Loading...
03/03/1983 - Advisory Parks & Recreation Commission CITY OF EAGAN SUBJECT: REZONING AND PRELIMINARY PLAT SUNSET ADDITION APPLICANT: BRADLEY J. SWENSON, TRI -LAND COMPANY LOCATION: PART OF THE NA OF SECTION 25 DIRECTLY WEST OF THE SADDLEHORN ADDITION EXISTING ZONING: R -1 (RESIDENTIAL SINGLE DISTRICT) DATE OF PUBLIC HEARING: MARCH 22, 1983 DATE OF REPORT: MARCH 17, 1983 REPORTED BY: DALE C. RUNKLE, CITY PLANNER APPLICATION SUBMITTED: The first application submitted is a request to rezone approximately 5 acres from R -1, Residential Single District to R -1 PD (Residential Single District under a Planned Development) to allow a deviation from the R -1 zoning requirements. The second application submitted is a request for preliminary plat, Sunset Addition, consisting of approximately 5 acres and containing 18 single family lots. ZONING AND LAND USE: Presently, the parcel is zoned R -1 (Residential Single District) and would allow only single family lots with a mini- mum width of 85' and containing 12,000 square feet. The Comprehensive Guide Plan designates this parcel as R -1 (Residential Single District) with a density of 0 -3 dwelling units per acre. COMMENTS In November of 1978, the first application was received to rezone and plat this particular parcel. In May, 1979,,the City Council approved the rezoning to R -1 (Residential Single District) and a preliminary plat, Sunset Addition, consisting of 12 single family lots. The preliminary plat was never finaled because the or- iginal owner and the applicant could not meet or obtain the bonding requirements needed to final the original plat. Therefore, the orig- inal plat, Sunset Addition, expired as originally proposed. Presently, there is an application requesting a rezoning to an R -1 Planned Development and a preliminary plat, Sunset Addition, which would contain 18 single family lots. The rezoning proposed would allow a deviation from the R -1 zoning requirements. The smallest lot size proposed within this plat is 67' lot width and 9,443 square feet. The largest lot is 85' lot width and 11,980 square feet. The gross density for the Sunset Plat is 3.6 dwelling units per acre and the net density is 4.3 dwelling units per acre. If the preliminary plat would follow the R -1 zoning requirements, the applicant could plat 14 single family lots which would meet all the requirements of the R -1 zoning district. Therefore, there is CITY OF EAGAN REZONING AND PRELIMINARY PLAT SUNSET ADDITION MARCH 22, 1983 PAGE TWO only a net increase in density of four lots or four dwelling units in this particular plat. Access to this development would be from Hackmore Drive. The appli- cant is proposing to dedicate a 25' half right -of -way for the exten- sion of Hackmore Drive, and in order to meet the minimum requirement for rights -of -way, an additional 25' would have to be obtained from the property owner to the south. If this could not be obtained, then the entire 50' right -of -way would have to be provided by the applicant. The access to the lots would be by a north -south street proposed stubbing to the north property line. This would then allow public access to the north and the future extension of Augusta Lane_. The applicant should provide a temporary cul -de -sac either on the northerly two lots or an easement from the north property owner. In 1978 -79, when the original plat was being processed, there was a concern regarding storm water drainage. It is staff's understand- ing that storm sewers are not proposed as part of this development, therefore, on site ponding shall be required until storm sewers are brought in this area. If approved, the preliminary plat should be subject to the following conditions: 1) Adequate rights -of -way be obtained for Hackmore Drive. 2) A temporary cul -de -sac be provided on the north end of Augusta Lane. 3) No variances be allowed for side setbacks except for topographic or vegetation reasons. 4) The plat shall be subject to the Park Commission's review and recommendations. 5) A development agreement shall be entered into and signed by the applicant prior to final plat. 6) A deviation from the R -1 zoning be allowed so that the width of the single family lots can be 67' in width and a minimum of 9,443 square feet. ENGINEERING RECOMMENDATIONS 7) A berm and ponding area be constructed over Lot 1, Block 1 so as to contain all excess runoff as a result of this development. 8) A drainage easement or written agreement with the property owner to the north over whose land the runoff from the northern half of this plat will cross. r MEMO TO: THE ADVISORY PLANNING COMMISSION, C/O DALE C. RUNKLE, CITY PLANNER FROM: RICHARD M. HEFTI, ASSISTANT CITY ENGINEER DATE: MARCH 17, 1983 SUBJECT: PRELIMINARY PLAT FOR SUNSET ADDITION The Engineering Division of the Department of Public Works has the following comments regarding this proposed preliminary plat. DRAINAGE /TOPOGRAPHY This proposed development is located in the NW4 of Section 25, im- mediately west of Saddlehorn Addition. The existing topography generally shows relief being from the middle of this plat to the northeast and south. The slopes are rather mild with the excep- tion of the northwest corner of this proposed development and range from a maximum of 20% in that corner to 5% along the south- ern half of this proposed Addition. Meanwhile, this proposed de- velopment straddles two drainage areas with the north half drain- ing towards Pond JP -27 and the south half towards Pond LP -32. Figure 1 illustrates this more clearly. Neither pond presently has a positive outlet. Although direction of the runoff will remain the same upon devel- opment of this plat, the amount of runoff generated upon comple- tion of this development will increase. Consequently, it will be the developer's responsibility to handle this increased runoff without adversely affecting adjacent properties. Thus, a drain- age easement or letter of understanding granting permission for this excessive runoff to cross the property to the north must be obtained by the developer prior to final plat approval. In addi- tion, a temporary holding pond shall be constructed on Lot 1, Block 1 of sufficient size to contain the excess runoff generated from the south half of this development. Also, a berm of suffi- cient height and width., as determined by the City Engineer, will be required along the west property line of Lot 1, Block 1 to in- sure that all excessive drainage generated from this plat will be retained on site until a positive storm sewer system is made available. UTILITIES Sanitary sewer and water are installed up to the east property line of this proposed preliminary plat. Both are of sufficient size, capacity and depth to provide service for this proposed de- velopment. However, no storm sewer exists within the proximity of this development to provide service to it. Sanitary sewer and water main will have to be installed along Hackmore Drive across the entire width of this proposed Addition along with installation of sanitary sewer, water main and servi- ces within the interior of this plat. If the utilities are in- stalled privately, they must be prepared by a registered engineer R CITY OF EAGAN REZONING AND PRELIMINARY PLAT SUNSET ADDITION MARCH 22, 1983 PAGE THREE 9) A temporary cul -de -sac be constructed at the end of Augusta Lane. 10) A 15' utility and drainage easement shall be required over Lot 9, Block 2 and a 30' drainage and utility easement shall be required centered over the common lot line between Lots 5 and 6, Block 1. 11) A 10' utility easement be dedicated adjacent to all publicly dedicated right -of -way and a 5' drainage and utility easement dedicated adjacent to all exterior lot lines with a 10' drainage and utility easement centered over all interior lot lines. 12) The southerly 25' half right -of -way of Hackmore Drive shall be obtained prior to final plat approval. 13) This development shall be responsible for its trunk area storm sewer assessment and all costs for the installation of streets and utilities within this development. 14) If the utilities and streets are installed privately, the plans and specifications shall be prepared by a registered engineer and submitted to the City for approval. RMH /jach 1 ENGINEERING REPORT SUNSET ADDITION MARCH 17, 1983 PAGE TWO and approved by the Engineering Department. Since all the drainage will be overland, no storm sewer is being proposed to be construct- ed nor is it required at this time. STREETS Hackmore Drive provides access to the southeast corner of this pro- posed development. This street is constructed to its ultimate sec- tion, that being 32' face -to -face in width, concrete curb and gut- ter and bituminous surfacing. Access to this proposed development will be by extending Hackmore Drive across the entire width of this preliminary plat with Augusta Lane providing interior access for the lots. Augusta Lane will be improved with a temporary cul -de -sac at the north end which will provide for continuation of the street when the properties to the north eventually develop. As with the utilities, plans for the street improvements, if installed privately, shall be prepared by a registered engineer and approved by the Engineering Department. EASEMENT /RIGHT -OF -WAY To insure the proper access to this proposed plat, a 50' street right -of -way will be required for the extension of Hackmore Drive. However, only the north 25' half right -of -way will be dedicated as a part of this plat. Subsequently, it will be the developer's responsibility to acquire the southerly 25' prior to final plat approval. In addition, a 50' full right -of -way shall be dedicat- ed as a part of this plat for the interior street. A 10' utility easement shall be required along all property abut- ting publicly dedicated right -of -way, with a 5' utility easement dedicated along all exterior lot lines and a 10' drainage and utility easement centered over all interior lot lines. Exceptions to this are the north lot line of Lot 9, Block 2, which shall re- quire a 15' drainage and utility easement for future storm sewer extension and a 30' drainage and utility easement shall be cen- tered over the common lot line of Lots 3 and 4, Block 1, for fu- ture storm sewer and /or drainage swale construction. ASSESSMENTS Existing assessments levied on this property include sanitary sewer trunk area and water trunk area and were assessed under Pro- ject 241. Therefore, as for City policy, this proposed develop- ment shall accept its responsibility for storm sewer trunk area assessments calculated at the rate in effect at the time of final plat approval. At this time, the trunk area storm sewer assess- ment may be calculated as follows: Net Acreage 5.0 ac 0.91 acres(row) 4.09 acres Net Area 4.09 X 43,560 sq.f t. 178,160 sq.ft. Trunk Area Storm Sewer Assessment 178,160 sq.ft.X 0.0431 /sf $7,679.00 r t ENGINEERING REPORT SUNSET ADDITION MARCH 17, 1983 PAGE THREE In addition to the assessments on the previous page, all costs related to interior street and utility construction shall be the sole responsibility of this development whether the work is per- formed under private contract or assessed under City contract. I will be available to discuss any aspect of this report with the Advisory Planning Commission at their meeting on March 22, 1983. Respectfully sub itted, i Richard M. He i, P.E. Assistant City Engineer RMH /jach MENDOTA \HTS 11'11 ttMA i RB i k� Ind. GB' iiM CLUB r .J E G .J. :Y: COMMERCIAL PLANNED DEVELOPMENT R I tr Jlnd f Ind E� ELT oaa[ -aMtr- I R'Il tJ NI Ind. iat, ran. ro 7 /saLeR r R N R-1 till& R1 P Ind.. Ind. NB R -III RIII R -{II R -II R -II D; R IN y .,CSC J i (nd. R -11 i P ..�E, R-11 ,n U LB err R I w a 1 1 f�ff :F R-1 P Ind w R 111 a R I_ s a$ R t a.�` B P R -I �_s, ..t� 0 i a' ..R II —R R jv CHALL RR41 II RI SV e RN IN J ••11• far. �x. R II HS Al R-1 �j R -11 R-1 R-111 l� ri LB R 111 Rill R-4: R•ill t a�} CSC LB R t R -111" R -III R 11 R -II i i s D 11 R II �•n ..:,;,lug R 11 R -II 5 E.e I. f'r� CSC' g R r �4 LB R-1 R -I P R-1 pnn�ra P -11 O G7t KTY" R �t. R -II G�'F rK�• i R -11 i R-1 P Al f R -11 ,.gin J I E art. P u, k►'"` r C �ROSEMOUN� f A A GB B- C. S. A. H. 30 1 42 r 2 AUDITOR'S SUBO. NO. 42 R -1 pa rc e t o raw A A P K K PK R 1 E R -1 R-1 OVERHILLI 4& I co ins=•? r�• ,3 �.i ,F,,�;► K ;.jam y.:t ,L :.3 v„t• ...t. rte.•: CO PRELIMINARY PLAT: SUNRISE ADDITION 1 a I VICINITY Y1► 1474I.R I k X 11702. f T y' DATA 8 1 L9.ALKSO1M110T1: TIKSOUTHIAL THE 6YT 3II.KFEET Of THE WEST U2TSN►EETO/ THE NORTH HAL /OF THE NORTH- 9.1 KST DUARTE6,61ICTION 20. TOWNSHIP E7,6ANK 39, 04cOTA 1 I COUNTY, YNME00TA NN I 1__ -Hq.N_ i EOKS ACRCAEE� E1M0, Rir1.N «3 8 7 pp I AN1ITf y MA3. /Tf /IIDPOSN LAND Log; M ro V4 �O.N- ,N _J IAKYENTSI ALL'LOIS TO NAVE 3 FOOT DRAINAGE EAKYENTS ON 010[ AND MACK LOT LINES UNLESS OTHRRWISE SHOWN. ID FOOT r- RAKYENTS ON ALL STREET LINES. ESr1i1�.- I KCTIONS3, TIT 6.23 0Ml.IT I ,7 M f 0,403 /T KN6TY CALCYLATN/N !.{UNITS Nr ACAS 1 NIONY{ 6/ r W -00.04- W 4.1 UNIT{ {r ACNE INMUrq Mien! 1 1 8 9 I I e I 4; fAAlFT d SA03.IT N 64004- -NON_ SAW. /T W iJ 6URVEYOR: BRADLEY& SWENSON l7 EOISTRATION NO 19233 _040- 1_ 2 I I S HAAS /T 0AA7. /T E -"064- -04604_ SCALE C•.O' 1 E I 11>00. ►T S 1 0 S4► L i I NPTT— 110.04 HACKMDRE DRIVE E f s PRELIMINARY PLAT: SUNRISE ADDITION f i 1 tom; VICINITY IWAI sF— 1 1 _r •t SITE DATA dto L92AL DESCRIPTION: THE SOUTH MALI O► THE EAST 331.90 FEET Nw IN NE IN t •••A p i •'I 1� OF THE WEST MISS Ft tT OF THE MONTH HALF OF THE NORTH- Slt�t►T W[sTDOART[R,KCTION 14TOWNtHIP21,01AN94 ES,DANOTA COUNTY, MINNESOTA IN- q i• awa ACREAGE• 8ACR90, MWLaIA PROPOSED LAND Uatl M Fo aW IN at w 1\� f .ra -M; lT T EASEMENTSI ALL LOTS TO HAVE D FOOT d1AINAOC EASEMENTS ON SIDE AND MACK for LIME! UNLESS OTHERWISE SHOWN. to FOOT EASEMENTS ON ALL STREET LINES. )EC rION is, LET R.73 y�` 2 S.SUNITS HI ACNE /IAdWNSR /WA<j S P. R /WN01 To 1 •.A UNITS ►p ACRE Ir�AM M ASS.ITt p� SE Sa w r, t11F, al l SURVEYOR: BRADLEY SWENSON j y REGISTRATION NO I5235 4 PAK-1jt 1 h ji j S•FT t I of SCALE I•.40' E EXISTING T R l i LY lkr TOPOGRAPHY ,�I,. r t 4SOAF w_ M I j L'- ti ?'a. T' `a' 9f r•�,(1�.4E: w.�'i iG.� IF .iru.A{rila JJIL�i..A '...i.1.1►.�iul ��.�►aLwSuA :ARit. til' ..ice CITY OF EAGAN SUBJECT: REZONING AND PRELIMINARY PLAT WOODHAVEN ADDITION APPLICANT: TERRY STOVER LOCATION: PART OF THE Eh OF THE NE4 OF SECTION 19 EXISTING ZONING: R -4 (RESIDENTIAL MULTIPLE DISTRICT) AND CSC (COMMUNITY SHOPPING CENTER DISTRICT) DATE OF PUBLIC HEARING: MARCH 22, 1983 DATE OF REPORT: MARCH 17, 1983 REPORTED BY: DALE C. RUNKLE, CITY PLANNER APPLICATION SUBMITTED: The first application submitted is a request to rezone approximately one acre from CSC (Community Shopping Cen- ter District) to R -4 (Residential Multiple District) located in part of the Eh of the NE4 of Section 19. The second application submitted is a request for preliminary plat approval, Woodhaven Addition, which would consist of approximately two acres and contain two multiple lots located in part of the Eh of the NE I- of Section 19. ZONING AND LAND USE: Presently, the property is zoned R -4 (Residen- tial Multiple District) and CSC (Community Shopping Center District). Both zonings would allow multiple development. However, the CSC Dis- trict would require a conditional use permit for multiple develop- ment construction. The Comprehensive Guide Plan designates this par- ticular parcel as CSC (Community Shopping District) and R -4 (Residen- tial Multiple District). The proposed development is consistent with the use proposed for the property. COMMENTS: The proposed site consists of approximately two acres lo- cated in the southeast quadrant of Rahn Road and Beau D' Rue Drive. The site is heavily wooded and has a great deal of topographic re- lief or slope on this particular site. No matter what is proposed for development on this particular site, it is going to be difficult regarding the terrain and vegetation. The applicant is proposing to construct two 18 -unit apartment build- ings for a total of 36 dwelling units. The applicant is proposing 8 studios and 10 one bedroom with den in each of the buildings. Two of the ten 1- bedroom units are being proposed for handicapped per- sons. As stated above, each lot would contain approximately one acre and calculating the area needed for an 18 -unit building, the appli- cant should have 46,860 square feet. In reviewing the total densi- ty, it appears that the applicant is approximately 2.4 dwelling units over the allowed density for the net area of the lots. Therefore, a variance for the 2.4 units has to be approved. In reviewing this e CITY OF EAGAN WOODHAVEN ADDITION MARCH 22, 1983 PAGE TWO variance, staff had suggested that the applicant reduce the density and come into conformance with ordinance requirements. The appli- cant has stated that he needs 18 units per building in order to make the project feasible. If the applicant reduces the density on the project, the development would not be feasible to pursue. The appli- cant can comment on the financial aspects of the development proposal at the public hearing. The present proposal has site coverage of 11.4 The applicant is proposing to provide 13 underground parking spaces per each dwelling unit. According to ordinance requirements, the applicant must provide one garage space for each dwelling unit and 12 parking spaces per unit for a total of 2z parking spaces. The applicant has revised his site plan to add an additional four car garage on the end of each apartment unit making the garage spaces 17 which is closer to City policy. In adding these additional gar- age spaces, the grades or the elevation of the building will change substantially, and additional fill would have to be provided. The applicant can also go over the detail aspects of the elevations with or without the garage spaces. The outside parking spaces according to City Code should be 27. The applicant is proposing 30 out- side spaces on Building A and 29 spaces on Building B. Therefore, the outside parking is adequate, but the garage parking is short. In reviewing the site plan for parking spaces, the site plan present- ly shows a 9 x 20 parking space. The applicant should increase the width to 10 x 20 for the parking space requirement. The applicant is proposing two accesses to this particular project. One access will be off of Rahn Road and the other access off of Beau D' Rue Drive. It appears that the access is adequate and is pulled back as far as possible from the intersection of Beau D' Rue and Rahn Road. If the development proposal is approved, the preliminary plat should be subject to the following conditions: 1) A variance must be approved allowing the 2.4 dwelling units al- lowed on the site. 2) A variance shall be required to allow the development to be short one garage space per building or five garage spaces per building depending on which plan the Advisory Planning Commission accepts. 3) The outside parking spaces and drives shall meet all City Ordi- nance requirements. 4) A detailed landscape plan shall be submitted and reviewed by staff prior to final plat approval. 5) A development agreement shall be entered into and approved prior to final plat. MEMO TO: THE ADVISORY PLANNING COMMISSION, C/O DALE C. RUNKLE, CITY PLANNER FROM: RICHARD M. HEFTI, ASSISTANT CITY ENGINEER DATE: MARCH 16, 1983 SUBJECT: PRELIMINARY PLAT FOR WOODHAVEN ADDITION The Engineering Division of the Department of Public Works has the following comments regarding this proposed preliminary plat. DRAINAGE /TOPOGRAPHY This proposed development is located in the southeast corner of the intersection of Beau D' Rue Drive and Rahn Road, in the North- east Quarter of Section 19. The topography of this proposed de- velopment is.quite hilly and is covered with trees and shrubbery. The elevations on this parcel range from a high of 856 located along the church boundary to a low of 804 located in the vicinity of the boundary with Beau D' Rue Drive. Subsequently, with such a vast difference in elevation over a relatively small distance, the existing slopes reach as high as 37% along the eastern por- tion of this proposed development. Subsequently, the drainage from this area is northerly in the direction of Pond AP -1 located in Woodhaven Park. In addition, a 21" storm sewer outlet dis- charging runoff collected in Rahn Road onto proposed Lot 2 flows overland into Pond AP -1, which has a positive outlet to the Minnesota River as illustrated by Figure 1. The grading necessary to implement this proposed development will require a great deal of excavation and subsequent placement of the excavation upon City parkland. The problem with this, as pro- posed, is that the embankment on the parkland will encroach the ponding area, thereby reducing the storage volumes somewhat. In addition, the embankment material placed on the parkland will be at a 2:1 slope, which by maintenance standards is extremely diffi- cult to maintain. Moreover, this proposed embankment area faces a northeasterly direction thereby creating unfavorable conditions for establishing adequate vegetation coverage to prevent soil ero- sion resulting from runoff across the steep slopes. In addition, the placement of fill material on the parkland will require the existing 21" storm sewer presently discharging at the northerly property to be extended approximately 60' in to the park area. Nevertheless, if this proposed development is approved, then much emphasis must be placed upon the erosion control measures. Accord- ingly, a detailed erosion control and turf establishment plan shall be approved by the City prior to final plat approval. Since erosion control will be critical, all parking lot drainage must be contained and directed to Pond AP -1 via storm sewer. The drainage off of the parking area for Building B may be directed into the existing manhole shown on Lot 2. Meanwhile, the drain- age from the parking lot for Building A may be directed towards the westerly property line, collected there and conveyed into Pond AP -1 from there via storm sewer. CITY OF EAGAN WOODHAVEN ADDITION MARCH 22, 1983 PAGE THREE 6) All easements shall be dedicated as requested by City staff. 7) The development plan shall be subject to the Park Commission's review and comments. 8) All other applicable City ordinances shall be met. ENGINEERING RECOMMENDATIONS 9) A 40' half right -of -way shall be dedicated for both Beau D' Rue Drive and Rahn Road. 10) A 10' utility and drainage easement shall be provided along all publicly dedicated right -of -way and a 5' drainage and utility easement shall be dedicated along all exterior lot lines with a 10' drainage and utility easement centered over all interior lot lines. 11) This development shall accept its responsibility for lateral benefit from trunk water main at the rates in effect at the time of final plat approval. 12) All costs for installing sanitary and water services, internal storm sewer, driveways, concrete curbing and parking areas shall be the sole responsibility of this development along with the costs for extending the City's existing 21" storm sewer to the toe of the proposed embankment. 13) The access from Building B to Beau D' Rue Drive shall be set back 150' from the intersection of Rahn Road. 14) A detailed grading, drainage and erosion control plan shall be submitted to the City for approval prior to final plat approval. RMH /jach ENGINEERING REPORT WOODHAVEN ADDITION MARCH 22, 1983 PAGE TWO UTILITIES Utilities of adequate size, capacity and depth exist within Rahn Road and Beau D' Rue Drive to service this proposed development. For instance,a 9" sanitary sewer line is in place along Rahn Road which intersects a 9" sanitary sewer line within Beau D' Rue Drive. Meanwhile, an 8" water main is also in place within Rahn Road and Beau D' Rue Drive. Finally, existing storm sewer consists of a 24 pipe along Beau D' Rue Drive and a 21" pipe bisecting this par cel and discharing into Pond AP -1. Figure 2 illustrates this more clearly. It is proposed to service this development from existing utility lines. Building B is proposed to be serviced off of existing san- itary sewer and water stubs to the property line, while sanitary sewer and water services for Building A will have to be connected directly to their respective utility lines located within Beau D' Rue Drive. STREETS Streets bordering this proposed development include Rahn Road along the southwesterly boundary and Beau D' Rue Drive along the northwesterly boundary of this proposed preliminary plat. Beau D' Rue Drive is constructed to its ultimate design section and width, that being 44' face -to -face, bituminous surfacing and con- crete curb and gutter. Rahn Road consists of a 36' face -to -face wide bituminous surfaced street with bituminous curbing which will be increased to 44' face -to -face in width and improved with con- crete curb and gutter sometime in the future, although no time- table has been set for any such improvement. Access to Lot 1 is being proposed to be taken from Beau D' Rue Drive, approximately 150' from the intersection of Rahn Road. This meets the minimum setback for driveways from major intersec- tions. It is also approximately directly across from the drive- way from Cedarvale Lanes. Meanwhile, the access for Building B, Lot 2, will be off of Rahn Road. Finally, no trailway will be required since a trailway exists along Rahn Road on the other side of the street from this proposed development. EASEMENTS /RIGHT -OF -WAY A 33' half right -of -way for both Beau D' Rue Drive and Rahn Road have been previously dedicated along with a 10' wide storm sewer easement crossing Lot 2. As a condition of final plat approval, a 40' half right -of -way will be required to be dedicated for both Beau D' Rue Drive and Rahn Road as they are both designated as collector streets. The r ENGINEERING REPORT WOODHAVEN ADDITION MARCH 22, 1983 PAGE THREE additional 7' of right -of -way will require approximately a 2' vari- ance from the required 50' setback from the property line to the building. In addition, a 10' utility easement shall be required along all publicly dedicated right -of -way and along all exterior lot lines with a 10' utility and drainage easement centered over all interior lot lines. ASSESSMENTS Trunk assessments have been levied against this proposed develop- ment for storm sewer area, sanitary sewer area and lateral bene- fit, water area, and streets. This proposed development is still responsible for its lateral benefit from trunk water main assess- ment. The amount this proposed development will be responsible for is determined by City assessment policy. In this instance, the assessable front footage is considered the total front foot- age along Rahn Road and Beau D' Rue Drive less a 150' corner lot credit. Thus applying this assessable footage at the lateral benefit rate in existence at the time of final plat approval will yield the final assessment for lateral benefit from trunk water main this proposed development is responsible for. At this time, this calculation would result in the following: 778 FF 150'(corner lot credit) X $19.10/FF= $11,995.00 Otherwise, the cost for installing sanitary and water services, parking lot storm sewer, storm sewer extension, concrete curbing, driveways and parking areas shall be the sole responsibility of this development. I will be available to discuss any aspect of this report with the Planning Commission at their meeting on March 22, 1983. Respectfully submitted, Richard M. He o, P. E. Assistant City Engineer RMH /jach t 698.0 I MF V .1 ADOW y o 700.0 �e• I J C-k e �2 �C Ct y CP y 715 7/8 O 0 �'o SIE 'Y., ms s• tNpW te; /PARK 1. C e V FOX C•d a IGAM RIDGE t �e. a!• CP 7 CP- 7 y 1 76x.0 ,2�! r% 769.0 2• I AP 41 °ita 820.0 V INDUSTRIAL R 971.0 1. o a oQ j 80.0 I k .0 �0 ry i� -te ,�T 1 l N� P�Df iE JPr) v 795.0 AP 20 e° A-bbb AP T A-11 7 Yi. AGK Art 708. AP T L !838A �B(gC`/1�� 1l j GAN MEAPoSCENTE I BP-1 A-mm.- A- 16.5 1.3 1 y4 '4 P�L�CB, BELVR�� 799.0 AP-3 SLACKHAWK II Vim'• t 6 803.6 PARK �j7 BO8.0 rf� 9 w r B a A PO�DH1 N 7_ m. s� ARK 60 800 w A BP`29 808, O AP m c'.1 86BB M i] �I9.o --r 804 0 804.0 T 67 k-s OAq T i7 r- r T 881.. r a i 893.0 6" r w' f T F a• Ct P DALE J S .'GAN J. GP I PARK NFt" BP-25 88 �i F 924.0 930.0 1:LNOOt`� F tE@BAgE l2�� AP-35 e9 s 36'l' C. s A M� v P -3--� 864, �s JUN109 �,'B60Pf" t 918.0 HIGH m. I AP-8 924 869.0 f P ��rH 1 8�' `8760 r 7 9200 L�Fl '94.0 gP-23 i A BP ,pp E �J L.J c 0o i�Eedlt AP-22 AP �ti as 6 r 873.0 8 5 y N E _RDVC �t L 3 7� 9050 e H 877.0 8 -bb 2 FMI 90.0 L C IU C A 21 �21� S, A 9%40ti 12 i AP -21 c� 12 N 1 891.3 AP -24 �l BP-20'!ki ltiavr °n 899.0 2. A -cc 872.0 AP-23 "Ci! rn 916. j i 1 I+ tiN f 874.0 889.3 I 970 i� ti �l 8960 /4 y p r tol A pp Q'• AD_O PPo26C.Nh r 'll ''BP I9 BP p r f91IS 0 ��0 9/9.0 V Figure I 8 J 9 2 0, -j =.r.- .e A nor= P 6a A AP -13 AP-10 9340 777 Q 382 5 PRESSURE REDUCING 5 7 x STATION e LL RQ, z SILVER BELL __IZ'_ 1 2! 656 658 z ti e p I J i e• 65 Ix ESSURE W ,{o EDUCING 9 t S ATIONO Q^ r 652 voe \3 492 f t BOWLING LANE WET 98 �Py TAP �ti 1 I WET TAP b 4 '63' x TRAIL PJ s� Ec: OODMAVEN 501 �y PARK WET TAP p' WOODHAVE WET TAP-\ (at 61 j 473 357. 1 17 r G N i ONE OPEN ,,,60 WE TAP- FIRE ;„ALL N I WET TAP I 1 WET TAP 6 Z 1 G 4 359 LEGEND i ruRaulsE Gt jG SAN SEWER IZ` TUR% L I I I I I 4 65 LA E I l I i WATER MAIN 8 r Q Mydronl F G.V TIE CARD N0. _u 12 STORM SEWER I N M&* y i —'15�- Figure 2 calcw floats a 0 100 200 300 400 500 JAS NKMN, I9KI UKRUI III IitN. tIG EAGAN MINNESOTA SAN SEWER LOCATION PLAN oy�: JJ A M no «u Rl .1.— WATER MAIN t Preliminary Plat Of t -Pondinq Arse WOODHAVEN ADDITION ,RtMOr'/•'t: 1i e' 1•ww• M Ytw 111 r� I e•�er ,w ew 1 1 1 111 I e t c Ib' e0} R DI I i O 1 •>tie.eo i RAHN ROAD IW I C I 1 I 1 w 1 i W i h•« wr 1 1 1 •ter» w•`M N M ti y+r M.��• N u� »w r 4w.. r wr w, .ry fl.fr x'. M. w i M•w w ww. y... u1 r.1 rf. Yi =M r� �.w Nrrr l•. rlwr wNw 'I .�ri r "INr�.�uwlwr r• •Y.-r —I xti N..r •y w I rr. r.r rr7 MM... Iu f.wr w •Y .uy N N•N 4rlr 14w w 11 wrY r. r r.rw u r.rrr •N•1 w r» �rrr.w» Y•frw wu M YN V w» rr. r• Yr Ir N �I�eiA r� •YI•V1N'IN� ti r" w t t L 4 ry: �tl SY Y:• t•'1 Z ti, S x y r Y r 'r �'r. iv 1 Ponding Area 31► Preliminary Plat Of s WOODHAVEN ADDITION f u -t0bm N3B•O7') E 34[•,t ao•E 513.)4- f US t�Re— 371 COT. N.o' Q F y.1- L�T /i 1 1'�..•a o. y w o o w w G': IMr'[M tC •p >1 1 rtttt�tl Ytt[_I p n• I 1 o// v i f•'nt ,71w �tp.o �o.j i�\ an:t to LL 8uildin 1 er. I �0 �Y. .O• _,00.0 W .N,C•� ')O .W N 30 44 34 li• N4«. d r1 t.• n N•Yt1tYtN,t•YN Mp {K t•tY t•«Itt w 1.. N wl t z�YC q [.N'•I YN.rw•+M W Y«4N V. NN..1 r •.nn ..a N.w ...N t t.....lf M 1« "4.11..1Nt N Doom^ t �.w SURVEYING SOMA SERVICES i] r 1i �o UAVtY11110 7 If :rr.:»o Ices. 4V�.1'Rettr t"!N M'tlwapt Uti i tY_ ra rng on WOO ADMMITIM jr_. t JS O r• _l •f 11�. §k lF d�!!.r tly. ~4 r I A".6.ro6 AALA t .7�•�; �.f .r. e.� r Vt •n. Plea "A" s 13UILDIING "g" MENDOTA \HTS t•R Faint -7 f.. GB Ind. t/ it ;N s. 7 ;.Ink LCwf� R II •.T+� o Ind, a, Ind 2 A, U vv J �p R4 fli Ind `��N�t .r R1 p tf Ind. .Y /L INpUSfW W WNY RQI� l R -IV R id III 1 �r f:�• k MBE Ind. 3NB) RIII R -II P E u. LB R-11 e�E illy LB CSC Rla [G OLF R 11 YRJ1I R I 18 P 4 Fill R -I s~ 7 „i\ ,,�.a. rs I-Jr RII �vR F P —iw R III,.» CITY R-11 ALL R-I R I csc p, y, tiw; za R -II j LB :L R -III A LB o RB R -III R -(It' R Illy R l� �s R -III CSC /GB /LB R III i: t4�*:• yt w w e q r t P s i 1 la.J e• `t• 7 ��1. t E f M{' RII C r !f RII i F' rs. R I R-11 NB R I V LB R -III LB RI CSC 5.;- t' r— .r J RB CEN f LB P R s R -I k* 1 LB R I m R -I P n,E<' ,I R s x Y Of R -I QLF k R -II R -II 1 3 3 i R -I I Omar.; wn ca Wa w R-11 p t i l RAlfrtfxCs P'r.�p{TY F k 3 I P APPLE VALLEY I r I �ROSEMOUN April 1983 MEMO TO: ADVISORY PARKS AND RECREATION COMMISSION FROM: KEN VRAA, DIRECTOR OF PARKS AND RECREATION RE: WINDTREE RE -PLAT 2nd ADDITION An application has been submitted for a replat of Windtree 2nd Addition which currently consists of 27 lots to be sub divided into 39 lots. The "new" addition would be entitled Windtree 3rd Addition. (See attached planners report) The neighborhood park servicing this development (Service Section 13) has already been received in late 1982. This park land was received with the platting of Windtree 2nd Addition. The City received the entire 14 acre park to complete the parks dedication requirement for the entire Windtree Additions. This 14 acre dedication, when combined with the land dedication in the Gopher -Eagan P.U.D. will provide a park area of approximately 31 acres. Because the City has already received its park land dedication from Windtree, no additional dedication can be required should the proposed re- platting be approved. However, staff has a concern with the proposed future access to the park. This access point is to be provided in the future with the platting of another phase of the Windtree Additions. The access would come off of the proposed Ridgewood Street and enter the park at a questionable location. The City's systems planning Consultant, Tim Erkkila was asked to review the park and the proposed access and to provide his comments. Mr. Erkkila's response and graphic is attached to this report. The currently proposed access to the park from Ridgewood Street is over rugged topography with a steep slope down into an area that is distant from the main focal point of the park, and enters into a low area which is used for ponding purposes. Therefore, it would be the suggestion of the staff to include a provision that an amendment be added to the development agreement to change the location of the access to the park. The exact location could be determined at the time of any future platting. A provision in this replat concerning this issue would alert the developer of the City's intent to review and change the access to a location that best meets the needs of the park and develop- ment. Staff will provide additional background information and explanation at the Commission's meeting on April 7th. Should you have any questions in regards to this issue requiring clarification before that time, please feel free to call the office. CITY OF EAGAN SUBJECT: REZONING AND PRELIMINARY PLAT WINDTREE 3RD ADDITION APPLICANT: WINDTREE COMPANY, C/O RICHARDSON PROPERTIES INC. LOCATION: BLOCKS 1, 2 AND 3, WINDTREE 2ND ADDITION EXISTING ZONING: R -1 (RESIDENTIAL SINGLE DISTRICT)' DATE OF PUBLIC HEARING: MARCH 22, 1983 DATE OF REPORT: MARCH 16, 1983 REPORTED BY: DALE C. RUNKLE, CITY PLANNER APPLICATION SUBMITTED: The first application submitted is a request to rezone Blocks 1, 2 and 3, Windtree 2nd Addition consisting of ap- proximately 15 acres from R -1 (Residential Single District) to R -1 PD (Residential Single District under a Planned Development) to al- low a deviation from the R -1 zoning standards. The second application submitted is a request to replat Blocks 1, 2 and 3, Windtree 2nd Addition consisting of approximately 15 acres into 39 single family lots. ZONING AND LAND USE Presently, the property is zoned R -1 (Residential Single District) and would allow only single family lots which would contain a mini- mum of 12,000 square feet and 85' widths at the 30' setback. The Comprehensive Guide Plan also designates this parcel as R -1 (Resi- dential Single District) with a density of 0 -3 dwelling units per acre. Therefore, the existing development and proposed development are in conformance with the Comprehensive Guide designation. COMMENTS Presently, Windtree 2nd Addition has been platted as 27 single fami- ly lots. Windtree Drive and the two cul -de -sacs had been construct- ed which provides access to this Addition. However, no homes had been constructed within this Addition. The applicant is now proposing to replat the 27 lots in the Wind- tree 2nd Addition to 39 lots and rename the plat, Windtree 3rd Addi- tion. This proposed replat would have a net increase of 12 single family lots. The original development proposal consisted of 1.8 dwelling units per net acre and the new development proposal would have a net den sity of 2.6 dwelling units per net acre. The minimum lot size in CITY OF EAGAN WINDTREE 3RD ADDITION MARCH 22, 1983 PAGE TWO the Windtree 3rd Addition replat would be 65' lot width at the 30' setback line by 140' for an area of 9,100 square feet. The average lot size is approximately 17,000 square feet. In reviewing the existing plat and the overlay, or new plat, there have been easements recorded and utilities installed which will have to be relocated. It is staff's understanding that a vacation hear ing.will have to be set up by the City Council to vacate the exist- ing easements prior to the recording of the Windtree 3rd Addition. In the past year, there have been a number of requests to replat or rezone areas to an R -1 PD which would allow smaller single family lots vs. what is allowed in an R -1 zoning district. The City Coun- cil on occasion has approved a minimum of 60' lot widths in areas where there have not been many major concerns by residents within the area. It appears that the smaller lots are in demand and that developers and builders.are trying to respond to this demand and market. If the preliminary plat is approved, it should be subject to the following conditions: 1) No variances be allowed for the side setback of the dwelling units except for topography and vegetation. 2) The lot size deviation will have to be approved allowing a minimum of 65' lot widths at the 30' setback and a minimum square footage of 9,100 square feet. 3) A new development agreement, or an amendment to the existing development agreement shall be completed prior to the final plat. 4) The existing easements must be vacated prior to the filing of the Windtree 3rd Addition. 5) All other applicable ordinances shall be met. ENGINEERING RECOMMENDATIONS 6) If installed privately, the plans and specifications for the utility services shall be prepared by a registered engineer and submitted to the City for approval. 7) A 10' utility and drainage easement shall be dedicated adjacent to all publicly dedicated right -of -way and a 5' drainage and utility easement along all exterior lot lines with a 10' utili- ty and drainage easement being centered over each interior lot line. 8) The utility and drainage easement as described on the Windtree 2nd Addition in Block 3 shall remain the same and be incorpor- ated with this plat. CITY OF EAGAN WINDTREE 3RD ADDITION MARCH 22, 1983 PAGE THREE 9) Where required, cross easements shall be provided for sewer services. 10) This development shall be responsible for all costs resulting from the utility service construction. RMH /jach MEMO TO: THE ADVISORY PLANNING COMMISSION, C/O DALE C. RUNKLE, CITY PLANNER FROM: RICHARD M. HEFTI, ASSISTANT CITY ENGINEER DATE: MARCH 16, 1983 SUBJECT: WINDTREE 3RD ADDITION The Engineering Division of the Public Works Department has the following comments regarding this proposed preliminary plat. DRAINAGE /TOPOGRAPHY This proposed development is located in the Southwest Quarter of Section 13, east of Elrene Road and north of Wescott Road. This area has been previously platted as Windtree 2nd Addition. Sub- sequently, all grading and drainage affecting this area has been completed, and thus further grading and drainage work will not be required. UTILITIES Utilities are in place to service the existing platted lots as contained within Windtree 2nd Addition for sanitary sewer and water service. In order to service the newly created lots proposed under Windtree 3rd Addition and so as not to disturb the existing bituminous sur- faced street, several of the current services will require branch- ing off the existing service in order to service two lots. This procedure is relatively new and subsequently, staff is in the process of developing standards for proper design and construc- tion. However, staff feels that any disadvantage resulting from servicing two lots from one sanitary sewer service and one water service are greatly outweighed by maintaining the structural and aesthetic integrity of the existing street by eliminating patches within the street surface from new sewer and water services. STREETS Access to this site is provided off of Elrene Road with Windtree Drive, Windtree Court and Windtree Circle providing interior ac- cess to all lots within the Windtree 2nd Addition. These streets are all constructed to their ultimate cross section, that being a 32' face -to -face width, concrete curb and gutter, gravel base, and bituminous surfacing. The proposed Windtree 3rd Addition will utilize all existing streets for access, therefore, no new street construction will be required. EASEMENTS /RIGHT -OF -WAY All right -of -way for streets and utility purposes has been dedi- cated with Windtree 2nd Addition. In addition, all necessary ENGINEERING REPORT WINDTREE 3RD ADDITION MARCH 22, 1983 PAGE TWO easements were dedicated at that time. The proposed replatting of Windtree 2nd Addition will require a hearing to be conducted by the City Council for the vacation of all easements contained within the Windtree 2nd Addition plat. Meanwhile, the proposed Windtree 3rd Addition plat shall contain 10' utility and drainage easements adjacent to all public- dedica- ted right -of -way and along all exterior lot lines with a 10' util- ity and drainage easement centered over each interior lot line. In addition, the utility and drainage easement as described on the Windtree 2nd Addition in Block 3, shall remain the same and be incorporated in the Windtree 3rd Addition_ Furthermore, as a result of the necessity to share sewer and water services, cross easements over these services shall be required for private ser- vices crossing another lot in order to reach the City's services. Figure 1 more clearly illustrates this. ASSESSMENTS All related assessments have been levied over the Windtree 2nd Addition, therefore, the only cost to be associated with this development will be the cost to branch off existing water servi- ces which shall be the sole responsibility of this development. I will be available to discuss any aspect of this report with the Advisory Planning Commission at their meeting on March 22, 1983. Respectfully submitted, 4 6�9_ Richard M. Hef i, P.E. Assistant City Engineer RMH /jach I I i I t i I i EhS�M� SITS Ar?£A. 'zEQU t2(t�LU GfZ- EtE;�tCi' VN hSW S19 CLE�IU oUT I V I, I, c' 4L Noy To <7a L5 city of eagan UTILITY SERVICES approved standard PUBLIC plate WORKS FROM EXISTING SERVICES DEPARTMEN O �n Suite 100 2611 Central Ave. N.E. o Minneapolis, Mn. 55418 781 -6696 0 �U@ffiz LANDSCAPE ARCHITECTURE *PLANNING* DESIGN M E M O R A N D U M March 24, 1983 TO: Ken Vraa /Park Commission FROM: Tim Erkkila, Park Planner RE: Windtree Park Dedication and Subdivision We have reviewed the proposed park dedication to Windtree Park. The vehicular access to the park (as proposed by the developer) would be off of a 125' wide frontage on Ridgewood Drive. Unfortunately, this access location will not be suitable. We recommend a more northerly access. Unfortunately, even our preferred entry has problems, it is on a "saddle back" ridge. See the attached sketch. We recommend that the City either: 1. Accept the two lots (190' of frontage on Ridgewood) just north of the previously proposed park access. The developer could use the previously proposed park access for a lot. The City could then at some future date work out grading details on how to get into the main area of the park. Or..... 2. The park entrance road could be planned now, grading and grading limits determined. Then the developer asked to rough grade in the road. In return for this, perhaps through the planning process, we could verify if we can give him back two lots (the old access and one or the other of the north lots). Before such a deal can be struck, however, the grading must be worked out. If necessary Erkkila Associates will assist the City in the grading plan and revised park boundary. Otherwise, I am sure Public Works, the City Engineer, or the developer's engineer could assist you. TWE /sg attachment r"K F..wiw smpr W, M Lq 1 IL I LOW FIL1. AKFA� S 1 HILL R Er►�� Drive I°arK CO-me, �hru�h �hc or bo�h uF i-hes� fits. j �G d p Should be. PurK Pmp' PU N p-� I ropose�, I r7ed ar ko be rc�rne� Pre p�r� �.ri�,l41a A°boc. Muc�� 7y, l°IS3 April 1983 TO: ADVISORY PARKS AND RECREATION COMMISSION FROM: KEN VRAA, DIRECTOR OF PARKS AND RECREATION RE: FEE SCHEDULE NORTHVIEW ATHLETIC FIELDS In March of 1980 the City established the following fees for the use of the Northview Athletic Fields for week -end tournaments: Class One: Eagan Adult Leagues 1. $50.00 per week -end for trash pick up and extra service on toilet facilities. 2. $100.00 damage deposit, refunded if no damage occurs. Class Two: Tournaments that include non resident teams. 1. $100.00 per week -end for trash pick up and extra service of toilet facilities. 2. $100.00 damage deposit, refunded if no damage occurs. 3. $5.00 per team basic charge. Maintenance: If maintenance is desired, payment shall be made by the tournament sponsor for actual pay and actual fringe benefits for equipment at actual rental rates. All Eagan adult leagues are now directed by the City. In addition, be- ginning in 1983, the softball fields will have permanent base anchors in place which requires different procedures for installing. Therefore, a change in policy, procedure and fee structure appears necessary at this time. The suggested changes are as follows: 1. Eliminate the class one category as it no longer applies. 2. Adjust the field use fees to reflect maintenance costs. Proper maintenance of the fields during the course of a tournament is necessary now that permanent equipment is in place. 3. In essence, more than one category of user fees is no longer required. The suggested new fee scale is: Tournament fees for Northview softball fields. 1. $125.00 for a one day tournament. 2. $150.00 plus $5.00 per team for a two day tournament. 3. $150.00 damage deposit, refunded if no damage occurs. The City will drag the fields and set out the permanent bases for the tournament sponsor each day. An additional cleaning of satellites and trash pick up will also be scheduled. To cover these additional costs to the City, an increase in field use fees seem appropriate. Fee Schedules Northview Athletic Fields Page 2 Staff has reviewed fees charged by other communities and found a wide variation in fee structures. For example, Plymouth charge $35.00 per field per day; plus $6.00 per hour to have a staff person present. Eden Prairie does not allow non -City leagues or teams to use its fields. Charge to City teams is $50.00 per day. St. Louis Park charges $30.00 per day /per field. There are additional charges made for use of the shelter and lights. The City provides one drag of the fields; no outside teams may use the fields. FOR COMMISSION ACTION To review the rate structure for charges made for the use of Northview Athletic Fields and recommend a fee structure for immediate implementation. Staff would also like to retain discretion for charging a lessor fee for youths and instances in which a limited one day: event is requested. April 1983 TO: ADVISORY PARKS AND RECREATION COMMISSION FROM: KEN VRAA, DIRECTOR OF PARKS AND RECREATION RE: FEE SCHEDULE NORTHVIEW ATHLETIC FIELDS In March of 1980 the City established the following fees for the use of the Northview Athletic Fields 'for week -end tournaments: Class One: Eagan Adult. Leagues 1. $50.00 per week -end for trash pick up and extra service on toilet facilities. 2. $100.00 damage deposit, refunded if no damage occurs. Class Two: Tournaments that include non resident teams. 1. $100.00 per week -end for trash pick up and extra service of toilet facilities. 2. $100.00 damage deposit, refunded if no damage occurs. 3. $5.00 per team basic charge. Maintenance: If maintenance is desired, payment shall be made by -the tournament sponsor for actual pay and actual fringe benefits for equipment at actual rental rates. All Eagan adult leagues are now directed by the City. In addition, be- ginning in 1983, the softball fields will have permanent base anchors in place which requires different procedures for installing. Therefore, a change in policy, procedure and fee structure appears necessary at this time. The suggested changes are as follows: 1. Eliminate the class one category as it no longer applies. 2. Adjust the field use fees to reflect maintenance costs. Proper maintenance of the fields during the course of a tournament is necessary now that permanent equipment is in place. 3. In essence, more than one category of user fees is no longer required. The suggested new fee scale is: Tournament fees for Northview softball fields. 1. $125.00 for a one day tournament. 2. $150.00 plus $5.00 per team for a two day tournament. 3. $150.00 damage deposit, refunded if no damage occurs. The City will drag the fields and set out the permanent bases for the tournament sponsor each day. An additional cleaning of satellites and trash pick up will also be scheduled. To cover these additional costs to the City, an increase in field use fees seem appropriate. Fee Schedules Northview Athletic Fields Page 2 Staff has reviewed fees charged by other communities and found a wide variation in fee structures. For example, Plymouth charge $35.00 per field per day; plus $6.00 per hour to have a staff person present. Eden Prairie does not allow non -City leagues or teams to use its fields. Charge to City teams is $50.00 per day. St. Louis Park charges $30.00 per day /per field. There are additional charges made for use of the shelter and lights. The City provides one drag of the fields; no outside teams may use the fields. i FOR COMMISSION ACTION To review the rate structure for charges made for the use of Northview Athletic Fields and recommend a fee structure for immediate implementation. Staff would also like to retain discretion for charging a lessor fee for youths and instances in which a limited one drag event is requested. E i s April 1983 1 i MEMO TO: ADVISORY PARKS AND RECREATION COMMISSION FROM: KEN VRAA, DIRECTOR OF PARKS AND RECREATION RE: WINDTREE RE -PLAT 2nd ADDITION f An application has been submitted for a replat of Windtree 2nd Addition which f currently consists of 27 lots to be sub- divided into 39 lots. The "new" addition would be entitled Windtree 3rd Addition. (See attached planners report) The neighborhood park servicing this development (Service Section 13) has already been received in late 1982. This park land was received with the platting of Windtree 2nd Addition. The City received the entire 14 acre park to complete the parks dedication requirement for the entire Windtree Additions. This 14 acre dedication, when combined with the land dedication in the Gopher -Eagan P.U.D. will provide a park area of approximately 31 acres. Because the City has already received its park land dedication from Windtree, no additional dedication can be required should the proposed re- platting be approved. However, staff has a concern with the proposed future access to the park. This access point is to be provided in the future with the platting of another phase of the Windtree Additions. The access would come off of the proposed Ridgewood Street and enter the park at a questionable location. The City's systems planning Consultant, Tim Erkkila was asked to review the park and the proposed access and to provide his comments. Mr. Erkkila's response and graphic is attached to this report. The currently proposed access to the park from Ridgewood Street is over rugged topography with a steep slope down into an area that is distant from the main focal point of the park, and enters into a low area which is used for ponding purposes. Therefore, it would be the suggestion of the staff to include a provision that an amendment be added to the development agreement to change the location of the access to the park. The exact location could be determined at the time of any future platting. A provision in this replat concerning this issue would alert the developer of the City's intent to review and change the access to a location that best meets the needs of the park and develop men t Staff will provide additional background information and explanation at the Commission's meeting on April 7th. Should you have any questions in regards to this issue requiring clarification before that time, please feel free to call the office. MEMO TO: ADVISORY PARKS AND RECREATION COMMISSION FROM: KEN VRAA, DIRECTOR OF PARKS AND RECREATION DATE: MARCH 25, 1983 RE: 1. Time change meeting with City Council 2. Parks review Please note the time change from 7 :00 to 7:30 P.M for the joint meeting with the City Council on Tuesday, March 29th. The City Council has a brief public hearing scheduled before the joint meeting necessitating the 7 :30 P.M. starting time. There are two development proposals which will (tentatively) appear on the April 7th Commission meeting with potential and significant impact to park land. Because of the issues involved, on site visits seem approp- riate and have been scheduled for April 5th. For those of you who can make the meeting, we will be meeting at the northwest corner of Rahn Road and Beau D'Rue, at 4 :30 P.M. (Members will be asked to confirm this time at the meeting of March 29th and indicate if they will be in attendance) The site to be reviewed is a small parcel of land between Rahn Road and Woodhaven Park. (See attachment) The second site is along Wilderness Run Road near Schwanz Lake. Members will proceed to this location immediately after review of the first site. We will have to do so "trouncing'' through the woods." So wear your "grubbies" and boots. Hope to see you on the 29th. MEMO TO: HONORABLE MAYOR AND CITY COUNCIL MEMBERS ADVISORY PARKS AND RECREATION COMMISSION TOM HEDGES, CITY ADMINISTRATOR FROM: KEN VRAA, DIRECTOR OF PARKS AND RECREATION DATE: MARCH 25, 1983 RE: PARK SYSTEM PLAN JOINT MEETING MARCH 29th 7:30 P.M. The tentative agenda for the joint Council and Advisory Commission meeting is as follows: (1) Update from last meeting. (2) Trails (Section E) (3) Ponds Lakes (Section G) (4) Development Program; for ten concept plan sites (5) Analysis and Recommendations; Ten selected park sites (6) Special Facilities (Section F) (7) Neighborhood Work Shops; Presentation Format. Because of the volume of information to be reviewed at this meeting, a general "outline approach" will be taken as used at the last meeting. However, consultant and staff are willing to take as much time as necessary to adequately cover the material. Please remember to bring your System Plan Folder to aid you as we go through the plan section. Ila W 0 Wk a OF IN WA SM ■r Vii- z IIIII 11 /IN■ NNW-To 1111112 0 i�� e :+r a Islam III ME I HIRM MEN JUNIOR M ME ME PF -741A, HIGH 111 a ■tl■ z� 1 ai, Diu n� ua' SFA �r is in jam: '�"0.,�,� UPI sip now UIC -1111111 INN I WW Ml l i yr 1 c• to c 1 March 14, 1983 MEMO TO: HONORABLE MAYOR CITY COUNCIL ADVISORY PARKS RECREATION COMMISSION TOM HEDGES, CITY ADMINISTRATOR FROM: KEN VRAA, DIRECTOR OF PARKS RECREATION RE: PARKS SYSTEM PLAN Attached is the draft sections for Ponds and Lakes, Special Use Facilities and Public /Private Recreation. (Sections D, E, F) Please insert them into the appropriate indexes in your notebooks. As with all previous sections, your close reading and review is appreciated. Should you find errors within the drafts, please mark it and bring it to my attention so the final typing and printing of the report will be correct. These draft sections, along with the trails section previously distributed, will be discussed at the joint meeting of the City Council and Advisory Commission on Tuesday, March 29th. Also attached is a recent memo from Mr. Erkkila outlining a revised system plan schedule. The revised schedule has been extended several months be- yond the original projected completion, but I believe we are all in agree- ment that the quality of the product is more important than meeting the once proposed time schedule. Res Q f submitted, f Ke ;erector Parks and Recreation /bp 0 Suite 100 2611 Central Ave. N.E. o Minneapohs, Mn. 55418 781 -6696 0 \r:.l LANDSCAPE ARCHITECTURE *PLANNING* DESIGN DATE: March 7, 1983 TO: Eagan Mayor, Council Members, and City Administrator, Parks Committee and Park Director. FROM: Tim Erkkila, park planning consultant RE: Park System Plan Schedule Update During the February 8, 1983 presentation to the Council and Park Committee, an updated schedule was requested. Over the last 10 months, much has been achieved, yet much remains to be resolved. Probably 6 or 7 more months should be expected. The following chronology of park planning activities is proposed. March Consultant works on park concept plans, recommendations and analysis on selected sites. March 29 Joint meeting of Council and Parks Committee. Topics: Trails plan, pond and lake study, individual park concept plans and recommendations, special facilities recommendations. April Acquisition and development prioritizations reviewed. April 11 -21 Neighborhood Workshops (6). Topics: General overview on plan direction, lakes and trails, concept plans and recommendations on park sites. Explanation that while prioritiza- tion has occurred, no immediate action should be expected until funding has been resolved. May Draft plan will be submitted for review. Implementation strategies outlined. Eagan Park System Plan Schedule Update March 7, 1983 page 2 June Joint Council and Park Committee meeting on draft plan and discussion on a possible public presen- tation of the plan. July Consultant shall receive city instruction on plan finalization and make any revisions. Maintenance plan outlined. August Final plan printed and distributed. These dates are approximate and will be modified to reflect city goals and ability to review and respond to the park plans. April 1983 METRO TO: ADVISORY PARKS AND RECREATION COMMISSION FROM: KEN VRAA, DIRECTOR OF PARKS AND RECREATION RE: SITE SPECIFIC PROGRAM EAGAN PARKS, FOR YOUR INFORMATION Several months ago, the Director of Parks and Recreation with the parks foreman, Jim McGuffee, thought it essential to initiate a program of parks maintenance which would be more responsive to the specific mainte- nance needs of each park. Hence, the analogy "sites specific" come into play when discussing such a maintenance program. The purpose of this memo is to provide you with some background, purpose and goals of this site specific program as now currently being envisioned by the staff. Background At the time I was hired by the City as Director of Parks and Recreation, one of my initial tasks was to maximize upon the existing resources of manpower, and equipment to improve upon the level of mainte- nance being provided to the parks and overall system. The initial under- standing was to assess the capabilities of the staff, the level service then being provided, park usage levels identified by the community and commission, equipment capabilities and various limitations imposed upon maintenance programs. After the reviewal process, several actions were taken which resulted in significant changes in personnel, equipment and scheduling. One such action was the approval by the City Council to purchase a 7 -Gang Reel Mower which better met the mowing needs of the system. Second, part time seasonal employees were grouped into a crew for the specific purpose of mowing, trimming City parks and public facilities. This "mowing crew which supplemented regular staff utilizing the 7 -Gang Mower and other large mowing equipment, were programmed into a schedule of mowing /maintenance which provided for a higher level of service which included expanded areas of parks mowing which were previously overlooked. This program produced several results improved park appearances, improved level of efficiency, "freeing up" higher paid and higher skilled full time employees who could then be programmed into other areas of maintenance and development. As part of the mowing crew program, the department developed for each mowing area a level of service specific to the park. For example, River Hills Park East would have the major portions of the park mowed weekly by the Seven Gang, and another portion by the mowing crew. Other areas of the park might be mowed every other time and still other remote or secluded areas perhaps only three or four times during the year. Hence, each park would only receive as much time and effort as good park practices and conditions warranted. In a sense, the mowing program for each park became "site specific." This then became the basis of the "site specific" program now being planned and expanded to include other aspects of parks maintenance. This then became the direction now being pursued by the park foreman to include a "site specific" program which would include such areas as fertilization, seeding, aerification, herbcide application and the like. The "site specific" program will now take into consideration different factors for site rehabilitation usage patterns as well as many other factors. These factors will then be considered in more detail as to application of fertilizers and requirements and the like to insure the maximization of all resources. As an example, the task that was most efficient for the City to apply a slow release of fertilizer during the spring months to all parks that were being used. Carnelian, Woodhaven, Cedar Pond, Northview have now been given an application of the same type of fertilizer although different amounts might be used. Certain economies were realized from this approach both in the application process and in the purchase process of the same fertilizer. It has been suggested that this approach was effective 800 of the time if proper steps were taken over 800 of the park areas. How ever, with the growth of the park system, the increased cost of fertilizers, manpower and equipment the "site specific" program will seek to achieve a higher level of maximization. Hence, the 80% factor will move closer to 100% maximization based on a "site specific" approach. Factors to be considered will be such factors as soil, grass type, usage pattern, soil compaction, moisture of better targeting the approach of the application of fertilizer. With the new "site specifid'program with our past example of use of fertilizer, Carnelian, Woodhaven Parks treated similarily Cedar Pond and Northview would certainly have different rates of application, fertilizer demands as well as different timing applications as such. As to what is being done now, the program is under the direct responsibility of the parks foreman, Jim McGuffee. At this point Jim has developed a park site assessment sheet of each park. This sheet will be used as a means of referencing and outlining such factors such as the soils, drainage problems, mix of grass types, usage patterns, and the like. When the assessment sheets are completed, the sheets will be kept on file to help the department to make decisions such as the type, amount and the best time to fertilize or apply herbicide, type of over seeding, etc. The complete record of action taken will be recorded with the result of the work performed also noted. Adjustment in future years program for each site will be made if necessary. As indicated, the program has only been initiated within the last several months. Soil samples have yet to be taken, but nearly all parts of the assessment sheet have been completed. It is hopeful that during the coming months parts of the program can be initiated so that by 1984 all sites can be part of the "site specific" program. As future parks are acquired and developed, they too can be added to the program. Thus, insuring that the parks process is as cost efficient and cost effective as possible. With limited resources within the City and the department, it is essential that efforts be taken to try to get the "biggest bang for the buck by maximizing the efforts and material invested in each of the City parks. If members would like, I would be happy to expand upon this informative memo. It may be many months before the "site specific" program becomes implemented in its entirety, but the process has begun. I would also like to comment on the efforts Jim McGuffee has already put into this new approach to parks maintenance in that he has accepted the new challenge most readily and has made significant progress in the organizational and the data collection phase of this program. -2- RV of czaga 3795 PILOT KNOB ROAD, P.O. BOX 21199 BEA BLOMQUIST EAGAN, MINNESOTA 55121 Mayor PHONE: (612) 454 -8100 THOMAS EGAN JAMES A. SMITH JERRY THOMAS THEODORE WACHTER April 5, 1983 Counco Members THOMAS HEDGES City Admirustrotor EUGENE VAN OVERBEKE J.E. Parranto, Inc. C+tyOerk ATTENTION: Mr. Mark Parranto 3908 Sibley Memorial Highway Eagan, Minnesota 55122. Mr. Thomas Willmus 2660 North Cleveland St. Paul, Minnesota 55113 Re: Park Land Dedication; Mallard Park Addition Enclosed in this letter are photo copies of material relative to the park land dedication of the Mallard Park 1st, 2nd, and 3rd additions. As you read through the material, I'm sure you too will conclude that there is an agreement between Mr. Willmus and the City of Eagan for a future neighbor hood park on the Willmus Properties which would be coming from a future park dedication requirement and from any shortage of parks dedication made in the Mallard Park additions. This future neighborhood park would be in the area to the north of Mallard Park owned by Mr. Willmus. You will find an exhibit which generally shows this area in the packet of information. I It has been my understanding that the exact parks dedication deficiency from the Mallard Park 1st, 2nd, and 3rd additions was not known immediately at the time of final platting of these additions. Thus the result of the City's desire to proceed with a trails construction project and because Mr. Willmus wished to final plat his parcel prior to the final surveying and conveyance of the four parcels of land which made up the parks dedication. To help you with the history and provide you with some background on this issue, I have enclosed the following items: Item A. Minutes of the parks committee dated July 14, 1977. Item B. Minutes of the parks committee dated August 11, 1977. Item C. B.R.W. letter to Thomas Hedges, dated February 17, 1978. Item D. Minutes of the City Council dated February 21, 1978. Item E. Letter from Thomas Willmus to Thomas Hedges with attachments, dated February 28, 1978. Item F. Letter from City Attorney, Paul Hauge to Mr. Willmus, dated March 3, 1978. THE LONE OAK TREE THE SYMBOL OF STRENGTH AND GROWTH IN OUR COMMUNITY Mr. Mark Parranto Mr. Thomas Willmus April 5, 1983 Page 2 Also included and identified as: Item G. Are the area calculations for Mallard Park 1st addition as copied off the preliminary plat application. Item H. Item I. Photo copies of Mallard Park 2nd and Mallard Park 3rd additions, again from the preliminary plats which are on file with the City. Item J. Is a copy of the gross area calculations for dedicated park land, taken from surveys submitted by B.R.W. and sent to the City. And, finally; Item K. Is a resolution of the City Council concerning park land dedication formulas dated June 4, 1974 which became part of the sub division ordinance. In reviewing the park area computations, (Item J) the park land dedications given totals 9.87 gross acres. Combining this 9.87 gross acres with the total area calculations for acreage from Items G, H, and I (which is the Mallard Park 1st, 2nd, and 3rd additions) there is a total gross area of 72.3 acres. Apply- ing the City's 10% park dedication formula, the City should receive 7.23 acres of park land. While the City did receive 9.87 acres, this land is subject to only half credit of 4.93 acres, because it lies within the N.S.P: power line easement or is ponding area. Therefore, there is a net deficiency of 2.3 acres (7.23 4.93 2.3 acres). The 50% credit for park land received is based on (Item K) which provides for partial credit when the dedication includes ease- ments (See page 3). Further, in a letter from Mr. Paul Hauge, City Attorney (Item F) to Mr. Willmus, in paragraph 2, Mr. Hauge again indicates that "an exact calcualtion taking into account of easement deduction" will be made. Assuming my math is correct, and based on the information that I have received, it would appear that there is still an an additional 2.3 acres of park land dedication from Mallard Park 1st through 3rd additions which is owed to the City. It still is the City's intent to acquire /develop a neighbor- hood park in this park service section and is relying on the agreement with Mr. Willmus to insure that the neighborhood park becomes a reality. At this time, the City would like verification by Mr. Willmus that these calculations agree with his; And, his assurance that the City will receive this park land with the future park land contribution. Further, it is the City's intent to provide a park of sufficient size to meet the neighborhood needs and, therefore, all other land sales from Mr. Willmus's property for development purposes will be subject to the land dedication requirement to insure that the City and the community can be serviced by such a neighborhood park. Mr. Mark Parranto Mr. Thomas Willmus April 5, 1983 Page 3 As further development of the property is contemplated, please be aware that I would be happy to meet with Mr. Willmus or his planners to assist in specifically siting the park. If you have any questions regarding the material I have enclosed or calculations, please feel free to contact either myself or Mr. Hauge. Sincerely, Ken Vraa, Director Parks and Recreation City of Eagan KV:bp Enclosure cc: Thomas Hedges, City Administrator Paul Hauge, City Attorney Advisory Parks and Recreation Commission Dale Runkle, City Planner April 1983 TO: DIRECTOR OF PARKS RECREATION, VRAA PARKS RECREATION COMMISSION FROM: RECREATION PROGRAMMER, PETERSON RE: POLICY FOR USE PERMITS FOR SOFTBALL, BASEBALL, SOCCER ON CITY FIELDS ISSUES: With the increase in City population, the growth in popularity of soft- ball, baseball and soccer, the emergence of Rosemount area athletic association teams comprised of boys and girls who reside in Eagan in addition to the numerous Eagan Athletic Association and Mend -Eagan Athletic Association teams; a means to ensure that fields are used as reserved for league games has be- come necessary. Staff has implemented a procedure for the handling of requests which relies soley upon actual games. The adoption of this into a policy by the commission bears consideration. Background Information In the past, representatives from each athletic association requested from the Parks and Recreation staff, fields needed for their association from; for example, May 15 June 30. In addition to City fields, the associations requested fields from the school districts. Permits for City fields were written, assigning fields to associations usually for M, T, W and Thursdays. The department has separate joint maintenance agreements with the school districts whereby the City drags infields and paints foul lines. The City may also lay out and stripe soccer fields. The maintenance schedule was drawn from the permits issued which indicated the frequency of usage. During the course of "the season on several occasions staff would note a field not being used, that was marked "reserved" or note a practice in progress on a game field. On one occasion, following a costly lay out of a soccer field, it was noted that only 3 games were scheduled to be played on it. It appears as though the practice of the athletic associations has be- come to secure as many fields as possible for their season and then assign games here and there to give each "league" a variety and never inform the department regarding open dates on a given field. Discussion In order to prioritize maintenance and to identify available field space for the anticipated influx of new teams, a means to coordinate the assignment of games to fields by date is necessary. The primary over lap on field requests will occur for 90' baseball fields. In addition, a limited number of requests may materialize in which "a field, anywhere, on a specific date will suffice Unscheduled fields could be identified to meet those needs. The philosophy of the department has been to fulfill the field needs of youth athletic associations as generally as possible. At this time, it is not known whether the athletic associations fully appreciate the limited available field space nor how they will adjust their approach to field permits. Page 2 In the issuance of permits the following criteria will be used: 1. On requests that overlap, such as for 90' diamonds. The number of games scheduled among the three organizations onto the two fields would be based on a ratio such as the number of Eagan teams compared to the number of games requested in relation to the number of game dates available. 2. For other fields, an organization that historically used a field would be scheduled onto it, however, open dates would be noted and would be available to other groups. 3. The issue of two games on a field per night may need to be addressed; i.e. a permit written.for 6 :00 -7:15 P.M. another from 7 :15 -8:30 P.M. Advantages to the New Procedure A cost effective maintenance schedule could be drawn from the frequency of field use. Specific field availability for special events and other single time field usage requests could be better administered by City staff. Action to be Considered Should the procedure instituted by City staff whereby permits for use of City fields for softball, baseball and soccer are issued on a specific date basis per field for scheduled games become a policy for the department. l irs TIMIE IFOR CRiEATIViE J IPtAY by Jay Beckwith HE CHILDREN OF AMERICA are being reared in single- parent our society begins to be appreciated, are in the midst of a change of families. there will be a nationwide effort to immense proportions. There is Pac -Man type games now gross revive more natural play ex- a real possibility that most children more than records and movies com- periences. It is easy to foresee the will no longer play in ways that you bined. adult awareness of jogging and fit and I know as play. Active, ex- American children, in great ness being applied to the needs of ploratory, creative play is becoming numbers, are failing the minimum youth. increasingly unavailable to modern standards of the President's Council What irony: At the time when children. Treehouses, swimming on Physical Fitness and Sports. recreation services are most needed holes, even the streets, are no longer These facts indicate a radical they are being cut back in unprece- part of the typical child's environ- change in the child's environment dented fashion. The current financial ment. Yet, at the same time that the and lifestyle and suggest ominous crisis in recreation will inevitably places for play are disappearing, trends for the future. We can no end. The question is whether public commercial passive entertainment is longer assume that children will find recreation will survive or be replaced on the rise. the kinds of natural play experiences by services and facilities available Consider these facts: that enable their development as only to those who have the price of The typical child spends more physically and socially competent admission. time watching TV than at school. adults. More than half of the children From this perspective, park and hose individuals and organiza- under 12 are living in multi- family recreation programs assume a new T tions in parks and recreation housing. significance. As the impact on are concerned with preserving Over 20 percent of the children children of such massive changes in America's long and admirable tradi- tion of making public recreation op- "street experience will not be ade- developed. Object oriented themes portunities available to all citizens. quate, like rocketships were very popular. To continue this tradition, new Playgrounds are a particularly Abstract shapes were later in- methods of financing must be found. good place to stimulate community troduced; people believed that Personnel must take on the unac- involvement for several reasons: The children would have more freedom customed role of advocate and cost is relatively low; the need for to create their own imaginary play become active in increasing public improvement is obvious; they are world. Finally, wooden equipment awareness of the need for facilities highly visible the focus of the com- was developed to create more and programs that are responsive munity involvement can be placed naturalistic environments. While and open to everyone. on a single issue; and when well these approaches resulted in en- There are many ways to increase designed, they are totally positive vironments that appeared very public awareness; none is better than and non controversial. different, all areas evolved from the direct involvement. In my work as a same basic ideas about how and why playground designer, I have found a �j istorically, there have been two children play. vast reservoir of energy and 1 1philosophies behind providing Recently, new ideas have been enthusiasm that is generally untap- playgrounds. In the late 1800s, the emerging that build upon past ideas ped. Parents of young children are purpose was to get "urchins" off the about play and expand them with an important force in the com- street and into some kind of physical insights from modern child develop munity. Frequently, however, this development and citizenship pro- ment research. Direct study of play group does not become active in gram. During the early 1900s, as the behavior is extremely difficult; the recreation until their children reach automobile created the great subur- very act of observation distorts the "Little League" age, if at all. Yet, banization of America, the play- child's natural actions so that most when a playground improvement ground concept became increasingly standard research methodologies are project is opened up for community more entertainment oriented. Play- valueless. The difficulty in obtaining input, a great deal of response is grounds became miniature versions scientific objectivity is so great that generated. of amusement parks. very little work has been done in this Parents are greatly concerned That children use their imagina- field. Indeed, more is known about with the quality of the environment tion during play was "discovered" in almost any subject than is known their children experience in their the 1950s, and theme play equip- about human play. formative years. They know that an ment became the vogue. Three basic In the past few years this situation exclusively "backyard" (or worse, kinds of theme playgrounds has changed somewhat as new, in- M v y W ,0 V G w direct methods of observation have grounds take some of the pressure off been developed. While there is still the natural environment and are re- no specific measurement for "play," quired by our increasing urbanizes- x x� there are good tools to use to measure tion. the relative performance of various Thus playgrounds have a very im environments. Length of play portant role to play in the overall '."'A� episode, number of interactions bet- design of any park system. But when ween children, frequency of ut- we create environments that are so �f terance, and changes in self concept boring children don't use them, then of the children can all be measured the whole exercise is a failure. and compared from one setting to The adventure playground move- another. As a result of these and ment has struggled for over 15 years x other measurements criteria, infor- to bring this message to America mation about how and why children without significant impact. Perhaps play is beginning to emerge. the idea must evolve into a new Environments that promote better form. But something must be done to play patterns do exist. Some of the begin to provide the diversity and qualities that make these environ- complexity presented by nature with ments successful have been identified in our playgrounds. and form the basis of a new set of design principles. The more impor- onnecting playevents has been tant of these ideas are presented C demonstrated to expand the here. duration and complexity of play pat- terns. This design principle is one of I f we do nothing else, we must the simplest to document and use. come to accept that children find Play environments are made up of most playgrounds boring. They are interest areas (playevents) and path neat and tidy and easy to maintain, ways between them (links). When but children simply will not choose these pathways are made clear and them unless forced to by adults. interesting, children are able to move Children are information gather- from one activity to the next without ing machines of enormous power. interruption. They poke, pry, taste, hit, move, and In the past, the design principle upright in the ground. Even painted generally investigate until they has been that each playevent should trails on hardtop surfaces will induce know all there is to know about be separate. Many believed that such children to follow the path and cycle their environment. They are pro- isolation would provide for better from one event to another, thus grammed by their biology for this use, more room for queing up, and reducing the queing and the horse- non -stop investigation because with- less conflict. As with many precon- play. out such learning Homo sapiens ceived adult ideas about how The better solution to creating could not survive. children play, this concept has been linkages is to connect the playevents When we adults make boring, sim- shown to be exactly contrary to into one large and complex structure. pie, easy- to-maintain, cheap play- children's real behavior. Indeed, In this way the children are cons grounds, we are fighting human what this approach creates is con- tantly on the move, interacting with nature at a basic level. Of course we flict. the play equipment and each other don't notice that our playgrounds are Children do not wait patiently in in a sort of purposeful chaos, failures because we don't keep track line for their turn; instead, they are reminiscent of activity in a bee hive. of non -use, only accidents and van- continually at play with each other. dalism. When these are reduced we Adults see this as "horsing around" j earning to be accepted by play- pat ourselves on the back and feel and are rightfully concerned because Lmates is one of the most impor- successful. accidents may result. The solution to tant aspects of children's play. To a Children want and require in- managing "horsing around" is not in large extent, children's social iden- teraction with the complexity of teaching children better "citizen- tity is formed in free play with peers. nature: rocks, trees, water, and earth. ship" but in modifying the environ- Kids learn to be winners or losers Unfortunately these natural ment to allow for natural play pat- during play. But while the process of j materials break down when used by terns. socialization has been stressed in hundreds of children. A playground Even the most traditional, play en- early childhood education and concentrates the children's investiga- vironment can be .greatly improved recommended in child rearing prac- tion and contact with the elements in by creating "links" between play- tires, it has not been considered im- a more durable setting, one that can events. These can be created by bal- portant in play environments. Try I take constant use and survive. Play- ance beams, stepping logs, or tires set this experiment: Take one ball and �I the 15 years I've been building neigh- borhood playgrounds, money has never been the fundamental prob- W hen these factors--complexity, lem. Once the community is alerted linkage, group plan, flexibility, to the need and involved with find challenge, development, and ing the solutions, the funds seem to safety —are combined during the appear automatically. playground design process, "creative This is a sort of magic. Today, play environments" are born. These you're sitting with cutbacks and are at once traditional and at the layoffs. In six months you could be same time a radical departure from installing an impressive new play anything available. ground. In a year you could be build The creative playground concept ing on that success to revitalize your offers a clear and well organized whole program. Lots of innovative solution for playground improve- directors around the country are ment. You can present these princi- using this design approach suc- ples to explain why your playground cessfully. improvement project will provide Kids need to get outside, away much needed benefits to your com- from passive TV watching, to play munity. If you combine this design with their friends. Our neighbor- approach with meeting the needs of hoods need safe places to play that children and the safety requirements will really attract kids and give them suggested by the Consumer Product the kinds of challenges that build Safety Commission, you have com- strong and competent bodies. This is pelling reasons for renovating exist- the kind of project that you and your ing facilities or creating new play community can tackle and get quick jareas. results. Of course, there will be few or no Let's get hopping—time's funds available. Here is where citi- a'wasting —end so are our children! i zen involvement really pays off. In Reprint ed from September 1982 Parks Recreation I I I I I I I i i 1 ter than a narrow slide; a tire swing While the adventure playground is better than a to /fro swing. Not that won't work in most situations man single slides or to /fro swings are not sites can have some form of loose used. But, given the choice, kids will parts. Using sand as a fall cushion is go for the wide slide and tire swing often a possibility. Selecting play every time. structures with bridges and other soft Second, as many playevents as components is another possibility. possible should have space in which Selecting play structures with kids can watch other children play bridges and other soft components is on the equipment. A wide platform also a practical method. The bal- at the top of the slide allows them to ance between the play potential of congregate and talk about their play. flexibility and the durability prob- This is where leadership and crea- lems such softness may introduce is a tive imagination 'are really difficult one to manage. When 4 develop If you observe children, designing a new play environment you'll see that most of their play time or purchasing equipment, this issue is taken up with discussing what should be prominent in your deci- they are going to do rather than in sion- making process. actually doing it. Ideally, this plat- Kids play up to the limit of their form at the top of the slide, or next to abilities. When we default on our the climber, ought to have a second- responsibility to design challenge ary playevent so that the children into the playground, the children have several options. This scheme either find ways to use the equip- provides freedom of choice and sup- ment we never dreamed of or ports good play patterns that result they go somewhere else. Some of the x from abundant play opportunities. very earliest playgrounds had equip 3 A note of caution here. There are ment drawn directly from gym- many commercially available play nastics. A few examples of this type structures with lots of decks and few of equipment are still available` playevents. These look impressive to parallel bars, chinning bars, horizon grown ups and sell well because they tal ladders —lout even these few re- are low in price (playevents require maining designs are rarely being in- 50 kids and put them on a concrete expensive hardware), but studies stalled these days. We not only need yard with a chain link fence around have shown that they have very lit- to return to the "old- fashioned" it for an hour. This is a recipe for dis- tle real attraction for children. ideals of providing fitness apparatus aster, yet this is a typical play ex- for children, but we must also extend perience for children each day at hings that move have more play and expand upon those ideas with school. T potential than static compo- modern knowledge of the require When there is little to do, children nents. Sand and water are great play ments for normal development. will fight to possess the limited play materials; concrete is not. Flexible The general concept of strength is resources that do exist. This behavior materials can be combined in many an easy one for most of us. Precise not only creates a great deal of anger ways. They can change shape them knowledge of all muscle groups and and hostility, but it also creates selves (sand) or combine to create the activities required to develop bullies and losers. In contrast, if there new shapes (blocks). them has become the science of are one and one -half play activities The concept of flexibility can be kinesiology. It is now known that, in per child, then there is not only applied to equipment design. A bal- addition to strength, children must something for everyone to do, but ance beam supported on springs or develop the ability to combine also a choice of playevents for each rubber will be used much more than several different motor activities into child. In such play environments, a static beam. Equipment that en- a smooth and integrated sequence. there is almost no fighting, supervi- courages the child to be flexible and This skill is generally called coor- sion is very pleasant, and there are invent new ways of playing on the dination. Modern ideas about coor- rarely accidents. equipment will be more popular dination, however, also include sen- In addition to simply having suffi- than equipment that directs the child sory information processing ability cient play resources, the playevents into fixed patterns. A banister slide that integrates muscle activity with themselves should be designed to (two parallel pipes inclined at about environmental inputs. enhance group play. Two design 28 degrees and set 14 inches apart) Recently, the need for play ac- changes greatly enhance social in- will interest children longer and tivities that promote balance ability teraction. First, make as many ac- stimulate much more varied has been receiving the attention of tivities as possible usable by several behaviors than a traditional (climb- researchers and educators. It seems children at once. A wide slide is bet- the stair sit -on- your- bottoH slide. that many children have balance r pliers of playground equipment who vert them into laboratories for have examined the question of human development. xr challenge in a systematic and Of course no one wants to see meaningful way. As an aware buyer children hurt, and everybody is in �r you can however pick and choose favor of safety. While the idea of r *r among the various offerings to pro- safety is critical, we generally sup- OEM vide your community's children port it for the wrong reasons. with some aspects of a challenging No playground can ever be com- play environment. pletely safe. Kids play at the limit of As designers and buyers, let us re- their ability. This means that they jest expensive play structures which will fail, in fact they will fail often. are really only several slides con Our design goal ought not to be the nected by narrow bridges. We must removal of places where kids fail, but demand provisions for challenge— to so design the playground in which for balance, coordination, flexibility kids can fail often and not be hurt. and strength. The Consumer Product Safety Commission (CPSC) has identified P laygrounds ought to be develop- falls from equipment as the single mental; that is, they should pre- most common source of playground sent each activity in several levels of injury. These injuries can be greatly challenge so that every child can ex- reduced by installing a good fall -ab- perience a success and return year sorbing ground cover and by keeping after year to discover more challeng- playground equipment to the lowest ing activities. For example, upper height possible consistent with func- body strength can be developed on a tion. horizontal ladder. But what if the While no playground can be en- child is too young to use that design? tirely safe, there is much that we can Then, an inclined ladder is easier. A do to remove hazards. This is an im- jeq chinning bar, parallel bars, and clim- portant distinction: A hazard is bers can build the same muscle something a child didn't see--glass groups, so even the smallest child in the sand, for example; a challenge can have an appropriate challenge. is a risk the child can see and choose x Or, the more advanced children can to undertake, like crossing the X use a ring traverse or cable ride, both horizontal ladder. We must try to of which require a great deal of skill. remove all hazards the hidden a Thus, a developmentally sound play- dangers —in the playground. But at ground presents every activity in the same time we should be trying to many skill levels. introduce as many challenges as deficiencies that impair acquisition An additional benefit of this possible so that when children take a of other movement skills. Indeed, design approach is that it tends to chance, they are doing so where we there is some indication that balance allow disabled children to experience expect it and can provide for failure problems play a significant role in integrated play with other children. by adding fall cushions, railings, and many learning disabilities. While No particular playevent ought to be other measures. this research is not conclusive, the correct for every child. If it were, it Our reason for emphasizing safety current studies are very provocative would not be very challenging. is the goal of reducing accidents. An and are certainly sufficient to indi- However, within any specific play- equally important goal is allowing cate that balance activities ought to ground there ought to be several children to really take risks, to be a significant part of any play- events to provide an appropriate challenge themselves, to fail and to ground design. challenge to any child. try again —in a safe environment. In Lower back pain is the leading For a playground to be truly a playground where hazards have cause of worker disability in the developmental implies not only been reduced, children are much United States. Most of these injuries many levels but also attention to all more creative and innovative in are the direct results of poor postural aspects of human development. their use of the equipment. On a habits and inadequate trunk flex- Clearly, we are a long way from pro- playground where one mistake ibility. Poor posture and a defensive viding such community recreation means serious injury, children move spinal musculature often start in facilities. The first step in reaching cautiously. If playgrounds are to be childhood. Good habits and ap- such an ambitious undertaking is to learning places, they must be as safe propriate activities must replace our set the goal. So long as we view play- for experimentation and failure as total negligence of this problem. grounds as routine amenities or as we can make them. There are now no commercial sup- necessary evils we shall never con C 57 MEMO TO: ADVISORY PARKS AND RECREATION COMMISSION FROM: KEN VRAA, DIRECTOR OF PARKS AND RECREATION DATE: APRIL 7, 1983 RE: WOODHAVEN ADDITION As you are aware, several members of the commission were at the on site review of the Woodhaven Addition on Tuesday, April 5th. Having had an opportunity to review the site and following the formal presentation April 7th, there are potentially several options which the commission may choose to follow. To assist you with your recommendation, I have prepared the following three options which might prove to be a "framework" on which a motion might be developed. Option 1 Reject the developers request to encroach upon park land for grading purposes. Rationale: The loss of mature trees represents a substantial loss to the park effecting the aesthetics and natural characteristics of portion of the park. Other than a clean -up, there is no substantial gain to the park as the result of the grading. What gain is achieved, as the result of allowing the developer to encroach upon the park, might be accomplished with a thorough clean up by City crews and the construction of a trail, (which is being recommended in the systems plan study). Option 2 Approve the developer to encroach upon City park land, subject to the Advisory Planning Commission's approval of a variance on the number of enclosed parking spaces required for lot two. Rationale: The addition to the main apartment structure of the four enclosed garage units, apparently causes the developer to increase the slopeage into the park area to a two -to -one slope. This increased slopeage makes the park area less desirable and causes concern for erosion control, maintenance, and access. Secondly, the requirement for the garages would also require the elimination of between five to seven mature oak trees on the site as well as potential loss of four to seven mature oaks on park property adjacent and /or near to the property line. Therefore, approval with the condition that the Planning Commission would approve development without the additional require ment for four outside covered garages would allow for a three -to- one slope or less and allow for the preservation of substantial number of trees. Option 3 Approval of the encroachment onto park property without regard to final slope. Rationale: Despite the loss of the trees and the construction of a two -to -one slope, the benefit to the park system outweighs the loss, and con- sequently could be approved. It would be assumed that under any of the conditions of approval, that the Advisory Commission would recommend a cash dedication; and the requirement of the developer to provide for a 10' wide trail connection from Beau D'Rue to Woodhaven Park consisting of a compacted limestone surface. APRIL 7, .1983 MEMO TO: ADVISORY PARKS AND RECREATION COMMISSION FROM: KEN VRAA, DIRECTOR OF PARKS AND RECREATION RE: OAKWOOD PARK ADDITION As you are aware, there was a lack of information regarding the proposed Oakwood Addition in your park packet for April 7th. The lack of information, which typically accompanies your packet, is the result of the developers request to receive approval by the Advisory Parks and Recreation Commission regarding the proposed land swap prior to review by the Planning Commission. Although the Advisory Commission and staff had some knowledge of the impending proposal, it was conceptual in nature without sufficient detailing to allow staff to provide additional information for the commission's reviewal. The reviewal of the site on April 5th by members of the commission and staff, was beneficial in clarifying several concerns regarding this proposal. How- ever, the lack of a final grading plan and engineering reviewal, does raise certain concerns as it relates to the park property. These concerns, which may be addressed at the April 7th commission meeting, might be identified as follows: 1. The uncertainty of the N.H.O.W. for Schwanz Lake which might impact the ability to provide for a trail around the south end of Schwanz Lake. 2. The grade of slopes between the rear lot lines and the lake area to allow for trail construction. 3. The resolution of the remaining park land which would be owed to the park. 4. The qualitative change and characteristic of the park land which is swapped. The Advisory Commission, after reviewal and addressing of its concerns, may wish to give either final approval with its recommendation or, it may wish to give only tentative approval subject to reviewal of topographic features. This tentative approval would allow the developer to proceed to the Advisory Planning Commission with the understanding that conceptual approval has been provided by the Advisory Commission with only minor revisions and adjustments necessary for final plat approval regarding the slopeage, elevation, etc. MEMO TO: ADVISORY PARKS AND RECREATION COMMISSION FROM: KEN VRAA, DIRECTOR OF PARKS AND RECREATION DATE: APRIL 7, 1983 RE: WOODHAVEN ADDITION As you are aware, several members of the commission were at the on site review of the Woodhaven Addition on Tuesday, April Sth. Having had an opportunity to review the site and following the formal presentation April 7th, there are potentially several options which the commission may choose to follow. To assist you with your recommendation, I have prepared the following three options which might prove to be a "framework" on which a motion might be developed. Option 1 Reject the developers request to encroach upon park land for grading purposes. Rationale: The loss of mature trees represents a substantial loss to the park effecting the aesthetics and natural characteristics of portion of the park. Other than a clean -up, there is no substantial gain to the park as the result of the grading. What gain is achieved, as the result of allowing the developer to encroach upon the park, might be accomplished with a thorough clean up by City crews and the construction of a trail, (which is being recommended in the systems plan study). Option 2 Approve the developer to encroach upon City park land, subject to the Advisory Planning Commission's approval of a variance on the number of enclosed parking spaces required for lot two. Rationale: The addition to the main apartment structure of the four enclosed garage units, apparently causes the developer to increase the slopeage into the park area to a two -to -one slope. This increased slopeage makes the park area less desirable and causes concern for erosion control, maintenance, and access. Secondly, the requirement for the garages would also require the elimination of between five to seven mature oak trees on the site as well as potential loss of four to seven mature' oaks on park property adjacent and /or near to the property line. Therefore, approval with the condition that the Planning Commission would approve development without the additional require ment for four outside covered garages would allow for a three -to- one slope or less and allow for the preservation of substantial number of trees. Option 3 Approval of the encroachment onto park property without regard to final slope. Rationale: Despite the loss of the trees and the construction of a two -to -one slope, the benefit to the park system outweighs the loss, and con sequently could be approved. It would be assumed that under any of the conditions of approval, that the Advisory Commission would recommend a cash dedication; and the requirement of the developer to provide for a 10' wide trail connection from Beau D'Rue to Woodhaven Park consisting of a compacted limestone surface. APRIL 7, 1983 MEMO TO: ADVISORY PARKS AND RECREATION COMMISSION t FROM: KEN VRAA, DIRECTOR OF PARKS AND RECREATION RE: OAKWOOD PARK ADDITION i As you are aware, there was a lack of information regarding the proposed Oakwood Addition in your park packet for April 7th. The lack of information, which typically accompanies your packet, is the result of the developers request to receive approval by the Advisory Parks and Recreation Commission regarding the proposed land swap prior to review by the Planning Commission. Although the Advisory Commission and staff had some knowledge of the impending proposal, it was conceptual in nature without sufficient detailing to allow staff to provide additional information for the commission's reviewal. The reviewal of the site on April 5th by members of the commission and staff, was beneficial in clarifying several concerns regarding this proposal. How- ever, the lack of a final grading plan and engineering reviewal, does raise certain concerns as it relates to the park property. These concerns, which may be addressed at the April 7th commission meeting, might be identified as follows: 1. The uncertainty of the N.H.O.W. for Schwanz Lake which might impact the ability to provide for a trail around the south end of Schwanz Lake. 2. The grade of slopes between the rear lot lines and the lake area to allow for trail construction. 3. The resolution of the remaining park land which would be owed to the park. 4. The qualitative change and characteristic of the park land which is swapped. The Advisory Commission, after reviewal and addressing of its concerns, may wish to give either final approval with its recommendation or, it may wish to give only tentative approval subject to reviewal of topographic features. This tentative approval would allow the developer to proceed to the Advisory Planning Commission with the understanding that conceptual approval has been provided by the Advisory Commission with only minor revisions and adjustments necessary for final plat approval regarding the slopeage, elevation, etc. j t city of Seaga 3795 PILOT KNOB ROAD, P.O. BOX 21199 BEA BLOMQUIST EAGAN, MINNESOTA 55121 Mayor PHONE: (612)_ 454 -8100 THOMAS EGAN JAMES A. SMITH JERRY THOMAS April 5, 1983 THEO M R C ouncil THOMAS HEDGES City Administrator J.E. Parranto, Inc. EUGENE r kERBEKE ATTENTION Mr. Mark Parranto 3908 Sibley Memorial. Highway Eagan, Minnesota 55122 Mr. Thomas Willmus 2660 North Cleveland St. Paul, Minnesota 55113 Re: Park Land Dedication; Mallard Park Addition Enclosed in this letter are photo copies of material relative to the park land dedication of the Mallard Park 1st, 2nd, and 3rd additions. As you read through the material, I'm sure you too will conclude that there is an agreement between Mr. Willmus and the City of Eagan for a future neighbor- hood park on the Willmus Properties which would be coming from a future park dedication requirement and from any shortage of parks dedication made in the Mallard Park additions. This future neighborhood park would be in the area to the north of Mallard Park owned by Mr. Willmus. You will find an exhibit which generally shows this area in the packet of information. It has been my understanding that the exact parks dedication deficiency from the Mallard Park 1st, 2nd, and 3rd additions was not known immediately at the time of final platting of these additions. Thus the result of the City's desire to proceed with a trails construction project and because Mr. Willmus wished to final plat his parcel prior to the final surveying and conveyance of the four parcels of land which made up the harks dedication. To help you with the history and provide you with some background on this issue, I have enclosed the following items: Item A. Minutes of the parks committee dated July 14, 1977. Item B. Minutes of the parks committee dated August 11, 1977. Item C. B.R.W. letter to Thomas Hedges, dated February 17, 1978. Item D. Minutes of the City Council dated February 21, 1978. Item E. Letter from Thomas Willmus to Thomas Hedges with attachments, dated February 28, 1978. Item F. Letter from City Attorney, Paul Hauge to Mr. Willmus, dated March 3, 1978. THE LONE OAK TREE THE SYMBOL OF STRENGTH AND GROWTH IN OUR COMMUNITY Mr. Mark Parranto Mr. Thomas Willmus April 5, 1983 Page 2 Also included and identified as: Item G. Are the area calculations for Mallard Park lst addition as copied off the preliminary plat application. Item H. Item I. Photo copies of Park 2nd and Mallard Park 3rd additions, again from the preliminary plats which are on file with the City. Item J. Is a copy of the gross area calculations for dedicated park land, taken from surveys submitted by B.R.W. and sent to the City. And, finally; Item K. Is a resolution of the City Council concerning park land dedication formulas dated June 4, 1974 which became part of the sub division ordinance. i In reviewing the park area computations, (Item J) the park land dedications given totals 9.87 gross acres. Combining this 9.87 gross acres with the total area calculations for acreage from Items G, H, and I (which is the Mallard Park 1st, 2nd, and 3rd additions) there is a total gross area of 72.3 acres. Apply- ing the City's 10% park dedication formula, the City should receive 7.23 acres of park land. While the City did receive 9.87 acres, this land is subject to only half credit of 4.93 acres, because it lies within the N.S.P. power line easement or is ponding area. Therefore, there is a net deficiency of 2.3 acres (7.23 4.93 2.3 acres). The 50% credit for park land received is based on (Item K) which provides for partial credit when the dedication includes ease- ments (See page 3). Further, in a letter from Mr. Paul Hauge, City Attorney (Item F) to Mr. Willmus, in paragraph 2, Mr. Hauge again indicates that "an exact calcualtion taking into account of easement deduction" will be made. Assuming my math is correct, and based on the information that I have received, it would appear that there is still an an additional 2.3 acres of park land dedication from Mallard Park 1st through 3rd additions which is owed to the City. It still is the City's intent to acquire /develop a neighbor- hood park in this park service section and is relying on the agreement with Mr. Willmus to insure that the neighborhood park becomes a reality. At this time, the City would like verification by Mr. Willmus that these calculations agree with his; And, his assurance that the City will receive this park land with the future park land contribution. Further, it is the City's intent to provide a park of sufficient size to meet the neighborhood needs and, therefore, all other land sales from Mr. Willmus's property for development purposes will be subject to the land dedication requirement to insure that the City and the community can be serviced by such a neighborhood park. Mr. Mark Parranto Mr. Thomas Willmus April 5, 1983 Page 3 As further development of the property is contemplated, please be aware that I would be happy to meet with Mr. Willmus or his planners to assist in specifically siting the park. If you have any questions regarding the material I have enclosed or calculations, please feel free to contact either myself or Mr. Hauge. 1 Sincerely, K Vf" Director Parks and Recreation City of Eagan KV:bp Enclosure cc: Thomas Hedges, City Administrator Paul Hauge, City Attorney Advisory Parks and Recreation Commission Dale Runkle, City Planner April 1983 MEMO TO: ADVISORY PARKS AND RECREATION COMMISSION FROM: KEN VRAA, DIRECTOR OF PARKS AND RECREATION RE: APRIL 7, 1983 COMMISSION MEETING The April 7th meeting of the Commission has a rather lengthy agenda planned. However, many of these items may only take a few minutes to discuss, while other items may be deferred if necessary. The first item on the agenda, under development proposals, is the preliminary plat application for the Sunset Addition, which is a five acre parcel of land immediately west of the Saddle Horn Addition. The original preliminary plat filed in 1979, was never filed by the land owner and therefore expired. The newly proposed plat is for 18 single family units. This proposed addition is located in park service section 26, although the nearest park to the area is Lakeside Park which is approximately 3/4 of a mile away. The Lexington South Planned Unit Development will provide a park area near Schwanz Lake, which is in close proximity to this plat. The original recommendation by the Advisory Commission for the Sunset Addition was a cash dedication requirement. It would be staff's recommendation to again require a cash dedication be made. (See enclosed planners report for additional information concerning this preliminary plat proposal) Woodhaven Addition, a preliminary application for rezoning approximately one (1) acre from community shopping center to R -4 zoning. This one acre rezoning would be combined with an additional one acre land immediately adjacent to it which is currently zoned R -4. The applicant is proposing to construct two 18 unit apartment buildings for a total of 36 dwelling units. The site for this addition has difficult topographic problems which will re- quire a great deal of excavation and regrading. Because of this, the developer is asking the Commission for permission to encroach upon existing park land to accomplish the grading necessary to complete this project. Members who were able to make the April Sth development review committee meeting at the site are aware of the developers proposal at this time. Mr. Stover, the applicant will be at the Commission meeting to review in greater detail the implications of the grading and the impact to the park site. Enclosed within this packet is the planners and engineers report in regards to this proposed addition. The third item on the agenda is the Windtree 3rd addition; which is a proposed replat of the Windtree 2nd addition. A separate one page memo, with attachments, is provided within the packet for your review. With the approaching neighborhood workshops, assignment of Advisory Commission members to be in attendance at the neighborhood meetings should be made. These planned meetings are for April 11, 13, and 14 and April 18, 20, and 21. Neighborhood meetings will begin at 7 :00 P.M. at City Hall. A special presentation, of a film on leaf composting(approximately 20 minutes) is to be shown. Members previously requested staff to review the potential Memo April 7th meeting April 1983 Page 2 Commission with a preliminary proposal for a composting program at the May meeting, if there is an interest to proceed further. This film is being presented through the courtesy of Turf Supply Company of Eagan and Mr. Don Belkengren. Mr. Belkengren will be available to answer your.questions that 4 evening. OLD BUSINESS Systems plan consultant, Tim Erkkila will be present at the meeting to review several elements of the system plan. Enclosed in this packet for your reading prior to the meeting are the "analysis and recommenda- tions" for 10 park sites as performed by Mr. Erkkila. Mr. Erkkila will also have available the concept plans for Fish Lake, Pilot Knob and Schwanz Lake Park areas for study. The systems plan consultant will outline for the Advisory Commission Section "I" in the plan entitled Acquisition and Develop- ment Plan. As always, this is a draft document subject to your modification as appropriate. Mr. Erkkila and I believe it would be important for the Advisory Commission to go through this section prior to the neighborhood meetings to be better able to respond to questions from neighborhood groups. With the approaching neighborhood workshops, assignment of Advisory Commission members to be in attendance at the neighborhood meetings should be made. These planned meetings are for April 11, 13, and 14 and April 18, 20, and 21. Neighborhood meetings will begin at 7 :00 P.M. at City Hall. The second item under "old business" is Commission Objectives for 1983. This has previously been reviewed by the Commission at its February and March. meetings and then deferred to this month for final enactment and establishment of a time frame. Under "new business there are two items, one concerning field scheduling as a policy, and a proposed revision to the fee schedule for Northview Athletic Field rental. Under "Other business and reports you will find an enclosed report regarding the park and recreation department's Site Specific Program. The memo be self explanatory, but I would be happy to answer any questions Commission members may have in regards to it. Also enclosed for your information, is an article on playground equipment entitled "It's Time for Creative Play." j This is a reprint from an article in the National Recreation and Parks Association journal. The sub committee on Teens is requested to establish a meeting date within the next two to three weeks, to review several program options. Another item within the packet is a copy of a letter addressed to Mr. Wilmus and Mr. Parranto regarding the park land in arreax for Mallard Park 1st through 3rd addition. Members will recall that as a condition of approval for the Mallard Park 1st addition re- platting, the issues of park land is to be resolved. Commission members should also mark their calendars for Saturday, April 23rd. The City Administrator and City Council are planning a City tour for planning and parks commission members of the community in recognition of volunteer week. a Memo April 7th meeting April 1983 Page 2 for instituting a leaf compost program at park sites as a service to the community. Staff has been reviewing several alternatives for trying to provide such a composting program, and in investigating this program was made aware of a film that was produced by the Judd Ringer Corporation. As a means of informing the Advisory Commission and providing some background, the film has been scheduled for review. It will be the intent to provide the Advisory Commission with a preliminary pTOposal for a composting program at the May meeting, if there is an interest to proceed further. This film is being presented through the courtesy of Turf Supply Company of Eagan and Mr. Don Belkengren. Mr. Belkengren will be available to answer your questions that evening. OLD BUSINESS Systems plan consultant, Tim Erkkila will be present at the meeting to review several elements of the system plan. Enclosed in this packet for your reading prior to the meeting are the "analysis and recommenda- tions" for 10 park sites as performed by Mr.'Erkkila. Mr. Erkkila will also have available the concept plans for Fish Lake, Pilot Knob and Schwanz Lake Park areas for study. The systems plan consultant will outline for the Advisory Commission Section "I" in the plan entitled Acquisition and Develop ment Plan. As always, this is a draft document subject to your modification as appropriate. Mr. Erkkila and I believe it would be important for the Advisory Commission to go through this section prior to the neighborhood meetings to be better able to respond to questions from neighborhood groups. The second item under "old business" is Commission Objectives for 1983. This has previously been reviewed by the Commission at its February and March meetings and then deferred to this month for final enactment and establishment of a time frame. Under "new business there are two items, one concerning field scheduling as a policy, and a proposed revision to the fee schedule for Northview Athletic Field rental. Under "Other business and reports" you will find an enclosed report regarding the park and recreation department's Site Specific Program. The memo should be self explanatory, but I would be happy to answer any questions Commission members may have in regards to it. Also enclosed for your information, is an article on playground equipment entitled "It's Time for Creative Play." This is a reprint from an article in the National Recreation and Parks Association journal. j The sub committee on Teens is requested to establish a meeting date within the next two to three weeks, to review several program options. Another item within the packet is a copy of a letter addressed to Mr. Wilmus and Mr. Parranto regarding the park land in arre for Mallard Park 1st through 3rd addition. Members will recall that as a condition of approval for the Mallard Park 1st addition re- platting, the issues of park land is to be resolved. Commission members should also mark their calendars for Saturday, April 23rd. The City Administrator and City Council are planning a City tour for planning and parks commission members of the community in recognition of volunteer week. Memo April 7th meeting April 1983 Page 3 An official invitation from the City Administrator's office inviting members and spouses to this tour will be forthcoming. Should members have any questions in regards to items on the agenda.or in the packet, please contact me prior to the meeting. April 1983 MEMO TO: ADVISORY PARKS AND RECREATION COMMISSION FROM: KEN VRAA, DIRECTOR OF PARKS AND RECREATION RE: SITE SPECIFIC PROGRAM EAGAN PARKS, FOR YOUR INFORMATION Several months ago, the Director of Parks and Recreation with the parks foreman, Jim McGuffee, thought it essential to initiate a program of parks maintenance which would be more responsive to,the specific mainte nance needs of each park. Henc, the analogy "sites specific" come into play when discussing such a maintenance program. The purpose of this memo is to provide you with some background, purpose and goals of this site specific program as now currently being envisioned by the staff. Background At the time I was hired by the City as Director of Parks and Recreation, one of my initial tasks was to maximize upon the existing resources of manpower, and equipment to improve upon the level of mainte- nance being provided to the parks and overall system. The initial under- standing was to assess the capabilities of the staff, the level service then being provided, park usage levels identified by the community and commission, equipment capabilities and various limitations imposed upon maintenance programs. After the reviewal process, several actions were taken which resulted in significant changes in personnel, equipment and scheduling. One such action was the approval by the City Council to purchase a 7 -Gang Reel Mower which better met the mowing needs of the system., Second, part time- seasonal employees were grouped into a crew for the specific purpose of mowing, trimming City parks and public facilities. This "mowing crew which supplemented regular staff utilizing the 7 -Gang Mower and other large mowing equipment, were programmed into a schedule of mowing /maintenance which provided for a higher level of service which included expanded areas of parks mowing which were previously overlooked. This program produced several results improved park appearances, improved level of efficiency, "freeing up" higher paid and higher skilled full time employees who could then be programmed into other areas of maintenance and development. As part of the mowing crew program, the department developed for each mowing area a level of service specific to the park. For example, River Hills Park East would have the major portions of the park mowed weekly by the Seven Gang, and another portion by the mowing crew. Other areas of the park might be mowed every other time and still other remote or secluded areas perhaps only three or four times during the year. Hence, each park would only receive as much time and effort as good park practices and conditions warranted. In a sense, the mowing program for each park became "site specific." This then became the basis of the "site specific" program now being planned and expanded to include other aspects of parks maintenance. This then became the direction now being pursued by the park foreman to include a "site specific" program which would include such areas as fertilization, seeding, aerification, herbcide application and the like. The "site specific" program will now take into consideration different factors for site rehabilitation usage patterns as well as many other factors. These factors will then be considered in more detail as to application of fertilizers and requirements and the like to insure the maximization of all resources. I As an example, the task that was most efficient for the City to apply a slow release of fertilizer during the spring months to all parks that were being used. Carnelian, Woodhaven, Cedar Pond, Northview have now been given an application of the same type of fertilizer although different amounts might be used. Certain economies were realized from this approach both in the application process and in the purchase process of the same fertilizer. It has been suggested that this approach was effective 800 of the time if proper steps were taken over 80% of the park areas. How ever, with the growth of the park system, the increased cost of fertilizers, manpower and equipment the "site specific' program will seek to achieve a higher level of maximization. Hence, the 80% factor will move closer to 100% maximization based on a "site specific' approach. Factors to be considered will be such factors as soil, grass type, usage pattern, soil compaction, moisture of better targeting the approach of the application of fertilizer. With the new "site specifid' program with our past example of use of fertilizer, Carnelian, Woodhaven Parks treated similarily Cedar I Pond and Northview would certainly have different rates of application, fertilizer demands as well as different timing applications as such. As to what is being done now, the program is under the direct responsibility of the parks foreman, Jim McGuffee. At this point Jim has developed a park j. site assessment sheet of each park. This sheet will be used as a means of referencing and outlining such factors such as the soils, drainage problems, mix of grass types, usage patterns, and the like. When the assessment sheets are completed, the sheets will be kept on file to help the department to make decisions such as the type, amount and the best time to fertilize or apply herbicide, type of over seeding, etc. The complete record of action taken will be recorded with the result of the work performed also noted. Adjustment in future years program for each site will be made if necessary. t As indicated, the program has only been initiated within the last several months. Soil samples have yet to be taken, but nearly all parts of the assessment sheet have been completed. It is hopeful that during the coming months parts of the program can be initiated so that by 1984 all sites can be part of the "site specific' program. As future parks are acquired and developed, they too can be added to the program. Thus, insuring that the parks process is as cost efficient and cost effective as possible. With limited resources within the City and the department, it is essential that efforts be taken to try to get the "biggest bang for the buck by maximizing the efforts and material invested in each of the City parks. If members would like, I would be happy to expand upon this informative memo. It may be many months before the "site specific' program becomes implemented in its entirety, but the process has begun. I would also like to comment on the efforts Jim McGuffee has already put into this new approach to parks maintenance in that he has accepted the new challenge most readily and has made significant progress in the organizational and the data collection phase of this program. -2- 377 T'ATIVF AGmT'1.)A ADVISORY PARKS AT,`Tn F.FCRFATION C 44ISSIM FACAIN, r ]TTN'FSOTCA POLICE COIT RENCT ROC E 7:00 P.M. RM!IAR 10TII?U MARCH 3, 1983 1. GAIL TO ORDER kTD PLEDGE OF AT I MIA rF 2. ADOPTION OF AGENM ANT APPROVAL OF MDI YM FRCM FEBRWY 3, 1983 APPROVAL OF SPTTIAL ME,M. LTG FFPRTYARY 8, 1983 3. DEVELAPMIlWT PROPOSALS a) Coachman. Highlands b) Park Ridge Addition c) Tiberon Addition /Replat of Mallard Park lst Addition 4. OL T) BtSD E.SS a) Omission Objectives ectives 1983 b) Composted Material TYpdate c) Gifts Book Review d) System Plan TYpdate 5. ^TEW BUSINESS a) Parkes 1983 b. OTTER BUSINESS /RrPOR!'S a) Winter Program Report b) District 195 Fagan Sumner School Program c) Fish lake Park d) Field Scheduling TTew Procedure 7. ADJOt1MMIr ;v 9 TO: ADVISORY PARS RFC.R�'AION nIVISSION FROM: MI VRAA, DIRECTOR OF PARYS RECREATION? RE: AMInA MARCH 3, 1983 Please be aware, due to a conflict of a joint meeting of the Fagan/ Burnsville Cable Commission, the Advisory Parks Recreation Commission meeting for March 3, 1983 has been mved to the police department conference room After the call to order and approval of minutes and agenda, there are three development proposals before the City and commission for reviewal. First, Coachman Highland, located in section 9 which is in close proximity to Coachman Park. The developer has proposed to staff that the parks dedication be provided by a land dedication. 'this proposed land parcel begins with Letendre along the west edge of the proposed plat. This area is wooded with a steep grade forming a ravine extending from Letendre northward. Because the (Yty has previously identified Coachman Park as the neighborhood facility, and the close proximity of this plat to this park, staff is recommending that a cash dedication be required rather than acceptance of this proposed land dedication. (See planners report, attached, for additional information). The second development proposal is entitled "Park Ridge Addition" which consists of 37.5 acres and would contain 114 single family units. The location of this addition is immediately west of Orrin ^meson "Ridge Cliff Addition The Advisory Commission has previously reviewed this same parcel of land for a proposed P.U.D. application which was entitled "Galaxie Park." I!his P.t?.D. was withdrawn in 1982 and a new proposal, under a different developer, is being submitted. At the time of the review of the P.U.P. by the Advisory Commission, the recommendation of the commission was for a cash dedication. Again, because of the close proximity of this parcel to Ridge Cliff Park. Staff is again recommending that a cash dedication fee be required with this proposed addition. (See planner report attached). The third development proposal requested is for a replat of Mallard Park 1st addition. This plat contains approximately 5.5 acres and is located immediately east of %odgate Lane and south of the highline trail. Enclosed in this packet is a separate memo to the Advisory Commission with a planners report for review. Under old business several items were deferred from the February meeting. The first of which is the determination of 1983 commission objectives. Previously, members had suggested the following items: The continuation of the official naming of as many parks as signs might be constructed for in 1983, continuation of reviewing parks /playgrounds in other communities, suggestions for visiting special use facilities in other communities such as swinudng pools, tennis courts, ice arenas and the like and the completion of the systems plan study. Additional suggestions and input from the commission members is being requested by the chairman at this meeting. The second item under old business concerns the gifts booklet that staff has been working on. Additional art work to go along with the verbage has been prepared and will he reviewed with the Advisory Commission for comment. In addition, sections that were previously been identified to be rewritten by the commission have been completed and will be distributed to the members for a second reviewal. The staff will also review for the commission the remaining steps to be taken and the time frame for the completion of the catalog. Staff will make a brief report on additional information concerning composted material to be used an park sites. Staff has sent a letter to the Minnesota Waste Control Commission asking for the reviewal of potentially three park locations as well as other park sites which also might be considered for usage of this material. The final item under old business concerns the systems plan study. Mr. Frkkila and staff are projecting that the second and third weeks of April would be suitable to meet with neighborhoods in the park planning districts, •for. reviear of -the information in the system plan and their park district area. Staff will review with the Advisory Commission a revised time table for the study and specific dates for the district meetings. Under new business, staff is asking the commission to review and prioritize five or six park sites for naming. The sub committee on parks naming could then refine this list with the commission's input, to begin the process of official naming. Staff would like to proceed with the construction of these park signs during April for installation in early May. T.tnder other business and reports, although no formal action will be required, is a presentation on the Winter programs. r1mclosed in the packet is a report from Throthy Peterson concerning the winter programs. Staff will also explain the proposed summer school program that District 196 will be offering during the summer. lbe department has initiated a for service program' that will complement the proposed offering at 'Thomas Lake School. Relating to Fish Lake Park and the controversy over the ownership of Outlot "B the City Council at its February 15th meeting asked the attorney from both sides to submit written material on their respective findings. Staff will be providing the commission members with information submitted by the attorneys. Finally, staff will like to report on a change in procedure recently adopted by the department for the handling and assigning of soccer /softball fields to various organizations. This is a result of anticipated demands for field space and the obviously restricted supply. One additional note I've cone across I thought commission members might be interested in from a recent newsletter: The PRORIlMITY OF CJRBA PAPM My P-WTCE 7— T VALUE OF A TUI E. In its monthly feature, "Economics of Amenity r%ws," the newsletter PLACE (November) reports on a TT. of Massachusetts study of the cost effectiveness of urban parks. "Apparently property values rise the most," says the study group, 'when a nearby park emphasizes natural open space as opposed to intense develop- ment for organized recreation." Proximity, it seems, also counts. In kbrcester, for example, the study finds that a house, on the average, located 20 feet from a park sells for $2,675 more than a similar one 2,000 feet away. The researchs also calculated that parks are worth about fit a visit. For a particular town's 219 acres of urban park land that costs 5125,000 a year to operate, some $424,597 was generated annually through public usage. As always, if you are unable to attend the meeting, please contact the office.