Loading...
2750 Sibley Memorial HwyCity o[EaQan 3830 Pilot Knob Road Eagan MN 55122 Phone: (651) 675-5675 Fax: (651) 675-5694 Use BLUE or BLACK Ink For Office Use ��' Permit #: If /U` Permit Fee: /155-a) JUL 2 619-1) J �% %/2011/FIRE SUPPRESSION SYSTEMS PERMIT APPLICATION* Date: + s 7 — ll Site Address: e2,7 50 ting t� /ie N td Y la 6 //t7' ff 4p \ Tenant: 06 r S Coon 1 ? 4)6 / Suite #: PROPERTY OWNER TYPE OF WORK CONTRACTOR FIRE PERMIT TYPE Name: Address / City / Zip: Applicant is: Description of wo h5/21/4/Yori/ #i 300 575)(44 Construction Cost: 02..4g-5-0 Estimated Completion Date: —c L - 1/ Name: Address: it O • l '1- 7 State: M IV Zip: .g5 --o S5 Contact: Sprinkler System (# of heads ) _ Fire Pump _ Stand •ipe City:l(/etdei / Phone: & S/ —/�y ,51-- l 301- V � Y Email:eiVf S 4o e7cikq DESCRIPTION OF WORK: FEES Commercial $55.00 Minimum (includes State Surcharge) - If the Permit Egg is Tess than $10,010, surcharge is $ 5.00 - If the Permit Fee is > $10,010, surcharge increases try $.50 for each $1,000 Permit Fee (i.e. a $10,010-$11,010 Permit Fee requires a $ 5.50 surcharge) WORK TYPE I ,,, New _ Addition rt �'� Alterations , Remodel 459 Other. Residential OR 3/4" Displacement Fire Meter - $204.00 Educational Contract Value $B 57 x 1% _ $- `�% Permit Fee $ _ Surcharge �r $ 7 TOTAL FEE Fire Meter TOTAL FEE *Requirements: 2 complete sets of drawings and specifications, cut sheets on materials and components to be used 1 hereby apply for a Fire Suppression System permit and acknowledge that the information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan and with the Minnesota Building/Fire Codes; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. x I! egi r Applicant's Printod Name x Applicant's Signature 25 0 1 CALL BEFORE YOU DIG. Call Gopher Sta One Cali at (651) 454-00 Call 48 hours before you intend to dig to receive locates of underground utilities. FOR OFFICE USE REQUIRED INSPECTIONS ct i sr5 t urtdergrounnuiility damage. herstateonecali.or Hydrostatic Trip C nditions of Issuance: Rough In Final Permit Reviewed by: r fi City of Eaall 3830 Pilot Knob Road Eagan MN 55122 Phone: (651) 675-5675 Fax: (651) 675-5694 a 0 allYkkj9 1A7L- 11 S. - 222±Llig.65 b3ex' Use BLUE or BLACK Ink Permit #: Permit Fee: Date Rec Staff: 2011 COMMERCIAL BUILDING PERMIT APPLICATION �-7 Date: 7 -e:20 -i) Site Address: /,� S /1)17 t m011, 4kI I #1'1, 7 Tenant Name: (381,141/ A 1.-11e 1 (Tenant is: New / 'Existing) Suite #: Former Tenant: PROPERTY OWNER Name: 1 An#/.7 sAl^t n4 LS. Phone:o51— z-i5A - S .'bo Address/City/Zip: 2-7 SO tb/e7 Ale ',nok?`R/ /Iw Applicant is: Owner Contractor / TYPE OF WORK Description of work: at i'vi 01;1') 0 frl Construction Cost: CONTRACTOR p Name: CarVI41.01/ 1 ,.S`TL- t.0 /C i , Ji( License #: 20O 4'.‹.-33-' Address: 3 /6 11)a'AAA .5 I1A2 City:at /9f'f ali AI`s State: Mk? Zip: 53-0O % Phone: 50%- 263-®0-7k�4fj 3b2 - -7I k l Contact:S4e (/e- )V I S ' d Email: ARCHITECT / ENGINEER Name: Registration #: Address: City: State: Zip: Phone: Contact Person: Email: Licensed plumber installing new sewer/water service: Phone #: NOTE: Plans and supporting documents that you submit are considered to be public information.' Portions of the information may be classified as non-public if you provide specific reasons that wouldpermit the City to conclude that they are trade secrets. CALL BEFORE YOU DIG. Call Gopher State One CaII at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.qopherstateonecall.org I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of / ork which requires a revie1 and approval of plans. x..-fev.e Applicant's Printed Name Applicant's Signature Page 1 of 3 CASH RECEIPT ct ct wLL0 >1- - 3830 PILOT KNOB ROAD EAGAN, MINNESOTA 55122 tey z 0 0 2 ACCOUNT CODE .IIE b2 E 9091¶ :16L 091 bit b0:1 alieL 9/ 0.11 --11171/(1 6O0(E NYE IIPI4 • 1...13 IPt• alas EZI Ioflg m IMIOWN sannialan eulled lau (9zz) 3thIVEI-L09-888 siumpiampsosaamed pig 1 W .14 616 -L091 -SL tt.tnotttittotamotdVII, Dne,DIWIRSPLIS73.0.1 J7Th ne. 60099 NIN NONNVO 8L00-£93 (L0g) 'M 1s VIONVO g 2.9£99003 'Oil 1V101:13INIA103 R oNnBaaniati 11/111\1301S31:1 8 L91 n'3,N1 NO11 111:11SNO3 NONNVO 4; 7 CA1(449 • .= 1,-, -7113VSKP'4'4i> '7,--7HUM,W2t5MT:1,,ZrVanIZOKINM-Z; • 44" C!tyofEaall 3830 Pilot Knob Road Eagan MN 55122 Phone: (651) 675-5675 Fax: (651) 675-5694 /DO ti2,1 ZOh1y r Use BLUE or BLACK Ink Permit Fee: _ 30 9f. 00 Date Received: Staff: 2011 COMMERCIAL PLUMBING PERMIT APPLICATION Date: Site Address: + /50 t Royj%/C'ry'I712t,4 / /'L, Y Tenant: /-szisr ' 1DeR Suite #: PROPERTY OWNER Name 1 ` Phone: CONTRACTOR Name: (-1-key -10-9-7- _ Iii € k b I I l4 license #: s % r� Address: 3i;c i k 12-r) City: 4r-Lkley State: 023 Zip: ASO 3 Phone: 60- 200- 5088 Email: TYPE OF WORK New Replacement Repair Rebuild Modify Space Work in R.O.W. _ _ / PL) i Description of work: ---1-777/ g PERMIT TYPE COMMERCIAL New Construction Modify Space �yily._,,k.6...L _ Irrigation System (_ yes / no) (_ RPZ / PVB) C' _ • Rain sensors required on irrigation systems • Avg. GPM (2" turbo required unless aller size allowed by Public Works) Meters Call (651) 675-5646 to verity that tests passed prior to picking up meter. Domestic: Size & Type Fire: 1 Avg. GPM High demand devices? Flushometers _Yes _No COMMERCIAL FEES: $55.00 Minimum (includes _Yes _No State Surcharge) OR Contract Value $ x 1% Required - If the Permit Fee is Tess = $ 50 - 67 0 Permit Fee on ALL new buildings and boulevard irrigation systems - = $ 0 (94 -Ob Radio Meter Read than $10,010, the surcharge is $5.00 = $ Meter(s) - If the Permit Fee is > $10,010, the surcharge increases by $.50 for each $1,000 Permit Fee Permit Fee requires a $5.50 surcharge) = $ ` 2 - 0 O State Surcharge (i.e. a $10,010-$11,000 Following fees apply Call the City's Engineering when installing a new lawn irrigation system. $ 6 - 0 0 Water Permit Department, (651) 675-5646, for required fee amounts. '- - -F- _ eatment Plant $ Water Supply & Storage $ State Surcharge TOTAL FEES $- _,_, 30 9' d CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.gopherstateonecall.orq I hereby acknowledg that this information is complete and accurate; that the work will be in confo ance with the ordinances and codes of the City of Eagan; that I understand this is armit, but only an application for a permit, and work is not to start with plan in these o or which requires a review and approval of plans. x Applicant's'Printed Name x permit; th�Yf iie work will be in accordance with the approved Applicant's Signature Page 1 of 3 City of Ea�au 3830 Pilot Knob Road Eagan MN 55122 Phone: (651) 675-5675 Fax: (651) 675-5694 Ci�-ll ��- 2(( 3-4 Cl/I& ck- MAR ? 3 2011 Use BLUE or BLACK Ink Permit #: 2S ( .f Permit Fee: 4-P--/ 7. o (' Date Received: Staff: /2 / 1 2011 COMMERCIAL PLUMBING PERMIT APPLICATION Date: 3/ % Site Address: 256 St I . ' � IPA. Tenant: Suite #: J PROPERTY OWNER Name: Lbse,..,,, Qk-- ��. - Phone: CONTRACTOR Name: `% 1,` 'etifikPe2 .1-31140,- 4 J 14 License #: ,. 171 tiQC O—‘' Address:t126 5, T 4 p City: b .D State: rge1/4-)Zip: 5-3-3 cy Phone: 769""()L3—(79tie) Email: Kf { usi/1^-36"/‘. c' Y r - TYPE OF WORKC2.._,.1/4.3e) ,_New Replacement Repair Rebuild Modify Space Work in R.O.W. _ _ Description of work: kJCS��- p �i c.. -s- PERMIT TYPE COMMERCIAL pS.New Construction Modify Space Irrigation System (_ yes / jmo) (_ RPZ / PVB) • Rain sensors required on irrigation systems • Avg. GPM (2" turbo required unless smaller size allowed by Public Works) Meters Call (651) 675-5646 to verity that tests passed prior to picking up meter. Domestic: Size & Type Fire: 1 Avg. GPM High demand devices? Yes _No Flushometers _Yes _No COMMERCIAL FEES: $55.00 Minimum (includes State Surcharge) OR Contract Value $� �l x 1 % Required - If the Permit Fee is Tess ___,, _$ f--,-,,,.,„ Permit Fee on ALL new buildings and boulevard irrigation systems 4 = $ Radio Meter Read than $10,010, the surcharge is $5.00 = $ Meter(s) - If the Permit Fee is > $10,010, the surcharge increases by $.50 for each $1,000 Permit Fee l Permit Fee requires a $5.50 surcharge) = $ 6 - 00 State Surcharge (i.e. a $10,010-$11,000 Following fees apply Call the City's Engineering when installing a new lawn irrigation system. $ Water Permit Department, (651) 675-5646, for required fee amounts. $ Treatment Plant $ Water Supply & Storage 7 $ T v ' 0 6 State Surcharge / TOTAL FEES $ CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.copherstateonecall.org I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start withot a permit; that the work will be in accordance with the approved plan in t)me case of work which equires a review and approval of plans. x Applicant's Printed Name FOR OFFICE USE Applicant's Signature Required Inspections. Under.Ground ' .d. Rough In TMAir Test V Require Page 1 of 3 41°' City of Eau 3830 Pilot Knob Road Eagan MN 55122 Phone: (651) 675-5675 Fax: (651) 675-5694 Use BLUE or BLACK Ink Permit #: i g."3 3 7 Permit Fee: MIA10 Date Received: Staff: 2011 SEWER AND WATER CONNECTION AND AVAILABILITY CHARGES EXISTING COMMERCIAL PROPERTY re0C 4.-, 3 1 ZZ 4 11 P3rjc,5 FOR OFFICE USE ONLY Date: She ln 2 / S ! Los "f `j f L) rJL 4-84 re ed PRY irPropertyOwner: Address: 2.Sp S tel Q (fl ij� . Phone Nu er: SSD ( ? Cify,R O W Permit v "^ Q_ RCl J Plumber: 78S— Contact Na e: Count R O W Permit x L4 X.C/9U�7i i-- SEWER=', iZtts Sewer Service Water Service Water lateral charge Sewer lateral charge Water trunk Sewer trunk Water supply storage City SAC @ $100 / unit Receipt #: , Date: MCES SAC @ $2,230 / unit Treatment Plant @ $765 / unit Receipt #: , Date: Septic abandonment $ 50.00 Permit Fee $ 50.00 State Surcharge $ 5.00 Permit Fee $ 50.00 *Plumbing Permit Required — water meter to be acquired with building permit TOTAL: State Surcharge $ 5.00 TOTAL: SEWER & WATER Sewer Service Water Service Sewer lateral charge Water lateral charge Sewer trunk Water trunk City SAC MCES SAC Receipt # , Date Water supply & storage Receipt # , Date Treatment plant Septic abandonment —g40_0n Permit Fee $ 100.00 State Surcharge $ 5.00 *Plumbing Permit Required — water meter to be acquired with building permit TOTAL: /66-00 Number of SAC units is determined by the Metropolitan Council Environmental Services (651) 602-1000. CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.gopherstateonecall.orq Cc: City of Eagan Finance Department Date: Tenant: C!ty of Emit 3830 Pilot Knob Road Eagan MN 55122 Phone: (651) 675-5675 Fax: (651) 675-5694 3/7120 A e-cf(--0 p ticto,s �wc e o 8n Use BLUE or BLACK Ink For Office ti� 3 S Permit #: Permit Fee: Date Received: Staff: 2011 MECHANICAL PERMIT APPLICATION } Site Address: 2.7.0 SrrVtCY Me of r4( :y"1414 f 1( Suite #: RESIDENT I OWNER Name: LOs4 SQA'" e-01 Came', CaPhone: ksl - 4S4 -.5.0 8( Address / City / Zip: r 7S0 S) b it. Ole 010 Ptd(' HI' 11 1441 CONTRACTOR Name:6,4 ) YLt n de. f 1-6-4"; n����J�{ �' tc •License #: Address:) I. a 1� O fY' City:'R t L 4lel State:INI\ l'1 Zip: 50 LCCOPhone: (05 k - .g S- ll.l, Contact: I0 `NN O r'.\, ()Y"1 Email: ,°enerale S I VQ AJPr ' & it . = r7 TYPE OF WORK X New Replacement Additional Alteration Demolition -tom Description of work: flYDt-( sysie"'k -004- hew GA{ Ckla Noir awf e'"Ct(e L NOTE: Roof mounted and ground mounted mechanical equipment is required to be screened by City Code. Please contact the Mechanical Inspector for information on permitted screening methods. PERMIT TYPE_ RESIDENTIAL Furnace COMMERCIAL X New Construction _ Interior Improvement Air Conditioner Install Piping _ Processed _ Air Exchanger _ Gas Exterior HVAC Unit _ Heat Pump _ _ Under / Above ground Tank ( Install / _ Remove) Other **When installing/removing tank(s), call for inspection by Fire Marshal and Plumbing Inspector RESIDENTIAL FEES: $55.00 Minimum Add-on or alteration to an existing unit (includes burned out appliances, ductwork, etc.) (includes $5.00 State Surcharge) $5.00 State Surcharge) $ TOTAL FEE $95.00 Fire repair (replace COMMERCIAL FEES: $75.00 Underground tank $55.00 Minimum (includes installation/removal OR State Surcharge) $10,010, surcharge is $ 5.00 surcharge increases by $.50 for each $1,000 Permit Fee requires a $ 5.50 surcharge) Contract Value $ 164 /zoo. x 1% _ $ 16 4Z 000 Permit Fee - If the Permit Fee is Tess than Fee = $ ' O' Surcharge - If the Permit Fee is > $10,010, (i.e. a $10,010-$11,010 Permit A -7 O� _ $ TOTAL FEE CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www,llopherstateonecalLorg, I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. x-7-0 re '``o�SO Applicant's Printed Nam licant's Signatur FOR OFFICE USE R�evewed By: Date: S Required` Inspections: Under Ground Rough In Alt* Test Gas ServiceiTest _In -floor Heat y Final Exterior HVAC Screening Inspection y10 \._-' LL— City of Eaall Plays v 3830 Pilot Knob Road Eagan MN 55122 RECEIVED Phone: (651) 675-5675 Fax: (651) 675-5694 MAR 0 4 2011 Use BLUE or BLACK Ink Date Received: 2011 FIRE SUPPRESSION SYSTEMS PERMIT APPLICATION* Date: IAAR04 1 ) A011 Site Address: d95D JA314.' ikpunoriQ') tt17f Tenant: Los-% C>pur y Suite #: PROPERTY OWNER Name: Lo s -t 5p,,,_r Phone: Address / City / Zip: Q.1SO S.ble,i 1114.,-,®riai Hwy Applicant is: Owner ? Contractor TYPE OF WORK Description of work: Ne,o V.rz Set,..kler sis-4ew, g.r 't1,► Ne.,.,9 C tub hc,Asa Construction Cost: 3y, S OO Estimated Completion Date: 3 une 1"[`H` act' CONTRACTOR Name: c- r c IC , re 4 Sokek License #: CI 29 1 Address: ? Pxnr la& • D.I4 Sit City: r...,.i?e.,4 State: MN Zip: 556SS Phone: (ola•a d•Lr19a Contact:Tr-ea ?ule.✓\\e Email: 0,,,?23OS ( »isi t. Lor-, FIRE PERMIT TYPE X Sprinkler System (# of heads Z63) Standpipe WORK TYPE K New Addition Fire Pump _ _ Alterations _ Remodel Other: Other: DESCRIPTION OF WORK: Commercial Residential Educational FEES $55.00 Minimum (includes State Surcharge) OR $10,010, surcharge is $ 5.00 surcharge increases by $.50 for each $1,000 Fee requires a $ 5.50 surcharge) � Contract Value $ �,ry�50e0 x 1% - If the Permit Fee is less than _ $ .3 7�j-W Permit Fee Permit Fee = $ 5.--°6 Surcharge - If the Permit Fee is > $10,010, (i.e. a $10,010-$11,010 Permit $ 360 - oO TOTAL FEE 3/4" Displacement Fire Meter - $203:0 .62 y CDC �CKMeter ire $ 6'642 `CO TOTAL FEE *Requirements: 2 complete sets of drawings and specifications, cut sheets on materials and components to be used I hereby apply for a Fire Suppression System permit and acknowledge that the information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan and with the Minnesota Building/Fire Codes; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. x YeoERlco ,,e✓y+e_ Applicant's Printed Name AteleApplicant's Signature S, is emsq(fv ( Hw Y qki CALL BEFORE YOU DIG. Call Gopher State One CaII at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.gopherstateonecall.orq IRED INSPECTIONS Hydrostatic Trip Conditions of Issuance: Pump Test Central Station �City oiEa 3830 Pilot Knob Road Eagan MN 55122 Phone: (651) 675-5675 Fax: (651) 675-5694 RECEIVED SEP 2 3 2010 Use BLUE or BLACK Ink Pte* 77017 Pam* Fee: /6/ Date Received:—/0 Stat. 2010 COMMERCIAL BUILDING PERMIT APPLICATIONcolla fpr it Date: q --(2d110 Site Address: L 1 SO S J b ie % Ae 1-,iaP k l /111 h w# y Tenant Name: /s+ _Sp Li L %-e- (Tenant Is: New /.../ "Existing) Suited: Former Tenant PROPERTY OWNER Name: CS f'Y)G( 4 'S 111"11 `L- Phone:1657 - (ISA - ',� 46AddressAddr ( / City / Zip: a/SO S:1 / "/� t e. ile) 0)-14 1 N 14.7 / Applicant is: Owner V Contractor TYPE OF WORK ... CONTRACTOR Description of work 1/e w 64 eif 44 of ,1- ad / 14 pH Is u,, ) cl y ,f Construction Cost7% 5 4 4D0 y f Name: Cc Yt n Ovt 8c,1(1iST I- (46-4101,J h C Licensee*: 2 6 06,... 3, 1.7 Address: . /S DQkD/'cs W CLQ i . City: nth rq /LS /�S$. state: J h1 Zip:. X5 1 % Phone: sv7- 2!,.. - c o'?k / Contact &S- -tv /Vbi + d Email: ean/r1DfMCo/1S "Pi -Oki -illef- et' ARCHITECT / ENGINEER Name: f 3^; nu itSi ®vt 0 e s,1 VI Registration #: Address: 10 (O e k y of It tAt City: 4kQ Ci47 State: '4 ►1. Zip: s ` ii 1 Phone: (PSI ^ _i y5^ 0) Lf t/ Contact Person: C -it k LS P2+-0^ScP Al Email: L m e nd n, (4, ectkiti Z in k-1) t Licensed plumber instating l2oL sewer/water service: Phone 5: NOTE: Warts and sap /ng docuir+ Iririet's t si It a to < ` sof , t'tie irrtiaur ciaaa�k ►n -put tt CALL BEFORE YOU DIG. Call Gopher State One Cali at (651) 4544002 for protection against underground utility damage. CaII 48 hours before you intend to dig to receive locates of underground utilities. www.gor,herstateonecall.ora 1 hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that 1 understand this is not a permit, but only an application for a permit and work is not to start without a permit that the work will be in accordance with the approved plan in the case of ,• rk which requires a reviewpnd approval of plans, $+eve ivaid 4 Applicant's Printed Name Signature Page 1 of 3 6O 6 ib(c icirtobz. ( 6.0y DO NOT WRITE BELOW THIS LINE q 70 (--/' SUB TYPES Foundation _ Apartments �. Lodging Miscellaneous WORK TYPES ,,,/New Addition Alteration _ Replace _ Retaining Wall DESCRIPTION Valuation Plan Review (25% 100%2n Census Code # of Units * of Buildings Type of Construction _ Public Facility ,! Commercial /Industrial ..__ Greenhouse / Tent Antennae _ Interior Improvement Exterior Improvement Repair Water Damage g0ooa Y �s REQUIRED INSPECTIONS Footings (New Building) Footings (Deck) Footings (Addition) Foundation Drain Tile Occupancy Code Edition Zoning Stories Square Feet Length Width ✓ Roof: Decking Insulation .Ice & Water Final ✓` Framing Fireplace: Rough In fir Test _Final ✓insulation Meter Size: Final CIO Inspection: Schedule Fire Marshal to be present ✓Yes No Reviewed By: M k@- �-� , Building Inspector Reviewed By: , Planning Accessory Building _ Exterior Alteration -Apartments _ Exterior Alteration -Commercial Exterior Alteration -Public Facility Siding _ Demolish Building* _ Reroof — Demolish Interior _ Windows Demolish Foundation Fin) Repair _ Salon Owner Change `Demolition of entire building - give PCA handout to applicant /4-2 ,2c c7 City Water Booster Pump PRV MCES System d �c�r /N-50eSAC Units y �-s Fire Sprinklers y r✓5 Sheetrock ✓Fina! / C.O. Required Final /No C.O. Required Other Pool: _Footings _AirfGas Tests Final Siding: Stucco Lath Stone Lath Brick Windows Retaining Wali Erosion Control COMMERCIAL FEES Base Fee Surcharge Plan Review MCES SAC City SAC S&W Permit & Surcharge Treatment Plant Treatment Plant (Irrigation) Park Dedication Trail Dedication Water Quality 9,3160.15- 83 ,06) ,3160.15- 836.06) lo o53-:09 Water Quality Water Supply & Storage (WAC) Storm Sewer Trunk Sewer Trunk Water Trunk Street Lateral Street Water Lateral Other: TOTAL /67/ cL03. 4, Page 2 of 3 jjA Metropolitan Council II October 20, 2010 Dale Schoeppner Building Official City of Eagan 3830 Pilot Knob Road Eagan, MN 55122 RECEIVED OCT 222010 Environmental Services Dear Mr. Schoeppner: The Metropolitan Council Environmental Services (MCES) Division has reviewed the SAC assignment for the Lost Spur. The original letter for this determination was dated September 30, letter reference 100930A2. This project is located at 2750 Sibley Memorial Hwy within the City of Eagan. This project should be charged no additional SAC Units, instead of the 26 units originally assigned. The SAC review is based on new information. Charges: Office 832 sq. ft. @ 2400 sq. ft./SAC Unit Banquet (food prep w. dishwashing & liquor) 7942 sq. ft. @ 590 sq. ft./SAC Unit SAC Units 0.35 13.46 Retail 379 sq. ft. @ 3000 sq. ft./SAC Unit 0.13 Restaurant (full service) Indoor seating 36 seats @ 8 seats/SAC Unit 4.50 Outdoor seating — 75% outdoor discount applied 3046 sq. ft. @ 15 sq. ft./seat @ 8 seats/SAC x 25% 6.35 31 feet @ 1.5 feet/seat @ 23 seats/SAC Unit 0.90 Total Charge: 25.69 or 26 Bar Credits: Future Demolition Lost Spur (Look -Back Use) Office 778 sq. ft. @ 2400 sq. ft./SAC Unit 0.32 Pro Shop 1.00 Meeting Room 318 sq. ft. @ 1650 sq. ft./SAC Unit 0.19 Banquet 3.98 2350 sq. ft. @ 590 sq. ft./SAC Unit Restaurant Indoor seating 3342 sq. ft. x 80% @ 15 sq. ft./seat @ 8 seats/SAC 22.28 Outdoor Lounge 384 sq. ft. @ 15 sq. ft./seat @ 22 seats/SAC Unit x 25% 0.29 Bar 414 sq. ft. x 80% @ 15 sq. ft./seat @ 22 seats/SAC Unit 1.00 Total Credit: 29.06 or 29 Net Charge: 0 www.metrocouneil.org 390 Robert Street North • St. Paul, MN 55101-1805 • (651) 602-1005 • Fax (651) 602-1477 • TTY (651) 291-0904 An Equal Opportunity Employer City of Eagan Mike Maguire Mayor Paul Bakken Cyndee Fields Gary Hansen Meg Tilley Council Members Thomas Hedges City Administrator Municipal Center 3830 Pilot Knob Road Eagan, MN 55122-1810 651.675.5000 phone 651.675.5012 fax 651.454.8535 TDD Maintenance Facility 3501 Coachman Point Eagan, MN 55122 651.675.5300 phone 651.675.5360 fax 651.454.8535 TDD www.cityofeagan.com The Lone Oak Tree The symbol of strength and growth in our community. October 8, 2010 Steve Norstad- Cannon Construction, Inc. 315 Dakota St. W. Cannon Falls, MN 55009 RE: Lost Spur Golf Club ( Foundation Permit ) 2750 Sibley Memorial Highway Dear Steve, We have started our review of the construction documents submitted in pursuit of obtaining a building permit for the above -referenced project. This review is not intended to be an exhaustive and comprehensive report. Unless otherwise noted, all references are to the 2006 I.B.C. It is our goal that this review will help you in complying with the applicable codes and we are, therefore, requesting that the items checked below be addressed: 1 Project Spec 1 Certificate of Survey 1 Special Structural Testing & Inspection Program Summary Schedule with signatures. If you have any questions please contact me by phone 651-675-5676 or mlence • ,c ityofea Elan .com Sincerely, /) ,Lb Mike Lence Senior Inspector City of Eagan Mike Maguire Mayor Paul Bakken Cyndee Fields Gary Hansen Meg Tilley Council Members Thomas Hedges City Administrator Municipal Center 3830 Pilot Knob Road Eagan, MN 551 22-1 81 0 651.675.5000 phone 651.675.5012 fax 651.454.8535 TDD Maintenance Facility 3501 Coachman Point Eagan, MN 55122 651.675.5300 phone 651.675.5360 fax 651.454.8535 TDD www.cityofeagan.com The Lone Oak Tree The symbol of strength and growth in our community. November 4, 2010 Steve Norstad — Canon Construction, Inc 315 Dakota St W Cannon Falls, MN 55009 RE: Lost Spur Golf Club (Building Permit) 2750 Sibley Memorial Highway Dear Steve, We have started our review of the construction documents submitted in pursuit of obtaining a building permit for the above -referenced project. This review is not intended to be an exhaustive and comprehensive report. Unless otherwise noted, all references are to the 2006 I.B.C. It is our goal that this review will help you in complying with the applicable codes and we are, therefore, requesting that the items below be addressed: ✓ 2 sets of Landscaping Plans ✓ Energy Compliance forms from: Ashrae Standard 90.1 — 2004 for HVAC, Service Water Heating and Lighting ✓ 1 Emergency Response Site Plan (Example and contact information enclosed). ✓ Fire Protection System Plan Review Information. Contact Fire Marshal Dale Wegleitner with questions at 651-675-5906. If you have any questions regarding the above items, please feel free to contact me at 651-675- 5676 or mlencen,cityofeagan.com Sincerely, Mike Lence Senior Inspector City of Eagan YeMo TO: Scott Peterson, Building Inspections Peggy Fleck, Community Development Jon Hohenstein, Community Development Mike Ridley, Planning Dale Wegleitner, Fire Marshal Tom Colbert, Engineering John Gorder, Engineering Dave Westermayer, Engineering Leon Weiland, Engineering Tim Plath, Engineering Eric Macbeth, Maintenance Gregg Hove, Maintenance Wayne Schwanz, Utilities Jim McDonald, Police Department Mark Anderson, Electrical Inspector FROM: Mike Lence, Senior Building Inspector DATE: 09/30/2010 # 26 RE: Plan Review For: NEW BANQUENT & GOLF PRO BUILDING. LOST SPUR GOLF COURSE. 2750 SIBLEY MEMORIAL HWY (FOOTING & FOUNDATION PERMIT ONLY) The plans are in our plan review section for your review and comment. Please return this form to my attention with your signed comments within 7 days. Please indicate any concerns you have with these plans and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please submit the proper "hold request" form to me. Comments: Indicate below any fees that are to be collected with the building permit. Amount ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No Landscape Security Required Zoning: Water Quality Dedication Meter Size: Park Dedication Trail Dedication Tree Dedication PRV Required Signature Date G:\Building Inspections\FORMS\Commercial Bldgs Final & Plan Review Letters City of Eapll TO: Scott Peterson, Building Inspections Peggy Fleck, Community Development Jon Hohenstein, Community Development Mike Ridley, Planning Dale Wegleitner, Fire Marshal Tom Colbert, Engineering John Gorder, Engineering Dave Westermayer, Engineering Leon Weiland, Engineering Tim Plath, Engineering Eric Macbeth, Maintenance Gregg Hove, Maintenance Wayne Schwanz, Utilities Jim McDonald, Police Department Mark Anderson, Electrical Inspector FROM: Mike Lence, Senior Building Inspector DATE: 09/30/2010 # 26 RE: Plan Review For: NEW BANQUENT & GOLF PRO BUILDING. LOST SPUR GOLF COURSE. 2750 SIBLEY MEMORIAL HWY (FOOTING & FOUNDATION PERMIT ONLY) The plans are in our plan review section for your review and comment. Please return this form to my attention with your signed comments within 7 days. Please indicate any concerns you have with these plans and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please submit the proper "hold request" form to me. Comments: - S� NSJYt LY4e4;4 Ji O_vi 1/150 40 vsq.e ,,Jict OMAS Indicate below any fees that are to be collected with the building permit. Amount ❑ Yes ❑ Yes ❑ Yes ❑ Yes ❑ Yes ❑ Y ❑ No ❑ No ❑ No ❑ No ❑ No No Landscape Security Required Zoning: Water Quality Dedication Meter Size: Park Dedication Trail Dedication Tree Dedication PRV equired Si./ ,40,-.111L ature c /3//D Date G:\Building Inspections\FORMS\Commercial Bldgs Final & Plan Review Letters C!ty of Evan TAltit Yes TO: Scott Peterson, Building Inspections Peggy Fleck, Community Development Jon Hohenstein, Community Development Mike Ridley, Planning Dale Wegleitner, Fire Marshal Tom Colbert, Engineering John Gorder, Engineering Dave Westermayer, Engineering Leon Weiland, Engineering Tim Plath, Engineering Eric Macbeth, Maintenance Gregg Hove, Maintenance Wayne Schwanz, Utilities Jim McDonald, Police Department Mark Anderson, Electrical Inspector FROM: Mike Lence, Senior Building Inspector DATE: 09/30/2010 # 26 RE: Plan Review For: NEW BANQUQN & GOLF PRO BUILDING. LOST SPUR GOLF COURSE. 275'SIBLEY MEMORIAL HWY (FOOTING & FOUNDATION PERMIT ONLY) The plans are in our plan review section for your review and comment. Please return this form to my attention with your signed comments within 7 days. Please indicate any concerns you have with these plans and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please submit the proper "hold request" form to me. Indicate below any fees that are to be collected with the building permit. Amount ❑ Yes in No ❑ Yes No ❑ Yes No ❑ Yes No ❑ Yes No ❑ Y- ❑ No Landscape Security Required Water Quality Dedication Park Dedication Trail Dedication Tree Dedication PRV Required Signature Date Zoning: p Meter Size: ( 01-677 D G:\Building Inspections\FORMS\Commercial Bldgs Final & Plan Review Letters Pam Dudziak From: Mike Ridley Sent: Thursday, October 14, 2010 8:02 AM To: Dale Wegleitner; Pam Dudziak Cc: John Gorder Subject: RE: Lost Spur I think the 150 stalls makes sense. From: Dale Wegleitner Sent: Thursday, October 14, 2010 7:53 AM To: Pam Dudziak Cc: John Gorder; Mike Ridley Subject: RE: Lost Spur Pa m The design capacity comes from the building code. I didn't look at the size of the driveway but due to limited access to the site we will require that be no parking on the driveway. From: Pam Dudziak Sent: Wednesday, October 13, 2010 4:03 PM To: Dale Wegleitner Cc: John Gorder; Mike Ridley Subject: Lost Spur Dale, I looked at the site/parking plan for the new offices and banquet hall at Lost Spur. I am trying to calculate off-street parking requirements. Between the reconstructed parking lot and the two overflow lots, they are providing 150 stalls. Do you restrict parking on the driveway into this site? Also, how do you determine design capacity of a banquet hall? I counted the seats on the table layout they provided on their floor plan and came up with 491. For parking then, • Using the restaurant/bar standard, @ 1 stall per 3 seats = 164 stalls. • Using the church/club standard, @ 1 stall per 3.5 seats = 144 stalls. • I estimated another 543 s.f. of office @1/150 = 3 stalls • And 543 s.f. retail pro shop @1/200 = 3 stalls • For a Grand Total of 170 OR 150 stalls (take your pick). • I did not include bathrooms, hallways, reception area and mechanical rooms. By one measure they have enough parking, by another they need more. Maybe I should have them provide a proof of parking plan, particularly if they cannot parking along the driveway in case of a really well -attended event, or for an event that packs chairs into the banquet area in rows rather than around tables. Thanks, Pam Pamela Dudziak 1 Planner 1 City of Eagan City Hall 1 3830 Pilot Knob Road 1 Eagan, MN 551221651-675-56911651-675-5694 (Fax) 1 pdudziak(c�cityofeagan.com THIS COMMUNICATION MAY CONTAIN CONFIDENTIAL AND/OR OTHERWISE PROPRIETARY MATERIAL and is thus for use only by the intended recipient. If you received this in error, please contact the sender and delete the e-mail and its attachments from all computers. 1 City of Eagan Nemo TO: Scott Peterson, Building Inspections Peggy Fleck, Community Development Jon Hohenstein, Community Development Mike Ridley, Planning Dale Wegleitner, Fire Marshal Tom Colbert, Engineering John Gorder, Engineering Dave Westermayer, Engineering Leon Weiland, Engineering Tim Plath, Engineering Eric Macbeth, Maintenance Gregg Hove, Maintenance Wayne Schwanz, Utilities Jim McDonald, Police Department Mark Anderson, Electrical Inspector FROM: Mike Lence, Senior Building Inspector DATE: 09/30/2010 # 26 RE: Plan Review For: NEW BANQUENT & GOLF PRO BUILDING. LOST SPUR GOLF COURSE. 2750 SIBLEY MEMORIAL HWY (FOOTING & FOUNDATION PERMIT ONLY) The plans are in our plan review section for your review and comment. Please return this form to my attention with your signed comments within 7 days. Please indicate any concerns you have with these plans and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please submit the proper "hold request" form to me. Comments: Indicate below any fees that are to be collected with the building permit. Amount ❑ Yes ❑ No Landscape Security Required Zoning: ❑ Yes ❑ No Water Quality Dedication Meter Size: ❑ Yes ❑ No Park Dedication ❑ Yes ❑ No Trail Dedication ❑ Yes ❑ No Tree Dedication ❑ Yes ❑ No PRV Re.�•;,� d Date 1 ty G:\Building Inspections\FORMS\Commercial Bldgs Final & Plan Review Letters City of Eagan Ve�o TO: Scott Peterson, Building Inspections Peggy Fleck, Community Development Jon Hohenstein, Community Development Mike Ridley, Planning Dale Wegleitner, Fire Marshal Tom Colbert, Engineering John Gorder, Engineering Dave Westermayer, Engineering Leon Weiland, Engineering Tim Plath, Engineering Eric Macbeth, Maintenance Gregg Hove, Maintenance Wayne Schwanz, Utilities Jim McDonald, Police Department Mark Anderson, Electrical Inspector FROM: Mike Lence, Senior Building Inspector DATE: 09/30/2010 # 26 RE: Plan Review For: NEW BANQUENT & GOLF PRO BUILDING. LOST SPUR GOLF COURSE. 2750 SIBLEY MEMORIAL HWY (FOOTING & FOUNDATION PERMIT ONLY) The plans are in our plan review section for your review and comment. Please return this form to my attention with your signed comments within 7 days. Please indicate any concerns you have with these plans and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please submit the proper "hold request" form to me. Comments: ©g -015 rev awl , s cam. -Fde. , h P deurld> is actio 5 1i t : Indicate below any fees that are to be collected with the building permit. Amount ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes ❑ No ❑ Yes Z No Landscape Security Required Zoning: Water Quality Dedication Meter Size: Park Dedication Trail Dedication Tree Dedication PRV Required nature Date G:\Building Inspections\FORMS\Commercial Bldgs Final & Plan Review Letters Mike Lence From: John Gorder Sent: Tuesday, October 05, 2010 11:23 AM To: 'mark@mbi-nf.com' Cc: Mike Lence Subject: Message for Mark Osborn re: Eagan Lost Spur Building Permit Hi Mark, The City of Eagan Engineering Division has reviewed the civil plans for the above -referenced project, and offer the following comments for revision: • Please provide a removals plan sheet • Provide a separate utility plan showing existing and proposed water and sewer line sizes and pipe types, or re- title and revise the Grading Plan to include detailed utility information. • The parking lot grades in the northwest parking area are in excess of 5%. Consideration should be given to reducing the grading via additional grading or retaining walls. • A "clean" Site Plan should be provided showing parking dimensions and numbers. The Grading Plan proposes 9' x 19' stalls. City code requires 10' x 19' minimum stalls. Please verify the existing stall dimensions. Our Planning & Zoning department will review this application and provide further comment on this matter. • A MnDOT r/w permit is required for any work in TH-13 right-of-way. Please provide evidence of this permit prior to Eagan permit issuance. • An MPCA General Storm Water permit is also required. Please provide evidence of this permit prior to Eagan permit issuance. • Note "City Project No. 10 -BP -E" on all civil plan sheets. Please contact me if you have any questions. Please forward one copy of the revised civil plans to my attention. Other City of Eagan departments may have further comments regarding the application, and will follow up directly to the appropriate parties in the near future. Thanks, John Gorder 1 Assistant City Engineer 1 City of Eagan City Hall 13830 Pilot Knob Road !Eagan, MN 551221651-675-56451651-675-5694 (Fax) I jgorderacityofeagan.com Citi of Etall THIS COMMUNICATION MAY CONTAIN CONFIDENTIAL AND/OR OTHERWISE PROPRIETARY MATERIAL and is thus for use only by the intended recipient. If you received this in error, please contact the sender and delete the e-mail and its attachments from all computers. 1 City of Ea�all YoMo TO: Scott Peterson, Building Inspections Peggy Fleck, Community Development Jon Hohenstein, Community Development Mike Ridley, Planning Dale Wegleitner, Fire Marshal Tom Colbert, Engineering John Gorder, Engineering Dave Westermayer, Engineering Leon Weiland, Engineering Tim Plath, Engineering Eric Macbeth, Maintenance/ Gregg Hove, Maintenance Wayne Schwanz, Utilities Jim McDonald, Police Department MarkAnderson Electrical In ector ROM: Mike Lence, Senior Building Ins ebor • • 09/30/2010 # 26 RE: Plan Review For: NEW BANQUENT & GOLF PRO BUILDING. LOST SPUR GOLF COURSE. 2750 SIBLEY MEMORIAL HWY (FOOTING & FOUNDATION PERMIT ONLY) The plans are in our plan review section for your review and comment. Please return this form to my attention with your signed comments within 7 days. Please indicate any concerns you have with these plans and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please submit the proper "hold request" form to me. Comments: Mei /466\7 pt4,m c ' pri)sr- 74 Pt F Indicate below any fees that are to be collected with the building permit. Amount ❑ Yes LJNo Landscape Security Required Zoning: ElYes No Water Quality Dedication Meter Size: ❑ Yes No Park Dedication ❑ Yes ❑ No Trail Dedication ❑ Yes ❑ No Tree Dedication ❑ Y ❑ No PRV Require Date 07g//o G:\Building Inspections\FORMS\Commercial Bldgs Final & Plan Review Letters City of Eagan Ye�o TO: Scott Peterson, Building Inspections Peggy Fleck, Community Development Jon Hohenstein, Community Development Mike Ridley, Planning Dale Wegleitner, Fire Marshal Tom Colbert, Engineering John Gorder, Engineering Dave Westermayer, Engineering Leon Weiland, Engineering Tim Plath, Engineering Eric Macbeth, Maintenance Gregg Hove, Maintenance Wayne Schwanz, Utilities Jim McDonald, Police Department Mark Anderson, Electrical Inspector FROM: Mike Lence, Senior Building Inspector DATE: 09/30/2010 # 26 RE: Plan Review For: NEW BANQUENT & GOLF PRO BUILDING. LOST SPUR GOLF COURSE. 2750 SIBLEY MEMORIAL HWY (FOOTING & FOUNDATION PERMIT ONLY) The plans are in our plan review section for your review and comment. Please return this form to my attention with your signed comments within 7 days. Please indicate any concerns you have with these plans and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please submit the proper "hold request" form to me. Comments: Indicate below any fees that are to be collected with the building permit. Amount ❑ Yes ❑ Yes ❑ Yes ❑ Yes ❑ Yes ❑ Yes No No No No Nq Landscape Security Required Zoning: Water Quality Dedication Meter Size: Park Dedication Trail Dedication Tree Dedication PRV Required Signature 10- S- 10 Date G:\Building Inspections\FORMS\Commercial Bldgs Final & Plan Review Letters •P- City of Eaaall Mike Maguire Mayor Paul Bakken Cyndee Fields Gary Hansen Meg Tilley Council Members Thomas Hedges City Administrator Municipal Center 3830 Pilot Knob Road Eagan, MN 55122-1810 651.675.5000 phone 651.675.5012 fax 651.454.8535 TDD Maintenance Facility 3501 Coachman Point Eagan, MN 55122 651.675.5300 phone 651.675.5360 fax 651.454.8535 TDD www.cityofeagan.com The Lone Oak Tree The symbol of strength and growth in our community. November 9, 2010 Steve Norstad 315 Dakota St. W., Cannon Falls, MN 55009 RE: New construction at Lost Spur Steve, The City of Eagan has a long history of recognizing the negative impacts of airport noise on land uses within its boundaries and has proactively taken mitigation measures to ensure both compatibility of uses and protection of interior sound levels through construction methods. City staff is aware of pending building plans for new construction on the Lost Spur site. Current Zoning Code standards require noise mitigation only for certain new construction projects in response to aircraft noise. Because these requirements only apply to new construction associated land use or subdivision changes, the current proposed construction on the Lost Spur site is exempt from these standards. The Lost Spur site is within MSP Airport Noise Zone 3. While the city cannot require Zone 3 standards to be met for the proposed construction, we strongly encourage the design of the building envelope, windows, insulation, etc. be done so in consideration of the close proximity to MSP airport. Typically these standards require that interior sound levels of between 45 dBI and 50 dBI are achieved through a reduction of between 19 dBI and 24 dBl from outside to inside noise. If you have already considered airport noise mitigation in your plans then we appreciate the extra attention to the building design. If not, the City of Eagan encourages you to do so. Please let us know if we can be of further assistance and best of luck with your project. Sincerely, Michael J. Ridley, AICP City Planner (651) 675-5650 mridley@cityofeagan.com cc. Osman Prop Inc., 2750 Sibley Memorial Hwy, Eagan, MN 55121 11,1°' City of Eagan 3830 Pilot Knob Road Eagan MN 55122 Phone: (651) 675-5675 Fax: (651) 675-5694 2010 COMMERCIAL l ibI6y/'�)61 ,/(.41 rICt (11 BUILDING PERMIT APPLICATION Use BLUE or BLACK Ink Permit Fee: / jr • t� V Date Received: Staff: Date: (0 /y ( 16 Site Address: T..y'(Lj SGA,,s,-de q00 F} Laes4 Of P;(6r 14 Tenant Name: CI e LL‘r P, a n v► Q` o u 4 d G a r (Tenant is: New / Existing) Suite #: Former Tenant: L J PROPERTY OWNER Name: 6 ,rw14 tel Pf 0 p r \. eii e .S T,., G Phone: �•- Address/City/Zip: a -J0 S'ic! i Mr.rvi6('i'a,t Kw'/ /t G UA M/✓/ Applicant is: Owner k Contractor TYPE OF WORK Description of work: (1 in q r 0, 61 e 2--)e . S 4;04 o e.(1 O (J it d Construction Cost: 4' I'l 00 CONTRACTOR Name: C )ear C l a r, ive) O-4 4-01 00 r License #: Address: .fl) S sr r a �� N� City: .-//4: i► r1 e a rat- S State: M /1/ Zip: r S' Ci /2 ,Phone: l % II) 1;01 -re' 06 Contact: Wd,✓1 /(4 ayve/ Email: "T.'viCCriy-VeCeclear cL4vMee, ARCHITECT / ENGINEER Name: G1` C E-ytcy,,,' e .r,'A► �_ J C Registration #: 1 j 36 6 j Address::^ f f' l ;Ai, J �l1 }yV-4/.eel- City: Oak Po('esS - State: L Zip: 6 0 Li p1 Phone: C -3bT) L4 Pct. d 4 0O J- Contact Person w/ ,' °V a YS -V 'CAL Email: u ✓ k . , ID,, L e .. C b r Licensed plumber installing new sewer/water service: Phone #: NOTE: Plans and supporting documents that you submit are considered to bepubllc to ation. Portions of the information may be classified as non-public if you provide specific reasons that would permit the City to conclude that they are trade secrets. CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.pooherstateonecalLoro I hereby acknowledge that this information is complete and accurate; that the work will be in conforman with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application or a permit, andrk is t to start without a permit; that the work will be in accordance with the approved plan in the case of work wh; h requires a revi and proval of plans. Vette S'cLL0 . Applicant's Printed Name Lt 1.19Lf x Applic gnature 'rrslat Co/ 7 Page 1 of 3 V(53� Stt TYPES Foundation Apartments Lodging d� l taq L DO NOT WRITE BELOW THIS LINE Miscellaneous WORK TYPES New Interior Improvement Exterior Improvement Public Facility V Commercial / Industrial Greenhouse / Tent Antennae Addition Alteration (5I) Repair Replace Water Damage Retaining Wall DESCRIPTION Valuation Plan Review (25%_ 100% ) Census Code # of Units # of Buildings Type of Construction REQUIRED INSPECTIONS Footings (New Building) Footings (Deck) Footings (Addition) Foundation Drain Tile Roof: _Decking _Insulation Framing Fireplace: _Rough In _Air Test _Final Insulation Meter Size: Occupancy Code Edition Zoning Stories Square Feet Length Width Ice & Water Final Accessory Building _ Exterior Alteration -Apartments Exterior Alteration -Commercial Exterior Alteration -Public Facility Siding Reroof Windows Fire Repair q6,11 _ Demolish Building* _ Demolish Interior — Demolish Foundation Salon Owner Change *Demolition of entire building - give PCA handout to applicant MCES System SAC Units City Water Booster Pump PRV Fire Sprinklers Sheetrock Final / C.O. Required ✓ Final / No C.O. Required Other: Pool: _Footings _Air/Gas Tests _Final Siding: _Stucco Lath _Stone Lath _Brick Windows Retaining Wall Erosion Control Final C/O Inspection: Schedule Fire Marshal to be present: Yes /No Reviewed By: A4I* L • , Building Inspector Reviewed By: M� , Planning COMMERCIAL FEES Base Fee Surcharge Plan Review MCES SAC City SAC S&W Permit & Surcharge Treatment Plant Treatment Plant (Irrigation) Park Dedication Trail Dedication Water Quality Water Quality Water Supply & Storage (WAC) Storm Sewer Trunk Sewer Trunk Water Trunk Street Lateral Street Water Lateral Other: TOTAL Page 2 of 3 City of Eaaau 3830 Pilot Knob Road Eagan MN 55122 Phone: (651) 675-5675 Fax: (651) 675-5694 RECEIVED Use BLUE or BLACK Ink Forj� Q� Permit #:(U e0 p Permit Fee: l .� Date Received: /- Staff: Staff: SEP 2 3 2010 2010 COMMERCIAL BUILDING PERMIT APPLICATION �' x(64-5rt9 ,i Date: q -r2 c J Site Address: 1 SO S '. )e )(l e k -i a 1 /Ji h 1 - 7 7 (Tenant is: New / Existing) Suite it: Former Tenant Tenant Name: A/ 5't` 5 P u i- 1T- � 61, h/ PROPERTY OWNER r ` 111^r1 Name: US /'i7t( ✓1 •S ti j^ '`t- Phone: 65/ - LISA - 6-66 d Address / City / Zip: cq./5O S,'--4 Je 'j iti e. Pr) 01-1q 1 )4 kly Applicant is: Owner X Contractor TYPE OF WORK Description of work: ///ve W i�Q. n -it t+.4- ail /(/' f-3-0 ,r i( i) d ))1 47 Construction Cost _ f0; OOQ Fn.( pi Ge& o CONTRACTOR Name: CCL ti. V) Qty Ed /15`i i• N C4)O/1 r 1 h C License6. #: 2 Oo 6..3S-1 Address: ../5 DQy?D1'G Si.tJ. City: OaYpn4)'j ,9 //S State: ItlI7 Zip: ,5:900_ /j Phone: S -V7 - Z6, a- Cri l/i�,1 k Contact Vt Woks --ad Email: ealf®vieOl,si-et4.6,4+; -,idf�•)4et ARCHITECT / ENGINEER Name: 7-1^+ nu kis/ e ti 0 e -Si 1 vi Registration #: C �( Address: / 0 &' £ k y oki A-1,14,City: /' kk Ci 7-7 State: MVI . s- 0) if 6S -tiff Phone: &S)- 8 LIy ,,ee��Zip: Contact Person: t—fl I.I'S I R4- SC i Email: l- i m e ns, aryl (, EQ,h , J i,1 }<'_ 4 @ Licensed plumber installing Dfoy sewer/water service: Phone #: NOTE: Plans and supporting documents that you submit are considered to be public information. Portions of the information maybe classified as non-public if you provide specific reasons that would permit the City to conclude that they are trade secrets. CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. CaII 48 hours before you intend to dig to receive locates of underground utilities. www.gopherstateonecall.ora 1 hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that 1 understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of rk which requires a review nd approval of plans. x +eve NO ) -6411 d x . 120 Applicant's Printed Name Appl cant's Signature Page 1 of 3 -76o oiLiciikt( DO NOT WRITE BELOW THIS LINE SUTB YPES Foundation Apartments Lodging Miscellaneous W1RK TYPES New Addition Alteration Replace Retaining Wall DESCRIPTION Valuation Plan Review (25% _ 100% Census Code # of Units # of Buildings Type of Construction Public Facility Commercial / Industrial _._ Greenhouse ! Tent Antennae Interior Improvement Exterior improvement Repair _ Water Damage -C/©/coo0 yeS REQUIRED INSPECTIONS Footings (New Building) Footings (Deck) —,sFootings (Addition) V' Foundation Drain Tile Occupancy Code Edition Zoning Stories Square Feet Length Width Root _Decking __Insulation _Ice & Water _Final Framing Fireplace: _Rough in ___Air Test _Final insulation Meter Size: _ Accessory Building Exterior Alteration -Apartments _ Exterior Alteration -Commercial _ Exterior Alteration -Public Facility Siding Reroof Windows Fire Repair Demolish Building* _ Demolish interior Demolish Foundation Salon Owner Change *Demolition of entire building — give PCA handout to applicant MCES System SAC Units Q - fJ er 42,)1 City Water Mel -60414 Booster Pump PRV Fire Sprinklers �gheetrock / C.O. Required Final /No C.O. Required Other: Pool: Footings _Air/Gas Tests _Final Siding: _Stucco Lath _Stone Lath Brick Windows Retaining Wall Erosion Control Final CIO Inspection: Schedule Fire Marshal to be present: Yes Reviewed By: 1i L. , Building Inspector 'V/No Reviewed By: , Planning COMMERCIAL FEES Base Fee Surcharge Plan Review MCES SAC City SAC S&W Permit & Surcharge Treatment Plant Treatment Plant (Irrigation) Park Dedication Trail Dedication Water Quality /9/7S sod Water Quality Water Supply & Storage (WAC) Storm Sewer Trunk Sewer Trunk Water Trunk Street Lateral Street Water Lateral Other: TOTAL .`�,9-1, 3? Page 2of3 A Metropolitan Council 44 October 20, 2010 Dale Schoeppner Building Official City of Eagan 3830 Pilot Knob Road Eagan, MN 55122 RECEIVED OCT 2 2 2010 Environmental Services Dear Mr. Schoeppner: The Metropolitan Council Environmental Services (MCES) Division has reviewed the SAC assignment for the Lost Spur. The original letter for this determination was dated September 30, letter reference 100930A2. This project is located at 2750 Sibley Memorial Hwy within the City of Eagan. This project should be charged no additional SAC Units, instead of the 26 units originally assigned. The SAC review is based on new information. Charges: Office 832 sq. ft. @ 2400 sq. ft./SAC Unit Banquet (food prep w. dishwashing & liquor) 7942 sq. ft. @ 590 sq. ft./SAC Unit SAC Units 0.35 13.46 Retail 379 sq. ft. @ 3000 sq. ft /SAC Unit 0.13 Restaurant (full service) Indoor seating 36 seats @ 8 seats/SAC Unit 4.50 Outdoor seating - 75% outdoor discount applied 3046 sq. ft. @ 15 sq. ft./seat @ 8 seats/SAC x 25% 6.35 31 feet @ 1.5 feet/seat @ 23 seats/SAC Unit 0.90 Total Charge: 25.69 or 26 Bar Credits: Future Demolition Lost Spur (Look -Back Use) Office 778 sq. ft. @ 2400 sq. ft./SAC Unit 0.32 Pro Shop 1.00 Meeting Room 318 sq. ft. @ 1650 sq. ft./SAC Unit 0.19 Banquet 2350 sq. ft. @ 590 sq. ft./SAC Unit 3.98 Restaurant Indoor seating 3342 sq. ft. x 80% @ 15 sq. ft./seat @ 8 seats!SAC 22.28 Outdoor Lounge 384 sq. ft. @ 15 sq. ft./seat @ 22 seats/SAC Unit x 25% 0.29 Bar 414 sq. ft. x 80% @ 15 sq. ft./seat @ 22 seats/SAC Unit 1.00 Total Credit: 29.06 or 29 _ Net Charge: 0 www.metrocouncil.org 390 Robert Street North • St. Paul, MN 55101-1805 • (651) 602-1005 • Fax (651) 602-1477 • TTY (651) 291-0904 An Equal Opportunity Employer CITY OF EAGAN 3795 Pilot Knob Rood Eagan, MN 55122 PHONE: 454-8100 BUILDING PERMIT N2 4442 Receipt # S 22 3 'D To be used for ik4dn _ Date 19 Site Address r1em. Erect ? Occupancy Lot Block Sec/Sub. Alter p Zoning Parcel # Repair Fire Zone _ Enlarge ? Type of Const. 71 CC Name Move ? # Stories z 0 Address t -- ? Demolish E] Front ft. City ? t`• Phone Grade ? Depth ft. Approvals Fees o Name € L ?6 E??i1kbT oa Address 777 v? Pau?. D{,.,..0 64 r) -467 . Name _ Address I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with a'I applicab'e State of Minnesota Statutes and City of Eagan Ordinances. Signature of Permittee A Building Permit is issued to: all work shall be done in accordafice with all applicable State of Mir Building Official Assessment _ Water & Sew. Police Fire Eng. Planner Council Bldg. Off. _ APC Permit '• Surcharge Plan check SAC Water Conn. Water Meter Total on the express condition that Statutes and City of Eagan Ordinances. Permit # Daft Issaw P Plumbing - 7 4/50 A? Mechanical INSPECTIONS DATE INSP. Rough-in Final Footings -?j Date Insp. Date Insp. Foundation Iumbing - ?7 Frame/ins. , T Mechanical Final Remarks: •/• 19' £Y rs no r mom ?/l CITY OF EAGAN 3795 Pilot Knob Rood Eagan, Minnesota 55122 Phone: 454-8100 RE"NIC.PLUMBItIG _ PERMIT Date: February 7, 1978 Site Address: ` i?zley Niern. I Lot Block Sub/Sec. Name Lost Spur Country club Address 2750 Siblelt t1em. Hwy. O City -,an Phone: Name "---Iewood Plumbing b Heating Inc. Address 1"? ,?ar iu:F rtrnet City Phone: This Permit • issued on the express condition that all work shall be Min7matutes and City of Eagan Ordinances. No. Receipt No Single Residential 288 V Multi Res., Comm./Ind. New/Alter./Repair alteration - addn. Cost of Installation Permit Fee 150.00 Surcharge Total done in accordance with all applicable State of Building Official WELL DRILLER'S DATE BISSON'S WELL & PUMP CO. SIZE OF WELL INCHES WELL DEPTH , FEET CASING DEPTH Z ,7-, FEET WELL RECORD / PHONE 901011W WATER LEVEL :?7 O FEET DRAW DOWN FEET CAPACITY GALLONS-41-52 PER %HR. CASED WITH DEPTH OF IMPERVIOUS FORMATION FEET SAND POINT FEET INCHES/B INCHES ?y??? MAKE AND TYPE MATERIAL: WELDED JOINT ? SCREWED JOINT REMARKS: Kind of Formation Color Started Depth Ended Depth Width of Forma. Remarks INSPECTION RECORD CITY OF EAGAN PERMIT TYPE: 3830 Pilot Knob Road Permit Number: Eagan, Minnesota 55122-1897 Date Issued: (612) 681-4675 SITE ADDRESS: ,: , :, 1; 1 ,?: ?. i MEMORTAL HWY -,1 =. I I llN 4 PERMIT SUBTYPE: APPLICANT: ;1 1 4 { s, TYPE OF WORK: PM Ii --111NG I F0 MAFtb"`i? PLAN RF'VIF'urD BY 30F VOU1.`-, ': T ar Permit Holder Date Telephone # PLUMBING HVAC Inspection Date Insp. Comments FOOTINGS FOUND FRAMING ROOFING ROUGH PLUMBING PLBG AIR TEST ROUGH HEATING GAS SVC TEST INSUL GYP BOARD FIREPLACE FIREPLACE AIR TEST FINAL PLBG FINAL HTG ORSAT TEST BLDG FINAL DOMESTIC METER IRRIGATION METER FLUSH MAINS CONDUCTWITY TEST HYDROSTATIC TEST BSMT R.I. BSMT FINAL DECK FTG DECK FINAL CITY OF EAGAN Remarks ?iS?cs Additian Section 4 Lot 5 Blk 2 Parcel 10 00400 050 02 Owner -r7) c :._ c, .? Street-1754 / v il,% m /sr i State h Improvement Date Amount Annual Years Payment Receipt Date STREET SURF. STREET RESTOR. GRADING SAN SEW TRUNK y 1968 $1018.50 $33.95 30 PAID SEWER LATERAL WATERMAIN WATER LATERAL WATER AREA 1977 $2211.60 $147.44 15 b [) STORM SEW TRK STORM SEW LAT CURB & GUTTER SIDEWALK STREET LIGHT WATER CONN. BUILDING PER. 1443 10-75 SAC $200.00 3168 10-24-69 PARK .s $300.00 1911 10-24-69 CITY OF EAGAN Remarks ?/- V7 1-Afd /r = J'-L itibn Section 4 Lot 012 Blk 05 Parcel #10 00400 012 05 Owner 1 ' Street 2750 Sibley Mem Hwy State I rovement .. Date Amount Annual Years Payment Receip Date STREET SURF. 42 A-e? t STREET RESTOR. . GRADING SAN SEW TRUNK IN, SEWER LATERAL WATERMAIN WATER LATERAL WATER AREA STORM SEW TRK STORM SEW LAT CURB & GUTTER SIDEWALK STREET LIGHT WATER CONN. BUILDING P . SAC P CITY OF EAGAN Remarks ??? ??A,r /217 dcc• ???'st?, - - -` : ms's Additio Section Lot 012 Blk 05 "Irl Parcel 10 00400 01.4 05 asman Prop. Inc. Fee Owner Street -,2J-5D-S1hZEy_-meID HWv 5tateL_ _ PAGAN MN 55121 Improvement Date Amount Annual Years Payment Receipt Date STREET SURF. STREET RESTOR. GRADING SAN SEW TRUNK !!J0 1969 C)266, 2-S 308, 88 30 1 Paid SEWER LATERAL ?J ,z WATERMAIN WATER LATERAL WATER AREA 3P31 1977 ..." r# r "2,640?w, - STORM SEW TRK STORM SEW LAT CURB & GUTTER SIDEWALK STREET LIGHT SAC 525.00 42461 4-9-84 WATER CONN. 470.00 42461 4-9-84 BUILDING PER. #3779 1443 7 0-75 SAC 3168tvilVII .0-24-69 PARK 10 00400 012 05 combination of the following parcels - Su,,Per- Clµb ,050 M 30(-1- 8 010 06 3043-D 020 06 3042-A 040 06 3045 050 06 3048-A 060 06 3048-B1 Acreage 66.58 CITY OF EAGAN Remarks Addition section 4 Lot 1 Blk 6 Parcel 10 00400 010 06 Owner L!IK2 Q-1 ?. Street State ITT /Yu.t:Zr': ?(1 ?r11 ;) ?a?1? ot1i;; ; !/ )?_ Supper Club 130114_3' ? Improvement Date Amount Annual Years Payment Receipt Date STREET SURF. STREET RESTOR. GRADING SAN SEW TRUNK 1968 i n SEWER LATERAL WATERMAIN WATER LATERAL WATER AREA 1977 190.00 12.66 1 NP. STORM SEW TRK STORM SEW LAT CURB & GUTTER SIDEWALK STREET LIGHT WATER CONN. SUILDING PER. SAC PAR K CITY OF EAGAN Remarks Addition SeCtiOrn Lot 2 Blk Owner Am k1_/ l} :'>r;.y Street 2750 Mem. 118.Y . 5510 Z. 30f* Improvement Date Amount Annual Years Payment Receipt Date STREET SURF. STREET RESTOR. GRADING SAN SEW TRUNK 1 IS qO 1 71.20 -30 Pai id SEWER LATERAL WATERMAIN WATER LATERAL WATER AREA ?'A- 1977 W13-60 3 -9. .l3 -?; `C. STORM SEW TRK STORM SEW LAT CURB & GUTTER SIDEWALK STREET LIGHT WATER CONN. BUILDING PER. SAC PARK CITY OF EAGAN Remarks 9 "4'90S . --j v 04.4) ZIA2 Addition Section 4 Lot Owner) 14 4C 2, Street t, I, III 7 5-t . 5.516 z a oot?oo 040 06 4o y? Improvement Date Amount Annual Years Payment Receipt Date STREET SURF. STREET RESTOR. GRADING SAN SEW TRUNK 1968 .00 0.20 30 Paid SEWER LATERAL WATERMAIN WATER LATERAL WATER AREA 1977 3921.6-0 .44 15 A STORM SEW TRK STORM SEW LAT CURB & GUTTER SIDEWALK STREET LIGHT WATER CONN. BUILDING PER. SAC PARK CITY OF EAGAN 1 Remarks I F?5 ? d?r) ^, r r Addition Sectim 4 Lot- 5 Blk Owner, 1 , M.Ld \ ?? r - Street 2790 Sibley Hwy. dit 4 Improvement Date Amount Annual Years Payment Receipt Date STREET SURF. STREET RESTOR. GRADING SAN SEW TRUNK 1968 533.75 17.79 30 Paid SEWER LATERAL WATERMAIN WATER LATERAL WATER AREA 1977 1159-00 77.2 1 10 c ., Y-22-6-76. STORM SEW TRK STORM SEW LAT CURB & GUTTER SIDEWALK STREET LIGHT WATER CONN. OUILDING PER. SAC PARK CITY OF EAGAN Remarks?,,?a Addition 'Section Lot 6 B 6 Parcel 10 0 G00 060 06 owner Street 1750 Sibley Hwy State_ Eagan,MN 55121 /,--) - !' rJZ - ?tl Improvement Date Amount Annual Years Payment Receipt Date STREET SURF. STREET RESTOR. GRADING SAN SEW TRUNK yD 1968 3769.5o 125.65 30 Paid SEWER LATERAL 1969 6120.00 06 00 1 Paid WATERMAIN WATER LATERAL WATER AREA 3 1977 10366.40 691.09 1 STORM SEW TRK STORM SEW LAT CURB & GUTTER SIDEWALK STREET LIGHT WATER CONN. BUILDING PER. SAC 26o.oo 6572 10-10-72 PARK Receipt PLUMBING PERMIT Permit No. II CITY OF EAGAN Fee 7` U I Y` Fill in numbered spaces S/C_ Type or Print legibly Tot. 1. Date 2. Installation Cost e2 7Sa r,'? .. 3. Job Address ` ?t-/ 4' / ? Lot Blk. Tract 4. Owner 5. Contractor /D/) P(c all )?L (? . Phone 6. Address 61 _? (? Z (? L-) )? L, 7. City ./} State Zip 8. Building Type: Residential-:E4-J Commercial ? Institutional ? 9. Work Description: New ? Add ? Alter ? Repair ? 10. Describe Lu A TEL C' # /'Ps ,L) GL Q U L )'? 11. No. Fixtures Water Closet No. Fixtures Ces l/D i fi ld Bath tubs spoo ra n e ti S T k Lavatory ep c an Soft e Shower n r W ll Kitchen Sink e Urinal/Bidet Oth Laundry Tray er Floor Drains Drinking Ftn. Slop Sink Gas Piping Outlets 12. 1 hereby certify that the above information is true and correct, and I agree to comply with all ordihance and codes governing this type of work. Signed : ( / , /JJ lc ,lam for T Rough n Inspections: Date' Date Insg,,,?? This is your permi herT numbered and a e Pp Approved CITY OF EAGAN 454-8100 r?nP'+igp?jl,?' Aljyi.:.?-..... r-:n:.?vt.,? RY, '!•Kf _ y::.b-??y.!t'w,'; ".i_Yz+t; ,.. ,a..r. ...?-T-... ?. ... LOST SPUR CITY OF EAGAN _ 1: ? : p J 17036 3830 Pilot Knob Road, P.O. Box 21-199, Eagan, MN 55121 ~ PHONE: 454-8100 BUILDING PERMIT Receipt # To be used for RE-ROOFING Est. Value $4.000 Date SEP $ 1989 Site Address 2750 SIBLEY MMRIAL HWY Lot 014 Block 05 Sec/Sub. OFFICE U SE ONLY Parcel No. 10-00400-014-05 Occupancy FEES Zoning W Name (Actual) Const Bldg. Permit 64.00 o Address (Allowable) 2.00 Surcharge City Phone 454-2330 # of Stories Plan Review Length o Name P 0 INC Depth - SAC Cit po U a 386 N WABASHA Address S.F. Total y , cc City ST PAUL Phone 642-1264 S.F. Footprints SAC, MCWCC Water Conn On Site Sewage ~ ¢ W Name *L PANIAN On Site Well t M W w er a eter _= Address 1800 FLAIR MWCC System ia r W = City ST PAUL Phone 642-1264 City Water Acct. Deposit PRV Required S/W Permit I hereby acknowlege that I have read this application and state that the Booster Pump S/W Surcharge information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Treatment PI Signature of Permitee APPROVALS Road Unit A Building Permit is issued to: P C INC Planner Park Dad. on the express condition that all work shall be done in accordance with all Council applicable Slate of Minnesota Statutes and City of Eagan Ordinances. Bldg, Off. Copies Building Official Variance TOTAL ".00 Permit No. Permit Holder Date Telephone # WATER SEWER PLUMBING H.VA.C. ELECTRIC Inspection Date Insp. Comments Footings I Foundation Framing Roofing Rough Plbg. Rough Htg. Isul. Fireplace Final Htg. Final Plbg. Const. Meter Plbg. Inspector - Notify Plumber Engr./Plan Bldg. Final Deck Ftg. Deck Final Well Pr. Disp. ....'. Cfertificate of Cccnpanc4 Wit4 of Wagan Teoarbnent of 13nifthIg 3*61m m This Certificate issued pursuant to the requirements of the Uniform Building Code certifying that at the time of issuance this structure was in compliance with the various ordinaillces of the City regulating building construction or use. For the following: Use C7assiFication. C OMM / I N D MISC.-LOST SP U_ 20501 ?Idg. Permit No. Occupancy'\Type Zoning District cant. 09W RRUME-Mm Owner of Building Add2ss 2750 S= T124FJAL f KAGAN Bui,Wg Add-2750 SIB[EY MNJRIAL }WY Locality L14, B5, SDCPICN 4 Date: 04/30/43 Building Official POST IN A CONSPICUOUS PLACE INSPECTION RECORD 6TV OF EAGAN PERMIT TYPE: 3830 Pilot Knob Road Permit Number: Eagan, Minnesota 55123 Date Issued: (612) 681-4675 SITE ADDRESS: 01 , . APPLICANT: i I 1 uH 'I t !,w ) f ot'h of 1, .;t PERMIT SUBTYPE: .1,1 , . F TYPE OF WORK: D ',i - ik l I' I t fIH 1tt1 t ? t. ? rte y.•H'•H i 0:11/1,1 AI It RA1 IN I Il'; i 'il'III2 INSPECTION TYPE DATE INSPECTION TYPE DATE INSPTR. Permit No. Permit Holder Date Tone i S/W 4IL4049046 VAC 3 /8 g 0 7'- 11 ?` ELECTRIC Z ELECTRIC Inspection Date Insp. Comments Footings I Foundation Framing {{ ,, 13 1l?? A (yv r ll (? Roofing Rough Plbg. Rough Htg. Isul. Fireplace Final Hlg. Orsat Test Final Plbg. Pibg. Inspector - Noft Plumber Const. Meter Engr./Plan Bldg. Final /rl/ 3 K ` 30 j Lr1?7?eYS?Q? Deck Ftg. Deck Final Well Pr. Disp. J? GU W H RECEIPT CITY OF EAGAN P. 0. BOX 21-199 EAGAN, MINNESOTA 55121 DATE 01. 19' RECEIVED f . FROM AMOUNT $ ? CASH ? CHECK DOLLARS loo FOR l i _ FUND CODE AMOUNT Thank You 4 BY White-Payers Copy Yellow-Posting Copy Pink-File Copy CG Ur 1.C4 OA- t OF EAGAN Pilot Knob Road PERMIT NO.: ` n, MN 55122 DATE: , 1g: _ No. of Units: ess: - Address: ?~ ') fi!}.1? :P6tcfOX tt,. to comply with the City of Eagan Connection Charge: Account Deposit: Permit Fee: Surcharge: _ Misc. Charges: Total: Date Paid: of Insp.: CITY OF EAGAN WATER SERVICE PERMIT 3793 Pilot Knob Road PERMIT NO.: Eoqan, MN 55122 DATE: Zoning: No. of Units: Owner: Address: Site Address: Plumber: Meter No.: Connection Charge: Size: Account Deposit: Reader No.: Permit Fee: 1 agree to comply with the City of Eagan Surcharge: Ordinances. Misc. Charges: Total: BY - Date Paid: Dote of Insp.: Insp.: SEWER SERVICE PERMIT PERMIT NO.: DATE: ; i z No. of Units: to comply with the City of Eagan Connection Charge: Account Deposit: _ Permit Fee: Surcharge: Misc. Charges. - Total: Date Paid: ITY OF EAGAN WATER SERVICE PERMIT 795 Pivot Knob Road t PERMIT NO.: Eagan, MN 55122 DATE: Zoning: No. of Units: Owner: Address: Site Address: Plumber: Meter No.: Connection Charge: Size: Account Deposit: Reader No.: Permit Fee: 1 agree to comply with the City of Eagan Surcharge: Ordinances. Misc. Charges: Total: BY Date Paid: Date of Insp.: Insp.: CITY OF EAGAN 3830 Pilot Knob Road P. O. Box 21199 Eagan, MN 55121 Zoning: PF Owner: Osman Pro ertie., Address: ?p Address: 2 7 Hi qh, Z ber. Bergstrom plb r 3 yo2 o2ao 9? Size: - ..?? Reader No.: am* chy of ""a Maaea. By Date of In- P. Zoning; Owner: Address: t t ? ? ? r t ? ? C Site Address: --------------- Plumber; Meter Size: Reader No.. I agree to emply wM orapeaor. ' Ee?ea ?y )ate of Insp.: Plumber. ` 'C WATER SERVICE PERMIT CITY OF EAGAN 3830 Pilot Knob Road P'O•E x21199 Eagan, MN 55121 Zoning; Owner. `7- • ro Address: Site Address: PERMIT NO.: 5408 DATE: 4-17-84 No. of Units: 1 - ConnectionChorge:47p.00. - Acm'nt Deposit: 15 .0 6-n d Permit Fee: 10.00 vd Surcharge: .50 d Misc. Charges: 6 3.0 O p d Total: Date Paid: - Insp.: WATER SERVICE PERMIT PERMIT NO.: DATE: No. of Units: Connection Chorf Account Deposit: Permit Fee: Surcharge: Misc. Charges: _ Total: Data Paid SEWER SERVICE PERMIT - PERMIT NO.: DATE: 1,- No. Of Units. "roe to "ft* wah WiaaeeaL Nie City of Eataa of Insp,: pd noction arm: S { , Account Deposit; I •?^ Penruk Fee: .1. ?' Surcharge: - Misc. me roes: - Total: Dare Paid: / / / 8 ' G 4 9 9 8 ? Request Date Fir o. Rough-n Inspection Required? ady Now ? Will Notify Inspector ? Y. o When Ready? 11jjEensed contractor ? owner hereby request inspection of above electrical work at: Job Address (Scree Boz or ule o a city o Section No. Township Name or No./ I Range No. County Occupant (PRINT) &441L 6-4 ? Phone No? /'z - 3 D Power Supplier Address Electrical Cormactor (Company ame) Contrector5 Licenm No. Ries Electric Company A-39770 Mailing Address (Contractor or Owner Making Installation) 777 North Concor uth aul, innesota 55075 Authorized Signature (Dentragler gl Ilatbn) Phone Number 451-2238 MINNESOTA STATE BOARD OF ELOiRICITY THIS INSPECTION REOUEST WILL NOT Griggs.Mldmy Bldg. - Room S- BE ACCEPTED BY THE STATE BOARD 1821 Unnieraky Ave., SL Paul, MN 58104 UNLESS PROPER INSPECTION FEE IS Phone (612) SQ4)800 ENCLOSED. /e9 4t' 0 REQUEWQGEOR ELECTRICAL INSPECTION ll? See inslrudions for completing this form on back of yellow copy. X" Below Work Covered by This Request EB-OOM-0] New Add Rep. Type of Building Appliances Wired EquipmentWirad Home Range Temporary Service Duplex Water Heater Electric Heating Apt. Building Dryer Other (Specify) Comm./Industrial Furnace Farm Air Conditioner Other (specify) contactors Remarks: r']/)9ii1 i Q{? /:??? Compute Inspection Fee Below: Py? lc/-/.k 4/,?L # Other Fee # Service Entrance Size Fee # Cirmits/Feeders Fee Swimming Pool 0 l0 200 Amps (p 0 to 100 Amps O,Da Transformers Above 200_Amps Above 100Amps Signs Inspectors Use Only: TOTA yF? Irrigation Booms Special Inspection "t Alarm/Communication Other Fee r I, the Electrical Inspector, hereby Rough-in _ certify that the above inspection has been made. Rnal oafs /?,? OFFICE USE ONLY This request mid 18 months from dr z5l?° ° 23 ?'a yirw A5 ? Request Date 71 ?' _ !r Fire No. Rough-in Inspection Required? Ready Now D .Will Notify Inspector Wh R d ? Yes ? No en ea y licensed contractor ? owner hereby request inspection of above electrical work at: Job Address (Street. Box or Route No.) 27 3 3'? m . ) w . City ?rtiu Section, Township Name or No ? 2-7 Range No. A County Occupant (PRINT) yy7 Osrnu roi. jai 11h c. Phone No. "tS2- 660 Power Supplier Address Electrical Contractor (Company in I Contracto i Uce66, CA 06 Mailing Addr sa (Oontraclor or Ow Making Ipstallation) / Aumpneed Sigh.wre ICOntractor; er Making IInstalla)o) Ph ne Numbe{ - 4 0 7 7 MINNESOTA STATE BOARD OF E TRICITY THIS INSPECTION REQUEST WILL NOT Griggs-Midway Bldg. - Room S-173 BE ACCEPTED BY THE STATE BOARD 1821 University Ave., St. Paul. MN 55104 UNLESS PROPER INSPECTION FEE IS Phone (612) 642-0800 ENCLOSED. c??j 1 3 REQUEST FOR ELECTRICAL INSPECTION I? Sep, instrucbO for completing this form on back of yellow copy. L211 0 ? "X" Below Work Covered by This Request dMc} EB-00001-08 F ??``;?'GPlT0?5 New Add Rep. Type of Building Appliances Wired Equipment Wired Home Range Temporary Service Duplex Water Heater Electric Heating Apt. Building Dryer Other.(Specify) Comm./Industrial Furnace Farm Air Conditioner Other (specify) Contractors Remarks: Compute Inspection Fee Below: # Other Fee # Service Entrance Size Fee # Circuits/Feeders Fee Swimming Pool 0 to 200 Amps 'S 0 to 100 Amps ?. D3 Transformers Above 200 _ Amps LGee J 3 Signs Inspectors Use Only, '? c?7 TOTAL _ Irrigation Booms ///, f_ tn r dj Special Inspection A n) Alarm/Communication THIS INSTALLATION MAY BE ORDERED DISCONNECTED IF NOT Other Fee COMPLETED WITHIN 18 MONTHS. I, the Electrical Inspector, hereby certify that the above inspection has been made. Rough-in Final oate/!„2/ J? oatg,? ,?j 1 J OFFICE USE ONLY a This request vod 18 months from This request void 18 months from 24981 ? r llt,'( L t 3 5 Stir rr rs-8? ?b,00 Request ate Fire No. Rn UgM1-in Inspection Requiredt J adv N(pv ? Will Notify Inspec- aR ? Yes No tot itheu Read, cen ed Electrical Contractor I hereby request inspection of above ? Owner f electrical work installed at: Street Address, Bon or R to N C' 0 section 0. Towns ?p N e or Range No. Occu g n INNTTI P o N ? Power Supplier Atltlress Ele n Co tp ICOmpany 1 Contr tot's License No. 371-7 ss IC tar or caner Making Instaila :7 54v Author' ignat a (Con[ actor Own Maki stalls l' nl P Numb arr /J ? M TATE BOARD OF ELECTRICIT THIS INSPECTION REQUEST WILL NOT Qr' 6 -1 idway Bldg. -Room N-181 BE ACCEPTED BY THE STATE BOARD 1 University Ave., St. Paul. MN 56106 UNLESS PROPER INSPECTION FEE IS _. ._._. _..- ---- ENCLOSED. ??1 REQUEST FOR ELECTRICAL INSPECTION 1 ER-00o0l-03 w 4 1 ' See instructions for complat:nEsthis form on back of ynllow copy. II ,,,15 ?? t? "X" Below Work Covered by This Request t J Add Rep. . Type of Building Appliances Wired Equipment Wirlad Home Range Temporary Service Duplex Water Heater Lighting Fixtures Apt. Building Dryer Electric Heating Commercial Bldg. Furnace Silo Unloader Industrial Bldg. Air Conditioner Bulk Milk Tank Farm Cher .peci V ther ISperifyl t ar specify Other Other Compute Inspection Fee Below n Fee Service Entrance Size p Fee Feeders?Subfeeders k Fee Circuits 0 to 100 Am 0 to 30 Am s 0 to 30 Am 101 to 200 Amps 31 to 100 Amps 31 to 100 q, Above 200 Amps Above 100-Amps Above 100_Am1s Transformers Remote Control Circ. Partial/Other Fee Signs Special Inspection 5 TOT Remarks FEE .• Rough-in Data I, Ih ctricel t Inspector, hereby certify that the above Final Daie ]?1 spection has been mado. This request void 18 n.nnnc? f-, s request void r (y1 ,onths from -d- S(3ol ?? or Ro to N , Street Addres 1 Cr - ? YII / /? Y SieCtimlNo. Towns Name or n Range o. Cou ty pp G'L Occu Writ (PRI T) Phor No.. -? w r Supplier Address P Elect ri al ont?Comon Q15m Contractor's License=o. 7 Mai I g A Jress )Co ractor r caner Ma ing Installation) ?J? ? 1 -_ (/,z+/ d Signature ICont ctbr?0 ut or nor Making Ir15latignl Ph umber + MINN OTA STATE BOARD OF ELECT CITY THIS INSPECTION RE UEST WILL NOT Gr' s-Midway Bldg. -Room N-191 BE ACCEPTED BY THE STATE BOARD 821 University Ave., St. Paul, 55106 UNLESS PROPER INSPECTION FEE IS Ph- 16121 297_2111 ENCLOSED. L/.cmensea tiectncai t,omractor I hereby request inspection of above ? Ownjr electrical work installed at: REQUEST FOR ELECTRICAL INSPECTION /E6-00001-pe4 rp See instructions for completing this form on back of yellow COPY. r.r,/ 40? 0 7 Q "X*' Below WkorCovered by This Request ' 17 Nea Add Sep. Type of Building Appliances Wired Equipment Wired Home Range Temporary Service Duplex Water Heater Lighting Fixtures Apt. Building Dryer Electric Hearin Commercial Bldg. Furnace Silo Unloader Industrial Bldg. Air Conditioner Bulk Milk Tank Farm Other peel v Other lSpecifyl t ,r uecilY Other Other Compute Inspection Fee Below M Fee Service Entrance Size ft Fee Feeders/Subfeeders d Fee Circuits 0 to 200 qm s 0 to 30 Amps 0 to 30 Amps Above 200 Amps 31 to 100 Amps 31 to 100 Amps Swimming Pool Above 100Am s Above 100-Am Ps Transformers Irrigation Booms Partial%Other Fee Signs Special Inspection h TOTAL FE Remarks liYi, . : - "j /i., rrJ1 Bough-in Date 1, the Electrical 414 ? t Inspector, hereby certify that the above Final ?,/ inspection has been -W made. This r"u"t void 18 monp a from 31r3/9?) - - Recurred? eady Now Will Notify Inspec- for When Ready Yes o Md'Liceased Electrical Contractor I hereby request inspection of above ? Owner electrical work installed at: Stteey Address, Box or Roue No . City ec o. To ship Name r No. Range C j O.cup_IV (PRAINT) Phon No. Po r Suppjior Address Ele tri I C r for ICOmpa m Cant or'a License No. rac ' 03- Mailin dr s ICo r or or caner Mak ng nsm ila i i h C V nze ignature Contra or can r Makin Installation) Number V E BOARD OF ELE RICITY Gr -Midway Bldg. - Room N•19 1821 University Ave., St. Paul, MN 55104 THIS INSPECTION REQUEST WILL NOT BE ACCEPTED By THE STATE BOARD UNLESS PROPER INSPECTION FEE IS ENCLOSED. p U^ I U I REQUEST FOR ELECTRICAL INSPECTION C« EB-00001-03 W6 u 'See instructions for completing this form on hack of yellow copy. "X" Below Work Covered by This Request G Jew Atld Rep. Type of Building Appliances Wired Equipment Wired Home Range Temporary Service Duplex Water Heater Lighting Rxtures Apt. Building Dryer Electric Heatin Commercial Bldg. Furnace Silo Unloader Industrial Bldg. Air Conditioner Bulk Milk Tank Farm they peci y Other (Specify) t er Speu y Other Other Compute Inspection Fee Below k. Fee Service Entrance Size k Fee FeedersrSubfeeders p Fee circuits .0 to 100 Amps 0to 30 Amos 7-1 0to 30 Amps 101 to 200 Amps 31 to 100 Amps 31 to 100 Am s Above 200 Amps Above 100-Amps Above 100_Am s Transformers Remote Control Circ. Partial/Other Fee A Signs Special Inspection s T Al Remar s cf I - FEE. eo -` 2tc . n r Rough-in Date I, the Ele c tricot I Inspector, hereby certify that the above Final to t..-- ?/ inspection hes been made. This request void 18 months from Thi§ request void 1 8 months from 'P 60478 Date of this Request 3 ` .7 of - I, as E rficensed Electrical Contractor ? Owner, do hereby request inspection of the above electri- cal wiring installed at: Street Address or Route No. Z 7rQ 3l J L-r Ktiu f City r,4(; }A B Section Township/ /4 OIJA9Cp/a Qs Range County PR (GFi'`T"Q J'y /2 :?F- /'t C- . Which is occupied by 46 S T 5a (Name of occupant) Is a roughin inspection required on this job? No ? Yes ? Ready Now ? Will Call ? Power Supplier Ad- X57 re V' ?K- ? Address ? - ?A L- Electrical Contractor (- © P-1 J---L 4A f.t W Jiro Yef Contractor's License No. (Company Name) Mailing Address -6- SY- '6 12- o P, V U- Y Authorized Signature f? - lU'N I ? (Electrical contractor or owner STATE BOAR . COPY. I or Phone No.-Z-? 'I-IJ- 36 inspection request will not be accepted by the i Board unless.-proper inspection fee is enclosed. Minnesota State Board of Electricity 10-54 University Ave., St. Paul, Minn. 55104-Phone 645-7703 REOUEST FOR ELECTRICAL INSPECTION CHECK BELOW WORK COVERED BY THIS REQUEST P 60478 Type of Building New Add. Rep. Check Appliances Wired For Check Equipment Wired For Homa ? ? ? Range ? Temporary Wiring ? Duplex ? ? ? Water Heater ? Lighting Fixtures ? Apt. Bldg. ? ? ? Dryer ? Electric Heating ? Commercial Bldg. ? ? ? Furnace ? Silo Unloader ? Industrial Bldg. ? ? ? Air Conditioner ? Bulk Milk Tank ? Farm ? ? ? 1 LList 1 LList other ? ? ? } p } HerersI p Herers? COMPUTE INSPECTION FEE BELOW Service Entrance Size: # Fee Feede f : # Fee Circuits: # Fee 0 to 100 Amps. 0 to e 0 to 30 Am eres 101 to 200 Amps. 31 to 0 A 31 to 100 Amperes Above 200 Amps. Above 00 Am Above 100_Amps. Transformers Remote Control Circ. Partial or other fee - S' ns Special Ins ection Minimum fee $5.00 T 0 Remarks ! 0 g. 1 b e 1 ( 8 TOTAL FE D O I, the Electrical Inspector, hereby certify has been made. V (Final) This request void 18 months from This mggest void 18 months from 0 DD 4/DD 01A t *5 -o d 7 `, a? O 74646 Date of his Request 7 7 I, as If Licensed Electrical Contractor ? Owner, do hereby request inspection of the above electri- cal wiring installed at: Street Address or Route No. 273-0 St 13L r Y Ante Se City 11 Section Township C Pt N Range County Q H tC_u r ?t Which is occupied by O S T it - NL i (Name of Occupant) Is a roughin inspection required on this job? No ? Yes ? Ready Now ? Will Call ? Power Supplier /V- S, CO Address ? T. 1 A t! Electrical Contractor 1"7 r'i c kd W sr-i} (-=Tff Contractor's License r od d f e (company P"me) Mailing Address Authorized Signature ?airsa i Phone No ;? 6 -PO 3 W_ Minnesota State Board of Electricity - }954 University Ave., St. Paul, Minn. 55104-P 7703 REQUEST FOR ELECTRICAL IIT ON CHECK BEI:OW WORK COVERED BY THIS REQUEST O 7464.6 Type of Building) New Add . Rep. Check Appliances Wired For Check Equipment Wired For Home ? ? ? Range ? Temporary Wiring ?- Duplex ? ? ? Water Heater ? Lighting Fixtures ? Apt. Bldg. ? ? ? Dryer ? Electric Heating ? Commercial Bldg. ? ? ? Furnace ? Silo Unloader ? Industrial Bldg. ? ? ? Air Conditioner ? Bulk Milk Tank ? Farm, E] E] E] 1 List 1 List ther '' - Other,:' ? ? ? pp yy Al HeherI ? pp Heiers? COMPUTE INSPECTION FEE BELOW A?,_ k\'V Service Entrance Size: # Fee Feedvs& . # Fee Circuits: # Fee 0 to 100 Am s. 0 s A eres 0 to 30 Amperes 54 101 to 200 Amps. 3 " 1 A eres 31 to 100 Am eres v0 Above 200 Amps. Abo 00 Amps. Above-191t)_.A mps. (o "C Transfoimers 7 mot . ontrol Circ. Partial or other fee Signs Special Inspection Minimum fee $5.00 Remarks J 0 S 6` C TOTAL FEE r38' 1, the the Electrical Inspector, hereby chat/tkf?/aoverinspection has-been made. !7Z, rd (Rough-in) ) f?C4? Date (Final) Date a-7- 7? This request void 18 months from l b 1- 77 lj.?? 7b , as 17 CASH RECEIPT CITY OF EAGAN 3795 PILOT KNOB ROAD EAGAN, MINNESOTA 55122 DATE V2 - / Y 19 ?Q RECEI ???? ??????NNNNMMIIII ?? AMOUNT S & DOLLARS loa CASH e C ECK l FOR/?? FUND COOS AMOUNT BY v? 09100 FAYFR'S. COPY EAGAN TOWNSHIP BUILDING PERMIT N° 2179 j Owner _r;? . !------- _...rt!=t- ............... Eagan Township . Address (present) ..a27.a.d-___... 4; --- Town Hall Builder ............................................................................................. / .. Date ................... .?.................. .:.... Address ................................................. ......................................°---.. DESCRIPTION Stories To Be Used Fox Front Depth Heigh! Est. Cos! Permit Fee Remarks LOCATION Street. Road or other Description or Location Ldr I lsiocx Addition or 'tract oia 1 45 1 /a aoyco aia cs This permit does not authorise the use of streets, roads, alleys or sidewalks nor does if give the owner or his agent the right to create any situation which is a nuisance or which presents a hazard to the health, safely, convenience and general welfare to anyone in the community. THIS PERMIT MUST BE K PT ON TH& PREMISE WHILE THE WORK IS IN PROGRESS. .................... This is to certify, that-- AYLI"t ..........-.............has permission to --upon the above described premise subject to the provisions of the Building Ordinance for Eagan Township adopted April 11, 1955. p, ........................ ?/?? ? N .....----... Per ....._.._... c` ®°"-."::?................................................ . C airman of Tnwn Board Building Inspector R. f$. EAGAN TOWNSHIP BUILDING PERMIT Owner ...lr.......... --.-/^'................ /?.....................--' Address (Present) '.t....fl...?.`:` . ........................................... Builder Address DESCRIPTION N° 3048 Eagan Township Town Hall Date ._6..? /,1-- J 3 Stories Bel Used For T o Front Depth Heigh! Est. Cost Permit Fe -- - ' ? re-- Street. Remarks Road or other Descrlpnon or LOCanon I Lot t510Cx Apdulon or Tract This permit does not authorise the use of streefa, roads, alleys or sidewalks nor does it give the owner or his agent the right to create any situation which is a nuisance or which presents a hazard to the health, safety, convenience and general welfare to anyone in the community. THIS PERMIT MUST BE KEPT ON THE PREMISE WHILE THE WORK IS IN PROGRESS. This is to certify. that.. ............ ... . ...........has permission to erect a..s'-';j.4...............................upon the above described premise subject to the --2---- p -r---------------------- of the Building Ordinance for Eagan `Township ed ted April 11. 1955. Per lsle? 2 ...-....' "' ... ............. ` ? ...................... ................................. ? Chairman 0 f nwn )?ioard Building Inspector -.6 16 EAGAN TOWNSHIP BUILDING PERMIT Owner ...... 4-¢-4 ...... ...... ? v.' ................................. Address (present) .... r7s?<._??'.?` Builder .... !c^-r......p :.`.'.".!'.Y?.._.. ............................... '-°.:!?:`. Address .... ..?.. .F.--°--.....?.•?..?::?: ... N° 2304 Eagan Township Town Hall Data .--- /7v ...................... ...................... Stories To Be Used For Front Depih Heigh! Esi. Cos! Permit Fee Remarks 0-0 LOCATION This permit does not authorise the use of streets, roads, alleys or sidewalks nor does it give the owner or his agent the right to create any situation which is a nuisance or which presents a hazard to the health, safety, convenience and general welfare to anyone in the community. THIS PERMIT MUST BE SEPT ON THE PR WISE WHILE THE WORK IS IN PROGRESS. ? This is to certify. that.....7't`...a. .--5? ..•?' ......-._[......... has permission to erect a..... ........................ .upon the above described premise subject to the provisions of the Building Ordinance for Eagan Township adopted April 11, 1955. a ................................. .......... .._ ........ Per .................... ?/? . airmen ok;n Board ilding Inspector CITY OF EAGAN 3795 Pilot Knob Road Eagan, MN 55122 . PHONFSt 454-8100 BUILDING PERMIT APPLICATION N4 4442 Receipt # 6931 $223 000 To be used for R . , ebuild d Addn_ Date August 2, 19 77 Site Address 2750 Sibley Mem. Hwy Erect ? Occupancy B3 Lot Block Sec/Sub. Alter t Zoning P Parcel # 10 0000 012 05 Repair j7 Fire Zone III Enlar e III -N $p fi T e of Const g ? yp . z w Name Osman Prop. Inc. Move ? # Stories Address 2790 Sibley Mem HW Demolish ? Front ft. ° City Eagan Phone 452-5660 Grade ? Depth ft. Aeeeevels Feas d Name SWA41tzer Const CO., 1nG Address 777 Raymond St. Paul o;,...,. 645-4677 Name _ Address I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with oll applicable State of Minnesota Statutes and City of Eagan Ordinances. Signature of Permittee W ?t S A Building Permit is issued to: \ly" r• all work shall be done in accordance WlMh !,=P icable State of i; Assessment Water & Sew. Police Fire Eng. Planner Council _ Bldg. Off. - APC Permit .»°. ]V Surcharge 111.50 Plan check 169.25 SAC Water Conn. -- Water Meter Total 619/25 on the express condition that and City of Eagan Ordinances. Building Official EAGAN TOWNSHIP BUILDING PERMIT Owner ....f?..-9_... v..---............................. Address (present) .... /? .....- ................. Builder ...... 'r.!-"?`=`-?..---1"!,.$,?...... / - -. ...................... e Address .._..................... .....w....... ..?!tit.•rtio_' ................ ....... DESCRIPTION N° 2582 Eagan Township Town Hall Date O is/ "7/ ........................ Stories To Be Used For -Front Depth Heigh! Est. Cos! ' Permit Feel Remarks p ..6c...^--^-?.? vim.-??•v ?o ?J /a '? ?'t!?r/s-a / T15? ? ? ,i.ey?r ?? .4? ?C ???i%/7. TION Street. Road or other Mscrlptlon or LOCallOn I Lo! I Blocs I Addition or Tract This permit does not authorise the use of streets, roads, alleys or sidewalks nor does it give the owner or his agent the right to create any situation which is a nuisance or which presents a hazard to the health, safety, convenience and general welfare to anyone in the community. THIS PERMIT MUST BE KEPT ON THE P EMISE WHILE THE WORK IS IN PROGRESS. ?n This is to certify, that .............va?F??"..... has permission to erect a.ga......... upon the above described premise ubjec! io the provisions of the Building Ordinance for Eagan Township adopted April 11, 1955. ..........................hl'G.-:r.._..... ..'.of-/.`.Tnw:nnn -- Board a. r.d...._..... Building ......-.._......_..................---...... 8 Insp Chaizm acto -8 r I. 1 D??-- US a j?4L TOWN OF EAGAN 3795 Pilot Knob road Eagan, Minnesota 55121 PERMIT NO. 111 The Board of Supervisors hereby grants to Wenaal_ Plmnhing & HASiang rno. Of 3600 Remshan mime.- Ragm. M@1 55129 a Er al Permit for: (Owner) Loot Sp= b A6_ at 2750 Sibley Maaori8l Highw y pursuant to application dated 10/11/92 Fee Paid: $20.06 Dated this 10th day of Oetober , 1p?2• •50 8/0 Buiiding Inspector r plo7- - ? S o.T cr???C TOWN OF EAGAN 3795 Pilot Knob Rcad St. Pauli Minn. 55111 PERMIT NO.: 18 The Board of Supervisors hereby grants to Project Plumbing. of 9743 Humboldt Ave. So., Mpls. a umbin Permit for: (Owner) Lost_Spur T _ at 2750 Sibley Mem. Hwy,__ pursuant to application dated 10/8/70 Fee Paid: $20.00-,--- Dated this 15th day of October , 19,9• Building Inspector SPECIAL USE PERMIT FAG0 TOWNSHIP D6.KOTA COUNTY, MINNESOTA The Board of Supervisors hereby grants to Lost SAUr, Inc. of 2750 Sibley Memorial Eighway a Special Use Permit pursuant to application dated Dec. 28o 1969 for the following purposes: Shriner's sign - Sign No. 30 Dated: December 22, 1969 Fees Paid: $ 15.00 BY: Chairman Attest. Clerk EAGAN TOWNSHIP ?B?U.I/ ?LDING PERMIT Owner 1-014 -- ---..-0--164------------------------- Address (present) Builder 0i".. --.... tC--,IA-1 -----......_ ............._.._.. YY Address ......... ----------------------------------------------------------------------------- '------ DESCRIPTION N° .. 706 Eagan Township Town Hall Date J Stories To Be Used For Front Depth Height Est. Cost Permit Fee Remarks O6 O B a/QJ? ?? f^ 1 r x100 LOCATION Street, Road or other Description of Location Lot I Flock I Addition or Tract This permit does not authorize the use of streets, roads, alleys or sidewalks nor does it give the owner or his agent the right to create any situation which is a nuisance or which presents a hazard to the health, safety, convenience and general welfare to anyone in the community. THIS PERMIT MUST BE KEPT ON THE PREMISE WHILE THE WORK IS IN PROGRESS. This is to certify, that ................................................................has permission to erect a-------------------------------------------------------------- upon the above described premise subject to the provisions of the Building Ordinance for Eagan Township adopted April 11, 1955. ..- ...................................................................................... Per ............ .. .... .. .... ../"`..::Y..f!1.................._..........----.......... Chairman of Tnwn Board Building Inspector ' 16- 60'/00-D/y-v6 CORRECTION NOTICE DATE: Afl CA Address Owner/ Owner/Agent Add 73 D Ordinance Nos. and Corrections - Correct By For reinspection Eagan Dept. of Inspectic 3795 Pilot Knob Rd. Eagan, Minnesota 55122 454-8100 7tL'4 ? 14ML I Inspector: Site Name /- ?7- 13 0/ Dept.: 2r?? l I EAGAN TOWNSHIP Owner 14 BUILDING PERMIT Address (present) --'-------...ec........ u-.:....--c-n pw--. e r Builder - ---- e..... Address --------------------- ------ ...---- ._._.._ ............_ .. / DESCRIPTION NG 104 Eagan Township Town Hall Dat;'??f-.. X-... Stories e Vsed For To B Fron t _Dep t h Height_I Est. Cost Permit Fee Remarks } ` L XYGL?/KC?ivO nt [ O? / ? j ??'1 J? ? LOCATION Street, Road or other Description of Location Lot I Block I Addition or Tract 6ia I as This permit d not authorize yne use of streets, roads, alleys or sidewalks nor does if give the owner or his agent the right to ere any situation w ich is a nuisance or which presents a hazard to the health, safety, convenience and general welfare to anyone in the community. THIS PERMIT MUST BE EPT ON E ISE WHILE THE WORK IS IN PRO This is to certify, that.... ... .... .. ........has permission to erect a. .. ... ------ - .-.--.--.upon the above described premix atons of the Building Ordinance for Eagan Township adopted April 11, 1955. ....'----'- ?-- ? - - ?- -- -- -...-----._... Per ._------....._..-- ...............-----.........._'-----.............'----...... Chai - -rm-an n of oard Building Inspector CITY df EAGAN BUILDING PERMIT Owner 9VL.!!{...4 Address (present) Builder J ll.>x-=!?........ .. - ° ..........dN............. . Address ?1y ?.......,ICe...t. 01CLI..1....(/KY ........... DESCRIPTION N2 3779 3795 Pilo! Knob Road Eagan, Minnesota 55122 454.8100 Dale j .......... _....... 9forias To Be Used For _Fron! Depth Height Eei. Coe! Porm t 0 Remarks of t? ousP 711 7a t?L7 I' LOCATION 'd / Street. Road or other Description of Location I Lo! I Block I Addition or Tract This permit does not authorise the use of streets, roads, alleys or sidewalks nor does it give the owner or his agent the right to create any situation which is a nuisance or which presents a hazard to the health, safety, convenience and general welfare to anyone in the community. THIS PERMIT MUST B E =P.11'.. I E WHILE THE WORK IS IN PRO ESA. This is to certify, that ..i? ...........has permission to ?.. ... :... ?.._upon the above descr" d emise subject to the provisions of all applicable Or noes for. th ClJy7 of agar .... ........ ............... .., .. = .......................................... PaL..1?- ...---.............. Mayor Building Inapeelor ;:again Township Dakota-.County, Minnesota Application for Building Permit Type of building or work contemplated. Circle correct descriptions. Residential ommercia Industrial Other .................................................................. Build Enlarge Alter Repair install Move Wreck Other ............... Dimensions-....._"".... '----------- -'.._ Cost.Mba 0....------- - A 00 Details or Location PERMIT NO ....................... Date AA2,140061 ....°-- 379 Number Street Between what cross streets Sisa Est. Valuation .zoo sA846rff VAk y Lc Bloclc Ad dition Rearrangement or Tract Owner /-0,5T._ LFVX,_(4.91) ............... Address A'1a.....f.lBi I'----.°.. Contractor FR-I-Q1144". ..... Addres s/ ...5.,7(-.-SLf:fil .tt..... '57'- s -'L---------%ala- 7 m7J ?/ o p The undersigned hereby makes application for a permit to 'y - do work as herein specified, agreeing to do all work in strict ""'"-'"'""""' accordance with the building 'nance ado pril 11, 1955 T029l ee collecied. b _ a To ip ar Permit fees are not refundable. ......... ............. .... ..... ------ .........r ......-- ................. Signed ""LOST SPUR CITY OF EAGAN 3830 Pilot Knob Road, P.O. Box 21-199, ?agan, MN 55121 PHONE: 454-8100 BUILDING PERMIT Receipt # To be used for RE-ROOFING Est. Value $4,000 Date SEP Site Address 2750 SIBLEY MEMORIAL HWY Lot 014 Block 05 Sec/Sub. Parcel No. 10-00400-0 1 4-0 5 W Z O Name Address City _ Phone 454-2330 Name P C INC Address 386 N WABASHA City ST PAUL Phone 642-1264 SWIName _F PANIAN Address 1800 BLAIR aw City ST PAUL Phone 642-1264 I hereby acknowlege that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and Cit of Eagan Or finances. Signature of Permitee A Building Permit is sued to: __JP C INC on the express condition that all work shall be done in accordance with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Building Official N°_ 17038 19 89 OFFICE USE ONLY Occupancy FEES Zoning (Actual) Const Bldg. Permit 64.00 (Allowable) Surcharge 2.00 # of Stories - Length Plan Review Depth SAC, City S.F. Total SAC, MCWCC S.F. Footprints _ On Site Sewage Water Conn On Site Well Water Meter MWCC System - Acct. Deposit City Water PRV Required S/W Permit Booster Pump S/W Surcharge Treatment PI APPROVALS Road Unit Planner Park Ded. Council Bldg. Off. Copies Variance TOTAL 66.00 MASTER CARD • LOCATION STRUCTURE AND Ilr?t Permit No. Issued Issued To Contractor Owner BUILDING PLUMBING .J ?As?v?® I L 2Poo S?J,NY? ?Q??As ?? CESSPOOL - SEPTIC TANK WELL ELECTRICAL HEATING GAS INSTALLING SANITARY SEWER OTHER OTHER e • vr, Approved Items (Initial) Date Remarks Distance From Well FOOTING D .. J®® SEPTIC FOUNDATION (?- CESSPOOL FRAMING TILE FIELD FT. FINAL ELECTRICAL DEPTH HEATING T V OF WELL GAS INSTALLATION SEPTIC TANK y CESSPOOL DRAI NFI ELD PLUMBING WELL SANITARY SEWER Tam 2f?,? - Violations Noted on Back COMMENTS: COMPLIANCE INSPECTION REPORTS TO BE USED ONLY IN EVENT OF OBSERVED VIOLATIONS • PERMIT NO. DATE OF INSPECTION CONDITIONS OF CONSTRUCTION AT THIS INSPECTION ? NO EVIDENCE OF NON-COMPLIANCE OBSERVED. 11 ACCEPTABLE SUBSTITUTIONS OR DEVIATIONS. NON-COMPLIANCE. BUILDER WILL COMPLY WITHOUT DELAY. ITEMIZED AND DESCRIBED AS FOLLOWS: NON-COMPLIANCE. BUILDER DOES NOT INTEND TO COMPLY. ? COMPLETION OF CERTAIN IMPROVEMENTS WILL BE DELAYED BY CONDITIONS BEYOND CONTROL. ? REINSPECTION REQUIRED REINSPECTION TE OF REINSPECTION CERTIFICATION -I certify that I have carefully inspected the above in which I have no interest present or prospective, and that I have reported herein all significant conditions observed to be at variance with ordinances of the Town of Eagan, approved plans and specifications, and any specific require- ments for off-site improvements relating to the property inspected. ? ALL IMPROVEMENTS ACCEPTABLY COMPLETED BUILDING INSPECTOR DATE U • . q. 23 MASTER CARD LOCATION STRUCTURE AND LAND USED AS G',C, I A? ?use /OIT /T Permit No. Issued Issued To Contractor Owner BUILDING O • 02t S a hag PLUMBING - CESSPOOL - SEPTIC TANK WELL ELECTRICAL HEATING GAS INSTALLING SANITARY SEWER OTHER OTHER 0 • Items Approved (Initial) Date Remarks Distance From Well FOOTING SEPTIC FOUNDATION CESSPOOL FRAMING •j 1-7*k TILE FIELD FT. FINAL ELECTRICAL HEATING DEPTH OF WELL GAS INSTALLATION SEPTIC TANK CESSPOOL DRAINFIELD PLUMBING WELL SANITARY SEWER / OMMENTS: pop Violations Noted on Back COMPLIANCE INSPECTION REPORTS TO BE USED ONLY IN EVENT OF OBSERVED VIOLATIONS 0 PERMIT NO. DATE OF INSPECTION CONDITIONS OF CONSTRUCTION AT THIS INSPECTION NO EVIDENCE OF NON-COMPLIANCE OBSERVED. ? ACCEPTABLE SUBSTITUTIONS OR DEVIATIONS. ? NON-COMPLIANCE. BUILDER WILL COMPLY WITHOUT DELAY. NON-COMPLIANCE. BUILDER DOES NOT INTEND TO COMPLY. ? COMPLETION OF CERTAIN IMPROVEMENTS WILL BE DELAYED BY CONDITIONS BEYOND CONTROL. ITEMIZED AND DESCRIBED AS FOLLOWS: ? REINSPECTION REQUIRED DATE OF REINSPECTION • REINSPECTION REVEALED CE RTI FI CATION -I certify that I have carefully inspected the above in which I have no interest present or prospective, and that I have reported herein all significant conditions observed to be at variance with ordinances of the Town of Eagan, approved plans and specifications, and any specific require- ments for off-site improvements relating to the property inspected. F1 ALL IMPROVEMENTS ACCEPTABLY COMPLETED BUILDING DATE 23 ?-Z jr?- l r3loCk 11?? COMMERCIAL ?H akA V stn) Co k- 2?UIL?ING PERMIT APPLICATION CITY OF EAGAN I 651-681-4675 Call 651-215-0700 for details. Foundation Only New Construction Interior Improvement • Structural Plans (2) sets • Architectural Plans (2) sets • Architectural Plans (2) sets • Civil Plans (2) • Structural Plans (2) • Code Analysis (1) '• • Certificate of Survey (1) • Civil Plans (2) • Project Specs (1) • Code Analysis (1) " • Landscaping Plans (2) • Key Plan (1) • Project Specs (1) • Code Analysis (1) •' • Master Exit Plan (1) • Spec. Insp. & Testing Schedule • Certificate of Survey (1) • Energy Calculations (1) not always" • Soils Report (1) • Spec. Insp. & Testing Schedule (1) " • Elec. Power & Lighting Form (1) not always- • Meter size must be established • Meter size must be established • Meter size must be established - if applicable • Project Specs (1) 1 • Energy Calculations (1) •' 1 d • Electric Power & Lighting Form (1) " l 1 • Master Exit Plan (1) l 1 • Fire Protection Plan (1)" d 1 • Soils Report (1) 1 • MC/ES SAC determination letter • MC/ES SAC determination letter • MClES SAC determination letter call 651-602-1000 call 651-602-1000 call 651-602-1000 " Contact Building Inspections for sample Food & beverage or lodging facilities - submit plan to MN Department of Health. DATE: WORK TYPE: Y, NEW _ REMODEL SITE ADDRESS: TENANT NAME: FORMER TENANT NAME, IF APPLICABLE: DESCRIPTION OF WORK PROPERTY OWNER Name: 1564111 Last First P 29S6 C 111. - me+ ? ... f. City: EA{ C. n! State: 144. Zip: S 5?'? 1 ) eat 1?3?? Company: SaAxe./ (..prgTJ?Tla?? Phone #: ( (111 CONTRACTOR L ,/? Street Address: ?Sl r0-1 ?, -94 48 City: S`7- PAIA,?- State: MN Zip: BSI l,4 ARCHITECT/ N ENGINEER Company: Name: Street Address: City: State: Phone #: Registration #: 10, CONSTRUCTION COST: /4 4 6 S ._- Licensed plumber installing new sewer/water service: Ph ne I hereby acknowledge that I have read this application, state that the information is correct, and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. Signature of Applicant: O Updated 1102 "t 0 ? B S 10 -0 -\--- A T'1#16 Phone #: OFFICE USE ONLY SUBTYPE ? 01 Foundation ? 14 Apartments ? 15 Lodging ? 25 Miscellaneous WQRK TYPE Y 31 New ? 32 Addition ? 33 Alterations ? 34 Replacement ? 26 Public Facility ? 27 Commercial/Industrial ? 28 Greenhouse ? 29 Antennae GENERAL INFORMATION Census Code Z-9 SAC Code No. of Units No. of Bldgs. I Const. (Actual) .. II (Allowable) ( UBC Occupancy u_i Zoning # of Stories Length Width Basement sq. ft. First Floor sq. ft. sq. ft. MISCELLANEOUS INSPECTIONS ? Gas Service Test 0 Heating APPROVALS Planning P I sl 16 ? 35 Tenant Impr 0 42 Demolish (Foundation) ? 46 Windows/Doors ? 36 Move Bldg ? 43 Reroof ? 47 Repair ? 37 Demolish (Bldg) ? 44 Siding ? 48 Authorization 0 38 Demolish (Int) ? 45 Fire Repair Building 8a R* 30 Accessory Bldg ? 32 Ext Alt - Apts. ? 34 Ext Alt - Comm. ? 35 Ext Alt - PF 0 37 Nail Salon sq. ft. sq. ft. sq. ft. sq. ft. MC/ES System City Water Fire Sprinklered 0 Insulation ? Plumbing Engineering ? Stucco/Stone Variance Permit Fee Surcharge' " Plan Review MC/ES SAC City SAC ? ao9, 2 s Water Supply & Storage S/W Permit S/W Surcharge Treatment Plant Park Dedication Trails Dedication Water Quality Other Copies VALUATION $ l? y 96S ?? % SAC SAC Units Meter Size Total 3???a? ?,Ty copy /0 DD'/OD O/3'' ?/3 l? s City of Eagan Assessor's Office 3795 Pilot Knob Road Eagan, MN 55122 Dear Sir: In conjunction with the sale of a portion of our property to the Minnesota Department of Transportation, we agree to pay after said sale the same amount of special assessments for the water lateral as presently amortized. County property identification number: (I0-00400-012-05-2 )and described as follows: J0 001/40 0/f/ 0S That part of Government Lot 2, Section 4, Township 27, Range 23, commencing on the East right of way line of State Trunk Highway 13 at its intersection with the South boundary line of the North 25 acres of Government Lot 2, thence Easterly along said Southerly boundary line 428.00 feet to the point of beginning, thence North to the South right of way line of Interstate 494, thence Easterly along the right of way line to the easterly line of Government Lot 2, thence Southwesterly to a point 37 feet Southwesterly of the Southeast corner of Government Lot 2, thence Westerly and parallel with the South boundary line 643 feet, thence Northeasterly 37 feet parallel with the East boundary line to the South line of Government Lot 2, thence Westerly to the point of beginning, except the South 85 feet of the Westerly 265 feet of the above described tract. Sincerely, Date: The City of Eagan agrees with the above stipulation and will concur with said agreement upon receipt of legal division notice from the County of Dakota. City of Eagan Assessor Date: ,)OT TP MA (1 -791 ,rJEt'OTQ.DEPARTMENT OF TRANSPORTATION RIGHT OF WAY PARCEL LAYOUT ugraphic information required: Proposed RM line and access taking. Lot lines and dimensions. North Arrow. Outline and location of all hoildinc s and improvarnents. Street or highway frontage. ,?q3- YCq ' S.P. 1011, (494 •3+3)ga1 .___._COLJNTY?QAYP PARCEL NO. ?048 OWNER Otnaq,y ORoI€Krau r_T.!c . Scale t" m 9,00 ft. 1 Gov rT J Go•'r LoT 1 LoT rl i nJ a n? 0 ? a t-T ou ", ? or 4 rro JI'1j Lo+- 5 I, i V I I 16ov l? `ont sketch i/- 7-9 Parcel No. ;Z•o9lf Date ,_il - - Tr R O B E R T F. A C K E R MA N N i FIRST FEDERAL BUILDING SUITE 403 50 EAST 5TH STREET ST. PAUL, MINNESOTA 55101 ROBERT F. ACKERMANN, A.I.A. July 18, 1975 AND A S S O C I A T E S , I N C . A R C H I T E C T S TELEPHONE 612-226-SOSS HAROLD O. HANSEN L IVSM 614 Endicott Bldg. St. Paul, MN 55101 Attn: Merwyn Lamb Re: Water Service New Osman Club Facility Dear Merwyn: JUL X11975 I have asked Ben Ratzlaff of the Osman Properties to send a letter to the City of Eagan requesting city water service to the new Osman Club facility to be constructed about 300' south of the existing Osman Club (see attached site plan). Harry S. Johnson did some preliminary site planning for the Osman properties, and he proposed running the water service back from Highway 13 as shown on their utility concept drawing. This drawing proposed some future housing, both townhouses and condominiums; however, this is very preiminary in nature and has not had the benefit of review with the Eagan planning commission. The Osman Club building committee and this office thinks that since this proposed future housing is very preliminary and the concept is speculative in nature, it might be better to run the water along Highway 13 so as not to interfere with any fu- ture development of the site. We would like your input on where the water service should run, along with the City of Eagan's, as well as Bob Rosene's re- commendations. We have a planning commission meeting at Eagan at 7:00 p.m. on Tuesday, July 22, 1975. We are going to present informally the plans for the new Osman Club facility. (continued) ?i Mr. Merwyn Lamb 2 July 18, 1975 We are scheduling our working drawings and specifications to be completed and ready for a final review with the owners the first week in September. I know that you will be able to meet this sched- ule. Very truly yours, Robert F. Ackermann F, Assoc., Inc. SJVLt1-`tit-2? Robert F. Ackermann RFA:lh Enclosures cc: Bob Olson Potentate 1975 Gordon Elmquist Ben Ratzlaff cc site plan Russ Troy cc site plan Bob Rosene cc site plan Dale Peterson cc site plan - ,. 1 1-494 "q a. b a / ??p6 ?,00 I71/D a alp-;', 9 O i------------ -- fl oa ,IJ 7 j I // 1- l I ?l L I ARRY S. JOHNSON OAIPANIES, INC. AIRLAKE INDUSTRIAL PARK 8330220TH STREET WEST LAKEVILLE. MINNESOTA 55044 PHONE 16121 469.4481 --- n -- - 2 CITY OF EAGAN CASHIER: JS TERMINAL NO: 699 DATE: 08/25/00 TIME: 07:02:30 ID: NAME: DLR CONSTRUCTION 3210 9001 1500 HIGHVIEW A 60.00 2155 9001 1500 HIGHVIEW A 0.50 Total Receipt Amount: 60.50 CR136476 USER ID: JAN 2000 BUILDING V? 4" D- 14 9 (, .r 10 -OOyov- Name: 0! WA) 1wel P-/(a Phone #: n l4 -O Last First 3 registered site surveys showing sq. #. of tot, sq. fl. of house and glt roofed areas (211% maximum lot coverage allowedl 2 copies of plans (show beam & window sizes; poured Ind. design, etc.) I set of energy cotcutatlons 3 copies of tree preservation plan If lot platted alter 711/93 Street Address: 2-7S0 -20-ej k-4Vt l L 1416th, ? City 6TQW State: 14&) Zip:: Sg'?Z r' DATE: I IS 10 O . 1 CONSTRUCTION COST: DESCRIPTION OF WORK: / 1flU7O? ?? STREET ADDRESS: ?- r n? k-v t i v? LOT: BLOCK: _Qt?- SUBD./P.I.D. #: PROPERTY OWNER CONTRACTOR ARCHITECT/ ENGINEER Company. QL (,(J/?7?UG7/BfJ Phone #: 4?S / (area code) Street Address: / /S y? 1901' License # Exp. 3 3 City /719d 1 6-J State:) Zip: 6-4,0 Company: Telephone C ( PERMIT APPLICATION (RESIDENTIAL) % }ro CITY OF EiAGAN 3830 PILOT KNOB RD - 55122 yx \ 651.681-4675 Rarn xiallRegahReatrlrenterltE a(4-()V 2 copies of plan 1 sel of energy calcuiotions for heated additions t site survey for exterior additions & decks Name: Street Address: Registration #: City Sewerlwater Ildensed plumber State: I hereby acknowledge that I have read this application, state that the Information of Minnesota Statutes and City of Eagan Ordinances. OFFICE USE ONLY Certificates of Survey Received - Yes Tree Preservation Plan Received - Yes No Phone #: No - Not Required Zip: to comply with all applicable State OFFICE USE ONLY BUILDING PERMIT SUBTYPES ? 01 Foundation ? 07 05-plex ? 13 16-piex ? 21 Porch (3-sea.) ? 31 ExL Aft - Multi ? 02 SF Dwelling ? 08 06-piex ? 17 Garage ? 22 Porch/Addn. (4-sea.) ? 33 : Ext. Aft - SF O 03 01 of_ plex ? 09 07-plex ? 16 Deck ? 23 Porch (screened) ? 36 Multi ? 04 02-plex ? 10 08-plex ? 19 Lower Level ? • 24 Storm Damage ? 05 03-plex ? 11 10-piex Rog _Y or_ N ? 25 Miscellaneous ? 06 04-piex ? 12 12-plex ? 20 Pool ? 30 Accessory Bldg. WORK TYPE ? 31 New ? 36 Move Bldg. ? 43 Reroof ? 32 Addition ? 37 Demolish (Bldg)* ? 44 Siding ? 33 Alteration ? 38 Demolish (Interior) ? 45 Fire Repair ? 34 Repair ? 42 Demolish (Foundation) ? 46 Windows/Doors * Give PCA handout to applicant for demolition permit GENERAL INFORMATION SAC Code # of Stories sq. ft. No. of Units Length sq. ft. No. of Buildings Width Footprint sq. ft. Const. (Actual) Basement sq. ft. Census Code (Allowable) Main level sq. ft. MC/ES System UBC Occupancy sq. ft. City Water Zoning sq. ft. Booster Pump PRV Fire Sprinklered MISCELLANEOUS INSPECTIONS ' Stucco/Stone ? APPROVALS Planning Building Engineering Variance Permit Fee Surcharge Plan Review License MC/ES SAC City SAC Water Conn. Water Meter Acct. Deposit S/W Permit S/W Surcharge Treatment PI. Park Ded. Trails Ded. Other Copies Total: Valuation: $ SAC Units % SAC e • 1, Be! -17 7VA PROPERTY DATA SYSTEM TAXPAYER INQUIRY CURR 319 PROPERTY ID NEXT II I I r' I I I Pt.Con: Mt.Adr: p HOUSE# FRACTION STREET NAME UNIT ZIP-4 Front: Back: 1/_ Right: Left: , Owners: Owner3: Owner2: 0wner4: sue, Zoning: Prim/sec: Yr.blt: 0000 Area: Acres: Sch.Dst: 197 Wshd: 00 Gr/Os/Ex: Subrecs: 00 Width: Depth: j Mkt-Land Mkt-Bldg Mkt-Mach Mkt-Tot Tx Capacity Hd PT %Own Legal Description: LOT BLOCK S SECTION 4 c` i= C ?d M son 1. mom 1 101111111 '£?I kN Clear GoTo GoTo EXIT - i? ?µ l,,' MENB.,. 11.,9?re?n . n re4k0Nn UaIIIr,Hiell d .. l1 1Pt6 vm GB - a .i?P2( 82 156.1_ I'?S „ l?arJII t I SxWnE nb hMiaos.. Microsoft ftl slnsppfsDa.IPIMS/cs P{, 4 .r. p ` aII® w? a ?3...I_lC I¢PM.,41 a?? ?V\- V? Via Y ? mETROPOLITRn UlfTE COnTROL commimon Twin Cities Rrea RECEIVED LI-1 I:3 December 5, 1983 350 METRO IOUARE BLDG. 7TH 6 ROBERTITREETI IAMT PAUL Mn 55101 6121222.8423 Mr. Richard M. Hefti Assistant City Engineer City of Eagan 3795 Pilot Knob Road Eagan, MN 55121 Dear Mr. Hefti_ This letter is in response to the City's request to allow theLLost-_Spur--CouhttyClub_iresidence to connect directly to the MWCC interceptor. It is the Commission's understanding that there is a local laterial on Highview Avenue capable of providing gravity sanitary sewer service to this property. The Commission's interceptors are intended to provide sanitary sewer service to the upstream community and to permit laterial and trunk sewer connections within the City of Eagan. The interceptor is not intended to provide laterial services. Since gravity service can be obtained through local sewer mains, the Commission hereby denies your request to connect directly to the Commission's interceptor sewer. If you have any questions in this regard, please contact Mr. Donald Bluhm of the Commission's staff. Sincerely, i J. Ha r gton Directo f Enginee ng BJH:DSB:BJB '.k_ ,e?y??ed6y^ It of 3795 PILOT KNOB ROAD. P.O. BOX 21199 EAGAN. MINNESOTA 55121 PHONE: (612) 454-8100 November 25, 1983 ? p d? c ol/4a /0-00y60 - 0 IAI-05' d MR R I ODDE METROPOLITAN WASTE CONTROL COMMISSION 350 METRO SQ BLDG 7TH & ROBERT STS ST PAUL MN 55101 Re: Lost Spur Country Club residence BEA BLOMQUIST MMU THOMAS EGAN JAMES A. SMITH JERRY THOMAS THEODORE WACHTER Corm Members THOMAS HEDGES City Atl hstrasar EUGENE VAN OVERBEKE City Clete Transmitted are two fully-executed permit applications for connection to the Metropolitan Waste Control Commission facilities. Also enclos- ed please find a sketch of the proposed connection. The actual tap- ping will be performed by the City's Utility Department as indicat- ed within the connection detail as shown on the attached sketch. Although a City sewer exists within Highview Avenue and could provide service to this residence, it would involve more costly construction. For one thing, it would amount to approximately 80 extra feet of ser- vice line. Furthermore, the existing fence, shrubbery, tree, power pole and existing street encountered would result in more difficult and costly construction to this residence. Subsequently, it appears it would be more feasible to provide this residence with sewer ser- vice off of the Metro facility rather than the City facility. If you have any questions regarding this permit application, please do not hesitate to contact me. Your prompt response to this appli- cation request will be greatly appreciated in lieu of the rapidly approaching end to the construction season and the desire of the Lost Spur Country Club to provide sanitary sewer service to this re- sidence yet this year. Sincerely, Richard M. fti, P.E. Assistant City Engineer RMH/jach cc - Al Webster, Webster Co., Inc., 845 Edgerton St., St. Paul 55101 Joe Connolly, Utility Superintendent THE LONE OAK TREE ...THE SYMBOL Of STRENGTH AND GROWTH IN OUR COMMUNITY ? I \\ ?n `?-? C i 3650 f t i 800 -' G` -7AWm-- N SON-P- I" 100' ??1 \ 40 -- - pC p ® ../ o I? - 770 46- ??-e 0 rso 45.95 \ c` / QRQPO5?9 1 ? _ - - -i / / SeWQC S?CUtG~ 175 Fence°i pR te78f:84x?-k o - < !I ` Li j t 1 / / / / t 1 F"u5P aeu- N'. ig CARED 1401.E i GROUT6.p 45" 4- CONNECTION DETAIL. city of eagan P PUBLIC WORKS rIC on oTR AC m D LOSr SPUR COUNT`( approved: I standard C1-U6 SANtTARY5t-: ie?R plate #: ,6z WRIT?TEE ?LITRn 9 comlon PERMIT FOR CONNECTION TO OR USE OF COMMISSION FACILITIES (Submit in Duplicate) The "Sewage and Waste Control Rules and Regulations For The Metropolitan Disposal System" adopted pursuant to and under the provisions of the Metropolitan Waste Control Commission Act (Minnesota Statutes, Chapter 473C) constitute a part of this agreement. The community listed below has adopted a comprehensive sewer plan and has submitted it to the Waste Control Commission as required by the Waste Control Commission Act. The proposed con- nection conforms to the adopted comprehensive plan or adopted revisions thereof. This permit does not replace permits required by Minnesota Pollution Control Agency or the neces- sity of securing other permits and fulfilling requirements of other governmental units. The permittee shall indemnify and hold harmless the Waste Control Commission from any and all damages or claims as a result of any condition including damage to Waste Control Commission facilities involving the installation of the connection. This permit is subject to modification or revocation and may be suspended at any time for failure to comply with terms stated herein. Acknowledgement of permit fees in accordance with Section IV of the Rules and Regulations for parties other than government units, if applicable, is made a part of this permit agreement. Supplemental Data Sheet. on the reverse side of this sheet is included as part of this Agreement. If this connection is not made within 90 days from the date of execution this permit is null and void. APPLICANT: Signature (Municipal Official): Title: Community: Eagan APPROVED: Date: Signature DIRECTOR OF ENGINEERING Metropolitan Waste Control Commission Note: Fill out reverse side PERMIT FOR CONNECTION TO METROPOLITAN WASTE CONTROL COMMISSION FACILITIES Supplemental Data Sheet Community EAGAN Individual Making Application RICHARD M. HEFTI Representing Who CITY OF EAGAN Location of Connection LOST SPUR COUNTRY CLUB RESIDENCE Date 11-22-83 Phone 454-8100 Work to beDone by WASTER COMPANIES Type of Connection see attached sketch Size of Connecting Sewer 4° Invert Elevation see attached sketch Area Served in Acres: Depth 10" +/- Pipe Material PVC Residential 0.25 Commerical Industrial Predicted Flow in Gallons Per Day Initial 300 Design _ 300 Characteristics of Discharge: Residential Commerical Industrial Unusual Characteristics of Above (Strength, Oils, Chemicals, Temperature and etc.) MEMO TO: DIANE DOWNS, UTILITY BILLING CLERK FROM: EDWARD J. KIRSCHT, SR. ENGINEERING TECH DATE: OCTOBER 250 1990 SUBJECT: PLAT AND PARCEL NO. 10-00400-013-05 2790 SIBLEY MEMORIAL HIGHWAY (OSMAN PROPERTY) CHANGE REF (RESIDENTIAL EQUIVALENT FACTOR) I have recomputed the REF for the Osman property. The total REF'S for 2790 Sibley Memorial Highway should be 1.6 instead of the 5.13 REF'S. This recomputation was based upon the property being actually 1.4 acres instead of 4.5 acres. Edward J."Kirscht Sr. Engineering Technician cc: Michael P. Foertsch, Assistant City Engineer EJK/jf C L 4VED ITY USE ONLYCEIPT #: SURECEIPT DATE APINSPECTOR PLUMBING PERMIT # 2000 PLUMBING PERMIT (COMMERCIAL) CITY OF EAGAN 3830 PILOT KNOB RD EAGAN, MN 55122 651-681-4675 Please complete for: all commercial/industrial buildings multi-family buildings when separate building permits are not required for each dwelling unit installation of backflow preventer in commercial areas or residential boulevards Date: 3 - 27 - o c Work Type: _ New Bldg. _ Add-on 6 Repair _ U.G. Sprinkler _ RPZ Description of Work: lcGrt.JOfz& d&rz 1't.itP"JGX+va, 4 ,940 44.r r/e,- To inquire if Pressure Reducing Valve is required on new service, call 681-4646. FEES 1% of contract price or $30.00 minimum Contract Price: $ ado-- x 1% _ $ 32 , au COMPLETE THIS AREA ONLY IF INSTALLING UNDERGROUND SPRINKLER SYSTEM Base Fee $ 30.00 Water Meter: 2" Turbo - $897.00 unless plan approved for smaller size $ 1-1/2" Turbo - $ 726.00 Service: _ existing (if coming off domestic line) OR _ new If "new service". contact Jerry Wobschall. Finance Consultant, to confirm adding fees for: Water Permit & Surcharge $ 50.50 Water Supply & Storage $ 840.00 Water Treatment Plant Charge $ 492.00 cc: Dime Downs, Utility Ming - underground sprinNerperndts State Surcharge $.50 minimum; calculate at $.50 for each $1,000 Base Fee Base Fee $ 37.° State Surcharge $ £a Total Fee $ 3 T. so I hereby acknowledge that I have read this application, state that the information is correct, and agree to comply with all applicable City of Eagan ordinances. It is the applicant's responsibility to notify the property owner that the City of Eagan assumes no liability for any damages caused by the City during its normal operational and maintenance activities to the facilities constructed under this permit within City property/right-of-way/easement. SITE ADDRESS: 2750 Sibley Memorial Highway TENANTNAME: Lost Spur Golf Course INSTALLERNAME: Dakota Plumbing & Heati TELEPHONE#:651-454-2339 (AREA CODE) INLEPHONE #:651-454-6645 (AREA CODE) STREETADDRESS: 3650 Kennebec Drive, Suite 102 CITY: Eagan STATE: MN ZIP: 55122 t 2 7 SIGNATURE OF PERMITTEE CITY USE ONLY DOMESTIC METER SIZE: COMPOUND TURBO • Contact Utility Billing Division for price: 651- 681-4631. IRRIGATION METER SIZE: • 2" turbo unless approval for smaller meter granted by Public Works. • Contact Utility Billing Division for price: 651-681-4631. PRV: Yes No PRIOR TO SELLING A METER: • On Permit Entry screen, enter site address to look up sewer and water permit #. Select S&W Permit and check that hydrostatic and conductivity tests have been approved. If not, do not issue meter. Miscellaneous • Meter larger than 5/8" - ask plumber to wait while you call Central Maintenance (ext. 300) and verify that one is in stock. • To schedule inspection of the inside water line and backflow preventer, call 651-681-4675. • To schedule water turn-on, call 651-681-4300. CD/Permit forms/plbg permit (comm) 2000 Cleo 'L, -4- D/? - 05 ADDRESS TELE. NO. Cl':"Y Jr EACA:I P E L M I T A P P L I C A T I O N ("ubmit in Triplicate) CTATE' OF 1.uNESOTA) COUNTY OF DAKOTA ) ss. I/"Te, the undersigned, being first duly sworn, hereby make the following application to the City Council and Planning Ccmmission of the Village of Eagan, Dakota County, Minnesota: . 1. Application is hereby made for: (Check appropriate item(s) Dumping permit under Ordinance No. 1 Trailer Coach Park Permit under Crdinance No. 2 X_ Building Permit under Ordinance No. 3 kennel Permit under Crdinance No. 5 Rezoning under Ordinance No. 6. Special Use Permit under Ordinance No.,b" E:;cavating Permit under Ordinance No. 8 Plat approval under Ordinance No. 10 3iga Permit under Ordinance No. 16 ?1tirer--(describe) Applicants have the responsibility of checking all applicable ordirop.ces pertaining to their app3.ication and complying with all ordinance requi.re- ments. 3. Legal description of land to be affected by app'YicatYoU Jac4vrl=x+g acreaOe or square footage of land involved, and street address, if any: 2750 Sibley Memorial Highway k. Proposed name of plat: Osman Country Club AGREEMENT RELATING TO PRIVATE DRIVEWAY This Agreement made this 26th day of August, 1992, by and between-the CITY OF EAGAN (Cit)„ a Minnesota municipal corporation, and Osman Property, Inc., a Minnesota Corporation, hereinafter referred to as Landowner. RECITALS WHEREAS, the undersigned Landowner is the Owner in fee of certain real property located in the City of Eagan, County of Dakota, State of Minnesota, and more particularly described on the attached Exhibit A hereto. WHEREAS, Bridgeview Terrace is a dedicated right-of-way, pursuant to Post Addition No. 3 and Valley View Plateau Addition on file and of record with the Dakota County Recorder. WHEREAS, Bridgeview Terrace in part abuts the property described on the attached Exhibit A owned by the Landowner. WHEREAS, Bridgeview Terrace has not been opened or improved by the City and has not otherwise been opened to public vehicular traffic for that portion of Bridgeview Terrace described as follows: that portion of Bridgeview Terrace lying north of the northerly right-of-way line of Highview Avenue. WHEREAS, the above-described portion of Bridgeview Terrace that has not been opened to public vehicular traffic and has not been improved by the City is that portion which would otherwise serve as access to the property described on the attached Exhibit A. WHEREAS, the Landowner has requested that the City approve a private driveway over the unimproved and unopened portion of Bridgeview Terrace. WHEREAS, the City of Eagan is willing to allow the Landowner to use the unopened and unimproved portion of Bridgeview Terrace for purposes of a private driveway subject to the terms and conditions hereinafter stated. NOW, THEREFORE, THE CITY OF EAGAN AND THE UNDERSIGNED LANDOWNER, FOR HIMSELF AND HIS SUCCESSORS, HEIRS AND ASSIGNS DO HEREBY AGREE: 1. Under the terms and conditions stated herein, the Landowner is hereby authorized by the City to use the unopened and unimproved portion of Bridgeview Terrace, previously described, as a private driveway for the limited purpose of providing access to the real property described on the attached Exhibit A: .2. Nothing contained herein shall be deemed an opening or an improvement by the City of the unopened and now unimproved portion of Bridgeview Terrace. 3. Nothing contained herein shall be deemed an assumption by the City of any responsibility for construction, maintenance or repair of the unimproved and unopened portion of Bridgeview Terrace to be used by the Landowner as a private driveway. 4. Nothing herein contained shall be deemed a waiver or abandonment or transfer of the right, title and interest that the City of Eagan holds to Bridgeview Terrace by reason of the dedication of said Bridgeview Terrace, including the unimproved and unopened portion thereof. 5. The private driveway to be used by Landowner is subordinate to the dedication of Bridgeview Terrace to the City. 6. The Landowner shall be responsible for all costs relating to construction, maintenance and repair, including grading and snow removal, with respect to use of the private driveway. 7. At his expense, the Landowner shall record with the Dakota County Recorder a certified copy of this Agreement, within 30 days of City Council approval of this Agreement. 8. No structures shall be placed on the private driveway. 9. The approval given herein by the City is contingent upon all the conditions expressed herein being met and continuing to be met. 10. The private driveway shall not be used in a manner inconsistent with the City's right, title and interest in the dedicated portion of Bridgeview Terrace, including the unimproved and unopened portion thereof. 11. The Landowner does hereby agree that when the unopened or unimproved portion of Bridgeview Terrace is opened to the public or otherwise improved by the City, then the private driveway as contained within the unimproved and unopened portion of Bridgeview Terrace will be removed by the Landowner at no expense to the City, but at the expense of the Landowner. 12. The Landowner agrees that if the unopened and unimproved portion of Bridgeview Terrace is improved and opened to public vehicular traffic, and if special assessments are levied against the property described on the attached Exhibit A, pursuant to Chapter 429 of the Minnesota Statutes, then the Landowner shall not object to the levy of special assessments on the ground that the property described on Exhibit A had existing access from Bridgeview Terrace. The Landowner, for himself, his heirs and assigns, does hereby waive any objection to said special assessments based on the grounds so specified in this paragraph. 13. This agreement shall be binding upon the undersigned parties and their successors, heirs and assigns. This agreement shall run with the property described on the attached Exhibit A, and be binding upon the owner thereof and his heirs and assigns. 14. The Landowner, for and on behalf of his heirs, assigns and successors in interest, does hereby agree to defend, indemnify and hold the City harmless from all costs and expenses, claims and liability relating to or arising out of the construction, maintenance, use, operation, interruption, discontinuance, abandonment or termination of the private driveway. 15. The Landowner for and on behalf of his heirs, assigns and successors in interest, shall be responsible for maintenance and repair and reconstruction of the private driveway at all times, and under all conditions the private driveway shall be accessible and available to emergency vehicles, such as fire trucks and police and ambulance vehicles. 16. The Landowner shall construct the driveway to be 12 feet wide from edge of gravel to edge of gravel and it must contain 6 inches of Class 5 gravel. IN WITNESS WHEREOF, the parties have executed this agreement the day and year first set forth above. EAGAN A. Its Mayor 17 By: VanOverbeke Its Cler APPROVED AS TO FORM: City Attorney's Office Dated: APPROVED AS TO CONTENT: Pu lic Works Department Dated: ev- P- y Z Osman Property Inc. A Minnesota Corporation STATE OF MINNESOTA) :ss. COUNTY OF DAKOTA) On this lat day of? 19931before me a Notary Public within and for said County, p rsonally appeared THOMAS A EGAN AND E.J. VANOVERBEKE to me personally known, who being each by me duly sworn, each did say that they are respectively the Mayor and Clerk of the City of Eagan, the municipality named in the foregoing instrument, and that the seal affixed on behalf of said municipality by authority of its City Council and said Mayor and Clerk acknowledged said instrument to be the free act and deed of said municipality. JUDY M. JENKINS NOTAR )? I - INN TA DAKOTA COUN My oaenWbn a bras 7-72 97 9---- E STATE OF MINNESOTA) :ss. COUNTY OF DAKOTA) N?f}a Pub/ c On this v2 9 day of / v v 19 `before me a Notary Public within and for said County, personally appeared lJr+ ? e? to me pers _9ally known ho being eaek m?q duly sworn, eeeh did say that respectively the ????)<?sie%rt a-- 42r;0 and of the Corporation named in the foreg ing instrument, and that the seal affixed to said instrument is the corporate seal of said corporation, and that said instrument was signed and sealed in behalf of said corporation by authority of its Board of Directors and said J>e it rt,'S Cf>7 d???yr? k- and acknowledged said instrument to be the free act and deed of the corporation. r LEONARD A. RAPOPORT NOTARY PUBLIC -MINNESOTA HENNEPIN COUNTY My Cornrnlasbn Expfreg Sept. 4.1987 -j /e EXHIBIT A PT OF SE1/4 OF NWl/4 LY E OF STH#13 PT OF G L2 LY S & E OF LINE BEG INT E R/W STH #13 & S LINE N25ACS E428 FT N TO PT163FT S OF N LINE E 134FT N TO S R/W ISH-494 E ON S R/W494 TO E LINE G L2 &THERE TERM ALSO PT OF G L4 LY E OF STH #13 ALSO PT OF G L5 BEG80RD W OF SE COR N 75 5/16RD SW90RD E52 6/16RD TO BEG ALSO S320FT OF W990 FT OF G L5 EX PAR209B OF STH RW PLAT 19-32 CONT r HWY.13 7 GORDQN P $ H?`.ATRIG? G1•i R LST NEQ?On! ?c ?Ct t?,( i,1Vf.?lh mod ?l A le 1 .0 .1 Post z • /4ddi +ion we w No.3 i w s .,f LOST SPUR 9- 2 ' 3 4 5 a L E Y !?'? / G H ?/ l E W ?i 90?.+•? a?•43'ia?C ? e, J V ? J ?' P4r+ a; ?1J?r ". 1_ OT 7 i 7 14 w 4 b ? ?r PERMIT CITY OF EAGAN 3830 Pilot Knob Road PERMIT TYPE: a r. Eagan, Minnesota 55123 Permit Number: 2 ; 7 (612) 681-4675 Date Issued: 13 ;' r / v SITE ADDRESS: >FCTICi'i DESCRIPTION: LUS I 5 UP 3tail,cin?' !,Jock "i yce U's .. OCr.it •'ritia Y fG CIJi?II~i I1'Plit ."47G( fll_IERP,i10Pd A REMARKS: FEE SUMMARY: VALID". 1 1 it P'. N 11 rl ., Fi 0 ,, f'lart Rs.:.ew CONTRACTOR: OWNER: n'7"'2t 71 r 3 ChEtINEi I ,t. t„ iln t9v{ ,'l. i C5MAIN ^14 fl I C 1 .:TI, Ey 11F110kI oju? i5Lb11?'L' P41V 559b3 FAGF',N i?p! (Sf'??'1 35 Ci-r!6:;''-', L12)95S'-'.i ti6[7 . T herc5y acknowled5a th - t I have rend tIn ie app I,catt.t7n +n<1 a t6 LL' 111 t. tw... }uYhIjf:f.ipn i.3 ccrrVcc aII(I rggl- ee t d c;0zipIy with i,I S[,atuto? and City o? !n(, i. or'd.incnces, L PPLICA T/PERMIT SIG RE ISSUED BYLSIGNATURE REACTIVATE' _ PERMIT # a0 'S 0/ CITY OF EAGAN 1993 BUILDING PERMIT 681-4675 APPLICATION y'. f. . PECD SINGLE & MULTI-FAMILY 2 sets of plans, 3 registered site surveys, 1 copy of energy talcs. COMMERCIAL 2 sets of architectural & structural plans, 1 set of specifications, 1 copy of energy talcs. Penalty applies: '1) when PPermit is typed, but not picked up by last working day of month in which request is made, 2) address is changed or 3) lot change is requested once permit is issued. Date - l /5`%3 Valuation of work /?/ 3 $3 <?'- Site Address:4-Ii 5D111- C'ILF o? G'L d SD 5'I?!?y .fir«&. % f,Gv (3 STREET SUITE / Tenant Name: (commercial only) LOT / BLOCK g SUBD. _ P.I.D. M Description of work: p o The applicant is: ? Owner ontractor ? Other (Describe) 12 ` 5! SL Name 21,g -v Phone Property LAST FIRST Owner Address r;725'0 el ,o4?10 r??-11 /3 STREET STE # City State Zip .eve: fl Phone J `So7 356 Company Contractor / Address !C , ,,91o License # Exp.- city Z _pu,a/ x;P ,° . State Zip SS5;/3 Company 5:??evi 5- • Phone Architect/ Engineer Name ??? -.Registration # Address ! /r>/? `/ City -6w ye4 G?&1? 'y?T State Zip Sewer & water licensed plumber :n h ```Y9 Processing time for sewer & water permits is two days once area has b n approved. I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of Eagan Ordinances. M Signature of Applicant: ?° OFFICE USE ONLY BUILDING PERMIT TYPE ? 01 Foundation ? 06 Duplex ? 11 Apt./Lodging ? 02 SF Dwg. ? 07 4-Plex ? 12 Multi. Misc. ? 03 SF Addition ? 08 8-Plex ? 13 Garage/Accessory ? 04 SF Porch ? 09 12-Plex ? 14 Fireplace ? 05 SF Misc. ? 10 Multi. Add'l. ? 15 Deck WORK TYPE ? 31 New 33 Alterations ? 35 Tenant Finish ? 32 Addition 34 Repair ? 36 Move GENERAL INFORMATION ? 16 Basement Finish ? 17 Swim Pool ? 18 Comm./Ind. eW 19 Comm./Ind. Misc. ? 20 Public Facility ? 21 Miscellaneous ? 37 Demolish Const. (Actual) Basement sq. ft. MWCC System (Allowable) 1st F1. sq. ft. City Water UBC Occupancy ? 2nd F1. sq. ft. PRV Required _ Zoning Sq. Ft. total Booster Pump # of Stories Footprint Sq. ft. Fire Sprinkler Length On-site well Census Code ? Depth On-site sewage SAC Code APPROVALS wnk Planning Building Assessments Engineering Variance REQUIRED INSPECTIONS ? Site ? Footing tR Framing ? Insulation ? Wallboard [?K Final ? Draintile ? Fireplace Permit Fee `193.50 veiustfon: e) Surcharge Plan Review S? License MWCC SAC City SAC Water Conn. Water Meter Acct. Deposit S/W Permit S/W Surcharge Treatment Pl. Road Unit Park Ded. Trails Ded. Copies Other Total: 13 534 ZS SAC % SAC Units 1993 MECHANICAL PERMIT (RESIDENTIAL) CITY OF EAGAN 3830 PILOT KNOB RD EAGAN MN 55122 (612) 681-467S PLEASE COMPLETE FOR SINGLE FAMILY DWELLINGS. ALSO, FOR TOWNHOMES AND CONDOS WHEN PERMITS ARE REQUIRED FOR EACH UNIT. NEW CONSTRUCTION ADD-ON A/C ADD-ON FURNACE DATE FEES HVAC: 0.100 M BTU $ 24.00 ADDITIONAL 50 M BTU 6.00 GAS OUTLETS (MINIMUM 1 Oa $3.00 EACH) ADD-ON/REMODEL (EXISTING CONSTRUCTION) $ 15.00 STATE SURCHARGE TOTAL .50 SITE ADDRESS: OWNER NAME: TELEPHONE #: INSTALLER: ADDRESS: CITY: STATE: ZIP CODE: TELEPHONE #: SIGNATURE OF PERMITTEE 1993 MECHANICAL PERMIT (COMMERCIAL) CITY OF EAGAN 3830 PILOT KNOB RD EAGAN MN 55122 (612) 6814675 PLEASE COMPLETE FOR ALL COMMERCIAL/INDUSTRIAL BUILDINGS. ALSO COMPLETE FOR APARTMENT BUILDINGS OR OTHER MULTI-FAMILY BUILDINGS WHEN SEPARATE PERMITS ARE NOT REQUIRED FOR EACH DWELLING UNIT. DATE: 3- /," f 3 CONTRACT PRICE: $ 36 ?{o ;t;-0 NEW BUILDING INTERIOR IMPROVEMENT WORK DESCRIPTION: _ /Ier=tee ,< 1% OF P ?NTRACT FEE PROCESSED PIPING: MINIMUM FEE: STATE SURCHARGE FEES $ cs6,ylo $25.00 $25.00 $.50 FOR EACH $1,000 OF PMi'' FEE. TOTAL $ 51D 5(9• SITE ADDRESS: OWNER NAME:A&V 5 7- 5n E S?t{/oH?! CG?3 TELEPHONE #: TENANT NAME: (IMPROVEMENTS ONLY) INSTALLER: 2Z/yE 1'LT3G v4 ADDRESS: /per h'vs'? /coo ?L 3 rf?T CITY: STATE: ZIP CODE: 55_1"5?3 TELEPHONE #: j © ?;- 3 5-6 SIGNATURE OF PERMITTEE CITY INSPECTOR 14 JENE T. SIGVERTSEN A.I.A. ARCHITECT 4825 BABCOCK TRAIL EAST INVER GROVE HEIGHTS MINNESOTA - 55077 13 lulu-, May 17, 1993 (0 0 01/60 o/ yz" Mr. Joseph Merchak Building Inspections City of Eagan 3830 Pilot Knob Road Eagan, MN 55122-1897 Re: Lost Spur Golf and Country Club Dear Mr. Merchak: The remodeling of subject facility is now completed and inspected by your offices. You requested a letter identifying how we would structurally deal with existing undersized second floor joists. The following is our response: At the time we plan to remove the second construction of the original farm house, projecting through the roof of the club, we would commission a registered professional structural engineer to design a solution for this problem. Basically the solution probably will be similar to the following: Cut projecting second floor farm house to a dimension just above ductwork resting on the farm house second floor. Provide trusses spanning over entire removed area designing structural connections from trusses to undersized roof joists. (See attached drawing indicating area of problem outlined in red.) This work will probably not happen immediately; however, at the time the work proceeds, our structural engineer will be in contact with you to review the solution. Thank you for your assistance regarding our recently completed remodeling project. Sincerely yours, Jene T. Sigvertsen, AIA cc: Lost Spur Management Committee Larry Stahl, Osman Temple Recorder Steve Skar, General Manager Wayne Streiff, Construction Manager Building File MEMBER AMERICAN INSTITUTE OF ARCHITECTS 612-450-0801 PLEASE COMPLETE FOR ALL COMMERCIAUINDUSTRIAL BUILDINGS. ALSO FOR MULTI- FAMILY BUILDINGS WHEN SEPARATE PERMITS ARE NOT REQUIRED FOR EACH DWELLING UN T. _X NEW CONSTRUCTION ADD ON REPAIR WORK DESCRIPTION: CONTRACT PRICE: $ // 00 ©" FEE: 1% OF CONTRACT FEE. STATE SURCHARGE: 5.50 FOR EACH $1,000 OF Pp"T FEE MINIMUM FEE $ 25.00 CONTRACT PRICE X 1% STATE SURCHARGE TOTAL SITE ADDRESS: ca?. TENANT NAME: OWNER NAME: INSTALLER: L l $ 56 so STE. # FOR: lo? 2 ?_ CITY OF EAGAN CODE: / (:s_ 1993 PLUMBING PERMIT (COMMERCIAL) CITY OF EAGAN 3830 PILOT KNOB RD EAGAN MN 55122 (612) 681-4675 PHONE #• 3S1 - Y/5: PLEASE COMPLETE FOR SINGLE FAMILY DWELLINGS. ALSO, FOR TOWNHOMES AND CONDOS WHEN PERMITS ARE REQUIRED FOR EACH UNIT. NO. FIXTURES SHOWER WATER CLOSET BATH TUB LAVATORY KITCHEN SINK LAUNDRY TRAY HOT TUB/SPA WATER HEATER FLOOR DRAIN GAS PIPING OUTLET • minimum . ROUGH OPENINGS WATER SOFTENER PRIVATE DISP. • Daixty. uc. U.G. SPRINKLER • home under cont. ALTERATIONS • to ousting WATER TURN AROUND STATE SURCHARGE TOTAL: C TOTAL 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 3.00 1.50 5.00 15.00 3.00 15.00 15.00 .50 SITE ADDRESS: OWNER NAME: INSTALLER: ADDRESS: CITY: STATE: ZIP CODE: PHONE #: ( ) SIGNATURE OF PERMTITEE 1993 PLUMBING PERMIT (RESIDENTIAL) CPPY OF EAGAN 3830 PILOT KNOB RD EAGAN MN 55122 (612) 6814675 LOT 014 BLOCK 5 SUED. SECTION 4 RECEIPT # 22116 S/W PERMIT #23291 CITY OF EAGAN SEWER/WATER REPAIR PERMIT 1994 Date: '(/, - /a - 7f Sewer (-? Water Fee: $50.50 Description: Gr?af?r /QeQ,c , ?? fw---e4 2 Area/address to be repaired: ?7SD S,'6?ey /yeri a`-'y Installer: Street address: V /.z_-o _Z7- S /z A'`- ?/ City, state & zip: Telephone #: Owner name: SPUR Street address: -`/----?1-?---? 2750 SIBLEY MEMORIAL. HWY City, state & zip: EAGAN MN 55121 Phone #: 454-2330 La eg?-c_ e /1--• Al /!/ -5-5-11171,2 ;r- - d' Signature of Pe r 1?'k,Y?B?);t$(X(,?Y,(.°,:XL'?.?iY}.YY,o?a?t.°O!OX'?Y;; ,Y1:CY:r'hY ?Y?'($("tXk: ?G>?C•r. CITY Or EAGAN _ASHIER; ISM TERMINAL NOe --2 DATE; 04/12/94 TIME a 0915603[) 10 NAME: CAPRAS UTILITIES 3202 9001 2750 SIBLEY ME:M 50.00 Wi55 9001 2750 SIBLE.Y MEM 0.50 Total Receipt Amount; 50.50 USER ID: DENICE f# - L ? BL S Sul; L CITY USE ONLY RECEIPT #: 7 cl / /• RECEIPT DATE: / 1998 PLUMBING PERMIT (COMMERCIAL) CITY OF EAGAN 3850 PILOT KNOB RD EAGAN, MN 5512E (612) 681-4675 Please complete for: all commercial/industrial buildings multi-family buildings when separate building permits are pot required for each dwelling unit backtlow preventer to be installed in commercial areas or residential boulevards Date: 07 (a q c' Work Type: _ New Bldg. X Add-on Is Water Mete Requ' d7 _ Yes No Water Flow To inquire KPressure Reducing Valve la-required on new service, call 6814646. FEES U o 1% of contract price or $25.00 minimum Contract Price: $ I x I% COMPLETE THIS AREA IF INSTALLING UNDERGROUND SPRINKLER SYSTEM Service: Existing (if coming off domestic line) OR _ New Backflower Preventer Permit Fee $ 25.00 Water Meter 1"@ $189.00or 2"Turbo @ $871.00 $ If "new service" add Water Permit $ 50.00 = $ WAC $ 807.00 = $ Water Treatment $ 444.00 = $ Permit Fee $ 2 ( V State surcharge is S.50 per S 1,000 ofRj mtt fee or minimum of $.50 per permit State Surcharge $ ' SI Total Fee $ I hereby admowledge that I have read this application, state that the infommation is correct, and agree to comply with all applicable City of Eagan ordinances. It is the applicant's responsibility to notify the property owner that the City of Eagan assumes no liability for any damages caused by the City during its normal operational and maintenance activities to the facilities constructed under this permit within City propertyhightof- way/easement. SITE ADDRESS: 61 75-D `- -! 11A-1 ?n (/'' ? "", , t TENANT NAME: ? , />? , ?? r r t ' INSTALLER NAME:/ I (' ?/ C? a ? Y ??? S Alt ?doD/? / TELEPHONE , N STREET ADDRESS: Zm CITY: -P-j y 2!:l 0N?- ` STATE:/" 1ZIP: _ Repair _ U.G. Sprinkler GPM OF PEPMTTEE CITY USE ONLY COMMERCIAL. PLUMBING PERMIT -1998 METER SIZE PRV Yes No Domestic irrigation UTILITY CONNECTION (APPLIES TO NEW SERVICE ONLY) REVIEWED BY: Building Inspector To determine meter size Date • See if it is indicated on back of Building Inspections card • Enter address in PIMS Screen 301 to obtain S&W permit # * Check PIMS Screens 110 (Remarks) • If gallons per minute are less than 25, a I" meter will be required. If gallons per minute are more than 25, a 2" turbo with strainer will be required This information is to be supplied by the designer of the system. Consult with Plumbing Inspector if Licensed Plumber does not know GPML Before selling meter • Check PIMS Screen 320 for approval of inspection results. No meter will be sold before all sewer and water inspections are complete on a new service. If new service lines are not required, one check may be written for meter and permit costs. Write meter type and size on receipt, code to 3716-9220 (meter portion only), and forward copy to Utility Billing Clerk. • Enter meter size, type, receipt #, date & amount paid on PIMS Screen 110. Copy of receipt should be given to Utility Billing Clerk. Miscellaneous Information • The installer is to contact Building Inspections at 681-4675 for inspection of the inside water line and backflow preventer. The Central Maintenance Division may be reached at 6814300 for water turn-on. • If meter is over 5/8", notify Central Maintenance so they can tell you if there is one in stock before plumber goes over there. JS/FornmN /p16g permp (eomm)1997 '?;k:k'kiRY(.Ytlk$:XM' 7F??7K7KXOK7K7Y7'i<XC?K:k?K%f?il:?K:??'?'7l'?C:KK?.'?XR; ?<7k1k ^.ITY OF EAOAN CASHIER: S TERMINAL. NO. 'R8 DA'SE'l TIME.. • 0:3's f-O ID i DAME: ARTISAN CONST CO (IF ST PAPL 3M 9001 2750 SIB MEM HN 17.25 2155 9001 2750 SIB M'M HN 2.00 l Total Receipt Amount: FlS„2? USER 11)e NAMICY CITY OF EAGAN 3830 Pilot Knob Road Eagan, Minnesota 55122-1897 (612) 681-4675 6L$ MISC. NEW 434 ALT. RESIDENTIAL SITE ADDRESS: P.I.N.: 10-00400-014-05 2750 SIBLEY MEMORIAL HWY LOT: 14 BLOCK: 5 SECTION 4 DESCRIPTION: PERMIT TYPE: BUILDING Permit Number: 032501 Date Issued: 07/09/98 n j i C I 7 I. DECK Bu ld' rig Permit. Type Building Work Type 'Census Cote tl PERMIT REMARKS: PLAN REVIEWED BY JOE VOELS FEE SUMMARY: Base Fee Surcharge Total Fee VALUATION $87.25 $2.00 $89.25 CONTRACTOR: 4RTISAN 1623 YORK ST PAUL (4612) 414-4788 - Applicant - 24144788 MN 55106 $4,000 OWNER: LOST SPUR 2750 SIBLEY MEMORIAL HWY EAGAN MN 55121 (612)452-5660 I hereby acknowledge that I have read this information is correct and agree to comply Statutes and City of Eagan Ordinances. • APPLICANT/PERMITE SIGNATUR application and state that the with all applicable State of Mn. 1998 BUILDING PERMIT APPLICATION (COMMERCIAL) Uq 2 5 OF EAGAN - -1 CITY 4675 2A0 68I 675 Su mit following to obtain necessarv permit Foundation Only New Construction Interior Improvement structural plans (2 sets) architectural plans (2 sets) architectural plans (2 sets) civil plans (2 sets) structural plans (2 sets) code analysis (1) " code analysis (1) civil plans (2 sets) project specs (1 set) soils report (1) landscaping plans (2 sets) Key Plan project specs (1) code analysis (1)" energy calculations (1)notalways" Special Inspections & Testing Schedule " soils report (1) Electric Power & Lighting Form (1) not always " SAC determination letter from MCNVS - SAC determination letter from MCIWS - SAC determination letter from MCNVS - call 602-1000 call 602-1000 call 602-1000 Special Inspections & Testing Schedule (1) project specs (1) energy calculations (1) " Electric Power & Lighting Form (1) " l,anmcr ouuumg mspecaona ror sample Food & Beverage or Lodging facilities: Plan must be submitted to Minnesota Department of Health. Call 215-0700 for details. E: C^ 2--( - 75 WORK TYPE: "NEW 4-- REMODEL DAT DESCRIPTION OF WORK: CONSTRUCTION COST: _ SITE ADDRESS: LOTI BLOCK Gdd SUBD. I TENANT NAME: o s /- SUITE M P.I.D. # v Name: L S ??U Phone #: y ,?, ?y b PROPERTY Last First ?VNER ? Street Address: LFJ.hN 1 2 ity State: Zip: R A," 7'?S ? /? Phone #: ( 7 CONTRACTOR Street Address: A!/ License #?h1?li(+r City S ??aG State: Zip: ARCHITECT/ ENGINEER Company: 69 6?'Ve Phone #: Registration #: Street Address: City Sewer & water licensed plumber (only if installing sewer & water): State: 1 hereby acknowledge that I have read this application and state that the information Minnesota Statutes and City of Eagan Ordinances. i Signature of Zip: and agree to State of BUILDING PERMIT TYPE ? 01 Foundation ? 16 CommAnd. WORK TYPE AB-'-31 New ? 32 Addition GENERAL INFORMATION Const. (Actual) _ (Allowable) UBC Occupancy Zoning # of Stories Length Depth APPROVALS OFFICE USE ONLY .4!t-19 Comm./Ind. Misc. ? 21 Miscellaneous ? 20 Public Facility ? 33 Alterations ? 35 Tenant Finish ? 34 Repair ? 37 Demolition Basement sq. ft. MCNVS System First Floor sq. ft. City Water sq. ft. Fire Sprinklered sq. ft. Census Code ?/3 7 sq. ft. SAC Code 30 sq. ft. Census Bldg. / Footprint sq. ft. Census Unit o Planning Building Engineering Variance Permit Fee Surcharge Plan Review MCNVS SAC City SAC Water Conn. S/W Permit S/W Surcharge Treatment PI., Park Ded. Trails Ded. Water Qual. Other Copies Total: % SAC SAC Units Meter Size Valuation: $ /I L f ?. Y U` :511710 ,.1 5, IIJ 2"15o S.b1e,Y' minnesota department' of 'he alth ?g13 . 5 O .717 ae.. delaware st minneapolis 55440, w . . (612) 246-5221 - . 6t. FSka, oka 552 ;;. , t'Claettts :,. , a«`"a '•atiL?r z; A tA#44. IA4, a 'Ir. i kort CJ"aa fiis? + atzt ;d i w i:its t3 Otte on Plr::h i.1r, cvr ^?aA;e cOIN Club Additi?n, y y j. to y } p y ?y {yy{. l s piSYH.SI..I fi.M?1LY 'lyi (I Ir`.CLCw R.V??. 1-11n=i4r' YM ?. Lq*fSC iiFi.` ?Sb?R?i& t iaa ?eeC ?Fx? a tbe_.oa..a.at?44 , it. i: l';)+,z .y°_ax r.n tt v:a :tDrat Ct?? tra. rsuat cyst in€ egte?l im,.order. .44at ilta tiea??ai?Y? ??aalas?t?ar$ i?F ca?? "bay g3rns or. K bpa[n f?pt y I. to y? ain.?A p e1 y? « l. i5'erit'Ai L1Qr d :??}sar to ^b it -111 '39F.i'IRral OKyal'o M".Aity 3 alj act ?.6'. :C4!FI?2.?#?ttlfj?.- 3lriale ea?.a,ubi aCw ?citx r* '"I':L 'fianivirtwl i_n 01 hiattzafiiaslic "ghis vri(cAt( a=Nice, #n Hinoa,vPe?ie;: is ©rftr thaf_. U zin rs?t a Lhn 4 nti? e?3 & saa '. t. niaaaCl icatic a Ls Native -Soot to Y LV Under aopaarat e4vax; if boat have, alzy questions ita r mgard to the infomartoa asnuillbad -ia this t*port,. plaatteL C twat V?ri i'lehaze -Clsek. -of tithe affics. Yc;v 's : Very "tr+nlr, Cast lbzal ftst aowt riwg cix*Plevogd plumb#n erci Iaf4lor€sosxt d 7?d3.? :W?d?t ?tivieia?s ....a.' Plumbing'Unit HR&R(3),; RC :hr ap equal opportuniiy employer ?3 MINNESOTA DEPARTMENT OF HEALTH Division of Environmental Health REPORT ON PLANS Plans and specifications on Plumbing for Osman Golf Club Addition Location Eagan, Minnesota Date Examined January 23, 1978 Prepared and submitted by Park Engineering Incorporated, 5700 West 36th Street, Minneapolis, Minnesota Date Received November 21, 1977 Plan File No. A-2955 January 19, T77'9- Ownership Spur Incorporated 2750 Sibley Highway, Eagan, Minnesota Scope - This examination project only and insofar Code, as amended, apply sewerage system to which These plans and specifications Minnesota Plumbing Code, and a the understanding as stated in the usual reservations as stat "Information Relative to Plan Paul B. Jo on, P.E. Senior E neer Section of U9ater Supply and General Engineering is limited to the design of this particular as the provisions of the Minnesota Plumbing, and does not cover the water supplV or this plumbing system is connected. Conclusion comply with the provisions of the re recommended fcr approval with the preceding., paragraphs, and with ed on the appended sheet entitled, Examination." Richard D. Clark Public Health Engineer Section of Water Supply and General Engineering MINNESOTA DEPARTMENT OF HEALTH Division of Environmental Health Information Relative to Plan Examination The examination of plans and specifications for water supply and sewerage systems (Regulation MHD 136(a)), plumbing systems (Regulation MHD 139(a)(1)), and swimming pools (Regulation MHD 141(c)), is made to provide information concerning the sanitary features of projects presented for consideration in accordance with the above regulations of the Commissioner of Health. The approval of such plans is given upon the supposition that the survey and other data on which the design is based are correct, and that necessary legal authority has been obtained to construct the project. The responsibility for the design of structural features and the efficiency of equipment must be taken by the engineer or architect who designs the project. Water supply plans are examined with regard to the location, construction and operational features of the design and maintenance of all parts of the system which may affect the safety and sanitary quality of the water. Examination is based on the standards of this Department. Plans of sewage disposal systems considered by this Department are limited to those systems that can utilize soil absorption. They are examined with regard to the features of design which concern location, construction, operation and maintenance of the system and which may affect the public health. The examination is based upon information contained in the bulletins entitled "Tentative Standards for Design of Small Sewage Works," July 1962, and the recommended "Ordinance and Code Regulating Individual Sewage Disposal System," 1971. Plans on plumbing systems are examined only insofar as the provisions of the Minnesota Plumbing Code apply. Swimming pool plans are examined with regard to the features of location and design which may affect the safety and sanitary quality of the water for public bathing. The examination is based upon Regulation 14HD 141, Public Swimming Pools. The Commissioner of Health reserves the right to withdraw his approval of plans if construction of the project is not undertaken within a period of two years. The fact that plans have been approved by the Commissioner of Health does not necessarily mean that recommendations for alterations or additions may not be offered at some later time ,?hen changed conditions or advanced knowledge make improvements necessary. OF MINNESOTA DEPARTMENT OF HEALTH Division of Environmental Health Plumbing Inspections Special care should be taken to insure that the material and installation of the plumbing system are in accordance with the pro- visions of the Minnesota Plumbing Code. It is necessary that the State Health Department make roughing-in and final inspections of the plumbing system to determine whether it complies with the Code. Provisions should be made for applying an air test at the time of the roughing-in inspection as outlined in 14HD 134 of the Code. In order to facilitate this work, therc is attached a self-addressed card which should be returned, indicating the name of the plumbing contractor so that arrangements can be made for the state Health Department to be notified by him as to the time that the installation will he ready for test and inspections. No acceptance of the plumbing installation can be given until the inspection and test of the roughing-in work [MHD 134(d)(1)), finished plumbing [MHD 134(4)(2)), and the inspection of the completed installation have been made by a representative of the State Health Department and found to be in accordance with the provisions of the Code. 0 stt? d - 5V 1minnesota. department of health minnesota department of health 717 6.e. delaware St. minneapolis 55440 Mr. David W. Snyder Sweitzer Construction Company 777 Raymond Avenue St. Paul, Minnesota 55114 October 17, 1977 OCT -is 167 Dear Mr. Snyder: We have received and reviewed the plena and specifications covering the food and beverage service equipment layout which was submitted by Harrison lknwe Restaurant Equipment Company to serve the proP069d new food service addition for the Lost Spur Country Club located at 2750 Sibley Highway in. Fagan,"Mimaesota, Dakota County. The food service plans and specifications appear to be in general conformity with the Standards of this Department. However, the following requirements must be met: 1;' An approved floor such as stainless steel or quarry the oust be provided for the floorless walls-in cooler/freezer. 2. The minimum acceptable floor for the dry storage room is 1/8 in& vinyl asbestos tile. The proposed concrete floor does not most this criteria. 3. The minia>a acceptable.floor in the janitors closet is sealed concrete. 4. Notify this office regarding any connection to the municipal water supply. If so, hew will the existing water well be utilized? You are reminded that plans and specifications nut be submitted to this Department for review amend approval prior to any new construction, major remodel- ing or alterations as required by Minnesota Statutes Chapter 157.03. This. project was initiated in violation of this law. Detailed plans =A specifications covering the system of plumbing moat be submitted for review and approval. These plans mist be submitted in duplicate and be properly sigged-by a registered a&chitect or engineer in the State of Minnesota. an equal opportunity . employer CASH RECEIPT CITY OF EAGAN P. O. BOX 21-199 EAGAN, MINNESOTA 55121 L/ DATE 19 i? RECEIV@b t - i•• FROM - / ,- AMOUNT $ & DOLLARS ]oo ? CASH ?? CHECK i FOR -? FUND CODE AMOUNT / Thank You BY A White-Payers Copy Yellow-Posting COPY Pink-File Copy riV49sartment of health Q 7ft%.9. delaware st. minneapolis 55440 We expect to receive the additional requested information regarding this project as soon as possible in order that we natty complete the plan review. One set of food service equipment plans, appropriately stamped, are being forwarded to Mr. Pahl Samuels of Harrison Hausa Restaurant Equip- rant Company. At such time as construction is completed, please communicate with Mr. James Witkowski, Sanitarian in this office, in order that he nay make a final on-site inspection. If you have questions concerning this scatter, please communicate with us at 296-5341. Yours very truly, M. Frederick Mitchell, Section Chief Hotels, Resorts and Restaurants. oc:Paul Sannels, "patent Marketing Manager, Harrison House Eagan Building Inspector, W. Dale Peterson MEM:pac cc:Jim Witkowski` Roman Koch an equal opportunity employer ;, ss _ Da'-es p I 7. 2 BUILDnZ PERMIT APPLICATION LOT BLOCK ADDITION : ARCE.T_I & SECTION NUMBER IF UNPLATTED ,O ,0.9 '9 ey L--__-? ?Dll?': Sri Or 2ARCEL X-/.P U .- -40 ^`SI OCCUPANCY 6 USE 16-&l l el m AiT 3 ' fir- Al t Dhin ?Iirsl FRP 2 on r Y'111ER _50f ryta,n Ar09` TELEPHONE NO.? ?.._.._. . _so CO TRACTCR?, ex (!exs T It o . TELEPHONE YIO. 69s 96 7- ? - SAPcZE55 777 di t/m,mn - J7 Acv Note- Include site plan, building plans, and energy calculations with thi_r application signed (/C d /% / f f> /L __.. OFFICE USE IALUATIOU 9A3 0 00 e-d tt l'XPIECTIOP] X,TER 1ALTER _tUILDING PERMIT FEE --- ^711RCH7k.PGE FEE ` .PLAN CFECK FEE jG 9 PARK DEDICATIO74 FEE OTHER .- ;,r,mAL* y? ^ / f r 1 TIPROVALS. /!??7I SS?,SSMEW, CLERK BUILDING D POLICE DEPT. !._. !1r-mrR & SMR DEPT. FIRE DEPT PARK DEPT. _„?.. ??/ ,S 7 7 CITY OF EAGAN AND OCB REALTY CO. EXTENSION OF STORM SEWER AGREEMENT CONTRACT 96-P EAGAN WOODS OFFICE PARK 2ND ADDITION THIS AGREEMENT, made and entered into this ? day of May, 1996, by and between the CITY OF EAGAN, a Minnesota municipal corporation (hereinafter "the City"), whose address is 3830 Pilot Knob Road, Eagan, Minnesota 55122-1897; and OCB REALTY CO., a Minnesota corporation (hereinafter "Developer"), whose address is 10260 Viking Drive, Eden Prairie, Minnesota 55344. WHEREAS, Developer has applied to the City for subdivision approval (Eagan Woods Office Park 2nd Addition) affecting property located in the City of Eagan, Dakota County, Minnesota; and WHEREAS, in conjunction with the Developer's proposed subdivision, the City requires the extension of storm sewer from Developer's property (described on Exhibit A and referred to as "Developer's Property") across a portion of property owned by Osman Properties, Inc. (described on Exhibit B and referred to as "Osman Property") (collectively referred to as the "Property"); and WHEREAS, the City has agreed to share in a small portion of the cost of the Project in accordance with Section 7 of this Agreement. NOW, THEREFORE, in consideration of One Dollar and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged and for other good and valuable consideration, the City and Developer agree as follows: 1. Developer Improvements. The Developer shall install the following improvements in connection with its project: an 19 to 21 inch storm sewer with reinforced concrete pipe and all related appurtenances as described in construction plans dated April 23, 1996, and Addendum dated April 30, 1996 (hereinafter referred to as the "Project"). Seven (7) complete sets of all required detailed plans and specifications, as required, shall be prepared by a registered professional engineer and shall be submitted to the City's Public Works Department prior to the issuance of the permit to proceed. The City has approved the-plans and specifications. The Project shall be completed in accordance with approved plans and specifications on file in the office of the City's Public Works Department, which are hereby made a part of this Agreement, as follows: Item Completion Date Erosion & Sediment Control Measures .......................... June 15, 1996 Storm Sewer & Grading Improvements ......................... August 1, 1996 Trench, Ravine and Pond Restoration ............................ August 15, 1996 except as this period time is extended by resolution by the City Council. The Developer shall be responsible for all damage caused as the result of the Project, including but not limited to, restoration of existing control structures and cleanup of public right-of-way, until the Project is completed. As a portion of the erosion and sediment control plan the Developer shall re-seed or sod any disturbed areas in accordance with the approved erosion and sediment control plan prepared by BRW, Inc., dated April 23, 1996, and Addendum dated April 30, 1996. The City reserves the right to perform any necessary erosion and sediment control or restoration as required if these requirements are not complied with after notification by the City as stipulated in paragraph 8 "Default by Developer." The Developer shall be financially responsible for payment for this extra work. 2 3. Drainage Easement Through Affected Property. Upon completion of the Project and acceptance by the City as defined in Section 5(e) herein, the Developer (and Osman Properties, Inc.) shall grant to the City public drainage easement in the form of attached Exhibit "C". 4. Initial Inspection. The Developer shall provide the City Public Works Department with a two (2) working day notice prior to the commencement of work under this Agreement. The City shall have a reasonable time, not to be less than five (5) working days after commencement of construction of the Project, to inspect the Project site. Upon failure to comply with the terms of this paragraph, the City may require additional security as provided in paragraph 11 "Financial Security Release" herein. 5. Construction of Improvements. A. Approval of Contractors and Engineer. The City Public Works Department has approved BRW, Inc. as the engineer that has prepared plans and specifications for the Developer for the design or construction of the required storm sewer improvements. Any substitute engineer must be approved in writing by the City Public Works Department and such approval shall not unreasonably be withheld. B. Construction. The Project shall be constructed in accordance with the plans and specifications approved by the City Public Works Department. The Developer shall cause the contractors to furnish the City Public Works Department with a written schedule of proposed operations, subcontractors and material suppliers, at least five (5) days prior to commencement of construction work. The Developer shall notify the City in writing, coordinate with City Engineering staff and hold a pre-construction conference 3 meeting with all affected parties including but not limited to the City, Developer's engineer and the engineer's inspector, Developer's contractor, representatives of Osman Properties, Inc. and all affected utility Companies, at least three (3) days prior to starting construction of the Project. C. Periodic Inspection. The Public Works Department, or its designated representative, shall periodically inspect construction of the Project. The Developer shall notify the Public Works Department two (2) days prior to the commencement of any construction activity. Failure to notify the City to allow it to inspect said work shall result in the City's right to withhold the release of any portion of the Financial Security resulting from work being performed without the opportunity for adequate City inspection pursuant to paragraph 11 "Financial Security Release". D. Faithful Performance of Construction Contracts. The Developer shall fully and faithfully comply with all terms of any and all contracts entered into by the Developer for the installation and construction of the Project and agrees to repair or replace as directed by the City, and at Developer's sole cost and expense, any work or materials that are defective or become defective during the warranty period, in the reasonable opinion of the City, until acceptance by the City. E. City Acceptance. Within thirty (30) days after completion of the construction required to be done under the Project in accordance with the ordinances and approved plans and specifications, the Developer shall give written notice to the City. The City shall then inspect the improvements and notify the Developer of any improvements that do not so conform. Upon compliance with such ordinances and 4 approved specifications, the storm sewer shall become the property of the City upon written notice of acceptance by the City. Upon failure to comply with the terms of this paragraph, the City may require additional security as provided in paragraph 11 "Financial Security Release", herein. If the Developer's improvements do not conform, notice shall be given to the Developer of the need for repair or replacement or, in its discretion, the City may proceed under paragraph 8, "Default by Developer". F. Engineering Submittals Required. Three (3) blue line copies and one digital copy of CADD plans in DXF format (3.5 diskette or 4 millimeter DAT) of the detailed record plan "as built" drawings of those public improvements constructed described in Paragraph 2, "Development Improvements", shall be provided by Developer to the City no later than thirty (30) days after completion and acceptance of these improvements by the City and prior to release of any financial securities unless otherwise approved in writing by the City Public Works Department. In addition, final quantity tabulations shall be required which must include the following items: 1. Storm sewer by lineal footage and size. 2. Number of manholes, catch basins, flared-end sections, outlet control structures, etc. 6. LICENSE. The Developer hereby grants the City, its agents, employees, officers and contractors, a license to enter Developer's Property to perform all inspections provided for herein by the City Public Works Department or its designated representative during the installation of public improvements. Developer will provide documentation satisfactory to the City granting it a license over the Osman Property to allow for City 5 inspection of the improvements. The license shall expire after the Project have been constructed and accepted by the City. 7. RESPONSIBILITY FOR COSTS. A. Except as otherwise provided herein, the City agrees to reimburse Developer in an amount equal to Eight and one-half per cent (8 1/2%) of the initial cost of constructing the Project; provided however, in no event shall the contribution of the City exceed $15,000.00 and provided further that this contribution shall not be paid until the Project is completed after final acceptance by the City. The Developer shall be responsible for all other costs in connection with the Project, including, but not limited to inspection and acceptance, authorization of improvements, bidding, surveys and compliance tests, environmental assessments and/or environmental impact statements if required, and soil and water conservation district charges. B. The Developer shall hold the City, and its officers and employees, harmless from all claims made by the Developer and third parties for damages sustained or costs incurred, resulting from the construction of the Project. The Developer shall indemnify the City and its officers and employees for all costs, damages or expenses which the City may pay or incur in consequence of such claim, including attorneys fees. C. The Developer shall reimburse the City for all costs incurred in the enforcement of this Agreement, including engineering fees. The prevailing party shall be entitled to an award of its reasonable attorney fees. 8. DEFAULT BY DEVELOPER. In the event of default by the Developer as to any of the work or obligation required to be performed by it hereunder, the City 6 shall give the Developer written notice by United States mail to the address above or such other address as Developer may request in writing, specifying the work in default and required to be done by the Developer. The Developer shall be given at least three (3) working days to remove the default. If the Developer fails to cure the default, the City may, at its option, perform said work. The Developer shall within thirty (30) days of formal billing, reimburse the City for any expense incurred thereby. In the event of default on any work required to be performed by the Developer herein which is, in fact, installed by the City, and upon failure of the Developer to make payment upon billing, when due, the City may proceed to bill the Developer or may proceed to collect on the letter of credit, or collateral agreement provided in paragraph 9 herein. Notice to the Developer shall also constitute notice without further action to any contractor or subcontractor, whether they are approved and accepted by the City or not. In the event of emergency as determined by the City Public Works Department, the three (3) working day notice requirement to the Developer shall be and hereby is waived in its entirety (provided that the City agrees to use reasonable efforts to contact the Developer by telephone) and the Developer shall reimburse the City upon being billed thereof for any expenses so incurred by the City in the same manner as if mailed notice as described hereinbefore had been given. It is understood by the parties, however, that the responsibility of the Developer is limited by strikes and force majeure. 9. FINANCIAL SECURITY REQUIREMENTS. No work shall be commenced under this Agreement until the Developer has deposited with the City, a financial security or irrevocable letter of credit, for 100% of the estimated cost of the 7 improvements specified in Paragraph 2 and Exhibit "D" of this Agreement in the total amount of One hundred Fifty-nine Thousand and Seven-hundred Thirty-six Dollars ($159,736.00) securing the full performance of this Agreement. Such financial security or irrevocable letter of credit, shall be approved by the City Attorney and shall continue to be in full force and effect until released by the City, in accordance with Paragraph 11 of this Agreement. 10. GUARANTY. Notwithstanding anything contained in the Easement Agreement attached as Exhibit "C" hereto, the Developer guarantees all work required to be performed by it hereunder for a period of two (2) year subsequent to written acceptance of same by the City against both poor material and faulty workmanship and shall be solely responsible for the cost and expense to perform all required work pursuant to the Developers plans and specifications within thirty (30) days of written notification by the City. In addition, the Developer shall provide a two-year Maintenance Bond in at least the amount of 50% of the estimated costs of storm sewer and grading as identified in Exhibit "D" from the date the City Council acknowledges completion of said improvements. 11. FINANCIAL SECURITY RELEASE. Upon Developer's written request and upon completion and acceptance by the City of any Developer installed improvements, a percentage of that portion of the financial security, covering those specific improvements shall be released, except, however, the final twenty (20%) percent of the financial security shall be held until the two-year warranty bond identified above, acceptable to the City, has been provided and a final inspection and written acceptance of 8 all Developer installed improvements have been performed by the City. At the time of final acceptance of all construction items, if it is determined by the City that the approved plans and specifications were not strictly adhered to, or that work was done without City inspection, the City may require as a condition of acceptance, that the Developer post a cash escrow or irrevocable letter of credit, equal to 125% of the estimated amount necessary to correct the deficiency or to protect against deficiencies arising therefrom. Said cash escrow or irrevocable letter of credit, shall remain in force for such time as the City deems necessary, not to exceed five (5) years. In the event that work, now concealed, was done without permitting City inspection, the City may, in the alternative, require the concealed condition to be exposed for inspection purposes. 12. CITY'S DUTIES. The terms of this Agreement shall, unless otherwise specified herein, not be considered an affirmative duty upon the City to complete any improvement herein, except that the City may, as provided in paragraph 8 "Default by Developer" herein, perform work which the Developer has failed to complete and which is necessary to complete the Project. 13. INSURANCE. A. General Insurance Requirement. The Developer shall not commence work under this Agreement until it has obtained all insurance required under this provision and have filed the Certificate of Insurance or the certified copy of the Insurance Policy with the City. The Developer shall not allow any subcontractor to commence work on his subcontract until all insurance required for the subcontractor has been obtained. Each 9 insurance policy shall contain a clause providing that it shall not be canceled by the insurance company without thirty (30) days written notice to the City of intent to cancel. B. Liability Insurance. The Developer shall procure and maintain during the term of this Agreement personal injury liability insurance with a minimum coverage limit of $1,000,000.00 per occurrence which shall protect them from claims for damages for personal injury, including accidental deaths, which may arise from the operations under this Agreement, whether such operations be by themselves or by any subcontractor or by anyone directly or indirectly employed by any of them. 14. TERMS OF BREACH. Breach of any terms of this Agreement by the Developer shall be ground for denial of building or occupancy permits for building within the Eagan Woods Office Park 2nd Addition until such breach is corrected by the Developer. 15. VALIDITY. If any portion, section, subsection, sentence, clause, paragraph or phrase of this Agreement is for any reason held to be invalid, such decision shall not affect the validity of the remaining portion of this Agreement. 16. RECORDING. This Agreement may be recorded, at the City's option, with the Dakota County Recorder and the Developer shall provide and execute any and all documents necessary to implement the recording of this Agreement. After the Developer has completed the work required of it under this Agreement, at the Developer's request, the City will execute and deliver to the Developer a release. 10 17. NOTICE. Any notice, demand or other communication permitted or required hereunder shall be deemed duly given, when delivered or mailed to the address noted in this Agreement. 18. BINDING AGREEMENT. The parties mutually recognize and agree that all terms and conditions of this Agreement shall run with the land herein described and shall be binding upon the heirs, successors, administrators and assigns of the Developer referenced in this Agreement. IN WITNESS WHEREOF, we have hereunto set our hands and seals. CITY OF EAGAN, a Minnesota A. Egan Its: Mayor AAA By: VanOverbeke Its: Ci Clerk OCB REALTY CO. By: ^r Its: 11 STATE OF MINNESOTA) ) ss. COUNTY OF DAKOTA ) On this 2.04day of 1996, before me a Notary Public within and for said County, personally-appe ed THOMAS A. EGAN and E.J. VanOVERBEKE to me personally known, who being each by me duly sworn, each did say that they are respectively the Mayor and Clerk of the City of Eagan, the municipality named in the foregoing instrument, and that the seal affixed on behalf of said municipality by authority of its City Council and said Mayor and Clerk acknowledged said instrument to be the free act and deed of said municipality. JUOYM. JENK~9 NOTARY PUTA6"'NN rA MYCarrpnlsslonr COUNTY ?4 2000 Not ? ubli J STATE OF MINNESOTA ) -_ ss. COUNTY OF )!V,:: ?L ) ,?_ 1996, before me a Notary Public within On this ?. day of ary and for said County, personally appeared I ry,jTy.r I 1 't'h to me personally known, who being by me duly sworn, each did say that he/she is the \11, of OCB Realty Co., the corporation named in the foregoing instrument, and that said instrument was signed on behalf of said corporation by authority of its Board of Directors and said acknowledged said instrument to be the free act and deed of the JULIE SAUSER WTAMPUeUC-MNNE=A DAWTACOUNIY 9W CW=k&n E*kft Jan. 91. 20 1. ? 2.2?--- Notary Public APPROVED AS TO FORM: City Attorney's Office Dated: S(Z117c' 12 APPROVED AS TO CONTENT: r Publid/Work's Department Dated: - 21 -,q, - THIS INSTRUMENT WAS DRAFTED BY: SEVERSON, SHELDON, DOUGHERTY & MOLENDA, P.A. 7300 West 147th Street, Suite 600 Apple Valley MN 55124 (612) 432-3136 RBB/wkt 206-13000 13 MAY-24-19% 12:13 HPW 612 370 1378 P. 02,-05 EXHIBIT A May 24, 1996 PROPERTY DESCRIPTION FOR OCB RFALTY COMPANY OUTLOT B, EAGAN WOODS OFFICE PARK, according to the plat thereof on file and of record in the office of the Registrar of Titles , Dakota County, Minnesota; and All that part of Government Lot 5, Section 4, Township 27 North, Range 23 West of the 4th Principal Meridian, Dakota County, Minnesota, described as follows: Commencing at the southeast corner of said Government Lot 5, also being the southeast corner of the Northeast Quarter of said Section 4; thence on an assumed bearing of North 00 degrees 26 minutes 24 seconds West along the easterly line of said Government Lot 5 and said Northeast Quarter for 1166.23 feet to an intersection with the easterly extension of the southerly line of EAGAN WOODS OFFICE PARK, according to the plat thereof on file and of record in the office of the Registrar of Titles in and for said Dakota County, said intersection being the actual point of beginning of the land to be described; thence South 00 degrees 26 minutes 24 seconds East along said easterly line of Government Lot 5 for 581.19 feet; thence South 89 degrees 50 minutes 58 seconds West for 358.09 feet to a Judicial Landmark set pursuant to Dakota County District Court File No. 74372; thence South 00 degrees 26 minutes 28 seconds East for 265.02 feet to a Judicial Landmark set pursuant to said Dakota County District Court File No. 74372; thence South 89 degrees 29 minutes 14 seconds West for 711.59 feet to a point in the north line of the south 320 feet of said Government Lot 5; thence North 00 degrees 13 minutes 29 seconds West for MAY-24-1996 12:14 SRW 612 370 1378 P. 03/0 _ 4.70 feet to a Judicial Landmark set pursuant to said Dakota County District Court File No. 66463; thence South 89 degrees 40 minutes 54 seconds West for 250.45 feet to a Judicial Landmark set pursuant to said Dakota County District Court File No. 66463, said Judicial Landmark being a point in the west line of the Southeast Quarter of the Northeast Quarter of said Section 4 as established by said Dakota County District Court File No. 66463; thence North 00 degrees 24 minutes 28 seconds west along said west line for 837.75 feet to a point in the southerly line of said PAGAN WOODS OFFICE PARK distant 0.52 feet easterly from the southwest corner of said EAGAN WOOD OFFICE PARK, said point being marked by a Judicial Landmark set pursuant to said Dakota County District Court File No. 66463; thence North 89 degrees 27 minutes 33 seconds East along said southerly line and its easterly extension for 1319.63 feet to the point of beginning; EXCEPT that part which lies southwesterly of the following described line and its extensions; Commencing at said point in the southerly line of EAGAN WOODS OFFICE PARK distant 0.52 feet easterly from the southwest corner of said EAGAN WOODS OFFICE PARK, said point being marked by a Judicial Landmark set pursuant to said Dakota County District Court File No. 66463; thence South 00 degrees 24 minutes 28 seconds west along the west line of the above described property for 667.05 feet to the actual point of beginning of the line to be described; thence South 77 degrees 29 minutes 02 seconds East for 781.83 feet to the southerly line of the above described property and there terminating; and Gebo4.k14 MAY-24-1996 12:14 BRW 612 370 1378 P.04i05 All that part of the following described property: The West 990 feet of the Southeast Quarter of the Northeast Quarter, being a part of Government Lot 5, Section 4, Township 27, Range 23, Dakota County, Minnesota, which lies southerly of the most southerly line of the following described property and its easterly extension: All that part of Government Lot 5, Section 4, Township 27 North, Range 23 West of the 4th Principal Meridian, Dakota County, Minnesota, described as follows: Commencing at the southeast corner of said Government Lot 5, also being the southeast corner of the Northeast Quarter of said Section 4; thence on an assumed bearing of North 00 degrees 26 minutes 24 seconds West along the easterly line of said Government Lot 5 and said Northeast Quarter for 1166.23 feet to an intersection with the easterly extension of the southerly line of EAGAN WOODS OFFICE PARK, according to the plat thereof on file and of record in the office of the Registrar of Titles in and for said Dakota County, said intersection being the actual point of beginning of the land to be described; thence South 00 degrees 26 minutes 24 seconds East along said easterly line of Government Lot 5 for 581.19 feet; thence South 89 degrees 50 minutes 58 seconds West for 358.09 feet to a Judicial Landmark set pursuant to Dakota County District Court File No. 74372; thence South 00 degrees 26 minutes 28 seconds East for 265.02 feet to a Judicial Landmark set pursuant to said Dakota County District Court File No. 74372; thence South 89 degrees 29 minutes 14 seconds West for 711.59 feet to a point in the north line of the south 320 feet of said Government Lot Si thence North 00 degrees 13 minutes 29 seconds West for 4.70 feet to a Judicial Landmark set pursuant to said Dakota County District Court File No. 66463; thence South 89 degrees 40 minutes 54 seconds West for 250.45 feet to a Judicial Landmark set pursuant to said Dakota County District Court File No. 66463, said Judicial Landmark being a point in MAY-24-19% 12:15 BRW 612 370 1378 P.05/05 the west line of the Southeast Quarter of the Northeast Quarter of said Section 4 as established by said Dakota County District Court File No. 66463; thence North 00 degrees 24 minutes 28 seconds west along said west line for 837.75 feet to a point in the southerly line of said EAGAN WOODS OFFICE PARK distant 0.52 feet easterly from the southwest corner of said EAGAN WOODS OFFICE PARK, said point being marked by a Judicial Landmark set pursuant to said Dakota Countv District Court File No. 66463; thence North 89 degrees 27 minutes 33 seconds East along said southerly line and its easterly extension for 1319.63 feet to the point of beginning. which lies easterly of the following described line and its extensions: Commencing at said southeast corner of Government Lot 5, also being the southeast corner of the Northeast Quarter of said Section 4; thence on an assumed bearing of North 00 degrees 26 minutes 24 seconds West along the easterly line of said Government Lot 5 and said Northeast Quarter for 1166.23 feet to an intersection with the easterly extension of the southelly line of EAGAN WOODS OFFICE PARK, according to the plat thereof on file and of record in the office of the Registrar of Titles in and for said Dakota County; thence South 00 degrees 26 minutes 24 seconds East along said easterly line for 581.19 feet; thence South 89 degrees 58 minutes 09 seconds west for 358.09 feet to a Judicial Landmark set pursuant to Dakota County District Court File No. 74372; thence South 00 degrees 26 minutes 28 seconds East for 265.02 feet to a Judicial Landmark set pursuant to said Dakota County District Court File No. 74372; thence South 89 degrees 29 minutes 14 seconds west for 177.13 feet to the actual point of beginning of the line to be described; thence South 00 degrees 26 minutes 28 seconds East for 321.14 feet to the south line of said Southeast Quarter of the Northeast Quarter and there terminating. ocboa2A14 TOTAL P.05 EXHIBIT .B Parcel 1 -Ihat part of Goven*unert Lots 1,2,4,:; and the southwest 1!4 of tine north«--st U4 of Section 4, To«nship 27 North: R:a?l: 23 West, Dakota Count, 1 _i-,nesota desc-Tlbei as L-illows: Commencing at the northeast corntr of said C.Goven unent Lot I', thence South 0 degrees 25 minutes 14 seconds East 24541.49 feet to the 3011theas, come: a: Government Lot 5, said Section 4: thence SOULn 99 degree,- 37 rn:nutes 46 seconds West 329.79 feet to the point oC beginning of the property to ix described; thence hrorth 0 degrees 2e) minutes 13 seconds West 330.00 feet; Qhtnce South 89 degrees 37 minutes 46 seconds West 990.00 feet to the point of intersection .with hereinafter described line "A"; thence North 0 degrees 26 minutes 13 seconds West 976.60 feet along said Line "A" to the point o intcrsection -with the milita^: reservation line %vhl--h deCiries the westerly bxmdan of Govemrnent Lots 1 sad 5 in said Section 4; thence Nor-Ch 32 degrees 30 minutes 52 seconds East 516.58 feet alone said rnilitsn resen'a ion line IO the poi nm of lntersecuon \t!th the so::the;ly nigh: of wav line of S.T.H. No. 491, as sho«n on Mi mesota Departrttsnt o•.`Transportatior. might of Wat' Plat No. 19-32; thence North 83 deWees 28 rninutes 52 seconds :vest 57.50 feet along said Tight of wav lin: thence South 89 degrees 56 minutes 18 seconds West 1318.60 feet aione said right of %vay line to Ltie point of intersection \-,ith the easterljv right of wa,; hn- of %va 1Ln:, of T. r- No. 13; IhluGce South 19 degrees 28 minutes 33 seconds West along the caste:ly r i s of 'xa: of T.H. No. 13, a distance of 21 18.02 feet to the point of'intersection With aline ,xhich has a bearing oC Sout;I 89 degrees 56 rnt nutes 07 seconds West and passes Chrough the point of beginning, thence North 89 degrees 56 minute: 07 srcands East 2642.92 feet the point of beairming. Lire ?» ' Beginning at the midpoint of a line drawn from the sowhe:lst comer of said G..)verrLment Lot 5 to the Southwest comer c1 Government Lot 4 in said SeCtlon 4; thence N.:?rth C; degrees 26 ;ninutes 13 seconds West 24:4.05 to the midpoint of a line drawn front the nortreast carver of said Government Lot l t? the north) est comer of Gove=cnt Lot 2 in said Se:ticn 4. EXCEPT FOR The West 990 feet of the Southeast Quarter of the Northeast Quarter, being a pan of Government Lot 5, Section 4, Township 27, Range 23, Dakota Comity, 2vfmaesota, which lies sorti^e:ly of the most southerly line of the following described proverty and its easterly extenroa: All that part of Government Lot 5, Section 4, Township 27 North, Range 23 West of the 4th Principal Meridian, Dakota County. Minnesota, described as follows: Commencing at the Southeast corner of said Government Lot 5, also being the Southeast corner of the Northeast Quancr of said Section 4; thcae on an assumed bcering of North 00 dagr=s 26 nth me 24 seconds West along the easterly line of said Gover^-ent Lot 5 and said Northeast Quarter for 116623 feet to an intersection with the . =ugly cxaersion of the southerly line of EAGAN WOODS OFFICE PARK, according to the pat thereof on file end ci :cc?°a n :h= o- c,^ ci =^ Regis= r of T"rtles in and for said Dakota County, said intersection being the actual point of beginning of the land to be c?c toe ; **=ence South 00 degrees 26 minutes 24 seconds East along said easterly line of Government Lot 5 for :81.19 fees; thence South 89 degrees 50 mimrtcs 58 seconds West for 358.09 feet to a judicial Lan-dmerk set pursuant to Dakota County District Court File No. 74372; thence South 00 degrees 26 rpinutes 28 seconds East for 265.02 feet to a Judicial Landmark set pursuant to said Dakota County District Court File No. 74372; thence South 89 degrees 29 minutes 14 seconds West for 711.59 feet to a point in the North line of the South 320 feet of said Government Lot 5; thence North 00 degrees 13 minutes 29 seconds West for 4.70 feet to a Judicial Landmark set pursuant to said Dakota County District Coun File No. 66463; th_=ce South 89 degrees 40 minutes 54 seconds West for 250.45 feet to a Judicial Landmark set pursuant to said Dakota County District Court File No. 66463, said Judicial Landmark being a point in the West line of the Southeast Quarter of the Northeast Quarter of said Section 4 as established by said Dakota County District Court File No. 66463; thence North 00 dcgees 24 minutes 28 seconds West along said West line for 837.75 feet to a Foint in Lh sourht: iy line of said EAGAN WOODS OFFICE PARK distant 0.52 fee,, easterly from the Southwest corner of said EAGAN WOODS OFFICE PARK, said point being marked by a Judicial L:rdmark set pursuant to said Dakota County District Court File No. 66463; thence North 89 degrees 27 minuses 33 seconds East along said southerly line and its caste.-iv c:ctersion for 1319.63 feet to the point of bc?rnina. which lies easterly of to following described line and its cdmrio= Commencing at said Southeast corner of Govemmew Lot 5, also being the Southeast corner of the North= Quarter of said Section 4; thence on an assumed ^^ g of North 00 degrees 26 minutes 24 seconds West along the easterly line of said t zove ?r^errt Lot 5 and said Northeast Quarter for 1166.23 feet to an intersection with the e-- Y iy exension of the southerly 'line of EAGAN WOODS OFFICE PARK according to the plat thereof on file and of record in the ogee of the Registers of Titles in and for said Dakota County, thence South 00 degrees 26 minutes 24 seconds East along said easterly lire for 581.19 feet; thence South 89 degrees 58 mirarr 09 seconds West for 358.09 feet to a Judicial land *+ark set pursuant to Dakota Counuy District Court File No. 74372; thence South 00 degrees 26 minutes 28 seconds East for 265.02 feet to a Judicial Landmark set pursuant to said Dakota County District Court File No. 74372; thence Sourh 89 degees 29 minutes 14 seconds West for 177.13 feet to the actual point of beginning of the line to be described; thence South 00 degrees 26 minutes 28 seconds East for 321.14 feet to the South line of said Southeast Quarter of the Northeast Quarter and there tcxrt=ting. Dakota Counry, Minnesota Abstract Property Parcel2 All that part of the following described property: All that part of Government Lot 5, Section 4, Township 27 North, Range 23 West of the 4th Principal Meridian. Dakota County, Minnesota, described as follows; Commencing at the Southeast corner of said Government Lot 5, also being the Southeast corner of the Northeast Quarter of said Section 4; thence on an assumed bearing of North 00 degrees 26 minutes 24 seconds West along the easterly line of said Government Lot 5 and said Northeast Quarter for 1166.23 feet to an intersection with tine easterly extension of the southerly line of EAGAN WOODS OFFICE PARK, according to the plat thereof on file and of record in the office of the Registrar of Titles in and for said Dakota County, said intersection being the actual point of beginning of the land to be described; thence South 00 degrees 26 minutes 24 seconds East along said easterly tine of Government Lot 5 for 581.19 feet; thence South 89 degrees 50 minutes 58 seconds West for 358.09 feet to a Judicial Landmark set pursuant to Dakota County Distr t Court File No. 74372; thence South 00 degrees 26 minutes 28 seconds East for 265.02 feet to a Judicial Landmark set pursuant to said Dakota County District Court Fite No. 74372; thence South 89 degrees 29 minutes 14 seconds West for 711.59 feet to a point in the North line of the South 320 feet of said Government Lot 5; thence North 00 degrees 13 minutes 29 seconds West for 4.70 feet to a Judicial Landmark set pursuant to said Dakota County District Court File No. 66463; thence JUUth 89 decrees 40 minutes 54 seconds West for 250.45 feet to a Judicial Landmark set pursuant to said Dakota County District Court Pile No. 66463. said Judicial Landmark being a point in the West line of the Southeast Quarter of the Northeast Quarter of said Section 4 as established by said Dakota County District Court Fite No. 66463: thence North 00 decrees 24 minutes 28 seconds West along said West tine for 837.75 feet to a puiut in the southerly line of said EAGAN WOODS OFFICE PARK distant 0.52 feet easterly from the Southwest corner of said EAGAN WOODS OFFICE PARK, said point being marked by a Judicial Landmark set pursuant to said Dakota County District Court File No. 66463: thence North 89 decrees 27 minutes 33 seconds East along said southerly line and its easterly extension for 1319.63 feet to the point of beginning; which lies southwester)}' of the following described line mid its extensions: Commencing at said point in the southerly line of EAGAN WOODS OFIrICE PARK distant 0.52 feet easterly from the Southwest corner of said EAGAN WOODS OFFICE PARK. said point being marked by a Judicial Landmark set pursuant to said Dakota County District Court File No. 66463; thence South 00 degrees 24 minutes 28 seconds West along the West line of the above described property for 667.05 feet to the actual point of beginning of the line to be described; thence South 77 degrees 29 minutes 02 seconds East for 781.83 feet to the southerly line of the above described property and there terminating. Dakota County Torrens Property Torrens Certificate No. 103892 EXHIBIT C DRAINAGE EASEMENT AGREEMENT This Agreement is made and entered into this day of 11995, by and among OCB Realty Co., a Minnesota corporation ("OCB"), Osman Properties, Inc., a Minnesota corporation ("Osman") (OCB and Osman are sometimes collectively referred to as the "Grantors"), and the City of Eagan, a municipal corporation under the laws of the State of Minnesota ("Grantee"). RECITALS A. OCB owns certain land in the City of Eagan, County of Dakota and State of Minnesota legally described on Exhibit A attached hereto and made a part hereof (the "OCB Land"). B. Osman owns certain land in the City of Eagan, County of Dakota and State of Minnesota legally described on Exhibit B attached hereto and made a part hereof (the "Lost Spur Land"). C. OCB intends to construct a drainage and ponding system across portions of the OCB Land and the Lost Spur Land in order to drain stormwater from the OCB Land and other land across the OCB Land and the Lost Spur Land, as described on Exhibit C attached hereto and made a part hereof (the "Drainage System"). D. The Grantors are willing to grant and hereby do grant the easements set forth in Sections 1 and 2 below (together, the OCB Easement and the Osman Easement described in Sections 1 and 2 below are referred to as the "Easement") over, under and across a portion of the OCB Land and a portion of the Lost Spur Land, as described in Exhibits D and E (the OCB Easement Area and the Lost Spur Easement Area described in Sections 1 and 2 below are referred to herein as the "Easement Area") in consideration of other actions of the Grantee and other agreements between the Grantors. E. On May 15, 1995, the City Council of the City of Eagan approved GCB's preliminary plan development and preliminary subdivision of Eagan Woods Office Park 2nd Addition, which provides for the construction of the Drainage System and the Easement set forth in this Agreement. NOW, THEREFORE, in consideration of the foregoing, other agreements between OCB, ,Osman, and Eagan Woods Land Limited Partnership, and of One Dollar ($1.00) and other good and valuable consideration, the parties hereto agree as follows: 1. OCB hereby declares, covenants, grants, quitclaims and conveys to Grantee, upon and subject to the terms and conditions hereinafter set forth, including without limitation the reservations in the Grantors for the benefit of the land as set forth in Section 8 below, an easement ("OCB Easement") for drainage and ponding purposes over, under, and across the portion of the OCB Land located in the County of Dakota, State of Minnesota, legally described in Exhibit D attached hereto and made a part hereof (the "OCB Easement Area"), together with a right of access to the OCB Easement Area for maintenance, repair and replacement of the Drainage System required by paragraph 6 of this Agreement. 2. Osman hereby declares, covenants, grants, quitclaims and conveys to Grantee and OCB, upon and subject to the terms and conditions hereinafter set forth, including without limitation the reservations in the Grantors for the benefit of the land as set forth in Section 8 below, an easement ("Osman Easement") for drainage purposes over, under, and across the portion of the Lost Spur Land located in the County of Dakota, State of Minnesota, legally described in Exhibit E attached hereto and made a part hereof (the "Lost Spur Easement Area"), together with a right of access to the Lost Spur Easement Area for maintenance, repair and replacement of the Drainage System required by paragraph 6 of this Agreement. 3. The OCB Easement and the Osman Easement are limited to the use as underground and natural surface drainage and ponding over, under, and across the OCB Easement Area and the Lost Spur Easement Area and, in the exercise of such easement rights, Grantee shall preserve the Easement Area in as natural a state as its use for drainage purposes by Grantee and OCB and the existence of the Drainage System permits and, in any event, in appearance and to a standard reasonably consistent with the balance of the OCB Land and the Lost Spur Land, as the case may be. 4. Without limiting the generality of the foregoing, no building, structure, fence or other improvement, whether temporary or permanent, may be constructed, placed or maintained on the Easement Area by Grantee (with the exception of the Drainage System), except that this shall not prohibit the installation of additional necessary materials (including, but not limited to, pipes, culverts, or manholes) installed in accordance with the maintenance of the Easement Area or the maintenance, repair, or replacement of the Drainage System. OCB shall not construct, place, or maintain any building, structure, fence or other improvement, whether temporary or permanent (with the exception of the Drainage System) on the Lost Spur Easement Area. 5. Grantee agrees that the OCB Land and the Lost Spur Land shall not be subject to any special, area or other assessment for the initial construction and maintenance of the Drainage System. 6. OCB shall construct the improvements necessary to establish the Drainage System. Upon completion of construction, Grantee shall, as necessary, maintain, repair and replace the Drainage System or components thereof in accordance with this Agreement. 7. All improvements to the Easement Area proposed by Grantee or OCB (in GCB's capacity as grantee of the OsmanEasement) after the initial construction of the Drainage System shall be consistent with the purpose and the limitations set forth in Sections 3 and 4 above. -2- 8. No building, structure, fence or other improvement, whether temporary or permanent, may be constructed, placed or maintained on the Easement Area by Osman or OCB (in GCB's capacity as owner of the OCB Land) without the prior approval of Grantee, which shall not be withheld unreasonably and without good cause; provided, however, that this shall not prohibit the maintenance or replacement of any improvements which exist on the Easement Area on the date of this Agreement and which do not interfere with the Drainage System, nor shall this prohibit the construction of a golf cart bridge by Osman which will cross and be located over a portion of the Lost Spur Easement Area. 9. Nothing in the Agreement shall prevent, and there is hereby reserved to the Grantors, their successors and assigns as owners of the OCB Land and the Lost Spur Land, the right (a) to drain water into the Easement Area, whether such drainage originates on the OCB Land, the Lost Spur Land, or otherwise, (b) to install and maintain trees, shrubs and vegetation in the Easement Area, and (c) to fill, grade and improve the OCB Land or the Lost Spur Land, and in connection therewith to extend the Drainage System to permit continued drainage into the Easement Area, consistent with applicable code requirements. Except for the rights expressly granted to Grantee above, all rights in and to the Easement Area are hereby reserved to the Grantors and, without limiting the generality of the foregoing, the Grantors may use the Easement Area for all uses and purposes not inconsistent with the rights expressly granted to Grantee. 10. The Easement Area, but not any other part of the property of the Grantors, is hereby subjected to the provisions of this Agreement and shall hereafter be owned, occupied, leased, sold or otherwise transferred subject to and together with the covenants, easements and restrictions of this Agreement. All of the provisions hereof shall be deemed to be covenants, easements and restrictions running with the land and shall benefit and burden the Grantors, Grantee, their respective successors and assigns, provided, however, that notwithstanding any other provision hereof, Grantors and their successors and assigns shall not have any liability or responsibility under this Agreement except for such person's own acts during the period such person owned or held the interest bound by this Agreement. IL The Grantors shall at all times during the term of this Agreement have the right to mortgage all of their right, title and interest in the OCB Easement Area or the Lost Spur Easement Area, as the case may be; provided, however, any mortgage on the OCB Easement Area or the Lost Spur Easement Area shall be subordinate and inferior to the rights, privileges and interest created under this Agreement. 12. Notwithstanding any provisions of this Agreement to the contrary, this Agreement is solely intended to grant a drainage easement and does not convey to the public or otherwise any right of way or pathway easement. 13. The Grantors and Grantee represent that they have the requisite power and authority to enter into and perform this Agreement and that this Agreement has been duly authorized by all necessary action, on the part of Grantors and Grantee and has been duly executed and delivered. -3- IN WITNESS WHEREOF, the parties hereto have duly executed this Agreement effective as of the date indicated above. MI:0038984.10 OCB REALTY CO By Its OSMAN PROPERTIES, INC. By Its CITY OF EAGAN By Its And by Its -4- STATE OF MINNESOTA ) ACKNOWLEDGMENT COUNTY OF 1 The foregoing instrument was acknowledged before me this day of 1995, by the of OCB Realty Co., a Minnesota corporation, on behalf of the corporation. Notary Public STATE OF MINNESOTA ) ACKNOWLEDGMENT COUNTY OF 1 The foregoing instrument was acknowledged before me this 1995, by the of Osman Properties, Inc., a Minnesota corporation, on behalf of the corporation. Notary Public day of -5- STATE OF MINNESOTA ) ACKNOWLEDGMENT COUNTY OF ) The foregoing instrument was acknowledged before me this day of , 1995, by and the and respectively, of the City of Eagan, a Minnesota municipal corporation, on behalf of the municipal corporation. Notary Public THIS INSTRUMENT WAS DRAFTED BY: Faegre & Benson (RLR) 2200 Norwest Center 90 South Seventh Street Minneapolis, MN 55402 Phone: (612) 336-3000 M7:0038984.10 -6- EXHIBIT A TO DRAINAGE EASEMENT AGREEMENT LEGAL DESCRIPTION OF THE OCB LAND EXHIBIT B TO DRAINAGE EASEMENT AGREEMENT LEGAL DESCRIPTION OF THE LOST SPUR LAND E)CIMIT C TO DRAINAGE EASEMENT AGREEMENT DRAWING OF THE EASEMENT AREA The Easement Area is that portion of the Land which is designated as such on the drawing attached hereto as page 2 of this Exhibit C. EXHIBIT D TO DRAINAGE EASEMENT AGREEMENT LEGAL DESCRIPTION OF THE OCB EASEMENT AREA A permanent drainage easement for public ponding purposes over, under and across all that part of OUTLOT B, EAGAN WOODS OFFICE PARK, according to the plat thereof on file and of record in the office of Registrar of Titles, Dakota County, Minnesota, described as follows: Commencing at the most northerly comer of said OUTLOT B; thence on an assumed bearing of South 32 degrees 31 minutes 53 seconds West along the northwesterly line of said OUTLOT B for 80.00 feet to the southerly line of the DRAINAGE & UTILITY EASEMENT adjacent to the northeasterly line of said OUTLOT B; as said DRAINAGE & UTILITY EASEMENT was dedicated by said plat of EAGAN WOODS OFFICE PARK; thence South 53 degrees 58 minutes 59 seconds East along said southerly line for 115.00 feet to the actual point of beginning of the permanent easement parcel to be described; thence continue South 53 degrees 58 minutes 59 seconds East along said southerly line for 40.00 feet; thence South 77 degrees 25 minutes 19 seconds East along said southerly line for 367.74 feet; thence North 80 degrees 54 minutes 29 seconds West for 367.20 feet; thence North 53 degrees 58 minutes 59 seconds West for 50.00 feet; thence North 36 degrees 01 minutes 01 seconds East for 20.00 feet to the point of beginning. EXHIBIT E TO DRAINAGE EASEMENT AGREEMENT LEGAL DESCRIPTION OF THE LOST SPUR EASEMENT AREA A permanent easement for storm sewer purposes over, under and across the following described property: All that part of Government Lot 2, Section 4, Township 27 North, Range 23 West, Dakota County, Minnesota, lying easterly of the easterly right of way line of State Trunk Highway Number 13 and lying southerly of MINNESOTA DEPARTMENT OF TRANSPORTATION RIGHT OF WAY PLAT NO. 19-32; Said permanent easement is a strip of land 30.00 feet wide, the centerline of said strip being described as follows: Commencing at a point in the easterly line of said Government Lot 2, said point being the most westerly comer in the northerly line of EAGAN WOODS OFFICE PARK, according to the recorded plat thereof; thence on an assumed bearing of South 32 degrees 30 minutes 52 seconds West, along said easterly line of Government Lot 2 and the northwesterly line of said EAGAN WOODS OFFICE PARK, for 324.98 feet to the actual point of beginning of the centerline to be described; thence North 53 degrees 58 minutes 59 seconds West for 20.50 feet; thence North 79 degrees 13 minutes 15 seconds West for 586.37 feet and said centerline there terminating; And said permanent easement is a strip of land 25.00 feet wide, being 15.00 feet to the left and 10.00 feet to the right of the following described line: Beginning at the terminus of the above-described centerline; thence North 79 degrees 13 minutes 15 seconds West for 43.00 feet; thence South 89 degrees 56 minutes 18 seconds West for 64.00 and said line there terminating; And said permanent easement is a strip of land 30.00 feet wide, the centerline of said strip being described as follows: Beginning at the terminus of the above-described line; thence South 89 degrees 56 minutes 18 seconds West for 46.00 feet; thence North 61 degrees 47 minutes 17 seconds West for 95.00 feet; thence South 89 degrees 56 minutes 18 seconds West for 367.20 feet; thence South 67 degrees 26 minutes 18 seconds West for 54 feet, more or less, to said easterly right of way line of State Trunk Highway No. 13 and there terminating. EXHIBIT D CONSTRUCTION OF STORM SEWER FINANCIAL GUARANTEE CALCULATIONS OCB REALTY CO. _l T J 1996 The financial guarantee amount for the above-referenced construction has been calculated in accordance with current City policy. The amount must be guaranteed by a letter of credit, non-interest beating cash escrow or other means accepted by Council. This must be submitted and approved prior to construction. 1. SITE DEVELOPMENT A. GRADING (within easement including erosion control and restoration) Lump Sum - (Private Contracts) $43,515.00 SUBTOTAL $43,515.00 2. ESTIMATED COSTS OF UTILITIES A. Storm Sewer $116,221.00 SUBTOTAL $116,221.00 3. TOTAL ESTIMATED COSTS OF FINANCIAL GUARANTEE ITEMS $159,736.00 This number includes 30% for engineering, legal, administration and financial costs. CONSTRUCTION ESCROW AGREEMENT CONTRACT 96-P EAGAN WOODS OFFICE PARK 2ND ADDITION THIS AGREEMENT, made and entered into this _2Z&-day of May, 1996, by OCB REALTY CO., a Minnesota corporation (hereinafter "Developer") for the benefit of the CITY OF EAGAN, a Minnesota municipal corporation, (hereinafter the "City"). WHEREAS, the Developer has implied to the City for its subdivision approval affecting property located in the City of Eagan, Dakota County, Minnesota; and WHEREAS, in conjunction with the Developer's proposed subdivision, the City requires the extension of storm sewer from Developer's property across a portion of property owned by Osmon Properties, Inc. (hereinafter referred to as the "Project"); and WHEREAS, in conjunction with this Project, the City will incur certain costs including administrative and technical professional review involved in the processing of such application, and the City requires a guarantee that such costs will be paid by the Developer; and WHEREAS, the City has agreed to share in a small portion of the cost of the Project upon the terms and conditions set forth in that certain Agreement between the City and the Developer concerning the Extension of the Storm Water Sewer Agreement; and WHEREAS, the Developer agrees as part of the Project to provide cash to the City in the amount and with the conditions satisfactory to the City, providing security to the city and for the ultimate payment of all such costs incurred by the City in connection with the Project. NOW, THEREFORE, the Developer agrees as follows: 1. Construction Management Deuosit. The Developer shall deposit with the City the cash in an amount as determined by Exhibit "A" prior to commencing work on the Project. The construction management deposit is used by the City to cover inspection, construction agreement compliance, construction coordination, administrative costs for City approval, acceptance of privately constructed City improvements, and all other utility construction requirements, and legal and engineering costs incurred by the City in connection with this Agreement and the Extension of Storm Sewer Agreement executed by the Developer on NlA'? 1996. 2. Use of Deposited Funds. The City may draw upon the deposits to pay the costs it incurs. The City shall determine all of its costs, including both administrative and technical professional services, at the rates listed in the most current fee schedule adopted by the City Council for the most current fee schedule of a City authorized consultant. A copy of the current administrative and consulting rates is attached which rates are subject to change by the City Council, without notice to the Developer. (See Exhibit "B" 3. Conditions of Deposit. The following conditions shall apply to the account contemplated under this Agreement. a. If not listed in the City fee schedule, administrative hourly rates for processing applications shall be determined by multiplying employee's hourly rate by a factor of 2.0 to cover all benefits and overhead incurred by the City. b. Payment shall be made to City consultants, including but not limited to engineering, legal, and planning, in the amounts actually billed to the City, according to the customary consulting rates in effect at that time. Such consulting services or costs shall reasonably and necessary relate to the subject matter of the applications for payment as determined by the City. C. The City shall reimburse itself for all costs and expenses incurred by the City from the deposit(s) under this Agreement. d. The City shall not be responsible for paying any interest on the account contemplated under this Agreement. e. If in the discretion of the City, there is deemed to be an inadequate balance in the deposit account to pay for all the fees and costs incurred or to be incurred by the City, the City will notify the Developer of the need for additional deposits. The Developer agrees to make such additional deposits within ten (10) days of receipt of such notice. For purposes hereof, receipt of the notice shall be deemed made upon the depositing of the notice in the U.S. mail, postage prepaid. f. No application or permits will be acted upon or processed by the City until all amounts due at the time of submission have been paid 2 in full, or the City finance department determines that there are sufficient funds available from a prior deposit to pay all estimated City bills. 4. Positive Balances In Account. In the event that there is a positive balance in the deposit account and there is (1) completion of the construction process, or (2) an application is withdrawn by the Developer, or (3) the application is denied by the City for any reason, then the balance shall be paid to the Developer within thirty (30) days of receipt by the City of a written request by the Developer for payment. 5. Accounting. If there has been activity in the account, the City will provide a monthly accounting of all expenses charged against the account when requested by a Developer, but in no event more often than monthly. An accounting will be provided when a notice is made by the City for additional deposits. 6. Terms of Breach. In the event of breach of any terms of this Agreement by the Developer, including but not limited to the failure to make additional deposits when required by the City, the City may at its option, cease processing any application being made by the Developer and order the Developer to cease any further development or progress under the terms of this Agreement. The City may withhold approval of any portion of the application or development until such time as the breach is cured. The Developer waives any rights against the City for damages claimed by the Developer should the City exercise its rights hereunder. Furthermore, the Developer shall be responsible for all costs and expenses, including reasonable attorney fees incurred by the City to enforce this Agreement or to collect for any monies due the City from the Developer pursuant to this Agreement. 7. Validi . If any portion, section, subsection, sentence, clause, paragraph or phrase of this Agreement is for any reason held to be invalid, such decision shall not affect the validity of the remaining portion of this Agreement. 8. Binding Agreement. The Developer mutually recognizes and agrees that all terms and conditions of this Agreement shall run with the land herein described and shall be binding upon the heirs, successors, administrators and assigns of the parties referenced in the Agreement. 3 IN WITNESS WHEREOF, we have hereunto set our hands and seals as of the day and year first written above. STATE OF MINNESOTA) ) ss. COUNTY OF DAKOTA ) OCB REALTY CO. By: ti. HOMAS MrrcHtL ._ -Yr Its: RESIDENT On this d G+L day of ?, 1996, before me a Notary Public within and for said County, personally appeared THOMAS A. EGAN and E.J. VanOVERBEKE to me personally known, who being each by me duly sworn, each did say that they are respectively the Mayor and Clerk of the City of Eagan, the municipality named in the foregoing instrument, and that the seal affixed on behalf of said municipality by authority of its City Council and said Mayor and Clerk acknowledged said instrument to be the free act and deed of said municipality. 0100;111 ;1:; JUDY M. JENKINS NOTARY PUBLIC-MINNESOTA = DAKOTACOUNTY `•••• My Commission Expires Jan. 31. 2000 /Nbt P lic 4 CITY OF EAGAN, a Minnesota STATE OF MINNESOTA) ss. COUNTY OF On this day of 1111?J 1996, before me a Notary Public within and for said County, personally appeared rrYYr,, O?rry-l! to me ersonally known, who being by me duly sworn, each did say that he/she is the ? [ of OCB Realty Co., the corporation named in the foregoing instrument, and that said instrument was signed on behalf of said corporation by authority of its Board of Directors and said VP acknowledged said instrument to be the free act and deed of the corporation. JULIE £ap5'cR NMARY PL_L:- - ? !NNESM THIS INSTRUMENT WAS DRAFTED BY: SEVERSON, SHELDON, DOUGHERTY & MOLENDA, P.A. 7300 West 147th Street, Suite 600 Apple Valley MN 55124 (612) 432-3136 RBB/wkt 206-13000 Notary Public 5 EXHIBIT A Construction Management Deposit (1) Construction Costs $0 - $150,000.00 $150,001.00 - $500,000.00 $500,001.00 + Deposits 8% ($1,000.00 minimum) initial deposit 6% ($12,000.00 minimum) initial deposit 5% ($30,000.00 minimum) initial Deposit EXHIBIT "B" CITY OF EAGAN EQUIPMENT RATES HOURLY RATE Pick-up Truck $22.00 1-Ton Dump Truck $23.00 Single-Axle Dump Truck $32.00 Tandem Axle Dump Truck $40.00 Tractor $15.00 Backhoe/Loader $35.00 Front End Loader $60.00 Road Grader $70.00 Street Sweeper $41.00 Roller $20.00 Paver $20.00 Air Compressor $15.00 50 KW Generator $35.00 Sewer Jetter $66.00 Sewer Rodder $33.00 Sewer Vacuum - Trailer $33.00 Sewer Vacuum - Truck $70.00 Groundmaster Mower $22.00 Pump 6" $25.00 Pump 8" $28.00 Skid Loader $35.00 Chipper $15.00 Tanker $30.00 CITY STAFF RATES Department Directors $80.00 Assistant City Engineer $60.00 City Planner $60.00 Maintenance Superintendent $60.00 DesigwDevelopment Engineer $55.00 Park Planner $50.00 Maintenance Supervisor $50.00 Senior Planner $50.00 Water Quality Coordinator $50.00 Senior Technician $45.00 Project Planner $40.00 Technician $40.00 Aide $30.00 Intern $20.00 Maintenance Person $20.00 (Regular) $30.00 (Overtime) Survey Crew (Includes Vehicles & Equipment) 2 Person $70.00 3 Person $90.00 Foreman $24.00 Survey Crew (Includes Vehicles & Equipment) 2 Person $70.00 3 Person $90.00 Billing rates to the railroad for fires caused by them: Manpower $ 9.00 Pumper $200.00 Tanker Chief s Vehicle $150.00 Rescue, Grass Rigs Command Vehicle, Aerial (Minimum Charge 1 hour) $500.00 CITY ATTORNEY Development Work $145.00 General Legal Work $ 95.00 Paralegal $ 50.00 FAEGRE & BENSON PROFESSIONAL LIMITED LIABILITY PARTNERSHIP =o NORW CENTER, 90 SOUM SEVENTH STREET MEVNEAPOLIs, MiNNTsarn 534023901 TELEPHONE 612-336-3000 REBECCA L ROM FACSIMILE 612-336-3026 6121336-3204 May 23, 1996 Mr. Bob Bauer BY MESSENGER Severson, Sheldon, Dougherty & Molenda, P.A. Suite 600 7300 West 147th Street Apple Valley, MN 55124-7538 Re: OCB Realty Co. Storm Sewer Proiect Dear Bob: Enclosed is an Irrevocable Letter of Credit No. 76199 in the amount of $159,736. I believe this satisfies the requirements for the issuance of a permit to commence the project. If you have any questions concerning the enclosed, please call me at your convenience. Very truly yours, ? ?t 1 Rebecca L. Rom RLR:can Enclosure cc/enc: Tom Lincoln (By Telecopy) H. Thomas Mitchell (By Telecopy) M1:0140934.01 Minneapolis Denver Des Moines Washington, D.C. London Frankfurt Almaty FIRST BANK First Bank National Association Minneapolis Office 601 Second Avenue South Minneapolis, Minnesota 55402-4302 612 973-0735/0710 MAY 22, 1996 CITY OF EAGAN 3830 PILOT KNOB ROAD P.O. BOX 21199 EAGAN, MINNESOTA 55121 International Banking Division Cable: FIRSTBANK, MPS TELEX: 192179 FBNA INTL MPS S.W.I.F.T.: FNBMUS44 Fax: 612 973-0838 WE HEREBY ESTABLISH OUR IRREVOCABLE LETTER OF CREDIT NO. 76199 IN THE AMOUNT OF ONE HUNDRED FIFTY NINE THOUSAND SEVEN HUNDRED THIRTY SIX AND NO/100 U.S. DOLLARS ($159,736.00) AND AUTHORIZE YOU TO DRAW AT SIGHT ON FIRST BANK NATIONAL ASSOCIATION, MINNEAPOLIS OFFICE. FOR ACCOUNT OF: BUFFETS, INC. 10260 VIKING DRIVE EDEN PRAIRIE, MINNESOTA 55344 DRAFTS ON US AT SIGHT MUST BE ACCOMPANIED BY BENEFICIARY'S SIGNED STATEMENT (PURPORTEDLY SIGNED BY AN AUTHORIZED OFFICIAL OF THE CITY OF EAGAN) AS FOLLOWS: "SUMS CLAIMED ARE DUE AND PAYABLE TO THE CITY OF EAGAN BY VIRTUE OF DEFAULT BY OCS REALTY CO. UNDER THE TERMS OF THE STORM SEWER EXTENSION AGREEMENT CONTRACT 96-D DATED MAY 20, 1996, BY AND BETWEEN OCB REALTY CO. AND THE CITY OF EAGAN, AND FAILURE TO CURE AFTER APPLICABLE NOTICE AND CURE PERIODS." THE AMOUNT OF ANY DRAFT(S) DRAWN UNDER THIS CREDIT ARE TO BE ENDORSED ON THE REVERSE SIDE HEREOF, SUCH DRAFT(S) MUST BEAR THE CLAUSE "DRAWN UNDER FIRST BANK NATIONAL ASSOCIATION, MINNEAPOLIS OFFICE CREDIT NUMBER 76199 DATED MAY 22,1996.- IT IS A CONDITION OF THIS LETTER OF CREDIT THAT IT SHALL BE AUTOMATICALLY EXTENDED, WITHOUT AMENDMENT, FOR SUCCESSIVE ONE-YEAR PERIODS FROM THE THEN CURRENT EXPIRATION DATE OR ANY APPLICABLE FUTURE EXPIRATION DATE, UNLESS SIXTY (60) DAYS PRIOR TO ANY EXPIRATION DATE WE NOTIFY YOU IN WRITING THAT WE ELECT NOT TO RENEW THIS LETTER OF CREDIT. WE HEREBY AGREE WITH DRAWERS THAT DRAFTS AS SPECIFIED ABOVE WILL BE DULY HONORED UPON PRESENTATION TO FIRST BANK NATIONAL ASSOCIATION, 601 SECOND AVENUE SOUTH, MINNEAPOLIS, MINNESOTA 55402-4302 IF PRESENTED ON OR BEFORE MAY 22,199 , OR SUCH DATE TO WHICH THE EXPIRATION HAS BEEN EXTENDED, AS ABOVE PROVIDED. THIS LETTER OF CREDIT IS SUBJECT TO THE UNIFORM CUSTOMS AND PRACTICES FOR DOCUMENTARY CREDITS (1993 REVISION) INTERNATIONAL CHAMBER OF COMMERCE PUBLICATION NUMBER 500, OR ANY SUBSEQUENT REVISION THERETO. NATIONAL ASSOCIATION, MINNEAPOLIS OFFICE A HO IZED SIG RE 76199KHR.DOC i FIRST BANK First Bank National Association Minneapolis Office 601 Second Avenue South Minneapolis, Minnesota 55402-4302 612 973-073610710 MAY 22, 1996 International Banking Division Cable: FIRSTBANK, MPS TELEX: 192179 FBNA INTL MPS S.W.I.F.T.: FNBMUS44 Fax: 612 973-0838 ENCLOSED IS OUR LETTER OF CREDIT NUMBER 76199 BENEFICIARY APPLICANT CITY OF EAGAN BUFFETS, INC. 3830 PILOT KNOB ROAD 10260 VIKING DRIVE EAGAN, MINNESOTA 55121 EDEN PRAIRIE, MINNESOTA 55344 ATTN: JACKIE M. FIEBELKORN FIRST BANK NATIONAL ASSOCIATION, MINNEAPOLIS OFFICE AUTHORIZED S NATURE ORIGINAL SEN TO• BECKY ROM FAEGRE & BENSON 2200 NORWEST CENTER 90 SOUTH 7TH STREET MINNEAPOLIS, MINNESOTA 55402 76199KHR.DOC MASTER CARD Permit Noo. Issued Issued To Contractor Owner BUILDING n PLUMBING CESSPOOL - SEPTIC TANK WELL ELECTRICAL HEATING GAS INSTALLING SANITARY SEWER OTHER OTHER Items Approved (Initial) Date Remarks Distance From Well FOOTING SEPTIC FOUNDATION i CESSPOOL FRAMING TILE FIELD FT. FINAL ELECTRICAL HEATING DEPTH OF WELL GAS INSTALLATION SEPTIC TANK CESSPOOL DRAINFIELD PLUMBING WELL SANITARY SEWER i Violations Noted on Back COMMENTS: COMPLIANCE INSPECTION REPORTS TO BE USED ONLY IN EVENT OF OBSERVED VIOLATIONS PERMIT NO. CONDITIONS OF CONSTRUCTION AT THIS INSPECTION ? NO EVIDENCE OF NON-COMPLIANCE OBSERVED. ? ACCEPTABLE SUBSTITUTIONS OR DEVIATIONS. DATE OF INSPECTION ? NON-COMPLIANCE. BUILDER WILL COMPLY WITHOUT DELAY. ITEMIZED AND DESCRIBED AS FOLLOWS: NON-COMPLIANCE. BUILDER DOES NOT INTEND TO COMPLY. ? COMPLETION OF CERTAIN IMPROVEMENTS WILL BE DELAYED BY CONDITIONS BEYOND CONTROL. ? REINSPECTION REQUIRED REINSPECTION REVEALED DATE OF REINSPECTION CERTIFICATION-1 certify that I have carefully inspected the above in which I have no interest present or prospective, and that I have reported herein all significant conditions observed to be at variance with ordinances of the Town of Eagan, approved plans and specifications, and any specific require- ments for off-site improvements relating to the property inspected. ? ALL IMPROVEMENTS ACCEPTABLY COMPLETED BUILDING INSPECTOR DATE SINGLE FAMILY DWELLINGS 2 SETS OF PLANS 3 REGISTERED SITE SURVEYS 1 SET OF ENERGY CALLS. 1989 BUILDING PERM--r APPLICATION CITY OF EAGAN Iola MULTIPLE DWELLIN 2 SETS OF PLANS REGISTERED SITE SURVEYS - (CHECK WITH BLDG DIV.) 1 SET OF ENERGY CALLS. COMMERCIAL 2 SETS OF ARCHITECTURAL & STRUCTURAL PLANS 1 SET OF SPECIFICATIONS 1 SET OF ENERGY CALLS. MULTIPLE DWELLINGS RENTAL UNITS FOR SALE UNITS f OF UNITS NOTE: ADDRESSES FOR CORNER LOTS - CONTRICTOR/HOMEOWNER MUST DESIGNATE WHICH ADDRESS IS DESIRED. NO CHANGES WILL BE ALLOWED ONCE BUILDING PERMIT IS ISSUED.. SEWER A WATER PERMIT FEES AND ACCOUNT DEPOSIT FEES WILL BE INCLUDED WITH THE BUILDING PERMIT FEE. PROCESSING TIME FOR SEWER AND WATER PERMITS IS TWO DAYS ONCE A PERMIT HAS BEEN COMPLETED INDICATING A LICENSED PLUMBER. PENALTY APPLIES WHEN: PERMIT IS NOT PAID FOR IN SAME MONTH IT IS REQUESTED. LOT CHANGE IS REQUESTED ONCE PERMIT IS ISSUED. To Be Used For: j ? j SpGI/2 Valuation: Yj22 0 Date: G? Site Address ?22'fz-72 Lot ON Block 0J Parcel/Sub , 10- 001{00-Q1q l'J Owner Address sf7' ?75`? 141i{T/G- City/Zip ??Code /?P?/ Phone Contractor [ ?, ?/?? Address Al L? Y,iZ-Hye, Occupancy Zoning Actual Const Allowable # of stories Length Depth S.F. Total Footprint S.F. On site sewage On site well MWCC System City water PRV required Booster Pump City/Zip Code ` / U APPROVALS Phone Planner Council Arch./Engr. Bldg. Off. Variance ? 1?1_i4Z'? Address Zs-e City/Zip Code s-x ?' lzL -zlzly Phone e Z? ! FEES Bldg. Permit 400 Surcharge 2.66 Plan Review SAC, City SAC, MWCC Water Conn Water Meter Acct. Deposit S/W Permit S/W Surcharge Treatment Pl. Road Unit Park Ded. Copies SUBTOTAL Penalty TOTAL o0 /o ooyao oia. os EAGAN TOWNSHIP 3795 Pilot Knob Road St. Paul, Minnesota 55111 Telephone 454-5242 PERMIT FOR SEWER SERVICE CONNECTION DATE: October 10, 1972 OWNER: Lost Spur Whse. NUMBER 1163 Address 2750 Sibley Memorial Highway PLUMBER Wenzel Plumbing & Heating TIM OF PIPE Heavy Cast Iron DESCRIPTION OF BUILDING Industrial Commercial) Residential ` Multiple Dwelling I No, of units Xx Location of Connections: Connection Charge 260.00 pd 10/10/72 Permit Fee 10.00 d 10/10/72 .50 Pd 10/10/72 - s/o Street Repairs Sewer Tap 35.00 pd 10/10/72 Total Inspected by: Date Remarks:. -? By. Chief Inspector In consideration of the issue and delivery to me of the above permit, I hereby agree to do the proposed work in accordance with the rules and regulations of Eagan Township, Dakota County, Minnesota By Wenzel Plumbing & Heating, Inc. 3600 Kennebec Drive, Eagan 55122 Please notify when ready for.inspection and connection and before any portion of the work is covered. /D OO /Plo D/a 05 EAGl:N TOWNSHIP 3795 Pilot Knob Road St. Paul, Minnesota 55111 Telephone 454-5242 PERMIT FOR SEWER SERVICE CONNECTION DATE: May 23, 1968 OWNER: Lost Spur, Inc. PLUMBER Webster Co., Inc. NUMBER 176 Address 2750 Sibley Mein. Hwy. TYPE OF PIPE cast iron DESCRIPTION OF BUILDING Industrial Commercial Residential x Location of Connections: Multiple Dwelling I No. of units Connection Charge Permit Fee 7.50 Pd. 5/23 Street Repairs Total Inspected by: Date Remarks: By Chief Inspector In consideration of the issue and delivery to me of the above permit, I hereby agree to do the proposed work in accordance with the rules and regulations of Eagan Township, Dakota County, Minnesota By Wa4+atar Cn__ Tne. 85 Edgerton St. St. Paul inn. 55101 Please notify when ready for inspection and connection and before any portion of the work is covered. A0 OD?DD 4!a D5 EAGIB T014NSHIP 3795 Pilot Knob road St. Paul, Minnesota 55111 Telephone 454-5242 PERMIT FOR SEWER SERVICE CONNECTION DATE: May 23, 1968 OWNER: Lost Spur, Inc. PLUMBER Webster Co., Inc. NUMBER 177 Address 2750 Sibley Mem. Hwy. TYPE OF PIPE east iron DESCRIPTION OF BUILDING Industrial Coamerciall Residential I Multiple Dwelling ' No, of units Location of Connections: Connection Charge Permit Fee 7.50 Pd. 5/23 Street Repairs Total 7.50 Inspected by: Date Remarks: By Chief Inspector In consideration of the issue and delivery to me of the above permit, I hereby agree to do the proposed work in accordance with the rules and regulations of Eagan Township, Dakota County, Minnesota By Webster Go_. Tnn. Please notify when ready for inspection and connection and before any portion of the work is covered. /D 001/00 o/a 05 EAGAN TOWNSHIP :795 Pilot Knob Road St. Paul, Minnesota 55111 Telephone 454-5242 PERMIT FOR SEWER SERVICE CONNECTION DATE: May 23.' 1968 OWNER: _ T.oa . 4rn3r- Inc, PLUMBERWahster Co.- Inc._ NUMBER 178 Address 2750 Sibley Mem. Hw y TYPE OF PIPE cast iron DESCRIPTION OF BUILDING Industrial Commercial Residential Multiple Dwelling No. of units x Location of Connections: Connection Charge Permit Fee 7.50 Pd. 5/23 Street Repairs Tots 1 Inspected by: Date Remarks: By. Chief Inspector In consideration of the issue and delivery to me of the above permit, I hereby agree to do the proposed work in accordance with the rules and regulations of Eagan Township, Dakota County, Minnesota By. Webster Co., Inc. Please notify when ready for inspection and connection and before any portion of the work is covered. J A. 2/84 CITY OF EAGAN APPLICATION FOR PERMIT SEWER AND/OR WATER CONNECTION i (PLEASE PRINT) 1) PROPERTY ADDRESS: 2-7 90 S 18LEy MrMaztAL- rF (,Nw qy I= DESCRIPTION: i- oo .Z?c - o i -4-? - O .S s (Lot lock/Subdivision or Tax Parcel I.D. Number) I EXIS ---.C STRL?CITU 2E , DATE OF ORIGINAL BUILDING P=T ISSUANCE: PRESET 2^„II-77,/PELPOS=-) USE: C9 R-1 SINGLE FAMILY ? R-2 DUPLEX (TWO IN ITS) II ? R-3 TOWNHOUSE (THREE + UNITS) ( UNITS) ? R-4 APARir!L%1T/G-ONDa%MUTt?I ( - - UNITS) ? CaTERCLAL/RETAII/OFFICE ? L%MUSTRIAL ? INSTITUTIONAL/GOVERI1,1ENP 2) APPLICANT (PLEASE PRINT) NAME: Q S A4 /+A.) P2.0 PE rz i E s ADDRESS: Z76-0 5irSL-r-y M?MIg.eJr?? j;,py CITY, STATE, ZIP: C.4/,RAJ,A4,Aj,il. SSJZI PHONE: t? S '? - S !e (? o 3) PILT•'IBER NAME: PLEASE PRINT) 6cevsT-4cm PL-13L?. ? WE6s7-E-R e,0. )n1G ) FOR CLT-Y=USE ONLY ADDRESS: ` , 77 t5r $L?LF3y AV 9. PLUMBE S LICENSE: Active f lU? CITY, STATE, ZIP: l- JOPOL MI/JA) Expired PHONE: , - t aqa-1`I/O PLUMBER LICENSE NQ+?M? j Q Not of Record a niti5 4) OCCUPANT/Owe TER NAME: ADDRESS: CITY, STATE, ZIP: PHONE: IPLLA5L PRINT) t.. 5) INDICATE WHICH PERMIT IS BEING REQUESTED: ® CONNECTION TO CITY SEWER CONNECTION TO CITY WATER OTHER (PLEASE DESCRIBE) PLEASE HOLD APPROVED PERMIT FOR PICT:-UP BY ONE OF ABOVE ® PLEASE BAIL APPROVED PERMIT TO 1, 2, (D 4 ABOVE (Circle one) 7) SIGNATURE- DATE: Y ? R ol:alell:A i? i l? ?E?l:.? 11 i hl?!ii:r. . .. ... . . .. ... ... cif iMf llf rii?a!Ar?l?l?SOR®?iIF.Yr F O R C I T Y U S E O N L Y PER.^1IT ° ISSUED yr--.,?a FEES• $ ? -a SE:^:ER T?E'???iT_T (I:IC:.`.;D SUP,CHAtZGE) a'1?? $ i? ?-o WATER PERr1IT (INCLUDE SURCHARGE) ? _ WATER METER/COPPERHORN/OUTSIDE READER ?_ __ $ ? ?"Wd ? TER ,? ? a / 1 TAP (INCLUDE CORPORATION STOP) $ °?? ?-o ? . ^ ES?ER TAP _ ' $ i . a-d ACCOUNT DEPOSIT - SEWER $ ?-? ®`? ACCOUNT DEPOSIT - WATER $ -? ?o . o-? WAC $ ?S ?-? ?d SAC $ TRUNK T.4ATER ASSESSP?IENT $ TRUNK SEWER ASSESSMENT $ LATERAL BENEFIT/TRUNK SEWER $ LATERAL BENEFIT/TRUNK WATER $ OTHER $ TOTAL $ l?"0'??J AMOUNT PAID/RECEIPT # ?fZSaQ S?wIG?s DOES UTILITY CONNECTION REQUIRE EXCAVATION IN PUBLIC RIGHT OF WAY? " iv i YES IF YES, THEN A PERMIT FOR WORK WITHIN PUBLIC ROADWAY" MUST BE ISSUED BY THE _yn o?IrT ,r rte. Tr.,.- r?r'. _:? P.??,., DI'J?.,?..N. LINT AS A CONDI- TION. SUBJECT TO TFIE FOLLOWING CONDITIONS: APPROVED BY: [?? TITLE: ?? DATE : _ !? `/? ?%l? ? sir wrs ? ?? ? ?? sa s?? w:a wa ? re f? ? wa ?? na ?? ?a? w.a oF? ? w?.w w.a ?? r4 r r ? . ?G-oe3' e7_l3 / ?_ Q TELEPHONE 778 - 2733 m WEBSTER CO., INC. EXCAVATING HOUSE DRAIN CONTRACTORS AIR COMPRESSOR, BULLDOZER AND BACKHOE RENTALS 845 EDGERTON STREET ST. PAUL. MINNESOTA 55101 City of Eagan 3830 Pilot Knob Road Eagan,Minn. 55122 April 10,1984 Attn: Rich Hefti RE: Street restoration Lo5r SFia- Mr. Hefti, This letter is to confirm our conversation today regarding the intersection of Highview Ave. & Bridgeview Terrace. We will be installing a sewer service from the residence located at 2790 Sibley Memorial Highway to the City main in Highview Ave. The street portion will be restored to its original cond- ition and maintained by us for a period of one (1) year from the date the restoration took place. I thank you for your co-operation in this matter and trust that this letter is enough of a guarantee so that we can proceed with the project immediately. Si cerely, Allen N. Webster Jr. President /7 ??? ?? / CXA ? July 16, 2004 Minnesota Pollution Control Agency Mr. Ryan Gausper Lost Spur Golf Course 2750 Sibley Memorial Highway Eagan, MN 55121 RE: Storage Tank Release Investigation and Corrective Action Site: Lost Spur Golf Course, 2750 Sibley Memorial Highway, Eagan, 55121, Dakota Site ID#: LEAK00015768 Dear Mr. Gausper: Notice of Release The Minnesota Pollution Control Agency (MPCA) has been informed that a release has occurred or contamination has been encountered from storage tanks and/or storage tank facilities that you own and/or operate. The MPCA appreciates your timely notification so this site can be handled in an efficient manner. Legal Obligations Federal and state laws require that persons legally responsible for storage tank releases notify the MPCA of the release and/or discovery of contamination, investigate and, if necessary, clean up the release(s)/contamination. A person is considered legally responsible for a petroleum tank release if the person owned or operated the tank either during or after the release, unless specifically exempted under the law. For releases of other substances, a person is considered legally responsible if the substance discharged was under the control of the person at the time of the discharge or release or if the person was an owner or operator of the storage tanks and/or tank facility at the time the release occurred. If you believe that you are not legally responsible for this storage tank facility release, please contact the project manager listed below. Request to Take Corrective Action The MPCA requests that you take steps to investigate and, if necessary, clean up the release(s)/contamination in accordance with the enclosed MPCA fact sheets. The site investigation must fully define the extent and magnitude of the soil and/or ground water contamination caused by the release(s)/contamination. For petroleum release sites, the MPCA has facts sheets that will help you or your consultant properly investigate the release and report the results to the MPCA. Unless your site is considered "high priority" (see below), you must submit a report to this office which details the results of the investigation or concludes that excavation was sufficient to clean up the release within 10 months of the date of this letter. The MPCA reserves the right to reject proposed corrective actions if the requirements of the site investigation have not been fulfilled. Refer to the following web site for related guidance documents and information, http://www.pea.state.nin.us/programs/lust_p.html. For sites contaminated by pollutants other than petroleum, the MPCA requests that you or your consultant contact the MPCA project manager listed to discuss the investigation and reporting timeline that will be required for your site. The MPCA considers sites with "free product" (free-floating petroleum), that have affected or that threaten to affect drinking water supplies, sites where pollutants are being released to surface waters such as lakes or wetlands, sites where petroleum or other vapors have been detected within structures or that pose fire or explosion hazards, to be high priority for staff review. If one or more of these situations apply to your petroleum or non- petroleum facility, a Remedial Investigation/Corrective Action Design report (refer to guidance documents) must be submitted within 90 days. The MPCA reserves the right to reject proposed corrective actions if the requirements of the site investigation have not been fulfilled. In addition, if you know or discover that there is free product in a well, excavation, or borehole, you must notify the MPCA within 24 hours and IMMEDIATELY begin interim free product recovery (refer to guidance documents). If you have any question with regard to whether your site is "high priority" please contact the MPCA project manager listed below. 520 Lafayette Rd. N.; Saint Paul, MN 55155-4194; (651) 296-6300 (Voice); (651) 282-5332 (TTY); www.pca.state.mn.us St. Paul • Brainerd • Detroit Lakes • Duluth • Mankato • Marshall • Rochester • Willmar Equal Opportunity Employer • Printed on recycled paper containing at least 20 percent fibers from paper recycled by consumers. Mr. Gary Mackley Page 2 Reimbursement for petroleum sites: In 1987, the legislature established the Petroleum Tank Release Compensation Fund (Petrofund) to reimburse some responsible persons and volunteers (property owners not responsible for releases) who take corrective action for a portion of their costs. The Petrofund is administered by the Petroleum Tank Release Compensation Board (Petro Board), which is part of the Minnesota Department of Commerce. If the release at your site is a petroleum release, the MPCA encourages you to learn more about the Petrof ind reimbursement program by contacting Petrofund staff at 651/215-1775 or 1/800-638-0418 (in greater Minnesota only), or by reviewing the information that is available at the following website, http://www.pca.state.tnn.us/programs/lust_p.html. Because there are rules governing eligible costs of cleanup, the MPCA strongly encourages you to familiarize yourself with the enclosed proposal and invoice forms and the other program requirements in order to maximize the available reimbursement. Please note that final decisions regarding the amount of reimbursement are made by the Petro Board, not the MPCA. If you have not already done so, the MPCA recommends that you hire a qualified environmental consulting firm to help you investigate and clean up the contamination on your site. To be qualified, the consultant should have experience in performing investigations of contaminated sites and in developing and implementing corrective actions. For petroleum investigations, the consultant must be registered with the Petro Board if you wish to have your costs considered for reimbursement. A list of registered contractors is available from the Petrof ind staff. Please note that, under the Petro Board's rules, (see Minn. R. ch. 2890), you must solicit a minimum of two written competitive consultant proposals on a form prescribed by the Petro Board to incur costs eligible for reimbursement, and a minimum of two written competitive contractor bids must also be obtained for each contractor service. Again, the MPCA strongly encourages you to contact Petrofund staff for answers to all of your questions about bidding and the other Petrofund reimbursement program requirements. Required Response The MPCA requires that you respond to this letter within 30 days to indicate whether you intend to proceed with the requested work. If you do not respond within this time frame, the MPCA will assume that you do not intend to comply, in which case the MPCA Commissioner may issue you an enforceable order that will require you to take corrective action. Failure to cooperate with the MPCA in a timely manner may result in reduced reimbursement from the Petro Board, see Minn. R. ch. 2890. If you do not cooperate, the MPCA has the option of taking the corrective actions on your behalf and recovering its costs from you. If you have any questions concerning this letter or need additional information, please contact me at 651/296-7824. Please reference the above LEAK # in all correspondence. If you are calling long distance, you may reach the MPCA by calling 1-800/657-3864. Sincerely, G. 1i k Sarah Henderson Project Leader Petroleum and Landfill Remediation Section Majors and Remediation Division SAH:ais Enclosures cc: Marla Petersen, City Clerk, Eagan Craig Jensen, Fire Chief, Eagan Sheila Wiegman, Dakota County Solid Waste Officer 13333 1???5 ?" ? ?? 2005 FIRE SUPPRESSION SYSTEMS PERMIT APPLICATION City Of Eagan 3830 Pilot Knob Road, Eagan Mn 55122 Telephone # 651-675-5675 Fax # 651-675-5694 Requirements: 2 complete sets of drawings and specifications cut sheets on materials and components to be used Date fY-_/_/0 Site Address: o? ?}S(? Sl 1f,?Q >I 1?L2UVl tnA?\ Tenant / Building Name: p . + S 1pi r ~1 rM Pour-se The Applicant is: Owner _?,o Contractor Other ?-1 e L1tJ?? Sy? ?Cp?Q_ t? PROPERTY OWNER Address: 3 D3 a I S I c >f r Po City: ??Vf State: Zip: CONTRACTOR ???Srl I ir(Z? 'C°?7t]i l MNLicense #: C(W Address: I .L? f c? fy-) .SL &.)C--- City: ffio) S State: H /Li Zip: Phone #: LOl aJI ?,3(1 ESTIMATED COMPLETION.DATE: FIRE PERMIT TYPE: Sprinkler System (# of heads _ Fire Pump _ Standpipe Other: WORK TYPE: _ New Addition k4 Alterations _ Remodel Other: DESCRIPTION OF WORK: 1 Commercial _ Residential _ Educational Other: 1 1 I ?L)J C? sp]L "11 S L Il>/?0 ti? i ?2?w?4 r?? ?c ?Elvv? one s va iZ yln Aq s to U Please continue on reverse side PERMIT FEE: $50.50 Minimum Fee (includes State Surcharge) U Contract Value $ ^?j(? - x .01 • If Permit Fee is $1,000 or less, add $.50 => If Permit Fee is over $1,000, add $.50 per $1,000 Permit Fee 3/4" Displacement Fire Meter - $161.00 TOTAL FEE: $ tJ? • W Permit Fee $ , State Surcharge I hereby apply for a Fire Suppression System permit and acknowledge that the information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan and with the Minnesota Building/Fire Codes; that I understand. this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. Applicant's Printed Name Applicant's Signature DO NOT WRITE BEL T ? 4 d iu a F ? >? ?,<!L ! t 1 ti,1? ! le Diaui"Test F Rough Ins t s Ce'ntc`ahSt-4' Fuial f 6 ' '.A t Y ?'Av l ! y ?! ? ? a sSI? rv Y _ Z__Z? ? e 3 :? y •{; T k I l by Date., % '? :% az, 4 FF } a ?-SIfiO W :81. 2S 2006 COMMERCIAL BUILDING PERMIT APPLICATION City Of Eagan4 3830 Pilot Knob Road, Eagan Mn 55122 Telephone # 651-675-5675 FAX # 651-675-5694 • Structural Plans (2) sets • Civil Plans (2) Certificate of Survey (1) -Code'Analysis (1) " Project Specs (1) • Spec. Insp. & Testing Schedule " • Soils Report (1) • Meter size must be established d l 1 y 1 1 • SAC determination - call 651-602-1000 • Architectural Plans (2) sel • Structural Plans (2) • Civil Plans (2) • Landscaping Plans (2) • Code Analysis (1) " • Certificate of Survey (1) • Spec. Insp. & Testing Schedule (1) " • Meter size must be established • Project Specs (1) • Energy Calculations (1) " • Electric Power & Lighting Form (1) " • Master Exit Plan (1) • Emergency Response Site Plan (1) • Soils Report (1) • SAC determination - call 651-602-1 000 • Fire Stopping Submittals • Architectural Plans (2) sets • Code Analysis (1) " • Project Specs (1) • Key Plan (1) • Master Exit Plan (1) • Energy Calculations (1) not always" • Elec. Power & Lighting Form (1) not always- • Meter size must be established-if applicable 1 1 1 ' d. y • SAC determination -call 651-602-1000 Call MN Dept of Health at 651-201 A500 for details regarding food & beverage or lodging facilit ** Contact Building Inspections for sample and if required *•* Permit for new building or addition will not be processed without Emergency Response Site Plan. Date 9 / l dCld_/ Construction Cost 6'r1? 53 5F o o . Site Address a75D ?l/7/e?i /77emvYro( ?11??/. Unit/Ste # i Tenant Name ?ief??Los SRuY C ?. Former Tenant Name Yejr'ap a L.r Description of Work Re- Boa ; Wark oraQeY C.c?c t /C?°!25 = Property Owner 05rn n P7-0 Lt c, Telephone # ((a JG ?) 4SS- 591a 4 Applicant is: _ Owner X Contractor Contact#: (743) T Contractor PI- Mma-en le. C4Clri51-', =rz.G. y Address -7 7X0 S-6o zfe City. Gk jCn State Zip 55373 Telephone#(7Ga X77-??9I Arch/Engr V Registration # Address 1,4 N2r City State ZipF Telephone # ( ) Licensed plumber Installing new sewer/water service: Phone #: () I hereby apply for a Commercial Building Permit and acknowledge that the information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan and the State of MN Statutes; I understand this is not a permit, but only an application for a pemrit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. C L4 Applicant's Printed Name Applicant's S attue DO NOT WRITE BELOW THIS LINE I Sub Types ? 01 Foundation ? 26 Public Facility ? 30 Accessory Building =1 14 Apartments 1?' 27 Commercial/Industrial ? 32 Ext Alt-Apartments D 15 Lodging ? 28 Greenhouse ? 34 Ext Alt--Commercial 25 Miscellaneous ? 29 Antennae ? 35 Ext Alt-Public Facility ? 37 Nail Salon Work Types ? 31 New ? 35 Int Improvement ? 38 Demolish (Interior) ? 44 Siding ? 32 Addition ? 36 Move Bldg. ? 42 Demolish (Foundation) ? 45 Fire Repair ? 33 Alteration ? 37 Demolish (Bldg)* 143 Reroof ? 46 Windows/Doors ? 34 Replacement *Demolition (Entire Bldg only) - Give PCA handout to applicant Valuation b!4 SJ4- Type of Const ?D Width Plan Rev 100% --" 25%? Occupancy A MCES System SAC Units Zoning City Water Nbr. of Units Stories -' Booster Pump Nbr. of Bldgs Sq. Ft. - ° PRV --- Length - Fire Sprinklered Required Inspections - Footings (new bldg) _ Fireplace. _ R.I. _ Air Test _ Final - Footings (deck) _ Insulation' - Footings (addition) _ Sheetrock _ Foundation _ Final/C.O. _ Drain Tile _ Final/No C.O. _ Driveway Apron ? Other Roof -_4itrr _ Decking Insul Final _ Pool _ Figs Air/Gas Tests _ Final Framing _ Siding _ Stucco Lath _ Stone Lath - Final Windows Final C/O Inspection: Schedule Fire Marshal to be present. _ Yes ?No Approved By: Planning ) y?t /rl (^ Buil ding Inspector Base Fee Surcharge Plan Review SAC-MCES SAC-City S/W Permit S/W Surcharge Treatment Plant Treatment Plant (Irrigation) Park Dedication Trail Dedication Water Quality Water Supply & Storage (WAC) i7D , IT 32, SD Financial Guarantee Storm Sewer Trunk Sewer Lateral Street Water Lateral Other Total r qVI 2,E Sewer Trunk Water Trunk m4t6mw .lob Date: 9/5/2006 Work Order: 22129 Account Number: 1491 'uaauOl6l City View/ Lost Spur Country Club Mr. Ron Larson 2750 Sibley Memorial Hwy. Eagan, MN 55121 Job Site City View/Lost Spur CC Mike Schmidt651 455-5964 2750 Sibley Memorial liwy I,agan, MN 55121 Re-roof Sections 1, 2, 3, 4 and 5 as hollows: On Section l; tear off existing roof down to insulation and dispose of it. On Sections 2, 3, 4 & 5; tear off and haul away existing roof down to deck and dispose of it. Inspect deck. Repair or replace any damaged areas (call Sandy ASAP with info). On Section 1; inspect insulation & repair as necessary (call Sandy asap with info). On Section 1; install 2" polystyrene insulation over the existing to attain a total system R-Value of 22,2 On Sections 2, 3 4 & 5; install a combination of flat and tapered insulation to effect drainage and attain an average total system R-Value of 22.2. Raise perimeters as needed with wood blocking to accommodate the added insulation thickness. Install GenFlex 45 mil EPDM synthetic rubber roof membrane system. Membrane will be ballasted using 10 lbs. per sq ft washed round river gravel. Flash all protrusions, curbs, perimeters, etc., using mfg. recommended details. Use reinforced, non-penetrating perimeter termination. EAGAN Flash all plumbing stacks with pre-molded rubber PiP' c boots. BY ? ? ?WED , cam. 011 Qr, Install new pre-linished rant Ficia metal aT the perimeter. Cr ()6 Install new pre-finished cup uwtal on the parupct Willis. BUILVIIVG INSPECTIONS DEPT. Mcial (lashing will he laslcned Through the litcia to ovoid IhNlcuing through the rool'nenbrune. Replace the existing scuppcrN with new prclinishcd steel scuppers. Replace existing downspouts with new closed corrugated prelinished downspouts. CLEAN WORK SITE DAILY!!! '-. 0W 2006 FIRE SUPPRESSION SYSTEMS PERMIT APPLICATION City Of Eagan 3830 Pilot Knob Road, Eagan Mn 55122 Telephone # 651-675-5675 Fax # 651-675-5694 Requirements: 2 complete sets of drawings and specifications cut sheets on materials and components to be used Date Site Address: Ott StIoerbell Q. Aa Tenant / Building Name: S i { L)er bg,l l 'der a?? The Applicant is: Owner X Contractor Other PROPERTY OWNER SRrne_ Address: City: State: Zip: CONTRACTOR Summit Fire Protection MN License C-075 Address: 7301 Apollo Court City: Lino Lakes State: Minnesota Zip: 55014 Phone #: 651-251-1880 ESTIMATED COMPLETION DATE: nQ0 FIRE PERMIT TYPE: __)t Sprinkler System (# of heads Z3 _ Fire Pump _ Standpipe Other: WORK TYPE: _ New _ Addition x Alterations _ Remodel Other: DESCRIPTION OF WORK: Commercial _ Residential _ Educational Other: 'CA AU 6114. PERMIT FEE: $50.50 Minimum Fee (includes State Surcharge) Contract Value $ ZLn(IC) ' x .01 = $ 2l0 - Permit Fee • If Permit Fee is $1,000 or less, add $.50 ?> $ S d State Surcharge If Permit Fee is over $1,000, add $.50 per $1.000 Permit Fee 3/4" Displacement Fire Meter - $167.00 $ TOTAL FEE: $ .? ?? . SCE I hereby apply for a Fire Suppression System permit and acknowledge that the information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan and with the Minnesota Building/Fire Codes; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. tJlGf/1 2 ?l?li f e / ?J2 it Applicants Printed Name Applicant's Signature DO NOT WRITE BELOW THIS LINE REQUIRED INSPECTIONS Hydrostatic Flow Alarm _ .: Drain Test Rough In Trip Pump Test Central Station Final Conditions of Issuance: Permit Approved Date: I / ( / S? MAR-10-2008 MON 09:34 AM PINNACLE CONSTRUCTION FAX NO. 7634775611 P. 02 2 :129 City View/ Lost Spa: Camtry Cef'c' Mr. Roo Lai: on 2750 Sibley 09% A= WIT (W- Of SCCisS r, :,;lows: City View'/Lis: S CC man, N'\° 5512i 0'-' Section 1; m'li: Oli l':<7tiZ] allot dotal to E:? i Khon cod 0spose of •{ -v Sevions7.• 3 On , I& S;lCaC f(I 'r. ?' ?Ltl ;i\t/;V ::. _:::(1`•"% il'.C. ? ..,. ? ?-. 11i51)C:Ci deC;k. iZl':[J0.ir Or A T100 WY Ci::rlt:.9'.- awi (ail _+a;b?y r.,Sij! p Wi'.'. \ . ', iai() on ?CC;;OI'i !; 111:;7CLi Il)S:lliitlUll SL rcj,r:ir as neccssr!y (c;lll Se '- C-I ciio:) 2" 1n. lysLt ?::' . > ''.. GVtZ the LriIti[i €0 &t..:a] t0.(:i S}'3QL. 1' l O, Scciio:)s ?, 3 -4+ install corn: ' ,( it:Oe,'t; iri:a , Oa to l'iicct cira:na,?c _I:? sEP'I ,?: nrci'ssc ` [u? 1 systcrn 'A-Value of 22.2. ? -tr- j w. -J v?`Gkwes I r! S", I\iifSL' Wi'l7C lCl'S as .1::Cil3C; Wiii'1 wUOik '0(OGS1::`' t0 £:i7C '"''1 •' n•7;? } ' ;;..; _; . Instal Cleiligex 45 ni!: W OM Sync RCltc 11;1)?Cl be ULI. QCii L':;:Yt+ 10 1`ls 1'1fis17 ail [1COtfCiCi, ;iS, UC: JS, ;=Ci'1 n:' - .; la - t t., i L. •-+. ,F^, USc I"la!S) fill Uh:.. ',I fl tifC:ck, Wi47 .C-t t:0:aJ., 100; hista03 ncvJ r„c, liai:;,lcd c- -t fa:i : n' j a" L11::' lrtstall new pro-;urisil.::j ci.-p on :i:c pert:. ! vja:::,. Mct;d f1 S h ' Q11 it ,_ea...! C,ri)•t??l< t[io ?!O . ? .., _ . `c •_ ._. tJ .J(i- ? lil,l :l`!f'. 'd 1 rl:) ? ReIRace tho exi?:ia, with +?"j:I.LCe U}a SIIIIL; (•', n+nS"7i±tti Vv : city of eagen THOMAS EGAN Mayor July 26, 1993 RE: APPLICATION FOR GRADING/EXCAVATION/FILL TAX PARCEL: 10-00400-013-05 GENERAL LOCATION: Lost Spur Country Club Dear Property Owner: PATRICIA AWADA SHAWN HUNTER SANDRA A. MASIN THEODORE WACHTER Council Members THOMAS HEDGES City Administrator E.J. VAN OVERBEKE City Clerk PERMIT #EX-04-133 This letter is to inform you that the City has received an application to after the existing topography through grading, filling and/or excavating approximately 6.12 acres of the above-referenced parcel located within 350' of your property. This activity is not associated with any proposed development at the present time, but rather, only deals with the removal and/or deposit of clean fill material to accommodate the parking lot expansion. If there is any subsequent development proposal/application, you will be informed through a formal mailed notice. If you have any questions or concems regarding the City's review and processing of this Grading Permit, please contact the Engineering Division of the Public Works Department at City Hall, 681-4646 by August 16, 1993. Division cc: Mayor and City Council Tom Hedges, City Administrator Tom Colbert, Director of Public Works Mike Foertsch, Asst. City. Eng. Zoning Administration CEKAe MUNICIPAL CENTER THE LONE OAK TREE - MAINTENANCE FACILITY 3830 PILOT KNOB ROAD EAGAN, MINNESOTA 55122-1897 THE SYMBOL OF STRENGTH AND GROWTH IN OUR COMMUNITY 3501 COACHMAN POINT EAGAN, MINNESOTA 55122 PHONE: (612) 681-4600 PHONE: (612) 681-43DO FAX: (612) 681-4612 Equal Opportunity/Afflrmatlve Action Employer FAX: (612) 681.4360 TDD:(612) 454.8535 TDD:(612) 454-8535 ! 1 i F j NA IL ! ,41 zj? 4 pW NE?\ '? d/RrRr NE - NW HE N« [tue y" r ?b RtrD yyt CENIER NRV[ ylyyr. R Y PARK N PARR' ? i e y4 V ) I J 1 fVf R (EPIRRG C SW Rr W SE Sw SKYLINE RD ? n ST 'I I , s Cl ![KIN[ TR, S% eltT1«It M L ? ? y L?? f O i AD ? y - Ce RI. Na fil (G. R• P?c? P S ? J r 3 NER !' iNW Rto c o av J, re Nw h~p HE 0 RS I II \?,'p' ® 8 g ?? LE ? rosy L - i V , '•O 9 R RD GJ?IfIV iMtN _ PO R R R ^ N ? . r s, - RI C. FIKN PT ?C ?i Sw / F $ G Ss CI??IJ SE 2 • W p11IRRY s -RMOR lDIE R- PARK o r nER eLIIR 6 - mold MONoCiN PT. yt ? ?ylD (1(\?/`V\%p,/7I 6- RED«OOO T cEMw .. "? -` • ru Ra Ne ze E d P Si I / T ® 'sue . ?REO'LCRRY /MR CIRR/IG PACK IrrNW q,ICOC?E? P, NE NW ^ NW RILLS Got CIT ?C. ??_ I MIE Rr '`T ! Olac tR I \ J . A ?! tN Muf/ `^' 11k IOVRSL • Y HILL PIE2Irr 77 I 1+j/ / 1k IJ® E 1 LL .V[ TASarut =-? TR / -mod 1 '?j A 1 I ?l ! 8W . . _... x L.y ' SM f LN., ' R uFA00«LYN . tf D NL RR ., • a «L p ?-IIR ! NtIR[ R C RI ' 1 D .?y N Tflrl 4 J f ?IL«u' i 1`T' l L r NW g . 1.. 19 : r - Nw_B !?[ __ •I ,d' /11 - \ Z \ \ / I J llml IIII 1 ti 1- \ yI \ \ J //lJ/!/ I IIII I (1 \ ?0''C?\ n"7i ? (?-' `_ ?\ \ \?- \-.. ? \ \ \ r! ?\ ?-,_,? J 11 1 J°al 1 J ? I I 1 141 ?\ \Oti \ '?. \ ?_ \ ?\\? \31' \, /o // / I 1 r'I III I \\\.?T \`L` \?=• - `?_?\?? \1? \`??? (!ll`?111(I11 ?I?II?I?\11 \ \\ \\ ?F\ `• ???? ??? `? _?'?\ \ T - \\` \` •• II \III I 1 \?\ it 780 •t ;_. -?? \\-\\\III// yr ? \ --<,` a?? \?? ?\\\?` _ t \ I I yji?/?\\\\ 1{? ?\IV? yIx76p ik- •\ \ /I \. ?\? \\\? I? \?\\\- ?.1 IIII I<?? •( 1 Ill' \\ ` \ ??? I??r -\b? \\\\\\\ \ i {h ? 41 ? \ F\? 1 /., Y , , / \ \ \\ \\ 11' , 1 !! 11111 ` / I I AA l I S I v i l ?3 ?l \ / /? ? -' f ? \ o ! . - v .q\\0? 11.14 Yrl° ? l?llllll ! / ?I?III I 1 ? \ 1 1 a • /f'. ! \\\ !r ! 1 I r^ 1:11 I n11/ ?, J 181+111 L 'll ; IVI\? y y 1 4 I y ° ///r ???T ?? \\\?\\ 1111 I f ( ,IQ11???111, \?\J i,ll ? yillflII/? illlll{II V \ \ \\ /) /° Y y .. \ / / ll lill\ \\ ,l IIIINIIY u?'~III{1 \ \y`\\ Ili i / ? °, ?-_ _ \ I I / ? 1 '. hlll{llll.ll \` > 11111 Iu1 ??111\ \.J ? \~\`?\ F? '? / / / / (,r• 1 I ! / / Y ? . /?/%I11F? ?iT / Il?llfly?? TIH TI,g111` ? \ 1 ! 1 \ ?? ° ? / / 008.1 Il ? l \ !7?'l`T'?{f , \ ? lld J l I r ?I 11\\. ? ° \\?'l-i?? _??l - ` i? I / J \ ( fey( \ .\y III \ \ ,I j/ll(fl/? IIII 11 ? 1 ? \ \ 11? ?... : 111 J 1 I I I ( \ ? ? l`?? - _ , \ \ \ ? .i? l ?o. 111 I??L-?? \ r\ I /Jqf /l t IIII (V I f r \ 1!i-ySZTj^ 0\- \\' ?\\\ ? 1 / \ ! 1? i\ ?\ ?1 //!1 i I IIII I it ----_\ - /1 1 lI///ice \\\\\\l?'J\ \ I J rL/ 11 II hl\ /?`\ ?,. - \ \\\?? \ \\?? \\ 7/I / \//ml\\ -- iii 11j1 \? 111 ?Iv r/I till L i tg: -30\` ?\ \\ , / / ( 1 -•?,///r \\ I 141/II/i illr/ .?Z?Z? __ - ??? 8zp:\\\\ ?? 1 ?_ 1 \?! I IIII__ 1/1' i/r .??? \\\ ? p\\\?\\\\\\\ \ I-? ? \ ? \???.1/ JV//IIw 1 \` \, ) r 11 ? 11 X11 ? 1111\`?y??\?\\\\\\\\ 11830-. • \ \\\ \\-\! Ill!!l%ll? t\\- ~? 1?\I?°? \11\ \ \\\\ \\\\\\ ??-\ \\ \ \ \ IIl! It/ - / l an \ \_\. ` \ \ _?--?`\ \\ \ \ INWi r/ III ?\ 1/n ,IFl .r \ r ?-1 1 1 1 a-. \ \\\ \\ \ \ \ 11111 II! / 1 dl \/ \ f l 1 I I1(? .?--? ? \\ \ \ \ \\ INpI II \ fl{ { 111 1/ Ill/? - \?\\\\\\ \\\ \ \;\ 11 \\ .. J1 tl It ! I ) 1 I /' / / //o ?_ _?8 _?`\\\\\`\ ? 11!11 J/ Z - 11 / _ I 1 ! / 27, N --Z- \sp \\r 1• lllJr- \\\ \ \? I I 1 1/? \ ?,.11?\, : //, , i ? _ \\ \ , \ I _ \ \\\II1,.INlI.?I,Ii// /? _ .n ?1 \\\` II? IJL1/ ? I I ., ll? _.59. RAISED -AREA FIRST FLOOR -PLAN ' SCALE L 8':1=8' ' aw.J• a a :a s-_ s 4Gp ~gippl N F< N p0 ? m F ? O J w Ui i< ys cc J z i 2s Ow U LL J 0. 2 d a? rR 3 Uo Ni O J i a O W = s J , WW a Jm 0a LU (r N tWn n 9i W O1w '?Jf qMS C7, ¢Wo 1- ?f S U ~?t?0 Wpmp z ?qW Wlo W N W 1'R" w p t , I ? + -4 N P G4 4 @ i I pxq 3 1 ? , / 1 , r r 8 -? v a (r . _ 1 / 6 3 A M AV l i ! i . , Z I , @ I Y l r I .? I li 1 / Ir, r .14 J-L ?--- k 1 t ill 1 ? ? ld•$ xl n lA, ?, 2 ", M 8 Y Y y y Y Y 6x ifi? o ++ I 1 4 . Y I I Y I I nl V ?? _ t ? ` I I YI ?I 0 ? $ C 1 r m Y r, , I .I 2 8v` i?? 'k? :R r Bv004, .. I LI/ Y k E C 333 I; ? ? ''g X SyZW 14 I ? ?y ? TArF(QF C?? ? ,;d ?YOgv ?A ?p e ! Y y Y [ G4tT..9 v .r ? II b ' 1a{ 3 a S S ' _ N N t P l I l ?? p I L / v V2 2 Y 3 VVVV ? / t V . ? 0 I i N • : 6? ` u O N I' o ? ' V V Y ? ti I (I a Q : o ? u Ir ? ? ? 6 ??" a r _ _ ' I I JI $ ow °.y? e S 1? II II 44 -91-. b d_-? N r9 - j l { Y ? w P R B p 1 A "T?? I lL 4 f vi • Y a 1 it II ?4 \ ? p II E y tj ? I s x /] ?. . //?? I I Np90 E I • e ? ? ? i I ; ' I • REMODELING - LOST SPUR GOLF & COUNTRY CLUB 3750 SISLEY MEMORIAL HIGHWAY 17, BT. ?AUI; MINNESOTA'- sXEET JENE T. SIGVERTSEN AIA ARCHITECT 517-430.0001 i OF 7 IN 4025 VE BABCOCK TRAIL E. NO. 1077 INVER GROVE GROVE HEIGHTS NN. 55077 EAGAN TOWNSHIP BUILDING PERMIT Owner ...*±.L__ .......... Address (present) ....._......... Builder _...-.._..--'-------------- Address .__.__-.-..---...---.. e. t & DESCRIPTION 010-6-3 N` 179 Eagan Township Town Hall Dale --w.. .......... Stories To Be Used For Front I Depth Height Est. Cost l per m i! Fee Remarks a ? { LOCATION Street, Road o other Description of Location Lo! I Block Addition or Tract This p it does not authorize The use of streets, reads, alleys or sidewalks nor does if give the owner or his agent the rig Yo create any situation which is a nuisance or which presents a hazard to the health, safely, convenience and general welfare to anyone in the community. THIS PERMIT MUST BE?(,EPT T .PREMISE WHILE THE WORK IS IN PAOGR41§? This is to certify, that. . _` :. oq ..............has permission to erect a----- .......................... ...... .--------- .------ ....upon the above descr' d premise s V?w t-lo-the-provisions of the Building Ordinance for Eagan To ip adopted April 11, 5. 195 t ........::....... .. .....Per .......... .........___.._.....-------------------------------------------- Chairman of Building-Inspector CITY OF EAGAN Remarks Ihr9', ( '/ ' . Addition Section ?L Lot 1 elk 53 Parcel 10 wh00 010 53 Owner ,S 3'%)-'e it r),;. '^/n. Street 2951 Sibley Hwy. State Eagan,MN 55121 Improvement Date Amount Annual Years Payment Receipt Date STREET SURF. STREET RESTOR. GRADING SAN SEW TRUNK g 190 100.00 30 Paid SEWER LATERAL ' WATERMAIN WATER LATERAL WATER AREA qqq 1977 0. 0 23.36 1r 00 A -il- o STORM SEW TRK STORM SEW LAT CURB & GUTTER SIDEWALK STREET LIGHT WATER CONN. BUILDING PER. SAC PARK John Brockman 2011 Potentate 817 Johns Lane SE Stewartville, MN 55976 Cell 507-254-1296 Email johnbrockman@att.net DIVAN Frank Spevak Chief Rabban Donald Harmsen Assistant Rabban Roger Berge High Priest & Prophet Jeffrey Olsene Oriental Guide Russ Christofk Treasurer Tom West Recorder Bruce Thomas First Ceremonial Master Richard Purcell Second Ceremonial Master Michael Nehm Marshal Anders Haugen Captain of the Guard Larry Norte Outer Guard 2750 Sibley Memorial Highway • St. Paul, MN 55121 (651) 452-5660 • Fax (651) 683-0231 Email: doreen@osmanshrine.org August 10, 2011 Steve Norstad Cannon Construction 315 Dakota St W Cannon Falls, MN 55009 Dear Steve, This letter is to inform you that we have changed the room designations of the lower level of the Osman Shrine offices. This is the area on the far west end of the lower level. Your original plan had the area in the middle of the floor plan designated as storage. Many months ago, as we finalized the plans, we changed that room to be an office area. I believe that this is labeled room 303. This will be used during the Osman Shrine circus as a call center. It will also hold office files throughout the year. I hope this clarifies the floor plan. If you have any questions, please let me know. Sincerely, Thomas West Recorder it) n Shriners Hospitals for Children'"" Date: City of Eagan 3830 Pilot Knob Road Eagan MN 55122 Phone: (651) 675-5675 Fax: (651) 675-5694 Use BLUE or BLACK Ink For Office Use Permit #: 1 `t'7 6 -jI Permit Fee: - o 'V Date Received: Staff: 2011 SEWER AND WATER REPAIR / DISCONNECT PERMIT City Sewer City Water Repair Description Of Work. G — v" 2c��7 ?r� - c='� Disconnect Fee: $55.00 Street Address for Proposed Work Name:C[-t-t 3 Phone: OWNER Address / City / Zip: -2-5-4 jC. S =G�C1 7 ✓11 �iYrI��.Q� G�-�,J 4 Applicant is: Owner Contractor Licensed Pipelayer Master Plumber ?\ Property Owner Name: uz -e5 Phone: (,5 t-64'LS CYoZT-. Address / City / Zip: ? Z 4 Cifk ' '- nALAL Pipelayer Training Certification Card #: or Master Plumber License #: SUC7'j S%?•Y1^ I acknowledge that the information is complete and of the City of Eagan and the State of MN Statutes. not to start without a permit. Applicant (Print Name) accurate and that the work will be in conformance with the ordinances and codes I understand this is not a permit, but only an application for a permit, and work is App cant's Signature CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.gooherstateonecall.orq 41I/ CityofEaali 3830 Pilot Knob Road Eagan MN 55122 Phone: (651) 675-5675 Fax: (651) 675-5694 REOD\'ED FEB 242012 r Use BLUE or BLACK Ink For Office Use, Permit #: Permit Fee: Date Received: Staff: 2012 COMMERCIAL BUILDING PERMIT APPLICATION Date: alg01j a Site Address: 75-0 8I EL5\-) HWy Tenant Name: L 0s 71 Spur �c, / f `` ��'� 6'''11' (Tenant is: New / Existing) Suite #: Former Tenant: Name: jAr1ne_✓z5 / Z®...5 7L Phone: 4S/ 9S / -‘7330 Address / City / Zip: 2 750 .Sley f72cfr?c, /A, )4y ig''f/ $S1a 1 Applicant is: Owner Contractor Description of work: /J Ls / LG` /9p1 Construction Cost: • 3 f• on Q ®O Name: SL114cJ / r� 49' -519.17...S License #: See F `e. s Address: 3.25 in /. rt cso 74,9- / , k City: Q/0/1 c LGU State: MA/ Zip: S ?e 0 Phone: 507- 3b?`oc6., Contact: I:51 ' ! '..s 1 Email: auligell C.11Act &A -C /., �-d Name: Address: � -- n 5 /•/ i'19 Registration #: /6 / 7 7 '46 west Rl.%Rd /l ire City: ,P .s e,— State: MA/ Zip: c5 -5 -?0 / Phone: 507- ,2S0- l Eo Contact Person: % r' k.01 ble,A A11'1411 Email: Licensed plumber installi ng new sewer/water service: Phone #: CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.gopherstateonecall.orq I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work -will) be in accordance with the approved plan in the case of work whicF� requires a review an ap royal of plans. / j' d S at— Applicant's Printed Name x Applicant's Signature Page 1 of 3 DO NOT WRITE BELO THIS LINE 1:1S-1) IOLO/ 01)2.,u1 BUB TYPES Foundation Public Facility 1 Commercial / Industrial_ Accessory Building Apartments Greenhouse / Tent Miscellaneous WORK TYPES New Addition Alteration Replace Salon Owner Change DESCRIPTION Valuation Plan Review (25%_ 100% ) Census Code # of Units # of Buildings Type of Construction Antennae Interior Improvement 1. Exterior Improvement Repair Water Damage Occupancy Code Edition Zoning Stories Square Feet Length Width REQUIRED` INSPECTIONS Footings (#Ie v-Bttit tT IIr S4Djr Footings (Deck) Footings (Addition) Foundation Drain Tile Roof: _Decking _Insulation _Ice & Water Framing Fireplace: _Rough In _Air Test _Final Insulation Meter Size: Final _ Exterior Alteration—Apartments Exterior Alteration—Commercial Exterior Alteration—Public Facility Siding Reroof Windows Fire Repair Demolish Building* Demolish Interior Demolish Foundation Retaining Wall *Demolition of entire building - give PCA handout to applicant MCES System SAC Units City Water Booster Pump PRV Fire Sprinklers Sheetrock Final / C.O. Required Final / No C.O. Required Other: Pool: _Footings _Air/Gas Tests Final Siding: Stucco Lath _Stone Lath _Brick Windows Retaining Wall Erosion Control Final CIO Inspection:YYSchedule Fire Marshal to be present: Yes t Reviewed By: 1 i k1 L...? Le./ , Building Inspector k COMMERCIAL FEES t `7'1 geti�� Base Fee r Kl Surcharge Plan Review MCES SAC City SAC S&W Permit & Surcharge Treatment Plant Treatment Plant (Irrigation) Park Dedication Trail Dedication Water Quality eater Quality No Reviewed By: Water Supply & Storage (WAC) Storm Sewer Trunk Sewer Trunk Water Trunk Street Lateral Street Water Lateral Other: TOTAL% , Planning Page 2 of 3 OLORS HOWN IN THIS ORA NG ARE FOR ILLUSTRATION PURPOSES ONLY AND MAY NOT BE A TRUE REPRESENTATION OF ACTUAL COLORS - THE ELEVATION SHOWN IN THIS DRAWING ARE FOR ILLUSTRATION PURPOSES ONLY AND MAY NOT BE A TRUE REPRESENTATI I N OF ACTUAL k ED2326-10-20-11 CUSTOMER APPROVAL• LCI \5a 2§ 1—§§ ser 1 \\§\»\»\ \\\\\\.k sii I) ; \ al 2 �9,§ § $ , EB( , k I RETAIN M% k§\§ §\U &© /Y3Z7/-( e §k \� § /0-52-31-f a CUSTOMER APPROVAL __=40111266 Ghat- Xiiquor THE SUPER -MARKET OF LIQUOR STORES 1500 EAST OLD SHAKOPEE ROAD BLOOMINGTON MINNESOTA 55420 WE DELIVER PHONE 888_3334