATA WILL a. u.. or i. 11 -5.a �11 In II, .1� W. i� f w!Wn i &5. o•5.. w mg, �wr� a .1 r., w ar Mac. mai .s Karl wort l• N., 1>. 1 NM •+d1 a :mum,/ H 1. w I.L. 1 t. &au luau 1i al auy 141.1 W. 1.11 w.•. 5.a. 1.1 Yaaam, •LL 1.1 n Y. 1 wA 1•.y Wnvt laa a. Y. M 11•4 1W1 allona1 b, 11 low Wow/. 141 OW Lau, awlT aaaullaa. 1,1 1115.1 r. ••111 1. 4 ..r 1_,. ,/.7:17::::.:::;_.", 1 •I .i aye .7' ,..c .7 r.... f I .......i C ......1 ;,....t 7 7 Ind. 1 i CITY` o•.•1.4 R-I1 I nd. .0 G6 i i 11 r Ind. ''\I ,......0..., ...leila-s, P...Cf... r R-H Ind 3 e. COMMERCIAL PLANNED DEVELOPMENT 3 v v? V 1 1 n i y .•S .,.,j. tJ S. J .1 i i:;., C f, CITY OF EAGAN SUBJECT: PRELIMINARY PLAT ROBIN LANE 1ST ADDITION APPLICANT: METRAM PROPERTIES, VASCO BERNARDI LOCATION: PART OF THE SW4 OF THE SE4 OF SECTION 17 EXISTING ZONING: R (RESIDENTIAL MULTIPLE DISTRICT)AND R (RESIDENTIAL TOWNHOUSE DISTRICT) DATE OF PUBLIC HEARING: MAY 24, 1983 DATE OF REPORT: MAY 19, 1983 REPORTED BY: DALE C. RUNKLE, CITY PLANNER APPLICATION SUBMITTED: An application has been submitted requesting preliminary plat approval, Robin Lane 1st Addition, consisting of approximately 9.6 acres which would contain 2 apartment buildings with 112 dwelling units and 10 townhouse units located in the part of the SA of the SE4 of Section 17. ZONING AND LAND USE: Presently, the parcel is zoned R -4 (Residen- tial Multiple District) and R -3 (Residential Townhouse District). The application submitted is consistent with the existing zoning and the density permitted within the R -4 and R -3 zoning districts. The Comprehensive Guide Plan designates this parcel as R -4 and R -3 and the development is consistent with the proposed Land Use Guide. COMMENTS In review of this application, the biggest and most crucial issue to this development proposal is the access to the site. In review of access, the triangular portion is the only undeveloped portion along Silver Bell Road. To the east of the proposed development are the Manitou Townhouses which have private drives providing access to that development. To the west is Shannon Glen Condominiums which take di- rect access onto Silver Bell Road. The triangular portion undevelop- ed is zoned R -4 and does not have direct access to Silver Bell Road. Therefore, the triangular multiple zoned parcel is landlocked from access to Silver Bell Road. The applicant has met with the Manitou Townhouse Association to see if they could purchase access through Golden Hill Terrace. The Manitou Association and Metram Properties could not reach an agreement so this access could be worked out. Therefore, the access to the property will be from Robin Lane. Pre- sently, Robin Lane is a dedicated unimproved street running north of the property. Utilities have been provided in Robin Lane, but the street has not been constructed to City standards. The street will have to be upgraded in order to provide access to this development. From Robin Lane, the applicant is proposing a private street to pro- vide access to this development proposal. The private street is approximately 800' long and would terminate in the parking lot of Building B of the proposed development. CITY OF EAGAN PRELIMINARY PLAT ROBIN LANE 1ST ADDITION MAY 24, 1983 PAGE TWO As stated above, the access would be provided by this private street, however, Golden Hill Terrace and Bluebill Drive could be used for emergency vehicles if the private street was ever blocked. The proposed development will consist of two apartment buildings con- taining a total of 112 units. Each building would contain 24 one bedroom units, 26 two bedroom units and 6 three bedroom units for a total of 56 units per building. The applicant is proposing to pro- vide 116 underground parking spaces and 108 outside spaces for a total of 224 parking spaces. The applicant has proposed only a total of two spaces per unit instead of the'required 2.5 spaces per unit. This request has been reviewed by the Advisory Planning Commission in the past, and as long as the applicants require an underground park- ing space be rented with each unit in the building or the applicant provide the additional 56 outside parking spaces for the two apartment buildings, this requirement will be met. In review of this layout and design, it appears that the parking spaces are a 9 X 20 or 18 dimension. The present ordinance requires a 18 -20' length and a 10' width. Therefore, the existing parking should be expanded to the. 10' parking width requirement of the City code. The R -4 zoning consists of 7.3 acres and the 112 units are within the density requirements of the R -4 zoning. The lot coverage for the two apartment buildings are 14.6%, which is also within the City code requirements. The applicant has met all setback requirements and other City code requirements. The townhouse portion of the site is at the northerly end of the property under consideration. The R -3 zoning consists of 2.3 acres and the 10 townhouse units are within the density for the R -3 zoning. The townhouse portion meets all setback requirements and lot cover- age requirements in accordance with the City code. If approved, the preliminary plat should be subject to the following conditions: 1) A development agreement be signed and entered into prior to final plat approval. 2) Robin Lane shall be upgraded in order to provide proper access to this development. 3) The parking space shall be in conformance with the Eagan City Code which is a 10 X 20 dimension. 4) If two parking spaces per unit are allowed for this develop- ment, the applicant must rent an indoor parking space with each of the dwelling units or the applicant shall conform to the parking requirements of one covered space per unit and 11 outside parking spaces per unit. r, CITY OF EAGAN PRELIMINARY PLAT ROBIN LANE 1ST ADDITION MAY 24, 1983 PAGE THREE 5) A detailed landscape plan shall be submitted and approved by City staff and an adequate landscape bond shall be sub- mitted and not released until one year after the landscaping has been completed. 6) The plat shall be subject to the Park Commission's review and comment for park dedication of this preliminary plat. ENGINEERING RECOMMENDATIONS 7) An approved detailed erosion control /grading plan shall be re- ceived by City staff prior to final plat approval. 8) If the utilities and streets are to be installed privately, then plans and specifications prepared by a registered engineer shall be submitted to the Engineering Department for approval. 9) The proposed internal platted street shall be a minimum of 28' wide with concrete curb and gutter and bituminous surfacing. 10) The parking areas shall have concrete curbing around the peri- meter with any interior islands consisting of concrete curbing also. 11) The entire right -of -way of Robin Lane shall be dedicated as a part of the final plat. 12) A minimum of a 20' utility easement shall be required over all water main, sanitary sewer and storm sewer to be constructed within this proposed development. 13) A 10' utility easement shall be dedicated adjacent to all public right -of -way with a minimum of a 5' utility and drainage ease- ment being dedicated along all exterior lot lines and a 10' utility and drainage easement dedicated over all interior lot lines. 14) A ponding easement will be required to encompass the 840.0 high water level elevation of Pond AP -38. 15) This development shall be responsible for its additional storm sewer trunk assessment resulting from upgrading of zoning from residential to multiple. 16) All costs for installation of internal utilities and streets shall be the sole responsibility of this development. MEMO TO: THE ADVISORY PLANNING COMMISSION, C/O DALE C. RUNKLE, CITY PLANNER FROM: RICHARD M. HEFTI, ASSISTANT CITY ENGINEER DATE: MAY 19, 1983 SUBJECT: ROBIN LANE 1ST ADDITION- PRELIMINARY PLAT The Engineering Division of the Department of Public Works has the following comments to be considered by the Advisory Planning Commis- sion and the City Council: UTILITIES Due to the topography of this site, some of the utilities existing within Robin Lane, Bluebill Drive and Golden Hill Terrace are not of either sufficient depth or pressure to service this proposed de- velopment. For example, sanitary sewer within Bluebill Drive and Golden Hill Terrace is not of sufficient depth to provide service to this proposed development. However, the sanitary sewer within DRAINAGE /TOPOGRAPHY The topography of this parcel consists of rolling terrain which pro- vides for excellent natural drainage. Subsequently, much relief exists over this parcel with a high elevation in the vicinity of the northwest corner of Lot 1 of 870.0 falling to a low elevation of 810.0 located approximately at the midpoint of Outlot A. Correspond- ingly, the steepest slope exceed 33% (3.1) located along the norther- ly portion of this parcel with the flattest slopes being approximate- ly 8% and located on the southern portion of this proposed development. Subsequently, the drainage for this parcel is to be north for approx- imately the north half of this parcel and to the west for the approx- imate south half of this parcel. This drainage to the west is a por- tion of the drainage area for Pond AP -38 which presently has a posi- tive outlet with the controlled elevation established at 838.0. Mean- while the drainage from the north half of this parcel is towards the north in the direction of Pond AP -27. This pond is connected to the Blackhawk Lake trunk outlet which discharges into the Minnesota River basin. Figure 1 more clearly illustrates the drainage patterns. The proposed grading will adhere fairly closely to the existing con- tours with most of the grading being for the installation of the pri- vate internal street across Lot 1,and due to the hilly terrain, it will be necessary for this street to be at the maximum allowable slope of 8%. Even then, a retaining wall must be constructed along the east side of a portion of this street. An approved grading/ero- sion control plan will be required prior to final plat approval. Meanwhile, no additional trunk storm sewer construction will be re- quired as a result of implementation of this, development. However, some internal storm sewer for drainage of parking lots and streets will be required. This will be reviewed with staff as a part of the developer's utility plans. ENGINEERING REPORT ROBIN LANE 1ST ADDITION PRELIMINARY PLAT MAY 24, 1983 PAGE TWO Robin Lane is of sufficient depth, size and capacity to provide ser- vice to this proposed development. On the other hand, the water main within Robin Lane is not of sufficient pressure to provide ser- vice to the entire proposed development since it is located within a low pressure service area. However, it is of sufficient pressure to service the future townhouses within Outlot A. Otherwise, the exist- ing water main within the Townview Addition streets is of sufficient size, capacity and pressure to provide service to ,the,'remainder of this proposed development which is located within the high pressure service area. Finally, storm sewer is located within Robin Lane and consists of 36" trunk with eventual discharge into the Minnesota Ri- ver basin and a 21" lateral with its discharge into Pond AP -27. Al- though there is storm sewer within Bluebill Circle, it is not of suf- ficient depth to provide service to this proposed development. If utilities are to be installed privately, then plans and specifi- cations must be submitted to the Engineering Department for review to insure adherence to City standards and shall be prepared by a re- gistered engineer. STREETS Access to this proposed development will be provided off of Robin Lane since this is the only public right -of -way this parcel abuts. Presently, Robin Lane is an unimproved road but designated for con- struction this summer under Project 368. The proposed internal private street providing access to this devel- opment shall be a minimum of 28' wide with concrete curb and gutter and bituminous surfacing. Meanwhile, the parking areas should have concrete curbing around the perimeter with any interior islands being concrete curbing. Parking spaces should be 10'X 20', as per City code, and driving aisles shall be 24' in width. Even though only one access can be provided to this development be- cause of its landlocked situation, it is felt that emergency vehicles could utilize Golden Hill Terrace and be within 60' of Building B. In addition, the proposed parking lots are laid out so that circula- tion should not be impeded. RIGHT -OF- WAY /EASEMENTS This proposed development should dedicate the entire right -of -way of Robin Lane which crosses the northeast corner of Outlot A. A minimum of a 20' utility easement will be required over all water main, sanitary sewer, and storm sewer to be constructed within this proposed development. In addition, a 10' utility easement shall be dedicated adjacent to public right -of -way with a minimum of 5' ENGINEERING REPORT ROBIN LANE 1ST ADDITION PRELIMINARY PLAT MAY 24, 1983 PAGE THREE utility and drainage easement being dedicated along all exterior lot lines and a 10' utility and drainage easement dedicated over all in- terior lot lines. In addition, a ponding easement will be required to encompass the 840.0 high water level elevation of Pond AP -38. ASSESSMENTS All area assessments have been levied for sanitary sewer, water, and storm sewer on this proposed preliminary plat. However, Outlot A of Townview Addition and Parcel No. 020 -80 will require upgrading of the storm sewer trunk area assessment from residential to multiple. This corresponds to an increase of 1.08 per square foot or a total increase of $3,458.00 (7.35 acres X 43,560 square feet per acre X .0108). In addition, there is a pending assessment under Project 368 for the con- struction of Robin Lane. Although the parcels making up this prelim- inary plat have not been assessed for lateral benefit from trunk water or sewer, it is felt this development would not benefit from such assess- ment. All costs for installation of internal utilities and streets shall be the sole responsibility of this proposed development. I will be available to discuss any aspect of this report with the Plan- ning Commission at their meeting of May 24, 1983. Respectfully submitted, /5 Richard M. Hefti, U P.E. Assistant City Engineer RMH /jack I nr, K A L_________ i 7 c'c /7' r I r l'''' O 85 7 3 4 0 0 S I1 11•1 1 ca d 7 D 75 T ,..1 0, 8690 1 1' L.3 I '1/4. i 8400 I. .j i i i,.• L. di 4.. t 850 0 w t I/ I j ../40LaY. RIVGE *t: WI 1 v., i i i 7 C 6 P "4 4 1.. L--- 2 i r 81 1 9■,,.L._r,..60 1 i I" 1 a 1 6 1 I r 769.0 i r i ___4z_ _____C:a,,..,• I, .4 C -n 7 7 24 g i ,..i W.•t. 27' i I z e.0 CP-2 8200 NN .:..I 1 /i 0-1 :-J -i 1; 1.,..,,11 2N -7 1.,11 1 1r V i -A• a 0 l, L _____11 r. 0-c 1 ,k 1 s 3' 882.0 cr‘- N i A -N/ CP-6 J-e ii ,f. -)I -i'..%//' 9 1 k II 806 0 0., "...0.% lei jt e• DP-7 38 r 1 e.,,,... A.,"••••••■ 882.6 880 7. A-47 AP-35 ..,Nyr. tit.--,.- ,•,1 884 0:: A7J 1 -'fl 886 0, l ,I__ 3. -1 I AP-28 -1 909 ti e I -47 ftwok-A t4> .72. 2C 0 A J--,...-•,; fd AP-22 873 0 AP-12' 7 77 0 r• 9/e.o: 2(ii.:2- A-bb 8 g et '8-9' 27! 910 0 ....if 91l0. BP-2C1 r AP 880.5 885 0 Li 81 I t it 8/4.0 1 l' Al 27V 4,...,A`s ____11_.:_a- V -1--.._;"1.._. 7 11' 72 ..t.1 LI. 01 i ANDALE A 893 0 Bp 27 A-w i 886.3' )7/// "9900 AP-24 12 872 0 ,g; R74.0 29 3 AP-30 922 0 926 0 90 0 12 AP-23 889 3 t 8 960 1"\.■ 11 F AP-40 AP 8892 8930 12 BP-32 931 0 9 J4 0 AP-I4 AP-I6 9250 AP -4 910 0 .0" LP 894 2 A-001) 912 0 .'.'I 1/ BP-6 880.3 905.0 Bp BP-25 ,Iffi BP-4 870 0 O's 930 0 8800 C A 8 k BP-24 12. 924,p 918.0/ 5 Gf 1 8,48ri.g BP-I 808 B e 9 02 8-f -d 9-1 4. i rr BP21 9160-9200 BP-22 •:::ii 3.1 m 90l8 BP-7 9260 -c 1 /1 A-et J 2 T j p i ■mr,", 7 t r;:.. .77 4:: 1 1 isI ,X: A-bbb AP- 27 806.0 -A( 850.0 ”69_ 1 0 t: -fi:C‘50....%,...'.,7,",..._;\1 jp A■iik ...N, 1 1 1 i l l i ri 7 7 •j e -P 43 4 0 :1'-‘ `,X Vt. s ir e 1" 8 00 U ',11'..i..7...'!"! 4' 8 /0 AS' f_.! J. 8 772, 0 5/ 0 „#e9 2 :■-'-i Co to A HILLS a CIT,' 1" r).•.GAN mi.AP- 5CENTEE ,L..\ ''1: 1/ NOrt A ,.,.:t1 4 3 -1 9: 0 0 7 47. 1 l. .1' z. .7.• JP-II 8 30.1 8157 AP 367 1 5.... BELL. R•1.-3-077:"7.,.:?•:. 36 4 E-001/ t. *--1:::-,'. Ci t-r•f 0 b I _.......3 803.6 2 4-4 C 1 6 i 1 :1 r ---'1'. AP 37 ""r ,c_; _J BLA a 30 6 ....B r i "r is E 794.0 \83,7„..$ r3 1 rl r;.-, /'----Jp- i I t..-- T WI J; _:sKo..,....,p___,,,E,_.6 7 t c. 8 6 6 iN jp.36 f. 812 3 I BP-28 .SK LE -"-lf/8.01 1 LS-12 -e; 808.0 2 1 ft ,3 s_b OVOL r:Sz1.3___ JP-9 817.0 ,3 822.0 a,. 2 862.0 1.1 c 870.6 j35 '88126060 BP 42. 873.. 86 9. 2• 8724 881.3 6 0. 0 BP-15 898 0, A141 902 0 JP JP-48 JP-7- 1 8720 875.() 875 0 C:, 86 4.0. 859,4: I Lew 8580 8S 6 C 03350 BP-1711.:1::.641 889 0 c'" 642 4_tr- -1 L-c 892 9.‘ 4)40 L S-20 p LP-58 9,5?, 7 CP-5 ,t, 9 918 0 2/ 0 ALI 6P5 43 850 8 1 853 0 L TF r L-d_•,. 1L LP-At 884 0 888 0 77 P92 0 8P:8 1 90. 3 90C.5 321,0 1 :ARM is- I' 9.380( 914 t 8 ''"ftt• Y .1 3-21 PIGURE •*,,x •2--; LP-6 L.P 9?- 9 7 -ER HT STINGS 7 WATER IGHT ASTINGS f <4;o 120 5 c t 3 SE i ViN12C,EL SEE SHEET 13 PRESSURE REDUCING STATION „cal/ p •r N i 6 CRCSTRIOGE {MEI1111, HIM, AA)E{Us /SI/C UQ era TO R -3 R03 r- 3�.R -4 s KORSUNSKY ANK ERICKSON ITECTS, INC. 0■70 010/ WNHOJSE DEVELOPMENT ROBIN LANE 1ST ADt N Fl EAGAN, MINNESOTA •e J J i PROPOSED SITE PLAN SITE DATA ZcNt t•4 711,So1 W.•r 71 arm% Zo••••• S• 1111000.K 41 empire A LAN0.1L4 ma N ONC EE'.. l lam- 47r10 IV Tl•+01es 0,s1 1.EN• yD 4 Tr tie EKn'Drl 4LW NIA 1. .11%o DAL1NSa (b M. iD DOA =AL S11,t." WWI TZO'D. 1 V./..OS J4 •T 114 1,4 JCMM• II(•JV ORe41414 .D o4ouaG 2.2.4 VGL 14•44 (u1 A16.. 4r• 1V to •1 G1 AGy.S ('g4 4 LA•R O•Yf 11 tW tA: M A. I4711 17,4a1, 111 r•0!(1 •l•• ...cf. •011 ?L 1 111 1• to •1 Y' Olt! •1,1.0 b •1 (1•S •F.•'•', Nu 4• 144•1 S •i %h1 AT 1.0441 •••1 11 6S 1 •:JL b b••- •.•Z 11 71 JYf /tt K•0 .H O 0.1 1S 17 6••••• 1• K4 4. t.>.•v N •Je /•C_r.1.•41.AT tr ,ecr P.a s Lei r.Q anew. 0 0 0 s 5 PRELIMINARY PLAT LOT( I E ONI.111.0 4001 r rr.. ROBE I..V. P NGINE °M COMPANY INC. i.n.....uAA• L�� oo• [MY id. mca eu r,..umA uur P. 411.3000 o� BL I• CONDOMINIUM SHAN NC•IJ F I I1 1 i A r% l.'f 1 !0N C I�( 14 4. S& f AGAN LOT 2 Cs‘ IN CCNOC1fAI N Iut* t SHANNON GLEN FIRST ADDITION •'...•.14 w. W ..•f _C. e .t, 1...,. f.t. 111% 10 ••...r i r t"'•• rN.NE SOYA •1•• 0.. CITY OF EAGAN SUBJECT: REZONING AND PRELIMINARY PLAT BLACKHAWK ACRES REPLAT APPLICANT: HERBERT W. BERGSTROM, JR. LOCATION: LOTS 7 -12, BLACKHAWK ACRES, SECTION 17 EXISTING ZONING: R -4 (RESIDENTIAL MULTIPLE DISTRICT) AND R -3 (RESIDENTIAL TOWNHOUSE DISTRICT) DATE OF PUBLIC HEARING: MAY 24, 1983 DATE OF REPORT: MAY 19, 1983 REPORTED BY: DALE C. RUNKLE, CITY PLANNER APPLICATION SUBMITTED: The first application submitted is a request to rezone approximately 2 acres from R -4 (Residential Multiple Dis- trict) to R -3 (Residential Townhouse District) for a townhouse devel- opment located on Lots 7 -12, Blackhawk Acres, Section 17. The second application submitted is a request for preliminary plat approval consisting of approximately 5.5 acres containing 25 town- house units located on Lots 7 -12, Blackhawk Acres. ZONING AND LAND USE: Presently, the parcel is zoned R- 4.(Residen- tial Multiple District) and R -3 (Residential Townhouse District). The applicant is requesting to rezone approximately 2 acres to con- form with the development proposal. The Comprehensive Guide Plan designates this parcel as R -3 (Mixed Residential) with a density of 6 -12 units per acre. COMMENTS The application submitted is a request for a townhouse development which would be constructed along Robin Lane. Presently, Robin Lane is a platted "T" street to Blackhawk Road. Utilities have been ex- tended through Robin Lane right -of -way, but the street has not been constructed to City standards. Therefore, in order for this devel- opment to occur, Robin Lane will have to be upgraded to City street specifications. In reviewing the preliminary plat and surrounding land uses, Manitou Townhouses abut the development on the south and there are some exist- ing single family homes constructed along Blackhawk Road. The devel- opment would be abutting the single family on the west property line. To the north and west of the property is undeveloped, but the Robin Lane 1st Addition which Metram Properties is presently proposing abuts this development in the northwest corner. The total acreage of this development consists of 5.5 acres. The right -of -way for Robin Lane is .93 acres, so the total net acreage CITY OF EAGAN REZONING AND PRELIMINARY PLAT BLACKHAWK ACRES REPLAT MAY 24, 1983 PAGE TWO of the site is 4.5 acres. The applicant is proposing 25 townhouse units of which 17 are on the northeast side of Robin Lane and 8 will be constructed on the southwest portion of Robin Lane. The net den- sity of this development is 5.5 units per acre which is under the density of the land use guide and also within the density of an R -3 zoning district. The applicant is proposing double car garages for each one of the dwelling units. The applicant has also provided 2A' stacking in front of each of the units for additional parking plus visitor park- ing for each of the townhouse units. Therefore, the parking is more than adequate for this townhouse project. In review of the overall layout, the parcel is very difficult to de- velop. The topography and existing easements make the development difficult to lay out any other way than what has been provided by the applicant. If approved, the preliminary plat should be subject to the following conditions: 1) A development agreement be entered into between the City and the applicant prior to final plat. 2) A townhouse association and the articles and bylaws be reviewed by City staff prior to final plat. 3) A detailed landscape plan shall be submitted and an adequate landscape bond shall be required and not released until one year after the landscaping has been completed. 4) The parking areas shall be a blacktop surface and concrete curbing shall be required around the perimeter of the parking area. 5) Robin Lane shall be upgraded with this development proposal. 6) All easements shall be dedicated as requested by City staff. ENGINEERING RECOMMENDATIONS 7) A detailed erosion control /grading plan shall be approved by staff prior to final plat approval. 8) A variance be granted for the south private drive to exceed the 8% maximum grade if the grade cannot be flattened once the final grade for Robin Lane has been established. CITY OF EAGAN REZONING AND PRELIMINARY PLAT BLACKHAWK ACRES REPLAT MAY 24, 1983 PAGE THREE 9) If installed privately, utilities and street plans and specifi- cations shall be prepared by a registered engineer and submit- ted for approval by staff. 10) The proposed private drives shall be 24' wide with concrete curb- ing and bituminous surfacing. 11) The parking stalls shall be as per City Code. 12) Access to Lots-1 and 2, Block 4 and 5 shall be removed from Robin Lane and directed to the internal private drive. 13) The right -of -way for the realignment portion of Robin Lane which previously has not been dedicated be dedicated as a part of this final plat and shall be 60' wide. RMH /jach MEMO TO: ADVISORY PLANNING COMMISSON, C/O DALE C. RUNKLE, CITY PLANNER FROM: RICHARD M. HEFTI, ASSISTANT CITY ENGINEER DATE: MAY 19, 1983 SUBJECT: BLACKHAWK ACRES REPLAT The Engineering Division of the Department of Public Works has the following comments for consideration by the Advisory Planning Commis- sion and the City Council regarding this proposed development. DRAINAGE /TOPOGRAPHY The existing topography for this proposed development consists pri- marily of a ravine with the ridge of the ravine running along the easterly and southerly portions of this proposed development. The top of the ridge elevation for the east is approximately 842.0 while the top of the ridge elevation along the south is 868.0. The cor- responding slopes associated with this ravine average 25% along the south side and 14% along the east side. Correspondingly, the drain- age is towards the northwest corner of this proposed development towards Pond AP -27. This pond has a controlled outlet elevation of 801.0 with positive outflow via the Blackhawk Lake storm sewer into the Minnesota River basin. Figure 1 reveals this relationship. Due to the existing topography, it will be necessary for this devel- opment to provide a detailed erosion control plan along with its grading plan for review by staff. Strict adherence to this plan will be required so as to minimize erosion problems during and after con- struction of this project. Although final street grades cannot be established until the final street grades for Robin Lane are estab- lished, it appears that the street grades may approach 1O% for the private drive to the townhouses located within the southwest corner of this proposed development. Therefore, a variance may be required. UTILITIES Utilities of sufficient size, depth and capacity exist within Robin Lane to service this proposed development. These utilities consist of an 8" water main, an 8" sanitary sewer and a 21" lateral storm sewer and a 36" trunk storm sewer. The installation of the proposed utilities should be coordinated with the construction of Robin Lane so that the proposed utilities are constructed first. The proposed layout appears to encroach the Northern Natural Gas easement which may require special permission from the gas company. In addition, staff recommends that the 6" water main servicing the easterly townhouses be looped back into the existing water main within Robin Lane. Similarly, the water main to the southerly townhouses should be looped with one loop being south of the garages to provide for fire protection. If installed privately, the plans and specifications shall be pre- pared by a registered engineer and approved by staff prior to final ENGINEERING REPORT BLACKHAWK ACRES REPLAT MAY 24, 1983 PAGE TWO plat approval. STREETS Access to this development will be by way of Robin Lane. Robin Lane is currently an unimproved street with improvement scheduled to be made this summer under Project 368. The proposed private drives should be 24' wide with concrete curbing and bituminous surfacing. In addition, the perimeter of the parking areas should have concrete curbing around them. Furthermore, the access for the two separate units north of the gas easement should be eliminated from Robin Lane and should connect to the internal private drive. Otherwise, two accesses that close together could pose unnecessary traffic hazards. Crossing the gas easement with this driveway should not pose any problems since the private street crosses it anyway. RIGHT -OF -WAY /EASEMENTS The portion of the right -of -way for Robin Lane has already been dedi- cated as a part of the original Blackhawk Acres plat. However, the right -of -way for realignment of Robin Lane shall be dedicated as a part of this final plat and shall be 60' in width. Easements of sufficient width should be required over all internal utility lines in addition to a 10' utility easement adjacent to all publicly dedicated right -of -way and a minimum of a 5' drainage ease- ment adjacent to all exterior lot lines. This should be increased to 10' if there is no drainage easement on the adjacent parcel. ASSESSMENTS All trunk area assessments have been levied over Lots 7 -12. In addi- tion, there is a pending assessment for streets and utility services under Project 368. I will be available to discuss any aspect of this report with the Advisory Planning Commission at their meeting on May 24, 1983. Respectfully submitted, RMH /jack Richard M. Heft `s P.E. Assistant City Engineer CEtA: muSTR1 At.)‘, A-4f, i ta-r )4 4 A-6 A i i•Cy:Ot.A.71 p... A PI"! 2 BP-26', Tr ze.... L• rc 7 CR 838.0 rAsa N WAR!. 5CENTEF _i•-s 816 5 AP-.3c 7990- tcE..1. A'R damir........, 2 AP 4 803.6 1 ?ARK I J07'1- 7 1:r:it: 1 800 I" s •ta.A!n_,.,_•-•4 4 6- A-bbb 'Lib< BLACKHAWK PARK MOVE 4. -ALLL___? 2 r S,GAN "ii•:; A 6AP- i 4..4 SI% 886.3 17900 9/ 0 1 36:1CSAH 1' 884 0 1 41 1 ;ROVE: La; ■1 P 909 7 92C 0 -,c5r Ja 872 •:RN 874.0 AP 880.5 885 0 •06. 2 4.7.4 R: 11.1 CP-2 820.0 828 0 7 ,4-- 822.S 2 N 0 II il i 825.0 1 N, outcs CP-1 ...1_ 7 .7 J e 0-c i i t •00.8 CP-6 co /I' C I 1 i 881.0 860 3 OP-7 A-47 I .„_„,.4_,_...\,_ ,e.o 1.___,_ :1/ '-'r.,'- i JP 971.0 806.0 ......;7 il ki j i,... ,,,,,;.x,pie:,, L, i Pli 1 i 795C ---l 806_. 0 B p_zo ...,N iii J1 I i 1_,._ 2 it.: 8478/to{ t p --1-- 1 -'8ILL,s ,z r.,:. :4 1 4' N -6 L-Aci- 7/! I, 1 AR AP- 22 873.0 bb /)/6.96 0 n_71 8770 st i f i i AP-23 r r.:7 .1 i 889 3 896 0 11 !lb.3 i AP F C9/ 1 6 2 CLEV -\I 8 892 7 A 41". i 'I BP ANOALE I 893.0 !1 I BP 2.112 ie 8P-25 II B 113 3.3as 870, BP- 24; I 924.,(7 918.0 oi 1 .1 AP-7k )01 J Bp 3 885.8 4 894 .0 A I 9t2 f .1":72 BP-6 AP-12 880.3 9olo 085 3 BP-10-:;" ILL i JP 4, BP 825 Ot1 1 SK0 __..,.1 I 1 8 BP-29 862.0 808.0 le BP 9/1.0 8 866D k .,,,K. 4 OVD-11 1 4 i i t'l 48 8 t 20 7'7 ___LLeh'D 55 t____ 'JP -36 c 870.6 jp-35 I Ili 60 ?00° th BP- 3 42 f 572.4 869A 9/9 0 Bp-21 BP-22 BP 931 s 14- C) 938C( 1 1 7 L-r I/ AP 90 0 4 9220 9260 V7 tr ow."' gir if i' 9/2.0 919.8 i 921.0 29 4.- O Ap-15 N. 42' W AP-30 894 2 7 A-bbb A .4 J oe se _Jo 8- 9 -...27% illikci...s.-;3 UV- 2 9g.8 p::" A 1 '4 CP-3 8400 850 0 .t 1 JP-10 1 820.8 527.8 E.' .1■•■••••••••■■■■ 1E3 •54 ool: 11 L.5.-20 LP-58 912 0 y 127* IL■51'f :/tk 1 t 24 ci C E 1 Z 4 r T s r-5 A7.4.■ BP-18 882. 7 888.0 '4 81: 03 EN 901,-.1 C P 4 1 1 E ri 7 7 8400 1 1 oo T iE io N 7 1 X I D .1 L .s. i_2 6 D '857./ 869c) i '1/4 4 1 OP-4 1 868.0 L.S s- v., l 8 471%9,4.6 P BP =5' 1 n-H 874.0L 853.5- 8P-14 03 1 BP- I2J 931 0 9340 1 r Vii 3U 1277- -Vt 8 8 .8 530 842.0 r LP 4 1" ,JP-37 JP-48 lel Li JP-7 8720_874.Q 859.4 III/ --E A PIN 8 BP-8 9023 te' CITY 5 48* h 839.0 xi 839 11..844P' ..1-- 4._.;'/ .1'...: ...9 .2,.-- i- I 4 8-p 8-r F r F G-U RE I I "e• i p 'i -....0 -.1..... ii I i 9/9' 1,, L.S.-21 i ..4! AP-I4 N' 892! 1 2- .1 •y 9/.5.0 LP-5 I•. 918 0 :1' 92/0 1 T 8580 LP- 43 850.8 14 h :x. -7-r 0 Vaster L.P 8820 LP JP 815 7 83012. 4 JP-9 817.0 8224_ 853.0 ir721( LS.-28 8840 8580 ;7 906_5' L 9 9 0 0 ',11 I 1 7:171.-' 17 ..r"',...:,." Y 17.77 5' i --c ■I ,...._,F C... r Y r V L ---t,...,• 7 i r i LP 914 9/- ILVr_ PRESSURE REDUCING STATION ELL 35 0 PAR CE 'W T C GS 3 111 L WATER C STINGS FlGuRE Z P •I II /EITIN, IISEIE. LIIEIUI A AUK. $C ......o.. /KYLL_ PRELIMINARY PLAT BLACKHAWKS REPLAT LOTS- 7 OWNER. HEBERT and TERRY BERGSTROM SURVEYOR: BRADLEY J. SWENSON REG. NO. 15235 .7.... 4 -SITE PLAN .S0 Se ....4 4..mmos CS 4•••• W V W m CA alma a ao• am= 4.3 Yam am amIS Ia. P.a. law= al Parma lommia a PRELIMINARY PLAT BLACkHAWKS REPLAY LOTS- 7 OWNER. HEBERT and TERRY BERGSTROM EXISTING CONTOURS- N CITY OF EAGAN SUBJECT: REZONING AND REPLAT OF MALLARD PARK 2ND ADDITION APPLICANT: TOLLEFSON BUILDERS, CARL TOLLEFSON LOCATION: MALLARD PARK 2ND ADDITION IN PART OF THE SW4 OF SECTION 28 EXISTING ZONING: R -1 (RESIDENTIAL SINGLE DISTRICT) DATE OF PUBLIC HEARING: MAY 24, 1983 r i DATE OF REPORT: MAY 19, 1983 REPORTED BY: DALE C. RUNKLE, CITY PLANNER APPLICATION SUBMITTED: The first application submitted is a request to rezone approximately 21.4 acres from R -1 (Residential Single Dis- trict) to R -1 PD (Residential Single District Planned Development) to deviate from the R -1 zoning standards. The second application submitted is a replat, Mallard Park 4th Addi- tion, consisting of approximately 21.4 acres and will contain 54 single family lots. ZONING AND LAND USE: Presently, the existing zoning is R -1 (Residen- tial Single District) and would only allow single family lots with a lot width of 85' and a minimum of 12,000 square feet. The Comprehen- sive Guide Plan designates this parcel as R -2 (Mixed Residential) with a density of 3 -6 dwelling units per acre. The proposed development consists of 2.5 units per acre which is just slightly less than what is proposed in the Comprehensive Guide Plan. COMMENTS: During the past few months, there had been an application submitted to replat Mallard Park 1st Addition and a portion of an un- platted area directly west of Mallard Park 1st Addition for smaller single family lots. This subdivision has received final plat approval by the City Council on May 17, 1983. The City has received a second application to replat Mallard Park 2nd Addition for smaller single family lots. The original development consists of 21.4 acres and con- tains 42 single family lots. The smallest single family lot is 12,700 square feet with the largest lot being 30,750 square feet and the aver- age lot size is 17,980 square feet. The application now submitted is requesting to increase the number of lots from 42 to 54 for a net increase of 12 lots. The minimum lot width proposed is 65' width at the 30' setback and the minimum lot area would be 9,000 square feet. The average lot size would contain 13,675 square feet. CITY OF EAGAN REZONING AND REPLAT OF MALLARD PARK 2ND ADDITION MAY 24, 1983 PAGE TWO In reviewing the proposed replat, there are a number of factors which will pertain to this replat. The first factor is the streets have been constructed in Mallard Park 2nd Addition. This would consist of Mallard Drive, Mallard Circle, Woodgate Lane and the eyebrow off of Johnny Cake Ridge Road. Therefore, the configuration of the access has already been established, and the applicant is just shifting lot lines and reducing lot sizes to fit the additional 12 lots on this development. The second factor pertaining to this development is that there are existing easements and utilities in this development and some of the lots will not be changing because of the existing utilities which have been constructed from Woodgate Lane to the eyebrow on Johnny Cake Ridge Road. The applicant is proposing to phase this development into two phases, the south being the first phase to be constructed. In this phase, the applicant is proposing to develop 29 lots off of Mallard Drive and Mallard Circle with this first phase. Of these 29 lots, 14 are under the 12,000 square foot requirement. Since the special meeting of the Advisory Planning Commission held on May 10, 1983, criteria has been set up for small lots through the planned development process. One of the criteria the Planning Commis- sion suggested was that an overall grading plan be provided showing house elevations and the type of unit which will be constructed on each of the lots. The staff has provided this information to the de- veloper and it is staff's understanding that this exhibit will be pre- pared and presented at the May 24th meeting. If approved, the preliminary plat should be subject to the following conditions: 1) A revised development agreement shall be prepared and agreed to by the City and the developer. 2) A planned development agreement be prepared for the smaller lot subdivision. 3) All easements shall be dedicated as requested by City staff. 4) The grading plan with house elevation and type of home construc- ted on the particular lots shall be included in the planned de- velopment agreement and adhered to. w f CITY OF EAGAN REZONING AND REPLAT OF MALLARD PARK 2ND ADDITION MAY 24, 1983 PAGE THREE ENGINEERING RECOMMENDATIONS 5) If installed privately, the plans and specifications for the additional services to the new lots shall be prepared by a registered engineer and approved by the Engineering Department prior to final plat approval. 6) All easements to be vacated shall be vacated prior to final plat approval. 7) This development shall accept its responsibility for a lateral benefit assessment from trunk water main at the rates in effect at the time of final plat approval. 8) All costs for constructing utility services to the newly creat- ed lots shall be the sole responsbility of this proposed devel- opment. MEMO TO: THE ADVISORY PLANNING COMMISSION, 0/0 DALE C. RUNKLE, CITY PLANNER FROM: RICHARD M. HEFTI, ASSISTANT CITY ENGINEER DATE: MAY 19, 1983 SUBJECT: MALLARD PARK 4TH ADDITION PRELIMINARY PLAT The Engineering Division of the Department of Public Works has the following comments for consideration by the Advisory Planning Commis- sion and the City Council regarding this proposed development. DRAINAGE /TOPOGRAPHY Drainage and grading have been accomplished under the Mallard Park 2nd Addition. Therefore, no further grading or drainage will be re- quired over this area other than for individual house construction. UTILITIES Utilities of sufficient size, depth and capacity were constructed to service all of the existing lots within the Mallard Park 2nd Addition in 1978. This proposed replat will require the installation of additional ser- vices to the new lots. This may be accomplished by branching off of existing services as per standard details developed by the Engineer- ing Department so as to eliminate cutting individual services into the existing mains within the streets thereby creating a patch with- in existing streets. STREETS Access to this proposed development will be provided by two cul -de -sacs and a dead end street which were constructed as a part of the Mallard Park 2nd Addition. The streets are already built to City standards, therefore, no new street construction will be required. RIGHT -OF- WAY /EASEMENTS All right -of -way has previously been dedicated as a part of the Mal- lard Park 2nd Addition. Easements over interior lot lines will have to be vacated where the lot lines are proposed to be changed. This will require a petition by the developer for the City Council to hold a hearing on the ease- ment vacations. These easements should be vacated prior to final plat approval. On the other hand, new 10' drainage and utility ease- ments shall be dedicated over all newly created internal lot lines as a condition of this plat. ASSESSMENTS All area assessments have been levied for trunk water, sanitary sewer ENGINEERING REPORT MALLARD PARK 4TH ADDITION PRELIMINARY PLAT MAY 24, 1983 PAGE TWO and storm sewer for this proposed development. However, it appears that lateral benefit from trunk water main has never been assessed for the 16" trunk water main within Johnny Cake Ridge Road. There- fore, as a condition of this plat, this development shall be respon- sible for the lateral benefit from trunk water main assessment for the trunk water main within Johnny Cake Ridge Road at the rates in effect at the time of final plat approval. At today's rates, this assessment would amount to $13,363.00 (830 front feet X $16.00 per front foot). This amount takes into consideration 75' corner lot credits. In addition, all costs for constructing.utility services to the newly- created lots should be the sole responsibility of this proposed development. I will be available to discuss any aspect of this report with the Advisory Planning Commission at their meeting on May 24, 1983. Respectfully submitted, &cr_ Richard M. Hefts, P.E. Assistant City Engineer RMH /jach 1100, Sow CM Of e• N,MCJI,12r,R 1• 100, N `4' 1 %Ira AO j la 0 r t u� 1, is y •a r 5'% a� ty '1 7 eY /.•C. ‘27 4. O ".1.7:, h tw o i ;44 2 N y Lt♦ r, IX .y1e 1 tr q r ,��t yS�� 7AI d -p it n'r 4' :''''''''':::.;7/. psi lc S1 '''t v ti 0 J I •;f 3 °'"-'mil OO \.O /i`� f..\)t_//4), C\; y am is et' all l S0 tt q M I e\ t'ld.. y\ o� /rt p {11DOItp 0 \•%r l''' fa h: ��OO Sti .k/ y 9•,0 1 E oy l rIR Q IIk' /6 so r .0 6\ 7 R r ARlt 14 'Y od '1, 7 r\ p e so a 1 0? fi o p I c M1 Ll t C°i I 11: 1S „4 r\ a. SS S !n, /p s•';'•'••••••.:1 v. �Cf ;rt s‘`‘,.., r 1 d 1 351 I et y \;,'":-...-,6 S ti o° /1 o r:. s u J+. o o /4 ,q t a cc ..P y t s .az V a r o M1 a !f J r N/l'f4 b /'W !d p _rns„ !1 9 t -'2 °6'.28- v G'w n !B /�ti \1 b -fJA- j( 0'tp q 1 1 Ct e S8° 1 \oj•ti I pi'. A u6' i S a/Rz'- -j 7,2;z t bi C t b 43 Iv \'tmr 1 1 Q t FS •219 Ji/.es l \ti h a a 6 /it s r s� �S �1.1°I\ 1r I Sl J J9 m /2 l t I J1 P 29 3\ \b i.■44\' o ty 0 S� T 1 o A�Y o 0 .4 4 3 1 /o ell S o 1: ds ;N ;t y V. 1 c t 5 i !I Io \L /t k ,�1 S 0 Ll. /c/.Ir hh °1 r✓ o 1 t ,k d 55 °J° .te rY /1.111! E' L. 5 t• f ,r tY.. y f t 3/ VI J ..D” Z Ns O l Dy6. w \R y Lc ,J. `b S S I 1 1/ .100. IS S° to n 9f oo 1' N ru `Y v TB 0• JIa I 1ej a+YrMY /4i j*- y J31 bf E J %J'ilvf I 23 v1�� o r62 1 7 .,o i\ J2 .w.i ly 4 I 1 14 q I� 15 o h I I' p i bl�R_� Q 1 1i e o!'8 ti Q v I vrd':c'r i II i 2 f. T6 til;`,,i 1T as \t V io p OJ J I I I J",?/".4,'- III �IH t o Q 1:'' of tSI 7,..., ,,s... :e ddy ,,,,II ..1 I z:. ,...,vsiw,2 1 r L. 90C U_1 I70 I: 1 4.,7;101'--1. f l V 0.1••. n f.rr, r.4 F. Joe t xf.s.,..,.: 0......0 ./C°. /J tL LgRO I r/: H n .s ol.A 4 J f l aA °I 4 a o Z I A 'ni. 'OR /1/E rP 4 to l r ,r /Jt It .vdi'.'s'JJf ..v n l••r Pt II`I I Jl I I' 1 j /f �l Il lf 1:N 1 __JJ /I a %J f ./1J q P. M 1 N b :I ti S Iv,. s �I f �I T a l SCA /N "Ger t I h I I I~ I I 0 a I lr0 f7 I 1000 L )D_00_� I IO I 1020 C''' A, 0,,_ Al aui AP As f 1 pw MOMUMINT r00 DENOTES //10,V MARKED CY AE0/1TRA T /ON NO. 7051. BAf/J 504 BEAR /N°.1 If ASSUMtO. r4- P.w n,an r0,•40 0 Onreen K i r111 lrw/ 0/ trid, girl.., ICC J0 Zr O IRANA:E ANOUTILITY EA;CME NTS SNONN T1US f 00 1 1 J-- ME Inn .00 PICT ,w r•n in •aX4N'4Q SV4 I Lld3 •Y AE. Id St.Q 0E1I W M. Oro •30canINO LDr o.. u°.ESS OT'E•riSE ■•O.C•IED Or T,•E ►SAT. SAL LARD PAR/( SECONL oRl duva 46 (NEA3UR(D/ F N l9'. J JG f SE L 0R,t'1 501/7N L /NS' Or ,vfv or S SEC• :8 OA S -A ...•P• 80 ter 111'1 ff (Pre PE or W00,00,410 DDCLe'. Nr 'f .8 ER r C.4nt ?'[Order, `,.Ott CJUrty nnesot6 0 i ,J I ■er'', certify tIit tMS .netr, ,.s filed In the off lee of the County °eca -7, for record on this CAy of 11 It o'clock .Y. And tests duly rece, :eo In Boo' of on ✓Aye 0.. S D J e 11.► +0• 16 f are it 10 V f j 41.1" ,r..e4• LA 1r. 1 LI I0.) II LO 2J' too. o MALLARD PARK SECOND ADDITION PR.'-LIMINAkf K.V15E12 PLAT M ALLARD \0 `a I s 4r LBtoe•' aes•• •1 I441• a.r 10. C 7 1 4SIII l 11,141• ef PRAY .Iarx W.0 ll Leo Yur... lx .IIIY Ylx..a. W lrw .r I.W4w 1 s J u L v .x•/ w 11.1 4 L111 n 3 e. oo•' Itf 11414 aaaaa 1.1,1 1.x1Y n. 11,111 y tt 1 0 drawn 04: Ch•CAed L. �,n date: project no: Ie.t.lon.: sheet na. I e• s t o APPLE VALLEY Ind. 7/ Et Sole, 7••••••• R-U O 2 1 .L, i I ft 0 S., .1 .:41/ 1 0 •1 2:1 4 s r 'll .7. X0 "V LAKE R. rt.. .J.■ rAcr.,-..A.,TA s. FG Ind. tt zr•ri. Ind. Fei.1•4.....r 41• I. R-II CS6/GB/L4 R-1 7 ROSEMOUNT C. S A. H 0 cc* fft.1 P K A .J• 4 1 -.7 ))j O.P.-5!* r j, .J. -.),),.-7 ':‘•--,..,./)._,Lx.„ t J t.i..,.:•,7_,, 7: ..r.i;.../::);.,!:; I, .....j)..- 4_,... .-0,. .-...),.:-.4,- ,i t -1 A L TO: Ken Vraa FROM: Linda O'Brien SUBJECT: Easement Proposal DATE: May 11, 1983 Dear Ken: Some additional facts for the Park Committee members to consider in our request for easement are.enclosed with this memo. Dakota Electric has stated that the moving of their lines will cost approximately $300 to $350. Northwestern Bell estimates it will cost around $300 to move their lines. Additional excavation for the driveway access in the "present easement will cost approximately $100. The construction of retaining walls on possibly each side of the driveway will cost from $2700 to $3000. In total, this could amount to nearly $4000.00. Hopefully, the Park Committee could take another look at the easement proposal with these additional cost figures in mind. Sincerely, t 1210 WILDERNESS NUN 2 2 q •.);7"/ croSE 3 i Wq.DERNESS u L U I I Z 4 Z 1 N Q Q U Y Y o 4 0 L 1 4 3 PARK S 1x1 6 I 0000 2 N1 e LANE II 3 7 a•t ROA 1190_ MS• 113 .•Y Af1DN 0 0 •t r Mf• 3 +3 •V PARK 3 a• a n 2 1160 WIL DC PRESS RUN RD 1\ f 1 07• PI ii r I 4 RI PAM. •ELL TELE•E0ME AM% 1175 A2 2704 4400 A150 A10" SC A C 100 DAKOTA nu. .L 2Z N..R21W_ 0A HA CSE P1RST ADM EAGAN W.OE•R•OU 0 u•o11o• MYII IIIEI.K 111KI116.1 MAP SIUNDCR A }�'2 27�) R V MEMO TO: ADVISORY PARKS 4 RECREATION COM1ISSION FROM: KEN VRAA, DIRECTOR OF PARKS AND RECREATION RE: POLICY STATEMENT PARK LAND USAGE June 1983 Background: At the May 1983 Commission meeting, the Director of Parks and Recreation brought to the attention of the Commission a situation in which two residents who live next to the highline trail removed an old section line fence, tilled the soil, deposited rocks and brush along the trail with the intended purpose of planting a garden. No contact by these residents was made with City officials to gain permission for this garden. At the May meeting the Commission directed that the two residents be notified to discontinue this practice and that the Director prepare a policy state- ment that would address the utilization of City parks in a similar manner and correct other park abuse situations. Additional Comments: Staff has done a brief review of park usages to determine the extent by which adjacent residents have utilized park land for their own private purposes. Although the survey was brief and did not include all park site locations, there are approximately 22 known instances in which gardens, dog houses, wood piles, compost /litter are being maintained /kept on City park property. The problem with garden plots, while at first glance does not appear to be one which the commission should he overly concerned, does raise some philo- sophical and park usage implications. Some problems have already been noted with the unauthorized garden plots. As previously mentioned with the creation of these garden plots, residents have left debris, rock, brush, and other items on City park property which will eventually become the responsibility of the department to clean up. Another example is that on Friday, May 20th, the City's assessment clerk indicated that a resident who lives along Shale Lane asked if he could extend the fence that he was building "three or four feet into park property." When informed that such permission would not be granted, he stated that if his neighbors can have gardens on the park property then why not an extension of the fence! Finally, another caller into the department recently complained about the compost /brush pile that a neighbor was putting on City park property wanting the City to clean it up. Authority: The City Code Section 10.32 Subdivision 3 does prohibit dumping on City property. However, there is no specific authority pro- hibiting unauthorized garden plots. The Commission, Council and the Director of Parks and Recreation is given the right to issue an administrative rules and regulations governing parks as it relates to the usage of them. POLICY Unauthorized Park Land Usage: The usage of City park property, by adjacent or other residential property owners for garden plots, storage sheds, wood piles, dog kennels are unauthorized acitivities for which public parks are not to be used. These usages are outside the intent and purpose for which City parks exist, and constitutes an appropriation of park land for the private benefit of the individual. Usage of parks for individual purposes tie �i e 1 Page 2 is counter to the public policy: Therefore, the usage of parks in this manner is opposed by the Commission. Enacted on June 2, 1983 firer, the Director of Parks and Recreation shall take steps to inform and prohibit further usage of City parks in this manner with the appropriate individuals. Motion by Seconded by Approved by Opposed by