Loading...
3211 Valley Ridge Dr - PERMIT ~V-~o CITY OF EAGAN PERMITTYPE: euz~ rnc -~y 3830 Pilot Knob Road % Eagan, Minnesota 55123 Permif Number: 024336 (612) 681-4675 Date Issued: 0 S/ 0 9/ 9 4 SITE ADDRESS: 3211 VALLEY RIDGE DR LOT: 3 BLOCK: 2 ROBERT KARATZ DESCRIPTION: (ROOFING) Build ni g'Permit Type MULTI. (MISC.) Building Wa.rk Type REPAIR iQ . L~y, C~ (:Mp 0O (:~~aq(m REMARKS: INCL 3213 3215 3217 3219 3221 3223 3225 3227 3229 3231 3233 VALLEY RIDGE OR FEE SUMMARY: VALUATION $6,400 Base Fee $90.00 Surcharge $3.20 Total Fee $93.20 CONTRACTOR: - Applicant - OWNER: GRUSSING ROOFING 19350557 HAFNER AL 4305 SHADY OAK RD 3240 HILL RIDGE DR HOPKINS MN 55343 EAGAN MN (612) 935-0557 (612)771-2084 I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Mn. ~ Statutes and City of Eagan Ordinances. J pi'd APPLICANT/PERMITEESIGNATURE 'IS~~,n :SIG ATURI~~ CITY OF EAGAN 1994 BUILDING PERMIT APPLICATION 681-4675 1433t SINGLE & MULTI-FAMILY 2 sets of plans, 3 registered site surveys, 1 copy of energy calcs. COMMERCIAL 2 sets of architectural & structural plans, 1 set of specifications, 1 copy of energy calcs. Penalty applies: 1) when permit is typed, but not picked up by last working day of month in which request is made, 2) address is changed or 3) lot change is requested once permit is issued. Date Valuation of work _ &4~BD Site Address: !7 -a7- -1 9-3f-3 STREET SUITE # n 1 V Tenant Name: (commercial only) ~ LOT BLOCK ~ SUSD. I\ Descri tion of work: The applicant is: ? Owner ? Contractor ? Other (Describe) Name Phone -2 7 / - d 67 41 Property LAST FIRST Owner Address ~a 1lQ S7REET STE # City State Wf a'*u-- Zip Company Phone 9.35 -055~ COntl'aCtOP Address y30,5 icense # al~ Exp. City State 40Z~1,~ Zip Architect/ Company Phone Engineer Name Registration N Address City State Zip Sewer & water licensed plumber Processing time for sewer & water permits is two days once area has been approved. I hereby acknowledge that I have read this application and state that the information is correct and agree to comply with all applicable State of Minnesota Statutes and City of LlIEdgdn Ordinances. gnature of Applicant: OFFICE USE ONLY ~ n„ ~ kBUILDING PERMIT TYPE ~ ~ ~ ? 01 Foundation ? 06 Duplex ? 11 Apt./Lodging ? 16 Basement Finish O 02 SF Dwg. ? 01 4-Plex O 12 Multi. Misc. 11 17 Swim Pool ? 03 SF Addition O 08 8-Plex ? 13 Garage/Accessory 0 18 Comm./Ind. ? 04 SF Porch ? 09 12-Plex ? 14 Fireplace ? 19 Comm./Ind. Misc. ? 05 SF Misc. ? 10 Multi. Add'1. ? 15 Deck 0 20 Public Facility ? 21 Miscellaneous WORK TYPE ? 31 New ? 33 Alterations ? 35 Tenant Finish ? 37 Demolish 1:1 32 Addition ? 34 Repair ? 36 Move GENERAL INFORMATION Const. (Actual) Basement sq. ft. MWCC System (Allowable) lst Fl. sq. ft. City Water UBC Occupancy 2nd F1. sq. ft. PRV Required Zoning Sq. Ft. total Booster PumP # of Stories Footprint Sq. ft. Fire Sprinkler Length On-site well Census Code Depth On-site sewage SAC Code Census Bldg APPROVALS Census Unit Planning Building Assessments Engineering Variance REOUIRED INSPECTIONS ? Site ? Footing ? Framing ? Insulation ? Wallboard ? Final O Draintile ? Fireplace Permit Fee veimciQ,: $ Surcharge Plan Review License MWCC SAC City SAC Water Conn. Water Meter Acct. Deposit S/W Permit S/W Surcharge Treatment P1. Road Unit Park Ded. Trails Ded. Copies Other Total: SAC % SAC Units VILLAGE OF EAGAN WATER SERVICE PERMIT 3795 Knob Road PERMIT NO.• 1515 Eago *tN 55122 DATE: July 3, 1974 R .�4 Zoning: No. of Units: 12 Owner: Rivergste IIG Address: Site Address: 3211- 13- 15- 17 -19- 21•.23- 25 -27- 29..31 -33 Val1eyr1 Plumber: Berghorst Meter No.: Connection Charge: Size: Account Deposit: $3.0.00 Reader No.: Permit Fee: .50 agree to comply with the Village of Eagan Surcharge: Ordinances. Misc. Charges: Total: By ;* �-�� » Date Paid: Date of Insp.: Insp.: VILLAGE OF EAGAN SEWER SERVICE PERMIT 3795 Pilpt Knob Road PERMIT NO.: 2274 Eagas, MN 55122 DATE: July 3, 1 97 4 Z R-4 No. of Units: Owner: Riarmrsate II0 Address: Site Address: 3211•• 13- 15 -17- 1921 -23- 2927- 29 -31 -33 Valleyrii Plumber: Berghoret agree to comply with the Village of Eagan Connection Charge",-14.-'s' '`'` $10.00 Ordinances. Account Deposit: Permit Fee: .50 � f 7 Surcharge: By: Misc. Charges: Date of Insp.: Total: Insp.. Date Paid: 41/1 City of EaQali 3830 Pilot Knob Road Eagan MN 55122 Phone: (651) 675-5675 Fax: (651) 675-5694 Use BLUE or BLACK Ink For Office Use P N5 Date Received: ' Z'1 � 13 Staff:1 Permit #: Permit Fee: 2013 RESIDENTIAL BUILDING PERMIT APPLICATION Date: 07 1 Site Address ( `��� i6, Unit #: • `1 Phone: 1 6k -'3a ' Address / City / Zip: 3A 1 Q 6A\led Applicant is: Owner X, Contractor t kr ( Ce6tC5Ct ti x i - tt:: Lath t?k\( (NAO. & yt,�a�� cox- c0C $et-r.+ick, , Ci 3.t amp ion o work: e8t,,u;exl\ o 1ir-C> WW1\66 ci4y .tk'w►-CGh trt Qt5AC.0 EA -t cit • • p Construction Cost:r,' Multi -Family Building: (Yes / No 2\ ) (`e U�gA-C\ 1�,`Gb\ t_ JCC `�\(Ontact: Filo Address: q U �� � \� PL ME -City: .e(\geA State: 1 n, IV Zip: 6643a Phone: Rho* - Thi -a3-7-61665 License #: (i' (t91440 Lead Certificate #: P(f - 6 ‘3- ri Company: If the project is exempt from lead certification, please explain why: (see Page 3 for additional information) L3 111' COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING In the last 12 months, has the City of Eagan issued a permit for a similar plan based on a master plan? _Yes _No If yes, date and address of master plan: Licensed Plumber: Phone: Mechanical Contractor: Phone: Sewer & Water Contractor: Phone: NOTE: Plans and supporting documents that you submit are considered to be public information. Portions of the information may be classified as non-public if you provide specific reasons that would permit the City to conclude that they are trade secrets. CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.goi herstateonecall.orq I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. Exterior work authorized by a building permit issued in accordance with the Minnesota State Building Code must be completed within 180 days of permit issuance. x <6- - c ( x Apfflicant's Signature Applicant's Printed Name Page 1 of 3 2a1 t Va,k DO NOT WR E BEL • W THIS LINE SUB TYPES Foundation Single Family Multi 01 of /,Z Plex Accessory Building WORK TYPES New Addition Alteration Replace Retaining Wall DESCRIPTION Valuation Plan Review (25%_ 100% Census Code # of Units # of Buildings Type of Construction Fireplace Garage Deck Lower Level _ Interior Improvement Move Building Fire Repair Repair REQUIRED INSPECTIONS Footings (New Building) Footings (Deck) Footings (Addition) Porch (3 -Season) Porch (4 -Season) Porch (Screen/Gazebo/Pergola) Pool Occupancy Code Edition Zoning Stories Square Feet Length Width Foundation Drain Tile Roof: _Ice & Water Final Framing Fireplace: _Rough In Air Test _Final -rF! Insulation Sheathing Sheetrock Reviewed By: RESIDENTIAL FEES Base Fee Surcharge Plan Review MCES SAC City SAC Utility Connection Charge S&W Permit & Surcharge Treatment Plant Copies TOTAL 73 I/7 22-1 Siding Reroof Windows Egress Window Storm Damage Exterior Alteration (Single Family) Exterior Alteration (Multi) Miscellaneous _ Demolish Building* Demolish Interior _ Demolish Foundation Water Damage "Demolition of entire building — give PCA handout to applicant 107 R-3 MCES System SAC Units City Water Booster Pump PRV Fire Sprinklers Meter Size: Final / C.O. Required /AG Final / No C.O. Required 4,e HVAC _ Gas Service Test Gas Line Air Test Other: Pool: _Footings Air/Gas Tests Siding: _Stucco Lath _Stone Lath _ Windows Retaining Wall: _ Footings _ Backfill Radon Control Erosion Control , Building Inspector Final Brick Final Page 2 of 3 -321 \ -37X3, --ya (� � L I1 --s•l I 1 Use BLUE or BLACK ink' 1 r i For Office JUse I of C tEaia-2-7-\ t S2 2TS , 2, S22 1 I Penr$ti s / 7 •"! ( i Il Permit Fee: 6,2c,/,00 3830 Pilot Knob Road Lk', o" i Eagan MN 55122 11 Date' Received: j Phone: (651) 675-5675 I 1 Fax: (651) 675-5694 Z2—C1, 2-� 1 "323, , Staff_ I 1 2016 RESIDENTIAL BUILDING PERMIT APPLICATION Date: Site Address: / Eagan / 55121 unit#: 3211-3233 Name: Valley Ridge Townhomes tll Owner Address / City / Zip: 1650 City View Dr. / Eagan / 55121 Type of Work Contractor Applicant is: Owner Y Contractor Description of work: eas4 4- S 4Ji Construction Cost: y j ® 2.1 21- Company: 2Company: Capital Construction, LLC tt Phone: Multi -Family Building: (Yes .i / No Contact Cote Quinnell Address: 406 Gateway Blvd. State: MN Zip: 55337 License #: BC645094 Phone: 952-222-4004 City: Burnsville nail: cole c©capitalconstruction-Iic.com Lead Certificate #: NAT -F156131-1 the project is exempt from lead certification, please explain why: COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING in the last 12 months, has the City of Eagan issued a permit for a similar plan based on a master plan? Yes No If yes, date and address of master plan: Licensed Plumber: Phone: t Mechanical Contractor: Phone: { Sewer & Water Contractor; Fire Suppression Contractor; NOTE: Plans and supporting documents that you submit ars► can the information may be classified as non-public if you provide s, conclude that the are trade ide• r€ Phone: obe public information. Portions rasons that would permit the City f CALL BEFORE YOU DIG. Call Gopher State One Cali at (651) 454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.00nherstateonecall.orq I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that 1 understand this is not a permit, but only an application for a permit, and work is not to start without a permit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. Exterior work authorized by a building permit issued in accordance with the Minnesota State Building Code must be completed within 180 days of permit issuance. x Cole Quinnell Applicants Printed Name tee Applicant's Signature Page 1 of 3 1-For Office Use . /S0S 1' ` ' `; r ' r Permit#: ' N.,,,... "o Permit Fee: / 3 ECEIVE Date Received: v 3830 PILOT KNOB ROAD I EAGAN, MN 55122-1810 AI" (651)675-56751 TDD: (651)454-8535 I FAX:(651)675-569 OCT I i 2019 Staff: ►_i buiidinginspections ct cityofeagan.com BY: 2019 RESIDENTIAL BUILDING - 11T APPLICATION Date I v 1 1 + I q Site Address: 3 2 1 1 Yui/)t. v R irit"f r' Unit#: Name: r- t V S }. Sr.1,tl i (C ( t'.S i "ten I,G/ Phone: 'VS`2.2 77. 2 70, Resident! /�f ,r t Owner Address J City/Zip:_k/ 0 d 1�"' L2 - ,I9v? £ h i ,' 2)0 Applicant is: Owner X Contractor - 1J'Aizz � j 44 Type of Work Description of work: 2L/ ( i'Lii f n -I/ ot r Construction Cost: 3 D6)C> Multi-Family Building: (Yes_I No ) Company', c11611 ddfrd //ii ki;' ‘4"21/1d/ Contact: 7l/'3-5. i 171Vel - I Address' 5T3 I 7 1-,6i 4407/ ,4Y` /'7 City: L rqf 4c- Contractor 1 f State:Jfl'/Zip: Sir y2g Phone: /f$'ill 9[ mail:/ 'le/L/ 1SYM7/4eri 'f rfr f.fl,?-6,7 License _ (00/ 12 2 Z Lead Certificate#:,. T" Z 4'5 " 1 If the project is exempt from lead certification, please explain why: _a ..-m...w,«.... -.,,. ... _ ,. ., .... .... - - COMPLETE THIS AREA ONLY IF CONSTRUCTING A NEW BUILDING In the last 12 months,has the City of Eagan issued a permit for a similar plan based on a master plan? Yes No if yes,date and address of master plan: Licensed Plumber: Phone: Mechanical Contractor: Phone: Sewer&Water Contractor: Phone: Fire Suppression Contractor: Phone: NOTE:Plans and supporting documents that you submit are considered to be public information. Portions of the information may be classified as nonpublic if you provide specific reasons that would permit the City to conclude that they are trade secrets. You may subscribe to receive an electronic notification from the City of proposed ordinances by signing up for an email update on the City's website at www.citvofoanan.com/subscribe. Exterior work authorized by a building permit issued in accordance with the Minnesota State Building Code must be completed within 180 days of permit issuance. CALL BEFORE YOU DIG. Call Gopher State One Call at(851)454-0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities, vmw.gppherstateorrecail.orq I hereby acknowledge that this information is complete and accurate;that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit. and work is not to start without a permit; that the work will be in accordan e "h the approved plan in the case of work which requires a review and approval of tans.Pp r,;r, efil, ieri A t cant's Pr' to Name Ap II ants nature � / / \ �� -)K( L/` dte Dg �`�� k� -�� "� / / JI(/� �,�� �l� ^ / `~ _-��- / , " " DO NOT WRITE BELOW THIS LINE ' SUB TYPES Foundation Fireplace __ Pwruh(3'Swmmun) __ Eu�MorA]tm�dun(Single Fmm|�) --� Single Family -- Garage __ Por�h(4-Season) __ 4E�edor�A$mroWon(Multi)MultiDeuk Pmroh(Gnnoan(Gazebo/Pe,go!o) Miscellaneous01ofP|ex --� Lower Level --' Ppoi __� Accessory Building WORK TYPES Now __ Interior Improvement __ Siding __� Demolish Building" — Addition __� K8nve�uUd|og __ Roroo� __� Demolish Interior Alteration Fire Windows Demolish Foundation ��� __ __ __ ' ' Rop|mn* Repair Egress Window Water Damage __. Retaining Wall 'ommvouunuypnumuuomng-mipppcA handout to applicant DESCRIPTION ),,t_affoValuation Occupancy Ni � I, MCES System h mm Plan Review Code Edition , ,^� ' 1 " SAC Units (26% 18O6i) Zoning Mk City Water Census Code Stories Booster Pump #of Units Square Feet PRV #of Buildings Length Fire Suppression Required Type of Construction V �+ Width REQUIRED INSPECTIONS Footings(New Bui|ding) ____ Meter Size: ____ Footings ___� Final/C.C3, Required Footings (��ddition) �iFinal/NoC.<�. Required ___ �� Foundation ____Fpundation Before Backfill ' HVAC Service Test Gas Line Air Test Hood ---� TestsFinal Roof: Ice&VVaterFina} ___ Pon|: Footings Air/Gas am nm| Framing 3OMinutes 1Hour 24.) Drain Ta _ Fireplace: Rough In AirTas F|na| Siding: Stucco Lath Stone Lath BrickEFIS |nsuhatiun ___� Windows — 8hma�hing ___ RetminiugVVa1|: Footin8oQackfiKFina| — Sheetrock Radon Control PineVVa||� ____ F|mmSupprass1on: Rough |nFine| Braced _ Erosion Control ShoxvmrPan ___. Other: Reviewed By: , Building Inspector RESIDENTIAL FEES fclifti Base Fee /' Surcharge , fil.kli•J/ ^/ � Plan Review V ^/ ` �7/i " ' � I |NCESSAC ' 1(2 C|tyS�\C �~� ^^ � Utility Connection Charge ~ ' �� � y / / ) � � ^~� S&VVPermit f� Surcharge [� �° Treatment Plant �� / 1 �\ ^�� Radio Meter Read �� Copies (1.1 (/ V TOTALL � (111111 Page 2 of 3