Loading...
3697 Denmark AveCity of Eagan 3830 Pilot Knob Road Eagan MN 55122 Phone: (651) 675 - 5675 Fax: (651) 675 -5694 2010 MECHANICAL PERMIT APPLICATION Site Address: 3G i 7 De i v ? ) , 0 4 - k: fl- Tenant: Suite #: Date: l 061/o RESIDENT / OWNER CONTRACTOR TYPE OF WORK PERMIT TYPE en ALk( 14 ' r" Applicant's Printed Name Name: Li Sc E1e rr cd Phone C 17- 7 / Address / City / Zip: 3s &j ' , bci a t e_ (jr Rose va /t , ssiu Name: 51 PCO. A f1 (,� L U License #: Address: CA ! rO ii State: MA) Zip: �S 1 d Phone: Contact: ve... n P - re r Email: New " \ Replacement Additional Alteration Demolition Description of work: RESIDENTIAL X _ Furnace Air Conditioner Air Exchanger _ Heat Pump Other COMMERCIAL FEES: $70.50 Underground tank installation /removal $50.50 Minimum (includes State Surcharge) - If Permit Fee is less than $1,000, surcharge is $.50. - If Permit Fee is > $1,000, surcharge increases by $.50 for each $1,000 Permit Fee (Le. a $1,001 - $2,000 Permit Fee requires a $1.00 surcharge). OR New Construction Install Piping Gas RESIDENTIAL FEES: $50.50 Minimum Add -on or alteration to ari existing unit (includes $.50 State Surcharge) $90.50 Fire repair (replace bumed out appliances, ductwork, etc.) (includes $.50 State Surcharge) x Appl eviewed ; Rough Air Test Gas Service.Tes erior, HVAC Screening; Inspection Use BLUE or BLACK Ink Permit #: Permit Fee: Date Received: Staff: COMMERCIAL _ Interior Improvement Processed Exterior HVAC Unit _ Under / Above ground Tank ( Install / _ Remove) ** When installing/removing tank(s), call for inspection by Fire Marshal and Plumbing Inspector $. 0 • S0 TOTAL FEE Contract Value $ x 1% $ Permit Fee _ $ Surcharge = $ TOTAL FEE CALL BEFORE YOU DIG. Call Gopher State One Call at (651) 454 -0002 for protection against underground utility damage. Call 48 hours before you intend to dig to receive locates of underground utilities. www.gopherstateonecall.orq I hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan; that I understand this is not a permit, but only an application for a permit, and work is to sta- without a ermit; that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. ►��►, 771`r: g7+ - r J In -floor Heat , �Firta Jul 10 13 07:32a Gates General Contractors 7634387710 p.4 Use BLUE or BLACK Ink -------e---------- I For Office Use I Permit 9: Clay of Ea EaIl ~ Permit Fee: ~ 3830 Pilot Knob Road vi~ I Eagan MN 55122 I Date Received: I Phone: (651) 675-5675 I I Fax: (651) 675-5694 1 Staff: 1 1 I 2013 RESIDENTIAL BUILDING PERMIT APPLICATION Date: O / Site Address 3 3 ~3G 9 3(i -7 ~ Unit : Narne:_F1 ~'GJ~~ ~~y~ L 014 Phone: It 1y~0 7~~"/ / Z_ Resident/ Owner Address I City / Zip: Applicant is: Owner A/ Contractor Type of Work Description of work: 7 I G o.cp Construction Cost: Multi-Family Building: (YesNom Companyt:~;enT s rV C,ert Contact: L e- Addre-3-S2Py 9, 4✓ 57-1-' 949,0-S-~_Xcity: Contractor ,r State: A4,6~ Zip: T 7 -7 Phone: 72- 7>_l 5 License k Lead Certificate Z 3 f-~ l If the project is exempt from lead certification, please explain why: (see Page 3 for additional information) qua COMPLETE THIS AREA ONLY 1 CONSTRUCTING A NEW BUILDING In the last 12 months, has the City of Eagan issued a permit for a similar plan based on a master plan? _Yes _No If yes, date and address of master plan: Licensed Plumber: Phone: Mechanical Contractor: Phone: Sewer & Water Contractor: Phone: NOTE-- Plans and supporting documents that you submit are considered to be public information. Portions of the information maybe classified as non-public if you provide specific reasons that would permit the City to conclude that they are trade secrets CALL BEFORE YOU DIG. Call Gopher State One Call at 651 4540002 for rot2gion against underground utility damage. Call 48 hours before you intend to dig to receive locales of underground utilities. : Tjv,,_oooherstateonecall or, 1 hereby acknowledge that this information is complete and accurate; that the work will be in conformance with the ordinances and codes of the City of Eagan, that I understand this is not a permit, but only an application for a permit, and work is not to start without a permit. that the work will be in accordance with the approved plan in the case of work which requires a review and approval of plans. Exterior or authorized by a buildin permit issued in accordance with the Minnesota Building Code sl be completed within 180 day pe it issuance. / x )~j{/Gt/ tw rte/ x Applicant's Printed Name Applicant's Signatu Page 1 of 3