3425 Washington Dr - research docs for BL83168`4` C!tyofEaali
Mike Maguire
MAYOR
Paul Bakken
Peggy Carlson
Cyndee Fields
Meg Tilley
COUNCIL MEMBERS
Thomas Hedges
CITY ADMINISTRATOR
MUNICIPAL CENTER
3830 Pilot Knob Road
Eagan, MN 55122 -1810
651.675.5000 phone
651.675.5012 fax
651.454.8535 TDD
MAINTENANCE FACILnY
3501 Coachman Point
Eagan, MN 55122
651.675.5300 phone
651.675.5360 fax
651.454.8535 TDD
www.cityofeagan.com
THE LONE OAK TREE
The symbol of
strength and growth
in our community.
April 23, 2008
Kurt Nash
54 East Moreland Avenue
West St. Paul, MN 55118
RE: SUPERIOR MECHANICAL & COLLISION ADDITION
3425 WASHGINTON DRIVE
Dear Kurt:
We have started our review of the construction documents submitted in pursuit of
obtaining a building permit for the above - referenced project. This review is not intended
to be an exhaustive and comprehensive report. Unless otherwise noted, all references are
to the 2006 I.B.C. It is our goal that this review will help you in complying with the
applicable codes and we are, therefore, requesting that the following items be addressed:
• 1 MC /WS SAC determination
• 1 Special inspection and T
• 1 Set of energy calculations
• 1 Electric power & lighting form
• 1 Emergency response site plan
• Fire suppression/alarm plans — call Fire Marshal Dale Wegleitner
If you have any questions, please contact me at 651- 675 -5676 or
mlence@cityofeagan.com.
Sincerely,
)11,4e.,
Mike Lence
Senior Inspector
cP4
City of EaQali Memo
TO: Scott Peterson, Building Inspections
Mike Ridley, Planning
Dale Wegleitner, Fire Marshal
Tom Colbert, Engineering
John Gorder, Engineering
Dave Westermayer, Engineering
Leon Weiland, Engineering
Tom Struve, Maintenance
Eric Macbeth, Maintenance
Gregg Hove, Maintenance
Jim McDonald, Police Department
Mark Anderson, Electrical Inspector
Sarah Brandel, Community Development
Peggy Fleck, Community Development
The plans are in our plan review section for your review and comment.
Comments:
Indicate below any fees that are to be collected with the building permit.
# 43
FROM: Mike Lence, Inspector
DATE: April 23, 2008
RE: Plan Review For: Superior Mechanical and Collision — 3425 Washington Dr
(Lot 1 & 2, Block 3, Bicentennial 3rd Addition)
Please return this form to my attention with your signed comments within 7 days. Please indicate
any concerns you have with these plans and resolve these issues with the affected parties. If you are
requesting that issuance of the building permit be held, please submit the proper "hold request" form
to me.
Amount
❑ Yes ❑ No landscape security required Zoning?
❑ Yes ❑ No water quality dedication Meter Size
❑ Yes ❑ No park dedication
❑ Yes ❑ No trail dedication
❑ Yes ❑ No tree dedication
❑ Yes ❑ No PRV Required
Signature Date
CDB1dg Insp/Forms/ /Commercial Bldgs Final & Plan Review For REVISED 2 -07
City of Eapn WeMo
TO: Scott Peterson, Building Inspections
Mike Ridley, Planning
Dale Wegleitner, Fire Marshal
Tom Colbert, Engineering
John Gorder, Engineering
Dave Westermayer, Engineering
Leon Weiland, Engineering
Tom Struve, Maintenance
Eric Macbeth, Maintenance
Gregg Hove, Maintenance
Jim McDonald, Police Department
Mark Anderson, Electrical Inspector
Sarah Brandel, Community Development
Peggy Fleck, Community Development
FROM: Mike Lence, Inspector
DATE: April 23, 2008
RE: Plan Review For: Superior Mechanical and Collision — 3425 Washington Dr
(Lot 1 & 2, Block 3, Bicentennial 3 Addition)
The plans are in our plan review section for your review and comment.
Please return this form to my attention with your signed comments within 7 days. Please indicate
any concerns you have with these plans and resolve these issues with the affected parties. If you are
requesting that issuance of the building permit be held, please submit the proper "hold request" form
to me.
Comments: L-'
Indicate below any fees that are to be collected with the building permit.
Amount
d Yes ❑ No landscape security required '760 % Zoning?
❑ Yes ❑ No water quality dedication Meter Size
❑ Yes 0 No park dedication
❑ Yes 0 No trail dedication
❑ Yes 0 No tree dedication
❑ Yes 0 PRV Require
Signature
Date
# 43
. ' � � / 11 S te
CDBIdg Insp/Forms / /Commercial Bldgs Final & Plan Review For REVISED 2 -07
City of Eaaali demo
TO: Scott Peterson, Building Inspections
Mike Ridley, Planning
Dale Wegleitner, Fire Marshal
Ofr(. ,-)om Colbert, Engineering
John Gorder, Engineering
Dave Westermayer, Engineering
Leon Weiland, Engineering
Tom Struve, Maintenance
Eric Macbeth, Maintenance
Gregg Hove, Maintenance
Jim McDonald, Police Department
Mark Anderson, Electrical Inspector
Sarah Brandel, Community Development
Peggy Fleck, Community Development
ERGM
Mike Lence, Inspector
DATE: April 23, 2008
RE: Plan Review For: Superior Mechanical and Collision — 3425 Washington Dr
(Lot 1 & 2, Block 3, Bicentennial 3 Addition)
The plans are in our plan review section for your review and comment.
Please return this form to my attention with your signed comments within 7 days. Please indicate
any concerns you have with these plans and resolve these issues with the affected parties. If you are
requesting that issuance of the building permit be held, please submit the proper "hold request" form
to me.
Comments: ) e ,V 1 - .�ej
Indicate below any fees that are to be collected with the building permit.
❑ Yes ❑ No landscape security required
❑ Yes ❑ No water quality dedication
❑ Yes ❑ No park dedication
❑ Yes ❑ No trail dedication
❑ Yes ❑ No tree dedication
❑ Yes ❑ No PRV Required
Signature
Amount
Date
# 43
Zoning?
Meter Size
CDB1dg Insp/Forms / /Commercial Bldgs Final & Plan Review For REVISED 2 -07
City of Eap Nano
TO: Scott Peterson, Building Inspections
Mike Ridley, Planning.
Dale Wegleitner, Fire Marshal
Tom Colbert, Engineering
John Gorder, Engineering
Dave Westermayer, Engineering
Leon Weiland, Engineering
Tom Struve, Maintenance
Eric Macbeth, Maintenance
Gregg Hove, Maintenance
Jim McDonald, Police Department
Mark Anderson, Electrical Inspector
Sarah Brandel, Community Development
Peggy Fleck, Community Development
FROM: Mike Lence, Inspector
DATE: April 23, 2008
RE: Plan Review For: Superior Mechanical and Collision - 3425 Washington Dr
(Lot 1 & 2, Block 3, Bicentennial 3 Addition)
The plans are in our plan review section for your review and comment.
Please return this form to my attention with your signed comments within 7 days. Please indicate
any concerns you have with these plans and resolve these issues with the affected parties. If you are
requesting that issuance of the building permit be held, please submit the proper "hold request" form
to me.
Comments: O - C /ham -i� . 5ee rlms ,7
Gif �ro., (Vo. 013-? 7rvvIi -to 8 /G,. T,57 72
Indicate below any fees that are to be collected with the building permit.
Si
❑ Yes ❑ No landscape security required
❑ Yes ❑ No water quality dedication
❑ Yes ❑ No park dedication
❑ Yes ❑ No trail dedication
❑ Yes ❑ No tree dedication
❑ Yes LW No PRV Required
A2?-?r
CDBIdg Insp/Forms / /Commercial Bldgs Final & Plan Review For
Amount
Date
# 43
Zoning?
Meter Size
REVISED 2 -07
City of Eap Me�o
TO: Scott Peterson, Building Inspections
Mike Ridley, Planning
Dale Wegleitner, Fire Marshal
Tom Colbert, Engineering
John Gorder, Engineering
Dave Westermayer, Engineering
Leon Weiland, Engineering
Tom Struve, Maintenance
Eric Macbeth, Maintenance
Gregg Hove, Maintenance
Jim McDonald, Police Department
Mark Anderson, Electrical Inspector
Sarah Brandel, Community Development
Peggy Fleck, Community Development
FROM: Mike Lence, Inspector
DATE: April 23, 2008
RE: Plan Review For: Superior Mechanical and Collision — 3425 Washington Dr
(Lot 1 & 2, Block 3, Bicentennial 3rd Addition)
The plans are in our plan review section for your review and comment.
Please return this form to my attention with your signed comments within 7 days. Please indicate
any concerns you have with these plans and resolve these issues with the affected parties. If you are
requesting that issuance of the building permit be held, please submit the proper "hold request" form
to me.
Comments:
Indicate below any fees that are to be collected with the building permit.
Amount
❑ Yes ❑ No landscape security required Zoning?
❑ Yes ❑ No water quality dedication Meter Size
❑ Yes ❑ No park dedication
❑ Yes ❑ No trail dedication
❑ Yes No tree dedication
❑ Yes P N A PRV Required
s�Ri4,
Signature to
1-t-zr--0(
# 43
CD/Bldg Insp/Fo Commercial Bldgs Final & Plan Review For REVISED 2 -07
AAA AA
Metropolitan Council
44
May 20, 2008
Dale Schoeppner
Building Official
City of Eagan
3830 Pilot Knob Road
Eagan, MN 55122
Dear Mr. Schoeppner:
The Metropolitan Council Environmental Services (MCES) Division has determined SAC for the
Superior Mechanical and Collision to be located at 3425 Washington Drive within the City of Eagan.
This project should be charged 3 SAC Units, as determined below.
Charges:
Office
1282 sq. ft. @ 2400 sq. ft. /SAC Unit
Car Wash Bay
4 cars /day x 3.5 gal. /min. x 20 min. @ 274 gal. /SAC Unit
Service Bays (fast)
25 bays x 30% @ 2 bays /SAC Unit
Service Bays (major)
25 bays x 70% @ 14 bays /SAC Unit
Credits:
SAC Paid (6/78)
The business information was provided to MCES by the applicant at this time. It is the City's
responsibility to substantiate the business use and size at the time of the final inspection. If there is a
change in use or size, a redetermination will need to be made. If you have any questions, call me at 651-
602 -1378.
Sincerely,
JN:kb: 080520A1
Jessie Nye
SAC Coordinator
Environmental Services Division
cc: File, MCES
Peggy Fleck, Eagan
Kurt Nash, Langer Construction
www.metrocouncil.org
An Equal Opportunity Employer
Environmental Services
SAC Units
0.53
1.02
3.75
1.25
Total Charge: 6.55
4.00
Net Charge: 2.55 or 3
390 Robert Street North • St. Paul, MN 55101 -1805 • (651) 602 -1005 • Fax (651) 602 -1477 • TTY (651) 291 -0904
Superior Collision & Paint INC
3425 Washington Drive
Eagan, MN 55122
May 12, 2008
This letter is to confirm the conversation that was had between Superior Collision &
Paint INC and MIK Transportation 3445 Washington Drive regarding authorization to go
on their property during the construction process. I will repair any damage to sprinkler
system or landscaping caused by the construction of the new building. Thank you for
your help during the construction.
Superior Collision & Paint INC
Dan Sjolseth
651 -592 -7348
MIK Transportation
3445 Washington Drive
Eagan, MN 55122
MAY-42-22.22 13 T2 VIN SICKLE ALLEN & ASSOC
SPECIAL INSPECTION ANO TESTING S•flEDULE
(TO 8E USED IN ACCORDANCE vvrai THE GUIDELINES FOR SPECIAL INSPECTION TESTING)
PROJECT NAME : Superiot Colision PROL NO CNN 00060
LOCATION : E04(411 I, MN . PERMIT NO.
SPECIFICATION
SECTION ARTICLE
02200
03300
05120
03300
0S120
05210
06310
05120
048b0
NOTES:
OWNER
CONTRACTOR:
ARCHITECT:
SER:
'
TA
0NCRETE
DESCRIPTION (2)
SPECIAL GRADING
EXCAVATION & FILLING
BOLTS IN CONCRETE
REINFORCING SJ tEL
STRUCTURAL WELDING
HIGH STRENGTHBOLTING
STRUC1URLMASONRY
ACCEPTED FOR' BUILDING DEPARTMENT
REPORT
FREQUENCY
TA • PER TEST
TA PER TEST
TA WEEKLY
TA KLY . •
TA WEEKLY
TA WEEKLY
TA
THIS SCHEDULE TO BE RILED OUT AND INCLUDED IN THE PROJECT SPECIFICATION. IWO
AT THAT TIME 10 BE FILLED Our WHEN APPLYING FOR A BUILDING PERMIT.
PERMIT NO. TO BE PROVIDED BY THE BUILDING OFFICIAL
USE DESCRIPTION PER U.B.C. SECTION 1701.
SPECIAL INSPECTOR, TESTING AGENT OR FABRICATOR,
FIRM CONDUCTED TO PERFORM SERVICES.
ACRIOWLEOCEMENTS
RA TE REPRESENTATIVE MUST SIGN BEL .
FCRM: e 0-1/4 Co i •3• DATE:
FIRM: ct ci6 o".. DATE
Rik CNH ARCHITECTS DATE 5
FIRM: VANSICKLE ALLEN
FIRM:
FIRtE.
FIRM yler Xte
F: FIRM:
* THE INDIVIDUAL NAMES OF ALL PROSPECTIVE SPECIAL INSPECTORS AND TH
THEY INTEND TO OBSERVE MUST BE IDENTIFIED ON THE REVERSE SIDE OF
LEGEND SER STRUCTURAL ENGINEER OF RECORD
TA x TESTING AGENT
763 559 23 P 02
DATE:
DATE
• ASSIGNED
FIRM (3)
UNAV4
5 -7- osoe
DATE:
•DATE:
DATE
DATE: . 547:619 —
K
FORM.
SI SPECIAL INSPECTOR
F = FABRICATOR
May 2, 2008
City of Eagan
Attention: Dale Wegleitner
Regarding: Sprinkler System Installation
Gentlemen:
We are going to be contracted to install a fire sprinkler system in the Superior Mechanical and
Collision business located at 3425 Washington Drive. The General Contractor will be Langer
Construction.
We will be processing sprinkler plans in the upcoming weeks. These Sprinkler Plans, Hydraulic
Calculations and Permit Application will be submitted when completed prior to insatallation.
If you have any questions or need additional information, Please feel free to call.
Very truly yours,
otter
Project Estimator
VI G AUTOMATIC SPRINKLER COMPANY
G.
I 1NG
AUTOMATIC SPRINKLER CO.
VIKING SETS THE STANDARD...
FIRE PROTECTION SYSTEMS - SINCE 1924
1301 L'ORIENT STREET • ST. PAUL, MINNESOTA 55117 • (651) 558 -3300 • (800) 229 -6263 • FAX: (651) 558 -3310