1285 Town Center Dr c~ . z. c~
, 2005 COMMERCIAL BUILDING PERMIT APPLICATION
City Of Eagan
~ 3530 Pilot Knob Road, Eagan Mn 55122
Telephone # 651-675-5675 FAX # 651-675-5694
. . e - . - . . . -
• Structural Plans (2) sets • Archftectural Plans • (2) sets • ArchifeGural Plans (2) sets
• Civil Plans (2) • Strudural Plans (2) • Code Analysis (1)
. Certificafe of Survey (1) • Civil Plans (2) • Project Spea (1)
. Code Anaysis (1) ° • Landscaping Plans (2) • Key Plan (1)
. Project Spea (1) • CodeAnalysis (t) " • Master Exit Plan (1)
. Spec. insp. 8 Testing Schedule " • CeRificate of Survey (7) • Energy Calculations (1) not always"
• Soils Report (1) • Spec. Insp. & Testing Schedule (1) " • Elec. Power 8 Li9hting Form (t) nol always"
. Meter size must be esteblished • Meter size must be esta6iished • Meter size must be established-K applicable
1 • ProjectSpea (1)
j . Energy Calculations (1)
j • Electric Power & Lighting Porm (1)
j • Masler Exit Plan (1) l
l . Emergency Response Site Plan (1)
! • Soils Report (1) 1
. SAC determination • ca11651502-1000 • SAC detertnination • ca11 6 51-602•1000 • SAC determination-ca11651-602-1000
, . Fire Sto in Submittais
Call MN Dept of Health at 651 •215-0700 for details regarding food & beverage or lodging tacilities.
Contact Building Inspec[ions for sample and if required
Pcrmit for new building or addition will not be processed without Emergency Response Site Plan.
Date Y /'2 -7 /(D5 Construction Cost 798- oan
SiteAddress 7-,IW N GE7V7E:oO_ D!L_ ~iD iU ~~yy 0NO Gl UniUSte #
Tenant Name Former Tenant Name
Description of Work El G4G4 fUH+oG~k~ e` S~ ~Q' 2:!sK
Property Owner ~ F k) bh,/ pOi CAt Telephone # (9S2 ) C-39 Contractor e!t- CO^~ % 1:NC r
Address ~ Ly. LQ,D/NkoAr City J• ~~i U~
State (M/1~ Zip .S /)3 Telephone #((f~ f0_(b ~
Arch/Engr 14Y 4i T'4CI U 1'q / C V/? SW -.4. Nt,^I Registration # 2 Z 2E-S
Address SU i 2- u! City ApG.S
State ~N Zip Telephone # ( rp(L ) ~6 ~0 ~ ~
Licensed plumber installing new seweriwater service: Phone
I hereby apply for a Commercial Building Permit and acknowledge that the information is complete and accurate;
that the work will be in conformance with the ordinances and codes of the City of Eagan and the State of MN
Statutes; I understand this is not a permit, but only an application for a permit, and work is not to start without a
permit; that the work wi11 be in accordance with the approved plan in the case of work wluch requires a review and
approval of plans.
Applic ' Printed Name lic ' ignature
OFFICE USE ONLY \
Sub Types * .
? Ol Foundation 0 26 Public Facility 0 30 Accessory Building
? 14 Apartments 27 CommerciallIndustrial 0 32 Ext Alt-Apartments
0 15 Lodging ? 28 Greenhouse O 34 Ext Alt-Commercial
? 25 Miscellaneous ? 29 Antennae ? 35 Ext Alt-Public Facility
? 37 Nail Salon
Work Types
? 31 New ? 35 Int Improvement ? 38 Demolish (Interior) ? 44 Siding
? 32 Addition ? 36 Move Bidg. ? 42 Demolish (FoundaGon) ? 45 Fire Repair
,0' 33 Alteretion ? 37 Demolish (Bldg)• ? 43 Reroof ? 46 Windows/Doors
? 34 Replacement •Demolition (EnBre Bldg only) - Give PCA handout to applicant
Valuation 798 000 ~ Occupancy ~a MCES System
Census Code .32-1 Zoning City Water
SACUnits -O - Stories ~ BoosterPump
Nbr. of Units ° Sq. Ft. PRV
Nbr. of BId9s I Length Fire Sprinklered
Type of Const 13 Width
Required Inspecfions
_ Footings (new hldg) Insulation
Footings(deck) ~ FinaVC.O.
? Footings (addition) ? FinaUNo C.O.
_ Foundation Other -
Drain Tile
Roof Ice Pr Decking _ Insul Final Pool Ftgs Air/Gas Tests Final
V/ Framing _ Siding _ Stucco Stone
_ Fireplace _ R.I. _ Air Test _ Final Windows
Approved By: Planning CAAj~ Building Inspector
Base Fee 4 G-f 9. Z 3'
Surcharge 3q9~ ~
Plan Review 3 ~ L7~ • 61
MCES SAC
City SAC
Water Supply & Storage (WAC)
S/W Permit
S/W Surcharge
Treatment Plant
Park Dedication
Trails Dedication
Water Quality
Copies
Water Trunk
Sewer Trunk
Other
Total 607LI• ZG
M~1~T~lR~~z?~T~ ,
TO: TOM STRiIVE, SUPERINTENDENT OF STREETS & EQUIPMENT #1
LEON WEILAND, CONSTRUCTION INSPECTOR
DALE WEGLEITNER, FIRE MARSHAL
ERIC MACBETH, WATER RESOURCES COORDINATOR
GREGG HOVE, CITY FORESTER
JOHN GORDER, ASSISTANT CITY ENGINEER
KENT THERKELSEN, CHIEF OF POLICE
MARK ANDERSON, ELECTRICAL INSPECTOR
MIKE RIULEY, CITY PLANNER
PAUL HEUER, SYSTEMS ANALYST
SCOTT PETERSON, BUILDING INSPECTOR
TOM COLBERT, DII2ECTOR OF PUBL[C WORKS
TOM PEPPER, CHIEF FINANCTAL, OFFICER
LANE WEGENER, ENGINEERING TECHNICIAN
FROM: CRAIG NOVACZYK, SENIOR INSPECTOR
DATE: MAY 3, 2005
RE: PLAN REVIEW FOR FACADE REMODEL FOR TOWN CENTRE MALL
Wk2TOWN CENTRE DRIVE
tL9'?'
The plans are in our plan review section for your review and comment.
Please return this form to mv attention with your signed comments and the date of review
within seven days. If you have any concerns with these plans, please so indicate on this form and
notify and resolve these issues with the affected parties. If you are requesting that issuance of the
building permit be held, please fill out the proper "hold" request form.
Comments:
Indicate any fees that are to be collected with the building permit:
AMOUNT
? Yes ? No landscape security required Z O N I iV G?
? Yes ? No water quality dedication METER SIZE
? Yes ? No park dedication
? Yes ? No trail dedication
? Yes ? No tree dedication
? Yes ? No PRV Required
Signature Date
CD/FORMSBLDG INSP/PLAN REVIEW CRAIG N REV[SED 9- 02
~ City of Eapn May 4, 2005
Pat Geagan
MAYOR
Peggy Cadson DOUG OLSON
CY-CON 1NC
Cyndee Fields 360 W LARPENTEUR AVE
Mike Maguire ST PAUL MN 55113
Meg Tilley
COUNGL MEMBERS RE; 1285 TOWN CENTRE DRIVE
Thomas Hedges Dear Mr. Olson:
CffY ADMINISTRATOR
We have started our review of the construction documents submitted in pursuit of obtaining a
building permit for the above-referenced project. This review is not intended to be an exhaustive
and comprehensive report. Unless otherwise noted, all references are to the 2000 I.B.C. It is our
goal that this review will help you in complying with the applicable codes and we are, therefore,
requesting that the following items be addressed:
MUNICIPAL CENiER 1. Special Inspection & Testing Schedule (enclosed)
3830 Pilot Knob Road z. Emergency Response Site Plan (example enclosed)
3. Revise accessible parking signage detail to comply with Chapter 1341 of the MSBC.
Eagan, MN 55122-1810
651.675.5000 phone If you have any questions regarding Ihe above items, please feel free to contact me at 651-675-
651.675.5012fax 5683.
651.454.8535 TDD
Sincerely,
MAINTENANCE FApLfTV J. Craig Novaczyk ~
3501 Coachman Point Settior Inspector
Eagan, MN 55122
651.675.5300 phone JCN/js
651.675.5360 fax cc: R.andy Kling, Architectural Consortium LLC, 901 N 3rd St #220, Minneapolis MN 55401
651.454.8535 TDD
www.cityofeagan.com
THE LONE OAK TREE I
The symbol of
strength and growth
in our community.
Mi~MO~.~i:MnUM;
~T$r TOM STRUVE, SUPERINTENDENT OF STREETS & EQUIPMENT #1
LEON WEILAND, CONSTRUCTION IlVSPECTOR
DALE WEGLEITNER, FIRE MARSHAI.
ERIC MACBETH, WATER RESOURCES COORDINATOR
GREGG HOVE, CITY FORESTER
JOHN GORDER, ASSISTANT CITY ENGINEER
KENT THERKELSEN, CHIEF OF POLICE
MARK ANDERSON, ELECTRICAL INSPECTOR
MIKE RIDLEY, CITY PLANNER
PAUL HEUER, SYSTEMS ANALYST
SCOTT PETERSON, BUILDING INSPECTOR
TOM COLBERT, DIRECTOR OF PUBLIC WORK5
TOM PEPPER, CHIEF FINANCIAL OFFICER
LANE WEGENER, ENGINEERING TECHNICIAN
~ p ~-FRO1W--- CRAIG NOVACZYK, SENIOR INSPECTOR
DATE: MAY 3, 2005
RE: PLAN REVIEW FOR FACADE REMOAEL FOR TOWN CENTRE MALL
434-3TOWN CENTRE DRIVE
(1.z"r
The plans are in our plan review section for your review and comment.
Please return this form to mv attention with your signed comments and the date of review
within seven days. If you have any concerns with these plans, please so indicate on this form and
notify and resolve these issues with the affected parties. If you are requesting that issuance of the
building permit be held, please fill out the proper "hold" request form.
Comments• p M ~ ~o~ ? ~o~ a~C~ m ~ ~ ~^i/~ r~cp'?
r/t Ov? cd lO~cf
Indicate any fees that are to be collected with the building permit:
AMOUNT 5/Y
? Yes ? No landscape security required Z O N I N G?
? Yes ? No water quality dedication METER SIZE
? Yes ? o park dedication
? Yes ? o trail dedication
? Yes ? tree dedication
? Yes ? N PRV Required
5 "4~ aJ
Signature Date
CDIFORMSBLDG INSP(PLAN REVIEW CRAIG N REVISED 9- 02
~
TO: TOM STRUVE, SUPERINTENDENT OF STREETS & EQUIPMENT #1
LEON WEII,AND, CONSTRUCTION INSPECTOR
DALE WEGLEITNER, FIRE MARSHAL
ERIC MACBETH, WATER RESOURCES COORDINATOR
GREGG HOVE, CITY FORESTEIi
JOHN GORDER, ASSISTANT CITY ENGINEER
KENT THERKELSEN, CHIEF OF POLICE
MARK ANDERSON, ELECTRICAL INSPECTOR
MIKE RIDLEY, CITY PLANNER
PAUL HEUER, 5YSTEM5 ANALYST
SCOTT PETERSON, BUILDING INSPECTOR
TOM COLBERT, DIRECTOR OF PUBLIC WORKS
TOM PEPPER, CHIEF FINANCIAL OFFICER
LANE WEGENER, ENGINEERING TECHNICIAN
FROM: CRAIG NOVACZYK, SENIOR INSPECTOR
DATE; MAY 3, 2005
RE: PLAN REVIEW FOR FACADE REMODEL FOR TOWN CENTRE MALL
JMTTOWN CENTRE DRIVE
/2~65
The plans are in our plan review section for your review and comment.
Please return this form to mv attention with your signed comments and the date of review
within seven days. I£ you have any concerns with these plans, please so indicate on this form and
notify and resolve these issues with the affected parties. If you are requesting that issuance of the
building pemrit be held, please fill out the proper "hold" request form. ~4 ,-Pecade t ma~.
Comments:
a y r~
Indicate any fees that are to be collected with the buildmg permit: sp~j eQ LvV~--
AMOUNT
? Yes PNo landscape security required Z O N I N G?(` S~
? Yes water quality dedication METER STZE
? Yes park dedication
? Yes trail dedication
? Yes * No tree dedication
? Yes ? N PRV Required
i
Signature Date
CD/FORMSBLDG INSP/PLAN REV1E W CRAIG N RF.VI3ED 9- 02
Craig Novaczyk
From: Paul Nahurski [nkacpm@worldnet.att.net]
Sent: Tuesday, May 31, 2005 10:27 AM
To: Craig Novacryk
Subject: FW: Eagan Town Center - Site Plan
Attach ments: 0014D udziakC ityofEagan. d oc
0014Dudz1akCityofE
agan.doc (45...
Craig:
The attached letter went out to Pam Dudziak last Friday.
I called this morning to check in with her, but it appears she is out until this Thursday.
Would you be able to forward this to another person in planning for review so we can qet -
the City's concerns resolved and get the permit released?
I appreciate your he1p. Feel free to call with questions.
Paul H. Nahurski
NKA Construction Managers, Inc.
1787 Stanford Avenue
St. Paul, Minnesota 55105-2093
Direct 651 699-4727 Fax 651 699-3099
Email nkacpm@att.net
-----Original Message-----
From: John Boich [mailto:John.Boich@rreef.com]-
Sent: Friday, May 27, 2005 2:56 PM
To: pdudziak@cityofeagan.com
Cc: nkacpm@worldnet.att.net
Subject: Eagan Town Center - Site Plan
Pamela,
Attached you will find a letter addressing some concerns that you have raised in your
meeting with Mr. Pau1 Nahurski of NKA concerninq the Proposed Site Plan for the Eagan Town
Center renovation. If you have any questions, please let me or Mr. Nahurski know.
Thanks,
Please make note that my e-mail, physical address and contact inPO have changed.
Please update your records.
Sohn P. Boich
Property Manaqer
RREEF
7201 Ohms Lane, Suite 210
Edina, MN 55939
952.835.1800 ext. 13 P.
952.835.1888 F.
john.boich@rreef.com
(See attached file: 0019DudziakCityofEagan.doc)
1
This e-mail may contain confidential and/or privileged information. If you are not the
, intended recipient (or have received this e-maii in error) please notify the sender
immediately and destroy this e-mai1. Any unauthorized copying, disclosure or distribution
of the material in this e-mail is strictly forbidden.
2
May 27, 2005
Ms. Pamela Dudziak, Planner
CITY OF EAGAN
3830 Pilot Knob Road
Eagan, MN 55122-1897
RE: EAGAN TOWN CENTRE RENOVATION
Dear Ms. Dudziak:
This letter follows your meeting yesterday with RREEF's construction manager, Paul
Nahurski, to discuss the Planning DepartmenYs concerns, regarding the planned
reconfiguration of the parking lot along the west ]eg of the shopping center. Specifically,
the two items are the head in pazking along the store fronts and also the additional
employee parking off the rear service alley. My understanding is that the Building Permit
for the entire renovation is being held by the Planning Department pending clarification
of these two items.
Just to recap, Cy-Con Construction was awarded the contract and applied for a Building
Permit on or about April 27`h, per plans developed by Architectural Consortium. Cy-Con
received a plan review letter from the City on May 4`h' requesting three (3) items be
submitted prior to releasing the permit.
? Special Inspections & Testing 5chedule
? Emergency Response Site Plan
? Revision to the elevation of the accessible parking signage detail
My understanding is that these items have been prepared, submitted and approved.
Subsequently, a red-lined site plan was sent to the architect from the City Engineer to
revise the site plan, in order to revise the approach to the intersection in front of the Old
Chicago restaurant. ln brief, this revision eliminated five parking stalls and opened the
radius of the curb and gutter to provide better traffic circulation. Our consultant engineers
revised this plan in accordance with the City Engineer's request and it was resubmitted
on May 17`n
Ms. Pamela Dudziak, Planner
May 27, 2005
Page 2
Obviously we are anxious to address your concerns and get the permit released. This
entire project represents a significant investment to the property, one which updates its
1980's appearance and is intended to enhance its economic vitality. At this point we aze
now the better part of a month behind schedule getting started, but remain obligated to
complete this work before Labor Day.
In order to respond to your concerns on the site work and parking issues, we offer the
following:
Head-in Parking:
Many of the Tenants along the west leg of the building have "short term" customers and
these Tenanf s consistenfly asked for more accessible parking for this clientele. This type
of head in parking exists on most comparable convenience shopping centers throughout
the market.
I believe the specific concern relates to these.parkers backing into a prunary traffic lane,
but to the best of my knowledge, this is not in violation of any City codes or ordinances.
We would propose to add speed bumps and appropriate signage, which would help
reduce the speed of traffic along this traffic lane in front of the building to address this
concern. The Westerly approach to this intersection off of Town Centre Drive is cunently
signed as a"truck entrance" and is at best a secondary entrance to the property.
In regard to safety, head in parking will reduce the number of "short term" customers
having to cross the traffic lane from the West. With the addition of forty three (43) head
in parking stalls, of which six (6) are handicapped accessible, you can see the reduction
of several hundred "short term" customers not having to cross the traffic lane on a daily
basis. This reduces the nusnber of potential instances that a vehicle vs. pedestrian
accident may occur. The new head in parking also provides easier access for the
handicap.
Rear Alley Employee Parking:
The concern here is one of security for employees leaving in the dark. We concur with
you concern and will delete this element of the project.
Ms. Pamela Dudziak, Planner
May 27, 2005
Page 3
Ms. Dudziak, hopefully this response is an acceptable resolution to your concerns on the
site work being done to the property and the Building Permit can now be released. Please
feel free to call me, or RREEF's construction manager, Paul Nahurski with your
thoughts.
Sincerely,
John Boich
Property Manger
C:InnOnmlEagnn Town CenlerlCorresportJence100l4DuAziakCityofF.'u,qnn.doc
cc: Paul Nahurski
Page 1 of 1
Craig Novaczyk
From: Mike Ridley
Sent: Tuesday, May 31, 2005 12:46 PM
To: Pam Dudziak
Cc: Craig Novacryk
Subject: TC Renovation
Pam,
Craig showed me the letter fi-om the management company. I think we've done what we
can; they have eliminated the service drive parking so I told Craig to go ahead and release
the permit.
Thanks,
Mike
Michael J. Ridley, AIOP
City Planner
City of Eagan
651-675-5650
651-675-5694 Fax
mridley@cityofeagan.com
05/31/2005
Page 1 of 1
Pam Dudziak
From: Mike Ridley
Sent: Tuesday, May 31, 2005 1:46 PM
To: Pam Dudziak
Cc: Craig Novaczyk
Subject: TC Renovation
Pam,
Craig showed me the letter from the management company. I think we've done what we
can; they have eliminated the service drive parking so I told Craig to go ahead and release
the permit.
Thanks,
Mike
Michael J. Ridley, AICP
City Planner
City of Eagan
651-675-5650
651-675-5694 Fax
mrid ley@cityofeagan.com
06/03/2005
Page 1 of 1
Craig Novaczyk
From: Pam Dudziak
Sent: Monday, May 02, 2005 1:01 PM
To: Craig Novaczyk
Cc: Dale Schoeppner; Mike Ridley; Jon Hohenstein; John Gorder
Subject: Town Centre/Rainbow Remodel
Craig,
I have taken a preliminary look at the plans for the fagade remodels at Town Centre and Rainbow
Foods. We have no issues with the architectural design or materials they want to use.
From looking over their project manual, it appears they are planning to possibly add two new
freestanding buildings in the future. A 4,500 sq. ft. restaurant on the Town Centre property and a 3,500
sq. ft. retail building on the Rainbow site. Please be advised that neither of these new buildings has been
approved by zoning. The property would need to be subdivided to create separate lots for the new
buildings first.
Please note also that they are proposing to add parking, presumably to support the future new buildings.
They propose head-in parking along the front of the Town Centre retail building, and stalls on the back
side of the Town Centre building along the existing service drive. Please have Dale Wegleimer and
Engineering review this. They are also realigning the intersection oftheir southern access to Town
Centre Drive, which appeazs to result in it being offset from the driveway across the street. Engineering
should review this too.
I will do a more involved planning and zoning review once you distribute the routing sheet for the
building permit, but wanted to make you aware of the access, circulation, and additional parking
questions. Let me know if you have any questions.
Pam
Pam Dudziok
Planner, City of Eagon
3830 Pilot Knob Road
Eagan, MN 55122
Ph: 651-675-5691
Fax: 651-675-5694
OS/25/2005
Page 1 of 1
Pam Dudziak
From: Pam Dudziak
Sent: Wednesday, May 25, 2005 4:13 PM
To: Mike Ridley
Subject: Town Centre Parking Lot
Mike,
I met with the construction manager, Paul Nahurski, this morning and discussed our concems about the
redesigned parking lot at Town Centre. He was going to discuss it with the owners and I asked him to
send us a letter. He suggests they may be agreeable to eluninating the stalls in the service drive next to
Kohl's, and I think this is a good idea as it is a closed alley with building on both sides and no windows
or parking areas where there would be activity and people to watch what's happening there. He said
there are cameras, but thaYs little comfort to me - although it may record a crime event, no one's
probably monitoring them regularly.
As for the head-in parking along the building, it is only along the Old Chicago leg of the building, not
along the Walgreen's leg. He said the tenants want the convenient pazking right out front since their
businesses seem to entail mostly 15-minute customer visits. He said they all believe it is safer to
eliminate the peds having to cross the driving lane. He suggested they could install speed bumps along
that stretch to make it less attractive to through traffic and slow down those that are driving it. I thought
that was a pretty good idea. He also said the current parking lot redesign has nothing to do with plans
for a future building on the site, but current improvements would not be impacted by that if they do go
ahead with another building.
When I get the letter, P11 sit down with you and discuss it.
Pam
Pam Dudziak
Planner, City af Eagan
3830Pilot Knob Road
Eagan, MN 55122
Ph: 651-675-5691
Fax: 651-675-5694
06/03/2005
1tii~14~C1RANI3UN[;:
TO: TOM STRUVE, SUPERINTENDENT OF STREETS & EQUIPMENT #1
LEON WEILAND, CONSTRUCTION IN5PECTOR
DALE WEGLEITNER, FIRE MARSHAL
ERIC MACBETH, WATER RESOURCES COORDINATOR
GREGG HOVE, CITY FORESTER
JOHN GORDER, ASSISTANT CITY ENGINEER
KENT THERKELSEN, CHIEF OF POLICE
MARK ANDERSON, ELECTRICAL INSPECTOR
MIKE RIDLEY, CITY PLANNER
PAUL HEUER, SYSTEMS ANALYST
SCOTT PETERSON, BUILDING INSPECTOR
TOM COLBERT, DII2ECTOR OF PUBLIC WORKS
TOM PEPPER, CHIEF FINANCIAL OFFICER
LANE WEGENER, ENGINEERING TECHNICGIN
FROM: CRAIG NOVACZYK, SENIOR INSPECTOR
DATE: MAY 3, 2005
RE: PLAN REVIEW FOR FACADE REMODEL FOR TOWN CENTRE MALL
4342iI'OWN CENTRE DRIVE
~ZBS
The plans are in our plan review section for your review and comment.
Please return this form to mv attention with your signed comments and the date of review
within seven days. If you have any concerns with these plans, please so indicate on this form and
notify and resolve these issues with the affected parties. If you are requesting that issuance of the
building permit be held, please fill out the proper "hold" request form.
Comments: Ok'- ~C-
~
Indicate any fees that are to be collected with the building pernut:
AMOUNT
0 Yes ? No landscape security required Z O N I N G?
? Yes ? No water quality dedication METER STZE
? Yes ? No park dedication
? Yes ? No trail dedication
? Yes ? No tree dedication
? Yes Q'No PRV Required
r`$ignature Date
CD/PORbiS/BLUG INSP/PLA1V REVIEW CRAIG N REVISLD 9- 02
~
iDUM.
t3 lt
TO: TOM STRUVE, SUPERINTENDENT OF STREETS & EQUIPMENT #1
LEON WEILAND, CONSTRUCTION INSPECTOR
DALE WEGLEITNER, FIRE MARSHAL
ERIC MACBETH, WATER RESOURCES COORDINATOR
GREGG I30VE, CITY FORESTER
JOHN GORDER, ASSISTANT CITY ENGINEER
KENT THERKELSEN, CHIEF OF POLICE
MARK ANDERSON, ELECTRICAL INSPECTOR
MIKE RIDLEY, CITY PLANNER
PAUL HEUER, SYSTEMS ANALYST
SCOTT PETERSON, BUILDING INSPECTOR
TOM COLBERT, DIRECTOR OF PUBLIC WORKS
TOM PEPPER, CHIEF FINANCIAL OFFICER
LANE WEGENER, ENGINEERING TECHNICIAN
FROM: CRAIG NOVACZYK, SENIOR INSPECTOR
DATE: MAY 3, 2005
RE: PLAN REVIEW FOR FACADE REMODEL FOR TOWN CENTRE MAI,L
43i4 TOWN CENTRE DRIVE
t'z85*
The plans are in our plan review section for your review and comment.
Please return this form to mY attention with your signed comments and the date of review
within seven days. If you have any concerns with these plans, please so indicate on this form and
notify and resolve these issues with the affected parties. If you are requesting that issuance of the
building permit be held, please fill out the proper "hold" request form.
Comments• ~ 7e~_
Indicate any fees that are to be collected with the building permit:
AMO[JNT
? Yes ? No landscape security required Z O N I N G?
? Yes ? No water quality dedication METER SIZE
? Yes ? No park dedication
? Yes ? No trail dedication
? Yes ? No tree dedication
? Yes ? No PRV Required
lJS
Signa ure Date/
CD/FORMS/BLDG INSP/PLAN REVIEW CRAIG N REVISED 9- 02
! ~~~5+~?RA~fiACiM
TO: TOM STRUVE, SUPERINTENDENT OF STREETS & EQUIPMENT #1
LEON WEILAN?, CONSTRUCTION INSPECTOR
DALE WEGLEITNER, FIRE MARSHAL
ERIC MACBETH, WATER RESOURCES COORDINATOR
GREGG HOVE, CITY FORESTER
JOAN GORDER, ASSISTANT CITY ENGINEER
KENT THERKELSEN, CHIEF OF POLICE
MARK ANDERSON, ELECTRICAL INSPECTOR
MIKE RIDLEY, CITY PLANNER
PAUL HEUER, SYSTEMS ANALYST
SCQTT PETERSON, BUILDING INSPECTOR
TOM COLBERT, DIRECTOR OF PUBLIC WORKS
TOM PEPPER, CHIEF FINANCIAL OFFICER
LANE WEGENER, ENGINEERING TECHNICIAN
FROM: CRAIG NOVACZYK, SENIOR INSPECTOR
DATE: MAY 3, 2005
RE: PLAN REVIEW FOR FACADE REMODEL FOR TOWN CENTRE MALL
iffl'l~F/'POWN CENTRE DRIVE
{ !rj 7
The plans are in our plan review section for your review and comment.
Please return this form to mv attention with your signed comments and the date of review
within seven days. If you have any concerns with these plans, please so indicate on this form and
notify and resolve these issues with the affected paRies. If you are requesting that issuance of the
building pemut be held, please fill out the proper "hold" request form.
Comments:
Indicate any fees that aze to be collected with the building permit:
AMOUNT
? Yes ? No landscape security required Z O N I N G?
? Yes k No water quality dedication METER SIZE
? Yes ? No park dedication
? Yes ? No trail dedication
? Yes ? No tree dedication
? ? No PRV quired
Signatu e D e
CD/FORMSBLDG INSP/PLAN REVIEW CRAIG N REVISED 9- 02
I
(
X0R ND
TO: TOM STRUVE, SUPERINTENDENT OF STREETS & EQUIPMENT #1
LEON WEILAND, CONSTRUCTION INSPECTOR
DALE WEGLEITNER, FIItE MARSHAL
ERIC MACBETH, WATER RESOURCES COORDINATOR
GREGG HOVE, CITY FORESTER
JOHN GORDER, ASSISTANT CITY ENGINEER
KENT THERKELSEN, CHIEF OF POLICE
MARK ANDERSON, ELECTRICAL INSPECTOR
MIKE RIDLEY, CITY PLANNER
PAUL HEUER, SYSTEMS ANALYST
SCOTT PETERSON, BUILDING INSPECTOR
TOM COLBERT, DIRECTOR OF PUBLIC WORKS
TOM PEPPER, CHIEF FINANCIAL OFFICER
LANE WEGENER, ENGINEERING TECHNICIAN
FROM: CRAIG NOVACZYK, SENIOR INSPECTOR
DATE: MAY 3, 2005
RE; PLAN REVIEW FOR FACADE REMODEL FOR TOWN CENTRE MALL
t3ft TOWN CENTRE DRIVE
tz8r
The plans are in our plan review section for your review and comment.
Please return this form to mv attention with your signed comments and the date of review
within seven days. If you have any concerns with these plans, please so indicate on this form and
notify and resolve these issues with the affected parties. If you are requesting that issuance of the
building permit be held, please fill out the proper "hold" request form.
Comments•
Indicate any fees that are to be collected with the building perixvt:
AMOUNT
? Yes ? No landscape security required Z O N I N G?
? Yes ? No water quality dedication METER SIZE
? Yes ? No park dedication
? Yes ? No trail dedication
? Yes ? No tree dedication
? Yes o PRV Required
Signature Date
CD/FORMS/BLDG SP/PLAN REVIEW CRAIG N REVISED9•02
Clty Of E8Q8Il Me
TO: DALE SCHOEPPNER, CHIEF BUILDING OFFICIAL
DALE WEGLEITNER, FIRE MARSHAL
PAUL OLSON, SUPERINTENDENT OF PARKS
MIKE RIDLEY, CITY PLANNER
CAROL TUMINI, UTILITY BILLING CLERK
- TIM PAHR, ENGINEERING TECFINICIAN
LEON WEILAND, CONSTRUCTION INSPECTOR
TOM COLBERT, PUBLIC WORKS DIRECTOR
JOHN GORDER, DEVELOPMENT/DESIGN ENGINEER
TOM STRUVE, SZIPERINTENDENT OF STREETS & EQUIPMENT
PAUL HEUER, SYSTEMS ANALYST
ERIC MACBETH, WATER RESOURCE COORDINATOR
MARK ANDERSON, ELECTRICAL INSPECTOR
SCOTT PETERSON, PLUMBING INSPECTOR
CRAIG NOVACZYK, SENIOR INSPECTOR OR MIKE LENCE, SENIOR
INSPECTOR
FROM: TERRY ZELENKA, COMBINATION INSPECTOR
DATE: 08/26/2005
Ites'
SUBJECT: FINAL INSPECTION FOR PERMIT 69217 AT +259TOWN CENTRE DR
LEGAL: LOT 4 BLOCK 1 TOWN CENTRE 100 6TH
The Protective Inspections Division will be performing a final inspection at 1258 Town
Centre Drive on September, 23rd, 2005.
If you aze requesting that the Certificate of Occupancy be held, please fill out the proper
hold request form. Failure to retum the hold request form will be considered your approval. The
person, or department, requesting the hold is responsible for notifying and resolving any
problems with the affected parties.
CD/bldg insp/misc/final insp - comm bldgs
651 488 5696
0Si~24/2005 10:20 FA% 651 488 5696 CY CON INC 1@001
j • r
' Equal Opportunfty lEmpfoyer
CY-CON3 INC. GFNERAL CONTRAG"TORS
, PACSIMILE TRANSMITTAL SHEHT
zo: eraaq ti?ovac~y ~
~ ANY: DA'YSi
4L4 o-f F a,, s-as--a 5 -
i•'X ryUuBEK: U' 1'O'YALNp OP PAGES INCWpING COYCRr '
5-1- LP`l~- Su
PFIONE NUMBER: FAX NUb1DER:
65148&5696
na.
SI- eHO~~EjL
G0.1 ruC4u-,-z-4 -1-z s-~7 il. fri asa-osoi
? U1tGENT ? FOR RfiVIEW ? PLEpSE Cp1dMEN'I' ? PLEASE I;&PLY CI PLEAS& RHCYQ.S
NlYL$S/COMMIEN'C5:
. CY-CON, INC.
05/24/2005 10:20 FA% 651 488 5696 CY CON INC 121002
0 Special Structural Testing and Inspection Program Summary Schedule
ProjectName AMo+'Y 7-4V~I' Ct+'-h/ r13440 ProjectNo.
Locarion ~iv? 199/1/ ~
Permit No. (1)
Technical ? Type of Specific Report Assigned
Secrion A.xticle Destri tion (3) Tnspector (4 Frequtncy (5) Firm (6)
S_r - r 't 't
/ Cpa r?
~y f. _
. ! is r. - rl i
70N.3. Lr' =-T ?viilrC -4
t
T- T I AL
Note: This schedale shall be fi0ed out and includcd in a Special Structural Testing and Tnspection Program.
(If not otheiv.ise specified, assumed proe am will be "Guidelines for Special Inspection &'f esting" as contained in the State
$vilding Code and as modi5ed by the state adopted IBC.)
*A complete specificatioa-ready progcem ean be downloaded daecdy by visiting CASB/MN at www.cecmorg*
( 1) Pexxmt No. to be provided by the Building Official
(2) Referenced w the specific teclwical scope secdon in the pmgram
(3) Use descriptions per IBC Chapter 17, as adopted by Minnesota State Buildin„ Code.
(4) Special Iaspector- Technical (SIT); Speeial Inspecior - Structuial (5I5)
(5) Weekly, montlily, per tesUinspzcuon, per floor, etc.
(6) Name Of Fum con4racted te pecform StrviCes.
ACKN0WL£AGBMENTS ' (Eath appropriatt icpiesentetive Shall sign below)
owner- ~ Firm: TZ~~~F na~:
' Contado 0 Fum: ~f.~ -(~TrvL . 178te: Jf ~OS
Architech Firm: ~gfj rswJ1 r yi+YM CL& Date: S1Z3 tw
SER: Firm: Afm*frw I&IMAIr Pf Aate: 9&
SI-S! Firm: /?rylsN Date: 5tr igS
TA: Fiim B/7Yrv Dau- SI231OS"
F: Firm_ (IM,r„-F mrjal s nau: 512010S
If requested by engineer/erchitcct of rccord oL building official, the individual names oF all prospecrive special iaspxtors
and the work they intend to observe shall be identi5ed as an attachment
Legend: SHFt = Suvotuml Engineer of Rccord SI-T = Special Inspectoc - Technical TA = Tesring AgencY
SI-S = Special Inspecror - Structural F= Febrieator
Accepted for the Building Department By Date
BCSD-PR019 4I03
Z` DC~,(~~(~l~
~ SEP I
- ~ 9 200.5
By S
A Special Inspections Final Report
Eagan Town Centre Exterior Remodeling
Town Centre Road & Denmark Avenue
Eagan, Minnesota
Prepured for
NKA Construction Managers, Inc.
Project BL-05-02273
September 15, 2005
Braun ln[ertec Corporation
BRAUN BrounlntedecCorpomlion Phone' 9529952000
p 1 1001 Ho,ripshlie Avenoe S Fax 952 9452020
INTERTEC Min~~eopolis,MN 55438 Web: 6aunimeiieamm
September 15, 2005 Project BL-05-02273
Mr. Paul Nahurski
NKA Cons[ruction Managers Inc.
1787 Stanford Avenue
St. Paul, MN 55105-2043
Re: Special Inspection Final Report
Eagan Town Centre Exterior Remodeling
Town Centre Road & Denmazk Avenue
Eagan, Minnesota
Dear Mr. Nahurski:
Please find attached the Special Inspection Final fteport for the Eagan Town Centre Exterior Remodeling
project and the supporting Special lnspection Daily Reports for your review and records.
Special lnspections and Testing Procedures
The special inspection services provided for this project were provided by International Code Council
(1CC) certified special inspectors in accordance with the requirements of Chapter 1700 of the
lntemational Building Code (IBC), the Special Inspection and Testing Schedule and the project plans and
specifications.
The purpose of the special inspec[ion services is to provide a review of the work being performed by the
various contractors to determine if the work is being done according to the approved construction
documents. The special inspector does not have the responsibility or authority to, nor is it the intent of
special inspections to have them, judge, or modify the construction documents. Only the structural
engineer of record can do this.
As the special inspections were completed, a Special ]nspection Daily Report was prepared to summarize
the result of our inspections and testing. Copies of this report were provided to the site representa[ive of
the contractor for his review and records. As part of this repoR, items needing correction or
discrepancies observed from the approved construction documents were noted.
Plans and SpeciTications
The approved plans and projec[ documents were used for our inspections throughout the duration of the
project. From time to time, we have received plan modifications from the project structural engineer.
When received, these have been used to evaluate the work completed in the field.
Prnviding engineenng and envirnnmental solutions since 1957
NKA Construction Managers Inc.
Project BL-05-02273
September 15, 2005
Page 2
Soils
Prior to placement of pier foundations, the bearing soils were observed by an ICC cer[ified special
inspector. Several hand auger probes were performed in the bearing soils to depths of 2 to 4 feet below
bearing elevation. Several Dynamic Cone Penetrometer (DCP) tests were also performed in thebeazing
soils to depths of up to 3 feet below bearing elevation. The results of the hand auger probes and DCP
tests were used to judge the in-place condition of the soils. The bearing soils at the base of the pier
footings were judged suitable for support of the design bearing capacity.
Concrete Reinforcement
An 1CC certified special inspector for reinforced concrete completed the concrete reinforcement
observations. To conduct the observations, the special inspector initially reviewed the reinforcement and
dowel requirements on the project structural and shop drawings. Information reviewed included bar size,
bar length, bar spacing bar location, splice lengths and dowel placement. We also noted if the
reinforcement was free of rust, scale and soil prior to placement.
Concrete Placement Observations
Concrete placement observations were performed to monitor the procedures being used by the contractor
and to determine ifthey were consistent with typical industry standards.
Fresh Concrete Testing
Routine tests to dctermine the plastic concrete's slump and air content were done during each pour. In
addition, concrete cylinders were cast at rates specified in the project specifications to evaluate the
concrete's compressive strength.
Concrete Compressive Strength Testing
The concrete cylinders cast for the project were temporarily s[ored at the site and then retumed to our
laboratory for moist curing and testing. The results of the concrete compressive strength testing have
bcen forwarded to thc interested parties under a separate cover as they became available.
Masonry
Periodic observations were conducted during the masonry construction by an 1CC certified special
inspector for structural masonry ro determine if the construction met the requirements of the project plans
and specifications. In addition, concrete masonry units and grout prisms were sampled in intervals
specified by [he project plans. The masonry units sampled for the project were temporarily stored at the
site and then returned to our laboratory for moist curing and compressive strength testing. The results of
the compressive strength testing have been forwarded to the interested parties under a separate cover as
they became available.
Visual Weld Examinations
Visual weld examinations were conducted in accordance with American Welding Society (AWS)
DI.]-2004, Figure 5.4 and Table 6.1 requirements and the requirements ofthe projec[ specifieations.
NKA Construction Managers Inc.
Project BL-05-02273
September 15, 2005
Page 3
General
Services performed by Braun Intertec personnel on this project have been conducted with that level of
care and skill ordinarily exercised by members ofthe profession currently practicing in this azea.
No warranty, expressed or implied, is made.
Thank you for the opportunity to provide the special inspection and testing services for this project.
Afrer review of the attached Special [nspection Final Report, if you have any questions or require
additional information, please call Nate McKinney at 952.995.2228 or Ray Huber at 952.995.2260.
Sincerely,
BRAUN INTERTEC CORPORA7ION
/4-1/( /11A
Nathan L. McKinney, EIT
Engin eer-In-Train ing
a A. Huber, -
Vice President - Principal Engineer
Attachment:
Special Inspection Final Report
c: Mr. Chris Boodram; RREEF Management Company
Mr. Dale R. Schoeppner; City of Eagan
Mr. Mel Urlacher, PE; Anderson Urlacher P.A.
Rpt SpeciallnspectionTown Centre
.
B R AN N Braun Ineereec Corporation Fhone 9529952000
11001 Hampshlro Avenue 5~ fax: 952.9952020
INTERTEC N~inneapolis, MN 55438 Web bravninieoeccom
Special Inspection Final Report Page 1 ofz
City of: Eagan Date: September 15, 2005
Attention: Mc Paul Nahurski
Project Fagan Town Centre Exterior Remodeling
Town Centre Road and Denmark Avenue; Eagan Minnesota
Braun Intertec Project• BL-05-02273
In accordance with Section 1704 of the Interna[ional Building Code and the agreed upon scope of
services, special inspections and testing has been provided for the following items:
Soils. The bearing soils at the base of the pier footings were observed and were judged suitable for
suppoR of the design bearing capacity.
Concrete. The required testing in the field and in the laboratory has been completed. The available
results have been forwarded under separate cover. The placement procedures used were judged to have
met the project requirements. The compressive strength testing indicates the concrete placed has metthe
project requirements. No discrepancies were noted and [here are no outs[anding issues.
Reinforcing Steel. The reinforcement placement for ffie piers and pier footings was observed. No
discrepancies were no[ed and [here are no outs[anding issues.
Masonry. The periodic testing in the field and in the laboratory has been completed. The available
results have been forwarded under a separate covec The placement procedures used were judged to have
met the project requirements. The compressive strength testing indicates the masonry placed has met the
project requirements. No discrepancies were noted and there are no outstanding issues.
Structural Welding. The welded connections were observed according to the requirements of the
project specifications. Discrepancies were noted and documented. Following the required corrections,
the connections were found to be acceptable. There are currently no outstanding or unresolved
structural-steel-related issues.
Various reports have been issued that discuss the results of the concrete and masonry compressive
strength testing. These should be reviewed along with this final special inspection report.
Conclusion
Based upai the inspections performed and our attached reports, it is our professional judgment that, [o
the best of our knowledge, the inspected work was performed and completed in accordance with the
Praviding engineering nnd environmental solutions sinte 1957
.
.
Page 2 of 2
approved plans, specifications, A/E provided modifications and applicable workmanship provisions of
the International Building Code.
Inspecting Firm: Braun Intertec Corporation
I hereby certify that this plan, specification or report was
prepared by me or under my direct supervision and that 1 am
a duly Licensed Professional Engineer under the laws of the
State of Minnesota.
A, u r, PE
ice President
License Number: 15329
September 15, 2005
Attachments:
Special lnspec[ion Daily RepoRs, I& 2
Special [nspection Daily Reports, Steel #1 to Steel #4
Rpt Spccial Inspectioo-TOwn Cenire