4595 Nicols Rd - Final Plan Review Memos
MEMO T0: JAY BERTHE - POLICE DEPT. -
CAAIG KNUDSEN, ENGINEERING TECH.
TOM COLBERT, DIRECTOR OF PUBLIC WORKS
JIM STURM, PLANNING DEPT.
JON HOHENSTEIN, ADMINISTR6TION
HILL AKINSt ELECTRICAL INSPECTOR
JOE CONNOLGYt WATER DEPT.
FROM: DOUG REID, DEPARTMENT OF PROTECTIYE IN
D6TE: OcTOQtR 13? 1987
The preliminary construction X_
plans Por nOLIDqy SiAjjp???{yE (y1595 NIcoLs ICOAD)
' are in our plan revieu section for your review and comments.
Please return this form to Steve Hanson vith your iaitialed coments and the
date oP review. Failure to return form to Steve vithia five (5) days vill be
considered your approval. If you have aay objectioas to approval of these
plans, it is your responsibility to notify thi9 departmeat aad resolve any
probleas.
?
"C?m
MEMO T0: JAY BERTHE - POLICE DEPT.
CRAIG KNUDSEN, ENGINEERING TECH.
TOM COLBERT, DIRECTOR OF PUHLIC WORKS
JIM STUAM, PLANNING DEPT.
JON HOHENSTEINt ADMINISTRATION
SILL AKINS, ELECTRICAL INSPECTOR
JOE CONNOLLY, WATER DEPT.
FROM: DOUG REID, DEPARTMENT OF PAOTECTIVE INSPECTIONS
DATE: OC.TOU?R I3? IyH (
The preliminary construcbion x_
plans Por 1'1 OL I DAY 10l15l-bR (`I59 S N! CoLs Koao,)
' are in our plan revieW section for your review and comments.
Please return this Porm to Steve Aanson with your initialed comments and the
date of review. Failure to return Porm to Steve vithin Pive (5) days vill be
conaidered your approval. IP you have any obJections to approval of these
plans, it is your re9ponsibility to notify this department and resolve any
probleas. 69-'
'1
?Dm
--,
MEMO T0: J9Y BERTHE - POLICE DEPT.
CRAIG KNUDSEN, ENGINEERING TEC$.
TOM COLHERT, DIRECTOR OF PUBLIC WORKS
JIM STURMO PLANNING DEPT.
JON HOHENSTEIN, A?MINISTRATION
BILL AKINSt ELECTRICAL INSPECTOR
JOE CONNOLLY, WATER DEPT..
FROM: DOUG REIDp DEPARTMENT OF PROTECTIVE INSPECTIONS
DATE: OC.TOU?(L I3? I?IH?
The preliminary construction x_
plans forHOLlDqy Siq-110t?Ej-bR Li595 MIco? R)040
?
' are in our plan revieu section for your review and comments.
Please return this form to Steve Hanson with your initialed comments and the
date of review. Failure to return form to Steve vithia five (5) days vill be
considered your approval. If you have any objectioas to approval oY these
?
'?Dm
,9 -7 - ?? (f7
CZTY OF EAGAN
SUBJECT: CONDITIONAL USE PERMIT (AMENDMENT)
APPLICANT: HOLIDAY STATIONSTORESp INC.
LOCATION: LOT 1, BLOCK 1, MARI ACRES 2ND ADDITION
E%ISTZNG ZONING: CSC (COMMONITY SHOPPING CENTER)
DATE OF PUHLIC HEARING: JUNE 23, 1987
DATE OF REPORT: JUNE 8t 1987
REPORTED BY: PLANNING DEPARTMENT
APPLICATION SUMMAAY: In October, 1986, Holiday Stationstores
received a Conditional Use Permit for motor fuel sales in a CSC
district and a pylon sign for this proposed faculty at the
northwest corner of Cliff and Nicols Roads. The sign was approved
for 125 S.F. per side with a 25' maximum height.
9 requirement for the motor fuel sales approval was that the service
bays be operational in normal working hours at this site. Precision
Tune will be the "service" partner in this project. In an effort to
keep the signage for both Holiday and Precision Tune on one pylon
with pre-manufactured lighting sign logos -- the total signage area
needs to be inereased 9 S.F. to 134 S.F. The height will not be
inereased and the "Aoliday" sign was reduced by 17.5 S.F.
If approved this Conditional Use Permit shall be sub,ect to:
1) The one time sign fee of $2.50 S.F. of signage area for 134 S.F.
2) The location will remain where previously approved..
.
L I , 3 1, RAr?[ n- CreS a nd
lEZS0 T0: TOH COLBERT, DIRECTO& OF PQBLIC SiORSS
JIIi ST[IRM, PLAHtiING DEPARTHENT
BILL AgINS, ELECTRICAL IHSPECTOE
CRAIG SNQASEN, ENGINEERING TECH
F80H: DOQG REID, BUILDING INSPECfIONS DEPT
DATE:
The Protective Inspections Department will
a final inspection
for occupancy of / LJ IWIS 1?0ad on
3 9 S Hot?do,y S-Fo.i-ion S+or(t_
Please return within 48 hours with your approval or denial. Failure of
response within thab time frame will be determined as approval. Zt will be
each departments responsibility to contaet the construetion firm with
necessary requirements before final inspection and notifying the Building
Inspections Department when all requirements have been taken care of.
Thank-you.
DR
AP
(?7 ? v?.u G (/" c-
(SIGNATUBE & DATE)
CJ
l Lq'l
L)
?G ? rO /2. MA '1(? ?r? .
k 1, 3 I, (qo.r'i n e res
!¢2S0 T0: TOM COLHSBT, DIREClOH OF POSLIC ii0R6S
.1B! ST[TRti, PL9NNING DEPART!lfENT
BILL AgINS, II.ECTRICAL INSPECfOE
CRAIG SNQA$EN, FNGINEERING TECH
FROM: DOOG REID9 HQILDING INSPECfIONS DEPY
DATE:
The Protective Inspections Department will be erforming a Pinal inspection
Por occupancy oF v5'75 1 V Iw's I Qa? on
,? 9 $ Nol'do,y S-Fa}-ion S+ore-
Please return within 48 hours with your approval or denial. Failure of
response within that time frame will be determined as approval. It will be
each departments responsibility to contact the construetion firm with
necessary requirements bePore Pinal inspection and notifying the Building
Inspections Department when all requirements have been taken care oF.
Thank-you.
DR/js "
e
APPROVAL: ???DENIAL:
(SIGNATUAE & DATE) (SIGNATUAE & DATE)
??-?'-F'"`'??'`k`?
A