Loading...
08/06/1987 - Advisory Parks & Recreation CommissionTENTATIVE AGENDA ADVISORY PARKS & RECREATION COMMISSION EAGAN, MINNESOTA Thursday, Aug 6, 1987 6:30 P.M. Tour Parks Projects 7:30 P.M. Regular Meeting Eagan Municipal Center A. Call to Order and Pledge of Allegiance B. Approval of Agenda & Approval of Minutes of regular scheduled meeting of July 2, 1987 C. Consent Items/Development Proposals 1. Oak Cliff Pond Second Addition 2. B.B.D. Second Addition 3. Stoney Point Addition 4. Harvey's Heritage Addition 5. Cutter's Ridge Addition D. Old Business: 1. Manor Lake Addition 2. Stuarts Second Addition 3. Community Center Study Committee - Survey Information E. New Business F. Construction Projects Update 1. Tennis Courts Contract - Walnut Hill G. Other Business & Reports 1. City Newsletter 2. Cultural Garden - Status Report 3. 1987 Budget Process - Status Report 4. Annual Picnic 5. C.O.R.E. Application 6. Eagan High School/Northview Park 7. Litter from E.A.A. - Kevin Mitchel 8. Letter from Robert Smith H. Adjournment MEMO TO: ADVISORY PARKS RECREATION COMMISSION FROM: KEN VRAA, DIRECTOR OF PARKS RECREATION DATE: AUGUST 4, 1987 RE: THURSDAY, AUGUST 6 COMMISSION MEETING Preceding the 7:30 P.M. meeting, a Commission tour will leave City Hall beginning at 6:30 P.M. The tour will visit various parks projects now under construction and will be returning to City Hall at 7:30 for the beginning of the regular meeting. After approval of the agenda, approval of the July 2 Minutes and development items, the first order of business pertains to the Manor Lake Addition. Commission members will recall that Manor Lake Addition was presented to the Advisory Commission last month with a recommendation for denial. This item has been referred back to the Advisory Commission in effort to resolve the parks issue. Staff has met with Mr. Bob Middlemist, developer for the project, concerning the City's parks concerns. Included in this packet is a separate memorandum prepared by Landscape Arc hitect /Parks Planner, Steve Sullivan, concerning the alternatives available to the Commission and the developer concerning this project. The second item under Old Business is Stewart's Second Addition. This particular development is the apartment units at the street intersection of Lexington Avenue and Yankee Doodle. The developer has been in contact with staff concerning development of the pond area at this intersection. The Commission had previously recommended a full cash dedication rather than provide any credit for proposed trails around this pond. At a meeting with staff, the developer is proposing to modify this plan and enhance it in an effort to make this a visual and public amenity to the apartment units and area residents. This is intended to be done through coordinating the trailway around the pond with trailways within 0' Leary Park. (As of the writing of this memorandum, staff has not received new submissions regarding this.) The developer will be seeking credit toward this work against the City's cash dedication requirements. The developer is no longer requesting City maintenance for the trails. The third item under Old Business is the Community Center Study Committee survey information. Again included in the packet is a brief memorandum from the Director of Parks and Recreation concerning this issue. There are no new items to be considered under New Business. There is a single item under Construction Projects Update. This pertains to the recently awarded tennis and hard courts construction contract. Parks Planner, Steve Sullivan, will brief the Commission with additional information pertaining to the tennis courts contract; in particular, the Commission should be made aware of the decision by staff not to procede with tennis courts at Walnut Hill Park. Included in this packet is a memorandum to the Commission from staff regarding this particular item and the reasons for deletion of tennis courts at this location. Other Business and Reports There are eight items under Other Business and Reports for the Commission's review. The first is the deadline for the submission of articles for the City newsletter. Staff will be preparing items from the department and wishes to solicit concerns of the Advisory Commission which may be included in the newsletter. Item two: Staff will update the Advisory Commission on the recent Land and Art appraisal completed by the consultants to the City on the Cultural Garden. Staff has submitted the 1988 proposed Parks and Recreation budget to the City Administrator's Office. The Administrator is now reviewing all department budget requests for submission to the City Council. The Director of Parks and Recreation would briefly like to explain to the Commission some of the proposed budget inclusions, as well as exclusions in the 1987 budget. Roger Martin has asked that the Commission take up the issue of the "annual picnic" held in September of each year. Staff has recently received notification that its core application has received $15,000 for Fish Lake and Schwanz Lake. (See enclosures.) Park Superintendant John Von De Linde will be present to review this with the Advisory Commission. Staff will also update the Commission on the proposed Eagan High School /Northview Park joint development processing. Item seven is a letter from Mr. Kevin Mitchell representing the Eagan Athletic Association concerning the Association's desire to be involved in insuring adequate ball fields for youth participants. Chairman Martin and the Director of Parks and Recreation intend to meet with Mr. Mitchell in the near future to discuss ways in which the E.A.A. can be involved with the Commission's study and review process. The final inclusion is a letter from Mr. Robert Smith, addressed to Mayor Bea Blomquist. Mr. Smith makes note of the fact that the recent school patrol picnic had to be held outside of Eagan because facilities were not available in sufficient size to handle this event. Mr. Smith suggests that the City undertake a community center project. As always, if there are other items that should be placed on the agenda or members are unable to attend, please contact the department. Respectf !1 submitted, Directo o arks and Recreation KV /lb MINUTES OF A REGULAR MEETING OF THE ADVISORY PARKS AND RECREATION COMMISSION EAGAN, MINNESOTA JULY 2, 1987 A regular meeting of the Advisory Parks and Recreation Commission was called to order by Chairman Martin at 7:05 p.m. Members present were Porter, Sames, Alt, Martin, Carroll, Caponi, and Masin. Members Thurston, Kubik and Bertz indicated they would be unavailable for the meeting. Staff present were the Director of Parks and Recreation Ken Vraa and Parks Planner /Landscape Architect Steve Sullivan. AGENDA With a motion by Carroll, seconded by ALt, with all members voting in favor, the agenda was approved. MINUTES OF JUNE 4, 1987 CONSENT AGENDA ITEMS Subject to Approval With a motion by Alt, seconded by Sames, with all members voting in favor, the minutes of June 4, 1987 were approved. INVITATION TO JOIN MINNESOTA RECREATION AND PARKS ASSOCIATION Ms. Kay Zwernik, Executive Director of the Minnesota Recreation and Parks Association, and Ms. Joan Lonsbury, Chairman of Board and Commission section of MRPA, were present to invite the commission to become members of the state association. Ms. Zwernik reviewed for the Advisory Commission the benefits the association provides to its board and commission members. Joan Lonsbury distributed informational packets and flyers concerning recent activities of the board and commissions section. Chairman Martin and commission members questioned the cost, legislative lobbying efforts and other activities of the association. Chairman Martin started that he felt the cost was reasonable and the benefit to Eagan and the commission would be well worth the investment. With a motion by Dick Carroll, seconded by Caponi, and all members voting in favor, the commission recommended membership as a part of the Minnesota Recreation and Parks Association. The following Consent Agenda Items were presented for approval. With a motion by Carroll, seconded by Caponi, and all members voting in favor, the commission approved recommendation to the City Council on the following items: 1. Jean Addition /Wayne Murphy That a cash dedication requirement be a condition of plat approval. 2. Pine Ridge Addition That a cash dedication for seven lots be a condition of plat approval. 3. Eagan Royale Addition Revised, Meritor Corporation That this revised preliminary plat proposing 72 lots be subject to a cash dedication requirement. 4. Building Block Addition That this preliminary plat and amendment to the Cedar Cliff Planned Development be subject to a cash dedication requirement consistent with the Commercial /Industrial property. 5. Kinder Care Addition That this preliminary plat be subject to a cash dedication requirement consistent with the City's commercial /industrial policy. DEVELOPMENT PROPOSALS Manor Lake Addition Director of Parks Ken Vraa explained the revised development plan for Manor Lake Addition, explaining the circulatory system, topography, etc. Parks Planner Steve Sullivan reviewed the differences in the proposed parks plan from the original Manor Lake proposal and the revised proposal. Chairman Martin stated that the service section is a small residential area but that the proposed 2.1 acres for a park dedication is totally inadequate and is less than the required 10% land dedication. Commission member Caponi stated that under the old plan it appeared that the City had something for a park. He questioned whether this park met City standards for dedication. Steve Sullivan stated that the 2.1 acres of dedication does not meet the City's dedication policy. Bob Porter stated that Commission should recommend denial of this plat because the proposed park doesn't meet needs of the City, parks dedication, nor does it meet City Ordinance. There were additional questions from members Caponi, Sames and Alt regarding size of the park, potential for future expansion or acquisition elsewhere. With a motion by Masin, seconded by Caponi and all members voting in favor, it was recommended that the preliminary plat be denied in that the proposed park does not meet City Code requirements for a 10% land dedication, that the 2.1 acres is insufficient. Further, that the park does not provide for additional opportunities for expansion to the south as did the original Manor Lake Addition. Dallas Development Director of Parks and Recreation Ken Vraa reviewed the proposed Dallas Development stating that the issue for the commission has to do with proposed intended use of a private school. Chairman Martin stated that he felt the commission had adequately covered this issue at a previous meeting and unless there was other discussion or new information, this plat should be subject to a cash dedication. On a motion by Alt, seconded by Porter, with all members voting in favor, the commission has recommended that Dallas Development be subject to a cash dedication development consistent with the City's commercial /industrial policy. OLD BUSINESS Director of Parks and Recreation Ken Vraa distributed to the Advisory Commission the rating sheet to be used for prioritizing and rating commission objectives. There were several questions by members Caponi and Martin regarding methodology and the importance of prioritizing, noting that priorities may change as a result of time factors. 2 The commission then reviewed each of the commission's objectives and by mutual agreement, prioritized the various goals as distributed. It was decided to group these goals by priority categories and distribute them to the commission and City Council. COMMUNITY CENTER STUDY The Director of Parks and Recreation explained that in the packet there was a draft of an interim report to the City Council regarding the community center study. Three members previously reviewed an initial draft for a rewrite. The commission then reviewed each page of the draft or comment noting several changes in the report. Chairman Martin questioned whether staff had been able to do any work on the suggested survey of the community concerning their interest levels. The Director of Parks and Recreation responded that he was meeting with a firm later in the month who specializes in community surveys to determine its value to the City. After additional discusssion and questioning, with a motion by Caponi, seconded by Masin, it was recommended that the interim report to the City Council, with noted changes, be forwarded to the City Council. All members voted in favor. NEW BUSINESS LETTER OF REQUEST, MR ROY HARVEY, JR Director of Parks and Recreation Ken Vraa indicated that the City had been contacted by Mr. Roy Harvey, Jr. regarding the trailway on Riverton Avenue and Riverton Point. He stated that a letter from Mr. Harvey was included in the packet along with additional background information provided by staff. He stated that he was under the impression that Mr. Harvey was going to be present to discuss this item but was not available at this time. Commission member Carroll stated that he remembered the Advisory Commission had spent an inordinate amount of time regarding the whole trails' issue with the Blackhawk Oaks and Blackhawk Lake Additions. The question was whether the trail was installed prior to Mr. Harvey building his house. Director of Parks and Recreation Vraa said that the trail had been completed and installed prior to the house and lot construction. Mr. Caponi interjected that because he had built the house after the trail had been installed, he made some presumptions which he should not have done. He suggested that the commission reject this without comment because this is too trivial of an issue. Bob Porter suggested that this was a way of alleviating Mr. Harvey's problems, placing the burden on other homeowners. He questioned whether they had been contacted by Mr. Harvey or staff regarding this issue. Mr. Carroll stated that he felt the alternative was more difficult and that this was the best alternative of the two regardless of the timing of when the trail was installed. He went on to state that he agreed with staff's comment that the trailway is not completed and judgement is premature on its suitability. Mr. Sames commented that it is not unusual for the City to have a trail alongside people's homes. With additional discussion, and a motion by Porter, seconded by Masin, with all members voting in favor, it was the recommendation of the Advisory Commission that this trail stay at its present location. DNR FISHERIES PROGRAM Director of Parks and Recreation Vraa reviewed the current DNR Fisheries program and its impact upon City lakes. Bob Porter stated that he felt that this was an excellent program and one the kids of the community could take advantage of. There were several positive comments regarding the status of the fisheries program within the community. No action was taken on this item. PARS DEVELOPMENT CONSTRUCTION UPDATE Landscape Architect Steve Sullivan and Director of Parks and Recreation Ken Vraa reviewed the current status of the construction projects for the Advisory Commission. They noted that construction was beginning on Project 87 -01 and that tennis court contract would be open later in the month. OTHER BUSINESS AND REPORTS Staff reported on the current status of recreation programs and summer activities, noting that attendance continues to climb at the summer playground programs. Staff reported that there continues to be a rather strong market for recreation activities with the success of the Evening in the Park series, softball, playgrounds and Friday Fun days. The Parks Maintenance report was noted without comment from the Advisory Commission. ADJOURNMENT There being no further business of the Advisory Commission, with a motion by Alt, seconded by Porter, and all members voting in favor, the regular Advisory Commission meeting of July 2 was adjourned at 9:15 p.m. Date Secretary /Treasurer KV MEMO TO: ADVISORY PARKS AND RECREATION COMMISION FROM: KEN VRAA, DIRECTOR OF PARKS RECREATION DATE: AUGUST 4, 1987 RE: CONSENT AGENDA, AUGUST 6 COMMISSION MEETING Oak Cliff Pond Second Addition This site contains nine acres, is within the Winkler Jackson planned new development area. This P.D. has previously provided for its residential parks dedication requirements. Therefore, there are no recommendations for parks. B.V.D. Second Addition This plat consists of two lots on 2.5 acres at the intersection of Coachman and Yankee Doodle Roads. This particular parcel is immediately to the south of Quarry Park. Recommendation Let this plat be subject to a cash dedication requirement consistent with the City's commercial /industrial policy, and for a trailway on Coachman Road. The Stoney Point Addition This application is for 27.3 acres by Meritor Development for a single family development consisting of 78 lots. This development is east of Blackhawk Glen and immediately north of Blackhawk Hills Road. Recommendation That this plat be subject to a cash dedication requirement for residential property and for a trailway to be located along the east side of Federal Drive at the north property line and continue on the east and south side bordering Federal Drive and Blackhawk Hills Road. Harvey's Heritage Addition Primary plat is for rezoning 3.75 agricultural acres to R1 single family. This plat is for five single family lots along the southwest portion of Fish Lake, east of Pilot Knob Road. Recommendation That this plat be subject to a cash dedication requirement for single family development, and for a conservation easement to be placed on the four lots abutting Fish Lake. Such easements would protect existing vegetation. 7 Cutter's Ridge Addition This primary plat application is for rezoning 17 acres to R1 single family. This plat consists of 37 lots west of Pilot Knob Road and north of Deerwood Drive. This area is within Park Service Section 21. Recommendation That this plat be subject to a cash dedication requirement for the lots created and for a trailway along Pilot Knob Road. MEMO TO: ADVISORY PARKS RECREATION COMMISSION FROM: STEPHEN SULLIVAN, LANDSCAPE ARCHITECT /PARKS PLANNER DATE: AUGUST 4, 1987 RE: MANOR LAKE ESTATES BACKGROUND: At the July 2, 1987 meeting, the Commission reviewed and recommended denial for the proposed parkland dedication for Manor Lake Additions. Concerns of the Commission are summarized as follows: 1) The proposal providing 2.1 acres for parkland dedication did not allow for the necessary facilities for parkland development. Approximately .5 acres of the proposed 2.1 acres is lake and steep slopes. The flat area to the south is not at a dimension allowing for a 200'x200' minimum open play area. 2) The southern roadway does not allow for expansion for the park as the previous development proposal. Besides inadequate park area, the closeness of the roadways provided no "safety zone" to the open play activities. 3) The proposed sewer line which is to run east /west across the park places constraints on the development potential. Utility easements typically restrict the location of structural facilities such as playgrounds. The depth of the storm sewer may also influence the grading potential for the park. REVISED SUBMISSION: At the July 21 City Council meeting, the Council continued the item allowing additional time for revision and review by the Advisory Parks Recreation Commission at the August 6, 1987 meeting. The proponent has submitted a revised plat layout which increases the park area to 3.9 acres (Figure #1). The proposal allows for future expansion with development to the south and west. A road is proposed north of the parkland and extends to a temporary cul -de -sac. The developer anticipates to extend the road to the southeast corner of the existing homestead (Parcel A). Anticipating future purchase of Parcel A, the road could then continue through to the homesteaded parcel to create a cul -de -sac located within Parcel B. The developer owns Parcel B and until the future road connection is possible, he intends to develop only the westerly lot. The other two lots are land locked with no road frontage. The developer also proposed a trail corridor across the road from the park to the lake. PARKS DEDICATION/DEVELOPMENT REVIEW: The new proposal satisfies most of the Commission's concerns. The park has potential for future expansion with development of adjacent parcels. The developer has agreed to grade the park alleviating grading retraints in respect to the sewer line. The proposal does not, however, provide direct park access to the lake due to the bisection from the road. Staff proposed an alternative layout to the developer which allows for lake access from the park with no road bisection. (See Figure #2). Access to the homestead property and Parcel B would be accomplished with road links from the future developments to the south and west. This alternative approach (Figure #2) allows for park expansion, facility development, and lake access. The alternative relies on future development for road access to Parcels A B from the west. The developer is concerned that this alternative could landlock Parcels A B, assuming the westerly lots were not developed accordingly. Dale Runkle, City Planner, stated that typically adjacent developments are required to provide both utility and access linkage to landlocked parcels. Based on this determination, development according to Figure #1 is in accordance, but park needs are not satisfied. As a possible compromise, the developer agrees to according to Figure #2, allowing for direct lake following: 1) The future development of the southern and western to Parcels A B. FOR COMMISSION ACTION: 1 Denial of the proposal due to inadequate parkland dedication Approval of parkland dedication based on Figure #1 Approval of parkland dedication according to Figure #2 Approval of the Compromise Position Landscape Architect /Parks Planner SS /js o platting the property access subject to the parcels provides access 2) The developer would phase development in four stages with the park dedication area being the last. If the southern and western parcels do not provide timely and adequate access to the landlocked parcel, the City and developer could agree to developing the plat according to Figure #1. To review the development submission in regards to parks dedication recommending one of the following to the City Council: The City should review the parkland dedication again at the fourth phase of the development to determine if Parcels A B need access through the Manor Lake Addition. Then the park would be limited as in Figure #1. If access is available to Parcel A and B from the west, then the park would be as in Figure #2. 1 1 y2= 7 J am i R;F, 1 PROPOSED PARK DEDICATat)1il:. s... °r:. FUTURE PARKLAND EXPANSION L Z 1 1 FIGURE 1 1 Is - tfiannom■r%...%% % I %sft C) -13 13 C) r11 1 03 / c 1 1 lode \ w / _ / 20 n / / / /. /../ / / i i / / / P 4/ i n- / / / / / / / Jia / / / / / / / w t t P1 1. 0 THE POND AT CARRIAGE GREEN II EAGAN,MN • 4' 1.1" / I;1 ° h�`K zap, N ce t"— 1.D .32 q p — A\ 7' 4 P (` -pi _ VP fl t--}ir sP ' gi c o ° _s ; 4 1 Th POND SCHE>:. "IC • avid a.VIrscht ssociates, Inc. landsca"^ architects and site planners edina, minnesote-55436 (612) 938-4030 DATE 11-S116j DRAWN L WCAI REVISION RE: PARKS DEDICATION STUARTS SECOND ADDITION BACKGROUND: REVISED SUBMISSION 3. F. Paragraph 3 1i ivy APR- 4.3xLar A=Iccr v l fr C /1 fo TO: ADVISORY PARKS AND RECREATION COMMISSION 'E21 FROM: STEPHEN SULLIVAN, PARKS PLANNER /LANDSCAPE ARCHITECT DATE: AUGUST 6, 1987 PARKS DEDICATION /DEVELOPMENT REVIEW CITY OF EAGAN PARKS DEDICATION POLICY At the June 4, 1987 meeting, the Commission reviewed and recommended denial for providing any parkland dedication fee credit for the proposed recreation facility development adjacent to the northern storm water pond. The proposal included an 8' bituminous loop trail, three fitness stations, benches, fountain and landscaping. The Commission felt that the proposal did not provide significant or sufficient amenities to warrant a reduction in the parks dedication fee. The proponent has submitted a revised proposal for the recreational development of the storm water pond area. (See enclosed drawing.) The proposal deletes the miscellaneous benches and fitness stations. The amenities and facilities provided are as follows: 1. Landscaping, lawn and natural areas 2. Loop trail connected to municipal trail system 3. Pedestrian seating /overlook area 4. Fountain 5. Trail signage The estimate for development is $90,000.00. The proponent requests that the Commission recommend a waiver of the parks dedication fee. (See attached letter.) The application is for preliminary plat of a 102 unit apartment building on 9.2 acres. A parks cash dedication requirement of $392.00 per unit for apartments applies. The cash dedication required is $39,98 The proponent requests the Commission to evaluate the proposed amenity and determine the value of the proposal as it relates to the City's needs and Park Dedication Policy. The Park Dedication Policy provides for payment reduction according to the following: In those cases where subdividers and developers of land provide significant amenities such as, but not limited to swimming pools, tennis courts, handball courts, ball fields, etc. within the development for the benefit of those residing or working therein and where, in the judgment of the Director of Parks Recreation, such amenities significantly reduce the demands for public recreational facilities to serve the development, the Director may recommend to the Advisory Parks and Recreation Commission that the amount of land to be dedicated for park, playground and public open space (or cash contributions in lieu of such dedication) be reduced by an amount not to exceed 25% of the amount calculated under paragraph 2 above. The intent of the design according to the developer is to provide recreational amenities which complement the municipal trail system and O'Leary Park. The proposed loop trail would be signed with distance markers which could tie into the fitness trail /stations located at O'Leary Park. It would add additional distanct to the O'Leary Park trails. The signage would also provide general location information to trail linkage and parks. The proposal also places a pedestrian seating /overlook area at the intersection of Yankee Doodle and Lexington Avenue. The intent is to provide a pedestrian "station" at a prominent transportation node a place to rest, take bearing, observe the fountain and lake. The proposed landscaping is to enhance the trail experience and visual appeal of the ponding area. Staff's evaluation of the proposal concludes that these amenities enhance the property and provide recreational opportunities for public use. For Commission discussion it should be determined if the proposal has any value to the park system. Value substantiation can be simplified by asking, "What would the City pay for this and "Are there other recreation /facility needs where the cash park fee provides greater benefit FOR COMMISSION ACTION: Recommend one of the following to the City Council: 100% Cash Dedication Partial Cash Dedication based on approved value of the proposal Waiver Cash Dedication Respectfully submitted, ect, Parks Planner Stuart Corporation .41 300 Shepard Park Office Center 2177 Youngman Avenue St. Paul, Minnesota 551 16 -3048 (612) 698-0302 August 3, 1987 Mr. Ken Vraa Director of Parks City of Eagan 3830 Pilot Knob Road P.O. Box 21199 Eagan, MN 55121 RE: Carriage Green Phase II Pond Schematic Dear Mr. Vraa: Howard Stacker and I appreciated the input you and Steve Sullivan gave us reference the proposed improvements to the ponding area located at the southeast corner of Yankee Doodle Road and Lexington Avenue. Our landscape architect, David Kirscht has met with your staff and we are forwarding to you for review by the Eagan Park and Recreation Commission the revised plan which incorporates changes causing this improvement to enhance Eagan's O'Leary Park. As our improve- ments will reflect quality and similarity of signage in O'Leary Park, the residents of Eagan will accept this area as a natural extension to O'Leary Park. Once improved, the ponding area will be a significant asset to the City of Eagan, not only because it removes a environ- mental blight, but expands the city's facilities at O'Leary Park and creates a pleasant visual experience for individuals travelling in automobiles on Yankee Doodle Road and Lexington Avenue. As previously discussed, our preliminary estimates indicate that the proposed improvements will cost approximately $90,000. As such, we request that the Eagan Park and Recreation Commission waive the park dedication fee, allowing Stuart Corporation to apply those funds against the proposed improvements. We ave welcomed the opportunity to participate with the Cit ,of Eagan in the design of this improvement and look fo ward to its' implementation. V ri truly yours,, i Gerald L. ovell J AA Vice President /GLS:jk DEVELOP DESIGN BUILD MANAGE MEMO TO: ADVISORY PARKS AND RECREATION COMMISSION FROM: KEN VRAA, DIRECTOR OF PARKS AND RECREATION DATE: AUGUST 4, 1987 RE: SAMPLE SURVEY COMMUNITY CENTER As has been discussed, staff has researched the possibility of having an independent firm do a sample survey pertaining to a community center. (Attached is a letter from Mr. William Morris, President of Decision Resources.) Staff has met with Mr. Morris to discuss the process, advantages and disadvantages of proceeding now with a survey rather than wait until an architect has been selected. It is this writer's opinion that a survey would be an extremely helpful too! Questions could be structured to determine what citizens interests are, the strength of that interest, willingness to pay for it, facilities that should be included, as well as helping staff to set out a plan for how best to sell the necessary bond referendum. Of concern to staff is the "timing" of implementing such a survey. If the Commission and Council remain uncertain that there is a broad based support for a community center, and results of such a survey needed to demonstrate that there is (or there is not) support, then the survey should be done now. If, however, everyone is in agreement to proceed to the next stage, then a survey could be done later at the time an architect is commissioned to begin preliminary concept plans. FOR COMMISSION ACTION: Staff will provide additional background information pertaining to the sample survey and will be requesting the Commission for direction on how best to proceed. Respectf1i submitted, Director of arks Recreation KV /lb Decision 4 111 Resources Ltd. June 11, 1987 Mr. Kenneth Vraa Director of Parks and Recreation City of Eagan Eagan City Hall 3830 Pilot Knob Road Eagan, Minnesota 55122 Dear Mr. Vraa: This letter is a follow -up on our telephone conversation of last Wednesday. It is meant to provide you with a background on my company, as well as describe several projects undertaken in other cities which may have relevance in Eagan. The narrative will provide you with a general overview of our work; however, we pride ourselves on working with city staff and committees in tailoring research to fit their unique needs. DRL has been conducting survey research and strategic planning for cities for the past decade. Our first ventures were limited to specific problems the failure of the 1976 bond referendum in Plymouth for a community recreation center and the citizen unrest in Minnetonka over construction around Ridgedale. Both studies were designed to help city policy- makers in passing a new parks and recreation bond referendum in 1977 in Plymouth (that effort was successful!) and alleviating tensions in Minnetonka (action was taken, but the core problem was unavoidable!). Since that time, cities have also approached us to design general city opinion assessments or, quality of life studies as well as more focused readings of residents. Because of our work across the Metropolitan Area, we are able to bring a unique comparative perspective to the data analysis. In the past twelve months, wide ranging studies have been completed in Inver Grove Heights, Roseville, Shoreview, and a fourth study is being designed for Plymouth. A large -scale Metropolitan Area quality of life assessment for First Bank Systems completes our current data base on Metropolitan residents' attitudes, opinions, and lifestyles. The norms established by these other studies permit concrete discussion of citizens' evaluations of city services and program offerings, as well as the probability of passage of measures before the electorate. Of course, each city has its on unique identity and set of values to which citizens 3128 Dean Court Minneapolis, Minnesota 55416 (612) 920 -0337 strongly hold; but the ability to anticipate change or detect patterns which have characterized other areas give decision makers a very powerful tool for the assessment of policy options. The mix of questions contained on each survey is determined by the city; however, there are several topical areas which address issues common to most suburbs. It might be helpful for illustration, to discuss each: RESIDENTIAL PROFILE: Through the use of both demographic and attitudinal questions, DRL is able to develop a detailed profile of city residents. By merging demographics with variables such as length of time in residence and future mobility, residential waves can be detected and their implications for the future explored. Psychographic and recreational questions provide a means of deriving a city activities profile; in other areas, clusters of citizens sharing similar recreational preferences have been identified for both electoral and planning purposes. The profile, then, augments census and Metropolitan Council data by linking demographics to attitudes and activities. REFERENDUM PLANNING: Voters approach referenda with two general factors in mind: usefulness and cost. DRL has pioneered survey questions to determine the specifics of the referendum package with the best chance of passage. Both necessary characteristics and viable funding levels are established for an issue. Coalitions in support and opposition are identified, and messages of persuasion, reinforcement, or neutralization evaluated. Finally, communications channels for reaching targeted voters are rated for their cost effectiveness. SERVICES ASSESSMENT: All too often, city staff are unaware of problems in their germination stage; existing services can be criticized for their lack of responsiveness, their inability to address new problems, or their format of provision. DRL uses two types of questions: one set measures simple performance; another set views adequacy in terms of cost trade -offs. It is possible, then, to compile priority rankings and guidance for budget expansion or contraction. Much of our previous work has examined parks and recreation service evaluation: correct facilities mixes, upkeep and maintenance, perceived needs, usage, and desired changes. But, we have also evaluated such areas as emergency services, recycling, and economic development. CITY INTEGRATION: Using responses to open -ended queries, DRL is able to isolate what is uniquely special about a municipality in the eyes of its residents. Parallel to this uniqueness are the characteristics of the city which residents feel either must change or should remain inviolate. Another measure of community solidarity is the citizens' feeling of empowerment and awareness of city programs and personnel. When these and other measures are combined, DRL can determine the general predisposition of 5 Decision ME Resources Ltd. residents toward city- sponsored planned change. Naturally, the weight given to each of these topics as well as the individual questions asked depend upon the research objectives of the municipality. Once the survey has been administered and analyzed, DRL continues to work with the community. We want to insure, through follow up, that the city is able to use the data to its maximal extent. A written narrative highlights the major findings of the study and develops strategic implications. DRL then provides both formal presentations and work sessions. The former discuss the survey findings in a question and answer format; the latter raise key issues in a discussion setting. Many cities plan for a formal presentation to the City Council, as will as work sessions with city commissions and staff. After these meetings, DRL personnel are available by telephone to discuss any further questions resulting from the analysis or the strategic planning document. The cost of a survey depends upon both its length and the size of the random sample of households. We normally recommend a sample of 400 households in order to provide a breakdown of the data into segments of the community (e.g., residential zones, income, owner /renters, and longevity of residence). The minimum length of survey instruments in the past has been sixty question units. By "question unit" DRL acknowledges the fact that asking people to react to a list of options such as evaluating one of a set of ten city services takes little interview time and, hence, should not be counted as a "whole question." Bearing these considerations in mind, the cost of a sixty question unit survey of 400 randomly selected households is $4,800.00. An additional question unit increases the cost by $60.00. We have recently conducted studies of 110 question unit length and consider that to be the maximum achievable by telephone. A common question we are asked concerns keeping people on the telephone for the duration of a lengthy questionnaire. City surveys have never proven to be a great problem: most people are more than willing to spend time discussing their home towns. In fact, the disconnect, or refusal rate, for city studies is about three percent. Of course, the questionnaire is structured in such a fashion as to heighten interest for the respondent. But, in Minnesota, citizens are very interested and cooperative in answering non political questions. The issues raised by cities in previous studies run the gamut of municipal concerns. During the past three months, we have concluded surveys in three suburbs. The first of these, in Dakota County, focused on parks and recreation issues. The survey assessed facilities usage and need, in addition to judging the most desired characteristics in a proposed community /4 1t Decision MI Resources Ltd. recreation center. The second study, in Ramsey County, was evenly divided between city policies and parks and recreation issues. A very large part of the study analyzed in depth the a proposed community recreation center referendum. But, other concerns, such as general city services, future direction of economic development, and taxing /spending policies were also considered. The third study, also in Ramsey County, was partially a follow -up to a 1980 survey. The study was a total community assessment and covered issues from animal control to the housing market. The survey was motivated by a perceived feeling of uneasiness among residents since the earlier study; the results specifically detailed the salient concerns. As can be seen, survey research can be used in as many different ways as there are city concerns! I hope this discussion has provided some insight into the type of work we do and its potential usefulness for your purposes. I have also enclosed both a resume and a capabilities statement of DRL. If you should have any further questions, please feel free to contact me; in the meantime, I will plan on contacting your office after June 22nd. Sincerely, William D. Morris, Ph.D. President WDM:bbk encls. /7 Decision MI Resources Ltd. MEMO TO: ADVISORY PARKS RECREATION COMMISSION FROM: STEPHEN SULLIVAN, LANDSCAPE ARCHITECT /PARKS PLANNER DATE: AUGUST 27, 1987 RE: IMPROVEMENT CONTRACT 87 -2 TENNIS COURT /HARDCOURT PLAY AREA CONSTRUCTION WALNUT HILL PARK As a result of soil boring evaluation it has been determined that poor soils are located within the proposed tennis court area at Walnut Hill Park. Four boring were taken within the corners of the proposed tennis court. (See attached graphic) Boring #1 and #2 indicate a 5 to 6' depth of lean clay fill over 2' of silt. Boring #3 indicates 4' of lean clay fill over natural clay soils. Boring #4 indicates 3' of lean clay and clayey sand fill over natural soils. The fill soils are frost susceptible and settlement could also occur. At Boring #2 potential settlements of approximately 1" and differential frost heaves of approximately 1" could occur. The recommendation for tennis court construction according to Twin City Testing is as follows: We understand that the proposed tennis courts will have high quality surfaces with minimal differential settlement tolerances. Therefore, we do not recommend constructing the court on the existing fill at this site. The potential vertical movements due to both settlement and frost heaving could create cracking of the surface. In addition, potential frost heaves of the natural clay soils below the fill could also create unacceptable movements. If construction at this site is necessary for the tennis court, we recommend complete excavation to a depth of 6' below the entire tennis court area. Both fill and natural clays encountered within the 6' depth should be excavated, If areas of existing fill extend deeper than 6', we recommend excavating this material down to the natural soils. With this alternative, we also recommend that draintile be installed near the base of this and sand subbase. The draintile should consist of properly filtered perforated drain pipe which can be drained either to a storm sewer or other suitable outfall. Staff Recommendations Staff estimates that a 6' .subgrade excavation and imported granular fill would cost approximately $24,000, based on the 87 -2 proposal unit prices. A tennis court facility of this design costs approximately $25,000 $30,000. The soil correction would be in addition to the estimated facility costs. As a result of evaluating the soil borings and costs associated with tennis court development, staff has reviewed a hardcourt play area alternative. The City standard for a single court play area is a 40' x 40' bituminous pad. (See attached graphic). The boring indicate a 3' to 4' depth fill area adjacent to Boring #3 and #4. The recommendation by Twin City Testing for hardcourt play area construction is as follows: Based on the four soil borings performed, we recommend situating the basketball court at Boring #3. This boring is in the northwest corner of the previously proposed tennis court. The fill depth at Boring #3 is only 4' and the surface elevation is the highest of the four locations. We recommend that a 3' subcut be made under the entire basketball court. The base of this subcut should be surface compacted and any areas that yield excessively should be removed and replaced with compacted stable material. The excavation should then be refilled with compacted sand as outlined previously for the tennis court area. We also recommend that a draintile be installed in the sand subbase and allowed to drain to a storm sewer manhole or other suitable outfall. The draintile could consist of perforated PVC pipe which is filtered with a geotextile. We recommend that the draintile be installed around the perimeter of the basketball court. Staff estimates that a 3' subgrade excavation and imported granular fill would cost approximately $2,000.00 based on the Contract 87 -2 proposal unit prices. A hardcourt play area facility would cost approximately $2,500 $3,000. The soil correction would be in addition to the estimated facility cost. In consideration of the 40' x 40' hardcourt play area, the additional park space could be utilized for horseshoe pits. The horseshoe pits can withstand both frost heaving and settlement. The facility program would change for Walnut Hill Park and other recreational needs could be satisfied. For Advisory Park Recreation Commission: Staff has proceeded with the alternative of placing a hardcourt play area in the park rather than the tennis court facility, for the reasons noted above. It is also expected that sufficient room will allow for the placement of horseshoe pits adjacent to the hardcourts. If the Commission still wishes to proceed with a tennis court at Walnut Hill, appropriate direction and action will be required. SS /bls SITE MAP #3 .f4 O.KH. I C1. eenostw000! ammo.* I s losmose• f 2rww Holland I al 1 9.41e; LA, 420e a Mb IL .o,••, 11. .ms s MISIOl ..i Lgar r. o CO RD.32 Part view v 4600 !.ale e #2 .f1 WILDERNESS RUN ROAD tl city testing co on PLAY GROUND PROPOSED TENNIS COURTS LEXINGTON AVENUE EAGAN, MINNESOTA JOB NO. 4220 87 -905 T.B.M. EL.= 100.0' TOP OF HYDRANT. NO SCALE NOTE: BORINGS STAKED BY CLIENT. 1-MX_CGC A 7/w/.A. 2/ HM STATE OF DEPARTMENT OF NATURAL RESOURCES PHONE NO. 612/296-2959 July 23, 1987 John K. VonDelinde Parks Superintendent City of Eagan 3830 Pilot Knob Road P.O. Box 21199 Eagan, Minnesota 55121 Dear Mr. VonDelinde: Sincerely, Lee Sundmark Fisheries Specialist LS /242:ph METRO REGION FISHERIES, 1200 WARNER ROAD, ST. PAUL, MN 55106 cc: Duane Shodeen Martha Reger Bruce Gilbertson AN EQUAL OPPORTUNITY EMPLOYER 2 2.. FILE NO. We are pleased to inform you that we have been allocated $15,000 in funding for the aeration systems on Fish ($10,000) and Schwanz ($5,000) Lakes. This money is for either; the development of portable aeration systems, or application towards the development and installation of more permanent types of aeration. I will want to meet with you soon to discuss the types of aeration systems which will best meet our needs, and to discuss the details that need to be worked out before proceeding with both projects. Since we were unable to obtain sufficient funding for the pier on Fish Lake this fiscal year, you may choose to resubmit a C.O.R.E. application for consideration in fiscal year 1989. If you have any questions or concerns do not hesitate to call. Otherwise I will be in touch with you shortly. July 24, 1987 Mr. Roger Martin Chairman, Parks and Recreation Planning Commission City of Eagan 3838 Pilot Knob Road Eagan, MN 55122 Dear Roger, As you are probably aware, Eagan Athletic Association provides a broad range of youth sports programs for all residents in the city of Eagan regardless of school district. I'm writing to you on behalf of the association to express our concern that youth sports programs be given an appropriate voice and priority in the city's long -range planning efforts. I recently spoke to Ken Vraa about this issue and the need for better coordination and communication between the city and the athletic association in our respective planning activities. Ken was enthusiastic about the possibilities of a working relationship in this area and suggested that I contact you directly. The association has just begun the preparation of a new five year strategic planning process. I am heading the committee to develop this plan and would welcome the opportunity to meet with you to discuss our mutual interest in this topic. Please give me a call at 828 -2880 (day) or 452 -6518 (evening) so we may arrange a convenient time to get together. Si cerely, KRM /cmb Kevin R. Mitchell cc: Ken Vraat Cheryl Mesko 2 3 Mayor Bea Blomquist 3830 Pilot Knob Road P.O. Box 21 -199 Eagan, MN. 55121 Madam Mayor: July 17, 1987 4758 Hauge Cir Eagan, MN 55122 Enclosed is a letter to the editor, EAGAN CHRONICLE June 10,1987, a thank you letter to those who helped with the annual patrol picnic. I also, say thanks to those who sponsored, helped, and made donations to make the picnic a success. These young people do an excellent job in maintaining the safety of the other students. I write this letter as a question to you and the city council, why is it that the patrols from the five schools located in Eagan had to go to another communities facility to hold their function? A community the size of Eagan should have some facility to handle large functions. I know of a couple organizations that have to leave the community to hold their functions. An example, your community's hockey association, Eagan Hockey Association, had to go to the Majestic Ballroom in Cottage Grove to hold their annual Awards Potluck and Meeting and an insurance company located in Eagan has to go to Bloomington to hold their annual employee meeting. I am sure there are more. With the comming of a High School, which will be located in the community, a facility such as a community center, which could include an ice arena, gymnasium, swimming pool, meeting rooms, etc, would almost seem to be a necessity to handle school events, community events, or even local organizational gatherings. May I quote a statement from the City's Comprehensive Guide Plan, as one of its goals is to "develop as much of a self reliant community as possible wherein employment, recreational services, commericial services and community facilities for most of the needs of the residents will be provided within the community." Smaller communities have these facilities. Eagan, growing as it is, needs a facility which will cater to special intrest groups, the general populace, the young, the senior citizens and even those of us in the middle (middle age). Lets keep our residents in the community and not have them go to surrounding communities to hold their functions, skate, swim, have meetings etc. Whats exciting about a Mayor Bea Blomquist 3830 Pilot Knob Road P. 0. Box 21 -199 Eagan, MN. 55121 Si ely obert J. Smith cc: Tom Hedges, City Administrator Ken Vraa, Park and Recreation Dir. Council Members July 17,1987 community center is, local sport groups could sponsor tournaments, local organizations have mini conventions, trade shows etc, the list could go on and on. There would be a common theme to all these activities, people and revenue comming into the community. Please, take the time and look at the benefits that could result from a community center. Eagan needs one! I would like to take this opportunity to thank you in advance for taking the time and considering some of these thoughts to help make our community a better place. mlo Patrol picnic' successful To the editor: On May 19, tl3e Eagan Police Department and- the Eagan Lioness organization- were, hosts for the 18th annual School Patrol Picnic: There were 198 school patrol member* from; Noitthview, Pilot Kirob, Rahn; Tho nas.Lake and Trinity Lone Oak schools who a 1' would like to that* theper sonnel from these schools', for.- all the time and help they gave to the :many merchants busine es for their generous donattns, to Apple Valley ace Ares- for the use of t err beautiful facility and to m fellow_ officers: for them t#me 3 and help. Most of. all to the:- Eagan Lioness organization, without their help this picnic would not have been possible. No patrol member left hungry and each left with gifts. EAtoto a. #(40 itirdtt -1( 2 Lou Jeska Eagan Police Dept. CITY OF EAGAN SUBJECT: PRELIMINAN PLAT (OAK CLIFF POND 2ND ADDN) APPLICANT: BRUTGER COMPANIES, INC LOCATION: NW 1/4, SECTION 31 EXISTING ZONING: R -1 WITHIN WINKLER JACKSON PD (82 -3) DATE OF PUBLIC HEARING: JULY 28, 1987 DATE OF REPORT: JULY 23, 1987 REPORTED BY: PLANNING ENGINEERING APPLICATION: An application has been submitted requesting a Preliminary Plat for the Oak Cliff Pond 2nd Addition consisting of 33 owner occupied detached townhouse units on Outlot Bof,the Winkler Jackson Planned Development. This site contains '9 -acres immediately west of the similar 1st Addition that received Preliminary plat approval in June 1987 for 42 units. The original Planned Development Agreement called for a maximum 311 units on the west side of Slater Road. When the single family Oak Cliff Addition was approved in 1984, that number was amended to 231 units. Since then, rezonings and plats reduced the total number of units on Outlots B and C to 135 units on the 22 acres (6.3 units/acre). Oak Cliff Pond Additions will be the final residential areal on the west side of Slater Road to develop with another reduction in units from a possible 135 to 75 the total number of housing units on the west side of Slater road to 159. SITE PLAN: The existing vegetation consists of mature native hardwood trees and understory plant material. In an effort to save as many trees as possible, the developer will only grade the :,streets with the typical large .earth moving equipment. The lots will then be graded individually with smaller equipment such as a back -hoe. Retaining walls will be constructed if necessary and the building style will match the site as close as possible. Four building designs will be used the footprint on the site plan is shown only to demonstrate building setbacks and grading feasibility. All building and parking setbacks meet Code requirements. The 50' buffer area along the Burnsville /Eagan border that was discussed with the 1st Addition has been defined on the 2nd Addition plan. Staff recmmends that temporary fencing be installed prior` to any grading through the home building process to eliminate any chance of unnecessary tree loss. The proposed walk trail in that area will be soft surfaced so it can meander between the existing trees. An association will control common areas, exterior maintenance and trash pick -up. GRADING /DRAINAGE /EROSION CONTROL: The proposed site consists of wooded sloping topography with elevation differentials of approximately 70' The low point (El. 920) of this site is the normal water level of the easterly adjacent pond designated as Pond AP -10 in the City of Eagan's Comprehensive Storm Sewer Plan. The high point of this site is along the westerly property line with an existing elevation of about 990. The proposed grading plan attempts to maintain a 45' to 1 0' Wide buffer along the westerly side of Pond AP -10. The development is proposing to disturb the entire area south of the northerly property line and northerly of the pond. The development is also proposing undisturbed areas along its southerly boundary, adjacent to the single family Oak Cliff 4th Addition development. Also, the development is proposing to leave a :buffer between the development and residences of the River Woods 'singl e family residential area in the city of Burnsville. The ap ;Licaht has expressed to staff that they're very sympathetic to the o iimulg conditions in Oak Cliff Pond 2nd Addition. Their proposed grattln9 is basically limited at this time to the grading required :to construct the private street system within the development The applicant has expressed the fact that the individual housing, units are to be designed to fit the existing topography of the particular lot. As a result, staff will have an opportunity to review the lot grading on a per lot basis through the building permit process. Staff has determined that Lot 1, Block 4, as proposed, results nonbuildable lot. In addition to the proposed lot being heavi wooded, the lot will require 6 -16' of fill plus a retaining wall. The balance of the fill section sloping down to Pond AP -10, ex the maximum allowable 3:1 slope. In addition to Lot 1, Block 4, exceeding the maximum allowable 3:1 slope criteria, Lots 1 and 2 of Block 5, along with the proposed slope being constructed as a result of the entrance along the northerly side of the property, result in slopes down to Pond AP -10 in the area of 2 :1 instead of the 3t1 maximum allowed. The storm water runoff ,generated from the proposed site is intercepted by an internal storm sewer system and discharges into Pond AP -10 in four different locations. The development shall be responsible for revising the proposed storm sewer system to minimize the proposed number of outlets into Pond AP -10. The development shall also be responsible for providing the necesssary storm sewer outlets for Mary Mother of the Church and the proposed Cliff Road Shoppes development. No erosion and sediment control plan was submitted w h 'the preliminary plat application. Staff recommends that an erosion and sediment control plan, including both site map and narrative that meets the requirements of the general criteria, be submitted and approved by staff prior to the issuance of a grading permit or final plat approval. UTILITIES: Sanitary sewer and water main of sufficient capacity and depth have been stubbed to the proposed site fx existing facilities in Slater Road. zs' CONDITIONS: OAK CLIFF POND 1. All standard platting conditions shall be adhered to. 2. This plat shall be reviewed by the Advisory Parks and Recreation Commission for their dedication requirements. 3. A copy of the Homeowners Association that governs both Oak Cliff Pond Additions shall be reviewed by the City Attorney prior prior to final plat approval. ZS 4. All exterior building maintenance shall be the respond °ibility of the Homeowners Association. 5. The Building Inspections Department will require a minimum of 10' between buildings. 6. The exterior colors shall be compatible with the 1st Addition. 7. 25' minimum building setbacks along the private street will be required and 20' minimum in the cul -de -sac. 9. Fencing along the 50' buffer area on the Eagan/Burnsville border will be required during the construction process until those units closest to that line are finished. 10. The development shall be responsible for constructing the proposed internal private street system in accordance with City of Eagan design standards. 11. The development shall be responsible for dedicating the appropriate water main, sanitary sewer and storm sewer easements. 12. A revised grading plan shall be submitted to staff taking into consideration the concerns outlined in the staff report concerning the northerly end of Pond AP -10 and the impact the grading has on the ponding area. 13. This development shall dedicate adequate drainage ark! ponding easements to incorporate the required high water elevation necessitated by City storm water storage volume requirements. 14. All public utilities necessary to provide service to this development shall be ''designed by a registered professional engineer in accordance with City Codes and engineering standards and policies and approved by staff prior to final plat approval. 15. A detailed grading, drainage, erosion and sediment control plan must be prepared in accordance with current City stan and approved by staff prior to final plat approval. 16. This development shall be responsible for the acquisition of all regulatory agency permits in the time frame required by the affected agency. 17. The development shall be responsible for providing service to the northerly adjacent properties. 18. The development shall be responsible for providing utility easements (water and sanitary sewer service) in accordance with staff recommendations to adequately serve the, rortherly adjacent property. STATE ,P to'cam; -1- ��7jYw .-ners ttql7r AI CLI►r Oo4 0 1 HIGNwAY 'OAK CLIFF ION I ti 0 3RD ADDITION I (AM000 STATION/ ma c 1 0 1 y� 4 o 'V L....._...._... 0 1 7 2 NO. 1 32' :iri►T� 7.1 [ST I'1 4 2 •..--1 1 1 1. ssssss s s 11 1 1. I I ■■•••■•■••■•••■■,••••■•■03•111.... 1 A11.4 31.11 N NZ j 3/ I Mary Mohler GI TM Mesh i Proposed' Clltl Rood SDoppes OAK CLIFF POND 2nd ADDITION Preliminary Plat N. YS t OWNER- DEVELOPER ----c7. //T One Sw.00d Dr I Z-72: 6 2 Ou(f A/ J r 4 P.O21,7:419: vf�' SI. 56302 I' 2 Fr i I %jj TEL; {612)252 -6262 I m '1‘7"A 1 1 2 p/ I l 3q A t. I I I 0T (I -e 1 1 1 u I p 4 4 v 4 r ourLOr lia ii q 7 I Q J 11 I i s 1 J a 1 to f y III 1 s e 11 14 il 13 CA e CLIFF 1 1 1- ...I.. 1 1 ,I\\ s Jam\ D �I I II u v I ht" I 1\ lz 1 20 zl P 4 23 te I 1 I e ^rr r- I 6 r yf• I OAK I CLIFF MIDWEST LAND /y Y6YOp6. WQ SITE DATA Ar•• el LW 4 Acres el A.1.4.*, A.1.4.*, le An. of Lemon. mmw See. U Tl Ave. TOTAL AREA I2.40 ACRES 53 5031y•• F•.rr D•I31•e T..,003 2 .56111.1• pw Asr• LEGAL DESCRIPTION De11w DAR CLIFF. D•mN Ceaolr. MM•wIt CITY OF EAGAN SUBJECT: APPLICANT: ILLIAM HENNING COMPANY` LOCATION: OUTLOT A BBD ADDN., SW 1/4, SECTION 9 EXISTING ZONING: NB (NEIGHBORHOOD BUSINESS) DATE OF PUBLIC HEARING: JULY 28, 1987 DATE OF REPORT: JULY 21, 1987 REPORTED BY: PLANNING ENGINEERING APPLICATION: An application has been submitted requesting a Preliminary Plat for t e BBD 2nd Addition. This plat consists, of mediately north of the 1st Addition on the man and Yankee Doodle Roads. This proposal is for a self service car wash on Lot-1 (.92 acres and a 12,600 SF office/day care building on Lot 2 (1.53 acres). Code does not specifically list car washes in Neighborhood districts but does allow automobile service stations subject to a number of conditions. Gas pumps and two service bays were approved with the 1st Addition without car wash capabilities. Two Conditional Lse Permit conditions for auto service are important to t his application: Neighborhood Business Conditional Uses Item 3 Automobile Service Stations (b) The opening of any service station shall follow and not precede the construction and occupancy of a minimum of 10,000 sq. ft. of retail shopp,ng center floor space. (c) The opening of any service station shall provide service bays for minor repairs or service only and shall be designed to serve adjoining residents and not transients. The 14,000 SF strip center will open this fall, and the 8 bay, 3,70Q SF car wash has a lot coverage of 9% in a 20% district. The intent is to provide service for this heavily zoned multiple area. Code only allows car washes as permitted uses in GB districts and as a Conditional Use in CSC, RB and RSC districts. Therefore, a Rezoning or an Amendment to allow car washes as a Conditional Use in NB districts will be necessary. CITY OF EAGAN SUBJECT: PRELIMINARY PLAT, CODE AMENDMENT, CONDITIONAL USE PERMIT (BBD 2ND ADDN.) APPLICANT: WILLIAM HENNING COMPANY LOCATION: OUTLOT A BBD ADDN., SW 1/4, SECTION 9 EXISTING ZONING: NB (NEIGHBORHOOD BUSINESS) DATE OF PUBLIC HEARING: JULY 28, 1987 DATE OF REPORT: JULY 21, 1987 REPORTED BY: PLANNING ENGINEERING APPLICATION: An application has been submitted requesting a Preliminary Plat for the BBD 2nd Addition. This plat consists of two lots on 2.5 acres immediately north of the 1st Addition on the northeast corner of Coachman and Yankee Doodle Roads. This proposal is for a self service car wash on Lot 1 (.92 acres) and a 12,600 SF office/day care building on Lot 2 (1.53 acres). Code does not specifically list car washes in Neighborhood districts but does allow automobile service stations subject to a number of conditions. Gas pumps and two service bays were approved with the 1st Addition without car wash capabilities. Two Conditional Use Permit conditions for auto service are important to this application: Neighborhood Business Conditional Uses Item 3 Automobile Service Stations (b) The opening of any service station shall follow and not precede the construction and occupancy of a minimum of 10,000 sq. ft. of retail shopping center floor space. (c) The opening of any service station shall provide service bays for minor repairs or service only and shall be designed to serve adjoining residents and not transients. The 14,000 SF strip center will open this fall, and the 8 bay, 3,700 SF car wash has a lot coverage of 9% in a 20% district. The intent is to provide service for this heavily zoned multiple area. Code only allows car washes as permitted uses in GB districts and as a Conditional Use in CSC, RB and RSC districts. Therefore, a Rezoning or an Amendment to allow car washes as a Conditional Use in NB districts will be necessary. 33 Code does not list day care facilities as Permitted or Conditional Uses. There is a day care facility in the NB zoned Hilltop Addition. For that location, the. Council approved a Conditional Use Permit determining that the use was similar and compatible with other NB uses. The 1st Addition submission listed this area as a potential day care location: SITE PLAN: Two additional shared driveways serve these two lots. The 24' drive lane, no parking area along Coachman Road will be maintained. A landscape plan for both lots was submitted and ties in well with the previous proposal on a preliminary basis. 'All Landscape Policy requirements have been met and all setbacks /lot coverages meet Code requirements. LOT 1 CAR WASH: Access to the wash bays will be from the east or rear side of the building with the exit drying area on the west. This will help eliminate potential freeze /thaw problems in the winter. The building will also have blow dryers. The exit 'area will be striped visually separating the drying area from the drive lane. Three vacuum islands are provided near the eastern portion of the lot. Free flowing movement for the entire length between the convenience center and car wash lots will be provided but not between the car wash and office building /day care where movement will be limited to the drive lane along Coachman Road. All trash will be contained within the 4 -sided same exterior finish building. Staff recommends a solid brick exterior to match' the center. The proposed hours of operation shall be 7 :00 a.m. 10:30 p. LOT 2 OFFICE /DAY CARE: The proposed one -story 12,600 sq.ft. building would be split with 7,600 sq. ft. for office and 5,000 sq. ft. for a day care facility next to Coachman Park. 40 10' -wide parking stalls have been provided for the office building (Code requires 40) and an additional 20 will be provided for the day care (60 total). The stalls on the south side of the building should be moved to line up with those on the perimeter of the site, and the 14 along the eastern property line should be designated for employee use so those in front of the building are more available to the public. The trash has been enclosed within the building. Building elevations will not be completed until users have been determined. The applicant is aware that roof top fan units shall not be visable. GRADING /DRAINAGE /EROSION CONTROL: The proposed grading plan provides for a 3' high retaining wall along the parking area on the easterly side of the building on Lot 2. Staff advises against the use of retaining walls where feasible and recommends obtaining slope easements from the adjacent property owner. The remaining site grading required on the site is minimal. Existing storm sewer, adequately sized to serve this developnt,.is readily available in the southwesterly corner the site. The development proposes to intercept the run off generated by the site by an internal storm sewer system and convey the runoff to the existing storm sewer facility. Staff recommends the addition of two catch basins. One is to be located at the end radius on Coachman Road on the upstream. side of the entrance road and the other located in the southwest corner of the parking lot which serves the building on Lot 2. An erosion and sediment control plan acceptable to staff is required prior to building permit and grading permit issuance. UTILITIES: Sanitary sewer of sufficient size, depth, and capacity exist along the easterly right -of -way of Coachman Road. The development proposes to connect to the existing manholes. This will not be allowed. New connections directly into the sanitary sewer main will be required. An 8" water main stub from the existing 18" water main in Coachman Road has been provided. The development is required to provide an 8" water main along the westerly side of Lot 1, Then continue easterly along the common lot line of Lots 1 and 2 to the easterly line of the proposed development. The easterly extension is required to serve the easterly adjacent property. The proposed lots can then take their service from this 8" water main. STREETS /ACCESS /CIRCULATION: Access to the site is provided from Coachman Road. The proposed driveway location is required to be located opposite the existing drive on the west side of Coachman Road. The development is proposing the proper width driveway with acceptable curb return radii. The development shall be responsible for constructing concrete valley across the two driveway locations. Adequate turning radiuses are provided for unimpeded tra circulation. RIGHT WAY /EASEMENTS /PERMITS: The proper right -of -way width for Coachman Road and Yankee Doodle. Road was provided for with the BBD Addition. A 20' easement is required for the proposed water main extension through the property. Additional sanitary sewer easement is required for the existing sanitary sewer along the westerly side of the development. This development shall be responsible for the acquisition of all regulatory agency permits in the time frame required by the affected agency. This proposed development should assume its proportionate share of the pending assessments against the underlying parent parcel fox the upgrading of Yankee Doodle Road under Project 427. This proposed development will also be responsible for the folloWing proposed assessments as a condition of final plat approval: Project Descriptioa Usage Rate Quantity MeM 61 Water Area Upgrade Comn. /Ind. $1920 /Ac. 2.52 Ac. $4,838.40 70A Sanitary Sewer Lateral $15.06/FF 431.25 FF 6,494.62 Total Proposed Assessmegts All final assessment obligations will be calculated based on final plat dimensions and rates in effect at the time of the final plat approval. CONDITIONS: BBD 2ND ADDITION 1. All standard platting conditions shall be adhered to. 2. Both buildings shall be constructed on all four sides of the same material. 3. No rooftop mechanical equipment shall be visable. 4. Employee parking shall be designated on the east side office building. 5. The parking stalls on the south side of the building shall up with each other. 6. All signage shall be subject to the one -time sign fee of $2.50 SF, and signage over 7' tall will be subject to separate Conditional Use permits. 7. The landscape plan financial guarantee shall not be reieesed until one year after the installation date. 8. The car wash shall operate between the hours of 7:00 a.m. 10:30 p.m. only. 9. All trash shall be contained within the buildings. 3 10. The storm sewer as proposed will be revised to reflect the addition of two catch basins as outlined in the staff report. 11. An erosion and sediment control plan acceptable to staff shall be required prior to building permit or grading permit issuance. 12. The proposed sanitary sewer service taps into the existing sanitary manhole shall not be allowed. New connections directly into the sanitary sewer main will be required. 13. The development shall be responsible for extending an 8" water main along the westerly side of Lot 1 then easterly along the common lot lines between Lot 1 and Lot 2 to the easterly property line of the proposed development. 14. The proposed access to Lots 1 and 2 of the proposed developiaen shall be lined up with the westerly adjacent private drive. 15. The development shall be responsible for constructing concrete valley gutters across the two driveway entrance locations. 16. The development shall be responsbile for providing a 20' easement for the proposed 8" water main extension across the site. 17. The development shall also be responsible for providing additional easement for the existing sanitary sewer along the easterly side of Coachman Road. The width of the required sanitary sewer easement will be determined from the actual location of the sanitary sewer. 18. The development shall be responsible for the acquisition of all regulatory agency permits in a time frame required by the affected agency. 19. The development shall accept its additional assessment obligations as defined in the staff report in accordance with final plat dimensions and rates in effect at the time of the final plat approval. 20. The development shall dedicate 10' drainage and utility easements centered over all common lot lines and adjacent to private property or public right -of -way. 2 1. All utilities necessary to provide service to this development shall be designed by a registered professional engineer in accordance with City Codes and engineering standards and policies and approved by staff prior to final plat approval. 22. This plat shall be subject to the recommendations of the Advisory Parks And Recreation Commission and approved by City Council. 1 I A Al 1.911uat 4sa •am —DOE salePosse atioisPi ri NLr RIM 1111111 1111 1111 Ind Arall mumumerm ,41 mairmillOWINOMP4 ti 4Ti 1 a SIM 600 mou aucoLudolanaa bPItJ xod 0 al plead •Ipecia •enu.% .904n 19.1 wo mode u■s■ 'ON MOO 40 //CO CO spa}.yaie a.gsaleposse a4�ois1!�i laaaaa21112r uw 'ue8.N pw.1 u*u14/N1oo 6 uiplinq some R 4 -mnot JIRO iwu auewdoienep xoa prom sipeoa rr>tuuA -eit a 'ON 111141 CITY OF EAGAN SUBJECT: REZONING, PRELIMINARY PLAT, VARIANCE (STONEY POINT ADDITION) APPLICANT: MERITOR DEVELOPMENT CORPORATION LOCATION: SE 1/4, SECTION 16 EXISTING ZONING: A (AGRICULTURAL) DATE OF PUBLIC HEARING: JULY 28, 1987 DATE OF REPORT: JULY 21, 1987 REPORTED BY: PLANNING ENGINEERING APPLICATION: Separate applications have been submitted requesting a Rezoning of 27.3 Agricultural acres to an R -1 (Single Family) district and a PreliJairry Plat for the Stoney Point Addition. This plat containing 78 lots east of the Blackhawk Glen Additions and west of Hwy. 35E is in conformance with the January 1987 Land Use Plan that designates this area as Residential D -II (0 -6 units /acre). LAND USE: This development abutts agricultural land to the north and undeveloped R -3 and R -4 parcels within the Blackhawk Park P.D. also owned by Meritor Corporation. Sienna Corporation owns the R -1 property to the SW of the subject site (Blackhawk Hills). The topography is rolling with knolls and depressions. The existing vegetation is primarily young to medium in age consisting mostly of elm, cottonwood and poplar often found in the low lying areas. SITE PLAN /CODE CONFORMANCE: This proposal is for 78 lots varying in size from 9,375 SF to 49,300 SF averaging 13,900 SF. The gross density is 2.48 units /acre and the net density is 2.85 units /acre. The minimum lot width is 75',, similar to the Blackhawk Glen Additions to the west. That preliminary plat was approved for 111 lots in 1985 with 97 deviating from R -1 standards. The 1st and 2nd Additions containing 70 lots have been final platted and the following is a comparison of those additions and the proposed Stoney Point Addition. Blackhawk Glen Stoney Point 1st 2nd Additions 1st Addition 70 Number of Lots 78 38 Under 85' Width 42 29 Under 12,000 SF 40 20 Under 85' Width 19 12,000 SF 75' Minimum Lot Width 75' 10,006 Minimum Lot Size 9,375 SF Lk- Meritor Development will have one builder, J.B. Franklin, construct all of the homes but keep architectural control. All homes will have cedar siding and at least one tree per unit. This will help establish a more unified streetscape than in other small lot subdivisions. No variances from setback requirements have been requested for this single phased proposal. GRAINAGE /DRAINAGE /EROSION CONTROL: The topography on this site is rolling and generally slopes to Pond JP -5. Pond JP -5 is designated in the City of Eagan Comprehensive Storm Sewer Plan. The proposed street grades are in accordance with City of Eagan standards, however, the maximum allowable street grade of 8% is proposed at three different locations. In an attempt to minimize the proposed 8% street grades, staff advises the developer to consider lowering the street grades in the southeasterly and westerly part of the plat. Placing this excess material in the northeasterly cul -de -sac and the street located southerly from the northeasterly cul -de -sac where filling could be done will the proposed 8% street grades in those two locations. The proposed grading plan complies with the maximum allowable 3:1 slope criteria. The drainage on the site is being conveyed by storm sewer to Pond JP -5. The proposed development is identified in the Comprehensive Storm Sewer Plan as being tributary to Pond JP -5. The outlet pipe for Pond JP -5 however needs to be extended from Federal Drive. This required outlet pipe extension shall be the responsibility of this development. The submitted preliminary grading plan adequately covers the general criteria required in an erosion and sediment control plan. UTILITIES: Sanitary sewer of sufficient size, capacity and depth exists through the center of this site. Relocation of the sewer in Lots 4 and 5, Block 4 is proposed in order to accommodate proposed lot lines in the street alignment. It is recommended that a portion of the existing sanitary sewer in Lot 14, Block 1 also be relocated to conform with the proposed lot lines. The existing 8" water main at the southwesterly corner of the site is proposed to be extended through the site. The 30" trunk water .main which exists at the northwesterly corner of this site will be extended a short distance into this site in anticipation of future extension. The 30" trunk water main was anticipated being constructed along the north line of this site in the future roadway. However, because this development is not proposing a roadway along this northerly line, the 30" trunk water main will have to be extended northerly to Violet Lane and then easterly along Violet Lane to Federal Drive. Ultimately the 30" trunk main will cross I -35E and connect to the existing 30" main at Duckwood Drive and Pilot Knob Road. This development shall extend the water main in Federal Drive serving the northeasterly cul -de -sac to the north line of this site which will ultimately connect to the existing water main in Violet Lane. STREET CIRCULATION /SIDEWALK: This site will be served by Blackhawk Hills Road and Federal Drive. Both Blackhawk Hills Road and Federal Drive were recently upgraded as a part of the I -35E construction. Also as a part of the upgrading of Federal Drive it was anticipated a roadway would be constructed along the north line of this site. Therefore, a 44' wide street opening with curb returns was provided. The development will be responsible for removing the street opening and constructing concrete curb and gutter as required. Pacific Avenue located in Hampton Heights is proposed to be extended a short distance along the north line of this plat. This extension will require an easement from the property to the north because the centerline of Pacific Avenue is located along the northerly line of the property. Street right -of -way within this development is 60'. Therefore, the street surface will be required to be 32' wide, face of curb to face of curb. Consideration should also be given to extending the existing sidewalk located on the east side of Federal Drive at the north line of this plat along this development's east and south side abutting Federal Drive and Blackhawk Hills Road. EASEMENTS /RIGHT -OF- WAYS /PERMITS: The proper right -of -way width for Federal Drive and Blackhawk Hills Road has been previously dedicated. In addition to the common lot line drainage and utility easements, additional easements along the common lot line shall be dedicated of sufficient width to accommodate utility extensions as required with the final approved plans and specifications. This development shall be responsible for dedicating the required ponding easement for Pond JP -5 which incorporates the proposed high water elevation in accordance with the City of Eagan's Comprehensive Storm Sewer Plan. All regulatory agency permits shall be acquired within the appropriate time frame as required by the affected agency. ASSESSMENTS: The proposed site has been assessed for sanitary sewer trunk and storm sewer trunk facilities under Project #58 and #279 respectively. The following assessments are pending under Project 372: 4(if Project 372 372 Description Storm Sewer Lateral Street Use Single Family Single Family Rate $9.24/FF $29.49/FF Total Pending 2,14 FF 2,14 FF The following assessments have been proposed as a condition of plat approval: Project Description Uwe Rate Water Area Lateral Benefit From Sanitary Sewer Single Family Single Family $50/Ac. 27.3 $15.16/FF 350 zbtal Proposed Assessment The final assessment amount will be determined using at the time of final plat ,approval andbased on final and areas. Pendini $19,818 63,256 r =tes in effect p at dimensions CONDITIONS: STONEY POINT ADDITION 1. All standard platting conditions shall be adher d to. 2. No direct lot access onto Blackhawk Hills Roa /Federal Drive shall be permitted. 3. One street tree per unit shall be installed Wthin the ;front property line prior to building occupancy. A l'st of,PerfOtted species shall be submitted for staff approval .rior to 'final plat approval. 4. This development shall accept its additio al assessment obligations as defined in the staff's report in accordance with the final plat dimensions and the rates in effect at the time of the final plat approval. 5. This development shall •dedicate 10' draina e and tittlity easements centered over all common lot lines nd adlaceat to private property or public right-of-wa•. 7. All public streets and utilities necessary to to this development shall be designed by professional engineer in accordance with engineering standards and policies and approved to final plat approVal. 8. This development shall be responsible for re existing sanitary sewer line which runs basica middle of the site to accommodate the proposed configuration. 9. All internal public and private streets shall within the required right-of-way with City desig 10. This development shall be responsible for pro easements for the storm sewer outlets into Po realignment of the existing sanitary sewer. 11. This development shall be responsible for the all regulatory agency permits in the time frame affected agency. Plan. 6. This development shall dedicate adequate drain ge and pOading easements to incorporate the high water line f r Pond JP-5 in accordance with the City of Eagan Comprehensive Storm Water rovide service a registered ity Codes and by staff prior ()cation of the ly through the oadway aniClot be constructed standards. iding adequate d JP-5 and the acquisition of equired by the 12. The development shall be responsible for con truction of a temporary cul-de-sad in the northwesterly corner of the site. .13. The development shall be responsible for co structincthe required outlet for Pond JP-5 as a condition of this development. 14. The development shall be responsible for extending the 30" trunk water main which exists at the northwesterly corner of this site along the north line of the development to a point where the northerly street intersects the north line of the development. 15. This development shall be responsible for extension of the water main in Federal Drive serving the northeasterly cul -de- sac to the north line of this development. 16. This development shall be responsible for removing the existing 44' wide street opening at the northeasterly corner of the site. 17. The development shall be responsible for extending the existing sidewalk located on the east side of Federal Drive at the north line along this development's east and south sides abutting Federal Drive and Blackhawk Hills Road. 18. This plat shall be subject to the reommendations of the Advisory Parks And Recreation Commission and aproved by City Council." AfLLtT L1 401 111,„ L'EA0A7 MUNICIPAL CENTER 1w•{AM SON MO eiaaNOle: MM 'OIIOLY)MM LIMAS MAN 'M NOS LotlslodioO luswdoteAep ioi eyy 1 J V1d A1IVN1111113Bd 3UTOd £oUO3S `s 11 C g gg .t t t Y Y 4 4 g R II R L 9 9 _4 15 2 gag 111 E li M bb -ter: 398-1 r MA IOU. LS /YL/ UL• 'r OOPS UoillUOCUOD luawdol,AeO Jospvyy NV"ld ONIOVIde A8VNIWll3tld augod £auo3S CITY OF EAGAN SUBJECT: REZONING, PRELIMINARY PLAT (HARVEY'S HERITAGE ADDITION) APPLICANT: MARY K BRAUN LOCATION: SW 1/4, SECTION 15 EXISTING ZONING: A (AGRICULTURAL) DATE OF PUBLIC HEARING: JULY 28, 1987 DATE OF REPORT: JULY 14, 1987 REPORTED BY: PLANNING ENGINEERING APPLICATION: Separate applications have been submitted requesting a Rezoning of 3.75 Ag. (Agricultural) acres to an R -1 (Single Family) district and a Preliminary Plat for the Harvey's Heritage Addition. This plat consists of five single- family lots along the southwest portion of Fish Lake just east of Pilot Knob Road. This plat is in conformance with the January 1987 Land Use Map designating this area as D -I 0 -3 units /acre. SITE PLAN: Fish Lake is classified as a General Development Lake within the City's Shoreland Ordinance. The proposed building pad locations exceed the specific setback requirements and 75' minimum width at the water line. All typical City setbacks and R -1 standards have been adhered to except for the existing detached garage on Lot 1. The setback along the public street is 10' and 30' is required. Lot 1, containing 33,500 SF, and the existing home will receive access from a new driveway onto Drexel Court. Lots 2 -5 vary in size from 14,725 SF 23,400 SF and will be served from the proposed Braun Court. The existing gravel driveway to Pilot Knob Road will be removed with this proposal. w Lots 1 -4 are heavily wooded and Lot 5 is relatively open. The applicant intends to market the lots to individuals so that custom building sites are created with as little disturbance to the site as possible during grading, and construction. GRADING DRAINAGE /EROSION CONTROL: The grading of be accomplished in part by City Project No. 487 whi lot grading will be performed by the developer. Th lots basically provides for excavating Lots 2 and 3 excess material in Lots, 4 and 5. The proposed grad cut and fill slopes exceeding the maximum 3 to 1 a recommended the resulting slopes be no steeper than Drainage on the westerly end of the site will be proposed storm sewer in Braun Court, while the east directed to the existing storm sewer in Drex ultimately discharges to Fish Lake. EASEMENTS/RIGHT OF WAY/PERMITS: This developments half right -of -way for Braun Court and a 55' radius cul -de -sac. A 20' wide easement is required for extension from Braun Court. Ponding easement for JP -4) shall be dedicated in accordance with the Com Sewer Plan. raun Court will e the proposed grading oo the and p the ing plans Shows lowabl.e.- It is :1. irected to the rly end will be 1 Court which City of Eagan placing of fill Proper erosion control measures in accordance wit (SWCD) recommendations shall be utilized during the adjacent to Fish Lake. UTILITIES: Sanitary sewer and water main of suff'cient size and depth presently exist in Braun Court. City Projec No. 487, Braun Court Street Improvements, provides for sanitary sewer and water service stubs to each of the proposed lots. STREET CIRCULATION DRIVEWAY: Street access to the propeee d site will be provided from Braun Court and Drexel Cour Based on the public hearing for City Project No. 487, Lots 3, 4, and 5 will obtain driveway access to Braun Court, however, L 2 must obtain it's driveway access onto Drexel Court unless i shares in the assessments for Braun Court. all pro v ide 25' or the pro he storm *ewer Fish Lake Pond rehensive•=Storm All regulatory agency permits shall be acqui ed within the appropriate time frame as required by the affecte• agenoy ,(Co-unty Highway, MPCA, Department of Health, etc.). HARVEY'S HERITAGE ADDITION ASSESSMENTS: The proposed site was previously ass area and sanitary sewer trunk under Project No. 5 sewer trunk (large lot credit) under Project No. 279. No. 279, 61,875 S.F. of the 108,900 total square fee in the storm sewer trunk assessment. The balance, storm sewer trunk obligation, will be a cond development: Project Description Rate •uant 279 Storm Sewer Trunk .053 /SF a unt 492 47,02'/SF Under City Project No. 487, the proposeod site wil be subject to street, sanitary sewer service and water service ass= ssments. Final assessment obligations are determined base dimensions and areas and the rates in effect at th plat approval. ssed for water and for storm Under Project were included 47,025 S.F. of ition of this on final Fplat time of final CONDITIONS: 1. The grading plan shall be modified to adhere allowable 3 to 1 slope criteria. 2. Drainage on the westerly end of the develo directed to Braun Court while the easterly directed to the existing system in Drexel Court. 3. The development shall be responsible for provi right -of -way for Braun Court along with a 55' proposed cul -de -sac. 4. The development shall dedicate the necessary 2 for the storm sewer extension from Braun Court. 8. This development shall dedicate adequate drain easements to incorporate the required high w necessitated by City storm water storage volume 9. All public streets and utilities necessary to to this development shall be designed by professional engineer in accordance with C engineering standards and policies, and approve to final plat approval. 10. A detailed grading, drainage, erosion, and se plan must be prepared in accordance with current and approved by staff prior to final plat approv This development shall insure that all temp public streets shall have a cul -de -sac c accordance with City engineering standads. 12. A detailed landscaping: plan shall be prepared staff with adequate financial and time guara final plat approval. 13. All internal public and private streets shall within the required right -of -way in accordance w standards. 11. constr toted City design to the ment shall be end shall be ing. a:2 r ad i u wide e sa 5. This development shall accept its additio obligations as defined in the staff's rep assessments identified in City Project No. 48 with the final platy dimensions and the rates i time of final plat approval. 6. This development shall dedicate 10' draina easements centered over all common lot lines private property or public right -of -way. 7. This development shall dedicate all public right -of-w temporary slope easements for ultimate develop nt of ad roadways as required by the appropriate jurisdictional al asses rt in acc eff e and utility nd adjacent to ge and. poling ter elevation equirements. rovide service a registered ity c. wend by staff for iment control City standards 1. rary des nstruc nd approved by tees prior to be th 14. This development shall be responsible for the acquisition of all regulatory agency permits in the time frame equired by the affected agency. 17. All standard platting conditions shall be adhere to. 18. A variance to allow the existing detached garag 10' front property line shall be permitted. 15. This development shall fulfill its par s dedica requirements as recommended by the Advis•ry Parks nd Recreation Commission and approved by Council ac ion. 16. All standard platting and zoning conditions sh..11 be adhered to unless specifically granted a variance by Cou,cil action. P�12' 4 t- 1 17 sb Lill R c: j A- V Q O ,7 in f 2 et k 7 N tu N C Cr Q °-,,,-"e O9 ,581 90'99£ idnOO M „6Z,bZ.0 N 51 �no.f's 5 0 7, MS e �t�j 73X32:1O 3 „6Z, *Z• 0 S ,ZEI o 90'99£,/ ,00I Si 5 CITY OF EAGAN SUBJECT: REZONING, PRELIMINARY PLAT (CUTTER'S RIDGE ADDN. APPLICANT: GRAHAM DEVELOPMENT 'LOCATION: NE 1/4, SECTION 21 EXISTING ZONING: A (AGRICULTURAL) DATE OF PUBLIC HEARING: JULY 28, 1987 DATE OF REPORT: JULY 21, 1987 REPORTED BY: PLANNING ENGINEERING APPLICATION: Separate applications have been submitted requesting a Rezoning of 17.02 Ag. (Agricultural) acres to an R -1 (Single Family) district and a Preliminary Plat for the Cutter's Ridge Addition. This plat consists of 37 lots west of Pilot Knob Road and north of Deerwood Drive. This plat is in conformance with the January 1987 Land Use Plan that designates this area D -II Mixed Residential 0 -6 units /acre. LAND USE: The site generally consists of open grassland with an acre or so of hardwood trees just north of the existing 3 -acre homestead to the south. Except for the R -1 Kings Wood Addition along Pilot Knob Road to the north, all adjacent land uses are agricultural including the homestead that has a direct driveway onto Pilot Knob Road. This proposal eliminates that driveway with access onto the street 'A' cul -de -sac. Street 'A', the main access to this site, matches Rocky Lane on the east side of Pilot Knob Road. Road stubs to adjacent property have been provided and the applicant submitted a conceptual development plan onl to ensure that those areas could be serviced by roads and utilities. Those areas are owned by other people than the applicant. This plat consists of the 17 lots, Outlot 'A' (1.35 acres) that will be developed as the 2nd Addition when Street 'A' and 'C' connect providing public access to four more lots; and Outlot 'B' (.04 acres)• that will be incorporated into the King's Addition when that area develops. Lot 6, Block 1, the stove pipe lot, meets street requirement and all other lots are at setback line. Lot sizes vary between 12,000 gross density is 2.2 units /acre and the units /acre. No individual lot variances have the 50' width at the least 85' wide at the SF and 26,685 SF. The net density is 2.8 been requested. GRADING /DRAINAGE /EROSION CONTROL: The proposed grading plan provides for street grades in accordance with City of Eagan standards. The proposed streets generally conform to the existing contour of the land. The proposed grading plan complies with the City's maximum allowable 3:1 slope criteria. The developer will need to incorporate into his grading plan the future design grade for Pilot Knob Road. Drainage on this site is proposed to be conveyed by storm sewer to the northerly end of street "C From this point, the storm sewer will be extended northwesterly outside the plat boundary connecting to either the existing storm sewer in I -35E or be extended along the easterly right -of -way line of I -35E to Pond JP -5. Presently, MnDot is reviewing the proposed storm sewer connection to the I -35E storm sewer. Their review will evaluate if 16.5 acres of runoff from Cutter's Ridge can be accommodated in their storm sewer system. The easements required to extend the storm sewer beyond the plat boundaries shall be the responsibility of this development. It is recommended that storm sewer be extended southerly between Lots 6 and 7, Block 3, to the back lot line to intercept backyard drainage. It is further recommended this storm sewer be continued southerly between Lot 12, Block 3, and Outlot A to the westerly end of street "A This southerly extension of the storm sewer is required to intercept approximately 400' of street runoff which the development proposes to intercept in the backyard area of Lots 3 and 4, Block 3. However, even though the runoff from the westerly terminus of street "A" is being intercepted by the southerly extension of a storm sewer between Lot 12, Block 3, and Outlot A, the proposed storm sewer between Lots 3 and 4, Block 3 w i l l still be required to intercept backyard drainage. The erosion and sediment control plan which was submitted with this application was incomplete and requires revisions. A major concern in this project area is the impact which the runoff will have on Blackhawk Lake. Consideration should be given to design Pond JP -5 as a sediment basin. This sediment basin would serve as a storm water runoff treatment pond prior to its discharge into Blackhawk Lake. UTILITIES: Sanitary sewer to serve this site will be provided by an existing 8" sanitary sewer stubbed beneath I -35E. This existing 8" stub is approximately 800' north of the proposed development. The development has petitioned the City for the necessary trunk facility installation to serve the proposed development. The easements required to extend the sanitary sewer beyond the plat boundaries shall be the responsibility of this development. The development shall bear the responsibility of providing sanitary sewer extensions to its westerly and southerly boundaries adequately designed to serve the adjacent properties. Water service will be provided by the existing 16" trunk water main in Pilot Knob Road. It is recommended the water main in street "A from Pilot Knob Road to street "B along street "B" and thence southerly from street "B" in street "C be a 12" diameter water main. The 12" water main is required to provide the proper water -5-1 supply to the future Deerwood reservoir. This development will be served by only one source of water until future development occurs either north or south. STREETS /ACCESS /CIRCULATION: One access to this site is proposed at its northeasterly corner from Pilot Knob Road. The proposed connection of street "A" to Pilot Knob Road shall comply with the future upgrading of Pilot Knob Road based on its ultimate width and grade. The width of Pilot Knob Road abutting this site is a 64' wide roadway with an 8' wide bituminous trail on the west side separated by an 8' wide boulevard area. Street "C" is stubbed to the north and south while street "A" is stubbed to the west in anticipation of being extended in the future. Temporary cul -de -sacs shall be required at the southerly and northerly end of street "C" and at the westerly end of street "A Staff recommends that the lots adjacent to the proposed temporary cul -de -sac be platted as outlots until such a time when the temporary cul -de -sacs are removed and the streets extended. Minimum allowable street right -of -way width is 60', therefore, a 32' (face -to -face) wide street surface is required. Relative to street layout, consideration should be given to extending street "B" westerly to the plat's west line. This extension will provide more flexibility in developing the property to the west by not creating a large triangular shaped parcel between the proposed development and I -35E. EASEMENTS /RIGHT -OF- WAY /PERMITS: This development shall be responsible for dedicating a 60' half right -of -way for Pilot Knob Road and the construction easements necessary for upgrading of Pilot Knob Road in accordance with Dakota County Highway Department recommendations. This development is also responsible for costs associated with easement acquisition for sanitary sewer and storm sewer extensions beyond its plat boundaries. In addition to the common lot line drainage and utility easements, additional easements of sufficient width to accommodate the storm sewer extension between street "B" and street "A" shall be provided based on final approved plans and specifications. Also, all easements necessary to construct the required temporary cul -de -sacs outside the boundaries of this development shall be acquired prior to final plat approval. All regulatory agency permits shall be acquired within the appropriate time frame as required by the affected agency. The proposed development is subject to the following pending assessments for the upgrading of Pilot Knob Road under Project 466. PROJ. DESCRIPTION i.SEAGE 466 Street Residential Single Family Equivalent 466 Storm Sewer RATE $17.72/ff .12 /sf QUANIITY Ate. $700.25/ff $12,408 180,000 /sf 21,600 612 The rate used in the above table is considered one -half the normal residential rate. This proposed development should assume its proportionate share of the pending assessments against the underlying parent parcel for the upgrading of Pilot Knob Road under Project #466. The development will be responsible for the balance of the water lateral benefit and water area which were not previously assessed under Project #24. These additional assessment obligations are identified as follows: P1 1J. I SCRIPPICN DSEAGE RAZE QUANTITY AMP. 24 Water Area Single Family /ac $11.61 ac $14,512 less 1 lot (600) Balance $13,912 24 Water Lat. Benefit Single Family $12.47/ff 604 /ff 7,532 TOTAL $21,444 All final assessment obligations will be calculated on the quantities and dimensions of the final plat and in accordance with the rates in effect at the time of final plat approval. 10/ CONDITIONS: CUTTER'S ADDITION 1. All standard platting conditions shall be adhered to. 2. This plat shall be subject to the Advisory Parks Recreation Commission recommendations and approved by City Council. 3. The development shall be responsible for incorporating the future design of Pilot Knob Road into the proposed grading plan. 4. The development shall be responsible for bearing the costs of easement acquisitions necessary for trunk sewer facilities to serve this development. 5. The development shall be responsible for revising the proposed storm sewer plan in accordance with the recommendations in the staff report. 6. Installation of trunk sanitary sewer and trunk storm sewer to serve this site installed under a public improvement must be approved by Council action prior to final plat approval. 7. The development shall be responsible for providing a 12" water main along street "A" from Pilot Knob to street "B along street "B" to street "C" and then south to the southerly boundary of the proposed site. 8. The development shall be responsible for constructing temporary cul -de -sacs at the northerly and southerly ends of street "C" and at the westerly end of street "A 9. The lots which are directly affected by the temporary cul -de- sacs being constructed as a condition of this development shall be platted as outlots until such time when the temporary cul- de -sacs are removed and the streets are extended. 10. Staff recommends that street "B" be extended to the westerly boundary of the plat. 11. The development shall be responsible for dedicating a 60' half right -of -way for Pilot Knob Road and dedicating the necessary construction easements required for the upgrading of Pilot Knob Road. 12. This development shall be responsible for the acquisition of all regulatory agency permits in the time frame required by the affected agency. 13. A detailed grading, drainage, erosion and sediment control plan must be prepared in accordance with current City standards and approved by staff prior to final plat approval. 14. All public streets and utilities necessary to provide service to this development shall be designed by a registered professional engineer in accordance with City Codes and engineering standards and policies and approved by staff prior to final plat approval. 62• 15. This development shall accept its additional assessment obligations as defined in the staff report in accordance with the final plat dimensions and the rates in effect at the time of final plat approval. .63 TN PL. ciP ENGLE ROME u ir• K aa T• n ESGOii L EABAN MUNICIPAL J. CENTER wg BERRY A(7( PARR 4 C o l n O h A •1 a a N a CC •1 et 4'1, =1 it i Ns 414 g hall 1 r i r�l b' rrFOrrraort_�r�orrr�orrrF rt• 1 1 1 '17. o El cc o we a tl -,M W di ac Is 1. i$ c.) a a a 1 Oi ell 7 o c oebP_. t ;s.' ail —1 It o 1 j Zf tip- 1,..._:_....-. en r- a l ..__J •-r(- i •r` 8 a ss �'1. f,: l••. :AOi: -.._'l 1 e t7 4 (Vi 1, ,1 F j 1. j1'� t Y �.L p N J 1,, I a r 111 f ,I f i Lr—J `o —up- X g 71 v O4 ;1 R 1 '1 ':5 t1 °Fr f i j AS 11 0 50 100 200 400 Date: 7-1-1987 Scale: 1* 100' CONCEPT DEVELOPMENT PLAN EAGAN, MINNESOTA SOUTH 1/2 OF N.E. 1/4 SEC. 21, TWP. 27, RNG. 23 I 6 CUTTER'S RIDGE .N1, e[ '7> t IkA,7‘. a 4 ...v71:- :-0 :c. 4 I l'i 1"- 1 IL I i i I I 1 ,.3 3‘ s: ....1.7:77,-:\:: ::P. I I 1 fOli :7. ''`,1 \c• ZI' s. I, ji;. zr: 7% •*4".' s Th •:3 '7) 1 1 ••I s s 1- I g L:..." A- ''N' z re r t .c.: ,,i t 1 0 l• -..1 4 +11 ■saii "ri.) lj s Z 11/ I I '1,. 4: -7" ..Y.V "7 •1! 4 -...\\N s. -.-s.S..k\\s'a'' ...---1:---.. 'C7-7-:-.'-':7'. .s.'‘ N .::.t)_: /V/ k 7•":".. 2;1. 6 fz. .7./•;!;_:=;::::-\ v, ,,;•N 1 \N! .1soillkt togylet .V i 'i ‘..4 I... C i 11/2.ill\- Ja i ■Ti.' P azzzzzzzzz LATERAL BENEFIT from TRUNK WATER MAIN 604 FRONT FEET 1 TRUNK WATER MAIN ASSESSMENT AREA 4 1 1.6 ACRES I