MAINTENANCE FACILITY
3501 Coachman Point
Eagan, MN 55122
651.675.5300 phone
651.675.5360 fax
651.454.8535 TDD
www.cityofeagan.com
THE LONE OAK TREE
The symbol of
strength and growth
in our community.
October 10, 2008
Tom Ryan, RJ Ryan Construction, Inc.
1100 Mendota Heights Rd.
Mendota, MN 55120
RE: RASMUSSEN COLLEGE ADDITION
3500 FEDERAL DRIVE
Dear Tom,
We have completed our review of the construction documents submitted in pursuit of
obtaining a building permit for the above- referenced project. This review is not intended
to be an exhaustive and comprehensive report. Unless otherwise noted, all references are
to the 2006 I.B.C. It is our goal that this review will help you in complying with the
applicable codes and we are, therefore, requesting that the following items be addressed.
If you have any questions please call 651- 675 -5676 or e-mail mlence @cityofeagan.com
Sincerely,
/41
Mike Lence
Senior Inspector
• Provide detail for accessible bench and locker in men's and women's
dressing room. 5% of lockers, but not less than 1% shall meet accessible
reach ranges.
• There are over 200 parking spaces. This would require 7 accessible
spaces and accompanying access aisles. Please show all spaces and aisles.
• Address numbers to be visible from the street, 12 inches in height.
cc: Dale Schoeppner, City of Eagan Chief Building Official
City of Eaaall
Mike Maguire
MAYOR
Paul Bakken
Cyndee Fields
Meg Tilley
COUNCIL MEMBERS
Thomas Hedges
CITY ADMINISTRATOR
MUNICIPAL CENTER
3830 Pilot Knob Road
Eagan, MN 55122 -1810
651.675.5000 phone
651.675.5012 fax
651.454.8535 TDD
MAINTENANCE FACILITY
3501 Coachman Point
Eagan, MN 55122
651.675.5300 phone
651.675.5360 fax
651.454.8535 TDD
www.cityofeagan.com
THE LONE OAK TREE
The symbol of
strength and growth
in our community.
September 22, 2008
Tom Ryan
RJ Ryan Construction, Inc
1100 Mendota Heights Rd
Mendota Heights, MN 55120
RE: Rasmussen College Addition and Remodel
3500 Federal Dr
Dear Tom:
We have started our review of the construction documents submitted in pursuit of
obtaining a building permit for the above - referenced project. This review is not
intended to be an exhaustive and comprehensive report. Unless otherwise noted, all
references are to the 2006 I.B.C. It is our goal that this review will help you in
complying with the applicable codes and we are, therefore, requesting that the
following items be addressed:
1 Soils Report
• 1 Met Council SAC Determination
✓• Need signature from Testing Agency on Special Inspection and Testing
Schedule
✓• 1 Electric Power & Lighting form (example enclosed)
• 1 Emergency Response Site Plan (example enclosed)
• Fire Suppression / Alarm Plans. If you have any questions regarding this,
please call the Fire Marshal, Dale Wegleitner, at (651) 675 -5906.
If you have any questions concerning this letter, please call me at (651) 675 -5676 or
email me at mlence(a�citvofeagan.com.
Sincerely,
Mike Lence
Senior Building Inspector
Cc: Bryan Paulsen, 209 South Second St, Suite 201, Mankato, MN 56001
City of Eapi
Mike Maguire
MAYOR
Paul Bakken
Cyndee Fields
Meg Tilley
COUNCIL MEMBERS
Thomas Hedges
CITY ADMINISTRATOR
MUNICIPAL CENTER
3830 Pilot Knob Road
Eagan, MN 55122 -1810
651.675.5000 phone
651.675.5012 fax
651.454.8535 TDD
MAINTENANCE FACILITY
3501 Coachman Point
Eagan, MN 55122
651.675.5300 phone
651.675.5360 fax
651.454.8535 TDD
www.cityofeagan.com
THE LONE OAK TREE
The symbol of
strength and growth
in our community.
September 22, 2008
Tom Ryan
RJ Ryan Construction, Inc
1100 Mendota Heights Rd
Mendota Heights, MN 55120
RE: Rasmussen College Addition and Remodel
3500 Federal Dr
Dear Tom:
We have started our review of the construction documents submitted in pursuit of
obtaining a building permit for the above - referenced project. This review is not
intended to be an exhaustive and comprehensive report. Unless otherwise noted, all
references are to the 2006 I.B.C. It is our goal that this review will help you in
complying with the applicable codes and we are, therefore, requesting that the
following items be addressed:
✓•
• 1 Soils Report
1 Met Council SAC Determination
Need signature from Testing Agency on Special Inspection and Testing
Schedule
1 Electric Power & Lighting form (example enclosed)
• 1 Emergency Response Site Plan (example enclosed)
• Fire Suppression / Alarm Plans. If you have any questions regarding this,
please call the Fire Marshal, Dale Wegleitner, at (651) 675 -5906.
If you have any questions concerning this letter, please call me at (651) 675 -5676 or
email me at mlence(a�cityofeagan.com.
Sincerely,
Mike Lence
Senior Building Inspector
Cc: Bryan Paulsen, 209 South Second St, Suite 201, Mankato, MN 56001
t Metro olitan Council
Sincerely,
September 30, 2008
Dale Schoeppner
Building Official
City of Eagan
3830 Pilot Knob Road
Eagan, MN 55122
Dear Mr. Schoeppner:
The Metropolitan Council Environmental Services (MCES) Division has determined SAC for the Rasmussen College
addition/remodel to be located at 3500 Federal Drive within the City of Eagan.
This project should be charged 6 SAC Units, as determined below.
SAC Units
Charges:
Office
3830 sq. ft. @ 2400 sq. ft. /SAC Unit 1.60
Classroom (college)
9372 sq. ft. @ 540 sq. ft. /SAC Unit 17.36
Lab (college)
3564 sq. ft. @ 900 sq. ft./SAC Unit 3.96
Storage
520 sq. ft. @ 7000 sq. ft./SAC Unit 0.07
Credits:
College (6/89)
9433 sq. ft. @ 540 sq. ft./SAC Unit
The business information was provided to MCES by the applicant at this time. It is the City's responsibility to
substantiate the business use and size at the time of the final inspection. If there is a change in use or size, a
redetermination will need to be made. If you have any questions, call me at 651 -602 -1118.
Karon Cappaert
SAC Technician
Environmental Services Division
KC:kb: 080930A5
cc: J. Nye, MCES
Peggy Fleck, Eagan
Tom Ryan, RJ Ryan (email)
Total Charge: 22.99
17.47
Net Charge: 5.52 or 6
www.metrocounal.org
Environmental Services
390 Robert Street North • St. Paul, MN 55101 -1805 • (651) 602 -1005 • Fax (651) 602 -1477 • TTY (651) 291 -0904
An Equal Opportunity Employer
Mike Lence
From: John Gorder
Sent: Thursday, October 02, 2008 3:41 PM
To: 'Chris Remus'
Cc: 'Tom Ryan'; Mike Lence
Subject: RE: Rasmussen
Chris,
Thanks for the revisions. Another gate valve should be added on the new line's service tee into the
addition, for system isolation purposes. Also, any thought given to extending the existing hydrant lead
to the southwest for the new hydrant and service? Please consider and revise plans accordingly.
Thanks.
John Gorder, P.E.
Assistant City Engineer
City of Eagan
Phone: 651-675-5645
Fax: 651 - 675 -5694
jgorder@cityofeagan.com
From: Chris Remus [mailto:cremus @jrhinc.com]
Sent: Thursday, October 02, 2008 9:35 AM
To: John Gorder
Cc: 'Tom Ryan'
Subject: Rasmussen
John:
Attached are revised sheets 3.1 and 4.1 per your comments. Feel free to call with any questions. l believe the
contractor will also be submitting a full revised set here shortly.
Thanks,
Chris Wemus, P.E.
James R. Hill, Inc.
2500 W. County Road 42, Suite 120
Burnsville, MN 55337
Phone: (952) 890 -6044, ext. 104
Fax: (952 890 -6244
Email: cremus anjrhinc.com
IF PDF'S ARE ATTACHED TO THIS EMAIL SEE THE NOTE BELOW: (See Below)
CONFIDENTIALITY NOTICE:
INFORMATION IN THIS MESSAGE, INCLUDING ANY ATTACHMENTS, IS INTENDED ONLY FOR THE
PERSONAL AND CONFIDENTIAL USE OF THE RECIPIENT(S) NAMED ABOVE AND FOR THE PURPOSES
INDICATED. Any unauthorized review, use, disclosure or distribution is prohibited. If you are not the intended
recipient, or employee or agent responsible to deliver it to the intended recipient, you are hereby notified that any
dissemination, distribution or copy of this communication is strictly prohibited. If you receive this communication in
error, please contact the sender immediately by reply e-mail and delete all copies of the original message. Thank
You: James R. Hill Inc.
10/3/2008
Page 1 of 2
Mike Lence
From: John Gorder
Sent: Thursday, September 25, 2008 8:30 AM
To: 'Chris Remus'
Cc: Mike Lence
Subject: Rasmussen College - Addition & Remodel Building Permit
Hi Chris,
Engineering staff have completed a review of the above - referenced building permit civil plans, and offer
the following comments for revision:
• Note "City Project No. 08 -BP -K" on all civil plans
• Note the silt fence on the grading plan, and provide a detail
• The 6 -inch PVC sanitary sewer should be SDR 26
• Check hydrant spacing/ coverage for the new addition. Coverage should be provided to within
250 feet of the most remote point of the addition (around the perimeter of the building).
Please contact me with any questions. Please revise and submit an electronic copy back to me for
review. Thanks.
John Gorder, P.E.
Assistant City Engineer
City of Eagan
Phone: 651 - 675 -5645
Fax: 651 - 675 -5694
jgorder@cityofeagan.com
9/25/2008
Page 1 of 1
Technical �
_~�
Type of S
Specific A
Assigned
Section D
Cast place concrete -- S
SI P
Periodic
American Eneineering
Structural Steel bolting
S|-S ' P
._ _
American Engineering
Testing
----
Structural Steel welding �
�|'� � P
Periodic A
American
r
r
Unit Mason,). S
SI-T P
Periodic A
American Engineering �
Testing
S
Soils S
SI P
Periodic A
Location
Special Structural Testing and Inspection Program Schedule
Project Name _Rasmussen College
3500 Federa Drive Eagan, Mn
Project No 0762.10
Permit No.
Note This schedule shall be fihled out and included in a Special Structure Testing an and nsp on rogram.
(If not otherwise specified, assumed program will be "Guidelines for Special Inspection & as contained in the
State Building Code and as modified by the state adopted IBC)
*A complete specification-ready program can be downloaded directly by visiting CASE/MN at wwvv.cecrri.org*
(1) Permit No. to be provided by the Building Official
(2) Referenced to the specific technical scope section in the progr m.
( Use descriptions per IBC Chapter 17 as adopted by Mrnnesota State Building Code
(4) Special lnspector Technical (SIT) Special Inspector Special Inspector Structural (SIS)
( Weekly, nnon1h|y, perkesVinypection. per floor, etc.
(6) Name of Firm contracted to perform services.
ACKNOWLEDGEMENTS
_
Owner:
�� Firm:
Date:
-_� - ---�� � -
Architect: jor,... Firm: 4(iffiko - / Date: 6 .,':,
Contractor: Firm: Date:
_
SER: /� Firm: d / c, ,, , , Date
S��� ' / /
' / A B rm� .�,��. - Date: �� ~�
~=��=r '
TA: Fknr � _ . Date: �
F:
.
Firm: O
If requested by engineer/architect of record or building official, the individual names of all prospe we special
inspectors and the work they intend to observe shall be identified as an attachment.
Legend: GEA= Structural E i of Record 8|'T= Special Inspector 'Teohnica| TA Testing Agency
SI-S Special Inspector - Structural F = Fabricator
Accepted for the I3uilding Department By uc.„°
Date
CityofEa�afl
TO: Scott Peterson, Building Inspections
Mike Ridley, Planning
Dale Wegleitner, Fire Marshal
Tom Colbert, Engineering
John Gorder, Engineering
Dave Westermayer, Engineering
Leon Weiland, Engineering
Tom Struve, Maintenance
Eric Macbeth, Maintenance
Gregg Hove, Maintenance
Jim McDonald, Police Department
Mark Anderson, Electrical Inspector
Sarah Brandel, Community Development
Peggy Fleck, Clerical Technician
FROM: Mike Lence, Senior Building Inspector
DATE: September 19, 2008
#
RE: Plan Review For: Rasmussen College Addition and Remodel
Rasmussen College Addition
3500 Federal Dr (Lot 1, Block 1 Rasmussen College Campus)
The plans are in our plan review section for your review and comment.
Please return this form to my attention with your signed comments within 7 days. Please
indicate any concerns you have with these plans and resolve these issues with the affected
parties. If you are requesting that issuance of the building permit be held, please submit the
proper "hold request" form to me.
Comments:
Indicate below any fees that are to be collected with the building permit.
Amount
❑ Yes El No
❑ Yes ❑ No
❑ Yes ❑ No
❑ Yes ❑ No
❑ Yes ❑ No
❑ Yes ❑ No
Landscape Security Required Zoning:
Water Quality Dedication Meter Size:
Park Dedication
Trail Dedication
Tree Dedication
PRV Required
Signature Date
G: \Building Inspections \FORMS \Commercial Bldgs final & plan rev letters
City of Eagan Meo
TO: Scott Peterson, Building Inspections
Mike Ridley, Planning
Dale Wegleitner, Fire Marshal
Tom Colbert, Engineering
John Gordet, Engineering
Dave Westermayer, Engineering
Leon Weiland, Engineering
Tom Struve, Maintenance
Eric Macbeth, Maintenance
Gregg Hove, Maintenance
Jim McDonald, Police Department
Mark Anderson, Electrical Inspector
Sarah Brandel, Community Development
Peggy Fleck, Clerical Technician
FROM: Mike Lence, Senior Building Inspector
DATE: September 19, 2008
RE: Plan Review For: Rasmussen College Addition and Remodel
Rasmussen College Addition
3500 Federal Dr (Lot 1, Block 1 Rasmussen College Campus)
The plans are in our plan review section for your review and comment.
Please return this form to my attention with your signed comments within 7 days. Please
indicate any concerns you have with these plans and resolve these issues with the affected
parties. If you are requesting that issuance of the building permit be held, please submit the
proper "hold request" form to me.
Comments:
- n At . r Yw , J` re ✓i vim✓ ' %z !h l2e -
G. Y ro)ef A. - $? /:.
❑ Yes ❑ No
❑ Yes ❑ No
❑ Yes ❑ No
❑ Yes ❑ No
❑ Yes 0 No
❑ Yes Er--No
Indicate below any fees that are to be collected with the building permit.
Amount
Landscape Security Required Zoning:
Water Quality Dedication Meter Size:
Park Dedication
Trail Dedication
Tree Dedication
PRV Required
2!( 10
gnature Date
G: \Building Inspections \FORMS \Commercial Bldgs final & plan rev letters
CityofEaftali
TO: Gott Pet- • n, Building Inspections
Planning
Dale Wegleitner, Fire Marshal
Tom Colbert, Engineering
John Gorder, Engineering
Dave Westermayer, Engineering
Leon Weiland, Engineering
Tom Struve, Maintenance
Eric Macbeth, Maintenance
Gregg Hove, Maintenance
Jim McDonald, Police Department
Mark Anderson, Electrical Inspector
Sarah Brandel, Community Development
Peggy Fleck, Clerical Technician
FROM: Mike Lence, Senior Building Inspector
DATE: September 19, 2008
RE: Plan Review For: Rasmussen College Addition and Remodel
Rasmussen College Addition
3500 Federal Dr (Lot 1, Block 1 Rasmussen College Campus)
The plans are in our plan review section for your review and comment.
Please return this form to my attention with your signed comments within 7 days. Please
indicate any concerns you have with these plans and resolve these issues with the affected
parties. If you are requesting that issuance of the building permit be held, please submit the
proper "hold request" form to me.
Comments:
u ski' L4 ,r ,4-Lk sa
Indicate below any fees that are to be collected with the building permit.
Amount
E'Yes ❑ No Landscape Security Required 3 - s Zoning: £-1
❑ Yes ❑ No Water Quality Dedication Meter Size:
❑ Yes ❑ No Park Dedication
El Yes ❑ No Trail Dedication
❑ Yes ❑ No Tree De ation
❑ Yes ❑ No PRV eq red
Signature
G: \Building Inspections \FORMS \Commercial Bldgs final & plan rev letters
Date
c od "S -9•i(
9
A
C
rn
-
c
n
• October 2, 2008
z
Mike Lence
City of Eagan
- 3830 Pilot Knob Road
Eagan, MN 55122
Re: Rasmussen College - Eagan, MN
Comm. No.: 0762:10
Dear Mike,
As per my conversation with Larry Waite, Vice President of Operations at Rasmussen College, it was stated
that the largest occupancy of students and staff at the college including the new expansion would be at 200
occupants maximum. Once new construction is complete, there will be 207 parking stalls. We have designed
this site plan to meet the 30% green space requirement from the City of Eagan.
Mike, if you have any questions or concerns, please feel free to contact me at 507.388.9811 or Larry Waite
at 651.259.6514.
Shane Jandro
SCJ /tla
0762.10/1w!
209 South Second Si, Suite 201
Mankato, MN 56001
� I
507.388.9811 FAX 507.388.1751
e -mail: bpadepauisen- arch.com III PA U LS E N
www.paulsen- arch.com ARCHITECTS
3usiness Co
kdministrative Office
2450 Wayzata Boulevard
;uite 201
linnetonka, MN 55343
12/545 -4058
iasmussen
3usiness College
4. Paul
5 West Fiflh 5!.
1. Paul, MN 55102
12/222 -4474
iasmussen
3usiness College
Aankata
;ood Counsel Drive
Aankato, MN 56001
07/625 -6556
iasmussen RWN/ J r
3usiness College
Ainnetanka
2450 Wayzata 73■vd.
Ainne!onka.MN.55343
112/545-2000
31. Clod
3usiness College
85 North 37t11 Avenue
1L Cloud, MN 56303
;12/251-5600
February 15, 1989
City of Eagan
3830 Pilot Knob Road
e'ge3 Eagan, MN 55122
Dear Ladies and Gentlemen:
This letter is part of our preliminary plat application.
This legal description is: The north 344.87 feet of the North
Half of the Southeast Quarter of the Northeast Quarter of
Section 16, Township 27, Range 23, Dakota County, Minnesota.
Excepting therefrom that part embraced within the MINNESOTA
DEPARTMENT OF TRANSPORTATION RIGHT OF WAY PLAT NO. 19 -52
according to the recorded plat thereof.
The abstractor's certificate of names and addresses of property
owners within 350 feet has been ordered by Rehder, Wenzel, Inc
and will be forthcoming.
A history of the college is on page three of the enclosed
catalog.
The school hours are from 8:00 a.m. to 1:50 p.m. each day. Our
maximum student capacity is 300 with approximately 12 teachers.
A staff of eight work from 7:30 a.m. to 4:30 p.m.
Our evening school hours are 5:00 p.m. to 9:10 p.m. with expected
volume of 150 students and 15 staff persons.
Sincerely,
Robert Nemitz
Vice President
Enclosure
4
APR 06 '89 08:49 WOBKEN. WALSH, NOREEN ARCHITECTS
C!tyofEaau
TO: Scott Peterson, Building Inspections
Mike Ridley, Planning
Dale Wegleitner, Fire Marshal
Tom Colbert, Engineering
John Gorder, Engineering
Dave Westermayer, Engineering
Leon Weiland, Engineering
truv- aintenance
aln enance
Gregg Hove, Maintenance
Jim McDonald, Police Department
Mark Anderson, Electrical Inspector
Sarah Bran Pl Cammunity Development
Peggy Fleck, Clerical Technician
FROM: Mike Lence, Senior Building Inspector
RE: Plan Review For: Rasmussen College Addition and Remodel
Rasmussen College Addition
3500 Federal Dr (Lot 1, Block 1 Rasmussen College Campus)
The plans are in our plan review section for your review and comment.
Please return this form to my attention with your signed comments within 7 days. Please
indicate any concerns you have with these plans and resolve these issues with the affected
parties. If you are requesting that issuance of the building permit be held, please submit the
proper "hold request" form to me.
Comments:
Indicate below any fees that are to be collected with the building permit.
Amount
❑ Yes
❑ Yes
❑ Yes
❑ Yes
❑ Yes
Signat e
❑ No
No
No
❑ No
❑ No
❑ No
•
Landscape Security Required Zoning:
Water Quality Dedication Meter Size:
Park Dedication
Trail Dedication
Tree Dedication
PRV Requir -d
G: \Building Inspections\FORMS\Commercial Bldgs final & plan rev letters
P4#/b2
Date
City of Evan
Comments:
❑ Yes ❑ No
❑ Yes ❑ No
❑ Yes ❑ No
❑ Yes ❑ No
❑ Yes No
❑ Yes No
Signature
TO: Scott Peterson, Building Inspections
Mike Ridley, Planning
Dale Wegleitner, Fire Marshal
Tom Colbert, Engineering
John Gorder, Engineering
Dave Westermayer, Engineering
Leon Weiland, Engineering
Tom Struve, Maintenance
Eric Macbeth, Maintenance
Maintenance
Jim McDonald, Police Department
Mark Anderson, Electrical Inspector
Sarah Brandel, Community Development
Peggy Fleck, Clerical Technician
FROM: Mike Lence, Senior Building Inspector
DATE: September 19, 2008
dv?
RE: Plan Review For: Rasmussen College Addition and Remodel
Rasmussen College Addition
3500 Federal Dr (Lot 1, Block 1 Rasmussen College Campus)
The plans are in our plan review section for your review and comment.
Please return this form to my attention with your signed comments within 7 days. Please
indicate any concerns you have with these plans and resolve these issues with the affected
parties. If you are requesting that issuance of the building permit be held, please submit the
proper "hold request" form to me.
Indicate below any fees that are to be collected with the building permit.
Amount
Landscape Security Required Zoning:
Water Quality Dedication Meter Size:
Park Dedication
Trail Dedication
Tree Dedication
PRV Required
G: \Building Inspections \FORMS \Commercial Bldgs final & plan rev letters
9.- 2,2 - OK