Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
2103 Silver Bell Rd
r City of Eap 3830 Pilot Knob Road Eagan MN 55122 Phone: (651)676-5675 Fax: (651) 675-5694 ----------------- I Fw?Q?ce?set/?7/?/ /\ I Permit#: UU7 ?1?l7/y Permit Fee: / I I I I I 1 Date Received: I I I j Staff: I t----------------- I 2008 COMMERCIAL BUILDING PERMIT APPLICATION Date: Site Address: Z-) 03 S -' V e?- 3 e 112 d - Tenant Name: (Tenant is: -New/- Existing) Suite #: PROPERTY OWNER Jn 4 +4 Phone: b lol -7d Z 777 Name: t Y-To R S h A J 1 Address/City/zip: 2) ° 3 5. 1 d C IZ & C I ( R, Applicant is: Owner _ Contractor TYPE OF WORK Description of work: PA-M fl L Re?l?1 r?i e e t I o n!? Construction Cost: Z . D CONTRACTOR Name: License #: Address: City: State: Zip: Phone: Contact Person: ARCHITECT / Name: Registration #: ENGINEER Address: City: State: Zip: Phone: Contact Person: Licensed plumber installing new sewer/water service: Phone #: r.1VOTE Plans and suppor ing; documents that you submit are considered to be public information. Portions of the information maybe classirted as non public if you provide specific reasons that would permit the City to .' conclude i6t the` are trade secrets.' I hereby acknowledge that this Information Is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is sn without a permit; that the work will be in accordance with the approvcd plan In the case of work which requires a review and approval gf Applicant's Printed Name Ap ignature Page 1 of 3 DO NOT WRITE BELOW THIS LINE SUB TYPES: ? Foundation ? Public Facility ? Accessory Building Apartments ? Commercial ! Industrial ? Ext Alteration-Apartments ? Lodging ? Greenhouse ? Ext. Alteration-Commercial ? Miscellaneous ? Antennae ? Ext. Alteration-Public Facility ? Nail Salon WORK TYPES: ? New ? Interior Improvement ? Siding ? Demolish Building* ? Addition ? Move Building ? Reroof ? Demolish Interior ? Alteration ? Fire Repair ? Demolish Foundation ? Replacement ? Windows 'O Water Damage Demolition (entire building) - give PCA handout to applicant DESCRIPTION: Valuation 00,0.- OccupancyZ- MCES System -es Plan Review h +? Code Edition 012 ?_00-T SAC Units (25%100% Zoning R-q City Water S Census Code Stories Booster Pump # of Units ^`- Square Feet PRV # of Buildings - Length Fire Sprinklers tq eS Type of Const V 1 Width -- REQUIRED INSPECTIONS Footings (new bldg) ? Sheetrock Meter Size: Footings (deck) Final/C.O. Footings (addition) ?L Final/No C.O. _ Foundation HVAC _ Drain Tile Other: Roof: _ Decking _ Insulation _ Final _ IceNVater Pool: -Footings -Air/Gas Tests -Final Framing - Siding: -Stucco Lath -Stone Lath -Brick Fireplace: _R.I. _AirTest Final Windows Insulation Retaining Wall Final CIO Inspection: Schedule Fire Marshal to be present. - Yes X No Reviewed By: Building Inspector Reviewed By: -r , Planning COMMERCIAL FEES: Base Fee Surcharge Plan Review SAC-MCES SAC-City SNV Permit S/W Surcharge Treatment Plant Treatment Plant (Irrigation) Park Dedication Trail Dedication Water Quality Water Supply x Storage (WAC) 6 -z.s . _5-0 Financial Guarantee Storm Sewer Trunk Sewer Lateral Street Water Lateral Other Total Sewer Trunk Water Trunk Page 2 of 3 City of Baran RELEASE OF HOLD ProjectName/Number/Location: Rive,- P,6?e Legal Description: Lot Block Section/Subdivision Parcel #: Reason For Hold: caz wdlh 5fr f /rydr? 6y Release Hold On: Issuance of building permit Certificate of Occupancy Other (please explain) Hold Released By Reviewed by City Engine Please inform Engineering Secretary of this Release. 12-r3-v6 Date lz ,114--OG Date GFORMSB Jl of Hold 10'05 Page 1 of 2 Craig Novaczyk From: John Gorder Sent: Wednesday, December 13, 2006 1:39 PM To: Craig Novaczyk Subject: FW: Craig, Based on this, we are a go to release the permanent CO. Thanks. John From: Bieging Jr, Edward P [mailto:edward.p.bieging-jr@xcelenergy.com] Sent: Wednesday, December 13, 2006 1:31 PM To: John Gorder Cc: Patti Subject: RE: John, (2 -17 'DL J 'I G I wanted to give you an update regarding Silver Bell street light install. I have received a signed contract and a check in the amount of $1,975.00 from Premier Development Group Inc. I have consulted our construction crews for possible installation next week. It is my understanding that if everything goes well, we could have the street light installed by the end of next. On the other hand, if everything goes bad we are look at Spring 07. In any case we will be installing the new pole and fixture as requested by the City of Eagan. If you have any further question or concerns regarding this matter, please let me know. Thank you, Ed -----Original Message----- From: John Gorder [mailto:JGorder@cityofeagan.com] Sent: Friday, December 08, 2006 11:25 AM To: Bieging Jr, Edward P Subject: RE: Ed, That looks very good. Thanks very much for the follow-through. John Gorder, P.E. City of Eagan Assistant City Engineer 3830 Pilot Knob Road Phone: 651-675.5645 Fax: 651-675-5694 jgorder@cityofeagan.com From: Bieging Jr, Edward P [mailto:edward.p.bieging-jr@xcelenergy.com] Sent: Friday, December 08, 2006 9:09 AM 12/13/2006 Page 2 of 2 To: John Gorder Subject: RE: John, Thanks for the information regarding the requirements for the City of Eagan. I will be sending a new contract for the installation of a 150W HPS Cobra Cutoff fixture, 4' mast arm mounted on a 30' direct buried fiberglass pole - Silver Bell Road. Please confirm as soon as possible if this is correct. Thank you, Ed -----Original Message----- From: John Gorder [mailto:JGorder@cityofeagan.com] Sent: Thursday, November 30, 2006 11:20 AM To: Bieging Jr, Edward P Subject: Hi Ed, As requested, attached please find the City of Eagan's street light guidelines. In the case of the Silver Bell Road street light, it is located at the intersection of a Local Residential drive and a Community Collector (Silver Bell Road), and therefore requires a 150-watt mast arm light. Please contact me with any further questions or if you need further info. John Gorder, P.E. City of Eagan Assistant City Engineer 3830 Pilot Knob Road Phone: 651-675-5645 Fax: 651-675-5694 jgorder@cityofeagan.com 12/13/2006 (5\ Oct rs 99'7 1?7 , 2005 COMMERCIAL BUILDING PERMIT APPLICATION City Of Eagan 3830 Pilot Knob Road, Eagan Mn 55122 5675 FAX # 651 675-5694 T l # 651 675 h _ a U ep one - - e - 3 5 3 3( S*(#j G ... I mprov. merit • Structural Plans (2) sets • Architectural Plans (2) sets • Architectural Plans (2) sets • Civil Plans (2) • Structural Plans (2) Code Analysis (1) • Certificate of Survey (1) • Civil Plans (2) • Project Specs (1) • Code. Analysis (1) • Landscaping Plans (2) Key Plan (1) • Project Specs (1) • Code Analysis (1) • Master Exit Plan (1) • Spec: Insp. & Testing Schedule • Certificate of Survey (1) Energy Calculations (1) not always** • Soils Report (1) • Spec. Insp. & Testing Schedule (1) • Elec. Power & Lightin g Form (1) not always** • Meter size must be established • Meter size must be established • Meter size must be established-if applicable i • Project Specs (1) 1 _ • Energy Calculations 5 • Electric Power & Lighting Form (1) i • Master Exit Plan (1) b 1 • Emergency Response Site Plan (1) *"' l I • Soils Report (1) l • SAC determination - call 651-602- 1000 • SAC determination - call 651-602-1000 • SAC determination - call 651-602-1000 • • Fire Stopping Submittals Call MN Dept of Health at 651-215-0700 for details regarding food & beverage or lodging facilities. ** Contact Building Inspections for sample and if required ? Wi p Si Pl t jtt R *** ' tt er.%o' I dt.et l- Permitter new building or add an. te cc_ i esponse c ition will not be processed without Emergency . Date Zoo?j Construction Cost 1000 Site Address zyc) 3 S i I V PX Re11 1? ta?t4ln h11 Unit/Ste # ?- iS Tenant Name NIQ ( J0.Cd.yyT -y%eW CCNxC k Former Tenan tt t Name t) I? Description of Work S P J?re l w 0- U Property Owner - ptnA i P T 1/C? t(Y?h lP yt?? Telephone #1370) 2??. 4435 Contractor Wr0 1/1 ISkIIrIM4 l1ClO?Wl LY1? Address 4yC? n Z C2 -N '_Ave, S; ? i l 1 C? l City S'1 CA 1 State t.? Zip r 6 3o f Telephone # (32f,) Zri-7. 77.11o7r ToM x41 b (z Sao 5 /? Arch/Engr ` 1 ? 1rQ_ff 7i t C Registration # Z z gS ? I Address Z It ? s Rkr Ave- s-c, city S? ckcn.3A _ State Zip Telephone # (3Z0) Jo54. m70 Go .?Qe?c) t e?r+ni c•>ti( n t T 7 Licensed plumber instal ling new sewerlwater service: h h r 114 U,n`I JAN 0 1 cuuJ I hereby apply for a Commercial Building Permit and acknowledge that th 'information is comp d Q accurate; that the work will be in conformance with the ordinances and codes of th City of Eagan an State of MN Statutes; I understand this is not a permit, but only an application for a pe y s not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. cdl 11017•W.S341 `?YVI l? hO Applicant's Printed Name Applic is Signature OFFICE USE ONLY Sub Types ? 01 Foundation • ? 26 Public Facility ? 30 Accessory Building 14 Apartments Cewoa S ? 27 Commercial/Industrial ? 32 Ext Alt-Apartments ? 15 Lodging ? 28 Greenhouse ? 34 Ext Alt-Commercial y ? 25 Miscellaneous ? 29 Antennae ? 35 Ext Alt-Public Facility ? 37 Nail Salon W rk Types ?V ? 31 New ? 35 Int Improvement ? 38 Demolish (Interior) ? 44 Siding ? 32 Addition ? 36 Move Bldg. ? 42 Demolish (Foundati on) ? 45 Fire Repair ? 33 Alteration ? 37 Demolish (Bldg)* ? 43 Reroof ? 46 Windows/Doors ? 34! Replacement *Demolition (Entire Bldg only) - Give PCA handout to applicant d0 Valuation '.S$g i; QOD Occupancy Census Code /a Zoning SAC Units Stories Nbr. of Units Sq. Ft. Nbr. of Bldgs I pr?M PIX& wA'u- Length Type of Const WA? g Width Rep fired Inspections Footings (new bldg) _ Footings (deck) Footings (addition) i Foundat on ii _/R-'2. sZ. 3 y-Gitir.+?G? 2Z 070 P, - Drain Tiler / Roof ? Ice Pr Decking _ Insul ? Final Framing ? ? Fireplace ?R.I. ?Air Test ?Final Approved By: Planning Base Fee Surcharge Plan Review MCES SAC City SAC Water. Supply & Storage (WAC) S/W Permit /8, to #4.70 1 3,& GSA zs-o.ea ¢Yoo,s•+ s/ 40 /00.e..? S1W Surcharge Treatment Plant Park Dedication Trails Dedication Water Quality Copies Water Trunk Sewer Trunk . sra 8G / ??s'• 0-0 117 2,0 .0-0 MCES System City Water Booster Pump PRV Fire Sprinklered /3!Z Insulation Final/C.O. _ Final/No C.O. f Other E=c,,r+l P4Ai Pool Ftgs Air/Gas Tests - Final Siding _ Stucco - Stone Windows Building Inspector It®®l POI SArt. Ulan- (os) t &/2.00 F0J¢. tRQJf.R PAI Other 7, S-0A • 0-0 - LA-vv 044ArP Fm 4 orsf / 8 V1,3 .3 0 - 5 -R&er A4 V 656"avy- (A"ifies- Boat) R TyrwL 8 .!?O J4 5`1 .4(-(1 Metropolitan Council Environmental Services January 13, 2005 Dale Schoeppner Building Official City of Eagan 3830 Pilot Knob Road Eagan, MN 55122 Dear Mr. Schoeppner. D)GC??S??]C?? II JAN 14 2005 IU The Metropolitan Council Environmental Services Division has determined SAC for the River Ridge of Eagan to be located within the City of Eagan. This project should be charged 45 SAC Units, as determined below. SAC Units Charges: Condominiums 45 units @ 1 SAC/Unit 45.00 If you have any questions, call me at 651-602-1113. Sin rely, Jodi . Edwards Staff Specialist Municipal Services Section JLE: (15) 05011352 cc: S. Selby, MCES Carolyn Krech, Finance Department, Eagan Tom Hendel, Lyon Contracting & Development Inc. www.metrocouncil.org Metro Info Line 602-1898 230 East Fifth Street • St. Paul, Minnesota 55101-1626 • (651) 602-1005 • Fax 602-1138 • TTY 291-0904 An Equal Opportunity Employer 443 Lafayette Road North St. Paul, Minnesota 55155 www.doli.state.mn.us April 13, 2006 L I 651-284-5000 TTY: 651-297-4198 1-800-DIAL-DLI APPROVED FOR USE Premier Development Group 5605 W. 36th St., #204 St. Louis Park MN 55416 RE: Hydraulic Passenger - Elevator ID# Site: River Ridge of Eagan Condos 2103 Silver Bell Rd. Eagan 55121 Dear Sir/Madam: -12501 PT05-01 Minnesota Statutes Chapter 16B provides that the Department of Labor and Industry, Building Codes and Standards Unit, Elevator Safety Section, inspect and approve elevators and manlifts (endless belt lifts) before they can be legally used in Minnesota. An inspector from the Elevator Safety Section recently inspected your facility and determined it meets requirements of the Minnesota Elevator Safety Code. NOTE: Compliance with Minnesota Rules and the ANSI/ASME A17.1, Safety Code for Elevators and Escalators does not necessarily assure compliance with the Americans With Disabilities Act of 1990. Sincerely, BUILDING CODES AND STANDARDS Bill J. Reinke State Elevator Inspector blr/rsq (CE-2) c: Schoeppner, Dale R., BO, City of Eagan Schindler Elevator Corp. Lyon Contracting & Dev. ElFormCE2 This Information can be provided to you in alternative formats (Braille, large print or audio tape). An Equal Opportunity Employer City of Eap to TO: DALE SCHOEPPNER, CHIEF BUILDING OFFICIAL DALE WEGLEITNER, FIRE MARSHAL PAUL OLSON, SUPERINTENDENT OF PARKS MIKE RIDLEY, CITY PLANNER CAROL TUMINI, UTILITY BILLING CLERK TIM PARR, ENGINEERING TECHNICIAN LEON WEILAND, CONSTRUCTION INSPECTOR TOM COLBERT, PUBLIC WORKS DIRECTOR JOHN GORDER, DEVELOPMENT/DESIGN ENGINEER TOM STRUVE, SUPERINTENDENT OF STREETS & EQUIPMENT PAUL HEUER, SYSTEMS ANALYST ERIC MACBETH, WATER RESOURCE COORDINATOR MARK ANDERSON, ELECTRICAL INSPECTOR SCOTT PETERSON, PLUMBING INSPECTOR CRAIG NOVACZYK, SENIOR INSPECTOR OR MIKE LENCE, SENIOR INSPECTOR FROM: TERRY ZELENKA, COMBINATION INSPECTOR DATE: APRIL 17TH, 2006 SUBJECT: FINAL INSPECTION FOR 2103 SILVER BELL ROAD RIVER RIDGE CONDOS The Protective Inspections Division will be performing a final inspection at 2103 Silver Bell Road on April 17th, 2006. If you are requesting that the Certificate of Occupancy be held, please fill out the proper hold request form. Failure to return the hold request form will be considered your approval. The person, or department, requesting the hold is responsible for notifying and resolving any problems with the affected parties. CD/bldg insp/misc/final insp - comm bldgs TO: TOM STRUVE, SUPERINTENDENT OF STREETS & EQUIPMENT LEON WEILAND, CONSTRUCTION INSPECTOR DALE WEGLEITNER, FIRE MARSHAL ERIC MACBETH, WATER RESOURCES COORDINATOR GREGG HOVE, CITY FORESTER JOHN GORDER, ASSISTANT CITY ENGINEER KENT THERKELSEN, CHIEF OF POLICE MARK ANDERSON, ELECTRICAL INSPECTOR MIKE RIDLEY, CITY PLANNER PAUL HEUER, SYSTEMS ANALYST SCOTT PETERSON, BUILDING INSPECTOR TOM COLBERT, DIRECTOR OF PUBLIC WORKS TOM PEPPER, CHIEF FINANCIAL OFFICER LANE WEGENER, ENGINEERING TECHNICIAN FROM: CRAIG NOVACZYK, SENIOR INSPECTOR DATE: JANUARY 19, 2005 RE: PLAN REVIEW FOR RIVER RIDGE OF EAGAN (45 unit condominiums) 2103 SILVER BELL ROAD LOT 2 BLOCK 1 VOGEPOHL ADDITION The plans are in our plan review section for your review and comment. #10 Please return this form to my attention with your signed comments and the date of review within seven days. If you have any concerns with these plans, please so indicate on this form and notify and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please fill out the proper "hold" request form. Comments: Indicate any fees that are to be collected with the building permit: AMOUNT ? Yes ? No landscape security required ? Yes ? No water quality dedication ? Yes ? No park dedication ? Yes ? No trail dedication ? Yes ? No tree dedication ? Yes ? No PRV Required Signature ZONING? METER SIZE Date TO: TOM STRUVE, SUPERINTENDENT OF STREETS & EQUIPMENT LEON WEILAND, CONSTRUCTION INSPECTOR DALE WEGLEITNER, FIRE MARSHAL ERIC MACBETH, WATER RESOURCES COORDINATOR GREGG HOVE, CITY FORESTER JOHN GORDER, ASSISTANT CITY ENGINEER KENT THERKELSEN, CHIEF OF POLICE MARK ANDERSON, ELECTRICAL INSPECTOR MIKE RIDLEY, CITY PLANNER PAUL HEUER, SYSTEMS ANALYST SCOTT PETERSON, BUILDING INSPECTOR TOM COLBERT, DIRECTOR OF PUBLIC WORKS TOM PEPPER, CHIEF FINANCIAL OFFICER LANE WEGENER, ENGINEERING TECHNICIAN FROM: CRAIG NOVACZYK, SENIOR INSPECTOR DATE: JANUARY 19, 2005 RE: PLAN REVIEW FOR RIVER RIDGE OF EAGAN (45 unit condominiums) 2103 SILVER BELL ROAD LOT 2 BLOCK 1 VOGEPOHL ADDITION The plans are in our plan review section for your review and comment. Indicate any fees that are to be collected with the building permit: AMOUNT Yes ? No landscape security required Yes ? No water quality dedication Yes ? No park dedication Yes ? No trail dedication Yes ?6 No tree dedication ? Yes ? No PRV Required so- Signature #10 'TROD ZONING?feL? METER SIZE Date Please return this form to my attention with your signed comments and the date of review within seven days. If you have any concerns with these plans, please so indicate on this form and notify and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please fill out the proper "hold" request form. SITE'PLAN REVIEW CHECKLIST Date of Review: l 110ro Project Name: W- f D Request: 2 Use: Proposed Use:? ?t Plw?t / (yo ??ds ?(? Zoning: a- //T Comp. Plan Designation: ( (-L-> District Standards: Building Coverage:207 M4 Building height: Exterior Ma Roof Material: Setbacks: , Building: ?front? side 'a®' 'o side rear thoroughfare Green Space: X Parking: front r . side a side rear 6 thoroughfare "°? I C(S Parking and Off-street Loading: movc ,YV ea6CO Parking: ? `?? rn/? Stalls Required: Qb Stalls Proposed: 0 402 lam' V9' Stall Size: e (au m Drive Aisle Width: 74 Off-Street Loading: Location: Materials: Screening: 52 01 4` Trash Enclosure: , ., Attached: v , Materials: ?1 ? ? ?• 2 l 9a b?- 1 ?dd"J ? Landscaping and Screening: 5! . ., Quantity: (3 percent of building value) Size of Plantings: Coniferous - 6 feet Hedge - 3 feet Deciduous overstory - 2.5" Deciduous understory - 1.5" Required screening: parking, loading, service, and outdoor storage az_ eas :,,' ' l y? •, } ?,; S 75 percent in opacity, 3 feet in height 'adjacent to freeway Planting Islands: more than 50 stalls, 5 percent of parking lot area Irrigation system required f Tree preservation/mitigation plan Access: Streets/Driveways: Width and length Off-°scv Stack. g distance for drive-thru Pedestrian Circulation: A. Sidewalk: location (public vs. private) <+ width ` conformity with tiaii plan c- 'Signage: } Type Pylon Monument Wall Other Setback Area Illumination Lighting: 1 '1 Shielded Wall-mounted Parking lot v ,? Jam' :;11`.\ ?+'r ,J /• 1,, . t•:,. . .?'r: . PAT GEAGAN Mayor January 24, 2005 PEGGY CARLSON CYNDEE FIELDS Cole Group Architects 216 Park Ave S MIKE MAGUIRE St. Cloud MN 56301 MEG TILLEY Council Members RE: RivetRidge of Eagan Condos We have completed our review of the site plan and landscape documents THOMAS HEDGES submitted in pursuit of obtaining a building permit for the above referenced CiryAdministmtor project. It is our goal that this review will help you in complying with the applicable zoning codes and we are therefore, requesting that the following items be addressed: Municipal Center. 3830 Pilot Knob Road ? The lighting plan indicates there are no lights on the back side of the Eagan, MN 55122-1897 property near the gazebo if that is not true then a revised plan should be submitted. Also, the height of the light poles is omitted from the Phone: 651.675.5000 lighting plan; please indicate the height of the lights. Fax: 651.675.5012 TDD: 651.454.8535 ? As proposed, the building occupies more than 20% of the lot area, the zoning code allows for a building coverage maximum of 20 percent. Maintenance Facility: The building coverage as proposed is 21 percent and that does not 3501 Coachman Point include the gazebo (area not indicated on plans) please address this Eagan, MN 55122 issue. Building coverage includes anything that has a roof so the gazebo would be figured into this amount. I am not able to release the Phone: 651.675.5300 building permit based on the building coverage discrepancy. If you Fax: 651.675.5360 want to exceed this requirement you must apply for a Variance. TDD: 651.454.8535 If you have any questions please call me at 651-675-5696. www.ciryofeagan.ccm Sincerely, Sheila Cartneyl? THE LONE OAKTREE Planner The symbol of strength C: Lyon Construction & Development and growth in our community ,j LLN-7 ?Ikd -Z)M TO: TOM STRUVE, SUPERINTENDENT OF STREETS & EQUIPMENT #10 LEON WEILAND, CONSTRUCTION INSPECTOR DALE WEGLEITNER, FIRE MARSHAL ERIC MACBETH, WATER RESOURCES COORDINATOR GREGG HOVE, CITY FORESTER JOHN GORDER, ASSISTANT CITY ENGINEER KENT THERKELSEN, CHIEF OF POLICE MARK ANDERSON, ELECTRICAL INSPECTOR MIKE RIDLEY, CITY PLANNER •- ,?? ?U?l? PAUL HEUER, SYSTEMS ANALYST SCOTT PETERSON, BUILDING INSPECTOR o ©? ?/ TOM COLBERT, DIRECTOR OF PUBLIC WORKS Ovl V ? ' TOM PEPPER, CHIEF FINANCIAL OFFICER LANE WEGENER, ENGINEERING TECHNICIAN .?.-? ?XRn*'T• .CRAIG NOVACZYK, SENIOR INSPECTOR DATE: JANUARY 19, 2005 ?i?Gd?i? L-E+ -VA-c- L) Al RE: PLAN REVIEW FOR RIVER RIDGE OF EAGAN (45 unit condominiums) 2103 SILVER BELL ROAD LOT 2 BLOCK 1 VOGEPO?HLADDI/TION / ?-- ??,d? 0"> a 7C ?7/l 'Vol ?TQSS;X' - he plans are (n our plan review section for your review and comment. Please return this form to my attention with your signed comments and the date of review within seven days. If you have any concerns with these plans, please so indicate on this form and notify and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please fill out the proper "hold" request form. Comments: /J 11 Q. ?'0. ? .? J f a7' 7hL t416/,. X m--? w` t!'/rrs7 /!t'`1? e ??"'?` Indicate any fees that are to be collected with the building permit* MOUNT i.!? iiGrr c,c, ? Yes ? No landscape security required ? Yes ? No water quality dedication ? Yes ? No r park dedication ? Yes ? \No trail dedication ? Yes ? `o tree dedication ? Yes ?, 13 PRV Required Signature ZONING? yy METER SIZE ( V? 1 ( --2,t05- Date TO: TOM STRUVE, SUPERINTENDENT OF STREETS & EQUIPMENT LEON WEILAND, CONSTRUCTION INSPECTOR DALE WEGLEITNER, FIRE MARSHAL ERIC MACBETH, WATER RESOURCES COORDINATOR GREGG HOVE, CITY FORESTER ?? JOHN GORDER, ASSISTANT CITY ENGINEER KENT THERKELSEN, CHIEF OF POLICE MARK ANDERSON, ELECTRICAL INSPECTOR MIKE RIDLEY, CITY PLANNER PAUL HEUER, SYSTEMS ANALYST SCOTT PETERSON, BUILDING INSPECTOR TOM COLBERT, DIRECTOR OF PUBLIC WORKS TOM PEPPER, CHIEF FINANCIAL OFFICER LANE WEGENER, ENGINEERING TECHNICIAN FROM: CRAIG NOVACZYK, SENIOR INSPECTOR DATE: JANUARY 19, 2005 RE: PLAN REVIEW FOR RIVER RIDGE OF EAGAN (45 unit condominiums) 2103 SILVER BELL ROAD LOT 2 BLOCK 1 VOGEPOHL ADDITION The plans are in our plan review section for your review and comment. Please return this form to my attention with your signed comments and the date of review within seven days. If you have any concerns with these plans, please so indicate on this form and notify and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please fill out the proper "hold" request form. Comments: ?Age4^ 11 /??i ? / ,s ?? ?? ?? tvnt(Q r G_}y_ _ F.-D;. No. 05-- Of--o ay d fro y:pwz -7ta 77;4E-27i #10 yw't" 644C& Indicate any fees that are to be collected with the building permit: AMOUNT ? Yes ? No landscape security required ? Yes ? No water quality dedication ? Yes ? No park dedication ? Yes ? No trail dedication ZONING? METER SIZE ? Yes ? No tree dedication ? Yes Q-No PRV Required Si nature -3-/7-05- Date TO: TOM STRUVE, SUPERINTENDENT OF STREETS & EQUIPMENT LEON WEILAND, CONSTRUCTION INSPECTOR DALE WEGLEITNER, FIRE MARSHAL ERIC MACBETH, WATER RESOURCES COORDINATOR GREGG HOVE, CITY FORESTER JOHN GORDER, ASSISTANT CITY ENGINEER KENT THERKELSEN, CHIEF OF POLICE MARK ANDERSON, ELECTRICAL INSPECTOR MIKE RIDLEY, CITY PLANNER PAUL HEUER, SYSTEMS ANALYST SCOTT PETERSON, BUILDING INSPECTOR TOM COLBERT, DIRECTOR OF PUBLIC WORKS TOM PEPPER, CHIEF FINANCIAL OFFICER LANE WEGENER, ENGINEERING TECHNICIAN FROM: CRAIG NOVACZYK, SENIOR INSPECTOR DATE: JANUARY 19, 2005 RE: PLAN REVIEW FOR RIVER RIDGE OF EAGAN (45 unit condominiums) 2103 SILVER BELL ROAD LOT 2 BLOCK 1 VOGEPOHL ADDITION The plans are in our plan review section for your review and comment. #10 Please return this form to my attention with your signed comments and the date of review within seven days. If you have any concerns with these plans, please so indicate on this form and notify and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please fill out the proper "hold" request form. Comments: a.644? 4 Indicate any fees that are to be collected with the building permit: AMOUNT ? Yes ? No landscape security required ZONING? ? Yes ? No water quality dedication METER SIZE ? Yes ? No park dedication ? Yes ? No trail dedication ? Yes ? No tree dedication ? Yes ? No PRV Required Signature Date TO: TOM STRUVE, SUPERINTENDENT OF STREETS & EQUIPMENT LEON WEILAND, CONSTRUCTION INSPECTOR DALE WEGLEITNER, FIRE MARSHAL ERIC MACBETH, WATER RESOURCES COORDINATOR GREGG HOVE, CITY FORESTER JOHN GORDER, ASSISTANT CITY ENGINEER KENT THERKELSEN, CHIEF OF POLICE MARK ANDERSON, ELECTRICAL INSPECTOR MIKE RIDLEY, CITY PLANNER PAUL HEUER, SYSTEMS ANALYST SCOTT PETERSON, BUILDING INSPECTOR TOM COLBERT, DIRECTOR OF PUBLIC WORKS TOM PEPPER, CHIEF FINANCIAL OFFICER LANE WEGENER, ENGINEERING TECHNICIAN FROM: CRAIG NOVACZYK, SENIOR INSPECTOR DATE: JANUARY 19, 2005 RE: PLAN REVIEW FOR RIVER RIDGE OF EAGAN (45 unit condominiums) 2103 SILVER BELL ROAD LOT 2 BLOCK 1 VOGEPOHL ADDITION The plans are in our plan review section for your review and comment. #10 Please return this form to my attention with your signed comments and the date of review within seven days. If you have any concerns with these plans, please so indicate on this form and notify and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please fill out the proper "hold" request form. Comments: Indicate any fees that are to be collected with the building permit: AMOUNT ? Yes ? No landscape security required ? Yes ? No water quality dedication ? Yes ? No park dedication ? Yes ? No trail dedication ? Yes C!- No tree dedication ? Yes ? No RV Required Signature ZONING? METER SIZE _(-« -off Date TO: TOM STRUVE, SUPERINTENDENT OF STREETS & EQUIPMENT LEON WEILAND, CONSTRUCTION INSPECTOR DALE WEGLEITNER, FIRE MARSHAL ERIC MACBETH, WATER RESOURCES COORDINATOR GREGG HOVE, CITY FORESTER JOHN GORDER, ASSISTANT CITY ENGINEER KENT THERKELSEN, CHIEF OF POLICE MARK ANDERSON, ELECTRICAL INSPECTOR MIKE RIDLEY, CITY PLANNER PAUL HEUER, SYSTEMS ANALYST SCOTT PETERSON, BUILDING INSPECTOR TOM COLBERT, DIRECTOR OF PUBLIC WORKS TOM PEPPER, CHIEF FINANCIAL OFFICER LANE WEGENER. ENGINEERING TECHNICIAN CRAIG NOVACZYK, SENIOR DATE: RE: PLAN REVIEW FOR RIVER RIDGE OF EAGAN (45 unit condominiums) 2103 SILVER BELL ROAD LOT 2 BLOCK 1 VOGEPOHL ADDITION The plans are in our plan review section for your review and comment. #10 Please return this form to my attention with your signed comments and the date of review within seven days. If you have any concerns with these plans, please so indicate on this form and notify and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please fill out the proper "hold" request form. Comments: ae(4..,4? 11-A r?-?-- Indicate any fees that are to be collected with the building permit: AMOUNT ? Yes ? No landscape security required ZONING? ? Yes 0- No water quality dedication METER SIZE ? Yes ? No park dedication ? Yes ? No trail dedication ? Yes ? No tree dedication ? ? No PRV Required ' 1G119 Signatur e Date TO: TOM STRUVE, SUPERINTENDENT OF STREETS & EQUIPMENT LEON WEILAND, CONSTRUCTION INSPECTOR DALE WEGLEITNER, FIRE MARSHAL ERIC MACBETH, WATER RESOURCES COORDINATOR GREGG HOVE, CITY FORESTER JOHN GORDER, ASSISTANT CITY ENGINEER KENT THERKELSEN, CHIEF OF POLICE 'MARK ANDERSON, ELECTRICAL INSPECTOR MIKE RIDLEY, CITY PLANNER PAUL HEUER, SYSTEMS ANALYST SCOTT PETERSON, BUILDING INSPECTOR TOM COLBERT, DIRECTOR OF PUBLIC WORKS TOM PEPPER, CHIEF FINANCIAL OFFICER LANE WEGENER, ENGINEERING TECHNICIAN FROM: CRAIG NOVACZYK, SENIOR INSPECTOR DATE: JANUARY 19, 2005 RE: PLAN REVIEW FOR RIVER RIDGE OF EAGAN (45 unit condominiums) 2103 SILVER BELL ROAD LOT 2 BLOCK 1 VOGEPOHL ADDITION The plans are in our plan review section for your review and comment. #10 Please return this form to my attention with your signed comments and the date of review within seven days. If you have any concerns with these plans, please so indicate on this form and notify and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please fill out the proper "hold" request form. Comments: J Indicate any fees that are to be collected with the building permit: AMOUNT ? Yes ? No landscape security required ? Yes ? No water quality dedication ? Yes ? No park dedication ? Yes ? No trail dedication ? Yes ? No tree dedication ? Yes ? No PRV Required Signature ZONING? METER SIZE i- )- ?z -o Date Date 12/30/2005 rJ CO/PF Page Permit Inspections Entry Comments Identification: EA068291 - 2103 Silver Bell Rd Comments: 12/07/05 Patial Framing CN & ML : (Phase 1, 3rd fl) - Correct all lateral bracing regmts for attic trusses (see truss specs) - - Complete attic draft stopping above noth stairwell - - Extend all attic draft stopping to bottom of roof decking - - Extend all attic draft stopping thru exterior soffits - - Provide detail for preserving 2 hour fire barrier assembly at in wall washer drain at laundry closet - - Extend PVC clean out in laundry closet thm 2 hour fire barrier assembly and fire stop approperately ** Framing inspection stopped because of time ** 12/08/05 Conf d Partial Framing CN & ML : (Phase 1, 3rd fl) - Remove exterior sheathing to insulate all angled comers - - Complete north end exit enclosure ceiling framing - Fix framing members in stair enclosure that were damaged by ledger lag bolts from opposite side of two hr stair enclosure (north end) - - Seal attic draft stop around 1 112 " vent pipe above laundry closet in unit 316 - - Verify that washer hook up boxes are rated for installation in 1 hr unit seperation partitions - - Provide a rated assembly detail for a Ihr seperation at back to back shower installation - - Add windwash at exterior wall line at deck locations - - Provide bearing for the R80B roof truss in unit 315 (bathroom) - - Fix framing at southeast comer of north stair enclosure to ensure two hour rating when rocked (wall common to unit 314) - - Add backing stud to bathroom closet - corridor wall in rm 314 - - Install fire retardent treated plywood to roof trusses 4 it on either side of two hr Fire Wall - No openings are allowed within 4 ft of two hr Fire Wall - Remove nailer that intempts continuous double layer of rock on two hr Fire Wall - Provide fire stopping details for pvc plumbing penetrations thm two hr Fire Wall - - Frame attic access at location specified on reviewed plans - - Provide attic access to false dormers - - Complete attic draft stopping above wall common to the storage room and unit 310 - 12/16/05 Framing partial Cn : (Phase 1, 3rd fl) - Add gussets to truss peaks above catwalk - Compleate catwalk - Seal draftstopping at roof deck adjacent to stair enclosure *** Ok to insulate - see framing corrections at insul insp*** 12/19/05 Framing partial Cn : (Phase 1, 2nd fl) - Check framing details on framing plan for floor truss strongback requirements - - Fire caulk all installed sprinkler piping - - Complete sprinkler pipe installation - - Add nail plates where required at sprinkler pipe installation - - Remove exterior sheathing and insulate all angled comers - - Fire caulk water line penetrations thin 2 hr stair enclosure wall above the laundry closet in rirr 216 - - Fire stop 4" hole thm top plates at unit 216 bathroom - Date 12/30/2005 Page Permit Inspections Entry Comments Identification: EA068291 - 2103 Silver Bell Rd Comments: - Provide Ihre protection between back to back showers of units 215 & 213 - - Seal all holes and penetrations thm draft stopping between units - - Fire stop gaps in dead space lids - - Seal exterior sheathing above Magic Pac openings - - Fix corridor wall where floor trusses overhang into corridor, near 2hr Fire Wall (maintain lhr protection) - - Provide 1 hr protection for unit partition between units 212 & 214 at shower - - Remove foam and add the appropriate fire stopping (collar) at 3" PVC waste penetration thm 2 hr stair enclosure wall - 12/20/05 Insulation CN : (Phase 1, 3rd fl) - Insulation and vapor barrier ok except that the vapor barrier has to be remove where the truss hangers were not installed at the girder intersection - - Fire stop 3" hole thm top plates in unit 317 master bath - - Add a wall stud (16" oc) in master bath wall in unit 317 - - Add backer stud at dead space adjacent to main shower in unit 317 - - Install fire stop in ceiling of dead space in unit 313 - * * * All framing corrections shall be completed prior to any sheetrock going on the walls or ceiling*** 12/29/05 Partial Framing (Phase 1, 1st fl) TM: - Firecaulk penatrations at 2 hr.walls -stairway & hallway - repair all electrical boxes over cut - firecaulk all exterior to interior penatrations (typical) - erify length of dryer runs - partition wall between #1174115, solid blocking at wall ceiling and fill space with insulation - add hangers on vent pipes for dryer 4117 - fire caulk sprinkler penatrations typical all units - between units #115 q fill space with insulation - #111 firestop dead space at shower & missing sprinkler head and seal draft stop, remove 2 hr. assembly and attach with approved nail (was stapled), add nailer for floor above at 2 hr., no support at edge of floor - #112 add nailer at 2 hr. for floor above, no support - tempered glazing reguired at all hazardous locations replace 1 stud at staggered seperation wall (split), sheetrock not nailed at the tub area of #114 but on the #112 side - #114 at elec. box fill all practice holes - firecaulk all floor-cieling penatrations in parking garage Date 04/18/2006 Page Permit Inspections Entry Comments Identification: EA068291 - 2103 Silver Bell Rd Comments: 12/30/05 CN : * * * Note : The correction remarks dated from 12/7/05 do u 12/29/05 have been copied to Mike & Tom via E- mail, and also into the File # 10 in the plan room. 12/30/05 Partial insulation (Phase 1, 2nd fl) CN: - Ceiling insulation ok except for the area adjacent to the 2hr Fire Wall. The roof decking is being removed and replaced with fire retardent treated plywood. Water from roof snow melt is a problem. Check for water damage on all floors at reinspection. Ok 1/6/05 CN 115105 Partial framing (Phase 1, 1 st fl) CN: - Stuff stud bays full of batt insulation above ceiling line at partition walls between units 117 & 115 and 115 & 113. Add backing nailers on both sides of partitions a ceiling level - DONE CN - Add 2nd layer of fire rock to 2 hr firewall in end units - DONE CN - Add backing nailers to 2hr firewall at floor and ceiling levels in end units - DONE CN - Check for tempered glazing where required - 1st fl penetrations can be seen from garage. Firestopping shall be inspected prior to final ** Check remaing framing corrections at insulation inspection** 1/09/06 Insulation (Phase l,1 st fl) CN - Not ready - call for reinspection - Ok to rock units 117 &115 1/09/06 Framing (Phase 1, 1st & 3rd fl) - Install a fire collar per fire stopping submittals at 3" PVC penetration tbm 2 hr Firewall at 3rd floor end unit - DONE CN - Fire stop all other penetrations thin 2 hr Firewall (per specs) on the 1st It (unit 111) prior to rocking - DONE CN - Add backing for ceiling nailer at Firewall, above shower in unit 311 - DONE CN - Install sound channel to ceiling framing members & insulate ceiling on first floor DONE, ML - Verify IIC rating for fl/clg is being met using blown in insulation, get it inspected prior to rocking. *NOTE: According to the code review response letter from Cole Architects, the floor/ceiling assembly UL L528 as tested by Intest Laboratories Inc., obtains a STC rating of 58. The rating that the code requires is the Impact Insulation Class rating (IIC) . Verify That the assembly meets a 50 IIC rating - DONE CN (See plan rm file) 2/2/06 Partial Framing CN : (Phase 2) - 1st floor sound insulation in corridor ok - Trash chute 2 hr assembly ok - Stair enclosure 2 hr ceiling framing assembly ok - Center stairwell framing revisions done as engineered Framing 2nd floor Phase 11 2/8/06 ML: - Complete 2 hr separation above corridor-- gaps both sides. - Complete details at header on trash chute in room 208.- DONE CN - Repair studs under angle iron at mechical openings in several rooms. Date 04/18/2006 .t Page Permit Inspections Entry Comments Identification: EA068291 - 2103 Silver Bell Rd Comments: DONE CN - Complete draft stopping at outside wall room 209. - DONE CN - Block hole in plate at kitchen wall in room 207. - DONE CN - Fill holes in draft stop at corridor mechanical room: DONE CN - Add blocking at right side of window in rim area room 205.- DONE CN - Repair sprinkler pipe in corridor mech. room.- DONE CN - Finish detail at back of laundry standpipe visible from corridor. 2/9/06 Framing CN & ML : (Phase 2, 1st fl) - Complete the 2 hr Firewall assembly at 1st and 2nd levels DONE CN - Install exterior doors in all units without - Seal all penetrations thm draftstopping between units (concealed) DONE CN - Fire caulk gasline penetrations in community rm. DONE CN - Fireblock at ceiling level in water heater vent chase (rm 107) DONE CN - Room 107 shall not be insulated or rocked prior to inspectors approval (verify firecaulking submittals for all floor penetrations in the unit) DONE CN - Complete 1 hr wall assembly at laundry standpipes inline with corridors - Fireblock all unit partitions above the ceiling level (stuff area with fiberglass batts) DONE, ML - Add nailing plates at plmg penetrations in unit 103's 3/4 bathroom DONECN - Repair 2hr Firebarrier at phase 2 rated stair enclosure, 1 st & 2nd fls (call for inspection of each layer of rock) DONE ON 2ND FL ONLY CN - Add sheetrock to partition above ceiling line in unit 106 DONE CN - Complete 2hr header detail at trash chute room DONE CN - Reinspect fire caulking at locations marked with orange paint DONE CN 2/17/06 Partial framing Phase 2 CN : - See unfinished corrections from 2/09/06 - Complete rated barrier in concealed rim areas at 2nd & 3rd floor landings in 2hr stair enclsure DONE CN . - Add second layer of rock and fire caulk all penetrations thin 2hr stair enclosure walls on the unit side on 1 st floor - Get ceiling isulation inspected Smoke detectors for apartments on 1st 2nd and 3rd floors phase one all comp] ete and passed emergency lights also pass in phase one DW city of eagan PAC GEAGAN Mayor PEGGY CARLSON CYNDEE FIELDS MIKE MAGUIRE MEG TILLEY Council Members THOMAS HEDGES Ciry Administrator Municipal Center: 3830 Filar Knob Road Eagan, MN 55122-1897 Phone: 651.675.5000 Fax: 651.675.5012 1 DD: 651.454.8535 Maintenance Facility: 3501 Coachman Poinr Eagan, MN 55122 Phone: 651.675.5300 Fax: 651.675.5360 TDD: 651.454.8535 www.cityofeagan.com 'rHE LONE 0AKTRE1 The symbol of strength and growth in out community January 19, 2005 TOM HENDEL LYON CONTRACTING & DEVELOPMENT 600 25TH AVE S #111 ST CLOUD MN 56301 RE: RIVER RIDGE OF EAGAN 2103 SILVER BELL ROAD Dear Mr. Hendel: We have started our review of the construction documents submitted in pursuit of obtaining a building permit for the above-referenced project. This review is not intended to be an exhaustive and comprehensive report. Unless otherwise noted, all references are to the 2000 I.B.C. It is our goal that this review will help you in complying with the applicable codes and we are, therefore, requesting that the following items be addressed: 1 Please provide a soils report. 2a/ Complete and return the enclosed Special Structural Testing and Inspection Program Summary Schedule. 3 Complete and return the enclosed Exterior Lighting Power Allowance form. Provide fire stopping submittals. Provide CAD file for Emergency Response Site Plan. If you have any questions regarding the above, please contact me at 651-675-5683. Sincerely, y, ///?'?/ C? a ?'e?4? J. Craig Novaczyk Senior Inspector JCN/js Encl. cc: Norman E Cole, Cole Group Architects, 216 Park Ave S., St. Cloud MN 56301 Dale Schoeppner, Chiel Building Official .?, _Jr February 1, 2005 revised-see modifications in red Pat Geagan January 27, 2004 MAYOR Peggy Carlson Cyndee Fields TOM HENDEL Mike Maguire LYON CONTRACTING & DEVELOPMENT Meg Tilley 600 25TH AVE S #111 ST CLOUD MN 56301 COUNCIL MEMBERS RE: RIVER RIDGE OF B SV-ILLE EAGAN Thomas Hedges 2103 SILVER BELL ROAD CITY AommisTRAToR Dear Mr. Hendel: Further review of construction documents submitted in pursuit of obtaining a building permit for the above-referenced project requires that the following items be addressed. Unless otherwise noted, all references are to the 2000 I.B.C. MUNICIPAL CENTER 3830 Pilot Knob Road 1 Add a list of applicable codes to Code Summary. Designate recycling space complying with State Statute 1613.6, Subdivision 3(a). Eagan, MN 55122-1810 3/ All guard balusters spacing shall be less than 4". Sec. 1003.2.12.2 651.67 phone 4. Verify that all joist hangers, connectors, and fasteners are compatible with the 651.667575.5 .5012 fax pressure treated lumber being used. 651.454.8535 TDD All energy concerns (interior air barrier penetrations, etc.) shall comply with Chapter 7674 of the Minnesota State Energy Code. ?/6. A 60" turning radius is required within the U shaped kitchen in the main level MAINTENANCE FACILITY / party room. MSBC 1341.1640, Item D 3501 Coachman Point Accessible parking spaces shall be dispersed among the various accessible Eagan, MN 55122 / entrances. MSBC 1341.0403, Item E, Sub item (1) 651.675.5300 phone `?• Verify that accessible parking spaces and access isles are level with surface slopes 651.675.5360 tax / not exceeding 1:50 (two percent) in all directions. MSBC 1341.0428, Subpart 3 ?9 Accessible parking signage shall comply with Minnesota Statute 169.346, 651.454.8535 TDD Subdivision 2, Paragraph (a). Provide signage which states, Violation is subject // to $200.00 fine". i il i ll 1 4 f or to et rooms n a - 0. Prov de details for adaptable clearances and backing units. www.cityofeagan.com / MSBC 1341.1610 I.If 1. Shaft enclosures connecting four stories shall be constructed with 2-hour fire // barriers. Sections 707.4 and 1005.3.2 i h - t 12. An elevator lobby or smoke and draft control assembly complying w Sections 707.7 and 714.2.5.2 is required on the third floor. THE LONE OAK TREE w13. Refuse chute enclosure shall be constructed with 2-hour fire barriers. The chute The symbol of access openings shall be rated 90 minutes. Sections 707.13.1, 707.4, and Table strength and growth 714.2 in our community. 4. Refuse access rooms shall be constructed with 1-hour construction. Opening into refuse access rooms shall be rated 3/4 hour. Sec. 707.13.3 ";, -. AN000, X15. Provide details of firewall termination at roof deck. ?6. Provide framing detail for floor and roof truss support at perpendicular // intersection with firewall. Reference Section 705.2 17. Storage area lockers shall be constructed of fire retardant-treated wood. ?18. Provide specification for hazardous location and rated glazing. X19. Designate which finished floor system is being used in relationship to Detail 1/A5.1 (US Design No. L534). 90 Provide STC rating for floor/ceiling assemblies between units. Provide STC assemblies for sound attenuation per M.A.C. standards. ? 2. Provide details for a fire apparatus access road. Sec. 503, 2000 IFC ?23. We are requesting that the post indicator valve be removed. L-24. Provide interior finish requirements for ceiling and wall finishes and floor coverings. Chapter 8 25. Provide plumbing and mechanical plans for review. These plans need to be reviewed prior to issuing a building permit. Pull side door clearances for the accessible toilet rooms in the corridor near the party room shall comply with Chapter 1341.0442, Subpart 6, MSBC (Fig. 25, [a]). ?7. A 90-minute rated door assembly is required through the 2-hour rated fire wall at the attic level. k,215? Posting of occupant loads for assembly areasa shall comply with Sec. 1003.2.2.5 If you have any questions regarding the above requirements, please call me at 651-675- 5683. Sincerely, J. Craig Novaczyk Senior Building Inspector JCN/j s cc: Norman Cole, Cole Group Architects, 216 Park Ave South, St. Cloud MN 56301 T7 7 I- III February 7, 2005 J. Craig Novaczyk; Senior Building Inspector City of Eagan 3830 Pilot Knob Road Eagan, MN 55122-1897 RE: River Ridge of Eagan condominiums Per your code review letter dated January 27" (and February 1 n), the following items respond to your the above roject: concerns re ardin g g p ?1. Applicable building codes have been listed. (See revised sheet TI) ?2. Recycling space has been designated in the refuse room. (See revised sheet A2.1) V/ 3 This creates a spacing where due to the thickness of the c All balusters will be s aced a max of 4" o . . p . . balusters a 4" sphere cannot pass. This will be typical for all guard railings. (See sheet A5.1) t t d l b d ibl i h b 1 er use any pressure rea e um . e compat e w t 4. All joist hangers, connectors, and fasteners will v See spec. item 63 F N ?L `t e- S ? ?5. All energy concerns will comply with the Minnesota State Energy Code. / 6. A 60" turning radius has been added to the community room kitchen. (See revised sheet A3.1) v dd d b h h b v een a e y t e nort /. Due to the addition of 7 more parking stalls an additional accessible stall has entrydoor. (See revised sheetALI) OV8 Ac??,rg?? SSALC ? [ e?i?? Zo,v6 w r c !3 ? R-r-4 d t Al PA-AZ4 1L CwA-a n-& ?c 6?frra 2 t N & f? _ - _ 8. All accessible parking spaces and access aisles will not exceed a 2% slope in all directions. See notes t Al h I on s . ee (See revised sheet Al 1) d9 Accessible arkin signa e will comply . p g . . g 00. All units will be provided with blocking for future grab bars and clearances as required per code (See 2 A3 ) . revised unit plans on sheets A4.1 - A4.5 & additional notes on / n t det il i d ll t fi i S 4 h ill b h 2 h b ft i V o a se wa ypes, es, s, our arr ers. ( ee rev s w e constructed w re 11. All story s a t and sections throughout Architectural plans) V/12. A 90 min. rated, labeled door will be added to the elevator shaft opening in conjunction with the 18" draft curtain already in place on 1', 2Rd, & 3`d floors. (See revised sheets A3.1 & A3.2) ?13. Refuse chute will be constructed with 2 hour fire barriers and all access openings will be 90 min. / rated. (See revised section, door schedule and plans) ? 14. The refuse access room will be constructed with a min. 1 hour construction and openings will have a / min. 45 min. rating. ? 15. See detail 13-A5.2. rr SF? '??IS t bN,S V'16. ? See new detail 16-A5.3. -Al 7. Storage lockers will be constructed of steel and wire mesh by "Folding Guard Corp. " . !! /18. See revised specification. (Sheets AO & AO. 1) ? 19. See revised section I-A5.1. V?20. The floor/ceiling assembly between units will have a min. STC rating of 58 (see attachment "C" letter to the Gyp-Crete Corp.). In addition the cavities will be filled with insulation adding to the STC. ?21. A review for compliance with aircraft noise has been completed. (See attachment "D") 22. A fire access apparatus road will be maintained from the rear of the parking lot on the adjacent property where there is an existing fire hydrant. (See revised sheet Al. 1) X23. The post indicator valve will be removed. (See civil plans) ?24. Interior finishes will be selected by an Interior Designer for all public spaces and by the unit owners for each individual unit They will be submitted under separate cover and will comply with chapter S. 025. Plumbing and Mechanical plans will be submitted under separate cover. 0?26. Door clearances will be provided. (See revised sheet A3.1) 027 . In lieu of a 90 min. rated attic door through the 2 hour wall, we will be providing a 60 min. rated attic access through the ceiling on each side of the 2 hour wall. "2 Occupant loads in assembly areas will be posted per code. COLE GROUP A R CM I T E CTS Per your pre-code review letter dated January 19th, the following items respond to your concerns regarding the above project: .. A soils report will be submitted under separate cover. 2. The completed S.S.T.&I.P.S.S. is attached. (See attachment "A") ?3. The E.L.P.A. form will be completed and returned under separate cover by he Design Build Electrical Engineer/Contractor. 4. General fire stopping specs. are attached. More detailed cut sheets will be provided by subcontractor supplying and installing products. (See attachment "B") `15. An E.R.S.P. was emailed on 25 JAN 05. If you need another emailed or a paper copy please notify. Per the site plan and landscape review letter dated January 24's by Sheila Cartney, the following items respond to concerns regarding the above project: V/1 . Any lighting for the outdoor recreational area behind the building is to be done in the future at this point. When that area is designed, a lighting plan will be submitted. The height of the light poles will be 25'-0" on top of a 3'-0" concrete base (28'-0" total) See the Z factor on the Luminaire Location Summary schedule on the lighting plan. ?2. After reviewing the building calculations for compliance with lot coverage, the depth of three of the entry canopies have been reduced to 30" maximum. Also the balcony roofs have been pulled back. This reduction in covered roof area brings the old lot coverage area down to 22,411 s.f. or 19.8% coverage which is below the required maximum of 20%. Also please note the future gazebo has been eliminated. If you have any questions or require further information, please let me know. Sincerely, 9 Architect cc: Tom Hendel, Lyon Contracting Roger Fink, Premier Development S:\codeRevim1trs\04110Codel.lrmps COLE GROUP ARCHITECTS V LABORATORIES, INC. f' April 20, 1983 Gyp-Crete Corporation 900 Hamel Road Hamel, MN. This is in response to your request for an acoustical per- formance opinion on the following floor/ceiling construction: - 1" Gyp-Crete - 3/4" Thick T&G Plywood Subfloor - 12" Deep 2" x 4" Open Parallel Chord Trusses - 24" o.c. - RC-1 Resilient Channel - 5/8" Type X Gypsum Board We field-tested a construction of this type with the only exception being 3/4" Gyp-Crete was used instead of 1". The F-STC obtained on this test was a 58. An additional 1/4" of Gyp-Crete would result in a slight improve- rr ment in the F-STC and can be reliably predicted by what is known as the "Mass Law". The "Mass Law" formula is as follows: TL = 20 log w + 20 log f - 33 where - TL = Transmission Loss (dB) w = Surface Wt. (Pounds Per Sq. :t.) f = Frequency (Hertz) The approximate weight of the proposed system would be 17.0 pounds per square foot. The weight of the actual system in which the 59 STC was obtained was 14.8 psf. Taking the difference of 2.2 pounds and plugging it into the formula results in an approximate 2 dB increase in performance. There are some other considerations, but suffice it to say an F-STC of approximately 60 could be expected. V truly urs, R. O. Thomalla Manager f 2820 ANTHONY LANE SOUTH • MINNEAPOLIS. MINNESOTA 55418 • 612.781 -2603 • TWX (910) 563-3555 • CABLE: INTEST A wholly owned subsidiary of Conwed Corporation. .444-achm6n+ "C"r r. YYON March 25, 2005 City of Eagan Mike Lence, Senior Inspector 3830 Pilot Knob Road Eagan, MN 55122-1897 YYL ?Y`I LJ?YE.??ILL?J??? , Jl ??`1 . 600 25`h Avenue South Ste 111 St. Cloud, MN 56301 PO Box 7661 St. Cloud, MN 56302 (320)252-2267 Phone (320)252-3603 Fax RE: River Ridge Condos of Eagan Dear Mr. Lence, I1 MAR 2 8 2005 II UU It was brought to our attention by our excavating contractor, Veit & Company that St. Paul Utilities was listed as the plumbing contractor for this project. Please change the plumbing contractor to: JBerd Mechanical Contractors, Inc 3308 Southway Drive St. Cloud, MN 56301 320-646-0847 phone 320-656-0312 fax Mike Blaskowski Please accept our apologies for any confusion this has caused. Please call me with any questions. Sincerely, ,CPA Tom Hendel Lyon Contracting and Development 612-860-5341 02/16/2005 03:45 9526532125 PREMIER REST MGMNT PAGE 02 yck z0'3,?y- d 11 1im ** bWlb/;ttlHb 23:I77 9526582125 'Y` UAKWAIWId PREMIER REST MGMNT PAGE 22 mdlT!tq g am Aor=Mmdso ftmRI[ am aa1 Pwaww AW&V24m,.Yi •rmaQnaP-024 - I-x ?eJu eau . s p+lt 9ltlppddpt nnunQOaYd IRp+imdA 9wqv ,E qP `Rgbp>iYy y r {yaf ?p,71 RII PR{1w1501 jI ?Q mm ou r a0°13 • ?C .S O ti1.2. cra ma•I mm?utwjp m pow4mo um j je ywx (9? "Jy4 h00etsd'9?07rdLgy?eq idSl(?ryppL'AIly?J1y W CStS} 1? -'?? 1! XId$] l4!u?pv;^+4iac+a? (?) '???IigmgmqAOe3ue?'I+OyPbea'LlsvW?7B1s1dty0pdi+ea9paPn (? 'a??antaA°lp?paleolptatugs+la?pgdo7glG8 tt7 t+!?O?tA?r?AA4A4!???4sa'rDO?d (t} Z d ?BBtt L ' d 08o2Fi t90 t6T-ON 04 W-Gen_azs FES 16 '95 11.25 M,la C( SETZESSES66 lu 6Lt;T6S9TS9 srsssra7su? AJ440 d/,g-aq so Le 9oi SZT 59Q566 a ( OUR Leo so at Rai W '8 N 91P:iT SE102i., 9526532125 PAGE•02 ?w 90:E3 sous 91 g3-1 •'• 'otv m?md amp" Amon" =i90ld w31sa ar Me 2epwt Pig iedoug4 O 1 1/2" FOAM 2x6 TREATED WOOD DECKING E.I.F.S WATERPROOFING GYP. SHEATHING CAULKING FLASHING W/PVC SIDE TO LEDGER 2X8 TREATED JOIST METAL VENTED SOFFIT PANEL - FATO DETA« SCALE: 1 1/2" = I'-O" FLASHING AS REQ'D. (2) 2X8 TREATED LEDGER TYP. EXTERIOR WALL CONST. TO: TOM STRUVE, SUPERINTENDENT OF STREETS & EQUIPMENT LEON WEILAND, CONSTRUCTION INSPECTOR DALE WEGLEITNER, FIRE MARSHAL ERIC MACBETH, WATER RESOURCES COORDINATOR GREGG HOVE, CITY FORESTER JOHN GORDER, ASSISTANT CITY ENGINEER KENT THERKELSEN, CHIEF OF POLICE MARK ANDERSON, ELECTRICAL INSPECTOR MIKE RIDLEY, CITY PLANNER PAUL HEUER, SYSTEMS ANALYST SCOTT PETERSON, BUILDING INSPECTOR TOM COLBERT, DIRECTOR OF PUBLIC WORKS TOM PEPPER, CHIEF FINANCIAL OFFICER LANE WEGENER, ENGINEERING TECHNICIAN FROM: CRAIG NOVACZYI, SENIOR INSPECTOR DATE: JANUARY 19, 2005 RE: PLAN REVIEW FOR RIVER RIDGE OF EAGAN (45 unit condominiums) 2103 SILVER BELL ROAD LOT 2 BLOCK I VOGEPOHL ADDITION The plans are in our plan review section for your review and comment. #10 Please return this form to my attention with your signed comments and the date of review within seven days. If you have any concerns with these plans, please so indicate on this form and notify and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please fill out the proper "hold" request form. Comments: Indicate any fees that are to be collected with the building permit: AMOUNT ? Yes ? No landscape security required ? Yes ? No water quality dedication ? Yes ? No park dedication ? Yes ? No trail dedication ? Yes ? No tree dedication ? Yes ? No PRV Required Signature ZONING? METER SIZE Date 12/30/2005 09:09 EAGAN ENG+COM DEU 4 3206560312 1\G\ 2006 FIRE SUPPRESSION SYSTEMS PERMIT APPLICATION City Of Eagan 3830 Pilot Knob Road, Eagan Mn 55122 Telephone # 651.675.5675 Fax 6 651-675-5694 Requirements: 2 complete sets of drawings and specifications NO. 068 D01 " 4\-)q200 Date z I ?/ 1 0S 011 Site Address: 2 Q3 ? I VP-f64p--U Tenant/ Building Name: ?Z-I ve r of E,5-,1gctn The Applicant is: f , Owner Contractor Other PROPERTY OWNER f 1 Ve Pi else of Eactia>n -LC? Address: 5(005 ?f 3(p? S S U 1 4e ?? City: f4• I_OulsPark State: MN zip: 55-3 CONTRACTOR uy i f ??FCr?S i I? kler MNLicense #: GDS O Address: 3M3 SDU -h VVa Y Dsr city: e>+- CJ o y l State: "N zip; 5( '0-=?0 Phone #: 3?^ 094 ESTIMATED COMPLETION DATE: 1 / FIRE PERMIT TYPE: X Sprinkler System (# of heads lD?j - Fire Pump Standpipe Other: WORK TYPE: X New Addition _ Alterations _ Remodel ether: DESCRIPTION OF WORK: Commercial _ Residential _ Educational Other: Please continue on reverse side 12/30/2005 09:09 EAGAN ENG+COM DEV a 3206560312 NO.068 D02 PERMIT FEE: $50.50 Minimum Fee (includes state Surcharge) Contract Value $ 1Z4, 2"C.10-1 x .01 = $ I ? ?? 00 Permit Fee If Permit Fee is $1,000 or less, add $.50 => $ State Surcharge If Permit Fee is over $1,000, add $.50 per 51.000 Permit Fee 3/4" Displacement Fire Meter - $157.00 $ I L4 3- TOTAL FEE: $ I hereby apply for a Fire Suppression System permit and acknowledge that the information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Fagan and with the Minnesota Building/Fire Codes; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. PSI t 1"e L0V--60 --? Applicant's Printed Name Applicant's Signature DO NOT WRITE BELOW THIS LINE REQUIRED INSPECTIONS Hydrostatic Flow Alarm Drain Test _ Rough In Trip Pump: Test Central Station Final Conditions of Issuance: Permit Approved by: bete: l ! Wti . SECUR§T" ?QW L 40 3308 Southway Drive, St. Cloud, RAM 56301 40 320-656-0847 Phone, 320-656-0312 Fax December 30, 2005 City of Eagan ATTN: Dale 3830 Pilot Knob Road Eagan, MN 55122 PROJECT: River Ridge of Eagan ;1 I o 3 5:1v-4 13e tl 94 Eagan, MN RE: Permit Re-Apply Dear Dale: We would like to cancel permit 71688 and reapply with the correct contract amount. Please let me know if you have any questions. Sincerely, Megan orborg Assistant Project Manager CLAIM VOUCHER - REFUND REQUEST CITY OF EAGAN MAKE CHECK PAYABLE TO: ADDRESS: Security Fire Sprinkler 3308 Southway Drive St. Cloud, MN 56301 PERMIT # 71688 RECEIPT #/DATE: 98253 12/01/05 REASON FOR REFUND: Over-stated valuation VALUATION: $140220.00 TYPE OF REFUND: Building Permit Base Fee 0801.4085 $ Construction Meter Dep Refund 9220.2254 $ Curb Box D osit Refund 92202253 $ Fire Suppression Permit 0801.4096 $ 1402.70 Mechanical Permit 0801.4088 $ Plan Review Fee 0720.4222 $ Plumbing Permit 0801.4087 $ SAC (MC/WS) 9220.2275 $ SAC (City) 9379.4681 $ SAC (Admin) 0801.4246 $ Sewer Permit 6201.4532 $ Surcharge 9001.2195 $ Treatment Plant 6101.4685 $ Water Permit 6101.4507 $ Water Meters & Radio Read 6101.4509 $ Water Supply & Storage 6101.4680 $ Other (Invoice) 0501.4228 $ Total $ I declare under the penalties of law that this account, claim, or demand is just and that no part of it has been paid. SIGNATURE 01/04/2006 DATE 2005 FIRE SUPPRESSION SYSTEMS PERMIT APPLICATION City Of Eagan 3830 Pilot Knob Road, Eagan Mn 55122 Telephone # 651-675-5675 Fax # 651-675-5694 Requirements: 2 complete sets of drawings and specifications co-nUQ CI cut sheets on materials and comnonents to he used ( <<drv n ti $141)3 zo Pd-01Ll 0 2.ao k7 &k4 # 4- o;• z° C"LL,cL I A/aa 4-o Date // / vZ / / OS ??- t SSv s?Cii t?J C - - LLN-40 I t9 R Site Address: mom 1 Tenant / Building Name: ve- . The Applicant is: Owner Contractor Other PROPERTY OWNER G?o? rj?t/Gr?iN/? -o?S?2-?' Address: 4? l? l43 City: / State: ? Zip: S'6.30 CONTRACTOR ??L?(?i2MNLicense#: CeJ90 Address: p 4Ji? G[ ®u!? rt//?S?3ol ??' city: State: k-j Zip: S?P30 / Phone #: ?32D ck30-3/.? Z/ ESTIMATED COMPLETION DATE: FIRE PERMIT TYPE: X Spr• ler System (# of heads/o3o) _ Fire Pump _ Standpipe ther: WORK TYPE: New _ Addition _ Alterations _ Remodel ther: DESCRIPT WORK: Commercial Residential Educational _ 7 _ 0ther: P lease continue on reverse side 1 PERMIT FEE: $50.50 Minimum Fee (includes State Surcharge) Contract Value $ _A10aaO.Ot9 x .01 = $ 0/-?7- • -2-0 Permit Fee • If Permit Fee is $1,000 or less, add $.50 => $ 7 • State Surcharge If Permit Fee is over $1,000, add $.50 per %- $1,000 Permit Fee 3/4" Displacement Fire Meter - $161.00 $ TOTAL FEE: $ oZ0 I hereby apply for a Fire Suppression System permit and acknowledge that the information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan and with the Minnesota Building/Fire Codes; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of w?oo,rkk? which requires a review and approval of plans. / Applicant's Printed Name Applicant' ignature DO NOT WRITE BELOW THIS LINE REQUIRED IN9PECTIQN8 Hydrostatic Flow Alarm Dram Test Rough In -1 7X Trip Pump Test Central Station Final . . Conditions of Issuance: t ? s. Permit Approve _ Date: _ _/ b / -7?-M 0 2006 COMMERCIAL PLUMBING PERMIT APPLICATION CITY OF EAGAN 3830 PILOT KNOB ROAD, EAGAN NIN 55122 651-675-5675 5a-t J--7-3 o LIg 0 i 06 09 5 Date XO W Zo Site Address Unit # G Tenant Name R t U£I(R ?t?DI P- Ea 1 Former Tenant Name 1QV - t ?l?y I PropertyOwner L y Q yl ca l ?a G`f? Telephone #(J26)2-52-2-2&1 Contractor Z-Bey-J M echcl. VI t" C o In-F r0L C+() rS 1 cityl-•ck DVtC+ Address 3?R S1?V)way N-Wte, ? State ZiP.???6t _ TeiePhone#(32C) (tDS?O0a-1 [7t' Mt?i ? License# 0C)3256P//1 Expires: l??"3(-0(.0 The Applicant is - Owner Contractor - Other Work Type New Bldg _ Modify Space _ Irrigation System" Yes _No Work in public r-o-w /easement? _RPZ _ PVB: _ New - Repair/Rebuild _ Replace _ Remove Rain sensors are required on irrigation systems ,.,, J 1 n s+o I I aw V1 IVY 1` zw Description of Work -l.l t `?Y V I To inquire if Pressure Reducing Valve is required n w service, call 651-675.5646 Meters - Call 651-675-5300 to veri that hydrostatic, conductive +!oia tests passed prior to nicking up meter. It Irrigation Size & Type I I RA F, dPtvf 2" turbo req'd unless smaller size allowed by Public Works Fire Size & Price 3/4" meter hPR Y 7 200h Domestic Size & Type Avg GPM Includes high demand devices? - Yes - No Flushometers - Yes _ No PRV Required _ Yes -No Permit Fee $50.50 minimum (includes State Surcharge) Permit Fee Contract Value $ x 1% _ $ ?L $ `J Meter(s) 515. 'o Required on all new buildings & boulevard irrigation systems $ Radio Meter Read $ .? State Surcharge If rmi[ fee is less than $1,000, surcharge is $.50 if rmit fee is more then $1,0110, surcharge is S.50 for each $1,000 owed. Following fees apply when installing new lawn irrigation system $ ,th' A J - Co Water Permit Call the City's Engineering Depamnent, 651-675-5646, for required fee amounts $ N ? Treatment Plant $ Water Supply & Storage $ .50 State Surc $ 1 -TotalFe CPI(.O .OL I hereby apply for a Commercial Plumbing Permit and acknowledge that the information is complete and accurate; that the work will beam farm--re °^"' "•? ordinances and codes of the City of Eagan and with the Plumbing Codes; that 1 understand this is not a p it, but only an application for a permit, and work is not to start without a permit; that ,th'e work will be in accordance with the approved plan in the case of work t be requires a review and val f plans. DAVIQ Nc6l, V1 "i 1-e - Applicant's Printed Name App ecanfs Signature L CITY USE ONLY REQUIRED INSPECTIONS: _ U.G. Air Test - Gas Test _ Rough In Final PLANS SUBMITTED APPROVED BY: , BUILDING INSPECTOR General Information • Radio Meter Read (required on all new buildings. Boulevard irrigation systems may require a radio read - $141.00 • RPZ's must be tested every year and rebuilt every five years. Test results should be mailed to Paul Heuer at the City of Eagan. • A minimum fee permit per address is required for the following RPZ's: nw, rebuild, repair, remove. • Water meters include copper hom/strainer, remote wire, and touch-pad meter. METERS REQUIRING 4-HOUR ADVANCE NOTICE PRIOR TO PICK UP GPM METERS USE PRICE GPM METERS USE PRICE 1-20 5/8" residential $130.00 4-120 1-1/2" irrigation syst $ 827.00 displacement or turbine" Public Works maximum small commercial must approve continuous meter size 10 2-30 3/4" lawn irrigation $167.00 4-160 2" turbine large irrigation $ 1,040.00 maximum displacement residential system & continuous or production lines 15 small commercial 3-50 1" displacement large residential $210.00 1/4 to 160 2" compound bldgs over $ 1,962.00 bldg to 24 units 65 units maximum small commercial & continuous & large comm bldgs 25 irrigation systems 5-100 1-1/2" 25-64 unit bldgs $515.00 maximum displacement & continuous most comm bldgs 50 METERS REQUIRING 30-DAY ADVANCE NOTICE PRIOR TO PICK UP GPM METERS USE PRICE GPM METERS USE PRICE 5-350 3" turbine very large irrigation $1,394.00 6.500 4" compound +300 unit bldgs $3,864.00 system & production & very large lines comm. bldgs 1/2-320 3" compound +200 unit bldgs $2,516.00 10-1000 6" compound +400 unit bldgs $6,436.00 very large very large comm bldgs comm bldgs 15-1000 4" turbine very large $2,495.00 irrigation systems & production lines Comments • To schedule inspection of the inside water line and backilow preventer, call 651-675-5675. • To arrange for water tum-on, call 651-675-5200. cc: Utility Division Systems Analyst January 2006 2006 COMMERCIAL PLUMBING PERMIT APPLICATION CITY OF EAGAN 3830 PILOT KNOB ROAD, EAGAN MN 55122 651-675-5675 Date Site Address r,A I (7? C"'i\iQX ?EIO RC` - Unit # Tenant Name Former Tenant Name Property Owner Telephone # ( ) Contractor Address City State Zip Telephone # ( ) License # Expires: The Applicant is Owner Contractor - Other Work Type _ New Bldg _ Modify Space A Irrigation System" _ Yes _ No Work in public ro-w / easement? _RPZ _ PVB: X New _ Repair/Rebuild - Replace _ Remove Rain sensors are required on irrigation systems Description of Work To inquire if Pressure Reducing Valve is required on new service, call 651-675-5646 Meters - Call 651-675-5300 to verify that hydrostatic, conductivity, and bacteria tests passed prior to picking up meter. Irrigation Size & Type Avg GPM 2" turbo req'd unless smaller size allowed by Public Works Fire Size & Price 3/4" meter $167.00 Domestic Size & Type Avg GPM Includes high demand devices? _ Yes _ No Flusbometers Yes No PRV Required _ Yes _ No Permit Fee $50.50 minimum (includes State Surcharge) Contract Value $ x 1% Permit Fee $ Meter(s) Required on all new buildings & boulevard irrigation systems $ Radio Meter Read $ State Surcharge If Permit fee is leas than $1,000, surcharge is $.50 If Permit fee is more than $1,000, surcharge is 5.50 for each $1,000 owed. Following fees apply when installing new lawn irrigation system $ Water Permit Call the City's Engineering Department, 651-675.5646, for required fee amounts S 916 Treatment Plant Go/% $ Water Supply & Storage $ State Surcharge $ Total Fee n.r .r.. n'crk '. 11 6e i.. nnfnnnance with the I hereby apply for a Commercial Plumbing Permit =0 actmowtecge Mai me uuwulauou ," oo...P,..... a.. o..-..•-•-, ..•-• _._ .. _ --- ordinances and codes of the City of Eagan and with the Plumbing Codes; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work whicb requires a review and approval of plans. Applicant's Printed Name Applicant's Signature CITY USE ONLY REQUIRED INSPECTIONS: U.G. Air Test Gas Test _ Rough In Final PLANS SUBMITTED APPROVED BY: , BUILDING INSPECTOR General Information • Radio Meter Read (required on all new buildings. Boulevard irrigation systems may require a radio read - $141.00 • RPZ's must be tested every year and rebuilt every five years. Test results should be mailed to Paul Heuer at the City of Eagan. • A minimum fee permit per address is required for the following RPZ's: new, rebuild, repair, remove. • Water meters include copper horn/strainer, remote wire, and touch-pad meter. METERS REQUIRING 4-HOUR ADVANCE NOTICE PRIOR TO PICK UP GPM METERS USE PRICE GPM METERS USE PRICE 1-20 5/8" residential $130.00 4-120 1-1/2" irrigation cyst $ 827.00 displacement or turbine** Public Works maximum small commercial must approve continuous meter size 10 2-30 3/4" lawn irrigation $167.00 4-160 2" turbine large irrigation $ 1,040.00 maximum displacement residential system & continuous or production lines 15 small commercial 3-50 1" displacement large residential $210.00 1/4 to 160 2" compound bldgs over $ 1,962.00 bldg to 24 units 65 units maximum small commercial & continuous & large comm bldgs 25 irrigation stems 5-100 1-1/2" 25-64 unit bldgs $515.00 maximum displacement & continuous most comm bldgs 50 METERS REOUHtING 30-DAY ADVANCE NOTICE PRIOR TO PICK UP GPM METERS USE PRICE GPM METERS USE PRICE 5-350 3" turbine very large irrigation $1,394.00 6-500 4" compound +300 unit bldgs $3,864.00 system & production & very large lines comm. bldgs 1/2-320 3" compound +200 unit bldgs $2,516.00 10-1000 6" compound +400 unit bldgs $6,436.00 very large very large comm bldgs comm bldgs 15-1000 4" turbine very large $2,495.00 irrigation systems & production lines uomments • To schedule inspection of the inside water line and bacldlow preventer, call 651.675-5675. • To arrange for water turn-on, call 651-675-5200. cc: Utility Division Systems Analyst January 2006 / G 2005 COMMERCIAL PLUMBING PERMIT APPLICATION h D CITY OF EAGAN 3830 PILOT KNOB ROAD, EAGAN MN 55122 651-675-5675 Date Neil / b / 2005 Site Address 2103 S'dter Leek Raaa Unit # Tenant Name L„nn Cen}rac jr%c Former Tenant Name n1 4 Property Owner gikr RR ida g.o.n l.LC Telephone # (320' ) Contractor -S-&rd 1lcchanical Address 3303 SwIthwcw D6*n- City 5 I. Glwd State rA%4 Zip 51.301 Telephone # (3Z0) 1.5u 0841 License# 003258Pt1 Expires: 12 .131 5 Ki'n ?Jesrw The Applicant is - Owner -?- Contractor Other Work Type 'X New Bldg _ Modify Tenant Space _ RPZ PVB _ New _ Repair/Rebuild _ Replace _ Irrigation system Work within public right of-way/easement _ Yes _ No Rain sensors are required on irrigation systems Description of Work lolnm6tn 1 work on 3$ o;F oQt. To inquire if Pressure Reducing Valve is required on new service, call 651-675-5646 Meters - Call 651-675-5300 to verify that hydrostatic, conductivity, and bacteria tests passed prior to pickin g up meter. Mot ._ co.Ars.-t6 Irrigation Size & Type tiA t>~ tam Avg GPM 2" turbo req'd unless smaller size allowed by Public`Works Fire Size & Price 3/4" displacement 5161.00 to{?? r; P r'\ Domestic Size & Type a to Avg GPM I Co Includes high demand devices? _ Yes _j( No Flushometers _ Yes -)(- No PRV Required _ Yes -No Permit Fee $50.50 minimum (includes State Surcharge) Contract Value S 3-A'1 .500 x 1% _ $ 3115-0 Permit Fee $ I %4q.00 Meter(s) Required on all new buildings & boulevard irrigation systems S 141.00 Radio Meter Read If permit fee is $1,000 or less, surcharge is $.50 $ 2.00 State Surcharge If permit fee is over $1,000, surcharge is $.50 per $1,000 of the Permit Fee Following fees apply only when installing new irrigation system $ Water Permit Call Jerry Wobschall at 651-675-5024 for required fee amounts $ Treatment Plant $ Water Supply & Storage $ State Surcharge ------------------------------------------------------------------------------------------------------------------------ $ S"l1.1. 00 ----------------------------------------- Total Fee I hereby apply for a Commercial Plumbing Permit and acknowledge that the information is complete and accurat conformance with the ordinances and codes of the City of Eagan and with the Plumbing Codes; that I understand this application for a permit, and work is not to start without a permit; that the work will be in cordance with the approi which requires a review and approval of p ans. Any nt lesticnG olsase cd owlid a-rdn ,tint t?8ec Sot 320-656-' Applicant's Printed Name Applicant's Signature abut Io'rlly in the case of k APR 19 20 CITY USE ONLY REQUIRED INSPECTIONS: U.G. Air Test Gas Test _ Rough In Final PLANS SUBMITTED APPROVED BY: :?P BUILDING INSPECTOR General Information • Radio Meter Read (required on all new buildings & boulevard irrigation systems- $141.00 • RPZ's must be tested every year and rebuilt every five years. Test results should be mailed to Paul Heuer at the City of Eagan. • A minimum fee permit per address is required for the following RPZ's: new, rebuild, repair, remove. • Water meters include copper hom/strainer, remote wire, and touch-pad meter. METERS REQUIRING 4-HOUR ADVANCE NOTICE PRIOR TO PICK UP GPM METERS USE PRICE GPM METERS USE PRICE 1-20 5/8" residential $125.00 4-120 1-1/2" irrigation cyst $ 735.00 displacement sm commercial turbine" Public Works maximum must approve continuous meter size 10 2-30 3/4" lawn irrigation $161.00 4-160 2" turbine lg irrigation syst $ 931.00 maximum displacement residential & continuous sm commercial production lines 15 3-50 1" displacement very lg tea $296.00 1/4 to 160 2" compound bldgs over $ 1,849.00 bldg to 24 units 65 units maximum sm commercial & continuous & lg comm bldgs 25 on . ation systems 5-100 1-1/2" bldgs 25-64 units $429.00 maximum displacement & continuous most comet bldgs 50 METERS REQUIRING 30-DAY ADVANCE NOTICE PRIOR TO PICK UP GPM METERS USE PRICE GPM METERS USE PRICE 5-350 3" turbine very Ig irrigation $1,182.00 6-500 4" compound +300 unit bldgs & $3,563.00 syst & production very Ig comm bldgs lines 1/2-320 3" compound +200 unit bldgs $2,282.00 10-1000 6" compound +400 unit bldgs $6,076.00 very Ig comm, bldgs very Ig Comm bldgs 15-1000 4" turbine very lg irrigation $2,226.00 syst & production lines comments • To schedule inspection of the inside water line and backflow preventer, call 651-675-5675. • To arrange for water turn-on, call 651-675-5300. cc: Maintenance Division Clerical Technician January 2005 A3777. 00 2005 COMMERCIAL MECHANICAL PERMIT APPLICATION City Of Eagan 3830 Pilot Knob Road, Eagan MN 55122 Telephone # 651-675-5675 Please complete for: commercial/industrial buildings multi-family buildings when separate permits are not required for each dwelling unit Date .;l / 6 / 2005 Site Street Address 2103 Sdver Rell Rnod Unit# Tenant Name (if applicable) L,.on Cont(c eying Previous Tenant Name n1G Property Owner River Ridoe of Haan LLc Telephone Contractor Z•Berd Yiec)nanico-1 Street Address 3305 Soo?hvtaH Drive city 5t Ctood State IN N Zip Sb30i Telephone # ( 3 2.0 ) 68tr 084-1 Kim Pe?C(Wn Bond #: R-1-vi l b Expires: 05 The Applicant is Owner X__ Contractor Other Work Type A New Construction - Underground Tank _ Install -Remove *"see below Interior Improvement - Install Piping -Processed -Gas Nature of Work: Clerk n'c_1 work a'o n t upt "When installing/removing underground tank, call for inspection by Fire Marshal and Plumbing Inspector Permit Fees: $70.50 Underground tank installation/removal $50.50 Minimum (includes State Surcharge) or Contract Value $ 311,500.°° x 1% _ $ 3.1"15.00 Permit Fee • If eo rmit fee is $1,000 or less, add $.50 => $ 2.00 State Surcharge If en rmit fee is over $1,000, add $.50 for every $1,000 ep rmit fee $ 3 -111.00 Total Fee i hereby apply for a Commercial Mechanical Permit and acknowledge that the information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan and with the Mechanical Codes; that I understand this is not a permit, but only an application for a permit, and work is not to start without a perlni 't; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. David Berdan Applicant's Printed Name Applicant's gig-nature Approved By: ?j 1 `T D ^ d S -,y c2i! PtC'er6011 -1 -I Inspector pT T 0 T N 2005 RESIDENTIAL MECHANICAL PERMIT APPLICATION City Of Eagan 3830 Pilot Knob Road, Eagan MN 55122 Telephone # 651-675-5675 Please complete for: single family dwellings & townhomes/condos when permits are required for each unit Date Site Address Unit # Property Owner Telephone # ( ) Contractor Street Address City State Zip Telephone # ( ) Bond #: Expires: The Applicant is Owner Contractor Other Add-on or alteration to existing dwelling unit $ 30.00 furnace -Additional -Replacement air exchanger air conditioner -New - Replacement other State Surcharge $ .50 Total $ I hereby apply for a Residential Mechanical Permit and acknowledge that the information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan and with the Mechanical Codes; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. Applicant's Printed Name Applicant's Signature 3202303325 04/07/2006 15:03 3202303325 .:J-BERD PAGE 01/01 ENERGY CONCEPTS A4 2312 D. Cresnview Drive //105 Hudson, Wisconsin 54016 715 423-7456 fns 715.425-653 Debbie Sherwood 3308 Southway Dr. St. Cloud, MN 56301 Subject: River Ridge of Eagan Dear Debbie, April 7, 2006 a103 S.l? 6tl-f )e? Per my phone conversation with Scott Peterson, Mechanical Inspector for City of Eagan, J-Bend Mechanical shall provide a 14x6 hightlow transfer air grille from Conference Rm 110 to Exercise Rm 108. Please call with questions. Sincerely, c?I? govt- Craig Tarr President cc: Scott Peterson, Mechanical Inspector 3206560312 05/02/2006 10:29 3206560312 JBERD MECHANICAL PAGE 01/01 J?r'ruBERD 3308 Southway Drive St. Cloud, MN 56301 Phone: 320-656-0847 Fax: 320-656-0312 5-1-06 City of Eagan Attn: Scott Re: River Ridge of Eagan We have completed the start up of the Titan unit, and have calibrated all CO detectors per factory specs. If you should have any questions or need any further information please contact me at 320-656-0847. Jeff Johnson Service Manager J-Berd Mechanical 2006 BUILDING MOVE PERMIT APPLICATION City Of Eagan 3830 Pilot Knob Road, Eagan MN 55122 Telephone # 651-675-5675 FAX # 651-675-5694 -W ?5 50 Date - / o a l U G Street Address Of Building To Be Moved Va 3 S L /lam !? t l r( d Proposed Destination City W 4 d k-.V 14 State M N /V Highlight origin, route & destination on current City map. If County/State roads are used, provide copies of those permits. Proposed Date of Move Sb O / Time ?, ao Lf a.m. _p.m. Notify Eagan Police Department. Eagan Police will not accompany move until time coordination has been made with neighboring municipality. Size of Structure a y X t/O Weight G G-ac Is structure connected to _ City Sewer _ City Water Septic _ Well Electric Service Gas Service Other N z- Party responsible for utilities disconnect t Owner _ Mover _ Other Building in Eagan to be moved out of Eagan. _ Building in Eagan to be relocated in Eagan (requires Council action). Building to be moved into Eagan from another City (requires Council action). Building Owner Name Z Ye, /v C o y T.' Al G Street Address 3 4 n/ / B a e",& S# /0 3 City S / ?c u d State It'l* Zip-S' 343? Telephone # Q-20 7 Land Owner Name .5 '/- Street Address City State Zip Telephone # ( ) If land owner is not the same as building owner, provide approval from land owner to work on the property. Mover Name ?tirL'G? MAID $717ae,T. AI !-I- I-eYS Street Address ?9`/'75k 93" S7A'XE 7 City No 1,417,N State /VA/ Zip L 3 7 Telephone # (3 10) G ?° - 7 MN. License # 36,11, 7 ( (must submit copy) I guarantee I will repair any and all damage to local roadways, utilities, and public right-of-way that may be damaged by this moving operation. I acknowledge that the information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan and the State of MN Statutes; I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. /Py ;7t.VdY T? voS R o y TA- -t S I Al 7rc. v mdJ? Applicant (Print Name) Applicant's Signature v/s .kky.0, 1 ?"J-Jz $as ?Sle 0-so vti a o 513 S# t OFFICE USE ONLY Real estate taxes/assessments on building Real estate taxes/assessments on land Landowner approval Utility Disconnect Electric _ Gas Sewer/water Well _ Septic a ' A B 0 D E F G H MENDOTA NEIGNTS aaw aiw aooo iesR Sao isso „6R rw I \ CITY OF EAGAN o ;? rv t{ b i 1 2006 t T i w w LEGEND i a. j 4 t m o s v,' a? 1 s y mR11R RtlR ._:? r ;? i e Rrai R wR„aa ------------- .F: __ + '`' I On RRaf 2 Fu[ @Nn MNS ? • p ,^,;?Ya ' { + . mm . OROWY r. ?l 1 . I .w Y S .. I a 5 aem 6 Gam Y 8...ree 9 10 J 0 a U C fi 10 '? S' ? ? 1 ,.? n3 ??fi?' s? ? m IS .r, `lP f 4y b 6 7 ¢¢¢ ? tEBPNON ?? HlllS yf,GiONPi' ? ew._I e ? i ? }. ??. ,V, ? ? m" ?•? $5 ??.a'_ ` ® ?? yam"`" ? _". 4A .. Ji I Y.J: ?. '?.. :f yw d .3 Y ... := F f i 4 g r I ry\ -. c "b 1G s 3 f eaJ.x: ..,.. _. .?. ..V,?,„,ys ,..?. ,...» .. .... ........r..._...:. .. f;. .....,...r, x.?>:. ., . . e.......,. ..s..,.,...:....... l., k.._:::.- ,... ...:,?. .F-,-.;.??, , ,.u. .?:..;. .-.....-, ?„ sooo APPLE VALLEY ROSEMOUNT ?a a1M XN 16f0 I7M Is611 I? IM IIW 950 e0o 6A 1W A B G D E F G H I J. K L K L 6" wRRSnIR M ?5 19a FP 2007 COMMERCIAL MECHANICAL PERMIT APPLICATION City Of Eagan 3830 Pilot Knob Road, Eagan MN 55122 Telephone # 651-675-5675 Please complete for: commercial/industrial buildings multi-famil buildin s when se arate ermits are not required for each dwelling unit Date '3 / i /'2 ?ca_7 - S ? ? ? ? 7c ( ( 1- c( Site Street Address & ? d Unit # / / Tenant Name (if applicable) T 1 II / /-Ql & ( OYId? i Previous Tenant Name Property Owner Telephone # ( ) Contractor f??? rs' ?(? ` "?= p (-C.S Street Address l ?\ L? ^ e3? City 1 . t.? =. State Zip I Telephone # ((91? Bond #: 5ry` C3 'Expires: ?' I s?1 The Applicant is Owner \/ Contractor Other Work Type New Construction -Interior Improvement -Install Piping _ Processed t% Gas -Exterior HVAC Unit** **HVAC units must be screened _ Under/Above ground Tank _ Install _ Remove When installing/removing tank(s), call for inspection by Fire Marshal and Plumbing Inspector NatureofWork: ?5?? G aS Gt Permit Fees $70.50 Underground tank installation/removal $50.50 Minimum (includes State Surcharge) / or Contract Value $ c'1- 6 - x 1% _ $ Permit Fee $ State Surcharge To calculate surcharge If Permit Fee is less than $1,000, surcharge is 50 cents. If Permit Fee is> $1,000, surcharge increases by $.50 for each $1,000 Pemvt Fee (i.e. a $1,00142,000 Permit Fee requires a $1.00 surcharge). t l F U (/ T o a ee $ - I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan and with the Mechanical Codes; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. Applicant's Printed Name Applicant's Signature --------------------------------------------------------------------------------------------------------------------------------------------------------------- Approved By: , Inspector Date: Required Inspections: - U.G. _ R.I. - Air Test - Gas Service Test - Infloor Heat - Final 2007 RESIDENTIAL MECHANICAL PERMIT APPLICATION City Of Eagan 3830 Pilot Knob Road, Eagan AIN 55122 Telephone # 651-675-5675 Please complete for: single family dwellings & townhomes/condos when permits are required for each unit Date Site Address Unit # Property Owner Telephone # ( ) Contractor Street Address City State Zip ( ) Telephone # Bond #: Expires: The Applicant is Owner Contractor Other Fire repair (replace burned out appliances, ductwork, etc.) $ 90.00 This fee applies when extensive mechanical repairs are made to a building. Add-on or alteration to existing dwelling'unit $ 50.00 furnace -Additional -Replacement New air exchanger air conditioner heat pump other State Surcharge $ .50 Total $ I hereby apply for a Residential Mechanical Permit and acknowledge that the information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan and with the Mechanical Codes; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. Applicant's Printed Name Applicant's Signature *City otEaaQauu 3830 Pilot Knob Road Eagan MN 55122 Phone: (651) 675-5675 Fax: (651) 675-5694 Use BLUE or BLACK Ink 1 For Office Use j (� 1 Permit #: /re l �y / 3 / `% Permit Fee: elf) • 0i Date Received: I I 1 Staff. I J 2012 COMMERCIAL PLUMBING PERMIT APPLICATION Please bmit o (2) sets of plans with all commercial applications. - /v, / l d Date: 2- Site Address:. c?JQ 3 Tenant: ¢S 1 Suite I: PROPERTY OWNER , Name: �� 4-41A) &I/le/LA/5/ ' t iYl;- Phone: 7 �SQ� j/ /Z 0 0 CONTRACTOR Name: GM 1 CQ4) is 4 Ltr -19 0 License #: (iS i t s PM Address: C:577 D'7 EtCca2S/o(L City: 41 LOCLa `t a State: /974p: , // Phone: 9/.LI') Email: / J r no �7( /1L , • e_an " / TYPE OF WORK V New Replacement Repair ebuild Modify Space Work in R.O.W. _ _ — — _ Description of work: k)(:)--1' / �PYLGc.1 CI K PERMIT TYPE COMMERCIAL Ne onstni ' n Modify Space T ____ Irrigation System ( yes t Vno) PZ / PVB} • Rain sensors required on irrigation systems • Avg. GPM (2" turbo required unless smaller size allowed by Public Works) Meters Call (651) 675-5646 to verity that tests passed prior to picking up meter. _ Domestic: Size & Type Fire: 1 Avg. GPM High demand devices? Yes No Flushometers Yes _No COMMERCIAL FEES: $60.00 Minimum (includes $5.00 State Surcharge) OR Contract Value $ x 1% Required on - If the Permit Fee is less .$ 40 ' Permit Fee ALL new buildings and boulevard irrigation systems 3 $ Radio Meter Read than $10,010, the surcharge is $5.00 $ Meter(5) - If the Permit Fee is > $10,010, the surcharge increases by $.50 for each $1,000 Permit Fee Permit Fee requires a $5.50 surcharge) $ State Surcharge (i.e. a $10,010-$11,000 Following fees apply Contact the City's Engineering when installing a new lawn irrigation system $ Water Permit Department, (651) 675-5646, for required fee amounts. $ Treatment Plant $ Water Supply & Storage $ ``,,r�te State Surcharge _ $ (.l( ✓ TOTAL FEE CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.gopherstateonecall.orq I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a it; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. licarft A's Printed pp Name FOR OFFICE USE Required Inspections: Under Ground l Approved BY Air Test Gas Test Final VI Page 1 of 3 07/18/2014 11:20 6514303706 CRAFTSMEN HOME IMPV PAGE 02/03 , , Use BLUE o�BI.ACK Ink j^For4Mca uss —________' Cit of�a aIl I Pertnit#� i � � , , 3830 P11ot Knob F2oad j Penmit Fee: �5 I Eagan MN 5512� � �7 � Phot�e: (651)615-6675 � Dale Received: i � �ax:(651)675d684 � � � S18ff: � ����....�_� ��r����wJ 2014 COMMERCIAL BUILDING PERMIT APPLICATION pa�: �-1�-! �/ s��aaa�g� a �0 3 S r L vL r2 �CLL �cI - Tenant Name: ��V� ��DG� Q F ��¢��¢,v (Tenant Is: New/ X- Existing) 3ulte#: Former Ter�rrt: � Name��6uLS � I'�A•r1�S - P(L�'SIDE,�.� � a� Phone: �oS��� - 71 Y7 ' P11b�1'��'r/'��'YYII'1'el'.. Address/City!Zip: �03 S I L Vt 2 ��L�. �J. �d���N ri��u ,S5/a � '� , . ...,. . , ; . . .. � l : . Applicant Is: Owner �C Contractor �i r I ' '. ' Description of work � I��C�F I >�'Yp!��.IAI!��'It::;., i -' Construction Cost � � C� �,OOC:i. � �', ' ` �� N . ..< ame nse ,. �'�-FisN'��N t�Ovh� r'�� ,� ` � �� t��ce �: �C o? 7rJ �'F`l I Addrese; ��/.�S' f�CZ+4 N Clz �yl.V t� S_ t� ��t��y. �D�w1 A- �� �o��tr�fZt�r. ` I; . state; �'1/� Zip: �S�3S Phone: �� � �3� ^ 1.3�� - Conta�t: .TO I�F pJ EmaiC ��-y► C�. Gh � — S e�vlc e , e0/�'L i;...: : ..;.` . Name: Registration#: .I,. . i4h�li'�'�C'�IY��?1'8�1`. Address: Cfiy: State: Zip: Phone: � Corrtact Persvn: Email; Liceneed plumbe�installing,�sewer/water servioe; p�p�e�: � �C�7'E:A/�hsy�rrcl scij�jd�S►�'ag Uvcq�'tlra�ty�oel�ewtii�il-a►��corrs���d#o'#e;�rnb�ll�,�iifii�rr�rai�1�, ,pb�dons avrF :the irr�"arr,�io»1n���be�C�aa�l�l'�s�m�ny�ubli�ff,�►v:pravi�la sp��r���E w�mui�,p+�/t`t���til�r:ib , . �r �an�lud��at�h� :�rre lti�d��ir�t: ; ° - ....� ,:.,. ; CALL BEFORE YOU DI,�, Call(3opher State One Call at(sb1)454-OD02 for protection ageinst underground utility damage. C21146 hourS before you intend to dig to r�ceive Ipcates of underground utilities. www.qonberstateonecall orc� I hertiby acknowledge that this Inforrnakion is oomplete and accurate: that the work wiu be in conf�ormance with the ordinances ana codes of the Ciry of Eagan;�at I understand thls is not a permit, but only an application for a permit, and work Is not to start without a permit;that the work will be in accordance with the approved plan in the casa of work which requlres a review and approval of plans. x �D A.� �.� QS l�P�Y r AppllCant's PH�1ted Nsme x Applicant' 3lgnsture Page 7 of 3 � � 0.3 S � I���~ r� r( Y�� �� S�Y , j � " � DO NOT WRITE BELOW THIS LINE SUB TYPES Foundation Public Facility Exterior Alteration-Apartments � Commercial/Industrial _ Accessory Building _ Exterior Alteration-Commercial _ Apartments _ Greenhouse/Tent _ Exterior Alteration-Public Facility Miscellaneous Antennae WORK TYPES _ New _ Interior Improvement Siding _ Demolish Building" _ Addition _ Exterior Improvement �Reroof _ Demolish Interior _ Alteration _ Repair _ Windows _ Demolish Foundation _ Replace _ Water Damage _ Fire Repair _ Retaining Wall _ Salon Owner Change *Demolition of entire building—give PCA handout to applicant DESCRIPTION / Valuation / D�J oDC� � Occupancy �' �- MCES System Plan Review D�� Code Edition 2G�O* 6�l'�.� SAC Units ( ° _ Zoning City Water Census Code Stories Booster Pump #of Units Square Feet PRV #of Buildings � Length Fire Sprinklers Type of Construction _�' ,�{- Width j REQUIRED INSPECTIONS Footings(New Building) Sheetrock Footings(Deck) Final/C.O. Required Footings(Addition) Final/No C.O. Required Foundation Other: Drain Tile � Pool: Footings _Air/Gas Tests Final �,/ Roof:_Decking _Insulation �e&Water Final Siding:_Stucco Lath _Stone Lath _Brick Framing Windows Fireplace:_Rough In _Air Test _Final Retaining Wall Insulation Erosion Control Meter Size: Final C/O Inspection: Schedule Fire Marshal to be present: Yes ✓�No Reviewed By: [���� , Building Inspector Reviewed By: �/.� , Planning COMMERCIAL FEES Base Fee f /U ", 'JS� Water Quality Surcharge S4-. � Water Sampling Fee Plan Review c�,dtU Water Supply& Storage(WAC) MCES SAC Storm Sewer Trunk City SAC Sewer Trunk S&W Permit& Surcharge Water Trunk Treatment Plant Street Lateral Treatment Plant(Irrigation) Street Park Dedication Water Lateral Trail Dedication Other: Water Quality TOTAL /� ��5�, �� Page 2 of 3