Loading...
04/07/1983 - Advisory Parks & Recreation CommissionCITY OF EAGAN SUBJECT: REZONING AND PRELIMINARY PLAT HILLCREST ADDITION APPLICANT: J. E. PARRANTO ASSOCIATES, INC. MARK PARRANTO LOCATION: PART OF THE Ez OF THE NE4 OF SECTION 33 EXISTING ZONING: R -1 (RESIDENTIAL SINGLE DISTRICT) DATE OF PUBLIC HEARING: APRIL 26, 1983 DATE OF REPORT: APRIL 18, 1983 REPORTED BY: DALE C. RUNKLE, CITY PLANNER APPLICATION SUBMITTED: The first application submitted is a request to rezone approximately 14.1 acres from R -1 (Residential Single Dis- trict) to R -1 PD (Residential Single District under a Planned Devel- opment) to deviate from the R -1 zoning standards. The second application submitted is a request for preliminary plat, Hillcrest Addition, consisting of approximately 14.1 acres and con- taining 37 single family lots. ZONING AND LAND USE: Presently the property is zoned R -1 (Residen- tial Single District). The zoning occurred when an application was submitted for Walden Heights which was the second phase of the pro- posed subdivision. The Comprehensive Guide Plan designates the nor- thern portion of this property as R -1 (Residential Single District) with a density of 0 -3 dwelling units per acre. The southern portion of this site is designated R -2 (Mixed Residential) with a density of 3 -6 dwelling units per acre. Therefore, the development proposal is within the guidelines of the Comprehensive Guide Plan. COMMENTS: The proposed parcel contains 14.1 acres and is irregular- ly shaped. Access to the property would be from Pilot Knob Road with connections made to Erik's Boulevard and extending Richard Lane. Presently, Richard has not been improved and this development request would require the upgrading of Richard Lane in this sub- division as well as that portion which was originally platted in the Twin View Manor Subdivision. The applicant is proposing to create 37 single family lots. The reason for the R -1 Planned Development is that the minimum lot width requirement would be 80' vs. the requirement of 85' in the R -1 zon- ing district. The minimum lot size is 12,000 square feet. The issues in regard to this subdivision are providing access by Rebecca Lane to Pilot Knob Road. Presently, there is privately own- ed property between the proposed plat and the Pilot Knob Road rights- of -way. There should either be an easement or obtain rights -of -way for Rebecca Lane all the way to Pilot Knob Road. CITY OF EAGAN REZONING AND PRELIMINARY PLAT HILLCREST ADDITION APRIL 26, 1983 PAGF TWO r► The second issue in regard to this subdivision is that Richard Lane would be required to be upgraded within this proposed development. This upgrading would mean assessments to abutting property owners in Twin View Manor. Therefore, if these issues can be resolved, there should not be any problems with this proposed subdivision. In this proposed subdivision, the applicant is proposing to dedicate 60' rights -of -way for Richard Lane and Rebecca Lane. The new Sub- division regulations would allow the developer to dedicate 50' road right -of -way instead of the proposed 60'. This would strictly be the option of the developer. If approved, the preliminary plat should be subject to the following conditions: 1) The preliminary plat should be reviewed by the Dakota County Plat Commission because of access onto Pilot Knob Road. 2) A variance would have to be granted for Rebecca Lane because the grade is in excess of 8%. 3) A deviation on lot width would be required to allow the 80' lots. 4) A development agreement and a planned development agreement shall be entered into and signed prior to the application of final plat approval. 5) The plat should be subject to the extension of sewer in the Walden Heights 1st Addition. DCR /jach ENGINEERING RECOMMENDATIONS 6) Right-of-way for Rebecca Lane shall be dedicated to the right- of-way for Pilot Knob Road which shall also be dedicated as a part of this plat, a minimum of 75' half right -of -way from cen- terline. 7) A 10' utility easement shall be recorded along all property abutting publicly- dedicated right -of -way, with a 5' utility and drainage easement dedicated along all exterior lot lines and a 10' utility and drainage easement centered over all in- terior lot lines with the exception of the lot line between Lots 9 and 10, Block 1 where a 20' utility easement will be required to be centered over this lot line. CITY OF EAGAN REZONING AND PRELIMINARY PLAT HILLCREST ADDITION APRIL 26, 1983 PAGE THREE i 40 8) This development shall accept its responsibility for trunk area storm sewer assessment and also lateral benefit from trunk water main assessments. 9) All costs for the internal utilities and streets shall be the sole responsibility of this development with the exception of the lots within Twin View Manor which abut Richard Lane. RMH /jach MEMO TO: THE ADVISORY PLANNING COMMISSION, C/O DALE C. RUNKLE, CITY PLANNER 4 FROM: RICHARD M. HEFTI, ASSISTANT CITY ENGINEER DATE: APRIL 21, 1953 SUBJECT: HILLCREST ADDITION PRELIMINARY PLAT The Engineering Division of the Department of Public Works has the following comments regarding this preliminary plat. I. DRAINAGE /TOPOGRAPHY The topography of this parcel consists largely of a side hill with the top of the hill being near Pilot Knob Road at an elevation of 1070 with a low point of the side hill being along the westerly boundary of this parcel at an elevation of approximately 970. This contrast in elevation of 100' results in an average slope of 11 Consequently, all drainage is towards the westand eventually ends up within Pond LP -6. Currently, this pond does not have a positive outlet, however, this pond is not receiving runoff from its entire potential because it is not connected to LP -57 located to the west. It will be proposed to install the positive outlet for Pond LP -6 sometime in the future when the area west of this proposed develop- ment develops. Figure 1 more clearly illustrates this. Outside of the grading for the proposed street, only some addition- al grading over Lots 3, 4, 5 and 6 in Block 2 and Lot.3 of Block 1 are being proposed. Meanwhile, the grade on the east -west street shall not exceed 8% as required by City code. Furthermore, since the slopes are significant over this parcel, strict adherence to an approved detailed grading /erosion control plan shall be requir- ed. II. UTILITIES Utilities exist within Erik's Boulevard and consist of a 16" trunk water main and an 8" sanitary sewer. Although the water main is of sufficient size and capacity to handle this development, the sanitary sewer .is'not constructed to a sufficient depth to service this entire proposed development. Subsequently, this proposed de- velopment will have to rely on the development to the northwest (Walden Heights Addition) in order to be served by sanitary sewer. At this time, this development is nearing final plat approval, and if approved, construction of utilities would begin this summer. Due to the topography of the land adjacent to this development, there is no storm sewer which is easily accessible to this parcel. Figure 2 illustrates the relationship of this proposed development to the location of existing utilities. As previously mentioned, in order for this proposed development to be serviced with sanitary sewer, it will be necessary for the sanitary sewer to be constructed with the Walden Heights develop- ment. ENGINEERING REPORT HILLCREST ADDITION PRELIMINARY PLAT APRIL 26, 1983 PAGE TWO 4' III. STREETS 4 As for water main, it will be necessary to extend the existing 16" trunk line to the south and'Richard Lane. Subsequently, this will require a petition by the developer to the City to provide for this trunk water main extension. Meanwhile, the lateral water main with- in Richard Lane north of Rebecca Lane will be required to be looped back into the existing trunk water main within Erik's Boulevard. In addition, this development will be required to construct the neces- sary storm sewer to provide drainage. Existing streets abutting this proposed development include Erik's Boulevard which dead ends at the north boundary of Blocks 2 and 3, Delores Lane which dead ends at the extreme northeast corner of this proposed development and Pilot Knob Road (CSAH 31) which is adjacent to the most easterly boundary of this proposed development. Erik's Boulevard and Delores Lane are 32' wide bituminous paved City streets with concrete curb and gutter while Pilot Knob Road (CSAH 31) is under the jurisdiction of Dakota County and is a rural section with a 24' wide bituminous pavement. It is proposed to obtain access to this proposed development from Delores Lane, Erik's Boulevard and Pilot Knob Road. However, access to Pilot Knob Road will require a permit from the Dakota County Engi- neer which must be obtained prior to final plat approval. Meanwhile, the proposed internal streets shall be constructed to typical City standards which include a 32' wide bituminous pavement and concrete curb and gutter. IV. RIGHT -OF -WAY /EASEMENTS Existing right -of -way for Richard Lane from Delores Lane to north line of Block 2 has previously been dedicated with Twin View Manor. The remaining right -of -way for Richard Lane shall be dedicated as a part of this plat along with the right -of -way for tebecca Lane and the extension of Erik's Boulevard. This roadway shall be a min- imum of 50' in width. Furthermore, the right -of -way for Rebecca Lane shall be dedicated as a part of this plat to the westerly right -of -way line for Pilot Knob Road which shall be a minimum of a 75' half right -of -way from centerline and shall also be dedica- ted as a part of this plat. As for easements, a 10' utility easement shall be required along all property abutting publicly- dedicated right -of -way, with a 5' utility and drainage easement dedicated along all exterior lot lines and a 10' drainage and utility easement centered over all interior lot lines. Exceptions to this will be the common lot line between Lots 9 and 10, Block 1 where a 20' utility easement will be requir- ed centered over this lot line. This easement will be required for the sanitary sewer line which will serve this development. ENGINEERING REPORT HILLCREST ADDITION PRELIMINARY PLAT APRIL 26, 1983 PAGE THREE 4 4 V. ASSESSMENTS This parcel has been assessed the trunk area assessments for sani- tary sewer and water main under previous projects. Therefore, this development will be responsible for its area assessment for trunk storm sewer and also a lateral benefit from trunk water main at the rates in effect at the time of final plat approval. At the present rates, this would amount to a trunk area assessment for storm sewer of $22,567.00 and an assessment for lateral benefit from trunk water main of $17,452.00. In addition, all costs for the remaining inter- nal utilities and streets will be the sole responsibility of this development with the exception of the lots within Twin View Manor which abut Richard Lane. These lots will be responsible for the assessment from the benefit received for the construction of the utilities and streets within Richard Lane. I will be available to discuss any aspect of this report with the Advisory Planning Commission at their meeting on April 26, 1983 Respectfully submitted, Richard M. Hefti, P.E. Assistant City Engineer RMH /jach a LO 1 ..t BP-29 808.0 I 1 VI 8/4.0 -,..e it,1 V, r' zr 1 2 A-s 893 BP-3 42 Lj 881. 3 i i 0 r' BP-27 E 1 jit 6 8 0 6 4..... 47, fr BP-25 E4P-4 gi-s s3ao 924 8800 870 0 V „,,16,2 C S A 1, 1 1 ,....d.r n .2: l ka 931:3 ;7 1 137 9C4 1 .44 10.0' 40.44 At•t-,A* '8P la ,915.147 B-tt' 9260 15- 9/9.0AF '-'13PY2, c7 4 4 a WY/ 7 BP- 938 931.y LP 893.5 90/.5 B BP-6 I i 0 10 8-t 61 BP 918.0 I I :i. 9.24,47 9. i 0/ 0, 3 al Po. BP-28 862.0 866.0 BP 882.7 888.0 JP- 6 812 3 8/8.0 ele _bi I. SKovDALL 2i 38 873.Z 8694 816.6 8200 c rig jp-35 le 87 ft I 't.-t----- 7 1 0_874.0 659 4' LP-63 --Ar'F' 1 856.0 k 8580 L DAKOTA LS.-12 LS.-19 1 P-3 81 N, ti,tetuNt li i -_,....*Y+,- Frai t A 4 IJPr5 LP-1 so. BP I Bp- II -i---li- 9070A,k) ti- 9023 it>, d ...:b 1,.' -iii;,92.4. onl III LP-13 LS.-26 A KO TA COUNTY PA R K r t• ---r- .1 i 7 1 t; 1 1 -1 i 1 1 -1 8 e -ft 5 0 o 1 1 853.0 '::-.1 4 4 114.11 4 1 I I LP 43 850.8 12' L-c .___44.;W:AD N 0 :2, LP-6I i J .44,`,....o.: 41151'/Atl.:- 7-1- IPIA1,.14 iii, ■..„,i, i it_....__, L 898.0 LP LP I 4/ 960.0 905.0 962.0 t (1-.. LP 1 910.0 1 1 LP LP 22 3 1 3 1 I 1 .0 -STORM SEWER LAYOUT MAP FIG-ug.E l A A IM 4 .11•41malM14 6., PAT RicK m;ntt "arK ail 2 46 820.0 °are, JP -9 817.0 ezzdt J-dd C 17 etb/ 'e JP 2 5? s 925 940.0 11. J-ee t 1 LP-38 1861.3 875.0 RO "4\ LP-i6 6 O I BIS 1 -25 LP-37 6 tr 3 LP-3 863.0 862.0 864 867 2 3 JP-34 884.0 J-s 8900 J 1 0 J-t 4 LP-21 902.5 9040 1 LP-17 928.7 JP-20 852.0 855.0 n 1 b JP-28 4./ 96,8 J LP-45 878.3 882.5 LP-2 883.: 885c LP-19 900.2 903.0 O Bonestroo Consulting St Paul M drown by el.f '4,4 CITY OF EAGAN SUBJECT: Preliminary Plat for Townhouse Development Cedar Hills APPLICANT: Duraps, .Inc. Gary S. Pelton LOCATION: NE -1/4 of Section 31 (Slater's Road, south of Cliff Road) f1ST1NG ZONING: AG PD (Multiple Dwelling Under a Planned Development) DATE 01_ PUBLIC HEARING: April 26, 1983 DATE OF REPORT: April 18, 1983 REPORTED BY: John S. Voss, Planning Consultant APPLICATION SUBMITTED: An application has been submitted requesting approval of a pre- liminary plat Cedar Hills 1st Addition for an approximate 56 acre area for a town- house development which is a part of the previously approved Winkler /Jackson Planned Developmert. The property is located along the west side of Slater's Road, south of Cliff Road. The statistical design data related to the Cedar Hills Townhouse Development is as follows: Land Area Units Units per acre STATISTICAL DATA Townhouse Townhouse Phase Two Condominium Phase One on Outlot A on Outlot B Total 5.0 39.05 11.7 56.15* 24 180 104 308 4.8 4.63 8.89 5.48 To be platted To be platted To be platted Status into 24 Townhouse as an Outlot as an Outlot Units Includes .4 acre dedicated for public street in Phase One BACKGROUND: The Winkler /Jackson Planned Development agreement was executed on July 6, 1982. The Agreement is for a total of five years from that date. The Land Uses con- tained within that Planned Development Agreement for the 92 acres are as follows: PLANNING REPORT CEDAR HILLS 1ST ADDITION PREPARED BY: John S. Voss, Planning Consultant Page 2 COMMENTS: TOTAL: e 4 LAND USES: ZONING ACREAGE DWELLING UNITS Neighborhood Business 7.74 acres Limited Business 8.93 Single Family 1.95 Townhouse (Outlot B) 56.59 311 Multiple 10.22 143 Park 4.4 Right -of -Way 2.17 92.0 Acres 454 APRIL 18, 1983 The area encompassed by the Duraps, Inc. petition for the Cedar Hills 1st Addition is the above described "Townhouse Outlot B" area which provides for a maximum of 311 units. As noted above, the petitioner is proposing a development of 308 units over this same area. Therefore, the use and density appear to be consistent with the Planned Development Agreement. Other provisions of the Planned Development Agreement relate to assessments, park trail and pond dedication, sidewalks, street lights, building setbacks, preservation of trees, retaining walls and screening. It is expected that the developer will comply with each of these provisions. 1. Overall Design: The applicant has submitted a design plan illustrating how the total 204 townhouse development will be constructed. This is presented for information purposes only. As indicated above, only five acres of the approximate 56 acre area is being developed at this time. The remaining area will be platted into two outlots and will be required to be re- platted at a future date. This future re- platting will come before the Planning Commission for review similar to the review being con- ducted for Phase One at this time. Phase One consists of 24 townhouse units on a five acre area adjacent to Slater's Road. Each-townhouse unit will have a two -car garage and in addi- tion, the development provides for 2.4 outside parking spaces for a total of 106 parking stalls. This is generally adequate except that the developer has been requested to prcvide some additional outside parking stalls for guest parking. 2. The development appears to be generally well- designed. The developer has taken into account the rolling topography that exists on the site and the preservation of existing trees. Also, the internal circulation plan appears to be functional. The developer has requested to reduce the space provided in front of each garage from that which is shown on the plan submitted with the application. It is the feeling of the staff that any reduction from that which is shown should be resisted because it would adversely affect out- side parking. PLANNING REPORT —CEDAR HILLS 1ST ADDITION APRIL 18, 1983 PREPARED BY: John S. Voss, Planning Consultant Page 3 ,46 u 3. The developer is proposing a dedication of a new unnamed public street leading to Slater's Road. The location appears to fit well into the devel- opment and the site, however, a public street with a center boulevard is proposed and the maintenance of the boulevard area would have to be resolved with the City Engineering Department. 4. The Planned Developmert Agreement requires the developer to submit a detailed landscape plan with the final plat. It also requires the developer to con- struct retaining walls if requested by the City. In addition, the Planned Development Agreement requires the developer to mark and save trees over 6" in diameter. These requirements will have to be complied with prior to the approval of the final plat for this Phase One development. 5. Park Dedication: The Winkler /Jackson Planned Development Agreement provides for a dedication of a 4.4 acre area to the City for public park purposes. Exhibit "H" contained in the Planned Development Agreement, specifies the man- ner in which park dedication requirements shall be satisfied. 6. Concrete Curbs: The City's Zoning Ordinance, Section 11.10, Subdivision 12, requires that... "all off street parking areas shall be constructed with curbs or similar barriers to contain all vehicles." It also states that "all off street parking areas for four (4) vehicles or more shall be constructed with concrete curbs." Therefore, the developer shall be required to provide con- crete curbs in accordance with the above- stated requirement. 7.- Final Development Plans: In addition to action on the preliminary plat, the Planning Commission, at this time, is also conducting its review of the "Final Development Plans" for this Planned Development for Phase One. This review is provided by the City Code, under Chapter 11, "Land Use Regulations (Zoning) more specifically, Section 11.40, Subdivision ED. This provision of the Ordi- nance requires final building plans and specifications to be presented to the Building Inspector for review and recommendation to the Planning Commission and City Council. It also requires presentation to the City Staff of the Final Site Plan and Landscape Plan for review and recommendation to the Planning Commission and City Council. At this time, neither the final building drawings nor the landscape plan have been submitted for review. The final site plan for Phase One, however, has been submitted. The Planning Commission could delegate this review of the final building drawings and landscape plan to the City Staff. If approved, the final development plans for Phase One of the Cedar Hills 1st Addition and the preliminary plat for Cedar Hills 1st Addition, should be sub- ject to the following conditions: 1) A Final Site Plan is approved subject to providing a minimum of four (4) additional outside "guest" parking stalls, providing concrete curbs around driving surfaces as required by the City Engineer and subject to the City Engineering Department's approval of the public street providing for a center boulevard. PLANNING REPORT CEDAR HILLS 1ST ADDITION APRIL 18, 1983 PREPARED EY: John S. Voss, Planning Consultant Page 4 2. Par edication shall be•in accordance with the-provisions of Exhi bit "H" as containEd in the Planned Development Agreement: and as further specified by the City Council, upon recommendation of the Eagan Advisory Parks and Recreation Commission. 3. The developer shall be subject to compliance with all of the provisions of the Winkler /Jackson Planned Development Agreement. 4. Prior to construction of Phase One, the developer shall receive approval from the staff of the landscape plan and building plans. 5. Sidewalks: A sidewalk shall be required along one side of Slater's Road which is designated as a collector street. ENGINEERING RECOMMENDATIONS 6. A detailed grading /erosion control plan be submitted along with final plat application for approval. 7. If the streets and utilities are installed privately, the plans and specifications shall be prepared by a registered engineer in accordance with City standards and submitted with the final plat application for approval. 8. The divided street concept be denied. 9. An 8' bituminous trailway will be constructed along this development's easterly boundary. 10. A blanket utility easement shall be required over Lot 25, Block 1 (the common area) 11. Minimum right -of -way to be dedicated for a standard City street to be 50' wide. 12. This development shall accept its upgrading of the trunk storm sewer area assessment in the amount of $2,352.00. 13. All costs of internal utilities and streets will be the sole responsibility of this development. RMH /jack MEMO TO: THE ADVISORY PLANNING COMMISSION, C/O DALE C.'RUNKLE, CITY PLANNER FROM: RICHARD M. HEFTI, ASSISTANT CITY ENGINEER DATE: APRIL 21, 1983 SUBJECT: CEDAR HILLS PRELIMINARY PLAT The Engineering Division of the Department of Public Works has the following comments relating to this proposed preliminary plat. I. DRAINAGE /TOPOGRAPHY The existing topography for this area consists of numerous hills and small depressions. The high elevation is found near the south- west corner of this parcel and is at 1002. Meanwhile, the low el- evation is at Pond AP -10 at 920. Due to the distance between the high and low points, the 80' elevation difference does not pose any severe limitations on this property. However, with the slop- ing land located within this parcel, it will be required that strict adherence to an approved grading /erosion control plan be met. Meanwhile, the drainage for this parcel generally flows in- to Pond AP -10, which presently has no positive outfall from it. The relationship to this proposed development, the drainage area and Pond AP -10 are more clearly illustrated in Figure 1. The proposed grading plan for this area indicates that grading will be done so that all runoff will be collected by storm sewers and discharged into either Pond AP -10 or two smaller ponds located in the vicinity of the southeast corner of this parcel adjacent to Slater's Road. Staff recommends that these two ponds be provided with a positive outfall unless it can be demonstrated that a posi- tive outfall would not be required. Also, the water elevation with- in AP -10 should be closely monitored as development occurs so that the positive outlet can be constructed for this pond when it is needed. Nonetheless, this development will not require an outlet be constructed for Pond AP -10. II. UTILITIES Utilities of sufficient size, depth and capacity exist within this area to service it. For instance, a 12" trunk water main is in place along Slater's Road from Cliff Road midway to this property where it then turns into an 8" water main along the remaining por- tion of this property. Similarly, an 8" sanitary sewer is in place along Slater's Road from approximately Cliff Road to the midpoint of this parcel. Also, an 8" sanitary sewer is in place at the in- tersection of James Street and Slater's Road. Meanwhile, storm sewer is provided along Slater's Road from the south boundary of this proposed development to approximately 600' north. Figure 2 illustrates the relationship with the existing utilities to this proposed development more clearly. However, this storm sewer is designed only to handle runoff for Slater's Road, not this devel- opment. ENGINEERING REPORT PRELIMINARY PLAT FOR CEDAR HILLS APRIL 26, 1983 PAGE TWO Since no utilities for this development have been made available through previous projects, it will be the developer's responsibil- ity to construct necessary lateral water main, sanitary sewer and storm sewer to service this proposed development. If installed privately, these plans shall be prepared by a registered engineer in accordance with City standards. It should be noted here, that developing this area will eventually necessitate the initiation of a trunk storm sewer project to provide for a positive outfall from Pond AP -10. III. STREETS Slater's Road is the existing street which provides access to this parcel. It is a 44' wide bituminous pavement with concrete curb and gutter and has been built to its ultimate section. Although Cliff Road (County Road 32) borders the northern boundary of this parcel, access to this parcel would not be provided off of it. Access into this parcel is proposed to be taken from Slater's Road. The proposed internal street is to be a divided street with a cen- ter island for approximately 600' into this project where it will then split into a looped street to service the remaining portion of this parcel. Although staff does not recommend the divided street concept, if it is approved, each lane must be 20' in width with concrete curb and gutter on each side with a 14' wide center island. The looped street shall be constructed to City standards which include a 32' wide bituminous surface street with concrete curb and gutter. Furthermore, since Slater's Road is considered a collector street, an 8' bituminous trailway will be required along this development's entire easterly boundary. However, it may be constructed in phase with the development. IV. RIGHT -OF- WAY /EASEMENTS All right -of -way has been acquired for Slater's Road and Cliff Road (County Road 32) previously. Right -of -way shall be dedica- ted with this plat for all public streets and shall be a minimum of 80' in width for the divided street section with the remaining public street width being a minimum of 50'. A blanket utility easement shall be required over Lot 25, Block 1 (the common area) for this preliminary plat and a ponding easement incorporating a high water elevation of 924 surrounding Pond AP -10. V. ASSESSMENTS All trunk related assessments have been levied over this parcel. However, the trunk area assessment for storm sewer was assessed at the single family rate and should now be upgraded to the multi- family rate. The difference between these two rates is 0.0108 dollars per square foot. Thus, applying this rate over the ENGINEERING REPORT PRELIMINARY PLAT FOR CEDAR HILLS APRIL 26, 1983 PAGE THREE r assessable area results in this development being responsible for an additional assessment of $2,352 In addition, all costs of internal utilities and streets will be the sole responsibility of this development. I will be available to discuss any aspect of this report with the Advisory Planning Commission at their meeting of April 26, 1983. Respectfully submitted, 0120. z Richard M. Hef P.E. Assistant City Engineer RMH /jack linen mom AP 9310 8805 893 AP -4 89 0'0 CnaaE LI..NI PARK L S -19 L ilA KOTA 8 0 92/.0 gP. 86. E 4,1 869 JSSEN 12' AP-20 d e lf A A kk F -f a N 891.3 6,0 899.0 J A R L. 8380 AO 800 Al 8660 3a 1 K AP�2_Cd� 856.6 -R I2 KAHN AP -2 0ARK 878.5 888.0 A-t 6 5p/ A h 1! '//ti �z AP L I5. i PAG AN u S CENT ERg4 o- 8P- ea 1 BI6.5 d;C i 791.1 R IN AP -I6 u 919.81 925.0 �l P= 9 ti P -15 az 16.6 1894.2 A -bbb L 9 9337 l l 925.3 r is ir i X 938.0 I 1 t j .j 4 ,.944.0 .4ASiaQJ 1 980.0 I ESrAZES ua as, J I 984,0 r 1 R 23 W I ,----r--0. 19 t l LP 1 905.0 APPLE LEGEND PONDING AREAS AP 22 873.0 8770 885.3 15' A-bti AP 11 889.2 %*89 ii ;PI 9,. DAKOTA' COUNTY PAR 893 5 9 A 90/ I VALLEY A -bbb ;1 AP -23 889.3 1 8960 /V 8 0 4 8660 1 a 9 "-I B a r r 2tc 1 r a3' 8-b' 'Y j '.,-,,---1 I i i BP 3 'I az' i 881.3 i/ ANOAL 1 B93.0; BP-2 I: A_p l Ai J" l 8860 7 B N po_�f� ',...._.-4, Z1 1 BP- �B� 930.0 I rsJ c. S. A H r jje Iz i 918. 924 4 -28^ Q i 0 o m pu b 2c" o 3 j /9,02/9a70- Q� B3-23 �i 89 0 3t f Y Yl m ti 9f2. 910:0 "r 7 9/40c f 6� =2 1/ `n F9 ti ."3411 BP 32 931.0 934.0 AP -14� 90 •.0 795.0 7 843.7 AP -27 1 80f /.5 jP_3 2 5 d G i�, 839. I BP i 30 84/.f 9/0.0 cF80�� A 'G1 1 TB BP -6 880.3 905.0 8 9 AtL5. LI Y I 9 c 12 k.8 16.Q '-9 J7 BLACKHAWK PARK y{ JP= BP-2 829 792.0 794.0 L BP-29 12- BP 28 L.S. 22 LP 8 949.0 952.2 BP^I8 882.7 888.0 LP 960.0 962.0 E r C LP V Maw /L. 4 a spa I2' PRESSURE REDUCING STATION PRELIMINARY PLAT; CEDAR HILLS 1ST ADD. OuTLOT 889.94 S89 22`W 15799' 599 S. LINE OF S.1 /2 OF N.W. I/4 OF SEC. 31 L 250 VICINIT1 Map N SCALE 0.100' KORSUNSKY KRANK ERICKSON ARCHITECTS, INC. OM c.r•to irulDrO 3. WO. rt“. fOuTso riNNENOL.16., forMISOM 35401 GO 33 OM 0 r o. i.r emuct mmmmmm .0100 a. lour r am 0 Hal. N. mmmmm CEDAR HILLS TOWNHOMES EAGAN MINNESOTA DUR A PS INC. 112-97 Oa.. 0444-VI 142 6. SLAIE1 RC) I (N rikr*4 1.04r a., .1•I• NO •LIA; .11■.......-.• 4.7: ,"1„ .1 :11 Ill II ._/1 :t s 7 1 5- t`‘ J' 41 ;iii•ri ;_lit I 1 I z'o, ,r t• X PI li e 4. c Pbal, nr, Po NO CCM:0 SITE .‘k f,' till, r 4 MASTER SITE PLAN LIT c1 0 SO 100 200 NORTH COPTRIG.T, ORAN. {WKS. ANCWICTS, D.C. 103 PHASE ONE SITE PLAN KORSUNSKY KRANK ERICKSON ARCHITECTS, INC. )II( 00600 sto■ ON .0 .00 .0 CH. .0 SECOND alliNuf SOW. CEDAR HILLS TOWNHOMES EAGAN MINN'" TA DURAPS INC. 0 *8 30 C01.0.01. 001..S. •RA. 011.1{600 .40TICTS. OK- 10. B2-97 /18/8 00 cs. NORTH CITY OF EAGAN SUBJECT: Preliminary Plat for Surrey Gardens APPLICANT: Yankee Doodle Associates Dan H. Gustafson LOCATION: NE -1/4 of Section 16 South of Yankee Doodle Road and west of Federal Drive LAiST1NG ZONING: Multiple Residential R -4 DATE 01 PULL1C HEARING: April 26, 1983 DATE OF REPORT: April 18, 1983 REPORTED BY: John S. Voss, Planning Consultant APPLICATION SUBMITTED: An application has been submitted requesting approval of a preliminary plat for an approximate 7.64 acres adjacent and north of the Surrey Heights 6th Addition which would be developed with 88 rental apartments contained in two (2) buildings. The preliminary plat would provide for two (2) lots with a building loca- ted on each lot. BACKGROUND: The applicant represents that an 85 -unit apartment development was approved by the City for this property in 1974, however, it was never constructed. COMMENTS: 1. Zoning: The subject property is zoned Multiple Residential R -4 and the proposed total of 38 one bedroom and 50 two- bedroom units would require 6.09 acres and the total site is 6.3 acres after dedication of public streets. Therefore, the mini- mum density requirements of the City's Zoning Code have been met. 2. Statistical data related to the proposed plat and development are as follows: TOTAL LAND AREA: 7.64 acres 6.3 acres after public street dedicaticn BUILDING HEIGHT: 34 feet LOT COVERAGE: 20% DWELLING UNITS: Building "A" 19 one bedroom 25 two bedroom 44 Building "B" 19 one bedroom 25 two bedroom 44 TOTAL NUMBER OF UNITS: SURFACE PARKING: GARAGE PARKING: 88 units 132 spaces or 1.5 per unit 88 spaces or 1.0 per unit PLANNING REPORT SURREY GARDENS APRIL 18, 1983 PREPARED BY: John S. Voss, Planning Consultant Page 2 3. Site Plan Review: The site plan for the multiple dwellings has been reviewed and it appears to meet the City's Zoning Ordinance in all respects. While it is not indicated on the plan, the applicant has represented that concrete curbs will be constructed around all driving surfaces. Also, a landscape plan will be required prior to issuance of a building permit. 4. Additional Access: The Police and Fire Departments of the City of Eagan have stated a concern about the site plan which provides only one (1) vehicular access for these 88 units. They have requested that the applicant pursue an addition- al access leading to Yankee Doodle Road which may be restricted to right turns only. This would provide better emergency access to building "B There does not appear to be another way to develop a second access. The topography lead- ing to Surrey Heights Drive appears to be too steep for development of a suitable access. 5. Park Dedication: The park dedication requirements will be reviewed by the Eagan Advisory Parks and Recreation Commission. It is anticipated that park dedication will be satisfied by a cash contribution for each dwelling unit. It is also assumed that the developer will be required to construct a minimum eight foot (8') wide asphalt trail along Yankee Doodle Road. At present, a trail exists to the east, along Yankee Doodle Road, to the Federal Drive intersection. If the preliminary plat of Surrey Gardens is approved, it should be subject to the following: 1, The preliminary plat shall be reviewed and approved by the Dakota County Plat Committee. 2. Park dedication shall be accomplished in accordance with the requirements estab- lished by the City Council after review by the Eagan Advisory Park and Recrea- tion Committee. Said approval shall also contain the requirements for the con- struction of an asphalt trail along Yankee Doodle Road. 3. A second access shall be provided to the development to the satisfaction of the Eagan Police and Fire Departments. 4. The preliminary plat shall provide for two (2) lots with each building situated on a separate lot. 5. A detailed landscap3 plan shall be submitted to and approved by.the City Staff prior to construction. 6. A detailed plan providing for outside lighting shall be submitted to and approved by the City staff prior to construction. 7. Drainage and utility plans shall be approved by the City's Engineering Department. 8. Concrete curbs shall be constructed along the perimeter of all outside parking areas. CITY OF EAGAN SURREY GARDENS PRELIMINARY PLAT APRIL 26, 1983 PAGE THREE ENGINEERING RECOMMENDATIONS 9. If installed privately, the plans and specifications for the streets and utilities within this parcel shall be prepared by a registered engineer in accordance with City standards and submitted along with the final plat for approval. 10. The water main to be relocated shall be looped and the water main shall be constructed for Building A to provide fire pro- tection and shall also be looped. 11. No access be allowed to Yankee Doodle Road. 12. The private drive be 28' wide with concrete curb and gutter. 13. Concrete islands be required at each end of the center park- ing islands for each parking lot. 14. A 20' easement shall be dedicated as a part of this plat for those existing utilities which are not to be used as services and 20' easements shall also be dedicated for the relocated water main and also the proposed additional water main. 15. A 10' utility easement shall be dedicated along publicly dedica- ted right -of -way with a 5' drainage and utility easement dedi- cated along all external lot lines and a 10' drainage and utili- ty easement centered over all internal lot lines. 16. A 40' half right -of -way shall be dedicated for Federal Drive along with a 75' half right -of -way being dedicated for Yankee Doodle Road. 17. All costs for the internal utilities, private drive and parking lots shall be the sole responsibility of this development. RMH /jach MEMO TO: THE ADVISORY PLANNING COMMISSION, C/O DALE C. RUNKLE, CITY PLANNER FROM: RICHARD M. HEFTI, ASSISTANT CITY ENGINEER DATE: APRIL 20, 1983 SUBJECT: SURREY GARDENS PRELIMINARY PLAT The Engineering Division of the Department of Public Works has the following comments regarding this preliminary plat. I. DRAINAGE /TOPOGRAPHY The topography of this parcel has been altered by previous grading, but nonetheless slopes rather uniformly from southeast to north- west. This is reflected by the high point of this parcel being at an elevation of approximately 900 at the southeast corner of this parcel and the low point being at an elevation of 860 located at the northwest corner. This 40' elevation difference is realized over a large enough distance so that the average slope is about 6% although it varies from a maximum of 20 %along the easterly half of the southerly boundary to approximately 3% in the middle of this parcel. Consequently, the drainage follows the slope of the land and collects in the northwest corner of this parcel. From there, it is conveyed to Pond CP -1 via storm sewer. Currently, Pond CP -1 does not have a positive outlet. However, one will be constructed as a part of Project 371, Water Treatment Plant Utili- ty and Street Improvements. Under this project, Pond CP -1 will have an outlet to CP -2 which in turn will have an outlet which will drain to Pond JP 1. Although Pond JP presently has no con- trolled outlet, this will not be an immediate problem since the area surrounding it is presently undeveloped. Figure 1 more clear- ly illustrates this. The proposed grading will not alter this site greatly. In gener- al, the easterly half of this parcel will require some slight fill- ing while the westerly half will require a little more cutting. The drainage will be directed to internal storm sewer systems which will connect to existing City trunk storm sewer lines. II. UTILITIES Utilities of sufficient size, capacity and depth exist within this proposed development to provide service to it. For instance, an 8" water main is in place and loops through this area from the 20" trunk water main along Yankee Doodle Road to the 8" water main in Surrey Heights 4th Addition. Similarly, sanitary sewer exists along the north property line and crosses the northwest corner of this parcel to connect into the sanitary sewer located within Sur- rey Heights Drive. Finally, a 27" trunk storm sewer is in place along the north property line and a 15" storm sewer is in place along a portion of the south property line. ENGINEERING REPORT SURREY GARDENS PRELIMINARY PLAT APRIL 26, 1983 PAGE TWO Due to the layout of the proposed buildings, it will be necessary to relocate some of the existing water main located within this parcel. This water main shall be relocated so as to maintain the existing loop and also provide hydrants for fire protection. In addition, water main shall be looped from the existing 20" trunk main along Yankee Doodle north, along the east side of this pro- posed Building A, to the 8" water main located along the south boundary of this proposed development. The reason for this is to provide fire protection for this building. Meanwhile, the existing sanitary sewer laterals may be used as is. Finally, it will be necessary to construct lateral storm sewer to collect drainage from the parking lots. A lateral line will be required to be constructed north from the existing 27" storm sewer along Yankee Doodle to the parking lot for Building A, and also a short lateral will be required from the same existing storm sewer line to collect runoff at the west end of the private drive which par- allels Yankee Doodle Road. Similarly, a lateral will need to be extended from the existing storm sewer along the south boundary line of this property to the parking lot for Building B. No trunk utility construction will be required as a result of this development. III. STREETS This proposed development is bordered on three sides with exist- ing streets, with Federal Drive along the east, Surrey Heights Drive along the west and Yankee Doodle Drive along the north. Federal Drive is a 44' wide collector street with concrete curb and gutter and bituminous surfacing, and Surrey Heights Drive is a 32' wide street with concrete curb and gutter and bituminous surfacing. Both of these are City streets. Yankee Doodle Road, on the other hand, consists of 24' wide pavement, rural section and is under the jurisdiction of Dakota County. It is proposed to obtain access to this parcel off of Federal Drive. Access to Building B will be by means of 24' private street parallel to Yankee Doodle Road. However, it is recommend- ed that an additional entrance be added off of Surrey Heights Drive to provide better access for traffic and emergency vehicles to Building B. Access to this parcel off of Yankee Doodle Road is not recommended for the reason that Yankee Doodle Road will ultimately be a divided 4 -lane arterial street and it is not possible to construct turning lanes to this parcel in conjunc- tion with turning lanes for Federal Drive and Surrey Heights Drive. Furthermore, the layout for Building B is not conducive to providing this connection to Surrey Heights Drive. Subsequent- ly, a revised building layout for Building B will be required. In addition, since the private drive now becomes a looped street, it will be required to be 28' wide with concrete curb and gutter. ENGINEERING REPORT SURREY GARDENS PRELIMINARY PLAT APRIL 26, 1983 PAGE THREE As for the parking lots, they are recommended to be 64' modules with 10' wide stalls with concrete curbing around the perimeter. In addition, concrete islands will be required at each end of the center parking islands for each parking lot. This is to insure adequate width is always provided for emergency vehicles, espec- ially during the winter months when parking space lines are cover- ed with ice and snow. IV. RIGHT -OF- WAY /EASEMENTS The existing utilities presently have no easements within this parcel. Therefore, those utilities which are not to be used as services shall require easements to be dedicated as a part of this plat. Also, easements shall be dedicated for the relocated water main and proposed additional water main. Easements will not be required, however, for the proposed storm sewer laterals. In addition, a 10' utility easement shall be dedicated along all publicly- dedicated right -of -way with a 5' drainage and utility easement dedicated along all internal lot lines. Also as a part of this plat, a 40' half right -of -way shall be dedicated for Federal Drive along with a 75' half right -of -way being dedicated for Yankee Doodle Road. The right -of -way for Surrey Heights Drive has been previously dedicated. V. ASSESSMENTS All trunk related assessments have been levied for this proposed development. All costs for the internal utilities, private drive and parking lots shall be the sole responsibility of this devel- opment. I will be available to discuss any aspect of this report at the Advisory Planning Commission's meeting on April 26, 1983. Respectfully submitted, RMH /jack Richard M. Hefti, P.E. Assistant City Engineer A-h GAN A•u A -bbb MEADOW T F-1,2 •r• Pii:,,xlyg 805 414 %444 FOX RIDGE II 7.32.0 794.0 CP-3 840.0 8500 14-f C-h :CPU HP-3 71 840.0 8 -78 0 Hi 54. 1 I j I ITV/ P1 TRY LL_8 74.0: 87r. a 044 4.'437510 71" 88I0 15" CP 827.7 840.0' 18. ADDITIO I --;4„/ p 878 -a L 4; Iii 4 1 CENTEM H-0 4:AC PARK A. 2 _41 8.0 870.3 U.S, PDAZ;.. DP SERUlgot 884.0 870.0 r 890.0 PiL!)I 27 1 717 7 .42:11 _t.44 art 2, mew 8.1111111111118M1 4 ftief 'KEE z TA I AL 718.0 b. 1. SIE 47 T 41.1 a 4. ,...t., ig, t-b 44# N w ttit In GI ti Is El .1th. 1.1 0 c.7-z C-d ra r-0 BR C NW P-10 W CP- r 765.0 769.0 C 2 820.0 .t. 8 ROC ORKS DG E .41 P..2 7 -1 1; s 1 :r•C N. .,y 839.2 1 k" -J p _3 ..0 1 1 FR-, k_i ,.;4_4 x'• .er. r r .F.ISri N rji .1.„ ir 84/.0 2. .i ,......ijne'-i.84f.:L., 41/11,-§1 1, i *1:!‘ (dca -i- 1 I 41, re•S' f 'n7 -i/ g.9f1, BP- I BP- 26 CITY i ■4 4 F° -38 838.0 f il II d ---j 8 P 39.0: •s., :5!I c 2„ M P75CEigEPre ,,,„,„„c 816 5 -..ii* 791.3 .Jii,, "L„)/7 L. etp7,36_ ez Lt./W;04 0 :71- .:LiT.I. BP-2 8P-29 4011110, 808.0 ..ii 8/4.0 1 LL tiT I 808.0 crj p04:1 -eARK t CP- 9 698.0 700.0 e- k.:•• -t, 0 971.0 sote ;00 ^...0'• /I i JP-I 4; ,0 1 795.0 JP 4 I 806.0 Q AP-37 -,..0 it 1 p if 'AP- 2 r BLACKHAWK PARK 72 A 6 f- y 27!, A-S i 7 6c 41 ANDLE .■.4 t 1 14. CA) HP-2k 0.....§9p OS AAi v. f NO 3 ami i.VIEW ,N 'I. 2- i--N.,e,,. :"St di\ A\' 1 9.3. ---1' -I ..;,;7 --1-' 7.1_ fy r- '7,.. 1 47 1 1 .31. 7- Rh,Ey. 1 8 ■CiF.F AEP I 1 1 AO--.....4 10 SUBD: ZERNDIER i. i 1 1 I I %1 F859.3 1 i 866.0 L 48' 1.' 1. v.7. rg scHooL DP-I5 874.0 CI !'!4..• t5..,.. O; 24. 'Fft:94E 82 828.0 1 -2 OP-3 8 9 03 1' Lui BP 862.0 0 866.0 I B25 --1 886.3 z.- iv P- i 8P AP 4 870 0 2- 930 0 r 1 880 0 4- s i AP-35 i -C477 alak S A 14 BP-24 AP- 8 918 0 ...J., N: 4 BP-27 882.0 886.0 B JP 6'1 825.0 \928.42 DP 8690 857.3 '14 884.0 82.0 pi N.,...., III 842.0 852.0 1 868.0 L.S. s 1 DP-4 lit YAW E4 82 IRLE 8040 0.911L 10 s _Z1 r 27' 1 •D- 1 ..to :8:8 .0- --t 72" 1 4 J-. DP-7 I 880.3 818.0 k .r, .KOVDIZE 1 870 6 jp_35 JP-36 2 869.4 42 T_...-‘ ,2 8724 8 e JP JP r APJP-7 8 7 2 21' 8 :=P 2* I Pi 2 L i 560 4 874 0 g. LI 11-.v.,‘.,113488 13135 t '21.-, LP 44 883 5 g r. 24P 816 8200 8 re 3/4% JP -45 J-g f L.S.-12 rFoCK JP-8., 817 2 8200 LP-43 850.8 .5.t EAGANDAL.t. DP- 87C 877 JP-II 815.7 --71 JP 9_890.7 8960 830.0 1 JP 9 I 8 17.0 82204 dd I oP/ 4-se 1 EE S_. t CITY OF EAGAN P SUBJECT: REPLAT OF,PORTIONS OF BLOCK 1, 2 AND 3 OF THE EAGANDALE CENTER INDUSTRIAL PARK APPLICANT: Northwestern Mutual Life Insurance Company LOCATION: Eagandale Office Park Section 3 South of I -494 and east of Pilot Knob Drive EXISTING ZONING: LI Light Industrial DATE OF PUBLIC HEARING: April 26, 1983 DATE OF REPORT: April 19, 1983 REPORTED BY: John S. Voss, Planning Consultant APPLICATION SUBMITTED: An application has been submitted requesting a replatting of a portion of the Eagandale Center Industrial Park. More specifically, the areas to be replatted involve Lots 4 through 11 of Block 1, Lots 14 through 26 of Block 2 and Lots 15 through 17, and 29 through 36 of Block 3. The area to be replatted encompasses approximately 45 acres. PLANNER'S COMMENTS: 1. Interstate Highway Construction: This replat was necessitated primarily because Interstate Highway construction in the area, namely I -494 along the north and I -35E along the east, have affected access and traffic patterns. Therefore, the applicant is proposing to realign Eagan Industrial Road and Trapp Road. This would result in the dedication of certain additional land for the realignment and corresponding- ly, the vacation of certain portions of Eagan Industrial Road and Trapp Road. The dedications and vacations are illustrated on the preliminary plat of "Eagandale Of- fice Park" submitted by the applicant. The replatting also affects many of the previously platted industrial lots in the area. The applicant is proposing to create much larger lots than previously existed. In time, it is anticipated that some of these larger lots will again be replatted into smaller lots after the developers or users have been identified. 2. Communication With Existing Developments: The applicant has not communicated with all of the existing industrial developments in the area. It.is expected that the proposed replat will either have little effect or will actually improve the access and traffic patterns in this industrial area, however, the opinions of the affected industries in the area had not been expressed to the City staff at the time of the preparation of this report. 3. Vacation Hearing: Previously existing streets or right -of -way cannot be vacated simply by replatting. A hearing will be required at a City Council meeting in order to achieve vacation of the portion of Eagan Industrial Road and Trapp Road. PLANNING REPORT REPLAT OF PORTIONS OF EAGANDALE APRIL 19, 1983 Prepared by: John S. Voss, Planning Consultant Page 2 If this preliminary plat is approved, it shall lie subject to the following: 1. Approval by the City Engineer of all utility, drainage and grading plans. 2. The replat shall be subject to the approval of the vacation of the affected streets by the City. ENGINEERING RECOMMENDATIONS 3. A 10' utility easement will be required to be dedicated along all publicly- dedicated right -of -way with a 5' utility and drainage easement dedicated along all exterior lot lines and 10' drainage and utility easement dedicated along all interior lot lines. 4. A 20' utility easement will be required over the proposed water main located within Block 2. 5. The intersection of Avalon Avenue with Corporate Center Drive shall be reconstructed as a "T" intersection. 6. All costs associated with utility and street construction shall be, the sole responsibility of this development. 7. A detailed erosion control /grading plan shall be submitted for ap- proval along with the final plat. RMH /jach MEMO TO: THE ADVISORY PLANNING COMMISSION, C/O DALE C. RUNKLE, II. UTILITIES CITY PLANNER FROM: RICHARD M. HEFTI, ASSISTANT CITY ENGINEER DATE: APRIL 21, 1983 SUBJECT: EAGANDALE OFFICE PARK PRELIMINARY PLAT The Engineering Division of the Department of Public Works has the following comments regarding this proposed preliminary plat. I. TOPOGRAPHY /DRAINAGE The topography for this area consists mostly of rolling terrain with elevation differences of up to 50'. The steepest slopes found on this proposed development are within Lot 3, Block 2 and are approx- imately 20% while most of the area is platted with slopes of around 5%. Outside of a couple of small depressions, the drainage from this parcel is generally to the west. Some of this drainage is collected within the existing streets by storm sewer and eventually is discharged into the Minnesota River through a storm sewer line constructed concurrent with the recent 5 -494 project. The proposed grading over this parcel will result in additional storm sewer construction as most of this site will be leveled to provide for future buildings and parking lots. This will not pro- pose any problems since outflow has been provided to the Minnesota River. Nonetheless, compliance within approved grading /erosion con- trol plan will be required with most of the concern being control of erosion. Utilities of sufficient size, depth and capacity exist within the proximity of this proposed development to provide service to it. As can be seen from Figure 2, a 12" trunk water main is in place along Eagan Industrial Road along with a 30" trunk sanitary sewer and a 54" trunk storm sewer. The proposed utilities consist of water main, sanitary sewer and storm sewer. The proposed water main to be utilized for distribu- tion purposes and fire protection shall be 8" in diameter and loop- ed from the existing 12" main previously mentioned to the existing 8" water main dead end located within Trapp Road. Similarly, an 8" water main shall be looped from the existing 12" trunk within Eagan Industrial Road south to the existing 8" water main within Avalon Avenue. Also, storm sewer shall be constructed within Trapp Road and Corporate Center Drive to provide adequate drainage. If installed privately, the plans and specifications for this work shall be prepared by a registered engineer in accordance with City standards. ENGINEERING REPORT EAGANDALE OFFICE PARK PRELIMINARY PLAT APRIL 26, 1983 PAGE TWO w III. STREETS Eagan Industrial Road provides the primary access to this parcel and is a 44' wide street with bituminous surfacing and concrete curb and gutter. In addition, Avalon Avenue borders the south boun- dary of this plat and is also a 44' wide street with bituminous pavement and concrete curb and gutter. It is being proposed to relocate Eagan Industrial Road, Trapp Road and Avalon Avenue as shown on the preliminary plat. Eagan Indus- trial Road will turn into Corporate Square and connect to Avalon Avenue at the south end of this proposed development. With this new connection of Corporate Center Drive and Avalon Avenue, it is recommended by staff that the intersection of Avalon Avenue, west of Corporate Center Drive, with Corporate Center Drive being recon- structed as a "T" intersection with Corporate Center Drive being the through street. Eventually, this segment of Avalon Avenue be- tween Burnside Avenue and Corporate Center Drive will be eliminated. IV. RIGHT -OF- WAY /EASEMENTS Due to the relocation of Eagan Industrial Road into Corporate Cen- ter Drive, a portion of the old Eagan Industrial Road right -of -way is proposed to be abandoned between Corporate Center Drive and Trapp Road. This will require a petition from the developer to initiate a vacation hearing. However, it will be required that a drainage and utility easement be retained over this parcel since the City has utilities located within this area. In addition, it will also be required to vacate of portion of Trapp Road located within Block 2 of this proposed development. Similarly, a petition to hold a vacation hearing on this road will also be required along with a drainage and utility easement over the existing City utili- ties located within the southwest corner of Lot 3. A 10' utility easement will be required to be dedicated along all publicly- dedicated right -of -way with a 5' utility and drainage ease- ment dedicated along all exterior lot lines and a 10' utility and drainage easement dedicated over all interior lot lines. In addi- tion, a 20' utility easement will be required over the proposed water main located within Block 2. V. ASSESSMENTS All trunk area related assessments have been levied for sanitary sewer, water main and storm sewer over this proposed development. In addition, lateral benefit for sanitary sewer and water main has been assessed for Lots 14 -18, Block 2 of Eagandale Center In- dustrial Park 41 and also for Lots 15 -17 and 29 -36, Block 3 of Eagandale Center Industrial Park #1. These assessments include Block 3 and Block 4 of the proposed Eagandale Office Park develop- ment. Although Lots 4 -11, Block 1 and Lots 19 -26, Block 2 of ENGINEERING REPORT EAGANDALE OFFICE PARK PRELIMINARY PLAT APRIL 26, 1983 PAGE THREE Eagandale Center Industrial Park #1 have not been assessed their lateral benefit from trunk water main and sanitary sewer, they will not be required to do so since it is necessary for them to con- struct their own lateral water main and sanitary sewer to provide service to this area which comprises Lot 1, 2, and part of 3 and 4 of Block 2 of the proposed Eagandale Office Park development. I will be available to discuss any aspect of this report at the Ad- visory Planning Commission's meeting of April 26, 1983. Respectfully submitted, RMH /jach Richard M. He ti, P.E. Assistant City Engineer MEAOC1 m 1111 1E1 fra CP-I es' C-k z 14J g FOX RIDGE CP-2 e2ao 826.0 _j 0 'KS DG IU 1 WWI IOW 840.0 830.0 2" 0-g SCHOOL' Pt° It .-D 80.5 CP 827.7 8400 18 DP-2- 874.01 i 877.01 DP-6 874.0, 876.0 Lt. TFTWETs T M. 49477 Sr' H PARK OP-IP 868. 870.3 z WEIL 01 •3 yi! F- fr. Fdb 0 lE X MIN 816'7 -E-a- 4:11ii RIALI 4 E b F- L. 7 ii H-b 2 1 Ai 4. ri NO 3 H •__.W.-L. -6t3H1 1 j 1EW e ERJ IFIN I. es e. 'ACRES ha 01- i://004 itS.71-- eg• 1 1 14 7.L441 ,1 '...1:Cb 111 .7"."" i 893: I H I f .:".14 7 It .6 v REF VE A 7,E1 2EHNDER i ir 866.0: i SUBJECT PARCEL DP44 ir-■11 FRE_ r ADDITIOr MEN OTA 1 HTS 4: 7" -4-; 41 F-k •AM 11 U.S. p0, DP-19 SER v y li r IMa rr ii i i I i•mon DP-6 ft 6-13 1 8 0 3 ;82.0 0 S f L.S. 13-n SIN. 0 OPI5 7 J /I' t.i. 042.0 47 852.0 it tt 868.0' 1 DP-4 le f lb a Y 6' ANKEE' ,Itet_ E ROAD 0-pi L R __4 8" 1 il ;000Es( LEFtll i Nkl 3R0 I so Iva) C I 11 nr 4 HiLLS -Y 0- I 2:_ -7 ..1 J A ir. 8 D 4 P 8 1 0 0 1/4, 4 C 1 W ESCOTT L 7 11 N. D-vi q 17_72 E-g 1 L J-e Dc bP'• 0 880.3 12 1-7* ' 86 7 GARDEN 11 /L0 OP VIESCOTT i V I_ E-hi C P-1 828.0 1 822.3 2 NO 1, 'et ,i,/, ti t ae 1J-d I-.. jf, '','!f:; 0 877 0 1.......... 870 i .0 1 83! M.8 i 1 7 /,„[_,i 1 DP-7 806.0 rs,....0.**, 1 ..........0"Mrn■ 4 MS 84, 8.50.0 1 m' E' 872.0 jp .......4. 14 --j 892.2 1 832 r -4 1- j-I -7 7% 27 :1 1 3 N i I"I/ -\:c JP-I '"TG i eiw Kt JP -I3 "41\it r^, 1 Y.,' tI -13 71;:r 806.0 795.0 a 840.7 866.0 1 r 1 41k; 890.3 1 1 cF8Q JP -48294° 8870 JP-4I -4 848 ..,„y/') 839.2 I ib 0.0 U IiLAr.."."K "..31•;\ iiteNzP Irr r JoNBP HILL.,. ',N JP-4 8390 9: BP-26 47' rl A I CI T 839 0 i q 9 4 40 48. JP-15 ‘8 Ls.-14 JP-II 815 7 JP-44 88881 6 1 .8800 L 51 J ee6 o ,i..) Y BP 1 ,i /q.ciii,.1. I 8300 1 1 9 e ..,_11 1 i -l.:: -4- j-n 13LACKHAvvK J t V t e 8P 1 '•,t I 4 ,1 794 0 f 1 820 8 t 8 ,t4 77 S1.00 8 E 12 3 I;8j/P806 6' 827.8 'T1 BP-29 I 808.0 4, 2 814.0 BP -4 866.0 862.0 8-b 1 sx,v,h-LE L.S. t LS-13 C;(?, JP-36 8 1 06 JP-35 2:SX 8220 1. 23- DP-I1 855.7 8620 4 eSele• 1 0 4 FP- 823.7 838D JP-I9 870 2 874 0 66. 29 'e 30 7 E-8 EAGAN0A K.- NO. 2 s f E-r E-1..7.:NE OA 1-7:--:i K ROAD s._ -\----7--- I L 1 Lae NuA_s. '1'1 r..f.rp 101 I ill ti i. ,LI\ E-a u 72 E-n rLa L 2 fl ...-fraiA 1 ARK NO. 3 850'9 IH I L. es- JP-20 852.0 855.0 In I HIGH VI E W 0 MYG /G' w' 5 U $3 E c� FA R L EL INTERSTATE 494 ritlurt 1 AVALG SEE SHEET 39 INTERSTATE 494 ff 0 SAN SE■,tiE.I: WATER E,4A r 4 4 PRELIMINARY PLAT OF EAGANDALE OFFICE PARK �M!V P C_.1.1! R !4P11 RL•!IP J110,11i .wun wnrrn uw r.u MriflP 9rl lurk ...imS w rn. ur ur nar r .r uu �r un�rr r m M Y!u 11•x:11. MI u 1,1••• w �tr.rn !�rr.�rrr 41M r iL.1 i'fi.� f_Zff_ "MK LSD T 11/1K VIVO ,INC as Now It• 1.6 EAG•NOALE OFFICE PARK 1.. EAGAN, MINN. MO SO .44 NW •+.*w a•• PRELIMINARY (RADING, ORAINAGE, a UTILITY PLAN P O Boa U0, Wnrwpolli MN 564•0 1612) 936 411 N. Buun•s• Omar Ot. Mount Pryso•q K.60066 (3121626.•A •uos .NO• •040 I11 III t OPUS CORPORATION OESiGrsERS BUILDERS OEVELD ERS 777 E wispanAn 0o. Mdr•u•••. WI 11202 O.) 21-2960 3101 N. C.•nbo A••_ PM... A2 0012 1002) 274-7000 Ind. RH CS6/GB/LB 8 I.P. St l V f. C MDOIA clue J.• -5 Salt. Lll■ fl j ROSEMOUNT raw EMU 31/ *LOST SPUR COUNTRY CLUB PF )ST NO 3 PF MENIDOTA r-r'f'rt r r•-er f M- 808- HIS. 0 EAG; May 1983 MEMO TO: ADVISORY PARKS AND RECREATION COMMISSION W" FROM: KEN VRAA, DIRECTOR OF PARKS AND RECREATION RE: EASEMENT REQUEST SOUTH PROPERTY LINE OF OAK CHASE PARK Staff has received a letter from Mr. Mrs. O'Brien of 4434 Oak Chase Road, requesting a driveway easement to the lot immediately east of their resi- dence. (See copy of letter attached) There currently is a 30 foot drive- way easement on the northerly portion of the O'Brien property to allow access to lot 1, lot 2 of the third addition of Oak Chase which is the property immediately east of the O'Brien's. Apparently at the time of the platting of the parcel provision of the driveway easement was not made known to Dakota Electric and Northwestern Bell for the placement of utilities. Consequently, Dakota Electric and Northwestern Bell have placed underground lines and connection boxes within the present roadway easement. Therefore, if a roadway were to be constructed on the current easement these utilities would have to be relocated. There is a small but steep embankment from Oak Chase Road eastward which would have to be cut down to allow the roadway to be built. Review: Staff has reviewed the request from the O'Brien's which suggest a 30' wide by 240 foot long easement to be placed within park property to allow access to the adjacent lot. Staff has also had contact with representatives from Dakota Electric in regards to relocation of these utilities if the easement request were not granted. An on site visit to the area was made to review the site which has been staked and marked with all utility locations. In making the reviewal it was obvious that a 30' wide easement by 240' long would cause the removal of several large trees on park property. Many of these trees are greater than 8" in diameter, are well matured and provide a large overstory canopy. Relocating this driveway to the north, may well cause damage to occur to additional park trees as a result of the construction process. Representa- tives from Dakota Electric have also indicated that the movement of the electrical box would be time consuming and expensive. It is unclear at this time who would be responsible for the cost of relocating these utilities although it does not appear to be the responsibility of the parks and recreation department. Recommendation: The Advisory Commission has previously reviewed other requests for easement access on park property for private benefit. And, has indicated that in reviewing these requests that the best interest of the public must be given first priority for consideration over private needs. The commission has however, considered these requests when in instances of hardship, topography, etc. are involved. In reviewing this request, it appears that there would be a substantial loss of trees if the 30' wide 240' long easement were granted. There is also the potential loss of additional trees which are immediately adjacent to this requested roadway, if the request were approved as is. Staff is suggesting a modification to the request that would move the access point at Oak Chase Road. This access would he more northward approximately 30', after which the roadway would angle across park property and be merged into the current easement at a point 40 to 50 feet into the O'Brien's lot. This alternate would avoid the costly relocation of utilities by Dakota Page 2 Electric and would cause the least amount of disruption to existing topo- graphy, while maintaining the integrity of the park and tree area. It would also be staff's recommendation that any cost associated with staking, surveying and developing of this newly created easement he the responsibility of the property owner(s). cc: J.H. O'Brien Members may wish to visit the site prior to the May Sth Advisory Commission meeting on their own. At the time of this writing the roadway easement which currently exists has been staked and utility lines have been marked. Should members require additional information please feel free to contact the office. DATE: 4/13/83 TO: Ken Vraa, Park Rec Department FROM: Jim Linda O'Brien SUBJECT: Land Purchase Proposal Dear Ken: Enclosed is a sketch of our lot at 4434 Oak Chase Road. This shows the driveway easement to Lot 1, Block 2, 3rd addition. It also shows a proposed access easement. We wish to purchase from the City of Eagan the necessary property to allow for the proposed access easement. The reasons for this proposal are: 1) The lay of the land is better suited for a driveway access in the proposed easement. 2) Dakota Electric and Northwestern Bell will have to remove all lines to our home (Lot 2, Block 1, 1st addition) if the present driveway easement is used. It is unclear at this time as to who will be responsible for the cost of relocating the power and telephone lines. This is quite possibly a legal matter and one that can be avoided if the proposed easement is allowed. The owner of Lot 1, Block 2, 3rd addition is anxious to put the driveway in to his lot. He is interested in selling the property and believes that having the driveway completed will hasten the sale. Your prompt reply will be appreciated. 0 0 c w 0 0 m M M Sketch For: James O'Brien 4434 Oak Chase Road Eagan, Mn. DELMAR H. SCHWANZ LAND SURVEYOR 5 r Re Under Laws of The State of Minnesota 2978 145TH STREET W. BOX M ROSEMOUNT, MINNESOTA MSS SURVEYOR'S CERTIFICATE .COT2 dco (•f OAK CM,416" /3r No,27t/ .z/A/6 GJ 56 ;0 210 Ns °5716 r �f r 491 210 t F i b N II .coT o #10's# /fr Propose e Access Easem= t i1/ orres..11 srarel wF- Wogs II 11 1 I Ih 2 04K C/Nf jAOD mit emits 9 N V 7.6 4 0 7 Seals s Date: March 31, 1983 PHONE 512 423 -1769 A AF Coon/,' of I? o,T ROAD 22 T. /4 AlRop X Co. 64S r 1 d rAilY lie ~PO 22 2,, 0 0 3" 0 4 /Io.00 /94f.45 82 6S 42148 /01.07 w /00. -1 8 \,IN' c o' o 1 wAv AC E4.EU. a I N .seRr• :91o' 814. 2 I "c ys sro TA REOISTAATNIN NO 86/5 h N MEMO TO: ADVISORY PARKS AND RECREATION COMMISSION FROM: KEN VRAA, DIRECTOR OF PARKS AND RECREATION RE: COMPOST SITE OUTLINE FOR DISCUSSION PURPOSES ONLY May 1983 Background: The Advisory Commission has previously asked staff to investigate the possibilities for creating designated areas for "leaf composting" for City residents. At the April meeting, a brief film was shown describing the use of a compost culture and leaf composting collection programs in several communities. This film was presented as a means of providing the commission with additional background information. This memo is intended to serve as a framework for discussion by the commission to make a determination whether staff should pursue the issue further. Advantages: There are certain advantages to a leaf composting system. These advantages includes systematic disposal of leaves by residents, composted materials provide humus for planting and landscaping projects, a concern demonstrated by the City to maintain the environment for good community relations. Disadvantages: Disadvantages of the program might include additional cost factors involved with administering the program and the effort by staff to operate the composting program. Costs include the composting culture to aid in the decomposting process, potential equipment purchases, labor and hauling costs for debris or other materials not suitable for decomposing, i.e. garbage/ paper /plastic bags /tree roots, etc. In addition there may be problems with traffic dependent upon the location of the compost sites, problems with insects, bugs, rodents and the like. Program Outline: After considering the advantages and disadvantages already mentioned, plus others that members may also have concerns about, a program outline could be reviewed. One such outline envisioned by staff might include the following aspects: 1. Sites: There should be limited sites for the composting process. No more than three throughout the community. These sites would have to be at least 22 to 3 acres in size. Another option would be to have a single site which might be accessible to the entire community for residents to haul their leaves to. 2. Supervision: It might be very advisable to have supervision at the site to insure that brush and other unwanted items are not left. A program utilizing boy scouts or other service organizations who might supervise the site during hours of operation could be established. Hours of operation might include only week- ends or one or two week day evenings. 3. Composted Product: Whether at scattered sites or at a single location, it appears advisable to treat the leaf compost pile with the culture material to aid in the decomposition process. If scattered sites are determined to be the best advisable alterna- tive leaves would be hauled to a central location for treat- ment purposes. Once the composting has been completed the material could be disposed of in several ways. Page 2 a. It could simply be made available to community residents free for the taking. b. Or, it could be utilized by the City for park purposes. Because it does not appear likely that the City would have a screening process for the composted material its suitability of use by residents is not as good. As previously indicated, this memo is intended to serve as an outline for members discussion in which the advantages and disadvantages of a program along with its ramifications can be discussed. Direction as to if the staff should attempt to proceed with the development of a program for community compost sites, or to drop the idea; should be given. Play in the Age of Technology A LTHOUGH LIFESTYLES CHANGE, environments change, people change, one thing appears to be constant in our experience —play opportunities offered to children rarely change. Playgrounds and play equipment have altered very little over the past hundred years, and the reluctance of the play movement to move forward with changing worlds has con- tributed to the phenomena of "little used playgrounds," "misuse of play equipment," and "sterile play en- vironments." Pity the poor administrator, the unfortunate architect, and the help- less equipment manufacturer who, in an attempt to satisfy "needs," seem to exacerbate problems already in existence. Let's examine some of the concepts upon which we base our current playgrounds. I. Although we create play areas for "normal" play, and the U.S. Con- sumer Product Safety Commission (CPSC) guidelines talk about foreseeable misuse of equipment, there are many in the recreation field who firmly believe that there is no such occurrence as "normal" play. To believe that, one would have to also accept the antithesis that there is abnormal play on the playground. The fact is that all play is linked to learning. Cor Westland and Jane Knight, in Playing, Living, Learning: A World Perspective on Children's Opportunities to Play (Venture Publishing, 1982), point out that play is instructive, spontaneous, and natural. Children learn to use play equipment until, having Iearnt all the challenges of use, they have nothing more to learn from it. At this point, they seek additional, challeng- ing learning experiences, some of which we adults label "misuse." Thus, the child who has gone down the slide several times in the proper fashion, seeks additional play ex- periences by coming down head -first on his stomach or in tandem with other children. Youngsters who have conquered the experience of swinging in one direction will swing with a partner or use the swings for new challenges. The CPSC guidelines urge manufac- turers to create swing frames that by Frances Wallach, Ed.D. discourage climbing. How one does that remains a mystery to the best designers in the industry. Perhaps the word "normal" should be removed from any descriptions of play, since all children's play is nor- mal —just not the way we adults en- vision it. II. The direction today is to de- sign playgrounds that are as safe as possible, and this is laudable. After all, none of use wants our youngsters injured. But the more safeguards we provide, the lesser the challenge, the sooner the boredom. This is com- pounded by the role models that children constantly emulate; and the role models have become far more adventuresome and daring over the years. As a matter of fact, so have our Lifestyles. High risk activities have become exciting play experiences for adults —upon whom children model their play. Grownups today sky- dive, hang glide, balloon, and rock climb. Television shows children how exciting and satisfying these ad- ventures are. Is it any wonder that youngsters create high -risk situa- tions at play? Superman and Batman may have leaped off high buildings 40 years ago, but it was done in co- mic strips. Yesterday's fantasy has become today's reality, as we watch real people do actual jumps. As we build 38 -inch barriers around 30- inch high platforms, we are actually designing 68 -inch climbers for the high -risk emulator. No, we cannot ignore the safety factor in play, but it may be necess- ary to redirect our thinking. Since the most severe injuries occur not on play equipment but on the surface when a child falls from equipment, perhaps we should concentrate on providing the safest surfaces possible under equipment. III. Children do not have the same play patterns, and play intensity is heavily affected by environment. City kids, in dense, urban areas, are more competitive in their play than rural youngsters, and they tend to take greater risks as a method of ob- taining peer acceptance and recogni- tion. Play equipment in city parks is "misused" more frequently than in other settings simply because the competitiveness inherent in the crowded urban setting is not planned into the standard play experiences designed for universal use. And, in this age of high technology, our con- cepts of play are still simplistic. We think of climbing, sliding, and swinging as unilateral experiences. The major change in plan oppor- tunities came with the advent of "play systems," instead of single play experiences. Now, instead of a slide, a swing, a climber, we have con- nected these with platforms and bridges to provide a continuum for these same play experiences. Very few unique play pieces have evolved over the years. Perhaps the fault lies partially with our own creativity. Several years ago one of the major manufacturers, Game Time, held a think -tank session with experts in play from all over North America. They examined each play function, probed its weaknesses, and explored possibilities for change. Swinging, the group decided, was a solitary, single purpose experience that did not promote socialization. The group effort created the Atom Splitter Swing, the first new design to involve groups of youngsters in playing games on swings. And, although subsequent problems with the ball made it necessary to elimi- nate it, the circular swing concept has changed the way children view swinging. The newest play equipment out is the unique Spacenet, a constantly moving rope network in which children face several challenges at the same time. As they climb, the ropes, made of steel cables covered with nylon, move continuously, since any one movement by any one child stirs the entire structure. And, although the masts may rise as high as 24 feet in the air, the scientifically designed pyramid shaped rope net- work prevents any free fall when in use. There are now well over 40 Spacenets in playgrounds across the country, and the play experiences have been so enjoyable that a line of Spacenet products has been developed for all ages and budgets, the Space Cub being one of the most popular. PARKS RECREATION /APRIL 1983 INFORMATION KIT on HOCKER e the natural, lifetime, frustration -free sport everyone can enjoy the first time! Easy to learn. Low, low cost. All ages and sizes. Co-ed. Injury-free, safe, fun and exciting! ariN CaII Toll FREE 1. 800. 243.4141 ai Rocker International Federation (HIF) 54 Miller, Fairfield, Connecticut 06430 Af Suspense! How many points will it be? Please circle reader service card number 25 PCA INDUSTRIES Playlearn /SportsPlay Divisions 25th anniversary I SWEEPSTAKES CALL 800. 325 -4194 (IN MISSOURI CALL. 567 -6277) To learn how you can win one of more than 200 cash and product prizes from our playground, preschool, recreational and sports equipment catalogs. 2298 Grissom Drive St Louis. Mo 63141 Please circie reader service card number 26 38 PARKS RECREATION /APRIL 1983 IV. Play equipment is designed, purchased, and administered by adults who use memory as the basis for providing play experiences. And sometimes it shows. One park in the Northeast U.S. had, on its play- ground, several "stoop -ball walls," which went unused simply because today's younger generation has no idea of what stoop -ball is. The crea- tor of this equipment obviously grew up in a Northeast city —New York, Philadelphia, Boston —where build- ings had front outdoor stairs, and a city game Was created by throwing a rubber ball against these stoops. The game was totally unknown in the community in which it was placed. But you could identify the age and background of the designer by his design. Obviously, we can't have children designing and building parks. But we can pay a lot more attention to the way they play, and we can do a great deal more research on children's play. Do children like "up" or "down" better? Does a roof provide security or a climbing challenge? How long should a tunnel be before a 4-year old becomes frightened of enclosure? In other words, if we knew a lot more about children, we'd probably be able to come up with better equipment. As adults, our criteria for design and equipment selection are very different from the youngsters'. We worry about maintenance, durability of materials, and best value for the dollar. All of these concerns are es- sential, but they should be seen in perspective with the child's play needs. Remember, the best -main- tained, longest- lasting, unexciting playground just sits unused for a longer period of time. V. You would think, in our era of high technology, that we would have come up with many exciting play opportunities for youngsters with and without disabilities. One of the better directions we have taken is the development of community playgrounds to service all children, but we've got a lot to learn. We tend to be overly protective of disabled youngsters, and we remove the challenges, assuming that these children cannot tolerate challenge and possible defeat. Nonsense! No one faces —or conquers —more challenges than the disabled, in ev- ery facet of their everyday lives. Listed below are a few of the guidelines which should be adhered to when planning for thcsc and all—youngsters. Design for function —for capabilities, not handicaps; Understand the limitations of design. You cannot service every disability in the same setting with the same equipment; Encourage social experiences with your design. These are more im- portant for children than physical development; Understand the evident—the hid- den —needs of those you are designing for; Design to benefit everyone. Street curb cuts were meant to service wheelchairs, but are of im- measurable assistance to baby car- riages, bicycles, shopping carts, and so forth; Design for challenge—the lack of challenge in equipment causes misuse; Design to develop self image. Everyone needs to have a feeling of accomplishment; Design with creativity. You don't have to follow any rigid, tradi- tional concepts; Design for choice. A child needs to do a lot of decision- making on whether he plays alone or together, goes up on down, partici- pates in heavy activity or passive games; Design for learning— growing up is a learning experience; Design for participant recognition of his limitations. After all, the world will not modify itself for the individual, he has to learn to adapt; Let the participant learn about failure, it's a way of readying the child for the adult world; Don't be afraid to modify games. Winning is not as important as en- joying; Design with participants, both facilities and programs. It's time we moved forward in play. We face the challenge of electronic games, computers, and space adventures. Lifestyles are changing rapidly, and play reflects lifestyles. If we are going to service the needs of today's youngsters, we're going to have to enter the fast paced world and keep up with it. 0 42 March 1983 GPN F• O C• U• S ON PARKS AND RECREATION MARKETING YOUR PARK Funding for Fitness The profusion of fitness trails appearing everywhere gives rise to tales of private efforts to fund public parks. On Being Broke The dollars come to me and go, Today I've eight or ten to spend. Tomorrow I'll be sailing low and have to lean upon a friend.* Friends and friendly persuasion between busi- nesses, schools, civic groups, and park systems can go a long way toward helping parks expand. Here are four examples of public and private coopera- tion that have enriched each of the communities. These projects involve playground and fitness -trail equipment from Landscape Structures, Inc., De- lano, Minn. Site: Ridgeview School in Bloomington, Minn., a Minneapolis suburb. Project: A large, elementary -age playstructure with some adaptations for handicapped access. Ac- tivities include spiral slides, cable ride, cable walk, Playground equipment was acquired through the combined efforts of a city, school, and PTA. •A wne! apoan by Edgar A. Guest. lust Folks, (Cbieago. lll.. 1917).page /52 clatter bridges, platforms, ladders. Cost: Approximately $27,000 with about r/i pro- vided by the city and the remainder raised by the Parent /Teachers Assn. and the school district. The land used is owned by the school district. Participants: Community services department of the city of Bloomington; Jim Truvax, director of the Ridgeview PTA, and Bloomington School Dis- trict No. 271. Procedure: The idea was conceived by the Ridgeview PTA which contacted the city to see if a cooperative effort might be made for construction of a playground. A design was drawn, and although the school is adjacent to a city park, it was decided the playground would be situated on school prop- erty. The arrangement includes a contract between the school district and the city addressing liability, maintenance, and equipment ownership particu- lars. Site: Central Park in the city of Brooklyn Center, Minn., a Minneapolis suburb. Project: A 20- station exercise jogging course com- prising the HealthBeat 20 and an 8-ft.-wide, I -mile asphalt path. Participants: The city of Brooklyn Center; Gene Hagel, park and recreation director; F &M Savings Bank, BrookdaleOffice. Procedure: In the summer of 1980, Brooklyn Center was contacted by F &M Savings Bank with the idea of doing a community service project in conjunction with its branch bank opening. The city proposed a project, site, and cost sharing arrange- ment where the city would install the exercise course and an asphalt path on its land, if the bank would purchase the course. The bank had done a similar image- enhancement project in another city, and found that it was a successful, very positive, noncommercial kind of promotion. Each sign along the trail carries the name of the sponsor. Exercise courses in Minneapolis suburbs were in- stalled by a health- minded hospital. Site: Mount Normandale Park, Bloomington; Lake Cornelia Park, Edina; Round Lake, Eden Prairie all suburbs of Minneapolis. Project: Three different exercise courses ranging from a 10- station course to a 20- station combined VitaCourse and Wheel Course for people in wheelchairs. An asphalt pathway was also part of the proposal. Cost: Between $4,000 and $11,000. Costs were shared between the cities and a hospital. Participants: Fairview Southdale Hospital in Edina, and the cities of Bloomington, Edina, and Eden Prairie. Procedure: Fairview Southdale Hospital has a commitment to the communities it serves not only to provide healthcare, but to help improve com- munity health outside the hospital. Under the guidance of Nancy Gustafson, public relations director, the hospital assisted in the project to promote the concept of fitness. Site: Central Park in the city of Roseville, a suburb of St. Paul. Project: Development of a 220 -acre tract which includes a 95 -acre swamp, into a full facility urban park featuring seven softball fields, one baseball field, five soccer football fields, a 40 -acre nature area ampitheater, three playgrounds, a 20 -acre lake, 4 ih miles of trails, two exercise courses (regular and handicapped), four shelters, and a $250,000 park for the handicapped. Cost: Information unavailable. Participants: The city of Roseville; Frank Rog. park and recreation director; Bob Bershied, assis- tant; Roseville Central Park Foundation, an in- corporated, tax deductable foundation, Mrs. Harold J. Slawik, chairperson. Procedure: In 1961, a bond issue was passed to purchase an available 220 -acre tract of land in Roseville. In 1963, the Jaycees talked to the park Cavwdow44 i'!?v.^wr�raM and recreation board regarding a long -range proj- ect to benefit the community. After a master plan was developed, it was decided that the Jaycees would spearhead a drive to implement the plan. A citizens' committee was formed, and organized into subcommittees for publicity, engineering, and civic participation. This committee evolved into the Central Park Foundation. Their established goals to build the park have been a well defined group organization; selective participant involvement; a Playground is one of three at Roseville, Minn.'s highly developed 220 -acre Central Park. socially active program, highlighted by an annual fund- raising ball which has raised 5350,000 since its inception in 1967; and promotion of community awareness through a very aggressive publicity cam- paign. Because fitness has become a way of life in the 80's, parks are challenged with providing suitable programs and facilities. Fortunately, at the same time as communities and park directors look for ways to fund expansion in spite of shrinking budgets hospitals, businesses, and service clubs have been seeking ways to become identified with the trend. St. Mary's Hospital, Reno, Nev., is one of more than 300 hospitals and medical centers that has installed fitness facilities in local parks as a way to focus public awareness on good health rather than illness. Exercise stations can be adapted for use by the disabled as well as the able bodied. The Wells Fargo Bank of California is sponsor- ing a nationwide program offering grants of. to 1,000 parks interested in installing facilities. And Blue Cross -Blue Shield is funding fitness courses for communities in a nationwide health campaign to promote wellness and reduce health- care costs, and to position themselves as a "caring organization." "It's not enough to tell people to exercise and be healthy," says Tom Kilkenny, department of In- formation Services at Blue Cross of New Jersey. "After investigating many different avenues of health education, we decided we could best spend our money and efforts on fitness trails." Many of the Blue Cross fitness trails come from Parcourse, Ltd., San Francisco, which has installed more than 700 facilities in parks across the U.S. But the company goes one step beyond just providing the equipment. Its services may sometimes include helping find a donor; working with local planning commissions and the park departments on site plans; and managing media campaigns, clinics, and special events to educate the public on the benefits of fitness trails. Methods of acquiring and installing the courses vary in each community. The city of New Rochelle, N.Y., after soliciting a loan from a local bank, enlisted the local U.S. Marine Corps Reserve unit to construct the 18 stations. The community of Essexville- Hampton, Mich., population 15,000, successfully staged a "Fitness for Life" program which raised funds for seven Parcourse facilities from private sources. Fund- raising activites included everything from elemen- tary school walk- a- thons, to a promotion by the local A &P grocery store which sponsored a "Fit- ness for Life Donation Day" and gave 5 percent of sales to the project. The effort, spearheaded by Tom Gaffke, director of community education, and Robert Duyck, fund raising chairman curred no administration costs, so money directly into the project. Many organizations sponsor fitness trails as goodwill gestures. Perrier, bottler of French mineral water, has sponsored Parcourse Circuits across the•country as part of a marketing program to position themselves as the "healthy alternative to soft drinks and alcohol." Courses funded by Perrier Many corporations are sponsoring fitness trails as part of civic minded public relations campaigns. bear personalized signs carrying the Perrier logo and name, a constant reminder of the company's contribution. Many communities, rather than approach tional organizations, are turning to private four, tions, as well as civic groups such as Lion Rotarians, Optimists, and. 4H Clubs; Future Farmers; and Scouting organizations for as- sistance. The number of fitness trail projects occurring around the country testifies to the effectiveness of asking for outside help. The new wave of park directors aren't sitting back and waiting for good things to happen. They're going out and making them happen. EAGAN CITY HALL 7:00 P.M. REGULAR MEETING MAY 5, 1983 AGENDA ADVISORY PARKS AND RECREATION COMMISSION EAGAN, MINNESOTA 1. CALL TO ORDER AND PLEDGE OF ALLEGIANCE 2. ADOPTION OF AGENDA; APPROVAL OF MINUTES FROM APRIL 7, 1983 APPROVAL OF MINUTES FROM SPECIAL MEETING OF FEBRUARY 8, 1983 3. DEVELOPMENT PROPOSALS 4. OLD BUSINESS 5. NEW BUSINESS 7. ADJOURNMENT a) Crossroads Apartments; Kenneth Applebaum b) Hillcrest Addition; J.E. Parrnato, Associates c) Cedar Hills; Gary Pelton d) Surrey Gardens; Dan Gustafson e) Re -plat Eagandale Industrial; Northwestern Mutual Life a) Park Names b) Commission Objectives c) System Plan Study (Pilot Knob /Schwanz Lake) a) Easement Request Oak Chase Park; Mr. Mrs. O'Brien b) Leaf Composting Discussion 6. OTHER BUSINESS /REPORTS a) Letter Rosemount Area Athletic Association; Bill Katzenmaier b) Teen Program Summer 1983 c) "Play in the Age of Technology" d) Play Equipment Lakeside Park e) Marketing Your Parks MEMO TO: ADVISORY PARKS AND RECREATION COMMISSION FROM: KEN VRAA, DIRECTOR OF PARKS AND RECREATION RE: COMPOST SITE OUTLINE FOR DISCUSSION PURPOSES ONLY May 1983 Background: The Advisory Commission has previously asked staff to investigate the possibilities for creating designated areas for "leaf composting" for City residents. At the April meeting, a brief film was shown describing the use of a compost culture and leaf composting collection programs in several communities. This film was presented as a means of providing the commission with additional background information. This memo is intended to serve as a framework for discussion by the commission to make a determination whether staff should pursue the issue further. Advantages: There are certain advantages to a leaf composting system. These advantages includes systematic disposal of leaves by residents, composted materials provide humus for planting and landscaping projects, a concern demonstrated by the City to maintain the environment for good community relations. Disadvantages: Disadvantages of the program might include additional cost factors involved with administering the program and the effort by staff to operate the composting program. Costs include the composting culture to aid in the decomposting process, potential equipment purchases, labor and hauling costs for debris or other materials not suitable for decomposing, i.e. garbage/ paper /plastic bags /tree roots, etc. In addition there may be problems with traffic dependent upon the location of the compost sites, problems with insects, bugs, rodents and the like. Program Outline: After considering the advantages and disadvantages already mentioned, plus others that members may also have concerns about, a program outline could be reviewed. One such outline envisioned by staff might include the following aspects: 1. Sites: There should be limited sites for the composting process. No more than three throughout the community. These sites would have to be at least 22 to 3 acres in size. Another option would be to have a single site which might be accessible to the entire community for residents to haul their leaves to. 2. Supervision: It might be very advisable to have supervision at the site to insure that brush and other unwanted items are not left. A program utilizing boy scouts, or other service organizations who might supervise the site during hours of operation could he established. Hours of operation might include only week- ends or one or two week day evenings. 3. Composted Product: Whether at scattered sites or at a single location, it appears advisable to treat the leaf compost pile with the culture material to aid in the decomposition process. If scattered sites are determined to be the best advisable alterna- tive leaves would be hauled to a central location for treat- ment purposes. Once the composting has been completed the material could be disposed of in several ways. Page 2 a. It could simply be made available to community residents free for the taking. b. Or, it could be utilized by the City for park purposes. Because it does not appear likely that the City would have a screening process for the composted material its suitability of use by residents is not as good. As previously indicated, this memo is intended to serve as an outline for members discussion in which the advantages and disadvantages of a program along with its ramifications can be discussed. Direction as to if the staff should attempt to proceed with the development of a program for community compost sites, or to drop the idea; should be given. May 1983 MEMO TO: ADVISORY PARKS AND RECREATION COMMISSION FROM: KEN VRAA, DIRECTOR OF PARKS AND RECREATION RE: MAY 5th, 1983 COMMISSION MEETING There are five development items before the Advisory Commission at the May 5th meeting. The first three items are part of development agreements, and therefore will require only formal approval. (Planning memos are enclosed on each) (a) Crossroad Apartments is the development of a platted outlot in the Pilot Knob Heights 1st Addition and therefore its park land contri- bution has already been fulfilled in the P.U.P. (b) Hillcrest Addition is adjacent to and part of the proposed Walden Heights The parks dedication for this addition will be satisfied with the 4+ acres of park land previously identified with the Walden Addition. (c) Cedar Hills is for development of 56 acres in the Winkler /Jackson P.U.D. With the platting of this development the City is to re- ceive the park land already determined for this P.U.D. (d) Surrey Gardens; consisting of two buildings with a total of 88 units. The Surrey Heights development had included a provision for "early" cash payment of its dedication. In reviewing previous park commission minutes, staff was made aware that a cash dedication had apparently been paid on the first several additions. However, there is no indication that these payments would cover development of this land parcel. Therefore, a cash dedication for the 88 units is recommended. Further, that the developer be required to install a trail along Pilot Knob Road through the length of this plat consistent with City standards. (e) The final development proposal is for a re -plat of a portion of the Eagandale Office Park to accommodate a new roadway and transportation plan. Northwestern Mutual Life Insurance Company has asked the Planning Commission to "waive" the parks dedication fees. The Director of Parks and Recreation has not had an opportunity to discuss this request with Mr. Davis, representing Northwestern Mutual Life Insurance. Additional information should be available Thursday evening regarding this item. Old Business: Several items have been deferred from recent meetings because of the volume of work before the commission. Therefore, "Park Names" and "Objectives" have again been placed on the agenda for discussion purposes. The director will briefly review with the commission the Pilot Knob Park and Schwanz Lake concept plans. Mr. Erkkila would like the commission to review the plans at this time to provide him with some comments and suggestions. While the commission and council have previously reviewed the concept plans, a "favorite" plan was not discussed. w 4 Page 2 New Business: There are two items, (separate memos are enclosed) for new business. Other Business /Reports: Staff has received a letter from Mr. Bill Katzenmaier, President of the R.A.A.A., regarding field usage. A copy is enclosed. Staff will also outline the Teen program, planned for this year; an article on play has been enclosed "Play in the Age of Technology." Play equipment for Lakeside Park; and an article on "Funding for Fitness." As always, if you are not able to attend, please call the office. KV:bp May 1983 MEMO TO: ADVISORY PARKS AND RECREATION COMMISSION '�[r,1 FROM: KEN VRAA, DIRECTOR OF PARKS AND RECREATION 1 -N RE: EASEMENT REQUEST SOUTH PROPERTY LINE OF OAK CHASE PARK Staff has received a letter from Mr. F, Mrs. O'Brien of 4434 Oak Chase Road, requesting a driveway easement to the lot immediately east of their resi- dence. (See copy of letter attached) There currently is a 30 foot drive- way easement on the northerly portion of the O'Brien property to allow access to lot 1, lot 2 of the third addition of Oak Chase which is the property immediately east of the O'Brien's. Apparently at the time of the platting of the parcel provision of the driveway easement was not made known to Dakota Electric and Northwestern Bell for the placement of utilities. Consequently, Dakota Electric and Northwestern Bell have placed underground lines and connection boxes within the present roadway easement. Therefore, if a roadway were to be constructed on the current easement these utilities would have to be relocated. There is a small but steep embankment from Oak Chase Road eastward which would have to be cut down to allow the roadway to be built. Review: Staff has reviewed the request from the O'Brien's which suggest a 30' wide by 240 foot long easement to be placed within park property to allow access to the adjacent lot. Staff has also had contact with representatives from Dakota Electric in regards to relocation of these utilities if the easement request were not granted. An on site visit to the area was made to review the site which has been staked and marked with all utility locations. In making the reviewal it was obvious that a 30' wide easement by 240' long would cause the removal of several large trees on park property. Many of these trees are greater than 8" in diameter, are well matured and provide a large overstory canopy. Relocating this driveway to the north, may well cause damage to occur to additional park trees as a result of the construction process. Representa- tives from Dakota Electric have also indicated that the movement of the electrical box would be time consuming and expensive. It is unclear at this time who would be responsible for the cost of relocating these utilities although it does not appear to he the responsibility of the parks and recreation department! Recommendation: The Advisory Commission has previously reviewed other requests for easement access on park property for private benefit. And, has indicated that in reviewing these requests that the best interest of the public must be given first priority for consideration over private needs. The commission has however, considered these requests when in instances of hardship, topography, etc. are involved. In reviewing this request, it appears that there would be a substantial loss of trees if the 30' wide 240' long easement were granted. There is also the potential loss of additional trees which are immediately adjacent to this requested roadway, if the request were approved as is. Staff is suggesting a modification to the request that would move the access point at Oak Chase Road. This access would he more northward approximately 30', after which the roadway would angle across park property and be merged into the current easement at a point 40 to 50 feet into the O'Brien's lot. This alternate would avoid the costly relocation of utilities by Dakota Page 2 Electric and would cause the least amount of disruption to existing topo- graphy, while maintaining the integrity of the park and tree area. It would also be staff's recommendation that any cost associated with staking, surveying and developing of this newly created easement he the responsibility of the property owner(s) Members may wish to visit the site prior to the May Sth Advisory Commission meeting on their own. At the time of this writing the roadway easement which currently exists has been staked and utility lines have been marked. Should members require additional information please feel free to contact the office. cc: J.H. O'Brien w U "Fcr. James O'Brien 4434 Oak Chase Road Eagan, Mn. DELMAR H. SCH WA N Z LANO SURVEYOR e A C• Rp,stfarsd Under Laws of The State of Minnesota 2978 146TH STREET W. BOX M ROSEMOUNT, MINNESOTA QSass SURVEYOR'S CERTIFICATE 660.2711 .z/A/c W X2 SE• 82.68 A ,.g 9 5 716 'E v '17"si "td 04K CMS/ Aro as la /9 /J-Z it,/,V*t± 1511 fy I /,Vf_) 1 Po AID /•/B9 °S7 1u'6" /f0.00 /2 1.81 3 ti Date: March 31, 1983 ►/IONS 612 4211766 ^/F COA /6, O6 w%i6 ROAD .227 •r i t k 4 P co. E45Fm4rf 2 wit own* 30 L N 73/ N,T 'S7 '1b 'c /Oto7 w4% SF�t .l13 8d'• .W r o r it ivy mow o� Soap s !IOTA REG4STBAT NO 8625 N 1 10 3 s o EAGAN CITY HALL 7 :00 P.M. REGULAR MEETING APRIL 7, 1983 1. CALL TO ORDER AND PLEDGE OF ALLEGIANCE 2. ADOPTION OF AGENDA; APPROVAL OF MINUTES FROM MARCH 3, 1983 APPROVAL OF SPECIAL MEETING MINUTES FEBRUARY 8, 1983 3. DEVELOPMENT PROPOSAL PRESENTATION Leaf Composting 4. OLD BUSINESS 5. NEW BUSINESS 6. OTHER BUSINESS /REPORTS 7. ADJOURNMENT TENTATIVE AGENDA ADVISORY PARKS AND RECREATION COMMISSION EAGAN, MINNESOTA 1) Sunset Addition 2) Woodhaven Addition 3) Windtree 3rd Addition Replat 4) 1) Commission Objectives and Time Line 2) System Plan Study a. Concept Plans Pilot Knob Schwanz Lake Fish Lake b. Analysis and Recommendations 10 park sites c. Section I Draft d. Assignment Neighborhood Meetings 3) Park Names 1) Field Scheduling 2) Fee Schedule, Northview Athletic Fields 1) Site Specific Program 2) "It's Time for Creative Play" 3) Mallard Park Park Land Deficiency 4) Teen Sub Committee Set Meeting Date 5) City Tour MEMO TO: ADVISORY PARKS AND RECREATION COMMISSION FROM: KEN VRAA, DIRECTOR OF PARKS AND RECREATION RE: APRIL 7, 1983 COMMISSION MEETING April 1983 The April 7th meeting of the Commission has a rather lengthy agenda planned. However, many of these items may only take a few minutes to discuss, while other items may be deferred if necessary. The first item on the agenda, under development proposals, is the preliminary plat application for the Sunset Addition, which is a five acre parcel of land immediately west of the Saddle Horn Addition. The original preliminary plat filed in 1979, was never filed by the land owner and therefore expired. The newly proposed plat is for 18 single family units. This proposed addition is located in park service section 26, although the nearest park to the area is Lakeside Park which is approximately 3/4 of a mile away. The Lexington South planned unit development will provide a park area near Schwanz Lake, which is in close proximity to this plat. The original recommendation by the Advisory Commission for the Sunset Addition was a cash dedication requirement. It would be staff's recommendation to again require a cash dedication be made. (See enclosed planners report for additional information concerning this preliminary plat proposal) Woodhaven Addition, a preliminary application for rezoning approximately one (1) acre from community shopping center to R -4 zoning. This one acre rezoning would be combined with an additional one acre land immediately adjacent to it which is currently zoned R -4. The applicant is proposing to construct two 18 unit apartment buildings for a total of 36 dwelling units. The site for this addition has difficult topographic problems which will re- quire a great deal of excavation and regrading. Because of this, the developer is asking the commission for permission to encroach upon existing park land to accomplish the grading necessary to complete this project. Members who were able to make the April 5th development review committee meeting at the site are aware of the developers proposal at this time. Mr. Stover, the applicant will be at the commission meeting to review in greater detail the implications of the grading and the impact to the park site. Enclosed within this packet is the planners and engineers report in regards to this proposed addition. The third item on the agenda is the Windtree 3rd addition; which is a proposed replat of the Windtree 2nd addition. A separate one page memo, with attachments, is provided within the packet for your review. A special presentation, of a film on leaf composting (approximately 20 minutes) is to be shown. Members previously requested staff to review the potential for instituting a leaf compost program at park sites as a service to the community. Staff has been reviewing several alternatives for trying to provide such a composting program, and in investigating this program was made aware of a film that was produced by the Judd Ringer Corporation. As a means of informing the Advisory Commission and providing some background, the film has been scheduled for review. It will be the intent to provide the Advisory Memo April 7th meeting April 1983 Page 2 Commission with a preliminary proposal for a composting program at the May meeting, if there is an interest to proceed further. This film is being presented through the courtesy of Turf Supply Company of Eagan and Mr. Don Belkengren. Mr. Belkengren will be available to answer your questions that evening. OLD BUSINESS: Systems plan consultant, Tim Erkkila will be present at the meeting to review several elements of the system plan. Enclosed in this packet for your reading prior to the meeting are the "analysis and recommenda- tions" for 10 park sites as performed by Mr. Erkkila. Mr. Erkkila will also have available the concept plans for Fish Lake, Pilot Knob and Schwanz Lake Park areas for study. The systems plan consultant will outline for the Advisory Commission Section "I" in the plan entitled Acquisition and Develop- ment Plan. As always, this is a draft document subject to your modification as appropriate. Mr. Erkkila and I believe it would be important for the Advisory Commission to go through this section prior to the neighborhood meetings to be better able to respond to questions from neighborhood groups. With the approaching neighborhood workshops, assignment of Advisory Commission members to be in attendance at the neighborhood meetings should be made. These planned meetings are for April 11, 13, and 14 and April 18, 20, and 21. Neighborhood meetings will begin at 7 :00 P.M. at City Hall. The second item under "old business" is Commission Objectives for 1983. This has previously been reviewed by the Commission at its February and March meetings and then deferred to this month for final enactment and establishment of a time frame. Under "new business there are two items, one concerning field scheduling as a policy, and a proposed revision to the fee schedule for Northview Athletic Field rental. Under "Other business and reports you will find an enclosed report regarding the park and recreation department's Site Specific Program. The memo should be self explanatory, but I would be happy to answer any questions Commission members may have in regards to it. Also enclosed for your information, is an article on playground equipment entitled "It's Time for Creative Play." This is a reprint from an article in the National Recreation and Parks Association journal. The sub committee on Teens is requested to establish a meeting date within the next two to three weeks, to review several program options. Another item within the packet is a copy of a letter addressed to Mr. Wilmus and Mr. Parranto regarding the park land in arrear for Mallard Park 1st through 3rd addition. Members will recall that as a condition of approval for the Mallard Park 1st addition re- platting, the issues of park land is to be resolved. Commission members should also mark their calendars for Saturday, April 23rd. The City Administrator and City Council are planning a City tour for planning and parks commission members of the community in recognition of volunteer week. Memo April 7th meeting April 1983 Page 3 An official invitation from the City Administrator's office inviting members and spouses to this tour will be forthcoming. Should members have any questions in regards to items on the agenda or in the packet, please contact me prior to the meeting.