Loading...
4595 Nicols Rd - Final Plan Review Memos MEMO T0: JAY BERTHE - POLICE DEPT. - CAAIG KNUDSEN, ENGINEERING TECH. TOM COLBERT, DIRECTOR OF PUBLIC WORKS JIM STURM, PLANNING DEPT. JON HOHENSTEIN, ADMINISTR6TION HILL AKINSt ELECTRICAL INSPECTOR JOE CONNOLGYt WATER DEPT. FROM: DOUG REID, DEPARTMENT OF PROTECTIYE IN D6TE: OcTOQtR 13? 1987 The preliminary construction X_ plans Por nOLIDqy SiAjjp???{yE (y1595 NIcoLs ICOAD) ' are in our plan revieu section for your review and comments. Please return this form to Steve Hanson vith your iaitialed coments and the date oP review. Failure to return form to Steve vithia five (5) days vill be considered your approval. If you have aay objectioas to approval of these plans, it is your responsibility to notify thi9 departmeat aad resolve any probleas. ? "C?m MEMO T0: JAY BERTHE - POLICE DEPT. CRAIG KNUDSEN, ENGINEERING TECH. TOM COLBERT, DIRECTOR OF PUHLIC WORKS JIM STUAM, PLANNING DEPT. JON HOHENSTEINt ADMINISTRATION SILL AKINS, ELECTRICAL INSPECTOR JOE CONNOLLY, WATER DEPT. FROM: DOUG REID, DEPARTMENT OF PAOTECTIVE INSPECTIONS DATE: OC.TOU?R I3? IyH ( The preliminary construcbion x_ plans Por 1'1 OL I DAY 10l15l-bR (`I59 S N! CoLs Koao,) ' are in our plan revieW section for your review and comments. Please return this Porm to Steve Aanson with your initialed comments and the date of review. Failure to return Porm to Steve vithin Pive (5) days vill be conaidered your approval. IP you have any obJections to approval of these plans, it is your re9ponsibility to notify this department and resolve any probleas. 69-' '1 ?Dm --, MEMO T0: J9Y BERTHE - POLICE DEPT. CRAIG KNUDSEN, ENGINEERING TEC$. TOM COLHERT, DIRECTOR OF PUBLIC WORKS JIM STURMO PLANNING DEPT. JON HOHENSTEIN, A?MINISTRATION BILL AKINSt ELECTRICAL INSPECTOR JOE CONNOLLY, WATER DEPT.. FROM: DOUG REIDp DEPARTMENT OF PROTECTIVE INSPECTIONS DATE: OC.TOU?(L I3? I?IH? The preliminary construction x_ plans forHOLlDqy Siq-110t?Ej-bR Li595 MIco? R)040 ? ' are in our plan revieu section for your review and comments. Please return this form to Steve Hanson with your initialed comments and the date of review. Failure to return form to Steve vithia five (5) days vill be considered your approval. If you have any objectioas to approval oY these ? '?Dm ,9 -7 - ?? (f7 CZTY OF EAGAN SUBJECT: CONDITIONAL USE PERMIT (AMENDMENT) APPLICANT: HOLIDAY STATIONSTORESp INC. LOCATION: LOT 1, BLOCK 1, MARI ACRES 2ND ADDITION E%ISTZNG ZONING: CSC (COMMONITY SHOPPING CENTER) DATE OF PUHLIC HEARING: JUNE 23, 1987 DATE OF REPORT: JUNE 8t 1987 REPORTED BY: PLANNING DEPARTMENT APPLICATION SUMMAAY: In October, 1986, Holiday Stationstores received a Conditional Use Permit for motor fuel sales in a CSC district and a pylon sign for this proposed faculty at the northwest corner of Cliff and Nicols Roads. The sign was approved for 125 S.F. per side with a 25' maximum height. 9 requirement for the motor fuel sales approval was that the service bays be operational in normal working hours at this site. Precision Tune will be the "service" partner in this project. In an effort to keep the signage for both Holiday and Precision Tune on one pylon with pre-manufactured lighting sign logos -- the total signage area needs to be inereased 9 S.F. to 134 S.F. The height will not be inereased and the "Aoliday" sign was reduced by 17.5 S.F. If approved this Conditional Use Permit shall be sub,ect to: 1) The one time sign fee of $2.50 S.F. of signage area for 134 S.F. 2) The location will remain where previously approved.. . L I , 3 1, RAr?[ n- CreS a nd lEZS0 T0: TOH COLBERT, DIRECTO& OF PQBLIC SiORSS JIIi ST[IRM, PLAHtiING DEPARTHENT BILL AgINS, ELECTRICAL IHSPECTOE CRAIG SNQASEN, ENGINEERING TECH F80H: DOQG REID, BUILDING INSPECfIONS DEPT DATE: The Protective Inspections Department will a final inspection for occupancy of / LJ IWIS 1?0ad on 3 9 S Hot?do,y S-Fo.i-ion S+or(t_ Please return within 48 hours with your approval or denial. Failure of response within thab time frame will be determined as approval. Zt will be each departments responsibility to contaet the construetion firm with necessary requirements before final inspection and notifying the Building Inspections Department when all requirements have been taken care of. Thank-you. DR AP (?7 ? v?.u G (/" c- (SIGNATUBE & DATE) CJ l Lq'l L) ?G ? rO /2. MA '1(? ?r? . k 1, 3 I, (qo.r'i n e res !¢2S0 T0: TOM COLHSBT, DIREClOH OF POSLIC ii0R6S .1B! ST[TRti, PL9NNING DEPART!lfENT BILL AgINS, II.ECTRICAL INSPECfOE CRAIG SNQA$EN, FNGINEERING TECH FROM: DOOG REID9 HQILDING INSPECfIONS DEPY DATE: The Protective Inspections Department will be erforming a Pinal inspection Por occupancy oF v5'75 1 V Iw's I Qa? on ,? 9 $ Nol'do,y S-Fa}-ion S+ore- Please return within 48 hours with your approval or denial. Failure of response within that time frame will be determined as approval. It will be each departments responsibility to contact the construetion firm with necessary requirements bePore Pinal inspection and notifying the Building Inspections Department when all requirements have been taken care oF. Thank-you. DR/js " e APPROVAL: ???DENIAL: (SIGNATUAE & DATE) (SIGNATUAE & DATE) ??-?'-F'"`'??'`k`? A