2061 Park Center Dr - research docs for BL80920,BL81627TO: City of Evan demo Dale Schoeppner, Building Inspections Scott Peterson, Building Inspections VCraig Novaczyk or Mike Lence, Building Inspections Mike Ridley, Planning Carol Tumini, Utility Billing Dale Wegleitner, Fire Department Tom Colbert, Engineering John Gorder, Engineering Leon Weiland, Engineering Tim Pahr, Engineering Paul Olson, Maintenance Tom Struve, Maintenance Eric Macbeth, Maintenance Mark Anderson, Electrical Inspector FROM: Terry Zelenka, Building Inspector DATE: August 21, 2008 SUBJECT: Final Inspection For: Oakwoods East Senior Housing 2061 Park Center Dr. The Protective Inspections Division will be performing a final inspection at the above referenced property the week of September 11, 2008. If you have cause for not granting the Certificate of Occupancy, please submit a "hold request" to my attention. The person /department requesting a hold is responsible for notifying and resolving problems with the affected parties. City of Eaau TO: Scott Peterson, Building Inspections '0 Mike Ridley, Planning Dale Wegleitner, Fire Marshal Tom Colbert, Engineering John Gorder, Engineering ,Dave Westermayer, Engineering Leon Weiland, Engineering Tom Struve, Maintenance It Eric Macbeth, Maintenance 6iGregg Hove, Maintenance Jim McDonald, Police Department Mark Anderson, Electrical Inspector FROM: 1/Craig Novaczyk, Inspector DATE: October 8, 2007 RE: Plan Review For OAKWOODS EAST 2065 PARK CENTER DR. The plans are in our plan review section for your review and comment. Ncmo # 35 Please return this form to my attention with your signed comments within 7 days. Please indicate any concerns you have with these plans and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please submit the proper "hold request" form to me. Comments: Indicate below any fees that are to be collected with the building permit. Amount ❑ Yes ❑ No landscape security required Zoning? ❑ Yes ❑ No water quality dedication Meter Size ❑ Yes ❑ No park dedication ❑ Yes ❑ No trail dedication ❑ Yes ❑ No tree dedication ❑ Yes ❑ No PRV Required Signature Date CD/Bldg Insp/Forms //Plan Review For REVISED 2 -07 C!tyofEa�afl TO: Scott Peterson, Building Inspections %'Mike Ridley, Planning Dale Wegleitner, Fire Marshal Tom Colbert, Engineering John Gorder, Engineering Dave Westermayer, Engineering Leon Weiland, Engineering Tom Struve, Maintenance Eric Macbeth, Maintenance Gregg Hove, Maintenance Jim McDonald, Police Department Mark Anderson, Electrical Inspector FROM: Craig Novaczyk, Inspector DATE: October 8, 2007 RE: Plan Review For OAKWOODS EAST 2 065 PARK CENTER DR. The plans are in our plan review section for your review and comment. Please return this form to my attention with your signed comments within 7 days. Please indicate any concerns you have with these plans and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please submit the proper "hold request "form to me. ��� N 1 Comments: 1111 ler Yes ❑ No ❑ Yes )4 No ❑ Yes 1A No ❑ Yes No ❑ Yes 511 No ❑ Yes ❑ No Signature CDBIdg Insp/Forms //Plan Review For - Po ttto // Indicate below any fees that are to be collected with the building permit. landscape security required water quality dedication park dedication trail dedication tree dedication PRV Required Amount Su U Nov. Z, , o r i Date # 35 Zoning? Meter Size Memo REVISED 2 -07 Co 7Ic k.A.(lr *uI c c, C.I.s1. ;14-J3 1 6eiv I Craig Novaczyk From: Pam Dudziak Sent: Friday, November 02, 2007 1:27 PM To: 'Kari Gill' Cc: Craig Novaczyk Subject: Oakwoods Kari, I reviewed the Oakwoods plans and signed off on the footing and foundation permit today. Before the full building permit is released, the following items need to be addressed, and the PD Agreement will need to be recorded. The PD Agreement is at our City Attorney's office for signature, and I expect to deliver it to you next week for signature by the CDA. We need the revised Site Lighting Plan for the building permit. The Lighting Plan was revised for the Planned Development, but the old Lighting Plan was submitted for the building permit. Page 1 of 1 We also need some revisions to the Landscape Plan for screening of mechanical equipment on the north side. The plan shows a row of several a/c condenser units on the north side of the building The staff report noted that mechanicals should be screened with shrubs (both deciduous and evergreen), and screening was made a condition of the PD approval. The Landscape Plan submitted with the building permit shows perennials rather than shrubs around the equipment. The Landscape Plan should be revised to provide shrubs as required in the PD approval. Thank you and let me know if you have any questions. Pam Pamela Dudziak Planner, City of Eagan 3830 Pilot Knob Road Eagan, MN 55122 Ph: 651- 675 -5691 Fax: 651 - 675 -5694 11/08/2007 City of Eagan TO: Scott Peterson, Building Inspections Mike Ridley, Planning Dale Wegleitner, Fire Marshal Tom Colbert, Engineering ✓John Gorder, Engineering Dave Westermayer, Engineering Leon Weiland, Engineering Tom Struve, Maintenance Eric Macbeth, Maintenance Gregg Hove, Maintenance Jim McDonald, Police Department Mark Anderson, Electrical Inspector FROM: Craig Novaczyk, Inspector DATE: October 8, 2007 RE: Plan Review For OAKWOODS EAST 2065 PARK CENTER DR. The plans are in our plan review section for your review and comment. Please return this form to my attention with your signed comments within 7 days. Please indicate any concerns you have with these plans and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please submit the proper "hold request" form to me. Comments: ments: O / - - >,, h +k, f-i 5 yr e4•v-a P Er)ti ( k 0 rro,. 4 7 O7" ? c rovAe 7W4. fi Indicate below any fees that are to be collected with the building permit. `l rc4vh-A-w,t i rr+'ah ❑ Yes ❑ No landscape security required ❑ Yes ❑ No water quality dedication ❑ • Yes ❑ No park dedication ❑ Yes ❑ No trail dedication ❑ Yes ❑ No tree dedication ❑ Yes Cr' No PRV Required CD/Bldg Insp/Forms //Plan Review For Lr Amount 4 (D o. ID (9 - 07 ignature Date # 35 r Zoning? Meter Size REVISED 2 -07 4 11 ' City of Eagan Memo TO: Scott Peterson, Building Inspections Mike Ridley, Planning Dale Wegleitner, Fire Marshal Tom Colbert, Engineering John Gorder, Engineering Dave Westermayer, Engineering VLeon Weiland, Engineering Tom Struve, Maintenance Eric Macbeth, Maintenance Gregg Hove, Maintenance Jim McDonald, Police Department Mark Anderson, Electrical Inspector FROM: Craig Novaczyk, Inspector DATE: October 8, 2007 RE: Plan Review For OAKWOODS EAST 2065 PARK CENTER DR. The plans are in our plan review section for your review and comment. Please return this form to my attention with your signed comments within 7 days. Please indicate any concerns you have with these plans and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please submit the proper "hold request" form to me. Comments: Indicate below any fees that are to be collected with the building permit. ature ❑ adg Insp/Forms //Plan Review For Amount ❑ Yes ❑ No landscape security required Zoning? ❑ Yes ❑ No water quality dedication Meter Size ❑ Yes ❑ No park dedication ❑ Yes ❑ No trail dedication ❑ Yes ❑ No tree dedication ❑ Yes ❑ No PRV Required 10- /0-D`7 Date # 35 REVISED 2 -07 1(1° City of Ea�ali demo TO: Scott Peterson, Building Inspections Mike Ridley, Planning Dale Wegleitner, Fire Marshal Tom Colbert, Engineering John Gorder, Engineering Dave Westermayer, Engineering Leon Weiland, Engineering Tom Struve, Maintenance VEric Macbeth, Maintenance Gregg Hove, Maintenance Jim McDonald, Police Department Mark Anderson, Electrical Inspector FROM: Craig Novaczyk, Inspector DATE: October 8, 2007 RE: Plan Review For OAKWOODS EAST 2065 PARK CENTER DR. The plans are in our plan review section for your review and comment. Indicate below any fees that are to be collected with the building permit. Please return this form to my attention with your signed comments within 7 days. Please indicate any concerns you have with these plans and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please submit the proper "hold request" form to me. Comments: # 35 Amount ❑ Yes ❑ o landscape security required Zoning? ❑ Yes No water quality dedication Meter Size ❑ Yes No park dedication ❑ Yes ❑ No trail dedication ❑ Yep ❑ No tree dedication ❑ No PR Re Signa e Date CDBIdg Insp/Forms//Plan Review For REVISED 2 -07 City of Eagan Memo TO: Scott Peterson, Building Inspections Mike Ridley, Planning Dale Wegleitner, Fire Marshal Tom Colbert, Engineering John Gorder, Engineering Dave Westermayer, Engineering Leon Weiland, Engineering Tom Struve, Maintenance Eric Macbeth, Maintenance /Gregg Hove, Maintenance Jim McDonald, Police Department Mark Anderson, Electrical Inspector FROM: Craig Novaczyk, Inspector DATE: October 8, 2007 RE: Plan Review For OAKWOODS EAST 2065 PARK CENTER DR. The plans are in our plan review section for your review and comment. Please return this form to my attention with your signed comments within 7 days. Please indicate any concerns you have with these plans and resolve these issues with the affected parties. If you are requesting that issuance of the building permit be held, please submit the proper "hold request" form to me. Comments: Indicate below any fees that are to be collected with the building permit. ❑ Yes ❑ ❑ Yes ❑ ❑ Yes ❑ ❑ Yes ❑ ❑ Yes /-"` ❑ Yes 1 N Signature No No No No No, Amount landscape security required Zoning? water quality dedication Meter Size park dedication trail dedication tree dedication PRV Required Date # 35 CD/Bldg Insp/Fo I/Plan Review For REVISED 2 -07 116, City of Eaall Mike Maguire MAYOR Paul Bakken Peggy Carlson Cyndee Fields Meg Tilley COUNCIL MEMBERS Thomas Hedges CITY ADMINISTRATOR MUNICIPAL CENTER 3830 Pilot Knob Road Eagan, MN 55122 -1810 651.675.5000 phone 651.675.5012 fax 651.454.8535 TDD MAINTENANCE FACILITY 3501 Coachman Point Eagan, MN 55122 651.675.5300 phone 651.675.5360 fax 651.454.8535 TDD www.cityofeagan.com THE LONE OAK TREE The symbol of strength and growth in our community. November 21, 2007 Jerry Barrett CBS Construction Services Inc. 7062 Brooklyn Boulevard Brooklyn Center, MN 55429 RE: Oakwoods East —2061 Park Center Drive Dear Mr. Barrett: We have completed our review of the construction documents submitted in pursuit of obtaining a building permit for the above - referenced project. This review is not intended to be an exhaustive and comprehensive report. Unless otherwise noted, all references are to the 2006 I.B.C. It is our goal that this review will help you in complying with the applicable codes and we are therefore, requesting that the following items be addressed: 1. Revise plans to comply with Section 502.6 ICC /ANSI', A117.1 (2003) in underground parking facility (vertical clearances). 2. Accessible parking access aisles in every parking facility shall comply with MSBC Chapter 1341, Sections 502.4.2 and 502.4.4. The marking of access aisles shall comply with Chapter 1341. 3. Accessible parking spaces shall be identified per MSBC Chapter 1341, Section 502.7. Designate in the Code Analysis which units are Type A and which units are Type B per the ICC /ANSI, A117.1 (2003). Also, designate in the Code Analysis whether your are using Option A or B for Type B toilet rooms. Kitchens (Rooms 148 & 230) shall comply with Section 804 of the ICC /ANSI, A117.1 (2003). The pass through counter used by room 148 shall comply with Section 904.3 ICC /ANSI, A117.1 (2003) (Service Counter). Type A accessible kitchens shall comply with ICC /ANSI, A117.1 Sections 1003.12 through 1003.12.6.7. 8. Provide a detail for removable cabinets at kitchen sinks in the Type A accessible units (ICC /ANSI, A117.1). Provide a detail for the height of water closets in Type A accessible units per ICC /ANSI, A117.1. 10. Grab bar reinforcement shall comply with Section 1003.11.4 ICC /ANSI, A117.1 for Type A accessible units; 11. Provide a detail for lavatory heights in Type A accessible units (ICC /ANSI, A117.1). 12. Provide details for operable parts for Type A units (See Amended Section 1003.9). 13. The clear floor space for Type B unit kitchen sinks shall comply with Section 1004.12.2.1 ICC /ANSI, A117.1. 14. Provide details for operable parts for Type B units (See Amended Section 1004.9) 15. Provide interior elevations for laundry rooms (include accessible requirements per Section 611 ICC /ANSI, A117.1). 16. Provide details for turning spaces in storage facilities complying with Sections 304.3.1 or 304.3.2 ICC /ANSI, A117.1 17. Provide details for accessible storage facilities complying with Sections 905 and 404 ICC /ANSI, A117.1. 18. Provide details for smoke and draft control at elevator door openings. 19. Provide locations and details for draft stopping requirements at corridors and unit (fire partitions) separations. 20. Provide a framing detail that deals with joists running perpendicular to corridor on the room side and corridor side of corridor walls. 21. Provide a detail for the rated corridor (walls, floor /ceiling, etc.) 22. Specify the UL or GA listed and tested assembly for your typical floor /ceiling keynote #2. 23. Verify compliance with Section 714.2. If individual protection is required for any structural members, please provide details for review and application. 24. Provide details complying with Section 706.5 for the fire barriers at the stair enclosures and the elevator shaft. 25. Correct the stair gate note for Stair A. 26. Verify compliance with Section 2308.3 of the 2006 IBC for braced wall lines. 27. Provide details for a built up walkway (catwalk) in attic. 28. Provide fire stopping submittals designating listed and tested assemblies for all types of penetration (membrane and through) in rated walls, floor /ceilings, etc. Please revise plans accordingly and submit two new sets with changes bubbled. Incorporate all changes from addendums numbered 1 -4. If you have any questions concerning this letter, please call me at (651) 675 -5683. Sincerely, Craig Novaczyk Senior Building Inspector / Cc: Dawn Wieczorek Dale Schoeppner, Chief Building Official Mike Lence, Senior Building Inspector December 7, 2007 Mr. Craig Novaczyk Senior Building Inspector City of Eagan 3830 Pilot Knob Road Eagan, MN 55122 Re: Oakwoods East 2061 Park Center Drive Plan Review Comments Response Dear Mr. Novaczyk, in•site architects EAGAN EVIEWED ATE ` �S 61JILDING oNS PECTIONS DIVISION This letter is in response to the plan review comments we received from your office. For clarity, we've repeated the question and then indicated our response in BOLD. 1. Revise plans to comply with Section 502.6 ICC /ANSI, A117.1 (2003) in underground parking facility (vertical clearances). SEE REVISED PLAN AND SECTION 8/A6.1. 2. Accessible parking access aisles in every parking facility shall comply with MSBC Chapter 1341, Sections 502.4.2 and 502.4.4. The marking of access aisles shall comply with Chapter 1341. SEE REVISED PLAN. IN A VOICEMAIL MESSAGE, YOU REQUESTED THAT THE VAN SPACE AND ACCESS AISLE BE REVERSED SO THE VAN COULD PULL IN AND HAVE THE ACCESS AISLE ON THE PASSENGER SIDE INSTEAD OF REQUIRING THE VAN TO BACK IN SO THE ACCESS AISLE IS ON THE PASSENGER SIDE. AS THIS IS NOT REQUIRED BY CODE, WE WOULD PREFER TO RETAIN THE ARRANGEMENT SHOWN SINCE THIS PARKING IS FOR RESIDENTS ONLY AND SENIOR FACILITIES RARELY HAVE RESIDENTS DRIVING HCAP VANS SO THE CHALLENGE OF BACKING IN THE VAN MAY NEVER BE REALIZED. 3. Accessible parking spaces shall be identified per MSBC Chapter 1341, Section 502.7. SEE NOTES ON REVISED PLAN. 4. Designate in the Code Analysis which units are Type A and which units are Type B per the ICC /ANSI, A117.1 (2003). Also, designate in the Code Analysis whether you are using Option A or B for Type B toilet rooms. SEE REVISED CODE ANALYSIS. 5. Kitchens (Rooms 148 & 230) shall comply with Sections 804 of the ICC /ANSI, A117.1 (2003). SEE NOTES ON PLANS AND REVISED ELEVATIONS. 6. The pass through counter used by room 148 shall comply with Section 904.3 ICC /ANSI, A117.1 (2003) (Service Counter). THIS WAS REVISED IN ADDENDUM #1 - SEE DETAIL 10 /A10.2. Oakwoods East, Eagan MN Plan Review Comments Response Page 2 of 3 7. Type A accessible kitchens shall comply with ICC /ANSI, A117.1 Sections 1003.12 through 1003.12.6.7. SEE REVISED ELEVATIONS 12/A9.1. 8. Provide a detail for removable cabinets at kitchen sinks in the Type A accessible units (ICC /ANSI, A117.1). SEE NOTES ON PLANS AND DETAIL 1 /A10.1. 9. Provide a detail for the height of water closets in Type A accessible units per ICC /ANSI, A117.1. SEE SPECIFICATION SECTION 15440 - PLUMBING FIXTURES. 10. Grab bar reinforcement shall comply with Section 1003.11.4 ICC /ANSI, A117.1 for Type A accessible units. SEE REVISED UNIT PLANS ON A2.1 AND INTERIOR ELEVATIONS ON A9.1. 11. Provide a detail for lavatory heights in Type A accessible units (ICC /ANSI, A117.1). SEE REVISED ELEVATIONS ON A9.1. 12. Provide details for operable parts for Type A units (See Amended Section 1003.9). SEE SHEET E4.2 AND NOTES. 13. The dear floor space for Type B unit kitchens shall comply with Section 1004.12.2.1 ICC /ANSI, A117.1. SEE REVISED UNIT PLANS ON A2.1, 2.2 AND 2.3 AND INTERIOR ELEVATIONS ON A9.1. 14. Provide details for operable parts for Type B units (See Amended Section 1004.9). SEE REVISED ELECTRICAL SPECIFICATION SECTION, ATTACHED. 15. Provide inferior elevations for laundry rooms (include accessible requirements per Section 61 1 ICC /ANSI, A117.1. SEE ADDED ELEVATIONS 17 AND 18/A9.1. 16. Provide details for turning spaces in storage facilities complying with Sections 304.3.1 or 304.3.2 ICC /ANSI, Al 17.1. THESE SPACES ARE NOT FOR PUBLIC OR STAFF USE BUT FOR RESIDENT USE ONLY, SIMILAR TO WALK -IN CLOSETS WITHIN UNITS THAT ARE NOT REQUIRED TO HAVE TURNING SPACES. 17. Provide details for accessible storage facilities complying with Sections 905 and 404 ICC /ANSI, A117.1. SEE REVISED PLANS ATTACHED SHOWING TWO, FIRST FLOOR STORAGE SPACES REVISED FOR TURNING SPACES AND ACCESS AS REQUIRED FOR TWO ACCESSIBLE UNITS. 18. Provide details for smoke and draft control at elevator door openings. NOT REQUIRED PER IBC SECTION 707.14.1 EXCEPTION 4. 19. Provide locations and details for draft stopping requirements at corridors and unit (fire partitions) separations. SEE SPECIFICATION SECTION 06100.3.04.D. AND DETAILS 8/A6.2 AND 2/S2.3. 20. Provide a framing detail that deals with joists running perpendicular to corridor on the room side and corridor side of corridor walls. SEE DETAIL 3/S2.3. 21. Provide a detail for the rated corridor (walls, floor /ceiling, etc.) SEE WALL TYPE A3 ON SHEET A11.1. 22. Specify the UL or GA listed and tested assembly for your typical floor /ceiling keynote #2. THIS IS UL L570 AND IS ADDED TO KEYNOTE #2. 23. Verify compliance with Section 714.2. If individual protection is required for any structural members, please provide details for review and application. SEE DETAILS 19 AND 20/A6.1. 24. Provide details complying with Section 706.5 for the fire barriers at the stair enclosures and the elevator shaft. SEE DETAIL 7/S2.3 AND 3/A7.1. 25. Correct the stair gate note for Stair A. SEE REVISED NOTE ON PLAN ATTACHED. 1101 W River Parkway, Ste 330 / Minneapolis, MN 55415 / ph 612 -455 -1900 / fax 612- 455 -1907 Oakwoods East, Eagan MN Plan Review Comments Response Page 3 of 3 26. Verify compliance with Section 2308.3 of the 2006 IBC for braced wall lines. SEE STRUCTURAL NOTES FOR WOOD FRAMING ON SHEET S2.5. CORRIDOR AND PARTY WALL LINES ARE DESIGNED AS SHEAR WALLS TO TRANSFER LATERAL WIND LOADS DOWN TO THE FIRST FLOOR LEVEL. WALL SHEATHING CONNECTORS AND BLOCKING SPECIFIED BY NOTE F -8 OF GENERAL NOTES ON DRWG. S2.5. WALL ANCHORAGE AS PER NOTE F -4. 27. Provide details for the built up walkway (catwalk) in attic. SEE DETAIL 6/A1.4. 28. Provide fire stopping submittals designating listed and tested assemblies for all types of penetration (membrane and through) in rated walls, floor /ceilings, etc. THESE WILL BE PROVIDED UNDER SEPARATE COVER BY THE GENERAL CONTRACTOR. All items from Addendums 1 thru 4 and ASI #1 have been incorporated into this set. All changes as a result of ASI #1 and these plan review comments have been bubbled. If there are any questions or further clarifications, please call me at 612.455.1908. Sincerely, Dawn Wieczorek, AIA InSite Architects, Inc. Attachments Cc. Jerry Barrett, CBS Construction Greg Peterson, Dakota County CDA Jim Satz!, InSite Architects File 1 101 W River Parkway, Ste 330 / Minneapolis, MN 55415 / ph 612- 455 -1900 / fax 612- 455 -1907 December 20, 2007 Mr. Craig Novaczyk Senior Building Inspector City of Eagan 3830 Pilot Knob Road Eagan, MN 55122 Re: Oakwoods East 2061 Park Center Drive Plan Review Meeting Notes Dear Mr. Novaczyk, in ■site architects This letter is in response to the plan review comments we discussed at our meeting on December 17, 2007 at your office. We've repeated the numbered questions from the Plan Review letter dated November 21, 2007 and then indicated our response in BOLD. 5. Kitchens (Rooms 148 & 230) shall comply with Sections 804 of the ICC /ANSI, Al 17.1 (2003). SEE REVISED ELEVATIONS 15 AND 16/A9.2 AND ADDED ELEVATION 12A/A9.2. 7. Type A accessible kitchens shall comply with ICC /ANSI, A117.1 Sections 1003.12 through 1003.12.6.7. SEE ELEVATIONS 20 AND 21/A9.1 WITH NOTES DESIGNATING REMOVABLE CABINETS - no changes. SEE ATTACHED CUT SHEETS FOR COMPLIANT, SPECIFIED STOVE AND REFRIGERATOR. 10. Grab bar reinforcement shall comply with Section 1003.11.4 ICC /ANSI, A117.1 for Type A accessible units. ALL TUBS AND SHOWERS ARE FULLY BACKED FOR FUTURE INSTALLATION OF GRAB BARS PER SPECIFICATION SECTION 15440 - PLUMBING FIXTURES, PAGE 2. 12. Provide details for operable parts for Type A units (See Amended Section 1003.9). FOR ELECTRICAL DEVICES, SEE SPECIFICATION SECTION 16140 - WIRING DEVICES, PAGE 3 FOR MOUNTING HEIGHTS; AND REVISED SPECIFICATION SECTION 16472 -LOAD CENTERS (ESI #3- ATTACHED). SEE ATTACHED CUT SHEETS FOR COMPLIANT, SPECIFIED KITCHEN APPLIANCES. 14. Provide details for operable parts for Type B units (See Amended Section 1004.9). SEE RESPONSE TO QUESTION 12 ABOVE. 15. Provide interior elevations for laundry rooms (include accessible requirements per Section 611 ICC /ANSI, A117.1. SEE ATTACHED CUT SHEETS OF COMPLIANT, SPECIFIED WASHERS AND DRYERS. 18. Provide details for smoke and draft control at elevator door openings. SEE ATTACHED SEALEZE PRODUCT INFORMATION FOR ELEVATOR SMOKE SEAL BRUSHES WITH UL LABELS AND WHI TEST REPORTS. THIS PRODUCT HAS Oakwoods East, Eagan MN December 20, 2007 Plan Review Meeting Notes Page 2 of 2 Sincerel BEEN APPROVED BY MINNEAPOLIS AND BLOOMINGTON BUILDING OFFICIALS AND INSTALLED IN RESIDENTIAL PROJECTS. 20. Provide a framing detail that deals with joists running perpendicular to corridor on the room side and corridor side of corridor walls. SEE DETAILS 3/S2.3 AND 8/A6.2. 23. Verify compliance with Section 714.2. If individual protection is required for any structural members, please provide details for review and application. SEE REVISED DETAIL 21/A6.1 FOR THIRD FLOOR FRAMING WHERE STEEL DOES NOT CARRY MORE THAN ONE FLOOR AND ONE ROOF AND CAN BE PROTECTED BY MEMBRANE OR CEILING PROTECTION AS DESCRIBED IN 714.2.1. SEE NEW DETAIL 22/A6.1 FOR SECOND FLOOR FRAMING THAT CARRIES MORE THAN TWO FLOORS AND REQUIRES INDIVIDUAL PROTECTION PER 714.2.1. 24. Provide details complying with Section 706.5 for the fire barriers at the stair enclosures and the elevator shaft. SEE DETAIL 7/S2.3 AND 3/A7.1. All changes required from the items above have been incorporated into ASI #2 dated December 21, 2007 and attached to this letter. In Addition to the attached ASI #2 responding to Inspections comments, the following items from Planning need to be received by the City prior to issuing the Building Permit: • Electrical Energy Calcs for Lighting EMAILED TO CITY 11.19.07 • Emergency Response Site Plan EMAILED TO CITY 12.20.07 • Fire Protection Plan Review Form GENERAL CONTRACTOR WILL PROVIDE • Planned Development Agreement FILED WITH COUNTY, COPY AT PLANNING DEPARTMENT If there are any questions or further clarifications, please call me at 612.455.1908. Dawn Wieczorek, A InSite Architects, Inc. Attachments Cc. Jerry Barrett, CBS Construction Greg Peterson, Dakota County CDA Jim Salzl, InSite Architects File 1 101 W River Parkway, Ste 330 / Minneapolis, MN 55415 / ph 612- 455 -1900 / fax 612- 455 -1907 Craig Novaczyk From: Dawn Wieczorek [ dawn .wieczorek @insitearchitect.com] Sent: Thursday, September 18, 2008 2:22 PM To: Craig Novaczyk Subject: RE: Oakwoods East - Stair Landing at Stair 'A' Thanks for your review and acceptance. We did - receive the temporary CO yesterday with the resolution to this stair landing as a condition, that Craig has now been met. What is the next step for the fmal CO? This. Thank you, Dawn Wieczorek inisite architects From Craig Novaczyk [mato: 2008 2:16 PM ofeagan.com] Sent: Thursday, September To: Dawn Wieczorek Subject: RE: Oakwoods East - Stair Landing at Stair 'A' Dawn this matter. We agree that your interpretation lion to speak with the Building Official about your interpretation concerning had occasion has merit, and we will accept it. Thank you, Craig 10 /0f 10/06/200 Page 1 of 2 k ci ofea an.com Craig Novaczyk 1 Senior Building Inspector 1 City of Eagan the intended recipient. If you City Hall i 3830 Pilot Knob Road I Eagan, MN 55122 I (651) 675 -5683 I (651) 675-5694 cnovacz THIS COMMUNICATION MAY CONTAIN CONFIDENTIAL AND/OR OTHERWISE ROPRIETARY MATERIAL and is thus for use only by received this in error, please contact the sender and delete the e-mail and its attachments from all computers. m: Dawn Wieczorek [mailto: dawn .wieczorek ©insitearchitect.com] Sent: Wednesday, September Se tember 17, 2008 8 :24 AM To: Craig Novaczyk Cc: Greg Peterson; Jerry Barrett; Jim Salzl; ken hint Subject: Oakwoods East - Stair Landing at Stair 'A' In r n r - in IBC section 1009.4 exception 2 about doors reducing the required length of a landing at the top Craig esponse to our p hone conversation concerning of a stair, we would like to sugg est the following: Our interpretation he landing to the t s may be at y for the falling back t a is that the code is written for the stair condition when length traighh r in exception straight run has a wall on n a n both h sides all the way th door, annd d if tathe e on Ls t door were not allow he doorlf of the required landing as noted down the s w trying ' ' is directly addressed in this code section. While we don't have the full one -half of the require The actual condition we have at our Stair � OCT-23 -2007 ie:2? RAIRISCHAK 1.0l1612987 89:12 7635694117 errnin 11011= wirt PAIMIIIMIMMIll , spas" amsaminammismammemomm lwl!'!A^l lam`° �III� am'' g " WI Tuft sof be VuidsOrsts ite Sptodtl frispostiso & MOW Ditildistir Cat sad as essatiOd br the sir lidtliad 60 4 - +A &t by CASMIN etwwt, (1) Pea& Na is by pcsvidtQ bribe ikulitag Meld ( 2 ) to the n assailer y asrps ( � is site mow (4) t t16so b Cock. Ca) ea" maim% per teslikswassksims tom sts. (s) kisis Winn seasstabsi to pub= Wig*. • If s sad ' to etawa.eatr73t+e9tti Upend: WIL .. 11 PeatUdIZO a,