Loading...
07/05/1994 - City Council Regularr REGULAR MEETING EAGAN CITY COUNCIL EAGAN, MINNESOTA MUNICIPAL CENTER BUILDING JULY 5, 1994 6:30 P.M. I. 6:30 - ROLL CALL & PLEDGE OF ALLEGIANCE (BLUE) II. 6:30 - ADOPT AGENDA & APPROVAL OF MINUTES (BLUE) III. 6:35 - VISITORS TO BE HEARD (10 MINUTE TOTAL TIME LIMIT) IV. 6:45 - DEPARTMENT HEAD BUSINESS (BLUE) V. 6:55 - CONSENT AGENDA (PINK) , 2%A. PERSONNEL ITEMS . 4 (i, B. LICENSES, Plumbers C. RECOMMENDATION, Appointment to the Dakota Alliance for Prevention • 1 0 D. AMEND CONTRACT, E &V Incorporated, Construction Management Service, Police /Municipal ((e F. G. RECEIVE BIDS /AWARD SALE, Lexington Meadows Subdivision, McDonald Construction GAMBLING Permit, Knights of Columbus Council 7604, Starks Saloon, 3125 Dodd Road SPECIAL PERMIT, Target, to Allow one -day Outdoor Sales of Hot Dogs and Pop, July 15, 14 1994 11,).1. VACATE, Public Right -of -Way, Receive Petition /Order Public Hearing (Carol Street) I . PROJECT 674, Receive Feasibility Report /Order Public Hearing (Violet Lane - Streets and Utilities) 1001. CONTRACT 93 -06, Authorize Final Payment (T.H. 149 and N.W 2 3 K. PROJECT 672, Approve Agreement between Dakota County and C. P • and T.H. 3 - Signal Improvements) y l.(L. ACCEPTANCE, Carriage Hill Drive, Request for Dakota County f' of Public Right -of -Way M. FINAL PLAT, Galaxie Hill Oaks ( � 3 ,o N. FINAL PLAT, Rooney Addition 17 / VI. 7:00 - PUBLIC HEARINGS (SALMON) Center Expansion AGENDA . Parkway - Signal) P. Rail System (Cliff Road Acceptance of Jurisdiction 52 A. PROJECT 661R, Sibley Terminal Industrial Park (Yankee Doodle Road Rehabilitation) VII. OLD BUSINESS (ORCHID) VIII. NEW BUSINESS (TAN) s 71 l A. APPOINTMENT, Advisory Parks, Recreation and Natural Resources Commission Vacancies , J B. PRELIMINARY PLAT, Bachel's Backyard /A1 and Mary Kay Bachel, consisting of 2.81 acres for one single family lot and one Outlot on Lot 14, Zehnder Acres located in the SE 1/4 of Section 4 r1(4C. PRELIMINARY PLAT, Broman Addition /John and Flora Broman, consisting of 1.42 acres for three single family lot on Lot 11, Treffle Acres located in the SE 1/4 of Section 4 ' 'CI D. REZONING, Trails End /Thomas Murray, consisting of 5 acres from A (Agricultural) to R -1 (Single Family) located in the NE 1/4 of Section 14 and a PRELIMINARY PLAT consisting of 5 acres and 12 single family lots on part of Lot 2, Wescott Garden Lots (PID #10 - 83700- 011 -02) located in the NE 1/4 of Section 14 p , 11.,3 E. REZONING, Verdant Acres /John H. B. Martin and Assoc.,of 4.9 acres from A (Agricultural) to R -1 (Single Family) on part of Lot 3, Wescott Garden Lots (PID #10 - 83700- 041 -03) located in the NE 1/4 of Section 14 and a PRELIMINARY PLAT consisting of 4.9 acres and 6 single family lots on part of Lot 3, Wescott Garden Lots (PID #10 - 83700- 041 -03) located in the NE 1/4 of Section 14 I%. X. RI. ADDITIONAL ITEMS (GOLD) LEGISLATIVE /INTERGOVERNMENTAL AFFAIRS UPDATE (GREY) ADMINISTRATIVE AGENDA (GREEN) VISITORS TO BE HEARD (for those persons not on agenda) ADJOURNMENT The City of Eagan is committed to the policy that all persons have equal access to its programs, services, activities, facilities and employment without regard to race, color, creed, religion, national origin, sex, disability, age, marital status, sexual orientation, or status with regard to public assistance. Auxiliary aids for persons with disabilities will be provided upon advance notice of at least 96 hours. If a notice of less than 96 hours is received, the City of Eagan will attempt to provide such aid. MEMO TO: HONORABLE MAYOR AND CITY COUNCILMEMBERS FROM: CITY ADMINISTRATOR HEDGES DATE: JULY 1, 1994 SUBJECT: AGENDA INFORMATION FOR THE JULY 5, 1994 CITY COUNCIL MEETING OPT AGENDA /APPROVE MINUTES After approval is given to the July 5, 1994 City Council agenda, the regular meeting minutes for the June 21, 1994 City Council meeting and the minutes for the June 21, 1994 Special City Council meeting, the following items are in order for consideration. DEPiRTMENT>HEA BUSINE ............................................................... ........................ .......................................... .................... At this time, there are no items to be considered under Department Head Business. Agenda Information Memo July 5, 1994 City Council Meeting CONSENT }AGENDA .............................. ............................... ............................. ............................... .............................. ............................... There are fourteen (14) items on the agenda referred to as consent items requiring one (1) motion by the City Council. If the City Council wishes to discuss any of the items in further detail, those items should be removed from the Consent Agenda and placed under Additional Items unless the discussion required is brief. A. Personnel Items PERSONNEL ITEMS Item 1. Seasonal Park Attendant - -After interviews, it is the recommendation of Park Operations Supervisor Pelletier that Jerilyn Johanson be hired as a seasonal park attendant. ACTION TO BE CONSIDERED ON THIS ITEM: To approve the hiring of Jerilyn Johanson as a seasonal park attendant. Item 2. Seasonal Street Maintenance Workers - -After interviews, it is the recommendation of Supervisor of Streets Struve that Robert Becker and John Fenger be hired as seasonal street maintenance workers. ACTION TO BE CONSIDERED ON THIS ITEM: To approve the hiring of Robert Becker and John Fenger as seasonal street maintenance workers. Item 3. Seasonal Park Maintenance Worker - -After interviews, it is the recommendation of Park Operations Supervisor Pelletier that Jon Stevenson be hired as a seasonal park maintenance worker. ACTION TO BE CONSIDERED ON THIS ITEM: To approve the hiring of Jon Stevenson as a seasonal park maintenance worker. Item 4. Seasonal Recreation Assistant - -After interviews, it is the recommendation of Recreation Supervisor Nowariak that Jennifer Jensen be hired as a seasonal recreation assistant. ACTION TO BE CONSIDERED ON THIS ITEM: To approve the hiring of Jennifer Jensen as a seasonal recreation assistant. Agenda Information Memo July 5, 1994 City Council Meeting Item 5. Seasonal Basketball Referees /Coaches - -After interviews, it is the recommendation of Youth Development Coordinator Ashley that the following persons be hired as seasonal basketball referees /coaches: John Fenger, Tyrone Lovick, Stacy Brown, Andrew Kelson, Timothy Wentworth, Lane Purcell, Marcus Arcell, Paul Clark, Terrance Masso and Dennis Clark. ACTION TO BE CONSIDERED ON THIS ITEM: To approve the hiring of John Fenger, Tyrone Lovick, Stacy Brown, Andrew Kelson, Timothy Wentworth, Lane Purcell, Marcus Arcell, Paul Clark, Terrance Masso and Dennis Clark as seasonal basketball referee/ coaches. Item 6. Hearing Conservation Screening Agreement - -The City of Eagan contracts annually with the Health Department of the City of Bloomington to conduct the hearing conservation program required by OSHA regulations. The amount of the contract for 1994 is $2,835. The City of Eagan annually budgets money for this program. ACTION TO BE CONSIDERED ON THIS ITEM: To approve the hearing conservation agreement between the City of Eagan and the City of Bloomington. Item 7. Water Quality Coordinator Reclassification - -The scope of the position of the Water Quality Coordinator has changed significantly recently as a result of actions by the City of Eagan and the State of Minnesota relative to the Wetlands Conservation Act. There has also been a reorganization of personnel in that division. As a result of the reorganization of duties, a new Time Spent Profile for the position of Water Quality Coordinator was reviewed and run. The results indicate that the position should be reclassified from exempt level J to exempt level K. It is the recommendation of City Administrator Hedges and Director of Parks & Recreation Vraa that the Council approve the reclassification. ACTION TO BE CONSIDERED ON THIS ITEM: To approve the reclassification of the Water Quality Coordinator position from exempt level J to exempt level K. 3 Agenda Information Memo July 5, 1994 City Council Meeting PLUMBERS LICENSES B. Licenses, Plumbers - -City Code requires that plumbing contractors operati within the City of Eagan be licensed on at least an annual basis. Enclosed on page is the list of firms whose applications are in order for consideration by the City Council. ACTION TO BE CONSIDERED ON THIS ITEM: To approve the plumbers licenses as presented. PLUMBER LICENSES FOR APPROVAL - YEAR 1994 1. A -HANDY PLUMBING INC 2 AQUARIUS HEATING & PLUMBING 3 GORHAM -OIEN MECHANICAL INC 4. HOPKINS PLUMBING & HEATING 5. HORWITZ INC 6 MURR PLUMBING INC 7. N S MECHANICAL INC For July 5, 1994 City Council meeting Agenda Information Memo July 5, 1994 City Council Meeting RECOMMENDATION /DAKOTA ALLIANCE FOR PREVENTION C. Recommendation, Appointment to the Dakota Alliance for Prevention -- Recently, the Dakota Alliance for Prevention contacted the City of Eagan requesting that the City submit a name to them as a recommendation for appointment to the Dakota Alliance for Prevention. The Alliance, itself, would actually make the appointment. The City of Eagan submitted a news release to the local newspapers requesting volunteers for recommendation for appointment. The City received one application. That application was from Kathy Schaivone. Enclosed on pages through M 0 are a copy of Ms. Schaivone's letter and resume. ACTION TO BE CONSIDERED ON THIS ITEM: To recommend to the Dakota Alliance for Prevention that Kathy Schaivone be appointed by the Dakota Alliance for Prevention as a representative. co Tom Hedges City Administrator 3830 Pilot Knob Rd. Eagan, MN 55122 Dear Mr. Hedges: I am writing to submit my name for representative to the Dakota Alliance the position through a news article in of my resume for your information. I Alliance for the City of Eagan based the development of healthy commun Kathy Schaivone June 20, 1994 1 4358 Yorktown Dr. Eagan, MN 55123 688 -8189 JUN 2 4 consideration to serve as the Eagan for Prevention. I became aware of the local newspaper. Enclosed is copy believe I would be an asset to the on my background and commitment to ities. I am currently Project Manager with IMPROVE a prevention research project sponsored by HealthPartners and Blue Cross Blue Shield of MN. We are working with 44 local primary care clinics located throughout the Twin Cites area including many sites in Dakota Co. Our goal is to improve access and delivery of a variety of prevention services to the community. My interest in prevention and promotion of programs that target chemical health, is a result of many years of employment and volunteer experience in this field. While living in Los Angeles I was Administrator for a Chemical Dependency Recovery Program in the L.A. area. As far back as 1978 I volunteered as a phone crisis counselor for the Yale Alcohol Hotline. I have extensive experience in HIV /AIDS awareness and education, specifically, the role chemical dependency plays in increasing the risk of developing HIV. Additionally, I have a Master's Degree in Health Care Administration and Education. Although I am relatively new to the Eagan area (1 year) I believe that I can successfully represent the needs and concerns of the community. I am committed to ensuring the involvement of the community in the development of a strong chemical health network. I would be happy to speak with you regarding my background or interest. Thank you. Sincerely, Kathryn A. Schaivone 4358 Yorktown Dr. Eagan, MN 55123 (612) 688 -8189 Experience Project Manager, Group Health Foundation/HealthPartners, Minneapolis, MN Manager of IMPROVE, a prevention and continuous quality improvement research project funded by the Agency for Health Care Policy and Research. Co- sponsored by Blue Plus of MN and the Mayo Clinic Responsible for management of 4 million budget. Provide supervision and leadership for staff. Negotiate contracts.Coordinate public relations efforts. Recruit and liaison with primary care clinics participating in the project. Assist in development of evaluation methodologies. Acting Administrator, Kaiser Permanente, CDRP, Carson, CA June 1992 - September 1992 Administrator of 20 -bed inpatient chemical dependency unit and outpatient clinic. Developed scheduling protocols, which reduced registry usage. Facilitated team building groups, which led to the development of case management approach to patient care. Improved staff morale and productivity during a period of organizational change. Supervised nursing, professional and support staff. Administrative Director, UCLA Medical Center, Internal Medicine and Geriatrics, Los Angeles, CA August 1991- May 1992 Administration of 100 - physician (faculty and housestaff), primary care, academic, medical group. Supervised all patient care areas: nursing services, lab, reception, patient services and appointment center, triage phone and urgent care center. Developed managed care programs which enhanced patient care and reduced expenses. Responsible for budget management and personnel administration. Oversaw Utilization Review programs for outpatient services. Performed material management and capital equipment needs assessment. Developed staff training programs on cultural diversity in the workplace. Designed policy and procedures for ambulatory care. Administrative Resident, Kaiser Permanente, Los Angeles, CA August 1990 - August 1991 Graduate school residency in managed care. Medical Group and Hospital Training. Developed quality improvement guidelines and monitored compliance. Participated in JCHO and MediCal Reviews/Audits. Streamlined research protocol review system and implemented research programs. Assisted in establishment of budgets for tertiary and social services. Actively participated in executive and finance committees and union negotiations. 8 Kathryn A. Schaivone, page 2 Physician Relations Specialist, USC School of Medicine, Division of Postgraduate Medicine, Los Angeles, CA July 1987 - July 1990 Marketed physician programs to USC - affiliated community hospitals. Developed and administered continuing medical education program for physicians at community hospitals. Actively participated in education and quality assurance committees. Established and managed budget. Attended over 800 hours of physician CME lectures. Constructed brochures, syllabuses and advertising materials. Administrative Manager, USC School of Medicine, Clinical Immunology and Rheumatic Disease Section, Los Angeles, CA August 1985 - July 1987 Managed and supervised clinic and office operations. Coordinated all research activities. Recruited faculty and fellows. Responsible for grant writing and coordination. Developed policy and procedures for division. Managed budgets totaling $1 million. Cultivated planned- giving donors totaling $1.5 million. Additional Experience Youth Services Coordinator, American Diabetes Association, Southern California Affiliate Inc., Los Angeles, CA December 1983 - August 1985 Fund Raising Associate, National Board YWCA/Brakeley, John Price Jones Inc., New York, NY January 1983 - October 1983 Research Assistant, Planned Parenthood of NYC, New York, NY February 1982 - January 1983 Job Placement and Rehab Counselor, Pioneer Marine School/South Street Seaport Museum, New York, NY July 1981- February 1982 Education MPA - Health Care Administration, University of Southern California, May, 1991, USC Health Services Faculty Scholarship, U.S. Public Health Traineeship. BS - Social Work, New York University, June, 1981, University Honors Scholar. Academic Appointments Clinical Instructor of Family Medicine, USC School of Medicine, Los Angeles, CA Awards and Honors Who's Who of American Women, 16th Edition, 1988 -89; Agenda Information Memo July 5, 1994 City Council Meeting AMEND CONSTRUCTION MANAGEMENT CONTRACT /E & V INC D. Amend Contract, E & V Incorporated, Construction Management Service, Police/ Municipal Center Expansion -- Recently, the City Council approved a modification of the architects fees to cover the expanded scope for the Police Department /Municipal Center Expansion Project. Staff had requested a similar review of the scope of services and fee for construction manager. Enclosed on pages 1/ through / is a copy of correspondence received from E & V Incorporated, covering the proposed �modification of fees and outlining the changes in scope supporting a modification. Please note that all costs necessary to cover this modification had been assumed in the budget estimates presented to the Council to date. In addition, the modification is not a dollar per dollar increase based on the scope and, as a consequence, the construction manager's fee as a percent of total budget is being reduced from 4.5% to 4% of the construction budget. Staff has reviewed this proposal and discussed it with the construction manager and it is in order for consideration by the City Council at this time. By comparison, the construction management costs for the City of Eagan amounted to 6% of the total construction budget. ACTION TO BE CONSIDERED ON THIS ITEM: To approve an amendment to the construction management contract for E & V Incorporated for the Police /Municipal Center Expansion, as presented. ( o Mr. Doug Reid City of Eagan 3830 Pilot Knob Road Eagan, MN 55122 -1897 RE: Eagan Police/City Hall Facility Construction Management Contract Dear Doug: May 26, 1994 The project has changed in scope substantially since we submitted our proposal for CM services based on the Request for Proposal. We have attempted to document the scope changes and the effect to E &V, Incorporated. Based on the scope change, we are requesting a revised contract in the amount of $232,699. The revised contract amount is based on man hour requirements, not on percent of total cost of the project. Our original contract included 3640 man hours distributed over the sixteen (16) months of design, construction, and owner move -in. Our current contract includes 6249 man hours spread over the thirty -one (31) months. The original total budget was $3,000,000, including design fees, construction, and FF &E. The current budget is $5,846,000 plus cost of the communication systems. Also, we understand that the City may transfer some site development from the City managed/designed package to the City Hall project. The budgets approved by the City Council to date included an additional $100,000 to cover the scope change. Please prepare a change order or amendment to our contract. If you have any questions, please contact either Mike Stowe or myself. Sincerely, E&V Incorporated o•ert J. ve, P.E. Vice P =$' nt RJS /MSS /jef Attachments l� Michael S. Stowe - Senior Project Manager Budget Schedule • Design • Construction Total Months CITY OF EAGAN POLICE / CITY HALL Original $3,000,000 6 months 10 months 16 months Man Hours 3,640 6,249 x 1.72 Fee $135,000 $232,699 Percent of Budget 4.50% 3.98% * Does not include communication systems or site work. Current $5,846,000* x 1.95 14 months 17 months 31 months CITY HALL No cost Principal -In- Charge Project Manager 450 x $55 24,750 Field Construction Manager 1200 x $40 48,000 Coordinator 375 x $27 10, 125 Value Engineer 180 x $30 5,400 Cost Control 60 x $21.50 1,290 Clerical 300 x $17.63 5,289 Escalation 94,854 94,854 x 1.03 $97,699 RFP POLICE CITY HALL i :\i Start 6/93 7/93 7/93 Schematic Design 8/93 12/93 12/93 Design Develop 9/93 2/94 6/94 Site Work Begins (by Owner) 10/93 5/94 7/94 Construction Documents 12/93 5/94 9/94 Bidding 1/94 6/94 10/94 Start Construction 2/94 6/94 10/94 Final Occupancy 4/95 4/95 10/95 Budget $3,000,000 $3,530,000 $2,316,300 plus Communication plus Communication plus Site Work plus Site Work TOTAL BUDGET* $5,846,000 Communication + 120,000 Site Work To be determined Fee Adjustment (Man Hours) Project Manager 676 676 450 Field Construction Manager 1,640 1,640 1,200 Project Coordinator 568 560 375 Value Engineer 260 320 180 Cost Control 88 88 60 Clerical 408 400 300 TOTALS 3,640 man hrs. 3,684 man hrs. 2,565 man hrs. H Agenda Information Memo July 5, 1994 City Council Meeting RECEIVE BIDS /AWARD SALE LEXINGTON MEADOWS SUBDIVISION E. Receive Bids /Award Sale, Lexington Meadows Subdivision, McDonald Construction - -On Monday, June 27, 1994, the City received two proposals for the Lexington Meadow Subdivision. The apparent high bid came from McDonald Construction, Inc., at a total amount of $223,250 or an average of $27,900 per lot. The other bid was received from Hoffman Development Company in the amount of $165,000 for the eight lots or an average of $20,625 per lot. Staff is in the process of negotiating final details with the proposer. It is staff's recommendation that the sale be awarded to the apparent high bidder, McDonald Construction, thereby authorizing the execution of appropriate documents upon the final completion of negotiations. If it appears that negotiations cannot be successfully completed, staff will advise the Council of this fact on Tuesday evening. In that circumstance, the item would be continued until such time as details could be finalized. ACTION TO BE CONSIDERED ON THIS ITEM: To receive bids and award the sale of municipal surplus property known as the Lexington Meadows Subdivision to McDonald Construction at its bid prices of $223,250, as presented. 1 c Agenda Information Memo July 5, 1994 City Council Meeting GAMBLING PERMIT /KNIGHTS OF COLUMBUS /STARKS SALOON F. Gambling Permit, Knights of Columbus Council 7604, Starks Saloon, 3125 Dodd Road- - Enclosed without page number is a copy of the application received of the Knights of Columbus for a pull -tab gambling license operation to be located at Starks Incorporated, in Eagan. This application has been reviewed by staff and the Police De artment and no reasons have been identified for denial at this time. Enclosed on page is a copy of the resolution covering this matter. ACTION TO BE CONSIDERED ON THIS ITEM: To approve a gambling permit for the Knights of Columbus 7604 for the Starks Saloon premises as presented. 1 co WHEREAS, The Knights of Columbus #7604 has applied for a gambling premise permit to conduct a pull tab operation at Stark's Saloon, 3125 Dodd Road, WHEREAS, The Eagan Police Department has reviewed the application and has not identified any reason to deny; and WHEREAS, The Knights of Columbus #7604 has a gambling premise permit at Richard's Food & Liquor, 4185 South Robert Trail; NOW, THEREFORE, BE IT RESOLVED, that the City Council of Eagan, Dakota County, Minnesota, hereby approves the Knights of Columbus #7604 application to conduct a pull tab operation at Stark's Saloon, 3125 Dodd Road. Motion made by Seconded by: Those in Favor: Those Against: Dated: RESOLUTION CITY OF EAGAN GAMBLING PERMIT FOR KNIGHTS of COLUMBUS #7604 ON STARK'S SALOON PREMISES ATTEST: CERTIFICATION CITY OF EAGAN CITY COUNCIL BY: I, EJ. VanOverbeke, Clerk of the City of Eagan, Dakota County, Minnesota, do hereby certify that the foregoing resolution as duly passed and adopted by the City Council of the City of Eagan, Dakota County, Minnesota, in a regular meeting thereof assembled this 5th day of July, 1994. E.J. VanOverbeke, City Clerk Agenda Information Memo July 5, 1994 City Council Meeting SPECIAL PERMIT/TARGET G. Special Permit, Target, to Allow One -Day Outdoor Sales of Hot Dogs and Pop, July 15, 1994 -- Target Stores has requested a special use permit to allow temporary sales of hot dogs and soda pop as part of a Fun in the Sun Day on July 15. The staff report on this item is enclosed on pages through ACTION TO BE CONSIDERED ON THIS ITEM: To approve a special use permit for Target Stores to allow one -day outdoor sales of hot dogs and pop on July 15, 1994, subject to the conditions set forth in the staff report. REPORT DATE: June 27, 1994 APPLICANT: Target Stores PROPERTY OWNER Target Stores REQUEST: Special Use Permit LOCATION: Lot 3, Block 1, Cliff Lake Centre COMPREHENSIVE PLAN: CPD Commercial Planned Development ZONING: PD(CSC) - Planned Development (Community Shopping Center) SUMMARY OF REQUEST PLANNING REPORT CITY OF EAGAN If approved, this Special Use Permit shall be subject to the following: VI CASE #: 29- SP- 9 -6 -94 HEARING DATE: July 5, 1994 PREPARED BY: Kristy Marnin Target Stores has requested a Special Use Permit to allow temporary sales at the Eagan Target Store located at 2000 Cliff Lake Road. The applicant is requesting the permit to sell hot dogs and soda pop as part of a "Fun in the Sun Day" scheduled for July 15, 1994. The Eagan Fire Department will also be in attendance at this event. The hot dog /pop stand will be located on the south side of the parking lot. Hours of the event are 10:00 a.m. to 7:00 p.m. 1. Measures shall be taken to ensure smooth and safe vehicular traffic circulation. 2. Permit expires at 7:00 p.m. on July 15, 1994. 3. All applicable Code requirements. DRAINAGE d UTT1 881.1 021 -00 D� .• L a 11111 TTY A 4 FARI ING (> 4t - _ = CLIFF ROAD - - = - - KZ A VA A' IQ [ 00 PAINAGE `‘ 7,FUFNT SALE AREA CUB Alit 11111 1 IT FA'FUFN1 WL 68W . ' [,/ =� =J , ` = = — - — — C5 A A. . =rte =t3= _ .... _„ _ -- � r L 1 ) � nTFF ROAD) , r 2 N -- SUBMITTED BY APPLICANT Agenda Information Memo July 5, 1994, City Council Meeting VACATION /RECEIVE PETITION /ORDER PUBLIC HEARING (CAROL STREET) H. Vacate Public Right -of -Way, Receive Petition /Order Public Hearing (Carol Street)- - The staff has received a petition to vacate the majority of the platted but unimproved Carol Street right -of -way between Dodd Road and TH 3 south of and adjacent to the proposed Waterview Addition. All application materials have been reviewed and found to be in order for Council's consideration of scheduling a public hearing to formally consider this request. ACTION TO BE CONSIDERED ON THIS ITEM: To receive a petition to consider the vacation of public right -of -way for Carol Street and schedule a public hearing to be held on August 2, 1994. RECEIVE FEASIBILITY REPORT /ORDER PUBLIC HEARING (VIOLET LANE) I. Project 674, Receive Feasibility Report/Order Public Hearing (Violet Lane - Streets & Utilities) - -In response to a petition received from the developer of the Villas of Violet Lane development, the Council authorized the preparation of a feasibility report which has now been completed and is being presented to the Council (under separate cover) for their consideration of scheduling a public hearing to formally present this proposal. ACTION TO BE CONSIDERED ON THIS ITEM: To receive the feasibility report for Project 674 (Violet Lane - Streets & Utilities) and schedule a public hearing to be held on August 2, 1994. AUTHORIZE FINAL PYMT (TH 149 & NW PARKWAY) J. Contract 93 -06, Authorize Final Payment (Th 149 & Northwest Parkway - Signal Improvements) - -This item will be continued indefinitely in order to obtain appropriate signatures. ACTION TO BE CONSIDERED ON THIS ITEM: To continue this item indefinitely in order to obtain appropriate signatures. as Agenda Information Memo July 5, 1994, City Council Meeting DAKOTA COUNTY CP RAIL SYSTEM AGMT FOR TRACK CROSSING RENEWAL K. Project 672, Dakota County /CP Rail System Agreement For Track Crossing Renewal - -On June 7, the City Council previously approved an agreement that provided for the installation of crossing signals for the railroad crossing of County Road 32 (Cliff Road) just east of TH 3. Presently, another agreement has been prepared between Dakota County, the City of Eagan and the CP Rail System to provide for the actual railroad crossing roadway improvements. This agreement has been prepared by Dakota County, reviewed by City staff and found to be in conformance with current cost participation guidelines. This agreement is now being presented to the City Council for their favorable consideration. ACTION TO BE CONSIDERED ON THIS ITEM: To approve an agreement for Track Crossing Renewal between Dakota County, City of Eagan and CP Rail System for Project 672 (TH 3 & Cliff Road - Signal & Roadway Improvements) and authorize the Mayor and City Council to execute all related documents. Agenda Information Memo July 5, 1994, City Council Meeting CARRIAGE HILLS DRIVE L. Carriage Hills Drive, Request To Dakota County For Jurisdictional Transfer of Public Right -of -Way -- Presently, Carriage Hills Drive exists as a rural gravel road running east from Pilot Knob Road along the north side of Jensen Lake serving as a major access point to the Dakota County's Lebanon Hills Regional Park System. The vast majority of the frontage on this roadway is County a and with the remainder providing access to 4 -6 property owners. Enclosed on page I- is a location map showing the relationship of County owned property to Carriage Hills Drive frontage. Dakota County will be processing through district court a proposal to vacate the Egan's Carriage Hill plat which is a "paper" plat with unimproved lots and local public streets /cul -de -sacs. This is part of the Dakota County Park's process to develop this section of Lebanon Hills with park shelter buildings, fishing piers, hiking trails, etc. The City staff, in discussions with Dakota County, is recommending that as a part of this regional park development, that Dakota County officially take jurisdictional and related maintenance responsibilities for Carriage Hills Drive. In 1981, the County Board of Commissioners passed the resolution enclosed on page „( acknowledging the appropriateness of this proposal. However, it has never been formally accepted by the Dakota County Board of Commissioners. This will be considered if the City of Eagan formally requests this jurisdictional designation by Dakota County. Therefore, City staff has prepared the resolution enclosed on page Z which will then be considered by the County Board of Commissioners on July 19. ACTION TO BE CONSIDERED ON THIS ITEM: To approve the Resolution requesting County jurisdiction of Carriage Hills Drive and authorize the Mayor and City Clerk to execute all related documents. _ 06122 '94 16 :50 ID:EC-PARKS ADMIN ]it ■9596 BOARD OF COUNTY COMMISSIONERS DAKOTA COUNTY, MINNESOTA Dat. - - Resolution No. _ 87._ 472 Motion by Commiss . arris Coauaissioner. Hollettkaatp WHEREAS, Gerlach Way (gravel surface west of Harry Avenue), Echo Point Road, Carriage Hills Drive, Stassen Lane (South of Butler) are roads owned by local governmental agencies and located within County Parks, and WHEREAS, Harry Avenue south of County Road 88 Idell Avenue north of County Road 42 and 127th Street East from the Park Office to County Road 87, provide a direct access into County Park land, and a WHEREAS, park usage tends to increase the cost of maintaining the above named roads, and WHEREAS, Dakota County does not wish to place an undue burden on the governmental agencies in control of the above named roads. NOW THEREFORE BE IT RESOLVED, that the Dakota County Board will determine a fair share of the cost to maintain the above named roads due to perk usage to be paid to the local governmental agency, and BE IT FURTHER RESOLVED, that Dakota County may assume control of the above named roads located within County Parks, with local consent, provided funds are available for maintenance and upkeep. YES NO Harris X Harris Hollsehamp , X Holleniuetp Vas. — X Voss Atkine X Atkins Westland X $treefland State of Minnesota N. County of Dakota 1, C. D, Onischul, duly eleeted,taualified and acting County Auditor of the County of Dakota, State of llinnesnta. do hereby certify that 1 have compered the foregoing copy of a resolution with the original minutes of the proceedings of the Board of County Cornmiuiontrs, Dakota County, Minnesota, at their session held on the . 1nth. _-day o.! .B t ____ID_.81., now on file in my office, and have found the same to be a true and correct copy thereof. Witneee my hand and official seal at Hastings, Minnesota, this 21 day of 24 RV( 612-437-4560 PACE 3 om %I7 Jltiitut 612 437 4560 06 -22 -94 04:50PM P003 tt31 RESOLUTION CARRIAGE HILLS DRIVE ASSUMPTION OF JURISDICTIONAL & MAINTENANCE RESPONSIBILITIES BY DAKOTA COUNTY WHEREAS, Carriage Hills Drive was dedicated for public use on the Egan's Carriage Hill plat approved by the Dakota County Board of Commissioners on November 28, 1962; and and WHEREAS, Dakota County owns the vast majority of property serviced by this public right -of -way; WHEREAS, Carriage Hills Drive will be a primary entrance to the current and future expanded development of the Dakota County Lebanon Hills Regional Park system; and WHEREAS, it is appropriate that Carriage Hills Drive maintenance and improvement requirements be the responsibility of Dakota County. NOW, THEREFORE, THE CITY COUNCIL OF EAGAN, DAKOTA COUNTY MN, hereby requests the Dakota County Board of Commissioners to formally acknowedge the primary purpose of Carriage Hills Drive as being an internal regional park road and accept the jurisdictional responsibilities and obligations for maintenance, repair, reconstruction and other matters which are implied by ownership. The acceptance of jurisdictional responsibilities shall become effective on the date of County Board action. ATTEST: City Clerk CERTIFICATION Thomas A. Egan, Mayor I, E.J. VanOverbeke, Clerk of the City of Eagan, Dakota County, Minnesota, do hereby certify that the foregoing Resolution was duly passed and adopted by the City Council of the City of Eagan, Dakota County, Minnesota, in a regular meeting therefore assembled this 5th day of July, 1994. E.J. VanOverbeke Agenda Information Memo July 5, 1994 City Council Meeting FINAL PLAT /GALAXIE HILL OAKS M. Final Plat, Galaxie Hill Oaks- -The final plat documents for Galaxie Hill Oaks have been reviewed and approved. Security agreements have been provided. Approval of this final plat is in order. Enclosed on page is a copy of the final plat as it appears for recording at Dakota County. ACTION TO BE CONSIDERED ON THIS ITEM: To approve the final plat for Galaxie Hill Oaks. ,a I 1i 11 Wool — 1 1 1 1 1 � � 1 I • t• J � ti I 01 • 1 1 1 1 3 . ,1 11 1 t 11 1 r 1 -.; • { 1 1 ' ,...• / `may f� \\� 1 a qr es I i IS i _ - 1 ! 3;,:t�3 ;�: • 3�xr7 __ n -s! 'cm 1714 1718 iC 1N91Y N01171bCdSN:G1 40 1 /1 3nt1tl7d30 710s3NNin — « F I c 1 1 K ! 1 1 1 1 1 1 t i 1 1 I 1 1,1 it • 1 a01 Agenda Information Memo July 5, 1994 City Council Meeting FINAL PLAT /ROONEY ADDITION N. Final Plat, Rooney Addition - -Final plat documents have been reviewed and approved by staff for the Rooney Addition. Security a eements have been provided. Approval of this final plat is in order. Enclosed on page / is a copy of the final plat as it appears for recording at Dakota County. ACTION TO BE CONSIDERED ON THIS ITEM: To approve the final plat for Rooney Addition. w.•••■. gyn. . A g" • • 0 0.006 Ni Oa Ins a Val I a a St Ai • I ••• ••11111• IN •111 ..•• ..••• ••• •••• YAM 11••••ra • 111 • PAD IN 411 VII BS IP an :WM : • $ . .:• . • d ..,,.•■••••••••..cli. . 1u ; 8 • i• el 6 $ !I ; 7 0 Agenda Information Memo July 5, 1994 City Council Meeting PROJECT 661R, SIBLEY TERMINAL INDUSTRIAL PARK (YANKEE DOODLE ROAD REHABILITATION) A. Project 661R, Sibley Terminal Industrial Park (Yankee Doodle Road Rehabilitation) - -On April 19th, the City Council held a public hearing to consider the reconstruction and rehabilitation improvements for the Sibley Terminal Industrial Park incorporating Yankee Doodle Road from T.H. 13 to Terminal Drive and Terminal Drive from Yankee Doodle Road to T.H. 13. As a result of that public hearing, the Council deferred the Terminal Drive improvement for reconsideration in 1996 and directed staff to prepare a revised feasibility report for the improvement of only Yankee Doodle Road from T.H. 13 to Terminal Drive. On May 18th, the City Council held a special workshop meeting to review various alternatives for financing this reduced scope project. The Public Works Committee was then directed to review the options with the affected property owners on June 2nd and to provide a recommendation that would address the needs of the reconstruction /rehabilitation C.I.P. as well as an equitable method of financing the proposed improvements. At the June 7th Council meeting, a. revised feasibility report was then presented to the City Council. Enclosed on pages 3 through 5 is a copy of that report for the Council's review and reference during the public hearing. Councilmember Hunter subsequently requested an addendum to the feasibility report evaluating a patch arp4 repair with overlay alternative. This addendum is enclosed on pages 0 through �� ( This information has been shared with the Industrial Park's designated representative, Mr. Tim Herman, who has indicated that he will be presenting a counter - proposal of just a basic overlay without any patch and repair and requesting the City's participation for anything beyond actual construction costs. A letter to that effect is enclosed on pages * through * . At the June 7th Council meeting when the revised feasibility report was presented, Mr. Herman requested historical information pertaining to th patche yp,I. have been performed on Yankee Doodle Road. Enclosed on pages (P ' throug is a graphic representation and explanation depicting the location of all existing patches with a numerical reference of those that were performed by non -City forces, either by City contract or private permit. All locations without a numerical reference are representative of routine street maintenance patching by City forces. Agenda Information Memo July 5, 1994 City Council Meeting There have been numerous neighborhood meetings, special Council workshops, Public Works committee meetings, individual meetings and telephone calls with various representatives from this Industrial Park all requesting additional information, evaluations, cost estimates, alternative assessment methods and general discussions with City Council members, staff and the City's Consulting Engineering firm. An up -to -date breakdown of costs incurred as of the July 5th public hearing date will be available at the public hearing if necessary to help evaluate this counter - proposal by the Industrial Park property owners. All notices have been published in the legal newspaper and sent to all affected property owners informing them of this new public hearing for this revised scope of project. Steve Gaitlin of M.S.A. Consultants, Inc. will be presenting the details of the revised feasibility report and the addendum alternate improvement and, along with the Public Works Director, will be available to respond to any questions. ACTION TO BE CONSIDERED ON THIS ITEM: To close the public hearing and approve /deny Project 661R and, if approved, authorize the preparation of detail Plans and Specifications. * The referenced letter was not available at the time of printing of the packet. 3) Reg. No. 12754 FEAS -I 12.005 FEASIBILITY STUDY FOR SIBLEY TERMINAL INDUSTRIAL PARK STREET AND DRAINAGE IMPROVEMENTS JUNE 1994 City of Eagan Project Number 661 -R I hereby certify that this Feasibility Study was written by me or under my direct supervision and that I am a duly registered Professional Engineer under the laws of the State of Minnesota. P. Steven D. Gatlin, P.E. Date Prepared for City of Eagan, Minnesota 112 - 005 -12 3 `t IISI COISl1rG BUMS C .: En;'vEEK'w 1326 Energy Pork Drive St. Paul, MN 55108 612 - 6444389 fax: 612. 6449446 9800 Shelard Parkway Minneapolis, MN 55441 612 - 546.0432 fox: 612. 544.6398 FEAS -I 12.005 June 15, 1994 File No: 112 - 005.10 Honorable Mayor and City Council City of Eagan 3830 Pilot Knob Road Eagan, Minnesota 55122 RE: AMENDED FEASIBILITY STUDY - SIBLEY TERMINAL INDUSTRIAL AREA YANKEE DOODLE ROAD IMPROVEMENTS (City Project Number 661 -R) Dear Mayor and City Council: Please find enclosed the updated feasibility study for the referenced project. This report addresses street repairs and maintenance, as well as storm drainage improvements for Yankee Doodle Road. Also included is a preliminary cost estimate and preliminary assessment roll for the project. The assessments are proposed to be spread on a combination front foot and area basis as directed by the City Council. Please contact our office if you have questions or require further information regarding this project. Sincerely, MSA, CONS T TING ENGINEERS teden D. Gatlin, P.E. Vice President Enclosures Reviewed by: Public Wor Finance (o -ZM - 9y TABLE OF CONTENTS Transmittal Letter i Table of Contents ii Introduction 1 Scope 1 Existing Conditions 1 Exhibit 1 - Project Location Map 2 Proposed Improvements 5 FEAS -I I2.005 Exhibit 2 - Proposed Improvements 6 Exhibit 3 - Proposed Driveway Improvements 7 Exhibit 4 - Proposed Driveway Improvements 8 Exhibit 5 - Proposed Driveway Improvements 9 Exhibit 6 - Proposed Street Cross - Sections 10 Exhibit 7 - Standard Driveway Entrance 11 Easements and Permits 12 Project Cost 12 Project Financing 13 Assessment 13 Exhibit 8 - Street Assessment Area 15 Driveway Repairs 16 Exhibit 9 - Driveway Repair Summary 16 Project Schedule 17 Recommendations - 17 Conclusion 18 Appendix A - Cost Tabulation Appendix B - Preliminary Assessment Roll 5 co ii This amended feasibility study was authorized to investigate the necessary repairs, maintenance requirements, and improvements within the Sibley Terminal Addition industrial area. The study was requested following a public hearing to consider improvements to both Yankee Doodle Road and Terminal Drive. At the hearing, the Eagan City Council cancelled the original project. This report will outline both roadway and storm drainage improvements required on Yankee Doodle Road to bring the existing roadway and local storm drainage to current standards. Roadway improvements will include milling and overlay and complete reconstruction, depending upon the existing conditions within Yankee Doodle Road. The location of the area of study and proposed street improvements are presented in Exhibits 1 and 2. The area under study is currently zoned Ll for light industrial use. The purpose of this report is to consider upgrading the existing roadway section to restore the pavement to an improved surface condition and provide an additional 20 years of service life for the pavement. In addition, the improvements will enhance rideability and insure a uniform 10-ton load capacity. Also, it is proposed to construct storm drainage improvements within the southern portion of Sibley Terminal Addition on Yankee Doodle Road. Deteriorated sections of Yankee Doodle Road will be reconstructed or overlaid to meet the desired surface condition and desired 10-ton design standard. A presentation of the recommended design cross sections for both construction options is shown on Exhibit 6. A number of the driveway entrances within the development require reconstruction due to deterioration or non - conformance to City standard design. The existing driveway entrances have been compared to the City standard and it appears only a small number actually comply with the City requirements. However, most are in reasonably good condition and do not need complete replacement. Those requiring repair, replacement, or new entrances will be identified. Exhibits 3, 4, and 5 illustrate proposed driveway improvements. Based on direction from the Eagan City Council, property owners will be given an option to upgrade driveways on their own or have this work included as part of the City project. This feasibility report will present the existing conditions, proposed improvements, estimated construction and overhead costs, engineering, City administration, and fiscal costs. Possible financing methods will also be discussed and a preliminary assessment roll was prepared in accordance with the current City of Eagan assessment policy. EXISTING CONDTTTONS Streets - General Yankee Doodle Road is currently 44 feet wide with concrete curb and gutter. The roadway was initially designed to a 9 -ton design standard and was built in 1970. Major maintenance has been FEtiS- 112.005 ,c? -1- r NE 1 NE • SE • 4 P a S VSL MI= MIMS A nfSFX %>✓ SW 1 PROJECT. SITE SW SW SIBL.EY TERMINAL INDUSTRIAL PARK CITY OF EAGAN PROD. LOCATION M • ' 5 64. pli St NE t' I vEF BL.rFF of CICAA o CEP,' ILA AA TER TREATME it �. fACIL I T r NW =1T I Al.318 T FAC'L IT r city of eagan done in the area, including seal coating in 1983 and major crack filling and seal coating in 1989. Over the years, the City has also done incidental patching and minor repairs. The existing roadway pavement now shows signs of deterioration. This deterioration has been caused by inadequate drainage, leading to subgrade weakness and traffic loading which has resulted in surface distress. In order to detel„une the current conditions of Yankee Doodle Road and design a cross section to meet the 10-ton design standard, the existing load bearing capacity of these roadways was evaluated. The City employed Braun Intertec, Inc., to perform the required "road rating" tests. The tests included penetration borings to determine the existing bituminous and base thicknesses, as well as a structural evaluation consisting of measuring the pavement deflection in response to a known applied load. These analyses were based upon the results of the deflection tests, existing pavement section, subgrade soil classification, heavy commercial average daily traffic counts, and visual observations conducted by Braun and MSA engineers. The 10-ton load standard is currently met in most sections of Yankee Doodle Road. The City obtained traffic counts during October 1993, and MSA gathered vehicle type percentages in the field during the same time period. The Average Annual Daily Traffic (AADT) was 1,182 trips per 24 -hour period per lane at the intersection of Yankee Doodle Road and Highway 13. The AADT counts were not as great at the intersection of Terminal Drive and Highway 13 (258 per day per lane). The greater of these values was used in determining a roadway cross section. The following table presents the percentages of the ten vehicle types listed in the MnDOT Road Design Manual: Vehicle Type, Decrriptinrt of AAT)T Typical °l pf AAT)T 1 Passenger Cars 34.4 83.5 2 Panels & Pickups 39.5 9.0 3 Single Unit - 2 Axle /4 0.5 1.6 4 Single Unit - 2 Axle /6 12.6 1 8 5 Single Unit - 3 Axle 3.2 0.5 6 Tractor - trailer 3 -Axle 0.0 0.3 7 Tractor- trailer 4 -Axle 0.0 0.4 8 Tractor - trailer 5 -Axle 5.6 2.4 9 Tractor - trailer 6-Axle 0.0 0.0 10 Trucks w/ trailers and buses 4.2 - 0.5 These values were used to calculate a 1994 Equivalent Single Axle Load (ESAL) of 154 per day. This value was then used as a factor in the determination of the required pavement cross section. The City of Eagan also took traffic counts in May 1994. The data from those counts is available at the City Engineer's office. ,Soil rlaccifiratinn and Pavement Cnnrlitinrt The information presented in the Braun Intertec, Inc., report shows the approximate R -Value for the existing subgrade and the estimated Granular Equivalency for the existing street. FEAS - 112.005 Braun determined the effective GE along Yankee Doodle Road to be approximately 22 inches and the effective R -Value was R -21. In addition to Road Rater analyses, Braun provided the Pavement Condition Indexes obtained in October 1993. These values are presented below with the appropriate recommended means of restoration: Street Spr pt'i Va1t Rectnratinn RPgttirPri Yankee Doodle Road (from Sibley 5 Reconstruction /Overlay Highway to Terminal Drive) The PCI values rank the surface condition of the roadway on a scale from 0 to 100. This is an important aspect of street evaluation from which the following maintenance requirements can be deduced: PCI Rating MaintPna RPquirPrl 55 - 100 Crack Filling /Seal Coat 35 - 55 Bituminous Patch /Overlay 0 - 35 Reconstruction As outlined above, PCI ratings below 35 generally require removal of the existing pavement and reconstruction. Based upon the settlement of the street and soil borings, the existing aggregate base and subgrade may or may not require removal and reconstruction. PCI ratings between 35 and 55 indicate a street surface that can be restored through patching and overlaying the street, while those greater than 55 indicate the need for routine street maintenance in the form of seal coating. According to the Road Rater analysis, this street is structurally adequate to support 10-ton axle loads at this time; however, the MnDOT Road Design Manual identifies a 2.0% per year growth factor for Dakota County. With a 2.0% per year growth factor, the GE should be approximately 28.5 inches to adequately support the projected 10-ton traffic volumes into the future according to the MnDOT Road Design manual. In addition to the need for additional GE, localized repairs and pavement replacement will be required at various locations throughout the limits of the project. Site observations and the Pavement Condition Index (PCI = 5) determined by Braun indicate the middle 300 -400 feet of Yankee Doodle Road are badly deteriorated with exposed aggregate, severe cracking, and potholing. The curb and gutter sections are also cracked, and several have sunk below established grade to the point that drainage along the sag section of the street is greatly inhibited. Also, the intersection of Yankee Doodle Road and Terminal Drive shows similar deterioration. The other segments of Yankee Doodle Road show some pavement distress, although not as severe as in the low point or at the intersection with Terminal Drive. FEAS- 112.005 14P-4- , Stnrm Drainag The low point on Yankee Doodle Road does not have adequate catch basin inlet capacity as required in the City's Comprehensive Storm Water Management Plan. There are only two catch basins collecting the runoff from approximately 16 acres. The piping appears to be appropriately sized for the drainage. The installation of additional catch basins will eliminate the surface drainage within the curb and gutter section along this street. Since development of this area is nearly complete, it is not practical to handle drainage from abutting properties by internal storm sewer and stormwater must be picked up in the street system. Driveways Several driveway entrances along Yankee Doodle Road do not meet the city standard specifications for commercial entrances from a 44 -foot roadway. These entrances are inadequate for the high capacity traffic they currently handle. While these entrances do not meet City standards, most do not warrant complete replacement. Several existing driveways need repairs due to lack of curb radii and paving to control traffic. PROPOSF.T) TASPROVFMFATTS Strut improvements The proposed street section will match the existing 44 -foot roadway and will be a 10-ton per axle design standard. The proposed pavement section was determined using the data obtained during the road rating, completion of soil borings, and determining a granular equivalency factor from the MnDOT design specifications for a 10 -ton roadway. Based upon the existing subgrade and pavement cross section, an estimated GE value of 24 inches was determined. Based upon on site observations, milling of a 6-foot wide strip will be conducted to a depth of 2 inches to feather the new surface flush with the existing gutter line. In areas where substantial pavement deflection is evident, the remaining width of the street will be milled to a depth of 1 inch and a 3 -inch overlay will be applied to ensure the roadway meets the desired design cross section (GE= 28.5). This will be completed on the east and west 200 to 400 feet of Yankee Doodle Road. These areas were determined from the Braun Intertec report and visual observations of the existing pavement surface which were conducted using a 10 -foot long straight -edge to determine roadway deflection. The middle section of Yankee Doodle Road will require reconstruction to include granular subbase and subgrade drainage improvements. Removal of the pavement section and subgrade preparation will include the placement of select granular material and perforated drain tile to provide for improved subgrade drainage and an enhanced roadway lifespan. The Yankee Doodle Road street section will also be constructed to the 10-ton design standard. This reconstruction pavement section is presented in Exhibit 6. The pavement section will consist of 10 inches of aggregate base and 6 inches of bituminous pavement. Exhibit 2 shows the locations for both pavement overlay and reconstruction areas. The costs associated with the street reconstruction /overlay are outlined in Appendix A. FEAS- 112.005 MGM C POLLS SIBLG 1 TERMINAL INDURTFdAL PARK CITY OF EAGAN PAW. NO. PROPOSED Y LOUNGE DIESEL SERVICE 3207 HWY 13 N IMPROVEMENTS RECONSTRUCT SEE STREET SECTION - A EXHIBIT 6 MILL /OVERLAY SEE STREET SECTION -6 EXHIBIT 6 EXHIBIT T city of =Jan 1EL COfiSt11TD9C Mat y 3 4' VACANT 1 SAFETY KLEEN 3227 4 ti 5 p, A NS 3245 6 5 7 • VACANT 2 3195 VACANT EAGAN TRANSPOR TA T► & TRUCKING 2 4 3256 VACANT INDUSTRIAL PARK CITY OF EAGAN PROS. NO. DRIVEWAY Mp 1 x 3220 HOLMAN ERECTION 1125 1 1 2 S DIESEL SERVICE 3207 H WY 13 4 2 3240 PRCDUCTIGN P.PTS X ACCEPTABLE ENTRANCE • REQUIRE NEW DRIVEWAY ENTRANCE OCR A DRIVEWAYS REQUIRE REPLACEMENT OR MODIFICATION 3 city of eacJan \1St SBLEY TERMINAL INDUSTRIAL PARK CITY OF EAGAN mow. tro.. - "''R DRIVEWAY �ova,�eNns �' � l ZON PMENT X ACCEPTABLE ENTRANCE • REQUIRE NEW DRIVEWAY ENTRANCE 4 DRIVEWAYS REQUIRE REPLACEMENT OP MODIFICATION EX 3 T 4 city of eagan caMtuc ac�tm� VACANT 1'50 1711 11 1769 PROPOSED STREET RECONSTRUCTION PROPOSED MILL AND OVERLAY INDUSTRIAL PARK cmf of EAGAN PROJ. NO. DFNEWAYS ILFROVEMENTS 10 BEST BRANDS 1765 VALLEY LOUNGE STATE TRUNK HIGHWAY NO. 13 TERMINAL DRIVE X ACCEPTABLE ENTRANCE ,_ , • REQUIRE NEW DRIVEWAY ENTRANCE A DRIVEWAYS REQU'PE REPLACEMENT OP MODIFICATION 'S city oF ecicjcin ROW MSS CIRSVI rnK DIMS VARIES 4' PERF. HOPE EDGEDRAIN WITH OTEXTTLE SOCK AS NECESSARY) B618 CONCRETE CURB & GUTTER YILL 22' r- 2331 TYPE 41A BITUWNOUS ME AR COURSC- TACK COAT g. 2.00z 22' 2 - -2341 TYPE 41 BITUNINOU - TACK COAT 4' 2331 TYPE 319 BASE COu 10' CLASS 5 AGGREGATE B 18' SAND SUBCUT EXISTING 8618 CONCRETE CURB & GUTTER TYPICAL MILL /OVERLAY STREET SIBLEY TERMINAL INDUSTRIAL PARK CITY OF EAOAN PROD. NO. PROPOSED STREET SECTIONS Z oo s- 0. 67 0.67 B S WEAR COURSE RSE RECONSTRUCTED STREET SECTION A EXISTING BITUMINOUS SURFACE El1511NC CLASS 5 AGGREGATE BASE SECTION VARIES ROW ROW ELb0304 city of eagan l NOTE: 7" MIN. THICKNESS REQ. ON ENTIRE APRON. 7" MIN. 40' TYPICAL ENTRANCE FOR COMMERCIAL & INDUSTRIAL PROPERTIES tvi WHERE NEW DRIVEWA / ARE TO BE ACROSS EXISTING C & G, REMOVE EXISTING C & G AND REPOUR 'NTEGRAL WITH -*-E ENTRANCE. • CONCRETE APRON TO BE REQUIRED FOR ALL ENTRANCES. • CONTRACTION JOINT PATTERN TO BE DETERMINED BY ENGINEER. ® REQUIRED MIX DESIGNATION = 3A32. MSS cvSU C moats SIBLEY TERMINAL INDUSTRIAL PARK CITY OF EAGAN PROJ1. NO. 661 CITY STANDARD COMERCIAL ENTRANCE RAD. 30' 8 -6 CURB EXPANSION JOINT EXHOBOT city of eegan ,Stnrm Sewer improvements The storm sewer improvements along the middle 400 to 600 feet of Yankee Doodle Road will include six additional catch basins as presented in Exhibit 2 to remove runoff from the curb and gutter and route it beneath the surface. New curb and gutter associated with the reconstructed section of Yankee Doodle Road will also enhance storm drainage. The storm drainage improvements will be designed for the 25 -year storm at the sag points along Yankee Doodle Road, and for the 10 -year storm for all other areas of the project. The costs associated with the storm sewer construction are outlined in Appendix A at the end of this report. Driveway Fntranres Some driveway entrances along the lengths of Terminal Drive and Yankee Doodle Road will require modification or reconstruction to meet the City standard specification for driveway entrances. New entrances will be 40 feet wide with 30 -foot turn radii. Driveways to be repaired will match existing widths. The reconstructed driveway aprons will consist of a 7 -inch concrete section (mix designation 3A32) and will extend 12 feet behind the bituminous pavement edge. The City standard driveway entrance is presented in Exhibit 7. A listing of driveways requiring modification or replacement is presented in Exhibit 6 along with recommended improvements. Locations for driveway repairs or replacements are shown in Exhibits 3, 4, and 5. Utility Repairs As part of the project, minor repairs to the sanitary sewer and watermain systems will be completed as required. FASEMFNTS ANn PERMITS All storm sewer pipe required to upgrade the storm drainage within the area will connect to existing storm sewer and remain within the existing right -of -way. Additional easements are not anticipated for the project. In addition, permits should not be required for the storm drainage improvements as these improvements will not increase the runoff, but will reroute it into underground conduit flowing in the street gutters. All other work will be conducted within the existing right -of -way; therefore, no additional easements or permits are anticipated. pROJF.CT ['oST The estimated construction costs for the proposed storm drainage and street improvements are presented in Appendix A. The estimated overhead items such as engineering, construction staking and inspection, city administration, fiscal, and legal ex nses have been estimated at 30% and a L c. -12- FEAS -I 12.005 10% contingency cost has also been included. The estimated total project cost is $196,600. PROJFCT FINANCING The recommended method of financing the Yankee Doodle Road Street Improvements is through special assessments of all of the benefitted commercial properties in accordance with current City policy and direction of the Eagan City Council. The benefitting properties are proposed to be assessed the construction cost plus the estimated 30% indirect cost. Assessments will be paid over a 10 year period at the interest rate obtained at the time of the bond sale. A preliminary assessment roll is included as Appendix B of this report. It addresses proposed assessments to each specific property within the project area. The estimated street assessment on Yankee Doodle Road per linear foot of street footage is $34.72. The area assessment is proposed to be $428.42 per acre. The minor storm sewer improvements on Yankee Doodle Road are considered as repairs and are proposed to be funded by the City. Driveway repair or replacement costs are proposed to be charged directly to the benefitting property owners. Sanitary sewer or watermain repairs are funded by the City through existing utility funds. Curb repairs are also funded by the City based on current policy. ASSF_SSMFNT Assessments are proposed to be levied against the benefitted properties as outlined in the City of Eagan's current assessment policy for street reconstruction and as directed by recent action of the Eagan City Council. The proposed method of assessment is to apportion 50% of the assessable project costs to parcels abutting Yankee Doodle Road from TH 13 to Terminal Drive. The remaining 50% of assessable costs are proposed to be levied on an area basis, for all remaining benefitting properties within the project area who use the proposed improved section of Yankee Doodle Road but do not have direct abutting frontage. A summary of the assessment policy for such a project is presented below, and a preliminary assessment roll has been included as Appendix B of this report. The assessments presented are based upon preliminary cost estimates and will be revised based upon the actual construction costs. Bituminous Street Construction 75% 25% 100% 0% Concrete Curb Repairs (existing) 0% 100% 0% 100% Storm Sewer Repairs 0% 100% 0% 100% Sanitary Sewer/Watermain Repairs 0% 100% 0% 100% The method of determining the assessment was per front foot and area as presented below. The preliminary cost estimates are included as Appendix A. As indicated in the above table, property owners are not assessed for the repairs to existing concrete curb and gutter or the utility repairs PEAS- 112.005 Inning Typp Residential/Duplex All Other Types Assessed City Assessed City and adjustment being included in this project. The assessment area is shown on Exhibit 8. The assessment was calculated as follows: ,4trept AccPCCmPnt Abutting Street Assessment 50% of $134,600 = $67,300 Abutting Street Assessment Rate = Area Benefit 50% of $134,600 = $67,300 Area Benefit Rate = Driveway AccPCCmPnt Cost of driveway entrances is proposed to be charged on a unit basis for each installation. The unit assessment for driveway replacement or new driveway entrance installation is $2,145. FEAS -I 12.005 -14 I h7,' OO 1,938.42 FF 67,100 = 157.09 Acres $34.72/FF $428.42/Acre MSS COMM A D11-01 11111APIME woorr SBLEY TERMINAL INDUSTRIAL PARK CITY OF EAGAN PFiOJ. NO. R ASSESSMENT AREA 5/31 /94 EXHIBIT 0 city of eagan 1 Location (Address or parcel location) Existing Condition Proposed Improvement 1. Eagan Trucking - North Side Terminal Drive, just west of TH 13. 3131 Highway 13. Driveways into parcel being used with no standard curb opening or aprons. Install standard driveway entrances. 2. 3420 Terminal (Production Parts) Two existing non - standard driveways, one with bituminous ramp in gutterline, both with drop curb, no aprons on radii, ruts in radii. Install two standard driveway entrances to match existing widths. 3. 3259 Terminal Driveway lacks radii and apron, large boulders used for edge control, ruts evident. Replace with standard driveway entrance to match existing. 4. Three driveways on lot line between 3259 Terminal and vacant parcel to south with access to Aagard parcel. Two driveway openings created by breaking off back of curb, no curb openings or apron. Being driven over with no entrance (southerly driveway). Install three standard driveway openings. 5. Vacant parcel across street from 3291 Terminal (east side) Existing driveway into parcel has no curb opening, driving over curb. Install standard driveway opening to match existing driveway. 6. 3291 Terminal (south driveway) Driveway with drop in curb bituminous paving, deteriorated at radii. Install concrete curb and apron to match existing. 7. 3337 Terminal Driveway lacks curb on north side for edge control. Install curb on north side of driveway. 8. 1745 Yankee Doodle (Best Brands) Existing two driveways just east and west of Yankee Drive. Curb shows some cracking and settlement. Gutter for easterly driveway deteriorated. Install standard driveway entrances in reconstruction area for two driveways. I)RTVFWAY RF.PATRS EXHIBIT 9 - DRIVEWAY REPAIR SUMMARY PROJECT S cm-no City Council Receives Feasibility Report Public Hearing / City Orders Plans and Specifications City Council Receives Plans and Specifications / and Sets Bid Opening Advertise for Bids Bid Opening City Council Receives Bids / Awards Contract Assessment Hearing Construction Begins Construction Complete First Payment Due RFC O 1YDATTONS June 7, 1994 July 5, 1994 July 19, 1994 July 20- August 5, 1994 August 12, 1994 August 16, 1994 August 16, 1994 August 29, 1994 October 14, 1994 October 1995 • Street Reconstruction - Based upon the Road Rater analysis conducted by Braun, R- Values, and on -site observations, reconstruction would be the appropriate means of refurbishing the middle section of Yankee Doodle Road and the intersection of Yankee Doodle Road and Terminal Drive. • Pavement Milling - The outside six feet of Yankee Doodle Road in areas where reconstruction will not be done will be milled to a depth of two to three inches to provide a well matched pavement surface. It may also be appropriate to mill the entire cross section of street sections along Yankee Doodle Road that show significant deflection (>1/8" over the length of a 10 -foot straight -edge) or exhibit significant cracking or potholes. • Bituminous Overlay - A minimum of two inches of MnDOT Specification 2341 bituminous material would be placed upon the road throughout the overlay portion of the project. A 3 -inch overlay will be installed where the entire street section is milled to meet the required GE requirements. FEAS -I 12.005 S3 • Concrete Curb and Gutter - Deteriorated, severely cracked, or sunken curb and gutter will be replaced with new B618 curb and gutter. The non - standard curb and gutter at the intersection of Yankee Doodle Road and Terminal Drive will also be replaced as required with the reconstruction of that intersection. • Storm Sewer - Storm drainage improvements are required at the sag point within Yankee Doodle Road. These improvements would consist of the installation of additional catch basins and the associated RCP sewer pipe. • Structure Adjustment - All utility structures would be adjusted to match the proposed overlay surface. • Driveway Entrances - Driveway entrances will be modified or reconstructed as required to conform with the City Standard Detail Plates for commercial driveways. • Restoration - All boulevard areas that are disturbed during construction will be restored to their original condition. CONY"' The cost of the reconstruction /overlay of Yankee Doodle Road including the associated storm drainage improvements is estimated at $196,600. The project would be completed in accordance with the schedule provided in this report in the fall of 1994. The project would be funded through special assessments to the benefitted properties and City funding. The anticipated assessment per linear foot of street, including minor storm sewer improvements, is $34.72 for benefitting property abutting Yankee Doodle Road from Terminal Drive to TH 13. The remaining portion of the project cost to be funded by assessments would be assessed to benefitting properties using Yankee Doodle Road from Terminal Drive to TH 13 on an area basis. The assessment rate per acre of benefitting property would be $428.42 per acre. The Sibley Terminal Industrial Area Street and Drainage Improvements project is technically feasible from an engineering standpoint. The financial feasibility will have to be determined by the City of Eagan. FEAS - 112.005 A. YANKEE DOODLE ROAD Item Quantity Unit Estimated Unit Cost Estimated Cost RECONSTRUCTION Sawcutting 120 LF 2.00 240 Remove concrete curb and gutter 1,200 LF 3.50 4,200 Subgrade excavation 3,200 CY 5.00 16,000 18" sand subcut 2,900 TON 3.75 10,875 10" Class 5 aggregate base 2,000 TON 7.00 14,000 6" bituminous 1,000 TON 24.00 24,000 B618 concrete curb and gutter 1,200 LF 9.00 10,800 Sod 800 SY 1.50 1,200 2 x 3 box catch basins 6 EA 900.00 5,400 12/15" RCP 700 LF 25.00 17,500 4" edge drain 1,000 LF 5.00 5,000 Connect to existing structures 2 EA 200.00 400 Adjust existing structures 6 EA 250.00 1,500 Utility adjustment/repairs 1 LS 5,000 5,000 Subtotal $116,115 Contingencies (10%) 11,611 Estimated Construction Cost $127,700 Engineering and Administration (30 %) 38,300 TOTAL COST - RECONSTRUCT SEGMENT $166,000 APPENDIX A. Sibley Terminal Industrial Park Street and Drainage Improvements - Yankee Doodle Road City of Eagan Project No. 661 -R FEAs- 112.005 OVERLAY Milling 1,500 SY 1.25 1,880 Crack seal 900 LF 0.80 720 Bituminous patch 165 SY 17.75 2,930 2341 bituminous wear course 660 TON 24.00 15,840 Subtotal $21,370 Contingencies (10%) 2,130 Estimated Construction Cost $23,500 Engineering and Administration (30 %) 7,100 TOTAL COST - OVERLAY SEGMENT $30,600 TOTAL PROJECT COST YANKEE DOODLE ROAD $196,600 B. DRIVEWAY REPLACEMENT / CONSTRUCTION Item Quantity Unit Estimated Unit Cost Estimated Cost City standard driveways 12 EA 1500 $3,000 Contingencies (10 %) 300 Estimated Construction Cost $3,300 Engineering and Administration (30 %) 990 TOTAL PROJECT COST $4,290 NOTE: Drive replacement costs are not included in the total project cost estimate for Yankee Doodle Road. These costs are summarized separately as follows: FENS -1 12.005 RASIS OF STRF,FT ASSFSSMTNT Abutting Street Assessment Rate = Area Benefit Rate = Driveway Assessment Rate = FEAS - 112.005 APPENDIX B. Preliminary Assessment Roll Sibley Terminal Industrial Park - Yankee Doodle Road City of Eagan Project No. 661 -R Bituminous Street Reconstruction $134,600 - 0 - Concrete Curb Repairs - 0 - $21,500 Storm Sewer Repairs - 0 - 33,300 Driveway Assessment (as requested) - 0 - Sanitary Sewer/Watermain Repairs - - 7,700 $134,600 (68 %) $62,000 (32 %) Acspcsment City TOTAL PROJECT COST $196,600 Abutting Street Assessment 50% of $134,600 = $67,300 Area Benefit 50% of $134,600 = $67,300 5 "1 $67,100 1,938.42 FF it67 inn = 157.09 Acres $4 ,290 = 2 Each $34.72/FF $428.42/Acre $2,145 /Each APPENDIX B Preliminary Assessment Roll Sibley Terminal Industrial Park - Yankee Doodle Road City of Eagan Project 661R NOTE: Assessment calculations use footages in Column 3 to calculate Column 5 and percent area in Column 4 to calculate Column 7. 1 2 3 4 5 6 7 8 Legal Property Frontage - Tributary Street Driveway Area Total Assess. Descr. ID No. Yankee Area Assess. Assess. Benefit Doodle Road ® ® 2,145.00 0 East of 34.72/ EA $428.42/ Terminal FF Acre Drive Block 1, Lot 1 10- 68050-010-01 0 3.93 0 0 1,683.68 1,683.68 Block 1, Lot 2 10- 68050-020-01 0 5.12 0 0 2,193.49 2,193.49 Block 1, Lot 3 10-68050-031 -01 0 1.00 0 0 771.15 771.15 10- 68050-032 -01 2.07 886.82 886.82 Block 1, Lot 4 10-68050 -041 -01 0 4.10 0 0 1,756.51 1,756.51 10-68050-042 -01 1.19 509.82 509.182 Block 1, Lot 5 10-68050 -050-01 0 4.42 0 0 1,893.60 1,893.150 10-68050-062 -01 0.74 317.03 317.03 Block I, Lot 6 10-68050 -061 -01 0 4.77 0 0 2,043.55 2,043.55 Block 1, Lot 7 10- 68050-070-01 0 6.58 0 0 2,818.98 2,818.98 Block 1, Lot 8 10-68050-080-01 0 4.69 0 0 2,009.27 2,009.27 Block 1, Lot 9 10- 68050 - 090-01 0 4.42 0 0 1,893.60 1,893.60 Block 1, Lot 10 10-68050 -100-01 0 3.71 0 0 1,589.43 1,589.43 Block 1, Lot 11 Parcel A 0 2.00 0 0 856.83 856.83 Parcel B 0 1.75 0 0 749.23 749.73 Block 2, Lot 1 10-68050-011 -02 0 1.98 0 0 848.27 848.27 10- 68050-010 -02 2.24 959.65 959.65 Block 2, Lot 2 10-68050- 020-02 0 4.19 0 0 1,795.07 1,795.07 Block 2, Lot 3 10- 68050-030-02 0 0.78 0 0 334.17 334.17 10- 68050-031-02 0.78 334.17 334.17 10-68050-032 -02 1.07 458.41 458.41 10-68050-033 -02 0.81 347.02 347.02 Block 2, Lot 4 10- 68050-040-02 0 3.83 0 0 1,640.84 1,640.84 Block 2, Lot 5 10- 68050- 050-02 0 3.98 0 0 1,705.10 1,705.10 Revised June 17, 1994 1121005- 1S01jun 1 2 3 4 5 6 7 8 Legal Descr. Property ID No. Frontage - Yankee Doodle Road East of Terminal Drive Tributary Area Street Assess ® 34.72/ FF Driveway Assess. @ 2,145.00 EA Area Benefit $428.42/ Acre Total Assess. Block 2, Lot 6 10-68050 -060-02 0 4.31 0 0 1,846.48 1,846.48 Block 2, Lot 7 10-68050-070-02 0 2.97 0 0 1,272.40 1,272.40 Block 2, Lot 8 10- 68050 - 081-02 10- 68050-082 -02 0 3.23 1.07 0 0 1,383.79 458.41 1,383.79 458.41 Block 2, Lot 9 296.02 0 10,277.81 0 0 10,227.81 Best Brands; Lot 1, Block 1 363.64 0 12,625.58 4,290.00 0 16,915.58 Government Lot 6 SE 1/4 Section 8 011 -76 161.00 8.62 5,589.92 0 3,692.95 9,282.87 Government Lot 6 SE 1/4 Section 8 020-76 297.63 0 10,333.71 0 0 10,333.71 R.L.Johnson 2nd Addition 10- 39901 -010-01 640.13 9.51 22,225.31 0 4,074.24 26,299.55 Comsery No. One 10- 18200-011 -01 180.00 19.14 6,249.60 0 8,199.90 14,449.50 Mardelann Outlot B 10- 47285-020-00 0 12.73 0 0 5,453.75 5,453.75 Comsery No. One (Partial) 10- 18200-012 -01 0 13.01 0 0 5,573.70 5,573.70 Comsery No. One (Partial) 10- 18200-013 -01 0 4.75 0 0 2,034.98 2,034.98 Valley Acres 10- 81180-010-01 0 6.80 0 0 2,913.23 2,913.23 TOTAL FRONTAGE OR ACREAGE 1938.42 157.09 ASSESSMENT RECOVERY 67,301.93 4,290.00 67,300.02 138,891.95 112/005-1501.jua Revised June 17, 1994 COISl LTLIG EIGIIEERS 1326 Energy Park Drive St. Paul, MN 55108 612-644-4389 Fax: 612-644-9446 9800 Shelard Parkway Minneapolis, MN 55441 612. 546.0432 Fax: 612-544-6398 To: Eagan Public Works Staff . d City Council From: Steve Gatlin Subject: Addendum o . une 15, 1994, Feasibility Study for Sibley Terminal Industrial Park Area File: 112 - 005 -12 Date: June 28, 1994 (Revised) INTRODUCTION MEMORANDUM We have been asked to prepare an addendum to the feasibility report analyzing the proposed improvements to Yankee Doodle Road in the Sibley Terminal Industrial Park area, dated June 15, 1994. That report analyzes improvements to Yankee Doodle Road as requested by the City Council and discussed at recent Council meetings. The improvements include partial reconstruction, milling, and overlay of Yankee Doodle Road from Terminal Drive to TH 13. The proposed method of assessment, as directed by City Council, includes a front foot assessment for 50% of the cost to frontage abutting Yankee Doodle Road from Terminal Drive to TH 13. The remaining 50% of the project costs is proposed to be assessed on an area basis to all other property in the area not having direct frontage on Yankee Doodle Road, but having access to it via Terminal Drive, Yankee Drive, or Yankee Doodle Road north of Terminal Drive. The results of our investigation are summarized in the feasibility report prepared on June 15th. DISCUSSION The City staff and Council have received a request from property owners to consider an additional alternative. That alternative is simply, in lieu of the reconstruction of Yankee Doodle Road in the failed areas, patching selected deteriorated areas. The entire section would then be milled and overlaid to provide a uniform pavement surface condition. It was suggested that costs for this alternative be analyzed and an assessment roll prepared using the same method of allocating the costs as was used in the June 15th feasibility report. Fifty - percent of the costs of this project would be apportioned to the frontage on Yankee Doodle Road from Terminal Drive to TH 13, and the remaining 50% would be assessed on an area basis to all other property benefitting from the improvement who would use Yankee Doodle Road at TH 13 for access, but do not have direct abutting frontage. 005.2002jun ceo Memorandum June 28, 1994 Page Two A summary of the cost for this alternative and a preliminary assessment roll are attached. Note that the cost for this alternative is estimated to be $67,600. Using the assessment scenario as described, the assessment rate would be approximately $17.44 per front foot for property on Yankee Doodle Road and the area assessment rate would be $215.16 per acre. It should be noted that this assessment would be levied over the estimated period of the life of the improvement, which we would assume to be ten years. For this analysis, we assumed the following: 1. Because of unstable subgrade and poor subsoil drainage, the patched and overlaid section would have a useful life of 5 to 10 years. We used a figure of 10 years representing the maximum life cycle. Typical life of a roadway would be 30 years; therefore, improvements would have to be redone several times during the life of this roadway. Based on the fact that this improvement is not consistent with City of Eagan standards, all costs for the improvement would be assessed and there would be no City participation as would be a typical case for a standard reconstruction project. However, routine seal coating would be paid for by the City. 2. If the roadway were improved as recommended in the June 15th feasibility study, an overlay would be installed at mid -life for the project on Yankee Doodle Road at approximately Year 20. Estimated cost of that overlay in today's dollars would be $45,000. By City policy, this cost would be assessed. Also, the road would be sealcoated in years 5, 12, and 25 at a cost of $4,000 for each application, paid by the City. 3. As noted for the patch and overlay scenario, intermittent improvements would have to be done at years 10 and 25. The improvements would include, as a minimum, complete patching of the failed areas and sealcoating of the entire roadway. At mid - life of the improvement, a complete pavement repair and mill and overlay would have to be redone of the entire segment. Also, in years 5 and 20, the entire road would be sealcoated. 4. For the original scenario and the patch and overlay scenario, the following economic analysis would be used. For the original reconstruct and overlay project, the initial investment of $196,600 would have to be made at the beginning of the project. At year 20, an overlay would also have to be installed to restore the surface condition of the roadway. Estimated cost of the overlay is $45,000. In addition, sealcoating at years 5, 12, and 25 would be done at a cost of $4,000 per application. Total investment for this alternative is $253,600. Following City policy, $62,000 of the initial cost and $12,000 of the mid -life sealcoating would be City funded. Therefore, oos.zooz;un Memorandum June 28, 1994 Page Three the total cost participation would be $179,600 in assessments and $74,000 in City of Eagan costs, for a total investment during the life of the roadway of $253,600. For the second scenario, the investment of $67,600 would have to be made at the beginning of the improvement. At year 15, the entire improvement would have to be redone because of the anticipated failure of the pavement. Also, at years 10 and 25, repatching of the low area and sealcoating of the entire roadway would have to be redone at an estimated cost of $50,000 per improvement. Also, the road would have to be sealcoated at years 5 and 20. This cost of $8,000 ($4,000 per application) would be funded by the City. Thus, the total value of pavement expenditures over the life of the improvement, again estimated at 30 years, would be $243,200. Since this improvement would be done in a manner not consistent with City of Eagan standards, all costs except routine sealcoating would be assessed throughout the life of the improvement. Total cost of $235,200 would be assessed every 5 or 10 years as the improvements are done. SUMMARY AND CONCLUSIONS As both the original feasibility report alternative and the addendum are analyzed, the overall investment is very nearly the same -- $253,600 for the feasibility report alternative and $243,200 for the alternative analyzed in the addendum. However, the improvements would have to be nearly fully funded by benefitting properties under the second scenario except routine sealcoating. $235,200 would be assessed. Under the feasibility report alternative, $179,600 would be assessed. A graphic showing the investment made in the improvement throughout the life of the project and the assessment period is shown to illustrate the difference between the two alternatives. In summary, it is recommended that the improvement be ordered by the City Council as outlined in the June 15th feasibility report. The patch and overlay alternative does not correct subgrade deficiencies, including unstable material and moisture problems, if storm sewer improvements are not done and curb and gutter improvements are not made. The overall benefit to the public would best be realized by ordering the improvement as outlined in the June 15th alternative. Also, the overall costs to the property owners would be reduced by ordering improvement as originally considered. SG:tw 005- 2002.jun l� � COST ESTIMATE: PATCH /OVERLAY YANKEE DOODLE ROAD Milling 6,000 SY 1.25 • 7,500 Crack seal 2,000 LF 0.80 1,600 Bituminous patch 800 SY 17.75 14,200 2341 bituminous wear course 1,000 TON 24.00 24,000 Subtotal $47,300 Contingencies (10 %) 4,730 Estimated Construction Cost $52,030 Engineering and Administration (30 %) 15,609 TOTAL COST - OVERLAY SEGMENT $67,600 PRELIMINARY ASSESSMENT MODEL SIBLEY TERMINAL INDUSTRIAL PARK - YANKEE DOODLE ROAD PATCH /OVERLAY ALTERNATIVE CITY OF EAGAN PROJECT NO. 661 -R BASIS OF STREET ASSESSMENT. 112/005.2001 }un Acsessment Bituminous Street Repair (patch /overlay) $67,600 - 0 - Concrete Curb Repairs (none) - 0 - - 0 - Storm Sewer Repairs (none) - 0 - - 0 - Driveway Assessment (none) (as requested) - 0 - Sanitary Sewer/Watermain Repairs (none) - 0- - (1- $67,600 (100 %) - 0 - (0 %) TOTAL PROJECT COST $67,600 Basis: 50% Front Foot, 50% Area Assessment Street Assessment: V3 R00 = 1,938.45 FF $'1100 = 157.09 Acres Le5 $215.16 /Acre June 28, 1994 City $17.44/FF CITY OF EAGAN SIBLEY TERMINAL INDUSTRIAL PARK PROJECT 661 -R COST COMPARISON - ADDENDUM VS. ORIGINAL REPORT AT .TF.RNATF. 1 (June 15 Feasibility Report) Assumptions: Assess initial project over 10 years, overlay at year 20 assessed over 10 years. Sealcoating done at years 5, 12, and 25 funded by City. Initial Project Sealcoat Sealcoat Overlay Sealcoat Complete Total Cost 196,600 4,000 4,000 45,000 4,000 Reconstruction City 62,000 4,000 4,000 0 4,000 Assessment 134,600 0 0 45,000 0 0 AT .TF.RNATE 9 (June 28 Addendum) EXN- 112.005 0 5 EXHIBIT 1 5 12 10 15 20 20 25 25 June 28, 1994 30 Assumptions: Initial project done and repeated at year 15. Patch repairing and complete sealcoating done at years 10 and 25. Also, routine sealcoat, funded by City, completed in years 5 and 20. Since design /construction is not consistent with City policy, all costs for work assessed (except routine sealcoating in years 5 and 20). Initial Project Repairs/ Redo Initial Repairs/ Complete (Patch/Overlay) Sealcoat Patch/SC Project Sealcoat Patch/SC Reconstruction Total Cost 67,000 4,000 50,000 67,000 4,000 50,000 City 0 4,000 0 0 0 0 Assessment 67,000 0 50,000 67,000 4,000 50,000 30 ANAT .YSTS• Street Life Cycle Costs for Two Alternatives Alternative 1 Al ternative 9 Total Cost: $253,600 $243,200 City Cost: 74,000 8,000 Assessment: 179,600 235,200 June 28, 1994 The reconstruct/overlay alternative will cost slightly more over the life of the roadway, but the patch /overlay alternate will result in higher assessments to property owners over the life of the road. EXH- 112.005 to S PRELIMINARY ASSESSMENT ROLL Sibley Terminal Industrial Park - Yankee Doodle Road Patch /Overlay City of Eagan Project 661R NOTE: Assessment calculations use footages in Column 3 to calculate Column 5 and percent area in Column 4 to calculate Column 7. 1 2 3 4 5 6 7 8 Legal Property Frontage - Tributary Street Driveway Area Total Assess.. Descr. ID No. Yankee Area Assess. Assess. Benefit Doodle Road Q @ 2,145.00 East of 17.44/ EA $215.16/ Terminal FF Acre Drive Block 1, Lot 1 10- 68050- 010 -01 0 3.93 0 0 845.58 845.58 Block 1, Lot 2 10- 68050- 020 -01 0 5.12 0 0 1,101.62 1,101.62 Block 1, Lot 3 10- 68050- 031 -01 0 1.00 0 0 387.29 387.29 10- 68050- 032 -01 2.07 445.38 445.38 Block 1, Lot 4 10- 68050 -041 -01 0 4.10 0 0 882.16 882.:16 10- 68050 -042 -01 1.19 256.04 256.04 Block 1, Lot 5 10- 68050-050-01 0 4.42 0 0 951.01 951.01 10- 68050 - 062 -01 0.74 159.22 159.22 Block 1, Lot 6 10- 68050 - 061 -01 0 4.77 0 0 1,026.31 1,026.31 Block 1, Lot 7 10- 68050- 070-01 0 6.58 0 0 1,415.75 1,415.75 Block 1, Lot 8 10- 68050- 080-01 0 4.69 0 0 1,009.10 1,009.1() Block 1, Lot 9 10 -68050 -090 -01 0 4.42 0 0 951.01 951.01. Block 1, Lot 10 10- 68050 - 100-01 0 3.71 0 0 798.29 798.29 Block 1, Lot 11 Parcel A 0 2.00 0 0 430.32 430.32 Parcel B 0 1.75 0 0 - 376.53 376.53 Block 2, Lot 1 10- 68050-011 -02 0 1.98 0 0 426.02 426.02 10- 68050-010 -02 2.24 481.96 481.96 Block 2, Lot 2 10- 68050- 020 -02 0 4.19 0 0 901.52 901.52 Block 2, Lot 3 10 -68050 -030 -02 0 0.78 0 0 168.61 168.61. 10- 68050- 031 -02 0.78 168.61 168.61. 10- 68050 -032 -02 1.07 230.22 230.22 10- 68050- 033 -02 0.81 174.28 174.28 Block 2, Lot 4 10- 68050 -040 -02 0 3.83 0 0 824.06 824.06 Block 2, Lot 5 10- 68050 -050 -02 0 3.98 0 0 856.34 856.34 112/005- 2003jun 6c, June 28, 1994 1 2 3 4 5 6 7 8 Legal Descr. Property ID No. Frontage - Yankee Doodle Road East of Terminal Drive Tributary Area Street Assess. @ 17.44/ FF Driveway Assess. @ 2,145.00 EA Area Benefit @ $215.16/ Acre Total Assess. Block 2, Lot 6 10 -68050 -060-02 0 4.31 0 0 927.34 927.34 Block 2, Lot 7 10- 68050- 070 -02 0 2.97 0 0 639.03 639.03 Block 2, Lot 8 10- 68050- 081 -02 10- 68050- 082 -02 0 3.23 1.07 0 0 694.97 230.22 694.97 230.22 Block 2, Lot 9 296.02 0 5,162.59 0 0 5,162.59 Best Brands; Lot 1, Block 1 363.64 0 6,341.88 0 0 6,341.88 Government Lot 6 SE 1/4 Section 8 011 -76 161.00 8.62 2,807.84 0 1,854.68 4,662.52 Government Lot 6 SE 1/4 Section 8 020-76 297.63 0 5,190.67 0 0 5,190.67 R.L.Johnson 2nd Addition 10- 39901 -010 -01 640.13 9.51 11,163.87 0 2,046.17 13,216.04 Comsery No. One 10- 18200 - 011 -01 180.00 19.14 3,139.42 0 4,118.16 7,257.58 Mardelann Outlot B 10 -47285 -020 -00 0 12.73 0 0 2,738.99 2,738.99 Comsery No. One (Partial) 10 -18200 -012 -01 0 13.01 0 0 2,799.23 2,799.23 Comsery No. One (Partial) 10- 18200-013 -01 0 4.75 0 0 1,022.01 1,022.01 Valley Acres 10- 81180 -010-01 0 6.80 0 0 1,463.09 1,463.09 TOTAL FRONTAGE OR ACREAGE 1938.42 157.09 ASSESSMENT RECOVERY 33,806.27 0 33,801.12 67,607.39 I12 /003- 2003.jun 4 `l June 28, 1994 9 \ • • TERMINAL DR. YANKEE DOODLE ROAD The following is a drawing illustrating the existing areas on Yankee Doodle Road that were replaced due to construction both done by the city and those contracted out. Beginning at Terminal Drive, and moving east, the following areas where reconstruction took place; 7. The water hook up to 1750 Yankee Doodle Drive, 200 ft west of highway #13 right of way. (12 1. The installation of the Valley gutter at the intersection of Terminal Drive and Yankee Doodle Road. (1991) PuQLJ 2. The installation of the Best Brands driveway. ( Pa, vATE 3. The connection of Yankee Drive(Comsery Drive) and Yankee Doodle Road and utilities hook up. (1983) p,,,,, c. 4. The construction of the building at 1750 Yankee Doodle Road, and connecting to the sanitary sewer. (1986) pR,vArE 5. The installation of the driveway to 1750 Yankee Doodle Road. (1986) PR t ✓ATE 6. The installation of water main down the lot line during the Best expansion. (1993) PR ,varE (1986) PR ware- YANKEE DOODLE ROAD The following area were milled and patched by the city, highlighted in yellow, (beginning at Highway 13 and ending at Terminal Drive): lft X 75 ft joint repair with 1987 crackseal 2'X 4', 3'X 3', 2'X 2', 2'X 2', 2'X 2', 2'X 4' 7'X 8', 6'X 14', 2'X 7', 5'X 8' 1'X 40', 2'X 7' 2'X 7', 2'X 6', 2'X 49', 2'X 4', 2'X 2', 2'X 4' 4'X 2', 3'X 43', 8'X 40 o Agenda Information Memo July 5, 1994 City Council Meeting NEW BITS INESS APPOINTMENT /APRNRC A. Appointment, Advisory Parks, Recreation and Natural Resources Commission Vacancies - -Due to resignations, currently there are two vacancies existing on the Advisory Parks, Recreation and Natural Resources Commission. The City submitted an article to the local newspapers soliciting residents interested in being appointed to this Commission. The current alternate to the Commission, Michael Vincent, has indicated that he would be interested in being appointed to a regular membership on the Commission. Also, the City has received a letter from Sherie M. Wallace indicating interest in being appointed as a regular Commission member. Enclosed o page' 3-- is a copy of Mr. Vincent's letter. Enclosed on pages 13 through I sis a copy of Ms. Wallace's letter. One of the vacant regular positions will expire as of December 31 of this year. The other vacant position will expire as of December 31, 1995. It would be appropriate at this time for the Council to indicate whether or not one or both of the applicants should be appointed to regular Commission membership. The Council should also indicate which applicant should be appointed to which term. If both regular memberships are filled and the alternate position is therefore vacant, the Council then should direct staff to advertise for a replacement for the alternate membership on this Commission. ACTION TO BE CONSIDERED ON THIS ITEM: 1) To approve or deny an appointment to the Advisory Parks, Recreation and Natural Resources Commission for a term ending December 31, 1995. 2) To approve or deny an appointment to the Advisory Parks, Recreation and Natural Resources Commission for a term ending December 31, 1994. 3) If the current alternate member to the Commission is appointed to a regular membership, to approve or deny advertising for a replacement for the alternate membership. � CITY OF EAGAN City Administrator Thomas Hedges 3830 Pilot Knob Road Eagan, MN. 55122 -1897 Dear Mr. Hedges: Michael !1 s cent APRNR As a current one year alternate member with the Advisory Parks, Recreation & Natural Resources Commission, it has come to my attention that an opening for the Advisory Parks, Recreation & Natural Resources Commission is available for the three year member. I would like to be considered for the above three year term. Please let me know s at my next course of action should be. JUN 29 June 22, 1994 w Thomas Hedges City Administrator City of Eagan 3830 Pilot Knob Road Eagan, Minnesota 55122 -1897 Dear Tom: THE WALLACE GROUP PUBLIC RELATIONS • MARKETING COMMUNICATIONS • QUALITY TRAINING P.O. Box 36066 • Minneapolis, Minnesota 55435 • 612 341 -2100 3138 -B Farnum Drive • Eagan, Minnesota 55121 • (fax) 612 452 -3504 June 20,1994 U r C -C�- - C i JUN 2 3 I I am writing to express my interest in becoming a member of the Eagan Advisory Parks and Natural Resources Commission. To provide you and Council Members with a sense of whether I could make a contribution I would like to share some of my background with you. One of the reasons that my husband and I moved to Eagan was its splendid parks system, which I use regularly. As an active person, I walk and run regularly, both with and without my golden retriever. I have run marathons and was the Minnesota triathlete champion in my age group in 1987. My ties to the athletic community remain strong, including activities with the Kaiser Roll, which I helped as a key volunteer for many years, and with ALARC, the American Lung Association Running Club. Biking is still an interest, although it has been many years since I led bike tours for the Sierra Club, and completed the cross country skiing/biking/canoeing/ running marathon activities held in outstate Minnesota and Wisconsin, I value those experiences. I have made full use of the park and recreation facilities in every community in which I have lived and value their contribution in giving a healthy balance to my lifestyle and to each of those communities. Professionally, I am a partner in the Wallace Group, an Eagan-based marketing communications and public relations firm, which serves a wide variety of organizations. Previously, I was with AAA Minnesota for 10 years and assignments ranged from supervising training at the organization's service center in Apple Valley to marketing programs which included facility redesign of AAA's 26 offices around the state. Needless to say, keeping abreast of community activities was always important. Earlier, I was director of counseling for the Job Corps in St. Paul. I am a science graduate of the University of Washington and earned my master's degree in counseling from what is now the University of St. Thomas in St. Paul. My professional training has been rounded out with a series of seminars and workshops. As Eagan heads for the next century, a number of important decisions will have to be made on appropriate development and the character of our community If possible, I would like to make a contribution to the work of shaping the Eagan of the future. I will be pleased to provide whatever additional information that you might find helpful. About Sherie Mentzer Wallace... Sherie Mentzer Wallace is a partner and senior consultant in marketing, organizational development and training with the Wallace Group, a marketing communications and business consulting firm serving the Upper Midwest. An experienced counselor on customer service policies and practices, Wallace places special emphasis on quality management facilitation and customized training programs. Wallace helped form the organization after serving in the marketing, member services and human resources departments of the American Automobile Association in Minnesota. At AAA, she organized training programs and established standards for the organization's member services department. Earlier, Wallace carried out a major redesign and updating of the organization's almost 30 offices across the state and its telecommunications systems. A former director of counseling for the U.S. Job Corps in St. Paul, Wallace has used group facilitation skills to enhance teamwork and group decision making. She was a consultant on the design of a new customer service center for GE Capital Services and has worked with numerous corporations and nonprofit organizations on market trends, retail operations and sales and marketing strategies. An Education and Natural Science graduate of the University of Washington, Seattle, Wallace earned an M.A. in Counseling from the University of St. Thomas, St. Paul. Wallace is a member of the American Society for Training and Development, the Society for Marketing Professional Services and the American Society for Quality Control. Earlier, she was a board member of the International Facility Management Association and served as chair of its Education Committee. Active in community, charitable and athletic organizations, Wallace has been involved with the Kaiser Roll, the Eagan Community Partnership, battered women's shelters, the American Lung Association Running Club and the Minneapolis Ski Club. She is a past state triathlon champion and competes in marathons and long distance cross country ski events. Wallace is married and resides in Eagan. Agenda Information Memo July 5, 1994 City Council Meeting PRELIMINARY PLAT /BACHEL'S BACKYARD B. Preliminary Plat, Bachel's Backyard /Al and Mary Kay Bachel, consisting of 2.81 acres for one single family lot and one outlot on Lot 14, Zehender Acres located in the SE 1/4 of Section 4- -Al and Mary Bachel are requesting a preliminary plat consisting of one lot and one outlot on 2.8 acres in an R -1 (single family) zoning district located at 1485 Lone Oak Road in the southeast quarter of Section 4 on the north side of Lone Oak Road. The Advisory Planning Commission conducted a public hearing on this item at its meeting of June 28, 1994. The Planning Commission recommends approval of the preliminary plat subject to the five conditions set forth in the staff report. The minutes of the Planning Commission are enclojd on pages 7 ( 0 . through 7? The staff report is enclosed on pages 77 through .. . ACTION TO BE CONSIDERED ON THIS ITEM: To approve or deny the preliminary plat of one lot and one outlot for Bachel's Backyard located at 1485 Lone Oak Road subject to the five conditions recommended by the Advisory Planning Commission. n( MINUTES OF A REGULAR MEETING OF THE EAGAN ADVISORY PLANNING COMMISSION EAGAN, MINNESOTA JUNE 28, 1994 PRELIMINARY PLAT BACHEL'S BACKYARD - AL AND MARY KAY BACHEL Chairman Voracek opened the first public hearing of the evening regarding a Preliminary Plat consisting of 2.81 acres for one single family lot and one Outlot on Lot 14, Zehender Acres located in the SEA of Section 4. Shannon Tyree introduced this item. Ms. Tyree highlighted the information presented in the City staff's planning report dated June 22, 1994, noting the background and history of the subject property, the surrounding uses, the density and the size and setbacks of the proposed lots. Ms. Tyree also noted that the developer does not propose any grading, storm water or water quality improvements or utility extensions. Ms. Tyree further noted that the subject property lies within the Noise Zone IV as defined by the Metropolitan Council's Land Use Development Guide for compatibility with aircraft noise. She advised that Noise Zone IV is considered to be an area of "preventive" land use management and thus it is advised that sound attenuation design and construction standards be used to minimize indoor noise transmission. Ms. Tyree concluded that the proposed '� 4 PAGE 2 /ADVISORY PLANNING COMMISSION MINUTES JUNE 29, 1994 Preliminary Plat is consistent with the City's Comprehensive Guide Plan. The applicants, Al and Mary Bachel, were present and available for any questions. Member Segal inquired with the applicant as to their plans for development of the proposed Outlot. Mr. Bachel stated that he and Ms. Bachel recently purchased a hobby farm in New Prague and are subdividing their property in order to allow them to keep some of their property to move back to in case the hobby farm does not succeed. Paul Kline, a resident of 1490 Lone Oak Road, inquired as to the City's plans for running a road through the property from Skyline to the cul -de -sac to the south of the subject property. Member Voracek responded that before any development may occur on the Outlot, the applicant must come back for approval of their plan, including the location of any roadway. Member Voracek emphasized that the only issue before the APC this evening is whether the subject property should be subdivided. Member Isberg inquired as to whether the Outlot becomes a landlocked parcel due to no apparent access. Ms. Tyree responded that access is available by an extension of the Skyline Road cul -de -sac abutting the north property line of the Outlot. She further stated that currently the applicant has a 20 -foot access right -of -way on the Outlot and will be dedicating an additional 50 feet. Member Merkley inquired as to whether the City has any plans with respect to extending Skyline Drive. Ms. Tyree stated that the applicant's engineer did present a design plan for the Outlot, but emphasized that it is only a "ghost plat" because the property at this time is not being proposed to be developed. Ms. Tyree did note, however, that the applicant's street plan proposes a cul -de -sac in the property's low area and the City would propose that it be moved to the north to a high area. Mr. Kline again inquired as to what the plans are for putting the road through, to which Ms. Tyree clarified that there are no specific plans. Another resident in the area of the subject property stated that the City's Engineering Department told her husband not to build until all streets and utilities are in. She thus inquired as to the existence of any plans for streets and utilities through the property. Community Development Director Peggy A. Reichert responded that the City can give no assurances regarding location of streets but residents do have a right to petition that the streets be put in. Member Voracek added that the issue of subdividing the subject property does not answer the street location question nor does it bear on the issue of the street location to the Outlot. PAGE 3 /ADVISORY PLANNING COMMISSION MINUTES JUNE 29, 1994 Miller moved, Wallace seconded, the motion to approve a Preliminary Plat consisting of 2.81 acres for one single family lot and one Outlot on Lot 14, Zehender Acres located in the SW; of Section 15, subject to the following conditions: 1. These standard conditions of plat approval as adopted by Council action February 3, 1994, shall be compiled with; Al, B1, B3, Cl, F1 and H1. 2. A tree preservation plan shall be submitted when the Outlot is platted. 3. The plat shall be subject to a cash parks dedication and a cash trails dedication. 4. Architectural designs and construction methods for new construction within the development will incorporate sound attenuation standards sufficient to achieve an interior sound level of 45 DBA. 5. A notice will be recorded on each lot indicating that it is located within Metropolitan Council Noise Zone IV. All present voted in favor. PLANNING REPORT CITY OF EAGAN REPORT DATE: June 22, 1994 CASE #: 4- PP- 19 -5 -94 APPLICANT: Al & Mary Bachel HEARING DATE: June 28, 1994 PROPERTY OWNER: Al & Mary Bachel PREPARED BY: Shannon Tyree REQUEST: Preliminary Plat LOCATION: 1485 Lone Oak Road Lot 14, Zehender Acres COMPREHENSIVE PLAN: D -I Single Family Residential (0-3 units /acre) ZONING: R -1 Single Family ,SUMMARY OF REQUEST Al and Mary Bachel are requesting a Preliminary Plat consisting of one lot and one outlot on 2.8 acres in an R -1 single family zoning district located at 1485 Lone Oak Road inthe SE 1/4 of Section 4 on north side of Lone Oak Road. AUTHORITY FOR REVIEW: City Code Section 13.20 Subd. 6 states that "In the case of all platting, the Planning Commission and City Council shall be guided by criteria, including the following, in approving, denying or establishing conditions related thereto:" A. That the proposed subdivision does comply with applicable City Code provisions and the Comprehensive Guide Plan. B. That the design or improvement of the proposed subdivision complies with applicable plans of Dakota County, State of Minnesota, or the Metropolitan Council. C. That the physical characteristics of the site including, but not limited to, topography, vegetation, susceptibility to erosion and siltation, susceptibility to flooding, water storage, and retention are such that the site is suitable for the type of development or use contemplated. D. That the site physically is suitable for the proposed density of development. Planning Report - Bachel's Backyard June 28, 1994 Page 2 E. That the design of the subdivision or the proposed improvements is not likely to cause environmental damage. F. That the design of the subdivision or the type of improvements is not likely to cause health problems. G. That the design of the subdivision or the improvements will not conflict with easements of record or with easements established by judgement of court. H. That completion of the proposed development of the subdivision can be completed in a timely manner so as not to cause an economic burden upon the City for maintenance, repayment of bonds or similar burden. I. That the subdivision has been properly planned for possible solar energy system use within the subdivision or as it relates to adjacent property. (Refer to City Handbook on Solar Access). J. That the design of public improvements for the subdivision is compatible and consistent with the platting or approved preliminary plat on adjacent lands. K. That the subdivision is in compliance with those standards set forth in that certain document entitled "City of Eagan Water Quality Management Plan for the Gun Club Lake Watershed Management Organization" which document is properly approved and filed with the office of the City Clerk hereinafter referred to as the "Water Quality Management Plan ". Said document and all of the notations, references and other information contained therein shall have the same force and effect as if fully set down herein and is hereby made a part of this Chapter by reference and incorporated herein as fully as if set forth herein at length. It shall be the responsibility of the City Clerk to maintain the Water Quality Management Plan and make the same available to the public. $ACKGROUND/HISTORY: This lot was platted in 1950 as Lot 14 Zehnder Acres. When Prettyman Heights Addition was platted in 1989, it was platted with two cul -de -sacs extending west from what was then Auge Court (now Skyline Drive). It is the intention of the applicant to sell his home on Lot 1 and retain ownership of the newly created outlot for future development. No development is proposed for Outlot A at this time and any proposed development would require standard platting procedures. 0 Planning Report - Bachel's Backyard June 28, 1994 Page 3 EVALUATION OF REQUEST: A. Surrounding Uses. The following existing uses, zoning, and comprehensive guide plan designations surround the subject property: North - residential: Prettyman Heights Addiiton & Treffle Acres; zoned R -1; designated D -I. South - residential: Oslund Timberline Addition; zoned R -1; designated D -I. East - residential: Zehender Acres; zoned R -1; designated D -I. West - residential Prettyman Heights & Zehender Acres; zoned R -1; designated D -I. B. Preliminary Plat Review. Density, The proposed density for the development is 1.40 units /acre. Lata, Lot 1, Block 1, is 40,000 s.£; Outlot A, is 82,600. The total site area is 2.81 acres. Setbacks, The City Code requires a 50' setback from Lone Oak Road. The existing house on Lot 1, Block 1, is located approximatly 10' from the property line and approximatly 20' from the curb. The existing structure was built in 1959 and is a legal non - conforming structure. Tree Preservation It is not neccessary to obtain a tree preservation plan at this time, however, when a building permit is applied for it will be neccessary to submit one at that time. Grading/Wetlands The developer does not propose any grading with this application. The site contains rolling topography with a low area in the center of the site. City staff visited the site and confirmed that there are no jurisdictional wetlands on this site. The low area in the center of the site contains well - drained soils and, therefore, this area is not a wetland. Storm Drainage/Water Ouality This developer does not propose any storm sewer or water quality improvements with this application. This proposed lot split is in the lower reaches of Drainage Basin D. There are no recreational classified waterbodies downstream. The lot to be platted has already been developed and the remainder of the site will be platted as an outlot. In keeping with established policy, no cash dedication for water quality should be required for this development at this time. However, a water quality cash dedication will be required when the outlot is platted to allow development at a future date. F I Planning Report - Bachel's Backyard June 28, 1994 Page 4 Utilities No utility extensions are being requested by the applicant at this time. The existing house on Lot 1 is connected to the City's sanitary sewer to the northeast and to City water to the south from a 12" watermain in Lone Oak Road. An 8" sanitary sewer and a 6" watermain were stubbed to the northeast corner of the Outlot in 1989 under City Project 89 -F. If the Outlot develops in the future, then sewer and water service would be available from Skyline Road in the northeast corner of the Outlot. Access /Street Design Street access is currently provided to the existing house on proposed Lot 1 from Lone Oak Road. Street access for the Outlot would be provided from the future extension of Skyline Road. Skyline Road was upgraded in 1989 to a 32 -foot wide bituminous street to serve the Prettyman Heights development. Easements /Right -of -Way The preliminary plat shows that right -of -way will be dedicated in the northeast corner of the Outlot to allow for the future extension of Skyline Road. parks and Recreation. At its June 20, 1994 Advisory Parks, Recreation and Natural Resources Commission meeting it was recommended that the development be responsible for a cash parks dedication and a cash trails dedication. In addition, that the development not be subject to any water quality dedication. Airport Noise The property lies within the Noise Zone IV defined by the Metropolitan Council's Land Use Development Guide for Compatibility with aircraft noise. The proposal is considered to be in -fill within the context of the guidelines. As such, residential development is considered to be conditional and local units of government should consider the following: 1. Specific nature of the proposed use, including extent of associated outdoor activities. 2. Relationship of proposed use to other planning considerations, including adjacent land use activities, consistency with overall comprehensive planning and relation to other metropolitan systems. 3. Frequency of exposure of proposed uses to aircraft overflight. 4. Location of proposed use relative to aircraft flight tracks and aircraft on- ground operating and maintenance areas. Planning Report - Bachel's Backyard June 28, 1994 Page 5 5. Location, site design and construction restrictions to be imposed by the community of the proposed use with respect to reduction of exterior to interior noise transmissions and shielding of outdoor activities. 6. Method community will use to inform future occupants of proposed building of potential noise from aircraft operations. 7. Extent to which the community restricts the building from having facilities for outdoor activities associated with the use. 8. Distance of proposed use from existing or proposed runways, parallel taxiways or engine run -up areas. The site is located approximately two miles from the nearest runway end, but due to operating procedures, most traffic is maintained to the north of the site. While the site is approximately the same distance from the taxiways and run -up areas, the principal aircraft noise source in this location will be from sideline noise from arriving and departing aircraft. Noise Zone IV is considered to be an area of "preventive" land use management larger than and outside of the 65 DNL contour in which corrective measures are to be used. Because the surrounding area is existing residential with typical outdoor uses, in -fill residential development would not be prohibited. It would be important however to apply performance standards which will minimize indoor noise transmission and ensure notification of noise exposure to prospective future owners. A builder's guide is available from staff which outlines sound attenuation designs and construction methods. Compatibility with Surrounding Area. The area completely surrounding this proposed development is guided D -I single family residential. This development conforms to the area wide existing uses of single family residential. SUMMARY /CONCLUSION, The proposed Preliminary Plat of Bachel's Backyard is consistant with the City's Comprehensive Guide Plan and is similar to the type of existing residential. Planning Report - Bachel's Backyard June 28, 1994 Page 6 ACTION TO BE CONSIDERED To approve or deny the Preliminary Plat of one lot and one outlot for Bachel's Backyard. If approval of the plat is recommended it shall be subject to the following conditions: Standard Conditions 1. These standard conditions of plat approval as adopted by Council action February 3, 1994 shall be complied with: Al, Bi, B3, Cl, Fl, H1 Tree Preservation 2. A tree preservation plan shall be submitted when the Outlot is platted. parks and Recreation 3. The plat shall be subject to a cash parks dedication and a cash trails dedication. Airport Noise 4. Architectural designs and construction methods for new construction within the development will incorporate sound attenuation standards sufficient to achieve an interior sound level of 45 dBA. 5. A notice will be recorded on each lot indicating that it is located within Metropolitan Council Noise Zone IV. A. Financial Obligations 1. This development shall accept its additional financial obligations as defined in the staff's report in accordance with the final plat dimensions and the rates in effect at the time of final plat approval. B. Easements and Rights -of -Way 1. This development shall dedicate 10 -foot drainage and utility easements centered over all lot lines and, in addition, where necessary to accommodate existing or proposed utilities for drainage ways within the plat. The development shall dedicate easements of sufficient width and location as determined necessary by engineering standards. 2. This development shall dedicate, provide, or financially guarantee the acquisition costs of drainage, ponding, and utility easements in addition to public street rights -of -way as required by the alignment, depth, and storage capacity of all required public utilities and streets located beyond the boundaries of this plat as necessary to service or accommodate this development. 3. This development shall dedicate all public right -of -way and temporary slope easements for ultimate development of adjacent roadways as required by the appropriate jurisdictional agency. 4. This development shall dedicate adequate drainage and ponding easements to incorporate the required high water elevation plus three (3) feet as necessitated by storm water storage volume requirements. C. Plans and Specifications STANDARD CONDITIONS OF PLAT APPROVAL 1. All public and private streets, drainage systems and utilities necessary to provide service to this development shall be designed and certified by a registered professional engineer in accordance with City adopted codes, engineering standards, guidelines and policies prior to application for final plat approval. 2. A detailed grading, drainage, erosion, and sediment control plan must be prepared in accordance with current City standards prior to final plat approval. 3. This development shall ensure that all dead -end public streets shall have a cul -de -sac constructed in accordance with City engineering standards. 4. A separate detailed landscape plan shall be submitted overlaid on the proposed grading and utility plan. The financial guarantee for such plan shall be included in the Development Contract and shall not be released until one year after the date of City certified compliance. D. Public Improvements 1. tf any improvements are to be installed under a City contract, the appropriate project must be approved by Council action prior to final plat approval. E. Permits 1. This development shall be responsible for the acquisition of all regulatory agency permits required by the affected agency prior to final plat approval. F. Parks and Trails Dedication 1. This development shall fulfill its park and trail dedication requirements as recommended by the Advisory Parks, Recreation and Natural Resource Commission and approved by Council action. G. Water Quality Dedication H. Other 1. This development shall be responsible for providing a cash dedication, ponding, or a combination thereof in accordance with the criteria identified in the City's Water Quality Management Plan, as recommended by the Advisory Parks, Recreation and Natural Resource Commission and approved by Council action. 1. All subdivision, zoning and other ordinances affecting this development shall be adhered to, unless specifically granted a variance by Council action. Advisory Planning Commission City Council Approved: August 25. 1987 September 15. 1987 Revised: July 10 1990 Revised: F ebruary 2 1993 LTS #5 STANDARD.CON FINANCIAL OBLIGATION - Bachel's Backyard There are pay -off balances of special assessments totaling SO on the parcels proposed for platting. The pay -off balance will be allocated to the lots created by the plat. At this time, there are no pending assessments on the parcel proposed for platting. The estimated financial obligation presented is subject to change based upon areas, dimensions and land uses contained in the final plat. Based upon the study of the financial obligations collected in the past and the uses proposed for the property, the following charges are proposed. The charges are computed using the City's existing fee schedule and connections proposed to be made to the City's utility system based on the submitted plans. Improvement Use Rate Quantity Amount Sanitary Sewer Trunk S.F. $775 /lot 1 $ 775 Water Trunk S.F. 810 /lot 1 810 Storm Sewer Trunk S.F. .074 /sq ft 122,600 sq ft 9.072 TOTAL X10,657 CTI Ff Fan tai t �• Ot'ARQ■ rA 'A 1 4.! /f • • s MEN)) /NIfR[1A4£ I r+t ! FR IM / rry1.7 ter. .,° .m.1 fur fit (4 Bachei's Backyard ;1".; ffw 14 cQRT•d g k 1,rpm 1E,?• mil! r..R ter AyAn .ri ;truing.. min 1 , Alt '1TIJSTRMIL / 0 N1. )' 4' if rA' -r -r' . t 1i.; nit! Argiiintn,s, t 1 . 1 (j I , 1 . f i lc. . 6 ... I : - . :' - 1.1...3•:‘ I. ' 1 • 5-. !,,,, • , , , 1‘, , j, , t . :' -7.7. LI . — 1 t ;71 F,fr- -.1 .1- ,_ -.•;.-N , -..•:_-- , ;' - ; = -- .. - .• 1 . ..• - , .: 1 , . ' i 4:4, t _ ,(,.. , ' ''1 , i3 1 ‘ L.utit 1 (.. , % . , / .- • .., j‘ -_- ._ - ... .....' 4 ..... . ".. ":: - . .i) - . - . % • • • • Is - 9. o•... ,Tj „jk., ;.. I ( '''' '''". Z : irrelcck i ';•", i • ,. ); . If :tx :: , -:,-......-::.": i f : .. - : v ' 1 = bt. V " ' . 1 i - . i 1 - :.-:, ,t ,_. 1 PRELIMINARY PLAT: BACHEL'S BACKYARD 1 1 I R I _YJ Scale: 1 inch ■ 100 feet Rotes: 05 -13 -94 .. ,4 0.00(.0.0 ••C 14710 SOUTH ROS 11 ERT TRAIL ROSEMOUNT. MINNESOTA MON 812/423.17 / / : 1 4 ) ; k, 2 / 1 I • I 1 L__ 111D Is0 Q e SKYLINE ROAD O O Revised 05-31-94 06 -09-94 Added Road Dedication DELMAR H. SCHWANZ M SURVEYOR'S CERTIFICATE OUTLOT A ^ 200 N L �o T EFFL E :• -L- — I Proposed Drainage Utility Easements 1 I Utility easement per BLOCK 1 R Doe. 80.371101 • 371089 = I I - I I . — —6-1 *0 r-q R 2 O 0 ' Restricted 9 ' Ac — tONE � Preliminary Plat: RACHEL'S BACKYARD Owner- Developer: Mr. a Mrs Al Rachel Jr. 1185 Lone Oak Road Eagan, 1a Description: : Lot 16, ZEDDIDEP ACRES Areas: Cross Area ■ 122,600 square feat - 2.81 acres Lot 1 - 60,000 square feet Outlet A - 82,162 square feet Road - 458 square feet Present c Proposed Zoning: 8 -1 Single family residential Sheet 1 of 3 es 1. There is an existing bon sod pool on proposed Lot 1. 2. The house on proposed Lot 1 is connected to city sanitary sewer to the northeast and to city water from • water lice on the south side of Lone Rood. ed. Deere, N. senleenr IiirmwOte RpWSb1 1 Ns. SOK 3. Proposed Outlet A has public road access to the north off of Skyline Rood by road dedication in PRLT5YMAR BLIGHTS. Outlet A may he divided in the future with other property. =BENDER 4._City utilities are stubbed to the north line of =BEER ACRES in Skyline Mad 5. No site grading will be dons. 1 mentor wear wear n M 140•01. p a 0 1000 en. 0en es p'elfe' or et roe a .nae my 0•00 we 101 108 1 • 17 0 Lone Sanwa*, ender eey an IM Mn 10 • W IM S1.1. :e:e 04 et ,e 16.efeeOm OMee t / PRELIMINARY' PLAT:`1TBQC &EL'S._ _ E A ifiYARD \ \ '' I r- 2l•: / Orel 5,, :l g. :) . 1 , ..:7:.___._ . .__ . If 1 1 1 � ! /'' 11 / / ,/, i / i t / f i { 1 i / i --_, - 1 i ; L I,1,rn \ Doscriptioa: Area•• Present Mot•se 1 M,eey Openly MM 17.• awry. plot. M report or propose by wo a weep my Merl wronger and rat 1 pea duty Rrpupea Lori Survey*, eae*, wan lawn et we 11wa e1 immee040 05 -11 -94 06 -09 -94 Revised 05 -11 -94 Added Road Dadicatioa DELMAR H. 'SCHWANZ Loo err eon K Irpaem Weft Um, r 1h, am r rift 14710 SOUTH R09SRT TRAIL ROSEYOIMT, YIMHESOTA 10000 11V42347W • SURVEYOR'S CERTIFICATE : - I I ti lli_ ,. S 1 0 i l 1 1 — J P: i -- j•-• g tt \ 1 16U . IV I Its i f + 190 k , ,( • \\ \ ` \ OuV.OT A c, ■ \ 1 R • -1-1 TC Propo.eVia`.naga i I Otilit tats^ ants � • � BLOcK - ti- -• • ( � 'INpJ I' ( \ s _ ., too.. t (\ ` 1 't1 t �_ t 1 k - -- . . LO/Y£ R'04O -. Preliminary Plate RACUEL S 9ACETAfo Owner - Developer: Mr. 1 Mrs Al Rachel Jr. 1485 lone Oat Seed Eagan, NI 1 Lot 14, EOODODl0 ACRES Gross Area • 122,600 square feet - 2.91 eaves Lot 1 - 40,000 square feet Outlet A - 92.142 square feet 6 Proposed Zoning: R -1 Single family residential q( •. • 1 Mood - 419 square feet i J Sheet 2 of 3 1. There is an "mistime house sad pool on proposed Lot 1. 2. The house on proposed Lot 1 is connected to city sanitary sewer to the northeast sod to city water from • rater line on the south side of lone Oak bed. c• r- M.. / ,L 1. Proposed Outlet A Pas public road access to the north off of Stylise load by road dedication in PRETTYMAN HEIGHTS. Outlet A say be divided in the future with other property. 4. City utilities are stubbed to the north line of ZSf11C)ER ACRES in Skyline Road S. Mo site grading will be done. Utility Plan BACBEL'8 BACKYARD Sealer 1 inch w 100 t narsey earflty tnel Mt survey, pen. Of report we* On t»nd by rna of under my direct auparvanon and Inn I on, a duly RPOlalwed Land Surveyor unew Owe Woo of IM Stale W laWlaaela Dome 05 -13 -94 05 -31 -94 1 L 06-09 -94 Added Road Dedication DELMAR H. SCHWANZ UMO a.a ron .+r ftwiftw/Iwl,w Mm,r,.rr..loow 14110 SOUTH RO.ERT TRAIL ROSEMOUNT, YINWE30TA YOM 411/421/7M SURVEYOR'S CERTIFICATE PA"'::" . TY, aA.1 . r i •r ) r T( I ` 1 60 I r / •Prtl r r•ft r X1 1 -/ r .l I I I Ir I 200 T ~ - Inert - Lot 1 8602 Block 1 tzis tisg 12 store Sever See fleeced Plan 21890 or 8418 — 1 C. S.A.N NOzz6 -- tQN( C R071O w Rater Service q � Skyline Road Sheet 3 of 3 Szi.ting 8' PVC plugged at property line Bee Record Plan 21870 . Rai.ting 6' DIP water line plugged at property line See Record Plan 21870 Sanitary Sewer inert w 849.57 Plan grad. Lori sewer inert w 862.7 Plan grade Existing 9'9CP sanitary sewer See Record Plan 45, Project Mo. 14, Sheet 8 Utility easeernt. per Doc. Mo. 371101 1 371089. Serves the bonae on proposed Lot 1- heisting 12' CIP water line which serves th. house on proposed Lot 1. See record Plan No. 43, Sheet 6 \ CITY OF EAGAN FIGURE No. 17 STORM SEWER LAYOUT MAP PONDON) AREAS 1;;, STOW lawlERS tribal& ITTOsso SEWtfli 01•111101114 STORM LIFT STATION SNAMINs1 WORM MIT SUTTON Mrssosed STORM SOROS MAW 4,, 4 .4, .0 40. MAJOR OMSK* our - POND NORMAL !RATIN LEVU.. . . . . . 900 0 SONO WOW WATER MTV. • 900.0 OVtRLANO DRAMA= 1110111TE Scnlet i inch ■ 100 f et PRELIMINARY PLAT: erelimin.ry rink: 0n...er- newnlnpert 0.nerlpttont t A I DELMAR H. SCHWANZ t•.r' m.teroot w top n... 11r50 $Oatu 6 06f at TnAtl RosEuouwt. MIMNESOTA Silas SURVErOR S CEP vIrICATE RACHEL '5 BACKYARD r I .v�tl �' .'i • 1 ' /T . .. I I 1 5 1 4 ) f • 2 -E 3:H —NOP6 RACt1R1.'R RACRTARf Mt. t Piro Al Rechnt Jr. 3405 tune Onk *nod Ragan. RR tot 14. T.►.nr.Rntr ACRT.S cross Arne - 122.600 ,guer, Lot 1 - 40.000 •goose Lot 2 - 92.600 sonar, feet - 2.61 serer fent feet r r_ t t Prni•nned %ening! 8 -1 Ringte family tanit..ntlnl Not...t 1 Mreby e,.UIy MN thn tufvey. pion. 0 rapes eq geomm'.d by one er undo, wry &feet eupervbn and *VI e- a dub Ieg'ne.ed lend Surve w.set 18.1 tees et 10* Meg e) YN•Mleets 05 -11 -94 1. !her. le An erintlnq bonne and fwwtl en proposed Lot 2. 2. The bays, aorthenst Osk Road. a� N t q •1 R t 60 Z 11 l =� s e lreil • t /aa FINANCIAL. OBLIGATION LEGEND T I — , Utility easement per Ono. No.371101 t 371089 0 LONE "ad /( f?914 ti I Sh.et 1 of 7 on prolonged tnt 2 in connected to city sanitary newer to the eed to city voter from w wet.r lire. nn tit.. south 81,10 of lone Sanitary Sewer Trunk Water Trunk e hoF 6asi Storm Sewer Trunk 3. Proposed Lot 1 hen public road access to the north off of Aug. Rood vino, of a road A.Alentinn on the plot of rRr.TTyRAN RPtnrrs. 4. City atlliti.n sro stubbed to the north line nr Lrbmbrit bertrA in Ana.. Rand. 5. kin site grading will he Aone until ink 1 in r.nandlelded or • building 1.eratt 1n •ppllnd for. by Agenda Information Memo July 5, 1994 City Council Meeting PRELIMINARY PLAT /BROMAN ADDITION C. Preliminary Plat, Broman Addition /John and Flora Broman, consisting of 1.42 acres for three single family lots on Lot 11, Treffle Acres located in the SE 1/4 of Section 4- -Flora and John Broman are requesting a preliminary plat consisting of three single family lots on 1.42 acres located on Lot 11, Treffle Acres, at 1461 Skyline Drive. The Advisory Planning Commission conducted a public hearing on this item at its meeting of June 28, 1994. The Advisory Planning Commission recommends approval of this preliminary plat subject to the nine conditions set forth in the staff report. The minutes of the Planning Commission are encl,gAsed on pagesan through along with the staff report on pages `' through Pr'. co ACTION TO BE CONSIDERED ON THIS ITEM: To approve or deny a preliminary plat for John and Flora Broman /Broman Addition for three lots on 1.42 acres subject to the nine conditions recommended by the Advisory Planning Commission. PAGE 4 /ADVISORY PLANNING COMMISSION MINUTES JUNE 29, 1994 PRELIMINARY PLAT BROMAN ADDITION - JOHN AND FLORA BROMAN Chairman Voracek opened the next public hearing of the evening regarding a Preliminary Plat consisting of 1.32 acres for three single family lots on Lot 11, Treffle Acres located in the SE; of Section 4. Project Planner Tyree introduced this item. Ms. Tyree highlighted that information presented in the City staff's planning report dated June 22, 1994, noting the background and history of the subject property, the surrounding uses, the density and the size and setbacks of the proposed lots. No grading is presently proposed, but staff is recommending that a grading, drainage and erosion control plan be submitted to the City with the final plat. Ms. Tyree further noted that there are a total of 38 significant trees on the subject property, including a row of 22 pine trees along Skyline Road. She advised that the realignment of the existing driveway would result in two pine trees being removed, a loss of 5.3% of the total trees on site. She further noted that the alignment of the street connection to Skyline Road has not yet been determined and will depend on the development of the DeLosh property. She noted, however, the City staff recommends a dedication of the easterly 30 feet of the proposed Lot 3 as a street right -of -way in order to accommodate the future street extension to the north from Skyline Road. Ms. Tyree further noted that the property lies within the Noise Zone IV as defined by the Metropolitan Council's Land Use Development Guide for compatibility for aircraft noise. She advised that Noise Zone IV is considered to be an area of "preventive" land use management and thus it is advised that sound attenuation design and construction standards be used to minimize indoor noise transmission. Ms. Tyree concluded that the proposed preliminary plat is consistent with the City's Comprehensive Guide Plan. The applicant, John Broman, requested three amendments to the City staff's recommended conditions. Mr. Broman requested that Condition No. 7 be eliminated or in the alternative, it be amended to require the future builder of Lot 3 to provide the sanitary sewer and water services to that Lot. Mr. Broman reasoned that he is not a developer, but is merely subdividing the property to increase the value of his property as a whole. PAGE 5 /ADVISORY PLANNING COMMISSION MINUTES JUNE 29, 1994 Mr. Broman further requested that Condition No. 8 be eliminated, reasoning that there already exists a 10 -foot easement within the property. He further stated that the location of any proposed street is speculative and the tentatively planned location of the street would not be advantageous to the owner of the land for which the right -of -way is proposed. Finally, Mr. Broman requested that Condition No. 9 be eliminated, reasoning that there is no certainty that Lot 3 will be developed separately from Lot 2 as to require the removal of the driveway from Lot 3. He further stated that the removal of the driveway can be made a condition of the sale, and not platting. Design Engineer John Wingard responded to Mr. Broman's requests. Mr. Wingard stated that all the conditions were established in order to accommodate Lot 3 and therefore, they should remain as conditions of the Preliminary Plat. With respect to Condition No. 7, he stated that when the City improved Skyline Drive, staff believed the applicant's parcel would be divided into two lots, not three, and therefore, the City installed two sanitary sewer and water service stubs. He further stated that Lot 3 may be tied into the DeLosh stubs instead of stubbing to the Skyline Drive. With respect to Condition No. 8, Mr. Wingard stated that the easement will give the City flexibility in establishing the location of the road. Member Segal inquired of Mr. Wingard as to whether there are any problems by making the service connection a condition of sale or building permit. Mr. Wingard responded that it is problematic because there is no method of guaranteeing the work will be completed through the building permit process, as there is with a developer, from whom the City gets a letter of credit. Discussion ensued between Mr. Broman and Commission members regarding the reasoning for the subdivision of the property and the intent to improve each lot in the future. Mr. Broman stated that it is unreasonable to spend the money to tear up the street to place a service connection when it is an unknown if the lot will ever be used. Community Development Director Reichert stated that with the granting of a preliminary plat, an applicant has one (1) year to meet all the conditions for final plat before the preliminary plat expires. Therefore, as PAR explained, the applicant may have no costs until the final plat; within the one year period the applicant should know whether the parcels will be sold. Member Miller stated that based on the information just given by Ms. Reichert, the applicant is not injured by requiring the conditions. PAGE 6 /ADVISORY PLANNING COMMISSION MINUTES JUNE 29, 1994 Segal moved, Miller seconded, the motion to approve a Preliminary Plat consisting of 1.32 acres for three single family lots on Lot 11, Treffle Acres located in the SW; of Section 4 subject to the following conditions: 1. These standard conditions of plat approval as adopted by Council action on February 3, 1993. Al, B1, B3, Cl, C2, El, F1, G1, and H1. 2. This development shall be subject to a water quality cash dedication. 3. This development shall be subject to a cash parks dedication and a cash trails dedication. 4. Individual tree preservation plans shall be required at the building permit time for Lots 1 and 3. 5. Architectural designs and construction methods for new construction within the development will incorporate sound attenuation standards sufficient to achieve an interior sound level of 45 DBA. 6. A notice will be recorded on each lot indicating that it is within Metropolitan Council Noise Zone IV. 7. The developer shall provide sanitary sewer and water services to proposed Lot 3. 8. The final plat shall dedicate the easterly 30 feet of Lot 3 as public street right -of -way. 9. The existing driveway that serves the existing house on Lot 2 shall be reconstructed to be located entirely on Lot 2. All present voted in favor. PLANNING REPORT CITY OF EAGAN REPORT DATE: June 22, 1994 CASE #: 4- PP- 18 -5 -94 APPLICANT: Flora & John Broman HEARING DATE: June 28, 1994 PROPERTY OWNER Flora & John Broman PREPARED BY: Shannon Tyree REQUEST: Preliminary Plat LOCATION: 1461 Skyline Drive Lot 11, Treffle Acres COMPREHENSIVE PLAN: D -I Single Family Residential (0-3 units /acre) ZONING: R -1 Single Family SUMMARY OF REOUEST John and Flora Broman are requesting a Preliminary Plat consisting of three single family lots on 1.42 acres located on Lot 11, Treffle Acres located in the SE 1/4 of Section 4. AUTHORITY FOR REVIEW: City Code Section 13.20 Subd. 6 states that "In the case of all platting, the Planning Commission and City Council shall be guided by criteria, including the following, in approving, denying or establishing conditions related thereto:" A. That the proposed subdivision does comply with applicable City Code provisions and the Comprehensive Guide Plan. B. That the design or improvement of the proposed subdivision complies with applicable plans of Dakota County, State of Minnesota, or the Metropolitan Council. C. That the physical characteristics of the site including, but not limited to, topography, vegetation, susceptibility to erosion and siltation, susceptibility to flooding, water storage, and retention are such that the site is suitable for the type of development or use contemplated. D. That the site physically is suitable for the proposed density of development. E. That the design of the subdivision or the proposed improvements is not likely to cause environmental damage. Planning Report - Broman Addition June 28, 1994 Page 2 F. That the design of the subdivision or the type of improvements is not likely to cause health problems. G. That the design of the subdivision or the improvements will not conflict with easements of record or with easements established by judgement of court. H. That completion of the proposed development of the subdivision can be completed in a timely manner so as not to cause an economic burden upon the City for maintenance, repayment of bonds or similar burden. I. That the subdivision has been properly planned for possible solar energy system use within the subdivision or as it relates to adjacent property. (Refer to City Handbook on Solar Access). J. That the design of public improvements for the subdivision is compatible and consistent with the platting or approved preliminary plat on adjacent lands. K. That the subdivision is in compliance with those standards set forth in that certain document entitled "City of Eagan Water Quality Management Plan for the Gun Club Lake Watershed Management Organization" which document is properly approved and filed with the office of the City Clerk hereinafter referred to as the "Water Quality Management Plan ". Said document and all of the notations, references and other information contained therein shall have the same force and effect as if fully set down herein and is hereby made a part of this Chapter by reference and incorporated herein as fully as if set forth herein at length. It shall be the responsibility of the City Clerk to maintain the Water Quality Management Plan and make the same available to the public. BACKGROUND /HISTORY: This property was platted as Lot 11, Treffle Acres in 1950. A house was constructed on the lot in 1959. EVALUATION OF REQUEST: A. Surrounding Uses. The following existing uses, zoning, and comprehensive guide plan designations surround the subject property: North - South - East - West - Single family homes: Valley View Plateau; zoned R -1 ;designated D -I. Single family homes Treffle Acres; zoned R -1; designated D -I. Highview Park; zoned PF, Public Facilities; designated P, Parks. Single family: Heller Addition; zoned R -1; designated D -I. l�� Planning Report - Broman Addition June 28, 1994 Page 3 B. Preliminary Plat Review. Density. The proposed density of the project is 2.1 units /acre. Lots, The total plat area is 1.42 acres. The western most lot, Lot 1, is 22,000 s.f.; Lot 2, 21,150 s.f, has the existing home located on it; Lot 3 is 19,020 s.f. Setbacks. The existing home currently meets all required setbacks. The newly created lot lines were created to keep the existing home in compliance with the setback regulations. Tree Preservation A total of 38 significant trees currently exists on this site. Tree composition consists of oaks, cottonwood, ash, boxelder, various apple trees, and a row of 22 pine trees along Skyline Road. The existing home will be located on the middle of Lot 2. Through the relocation of the driveway to this existing house, two pine trees will be removed. This tree loss equates to 5.3% of the total trees on site. Allowable tree removal for this type of development is 25 %. Following an on -site review with the applicant, there is a possibility that only one pine will be removed for the new driveway. Individual Tree Preservation plans will be required before the two new lots are built upon. Grading /Wetlands The developer does not propose any grading with this application. The site grading for the two new houses will be done with the building permit for the houses. A minimal amount of grading will be needed to prepare the lots for the proposed house construction. City staff has visited the site and confirmed that there are no jurisdictional wetlands on this site. Therefore, no action is necessary with regard to wetland issues for this parcel. Before any grading of the lots is to occur, the development will be responsible for preparing a grading, drainage and erosion control plan to be submitted to the City with the final plat submittal. The builder of the lots will be responsible for installing and maintaining erosion control measures in accordance with the City's Erosion /Sediment Control Manual Standards. Storm Drainage/Water Quality The developer does not propose any storm sewer or water quality improvements with this application. The front yard areas will drain out to Skyline Road and the backyard areas drain to the north to the ravine in the Fred DeLosh property. This proposed development is located in Drainage Basin H, which contains no recreational water bodies. Because of the small size of the development, staff will recommend a cash dedication based on the total area of the proposed parcel, less the area of the one lot within the parcel that has already been developed. Planning Report - Broman Addition June 28, 1994 Page 4 Utilities Sanitary sewer and water service has been provided to Lots 1 and 2 of this development when Skyline Road was upgraded in 1990. The developer intends to connect to the existing 8" sanitary sewer and 6" watermain in Skyline Road and extend services to proposed Lot 3. The existing hydrants on Skyline Road will provide adequate fire protection to this site. When Skyline Road was upgraded, an 8" sanitary sewer stub that is approximately 25 feet deep and a 6" watermain stub were provided to the north into the northeast corner of Lot 3. The sewer and water stubs were intended to be extended to the north to serve the DeLosh property north of this site. Access /Street Design Street access is currently provided to this area from Skyline Road which is a publicly maintained bituminous street that was constructed by the City in 1990. The three lots will have their driveways connect to Skyline Road. The existing driveway for Lot 2 that serves the existing house will need to be reconstructed to build the driveway on Lot 2. A future street might connect to Skyline Road in the east corner of this development. The future street would serve the DeLosh property when it develops. This future street would loop from Skyline Road to High Ridge Terrace. Easements /Right -of- Way /Permits No additional right -of -way will be needed for Skyline Road. However, the City feels that right -of -way for the future street connection from Skyline Road to High Ridge Terrace should be dedicated with the final plat. The alignment of the street connection to Skyline Road has not been determined and it will depend on how the DeLosh property develops. City staff feels the dedication of the easterly 30 feet of Lot 3 as street right -of -way and should accommodate the future street extension to the north from Skyline Road. Parks And Recreation, At the June 20, 1994 Parks Recreation, Natural Resourses, Commission Meeting it was recommended that this development be subject to a cash parks and cash trails dedication. Airport Noise The property lies within the Noise Zone IV defined by the Metropolitan Council's Land Use Development Guide for Compatibility with aircraft noise. The proposal is considered to be in -fill within the context of the guidelines. As such, residential development is considered to be conditional and local units of government should consider the following: I 3 Planning Report - Broman Addition June 28, 1994 Page 5 1. Specific nature of the proposed use, including extent of associated outdoor activities. 2. Relationship of proposed use to other planning considerations, including adjacent land use activities, consistency with overall comprehensive planning and relation to other metropolitan systems. 3. Frequency of exposure of proposed uses to aircraft overflight. 4. Location of proposed use relative to aircraft flight tracks and aircraft on- ground operating and maintenance areas. 5. Location, site design and construction restrictions to be imposed by the community of the proposed use with respect to reduction of exterior to interior noise transmissions and shielding of outdoor activities. 6. Method community will use to inform future occupants of proposed building of potential noise from aircraft operations. 7. Extent to which the community restricts the building from having facilities for outdoor activities associated with the use. 8. Distance of proposed use from existing or proposed runways, parallel taxiways or engine run -up areas. The site is located approximately two miles from the nearest runway end, but due to operating procedures, most traffic is maintained to the north of the site. While the site is approximately the same distance from the taxiways and run -up areas, the principal aircraft noise source in this location will be from sideline noise from arriving and departing aircraft. Noise Zone IV is considered to be an area of "preventive" land use management larger than and outside of the 65 DNL contour in which corrective measures are to be used. Because the surrounding area is existing residential with typical outdoor uses, in -fill residential development would not be prohibited. It would be important however to apply performance standards which will minimize indoor noise transmission and ensure notification of noise exposure to prospective future owners. A builder's guide is available from staff which outlines sound attenuation designs and construction methods. Compatibility with Surrounding Area, The area located between Highway 13 and Pilot Knob Road, and Highview Avenue and Lone Oak Road is guided D -I single family residential. The existing use as a single family dwelling unit and the same proposed use are consistent with this entire area's Plan designation. SUMMARY /CONCLUSION The proposed Preliminary Plat is consistent with the City's Comprehensive Guide Plan designation for low density and appears to meet the required findings as listed on pages 1 and 2 of this planning report. Careful consideration should be given to the airport noise conditions listed below. It is important for prospective homebuyers to be aware of the potential aircraft noise. 1 o � Planning Report - Broman Addition June 28, 1994 Page 6 ACTION TO BE CONSIDERED To approve or deny the Preliminary Plat of three lots on 1.42 acres for Broman Addition. If approving, this plat shall be subject to the following conditions: Standard Conditions. 1. These standard conditions of plat approval as adopted by Council action on February 3, 1993. Al, B1, B3, Cl, C2, El, Fi, Gi, H1 Water Ouality 2. This development shall be subject to a water quality cash dedication. Parks. Recreation. Natural Resourses, 3. Shall be subject to a cash parks dedication and a cash trails dedication. 4. Individual tree preservation plans shall required at the building permit time for Lots 1 and 3. Airport Noise. 5. Architectural designs and construction methods for new construction within the development will incorporate sound attenuation standards sufficient to achieve an interior sound level of 45 DBA. 6. A notice will be recorded on each lot indicating that it is within Metropolitan Council Noise Zone IV. Utilities, 7. The developer shall provide sanitary sewer and water services to proposed Lot 3. Right of Way/ Easement 8. The final plat shall dedicate the easterly 30 feet of Lot 3 as public street right -of -way. Access, 9. The existing driveway that serves the existing house on Lot 2 shall be reconstructed to be located entirely on Lot 2. L A. Financial Obligations 1. This development shall accept its additional financial obligations as defined in the staff's report in accordance with the final plat dimensions and the rates in effect at the time of final plat approval. B. Easements and Rights -of -Way 1. This development shall dedicate 10 -foot drainage and utility easements centered over all lot lines and, in addition, where necessary to accommodate existing or proposed utilities for drainage ways within the plat. The development shall dedicate easements of sufficient width and location as determined necessary by engineering standards. 2. This development shall dedicate, provide, or financially guarantee the acquisition costs of drainage, ponding, and utility easements in addition to public street rights -of -way as required by the alignment, depth, and storage capacity of all required public utilities and streets located beyond the boundaries of this plat as necessary to service or accommodate this development. 3. This development shall dedicate all public right -of -way and temporary slope easements for ultimate development of adjacent roadways as required by the appropriate jurisdictional agency. 4. This development shall dedicate adequate drainage and ponding easements to incorporate the required high water elevation plus three (3) feet as necessitated by storm water storage volume requirements. C. Plans and Specifications STANDARD CONDITIONS OF PLAT APPROVAL 1. All public and private streets, drainage systems and utilities necessary to provide service to this development shall be designed and certified by a registered professional engineer in accordance with City adopted codes, engineering standards, guidelines and policies prior to application for final plat approval. 2. A detailed grading, drainage, erosion, and sediment control plan must be prepared in accordance with current City standards prior to final plat approval. 3. This development shall ensure that all dead -end public streets shall have a cul -de -sac constructed in accordance with City engineering standards. �b� 4. A separate detailed landscape plan shall be submitted overlaid on the proposed grading and utility plan. The financial guarantee for such plan shall be included in the Development Contract and shall not be released until one year after the date of City certified compliance. D. Public Improvements 1. If any improvements are to be installed under a City contract, the appropriate project must be approved by Council action prior to final plat approval. E. Permits 1. This development shall be responsible for the acquisition of all regulatory agency permits required by the affected agency prior to final plat approval. F. Parks and Trails Dedication H. Other LTS#5 STANDARD.CON 1. This development shall fulfill its park and trail dedication requirements as recommended by the Advisory Parks, Recreation and Natural Resource Commission and approved by Council action. G. Water Quality Dedication 1. This development shall be responsible for providing a cash dedication, ponding, or a combination thereof in accordance with the criteria identified in the City's Water Quality Management Plan, as recommended by the Advisory Parks, Recreation and Natural Resource Commission and approved by Council action. 1. All subdivision, zoning and other ordinances affecting this development shall be adhered to, unless specifically granted a variance by Council action. Advisory Planning Commission Approved: August 25. 1987 0 7 City Council September 15. 1987 Revised: July 10. 1990 Revised: February 2. 1993 FINANCIAL OBLIGATION - Broman Addition There are pay -off balances of special assessments totaling $0 on the parcels proposed for platting. The pay -off balance will be allocated to the lots created by the plat. At this time, there are no pending assessments on the parcel proposed for platting. The estimated financial obligation presented is subject to change based upon areas, dimensions and land uses contained in the final plat. Based upon the study of the financial obligations collected in the past and the uses proposed for the property, the following charges are proposed. The charges are computed using the City's existing fee schedule and connections proposed to be made to the City's utility system based on the submitted plans. Improvement Use Rate Quantity Amount Sanitary Sewer Trunk S.F. $775 /lot 2 lots $1,550 Water Trunk S.F. 810 /lot 2 lots L620 TOTAL $3.170 !ft • u+irns t A'E i con r/,, • ■■ 7 MHO' • ,, - -8 NE SF :1 M11.1.t I u - 111M11 IN • " emiemir) to E \\ s . _ r ifIr .% E ./ ( 4• • P 1 ' 1 ` 6 r ;. � L __ . rW rllO7 + ,�ri l AN178 NW nir• ring - R r1fi ttr rArh . rvr ,te -- EX U.7iR•.47 __ ft_ ._ _►) ww r, W Al EN)) 0 Low!! 4r `D q ��- 0( • rA'A OW CV i x R la � -• • .1 Ili nI• RD A RA "r,I (4) • Brornan Addition 44 _Tr Arr. RMD. (IW CCP 1∎1 ,�AI� I pR^rftMEJ F_ Mvv, rrttt►n rl tR.r 4' . Ayml SW .r, lE tMk I IAMAVI AC t t mull 1 I 1► rl 9 !Mt $t MI 5 WRtll,M7K)r` 1 6 nt i•MI r . !t'Mrr r t o r rwt r1 r iLt71 / r :. 1 4 , P114 1-'1 A1 A I I. 1 r, 1 F ., It _ ^1 1 t. ;�l` 4 '\ I t • • A ] ` ( :1; I rw 8 if • 1' , cir V. � 1 1 • r•: ' . ■ ; y r ` / ) w I.,, -- 'r /.1, l , ' l / i 1 r �. 1 C _ _1, __L '_ % r 1 ..-', 1 \ ,• ! h�: 11.1 r , . , % •I.1. 1,11) ' i .y. ;.,• „�• � , , L•�, 1 #••� .r 1 ' 1'l.` 1 t 'c' 1. CII n IM' Lr R� r' 1 1 . ., •; om I - �1��_j r1 J \ I_ 1 \�; i 1� \ „., 1\ t 1 l l ' � ,r J ,\ 1` \t \� ,\ ,:e..--_,..4,..- _ � ' 1 - f 1 ► r 1 / r J 1�1 1 1 ,1 tlrlr , 1 1, 1 1 t`� \• �`\t\ Y 1 _ � LI: ! ., t : 1 ?��r Y .'t �' 1 `I t .._ ' _;'r ` : r r T t • �tl 47 1 = ( ; 1� . .. •; 3;P . • 3 t \ \�(r i ., ( r' ( •� ' • e. l F'•', r 1) ` c F Q y I # L: : :i :' 1 . P .�` \1,•�.,r c, ( 1111 r r r: � r j r t • \_ j = ��� < x :::• ..::ilr , .i'� — r t'1\11� It ). 1f r � �{t- r>J r t '• !r ? t? `:: .:• ;'\t111'11 / + �`�j ' t` , .„ , �j. 1 l 71 1 ` I •T ',,a� (r t, • - yCt• ,IJ � - 1 ♦ \ T 1 'w ° J �. 1 A I.1 • 1 Broman Addition O .c 111 _ ♦ i • 1.r Owen, 1w•• 1 I rrl '. • • � _ ^_ _ ? fix? = _ ” r . • ‘., 284 feet storm sewer easement 1461 SKYLINE ROAD EAGAN MN Property I.D. number: 10- 77250 - 110 -00 pavement T TREE PRESERVATION PLAN k ONLY TWO TREES WILL BE REMOVED TO MAKE ROOM FOR THE NEW DRIVEWAY. THE IMPACT IS NIL. THE CHARACTER OF THE LOT IS RETAINED Concept to subdivide lot 11 into three lots with existing house on center lot. As pictured, no significant change in the grade would be required. 429 feet 10 tt more street easement as street was moved away to save trees Proposed New Driveway Lot 11 Treffle Acres, Dakota County, MN. voi Old Driveway 1 Trees Sheet 4 of 4 (By Owner) pavement 24 ft from lot to pavement North Possible house site suggestiions Scale: 1 inch = 100 ft West Lot 21,700 sq ft Center Lot 21,000 sq ft East Lot 18,000 sq ft \ 1 \1'r_,;r r. R 1 _ m 4DDJ;T;OINI I m I N I ' ( I I Drlinaye & Utility Easemen Pe Doc. No. 8-3-3 — SURVEYOR'S CERTIFICATE PRELIMINARY PLAT: BROM A N ADDITION 1 7 1 .) NOTES: Dated 05 -13 -94 u5 -3'1 -ern LAND SURVEYORS. INC Registered Under :Ann of The Stet* M Minneeote 14750 SOUTH ROBERT TRAIT. ROSEMOUNT. MINNESOTA 55068 DELMAR H. SCHWANZ 431.75 60 Foot Drainage & Utility 1. There is an existing house on proposed Lot 2 connected to City utilities. 2. City utilities are stubbed in to serve proposed Lots 1 and 3. 3. No site grading will be done, until a building permit is applied for. 1 hereby certify that this survey. plan. or report was prepared by me or under my direct supervision and that 1 am a duly Registered Land Surveyor under the laws of the State of Minnesota. Easement for Future Extep ions Preliminary Plat: Owner- Developer: Description: Areas: Present & Proposed am Sheet 1 of 4 612/4231769 RROMAN ADDITION Mr. & Mrs. John nrnran 1461 Skyline Road Eagan, MN Scale: 1 inch = 300 ft Lot 11, TREFFLE ACRES Gross Area 62,170 square fent 1.47. acre Lot 1 = 22,000 square feet Lot 2 = 22,150 square feet Lot 3 = 19,020 square feet Zoning: R -7 Single Family Residentia: Delmar H. Schwanz Minnesota Registration No. 6625 Site Plan 41 !� ! 11. s.‘43175 i *a t .\ \\ itfage•�A Utility F.asemen Pe No. 43 843 � - r -•• • 1 A \ r l 1 1)1 ,ROTF$� I i 1 '1 1)'Ther is an existing proponed Lot 2 connected to City utilities. 2. City utilities are stubbed in to serve proposed Lots 1 and 3. 3. No site grading will be done until a building permit is applied for. house on thereby certify that this survey, plan. or report was prepared by me or under my direct supervision and that I am a duly Registered Land Surveyor under the taws of the State of Minnesota. 05 - 13 - 94 Dated nc_e• DELMAR H. SCHWANZ LAND SUrWEVOr1S, INC Illepl,tered Undo. L*w el The stale of Minnesota 14750 SOUTH ROBERT TRAIL ROSEMOUNT, MINNESOTA 550ee e12/423.17e9 SURVEYOR'S CERTIFICATE PRELIMINARY PLAT: BROM A N ADDITION Preliminary Plat: Owner - Developer: Description: Areas: (ROMAN ADDITION Sheet 2 of 4 Mr. & Mrs. John Braman 1461 Skyline Road Eagan, MN Scale: 1 inch = 100 ft Q Proposed elevations = Finished grade Proposed Direction of Drainage Lot 11, TRF.FFI.E ACRES Gross Area 62,170 nquare feet 1.42 acres Lot 1 = 22,000 square feet Lot 2 = 21,150 square feet Lot 3 = 19,020 square feet Present & Proponed Toning: R -1 Single Family Residential * * * ** Possible house location on proposed Lots 1 and 31 Delmar H. Schwanz Minnesota Registration No. ee25 i8 49,c' J k 44 rr4 vi ON VI r ,, h •___. G� � W ▪ • P ) L a0 ' CI { S cn • Cc Iv`a`J o� L u _.4_ L -4 'D . -\ L CI W p 0 '" Ia. Z m �, • s s * o --�. oi. � m 7 \ `s- • • !T KW O� O � o a� s 0 me 1:,, � W O W A I s ma) 1.6 O CJ ft O r)o •ter^ • a �O M M 1 m ao P O. 1 , L i : a - fo A rt H ?� O t M Z Orl t to a," •• g N o ; ; a Q) N1 O F tr+rPz m r- r- \ \ s e. M • 0 . • s, z � 1 • mno E M a,,r a∎ . i_ A Ps 00 1� O • K x 0 N J\ / \ 0 0 Mt N O O S 110 0 0 z c 1 ' � "\ g.W' - m S C o OD 9. N O i ‘ re Up a I • C < m N t W p' \ ' X z Ref : BROMAN ADDITIO � -'� / 288 7 ar co a o 2:4 J` s w ., VI 6T S tr, 4: o .44) 0 0 ✓ N Oy P Till 0 +98.1,5 o • .f, ! o 1. it L r ■ Sh --t 3 of 4 O 0 r 0 • m 2 2 0 0 N FIGURE No. 17 STORM SEWER LAYOUT MAP CITY OF EAGA POND•10 AMA. mow gamma (pity* , •_ _-- ROi1M 1[w!R• (►tome ♦— tVOAM Lin r?ATION c. J • VON A LF UYA110N brumes* 0 STORY FOP= YAM ♦ • . .4 -4♦ YA.gll DIVISION ••■• POND NONMAL MAT[N %.*V .. . . . . . 100.0 POND MOM wATtq LSY[L * 900.0 Ov<NLAND CAA.(AOK Novrs LEGEND $ 7.0/ :67.0 87.2 / PLOT KN BA R . 1/65.0 12" 43.y 4 E 3 FIG. NO. 8 WATER DISTRIBUTION SYSTEM CITY OF 7 (CAGAN l / ; f.� COUNTRY,� ' - __m_ _mow • Cr- -; S4 �— _� _ `f � ; If J -ViE 1 ._. j .. _ I 4 MEAL t / PLATE t ! L - r •SNs7; �v , -! SITE ACRES „ L 9 F LO Kt4 ✓b PARK ;{ _ _ 1E N 4■. FIG. NO. 7 SANITARY SEWER TRUNK LAYOUT CITY OF AGAN SURVEYOR'S CERTIFICATE PRELIMINARY PLAT: BROM A N ADDITION nrinnye Utility rinenon re Doc. Nn . -P3 n44 --- — PIOTI S : 431.75 LANt) Ommypnl, INC Meh.Nq.d Undo, tows et M. g .,. el Minn..el. 14750 SOUTH noeenT TRAIL ROSEMOUNT. MINNESOTA 55066 012/423 -1769 1. There in nn exinting bonne on proponed Lot 2 connected to City utilities. 2. City ntilitien are ntnhhed in to serve proposed Lots 1 and 3. 3. No site grading will he done until a building permit is applied for. 1 hereby witty that this survey. plan, or report was prepared by me or under my direct supervision and that 1 em a duly Registered lend Surveyor under the laws of the Siete of Minnesota. Datsd 05 -13 -514 DELMAR H. SCHWANZ 7 FINANCIAL OBLIGATION LEGEND rrnIiminnry rlat: O nr- Dnvelopnr: hencription: Arran: Vrertant rr rropnned a Sanitary S ewer Trunk Water Tru At 4,1. Beasts Sr -aloe: 1 Enr-h - inn f ntIOMAN AIM) /TIOU Mr. . 1. Mr n. John nrr. nun 1461 Skyline Road Pagan, MN Lot 11, Tnr.FFI,r At'nn Groin Aron 62, 170 square font 1.42 nr•,rers Tot 1 T.nt 7 Toot 3 Shoot 1 of 4 22,OOn square feet = 21,150 ngnnrre !net. = 19,020 square feet Zoning: R - !tnyl Family Rnrtitirnti: Delmar H. Sehwanz Minnesota Registration No 6625 t ii 111 4 Agenda Information Memo July 5, 1994 City Council Meeting REZONING /PRELIMINARY PLAT /TRAILS END D. Rezoning, Trails End/Thomas Murray, consisting of 5 acres from A (Agricultural) to R -1 (Single Family) located in the NE 1/4 of Section 14 and a Preliminary Plat consisting of 5 acres and 12 single family lots on part of Lot 2, Wescott Garden Lots (PID #10- 83700- 011 located in the NE 1/4 of Section 14-- Thomas Murray is requesting a rezoning of 4.5 acres from Agricultural to R -1 and a preliminary plat (Trails End) consisting of twelve single family lots. The property is located south of Yankee Doodle Road between Wescott Hills Drive and Trails End Road. The Advisory Planning Commission conducted a public hearing on this item at its meeting of June 28, 1994. The Advisory Planning Commission recommends approval of the rezoning and approval of the preliminary plat subject to the four conditions set forth in the staff report. Tile minutes of the Advisory Planning Commission are enclosed on pages Z■D through . The staff report is enclosed on pages \ .t hrough f . �-- ACTION TO BE CONSIDERED ON THIS ITEM: To approve or deny a rezoning of 4.5 acres from Agricultural to R -1 (single family) and a preliminary plat (Trails End) for Thomas Murray, consisting of 12 single family lots located south of Yankee Doodle between Wescott Hills Drive and Trails End Road subject to the four conditions recommended by the Advisory Planning Commission. W3\ PAGE 7 /ADVISORY PLANNING COMMISSION MINUTES JUNE 29, 1994 REZONING AND PRELIMINARY PLAT TRAILS END - THOMAS MURRAY Chairman Voracek opened the next public hearing of the evening regarding a Rezoning of 5 acres from A (Agricultural) to R -1 (Single Family) and a Preliminary Plat consisting of 5 acres and 12 single family lots on part of Lot 2, Wescott Garden Lots (PID# 10- 83700 - 011 -02) located in the NE; of Section 14. Project Planner Mike Ridley introduced this item. Mr. Ridley briefly highlighted that information presented in the City staff's planning report dated June 21, 1994, noting the background and history of the subject property, the surrounding uses, the consistency with the Comprehensive Land Use Guide Plan, the density, size and setbacks of the proposed lots and the storm drainage, water quality and utility plans. Mr. Ridley further advised that the subject property has 88 significant trees of which 20 will be lost as a result of initial site development. Mr. Ridley further advised that the subject property is outside Noise Zone IV as defined by the Metropolitan Council Guidelines for land use compatibility, but due to its proximity the developers or builders are encouraged to consult the Buyer's Guide for Aircraft Noise Attenuation available from the City. Mr. Ridley further noted that the existing house is currently serviced by well and septic system and thus, sanitary sewer and water service connections will be required. Mr. Ridley concluded that the proposed zoning is consistent with the Comprehensive Guide Plan and the proposed land uses compatible with the surrounding land uses. Howard Kyllo, a representative of the applicant, was present for questions. Member Isberg inquired with staff as to the consistency of Conditions No. 2 and 3 with respect to timing. Mr. Ridley advised that the developer will not be responsible for abandoning any existing wells or septic systems until the completion of the extension of sanitary sewer and water main to the development. All present voted in favor. Isberg moved, Heyl seconded, the motion to approve a Rezoning of 5 acres from A (Agricultural) to R -1 (Single Family) located in the NE i of Section 14. Isberg moved, Miller seconded, the motion to approve the Preliminary Plat consisting of 5 acres and 12 single family lots on part of Lot 2, Wescott Garden Lots (PID# 10- 83700 - 011 -02) located in the NE; of Section 14 subject to the following conditions: PAGE 8 /ADVISORY PLANNING COMMISSION MINUTES JUNE 29, 1994 1. The developer shall comply with these standard conditions of plat approval as adopted by Council action on February 2, 1993: Al, B1, Cl, C2, C3, C4, D1, El, F1, G1, and H1. 2. The developer will be responsible for abandoning any existing wells and septic systems located on the site according to the County requirements upon the completion of the extension of sanitary sewer and water main to the development and connection thereto. 3. The existing house on Lot 9 shall connect to City sanitary sewer and water service within two months after the completion of the extension of sanitary sewer and water main to the development. 4. The developer will be responsible for removing the existing gravel driveway along the south property line. All present voted in favor. REPORT DATE: June 21, 1994 APPLICANT: Thomas H. Murray PROPERTY OWNER Trygve Hovland REQUEST: Rezoning and Preliminary Plat LOCATION: Part of Lot 2, Wescott Garden Lots (PID# 10- 83700- 011 -02) NE 1/4 of Section 14 COMPREHENSIVE PLAN: D -I, Single Family (0-3 units /acre) ZONING: A, Agricultural SUMMARY OF REOUEST Mr. Thomas Murray is requesting a Rezoning of 4.5 acres from A (Agricultural) to R -1 (Single Family) and a Preliminary Plat (Trails End) consisting of 12 single family lots. The property is located south of Yankee Doodle Road between Wescott Hills Drive and Trails End Road. AUTHORITY FOR REVIEW PLANNING REPORT CITY OF EAGAN City Code Chapter 13, Section 13.20, Subd. 6. states: In the case of platting, the Planning Commission and the Council shall be guided by criteria, including the following, in approving, denying or establishing conditions related thereto: A. That the proposed subdivision does comply with applicable City Code provisions and the Comprehensive Guide Plan. B. That the design or improvement of the proposed subdivision complies with applicable plans of Dakota County, State of Minnesota, or the Metropolitan Council. C. That the physical characteristics of the site including, but not limited to, topography, vegetation, susceptibility to erosion and siltation, susceptibility to flooding, water storage, and retention are such that the site is suitable for the type of development or use contemplated. CASE #: 14- PP- 16 -5 -94 HEARING DATE: June 28, 1994 PREPARED BY: Mike Ridley Planning Report - Trails End June 28, 1994 Page 2 D. That the site physically is suitable for the proposed density of development. E. That the design of the subdivision or the proposed improvements is not likely to cause environmental damage. F. That the design of the subdivision or the type of improvements is not likely to cause health problems. G. That the design of the subdivision or the improvements will not conflict with easements of record or with easements established by judgement of court. H. That completion of the proposed development of the subdivision can be completed in a timely manner so as not to cause an economic burden upon the City for maintenance, repayment of bonds or similar burden. I. That the subdivision has been properly planned for possible solar energy system use within the subdivision or as it relates to adjacent property. (Refer to City Handbook on Solar Access). J. That the design of public improvements for the subdivision is compatible and consistent with the platting or approved preliminary plat on adjacent lands. K. That the subdivision is in compliance with those standards set forth in that certain document entitled "City of Eagan Water Quality Management Plan for the Gun Club Lake Watershed Management Organization" which document is properly approved and filed with the office of the City Clerk hereinafter referred to as the "Water Quality Management Plan". Said document and all of the notations, references and other information contained therein shall have the same force and effect as if fully set down herein and is hereby made a part of this Chapter by reference and incorporated herein as fully as if set forth herein at length. It shall be the responsibility of the City Clerk to maintain the Water Quality Management Plan and make the same available to the public. BACKGROUND/HI STORY The Wescott Garden Lots subdivision was platted in 1889. This 120 acre subdivision (zoned Agricultural) was platted into twelve, 10 acre, lots. All of the original platted lots have been split into lots ranging from 1 to 5 acres or rezoned & replatted to R -1 subdivisions. The subject 4.5 acre parcel contains an existing home that was built in 1985. Planning Report - Trails End June 28, 1994 Page 3 EXISTING CONDITIONS From a high point near the center of the property, the grade falls off in all directions. The existing elevation of the home is approximately 10' above the grade of Trails End Road. The majority of site's vegetation is located along the north and west property lines and is intended to be saved. The home is served by a well and septic system. SURROUNDING USES The following uses, zoning and comprehensive plan designations surround the subject property: North - Wescott Square Multi - family; zoned R-4; designated D -III, Mixed Res. (6 -12 u /ac) South - Undeveloped; zoned A; designated D -I Single Family (0-3 u /ac) East - Woodlands North 3rd Addn; zoned PD /R -2; designated D -H, Mixed Res. (0-6 u /ac) West - Thorpe Woodland Garden; zoned R -1; designated D -I, Single Family (0- 3u /ac) EVALUATION OF REQUEST A. Rezoning Review The rezoning requested for the subject property is consistent with the Comprehensive Land Use Guide Plan designation of D -I, Single Family (0-3 units /acre). The proposed land use should be suitable with adjacent uses. B. Preliminary Plat Review Density - As proposed, the plat will have 12 lots on 4.5 acres that results in a site density of 2.66 units per acre which is consistent with the proposed zoning and the existing Guide Plan density designation of 0-3 u /ac. Lots - The applicant is proposing all lots to meet or exceed all R -1 lot size and width requirements. The lots vary in size from 12,000 to 20,940 s.f., with an average lot size of 13,868 s.f. Setbacks - The proposed lot sizes and configurations will allow all R -1 setback requirements to be met. Tree Preservation Policy - The Tree Preservation Plan submitted is acceptable. A total of 88 significant trees currently exist on site. Tree species composition consists of a variety of trees including pine,oak, cherry, elm cottonwood and boxelders. Initial site development will result in the loss of 20 significant trees (22.7% of the total). The allowable removal for this Planning Report - Trails End June 28, 1994 Page 4 type of development is 25 %. Tree loss will be the result of grading for the entrance road and the grading of some of the house pads. Water Oualily - This proposed development is located in drainage basin E. Runoff from the streets and driveways as well as much of the pervious area within the development will be discharged to Pond EP -2 north of Yankee Doodle Road near Gopher Smelting. Pond EP -2 is currently designated a nutrient basin in the City's Water Quality Management Plan but the area around it may be one of the City's top priorities for future park land acquisition. However, the negligible predicted increase in loading to Pond EP -2 caused by this development, along with the small size of the site and it's topographic unsuitability for on -site ponding, suggest that a cash dedication for water quality is appropriate. Parks and Recreation - At the June 20, 1994 Advisory Parks, Recreation and Natural Resource Commission (APRNRC) meeting, the commission recommended a cash dedication for parks, trails, and water quality. Airport Considerations - The property is located approximately one -half mile south of Noise Zone IV of the Metropolitan Council Guidelines for Land Use Compatibility with aircraft noise. As such no requirements are placed on the property, but, due to this proximity,the developer and builders are encouraged to consult the Builder's Guide for Aircraft Noise Attenuation available through staff. Grading/Wetlands - The preliminary grading plan proposes minimal grading for the streets and houses to protect the existing terrain and trees. The maximum cut shown is 10 feet and the maximum fill is 10 feet. The grading plan shows constructing the east -west street through the center of the site and along the north edge of the existing house. All the existing trees that are located in the center of the site would be removed during the grading for the streets and houses. The existing trees located in the backyard areas are proposed to be saved. The 2.5 acre site to the southeast of this development was used as a demolition landfill in the mid- 1980's. A small portion of this site in the backyard area of Lots 11 and 12 was also filled with the demolition landfill project. The report prepared by Valley Engineering dated April, 1984, that was submitted by the property owner when the application was made for a grading permit for the demolition landfill stated the following: The site area consists of 2.5 acres. It is proposed to be filled in order to improve its usefulness to the owner. The end use for the filled area is for residential yard space that will be compatible with the adjacent street elevations. Planning Report - Trails End June 28, 1994 Page 5 Consequently, the use of demolition material for fill that will have a top dressing of black dirt is considered to benefit the property. The quantity of material hauled into the demolition landfill was approximately 30,000 cubic yards. The material came from various construction sites around the southern metropolitan area. The material consisted of concrete, bricks and masonry. The developer's wetland consultant reviewed the site for jurisdictional wetlands and found none. Staff has confirmed this finding. The developer will be required to locate and abandon all septic systems and wells according to County and City requirements. The development will be responsible for installing and maintaining erosion control measures in accordance with the City's Erosion /Sediment Control Manual Standards. Storm Drainage/Water Quality - This proposed development is located in Drainage Basin E. Runoff from the streets and driveways as well as much of the pervious area within the development will be discharged to the existing catch basins and storm sewer on Trails End Road near Ivy Lane. This storm sewer system drains northerly to Pond EP -2 north of Yankee Doodle Road near Gopher Smelting. Pond EP -2 is currently designated a nutrient basin in the City's Water Quality Management Plan but the area around it may be one of the City's top priorities for future parkland acquisition. However, the negligible predicted increase in loading to Pond EP -2 caused by this development, along with the small size of the site and its topographic unsuitability for onsite ponding, suggests that a cash dedication for water quality is appropriate. A 1.1 acre portion of the site along the west edge will drain overland to the west to Pond EP -2.2. This pond is located in the Thorpe Woodland Gardens development. The pond receives approximately 18 acres of backyard drainage area and the pond does not have a storm sewer outlet. To protect the houses from flooding on Lots 6, 7, and 8 that back up to this pond, the minimum lowest entry level of the houses needs to be above elevation 863. The preliminary grading plan shows that the lowest walk -out elevation for the houses adjacent to Pond EP -2.2 is shown at 881.9. Utilities - The utility layout plan is acceptable. An 8" sanitary sewer of sufficient size, depth, and capacity was stubbed to this site from Trails End Road along the east edge of the site. The preliminary utility plan shows that all of the houses on this development will be served by a proposed 8" sanitary sewer that drains through the site to Trails End Road. The extension of the proposed 8" sanitary sewer through this development will be designed to allow gravity sanitary sewer service for the proposed houses. An 8" water main has been stubbed to the east edge of this site from Trails End Road. The preliminary water main layout plan shows extending the 8" water main through the site to the west end of the cul -de -sac. Planning Report - Trails End June 28, 1994 Page 6 The existing house on Lot 9 will need to be provided with sanitary sewer and water service. The developer will be required to connect the existing house on Lot 9 up to City sewer and water service within two months after the completion of the extension of sanitary sewer and water main service to the development. Access /Street Design - Street access to this site is readily available from Trails End Road, a 32 -foot wide street constructed along the east edge of this site in 1993 under City Project No. 648. The preliminary street layout plan shows extending a 500 -foot long cul-de -sac to the west through the center of the site from an existing street opening on Trails End Road. The development shall remove the existing gravel driveway that exists along the south property line of the site. The driveway serves the existing house on Lot 9. Easements/Right -of- Way /Permits - This development will be responsible for providing easements for the existing 18" storm sewer line that crosses through the northeast corner of Lot 1. The development will be responsible for ensuring that all regulatory agency permits (MPCA, MN Dept. of Health, MWCC, etc.) are obtained prior to final plat approval. Compatibility with Surrounding Area - The single family use adjacent to the high density multi- family development to the north is not a customary land use combination; however, the existing topography provides a grade separation and there is an existing line of mature vegetation along the north property line, shown to be saved on the grading plan, which will provide an adequate buffer. The proposed use is certainly compatible with the other existing and guided land uses in the area. The developer has provided a conceptual layout of future development may occur on the remaining Wecott Garden Lots to the south and west of the subject site. SUMMARY /CONCLUSION The proposed rezoning is consistent with the Guide Plan designation, and the preliminary plat is consistent with the R -1 zoning district requirements. The land use is compatible with the surrounding land uses provided the natural screen along the north property line is maintained to afford an adequate buffer. Utility services and access are available to serve the site. ACTION TO BE CONSIDERED To approve /deny the requested rezoning of 4.5 acres from Agricultural to Single Family. To approve /deny the requested 12 lot, Preliminary Plat subject to the following conditions of Plat Approval: Planning Report - Trails End June 28, 1994 Page 7 1. The developer shall comply with these standard conditions of plat approval as adopted by Council action on February 2, 1993: Al, B1, Cl, C2,C3,C4, DI, El, Fl, Gl . and Hl. 2. The developer will be responsible for abandoning any existing wells and septic systems located on the site according to County requirements. 3. The existing house on Lot 9 shall connect to City sanitary sewer and water service within two months after the completion of the extension of sanitary sewer and water main to the development. 4. The developer will be responsible for removing the existing gravel driveway along the south property line. A. Financial Obligations STANDARD CONDITIONS OF PLAT APPROVAL 1. This development shalt accept its additional financial obligations as defined in the staff's report in accordance with the final plat dimensions and the rates in effect at the time of final plat approval. B. Easements and Rights -of -Way 1. This development shall dedicate 10 -foot drainage and utility easements centered over all lot lines and, in addition, where necessary to accommodate existing or proposed utilities for drainage ways within the plat. The development shall dedicate easements of sufficient width and location as determined necessary by engineering standards. 2. This development shall dedicate, provide, or financially guarantee the acquisition costs of drainage, ponding, and utility easements in addition to public street rights -of -way as required by the alignment, depth, and storage capacity of all required public utilities and streets located beyond the boundaries of this plat as necessary to service or accommodate this development. 3. This development shall dedicate all public right -of -way and temporary slope easements for ultimate development of adjacent roadways as required by the appropriate jurisdictional agency. 4. This development shall dedicate adequate drainage and ponding easements to incorporate the required high water elevation plus three (3) feet as necessitated by storm water storage volume requirements. C. Plans and Specifications 1. All public and private streets, drainage systems and utilities necessary to provide service to this development shall be designed and certified by a registered professional engineer in accordance with City adopted codes, engineering standards, guidelines and policies prior to application for final plat approval. 2. A detailed grading, drainage, erosion, and sediment control plan must be prepared in accordance with current City standards prior to final plat approval. 3. This development shall ensure that all dead -end public streets shall have a cul -de -sac constructed in accordance with City engineering standards. 4. A separate detailed landscape plan shall be submitted overlaid on the proposed grading and utility plan. The financial guarantee for such plan shall be included in the Development Contract and shall not be released until one year after the date of City certified compliance. D. Public Improvements 1. If any improvements are to be installed under a City contract, the appropriate project must be approved by Council action prior to final plat approval. E. Permits 1. This development shall be responsible for the acquisition of all regulatory agency permits required by the affected agency prior to final plat approval. F. Parks and Trails Dedication H. h r 1. This development shall fulfill its park and trail dedication requirements as recommended by the Advisory Parks, Recreation and Natural Resource Commission and approved by Council action. G. Water Quality Dedication 1. This development shall be responsible for providing a cash dedication, ponding, or a combination thereof in accordance with the criteria identified in the City's Water Quality Management Plan, as recommended by the Advisory Parks, Recreation and Natural Resource Commission and approved by Council action. 1. All subdivision, zoning and other ordinances affecting this development shall be adhered to, unless specifically granted a variance by Council action. Advisory Planning Commission Approved: August 25. 1987 LTS'S STANDARD.CON City Council September 15. 1987 Revised: July 10. 1990 Revised: _ February 2. 199_ FINANCIAL OBLIGATION - Trails End There are pay -off balances of special assessments totaling $0 on the parcels proposed for platting. The pay -off balance will be allocated to the lots created by the plat. At the time, there are pending assessments totaling $24,403 for Project 648 on the parcel proposed for platting. The related assessments will be allocated to the parcels created by the plat. The estimated financial obligation presented is subject to change based upon areas, dimensions and land uses contained in the final plat. Based upon the study of the financial obligations collected in the past and the uses proposed for the property, the following charges are proposed. The charges are computed using the City's existing fee schedule and connections proposed to be made to the City's utility system based on the submitted plans. Improvement Use Rate Quantity Amount Water Trunk S.F. $810 /lot 12 $ 9,720 Storm Sewer Trunk S.F. .074 /sq ft 166,418 sq ft 12.315 TOTAL LIWZ �3l T • *VC. VT sr. .? - - aralut In • 3 • 4.:Warr • 'De 3f7 MOW T4.1 • AO% 4000 V 4 CMOCIO 41' a • sae= on S ! • E I SW olt3 :Dna 4 040 -a e. \ C IOW :‘\ •■•r P I ' ''''''T•4■■ ••". VI./CLIN Y — CLAW/AC! slaS ca.ri rouRse . lc 4 Of4 2 I •••:%. ,,, f !AIN 1 ASt -1 2. \ AM" •••%,,,, • SE d 4 6,1 0 OZ SW 514 al* 4 0 S 0m, / `-•.° 7r1 44 44.7•0 2 IL ' e--• . 4? r_ 7•6- ■•■ • -As •■•• 4fr'N A AT: t4 4._ .4 i41-4■•■.-1.4 5 1. ., a1 , 14.4 f — li fi (I T ;e: :t ^soh,. , •P{, St aLicr , visiagyo r ; 4 „( Cb 1 .-..*Nolootiume 'I • ' ta •X :• NW • t.... P;* 1 cr„,IR • annictrit "OM .7st , 7..„ .1x 0 ■4:7 4 i - !i 7 4'12 NV( c, ,1 11 .-- ft ) \\:• siowtzko tesiv \\\ .3E NE I ° 4 GIJIDE PLAN rb3 •� , ■ • e • P. r ems. a r: • 033 -03 OP , I• r• w■ 1 074.03 031 -03 273 1 CV 1- 03 014 • 1 • 3/- AFl =A MAP IN.� Y Y MI O. . ...i 11■1 1. ∎. 1Y to 1 • • 1.1. NY= I ,..._'1wT5 1 Yrs, ::.0. • I MIN 1 1l MI 8 I I 1 i / ..1 •1 I:t 8 1 e y iy.1 11 I `� 8 �I .. 1 L_= = /— '_'TIC a _... ill iiu1Ao �I I 2 L G is VdttrM . H SYMOH1 r, ono. 1■1e 8 1lm / :3305e3A00 OM Sl ITtll T'. atw 1122:. orscpsPrtom SITE DATA iii : :.: IIi t :. •] III t : . 1� .. • ;; IN.� Y Y MI O. . ...i 11■1 1. ∎. 1Y to 1 • • 1.1. NY= I ,..._'1wT5 1 Yrs, ::.0. • I MIN 1 1l MI 8 I I 1 i / ..1 •1 I:t 8 1 e y iy.1 11 I `� 8 �I .. 1 L_= = /— '_'TIC a _... ill iiu1Ao �I I 2 L G is VdttrM . H SYMOH1 r, ono. 1■1e 8 1lm / :3305e3A00 OM Sl ITtll T'. atw 1122:. orscpsPrtom SITE DATA r+u R• lee i S•,s;cr e, . ' 1 ' 1 1 1 • :r;,1 ge Win MI *YIP N � L' I i . - •... �. ' N N .r+ a ., � ..a _ i 1'1 ! „uu 1 11 o ell i ' ".10 • 1.. 1 — .kill k:k:' i Elpti "' 6U 1 3k: ▪ • ea 1• • • • • • • _I ln1.4d 1 • s j a� 1 1 1• Me .a g 4 4.3 111.+1•.00 a.._.40 •+..N JNfl7Q11 a rwar r= s 'f � : s / .• 1 iir — .. .... of IV / 1 ` +C • �i / � ` i / c'; < '. 4 ".” ' " 7141 ;a `- te? -�- :-.- ;s —i 3CC•:k: �r or outing .N Snglu .� ...... DI1IlIy111111•/1C:111111= 4113 0113 S11rl71 21+ air .. w ' ' I. o.u 44 Ii..n. , . ' w.. +i.+ +n J ■ ./. IM.wi M ilni i 1 11. i► %1 ArdtfNi 'H SrMOHI T1 kiiiir t�n�u� O■+3 S1iVbl Tl + as. /3 2 / g r a .. w ' ' I. o.u 44 Ii..n. , . ' w.. +i.+ +n J ■ ./. IM.wi M ilni i 1 11. i► %1 ArdtfNi 'H SrMOHI T1 kiiiir t�n�u� O■+3 S1iVbl Tl + as. /3 erwe't !'Lr1f4 "11 END APP TH• • LANE i 38 '7 A ll.S &ir i NtI' 1 r1� G � CONCEPTUAL LAYOUT DiTIO 2.0 1 1 2u 599/ 74.0 CARRIAGE HILLS GOLF COURSE aim amo_ 4 52.8/66.0 CE141 • • A.".P. Fi * 28 18" 20" 1.3/ )'‘ 58.1/73.0 7S 54.5/ 88.0 68.0 31.8/45.0 d( 24" LOTS ii II / / AIM Ai MB 111,111 -_, , v 111111 , / ,,-„,,\ ,, ,,,-,.' ,' A: 7 -c -- - .:,. — __=`-"-.8// -- / . ' ,. —) -- 's / 1'1 Ny s_ ,, ,,..,." ,, _:.L... A l - xa„...4.7....os \„.„..„, ........- .:,-, .., • 1 ---. .q • ', ; I I ! 1 ' • t ' 21 r... S" -- 1, I, J 7" ‘• - - - 11 f'- ‘t =1t . SITE 24' 21.4/ 34 f 10 M.G. ROUND STORI H.W. H L. 105S 63.1/78.0 FIG. NO. 8 WATER DISTRIBUTION SYSTEM CITY OF EAGA(r • v, CARRIAGE 11 HILLS CO OLF (Y SE CITY OF FIGURE No. 17 STORM SEWER LAYOUT MAP LE .ONOMO AREAS R0•4 mons (pules* ROM EEWERE (pf• ROMP LIFT DIATOM (KMy) • ROIMi UFT ETATIpM browned 0 STOMA FORGE MAN 41 ,. ♦ ♦ , 4♦ MAJOR DIVt1PW1 POND NORMAL MATER LEVQ . . . . . . . 100.0 E A G A N BON [R D MAf LEVEL • 100.0 � OVER ND 011AMAOE NOM n t == n z a s (- C fn CF. 4100.... ..........,!-,\,. - ' ./et• Jilmstwo 15 ,.......,-1--r—...--- i ...,..,_, •-• 1 I I NI V 4 0• 11M le — A A. I i 00 .... 11 /:\s--,, c.- --k, _C • .• • SITE ••• \ , -11.. RR •_ • ti • die 444 44 4446 FIG. NO. 7 SANITARY SEWER TRUNK LAYOUT CITY OF EAGA N 12" ▪ • — z. ▪ W � M • J 1 81M.ratago ; W z ■.••.. wr.... �.., wr.•.w aNn 7031 , �-z 1 I►ld MIl3ad / 133MS83A01 ON3 SlIVU1 3■i11a1w A►tltllW H STNON1 _,..,., I I ' �' 1 P: i i 1 !' 1. 111 i yl T' 111 \ � 111 L — �_ =_ __= � _- .L - _�_ = -- . z NO 00 IMl I.. 0 0 0u z 4 8 i! iv rT1 1rl Agenda Information Memo July 5, 1994 City Council Meeting REZONING /PRELIMINARY PLAT/VERDANT ACRES E. Rezoning, Verdant Acres /John H. B. Martin and Assoc., of 4.9 acres from A (Agricultural) to R -1 (Single Family) on part of Lot 3, Wescott Garden Lots (PID #10- 83700- 041 -03) located in the NE 1/4 of Section 14 and a Preliminary Plat consisting of 4.9 acres and 6 single family lots on part of Lot 3, Wescott Garden Lots (PID #10- 83700 -041- 03) located in the NE 1/4 of Section 14 - -John Martin & Associates is requesting a rezoning of 4.9 acres from Agricultural to R -1 (single family) on part of Lot 3, Wescott Garden Lots located in the northeast quarter of Section 14 and a preliminary plat consisting of 6 single family lots. The Advisory Planning Commission conducted a public hearing on this item at its meeting of June 28, 1994. The Advisory Planning Commission recommends approval of the rezoning and the preliminary plat subject to the eight conditions set forth in the minutes of the Planning Commission. These conditions modify the staff conditions in the following ways: Condition #4 (Revised) - This development shall extend the 16 inch trunk water main from Woodland Court to the west end of the property. Condition #7 (New) - The developer shall be responsible for mitigating tree loss by planting 39 Category B trees (21/2 inch deciduous or 6 foot conifer) with the first phase of development. Condition #8 (New) - The developer shall be responsible for supplying separate electrical services to each existing and future home. Enclosed on pages ci through i a copy of the Planning Commission minutes and enclosed on pages lL ",through (t ' is a copy of the staff report. ACTION TO BE CONSIDERED ON THIS ITEM: To approve or deny the rezoning of 4.9 acres from Agricultural to R -1 (single family) for John Martin & Associates and the preliminary plat consisting of 6 single family lots on part of Lot 3, Wescott Garden Lots subject to the eight conditions recommended by the Advisory Planning Commission. PAGE 9 /ADVISORY PLANNING COMMISSION MINUTES JUNE 29, 1994 REZONING AND PRELIMINARY PLAT VERDANT ACRES - JOHN H.B. MARTIN & ASSOC. Chairman Voracek opened the next public hearing of the evening regarding a Rezoning of 4.9 acres from A (Agricultural) to R -1 (Single Family) and a Preliminary Plat consisting of 4.9 acres .and 6 single family lots on part of Lot 3, Wescott Garden Lots (PID #10- 83700- 041 -03) located in the NE; of Section 14. Project Planner Ridley introduced this item. Mr. Ridley highlighted that information presented in the City staff's planning report dated June 21, 1994, noting the subject property's background and history, the surrounding uses, the consistency with the Comprehensive Land Use Guide Plan, the density, size and setbacks of the proposed lots, and the grading, storm drainage, water quality and utility plans. Mr. Ridley further noted that the subject property has a total of 15 significant trees and 24,900 square feet of significant woodlands. He advised that the initial site development will result in the loss of one significant tree and approximately 15,900 square feet of significant woodlands. Mr. Ridley advised that accordingly, mitigation requirements for the significant woodland removal is 39 category B trees, to include 21/2 inch diameter deciduous trees or six -foot conifer trees. Mr. Ridley also noted that the subject property is not within the Noise Zone IV of the Metropolitan Council Guidelines for Compatibility, but due to its proximity, the developer or builders are encouraged to consult the Builder's Guide For Aircraft Noise Attenuation available from the City. Neither the applicant nor its :representative was present at the public hearing. Chairman Voracek inquired to City staff as to whether the reference to the mitigation for the significant woodland removal by requiring 39 Category B trees should be a condition of the Preliminary Plat. Mr. Ridley indicated that it should be added as a condition. Member Segal inquired as to whether the proposed cul -de -sac on Lot 3, Block 2 and Lot 3, Block 1, is temporary and whether additional lots will be developed on that land. Mr. Ridley advised that those two lots are planned for subdividing and development in the future. John Wingard advised the Commission that Condition No. 4, requiring the extension of a 16 -inch trunk watermain from Woodland Court to the west end of the temporary cul -de -sac should be revised to require the extension to the west end of the entire parcel. Mr. Wingard reasoned that it is more feasible to extend it through PAGE 10 /ADVISORY PLANNING COMMISSION MINUTES JUNE 29, 1994 undeveloped property at this time. Additionally, he stated that by extending it to the west end of the property now, services can be stubbed to the adjacent "Greene" property planned for future subdivision. Chairman Voracek agreed with Member Merkley that extending the utilities lines to the western property line is consistent with other plats, but expressed concern about putting a condition on the Preliminary Plat without the applicant having an opportunity to speak to the issue. Member Merkley added that he does not have a lot of patience for applicants who do not take the time to answer questions or show up at public hearing for their applications. Member Merkely further noted to the City staff that Conditions No. 2 and 3 should be amended to be consistent with respect to timing, in addition, Condition No. 3 should have added language for the requirement that separate electrical services be connected to the existing homes. All present voted in favor. Merkley moved, Heyl seconded, the motion to approve the Rezoning of 4.9 acres from A (Agricultural) to R -1 (Single Family) on part of Lot 3, Wescott Garden Lots (PID #10- 83700 - 041 -03) located in the NE; of Section 14. Merkley moved, Heyl seconded a Preliminary Plat consisting of 4.9 acres and 6 single family lots on part of Lot 3, Wescott Garden Lots (PID #10- 83700 - 041 -03) located in the NE; of Section 14 subject to the following conditions: 1. The developer shall comply with these standard conditions of plat approval as adopted by Council action on February 2, 1993: Al, Bi, B4, Cl, C2, C3, C4, D1, El, Fi, G1, and Hi. 2. The developer shall be responsible for abandoning any existing wells and septic systems located on the site according to the County requirements upon the completion of the extension of sanitary sewer and water main to the development and connection thereto. 3. The utility layout plan shall include sanitary sewer and watermain service stub and electrical service connections to the existing houses and the developer shall connect to the City sewer and water and electric services within two months after completion of the utility extensions. t�s PAGE 11 /ADVISORY PLANNING COMMISSION MINUTES JUNE 29, 1994 4. This development shall extend the 16" trunk water main from Woodland Court to the west end of the plat. 5. Vacation of the excess right -of -way for Trails End Road is required prior to final plat. approval. 6. A permanent utility and temporary construction easement is required for future westerly extension of a 16: trunk water main to the westerly property line of the proposed development. 7. The developer shall comply with the City's standards for mitigation of significant woodland removal by planting 39 Category B trees, including one -half inch diameter deciduous trees or 6 -foot conifer trees. 8. Separate electrical services shall be provided to each existing and future home. All present voted in favor. SUMMARY OF REQUEST AUTHORITY FOR REVIEW PLANNING REPORT CITY OF EAGAN 1 LI 7 CASE #: 14- PP- 17 -5 -94 HEARING DATE: June 28, 1994 PREPARED BY: Mike Ridley REPORT DATE: June 21, 1994 APPLICANT: John H.B. Martin PROPERTY OWNER Kenneth H. Greene REQUEST: Rezoning and Preliminary Plat LOCATION: Part of Lot 3, Wescott Garden Lots (PID# 10- 83700 - 041 -03) NE 1/4 of Section 14 COMPREHENSIVE PLAN: D -I, Single Family (0-3 units /acre) ZONING: Agricultural (A) On behalf of the property owner, Mr. John H.B. Martin is requesting a Rezoning of 4.9 acres from Agricultural (A) to Single Family (R -1) and a Preliminary Plat (Verdant Acres) consisting of 6 single family lots. The property is located east of Wescott Hills Road, just west of Woodland Court. City Code Chapter 13, Section 13.20, Subd. 6. states: In the case of platting, the Planning Commission and the Council shall be guided by criteria, including the following, in approving, denying or establishing conditions related thereto: A. That the proposed subdivision does comply with applicable City Code provisions and the Comprehensive Guide Plan. B. That the design or improvement of the proposed subdivision complies with applicable plans of Dakota County, State of Minnesota, or the Metropolitan Council. C. That the physical characteristics of the site including, but not limited to, topography, vegetation, susceptibility to erosion and siltation, susceptibility to flooding, water storage, and retention are such that the site is suitable for the type of development or use contemplated. D. That the site physically is suitable for the proposed density of development. Planning Report - Verdant Acres June 28, 1994 Page 2 E. That the design of the subdivision or the proposed improvements is not likely to cause environmental damage. F. That the design of the subdivision or the type of improvements is not likely to cause health problems. G. That the design of the subdivision or the improvements will not conflict with easements of record or with easements established by judgement of court. H. That completion of the proposed development of the subdivision can be completed in a timely manner so as not to cause an economic burden upon the City for maintenance, repayment of bonds or similar burden. L That the subdivision has been properly planned for possible solar energy system use within the subdivision or as it relates to adjacent property. (Refer to City Handbook on Solar Access). J. That the design of public improvements for the subdivision is compatible and consistent with the platting or approved preliminary plat on adjacent lands. K. That the subdivision is in compliance with those standards set forth in that certain document entitled "City of Eagan Water Quality Management Plan for the Gun Club Lake Watershed Management Organization" which document is properly approved and filed with the office of the City Clerk hereinafter referred to as the "Water Quality Management Plan". Said document and all of the notations, references and other information contained therein shall have the same force and effect as if fully set down herein and is hereby made a part of this Chapter by reference and incorporated herein as fully as if set forth herein at length. It shall be the responsibility of the City Clerk to maintain the Water Quality Management :Plan and make the same available to the public. BACKGROUND/HISTORY The Wescott Garden Lots subdivision was platted in 1889. This 120 acre subdivision (zoned Agricultural) was platted into twelve, 10 acre, lots. All of the original platted lots have been split into lots ranging from 1 to 5 acres or rezoned & replatted to R -1 subdivisions. EXISTING CONDITIONS The site topography is rolling and some areas contain a limited amount of vegetation. There are two single family dwellings on the 4.9 acre site, one of which was an outbuilding that was remodeled and converted to a 1 bedroom residence. The City issued the building ��8 Planning Report - Verdant Acres June 28, 1994 Page 3 permit for this remodeling in September 1991. The original construction permits for the house and outbuilding cannot be located. The two homes are served by a single electric and well; each home has a septic system. The owner should provide separate electrical service and hook both buildings to City sewer and water. SURROUNDING USES The following uses, zoning and comprehensive plan designations surround the subject property: North and West - Undeveloped; zoned agricultural; designated D -I, Single Family (0- 3u /ac) South and East - Woodlands 4th; zoned R -1; designated D -I, Single Family (0-3 u /ac) EVALUATION OF REQUEST A. Rezoning The proposed rezoning is consistent with the Comprehensive Land Use Guide Plan designation of D -I, Single Family (0-3 units /acre). B. Preliminary Plat acuity - As proposed, the 61ots on 4.9 acres results in a density of 1.2 units per acre. The applicant's ultimate layout of 13 lots will translate to a 2.65 units per acre density. Both scenarios result in a density that is consistent with the proposed zoning and the existing Guide Plan designation. Lots - The applicant is proposing all lots to meet or exceed all R -1 lot size and width requirements. The lots range in size from 12,000 to 76,857 s.f., with an average lot size of 33,579 s.f. Setbacks - The proposed lot sizes and configurations will allow all R -1 setback requirements to be met. Tree Preservation Policy - The Tree Preservation Plan submitted is acceptable (with mitigation). A total of 15 significant trees and 24,900 square feet of significant woodlands presently exist on site. Existing tree species include oak, black cherry, elm, boxelder, cottonwood and spruce. Existing significant woodlands are composed of boxelder, elm, oak and other miscellaneous hardwoods. Initial site development will result in the loss of 1 significant tree (6.7% of the total), and in the loss of approximately 15,900 square feet of significant woodlands (63.9% of the total Planning Report - Verdant Acres June 28, 1994 Page 4 significant woodlands). This woodland removal will take place to grade down the hill located in the area of Lots 1 and 2 of Block 2. Allowable tree and woodland removal for this type of development is 25% of the total. Therefore the significant tree removal of only 6.7% is well below Tree Preservation standards; however, the removal of 63.9% of the significant woodlands is well above the allowable removal. Mitigation for this significant woodland removal is 39 category B trees (21 inch diameter deciduous trees or 6 foot conifer trees). This situation is one where the existing significant woodlands do not contain many high quality trees; therefore, once developed, the site will probably be better landscaped than it is now. Many of the trees in this woodland are boxelder and elms which are in poor shape and can be considered hazardous if left standing much longer. parks and _Recreation - At the June 20, 1994 Advisory Parks, Recreation and Natural Resource Commission (APRNRC) meeting, the commission recommended a cash dedication for parks, trails, and water quality. Airport Considerations - The property is located approximately one -half mile south of Noise Zone IV of the Metropolitan Council Guidelines for Land Use Compatibility with aircraft noise. As such no requirements are placed on the property, but, due to this proximity,the developer and builders are encouraged to consult the Builder's Guide for Aircraft Noise Attenuation available through staff. Grading/Wetlands - The preliminary grading plan proposes to grade a majority of Lots 1 and 2 of Block 1 and Lots 1 and 2 of Block 2 for the streets and houses. The maximum cut shown is 12 feet and the maximum fill is 6 feet. The grading plan shows constructing the east /west street through the center of the site. All the existing trees that are located in the middle of the site would be removed during the grading for the streets and houses. The existing trees located in the backyard areas of Lots 1 and 2 of Block 1 are shown to be saved. A minimal amount of grading will be needed on Lot 3 of Block 1 and Lot 3 of Block 2 to allow for the construction of the temporary cul -de -sac. Staff has confirmed that there is one jurisdictional wetland within the development parcel. The wetland is located in the southwest corner of the development on one of the large lots. No grading is being proposed in this area, so a Finding of No Significant Impact is appropriate. The developer will be responsible for abandoning any existing wells and septic systems prior to grading of the site. Before any grading of the lots is to occur, the development will be responsible for preparing an erosion control plan to be submitted to the City for review. The developer will (, • Planning Report - Verdant Acres June 28, 1994 Page 5 be responsible for installing and maintaining erosion control measures in accordance with the City's Erosion /Sediment Control Manual Standards. The 16" trunk water main will ultimately be extended westerly through the Green property to the west once it develops. This development is included in the intermediate pressure zone of the City's water supply system. Streets /Access /Circulation - Street access is available from Woodland Court, a 300 -foot long cul-de -sac constructed in the Spring of 1994 by the Woodlands 4th development. The preliminary street layout plan shows connecting to the west edge of the cul -de -sac and extending a 28 -foot street to the west for 350 feet. The developer will be required to construct a temporary cul -de -sac on the west end of the street extension. The two existing houses on this site currently have street access to the north on the gravel road designated as Trails End Road. The extension of Woodland Court through this site will direct the access to the south to Woodland Trail or Sunwood Trail. The developer submitted an overall street layout plan that shows how the surrounding properties could develop. As shown on the overall layout plan, Woodland Court might be extended to the west to serve another 8 to 10 lots. Storm Drainage/Water Quality - This proposed development is located in Drainage Basin J. The eastern portion of the site will be developed first and will generate runoff that will discharge to Pond JP -14, a designated storm water basin in the City's Water Quality Management Plan. The western portion of the parcel will be designated as two oversized lots, each of which will contain an existing residence. Staff recommends a water quality cash dedication for the four new lots to be platted east of the temporary cul -de -sac. The 350 feet of new street is proposed to drain to the east and then to the south to existing catch basins on Woodland Court. The existing storm sewer on Woodland Court has capacity for the area of this plat to drain to it. The existing storm sewer was constructed in 1993 by the Woodlands 4th development. Utilities - An 8" sanitary sewer is available in Woodland Court to serve this development. The preliminary utility plan shows connecting to the existing 8" sanitary sewer line and extending an 8" line to the west to the middle of the cul -de -sac. The sanitary sewer layout needs to include sanitary sewer stubs to the existing houses. A 16" trunk watermain was stubbed to this site from Woodland Court. This development will be responsible for extending the 16" watermain to the west end of the temporary cul -de- sac and then water services need to be provided to all six lots of this development. Planning Report - Verdant Acres June 28, 1994 Page 6 Easements /Right -of- Way /Permits - A pond easement is required over the wetland on Lot 3 of Block 2. The developer intends to vacate 30 feet of excess right -of -way along the east edge of Lot 1 of Block 1. Vacation of the excess right -of -way for Trails End Road is required prior to final plat approval. Permanent utility and temporary construction easement is needed for future westerly extension of a 16" trunk watermain to the westerly property line of the proposed development. This development shall be responsible for ensuring that all regulatory agency permits are acquired prior to final plat approval. Compatibility with Surrounding Area - The proposed land use will be compatible with the existing and forecasted single family development surrounding the Greene parcel. The developer has provided a conceptual layout of how future development may occur on the remaining Wescott Garden Lots to the north and west of the subject site. SUMMARY /CONCLUSION The proposed rezoning is consistent with the Guide Plan designation, and the current preliminary plat requested and the ultimate development design are consistent with the R -1 zoning district requirements. The land use is compatible with existing and anticipated surrounding land uses. Public access and utilities are available to serve the site. ACTION TO BE CONSIDERED To approve /deny the requested rezoning of 4.9 acres from Agricultural to Single Family. To approve /deny the requested 6 lot, Preliminary Plat subject to the following conditions of Plat Approval: 1. The developer shall comply with these standard conditions of plat approval as adopted by Council action on February 2, 1993: Al, B1, B4, Cl, C2, C3, C4, D1, El, Fi, G1 and Hl. 2. The developer shall be responsible for abandoning any existing wells and septic systems when City sewer and water main service is connected to the existing homes. Planning Report - Verdant Acres June 28, 1994 Page 7 3. The utility layout plan shall include sanitary sewer and water main service stubs to the existing houses and the developer shall connect to City sewer and water within two months after completion of the utility extensions. 4. This development shall extend the 16" trunk watermain from Woodland Court to the west end of the temporary cul -de -sac. 5. Vacation of the excess right -of -way for Trails End Road is required prior to final plat approval. 6. A permanent utility and temporary construction easement is required for future westerly extension of a 16" trunk watermain to the westerly property line of the proposed development. / 5 5 A. Financial Obligations STANDARD CONDITIONS OF PLAT APPROVAL 1. This development shall accept its additional financial obligations as defined in the staff's report in accordance with the final plat dimensions and the rates in effect at the time of final plat approval. B. Easements and Rights-of-Way 1. This development shall dedicate 10 -foot drainage and utility easements centered over all lot lines and, in addition, where necessary to accommodate existing or proposed utilities for drainage ways within the plat. The development shall dedicate easements of sufficient width and location as determined necessary by engineering standards. 2. This development shall dedicate, provide, or financially guarantee the acquisition costs of drainage, ponding, and utility easements in addition to public street rights -of -way as required by the alignment, depth, and storage capacity of all required public utilities and streets located beyond the boundaries of this plat as necessary to service or accommodate this development. 3. This development shall dedicate all public right -of -way and temporary slope easements for ultimate development of adjacent roadways as required by the appropriate jurisdictional agency. 4. This development shall dedicate adequate drainage and ponding easements to incorporate the required high water elevation plus three (3) feet as necessitated by storm water storage volume requirements. C. Plans and Specifications 1. All public and private streets, drainage systems and utilities necessary to provide service to this development shall be designed and certified by a registered professional engineer in accordance with City adopted codes, engineering standards, guidelines and policies prior to application for final plat approval. 2. A detailed grading, drainage, erosion, and sediment control plan must be prepared in accordance with current City standards prior to final plat approval. 3. This development shall ensure that all dead -end public streets shall have a cul -de -sac constructed in accordance with City engineering standards. 4. A separate detailed landscape plan shall be submitted overlaid on the proposed grading and utility plan. The financial guarantee for such plan shall be included in the Development Contract and shall not be released until one year after the date of City certified compliance. D. Public Improvements 1. If any improvements are to be installed under a City contract, the appropriate project must be approved by Council action prior to final plat approval. E. Permits 1. This development shall be responsible for the acquisition of all regulatory agency permits required by the affected agency prior to final plat approval. F. Parks and Trails Dedication 1. This development shall fulfill its park and trail dedication requirements as recommended by the Advisory Parks, Recreation and Natural Resource Commission and approved by Council action. G. Water Quality Dedication H. Dther 1. This development shall be responsible for providing a cash dedication, ponding, or a combination thereof in accordance with the criteria identified in the City's Water Quality Management Plan, as recommended by the Advisory Parks, Recreation and Natural Resource Commission and approved by Council action. 1. All subdivision, zoning and other ordinances affecting this development shall be adhered to, unless specifically granted a variance by Council action. Advisory Planning Commission Approved: August 25. 1987 LTS* 5 STANDARD CON City Council September 15. 1987 Revised: July 10. 1990 Revised: February 2. 1993 FINANCIAL OBLIGATION - Verdant Acres There are pay -off balances of special assessments totaling $6,864 on the parcels proposed for platting. The pay -off balance will be allocated to the lots created by the plat. At this time, there are no pending assessments on the parcel proposed for platting. The estimated financial obligation presented is subject to change based upon areas, dimensions and land uses contained in the final plat. Based upon the study of the financial obligations collected in the past and the uses proposed for the property, the following charges are proposed. The charges are computed using the City's existing fee schedule and connections proposed to be made to the City's utility system based on the submitted plans. Improvement Use Rate Quantity Amount None t % tc, ). r±s....._____k • 4' , A nsw ! 1 " % / . V - r:464 of t s ' r s • \ . '., • i X ■ it d.\ \. • •••••7:"..4. ..) fiv ..) ....wit A 4i v to ., a, D; 1. ..°1,------1r--.: n • ‘4 '1 ...'■ /5.- .1 ! . •• ti. . 1).3 , ■ a . - • .1•• - r"i . • ( 4 1. , :ia, _ . -,..- .______i flo +4 T ... ., 7 1 1 1 4 1. -maw co* t. *Dv. re Sr 3 rownwe rr • . mitt* moat 4 1? 1. Ato,•co0 4. drEDIFOOD 7. W.= in V:100t,t . • 3 ...' - • • .4;, •%.) ..,..‘ L- 12-L-11g 1% -;44 i L •■... / fir -Li , , ,,,■ ri: pi pm i....... , u , . i O'LLART 1Altir— 0 . „,:,......4 ii• .! *7■'). I • ' 0 i p :PI 7. _ a .." •7•: .7;i17: - • •.....d..•/- .3 L I ...4: . .. NY !I • as Ar IV 1? ; ' Winc,:Frr 2 iller il y: C \ , x *nom 1:L'' . • J . , . 1 . L f4ailm .' I Ti e li sa .,,,,AL ,-....i.t i • cestryt - :K61, _ ,• , • ,„4,,,, -it )catsrm,. ,..., .... g I l '":..- r _ i ..,. .+0, ? 7 ( g tLe7t . i: .. .Fi* N\ NO 1 • . .. CALOR/AC! f r 1;1 aotri '4"%et; room. / it NE SE \ ...■doself(Romil I OC AT I 0 N 7 01\111\10 GUIDE P1 AN tY /s 1 AREA MAP 8 1 r R 1 .; i =4, 4 h n 1.1! n 2 is S; i g v ;PI g :41; 11 OJ 1S .s 31402 1v l 0S3a & -d 3032 1rtlfUINNOY .1 • sa /(9 o € Y *pp pAA V. =R 112 p a.A QQa 6 � ..� ^ La R g. . ;p ooh boo "' :;,; s r� 1s �t y� b ci pa�3! 6!E ti 4i�t rca� V t o �l c 7 Go / • A A $ AAARAAAV y ; -$:$2S; AA o :; ...o. .or$$R soeaaooa;;; Ilats .. U O V) V) y �O W N CC W ZZ • 0 C — ZX < Z 0 C 0 1 O < W arm; golf /ce3 0 1 r. `O. o ti o O -J 0 3 A 1 b 0 S 1 1 I H 1 1 0 0 S 3 M 1 r J, LJ w r LJ 0 r 1 Z L J d. r > LJ O r 0 L 0 - oi 1 EPTUA! ! M J'JT = 3 W > 0.> L a'O • J ~ 3a Cr m CC 0 0 D. L. IA 1 14 s C/ V t i c a _ e 0 c 0 .l= . T LG214 a/29/9u Minnesota Lawful Gambling Premises Permit Application - Part 1 of 2 Y }: Type of APplica tion< .. Renewal Organization base license number New Premises permit number Organization Inf Nam of Organization Nam)? of 'f � 1 Caziez/e T6af' FOR BOARD USE ONLY BASE # PP # FEE CHECK INITIALS DATE Class of premises permit (check one) ❑ A ($400) Pull -tabs, tipboards, paddlewheels, raffles, bingo B ($250) Pull-tabs, tipboards, paddlewheels, raffles ❑ C ($200) Bingo only ❑ D ($150) Raffles only Business Address of Organization - Street or P. 0 Box (Do not use the address of your gambling manager) 3 /..?7 State Zip Code County /1�iPar/ ,PC/ 1�.Z.Z plif -07 Name of chief executive officer (cannot be your gambling manager) Title ,4J'AT/ f_ 4 0,e �i� 0 / %&#'r Bingo Occasions If applying for a class A or C permit, fill in days and beginning & ending hours of bingo occasions: No more than seven bingo occasions may be conducted by your organization per week. Day Beginning/Ending Hours Day Beginning/Ending Hours Day Beginning /Ending Hours Daytime phone number ( i 1 / 2 ) % - 6f Daytime phone number to to to to to .Gam blin 'Prep iseS ormat on to Mingo will not be conducted. check here EM f7le s' .'.Z .4/ f.•ti, & Does your orgaon own the building where the gambling will be conducted? n YES A rK NO If no, attach the following: • a copy of the lease (form LG202) with terms for at least one year. • a copy of a sketch of the floor plan with dimensions, showing what portion is be brad. A lease and sketch are not required for Class D applications. to Name of establishment where gambling will be conducted Street Address do not use a post office box number) J . / .291e /< , . s , 22'c• LP8,9 J 4 xr .n c,1) Jim a2) PO . /7 :a4w js/ L Is the premises located within city limits? ,Yes 0 No If no, is township O organized n unorganized n unincorporated City and County where gambling premises is located OR Township and County where gambling premises is located if outside of city limits i i/ () Name and address of legal owner of premises City State Zip Code .17.17. Address of sto , e s ace' of amblin e" ui rnent - do not Use a Po box number Addrass City State Zip code J/.25" 30.P1) . eMW At/ Cia #' G 4//.'L ff X2 Mr 7J7 J2 gar Gambling Bank Account information Bank Name / .1 ddress Name, address, and tee of persons eotho ized to sign nhecks and make depossts :and withdrawafs : ? • Organization's treasurer may not handle _garnb&nq funds • Name ZTos 3 939 J25/A2 e % *v i r,a‘/. R4ofte �/� ,4 = ice" 1 1a / 1�� ��G% ,�rv��3 �. ‘- Sz/s/W o / (G"~✓Ac/ 60‘,4/ r 5 , , /, /f c ictAl > -rZ,v Acknowledgement Gambling Site Authorization 1 hereby consent that local law enforcement officers, the board or agents of the board, or the commissioner of revenue or public safety, or agents of the commissioners, may enter the premises to enforce the law. Bank Records Information The board is authorized to inspect the bank records of the gambling account whenever necessary to fulfill requirements of current gambling rules and law. Oath 1 declare that: .1 have read this application and all information submitted to the board is true, accurate and complete; •aII other required information has been fully disclosed; Signature of chief c utive car x A vvy xe ti � ,� Local Government Ackr owledgena 1. The city 'must sign this application 11 the gambling prem- ises is located within city limits. 2. The county "AND township'• must sign this application if the gambling premises is located within a township. 3. The bcal unit government (city or county) must pass a resolution specifically approving or denying this application. City or County' City or County Name C t 1 Y oc E A- G-An} Signa re of person receiving application zeh.e Title 7 4.347.4r. Ass T Refer to the instructions for required attachments:. Mail to: Gambling Control Board Rosewood Plan South, 3rd floor 1711 W. County Reed B Roseville, MN B$113 Minnesota Lawful Gambling Premise Permit Application - Part 2 of 2 Date Received /�/ / .�s222 Address Title Township ** Township Name Bank Account Number •I am the chief executive officer of the organization; .1 assume full responsibility for the fair and lawful opera- tion of all activities to be conducted; .1 will familiarize myself with the laws of Minnesota governing lawful gambling and rules of the board and agree, if licensed, to abide by those laws and rules, including amendments to them; •any changes in application information will be submitted to the board and local unit of govemment within 10 days of the change; and .1 understand that failure to provide required information or providing false or misleading information may result in the denial or revocation of the license. 4. A coon of the bcal unit of government's resolution BD- proving this anofication must be attached to this avotication, 5. If this application is denied by the local unit of government, it should not be submitted to the Gambling Control Board. Township: By signature below, the township acknowledges that the organization is applying for a premises permit within township limits. Signature of person receiving application Title Date Received LG214(Part 2) (R.v7r2M1) MINUTES OF A SPECIAL MEETING OF THE EAA: CiY :e4!Itk::: . ••June 21, 1994 A Special City Council meeting was hek3 itTues ; :3i .ine 21, 1994 at 5:00 p.m. in the lunchroom of the Eagan Municipal Center building. Those in atteiiddri6e' were Mayor Egan and City Councilmembers Awada, Hunter, Masin and Wachter. Also present were Director of Public Works Colbert, Director of Community Development Reichert, Chief of Police Geagan, Assistant to the City Administrator Hohenstein and City Administrator Hedges. . VIEWING O 03A0 APE City Councilmembers viewed a videotape corrteining a eegment from the June 9, 1994 Channel 5 news on downtown Eagan. The tape was 58 secon4:ii? Iength.stz;f.ring a positive point of view concerning the vision several suburban communities have „.sp0.QI I ' Ea s 'to develop downtowns. TWIN CITY POULTRY /CEDARVALE' REDEVELOPMENT Assistant to the City Administrator Hohenstein stated that in accordance with the statutory requirements for adopting the Cedarvale special service district ordinance, a notice was mailed to all property owners in the affected area. He stated that a representative of Twin City Poultry at 3835 Beau d'Rue questioned whether there were any t}pt S for reduced or waived special service district charges for non -retail property owners. Assistant to* Hohenstein presented four (4) options Including: 1) include in district at standard rate, 2) ''rtioi'4e in district with short -term deferment of charges, 3) include in the district at a modified rate and 4) :exclude ffariThe. district. City Councilmembers discussed the possibility of the options. After further discussion, Mayor.jan:summarized the City Council consensus, stating that the Council did not support excludirig.:a Vropeiiir - from the district, but that a decision on the firm's charges will be deferred until the putiliti :I giiiir+j• on the district budget allowing Twin City Poultry to • appear and discuss the matter. POLICE FACILITY BIDS City Administrator Hedges reviewed a memo dated June 20, 1994 entitled Police Facility Bids” that discusses the base bid, alternatives for r ld ;:$ftetri tes;azid a recommendation to the City Council, all pertaining to the police facility bids that wefe :teeei cf :VSt.etki aday, June 15, 1994. Mike Stowe of E &V Construction appeared and stated that the police facility : project poptains twenty -nine (29) separate base bids for a total contract of $3,064,141. He stated that thins amount::i$. approximately $157,000 higher than the budget estimate and does not include any alternat0:::Mr. Stc'vi?i2 provided a detailed explanation of each bid stating that reasons for the increase include: 1r1i flation *;to how busy the construction trades are at the present and 2) the estimate for Bid #23 for the heattrig, ventilation and air conditioning was considerably higher than anticipated by both the architect and construction manager. Mr. Stowe recommended to the City Council that 25 of the 29 bids be awarded and that he would work with the successful bidders to consider certain change orders that would reduce the base bid by as much as $30,000. He also suggested that certain bids not be q Larded, such as the dumb waiter, that other bids be delayed for further analysis, including.the.;; ecurity systerri. Members of the City Council expressed concern regarding the higher bid; how@er;:::d R: e::40rnatives to awarding the bid would be detrimental to the project and agreed' Viitli':•3 '•'tlireeilori::2rid recommendation of Mike Stowe, the construction manager. Page 2 /EAGAN SPECIAL CITY COUNCIL MEEt1 ..MINUTE$..:, June 21, 1994 • Mayor Egan suggested that every abet be made to neg e the base bids in an effort to reduce the overage and hopes that the total project:tx the police facility. remodeling of the municipal center building can stay on budget. He further statedNtAhe official 1;0:A would be considered at the regular City Council meeting later in the evening, JuneW COMMUNITY DEVELOPMENT UPDATE Director of Community Development Reichert stated that her staff is making efforts to prepare a design charrette for the O'Neil property in order to consider potential development options. She stated that there is a necessity to develop a plan beforEf:t?ss O*Wid. Ai } *t#d the development is presented to the City if the parcel is to be given special conssd 'tatlor'r'fi t :i<kwfitt n development. Director of Community Development Reichert : .also stated.that the City is in need of more financial tools to proceed ahead with economic developm :;options. ; : :Shie stated that a work program will be presented to the Economic Development Cdiitxiibi ata #if :d'meeting. She further informed the City Council that the development submittal date ii4 f be mo a k from the 15th of the month to the 1st of the month allowing additional time for staff reports and better coordination of packets for both the Advisory Parks, Recreation & Natural Resources Commission and the Planning Commission meetings. N.O.I.S.E. ORGANIZATION Mayor Egan stated that he has been t ormnended as President of N.O.I.S.E. and if he accepts the nomination and is elected to the office, there could i l .many as two to three trips to the Washington D.C. area for congressional testimony each of the two.�!ears tit iifd in that office. City Councilmembers gave their consensus to increasing the travel buqigt to allow.Mgyoi Egan to fulfill those travel requirements. Members of the Council also congratulated the: May 0 00iptiasized the benefit his presidency would bring to the City of Eagan and its major : 0pl4yer; ::1Noithwest Airlines, during his leadership in that organization. There being no other Items of business, the meeting was adjourned at 5:25 p.m. Date OTHER BUSINESS City Clerk MEMO city of eagan TO: CITY ADMINISTRATOR HEDGES FROM: ASSISTANT TO THE CITY ADMINISTRATOR HOHENSTEIN DATE: JULY 1, 1994 SUBJECT: BEA BLOMQUIST CORRESPONDENCE Attached you will find a copy of correspondence which Bea delivered to City Hall on Friday relative to the City Attorney's correspondence of June 24 regarding the Bieter lawsuit. Bea contacted Virginia Discenza and indicated that she wished this to be distributed to the City Council but wanted it kept confidential. Because I do not know the details of your discussions with the Council in terms of the offer made by the City Attorney relative to this item, 1 have held it for you to distribute on Tuesday with any explanation you may wish to give rather than distributing it in your absence. If you have any questions regarding this item, please let me know. Otherwise, 1 have indicated in the Informative Memo that it may be necessary to have an executive session if you wish to discuss this at all with the City Attorney and Council. This may not be the best way to handle this, but it seems to make some sense. stant to the City Administrator Attachment JDH /vmd Post-It" brand fax transmittal memo 7671 #01 pages ► % :, *'# t �s ; reuf . , Dept. Pomo Y Fax # Fax F SENT BY: R -95% 4504 Oak Chase Road Eagan, MN 55122 June 29, 1994 Severson, Wilcox & Sheldon, P.A. Attention: Jim Sheldon 600 Midway National Bank Building 7300 W. 147 Street Apple Valley, MN 55124-7538 Cdr Jim 7- 1 -94 ;12:27PM ;SEVERSON WILCOX SHEL 612 681 4612;# 1/ 1 Please be advised that 1 am in receipt of your letter dated June 24, 1994. l want to go on record as not agreeing to accept a one time offer of (10) hours for a deposition. The event that my deposition would be taken, is dearly unlikely, depositions and discovery are over. The exception to this would be if myself or someone else from the city would be selected as one of the ten parties that would be allowed in the Hoffman counter suit. Depositions should pertain to concerns between Dors' Whitney and the Ryan Company. In my opinion, it would be unlikely to be anyone related to the city that is subpoenaed. I was scheduled for a June 16 deposition as I explained to you. The information for the deposition was completed during the dis ,va,r. T a only issue at hand is my taxes. As you know Judge Alsop stated to the court that 1 abide with Judge Noels' ruling. That Is to give them the tax forms with the lines blacked out; • I am not sure that 1 ever understood this order. The one time 10 -hour limit is arbitrary and cannot be set by the city. I do not know how long or how much I will need anyone to help me. The statute does not lock me in, therefore, I will not be locked in by a number drawn from thin air and that has no real meaning. This case has gone on for seven years and 1 cannot predict its future. We all know they do not have a case. Bea Blomquist ff c: Tom Hedges Tom Egan Members of the City Council 612 432 3780 07 -01 -94 12:27PM P001 #15 MINUTES OF A R t £EttN THE EAGAPf:::L�ITY COUNCIL Eagam{ Minnesota Juf0, 1994 A regular meeting of the Eagan Cit ' ciuncil was held on Tuesday, June 7, 1994, at the Eagan Municipal Center. Present were Mayor Egan and Councilmembers Wachter, Awada, Masin and Hunter. Also present were City Administrator Tom Hedges, Director of Community Development Peggy Reichert, Director of Pubki4rO. ; TQ]q .. : Colbert, and City Attorney James Sheldon. AGENT . City Administrator Hedges nptsd were no changes to the Agenda. Councilmember Hunter moved, Councilmember Awada seconded a motion to approve the agenda for the June 7, 1994 regular City Council meeting. Aye: 5 Nay: 0 ;: ;NyTES Minutes of May 18, 1994 Regtt:::: Council Meeting Councilmember Hunter noted that he...ya 0. present at the special meeting of April 12, 1994, his na0e41c • •be removed from the attendance list. Councilmember Hunter noted that several changes should be made to the Minutes of May 18, 1994, meeting. On the Page 8, third paragra h, third line, the statement where it says lack of suitability shct>xi:::W0,iged to "the same topographical concerns." Halfway''t?rr6 i ..: t3 &third paragraph it should read "that even though there A:s park proposed for this site, to plan for a park on the 105 ct~t:•e ti ;angle." Furthermore, the sentence which mentions access conce s sh4ti1d reflect that it is not provided as proposed but a reasoriaDle p ;;an for future access is given." On page 15, under LEGISLATIVE INTERGOVERNMENTAL AFFAIRS UPDATE, it should be added that some cities have used the community development block grant to offset special esessments for qualified low- income residents. Councilmember Wachter note4 tW 's:': g 17, it should be noted that a Ms. Elizabeth Kennealy Is' ' §biet 'ryt[nd Treasurer. Councilmember Hunter moved, Awada secci iced, a motion to approve the Minutes of the May 18, 1994, regular City Council meeting as amended. Aye: 5 Nay: 0 Minutes of May 18, :::X4 CtpC'QY0nci1 Workshop Councilmember Wachter moved,. ; Hunter seconded, a motion to approve the Minutes of the May 18, 1994 4.ty Counc .1:::Workshop. Aye: 5 Nay 0 Minutes of May 3, 1994, "tity Council Workshop -2- In the first paragraph, the name should be changed to the Golf Driving Range. Under the wading pool discussion, Councilmember Wachter mentioned that the wading.::: ib W anticipate necessary space for an all- season pool and that;: ¢tl: be strategically located. Councilmember Wachter moved, Awada_ a motion to approve the Minutes of the May 3, 1994: ]. as amended. Aye: 5 Nay: 0 Minutes of April 28, 1994, City Council Workshop Mayor Eagan moved, Wachter a motion to approve the Minutes of the April 28, 1994,ounci1 Workshop. Aye: 5 Nay: 0 DEPARTMENT HEAti EFp;INESS Councilmember Wachter raised te, i whether the City could raise money by selling its own bortfty Administrator Hedges said that he and his staff would li# g: ti>''explore this option and will determine the feasibility of the City selling its own bonds. Councilmember Wachter raised the issue of plastic street signs, instead of the metal type and whether they would be more economical. The Director of Public Works, .T'om responded by saying that he and his staff would check iii €ti::;tlhi3:$::?551.bility. Councilmember Wachter raised the4ossib4ity of putting names of individuals whom have not paid their:;: l Die taxes on cable television. A question was asked whether any reports on the Green Acres Project had been produced. The Director of Community Development, Peggy Reichert, said this information is partially completed. RECOGNITION Mayor Eagan noted that th6t i, .: ou. d. the residents who participated in the Normaic.:3:::2't ? sion. CONSENT AGENDVis In regard to Item I. Resolution and Findings of Facts, Denial of Rezoning of 30.1 Acres From R -4 to R -1 Located South of Lone Oak Road and North of Highway 55, Councilmember Wachter noted that he was not going to vote in favor. Mayor Eig0:::iiigit4d: Sheldon whether the Council should discU s the lette*: :::that it had received from Marrell Inc.'s attorney. Attorney Sheldon then noted that this letter merely is a stipulation 0g :facts. Mq Egan noted that the letter from Marrell Inc.'s attorll• :•.w .11 . >g::: eviewed at a later time Councilmember. Hunter also mentionwill join Wachter in not voting to approve Item I of the Conseil''• ends. In regard to Item L. License, Massage Therapist - Laceson Town, Kokomo Tan, Cliff Lake Center Councilmember Wachter ::i ii'&ec:zitifi? :the extent of the massage licenses and whether they were giv0:::10 individuals prior to Council approval. Administrator Hedge this matter would be looked into In regard to Item M. Contr4;:::Nt's: $ :2eceive Bids /Award Contract (Wilderness Run lst -4th Additions Street Rehabilitation), Councilmember Hunter noted that this Rehabilitation Project came in one -third lower than the feasibility report indicated, consequently, the assessments should be lowered from $3,500.00 to approximately $2,500.00. In regard to Item N. Projec'fi ::: 64 • :. :. Revise Pending Assessment Roll /Order Final Assessment Hearin : eo . t, Rehabilitation, Public Works Director Colbert noted that the City torney's Office, following an appraisal process, is::regpxu*d. ng that the pending assessment be revised to reflect.• i ax iauiit'assessment of $2,500.00 per single family residential 40egliivalent. Councilmember Masin questioned whether a homeowner wishing to pay now could get a refund if the costs are lower than $2,500.00. Public Works Director Colbert indicated he would look into the possibility. In regard to Item S. Project 656 Receive Feasibility 4 Report /Order Public Hearing (C4:V&1,:::A64eg$ Improvements - Silver Bell Road and T.H. 13) , Adminst'r4iti6rA1er446g noted that the feasibility report should be continues: to the June 21, 1994, City Council meeting. In regard to Item V. Ordinance A itiendme] ::: to Chapter 11 - Land Use Regulations (Zoning) By adding Section 11.04', Interim Use: Study Area and by Adopting by Reference Eagan City Code, Chapter 1 and Section 11.99, Mayor Egan noted that this issue was earlier discussed regarding the letter received from the Marrell Inc.'s attorney. Councilmember Hunter inquired whether it wpu:Ld be reasonable to shorten up this moratorium to a time perio:sof less than one year. Community Development Directo ofed that it was her intention to draw something utt: : :. : ::iD ' the summer or early fall. Councilmember Wachter indicated that li:was not in favor of the moratorium. Councilmember Awada mentioned 'that she was generally in favor of commercial development and that she would not like to see the developer unnecessarily delayed. -3- A. Personnel Items Item 1. Seasonal : aia scg trance workers - -It was recommended that Ryan Tru : anger and LIi emy Olson be haired as seasonal street maintenance : w orkers. Item 2. Seasonal street : ipmen t4iiintenance worker--It was recommended that Wayne Bi1tO : : : ::p 'hired as a seasonal street /equipment maintenance work et'': - Item 3. Seasonal park maintenance workers - -It was recommended that Rolf Simonson and Duane Barton be hired as seasonal .park maintenance workers. Item 4. Seasonal utilit: manenance worker - -:It was recommended that Darren Wilke be hired as a seasonal utility maintenance worker. Item 5. Seasonal rec ia at 'O : :;i ants - -It was recommended that Shannon Haugh, Heather Kjos, Chr Larson, Kimberly :Larson, Jonelle Nevanen, Colleen O'Shaughnessy, Joan Smebakken, Lynne Smebakken, Robin Stubblefield, Julie VandeWalker, Mark Wahlstrom and Kristin Wishy as seasonal recreation leaders and of Carolyn Beecher, Martha Buyck, Deborah Gretsfeld, Jasen Groff, Eva L'Herault, Derrick Hoffman cheile Huss, Allison Johnson, Charles McCarty, Keri Muench, Tia Angela Orton, Patricia Valusek, John Wahlstrom and Stepi : Zeitz be hired as seasonal recreation assistants. Item 6. Reorganization ity Development Positions - -It was recommended that the : ::p s.it1on of Assistant Chief Building Official be eliminated, that Bill Bruestle's title be changed to Senior Inspector and that Dale Schoeppner be appointed as Senior Inspector. Item 7. Student internship - -The Council was informed that John Devine III will bei0;.1:ng : : :a : : :$tudent internship in the Parks & Recreation area diir'i rid' th gi t r months. Item 8. Administrative sO reta - It was recommended that Diane Palmersheim be hired as Admnistrative Secretary. Item 9. Streets /equipment maintenance worker resignation - -It was recommended that the resignation of Bill Gallagher be accepted and that approval be given to fill the position of maintenance worker in the Streets /Equipment Division. B. Licenses, Plumbers It was recommended tC' : :: :'fers' licenses for Anderson Mechanical Inc., Best PlumbirigIet'rtg, K & K Heating & Plumbing Inc., Krumholz Company Inc., Larson Plp thing & Heating Inc., M & W Water & Sewer Inc. and Minnesota Mechai;ial of Minneapolis -St Paul Inc. be approved as presented. C. Pause for Pledge of Allegiance Proclamation It was recommended thak::::a::::: edd:141iaat: •n setting 7:00 p.m. on Tuesday, June 14, 1994,# be the Pause for the Pledge of Allegiance be approved. D. adoption, Amended MVTA at, Pow :Agreement It was recommended that • 'tiit"' amended MVTA Joint Powers Agreement be adopted. -5- E. Resignation, Advisory Parks, Recreation and Natural Resources Commission member It was recommended that t& resiggnation of Erin Ipsen- Borgersen from the Advisory parks.: Recreation & Natural Resources Commission be accepted. F. Special Use Permit, Pali:l.•:s: Mar g# Temporary Vegetable Stand It was recommended that a special use permit for Pahl's Market to allow the temporary sale of fruits and vegetables on the southwest corner of Dodd and Cliff Roads be approved as presented. G. Resolution and findings fact, denial of Comprehensive Guide ;f Plan amendment, Good Va1i , :ws It was recommended that re$blutaon and finding of facts for the denial of the comprehhensiv:c t .d:e plan amendment for 9.6 acres located west of Crests. d: e:: ve and east of I -35E in the southeast quarter of Secti§4:::fi:61Good Value Homes be approved. H. Resolution and findings of fact, denial of Comprehensive Guide Plan amendment, Centex Homes It was recommended tbat the resolution and finding of facts for the denial of the comp aia:e:1d? plan amendment for 19.52 acres located south of Towriiiit'r and east of Yankee Place in the northeast quarter of Sect on 15/Centex Homes be approved. I. Resolution and findings of :: iact. :menial of rezoning, Marell Incorporated It was recommended that the resolution and finding of facts for the denial of the rezoning of 30.1 acres from R -4 (Multiple) and A (Agricultural) to R -1 (Single Family) located in the northeast quarter of Section 12 for Mgrgell, Inc. be approved. J. Ratification, DTED Res.Q,tR Bazen /Lull Engineering Grant It was recommended that the resoltion supporting the grant application to the Department of Trade Economic Development for Lull Engineering be ratified. It was recommended that a massage therapist license for Laceson Town to perform therapeutic massage at Kokomo Tan in Cliff Lake Center be approved. M. Contract 94 -06. Recei :' B a :. :Wa' : ontract (Wilderness Run 1st - 4th Addition) It was recommended that :t he bls for Contract 94 -06 (Wilderness Run lst -4th AS304 ns ;: : .-- Peet Rehabilitation) be received and the contract beyia Contracting in the amount of $424,370.25 and the Mayor and City Clerk were authorized to execute all related documents. N. Proiect 660, Revise Assessment Roll /Order Final Assessment Hearing (Wi ;I r.rress Run 1st - 4th Addition) It was noted that the prap process for Project 660 (Wilderness Run lst -4th Adtitions,. Rehabilitation) was complete and it was recommended...::h it :;th revision of the pending assessment roll to reflect•:. : : :* :itax tium assessment of $2,500 per single- family residential :1a : be authorized. O. Proiect 674, Receive Petition /Authorize Feasibility Report (Violet Lane) It was recommended that.....t he..,..petition be received and the preparation of the feasibi1 t :::xe 0 t::: 4 Project 674 (Violet Lane - Streets and Utilities) be ' aiittiori'2ed P. Contract 94 -05, Receive BidjAwarc ;Contract (Dodd Roadl It was recommended that the bids fcii :Contract 94 -05 (Dodd Road - Street & Trails) be received and the contract be awarded to McNamara Contracting, Inc. in the amount of $716,739.75 and the Mayor and City Clerk were authorized to execute all related documents, subject to written State Aid approval. Q. Project 661R, Receive Revised Fea5I#ility Report /Order Public Hearing (Sibley � ;•: „Ustrial Park - Street Rehabilitation) This item was pulled from co» ent and was Acted upon seperately below. -6- R. Project 673. Receive Feasibility Report /Order Public Hearing (T. H. 3 /School Road) It was recommended tha;'the feasibility report for Project 673 (T.H.3 /School Road - Streets ,ax}d Utilities5 "be received and a public hearing be ordered to be he'3:d.:•.on July $;;:::;1994. S. Project 656, Receive Fe a'A2eport /Order Public Hearing (Cedarvale Access Improvement) It was recommended that the feasibility report for Project 656 (Cedarvale Access Improvements - Silver Bell Road and T.H.13) be continued to the June 21 CkWpc . :: T. Project 672, Approve Reilutid;(greeinent - Financial Participation (T. H. 3 /Cliff,.Road S'ttnal) It was recommended that::.: t4 :lt n /agreement for financial participation with the Soo :1; i4'ftaf : id and MnDOT for Project 672 (T.H.3 and Cliff Road - Signalization) be approved and the Mayor and City Clerk were authorized to execute all related documents. U. Ordinance, Community Investment Fund Ordinance /Policy It was recommended th.:.,:he..revised community investment fund ordinance and operational po1.c ),e ,Approved. V. Ordinance Amendment to C Ater 1 And Use Regulations It was recommended thg.t. amendment to Chapter 11, Land Use Regulations (Zoning::::hy adding Section 11.04, Interim Use: Study Area and by adopting reference Eagan City Code Chapter 1 and Section 11.99 be approved. W. Authorization, Request for Proposal, Lexington Meadows It was recommended teWWWf:vK: the sale of the Lexington Meadows Subdivision be approved i cl:'d stribution of the document to potential purchasers be authorizd. Councilmember Hunter moved; i 87i a motion to approve the Consent Agenda noting, Counilmember Huri#r and Wachter voting no on Item I. Aye: 5 Nay: 0 Project 661R, Receive Revise'if`@, siVy Report /Order Public Hearing (Sibley Terminal Industridt ; :i1W#fj;ytreet Rehabilitation1 Tim Herman spoke on behalf of business and property owners who would be affected by the proposed street rehabilitation project. Mr. Herman noted *that he and his coalition have never disputed the fact that this rehabilitation is nec , ;; :iia�ra?�er, their main concern is that there may be causes other =tti ptitii li :Nipar which may have caused the disintegration of this arOiii:undexonsideration for rehabilitation. Mayor Egan noted that, report existed which indicated the extent of maintenance ; w# ach tti#i City has done on this street over its entire existencea;:'tkipan looking at this report it would seem that the City wae:ii ne41: in any way in maintaining the street. Mr. Herman then indicated that he and the people he represents would like to find out who did the patch work on Yankee Doodle Road in order to determine whether repairs had been done negligently. Councilmember Hunter indi;i}tiOd.. he and the rest of the Council had inspected Yankee Dcs'od1 to and that the area which has been patched is very small in comp .the entire area that needs work. Councilmember Masin nt:ted that.,ankee Doodle Road was built in 1970 and that perhaps its;: us.e.fu*l,:f e had been extinguished at this point. Mayor Egan therl...nbtedthat the determination of who is at fault is premature and t i :tie issues at this stage is to determine the feasibility in regard to the financial burden of this Project and also the engineering feasibility. Councilmember Hunter moved, Wachter seconded, a motion to approve the feasibility report for Proj 661R (Sibley Terminal Industrial Park Street Rehabilitation) a/ d:::: erg::. p410 c hearing on July 5, 1994. Aye: 5 Nay: 0 Public H ringgi Vacate Drainage and Utility Easement (Lot 1, Block 1, United Stationers Addition) Mayor Egan introduced this item as Vacation /Lot 1, Block 1, United Stationers Addition. City Administl Hedges provided introductory comments and noted that on M4:;:; 1994, the City Council received a petition to vacate, a t,ipp_.sa ..; 4 drainage and utility easement and scheduled a publ::::04040 :1 notices have been published in the legal newspaper'arid "edit:"to all potentially interested parties. As of this date, Pub1WWorks Director Colbert noted, the staff has not received any obj00:tions to the proposed vacation. However, the City staff has identified a concern with the ability to construct a 60 -inch diameter storm sewer pipe along the southeast edge of the proposed building expansion that will result -8- with the vacation of this easem 3i i'beie4re Aly, the developer has agreed to construct 320 feet of:; his storm gi5der pipe in consideration of waiving the water quality dedication fee. This storm sewer would serve as a water quak:;ty bypassY:buting industrial storm water through a detention basin iii.44KtpA0Oharging it into Fort Snelling State Park and the Minne j:,,ter Councilmember Wachter moved, Awada seconded, a motion to close the public hearing and approve the vacation of a portion of utility easements over Lot 1, Block 1, United Stationers Addition as described and to execute all re : ;ts ::::4gp4pepts. Aye: 5 Nay: 0 Vacate Right -of -Way (Old Sibley Memoriar'kighway - West of Cedar Freeway) Project 667. Cedarvale Drive (Street R'nstruction) Mayor Egan introduced thi$;: pM :ifir: p5d.ai.)vale Drive (Street Reconstruction). City Administrator'Het?g tated that on May 18, 1994, the City Council reopended a contin0d public hearing to consider the reconstruction of Cedarvale Dave from Rahn Road to the Cedarvale Shopping Center. At that time, Mr. Parranto spoke as a representative of the affected property owners requesting the City to consider vacating this public right -of -way and allowing its Mayor Egan introduced this 4 aeif4i 6ation of a portion of Old Sibley Memorial Highway - West of Cedar Freeway. City Administrator Hedges noted that in a response to a petition submitted by an adjacent property owner, the City Council scheduled a public hearing to consider vacating excess public right -of -way on the north side of Old Sibley Memorial Highway near the Burnsville border where the new T.H. 13 alignment was 00:0tructed for the Cedar Freeway Interchange. All notices have been, ub. in the legal newspaper and sent to all potentially interes ties. Public Works Director Colbert received a response from VS. West..pressing concerns for protecting their existing facility::wt right -of -way to be vacated. The following language. be incorporated into the Council Resolution affecting tt: : :: :vacation: "Whereas, all persons, corporations, and municipalities owning or controlling electric or telephone pole lines, gas and sewer lines, water pipes, mains, hydrants, and other utilities thereon or thereunder shall retain the authority to continue maintaining the same or to enter upon such way or portion thereof vacated, to..m n . }n,, repair, replace, remove or otherwise attend thereto." Mayor Egan noted that the "wherebt" case in the recital should be included in the resolution. CouncOiemb Hunter moved, Wachter seconded, a motion to close the publg heat;:lg and approve the vacation of a portion of the pudic right -pway for Old Sibley Memorial Highway as described and authorized by the Mayor and City Clerk to execute all related documents with the whereas clause in the resolution. Aye: 5 Nay: 0 -9- reconstruction to be done privatI1y. ' '''at'*'e0,t11t of that public hearing, the City Council agairi:::: ontinued ti t item for reconsideration, and directed t1.ie.Public Works Committee to meet with Mr. Parranto and any of the other nterest04 roperty owners to further discuss the request and dr:::?W1y4::;A recommendation. Public Works Director Colbert summarized 'tf#a;:;?f'c Works Committee meeting. The Public Works Committee determined' 'that Project 667 should be denied and that maintenance should be done by a affected property owners. Councilmember Wachter raised::t# ::::: City liability when there is no agreement whereby th per v to itiOperty owners would maintain this street. Councilmember Hunter raised the.. ue o;...hether the proposed reconstruction was acceptable 4:Ki :z: r iitp ; : : :t quality and thickness of the asphalt being applied. M : by saying that these specifications are not equal to those which the City would normally use. However, since the property owners would be privately responsible for street maintenance, it is their responsibility,, if the street did require repair, to finance any future repairs. Councilmember Wachter noted that by denying Project 667, and subsequently approving the nec 5s arr. .vacation of right -of -way to the interested parties, the City sh'ot3:144:: of maintenance of this street. Councilmember Wachter also noted:.: ' assessment of $4,000.00 should be approved by the Coun4l:::::f::::a::2vacation is approved for Cedarvale Drive. Mayor Egan agre cl '"'Councilmember Masin moved, Awada seconded, a motion to deny Project 667 (Cedarvale Drive - Street Reconstruction). Aye: 5 Nay: 0 Mayor Egan then proposed a separate action to assess a $4,000.00 fee for Project 667 in case t4p47.e.. action to vacate Cedarvale Drive right- of- way. Ogik0n Wachter so moved, Hunter seconded. Aye: 5 Nay: 0 Vacate a Portion of Public Rightif -Wa E nglert Road Cul -de -Sac Mayor Egan introduced this item as Vacation of Englert Road Cul -de -Sac. City Administrator Hedges noted this hearing was in response to a petition submitted by the developer of the Pond View Townhomes Addition. The City Council scheduled a public hearing to consider a vacation of excess public right* -way at the west end cul -de -sac of Englert Road near Interstate5E. City Public Works Director Colbert mentioned th : :a . 3:,3: : : : 9 ..have been published in the legal newspaper and sent tti:::;a 1 :4 e0t4lly interested parties. A written objection was received f rom an'Irid vidual who objects to the vacation of the excess public right- of- waCUnder the premise that it will allow additional units. Mr. Colbert's::::ctaff has reviewed the site plan layout and has determined that this vacation will not affect the total number of units, but it would result in a reconfiguration that would affect size of the planned open space if the excess right -of -way was not vacated. -10- Councilmember Wachter moved::llasin secon ed, a motion to close the public hearing and approve Nwation of a:portion of public right -of -way for Englert Road a :: :described to authorize the Mayor and City Clerk to execute all re]i .ti3d..docu itiits. Aye: 5 Nay: 0 NEW BUSINESS Variance,'United Stationers, A variance of 4% to the maximum building coverage in a L -1 zoni .di:t ;, MT site plan review. Mayor Egan introduced this item ai :::a VatOnce /Site Plan Review /United Stationers. City Community De Director Reichert noted that R.L. Johnson Coy is:t*questing a variance of 4% to the 35% maximum building .c averag :: far: 3r;ot 1, Block 1, United Stationers Addition and a site :fr: # ed:j;d?:: ::tor the proposed expansion of the existing building. The City Councii's review of the site plan is a condition of a previously approved plat. Mayor Egan noted that in reading the staff report about this matter, that the developer would have a difficult time acquiring new land for this project and also that they had exercised good faith in attempting to acquire land for expansion. Mayor Egan noted that this variance required due to a professional oversight of the deve oper''scorisultant and that a hardship case has been created due::to :inadvertent mistake. Therefore, Mayor Egan noted th : wot1d'''support this variance. Councilmember Awada moved,flunter seconded, a motion to approve a variance of 4% to the maximum building coverage of 35% for Lot 1, Block 1, United Stationers Addition, and to approve the detailed plans with minor revisions for the proposed expansion of the existing building, subject to the waiver of water quality dedication fees in exchange for the developer corWWiatithIaZUfeet of 60 inch storm sewer. Aye: 5 Nay: 0 Final Plat, Pond View Townhomes tditia 3:: Mayor Egan introduced this item as a Final Plat for Pond View Townhomes Addition. Community Development Director Reichert noted that this item would normally be under the "Consent Agenda" but because a portion of Englert Road required vacation, the final plat for the Pond View Townhomes Addition falls::tknder "new business" subsequent to Council action on the vacatis:0. The final plans and Development Agreement for the F.,o,.nd•. gW„ pownhomes Addition have been reviewed by staff and found sati ti "• ::: #fie financial security has been provided as well. Follown4' '' 2cl fsf the vacation, final plat approval is in order at this time. Councilmember Hunter moved, Wachter seconded, a motion to approve the final plat for Pond View Townhomes Addition located east of Interstate 35E, south of Fish Lake, north of Englert Road. Aye: 5 Nay: 0 Contract 94 -04, Receive Bids.qkward Contract (Englert Road Street & Utilities) Mayor Egan introduced this iteiii::: ied that this item would normally fall under the "Consent Ageriii "•"but due to the Englert Road vacation, it now falls under "New Business." Councilmeinber Wachter moved, Awada seconded, a motion to receive bids for Contract 94 -04 - Engle 't:.:; tc i4:. . & Utilities and to award the contract to Ryan Contrab'ilii4:; :i0;::: amount of $150,223.10 and to authorize the Mayor and City C:tark tv::: xecute all related documents. Aye: 5 Nay: 0 Project 666, Receive Petit itiiil`:AfitheiiIie12evised Feasibility_ Report (Waterview Addition - Sanitary Sewer and Water Main Extensions) Mayor Egan introduced this time as Project 666, receive Petition, authorize Revised Feasibility Report. City Public Works Director Colbert stated that previously was a public hearing which. considered a similar request f0::;utj,lity extensions. However, due to the issues associated with devel'crp:iig.:. Waterview Addition as R -I single - family, the public hearing : wa s ::bSi•d and the Project was cancelled, to be reconsidered at::later The Waterview developer sent a letter to the Cow c ...:exp easing their continued support of the City's installat.i.c Uti'lities as originally proposed. During the time the 00144 and development issues regarding Waterview Addition were being evaluated by the City, Independent School District No. 196 passed a Bond Referendum providing for a new elementary school to be located on the east side of Highway 3, opposite the Waterview Addition. Similarly, the Pines Edge development was processed and rcp plat approval. This accelerated development &i :::: :0 # Q;: ' : I 3, now presents some scheduling conflicts with the ret�ties''fai" -'tie extension of utilities along T.H. 3 to service the Watervieddit;Qn. Public Works Director Colbert no d tha:tat a May 24, 1994, special workshop of the City Council; 06. ncil discussion leaned toward scheduling the requested utility extension in 1995 to coincide with the extension of utilities to service the east side of Highway 3. Mr. Colbert then highlighted the options available and the preliminary costs. Scott Johnson, President of Arcon Deve4pment, the developer of Waterview Addition, indicated. . ,.. Company are neutral on the use of Dodd Road as a means.:: 40048 g the sewer. He also noted that based on his conversations' 'wiff'1Kr. Colbert, installation of the sewer on the east side of Highway 3: :: 1 4.ould be the best option. Mr. Johnson also noted certain benefits iri::: Tutting in the sewer this summer rather than waiting until next year''. Mr. Johnson indicated that Arcon Development would be willing to participate in the cost of jacking the Highway and installing the sewer system. -12- Mayor Egan then inquired ab;{iit the cost:0 installing the sewer on the east side of Highway 3, . new sholiTder would not have to be installed. Mr. Colbert indicatec::::that if aAaw shoulder was not necessary, the cost of installing;; : : sewe d ; . : :woixld be $30,000.00. If a new shoulder did have to be put ii :F:::: t:: b u d cost an additional $20,000.00. Mr. Colbert then noted tha'''ii the City were to put in the sewer by jacking Highway 3, it would cost the City $12,000.00 to $15,000.00 more than if they were to put it in next year when the entire Highway 3 project was undertaken. Dr. Fitz expressed his con a:t�.: ''- ::project be done as soon as possible and that the proposal of:�tcon pekrelopment be accepted by the City. Councilmember Wachter indic0Wt3j t..C issues must be resolved before construction co ]i3 • get u rcaay this summer. First, they must clear this project with the Highway Department and second, the railroad must be contacted for any potential problems. Councilmember Awada said that she would be in favor of the construction along Highway 3 this summer because it would save the residents of Dodd Road from any additional traffic and also the City would recoup the $10,000.00 to:::::$i5.,.000.00 expense in property taxes. Councilmember Hunter moved, Awad'i34CSpded, a motion to receive the petition and authorize a revi3:ed feas report for Project 666R, (Waterview Addition- UtilityExtena;# }:::with specific direction on sanitary sewer alignment along::::tast' side of Highway 3 and financing by Arcon Constructi ; ti the Highway 3 crossing. Aye: 5 Nay: 0 Councilmember Hunter moved, Awada seconded, a motion to simultaneously prepare plans and specs for Project 666R. Aye: 5 Nay: 0 Preliminary Plat, Amundson Corne /Gilbert Amundson, Consisting of two lots on 1.25 prev Oared R -1 (single- family) acres located at the northeast inter_'0sctio0: ::pf Lenore Lane and Cliff Road in the southeast quarter of Sedtfon 2nd a variance of 25 feet to the Dakota County required 50 feet right -of -way dedication along Cliff Road. Mayor Egan introduced this item as a Preliminary Plat /Variance /Amundson Corner Addition. Citat; Community Development Director Reichert stated that Gilbert Amursa is requesting preliminary plat approval for .:, AteO�? ;1:2 acres of R -1 zoned property located at the north i :: - 490 : ee gon of Cliff Road and Lenore Lane. The Advisory Plaririi'ri'g" Ciiiii2ifittn conducted a public hearing on this proposed plat at its meet#5 of May 24, 1994 and recommends approval of this preliminary peat subject to seven conditions set forth in their minutes. The Planning Commission also recommends to the City Council that the City formally request a variance of 25 feet to the Dakota County required 50 -foot right -of -way dedication along Cliff Road. -13- Councilmember Awada moved, Osin second eW a motion to approve a preliminary plat for Amundson Coxner Additidh'consisting of two lots on 1.25 acres zoned R-1 located:ii4 the nort0Ost intersection of Lenore Lane and Cliff Road subjeWt9A 1. These standard conditions citlAa approval as adopted by Council action on February 2, 1993 shall be complied with: Al, Bi, B2, B3, B4, Cl; C2, C3, C4, D1, El, Fl, Gl, and Hi.. 2. The development shall swale to drain the landlocked low area that is locates in 05.0 west edge of the development to drain the area in a n8i direction. 3. The developer shall de right-of-way along C.S.A.H. #32 (Cliff Road) as rIisa 4066ta County. 4. Restricted access shall be dedicated along Cliff Road, and the existing driveway opening that connects to Cliff Road shall be removed and replaced with B-618 concrete curb and gutter. 5. The developer will beponsible for providing sanitary sewer and water service from L'efi6WT.w.1P. to Lot 1. 6. The Lot 1 driveway connecition to Lane will require removal of the existing B618 curb4nd..,gp#0and the construction of a new drop curb for the drivewy,:4iifiii...W" 7. The development is required to pay a cash parks, trails, and water quality dedication. -14- Councilmember Awada moved, Masin seconded, a motion to authorize City staff to formally request_avariance of 25 feet to the Dakota County required 50-foot right4j*41W440$00.on along Cliff Road as it would affect the Amundson 6biiide Aye: 5 Nay: 0 planned Development Amendment/H00 ProOkrties, Inc., to the Hadler Park Planned Development to allow Wbffice use for Lot 4 Block 1, Hadler Park Addition, located alone the south side of Cliff Road, west of Rahn Cliff Road, in the Northeast Quarter of Section 31. Mayor Egan introduced this time as a !Wined Development Amendment for Hoyt Properties, Inc. City CplOinunity Development Director Reichert noted that tipypper Inc. has requested an amendment to the Hadler Park $%00:90;)000ment to allow an office and educational use in the exrgt foot building at 2030 Cliff Road, located south of Cliff RoA4, north of Rahn Way and west of Rahn Cliff Road. This Planned Dev0Opment Amendment is intended to allow the former Dakota Count Western Courthouse facility to be utilized by School District No. 196 as an educational center with associated administrative offices. The Advisory Planning Commiion conduc€Og a public hearing on this matter at its meeting on May. :: 24, 1994„ And recommended approval of this Amendment subject to on dpndition :: ': garding the landscaping identified in the Commission Mini .its.;.;:e:ichert noted that some of the previous planned development 664']c0c4' are no longer relevant but noted that certain trees need to be replaced and other property improvements needed to be done. Hoyt Properties has agreed to all of the conditions set forth by the staff. Mayor Egan noted that he was very much in favor of this' amendment. Councilmember Hunter moved,'''kwa'8'i 46 ccn d, a motion to approve the amendment to Hadler Park Planned:# velopnt subject to: 1. Landscaping, as proposed 0W Ole ie Hac; er Park Landscape Plan on file with the City, is requxrrt:: 2 t:lx►ai'al guarantee shall be provided to the City prior to the ''3ssu4zi: :: :iif the building permit. Aye: 5 Nay: 0 Comprehensive Guide Plan Amendment, Ray Connelly, Changing the land use category of approximae.ly 7.93 acres from D -1 Single - Family Residential (0 -3 unites per acii:): tq, NB (Neighborhood Business) located in the northwest corner 'b :: :: :ili4 Avenue and Dif f lev Road in the Southwest Quarter of Section} Mayor Egan introduced this ti O tpi Guide Plan Amendment for Ray Connelly. Ci ; y :: Cpiitin.1fity Development Director Reichert stated that the Advis0y'•'pianning Commission conducted a public hearing on this matter 'at its meeting on May 24, 1994. Although the staff report concluded that the proposed Plan Amendment was not consistent with the working policies of the commercial land use study, the Planning Commission nevertheless recommends approval of this Guide Plan Amendment. ; M..:. ; . R+e.Lchex ..noted that neighborhood centers today are generally bi4:::.xl:::;'3x:::rafige of 20,000 to 25,000 square feet and serve about 1,066 Furthermore, it is estimated that within the mile radiut::::of tW Lexington /Diffley intersection, there are about 1,500 # useho3ds. Therefore, it appears as though there is a demand in the riOjighboOood to support some additional commercial development. Counciltit*ber Masin suggested that the significant number and scale of the public facilities in the area - namely the high school, middle school, two ballfield complexes and the Caponi Art Park - might justify more commercial use than the residential base itself. Community Development Director Reichert also noted that the City staff concurs wi4iiiithe Planning Commission's conclusion that single - family development: the northwest corner at Lexington and Diffley is unli4;.::::ka : : : : gan expressed his concern that this parcel of property 2jiii 4k : :: ' iii4Wi veloped and hopes that it may be developed in the near future. He noted that the City has dramatically' reduced the commercial zoning the area in ,recent years, but that the nature of the site pre non - commercial uses from being appropriate. He noted that the users that the applicant was bringing forward were viable, appropriate and real. -15- KfjOfff Ray Connelly noted that he a c1: : ri;is pikrtit:er have plans to use this parcel of land for a medical ce er. The siz:e::; :of this proposed building would be a minimum of X4.,,000 square - feet. However, Mr. Connelly cannot continue his tal #Cts, , with meth. 1 institutions unless he first acquires a commercial zOlipi . f.Rr ##Ys particular piece of land. He stated that residential its jp.: }# s location would not work due to its size and shape in relatioritb 'surrounding land uses and County roads. He further stated that he believed that activity in this corner of the intersection would create demand for the property in the opposite corner. He•said that he has excess interested users for this site at the present Public Works Director Colbert sp44 abotWthe access to this proposed building and noted that it would take some coordination between adjoining property owners, trt* CoupW and the City of :Eagan. Councilmember Wachter stated Planning Commission experience, this is iif: 'fioita ite to properly zone. He said that he has mixed feelings about adding commercial acreage to this area, but that he could be persuaded by its unique circumstances. Councilmember Awada noted that the most logical use for this property was a free - standing commercial building and noted that she would be supportive o.f application. Mayor Egan said that the banka adical facility uses shown in the application are appropriate for h. apea and while they might be better located across the street,hey liad developed there to date. He stated the need for this :.nter04 bn to have a finished look and that if the commercial, r'tiss the street does not develop soon, it may be appropi : the City to consider other uses in that location. Councilmember Hunter stated that he could be persuaded to either conclusion. He said that the commercial study does not support more commercial for the area itself „and that more commercial here may diminish the potential for neft� 400 farther east in Eagan. He said that despite t iis;•'' :use on the site appears to be spotty and inappropriate. He E i ther; : :i : ndicated that of the uses possible for neighborhood commerciala met ;cal facility and bank would have the least impact on retai:3:::.dever ailment in other commercial nodes. He stated that this proposal i?itfers : : :: he best opportunity to provide a finished look for the intersection Councilmember Awada suggested that this land use is only appropriate for lower intensity uses such as the medical facility, bank, day care facilities and a drug store::;:;:She stated that the restaurant indicated in the application wd d not be appropriate and should be addressed as part oX, . :,. an, 0g,,..application. Councilmember Masin stated''tYi'do 1d definitely not see residential in this location and that the: before the Council appeared to be a reasonable alternative. Vi -16- Councilmember Masin moved, :##witet'•geco?ict , a motion to approve a Comprehensive Guide Plan Amendment to change:::he land . use category of approximately 7.93 acres from D;+ (Single- Family Residential) to NB (Neighborhood Business) located 4g the north lest corner of Lexington Avenue and Diffley Road in the Sot t.•:+ t rter of Section 23. Aye: 5 Nay: 0 County Five -Year CIP Review Mayor Egan introduced this 40iiiNgiiPw of the County's Proposed 5 -year Capital ImproveYtdrit tj t:::: 995 -1999) . City Administrator Hedges noted that on Na 24, #*: 04, the City received a request from Dakota County to review 92sting (1994 through 1998) CIP and provide any suggestion$or motfications that should be taken into consideration for the; g04 t 's.::: 095 -1999) CIP. The County is requesting a response by Juri t. 13 . 5:4:: City Public Works Director Colbert noted that there were ten options for the Council consideration: Roadway improvements; signals; trailways and building improvements,. Roadway Improvements: 1. The request is a schedule...regar't ; ftq the improvement of Cliff Road from Lexington Avenue to T.H0. It that 1998 would be the year for improving Cliff R¢ c tr i?:::Lexington to Highway 3. 2. Rescheduling of the iltpr4vement of Lone Oak Road from Highway 55 to Inver Grove Heights. It was agreed upon that this improvement of Lone Oak Road would be rescheduled to 1997. 3. Miscellaneous improvements to Yankee Doodle Road /Pilot Knob Ring Road from 1997 through 1999... :... ... ai1n9 agreed that these improvements should be added t, p;'i::0;GBmprovement agenda. Signals: 1, The rescheduling request of4he ski alization of Lexington Avenue at Wescott Road. Council- agreed that::; .this Project would be rescheduled to 1995. 2. Relocating of traffic signals from Pilot Knob Road at Tower View Road to High Site Drive. The Council agreed that this would be done in the future to 1997. Trailways: 1. The consideration of a request fob: ::a new trail alpng the north side of Lone Oak Road from Lexingtort::::venue to Highway 55. The Council agreed that this new addition would be done in 1995. -17- 2. The request for a new ; t i i i r l . a uric "tax : west side of Pilot Knob Road from 494 into Mendota:f eights. The;ouncil agreed that this would be done in 1995. 3. The request for a trail ' 4.444iSuth side of Cliff Road from Lexington Avenue to Highway 3'::?s' ::;i 6mcil agreed that this would be scheduled for 1998. 4. The request for a trail along the south side of Yankee Doodle Road from Lexington 'Avenue into Inver Grove Heights. The Council agreed that this should::: # . : : :15:01 i Lt t0: :::for 1995. Building Improvement: 1. The proposed improvements to... Wescott Library - parking lot modifications, landscaping and signa4Cimpr iiments. The Council agreed that this should be schOgg30 :: for Councilmember Wachter moved, Masin seconded, a motion to accept the aforementioned options. Aye: 5 Nay: 0 Admin,strative Agenda special bMeeting City Administrator Hedges noted: that . i.t : : ; x'S recommended that a Special City Council meeting be h1 tl. .ek of June 13, 1994, for purposes of 1) reviewing the coarpzherns'ive annual financial report for December 31, 1993; 2) on -g0: q '''community development update; and 3) update on the Parks System Plan. Councilmember Masin moved, Egan seconded, a motion to hold a Special City Council Meeting for June 21, 1994, at 5:00 p.m. Aye: 5 Nay: 0 City Contract. o. 9*'O3 Public Works Director Colbert no ;d thContract change order #1, City Contract No. 94 -03, (Blue Cross Rci , Trailway and Storm Sewer) provides for revisions to the Blue Cross Road Trailway construction and storm sewer related items for Pond CP -6. Part A of the proposed change order provides for the addition of seeding with mulch and fertilizer and /or with wood fiber blanket to the Blue Cross Road Trailway portion of the Contract. The:;3d unit prices for the Blue Cross Road portion of the above referkii:ced items are the same as was bid for the Blackhawk por ;p : ;: : ::_ a ::: Con The addition of these items is necessary becauae:::i3'x: €i to the retaining wall construction and boulevard areas as ori�inall bid are being g y g proposed to save on retaining wall costs. Part A is:;nticipated to add approximately $1,500.00 to the Contract. -18- Part B of the change order i for deletion of four bid items and related quantities frofi the Pond Ctki% :6 storm.sewer work as proposed in the Contract. Part $.;:;includes thg..elimination of an outlet skimmer, reduction in thei:Ei move, sO tage and reinstall 12 -inch concrete pipe, and the ei 7 10444 the bid item to clear and grub the dead trees and stumps' i ii:P:v'i8''''CP -6. Part B of the change order also provides for a deduction of $29,412.50. The proposed Contract change order #1 provides for a $27,912.50 deduction to the Contract amount. Councilmember Hunter moved,OW00040, a motion to approve Contract Change Order #1 to City'Co .c t' 31p ::;:; 94 -03,, (Blue Cross Road, Trailway and Storm Sewer) and titlPauthcze the Mayor and City Clerk to execute all related documen Aye ; Nay: 0 VISITOR TO BE :.1 EARD Dave Munson spoke on behalf of the July 4, 1994, festivities at Rahn Park. Mr. Munson asked that the City provide additional portable restrooms. M Munson discussed the problem of where the carnival will be located next year and anticipates that Rahn Park will not be available for the following yegr:sJie Council noted that applications for the carnival would: e:::;subject to police approval of licenses for nonintoxicating liquozs, ariii g others. Councilmember Hunter moved, Masin seconded, a moion tp... ept the Lion's Club a: cr applications subject to Police Depa)tm ?it ap proval of certain licenses. Aye: 5 Nay: 0. Ray Johnson and Bob Bauer were also heard. They appeared in connection with the proposed comprehensive guide plan amendment for the northwest corner of Lexington Avenue and Diffley Road. They noted that they were in favor of the amendment to neighborhood business. MISCELL+1Eb"US Community Development Director ROcherOloted the success of the Trapp Farm Project. .... Public Works Director Colbert noted that Item P of the Consent Agenda should be subject to State aid approval. Councilmember Wachter mentioned that certain trees near the Cub Foods should be transplanted due to their 00e and that it might interfere with traffic. Councilmember Wachter men 34tiii: at t logo of Eagan should be on the cancellation stamp for mail processed at the Eagan Post Office. Mayor Egan noted to Public Works Director Colbert that the sod on County Roads is much worse than City maintained roads and that there seems to be a dual level of maintenance regarding City and County -19- roads. Mayor Egan inquired as tO. :ipould ensure that the County roads be maintained on aiiiequal level those in the City. Public Works Director Colbert meptioned that he will make an effort to come to some agreement with t40 i to better maintain the County roads and if this doeg: may approach Mayor Egan in the future to approach thetkzi4T:Ofiard. Mayor Egan also stated that an administrative intern, Joyce Pruit, had done a terrific job for the City and should be recognized. Councilmember Masin noted tfWV14344 the League of Minnesota Cities meeting and th*e: power to determine the speed limits within the citlOimits% Councilmember Masin noted that t, new $C Thomas Beckett Church and dedication went extremely Councilmember Masin also noted that she had seen brick on street medians and inquired as to whether it would be feasible for the City of Eagan to use brick on the roadway medians rather than concrete. Councilmember Wachter posed..the question to City Attorney Sheldon if there had been any changes 44e regarding City liability for injuries occurring at City jp614 Sheldon said he would look into the matter. . •.:•:::..:...::.*:-•:•.. _. ••::.:••••• :•.•:• - Councilmember Wachter moved, Egan seconded, a motion to approve the checklist dated June , 1994, in the amount of . Aye: 5 Nay: 0 . OURNME Councilmember Wachter moved, EgWsecorpd, a motion to adjourn the regular meeting of the Eagan CitgXoundia at approximately 10:30 p.m. EXECUTIVE SESSION City Council went into executive session thereafter with the City Attorney to discuss pending litigation. iOF EAGAN -20- •:•: E. J. VanOverbeke City Clerk