Loading...
601 River Ridge Pkwy ~ f~'`.. ~f~duN~~rrton! f~~tf~T DNLy ~343,q~'~•~~ ~ 5{~ G~ zoo6 COMMERCIAL BUILDING rERmuT arrLicaTtox City OF Eagan 3830 Pilot Knob Road, Eagan Mn 55122 , 1~S$ Telephone # 651-675-5675 FAX # 651-675-5694 J~W . • . • 5tructurel Plans (2) sets • ArchitecWral Plans • (2) sets • Architedmal Plans (2) sets • Clvil Plans (2) • Strudural Plans (2) . Code Malysis (1) " • Certificate of Survey (1) • Civil Plans (2) • Project Specs (1) • Code Analysis (1) " • Landscapng Plans (2) • Key Plan (1) . ProJectSpecs (1) • CodeAnalysis (1) " • MasterExilPlan (1) • Spac. Insp. 8 Testing Schedule " • Cerlificate of Survey (1) • Energy Calculations (i) not ahvays" • Soils Report (1) • Spec. Insp. & Testing Schedule (t) " . Elec. Power & Lig4Ning Fam (1) frot always" • Meter size must 6e established . Meter siza must be established • Meter size musl be established-if applica6le ) . Project Spacs (1) 1 • EnergyCakulations (1) ° 1 ~ • Electric Power 8 Lighting Form (1) " ~ ~ • Master Exil Plan (1) J ~ . Emergency Response SRe Plan (1) J 1 • SoilsReport ti~ 1 . SAC determination - call 651-602-1000 • SAC detertninatlon - mll 651-6Q2-10Q0 • SAC detertnination - ca11 651-802-1 0 00 • Fire Stopping SuGmittals • Fire Su ression/Alartn Plans Cal] MN Dept of Health at 651-215-0700 for details regxrding food & 6everage or lodging tacilities. Contact Building Inspecrions for sample and if required Permit for new building or diHon will not be processed without Emergency Response Site Plan. S ~ ~ N.. . ~ nac~~r~~r~ joo 1~~ver ~~~f~ccoo ~~`~S~ Sta,DO~, o0 , Site Address UniUSte # Tenant Name 1 eo~ Ie n't ~~-A. ig E M~ ~ti.~', Former Tenant ame I ~k.a' v~ l ~ DescriptionofWork ~c%UiN~.4-f[ONS t Fov(/N~5 t..~ 2 2 ~ L.~v (C PropertyOwner L„4~«~~S U~G~~ ~~~,v Telephone#(~J~ ~`IIo ~`~1 ~ Applicant is: _ Owner ~ Contractor Cootact (~L~v ) 3 ~ ~ 5~ ~ ~ ~C el ~ ~ Contractor Gj,c.t N a ~AGhn C~Arvi,D~ON _ Address ~K ~t ~ g7 City ~~t q h-f o+V State /b'~ ~ Zip q3 t Telephone # ~~~a ) ~~a a "7 Arch/Engr ~ ~ ri Registration # Address 4-a i ~IZF= NM ~ 7-7 C ~ i2. City G~ ` , State ~iJ Z Zip 5~°'7~°~ Telephone#(~1S) a ~9 c~ ~P.,~,~ > P r X ~ , r ~xs-t- Cc~+~ T/~o , Licensed plumber installing new sewerlwater service: Phone (`7J~ )"Y f'J ~~~~3 I hereby apply for a Commercial Buiiding Permit and acknowledge that the information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan and the State of MN Statutes; I understand this is not a pernilt, but only an appfication for a permi[, and work is not to start without a permit; that the work will be in accotdance with the approved plan in the case of woxk which requires a review and approval of plans. ~ N~; ip,~s ~ ss-l~~l~f ~oN~RI~ ~~DK~ - 1 Applicant's Printed Name App canYs Signature , ~ ~ ~ . . . DO NOT WRITE BELOW THIS LINE Sub Types ~ Ol Foundation ? 26 Public Faciliry ? 30 Accessory Building ? 14 Apaztments ? 27 Commercialllndustrial ? 32 Ext A1t-Apartcnents ? 15 Lodging ? 28 Greenhouse ? 34 Ext AIt--Commercial ? 25 Miscellaneous ? 29 Antennae ? 35 Ext Alt-Public Facility ? 37 Nail Salon W rk Types ~ 31 New ? 35 Int Improvement ? 38 Demolish (Interior) ? 44 Siding ? 32 Addition ? 36 Move Bidg. ? 42 Demolish (Foundation) ? 45 Fire Repair ? 33 Alteration ? 37 Demolish (Bldg)* ? 43 Reroof 46 WindowslDoors ? 34 Replacement "Demolition (Entire 81tlg only) - Give PCA hantlout to applicaM ap Valuation ~~i 660 Type of Const a Wdth ' ? Plan Rev 100~0 25% _ Occupancy MCES System SAC Units Zoning Ciry Water ? Nbr. of Units U Staries 2 Booster Pump . Nbr. of Bldgs I Sq. Ft. Sl~Z3~ PRV ? Length Fire Sprinklered Required Inspections ? Footings (new bldg) _ Fireplace _ R.I. _ Air Test _ Finai _ Footings (deck) _ [nsulation Footings (addition) _ Sheetrock Foundation _ FinaUC.O. Drain Tile Final/No C.O. Driveway Apron _ Other Roof Ice Pr Decking _ insul _ Final _ Pool Ftgs Air/Gas Tests Final _ Framing _ Siding _ Stucco Lath _ Stone Lath _ Final Windows Final C/O Inspection: Schedule Fire Marshal to be present. _ Yes ~ No Approved By: Planning Building Inspector BaseFee ~8/• Z~ ~(r~ ~UNO~lTo1~ oNL~ Surcharge S~ • 0 0 Plan Review 0. e o SAC-MCES 8~~~ saac~ty ~'j 6 oo•s-~ S/YJ Permit ~0 ~ ~ S/W Surcharge ~ +'ra Treatment Plant ~S,r `~D' ~ Financial Guarantee 7reffiment Plant (Irtigation) ~°'3~'~,f Storm Sewer Trunk 9z 8 7 Park Dedication 9`3j~LL • 7p Sewer Lateral SewerTrunk Trail Dedica6on ~i Z'~~O• Street Water Quality Water Lateral Water Trunk 99~ ug .$O Water Supply & Storage (WAC) Other Tota~ 393 `rI f$ ~ ~.a ~ Metropolitan Council July 20, 2006 Dale Schoeppner Building Official City of Eagan 3830 Pilot Knob Road Eagan, MN 55122-1810 Dear Mr. Schoeppner: , The Metropolitan Council Environmental Services Divisior. has determined SAC for the People of Praise Trinity School to be located at O'Neill llrive and Argentina Trail within the City of Eagan. This project should be chazged 56 SAC Units, as determined below. SAC Units Charges: Classrooms 18;590 sq: ft. @ 30 sq. ft./student @ 14 students/SAC Unit 44.26 Office 5365 sq. ft. @ 2400 sq. fr./SAC Unit 2.24 Conference 1660 sq. ft. @ 1650 sq. ft./SAC Unit 1.01 Gym 900 seats @ 110 seats/SAC Unit 8.18 Total Charge: 55.69 or 56 If you have any questions, call me at 651-602-1378. Sin erel~ Jessie Nye Administrative Technician = ,-'~,i i~ ~'i ~ . Environmental Services Division : " ~4 ~ , i~ ' 'i JN:kb:060720A5 ~ '.'.'L a 7[)0~ 1 ~i I cc: S. Selby, MCES Ron Radke, Gundlach Champion wanv. metrocouncil.org 390 Robert Street North • St. Paul, MN 55101-1805 • ~651) 602-1000 • Fes (651) 6D2-1550 • 1TY (651) 291-0904 An Equot Opportur~ity E.npioyer 27 October 2006 City of Eagan 3830 Pilot Knob Aoad Eagan, Minnesota 55122 Attenrion: Pamela Dudziak We would like to request release of the "Footings and Foundations" permit for our building site in Eagan in advance of the final plat approval. The People of Praise, and Lauka-Beck-Eagan will assutne full responsibility for early issuance of this permit, with the knowledge that the plat filing with Dakota County is not complete. We further understand that we won't receive the fiill, final building permit until the plat and other documents aze complete. l.^`~,.'""~ ~Cx~ii~GQ!2~+~ Daniel F. Lindeken, Secretary, People of Praise, Minnesota, Inc. ~ Larry Lauka, Lauka-Beck-Eagan RECEIVED OCT G 2006 ~'74~ asy~9'L 3 as 2006 COMMERCIAL BUILDING PERMTT APPLICATION City Of Eagan 3830 Pilot Knob Road, Eagan Mn 55122 Telephone # 651-675-5675 FAX # 651-675-5694 . . . Structural Plans (2) sets . Architectural Plans • (2) sets • Architectura4Plans (2) sets . Civil Plans ~ (2) . Structural Plans (2) • Code Analysis (1) " . . ~CertificateofSurvey (1) • CivilPlans (2) • ProjedSpecs (1) . CodeMalysis (1) " . Landscaping Plans (2) • Key Plan (1) . Projec[Specs (1) . CodeMalysis (7) • MasterE~titPlan (1) . Spec. Insp. & Testing Schedule " . Certificate of Survey (1) • Energy Calculations (1) not always" . Soils Report (1) . Spec. Insp. & Testing Schedule (1) • Elec. Power & Lighting Form (1) not always" . Meier size must be established . Meter size must be established • Meter size must be established-rf applirable 1 . ProjectSpecs (7) J . EnergyCalculations ~ (7) ° ) J • ElectYic Power & Lighting Form (i) ~ J • MasterE~titPlan (i) ~ ~ • Emergency Response Site Plan (1) ~ ~ • Soils Report (1) J . SAC determination - call 657-602-1000 • SAC determination - call 651-602-7000 • SAC tleterminafion - ca~l 851-802-iDDO • Fire Stopping Submittals • Fire Su ression/Alarm Plans Call MN Dept of Health at 65t-215-0700 for details regazding food & beverage or lodging facilities. Contact Building lnspections for sample and if required Permit £or new building or addition will not be processed without Emergency Response Site Plan. Dflte_~_/ ~~1~~ I (f ~{~'L I ~,~~,7J ConstructionCost ~~i ~a~ OOd ~ l Site Address ~ Uni/USte # Tenant Name ~Pl~ 0~ ~~+~'~SE T/~INlT~/ S~~L Former Tenaot Name d~/ Description of Work ~s . Property Owner ~~1~+~-'A' 8~~/ GN'f~I~N Telephooe 87 ` 7~ a,v • / Applicant isi Owner ~ Contractor Contact ( 90~p ) J 7~ ~+s ~ Z7 l~+LL/ Contractor (J t~srlvlP/0/1~ Address ~OX 2~8 City U~'L~~ State Z Zip 9 3 Telephone #(90L ) `7~Z ~ Z ~ ~ Arch/Engr S~ N Registretion # Address ¢7i~ /~r~ M c! <<.. De ~ City ci~7LPtr1A~/F f~YLC~S State W= Zip s~ Telephone#(~J~}- ~7~1 '~~O ~ Licensed plumber installing new sewerlwater service: Phone U I hereby apply for a Commercial Building~ Permit and acknowledge that the information is complete and accurate; that the work will be in conformance with the ordina~ces and codes oF the City of Eagan and the State of MN Statutes; I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will 6e in accorda with the approved plan in the case of work which requires a review and approval of pkans. ~/LLIir]'rf J • 1c.1}~~1'Y) f}C~'~ ' ` LL~--. Applicant's Printed Name Applicant's Sig re DO NOT WRITE BELOW 1~-IIS LINE Sub Types ? Ol Foundation G 26 Public Facility 30 Accessory Building ? 14 Aparhnents . f~ 27 Commercial/Industrial ? 32 Ext Alt-Apartments ? 15 Lodging G 28 Crreenhouse ? 34 Ext Alt-Commercial. ? 25 Miscellaneous ? 29 Antennae ? 35 Ext Alt-Public Facility ? 37 Nail Salon W rk Types ~ 31 New ? 35 int Improvement ? 38 Demalish (Interior) ? 44 Siding ? 32 Addition ? 36 Move Bldg. ? 42 Demolish (Foundation) ? 45 Fire Repair ? 33 AlteraUon ? 37 ~emolish (Bldg)" ? 43 Reroof ? 46 Windows/Doors ? 34 Replacement •Demalition (Entire Bidg only) • Give PCA handout to applica~t Valuation Type of Const ~ Width Plan Rev 100%_ 25%_ Occupancy MCES System SAC Units 5~. Zoning City Water Nbr. of Units Stories Booster Pump Nbr. of Bldgs Sq. Ft. PRV Length Fire Sprinklered ~uired Inspections Footings (new bldg) / Fueplace R.I Au Test Final Footings (deck) Insulation , _ Footings(addirion) ? 5heetrock ' ~ Foundation ~ FinaVC.O. : Drain Tile . . _ . : _ > FinallNo C.O. . . _ . . . ~ Driveway Apron ~ Other - - - ~ Roof Ice Pr ?Decking ~ Insul ? Final _ Pool Ftgs Air/Gas Tests Fuial ~ Framiug Siding _ Stucco Lath Stone Lath _ Final - Windows - Final C/O Inspection: Schedule Fire Marshal to be present. ~Yes _ No Approved By: Planning C.GA1~/' Building Inspector Base Fee ~3~5~ ~~'fr~°-.~~;t " Surcharge ~ ~ Z- ~0 . Plan Review Za .5~3. 2/ ~ f- ~-;-t'~ks'"t'~ F~S P?~i//oU5l~+ ~ SAC-MCES L~OLG~Pj _ (W/F7-L~~DUNO. ~,c•/? SAGCity SMI Permit SIW Surcharge Treatment Plant Financial Guarantee Treatment Plant (Irrigation) Storm Sewer Trunk Park Dedication Sewer Lateral Sewer Trunk Trail Dedication Street Water Quality Water Lateral Water Trunk Water Supply & Storage (WAC) Other ~j Total ZS .9re #~~b~ t o "77~33 oo~. ~ 200~ COMMERCIAL MECHAIVICAL rE~iT ArrLicaTiorr City Of Eagan 3830 Pilot Knob Road, Eagan MN 55122 Telephane # 651-675-5675 Please complete for: commercial/induslrial buildings muld-famil ~ buildin when se arate ertnits are not re uired for each dweliin unit nate ~ ~ ~ t~`~- (~9 6 l ~1 JC.' ~-~I G{L~° i' ~ ~ //~~~~q Site Street Address D~ 9 ~79~-- ~~rfi_r/"~~'`~ Unit # Tenaot Name (if applicable)"~C`~v~ ~(1 C9f~ \ Previous Tenant Name Property Owner Telephone # ( ) Contractor (~;~D/' ~l/.i~'l~ 3~~~ ' StreetAddress ~("}2~ ,LC~ City '}~~J~.~Ats~ \ State ~~~y~ Zip ~ 121 Telephone# ( ~LSS (Ql~(~ Bond Expires: The Applicaot is _ Owner ~ Contractor _ Other Work Type ~ New Construction _ Interior improvement _ Install Piping _ Processed _ Gas Under/Above gound Tank lnstall Remove When installing/removing tank(s), cal] for inspection by Fire Marshal and Plumbing [nspecror NatureofWark: /~y~(~ ~ ~ /fL~S Permlt F¢es $70.50 Onderground tank insta0ation/removal , 550.50 Minimum (includes Siafe Swcharge) or Contract Value $ j,7iop ,OG~ O x 1% _ $ 1~-. .O-a7~ ~.DlJ Permit Fee -T i ~ $ ~ i ~ State Surcharge ~ jr\ To calculate surcharge ~ ~ I, ~l If P, ermit Fee is less than $1,000, surcharge is 50 cents. I1 1' ~S lul I[Permit Fee is> $1,000, surcharge increases by $.50 11 QQT v for each $I,ODO Pertnit Fee (i.e. a$1,DOl-$2,000 Perm~l il ~ MAY 0 2 2 Fee reyuires a$1.00 surcharge). $ ?i c~ (7 ~ , e~ Total Fee I hereby acknowledge that this infonnation is complete and accurate; that the work will be in conformance with the ordinances and codes of the Ciry of Eagan and with the Mechanical Codes; that I understand this is not a permit, bu[ onl an application for a permit, and work is not to start without a permit; that the work will be in accordance with the ap an in [he case of work which requires a review and approval of plans. S~e:~~_ ~~9,~r, ApplicanYs Printed Name ApplicanPs Signature j-----' Approved By: s ' ~ ~ , Inspec[or Date: Required Inspec[ions: _ U.G. ~R.I. ~ ir Test d Gas Service Test _ Infloor Heat ~inal 2007 COMMERCIAL MECHANICAL PERMIT APPLICATION ~v ( rC~ City Of Eagan 3830 Pilot Knob Road, Eagan MN 55122 Telephone # 651-b75-5675 + Please comple[e for: commerciaUindustrial buildings 117 J ' multi-famil buildin s when se arate ermi[s are not re uired for each dwellin un~ ~ Date /D l~ l OZ ~ 2007 Site Street Address rp 0~ Kr ~/E,Q ~t ~ G~ /'~Q,~Gt~A Unit # Tenant Name (if applicable) Previous Tenant Name LJ~ i.t.r ANL Property Owner ~EDPLfi o~ PRll9s£_- rPAA~MAcflER. Telephone q,sa, )$'3y- 5o 3 0 Contracror ~<{~QK~.T /~~c~/AoV/,~_ _ StreetAddress /17U~ (n/~~/Y~//V~ Hf~~ /V City ~,QOOkL.yN /f,~~/< State /!~/N Zip S~SyY s Telephone #(~J63 ).~/5-~/a O C7 ~ Bond Expires: The Applica~t is _ Owner ~ Contractor _ Other Work Type ~New Construction _Interior Improvement _Install Piping _ Processed _Gas _Ex[erior HVAC Unit*" **HVAC units must be screened Under/Above gound Tank Install Remove When installinghemoving tank(s), call for inspection by Fire Marshal and Plumbing Inspecror NatureofWork: /Alvra./~ ~A1,L i,~f .(~p~~f2_ /nl Xrrc.alEn~ SMAw /G£ /~~/~ff7.V~- G'oo ~ Suf~0u~~0 Foz No% i~.-~, ~•Jsr t~. P¢1'mit Fe¢S $70.50 Underground tank installation/removal $50.50 Minimum (includes State Surcharge) ~ OP Contract Value $/Q 3~o ~ x 1°/a = $ 3,/ ~ Permit Fee , ~ p ~ ~ ~ $ • Jr~ State Suroharge To calculate surcharge t If Pemtit Fee is less thao $1,000, surcharge is 50 cents. If Permi[ Fec is >$1,OOQ surchazge increases by $.50 ~ (,~r(. ~Q. for each $1,000 Permit Fee (i.e. a$1,001-$2,000 Permit D,4TE Fee requires a$1.00 surcharge). ~ O~ f O $ ~ 07, Total Fee 1 I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan and with the Mechanical Codes; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in acwrdance with the approved plan in the case of work which requues a review and approval of plans. ,CAI~~n/ u F~.?E u/~~w~~ ApplicanPs Printed Name pplicanY's Signature Approved By: tnspector Da[e: Required Inspections: _ U.G. _ R.L _ Air Test _ Gas Service Test _ Infloar Heat _ Final ~ ~ ~ ioo~ COMMERCIAL PLUMBING rE~ ~ j f ~ ~ ~ ~ i T APPLICATION A~~~ ~ 4!-L~ S~~ _ ~ CITY OF EAGAN ~ ,g~~ ~ y~ 3830 PILOT KNpB ROAD, EAGAN MN 55122 Do not combine inside and outside plumbing on~he same application; separate applications a d/permits are re uired. Date / ~ ~ / Q ~ SiteAddress ~ ~ ~ f~~ ~~~~L~ Unit ft Tenant Name _ l~~,.~/'~~ F ~j~~ ~llr ~c,~C~7+~ ~ ormer Tenant Name ProperTy Owner lG ~ ~ ~ ,Q %S ( 1 ~ Telephone # ) k' f~ " Contractar ~~/Z ~L. ~ / ~ ~v n naaTe$5 / `7/ 1 ~ - X~ ~ ' g c,ty o ~ ` State - ~ 7 / ~ Z~P SS ~ Telephone # (~5 ) ~j~~ - /~~S License # ~O ~ Ex ?res: ~ - / n p _ ~ ~ 7 ~~nrn~ ~x~, / The Applicant is Owner - Contractor Other Work Type New Bld -~Z S Modify Sp~ Ne ~Irriga[ion System** _ Yes No Work in public r-o-w / easement? - P~' Repair{Itebuild la e R~in sensors are re oired on irri ation s stems ~ P~ emov~/o-~ -O ~ Description of Work To inquire if Pressure Reducing Valve is required on new servicq ca1165]-675-5646 Me[ers - Ca11~651-675-5646 to verify that hydrostatic, conducfivity, and bacteria tests passed prior to nickine Irrigarion Size & Type ~ meter. Avg GPM 2^ ~bo req'd unless smaller size allowed by Public Works Fire Size & Price 3/4" meter ~174.00 DomesGc Size & Type Avg GPM Includes high demand devices? Yes No Flushometers _ Yes _ No PRV Required Yes Permit Fee - - NO $50.50 mini..ium (includes State Surcharge) Con4act Value $ x 1% _ $ 7 , ~a Pemut Fee Required on all new 6uildings & boulevazd irrieation svstems $ ~ F1O Meter(s) $ Radio Meter Read $ ' S ~ State Surcharge Ifnermit £ee is less than $1,000, surcharge is $.50 If it ee is more [han S1,OOQ surcharge is $.50 for each 51,000 owed Following fees appty when ins[alling n¢w Iawn irrigation system ~ Ca(1 [he City's Engineering Depariment, 65]-675-5646, for required fee amounts p~•$ ~'ater Permit ~Y~-_ / p ~ ~ Treatment Plant ~n ~ate: Supply & Storage C/ $ ~ State Surchazge / ~ "~6 $ ` ' Total Fee I hereby apply for a Commercial Plumbing Pemut and aclmowledge that the information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan and with the plumbing Codes; that I understand this is not a peRnit~ but only an application for a ermit, and work is not to s without a pemi{t; that the work wi1] be in accordance with the approved plan in the case o r whi ~ nd a vaL u plan , ApplicanPs P ~nted Name pli ant's t e ~ CITY USE ONLY REQU[RED IIVSPECTIONS: _ U.G. _ Air Test _ Gas Test _ Rough In _ Final PLANS SUBMITTED APPROVED BY: - BUILDING INSPECTOR General Information • Radio Meter Read (requued on all new buildings. Boulevard imgation systems may require a radio read -$153.00 • RPZ`s must be tested every year and rebuilt every five years. Test results shouid be mailed to Paul Heuer at the City of Eagan. • A minimum fee perntit per address is required for the following RPZ's: new, rebuild, repair, remove. • Water meters include copper horn/shainer, remote wire, and touch-pad meter. METERS REOUIRING 4-FIOUR ADVANCE NOTICE PRIOR TO PICK UP GPM METERS USE PRICE GPM METERS USE PRICE 1-20 5/8" residential $136.00 4-120 1-1/2" irrigation Syst $ 855.00 displacement or turbine'* Public Works maximum small commercial must approve continuous meter size 10 2-30 3/4" lawn urigation $174.00 4-160 2" turbine large irrigation $ 1,063.00 maximum displacement residential system & continuous or production lines IS small commercial 3-50 1" displacement large residential $219.00 1/4 to 160 2" compound bldgs over $ 2,018.00 bldg to 24 units 65 units maximum small coxnmercial & continuous & large comm bldgs 25 irri ation s stems ~ 5-100 1-1/2" 25-64 unit bldgs $532.00 maximum displacement & continuous most comm bldgs 50 METERS REOIIIRING 30-DAY ADVANCE NOTICE PRIOR TO PICK UP GPM METERS USE PRICE GPM METERS USE PRICE 5350 3" turbine very large irrigation $1,411.00 6-500 4" compound +300 unit bldgs $3,956.00 system & production & very large lines comm. bldgs 1/2-320 3" compound +ZpO unit bldgs $2,577.00 10-1000 6" compound +400 unit bldgs $6,623.00 very large very large comm bidgs comm bldgs 15-1000 4"turhine verylarge $2,533.00 6" tur6o $4,090.00 irrigation systems & production lines Comments • To schedule inspection of the inside water line and backflow preventer, ca11651-675-5675. • To arrange for water huu-on, call 651-675-5200. cc: Utility Division Systems Malyst - December 2006 ~7~3~ ~~d ~s zoo~ C~MMERCIAL MECAAIVICAL rExNUr arrLtcaTiox City Of Eagan 3830 Pilot Knob Road, Eagen MN 55122 Telephone # 651-675-5675 Please completc for, commercial/industrial buildings multi-fami buildin when s rate rntitc ere not uired for each dwe~' uuit Date 4/ l z5 / Site Street Addresa J' ' ~ ~ ~ et~ ~ J \ ~ ~~l ~~CiC ~1nit k i~ ~ ~ TeuantName(itapplicable) EI~~E OY ~R~4i4c ~2/N~i~~~~PrevloasTenantName /U/~' Pmperty Owuer Telephone # ( ) Contrador JO y.JiTZ %N~- StreetAddr~s ~BZ~ XY~a`~ ~i~ ~ ci~y !>,~v~r~~i 1~~~- ~ , State ~~iil. Zip ^ TelepBone # (7G 3 ) ~{ZS - 7S~ ~ Bond tf• Expires: The Applicant is _ Owner ~ Contractor _ Other Work Type ~New Conshuction _Interipr Improvement x Install Piping _ Processed X Gas _Erzterior I-IVAC Unit•* "HVAC units must be screened UndedAbwe gronnd Tank Instatl Remove ~ When installing/removing tank(s), call for inspection by Fire MarsLal and Plumbing Inspector NatureoFWork:~ f-tWS~lz ~4n?c. ~2~ ~ri~L~x~ J~(JM/If flNl~ %EZsNru~Lfo~~ 75 ~ TL~t3~5, ~ Pei111it FCeB 570.30 Unaerground tank mslallaeodrerooval S505o M~ii m_ (includes Sm[e Surchmge) 'Ior ConhactValue $,~Z`~1 ~5•`~-~ x I% _ $ ~J~~~. ~S Pecmi[Fee -r 2 ~ ~ $ , . S~ State Surchazge n L~ ~j ~1 ~ n To cekulate surchsrge W u [fPemtit Fee is leas than 51,000, surchazgc is 50 ce¢ts. ~ e I~ IfPermit Fee is> S1,000, surcNazge increases by $.50 '4N~ ~ ~ LUU]~ J foreacb$1,OOOPern~itFee(i.e.a$1,001-$2,OOOPe~mit Fee requ~~~) $ Total Fee 3~, z5 I hereby acknowledge that this information is complete and accurate; that the work will be in confoanance wi[h the ordinances and codes of the City of Eagan and with the Mechanical Codes; that I imderstand t6is is not a permit, but ooly an applicadon far a permit, and wotk is not to start without a pertnit; tl~at the work will be in accoxdance with the approved plan in the c of work which requ~view and approval of ptans. ~ ~ /~~L~i~(fL~/L- 9 - Applic Ys Prmted Name Appl~'~ ,a Ys~S-ignature _ - - ----------~-------------~-7' - Approved Sy: S" ~`0 ~7 , Tuspector Date: Required Inspectiuns: _ U.G. ~R.I. ~ v Test ae Service Test _ Infloor Heat ~inal 4111011 City of Eagan Pat Geagan MAYOR Peggy Carlson Cyndee Fields Mike Maguire Meg Tilley COUNCIL MEMBERS Thomas Hedges CITY ADMINISTRATOR MUNICIPAL CENTER 3830 Pilot Knob Road Eagan, MN 55122-1810 651.675.5000 phone 651.675.5012 fax 651.454.8535 TDD MAINTENANCE FACILITY 3501 Coachman Point Eagan, MN 55122 651.675.5300 phone 651.675.5360 fax 651.454.8535 TDD www.cityofeagan.com THE LONE OAK TREE The symbol of strength and growth in our community. September 20, 2006 Ron Radke Gundlach Champion 600 E. Lakeshore Dr PO Box 278 Houghton, MI 49931 RE: 2600 INSPIRATION PKWY Dear Ron: We have started our review of the construction documents submitted in pursuit of obtaining a building permit for the above -referenced project. This review is not intended to be an exhaustive and comprehensive report. Unless otherwise noted, all references are to the 2000 I.B.C. It is our goal that this review will help you in complying With the applicable codes and We are, therefore, requesting that the items checked below be addressed: 2 sets Architectural Plans 2 sets Structural Plans 2 sets Civil Plans 2 sets Landscaping Plans 1 Code Analysis 1 Certificate of Survey 1 Spec. Structural Testing & Inspection Program Summary Schedule 4—' Pire Stopping Submittals Other 1 Project Specs 1 Energy Calculations 1 Electric Power & Lighting 1 Master Exit Plan -NI— 1 Emergency Response Site Plan 1 MC/ES SAC determination letter 1 Soils Report -4- Fire Protection System Plan) Review If you have any questions regarding the above items, please feel free to contact me at 651-675- 5683. Sincerely, J. Craig Novaczyk Senior Inspector Cc David Cihasky, SEH Inc. JCN/jh City of Eagan Pat Geagan MAYOR Peggy Carlson Cyndee Fields Mike Maguire Meg Tilley COUNCIL MEMBERS Thomas Hedges CITY ADMINISTRATOR MUNICIPAL CENTER 3830 Pilot Knob Road Eagan, MN 55122-1810 651.675.5000 phone 651.675.5012 fax 651.454.8535 TDD MAINTENANCE FACILITY 3501 Coachman Point Eagan, MN 55122 651.675.5300 phone 651.675.5360 fax 651.454.8535 TDD www.cityofeagan.com THE LONE OAK TREE The symbol of strength and growth in our community. November 13, 2006 RON RADKE GUNDLACH CHAMPION 600 E. LAKESHORE DR PO BOX 278 HOUGHTON, MI 49931 RE: 2600 INSPIRATION PKWY Dear Ron: We have completed our review of the construction documents submitted in pursuit Of obtaining a building permit for the above -referenced project. This review is not intended to ben exhaustive and comprehensive report. Unless otherwise noted, all references are to the 2000 I:�,C. It is our goal that this review will help you in complying with the applicable codes and we are, therefore, requesting that the following items be addressed: 1. Specify what grades will be attending this school. 2. Specify which sprinkler system is being installed throughout the building 3. Provide a listed and tested 2 -hour .fire wall assembly; include details fbr structural stability per Section 705.2. 4. Provide fastening requirements for all of the rated UL wall assemblies. 5. If the bleachers shown are being installed with this building permit, provide details per Section 1008 and MN State Statute 16B.616. 6. An ambulatory stall required by MSBC Chapter 1341.0460, Subpart] 4, shall be installed in the Men's toilet room, B138. 7. Accessible toilet stalls shall comply with MSBC Chapter 1341.0450, S1,ubparts 1-6, and, if applicable, Subpart 7, Items A-E. Sheet A001: Revise toilet paper dispenser location per Minnesota State Building Code 1341. . Provide accessible clear space requirements for toilet room fixtures, i. . A114 and B130. 2600 INSPIRATION PARKWAY PAGE 2 10. Provide details for the accessible sinks in classrooms and common areas. 11. Designate accessible storage areas, complying with Chapter 1341.0405, Item L, Sub Item (1) (lockers, closets, shelves, cabinets, and drawers). 12. Provide details for the elevator, including accessibility requirements, draft curtains, etc. 13. Provide BTU specification for all gas-fired equipment (boilers, water heaters, etc.) 14. If boilers in mechanical rooms over 500 sq. ft. have BTU ratings exceeding 400,000, two exits complying with Section 1007.1 shall be required. 15. The guard shown @ detail M14 on page A700 shall comply with Sections 1003.2.12 and 1003.2.12.1. 16. Provide details for the required returns for hand railings (Section 1003.3.3.11.5). 17. Provide layout of library stacks for Room B103. 18. Provide pages 404-408 of the architectural plans. 19. Revise the scales to match dimensions on plan. 20. Provide MSDS sheets on all hazardous material that may be stored in Chemistry Labs. 21. Provide a hazardous materials report comparing amounts with Tables 307.7(1) and 307.7(2). 22. Openings in the exit passageways shall comply with Section 1005.3.4. Normally, unoccupied areas such as A146 (custodial) and A151 (gyre storage) may not open into an exit passageway. Section 402.4.6 is specific to covered malls. 23. Roof access shall comply with Minnesota State Mechanical Code 306.5 and 306.5.1. "Hatch is 7.5 sq. ft." 24. Provide details concerning permanent ladders for roof level changes exceeding 30" per Minnesota State Mechanical Code 306.5.1. 25. All doors in Room B124 shall swing in the direction of exit travel, Section 1003.3.1.2. 2600 INSPIRATION PARKWAY PAGE 3 26. Provide revised exiting requirements for B109 and B107. Rooms with an occupant load exceeding 50 shall have two exits per Table 1004.2.1. 27. Provide seating details for stage (Room B 132). 28. Provide occupant load calculations and exit requirements that would include the use of the gym floor for seating at special events such as graduation ceremonies. If you have any questions, please feel free to contact me at 651-675-5683. J. Craig Novaczyk Senior Inspector JCN/js #3 TO: TOM STRUVE, SUPERINTENDENT OF STREETS & EQUIPMENT LEON WEILAND, CONSTRUCTION INSPECTOR DALE WEGLEITNER, FIRE MARSHAL ERIC MACBETH, WATER RESOURCES COORDINATOR GREGG HOVE, CITY FORESTER JOHN GORDER, ASSISTANT CITY ENGINEER JIM MCDONALD, CHIEF OF POLICE MARK ANDERSON, ELECTRICAL INSPECTOR MIKE RIDLEY, CITY PLANNER PAUL HEUER, SYSTEMS ANALYST SCOTT PETERSON, BUILDING INSPECTOR TOM COLBERT, DIRECTOR OF PUBLIC WORKS DAVE WESTERMAYER, ENGINEERING TECHNICIAN FROM: CRAIG NOVACZYK, SENIOR INSPECTOR DATE: 09/19/06 RE: PLAN REVIEW - PEOPLE OF PRAISE TRINITY SCHOOL 2600 INSPIRATION PKWY The plans are in our plan review section for your review and comment. Please return this form to my attention with your signed comments and the date of review within seven days. If you have any concerns with these plans, please so indicate on this form and notify and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please fill out the proper "hold" request form. Comments: Indicate any fees that are to be collected with the building permit: AMOUNT ❑ Yes 0 No landscape security required ❑ Yes ❑ No water quality dedication ❑ Yes 0 No park dedication O Yes 0 No trail dedication O Yes 0 No tree dedication O Yes ❑ No PRV Required ZONING? METER SIZE Signature Date CD/FORMS/BLDG INSP/PLAN REVIEW CRAIG N REVISED 9- 02 TO: TOM STRUVE, SUPERINTENDENT OF STREETS & EQUIPMENT LEON WEILAND, CONSTRUCTION INSPECTOR DALE WEGLEITNER, FIRE MARSHAL ERIC MACBETH, WATER RESOURCES COORDINATOR GREGG HOVE, CITY FORESTER JOHN GORDER, ASSISTANT CITY ENGINEER JIM MCDONALD, CHIEF OF POLICE MARK ANDERSON, ELECTRICAL INSPECTOR MIKE RIDLEY, CITY PLANNER PAUL HEUER, SYSTEMS ANALYST SCOTT PETERSON, BUILDING INSPECTOR TOM COLBERT, DIRECTOR OF PUBLIC WORKS DAVE WESTERMAYER, ENGINEERING TECHNICIAN FROM: CRAIG NOVACZYK, SENIOR INSPECTOR DATE: 09/19/06 RE: PLAN REVIEW - PEOPLE OF PRAISE TRINITY SCHOOL 2600 INSPIRATION PKWY #3 316 ;flOt� . 1-z) 66 The plans are in our plan review section for your review and comment. 5u11 LpeA Please return this form to my attention with your signed comments and the date of review within seven days. If you have any concerns with these plans, please so indicate on this form and notify and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please fill out the proper "hold" request form. Indicate any fees that are to be collected with the building permit: AMOUNT ❑ Yes ` No landscape security required 111-.°�WIdeepPe 6�lrt �v-e��-ne✓rt ZONING? ❑ Yes 0 No water quality dedication METER SIZE 5E1 Yes 0 No park dedication to .16 a -e-) *(13 S(o(o.40 )] Yes 0 No trail dedication( Lo. 1. ac) /acs, Ito. i ❑ Yes ,`l2/ No tree dedication - 546 et o +iV) ❑ Yes 0 No PRV Required Signature Date CD/FORMS/BLDG INSP/PLAN REVIEW CRAIG N REVISED) 9- 02 #3 TO: TOM STRUVE, SUPERINTENDENT OF STREETS & EQUIPMENT LEON WEILAND, CONSTRUCTION INSPECTOR DALE WEGLEITNER, FIRE MARSHAL ERIC MACBETH, WATER RESOURCES COORDINATOR GREGG HOVE, CITY FORESTER JOHN GORDER, ASSISTANT CITY ENGINEER JIM MCDONALD, CHIEF OF POLICE MARK ANDERSON, ELECTRICAL INSPECTOR MIKE RIDLEY, CITY PLANNER PAUL HEUER, SYSTEMS ANALYST SCOTT PETERSON, BUILDING INSPECTOR TOM COLBERT, DIRECTOR OF PUBLIC WORKS DAVE WESTERMAYER, ENGINEERING TECHNICIAN FROM: CRAIG NOVACZYK, SENIOR INSPECTOR DATE: 09/19/06 RE: PLAN REVIEW - PEOPLE OF PRAISE TRINITY SCHOOL 2600 INSPIRATION PKWY The plans are in our plan review section for your review and comment. Please return this form to my attention with your signed comments and the date of review within seven days. If you have any concerns with these plans, please so indicate on this form and notify and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please fill out the proper "hold" request form. Comments: Indicate any fees that are to be collected with the building permit: AMOUNT ❑ Yes 0 No landscape security required O Yes 0 No water quality dedication O Yes 0 No park dedication O Yes 0 No trail dedication O Yes 0 No tree dedication ❑ Yv 0 ; PRV Required Signature CD/FORMS/BLDG INSP/PLAN REVIEW CRAIG N ZONING? METER SIZE #3 TO: TOM STRUVE, SUPERINTENDENT OF STREETS & EQUIPMENT LEON WEILAND, CONSTRUCTION INSPECTOR DALE WEGLEITNER, FIRE MARSHAL ERIC MACBETH, WATER RESOURCES COORDINATOR GREGG HOVE, CITY FORESTER JOHN GORDER, ASSISTANT CITY ENGINEER JIM MCDONALD, CHIEF OF POLICE MARK ANDERSON, ELECTRICAL INSPECTOR MIKE RIDLEY, CITY PLANNER PAUL HEUER, SYSTEMS ANALYST SCOTT PETERSON, BUILDING INSPECTOR TOM COLBERT, DIRECTOR OF PUBLIC WORKS DAVE WESTERMAYER, ENGINEERING TECHNICIAN FROM: CRAIG NOVACZYK, SENIOR INSPECTOR DATE: 09/19/06 RE: PLAN REVIEW - PEOPLE OF PRAISE TRINITY SCHOOL 2600 INSPIRATION PKWY The plans are in our plan review section for your review and comment. Please return this form to my attention with your signed comments and the date of review within seven days. If you have any concerns with these plans, please so indicate on this farm and notify and resolve these issues with the affected parties. If you are requesting that issuancle of the building permit be held, please fill out the proper "hold" request form. Comments: Indicate any fees that are to be collected with the building permit: AMOUNT O Yes 0 No landscape security required O Yes 0 No water quality dedication O Yes 0 No park dedication O Yes 0 No trail dedication O Yes 0 No tree dedication O Yes 0 No PRV Required gnature Date D/FORMS/BLDG INSP/PLAN REVIEW CRAIG N ZONING? METER SIZE REVISED 9- 02 to' • #3 TO: TOM STRUVE, SUPERINTENDENT OF STREETS & EQUIPMENT LEON WEILAND, CONSTRUCTION INSPECTOR DALE WEGLEITNER, FIRE MARSHAL ERIC MACBETH, WATER RESOURCES COORDINATOR GREGG HOVE, CITY FORESTER JOHN GORDER, ASSISTANT CITY ENGINEER JIM MCDONALD, CHIEF OF POLICE MARK ANDERSON, ELECTRICAL INSPECTOR MIKE RIDLEY, CITY PLANNER PAUL HEUER, SYSTEMS ANALYST SCOTT PETERSON, BUILDING INSPECTOR TOM COLBERT, DIRECTOR OF PUBLIC WORKS DAVE WESTERMAYER, ENGINEERING TECHNICIAN FROM: CRAIG NOVACZYK, SENIOR INSPECTOR DATE: 09/19/06 RE: PLAN REVIEW - PEOPLE OF PRAISE TRINITY SCHOOL 2600 INSPIRATION PKWY The plans are in our plan review section for your review and comment. Please return this form to my attention with your signed comments and the date of review within seven days. If you have any concerns with these plans, please so indicate on this farm and notify and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please fill out the proper "hold" request form. Comments: Indicate any fees that are to be collected with the building permit: AMOUNT ❑ Yes ❑ No landscape security required ❑ Yes 0 No water quality dedication O Yes 0 No park dedication O Yes 0 No trail dedication O Yes '' No tree dedication O Yes 7 No PRV Required Ba Si: al Date ZONING? METER SIZE /60 -04 CD/FO ' /BLDG INSP/PLAN REVIEW CRAIG N REVISED 9- 02 #3 TO: TOM STRUVE, SUPERINTENDENT OF STREETS & EQUIPMENT LEON WEILAND, CONSTRUCTION INSPECTOR DALE WEGLEITNER, FIRE MARSHAL ERIC MACBETH, WATER RESOURCES COORDINATOR GREGG HOVE, CITY FORESTER JOHN GORDER, ASSISTANT CITY ENGINEER JIM MCDONALD, CHIEF OF POLICE MARK ANDERSON, ELECTRICAL INSPECTOR MIKE RIDLEY, CITY PLANNER PAUL HEUER, SYSTEMS ANALYST SCOTT PETERSON, BUILDING INSPECTOR TOM COLBERT, DIRECTOR OF PUBLIC WORKS DAYS' WES-TERibI-AER, RING TECHNICIAN FROM: CRAIG NOVACZYK, SENIOR INSPECTOR DATE: 09/19/06 RE: PLAN REVIEW — PEOPLE OF PRAISE TRINITY SCHOOL 2600 INSPIRATION PKWY The plans are in our plan review section for your review and comment. Please return this form to my attention with your signed comments and the date of review within seven days. If you have any concerns with these plans, please so indicate on this form and notify and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please fill out the proper "hold" request form. Comments: Indicate any fees that are to be collected with the building permit: AMOUNT ❑ Yes 0 No landscape security required O Yes E No water quality dedication O Yes `❑ No park dedication ❑ Yes 0 No trail dedication ❑ Yes 0 No tree dedication ❑ Xes 0 No PRV Required atule CD/FORMS/BLDG INSP/PLAN REVIEW CRAIG N Date ZONING? METER SIZE /0096 REVISED 9- 02 TO: FROM: DATE: SUBJECT: City of Evan Dale Schoeppner, Building Inspections Scott Peterson, Building Inspections Craig Novaczyk or Mike Lence, Building Inspections Mike Ridley, Planning Carol Tumini, Utility Billing Dale Wegleitner, Fire Department Tom Colbert, Engineering John Gorder, Engineering Leon Weiland, Engineering Tim Pahr, Engineering Paul Olson, Maintenance Tom Struve, Maintenance Eric Macbeth, Maintenance Mark Anderson, Electrical Inspector Nemo. Terry Zelenka, Building Inspector December 10, 2007 Final Inspection For Trinity School 601 River Ridge Parkway Permit #76305 The Protective Inspections Division will be performing a final inspection at the above referenced property on December 21, 2007. If you have cause for not granting the Certificate of Occupancy, please submit a "hold request" to my attention. The person/department requesting a hold is responsible for notifying and resolving problems with the affected parties. (►" f A r : 1�✓ I Y 1�� /C .� see `"fVud vUI{,: CCY6/vu , 6 `�' 4/1111 City of Eaall Mike Maguire MAYOR Paul Bakken Peggy Carlson Cyndee Fields Meg Tilley COUNCIL MEMBERS Thomas Hedges CITY ADMINISTRATOR MUNICIPAL CENTER 3830 Pilot Knob Road Eagan, MN 551 22-1 81 0 651.675.5000 phone 651.675.5012 fax 651.454.8535 TDD MAINTENANCE FACILITY 3501 Coachman Point Eagan, MN 55122 651.675.5300 phone 651.675.5360 fax 651.454.8535 TDD www.cityofeagan.com THE LONE OAK TREE The symbol of strength and growth in our community. December 21, 2007 Mr. Bill Wacker Trinity School 601 River Ridge Parkway Eagan, MN 55121 Re: Trinity School Dear Mr. Wacker, City staff conducted an inspection of the above property on December 14, 2007. The purpose of the inspection was to determine the status of the site improvements and compliance with the approved plans, relative to final inspection for a Certificate of Occupancy. Development of the site appears to have progressed according to the approved plans. However, as of the date of the inspection, the following items remain incomplete. a. Landscaping — The landscaping appears to have been installed, however, whether it is complies with the approved landscape plan could not be verified at this time. Please note that the financial guarantee for landscaping is held for two years following satisfactory installation. Therefore, with the installation havi ig occurred in 2007, the soonest the financial guarantee could be released s summer 2009. b. Screening of mechanical equipment — There are numerous locations on the building where mechanical equipment is exposed and visible (see photos attached). City Code requires that such equipment be screened. Pursuant to conversations you had with City Planner Mike Ridley in September, please provide a plan for screening the equipment and a proposed schedule for', implementation. This information should be received by January 15, 2d08. Please send us a written response confirming your receipt of this letter and rur intent to complete the above items in the specified time frame. Your cooperation in this matter is appreciated. If you have any questions about these items, plealse let me know. Sincerely, Pamela Dudziak Planner cc: Building Project File TO: FROM: DATE: SUBJECT: City of Evan Dale Schoeppner, Building Inspections Scott Peterson, Building Inspections Craig Novaczyk or Mike Lence, Building Inspections Mike Ridley, Planning Carol Tumini, Utility Billing Dale Wegleitner, Fire Department Tom Colbert, Engineering John Gorder, Engineering Leon Weiland, Engineering Tim Pahr, Engineering Paul Olson, Maintenance Tom Struve, Maintenance Eric Macbeth, Maintenance Mark Anderson, Electrical Inspector Terry Zelenka, Building Inspector December 10, 2007 Final Inspection For Trinity School 601 River Ridge Parkway Permit #76305 Neo The Protective Inspections Division will be performing a final inspection at the above referenced property on December 21, 2007. If you have cause for not granting the Certificate of Occupancy, please submit a "hold request" to my attention. The person/department requesting a hold is responsible for notifying and resolving problems with the affected parties. REPORT OF PROJECT TESTING PROJECT: TRINITY CHRISTIAN SCHOOL O'NEILL DRIVE & ARGENTA TRAIL WEST INVER GROVE HEIGHTS, MINNESOTA AET PROJECT No: 20-06558 REPORTED TO: GUNDLACH CHAMPION 600 EAST LAKESHORE DRIVE SUITE 300 HOUGHTON, MI 49931 ATTN: RON RADKE DATE: DECEMBER 10, 2007 INTRODUCTION This report summarizes the results of the project testing services we have conducted for the referenced project in Inver Grove Heights, Minnesota. Our services were conducted On a will- call basis, as authorized by. Mr. Ron Radke of Gundlach Champion, Inc on October 31, 2006. Our scope of services pertinent to this report included the following:, • Observing the soils in the bottom of the footing excavations for the new building: • Performing compaction tests in fill placed at the site. • Observing reinforcing steel placed in the concrete structural elements of the building, • Performing on-site testing of plastic concrete. • Performing compressive strength testing of concrete test cylinders. • Performing on-site testing of plastic masonry grout. • Performing compressive strength testing of masonry grout "prism" specimens, • Performing on-site testing of plastic masonry mortar. • Performing compressive strength testing of masonry mortar test cylinders. • Performing compressive strength testing of masonry block prisms. AET Project No. 20-06558 - Page 2 of 10 • Observing welded, bolted, and screwed connections for the structural steel frame, steel jpists and roof deck. • Summarizing the results of our services in a written report. PROJECT INFORMATION We understand the construction consists of a new Trinity Christian School building in Inver. Grove Heights, Minnesota: We further understand this construction: • Has two above grade levels. • Has approximate overall dimensions of 285 feet by 330 feet. • Has a finished floor elevation of 897.5. • Has bottom -of -footing elevations ranging from, 893 for the perimeter footings to 895 for interior footings. • Is supported by spread footings designed using an allowable soil bearing capacity of 4,000 pounds per square foot (psf). • Has masonry block walls with a structural steel frame supporting a steel joist and metal deck roof system. • Is able tom nt. tolerate up to /z -inch of differential settlement and up to 1 inch of total settle � • Is constructed in accordance with applicable building code requirements. Please note that deviations from the above design information could necessitate altering our conclusions and recommendations. 'Contact us if the information stated is different from the actual design. BACKGROUND INFORMATION Previously, a subsurface exploration program was performed at the referenced site by AE'. The results were presented in our July 12, 2006 Report of Geotechnical Exploration and Review AET Project No. 20-06558 Pae 3 of 10 (AET Project No. 09-00069). Refer to that report for pertinent background information and our recommendations. AET also observed the mass excavation for the referenced site and conducted soil densitiy tests in fill placed in the building pad, parking lot, and roadway area. The test results met or exceeded specified compaction levels at the locations and elevations tested. The observations and results were presented in our December 1, 2006 Report of Excavation Observation and Cofnpaction Testing (AET Project No. 20-06532). Refer to that report for pertinent background information and our recommendations. EXCAVATION OBSERVATIONS Excavation Observation and Results Between the dates of October 31, 2006 to May 2, 2007, we observed the excavation for the footings of the new school building. We were not present on a full-time basis. Our services were on a will -call basis, when requested by Gundlach Champion site; personnel. In addition to observing the soils exposed in the excavations, we conducted shallow hand auger borings and hand cone penetrometer probes in the bottoms of the excavations. The soils encountered were classified in general accordance with ASTM:D2488. Estimates were made of their strength properties based on their resistance to advancement of the hand auger and from the hand cone penetrometer readings. The soils exposed in the bottoms of the excavations were classified as naturally deposited sands with silt, silty sands, silty sands with gravel, clayey sands, and sandy lean clay; as well as previously placed and compacted fill soils consisting of sands with silt, silty sands, and silty sands with gravel. AET performed compaction tests on the fill as it was placed during the building pad preparation, as stated above. Our hand cone penetrometer probes indicated the naturally deposited soils and previously placed fill soils should be capable of supporting structural loads of up to 4,000 psf. Based on the hand auger borings and hand cone penetrometer { readings, it is our judgment the observed soils should be suitable for support of the anticipated building loads. AET Project No. 20-06558 - Page 4of10 On December 11, 2006, frozen soils were, observed below the previously placed new .interior footings and masonry walls near the southwest building corner of the new school. We conducted hand auger borings below the interior strip footings in this area to depths of approximately 3 feet and also performed hand cone penetrometer tests and dynamic cone penetrometer tests. We observed loose, wet soils with ice lensing in the upper lh foot. Soils extending to a depth of 11 feet below bottom of footing grades were judged to be frozen or previously frozen. We recommended that the wet and frozen soils be removed exposing the naturally deposited unfrozen soils approximately 2 feet below bottom of footing grades. ` Based on our discussions with Ron Radice, it is our understanding the concrete masonry unit wall, footings, .and frozen soils were removed until unfrozen naturally deposited sands were found. The footings and walls were then reconstructed. No standing water was observed in the bottom of the excavations. Compaction Testing Results AET performed a total of 46 compaction tests (#40 to #85) in interior wall backfill and utility trench backfill. The results of these field density tests were compared to the laboratory Standard Proctor maximum dry densities (ASTM: D698) for each different soil type at the test locations to calculate the compaction levels for each test. The results of thetests were presented previously. in our Report of Density Testing, dated May 25, 2007. In summary, the soils at the locations and elevations tested were ultimately compacted to specified levels: REINFORCING STEEL OBSERVATIONS Between the dates of November 3 to December 22, 2006, AET personnel observed the reinforcing steel present in the footings before concrete was placed. During our observations, we judged the following items for conformance to the most current structural drawings available at the project site: AET Project No. 20-06558 - Page 5 of 10 The conditions and dimensions of the various formwork. • That the proper number, size, spacing, and lap of the reinforcing steel were provided. • That proper concrete cover and support was provided between the reinforcing steel and the formwork and/or the ground surface. • That the reinforcing steel was substantially free of rust, scale, dirt, ice or other deleterious materials which will reduce adhesion with the concrete. Based on the results of our observations, it is our opinion that the reinforcing steel we observed in the structural elements was in substantial compliance with the current structural drawings present at the site. We did, however, note that footing pads L-21, M-20, and P-18 were missing two reinforcing bars. We informed the subcontractor of these deficiencies and observed the corrections were made prior to the placement of concrete. AET does not perform surveying' services: therefore, our observations of the reinforcing steel were based on the positioning of the formwork by the contractor. We are not responsible for the exact locations of the formwork. CONCRETE TESTING'' Field Testing of Concrete We performed testing of the plastic concrete as it was being placed for various structural elements of the construction between the dates of November 1, 2006 to July 17, 2007. Our services included the following: • Measuring the slump of the plastic concrete. • Measuring the percentage of entrained and entrapped air in the plastic concrete. • Measuring the temperature of the plastic concrete. • Casting 4 inch by 8 inch compression test cylinders. AET Project No: 20-06558 — Page 6 Of 10 All testing was performed in accordance with current ASTM procedures. The results of the on- site testing were presented in our Reports of Plastic Concrete Testing, which were issued under separate cover. Generally, the results of our testing indicated the concrete satisfied the project specifications. Compressive Strength Testing of Concrete We performed compressive strength testing of 48 sets of test cylinders cast byAET and 2 sets of P P g g Y test cylinders cast by the contractor from concrete placed in the building. The results of these tests were presented in our Reports of Compressive Strength of Cylindrical Concrete Specimens. Copies of these were previously submitted under separate cover. The test results for each set of cylinders exceeded the specified 28 -day design compressive strength. MASONRY TESTING Field Testing of Grout We periodically performed testing of the masonry grout on an as -requested basis as it was being placed for block corefill and bond beams of the masonry walls from January 5 to March. 23, 2007. Our services included the following: • Measuring the slump of the plastic grout. • Measuring the temperature of the plastic grout. • Casting compressive strength test specimens ("prisms' All testing was performed in accordance with current ASTM procedures. The results of the on- site testing were presented in our Reports of Plastic Grout Testing, which were issued wider separate cover. Generally, the results of our testing indicate the grout satisfied the project specifications. AET Project No. 20-06558 - Page Compressive Strength Testing of Grout We performed compressive strength testing of five sets of "prisms" cast from masonry grout that was used for block corefill and construction of bond beams for portions of the walls which were observed by AET personnel. The results of this testing were presented in our Reports of Compressive Strength of Grout Specimens. Copies of these reports were previously submitted under separate cover. The test results for each set of test prisms exceeded the design compressive strength. Field Testing of Mortar We performed testing of the mortar as it was being placed for the masonry walls on January 16, 2007. Our services included the following: • Measuring the slump of the plastic mortar. • Casting 2 inch by 4 inch compression test cylinders. All testing was performed in accordance with current ASTM procedures. The results • of the on- site testing were presented in our Report of Plastic Mortar Testing, which was issued under. separate cover. Generally, the results of our testing indicate the mortar satisfied the project specifications. Compressive Strength Testing of Mortar We performed compressive strength testing of one set of cylinders cast from masonry mortar. The results of this testing were presented hi our Report of Compressive Strength of Cylindrical Mortar Specimens. A copy of this report was previously submitted under separate cover. Masonry Block. Prism Testing We performed compressive strength testing of one set of 8 -inch. 10 -inch, and 12 -inch block prism specimens constructed by the contractor on. February 16, 2007, and of one set of 8 -inch, 10 -inch, and 12 -inch block prism specimens constructed by the contractor on April 24, 12007. AET Project No. 20-06558 — Page 8 'pf 10. The testing was performed according to ASTM:C1314. The results of the tests were presented in our Reports of Concrete Masonry Prism Testing, dated February 16 and April 24, 2007. OBSERVATIONS OF WELDED AND BOLTED CONNECTIONS An NDT technician from our firm observed field welded and bolted connections for the building on a will -call basis between the dates of April 12 to August 21, 2007. The scope of our services during these observations included the following; • Performing observations and nondestructive testing, as required, on in -process and com leted. field welding of structural steel framing. • Performing visual weld observations and nondestructive testing in accordance with the requirements of Section 6 of the AWS D1.1 Structural Welding Code (steel), Section 6 of the AWS D1.3 Structural Welding Code (sheet steel) and/or applicable contract documents. Individual welds were judged for quality; size and length. Full penetration welds were tested using ultrasonic methods. • Observing bolted connections for compliance with Section 9a of the "Specification for Structural Joints using ASTM: A325 or ASTM: A490 Bolts" approved by the Research Council on Structural Connections. This included observing bolted connection$ for appropriate bolt length, washer installation and ply contact of joint; and observing that the splined ends of the Tension Control Bolts (TCB's) were sheared off after tensioning. • Observingthe metal deck fastening connections for compliance with required codes and applicable project plans and specifications. Our observations indicated that the completed field welds for the structural connections gen4rally satisfied the requirements of the referenced codes and applicable project plans and specifications. AET Project No. 20-06558 — Page 9 of 10 Our observations of the bolted connections indicated that the plies of the observed connections were in intimate contact and satisfied the requirements of the referenced codes and applicable project plans and specifications. On May 18, 2007 we observed that there were a couple of side laps between supports that needed tek screws in the music area and that tek screws were missing on the roof deck m the common area. On May 25, 2007, we again observed the fasteners in these areas. At that dates we observed that the missing tek screws were now in place and that they satisfied the required codes and applicable project plans and specifications. On May 25, 2007, we observed that bolts needed to be tightened for the vestibule B104 and canopy off of corridor A135. On June 7, 2007, we again observed the bolts and they were now properly tightened. On June 7, 2007, we observed that not all Simpson Hold -Down Anchors were in place in the administrative office, music, and art room areas. On June 17, 2007, we observed that not all Hold -Down Anchors for the exterior stud walls were in place. On August 8, 2007, we observed that not all Hold -Down Anchors were in place in the auditorium. On August 21, 2007, we again observed the Hold -Down Anchors at the locations mentioned above and: observed that all anchors were in place according to the project plans. CLOSURE To protect the client, the public and: American Engineering Testing, Inc., this report (and all supporting information) is provided for the addressee's own use. No representations are made to parties other than the addressee. AET Project No. 20-06558 — Page 10 of 10 Our services on this project have been conducted to those standards considered normjalfor services of this type at this time and location. Other than this, no warranty, either express or implied, is intended. SIGNATURES Report Prepared By: Report Reviewed By: American Engineering Testing, Inc, American Engineering Testing, Inc. .11111111 k ara E. Olds, EIT Staff Engineer I Ryan F. Schmidt, PE Senior Engineer MN License No. 40501. Craig Novaczyk Page 1 of 2 From: Mary Granley Sent: Thursday, October 05, 2006 9:41 AM To: Craig Novaczyk Subject: RE: Building Permit for Trinity School The flag should state "Two development signs must be removed prior to issuance of the C/O's. See Mary G for further details." Thanks Craig, Mary From: Craig Novaczyk Sent: Thursday, October 05, 2006 9:27 AM To: Mary Granley Subject: RE: Building Permit for Trinity School Certainly. you may place a restriction on the CIO. Please be specific with your request. Craig Novaczyk Senior Building Inspector Office 651-675-5683 Fax 651-675-5694 cnovaczyk(a�cityofeagan.com From: Mary Granley Sent: Thursday, October 05, 2006 8:51 AM To: Craig Novaczyk Subject: RE: Building Permit for Trinity School May I please place that restriction on the CIO? Mary From: Craig Novaczyk Sent: Thursday, October 05, 2006 7:42 AM To: Mary Granley Subject: RE: Building Permit for Trinity School Yes, I'm reviewing the Trinity School plans. Craig Novaczyk Senior Building Inspector Office 651-675-5683 Fax 651-675-5694 cnovaczyke,cityofeagan.com From: Mary Granley Sent: Wednesday, October 04, 2006 3:38 PM To: Craig Novaczyk Subject: Building Permit for Trinity School Craig, 10/16/2006 Wage 2 of 2 Are you reviewing the building permit for Trinity School? I would like to have a restriction placed for rsjmoval of two development signs prior to the CIO being issued. Please let me know if you have it. Thanks! Mary Granley Sr. Code Enforcement Technician City of Eagan 3830 Pilot Knob Road Eagan, MN 55122 Phone 651-675-5690 Fax 651-675-5694 mgranley@cityofeagan.com 10/16/2006 Page 1 of 1 Craig Novaczyk From: Craig Novaczyk Sent: Monday, October 16, 2006 2:35 PM To: 'Justin Musser' Cc: Dale Schoeppner Subject: RE: People of Praise/Trinity School Project Justin, We don't have any forms or programs to complete the necessary calculations to show compliance. You need to choose one of the five methods of compliance in chapter 7676 of the Minnesota Energy (bode and show that your building meets the requirements per the method chosen. I don't know if the Department of Labor and Industry has forms/programs for this, but you may want to inquire. Thank You. Craig Novaczyk Senior Building Inspector Office 651-675-5683 Fax 651-675-5694 cnovaczykCa�cityofeagan .com From: Justin Musser [mailto:justinm@apexengineering.biz] Sent: Monday, October 16, 2006 9:33 AM To: Craig Novaczyk Subject: People of Praise/Trinity School Project Craig, I got a call from Ron Radke regarding the above project and he said you needed envelope calculation$ per Chapter 76.76. Is there some forms that need to be filled out or a program run? I did not see any forms in the chapter. Please let me know what needs to be done to complete the submittal. Justin Musser, PE Mechanical Engineer APEX Engineering 110A East Grand Avenue Eau Claire, Wisconsin 54701 Phone: 715-835-7736, Fax: 715-835-3771 Email: justinmc apexengineerinq.biz 10/20/2006 Craig and Pam or Erik, Page 1 of 2 Craig Novaczyk From: Jon Hohenstein Sent: Friday, October 20, 2006 8:35 AM To: Craig Novaczyk Subject: RE: Trinity School Footing and Foundation Permit Thanks for the follow up. You did great. I didn't think that you told him to go to Tom, but I wasn't sure. I spoke with Radke this morning and he said that when you said that you have done all you could, he ent back to Jarvis who went to Tom. I think the thing about appealing to Tom was part of his translation. Thanks again. Jon Jon Hohenstein Community Development Director City of Eagan 3830 Pilot Knob Road Eagan, MN 55122 651-675-5660 Fax 651-675-5694 jhohensteine,cityofeagan.com From: Craig Novaczyk Sent: Friday, October 20, 2006 6:55 AM To: ]on Hohenstein Subject: RE: Trinity School Footing and Foundation Permit ??? Craig Novaczyk Senior Building Inspector Office 651-675-5683 Fax 651-675-5694 cnovaczyka,cityofeagan .com From: Jon Hohenstein Sent: Thursday, October 19, 2006 5:19 PM To: Craig Novaczyk Subject: FW: Trinity School Footing and Foundation Permit Craig, I need to visit with you, too, about how the matter went to Tom. He was surprised to get the call and 1 work hard not to surprise him. We'll catch up after the plat issue is addressed. Thanks. Jon Jon Hohenstein Community Development Director City of Eagan 3830 Pilot Knob Road Eagan, MN 55122 651-675-5660 Fax 651-675-5694 jhohenstein(a�cityofeagan.com 10/20/2006 Craig and Pam or Erik, age 2 of 2 From: Jon Hohenstein Sent: Thursday, October 19, 2006 5:16 PM To: Craig Novaczyk; Pam Dudziak Cc: Mike Ridley; Dale Schoeppner; Erik Slettedahl; Robert Bauer Subject: Trinity School Footing and Foundation Permit Craig and Pam or Erik, Please see me tomorrow morning at 8:00 to follow up on the Trinity F&F Permit. The issue made it to Mr. Hedges and back to me late this afternoon and we need to be able to respond to the developer/contractor earl tomorrow on whether we have the necessary documentation from the County to release the permit or what we need to get yet. My understanding through the round about channel is that the permit has been reviewed and is in order to be released if Planning can sign off on the plat recording. Let me know if that is accurate. I have understood that because it takes a number of weeks for the County to actually record plats that We accept the receipt from the County that the Plat has been filed for recording as evidence that it will be done. I also understand that there have been some technical issues between Landform and the County that have required them to resubmit a number of times, but the developer has indicated that those issues have been addressed and it is their understanding that the plat has been accepted by the County at this point. Knowing that you (at least Craig and Erik) get in before I do, I am forwarding this so you can be ready to visit at 8:00. Please let me know if we have what we need or, if we don't, precisely what we need to release. Thanks. Jon Jon Hohenstein Community Development Director City of Eagan 3830 Pilot Knob Road Eagan, MN 55122 651-675-5660 Fax 651-675-5694 ihohenstein c(D.cityofeagan.com 10/20/2006 Pam, ]age 1 of 3 Craig Novaczyk From: Pam Dudziak Sent: Friday, October 20, 2006 12:26 PM To: Jon Hohenstein Cc: Mike Ridley; Tom Hedges; 'Bauer, Robert; John Gorder; Tom Colbert; Craig Novaczyk; Dale Schoeppner; 'Coyle, Peter J.'; 'lal@Iaukka.com ; 'bsporer@landformmsp.com' Subject: RE: Novus/Trinity School - Footing and Foundation Permit Jon, et al, I have a correction to my earlier comments. The discussion I had with Landform yesterday about revising an easement description was for a different project, not Trinity School. I apologize f r the confusion. Pam Pamela Dudziak Planner, City of Eagan 3830 Pilot Knob Road Eagan, MN 55122 Ph: 651-675-5691 Fax: 651-675-5694 From: Jon Hohenstein Sent: Friday, October 20, 2006 11:11 AM To: Pam Dudziak; 'lal@laukka.com'; 'bsporer@Iandformmsp.com' Cc: Mike Ridley; Tom Hedges; 'Bauer, Robert'; John Gorder; Tom Colbert; Craig Novaczyk; Dale Schoeppner; 'Coyle, Peter J.' Subject: RE: Novus/Trinity School - Footing and Foundation Permit Pam, Thank you for the update on the progress on this matter and the items that have changed hands this Week. Larry and Ben, Ron Radke has been in touch with our Inspections Division on an ongoing basis including yesterday td track the status of the footing and foundation permit and, as I believe you know, Peter Jarvis contacted Tom Hedges last evening about the status of the footing and foundation permit for Trinity School. Tom contacted mea ut his conversation with Peter and we have been following up this morning. I don't have Peter or Ron's emad addresses, so I am sending this to you to be routed as appropriate. We are tracking along the lines that were discussed when we were last together and our staff has bee working with Landform to get the details necessary for preparation and signature of the Plat and related docu nts for submittal to the County for recording. Since we cannot issue a building permit without a receipt indica 'ng that Plat submission that has been the critical item we have been working toward. Pam Dudziak's email b low outlines the current status of the necessary information from her perspective. Once those things are mpleted, she can sign off on the permit from the Planning standpoint. We are also aware that John Gorder fro the Engineering Division has been working with Landform on some of the engineering detail and has not s gned off on the permit. Unfortunately, John is out today, because of the school holiday, so we will need t0 follow u with him next week to determine if there are remaining issues the prevent him from signing off at this time. On or more of the items submitted this week were necessary to permit him to complete some of the documents that am's email notes that need to be completed and recorded with the Plat. We will keep working with Landform, you and 10/23/2006 -'am, Page 2 of 3 whomever else we need to in order to move that process forward. We realize that time is of the essen$ in this case and are as interested as you are in accomplishing the construction that is necessary this fall for the Trinity project to be completed. To summarize, while progress has been made and we understand that Landform has made changes tO the plat that were required by the County and will be acceptable to the County, we have not received the mylarj for signature or the related documents for execution and recording that would permit us to issue the buildifig permit. As a final side note that does not need to be addressed now, but needs to be addressed before the ult� nate subdivision of the property, it has been noted that the north -south collector street will ultimately serveur site, Jim Deanovic's property and the Cole property to the south. While the Cole family has not indicated pl ns to move forward on their property, we did want to encourage you to work with Jim on a street name that virould be acceptable to you both, so that the continuous street name fit both developments. Jim has indicated tilat he would prefer a name other than Inspiration Drive, which is currently noted on the plan and I learned from Ben today that Trinity may prefer a different name as well. In separate conversations, I encouraged Jim to Contact you and gave Jim's phone number to Ben to facilitate that conversation. We would be open to hearing the deas that you develop. Bob, Please respond with the status of the Plat and related recordable documents from your end. Please let everyone know if there are substantial outstanding items or if you have what you need to finalize the construction agreement and easement documents. If you have what you need, please indicate when they will be available to Larry's group for their signatures. Ben Sporer has also asked whether there is any way that they could provide a larger financial guarant a or other security to permit issuance of a footing and foundation permit for work that would be undertaken at they risk. As we discussed several weeks ago, their primary focus is to get the footings and foundation in before thel ground freezes and he asked whether there is a way to proceed in advance of the final details of the plat. I know that under ordinary circumstances, the path we have defined is as aggressive as we have been, but I agreed to pass the question on to you so that we explore every alternative. If there is an option and it requires Counci action, the next meeting is November 9. John, When you are back in the office, please confirm to Ben and us whether there are any remaining outstanding items that need to be submitted so you can sign off on the permit. Ben, Depending upon all of the answers above, how long will it be before you are able to submit mylars for 4ignatures here? Thank you to everyone for your attention to this matter. 1 will look for your responses. Jon Jon Hohenstein Community Development Director City of Eagan 3830 Pilot Knob Road Eagan, MN 55122 651-675-5660 Fax 651-675-5694 jhohensteinacityofeagan.com From: Pam Dudziak Sent: Friday, October 20, 2006 8:59 AM To: Jon Hohenstein Cc: Mike Ridley 10/23/2006 Pam, Wage 3 of 3 Subject: Novus/Trinity School Jon, The Manley Commercial Addition plat has not been recorded. It was first approved by Councjl about two months ago and I do not believe the City has received the mylars yet. On 10/17, the City Council approved an extension of time to record the plat which was requested by Landform on behalf Of the applicant. The City Attorney is preparing a construction/development agreement for this project, along vclith a conservation easement and temporary cul-de-sac easement agreement. The construction agreement is in lieu of our standard development contract since there is no subdivision here, but the outlot has to be replatted into a lot before a building permit can be issued. The two easements will need to be recorded with the plat, along with the Final PD Agreement. Landform has provided the legal descriptions and graphics for the easement agreements, although just yesterday they called and said the temporary cul-de- sac description is being modified, so we now need the new legal from them for that. In order to calculate the financial guarantee, we needed cost estimates for the improvements. We got them from Landform by e-mail late on 10/17. I do not know whether Engineering has been able to go through them and prepare the financial guarantee amount to forward to the City Attorney yet, but I know the City Attorney is waiting on that as well as the revised legal description for the temporary c -d -s easement before finalizing the documents for execution. On 10/9, Landform did indicate the contractor planned to start grading and tree removal early this week. We responded that the grading permit had to be issued first, and we needed the financial guarantee for that too. I do not know whether Engineering received everything necessary to issue the grading permit. All of this was discussed in the big meeting we had with all the parties a month or so ago. And there has been e-mail communication over the past few weeks about the various items, both between th attorneys and between City staff and Landform. If you want more detail about any of that communicati?n, please let me know. Pam Pamela Dudziak Planner, City of Eagan 3830 Pilot Knob Rood Eagan, MN 55122 Ph: 651-675-5691 Fax: 651-675-5694 10/23/2006 Message Craig Novaczyk 1age 1 of 4 From: Coyle, Peter J. [pcoyle@larkinhoffman.com] Sent: Wednesday, October 25, 2006 9:28 AM To: John Gorder; Pam Dudziak; Jon Hohenstein Cc: Mike Ridley; Bauer, Robert; Craig Novaczyk; Dale Schoeppner; Ial@laukka.com; bsporer@landformmsp.com Subject: RE: Novus/Trinity School - Footing and Foundation Permit thanks to all of you for your assistance in moving this forward; I know that the folks at Trinity appreciat it, as do Larry Laukka and Warren Beck. Pete Original Message From: John Gorder[mailto:JGorder@cityofeagan.com] Sent: Wednesday, October 25, 2006 9:23 AM To: Pam Dudziak; Jon Hohenstein Cc: Mike Ridley; Bauer, Robert; Craig Novaczyk; Dale Schoeppner; Coyle, Peter J.; lal@laukka.c$om; bsporer@landformmsp.com Subject: RE: Novus/Trinity School - Footing and Foundation Permit The grading permit was issued last week Tuesday (10/17), and grading has commenced. We have received a satisfactory cost estimate of public improvements from Landform to use asthe basis for the financial guarantee in the construction/ development agreement. 1 will plug the numbers n once a first draft of the agreement has been completed. Easement legal descriptions and graphics for the roadway and conservation have been submitted from Landform, and will be forwarded to the City Attorney's office for preparation of easement documents. John Gorder, P.E. City of Eagan Assistant City Engineer 3830 Pilot Knob Road Phone: 651-675-5645 Fax: 651-675-5694 jgorder@cityofeagan. com From: Pam Dudziak Sent: Friday, October 20, 2006 12:26 PM To: Jon Hohenstein Cc: Mike Ridley; Tom Hedges; 'Bauer, Robet; John Gorder; Tom Colbert; Craig Novaczyk; Dale Schoeppner; 'Coyle, Peter 3.'; 'Ial@laukka.com'; 'bsporer@ Iandformmsp.com' Subject: RE: Novus/Trinity School - Footing and Foundation Permit Jon, et al, I have a correction to my earlier comments. The discussion I had with Landform yesterday about revising an easement description was for a different project, not Trinity School. I apologize for the confusion. Pam Pamela Dudziak 10/30/2006 Message Planner, City of Eagan 3830 Pilot Knob Road Eagan, MN 55122 Ph: 651-675-5691 Fax: 651-675-5694 Page From: Jon Hohenstein Sent: Friday, October 20, 2006 11:11 AM To: Pam Dudziak; 'Ial@laukka.com'; 'bsporer@Iandformmsp.com' Cc: Mike Ridley; Tom Hedges; 'Bauer, Robert'; John Gorder; Tom Colbert; Craig Novaczyk; Dale Schoeppner; 'Coyle, Peter J.' Subject: RE: Novus/Trinity School - Footing and Foundation Permit Pam, Thank you for the update on the progress on this matter and the items that have changed hands this week. Larry and Ben, Ron Radke has been in touch with our Inspections Division on an ongoing basis including yesterday to track the status of the footing and foundation permit and, as I believe you know, Peter Jarvis co tacted Tom Hedges last evening about the status of the footing and foundation permit for Trinity Sch . Tom contacted me about his conversation with Peter and we have been following up this moming. I on't have Peter or Ron's email addresses, so I am sending this to you to be routed as appropriate. We are tracking along the lines that were discussed when we were last together and our staff h s been working with Landform to get the details necessary for preparation and signature of the Plat an related documents for submittal to the County for recording. Since we cannot issue a building permit w hout a receipt indicating that Plat submission that has been the critical item we have been working tow rd. Pam Dudziak's email below outlines the current status of the necessary information from her persp ive. Once those things are completed, she can sign off on the permit from the Planning standpoint. We a also aware that John Gorder from the Engineering Division has been working with Landform on soma of the engineering detail and has not signed off on the permit. Unfortunately, John is out today, because of the school holiday, so we will need to follow up with him next week to determine if there are remaini g issues the prevent him from signing off at this time. One or more of the items submitted this week wer necessary to permit him to complete some of the documents that Pam's email notes that need to be comp) ted and recorded with the Plat. We will keep working with Landform, you and whomever else we need t in order to move that process forward. We realize that time is of the essence in this case and are as int rested as you are in accomplishing the construction that is necessary this fall for the Trinity project to be pleted. To summarize, while progress has been made and we understand that Landform has made ch ges to the plat that were required by the County and will be acceptable to the County, we have not receiv the mylars for signature or the related documents for execution and recording that would permit us issue the building permit. As a final side note that does not need to be addressed now, but needs to be addressed before the ultimate subdivision of the property, it has been noted that the north -south collector street will uI imately serve your site, Jim Deanovic's property and the Cole property to the south. While the Cole fa ily has not indicated plans to move forward on their property, we did want to encourage you to work with Ji on a street name that would be acceptable to you both, so that the continuous street name fit both developments. Jim has indicated that he would prefer a name other than Inspiration Drive, which is currently noted on the plan and I learned from Ben today that Trinity may prefer a different name as well. In separate conversations, I encouraged Jim to contact you and gave Jim's phone number to Ben to facilitate that conversation. We would be open to hearing the ideas that you develop. Bob, Please respond with the status of the Plat and related recordable documents from your end. PI ase let everyone know if there are substantial outstanding items or if you have what you need to finalize the 10/30/2006 Message Page 3 of 4 construction agreement and easement documents. If you have what you need, please indicate when they will be available to Larry's group for their signatures. Ben Sporer has also asked whether there is any way that they could provide a larger financial uarantee or other security to permit issuance of a footing and foundation permit for work that would be and rtaken at their risk. As we discussed several weeks ago, their primary focus is to get the footings and foundation in before the ground freezes and he asked whether there is a way to proceed in advance of the fi al details of the plat. I know that under ordinary circumstances, the path we have defined is as aggressive s we have been, but I agreed to pass the question on to you so that we explore every alternative. If there s an option and it requires Council action, the next meeting is November 9. John, When you are back in the office, please confirm to Ben and us whether there are any remaining outstanding items that need to be submitted so you can sign off on the permit. Ben, Depending upon all of the answers above, how long will it be before you are able to submit myl,rs for signatures here? Thank you to everyone for your attention to this matter. I will look for your responses. Jon Jon Hohenstein Community Development Director City of Eagan 3830 Pilot Knob Road Eagan, MN 55122 651-675-5660 Fax 651-675-5694 jhohenstein(cr�cityofeagan.com From: Pam Dudziak Sent: Friday, October 20, 2006 8:59 AM To: Jon Hohenstein Cc: Mike Ridley Subject: Novus/Trinity School Jon, The Manley Commercial Addition plat has not been recorded. It was first approved by Council about two months ago and I do not believe the City has received the mylars yet. On 10/17, the City Council approved an extension of time to record the plat which was requested by I4andform on behalf of the applicant. The City Attorney is preparing a construction/development agreement for this project, along with a conservation easement and temporary cul-de-sac easement agreement. The constructilDn agreement is in lieu of our standard development contract since there is no subdivision here, but the outlot has to be replatted into a lot before a building permit can be issued. The two easements will need to be recorded with the plat, along with the Final PD Agreement. Landform leas provided the legal descriptions and graphics for the easement agreements, although just yesterday they called and said the temporary cul-de-sac description is being modified, so we now deed the new legal from them for that. In order to calculate the financial guarantee, we needed cost estimates for the improvements. We 10/30/2006 Message Page 4 of 4 got them from Landform by e-mail late on 10/17. I do not know whether Engineeringas been able to go through them and prepare the financial guarantee amount to forward to the Cty Attorney yet, but I know the City Attorney is waiting on that as well as the revised legal description for the temporary c -d -s easement before finalizing the documents for execution. On 10/9, Landform did indicate the contractor planned to start grading and tree removal early this week. We responded that the grading permit had to be issued first, and we needed the financial guarantee for that too. I do not know whether Engineering received everything necessadry to issue the grading permit. All of this was discussed in the big meeting we had with all the parties a month or so alp. And there has been e-mail communication over the past few weeks about the various items, both between the attorneys and between City staff and Landform. If you want more detail about any of that communication, please let me know. Pam Pamela Dudziak Planner, City of Eagan 3830 Pilot Knob Road Eagan, 44N 55122 Ph: 651-675-5691 Fax: 651-675-5694 Larkin Ho,, - Alt ttfq CONFIDENTIALITY NOTICE: INFORMATION IN THIS MESSAGE, INCLUDING ANY ATTACHMENTS, IS INTENDED ONLY FOR THE PERSONAL AND COFIDENTIAL USE OF THE RECIPIENT(S) NAMED ABOVE. This message may be an Attorney -Client communication from the law fire of Larkin Hoffman Daly & Lindgren Ltd., and as such is privileged and confidential. If you are not an intended recipient of this Message, or an agent responsible for delivering it to an intended recipient, you are hereby notified that you have received this message in error, and that any review, dissemination, distribution, or copying of this message is strictly prohibited. If you received this message in error, please notify the sender immediately, delete the message, and return any hard copy print-outs. No legal advicek is being provided or implied via this communication unless you are (1) a client of Larkin Hoffman Daly & Lindgren Ltd., and (2) an intended recipient of this message. CIRCULAR 230 DISCLOSURE: Any advice contained in this email (including any attachments unless expressly stated otherwise) is not intended or written to be used, and cannot be used, for purposes of avoiding tax penalties that may be imposed on any taxpayer. 10/30/2006 $i11, Page 1 of 2 Craig Novaczyk From: Jon Hohenstein Sent: Friday, December 01, 2006 12:39 PM To: Chris Grubb Cc: 'servantwjr@aol.com'; Mike Lence; Mike Ridley; Dale Schoeppner; Mike Scott; Tom Colbert; John Gorder; Julie Strid; Jan Severson; Craig Novaczyk Subject: RE: Northeast Eagan Street Names Thanks Chris. I hope this helps as you work with the Post Office. In case you were curious, the reason for the 601 address is that east west streets in that part of the community have addresses in that range. In addition to general consistency, it reinforces the general location of an address as emergency responders are routing to 4 location. As Chris notes, if you have other questions, please let us know. Jon From: Chris Grubb Sent: Friday, December 01, 2006 12:35 PM To: Jon Hohenstein Cc: 'servantwjr@aol.com'; Mike Lence; Mike Ridley; Dale Schoeppner; Mike Scott; Tom Colbert; John Julie Strid; Jan Severson; Craig Novaczyk Subject: RE: Northeast Eagan Street Names Gorder; The address for the new Trinity School will be 601 River Ridge Parkway. If anyone has any questions about this, please feel free to contact me. Thanks From: Jon Hohenstein Sent: Friday, December 01, 2006 12:28 PM To: Chris Grubb Subject: FW: Northeast Eagan Street Names From: Jon Hohenstein Sent: Tuesday, November 28, 2006 11:47 AM To: 'servantwjr@aol.com'; Pam Dudziak; Chris Grubb Cc: Mike Ridley; Dale Schoeppner; Mike Scott; Tom Colbert; John Gorder; Julie Strid; Jan Severson; Craig Novaczyk; Mike Lence Subject: Northeast Eagan Street Names Bill, Thanks for stopping in today. One and All, 12/01/2006 Bill, Page 2 of 2 Bill Rademacher will be the building manager at Trinity School. He is working on getting the addressing for the school in place. We have reached a conclusion in which the collector street will be named Ames Crossing (Road) and the school's entrance drive will be named River Ridge Parkway. It will be treated as a private street with appropriate street signage at the intersection. Trinity is pursuing the opportunity to address off of the River Ridge as a private street, much as some housing developments do, when they have private streets. I told him that formal addressing along the streets will occur when the subdivision is submitted for apprpval and that is in process at this time. I also told him that I wasn't sure whether the post office would agree to n address on either a public or private street until the subdivision is submitted for recording at the County, but there was no harm in the asking. Chris, At the point that addresses are assigned to the new lots in the subdivision, do you know yet what address number would you assign to the Trinity School lot, presuming that the private drive is named River Ridge Parkv'ay? Please advise. If the question is premature, please get in touch with the address list above when the subdivision is presented for addressing. Thanks. Jon 12/01/2006 Page 1 of 1 Craig Novaczyk From: Eric Macbeth Sent: Friday, April 11, 2008 12:23 PM To: Pam Dudziak; John Gorder; Craig Novaczyk; Gregg Hove Cc: Russ Matthys; Dale Wegleitner; Dale Schoeppner; Mike Ridley Subject: RE: People of Praise/Trinity School The rain garden should be inspected; when I last saw it some time ago it didn't look good at all. Eric Macbeth, Water Resources Coordinator Lakes and Wetlands Program 3501 Coachman Point Eagan, Minnesota 55122 Phone: (651) 675-5300 Fax: (651) 675-5360 Email: emacbeth@cityofeagan.com WWW: http://www.cityofeagan.com/lakesandwetlands From: Pam Dudziak Sent: Thursday, April 10, 2008 3:13 PM To: John Gorder; Craig Novaczyk; Eric Macbeth; Gregg Hove Cc: Russ Matthys; Dale Wegleitner; Dale Schoeppner; Mike Ridley Subject: People of Praise/Trinity School Gentlemen, I received a call from Bill Rademacher of People of Praise this morning asking if there are any outstanding issues with the Trinity School project that might involve Landform. I told him I'd have to put the questi n out to the rest of the staff. He mentioned planting of a rain garden, is there anything else? I believe they want to close out their contract with Landform, but if Landform is still responsible for anything on this project, they need to know. Please let me know the status so I can inform People of Praise. Thank you. Pam Pamela Dudziak Planner, City of Eagan 3830 Pilot Knob Road Eagan, MN 55122 Ph: 651-675-5691 Fax: 651-675-5694 04/14/2008 Mage 1 of 1 Craig Novaczyk From: John Gorder Sent: Wednesday, November 08, 2006 9:08 AM To: Craig Novaczyk Subject: Novus - Trinity School Craig, I received a call from the utility contractor inquiring as to whether he can proceed with on-site utility work soon. It is my understanding that the "full-blown" building permit needs to be issued before he can proceed, and that with the building permit a sewer & water permit is issued that allows his construction. I am OK with the on-site utility plan around the building. Is there still other outstanding items needed to issue the BP? Please let me know if I am off -base. Thanks. John Gorder, P.E. City of Eagan Assistant City Engineer 3830 Pilot Knob Road Phone: 651-675-5645 Fax: 651-675-5694 jgorder@cityofeagan.com 12/06/2006 Page 1 of 2 2 Tom Hedges From: Tom Garrison Sent: Thursday, September 14, 2006 4:36 PM To: Tom Hedges Subject: FW: Endorsement LetteNExec. Committee Meetings FYI, any direction? TOM GARRISON Communications Director City of Eagan (651) 675-5008 (office) (651) 675-5012 (fax) tganison@cityofeagan.com From: Brent Cory [mailto:BCory@eagamm~.com] Sent: Thursday, September 14, 2006 3:40 PM To: azwach@csmcorp.net; DKillian@Simon.com; lon.breedlove@ihrco.com; Tom Garrison Subject: Endorsement Letter/6cec. Committee Meetings ECVB Executive Committee: I recently received a request from Peggy Louiselle who heads up the development efforts for Trinity School at River Ridge. The school is currently located in Bloomington, but will soon be making the move to Eagan. They would like to add an 850 seat auditorium to the school and are currently in the process of seeking donations. Peggy is looking for a letter of endorsement from us stating that the auditorium would be a great addition to an already incredible community, yada, yada, yada. Typically this falis into the chamber of commerce category, but because the auditorium has the potential of attracting a regional audience, a letter from our organization would seem appropriate. Would anyone have objections to helping Peggy our with her school's request? She attached a sample letter we can customize for her purposes...l of course would let all of you review it prior to sending her the final version. I'd also like to propose that we begin meeting on a regular basis as an executive committee - during the months where the Board does not meet, I'd like to have a6out a one-hour meeting to discuss a variety of topics. During the months the Board meets, we could meet 30 minutes prior to thie Board meeting. PLEASE believe me when I say adding another meeting to a11 of our schedules is the last thing I want to do...l simply feel there are topics l should be bringing to all of you prior to going "public" with them. Also, this would be a great forum to begin discussing candidates for our 2D07 BOD vacancies, figuring out who will be elected as Chair, etc. If possible, I'd like to schedule a meeting for this month (9128/06) from 3- 4:30 pm ~ a FUN location TBD. Does this concept sound feasible, and would this time/date work for everyone? I would also like to use part of this meeting to conduct a review on my performance. Technically I'm only entitled to an annual review, but if you don't mind, I'd like to use this opportunity to garner your perceptions of my leadership during the past seven months and to get a sense of how you feel about the direction of our organization (don't worry, I'm not going to ask for a raise or company car...after all, we sort of have one of those already!!) - your advice will certainly serve as an important tool for me. Please emailJcall me with your thoughts. Thanks!! 9/14/2006 Page 2 of 2 Brent Cory Executive Director Eagan CVB 1501 Central Parkway Eagan, MN 55121 Phone: 651.675.5544 Fax: 651.675.5545 www.eagamm~.com 9/14/2006 j ~j l~" zao6 FIRE SUPPRESSION SYSTEMS PE~T arrLrcaTiorr p ~ (D ~ City Of Eagan Q /7~ o, D ~ 3830 Pilot Knob Road, Eagan Mn 55122 ~r~ 1 Telephone # 651-675-5675 Fax # 651-675-5694 Requirements: 2 complete sets of drawings and specifications cut sheets on materials and com onents to be used Date IO l~ l O-~j ~(,~l /~~1,l~D2 P( /~~L~ ~/~lv Site Address: ~ ~ti1 Tenant / Building Name: ~ ~ The Applicant is: Owner /V Contractor Other PROPERTY OWNER o-`T` ~~~Eh i S-Q _~l ~V1(~2 S, ,.Z~~ C Address: ~3rjO Ec~S-~` $ g~'~ S-~, City: ~ /r~,~n . State: 1~/U Zip: 5~~~?~' CONTRACTOR l~of ~S'}~E3~.~ `~il~2, ~I`O"~~G~~O~~vfNLicense#: ~0~'~ Address: ~~s ,~Lti.2 ~7Qm j-~~1 I~City: ~G~C~C~?1 State: Zip: V S~ ~ Phone ~51~~'-~~ ESTIMATED COMPLETION DATE: l~ / I D / D~ FIRE PERMIT TYPE: ~ Sprinkler System of heads 7a J~, _ Fire Pump _ Standpipe Other: WORK TYPE: ~ New _ Addition _ Alterations _ Remodel Other: DESCRIPTION OF WORK: Commercial Residential ~ Educational Other: ~ - 2$8f~-~- Please continue on reverse side PERMIT FEE: $50.50 Minimum Fee (includes State Surcharge) Contract Value b~ p x.O1 ~~~C~~ 6 O permit Fee • If Permit Fee is $1,000 or less, add $.50 ~ $ d~ State Surcharge If Permit Fee is over $1,000, add $.50 per $1,000 Permit Fee 3/4" Displacement Fire Meter - $167.00 $ ~ ~i ~ . ~ ~ TOTAL FEE: $ I ~C~ `lf . ~ ~ I hereby apply for a Fire Suppression System permit and acknowledge that the information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan and with the Minnesota Building/Fire Codes; Yhat I understand this isnot a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. ~ Q~ ~ S0. ~O C i l.l.Q~ ~ ~ ~ f" i~i~ Applicant's Printed Name pplicant's Signature DO NOT WRITE BELOW THIS LINE 'S i'i1} i aP tt 1 3 ~(}h~Pini~ '~~c: i !~PI~~(~i ~ i~~~; y3 '~,~fi5q'p ~ 3 ~jidt(~(i~~j3q~) SE~~ ~ ~ rI ~ . ~a 3~ ~ ~ i 'q ~ t ^~i k . (1 t ~ _ ~q§! ~(~~~~~1p ~1 7!~}~ 3II1~~13re ~ iI~I~~ ~ 4EE i t . v~~s~' .i~ ~ ~ i# i i: a° ~ ~iI~3~3ii 3~~ 0.. ( ~ ~ ~v' 1i ~ ~ i : A i ~ ~ 3 ~ C i , , I ~1 I P~ (IU~ ~ N ~ 3 `~~~a~~GI~ iBI~ k (k.~~ . x„* i ~ ~1~{ ~ ~ { f il~ g Nsr~~~o ~ 'li~~~'~~ ( ~~ry,', ~,~~I I , " v 5 it~`~~ ~~i i ~L pi $-t I ~ ~ ~ I ~I li i3 j~ ~ ~3~~~~ ~~~ntta . ~a r~'~-jj ~ ~ ~ ~i(a~ . _ 3 iI ~e v, ; ~1A~~ h ~ il3is'~ Ji~~~~I ~~r ',~t1Y6s~3Yd ~ ~ ~pIIP(I ~ ~I°d12II'~'~"5~~~~GIN{a.#~ ~-~11 'i~~ji3~~'r~ . _ ~ ~R y ~ ~ ~ ~ i„ 4 I~ ~E ~ ~~;.wtyr(i i lY~~~ rP~~~qilj~~ ~,?~_3 +~i+7=~~~~~y~~~~~ ~~~j~'~~"`~~~CTt€~tl'{~~~~~r~'~~3.C?I~.~~ f5 ~ EE~~~~3.~t ~~~jpt'v ~ 3 " . i i a o f~ I( ~ i ~ i ~1( ~ ~~i~~j~3~1~3'~ ~'~fl ~~i~ ' s„-+x~I~1~3~, ; ' ' ,`j'771, ' o- ~'lj~~ i'u~~ ~~I(tj~~t(; ~ ~ k ~ "`~t((r..ii~ T2u~'~ i!Y ~ . i~l~ ~`-~~~~~9~~ ~ti~~t~~ ~i ~ir~Illillil~~~ ~''C~llC~.lf.10~.3'Ofr~I55L7e'1TlC~~apf~#ryt~~: - ~ vi ~ `{°E~tt(II~(~ ~ F 41IiF~.llw6 t ri tt v~ "FEe( ~ r 7'iIS -a 1( G~., ~ i(~n(~ ( R FpCiI II~r6pI~ I i~ ~iHI~~~~~. t ~~~tl~ ~P( ~(i1 ~ ~ ii~ !Ii 3 f{ ~(I~Ii3 ~ ' t ~I+~„: ~ ~ p(, ~`~i i }}i~ (j I~) ~II!!i(~{. !n~° i~qi~ ~I It~ ~3 r~~ a'j 3~~ :-~h F(i t'~~~~) Ii~~~(.~j~,~ ~ ~~t`~~U~~~~~ 5 ~ ~ t E~ " ~ t (I ~ ~ ~ ~Ii~~~~1NR~"~,- . ~Pi~~ X tE~~~} l~l ~ CI i ' : ~ ~ ~ ; t i 4 ~ ~ ~a ~ : v~~~f~ Id~ I~~~}'13~"' f~~~[~~~ ~.r,~v Y i t ~ i ~~I - 7~~~ 7~ i " *.,..~~3 ~ i ~.:41 ~k(6i~ ~ i:+;~. EI'.t~!'~tr3i i~i~I~7~~~~4' 4,'~ t{ ~ ~j ~ i~ ~ I ~ 3~~ ,a ~ t~ f ~~~t~~~~ ~i~ll~Sli~~ ~3 II ~a i ~ ~ t ~ ~ iE(E~il~'hq~a` y-~~~` A jilllalill'14~h(i an p~v a vpv~if~13 " 'w~(4~i i e~°~'~"~(~ •~.u I'~ - s~I r i ,gr ~ ~I~,r ~ h ji i ~ _ f i; ( 3 gea ( i~ ~ i y i~ ( t nI43I~ s~s I ~ i~~ ~ ~f,~~~~~ ~~3 u~~~~-- f~,~~~~~~'~~---~ ~~~~~f~~~tul~ ' }~~,L + 81~I1 ~~~i3~.~ ~ ~ pir !1 " , ~ i x i jk ~ I)jry~ , :6 Ii~ . ~ ' ~ ~ I~F . ~ ~ ~ i) it 3 3 ~ i C ~'#~~11`~OV£5~~~ `.`C"~. (II i ~z~ ~~3'~('~w ~~ial~t~+,a' ~ I~l4~#'jd4i:~ : ' ~ i " ~ ~ ~a^~.~._. ~ ~ i v ~t ~k ~v4I~ ~ i ~II(~..~ "'n( ili~Va33ia~7 ~ ~ ~EI~1{~(~,~ ~ , to ~,~...e~~b~~ IH~~ .~(ir(~tl~f`(~E~~~~~._,... ii .a~,.~ ' ~~tt,~.Fi i' ~ - ~''~ii~~+ ijJ `et,j7n iit~~3~~r N~ ~~i~¢I~ +~a"~.~~' ( r~~~ p.~ Inll~.~(ita,~~ - !~.~~,,1 `~'k~44~I{la'„ , . - I~p~°`~ _ a ~~`~iq~°~.::._.._ .,i{~P?I~ -~3'5...'~-. , ij ~%~'gg ~ ~~1-~a~-~ 2006 COMM~RCIAL PLtTNIBING PERNIIT APPLICATION ~~~/s` CITY OF EAGAN - ~ 3830 PILOT KNOB ROAD, EAGAN NIN 55122 651-675-5675 Date / 10 / ~~o Z~sP,~rai}:ev, Pk~-~'y'. Site Address Z.~ V J wr- Q: d¢~Q '`~c Uuit # Tenant Name ~f~ ~+i ~ Sc.-~~ Former Tenant Name - Property Owner l fup~ V~} ~f c... 4f Telephone ) y ~ t ~ i ~ Contrector W~Zz ~ ~ uvw ~j ; I~Y ec..~. Address ~.1 l O. ~t...r~ o~.. ~ . ~ City 0.C ~w - State Zip `JrS ~ 2~ Telephone bS i) `f S a-~S~~o 5 I 2. ~ License # ~O'l ~ t~ti`'~ Expires: I Z•~31' ~~P The Applicant is _ Owner Contractor Other Work Type New Bldg _ Modify Space _ Irrigation System** V Yes No Work in public r-o-w / easement? RPZ - _ PVB: New _ Repaix/Rebuild Replace _ Remove ~ ~ Rain sensors are re uired on irri tion s sfems ~ DescriptionofWork .u~'`~0~.+'c ~~`~~w "~'1 ~ C~L~~~._ AII~~ - To inquve if resswe Reducing Valye is ~equired on n ervice, 51-675-5646 ~ - Meters - Call 651-675-5300 to verify tl~at hydrostatiq conduc[iviry, and bacteria tests passed prior to oicki¢e uo meter. ' Irrigafion Size & Type ~ Avg GPM 2" turbo req'd unless smaller size allowed by Public Works Fire Size & Price 3/4" meter 167.00 - r Domestic Size 8c Type t Avg GPM Includes high demand devices? _ Yes _ No Ftushometers ~ Yes No PRV Required _ Yes _ Na Permit Fee $50.50 mrnimum (iucludes State Surcharge) - ContradValue $ ~~~0, ~~~,Q~ x 1% _ $ ~~~~,~,5. __PermitFee ~ ~ $ / ~~0~. 0~ Meter(s) ~ . ~ /I, Required on all ¢ew buildings & 6oulevard imeation svstems $ 7 'Y D(~ RadiO Meter Read - $ •-~l )F~ Stafe Surcharge ~ ~ ~ If oemiit fee is less than $1,000, sureharge ~s $.50 If pemut fee is more than $1,000, surcLarge is $.50 for each 51,000 owed. Following fees apply when ius~lling new lawn imgation system ; $ - WaTer Petinit ~ Cal] the City's Engineering Deparunent, 651-675-5646, for required fee amounts ~ $ Treatment Plant $ ' Water Snpply & Storage _ $ State Surcharge ~ ~ ~ ~ $ _ . - . 5D Total Fee I hereby apply for a Commerciat Plwnbing Pemtit and aclmoivledge that the infomiauon is compkte ~ ccurate; that the vrork x~ll 6e i¢ confoxmence with the ordinances and codes of the Cily of Eagan and with. the Plumbing Codes; tLa[ I understand this is n 't, but only an appliration for a pertnit, and wo=Ic is ~wt ~ stait vrithout a permit; tl~at the work will be in accordance with the apprmed plan in the case of w' h requires a revie~v urd Appli~ t d Name ~ A~ lic igpatiu~e ' - ~ CTTY USE ONLY REQiIIRED INSPECITONS: ~ U.G. ~ Air Test ~ Gas Test ~Rough In . ~Final PLANS 5UBMIT1'ED - APPROVED BY: ~1 I S~' 4" , BIJILDING INSPECTOR GeneralInformarion • Radio Meter Read (required on all new buildings. Boulevard 'urigation systems may require a radio read -$141.00 • RPZ's must be tested every year and rebuilt every five years. Test results should be maileA to Paul Heuer at the City of Eagan. • A minimum fee permit per address is required for the following RPZ's: aew, rehtiild, reaair, remove. • Water meters include oopper horn/strainer, remote wire, and touch-pad meter. METERS REOUIRING 4-HOUR ADVANCE NOTICE PRIOR TO PICK UP GPM METERS USE PRICE GPM METERS USE PRICE 1-2o s/s" residential $13o.0o a-12o 1-1/2" iuigation syst $ 827.00 displacement or turhine** public Works marimum small commercial must approve - continuous . meter size 10 2-30 3/4" lawn iFrigation $167.00 4-160 2" turbine large irrigarion $ 1,040.00 ~ masimum' displacement residential ~ " system & ~ continuous or- producfionlines . IS small commercial 3-50 1" displacement large residential $210.00 I/4 to 160 2" compound bldgs over $ 1,962.00 bldg to 24 units - ~ 65 units maz;imum small commercial & ~ continuous & large comm bldgs ~ 25 iai ation s stems 5-100 1-1/2" 25-64 unit bldgs $515.00 marimum displacement & - - contindous most comm bldgs ' 50 - METERS_ REQUIRING 30-DAY ADVANCE NOTICE PRIOR TO PICK UP . GPM METERS USE PRICE GPM METERS USE PRICE 5-350 3" hufiine very large irrigation $1,394.00 6-500 4" compound' +300 unit bldgs $3,864.00 system & prOduction . & very large , lines comin.bldgs 1/2-320 3" compound +200 unit 61dgs $2,516.00 10-1000 6" compound +400 tinit bldgs $6,436.00" very lazge very lazge . comm bldgs ~ comm bldgs ~ 15-1000 4" turbine Very ]azge $2,495.00 irrigarion systems - - & production lines - Comments ~ ~ ~ ~ ~ - ~ ~ • To schedule inspection ofthe inside water line and bacl~low preventer, call 651-675-5695. ~ • To arrange for water turn-on, ca11651-675-5200. ce: Utiliry Division Systems Analys[ ~ Jarmary 2006 . . '~`7~~~ 3~ -i~ Zoo~ FIRE SUPPRESSION SYSTEMS rEx~iT arrr.icaTioN City Of Eagan 3530 Pilot Knob Road, Eagan MN 55122 Telephone # 651-675-5675 ~ ~'~u~. Requirements: 2 wmplete sets of drawings and specifications ~'~-~b ~ a a~ cut sheeu on materials and wm nents to be used Date 2 / ~ / ~L SiteAddress: ~O/ ~~C~G~~. ~6t ~--I[. ~G~~~ Tenant / Building Name: ~(~0~~ f~~ 1'1rL1 l~~f Yl SG~t Ua~ The Applicant is: _ Owner ~ Contractor _ Other PROPERTYOWNER_ ~~~'e' ?~^i..J 2 i~z ~ T`~ S~t+va L Address: ~0 0 ~ ~ ,'vraZ ~ i cj ~ e Ycc , ,,,i c~ City: cC u`"' State: ~t Zip: ~ S~ z( CONTRACTOR L-~ S i t?~ C~ MN License 1'S o u S`3~ Address: a-~~ C~n.es~.,, ~ S~,l ~ZCoy. GL.G ~ K~ State: 1M ~ zip: S'S3 s~ Phone#: ~SZ.~ 3C~`c'~'~-1312 ESTIMATED COMPLETION DATE: ~ / ~ / C7 / FIRE PERNIIT TYPE: _ Sprinkler System of heads _ Fire Pump _ Standpipe ~ Other: ~7~-(., ~p~-i'h ~ Fi'C~ WORK TYPE: ~New _ Addition _ Alterations _ ~ ~ ~ M ~ D Other: - EB~~-~ 2~~ DESCRIPTION OF WORK: ~Commercial _ Residential _ Educational _ Other: h S7?~-1~ ~ D~- ~YLc- ~~x-. S ~f.~ Please continue on next page PERMIT FEES 6a Contract Value $ 3 I 9~~ x.Ol 3 i~~ Permit Fee $50.00 Minimum SU $ ° State Surcharge To calculate surcharge If Pertnit Fee is ~$1,000, surcharge is 50 cents. If Permit Fee is >$1,000, surcharge increases by $.50 for each $1,000 Permit Fee, i.e. a$1,500 Permit Fee requires a $1.00 surcharge. 3/4" Displacement Fire Meter -$174.00 $ 1`~ Fire Meter TOTAL FEE: $ ~ ~ ' ~ U I hereby apply for a Fire Suppression System permit and acknowledge that the information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan and with the Minnesota Building/Fire Codes; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in acc r e ith the approved plan in the case of work which requires a review and approval of plans. ~zvl C.~9~lzt ~ Applicant's Printed Name Appli ant s Signature DO NOT WRITE BELOW TffiS LINE ~ _ ~ ~ ~ ~ ~ ~r r~ ~ f ; ~ ~ " ~ * _ ~ ~ : 12~(~~IRE'r1Y I~"~C~S~EGTIOI~'S ~ ; ~ ~ ~e- r ~ „ h. ' v . a v~W4 e `t ~ x,. r s' . ~ e. ~ ~ , am .r am ~ ,:~.~c1z~C~~hc y'~ ' ~io-~~farm ~ •Dr~hi Test < - In ~ ~ ~s = ~ ~ s~~p " ~ P~m~'~`est G~ntral Stati~5n fi ~ ~ ~ . ~ a: ~ ~x ' ~~dittc~s t~'Issuance ~ ~ ~ ~ ~ ` ~ , ~ - j .F b 'Sd`~ .r ~ a. 3t t~' ` : N ~ N ~H d ~ : a t . 5 3' ~ -f. x mbY ~ t ~ ; k m - E i~ Y'~.:. N`= i d~ `i - '~i-i..: J. dta. Suv ,-.S _ - g _ ~ ~@ Y . K ~,y,,,, ~ - r x XA^~ p ~w # a' ..md. - - m ' q~ Y~ ~ ' ~L F ~ ~ _ ~ ~ # m n. ~~~?y' ,~z : i ~cs _ %Y ~ b i ~ 9 y ~m.f NE ° - ~ a~ ~w ~ ~ ~ii `SA~. fi _ . ~ . Y- ~Y '-c14 t ~~~rn d,.' ~ y ~4 v. ~ 3T - ~'S.u p t ~ s~ : ~ . D . .-K'a.. m~ ~ . s... ~ _ r . . a , . lYgr~~t ~p~roved i3~at~: ~ / ~r ~ ~ ~ w z ~ ~ ~ - x- ~ : ~ _ _ , ~ ~ ~ zoo~ FIRE SI7PPRESSION SYSTEMS rE~iT ArrLicATiorr City Of Eagan 383U Pilot Knob Road, Eagan MN 55122 Telephone # 651-675-5675 / / .~1 ~ ~ ~ / h Requirements: 2 complete sets of drawings and specifications I P(}~Q ~(o cut sheets on materials and com onents to be used - a I~~~ ~ Date ~ / 2~ / 07 0 / Site Address: r 2/'?Yr /2?t~~Q ~0n.~ Tenant / Building Name: r~ ~i^e'u'S2 /d,h, SF-li JCkuo~ The Applicant is: _ Owner ~ Contractor Other PROPERTY OWNER Address: City: State: Zip: CONTRACTOR 1~~1, Suh~~S oty Sv.1~~ ~ Je~v~cv MN License Address: ~Zt~o ~,ues+ 7~'~`'` ~ City: Ec/ii4a3 State: MN Zip: S~S"U.~~ Phone q$'Z.- ~17~ ESTIMATED COMPLETION DATE: 3 ~ 0 7 FIRE PERMIT TYPE: _ Sprinkler System of heads Fire Pump _ Standpipe ~ Other: A.~~ Q~ /O Z Svp~.~y S~~s`kr+~ WORK TYPE: ? New Addition Alterations Remodel Other: DESCRIPTION OF WORK: ~Commercial _ Residential _ Educational ~Other: SN3TR/~9Tioh e~ OA~ ~N~ 2~~ Z /'r%~[ Sv~Y.~Go.~'Cra fy.r~(.-n i~'~'r N`~G~.erl ttaacl Please continue on next page PERNIIT FEES ContractValue $ Z~7~~~v x .Ol = $ .~~~J PermitFee $50.00 Minimum $ ~ 5~ State Surcharge 7o calculate surcharge If Permit Fee is <$1,000, surcharge is 50 cents. If Permit Fee is >$1,000, surcharge increases by $.50 for each $1,DOD Permit Fee, i.e. a$1,500 Permit Fee requires a $1.00 surcharge. 3/4" Displacement Fire Meter -$174.00 $ O Fire Meter TOTAL FEE: $ ~ ~ ~ I hereby apply for a Fire Suppression System permit and acknowledge that the information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan and with the Minnesota Building/Fire Codes; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. JJ~1~ Applic~~ant~'s Printed Name pplica rt's ignature DO NOT WRITE BELOW THIS LINE REQi7IRED INSPECTIONS - , ~ ~ ~ • ~ , . . ~ Hydrosfatic ~ Flow i~larm ~ ~ Drain Test ~ ~ ` ~Raugh In - ~ ` ~.:Tnp , k Pump Test ~ Central5tation 1 ; Final' ~Conditions ofIssuance: ' ~ ~ ~ Perumit Approved by:` Date w ~ ~ . ~ ~ ~ , , ~ 443 Lafayette Road N. ~ MINNESOTA DEPARTMENT OF (651)2s4-5005 www.dollstate.mna 55'155 ~gOR & INDUSTRY ny;1(651)297-4 98' January 15, 2008 APPROVED FOR USE People of Praise Minnesota Inc 23U0 East 88th Street Bloomington MN 55425 RE: Hydraulic Passenger - Elevator ID# -14065PT07-01 Site: ~ai 601 River Ridge Parkway 121 Dear Sir/Madam: Minnesota Statutes Chapter 16B provides that the Department of Labor and Industry, Building Codes and Standards Unit, Elevator Safety Section, inspect and approve elevators and manlifts (endiess belt lifts) before they can be legally used in Minnesota. An Inspector from the Elevator Safety Section recently inspected your facility and determined it meets requirements of the Minnesota Elevator Safety Code. NOTE: Compliance with Minnesota Rules and the ANSI/ASME A17.1, Safety Code for Elevators and Escalators does not necessarily assure compliance with the Americans With ~isabilities Act of 1990. Sincerely, BUILDING CODES AND STANDARDS ~/G~i" Gary .~Reev s State Elevator Inspector gwr/rsg (CE-2) Schoeppner, Dale R., BO, City of Eagan Schindler Elevator Corp. Gundlach Champion D CN ~ zo~8 D By ElForm This information can be provided to you in altemative formats (Braille, large print or audioWpe). An Equal Opportunity Employer City of Evan 3830 Pilot Knob Road Eagan MN 55122 Phone: (651) 675-5675 Fax: (651) 675-5694 Use BLUE or BLACK Ink For Office Use (/ Permit #: /04/ / A 3 Permit Fee: -71.-7 Date Received: Q(0' t 8- I Z Staff: 4 2012 COMMERCIAL BUILDING PERMIT APPLICATION Date: — 1$ ' 2011- Site Address: % o l g ver e. Po. r k..i al Ear.. M N Cr/ L Tenant Name: Tf y S ` o 12. ve.r IZ, ,c (Tenant is: New / )C Existing) Suite #: Former Tenant: 1 PROPERTY OWNER TYPE OF WORK CONTRACTOR ARCHITECT/ ENGINEER Name: Peo o f fro, I s e_ Address / City / Zip: 60 1 R 10ef- 1241c Qark.wa1 Applicant is: Owner Contractor Description of work: SC° re. 100 &fry o-" o Construction Cost: S COD Phone: GcI— =2gfl$ Cayce. N sr/ i( Name: S -4.'1/41.t. \LctcccG.6ov% License#: Address: 66I Qiver s 0(je_ PkwI State: AA,N Zip: 3IEI Contact:.rt.,2 i4e- eQf1.4.501.1 Name: D40.14A'ro h i LS City: 1—""..)e*A _ Phone: 65-/-2.4-11— 44 90/ Email: S e4! i ..so (�i/'�iy�i sL a1S• o� Address: 20 1 Da kkraN Ls Dr Registration #: City: amp iC, S State: S-11) Zip: S -7 /o 0 (o Phone: ,os -6p % — y 3 o t Contact Person: Ger Gor-cto,04 Email: Licensed plumber installing new sewer/water service: NOTE: Plans and supporting documents that you submit are considered to be public information. Portions of the information may be classified as non-public if you provide specific reasons that would permit the City to conclude that they are trade secrets. Phone #: CALL BEFORE YOU DIG. CaII Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.gopherstateonecall.orq I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will beQQin accordance with the approved plan in the case of work which re1uires review and approval of plans. x S+tjt 1-ktar►c. 0" Applicant's Printed Name x Applicants SYgnure Page 1 of 3 60I epi O NOT WRITE BELOW THIS LINE SUB TYPES Foundation Public Facility ✓ Commercial / Industrial Apartments Miscellaneous Accessory Building Greenhouse / Tent Antennae WORK TYPES _ New /Interior Improvement Addition V Exterior Improvement Alteration Repair Replace Water Damage Salon Owner Change DESCRIPTION Valuation Plan Review (25%_ 100% i4 Census Code # of Units # of Buildings Type of Construction S(� bb a REQUIRED INSPECTIONS Footings (New Building) Footings (Deck) Footings (Addition) Foundation Drain Tile Roof: _Decking _Insulation Framing Fireplace: _Rough In _Air Test _Final Insulation Meter Size: Occupancy Code Edition Zoning Stories Square Feet Length Width Exterior Alteration -Apartments Exterior Alteration -Commercial Exterior Alteration -Public Facility Siding Reroof Windows Fire Repair Demolish Building* Demolish Interior Demolish Foundation Retaining Wall *Demolition of entire building - give PCA handout to applicant Sheetrock MCES System SAC Units City Water Booster Pump PRV Fire Sprinklers /Final / C.O. Required ✓ Final / No C.O. Required Kilbc Other: Pool: _Footings _Air/Gas Tests _Final Ice & Water _Final Siding: _Stucco Lath _Stone Lath _Brick Windows Retaining Wall Erosion Control Final CIO Inspection: Schedule Fire Marshal to be present: Yes Reviewed By: CA• , Building Inspector No Reviewed By: , Planning COMMERCIAL FEES Base Fee Surcharge Plan Review MCES SAC City SAC S&W Permit & Surcharge Treatment Plant Treatment Plant (Irrigation) Park Dedication Trail Dedication Water Quality I (02..7_s 4. Go to 5.410. Water Quality Water Supply & Storage (WAC) Storm Sewer Trunk Sewer Trunk Water Trunk Street Lateral Street Water Lateral Other: TOTAL W Z7 i •1 I Page 2 of 3 t � Use BWE or BLACK Ink �L�kr��No G�-f-�1�. � Fororr�ceuse ---------i i . z�-� a-"�,�r--� ° � < ��. i i C�t of �a aIl s�������� � �� ,m ��� � Pe�,t#: , �f � ,� , i � � $f� 1 0�4 � � � Permit Fee: � �� j 3830 Pilot Knob Road � ' S�� � 2 � � Eagan MN 55122 �� � i i Phone:(651)675-5675 �J°�;._._._w._.._..__.__ � Date Received: � I � Fa�c: (651)675-5694 i Staff: � --------------�;�.�� 2014 COMMERCIAL BUILDING PERMIT APPLlCATlON �,�.3-�� Date: �`� r� Site Address: ��� ?1CLt' l�.'� 'l9+✓ r�� Tenant Name: 1C����� �F: 1 �a�� (Tenant is: IVew!�Existing) Suite�: Former Tenarrt: Name: �E'�K, �LK 1�'��� / l`°'�vl)/t.'� ��"Phone: 1���'��`�'�`�CC,�, P1'Op@Cl�/OWII@C Address/City J Zip: �j � � B�l�� �� ���� r�'�" Applicant is: ° Owner ontractor Type C1f WOt'k Description of work: ��� 1 � ��1.5�����1�� Construction Cost: � d�� ' � Name:--�1V�0 C�'!1� �Q'u��'' ��� License#: ����� y�7 COt1tt'1Ct01" Address: ���� 1�1h.'�^.i ��`I:`h 1``�- City: �« �G�� State:�Zip: ����� Phone: O ,1"' 7�� '��� Contact: �� � �'� EmaiL /KDv� �"� ��(�?0'� e .��Q'('. C d 1`i Name: Registration#_ AI'ChIt6Gt/Et1�g1'1�1'- Address: City: State: Zip: Phone: Contact Person: Email: Licensed plumber installing new sewedwater service: phpne#: NOTE:Plans and supportir�g dac�ments that you submit are cv»sit�r�d to be p�b�fc irrtama#vrs. Pvrtidns af the informa�iion may be cEass'rf"ied as nvn�ttublic if you provFde sp�cific r�s�s that wcurk�t p�nit the Cify to cottCJtrd�3 ithat the are'tt8de�rets. CALL BEFORE YOU DIG. Call Gopher State One Call at(651)454-0002 for rotection a ainst under round utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.aopherstateonecall.ora I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan;that I understand this is not a permit, but only an application for a it, and work is not to start without a ' permit;that the work will be in accordance with the approved plan in the case of work wh' r ires a review and approval of plans. x �i��� ���� X Applicant's Prir�ted Name icant's Page 1 of 3 � � DO NOT WRITE BELOW THIS LINE ��1 � �Z� SUB TYPES _ Foundation Pubiic Facility Exterior Alteration-Apartments ��S _ Commercial/Industriai _ Accessory Building ✓�Exterior Alteration-Commercial �°�� � _ Apartments _ Greenhouse/Tent _ F.uterior Alteration-Public Facility Miscellaneous Antennae WORK TYPES _ New _ Interior Improvement _ Siding _ Demolish Building* _ Addition _ E�cterior Improvement _ Reroof _ Demolish Interior _ Aiteration _ Repair � Windows _ Demolish Four�iation _ Repiace _ Water Damage _ Fire Repair _ Retaining Wall _ Salon Owner Change *Demolltlon of entire buliding-give PCA handout to appllcant DESCRIPTION p� Valuation ��� Occupancy '� MCES System `�_ Plan Review / t,i�S Code Edition �j /P� � SAC Units '�f 25% 100% '� �— ( _ � 2oning � City Water c-� Census Code �------- Stories Booster Pump -�` #of Units _____-�-��� Square Feet �---� PRV �-'� #of Buildings - Length �----'- Fire Sprinklers �-� Type of Construction _�� Width i�� REQUIRED INSPECTIONS Footings(New Building) Sheetrock Footings(Deck) Final/C.O.Required Footings(Addition) �Final/No C.O.Required Foundation pther: Qrain Tile Pool:_Footings _AirlGas Tests _Final Roof:_Decking �Insulation ice&Water Final Siding:_Stucxo Lath �Stone Lath �Brick �Framing Windows Firepiace:_Rough In _Air Test _Final Retaining Wali Insulation Erosion Control Meter Size• Final CJO Inspectlon: Schedule Fire Marshal to be present: Yes No Reviewed By: /�4+�— �- , Buliding Inspector Reviewed By: , Planning COMMERCIAL FEES Base Fee 1 '�{, ',�S' water quauty Surcharge �� ,�Q Water Sampling Fee Plan Review 59 '7,dl.� Water Supply &Storage(WAC) MCES SAC Storm Sewer Trunk City SAC Sewer Trunk S&W Permit&Surcharge Water Trunk Treatment Plant Street Laterai Treatment Plant(Irrigation) Street ' Park Dedfcation Water Laterai Trali Dedicatlon �ther: Water Quality TOTA�����9 O t Page 2 of 3 Dale Schoeppner From: Sent: To: Subject: Bjorklund, Gary (DU) <Gary.Bjorklund@state.mn.us> Friday, February 19, 2016 6:49 AM 'zarina.buendia@us.schindler.com'; Dale Schoeppner; DU.Elevator.ETrakit Final Approval for Permit Work at 601 River Ridge Pkwy, EAGAN SCHINDLER ELEVATOR CORPORATION: The ELV ALTERATION permit work has been completed and approved for the following project: Permit Number: i -00161 Project N. People of Praise - ELV-14065 Site L• cation: 601 River Ridge Pkwy, EAGAN The Department of Labor and Industry is required to inspect and provide approvals on elevator related devices prior to allowing them to be placed into service. An Inspector from the Elevator Safety Section recently performed an inspection of the work performed under the permit listed at the site above. The alteration is in compliance with the Department rules for elevators. CONSTRUCTION CODES & LICENSING DIVISION Elevator Section 1 Use BLUE or BLACK Ink 411, For Office Use �� /43 ,CC �ty O� �� �� Permit#: `V E a Permit Fee: i -3V-V 3830 Pilot Knob Road - Eagan MN 55122 Date Received: lib. �_-®� 1 i Phone: (651)675-5675 RECEIVED - buildinginspectionst"a)_cityofeagan.com Staff: wriai AUG 302017 t. 2017 COMMERCIAL BUILDING PERMIT APPLICATION it i Date:Oki"( ) I F Site Address: (JO► I AVel V( t, P L ,3 too Tenant Name: (Tenant is: New/ Existing) Suite#: Former Tenant: Name: LpIyY) i" LV1VQW - Opk (J(WAIT Phone: iti2'1.2 6fAlitc Property Owner Address/City/Zip: 1101 F. tV die. P I^ ,) c15 .-- $15-9$53 Applicant is: Owner _X_Contractor tkipskTrpi'G`(.it Oct-!(f)-17 Type of Work Description of work: fern ' Y.W1 j Tent- In Sti t 1%ftC 1 00 SF ei14NoPtI - sox(FA Construction Cost:_____SLEUD 22q) SF IUO lP lic x Name:U1"111 Y U/1 1 L.. YL( 11 J License#: -100/0:00 046 5 li e N D PLOOk) Contractor Address: City: ! ; )S UUQGY7�' State: 'IN Zip: 5CY414 I Phone: ?'' �) , 1- (ptI1' ' Contact:_ bil tvt V t bL. Email: 1 . - ,, ,114 - r al I - .it Li an.lwrit till..-L-54-00s5 -QIR cr 0ia-3 3-3og4-m iA) Name: Registration#: Architect/Engineer Address: 0• IRVC c.-il t(- City: `�� g"._<6. 0 i State: Zip: Phone: 4ccaoui?1`"r`li e,, 0.E -7,7 I- ay 41 Contact Person: Email: Licensed plumber installing new sewer/water service: Phone#: NOTE:Plans and supporting documents that you submit are considered to be public information. Portions of the information maybe classified as nonpublic if you provide specific reasons that would permit the City to conclude that they are trade secrets. You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's website at www.citvofeanan.com/subscribe. CALL BEFORE YOU DIG. Call Gopher State One Call at(651)454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.00pherstateonecall.orq I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan;that I understand this is not a permit,but only an applicati.n for a permit,and work is not to start without a permit;that I': work will be in accordance with the approved plan in the case of work * ich requ re 'ew and - 'ro =I of plans. Op Appi io 's Printed Name A• r► nt's Or 40, Page 1 of 3 1 (0 '1c33 , R:a....\., rk-4,7 t/-1 Cqq3 DO NOT WRITE BELOW THIS LINE'" SUB TYPES Foundation Public Facility Exterior Alteration—Apartments Commercial I industrial Accessory Building Exterior Alteration—Commercial Apartments v/ Greenhouse/Tent Exterior Alteration—Public Facility Miscellaneous _ _ Antennae WORK TYPES V New Interior Improvement Siding Demolish Building* _ Addition Exterior Improvement Reroof Demolish Interior Alteration Repair _ Windows Demolish Foundation _ Replace Water Damage Fire Repair Retaining Wall _____ Salon Owner Change *Demolition of entire building—give PCA handout to applicant DESCRIPTION Valuation f met) Fir:t . Occupancy lit MCES System islAs Plan Review tOteb Code Edition 20 ts-1140,1... SAC Units (25% 100%_) an•••••+., Zoning City Water Census Code Stories Booster Pump #of Units Square Feet PRV #of Buildings Length Fire Sprinklers Type of Construction V •1% Width REQUIRED INSPECTIONS Footings New Building Deck Addition Drain Tile Foundation Foundation Before Backfill Retaining Wall Vapor Barrier Erosion Control _ Framing 30 Minutes 1 Hour Steel Reinforcement _ _ Insulation Concrete Entrance Apron _ Sheetrock Other: Roof:_Decking Insulation Ice&Water Final Meter Size: Siding: Stucco Lath Stone Lath _Brick EFIS Electronic Set of Final Revised Plans Windows _ Fireplace:_Rough In Air Test Final /Final I C.O.Required — Pool:_Footings Air/Gas Tests Final V /Final/No C.O.Required Final CIO Inspection: Schedule Fire Marshal to be present: t/Yes No Reviewed By: , Planning New Business to Eagan: - Reviewed By: C_./Vir(-(04 Building Inspector FEES Water Quality Base Fee (55. /46 Storm Sewer Trunk Surcharge 1144-6> Sewer Trunk . Plan Review 1 g(-445 Water Trunk MCES SAC Street Lateral City SAC Street S&W Permit& Surcharge Water Lateral Treatment Plant Stormwater Performance Security Treatment Plant(Irrigation) Landscape Security Park Dedication Other: 14 arca Trail Dedication TOTAL: 41 13%..5-0 Page 2 of 3 - G '42" rte V _ P--e*"i ` 2-0 r For Office Use • 0 Permit#: -� f/70 0 EAGAN���� Permit Fee: / ` Cr Date Received: 3830 PILOT KNOB ROAD I EAGAN,MN 55122-1810 (651)675-5675 I TDD:(651)454-8535 I FAX:(651)675-5694 Staff: Plan Submittal:ealanslacitvofeaoan.com L 2018 COMMERCIAL BUILDING PERMIT APPLICATION Date: 8/31/18 Site Address: 601 River Ridge Pkwy (People of Praise) Tenant Name: Leann Murphy (Tenant is: New/ Existing) Suite#: Former Tenant Name: People of PraisePhone: 612-720-3068 Property Owner Address/city/zip: 601 River Ridge Pkwy Applicant is: _Owner 1 Contractor Type of Work Description of work: Renewal - Annual Event 9/16 Construction Cost: 2688.68 Name: Ultimate Events License#: Contractor Address: 13405 15th Ave N City: Plymouth State: MN Zip: 55441 Phone: 763-559-8368 Gina Vincent(SavannySdoeung) ssdoeung@ue-mn.Com Contact: Email Name: Registration#: Architect/Engineer Address: City: State: Zip: Phone: Contact Person: Email: Licensed plumber installing sewer/water service: Phone#: NOTE Plans and supporting documents that you submit are considered to be public information. Portions of the Information maybe classified as non-public if you provide specific reasons that would permit the City to conclude that they are trade secrets. You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's` website at www.citvofeaaan.comisubscribe. CALL BEFORE YOU DIG. Call Gopher State One Call al(651)454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.000herstateonecall.orq I hereby acknowledge that this information is complete and accurate;that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit but only an application for a permit,and work is not to start without a permit;that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. XSavanny Sdoeung X r Applicant's Printed Name pi' nt's Signature • DO NOT WRITE BELOW THIS LINE SUBTYPES '/ ' 1/6-Ge. 1d6 P4a/ _ Foundation _ Public Facility _ Exterior Alteration–Apartments Commercial/Industrial _ Accessory Building Exterior Alteration–Commercial Apartments Greenhouse/Tent Exterior Alteration–Public Facility Miscellaneous Antennae WORK TYPES New Interior Improvement , Siding Demolish Building* �_ Addition Exterior Improvement _ Reroof Demolish Interior _ Alteration Repair _ Windows _ Demolish Foundation — Replace _ Water Damage Fire Repair Retaining Wall Salon Owner Change 'Demolition of entire building–give PCA handout to applicant DESCRIPTION Valuation Occupancy MGES System Plan Review / Code Edition SAC Units (25% 100% t } Zoning City Water Census Code Stories Booster Pump #of Units Square Feet PRV #of Buildings Length Fire Sprinklers Type of Construction Width REQUIRED INSPECTIONS Footings_New Building—Deck_Addition Drain Tile Foundation Foundation Before Backfill Retaining Wall Vapor Barrier Erosion Control Framing 30 Minutes 1 Hour Steel Reinforcement Insulation Street/Curb Cut inspection Sheetrock Other: Roof:_Decking Insulation Ice&Water Final Meter Size: Siding:_Stucco Lath _Stone Lath _Brick EFIS Electronic Set of Final Revised Plans Windows Fireplace: Rough In _Air Test _Final Final/C.O.Required Pool: Footings _Air/Gas Tests _Final Final I No C.O.Required Final C/O Inspection: Schedule Fire Marshal to be present: Yes No Reviewed By: , Planning New Business to Eagan: Reviewed By: / —" ,Building Inspector FEES Water Quality Base Fee Storm Sewer Trunk Surcharge Sewer Trunk Plan Review Water Trunk MCES SAC Street Lateral City SAC Street S&W Permit&Surcharge Water Lateral Treatment Plant Stormwater Performance Security Treatment Plant(Irrigation) Landscape Security Park Dedication Other: Trail Dedication TOTAL: 4I) S Page 2 of 3 P/ f CC ::r / tG'/. e, a / rmit#:E jkG,A N l� aurae omi Permit Fee: Date Received: 7-4(1 3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810 01‘2-- (651)675-56751 TDD: (651)454-8535 I FAX:(651)675-5694 Staff: buildinginspections@cityofeacian.com L SFr 1itL 2018 COMMERCIAL FIRE ALARM PERMIT APPLICATION Date: 09/17/2018 Site Address: 601 River Ridge Parkway Tenant: People Of Praise - Trinity School suite#: 0 Requirements: 2 complete sets of drawings and specifications, cut sheets on materials and components Name: People Of Praise - Trinity School Phone: Property OwnerAddress i city i zip: 601 River Ridge Parkway Applicant is: Owner X Contractor Type of Work Description of work: Installing a Cellcom Communitcator Construction Cost: Estimated Completion Date: 10/31/2018 Name: Wellington Security License#: TS00657 Contractor Address: 5555 West 78th Street, Suite H city: Edina State:• MN Zip: 55439 Phone: (612)822-4094 Contact: Amanda Nelson Email: Anelson@wellingtonsecurity.com New Remodel Work Type Addition _Other: yAlterations DESCRIPTION OF WORK: Commercial _Residential f Educational FEES Contract Value$470.00 x.01 $60.00 Permit Fee Minimum 60.00 =$ Permit Fee Surcharge=Contract Value x$0.0005 =$ .24 Surcharge* If the project valuation is over$1 million,please call for Surcharge 60.24 _$ TOTAL FEE You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's website at www.citvofeagan.com/subscribe. I hereby apply for a Fire Alarm permit and acknowledge that the information is complete and accurate;that the work will be in conformance with the ordinances and codes of the City of Eagan and with the Minnesota Building/Fire Codes;that I understand this is not a permit,but only an application for a permit,and work is not to start without a permit;that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. x x_�✓�. �. 1�/P r� Applicant's Printed Name Appl' ant's Signature FOR OFFICE USE Reviewed By: G-r- ,,y.. /"` Date: 9 /7-I Required Inspections: Rough-In )(Final Fire Alarm Test L4`1 `]b'I�1 For Office Use Permit#. S 7 --7t� �, • • ,� , 3Permit Fee: 5 - 60 EAGAStaff: =maim=======i==- == I 3830 PILOT KNOB ROAD I EAGAN,MN 55122-1810 Payment Recvd: Yes (651)675-5675(TDD:(651)454-8535 I FAX:(651)675-561$ �+ =p 1 Plans: Electronic )( Paper Plan Submittal:eoIans(acityofeacian.com L. Li BY: 2019 COMMERCIAL BUILD IT APPLICATION Date: g-aq-'1 ! Site Address: 49O f 7rrllpbr r pa w (Peo1o(' of ?ta -se Tenant Name: Lee ftrl r /I/4[r p/t- (Tenant is: New I 1•/ Existing) Suite#: r Former Tenant: Name: Tcf)L Q dF ?aiSL Phone: to 5 ! 77 oC Property Owner Address/City/Zip: (0 Q! ?Ver 1 i el Pet' 9 Applicant is: Owner V Contractor T of Work Description of work: ?PHl e uJ&I r- Ann t�cd- i FNMA-i Q iy Construction Cost: Name: k ) s p 1�eh4R I * Sal License#:r� , f Contractor Address: 3 j Z tv j,'r -Rd N City: X pig to3 State: AM./ Zip: 5606(0 Phone: to 57— 3 2 51 'y Contact: 7e;t' LD l.0 Vf 411 Email: -geti e ' • 1 ,-,s re y / I . co Name: Registration#: Architect/Engineer Address: City: State: Zip: Phone: Contact Person: Email: Licensed plumber installing new sewer/water service: Phone#: NOTE:Plans and supporting documents that you submit are considered to be public information. Portions of the information may be classified as non-public if you provide specific reasons that would permit the City to conclude that they are trade secrets. ' You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's website at www.cltvofeaoan.com/subscribe. CALF..BEFORE YOU DIG. Call Gopher State One Call at(651)454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.aopherstateonecall.orq I hereby acknowledge that this information is complete and accurate;that the work will be in conformance with the ordinances and codes of the City of Eagan;that I understand this is not a permit, but only an application for a permit, and work is not to start without a pemilt;that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. x Lee Ann 1 , vrfily Applicants Printed Name / Appli t s Sign ure DO NOT WRITE BELOW THIS LINE - 77D SUB TYPES 601 Roi6-w. igiAv6 ' _ Foundation — Public Facility — Exterior Alteration-Apartments Commercial/Industrial _/Accessory Building — Exterior Alteration-Commercial Apartments ✓ Greenhouse/Tent _ Exterior Alteration-Public Facility Miscellaneous Antennae — W9RK TYPES V New _ Interior Improvement Siding — Demolish Building* Addition _ Exterior Improvement Reroof _ Demolish Interior Alteration _ Repair Windows _ Demolish Foundation Replace _ Water Damage Fire Repair _ Retaining Wall Salon Owner Change *Demolition of entire building-give PCA handout to applicant DESCRIPTION rr rr Valuation F int. Occupancy (A MCES System Plan Review Code Edition Z015M sI-' SAC Units (25% 100% ) Zoning City Water Census Code Stories Booster Pump #of Units Square Feet PRV #of Buildings Length Fire Sprinklers Type of Construction Width REQUIRED INSPECTIONS Footings New Building Deck Addition Drain Tile Foundation Foundation Before Backfill Retaining Wall Vapor Barrier Erosion Control Framing 30 Minutes 1 Hour Steel Reinforcement Insulation Street/Curb Cut Inspection Sheetrock Other: Roof: Decking Insulation Ice&Water Final Meter Size: Siding: Stucco Lath Stone Lath Brick EFIS Electronic Set of Final Revised Plans Windows Fireplace: Rough In Air Test Final Final/C.O.Required Pool: Footings Air/Gas Tests Final —7 Final/No C.O.Required Final CIO Inspection: Schedule Fire Marshal to be present: 1Yes No Reviewed By: Com`G S ' , Planning New Business to Eagan: .....--- Reviewed By: cD vo 1.1 . , Building Inspector ector FEES Water Quality Base Fee ic•e.--IP Storm Sewer Trunk Surcharge I/./CA.:D Sewer Trunk r Plan Review 1 N GL,D Water Trunk MCES SAC Street Lateral City SAC Street S&W Permit&Surcharge Water Lateral Treatment Plant Stormwater Performance Security Treatment Plant(Irrigation) Landscape Security Park Dedication Other: 4A Trail Dedication TOTAL: 135 . 6-c Page 2 of 3 For Office Use l Cil l e Permit#: /-- -62 7 I j-A s + „ %....- .4.0, Permit Fee: JAN 3 0 2020 II�Cv Staff: _ _ I 4. 3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810 \` �" Payment Recvd: Yes No I (651)675-5675 I TDD: (651)454-8535 I FAX: (651)675-5694 �` I p _ I Email: buildincinst ctionsfiaa?.citvofeagan.com — I P ;rv: Electronic Pa er Ia s. E ect p 1 Plan Submittal: eolansf cityofeaaan.com WO # 257436 2020 COMMERCIAL MECHANICAL PERMIT APPLICATION ❑ Please submit two(2)sets of paper plans with all commercial applications as well as an electronic set of the submittal,submitted via email,CD or flash drive rte Date: 1-22-2020 Site Address: 601 River Ridge , Eagan, MN 55121 Tenant: Trinity School People of Praise Suite#: Owner Name: Trinity School, Poeple of Praise Phone: 651-789-2888 Address/city/zip: 601 River Ridge Rd., Eagan, MN 55121 Name: Northern Air Corporation License#: MB003184 Contractor Address: 1001 Labore Industrial Ct. Ste. B city: Vadnais Heights State: MN Zip: 55110 Phone: 651-955-1720 Contact: Marc Tolvay Email: mtolvay@nac-hvac.com New / Replacement Additional Alteration Demolition Type of Work Description of work: Remove failed boiler and installed new. NOTE: Roof mounted and ground mounted mechanical equipment Is required to be screened by City Code. Please contact the Mechanical Inspector for Information on permitted screening methods. COMMERCIAL New Construction _Interior Improvement Permit Type _Install Piping _Processed Gas Exterior HVAC Unit Under/Above ground Tank ( Install/ Remove) COMMERCIAL FEES 36 500 Contract Value$ x.015 $60.00 Permit Fee Minimum 547.50 $75.00 Underground tank removal, includes State Surcharge = $ Permit Fee Surcharge=Contract Value x$0.0005 =$ �� 3 Surcharge If the project valuation is over$1 million, please call for Surcharge =$ 54 5-73- TOTAL FEE You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's website at www,cltvofeaaan.com!subscribe. I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan;that I understand this is not a permit,but only an application for a permit,and work is not to start without a pe ;that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. f� r Are"'Are"'X IV to X Ai ' Applicant's Printed Name t/ Appl ant'= Signature FOR OFFICE USE 't* --- Required Inspections: Reviewed By: Date:\ (43 0 f? Underground . Rough In Air Test Gas Service Test In-floor Heat t\ Final HVAC Screening