2975 Lone Oak Cir - Soils testing reportJUN 30 2006 12:01 FR 6516591379 TO 96516810235 P.01i09
AMERICAN
ENGINEERING
TESTINC, INC.
'I 975
LOne 0,14 'Pr
FAX TRANSMISSION
AMEPICAN ENCfINEERING TESTING, INC.
550 CLEVELANA AVENiJE NORTH
ST. PAUT., MN 55114
(651)659-9001
Fax: (651) 659-1379
To: Jason Miller Date:
Company: R,Y Ryan Construction Pages:
Fax No.: 651-681-0235 From:
Phone No.: 651-328-3761 Phone No.:
Sabject: Waters VI
June 30, 200b
9 inclad"mg this cover sheet
Ryan Schmidt
(651) 789-4657
Jason,
Attached please find our Report of Project Testing Services that summarizes our seroicps for ft Waters Vi
building. Plesse call me with any questions.
Thanks,
Ryan F. Schmidt PE
Staff Engineerll
American Engineering Testing, Inc.
(0) 651-789-4657 (F) 651-659-1379
rschm idtGDam enatest.com
Thirfacsimile and mryfiles [mnsmitted wich it are confidential and 'uuended solelyfor the use ofthe individualor entiry to wham
rheyarnaddressed. ThiscommunicaNonmayconrainmateriaJprotectedbyattorney-clientprivitege. ,[fyouarenarheintended
recipient or the persan responsib[e for defivering thejacsimile ta The intended retipdent, be advi.red ehatyou have received this
[ransmrssion in ernrandlhae any use, dissemination, fonvarding.prirtting orcopyingofthrs iormarion rs skiulyprohibited /j
you huve received this fauimlle !n error, please notify us af 1-$00-972fi364.
o.rs>ia(oetoi)
SUN 30 2086 12:01 FR
AMERICAN
ENGINEERIAG
TgSTING} INC.
CON5ULTANTS
• ENMIRONMENTAL
• GEOTECHNICAL
• Mp7EpIAL$
• FORENSICS
REPORT OF PRUJECT_TESTING SERVICES
PROJECT: REppRTED Tp:
W.ATERS VI BUII.DING CSM CORPORATION
LONE OAK DRNE 500 WASHINGTON AVENiJE SOUTH
EAGAN. MN SUITE 3000
MINNEAPOI.IS, MN 55415
ATTN: MR. DAVID WANKER
CC: R7 RYAN CONSTRUCTTON, INC.
ATTN. MR. JASON MILLER
AET JOB NO: 20-05650 DATE: JiJNE 28, 2006
INTRODUCTION
This report sn+,+m9*+,Ps tke results of the project testing services we have conducted for the
referenced project in Eagan, Mizmaota. The original contract foz the testiqg was through
GME Consultants, Inc. (GME). American Engineering Testing, Inc. (AET) mergcd with
GME on January 1, 2006, and the testing contract was assigned to AET. Our services were
conducted on a wi1F-call basis as requeatad by Mr. Chad Bettenberg with RJ Ryan Construction.
Our services were performed as authorized on October 12, 2005, by Mr. Randy Rauwerdink
C5M Corporadon. The scope of our work included the followu?g:
• Observing the soils "sn the buildiug excavations and judgiag their suitabiliry for structural
support.
• Perfotmiug in place density testing of compacted fill soiLs and evaluating for cobformance
with project specifications.
• Observing reinforcing steel placed in the structural foundadon elements for the building
addition.
6516591379 TO 96516810235 P.02i09
TNo tl? shell nM 6B MpmGCB6Laxcept h MI, wIVWt wltllen appoval M Finarkan EtplnweFpTeding, liw.
560 Cleveland Avenue Narth .$t Payl, MN $5114
Phone 651-659-8001 . Toll Free 800-972-6364. Fax 651-659-1379 . www.amengtesicom
9ttioee tlirougMut Florlda, Mlnnasote, SouN DekoW 8 Wi6COnein
ANAFFlMUTIVEqC7Ipry AND FAl1Al OPP0Rn1N1tt EMPLpYEp
SUN 30 2006 12:01 FR 6516591379 TO 96516810235 P.03i09
AET #20-05650 - Page 2 of 8
• Performing on-site testing of plasdc concrete.
• Performing eompressive strength testing of coacrete test cyIinders.
• Performing compressive stength testing of grout and masonry prisms.
• Performing observarions of the masoary wall coascruction for the building.
• Performing observations of the struchual steel welded and bolted connections.
• Performing observations of the puddle welding and TEK screw fasteniag during metal deck
uattallation.
• Slimmarize the results of our services in a wriaen report.
PROJECT INFORMATION
We understand the constnution included a new office/wazehouse building at the northwest
comer of Lone Oak brive and T.,one Oak Road in Eagan, Mimiesota. We fiuther vnderstand
this building will:
• Be orie-sWry in height.
• Have appraxirnate overall dimensions of 120' by 400'.
• Have a slab-on-grade elevatioa of 870.9.
• Be supported on spread footings proportioned for a maximum net allowable design soil
beazing prrssutc of 3,000 psf,
• Have masonry block walls, a structural steel interior frame and steel joists supporting a
metal deck roof.
• Be abte to tolerate up to ?h" of differential settlement and up co 1" offotal settlemene.
• Be constructed in accordance with applicable building code requirements.
Please note that deviations from the above design information could neCessitate altering our
conclusions and recommendations. Contact us if the information stated is different from the
actuaI design.
JUN 30 2006 12:02 FR 6516591379 TO %516810235 P.04/09
AET #20-05650 - Page 3 of 8
Building location and elevatioa information obtained at the site, and presenced in this report,
was based on offset stakes placed by others.
BACKGROUND INFORMATION
A geotechnical exploration program and analysis was perf'ormed for this pmject by GME. The
results were presented in their geotechnical report in 2003 (GME Project No. 10534) and
supplemental geotechnical zepon dated pr-tvber 14, 2005 ((3ME Project No. I0534-C). In
their report, GME recommended that the building be supported bq spread footings designed
using an altowable bearing capacity of 3,000 psf. Refer to the geotechnical reports for more
detaIIed information about the soil conditions azd the recommendations for buiIding support.
sou, oBSExvAUoNS .a.rna TEsTmTG
Excavation pbservation and Results
We observed the footing excavarion for the projact between from Decensber 20, 2005 to
January 16, 2006. We were not present at the site on a full-titne basis. Our services were
performed on a will-call basis, when requested by Mr. Bettenberg, which allowed us ta
observe the footing excavadons. In addition to observing the soiLs exposed in the axcavadon,
we conducted shallow 6and auger borings assd dynamic cone penetrometer (DCP) and static
cone penetrometer (SCP) probes in the bottom of the excavations. The soils encountered were
classifietl in generaI accordance with ASTM:D2488. Estimates were made of the soil strength
properties based on their resistance to advanCement of the hand augei aud from the hand cone
peneuometer readings. The soils were also compared w the soils described on the boring logs.
The soils exposed in the majoiity of the excavation bvttoms were classiSed as naturatly
depasited clayey sand. '1lxese soils were similaz to those described in the geo[echnical report
and the associated soil horing logs. The bottom of the excavation was at about elevation 867.
Our DCP/SCP probes indicated the soils should be capable of supporting structural loads of up
to 3,000 psf. Based on the hand auger borings and DCP/5CP readings, it is our judgment the
observed soils should be suitable for support of the fill and building loads.
SUN 30 2006 12:02 FR 6516591379 TO 96516610235 P.05i09
AET #20-05650 - Page 4 of 8
In the uorthwest portion of building pad, we ohserved existing fill over buried topsoil was
observed in the excavation bottom. These soils were judged unsuitable for support of the
footing loads based on the results of our observakions, hand auger borings amd DCP/SCP
readings. We recommended these soils be removed to expose the undexly'vng nacurally
deposited clayey sand, encountered at deptLs of about 1' to 3' below fooring grades. These
underlying naturally deposited soils were judged suitable to support the fill and structural loads
based on our hand auger borings and DCPlSCP readings. We further recommeuded this
subcut excavation include 1:1 lateral oversizing beyond the footings W pmvide proper lateral
support oF the fill and foundation loads.
From riecember 27 through 30, 2006, we periodically observed the subcut excavarion in the
northwest portion of the building pad, below footing azeas oniy. You elected to leave the fill
and buried topsoil in-place in slab subgrade areas and accept the risk of excessive slab
settiement in these azeas. The footing excavation was extended through the unsuiWble existing
fiA and buried topsoil to ffie underlying competent naturally deposited soils described above.
The soils we observed in the excavation bottnm were judged suitable to support the footing
loads.
No standiag water was observed in the bottom of the excavation.
5ince the excavarion terminated below foundatiou grades, 1:1 oversizing of the excavation
bottom and subsequern fill system was recommended. Our judgments of the excavation
oversizing were based on the off-set stalting aad elevadoa staking provided for us in the field
by earthwork contractor. Based on the information provided, it appeared that the
recomraended lateral oversizing was provided for the observed excavations.
Compaction TeslinE Resuits
GME/AET personnel performed compaction testing on a will-call hasis on the foundation wall
backfill between May 2 through 5, 2006. The results of these field density tests were
compared to the laboratory Standard Proctor maximum dry densides (ASTM: D698) for each
differern soil type to calculate the compaction levels for each test. The soils at the locaeions
and elevations tested were wmpacted to a m,ni,m,m of 95 % of the laboratory Standard Proc[or
maxmmum dry density as speci6ed.
JUN 30 2006 12:02 FR 6516591379 TO 96516810235 P.06i09
AET #20-05650 - Page 5 of 8
REINFORCING STEEL OBSERVATIONS
Prior to placement of concrete, GME/AET personnel periodically observed the reinforcin,g
steel present in the exterior sCrip footings and interior column pads. These observations were
gerformed between December 22, 2005 and Jauuary 16, 2006. Auring our observations, we
judged the foilowing items for conformance to the most current suucwral drawings available at
the project site:
• Tbe conditions and dimensions of the various formwork.
• That the proper number, size, spacing, and lap of the reinforcing steel were pravided.
• That proper concrete cover and support was provided between the reinfarcing s[eel end the
formwork andior the ground surface.
• That the reinfarciag steel was substantially free of rust, scale, dirt, ice or other deleterious
materials which will reduce adkaesion with the concrete.
Based on the results of our observaCions, it is our opinion that ttte reinforcing steel placed in
the obsarved structural elements was in subskantial compliance with rhe current stxucwrai
drawings present at the site. We must point out that GME/AET does not perfarm surveying
services. Therefore, our observations of the ieinforcing steel were based on the positioning of
the formwork by the contractor. We are not responsibte for the exacc locazions of she
formwork.
CONCRETE TESTING
We perfornned testing of the plastic concrete as it was being placed in some of the structural
elements of the btulding. dur services included the following:
• Measure the sIump of the plastic conCtete.
4 Measure the percentage oP entrained and entrapped air of the pLastic concrete.
JUN 30 2006 12:03 FR 6516591379 TO 96516610235 P.07i09
AET #20-05650 - Page 6 of 8
• Measure the temperature of the plastic coraxete.
• Cast 6" diameter by 12" lrigh compression test cylinders.
All testing was performed in accordance with current ASTM procedures. 'Fhe results of the
on-?site testing were presented in our Reparts of Plastic Concrete Testing, which were issued
under separate covec. The results of our tesu generally satisfied the project specifications.
We performed compressive strength testing of 15 sets of test cyIinders cast by GME/AET
personnel. The cesults of these tests were presented in our Reports of Compressive Strength of
Cylindrical Concrete Specimeas. Copies of these were previously submitcad under separate
cover. The test results exceeded the specifie3 28-day design compressive strength,
MASONRY OBSERYATIONS AND TESTING
During construction of the masotuy walls, AET personnel made four visirs to the site to
perform observations. Tbese services were performed between Januaxy 3 and February 15,
2006. Our services inciuded the following:
• Observe that the proper units were used, and that the uniu were clean and dry.
• Observe that the masonry bearing surfaces were clean before the moxtar and masonry units
were placed.
• Observe that the spaces to receive the grout were elean before grout coxefill was piaced.
• Observe the horizontal and vertical reinforcement, including plxcement and aligmnent of
bars and dowels, measuring the bar sizes and lengths of bar ]ap splices, and observing the
clearance between bars and clearance from masonry units.
• Observe the general construction praetices required by the project specifications.
JUN 30 2006 12:03 FR 6516591379 TO 96516816235 P.06i09
AET #20-05650 - Page 7 of 8
Based on our obsexvations, it appeared that those portions of the masonry wall which we
observed during wr visits to the site were being wnstructed in general Conformance witkl the
approved projecc ptans and specifications.
We also performed compressive streqgth testing of one set of corefill gr0ut speciuens casi by
GME and two sets of masonry pristns cast by the contractor that were place3 for construction
of the walls which were observed by A$T personnel. 1he results of these tests were presented
in oui Repotts of Corefiil and Concrete Masonry Prism Testiag. Copies of these reports were
previousiy suhmicted under sepazate covee. The test results exceeded the 28-day design
compressive strengths.
OBSERVATIONS OF WELDED AND BOLTED CUNNECT'[ONS
1VDT technicians from our firm observed field welded and bolted cannections for ttte building
oa a will-call basis on March 15, 2006, when contacted hy Mr. Bettenherg. It is our jttdgment
thai the field welds and bolts obsexved for the structural steel and bar joist connections satisfied
the requixements of the teferenced code and pzoyect specifications. The deck welds and deek
fasteners were judged to satisfy the requiremealts of the project speciCcations and the
referenced codes.
CLOSURE
To procect the client, ttte public and American Engineering Test'sng, Inc., this report (and all
supporting informa#on) is pxovided for the addressee's own use. No zepresentations are made
to parties other than tbe addiessee.
Our servicQS on this project have been conducted to those standazds cansidereci nonnal for
services of this type at this time and location. pther than this, no warranty, either express vr
implied, is intended.
JUN 30 2006 12:03 FR
6516591379 TO 96516810235 P.09i09
AET #10-05650 - Page 8 of 8
SIGNATCTRES
Report Prepared By:
American Engiueering Testing, Inc.
Repoct Reviewed By:
Amerlcan Engineering TesHng, Inc.
?
2-?
Ryan F. Schmi , PE
Staff Engineer II
MN License No. 40501
Chad A. underwooa, PB
5enior Geotethnical Eagineer